RENCANA ANGGARAN BIAYA (RAB) :

DED
PEMBANGUNAN SUMUR BOR
DI KOLAKA UTARA

KABUPATEN KOLAKA UTARA

2021
REKAPITULASI ANGGARAN

PEKERJAAN : DED PEMBANGUNAN SUMUR BOR DI KOLAKA UTARA


LOKASI : KABUPATEN KOLAKA UTARA
TAHUN ANGGARAN : 2021

JUMLAH
No. URAIAN DAN JENIS PEKERJAAN
HARGA

I PEKERJAAN PENDAHULUAN/PERSIAPAN 4,611,152.00


II PEMBUATAN SUMUR BOR, POMPA, TOWER AIR & TANGKI AIR 1 UNIT 46,643,987.84

TOTAL SUMUR BOR, POMPA, TOWER AIR & TANGKI AIR 1 UNIT 46,643,987.84
TOTAL SUMUR BOR, POMPA, TOWER AIR & TANGKI AIR 3 UNIT 139,931,963.52
REAL COST 144,543,115.52
PPN (10% X A) 14,454,311.55
TOTAL COST ( A + B ) 158,997,427.07
DIBULATKAN 159,000,000.00

Terbilang : SERATUS LIMA PULUH SEMBILAN JUTA RUPIAH

Kendari, Oktober 2021


Mengetahui/ Menyetujui DIBUAT OLEH :
PEJABAT PELAKSANA TEKNIS KEGIATAN (PPTK) KONSULTAN PERENCANA
DINAS PERUMAHAN RAKYAT KAWASAN CV. Maranggo Design
PEMUKIMAN DAN PERTANAHAN PROVINSI
SULAWESI TENGGARA Engineering consultant

THAHIRAH MUHSIN, ST.,MT Ir. ISKANDAR SYAH B.


NIP : 19831006 201101 2 015 Direktur
RENCANA ANGGARAN BIAYA (RAB)

PEKERJAAN : DED PEMBANGUNAN SUMUR BOR DI KOLAKA UTARA


LOKASI : KABUPATEN KOLAKA UTARA
TAHUN ANGGARAN : 2021

HARGA JUMLAH
NO. URAIAN DAN JENIS PEKERJAAN VOLUME SAT
SATUAN HARGA
1. 2 3. 4 5. 6.

I. PEKERJAAN PENDAHULUAN/PERSIAPAN
1 Pembersihan Awal, Pengukuran dan Pemasangan Bowplank 1.000 Ls 900,000.00 900,000.00
2 Papan Nama Proyek 1.000 Ls 411,152.00 411,152.00
3 Kesehatan Dan Keselamatan Kerja (K3) 1.000 Ls 1,500,000.00 1,500,000.00
4 Administrasi, Dokumen dan Pelaporan 1.000 Ls 1,800,000.00 1,800,000.00
JUMLAH 4,611,152.00
II PEMBUATAN SUMUR BOR, POMPA, TOWER AIR & TANGKI AIR 1 UNIT
A PEKERJAAN SUMUR BOR
1 Biaya Pengeboran Sumur 1.000 Paket 17,500,000.00 17,500,000.00
2 Pekerjaan Pipa 4 Inchi 42.000 M1 117,606.50 4,939,473.00
3 Pekerjaan Pipa Dorong Keluaran 1 Inchi 52.000 M1 31,751.50 1,651,078.00
4 Pekerjaan Pipa Keluaran 1/2 Inchi Untuk distribusi Dari Tower 62.000 M1 24,376.00 1,511,312.00
5 Mesin Pompa Air Celup (Submensible) 1.000 Unit 4,500,000.00 4,500,000.00
6 Pekerjaan Urugan Tanah Bawah Lantai
a. Pekerjaan Galian Tanah 0.160 M3 81,537.50 13,046.00
b. Pekerjaan Pondasi Beton Umpek Camp. 1Pc:3Krkl Setara k-175 0.160 M3 1,127,351.50 180,376.24
c. Pek. Kolom
- Beton Camp. 1Pc:3Krkl Setara K-175 0.063 M3 1,127,351.50 71,023.14
- Pembesian Polos 12.967 Kg 15,455.83 200,415.68
- Bekisting Kolom 2 x Pakai 1.680 M2 307,747.00 517,014.96
d. Pek. Pas. Batu Bata Camp. 1Pc:5Psr 2.380 M2 109,389.50 260,347.01
e. Pek. Plesteran Camp. 1pc:3Psr 4.760 M2 69,771.90 332,114.24
f. Pek. Acian 4.760 M2 40,287.50 191,768.50
g. Pas. Pintu Plat Besi 2 mm 1.000 M2 493,537.00 493,537.00
h. Pasangan Engsel 2.000 Bh 20,000.00 40,000.00
i. Pasangan Kunci Gembok 1.000 Bh 55,000.00 55,000.00
j. Pek. Rabat Beton Lantai Setara K-175 0.072 M3 1,127,351.50 81,169.31
HARGA JUMLAH
NO. URAIAN DAN JENIS PEKERJAAN VOLUME SAT
SATUAN HARGA
1. 2 3. 4 5. 6.
7 Pek. Tower air
a. Pek. Galian Tanah 0.400 M3 81,537.50 32,615.00
b. Pek. Pondasi Beton Umpak Camp. 1Pc;2Psr;3Krkl Setara K-175 0.400 M3 1,127,351.50 450,940.60
c. Pek. Pas. Besi Plat Agker Dudukan Tower 4.000 Unit 95,000.00 380,000.00
d. Pek. Besi Siku 60.60.6 mm 65.000 Kg 25,624.50 1,665,592.50
e. Pek. Besi Siku L 40.40.mm 295.700 Kg 25,624.50 7,577,164.65
8 Pas. Tangki Air Kapasitas @2400 Liter 1.000 Bh 4,000,000.00 4,000,000.00
JUMLAH 46,643,987.84
Kendari, Oktober 2021
Mengetahui/ Menyetujui DIBUAT OLEH :
PEJABAT PELAKSANA TEKNIS KEGIATAN (PPTK) KONSULTAN PERENCANA

DINAS PERUMAHAN RAKYAT KAWASAN PEMUKIMAN CV. Maranggo Design


DAN PERTANAHAN PROVINSI SULAWESI TENGGARA Engineering consultant

THAHIRAH MUHSIN, ST.,MT Ir. ISKANDAR SYAH B.


NIP : 19831006 201101 2 015 Direktur
DAFTAR ANALISA SATUAN PEKERJAAN

PEKERJAAN : DED PEMBANGUNAN SUMUR BOR DI KOLAKA UTARA

LOKASI : KABUPATEN KOLAKA UTARA


TAHUN ANGGARAN : 2021

A.2.3.1 HARGA SATUAN PEKERJAAN TANAH

1 Anl SNI A.2.3.1.1 1 M3 PEK. GALIAN TANAH SEDALAM 1 M

Harga Jumlah
No. Uraian Satuan Kwantitas
Satuan Harga
A TENAGA KERJA

1 Pekerja Org/Hari 95,000.00 0.7500 71,250.00

2 Mandor Org/Hari 115,000.00 0.0250 2,875.00

Jumlah Tenaga Kerja 74,125.00

B BAHAN

Jumlah Bahan -

C Jumlah (A+B) 74,125.00

D Overhead + Profit 10 % 7,412.50


E Jumlah Harga Satuan (C+D) 81,537.50

5
A.5.1.1. HARGA SATUAN PEKERJAAN SANITASI DALAM GEDUNG

2 Anl SNI 2016 A.5.1.1.32 PEMASANGAN 1 M' PIPA PVC TIPE AW DIAMETER 4"

Harga Jumlah
No. Uraian Satuan Kwantitas
Satuan Harga

A TENAGA KERJA
1 Pekerja Org/Hari 95,000.00 0.0810 7,695.00

2 Tukang Pipa Org/Hari 105,000.00 0.1350 14,175.00

3 Kepala Tukang Org/Hari 110,000.00 0.0135 1,485.00

4 Mandor Org/Hari 115,000.00 0.0040 460.00

Jumlah Tenaga Kerja 23,815.00

B BAHAN
1 Pipa PVC Æ 4" AW ex. Wavin M 50,000.00 1.2000 60,000.00

2 Perlengkapan % 66,000.00 0.3500 23,100.00

Jumlah Bahan 83,100.00


C Jumlah (A+B) 106,915.00

D Overhead + Profit 10 % 10,691.50

E Jumlah Harga Satuan (C+D) 117,606.50

3 Anl SNI 2016 A.5.1.1.25 PEMASANGAN 1 M' PIPA PVC TIPE AW DIAMETER 1/2"

Harga Jumlah
No. Uraian Satuan Kwantitas
Satuan Harga

A TENAGA KERJA

1 Pekerja Org/Hari 95,000.00 0.0360 3,420.00

2 Tukang Pipa Org/Hari 105,000.00 0.0600 6,300.00


3 Kepala Tukang Org/Hari 110,000.00 0.0060 660.00

4 Mandor Org/Hari 115,000.00 0.0020 230.00

Jumlah Tenaga Kerja 10,610.00


B BAHAN

1 Pipa PVC Æ 4" AW ex. Wavin M 7,000.00 1.2000 8,400.00

2 Perlengkapan % 9,000.00 0.3500 3,150.00

Jumlah Bahan 11,550.00

C Jumlah (A+B) 22,160.00


D Overhead + Profit 10 % 2,216.00

E Jumlah Harga Satuan (C+D) 24,376.00

6
4 Anl SNI 2016 A.5.1.1.27 PEMASANGAN 1 M' PIPA PVC TIPE AW DIAMETER 1"

Harga Jumlah
No. Uraian Satuan Kwantitas
Satuan Harga

A TENAGA KERJA
1 Pekerja Org/Hari 95,000.00 0.0360 3,420.00

2 Tukang Pipa Org/Hari 105,000.00 0.0600 6,300.00


3 Kepala Tukang Org/Hari 110,000.00 0.0060 660.00

4 Mandor Org/Hari 115,000.00 0.0020 230.00

Jumlah Tenaga Kerja 10,610.00

B BAHAN

1 Pipa PVC Æ 4" AW ex. Wavin M 10,750.00 1.2000 12,900.00

2 Perlengkapan % 15,300.00 0.3500 5,355.00


Jumlah Bahan 18,255.00

C Jumlah (A+B) 28,865.00

D Overhead + Profit 10 % 2,886.50


E Jumlah Harga Satuan (C+D) 31,751.50

5 Anl SNI 2016 A.5.1.1.28 PEMASANGAN 1 M' PIPA PVC TIPE AW DIAMETER 1 1/2"

Harga Jumlah
No. Uraian Satuan Kwantitas
Satuan Harga

A TENAGA KERJA

1 Pekerja Org/Hari 95,000.00 0.0540 5,130.00

2 Tukang Pipa Org/Hari 105,000.00 0.0900 9,450.00

3 Kepala Tukang Org/Hari 110,000.00 0.0090 990.00

4 Mandor Org/Hari 115,000.00 0.0030 345.00


Jumlah Tenaga Kerja 15,915.00

B BAHAN

1 Pipa PVC Æ 1,25" AW ex. Wavin M 15,375.00 1.2000 18,450.00


2 Perlengkapan % 22,050.00 0.3500 7,717.50

Jumlah Bahan 26,167.50

C Jumlah (A+B) 42,082.50

D Overhead + Profit 10 % 4,208.25

E Jumlah Harga Satuan (C+D) 46,290.75

7
A.4.1.1 HARGA SATUAN PEKERJAAN BETON

6 Anl SNI 2016 A.4.1.1.5 MEMBUAT 1 M3 BETON MUTU F' = 14,5 MPA (K 175), SLUMP (12±2) CM, W/C = 0,66

Harga Jumlah
No. Uraian Satuan Kwantitas
Satuan Harga

A TENAGA KERJA
1 Pekerja Org/Hari 95,000.00 1.6500 156,750.00

2 Tukang Batu Org/Hari 105,000.00 0.2750 28,875.00

3 Kepala Tukang Org/Hari 110,000.00 0.0280 3,080.00

4 Mandor Org/Hari 115,000.00 0.0830 9,545.00

Jumlah Tenaga Kerja 198,250.00

B BAHAN
1 Portland Cement Kg 1,500.00 326.0000 489,000.00

2 Pasir Beton M3 195,000.00 0.5430 105,885.00

3 Batu Pecah/Suplit 1/2 M3 290,000.00 0.7620 220,980.00


4 Air Ltr 50.00 215.0000 10,750.00

Jumlah Bahan 826,615.00

D Jumlah (A+B) 1,024,865.00

E Overhead + Profit 10 % 102,486.50

F Jumlah Harga Satuan (C+D) 1,127,351.50

7 Anl SNI 2016 A.4.1.1.17 1 KG PEMBESIAN BESI BETON POLOS/ULIR

Harga Jumlah
No. Uraian Satuan Kwantitas
Satuan Harga

A TENAGA KERJA
1 Pekerja Org/Hari 95,000.00 0.0070 665.00

2 Tukang Besi Org/Hari 115,000.00 0.0070 805.00

3 Kepala Tukang Org/Hari 105,000.00 0.0007 73.50


4 Mandor Org/Hari 115,000.00 0.0004 46.00

Jumlah Tenaga Kerja 1,589.50

B BAHAN

1 Besi Beton Kg 11,500.00 1.0500 12,075.00

2 Kawat Beton Kg 25,750.00 0.0150 386.25


Jumlah Bahan 12,461.25

D Jumlah (A+B) 14,050.75

E Overhead + Profit 10 % 1,405.08


F Jumlah Harga Satuan (C+D) 15,455.83

8
8 Anl SNI 2016 A.4.1.1.22 1M2 PASANGAN BEKISTING UNTUK KOLOM

Harga Jumlah
No. Uraian Satuan Kwantitas
Satuan Harga

A TENAGA KERJA
1 Pekerja Org/Hari 95,000.00 0.6600 62,700.00

2 Tukang Kayu Org/Hari 105,000.00 0.3300 34,650.00


3 Kepala Tukang Org/Hari 110,000.00 0.0330 3,630.00

4 Mandor Org/Hari 115,000.00 0.0330 3,795.00

Jumlah Tenaga Kerja 104,775.00

B BAHAN

1 Papan Bekisting M3 1,800,000.00 0.0400 72,000.00

2 Paku Biasa 5 - 12 cm Kg 24,000.00 0.4000 9,600.00


3 Minyak Bekisting Ltr 13,600.00 0.2000 2,720.00

4 Balok Kayu Kls. III M3 2,000,000.00 0.0150 30,000.00

5 Plywood 9 mm Lbr 150,500.00 0.3500 52,675.00


6 Dolken Ø (8 - 10) cm, Panjang 4 m Btg 4,000.00 2.0000 8,000.00

Jumlah Bahan 174,995.00

C Jumlah (A+B) 279,770.00

E Overhead + Profit 10 % 27,977.00

F Jumlah Harga Satuan (C+D) 307,747.00

A.4..4.1 HARGA SATUAN PEKERJAAN PASANGAN DINDING

9 Anl SNI 2016 A.4.4.1.9 1 M2 PEK. PASANGAN BATA MERAH TEBAL 1/2 BATA, 1 PC : 5 PSR

Harga Jumlah
No. Uraian Satuan Kwantitas
Satuan Harga

A TENAGA KERJA

1 Pekerja Org/Hari 95,000.00 0.3000 28,500.00


2 Tukang Pipa Org/Hari 105,000.00 0.1000 10,500.00

3 Kepala Tukang Org/Hari 110,000.00 0.0100 1,100.00

4 Mandor Org/Hari 115,000.00 0.0150 1,725.00

Jumlah Tenaga Kerja 41,825.00

B BAHAN
1 Batu Bata Biji 500.00 70.0000 35,000.00

2 Portland Cement Kg 1,500.00 9.6800 14,520.00

3 Pasir Pasang M3 180,000.00 0.0450 8,100.00


Jumlah Bahan 57,620.00

C Jumlah (A+B) 99,445.00

E Overhead + Profit 10 % 9,944.50


F Jumlah Harga Satuan (C+D) 109,389.50

9
A.4.2.1. HARGA SATUAN PEKERJAAN BESI DAN ALUMINIUM

10 Anl SNI 2016 A.4.2.1.1. PEMASANGAN 1 KG BESI PROFIL SIKU

Harga Jumlah
No. Uraian Satuan Kwantitas
Satuan Harga

A TENAGA KERJA
1 Pekerja Org/Hari 95,000.00 0.0600 5,700.00

2 Tukang Besi Org/Hari 105,000.00 0.0600 6,300.00

3 Kepala Tukang Org/Hari 110,000.00 0.0060 660.00

4 Mandor Org/Hari 115,000.00 0.0030 345.00

Jumlah Tenaga Kerja 13,005.00

B BAHAN
1 Besi Siku Kg 9,800.00 1.0500 10,290.00

Jumlah Bahan 10,290.00

C Jumlah (A+B) 23,295.00


D Overhead + Profit 10 % 2,329.50

F Jumlah Harga Satuan (C+D) 25,624.50

11 Anl SNI 2016 A.4.2.1.4 PEMBUATAN 1 M2 PINTU BESI PLAT BAJA TEBAL 2 MM RANGKAP

Harga Jumlah
No. Uraian Satuan Kwantitas
Satuan Harga

A TENAGA KERJA

1 Pekerja Org/Hari 95,000.00 1.0500 99,750.00

2 Tukang Besi Org/Hari 105,000.00 1.0500 110,250.00

3 Kepala Tukang Org/Hari 110,000.00 0.1050 11,550.00


4 Mandor Org/Hari 115,000.00 0.0520 5,980.00

Jumlah Tenaga Kerja 227,530.00

B BAHAN
1 Besi Plat Baja 2 mm Lbr 625,000.00 0.3472 217,000.00

2 Pasir Pasang M3 180,000.00 0.0230 4,140.00

Jumlah Bahan 221,140.00

C Jumlah (A+B) 448,670.00

E Overhead + Profit 10 % 44,867.00


F Jumlah Harga Satuan (C+D) 493,537.00

10
A.4.4.2 HARGA SATUAN PEKERJAAN PLESTERAN

12 Anl SNI 2016 A.4.4.2.3 1 M2 PEK. PLESTER 1 PC : 3 PSR, TEBAL 15 MM

Harga Jumlah
No. Uraian Satuan Kwantitas
Satuan Harga

A TENAGA KERJA
1 Pekerja Org/Hari 95,000.00 0.3000 28,500.00

2 Tukang Batu Org/Hari 105,000.00 0.1500 15,750.00

3 Kepala Tukang Org/Hari 110,000.00 0.0150 1,650.00

4 Mandor Org/Hari 115,000.00 0.0150 1,725.00

Jumlah Tenaga Kerja 47,625.00

B BAHAN
1 Portland Cement Kg 1,500.00 7.7760 11,664.00

2 Pasir Pasang M3 180,000.00 0.0230 4,140.00

Jumlah Bahan 15,804.00


C Jumlah (A+B) 63,429.00

D Overhead + Profit 10 % 6,342.90

F Jumlah Harga Satuan (C+D) 69,771.90

13 Anl SNI 2016 A.4.4.2.27 1 M2 PEKERJAAN ACIAN AIR SEMEN

Harga Jumlah
No. Uraian Satuan Kwantitas
Satuan Harga

A TENAGA KERJA

1 Pekerja Org/Hari 95,000.00 0.2000 19,000.00

2 Tukang Batu Org/Hari 105,000.00 0.1000 10,500.00


3 Kepala Tukang Org/Hari 110,000.00 0.0100 1,100.00

4 Mandor Org/Hari 115,000.00 0.0100 1,150.00

Kepala Tukang 31,750.00


B BAHAN

1 Portland Cement Kg 1,500.00 3.2500 4,875.00

Jumlah Bahan

C Jumlah (A+B) 36,625.00

D Overhead + Profit 10 % 3,662.50


F Jumlah Harga Satuan (C+D) 40,287.50

Kendari, Oktober 2021


Mengetahui/ Menyetujui DIBUAT OLEH :

PEJABAT PELAKSANA TEKNIS KEGIATAN (PPTK) KONSULTAN PERENCANA

CV. Maranggo Design


DINAS PERUMAHAN RAKYAT KAWASAN PEMUKIMAN DAN
PERTANAHAN PROVINSI SULAWESI TENGGARA Engineering consultant

THAHIRAH MUHSIN, ST.,MT Ir. ISKANDAR SYAH B.

NIP : 19831006 201101 2 015 Direktur

11
DAFTAR HARGA BAHAN DAN UPAH KERJA

PEKERJAAN : DED PEMBANGUNAN SUMUR BOR DI KOLAKA UTARA


LOKASI : KABUPATEN KOLAKA UTARA
TAHUN ANGGARAN : 2021
.
HARGA
NO. URAIAN JENIS TENAGA / BAHAN SATUAN
('Rp.)
1 2 3 4

I UPAH TENAGA KERJA :


1 Pekerja Hari 95,000.00
2 Mandor Hari 115,000.00
3 Tukang Batu Hari 105,000.00
4 Tukang Kayu Hari 105,000.00
5 Tukang Pipa Hari 105,000.00
6 Tukang Besi Hari 105,000.00
7 Tukang Cat Hari 105,000.00
8 Tukang Listrik Hari 105,000.00
9 Kepala Tukang Hari 110,000.00

II HARGA BAHAN

A BAHAN TANAH, PASIR, DAN BATU


1 Tanah Urugan (Didatangkan) M3 40,000.00
2 Pasir Urug M3 180,000.00
3 Pasir Pasang M3 180,000.00
4 Pasir Beton M3 195,000.00
5 Kerikil Beton M3 290,000.00
6 Batu Pecah/Suplit 1/2 Kg 290,000.00
7 Batu Gunung M3 180,000.00
8 Batu bata Bh 500.00

B BAHAN SEMEN
1 Portland Cement Kg 1,500.00

12
HARGA
NO. URAIAN JENIS TENAGA / BAHAN SATUAN
('Rp.)
1 2 3 4
C BAHAN KAYU
1 Balok Kayu Kls. I M3 3,500,000.00
2 Balok Kayu Kls. II M3 3,000,000.00
3 Balok Kayu Kls. III M3 2,000,000.00
4 Dolken Ø (5-10) cm, Panjang 4 m Btg 4,000.00
5 Kasau 5/7 Kayu Kls. II M3 3,300,000.00
6 Papan Kayu Kls. I M3 3,500,000.00
7 Papan Kayu Kls. II M3 3,000,000.00
8 Papan Kayu Kls. III M3 2,000,000.00
9 Papan Bekisting M3 1,800,000.00
10 Gypsum board 9 mm Lbr 100,500.00
11 Plywood 9 mm Lbr 150,500.00

D BAHAN SANITASI
1 Pipa PVC Æ 1/2" AW ex. Wavin M1 7,000.00
2 Pipa PVC Æ 1" AW ex. Wavin M1 10,750.00
3 Pipa PVC Æ 1,25" AW ex. Wavin M1 15,375.00
4 Pipa PVC Æ 4" AW ex. Wavin M1 50,000.00
5 Pipa PVC Æ 8" AW ex. Wavin M1 250,500.00
6 Mesin Pompa Air Celup (Submersible) Bh 4,500,000.00
7 Pas. Tangki Air Kapasitas @2400 Liter Bh 4,000,000.00

E BAHAN BESI
1 Besi Beton Kg 11,500.00
2 Kawat Beton Kg 25,750.00
3 Paku Biasa 5 - 12 cm Kg 24,000.00
4 Paku Sekrup Kg 33,200.00
5 Paku 10 cm Kg 24,500.00
6 Paku Seng Kg 35,000.00
7 Besi Strip Kg 33,650.00
8 Angker/Baut 15 - 20 cm Bh 18,350.00
9 Besi Plat Baja 2 mm Lbr 625,000.00
10 Kawat Las Kg 30,000.00
11 Pek. Pas. Besi Plat Angker Dudukan Tower Unit 95,000.00
12 Besi Siku Kg 9,800.00
13 Minyak Bekisting Ltr 13,600.00

13
HARGA
NO. URAIAN JENIS TENAGA / BAHAN SATUAN
('Rp.)
1 2 3 4
F BAHAN PENGGUNCI/PENGGANTUNG
1 Engsel Pintu Steinless Steel Bh 20,000.00
2 Pas. Kunci Gembok Bh 55,000.00
3 Tegel Plint Geranit 10 x 60 Cm (motif) Bh 55,000.00

G BAHAN DAN ALAT LAINNYA


1 Air Ltr 50.00
2 Lem Kg 51,000.00
3 Kertas Amplas Lbr 4,500.00
4 Pengeboran Sumur Bor Paket 17,500,000.00

Kendari, Oktober 2021


Mengetahui/ Menyetujui DIBUAT OLEH :
PEJABAT PELAKSANA TEKNIS KEGIATAN (PPTK) CV. Maranggo Design

DINAS PERUMAHAN RAKYAT KAWASAN Engineering consultant


PEMUKIMAN DAN PERTANAHAN PROVINSI
SULAWESI TENGGARA

THAHIRAH MUHSIN, ST.,MT Ir. ISKANDAR SYAH B.


NIP : 19831006 201101 2 015 Direktur

14
SPESIFIKASI TEKNIS

PEKERJAAN : DED PEMBANGUNAN SUMUR BOR DI KOLAKA UTARA


LOKASI : KABUPATEN KOLAKA UTARA
TAHUN ANGGARAN : 2021

NO. URAIAN DAN JENIS PEKERJAAN SPESIFIKASI TEKNIS

1 2 3.

I. PEKERJAAN PENDAHULUAN/PERSIAPAN
1 Pembersihan Awal, Pengukuran dan Pemasangan Bowplank Pembersihan sebelum dan sesudah pelaksanaan dan setelah pekerjaan selesai
2 Papan Nama Proyek Pembuatan Identitas Proyek
3 Kesehatan Dan Keselamatan Kerja (K3) P3K, APD dan lain - lain
4 Administrasi, Dokumen dan Pelaporan ATK, Foto Copy, Jilid, Dan Lain - Lain

PEMBUATAN SUMUR BOR, POMPA, TOWER AIR & TANGKI AIR


II
1 UNIT

A PEKERJAAN SUMUR BOR


1 Biaya Pengeboran Sumur Pemborongan pengeboran sumur bor satu set
2 Pekerjaan Pipa 4 Inchi Pipa dengan ukuran 4 Inchi, merek Wavin
3 Pekerjaan Pipa Dorong Keluaran 1 Inchi Pipa dengan ukuran 1 Inchi merek Wavin
4 Pekerjaan Pipa Keluaran 1/2 Inchi Untuk distribusi Dari Tower Pipa dengan ukuran 1/2 Inchi merek Wavin
5 Mesin Pompa Air Celup (Submensible) Mesin pomp air 20 meter keatas
6 Pekerjaan Urugan Tanah Bawah Lantai
a. Pekerjaan Galian Tanah -
b. Pekerjaan Pondasi Beton Umpek Camp. 1Pc:3Krkl Setara k-175 Pondasi dengan komposisi campuran 1 Pc : 2 Psr : 3 Krkl dengan kekuatan K-175
c. Pek. Kolom
- Beton Camp. 1Pc:3Krkl Setara K-175 Pekerjaan Kolom dengan komposisi campuran 1 Pc : 2 Psr : 3 Krkl dengan kekuatan K-175
- Pembesian Polos Besi dengan ukuran 12 mm
- Bekisting Kolom 2 x Pakai Papan Bekisting , 3/20 Kls.II dengn 2 x pemakaian
d. Pek. Pas. Batu Bata Camp. 1Pc:5Psr Pasangan Batu Bata dengan campuran 1 Pc : 5 Psr
e. Pek. Plesteran Camp. 1pc:3Psr Plesteran dengan campuran 1 Pc : 3 Psr
f. Pek. Acian Acian campuran semen dan air
g. Pas. Pintu Plat Besi 2 mm Pintu Plat Besi dengan tebal 2 mm
h. Pasangan Engsel Engsel merek IGM/Nisio atau yangg setara
i. Pasangan Kunci Gembok Kunci Gembok merek Sherlock atau yang sejenisnya
j. Pek. Rabat Beton Lantai Setara K-175 Pekerjaan rabat dengan komposisi campuran 1 Pc : 2 Psr : 3 Krkl dengan kekuatan K-175
7 Pek. Tower air
a. Pek. Galian Tanah -
b. Pek. Pondasi Beton Umpak Camp. 1Pc;2Psr;3Krkl Setara K-175 Pondasi dengan komposisi campuran 1 Pc : 2 Psr : 3 Krkl dengan kekuatan K-175
c. Pek. Pas. Besi Plat Agker Dudukan Tower Besi Plat dengan ukuran
d. Pek. Besi Siku 60.60.6 mm Besi Siku dengan ukuran 60x60x6 mm
e. Pek. Besi Siku L 40.40.mm Besi Siku L dengan ukuran 40x40 mm
8 Pas. Tangki Air Kapasitas @2400 Liter Tangki air dengan kapasitas 2400 liter

Kendari, Oktober 2021


Mengetahui/ Menyetujui DIBUAT OLEH :
PEJABAT PELAKSANA TEKNIS KEGIATAN (PPTK) KONSULTAN PERENCANA
DINAS PERUMAHAN RAKYAT KAWASAN CV. Maranggo Design
PEMUKIMAN DAN PERTANAHAN PROVINSI
SULAWESI TENGGARA Engineering consultant

THAHIRAH MUHSIN, ST.,MT Ir. ISKANDAR SYAH B.


NIP : 19831006 201101 2 015 Direktur

Anda mungkin juga menyukai