Analisa EI-3110

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK :
No. PAKET KONTRAK :
NAMA PAKET : PEKERJAAN FISIK PEMBANGUNAN/PRESERVASI JALAN PEMDA PROV SULSEL

PROP / KAB / KODYA : SULAWESI SELATAN


ITEM PEMBAYARAN NO. : 3.1.(10). PERKIRAAN VOL. PEK. : 1,00
JENIS PEKERJAAN : Galian Perkerasan Beton TOTAL HARGA (Rp.) : 578.256,17
SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYEK : 0,02

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L01) Jam 6,0241 4.532,31 27.303,10


2. Mandor (L03) Jam 1,0040 7.156,29 7.185,03

JUMLAH HARGA TENAGA 34.488,12

B. BAHAN

JUMLAH HARGA BAHAN 0,00

C. PERALATAN
1. Cocnrete Cutter E76 Jam 0,1785 92.019,26 16.424,68
2. Jack Hammer E26 Jam 1,0040 87.172,86 87.522,95
3. Compresor E05 Jam 1,0040 231.792,59 232.723,49
4. Dump Truck E09 Jam 0,2982 518.116,84 154.528,18

JUMLAH HARGA PERALATAN 491.199,30

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 525.687,42


E. OVERHEAD & PROFIT 10,0 % x D 52.568,74
F. HARGA SATUAN PEKERJAAN ( D + E ) 578.256,17

Note: 1 . Satuan dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 . Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 . Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 . Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan dan biaya-biaya lainnya.