RENCANA ANGGARAN BIAYA

PENUNJANG PELANGGAN BARU DAN TAMBAH DAYA


FUNGSI GARDU DISTRIBUSI

Pekerjaan : Perumahan Graha Mutiara


Lokasi : Lendang Bagian - Gondang Lombok Utara

HARGA SATUAN HARGA BAGIAN


JUMLAH
NO JENIS MATERIAL SAT VOL
BAHAN (Rp) UPAH (Rp) BAHAN (Rp) UPAH (Rp) HARGA (Rp)

I BP Pasang Baru Daya 1300VA


1 BP (Biaya Penyambungan Baru) - 55 1,318,000 - 1,318,000 - 72,490,000
2 UJL (Uang Jaminan Langganan) - 55 125,000 - 125,000 - 6,875,000
3 Matarai Rp. 10.000 - 55 12,000 - 12,000 - 660,000
4 SLO (Sertifikat Laik Operasi) - 55 125,000 - 125,000 - 6,875,000
5 NIDI (Nomor Identitas Instalasi Listrik) - 55 75,000 - 75,000 - 4,125,000
6 Material Jaringan Tegangan Rendah - 1 135,255,000 135,255,000 - 135,255,000
TOTAL 226,280,000
II MATERIAL UTAMA
1 Tiang Beton 12 mtr 350 daN bt 0 8,214,680 965,223 - - 0
2 Trafo Distribusi 100 kVA 3 phs 20 kV bh 0 38,482,600 1,648,500 - - 0
3 Konduktor MVTIC 3x150mm mtr 0 267,250 35,000 - - 0
4 Isolator tumpu 20 kV bh 0 733,320 51,400 - - 0
5 Cut Out 24 kV set 0 2,388,450 66,300 - - 0
6 Lightning Arrester 24 kV set 0 990,000 66,300 - - 0
7 Hotline Clamp ( LLC ) ukuran 150 - 150 mm2 bh 0 665,000 60,000 - - 0
8 Kawat AAAC 70 mm2 u/ jamperan di Gardu mtr 0 30,324 3,250 - - 0
9 Kabel NYY 1x95 mm2 untuk In let mtr 0 418,390 7,700 - - 0
10 Alluminium Binding Wire bh 0 15,000 8,700 - - 0
11 Tekep Isolator tumpu 20 kV bh 0 85,000 8,700 - - 0
12 Cover /Perisai Lightning Arrester 24 kV set 0 73,000 34,500 - - 0
13 Cover/Perisai Cut Out 24 kV , atas dan bawah set 0 126,000 34,500 - - 0
14 Cover/Perisai Bushing Trafo Primer 24 kV set 0 115,000 34,500 - - 0
15 Kawat AAAC 70 mm2 u/ hantaran arde3 & 5 ohm mtr 0 16,324 8,700 - - 0
TOTAL -
III MATERIAL NON UTAMA
1 Penghalang panjat set 0 98,700 9,000 - - 0
2 Tanda kilat besar bh 0 155,000 17,600 - - 0
3 Plat Identitas Gardu bh 0 155,000 17,600 - - 0
4 Yzer Werk 3 phs 20 kV konst. 2 tiang tanpa LV Board set 0 8,950,900 972,800 - - 0
5 Inlet 1 jur konst. 2 tiang set 0 2,194,970 51,000 - - 0
6 Cross arm Cut out u/trf. Portal set 0 4,185,100 64,800 - - 0
7 Cross Arm UNP 100 Type A1 set 0 4,333,500 40,500 - - 0
8 Arde 5 Ohm pas. Luar set 0 442,400 138,300 - - 0
9 Arde 3 Ohm pas. Luar set 0 891,350 138,300 - - 0
10 Sepatu Kabel AL-CU 70 bh 0 150,500 16,200 - - 0
11 Sepatu Kabel 95 mm2 CU-CU untuk kabel in let bh 0 49,200 16,200 - - 0
12 Lantai kerja Gardu 2 tiang (2,5x1,2x0,5 = 1,5 m3) bh 0 1,150,000 243,000 - - 0
TOTAL -
IV LAIN -LAIN
1 Angkutan Material ls 0 25,750,000 - - - -
2 Material Lainnya ls 0 17,500,000 - - - -
TOTAL -
TOTAL BIAYA 226,280,000

* Harga sewaktu waktu bisa berubah Mataram 22 November 2023


* Proses & pekerjaan di mulai sejak di lakukannya pembayaran
* Proses kwh Meter & Material Jaringan dilakukan bersamaan