BILL OF QUANTITY

(BOQ)
NAMA PEKERJAAN : PENINGKATAN JALAN DAN SLOPE PROTECTION
NAMA KEGIATAN : PENGEMBANGAN DAN PENINGKATAN PERLUASAN KESEMPATAN KERJA
INFRASTRUKTUR PEDESAAN PADAT PEKERJA I
LOKASI PEKERJAAN : KELURAHAN MATTIRO DECENG KECAMATAN TIROANG KABUPATEN PINRANG
SKPD : DINAS TENAGA KERJA DAN TRANSMIGRASI KABUPATEN PINRANG

HARGA SATUAN TOTAL HARGA BOBOT


NO URAIAN PEKERJAAN VOL SAT
(Rp) (Rp) (%)
A. PEKERJAAN JALAN
1. Pek. Timbunan Pilihan (Berbatu) 331.71 M3 94,500.00 31,347,048.60 37.17
31,347,048.60 37.17

B. PEKERJAAN KONSTRUKSI
1 Batu Belah 96.53 M³ 157,500.00 15,202,687.50 18.03
2 Pasir Pasang 102.23 M 3
112,000.00 11,450,208.00 13.58
3 Portland Cement (Pc) 50 Kg 387.20 Zak 68,000.00 26,329,600.00 31.22
52,982,495.50 62.83

C PEMBELIAN PERALATAN
1 Cangkul 8.00 Bh 80,000.00 640,000.00 0.76
2 Sekop 4.00 Bh 90,000.00 360,000.00 0.43
3 Gerobak Dorong 4.00 Bh 600,000.00 2,400,000.00 2.85
4 Sendok Semen 5.00 Bh 30,000.00 150,000.00 0.18
5 Linggis 3.00 Bh 150,000.00 450,000.00 0.53
4,000,000.00 4.74

Real Cost 88,329,544.10 104.74


Pembulatan 88,330,000.00
Terbilang:

DELAPAN PULUH DELAPAN JUTA TIGA RATUS TIGA PULUH RIBU RUPIAH"

Pinrang, 12 September 2015


PENYEDIA
CV./PT....................................

Nama Jelas
Jabatan
RENCANA ANGGARAN BIAYA
(RAB )
NAMA PEKERJAAN : PENINGKATAN JALAN DAN SLOPE PROTECTION
NAMA KEGIATAN : PENGEMBANGAN DAN PENINGKATAN PERLUASAN KESEMPATAN KERJA
INFRASTRUKTUR PEDESAAN PADAT PEKERJA I
LOKASI PEKERJAAN : KELURAHAN MATTIRO DECENG KECAMATAN TIROANG KABUPATEN PINRANG
SKPD : DINAS TENAGA KERJA DAN TRANSMIGRASI KABUPATEN PINRANG

HARGA SATUAN TOTAL HARGA BOBOT


NO URAIAN PEKERJAAN VOL SAT
(Rp) (Rp) (%)
A. PEKERJAAN JALAN
1. Pek. Timbunan Pilihan (Berbatu) 331.71 M3 94,500.00 31,347,048.60 37.13
31,347,048.60 37.13

B. PEKERJAAN KONSTRUKSI
1 Batu Belah 96.53 M³ 157,500.00 15,202,687.50 18.01
2 Pasir Pasang 102.23 M 3
112,000.00 11,450,208.00 13.56
3 Portland Cement (Pc) 50 Kg 387.20 Zak 68,250.00 26,426,400.00 31.30
53,079,295.50 62.87

C PEMBELIAN PERALATAN
1 Cangkul 8.00 Bh 80,000.00 640,000.00 0.76
2 Sekop 4.00 Bh 90,000.00 360,000.00 0.43
3 Gerobak Dorong 4.00 Bh 600,000.00 2,400,000.00 2.84
4 Sendok Semen 5.00 Bh 30,000.00 150,000.00 0.18
5 Linggis 3.00 Bh 150,000.00 450,000.00 0.53
4,000,000.00 4.74

Real Cost 88,426,344.10 104.74


Pembulatan 88,426,000.00
Terbilang:

DELAPAN PULUH DELAPAN JUTA EMPAT RATUS DUA PULUH ENAM RIBU RUPIAH"

Pinrang, 12 September 2015


PEJABAT PEMBUAT KOMITMEN
(PPK)

HERWIN RIZMA, SE
Nip. 19790312 201001 1 016
RENCANA ANGGARAN BIAYA
(RAB )
NAMA PEKERJAAN : PENINGKATAN JALAN DAN SLOPE PROTECTION
NAMA KEGIATAN : PENGEMBANGAN DAN PENINGKATAN PERLUASAN KESEMPATAN KERJA
INFRASTRUKTUR PEDESAAN PADAT PEKERJA I
LOKASI PEKERJAAN : KELURAHAN MATTIRO DECENG KECAMATAN TIROANG KABUPATEN PINRANG
SKPD : DINAS TENAGA KERJA DAN TRANSMIGRASI KABUPATEN PINRANG

HARGA SATUAN TOTAL HARGA BOBOT


NO URAIAN PEKERJAAN VOL SAT
(Rp) (Rp) (%)
A. PEKERJAAN JALAN
1. Pek. Timbunan Pilihan (Berbatu) 331.71 M3 94,500.00 31,347,048.60 37.11
31,347,048.60 37.11

B. PEKERJAAN KONSTRUKSI
1 Batu Belah 96.53 M³ 157,500.00 15,202,687.50 18.00
2 Pasir Pasang 102.23 M 3
112,350.00 11,485,989.90 13.60
3 Portland Cement (Pc) 50 Kg 387.20 Zak 68,250.00 26,426,400.00 31.29
53,115,077.40 62.89

C PEMBELIAN PERALATAN
1 Cangkul 8.00 Bh 80,000.00 640,000.00 0.76
2 Sekop 4.00 Bh 90,000.00 360,000.00 0.43
3 Gerobak Dorong 4.00 Bh 600,000.00 2,400,000.00 2.84
4 Sendok Semen 5.00 Bh 30,000.00 150,000.00 0.18
5 Linggis 3.00 Bh 150,000.00 450,000.00 0.53
4,000,000.00 4.74

Real Cost 88,462,126.00 104.74


Pembulatan 88,462,000.00
Terbilang:

DELAPAN PULUH DELAPAN JUTA EMPAT RATUS ENAM PULUH DUA RIBU RUPIAH"

Pinrang, 12 September 2015


PETUGAS TEKNIS
DISNAKERTRANS KAB. PINRANG

HARDIANSYAH, ST
DAFTAR
HARGA BAHAN / MATERIAL
NAMA PEKERJAAN : PENINGKATAN JALAN DAN SLOPE PROTECTION
NAMA KEGIATAN : PENGEMBANGAN DAN PENINGKATAN PERLUASAN KESEMPATAN KERJA
INFRASTRUKTUR PEDESAAN PADAT PEKERJA I
LOKASI PEKERJAAN : KELURAHAN MATTIRO DECENG KECAMATAN TIROANG KABUPATEN PINRANG
SKPD : DINAS TENAGA KERJA DAN TRANSMIGRASI KABUPATEN PINRANG

NO JENIS BAHAN/ALAT SAT. HARGA SATUAN KET.

1 Batu Belah Mᵌ Rp 157,500.00


2 Tanah Timbunan Pilihan (Berbatu) Mᵌ Rp 94,500.00
3 Pasir Pasang Mᵌ Rp 112,350.00
4 Semen PC (50 Kg) Tonasa Zak Rp 68,250.00
5 Pipa Beton Ø 60 Cm t = 7 Cm Bh Rp 215,000.00
6 Bensin Liter Rp 7,400.00
7 Solar Liter Rp 6,900.00
8 Oli Pelumas Liter Rp 40,000.00

DAFTAR HARGA
UANG PERANGSANG KERJA

NO JENIS UPAH SAT. HARGA SATUAN KET.

1 Pekerja Org/Hr Rp 65,000.00


2 Tukang Org/Hr Rp 70,000.00
3 Kepala Kelompok Org/Hr Rp 70,000.00
4 Mandor Org/Hr
5 Sopir Org/Hr
6 Pembantu Sopir Org/Hr
7 Operator Terlatih Org/Hr
8 Pembatu Operator Org/Hr

Pinrang, 12 September 2015


#NAME?
#NAME?

#NAME?
Rp -
MATTIRO DECENG

GALIAN PROTEKSI

Tinggi Galian = 0.50 M

Lebar Galian = 0.40 M

Panjang Galian = 330.00 M

Semi Volume = 66.00 M3

Dikali = 1.00 Bh

Jumlah = 66.00 M3

PASANGAN BATU 1 PC : 4 PS

PROTEKSI

KOPERAN TEGAK

Tinggi Pasangan = 0.30 M Tinggi Pasangan = 0.40 M

Lebar Pas. = 0.40 M Lebar Pas. Atas = 0.25 M

Panjang Pasangan = 330.00 M Lebar Pas. Bawah = 0.40 M

Semi Volume = 39.60 M3 0.33

Dikali = 1.00 M3 Panjang Pasangan = 330.00 M

Jumlah = 39.60 M3 Semi Volume = 42.90 M3

Dikali = 1.00 M3

Jumlah = 42.90 M3

PLASTERAN

PROTEKSI

Lebar = 0.25 M

Lebar = 0.40 M

0.65

Panjang Pasangan = 330.00 M

Semi Volume = 214.50 M2

Dikali = 4.00

Jumlah = 858.00 M2

REKAPITULASI VOLUME

1 VOLUME GALIAN

GALIAN PROTEKSI 66.00

PASANGAN BATU

KOPERAN 39.60

PROTEKSI 42.90
82.50

PLASTERAN

PROTEKSI 858.00

1 82.50 Pasir

1.17 96.53 Batu Pasangan

176 14,520.00 Semen

290.4 50

7.7 96.80 Semen

0.023 19.734 Pasir

102.23 Pasir

96.53 Batu Pasangan

387.20 Semen
LEMBAR PERHITUNGAN (CALCULATION

NAMA PEKERJAAN :
NAMA KEGIATAN :
LOKASI PEKERJAAN :
SKPD / T. A. :

DAMIJA (DAERAH MILIK JALAN) & P


PERSIAPAN BADAN JALAN
JARAK LEFT
STATION (STA)
(M)
Lebar
Lebar Kiri Rata Rata Luas Rata - Tinggi
Lebar (M') Kanan VOL. (M2) Lebar (M')
(M') (M') Rata (M3) (M')
(M')

0 + 0.0 5.00 2.50 2.50 2.50 0.15 2.00


50.0 2.50 125.00
0 + 50.0 5.00 2.50 2.50 2.50 0.15 2.00
0 + 50.0 5.00 2.50 2.50 2.50 0.15 2.00
50.0 2.50 125.00
0 + 100.0 5.00 2.50 2.50 2.50 0.15 2.00
0 + 100.0 5.00 2.50 2.50 2.50 0.15 2.00
50.0 2.50 125.00
0 + 150.0 5.00 2.50 2.50 2.50 0.15 2.00
0 + 150.0 5.00 2.50 2.50 2.50 0.15 2.00
50.0 2.50 125.00
0 + 200.0 5.00 2.50 2.50 2.50 0.15 2.00
0 + 200.0 5.00 2.50 2.50 2.50 0.15 2.00
50.0 2.50 125.00
0 + 250.0 5.00 2.50 2.50 2.50 0.15 2.00
0 + 250.0 5.00 2.50 2.50 2.50 0.15 2.00
50.0 2.50 125.00
0 + 300.0 5.00 2.50 2.50 2.50 0.15 2.00
0 + 300.0 5.00 2.50 2.50 2.50 0.15 2.00
50.0 2.50 125.00
0 + 350.0 5.00 2.50 2.50 2.50 0.15 2.00
0 + 350.0 5.00 2.50 2.50 2.50 0.15 2.00
50.0 2.50 125.00
0 + 400.0 5.00 2.50 2.50 2.50 0.15 2.00
0 + 400.0 5.00 2.50 2.50 2.50 0.15 2.00
50.0 2.50 125.00
0 + 450.0 5.00 2.50 2.50 2.50 0.15 2.00
0 + 450.0 5.00 2.50 2.50 2.50 0.15 2.00
100.0 2.50 250.00
0 + 550.0 5.00 2.50 2.50 2.50 0.15 2.00
0 + 550.0 5.00 2.50 2.50 2.50 0.15 2.00
2.9 2.50 7.15
0 + 552.9 5.00 2.50 2.50 2.50 0.15 2.00
552.9 1,382.15

88,462,000.0
-
CALCULATION VOLUME)

PEKERJAAN TIMBUNAN PEKERJAAN TIMB


LEFT RIGHT LEFT

Luas Rata Tinggi Luas Rata Tinggi 1 Tinggi 2 Luas Rata


Luas (M') VOL. (M3) Lebar (M') Luas (M') VOL. (M3) Lebar (M') Luas (M')
Rata (M') Rata (M') (M') Rata

0.30 0.15 2.00 0.30 0.05 0.05 0.50 0.03


0.30 15.00 0.30 15.00 0.03
0.30 0.15 2.00 0.30 0.05 0.05 0.50 0.03
0.30 0.15 2.00 0.30 0.05 0.05 0.50 0.03
0.30 15.00 0.30 15.00 0.03
0.30 0.15 2.00 0.30 0.05 0.05 0.50 0.03
0.30 0.15 2.00 0.30 0.05 0.05 0.50 0.03
0.30 15.00 0.30 15.00 0.03
0.30 0.15 2.00 0.30 0.05 0.05 0.50 0.03
0.30 0.15 2.00 0.30 0.05 0.05 0.50 0.03
0.30 15.00 0.30 15.00 0.03
0.30 0.15 2.00 0.30 0.05 0.05 0.50 0.03
0.30 0.15 2.00 0.30 0.05 0.05 0.50 0.03
0.30 15.00 0.30 15.00 0.03
0.30 0.15 2.00 0.30 0.05 0.05 0.50 0.03
0.30 0.15 2.00 0.30 0.05 0.05 0.50 0.03
0.30 15.00 0.30 15.00 0.03
0.30 0.15 2.00 0.30 0.05 0.05 0.50 0.03
0.30 0.15 2.00 0.30 0.05 0.05 0.50 0.03
0.30 15.00 0.30 15.00 0.03
0.30 0.15 2.00 0.30 0.05 0.05 0.50 0.03
0.30 0.15 2.00 0.30 0.05 0.05 0.50 0.03
0.30 15.00 0.30 15.00 0.03
0.30 0.15 2.00 0.30 0.05 0.05 0.50 0.03
0.30 0.15 2.00 0.30 0.05 0.05 0.50 0.03
0.30 15.00 0.30 15.00 0.03
0.30 0.15 2.00 0.30 0.05 0.05 0.50 0.03
0.30 0.15 2.00 0.30 0.05 0.05 0.50 0.03
0.30 30.00 0.30 30.00 0.03
0.30 0.15 2.00 0.30 0.05 0.05 0.50 0.03
0.30 0.15 2.00 0.30 0.05 0.05 0.50 0.03
0.30 0.86 0.30 0.86 0.03
0.30 0.15 2.00 0.30 0.05 0.05 0.50 0.03
165.86 165.86
PEKERJAAN TIMBUNAN BAHU JALAN
FT RIGHT

Luas Rata Tinggi 1 Tinggi 2 Luas Rata


VOL. (M3) Lebar (M') Luas (M') VOL. (M3)
Rata (M') (M') Rata

0.05 0.05 0.50 0.03


0.03 1.25 0.03 1.25
0.05 0.05 0.50 0.03
0.05 0.05 0.50 0.03
0.03 1.25 0.03 1.25
0.05 0.05 0.50 0.03
0.05 0.05 0.50 0.03
0.03 1.25 0.03 1.25
0.05 0.05 0.50 0.03
0.05 0.05 0.50 0.03
0.03 1.25 0.03 1.25
0.05 0.05 0.50 0.03
0.05 0.05 0.50 0.03
0.03 1.25 0.03 1.25
0.05 0.05 0.50 0.03
0.05 0.05 0.50 0.03
0.03 1.25 0.03 1.25
0.05 0.05 0.50 0.03
0.05 0.05 0.50 0.03
0.03 1.25 0.03 1.25
0.05 0.05 0.50 0.03
0.05 0.05 0.50 0.03
0.03 1.25 0.03 1.25
0.05 0.05 0.50 0.03
0.05 0.05 0.50 0.03
0.03 1.25 0.03 1.25
0.05 0.05 0.50 0.03
0.05 0.05 0.50 0.03
0.03 2.50 0.03 2.50
0.05 0.05 0.50 0.03
0.05 0.05 0.50 0.03
0.03 0.07 0.03 0.07
0.05 0.05 0.50 0.03
13.82 13.82