FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
PROYEK
NAMA PAKET
PROP / KAB / KODYA
ITEM PEMBAYARAN NO. PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN : BETON TANPA SEMEN Fc: 30 Mpa Fs : 4,1 MPa TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYEK :
A. TENAGA
1. Pekerja (L01) jam 2,1084 11.428,57 24.096,39
2. Tukang (L02) jam 1,0542 14.285,71 15.060,24
3. Mandor (L03) jam 0,1506 16.428,57 2.474,18
B. BAHAN
1 Fly Ash Kg 512,10 0,00 0,00
2 Pasir Beton Kg 802,54 339,29 272.290,36
3 Agregat Kasar Kg 802,54 240,74 193.204,07
4 Sodium Silikat Kg 109,51 5.500,00 602.305,00
5 Sodim Hidroksida Kg 54,85 4.000,00 219.400,00
6 Air Kg 18,30 20,00 366,00
C. PERALATAN
1 Wheel Loader E15 jam 0,0244 583.092,86 14.234,10
2 Batching Plant E43 jam 0,0753 801.165,33 60.328,71
3 Dump Truck E49 jam 0,2514 255.104,80 64.124,91
4 Con. Vibrator E20 jam 0,0753 38.847,18 2.925,24
5 Water Tank Truck E23 jam 0,0422 216.323,46 9.122,07
6 Conc. Paver E42 jam 0,0037 528.412,81 1.964,94
7 Alat Bantu Ls 1,0000 - 0,00
PROYEK
NAMA PAKET
PROP / KAB / KODYA
ITEM PEMBAYARAN NO. PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN 0 TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN 0 % THD. BIAYA PROYEK :
A. TENAGA
1. Pekerja (L01) jam 11.428,5714 0,00 0,00
2. Tukang (L02) jam 14.285,7143 0,00 0,00
3. Mandor (L03) jam 16.428,5714 0,00 0,00
B. BAHAN
C. PERALATAN
1 Wheel Loader E15 jam 583.092,8566 - 0,00
2 Batching Plant E43 jam 801.165,3314 - 0,00
3 Dump Truck E49 jam 255.104,7976 - 0,00
4 Con. Vibrator E20 jam 38.847,1795 - 0,00
5 Water Tank Truck E23 jam 216.323,4568 - 0,00
6 Conc. Paver E42 jam 528.412,8061 - 0,00
7 Alat Bantu Ls 0,0000 - 0,00