Anda di halaman 1dari 7

VOLUME

TIRER WEILAIN WEILAIN LEUBATAN REC. WJR CO KTR. CM T BUYASURI - REALIS


NO UR AIAN SAT KJ ATAWAI (
G s/d CO LOANG- REC. OMESURI LAM AHORA KJ ATAWAI ( ASI
PUOR BELAME -
KTR. CM T IDALOLONG (LEUBATANG- (RUJAP BARU) BOTO )
LIW ULAGANG)
LOANG LEWAYAN

FUN GSI SUTM

A MATERIAL UTAMA

1 Tiang besi 14 meter 350 daN btg -

2 Tiang besi 13 meter 200 daN btg -

3 Tiang besi 12 meter 200 daN btg 1 1 2 4

4 Tiang besi 11 meter 156 daN btg 1 1

5 Isolator tumpu 20 kV bh 8 10 3 20 29 1 6 18 6 101

6 Isolator tarik 20 kV set 6 6

7 Cut out 20 kV (polimer) bh 3 3

8 Fuselink 2 A - 30 A bh -

9 Lightning Arrester 24 kV (polimer) bh -

10 Pemasangan Konduktor AAA C 35 mm2 kms -

11 Pemasangan Konduktor AAA C 50 mm2 kms -

12 Pemasangan Konduktor AAA C 70 mm2 kms 0,300 0,200 0,250 0,100 0,200 0,150 0,250 0,250 1,700

13 Pemasangan Konduktor AAA C 95 mm2 kms -

14 Pemasangan Konduktor AAA C 120 mm2 kms -

15 Pemasangan Konduktor AAA C 150 mm2 kms -

16 Pemasangan Konduktor AAA C 240 mm2 kms -

17 Pemasangan Konduktor AAA C/S 50 mm2 kms -

18 Pemasangan Konduktor AAA C/S 70 mm2 kms -

19 Pemasangan Konduktor AAA C/S 95 mm2 kms -

20 Pemasangan Konduktor AAA C/S 120 mm2 kms -

21 Pemasangan Konduktor AAA C/S 150 mm2 kms -

22 Pemasangan Konduktor AAA C/S 240 mm2 kms -

23 Pemasangan LBS Motorised set -

24 Pemasangan LBS Manual set -

25 Pemasangan Recloser set -

B MATERIAL NON UTAMA

1 Perlengkapan druck schoor TM set -

2 Perlengkapan kontramast TM set -

3 Treck schoor (Standar) 17 kN TM set 1 1 2

4 Treck schoor tolak pinggang TM set -

5 Cross Arm UNP 10 Balance atau Unbalance :

a. Type A1 UNP 100 x 50 x 5 x 2000 (5 mm) set 3 1 1 1 3 2 4 2 17

b. Type A2 UNP 100 x 50 x 5 x 2000 (5 mm) set 1 1

c. Type A3 UNP 100 x 50 x 5 x 2000 (5 mm) set 1 1

d. Type B3 UNP 100 x 50 x 5 x 2500 (5 mm) set -

6 Live Line Connector 50 kV, 35-70 mm2, bh -

7 Live Line Connector 50 kV, 70-150 mm2 bh -

8 Live Line Connector 50 kV, 150-240 mm2 bh -

9 H. Type Conector 50-70 / 50-70 mm2 bh 2 2

10 H. Type Conector 70-150 / 70-150 mm2 bh -

11 Aluminium Binding Wire mtr -

12 Pengikat Top Ties Semi Konduktor 70 mm2 bh -


13 Pengikat Side Ties Semi Konduktor 70 mm2 bh -

14 Pengikat Top Ties Semi Konduktor 150 mm2 bh -

15 Pengikat Side Ties Semi Konduktor 150 mm2 bh -

16 Pengikat Top Ties Semi Konduktor 240 mm2 bh -

17 Pengikat Side Ties Semi Konduktor 240 mm2 bh -

18 Joint sleeve tension 35 mm2 + isolasi bh -

19 Joint sleeve tension 50 mm2 + isolasi bh -

20 Joint sleeve tension 70 mm2 + isolasi bh 2 4 6

21 Joint sleeve tension 95 mm2 + isolasi bh -

22 Joint sleeve tension 120 mm2 + isolasi bh -

23 Joint sleeve tension 150 mm2 + isolasi bh -

24 Joint sleeve tension 185 mm2 + isolasi bh -

25 Joint sleeve tension 240 mm2 + isolasi bh -

26 Joint Sleves 35 mm2 non tension + isolasi bh -

27 Joint Sleves 50 mm2 non tension + isolasi bh -

28 Joint Sleves 70 mm2 non tension + isolasi bh -

29 Joint Sleves 95 mm2 non tension + isolasi bh -

30 Joint Sleves 50-35 mm2 non tension + isolasi bh -

31 Joint Sleves 70-35 mm2 non tension + isolasi bh -

32 Joint Sleves 70-50 mm2 non tension + isolasi bh -

33 Joint Sleves 95-50 mm2 non tension + isolasi bh -

34 Joint Sleves 95-70 mm2 non tension + isolasi bh -

35 Penghalang panjat bh -

36 Tanda kilat kecil untuk Jaringan 20 kV bh -

37 Tanda kilat besar untuk Jaringan 20 kV set -

38 Arde TM (3 Ohm) set

a. One core Earthing Conductor 50 mm2 CU Mtr -

b. Elektroda Tembaga 5/8", 2,5 Mtr Btng -

c. Connector CU (BC 50 mm2 ke Elektroda) Bh -

d. Pipa Besi Galv. Med D = 5/8", 6 meter bh -

e. Link 25 x 25 bh -

f. Stopping Buckle bh -

g. Stainless Steel Strip 20 x 0,7 mm bh -


h. Sepatu Kabel CU 50 mm2 bh -

39 Sepatu Kabel AL CU 35 mm2 Bh -

40 Sepatu Kabel AL CU 50 mm2 Bh -

41 Sepatu Kabel AL CU 70 mm2 Bh 3 3


42 Sepatu Kabel AL CU 95 mm2 Bh -

43 Sepatu Kabel AL CU 120 mm2 Bh -

44 Sepatu Kabel AL CU 150 mm2 Bh -

45 Sepatu Kabel AL CU 185 mm2 Bh -

46 Sepatu Kabel AL CU 240 mm2 Bh -

47 Sepatu Kabel AL CU 300 mm2 Bh -

48 Sepatu Kabel AL CU 400 mm2 Bh -

49 Sepatu Kabel CU 35 mm2 Bh -

50 Sepatu Kabel CU 50 mm2 Bh -

51 Sepatu Kabel CU 70 mm2 Bh -

52 Sepatu Kabel CU 95 mm2 Bh -

53 Sepatu Kabel CU 120 mm2 Bh -

54 Sepatu Kabel CU 150 mm2 Bh -

55 Sepatu Kabel CU 185 mm2 Bh -

56 Sepatu Kabel CU 240 mm2 Bh -

57 Sepatu Kabel CU 300 mm2 Bh -

58 Sepatu Kabel CU 400 mm2 Bh -

59 Sepatu Kabel AL 35 mm2 Bh -

60 Sepatu Kabel AL 50 mm2 Bh -

61 Sepatu Kabel AL 70 mm2 Bh -

62 Sepatu Kabel AL 95 mm2 Bh -

63 Sepatu Kabel AL 120 mm2 Bh -

64 Sepatu Kabel AL 150 mm2 Bh -

65 Sepatu Kabel AL 185 mm2 Bh -

66 Sepatu Kabel AL 240 mm2 Bh -

67 Sepatu Kabel AL 300 mm2 Bh -

68 Sepatu Kabel AL 400 mm2 Bh -

69 Beton kaki tiang TM (0,223 M3) Btng 2 2

70 Semen Konduktif Fail -

FUN GSI SUTR

A MATERIAL UTAMA

1 Tiang besi 11 meter 156 daN btg 1 1

2 Tiang besi 9 meter 100 daN btg 1 1

3 LVTC 3 x 35 + 1 x 25 mm2 kms 0,200 0,300 1

4 LVTC 3 x 35 + 1 x 35 mm2 kms 0,050 0,450 0,500

5 LVTC 3 x 50 + 1 x 35 mm2 kms -

6 LVTC 3 x 50 + 1 x 50 mm2 kms -

7 LVTC 3 x 70 + 1 x 50 mm2 kms -

8 LVTC 3 x 70 + 1 x 70 mm2 kms 0,200 0

9 LVTC 3 x 95 + 1 x 70 mm2 kms -

10 LVTC 3 x 95 + 1 x 95 mm2 kms -

Pekerjaan Sambungan Rumah Titik 20 6 4

B MATERIAL NON UTAMA

1 Perlengkapan druck schoor TR set -

2 Perlengkapan kontramast TR set -

3 Treck schoor (Standar) TR set -

4 Treck schoor tolak pinggang TR set -

5 CCO 25 - 35 mm2 + Cover bh 2 2

6 CCO 25/35 - 50/70 mm2 + Cover bh -

7 CCO 50 - 70 mm2 + Cover bh 3 3

8 CCO 50/70 - 120/150 mm2 + Cover bh -


9 CCO 50/70 - 150/240 mm2 + Cover bh -

10 CCO 120 - 150 mm2 + Cover bh -

11 CCO 150 - 240 mm2 + Cover bh -

12 CCO 240 - 300 mm2 + Cover bh -

13 Joint sleeve tension 35 mm2 + isolasi bh 2 2

14 Joint sleeve tension 50 mm2 + isolasi bh -

15 Joint sleeve tension 70 mm2 + isolasi bh -

16 Joint sleeve tension 95 mm2 + isolasi bh -

17 Joint sleeve tension 120 mm2 + isolasi bh -

18 Joint sleeve tension 150 mm2 + isolasi bh -

19 Joint sleeve tension 185 mm2 + isolasi bh -

20 Joint sleeve tension 240 mm2 + isolasi bh -

21 Joint Sleves 35 mm2 non tension + isolasi bh -

22 Joint Sleves 50 mm2 non tension + isolasi bh -

23 Joint Sleves 70 mm2 non tension + isolasi bh 4 4

24 Joint Sleves 95 mm2 non tension + isolasi bh -

25 Joint Sleves 50-35 mm2 non tension + isolasi bh -

26 Joint Sleves 70-35 mm2 non tension + isolasi bh -

27 Joint Sleves 70-50 mm2 non tension + isolasi bh -

28 Joint Sleves 95-50 mm2 non tension + isolasi bh -

29 Joint Sleves 95-70 mm2 non tension + isolasi bh -

30 Arde TR (5 Ohm) bh

a. One core Earthing Conductor 50 mm2 CU Mtr -

b. Elektroda Tembaga 5/8", 2,5 Mtr Btng -

c. Coonector CU (BC 50 mm2 ke Elektroda) bh -

d. Pipa Besi Galv. Med D = 5/8", 6 meter bh -

e. Link 25 x 25 bh -

f. Stopping Buckle bh -

g. Stainless Steel Strip 20 x 0,7 mm bh -

h. Sepatu Kabel CU 50 mm2 bh -

31 Suspension Assembly 25 - 50 set 1 1

32 Suspension Assembly 50 - 70 set 4 5 1 10

33 Large Angle Assembly 25 - 50 set 2 2


34 Large Angle Assembly 50 - 70 set 2 3 5

35 Fixed Dead End Assembly 25 - 50 set 1 1

36 Fixed Dead End Assembly 50 - 70 set 1 3 4

37 Adjustable Dead End Assembly 25 - 50 set -

38 Adjustable Dead End Assembly 50 - 70 set -

39 Bundle End Protection set -

40 Beton Kaki Tiang TR (0,099 M3) Btng -

41 Semen Konduktif Fail -

FUN GSI GARD U

I MATERIAL UTAMA

1 Tiang besi 14 meter 350 daN btg -

2 Tiang besi 13 meter 200 daN btg -

3 Tiang besi 12 meter 200 daN btg -

4 Tiang besi 11 meter 156 daN btg -

5 Isolator tumpu 20 kV bh -

6 Isolator tarik 20 kV set -

7 Cut out 20 kV (polimer) bh -

8 Fuselink 2 A - 30 A bh -

9 Lightning Arrester 24 kV (polimer) bh -

10 Trafo 3 Phs 25 KVA - 20 KV bh -

11 Trafo 3 Phs 50 KVA - 20 KV bh 1 1

12 Trafo 3 Phs 100 KV A - 20 KV bh -

13 Trafo 3 Phs 160 KV A - 20 KV bh -

14 Trafo 3 Phs 200 KV A - 20 KV bh -

15 Trafo 3 Phs 250 KV A - 20 KV bh -

16 LV Board 3 Phs 1 Tiang set -

17 LV Board 3 Phs 2 Tiang set -

18 Kabel NYY 50 mm2 Mtr -

19 Kabel NYY 70 mm2 Mtr -

20 Kabel NYY 95 mm2 Mtr -

21 Kabel NYY 120 mm2 Mtr -

22 Kabel NYY 150 mm2 Mtr -

23 Kabel NYY 240 mm2 Mtr -

II MATERIAL NON UTAMA

1 Perlengkapan druck schoor TM set -

2 Perlengkapan kontramast TM set -

3 Treck schoor (Standar) 17 kN TM set -

4 Treck schoor tolak pinggang TM set -

5 Cross Arm UNP 10 Balance atau Unbalance :

a. Type A1 UNP 100 x 50 x 5 x 2000 (5 mm) set -

b. Type A2 UNP 100 x 50 x 5 x 2000 (5 mm) set -

c. Type A3 UNP 100 x 50 x 5 x 2000 (5 mm) set -

d. Type B3 UNP 100 x 50 x 5 x 2500 (5 mm) set -

6 Rangka Dudukan u/Trafo 3 Phs 1 Tiang set -

7 Rangka Dudukan u/Trafo 3 Phs 2 Tiang set -

8 Cross Arm Type A1 Balance / Unbalance : set -

Cross Arm u/ Dudukan CO / Arester 1 Tiang (Pakai Material


9 set 1 1
Lama )

9 Cross Arm u/ Dudukan CO / Arester 1 Tiang set 1 1

10 Cross Arm u/ Dudukan CO / Arester 2 Tiang set -

11 Pipa Inlet / Out Let Medium B + Invoring 2" set -


12 Pipa Inlet / Out Let Medium B + Invoring 2,5" set -

13 Pipa Inlet / Out Let Medium B + Invoring 3" -

14 CCO 25 - 35 mm2 + Cover bh -

15 CCO 25/35 - 50/70 mm2 + Cover bh -

16 CCO 50 - 70 mm2 + Cover bh -

17 CCO 50/70 - 120/150 mm2 + Cover bh -

18 CCO 50/70 - 150/240 mm2 + Cover bh -

19 CCO 120 - 150 mm2 + Cover bh -

20 CCO 150 - 240 mm2 + Cover bh -

21 CCO 240 - 300 mm2 + Cover bh -

22 H. Type Conector 50-70 / 50-70 mm2 bh -

23 H. Type Conector 70-150 / 70-150 mm2 bh -

24 Aluminium Binding Wire mtr -

25 Pengikat Top Ties Semi Konduktor 70 mm2 bh -

26 Pengikat Side Ties Semi Konduktor 70 mm2 bh -

27 Pengikat Top Ties Semi Konduktor 150 mm2 bh -

28 Pengikat Side Ties Semi Konduktor 150 mm2 bh -

29 Pengikat Top Ties Semi Konduktor 240 mm2 bh -

30 Pengikat Side Ties Semi Konduktor 240 mm2 bh -

31 Penghalang panjat bh -

32 Tanda kilat kecil untuk Jaringan 20 kV bh -

33 Tanda kilat besar untuk Jaringan 20 kV set -

34 Arde TM (3 Ohm) set

a. One core Earthing Conductor 50 mm2 CU Mtr -

b. Elektroda Tembaga 5/8", 2,5 Mtr Btng -

c. Connector CU (BC 50 mm2 ke Elektroda) Bh -

d. Pipa Besi Galv. Med D = 5/8", 6 meter bh -

e. Link 25 x 25 bh -

f. Stopping Buckle bh -

g. Stainless Steel Strip 20 x 0,7 mm bh -

h. Sepatu Kabel CU 50 mm2 bh -

35 Arde TR (5 Ohm) bh

a. One core Earthing Conductor 50 mm2 CU Mtr -


b. Elektroda Tembaga 5/8", 2,5 Mtr Btng -

c. Coonector CU (BC 50 mm2 ke Elektroda) bh -

d. Pipa Besi Galv. Med D = 5/8", 6 meter bh -

e. Link 25 x 25 bh -

f. Stopping Buckle bh -

g. Stainless Steel Strip 20 x 0,7 mm bh -

h. Sepatu Kabel CU 50 mm2 bh -

36 Sepatu Kabel AL CU 35 mm2 Bh -

37 Sepatu Kabel AL CU 50 mm2 Bh -

38 Sepatu Kabel AL CU 70 mm2 Bh -

39 Sepatu Kabel AL CU 95 mm2 Bh -

40 Sepatu Kabel AL CU 120 mm2 Bh -

41 Sepatu Kabel AL CU 150 mm2 Bh -

42 Sepatu Kabel AL CU 185 mm2 Bh -

43 Sepatu Kabel AL CU 240 mm2 Bh -

44 Sepatu Kabel AL CU 300 mm2 Bh -

45 Sepatu Kabel AL CU 400 mm2 Bh -

46 Sepatu Kabel CU 35 mm2 Bh -

47 Sepatu Kabel CU 50 mm2 Bh -

48 Sepatu Kabel CU 70 mm2 Bh -

49 Sepatu Kabel CU 95 mm2 Bh -

50 Sepatu Kabel CU 120 mm2 Bh -

51 Sepatu Kabel CU 150 mm2 Bh -

52 Sepatu Kabel CU 185 mm2 Bh -

53 Sepatu Kabel CU 240 mm2 Bh -

54 Sepatu Kabel CU 300 mm2 Bh -

55 Sepatu Kabel CU 400 mm2 Bh -

56 Joint Bimetal (35 - 35) + head shrink Bh -

57 Joint Bimetal (50 - 35) + head shrink Bh -

58 Joint Bimetal (50 - 50) + head shrink Bh -

59 Joint Bimetal (50 - 70) + head shrink Bh -

60 Joint Bimetal (50 - 95) + head shrink Bh -

61 Joint Bimetal (70 - 35) + head shrink Bh -

62 Joint Bimetal (70 - 50) + head shrink Bh -

63 Joint Bimetal (70 - 70) + head shrink Bh 4 4

64 Joint Bimetal (70 - 95) + head shrink Bh -

65 Joint Bimetal (95 - 70) + head shrink Bh -

66 Joint Bimetal (95 - 95) + head shrink Bh -

67 Joint Bimetal (95 - 120) + head shrink Bh -

68 Joint Bimetal (150 - 120) + head shrink Bh -

69 Pondasi Lantai Kerja Trafo Cantol (0,24 M3) Bh -

70 Pondasi Lantai Kerja Trafo Portal (0,5 M3) Bh -

71 Beton kaki tiang TM (0,223 M3) Btng -

72 Semen Konduktif Fail -

FINISHING

1 Foto dokumentasi lbr -

2 Gambar revisi lbr -

3 Penomoran tiang btg -

4 Pengecatan tiang 14 mtr btg -

5 Pengecatan tiang 13 mtr btg -

6 Pengecatan tiang 12 mtr btg 2 2


7 Pengecatan tiang 11 mtr btg -

8 Percobaan / testing JTM kms -

9 Tagging Jaringan (Jaringan dan Konstruksi) Titik -

LAINYA

A Jas a Pembongka ran = 60 % x ha rga jasa pema sanga n

Tiang besi 12 meter 200 daN btg -

Tiang besi 11 meter 156 daN btg 1 1 2 4

Isolator tumpu 20 kV bh 8 10 3 20 29 6 18 6 100

Isolator tarik 20 kV bh 6 6

Cut out 20 kV (polimer) set 3 3

Fuselink bh -

Pembongkaran Konduktor AAA C 70 mm2 kms 0,300 0,200 0,250 0,100 0,200 0,200 0,250 0,250 1,750

Perlengkapan druck schoor TM set 1 1

Perlengkapan kontramast TM set -

Treck schoor (Standar) 17 kN TM set 1 1 2

Treck schoor tolak pinggang TM set -

Cross Arm UNP 10 Balance atau Unbalance :

a. Type A1 set 3 1 1 1 3 2 4 2 17

c. Type A2 set 1 1 2

d. Type A3 set 1 1

e. Type B3 set -

pembongkaran Recloser set 1 1

11 Pembonkaran Trafo 3 Phs 50 KVA - 20 KV bh 1 1

Penghalang panjat bh -

Tanda kilat kecil untuk Jaringan 20 kV bh -

Beton kaki tiang TM bh 1 2 3

1 Tiang besi 9 meter 100 daN btg 1 1 2

Pekerjaan Sambungan Rumah Titik 20 6 4

2 LVTC 3 x 35 + 1 x 25 mm2 kms 0,200 0,300 1

3 LVTC 3 x 35 + 1 x 35 mm2 kms 0,050 0,450 0,500

4 LVTC 3 x 50 + 1 x 35 mm2 kms -

5 LVTC 3 x 50 + 1 x 50 mm2 kms -


6 LVTC 3 x 70 + 1 x 50 mm2 kms -

7 LVTC 3 x 70 + 1 x 70 mm2 kms 0,200 0

8 LVTC 3 x 95 + 1 x 70 mm2 kms -

9 LVTC 3 x 95 + 1 x 95 mm2 kms -

B Jas a Pelurusan = 30% x ha rga jasa pema sanga n

Tiang besi 12 meter 200 daN btg 1 3 4

Tiang besi 11 meter 156 daN btg -

Cross Arm UNP 10 Balance atau Unbalance :

a. Type A1 set -

c. Type A2 set -

d. Type A3 set -

e. Type B3 set -

Trafo 3 Phs 160 KV A - 20 KV bh -


JU MLAH MATERIAL
JU MLAH JA SA
JU MLAH MATERIAL DA N JA SA
Note : Pekerjaan Pembongkaran = 60% x Harga pasang
Pelurusan Tiang Miring = 30% x Harga Pasang

Anda mungkin juga menyukai