ANALISA HARGA SATUAN PEKERJAAN

PRESERVASI REKONSTRUKSI JALAN

NO. MATA PEMBAYARAN : 5.3.(2)


JENIS PEKERJAAN : Perkerasan Beton Semen dengan Anyaman Tulangan Tunggal
SATUAN PEMBAYARAN : M3
TOTAL VOLUME : 1000

JUMLAH HARGA
HARGA SATUAN
NO. KOMPONEN SATUAN KOEFISIEN
DASAR (Rp.)
(Rp.)

A. TENAGA
1. Pekerja Jam 1.4056 20,500.00 28,815.26
2. Tukang Jam 0.7028 22,700.00 15,953.82
3. Mandor Jam 0.1506 24,100.00 3,629.52
4, Kepala Tukang Besi Jam 0.0053 18,223.26 95.67
5, Tukang Besi Jam 0.0525 16,490.21 865.74
49,360.00
B. BAHAN
1 Semen Portland Tipe 2 Kg 410.0000 1,250.00 512,500.00
2 Pasir M3 0.6237 166,500.00 103,841.57
8 Plat Bekisting Lantai Metal M2 0.5700 750,000.00 427,500.00
9 Paku Kg 0.3500 15,680.00 5,488.00
10 Tulangan polos Ø12 kg 9.0210 11,076.03 99,916.37
11 Tulangan ulir D13 Kg 3.6696 11,076.03 40,644.66
JUMLAH HARGA BAHAN 1,189,890.59
C. PERALATAN
1. Wheel Loader jam 0.0244 549,064.00 13,403.40
2. Batching Plant jam 0.0502 444,071.00 22,292.72
3. Truck Mixer jam 0.2437 552,286.00 134,600.84
4 Con. Vibrator jam 0.0502 61,526.00 3,088.65
5. Water Tank Truck jam 0.0422 243,466.00 10,266.64
6. Conc. Paver jam 0.0074 190,000.00 1,413.06

JUMLAH HARGA PERALATAN 185,065.32

D. Jumlah (A+B+C) 1,424,315.91


E. Overhead dan Profit 10% x D 142,431.59
F. Harga Satuan Pekerjaan (D+E) 1,566,747.51

G. Harga Total Pekerjaan 1,566,747,505.74


PERHITUNGAN BIAYA KOMPONEN DALAM NEGERI
PRESERVASI REKONSTRUKSI JALAN

NO. MATA PEMBAYARAN : 5.3.(2)


JENIS PEKERJAAN : Perkerasan Beton Semen dengan Anyaman Tulangan Tunggal
SATUAN PEMBAYARAN : M3
TOTAL VOLUME : 1000

JUMLAH HARGA JUMLAH HARGA


HARGA SATUAN TOTAL VOLUME TKDN KDN KLN
NO. KOMPONEN SATUAN KOEFISIEN KETERANGAN
DASAR (Rp.) (%) (Rp.) (Rp.)
(Rp.) (Rp.)
A. TENAGA
1. Pekerja Jam 1.4056 20,500.00 28,815.26 28,815,261.04 ? ? ? (WNI/WNA)
2. Tukang Jam 0.7028 22,700.00 15,953.82 15,953,815.26 ? ? ?
3. Mandor Jam 0.1506 24,100.00 3,629.52 3,629,518.07 ? ? ?
4. Kepala Tukang Besi Jam 0.0053 18,223.26 95.67 95,672.14 ? ? ?
5. Tukang Besi Jam 0.0525 16,490.21 865.74 865,735.96 ? ? ?
49,360.00 49,360,002.48
B. BAHAN
1. Semen Portland Tipe 2 Kg 410.0000 1,250.00 512,500.00 512,500,000.00 ? ? ? (No Sertifikat TKDN)
2. Pasir M3 0.6237 166,500.00 103,841.57 103,841,567.31 ? ? ?
3. Plat Bekisting Lantai Metal M2 0.5700 750,000.00 427,500.00 427,500,000.00 ? ? ?
4. Paku Kg 0.3500 15,680.00 5,488.00 5,488,000.00 ? ? ?
5. Tulangan polos Ø12 kg 9.0210 11,076.03 99,916.37 99,916,368.16 ? ? ?
6. Tulangan ulir D13 Kg 3.6696 11,076.03 40,644.66 40,644,658.35 ? ? ?
JUMLAH HARGA BAHAN 1,189,890.59 1,189,890,593.82
C. PERALATAN
1. Wheel Loader jam 0.0244 549,064.00 13,403.40 13,403,404.99 ? ? ? (Dibuat + Saham Pemeilik)
2. Batching Plant jam 0.0502 444,071.00 22,292.72 22,292,720.88 ? ? ?
3. Truck Mixer jam 0.2437 552,286.00 134,600.84 134,600,839.32 ? ? ?
4. Con. Vibrator jam 0.0502 61,526.00 3,088.65 3,088,654.62 ? ? ?
5. Water Tank Truck jam 0.0422 243,466.00 10,266.64 10,266,638.55 ? ? ?
6. Conc. Paver jam 0.0074 190,000.00 1,413.06 1,413,059.65 ? ? ?

JUMLAH HARGA PERALATAN 185,065.32 185,065,318.02

D. Jumlah (A+B+C) 1,424,315.91


E. Overhead dan Profit 10% x D 142,431.59
F. Harga Satuan Pekerjaan (D+E) 1,566,747.51

G. Harga Total Pekerjaan 1,566,747,505.74


PERHITUNGAN RENCANA TKDN PEKERJAAN KONST
Nama Paket Pekerjaan Perkerasan Beton Semen dengan Anyaman Tulangan Tung
Tahun Anggaran 2023

Biaya Gabungan Barang dan Jasa (Rp.)


Uraian Pekerjaan
KDN KLN
(1) (2) (3)
Barang

I. Material Langsung (Bahan Baku) ? ?

II. Peralatan (Barang Jadi) ? ?

A. Sub Total Barang ? ?

Jasa

III. Manajemen Proyek dan Perekayasaan ? ?

IV. Alat Kerja/Fasilitas Kerja ? ?

V. Konstruksi dan Fabrikasi ? ?

VI. Jasa Umum ? ?

B. Sub Total Jasa ? ?

C. Total Biaya (A + B) ? ?
KERJAAN KONSTRUKSI
yaman Tulangan Tunggal

ang dan Jasa (Rp.) TKDN (%)


Total Barang/Jasa Gabungan
(4) (5) (6)

? ?

? ?

? ?

? ?

? ?

? ?

? ?

? ?

? ?