Anda di halaman 1dari 120

PT.

PLN (PERSERO) ULP SUMBERLAWANG


Keterangan Gambar :
No Nama Material Baru Eksisting
1 Tiang Beton
2 Tiang Besi
3 JTM 3 Fasa
4 JTM 1 Fasa
5 JTR 1 Fasa Only / UB
6 JTR 3 Fasa Only / UB
7 Trafo 1 Fasa
TRAFO 8 Trafo 3 Fasa
LESTARI 9 Fuse Cut Out s s
BARU
10 ABSW
B1-144/287
1RS11B 50 m 11 Vang Net
12 Schoor
55 m 13

Bongkar Pasang Konstruksi :


50 m Pasang Pasang
APP C12-350+E+BC Btg AAAC 3x70n50M Mtr
Lestari Baru Les
tar C12-200 Btg LVTC 3X70N50 Mtr
Lokasi Baru i Ba
ru CC1A Unit
CC8A Unit
CC7A Unit
P12 Unit
APP CA5 Unit BONGKAR

Les
Lestari Baru

tar
Lokasi lama CM212 Unit CM59 Unit

Ba r i
CM212A Unit CA5 Unit

u
CG 312-B Btg CA6 Unit
CM2-11M Unit CA1 Unit
CE12 Unit CA3 Unit
B1-144/285 250 KVA
1RS11B PU
1F12 Unit AAAC70MM2 Mtr
CM54 Unit Bongkar Pasang
CM55 Unit LVTC 2X70N50 Mtr
B1-285/B
167 KVA Unit
B1-285/C Keterangan Tambahan:
50 KVA
INDOMARET

Uprating Trafo 167 KVA Plasa Gadhira Gemolong

1 Trafo Lestari baru (PK) Pindah dari 285C ke 287 Golongan JTM, TRAFO, JTR, SR/APP
2 Penambahan 2 Tiang JTR Lestari Baru + LVTC (3x70 N70) 105m No. Gambar 1 Lembar 1
3 Geser KWH Meter Lestari Baru Dari Pintu depan ke Pintu Belakang Gambar dari Skala
4 Trafo baru 250 KVA di letakkan di 285C (bekas posisi trafo lestari baru) Perihal:
5 Uprating JTR LVTC 2x70 N50 Ke 3x70 N70 250m
6 PEKERJAAN PENAMBAHAN TIANG, JTM, TRAFO DAN JTR

Digambar
Diperiksa
Diketahui
Disetujui
PT. PT. PLN (PERSERO) DISTRIBUSI JAWA TENGAH & DI YOGYAKARTA Lampiran Perjanjian :
AREA SURAKARTA Nomor I : 0060.PJ/HKM.00.01/SKA/2018
Nomor II : 31.08/PD-PLN/STS/2018
DISTRIBUSI JAWA TENGAH DAN D.I. YOGYAKARTA
LAMPIRAN PERJANJIAN
HARGA SATUAN JASA
PEMBANGUNAN JARINGAN DISTRIBUSI UNTUK PB / PD AREA SURAKARTA
ZONA 3 - RAYON SRAGEN DAN RAYON SUMBERLAWANG

KO HARGA
NO URAIAN SAT KETERANGAN
DE SATUAN
KONSTRUKSI JTM 1 PHASA
1 ca1 Upah Pasang Konst. JTM 1 Fasa CA1 Unit 30,000
2 ca1-nUpah Pasang Konst. JTM 1 Fasa CA1-N Unit 30,000
3 ca1-pUpah Pasang Konst. JTM 1 Fasa CA1-PN Unit 30,000
4 ca1-pUpah Pasang Konst. JTM 1 Fasa CA1-P Unit 30,000
5 ca1' Upah Pasang Konst. JTM 1 Fasa CA1' Unit 12,000
6 ca1-p'Upah Pasang Konst. JTM 1 Fasa CA1-P' Unit 12,000
7 ca2 Upah Pasang Konst. JTM 1 Fasa CA2 Unit 53,000
8 ca2-nUpah Pasang Konst. JTM 1 Fasa CA2-N Unit 53,000
9 ca2' Upah Pasang Konst. JTM 1 Fasa CA2' Unit 28,800
10 ca3 Upah Pasang Konst. JTM 1 Fasa CA3 Unit 46,800
11 ca3-nUpah Pasang Konst. JTM 1 Fasa CA3-N Unit 46,800
12 ca3' Upah Pasang Konst. JTM 1 Fasa CA3' Unit 27,300
13 ca4 Upah Pasang Konst. JTM 1 Fasa CA4 Unit 50,700
14 ca4-nUpah Pasang Konst. JTM 1 Fasa CA4-N Unit 50,700
15 ca4' Upah Pasang Konst. JTM 1 Fasa CA4' Unit 50,700
16 ca5 Upah Pasang Konst. JTM 1 Fasa CA5 Unit 20,000
17 ca5-nUpah Pasang Konst. JTM 1 Fasa CA5-N Unit 20,000
18 ca5-1Upah Pasang Konst. JTM 1 Fasa CA5-1 Unit 20,000
19 ca5-2Upah Pasang Konst. JTM 1 Fasa CA5-2 Unit 20,000
20 ca5-3Upah Pasang Konst. JTM 1 Fasa CA5-3 Unit 20,000
21 ca5-4Upah Pasang Konst. JTM 1 Fasa CA5-4 Unit 20,000
22 ca5' Upah Pasang Konst. JTM 1 Fasa CA5' Unit 18,000
23 ca5-1'Upah Pasang Konst. JTM 1 Fasa CA5-1' Unit 18,000
24 ca5-2'Upah Pasang Konst. JTM 1 Fasa CA5-2' Unit 18,000
25 ca5-3'Upah Pasang Konst. JTM 1 Fasa CA5-3' Unit 18,000
26 ca5-4'Upah Pasang Konst. JTM 1 Fasa CA5-4' Unit 18,000
27 ca6 Upah Pasang Konst. JTM 1 Fasa CA6 Unit 38,000
28 ca6-nUpah Pasang Konst. JTM 1 Fasa CA6-N Unit 38,000
29 ca6' Upah Pasang Konst. JTM 1 Fasa CA6' Unit 38,000
30 ca7 Upah Pasang Konst. JTM 1 Fasa CA7 Unit 21,000
31 ca7-aUpah Pasang Konst. JTM 1 Fasa CA7-A Unit 21,000
32 ca8 Upah Pasang Konst. JTM 1 Fasa CA8 Unit 40,000
33 ca8-aUpah Pasang Konst. JTM 1 Fasa CA8-A Unit 40,000
34 ca9 Upah Pasang Konst. JTM 1 Fasa CA9 Unit 30,000
35 ca9-nUpah Pasang Konst. JTM 1 Fasa CA9-N Unit 30,000
1 sa1 Upah Pasang Konst. JTM 1 Fasa SA1 Unit 30,000
2 sa1-nUpah Pasang Konst. JTM 1 Fasa SA1-N Unit 30,000
3 sa1-pUpah Pasang Konst. JTM 1 Fasa SA1-PN Unit 30,000
4 sa1-pUpah Pasang Konst. JTM 1 Fasa SA1-P Unit 30,000
5 sa1' Upah Pasang Konst. JTM 1 Fasa SA1' Unit 15,000
6 sa1-p'Upah Pasang Konst. JTM 1 Fasa SA1-P' Unit 15,000
7 sa2 Upah Pasang Konst. JTM 1 Fasa SA2 Unit 53,000
8 sa2-nUpah Pasang Konst. JTM 1 Fasa SA2-N Unit 53,000
9 sa2' Upah Pasang Konst. JTM 1 Fasa SA2' Unit 28,800
10 sa3 Upah Pasang Konst. JTM 1 Fasa SA3 Unit 46,800
11 sa3-nUpah Pasang Konst. JTM 1 Fasa SA3-N Unit 46,800
12 sa3' Upah Pasang Konst. JTM 1 Fasa SA3' Unit 27,300

2 - 120
KO HARGA
NO URAIAN SAT KETERANGAN
DE SATUAN
13 sa4 Upah Pasang Konst. JTM 1 Fasa SA4 Unit 50,700
14 sa4-nUpah Pasang Konst. JTM 1 Fasa SA4-N Unit 50,700
15 sa4' Upah Pasang Konst. JTM 1 Fasa SA4' Unit 50,700
16 sa5 Upah Pasang Konst. JTM 1 Fasa SA5 Unit 20,000
17 sa5-nUpah Pasang Konst. JTM 1 Fasa SA5-N Unit 20,000
18 sa5-1Upah Pasang Konst. JTM 1 Fasa SA5-1 Unit 20,000
19 sa5-2Upah Pasang Konst. JTM 1 Fasa SA5-2 Unit 20,000
20 sa5-3Upah Pasang Konst. JTM 1 Fasa SA5-3 Unit 20,000
21 sa5-4Upah Pasang Konst. JTM 1 Fasa SA5-4 Unit 20,000
22 sa5' Upah Pasang Konst. JTM 1 Fasa SA5' Unit 18,000
23 sa5-1'Upah Pasang Konst. JTM 1 Fasa SA5-1' Unit 18,000
24 sa5-2'Upah Pasang Konst. JTM 1 Fasa SA5-2' Unit 18,000
25 sa5-3'Upah Pasang Konst. JTM 1 Fasa SA5-3' Unit 18,000
26 sa5-4'Upah Pasang Konst. JTM 1 Fasa SA5-4' Unit 18,000
27 sa6 Upah Pasang Konst. JTM 1 Fasa SA6 Unit 42,900
28 sa6-nUpah Pasang Konst. JTM 1 Fasa SA6-N Unit 42,900
29 sa6' Upah Pasang Konst. JTM 1 Fasa SA6' Unit 42,900
30 sa7 Upah Pasang Konst. JTM 1 Fasa SA7 Unit 23,400
31 sa7-aUpah Pasang Konst. JTM 1 Fasa SA7-A Unit 23,400
32 sa8 Upah Pasang Konst. JTM 1 Fasa SA8 Unit 42,900
33 sa8-aUpah Pasang Konst. JTM 1 Fasa SA8-A Unit 42,900
34 sa9 Upah Pasang Konst. JTM 1 Fasa SA9 Unit 31,200
35 sa9-nUpah Pasang Konst. JTM 1 Fasa SA9-N Unit 31,200
KONSTRUKSI JTM 3 PHASA -
1 cc1 Upah Pasang Konst. JTM 3 Fasa CC1 Unit 34,300
2 cc1-nUpah Pasang Konst. JTM 3 Fasa CC1-N Unit 34,300
3 cc1-1Upah Pasang Konst. JTM 3 Fasa CC1-1 Unit 34,300
4 cc1-1Upah Pasang Konst. JTM 3 Fasa CC1-1N Unit 34,300
5 cc1-aUpah Pasang Konst. JTM 3 Fasa CC1-A Unit 15,600
6 cc1' Upah Pasang Konst. JTM 3 Fasa CC1' Unit 15,600
7 cc1-1'Upah Pasang Konst. JTM 3 Fasa CC1-1' Unit 55,300
8 cc1-a'Upah Pasang Konst. JTM 3 Fasa CC1-A' Unit 55,300
9 cc2 Upah Pasang Konst. JTM 3 Fasa CC2 Unit 28,800
10 cc2-1Upah Pasang Konst. JTM 3 Fasa CC2-1 Unit 48,300
11 cc2-aUpah Pasang Konst. JTM 3 Fasa CC2-A Unit 48,300
12 cc2-nUpah Pasang Konst. JTM 3 Fasa CC2-N Unit 28,800
13 cc2-1Upah Pasang Konst. JTM 3 Fasa CC2-1N Unit 52,200
14 cc2' Upah Pasang Konst. JTM 3 Fasa CC2' Unit 52,200
15 cc2-1'Upah Pasang Konst. JTM 3 Fasa CC2-1' Unit 49,900
16 cc2-a'Upah Pasang Konst. JTM 3 Fasa CC2-A' Unit 23,400
17 cc3 Upah Pasang Konst. JTM 3 Fasa CC3 Unit 23,400
18 cc3-vUpah Pasang Konst. JTM 3 Fasa CC3-VN Unit 24,900
19 cc3' Upah Pasang Konst. JTM 3 Fasa CC3' Unit 24,900
20 cc4-1Upah Pasang Konst. JTM 3 Fasa CC4-1 Unit 24,900
21 cc5-1Upah Pasang Konst. JTM 3 Fasa CC5-1 Unit 24,900
22 cc7 Upah Pasang Konst. JTM 3 Fasa CC7 Unit 21,800
23 cc7-1Upah Pasang Konst. JTM 3 Fasa CC7-1 Unit 21,800
24 cc7-1Upah Pasang Konst. JTM 3 Fasa CC7-N Unit 21,800
25 cc7' Upah Pasang Konst. JTM 3 Fasa CC7' Unit 21,800
26 cc7-1'Upah Pasang Konst. JTM 3 Fasa CC7-1' Unit 21,800
27 cc8 Upah Pasang Konst. JTM 3 Fasa CC8 Unit 44,400
28 cc8-aUpah Pasang Konst. JTM 3 Fasa CC8-A Unit 44,400
29 cc8-nUpah Pasang Konst. JTM 3 Fasa CC8-N Unit 44,400
30 cc8-aUpah Pasang Konst. JTM 3 Fasa CC8-AN Unit 24,900
31 cc8' Upah Pasang Konst. JTM 3 Fasa CC8' Unit 24,900
32 cc8-a'Upah Pasang Konst. JTM 3 Fasa CC8-A' Unit 45,200
33 cc9 Upah Pasang Konst. JTM 3 Fasa CC9 Unit 45,200
34 cc9-nUpah Pasang Konst. JTM 3 Fasa CC9-N Unit 34,300

3 - 120
KO HARGA
NO URAIAN SAT KETERANGAN
DE SATUAN
35 cc9' Upah Pasang Konst. JTM 3 Fasa CC9' Unit 34,300
36 cc10 Upah Pasang Konst. JTM 3 Fasa CC10 Unit 34,300
37 cc10-Upah Pasang Konst. JTM 3 Fasa CC10-N Unit 34,300
38 cc10' Upah Pasang Konst. JTM 3 Fasa CC10' Unit 34,300
39 cc11 Upah Pasang Konst. JTM 3 Fasa CC11 Unit 34,300
40 cc11-Upah Pasang Konst. JTM 3 Fasa CC11-N Unit 15,600
41 cc11' Upah Pasang Konst. JTM 3 Fasa CC11' Unit 15,600
1 sc1 Upah Pasang Konst. JTM 3 Fasa SC1 Unit 34,300
2 sc1-nUpah Pasang Konst. JTM 3 Fasa SC1-N Unit 34,300
3 sc1-1Upah Pasang Konst. JTM 3 Fasa SC1-1 Unit 34,300
4 sc1-1Upah Pasang Konst. JTM 3 Fasa SC1-1N Unit 34,300
5 sc1-aUpah Pasang Konst. JTM 3 Fasa SC1-A Unit 15,600
6 sc1' Upah Pasang Konst. JTM 3 Fasa SC1' Unit 15,600
7 sc1-1'Upah Pasang Konst. JTM 3 Fasa SC1-1' Unit 50,000
8 sc1-a'Upah Pasang Konst. JTM 3 Fasa SC1-A' Unit 50,000
9 sc2 Upah Pasang Konst. JTM 3 Fasa SC2 Unit 28,800
10 sc2-1Upah Pasang Konst. JTM 3 Fasa SC2-1 Unit 48,300
11 sc2-1Upah Pasang Konst. JTM 3 Fasa SC2-1n Unit 48,300
12 sc2-aUpah Pasang Konst. JTM 3 Fasa SC2-A Unit 28,800
13 sc2-nUpah Pasang Konst. JTM 3 Fasa SC2-N Unit 52,200
14 sc2' Upah Pasang Konst. JTM 3 Fasa SC2' Unit 52,200
15 sc2-1'Upah Pasang Konst. JTM 3 Fasa SC2-1' Unit 49,900
16 sc2-a'Upah Pasang Konst. JTM 3 Fasa SC2-A' Unit 23,400
17 sc3 Upah Pasang Konst. JTM 3 Fasa SC3 Unit 23,400
18 sc3-vUpah Pasang Konst. JTM 3 Fasa SC3-VN Unit 24,900
19 sc3' Upah Pasang Konst. JTM 3 Fasa SC3' Unit 24,900
20 sc4-1Upah Pasang Konst. JTM 3 Fasa SC4-1 Unit 24,900
21 sc5-1Upah Pasang Konst. JTM 3 Fasa SC5-1 Unit 24,900
22 sc7 Upah Pasang Konst. JTM 3 Fasa SC7 Unit 21,800
23 sc7-1Upah Pasang Konst. JTM 3 Fasa SC7-1 Unit 21,800
24 sc7-1Upah Pasang Konst. JTM 3 Fasa SC7-N Unit 21,800
25 sc7' Upah Pasang Konst. JTM 3 Fasa SC7' Unit 21,800
26 sc7-1'Upah Pasang Konst. JTM 3 Fasa SC7-1' Unit 21,800
27 sc8 Upah Pasang Konst. JTM 3 Fasa SC8 Unit 44,400
28 sc8-aUpah Pasang Konst. JTM 3 Fasa SC8-A Unit 44,400
29 sc8-aUpah Pasang Konst. JTM 3 Fasa SC8-AN Unit 44,400
30 sc8-nUpah Pasang Konst. JTM 3 Fasa SC8-N Unit 24,900
31 sc8' Upah Pasang Konst. JTM 3 Fasa SC8' Unit 24,900
32 sc8-a'Upah Pasang Konst. JTM 3 Fasa SC8-A' Unit 45,200
33 sc9 Upah Pasang Konst. JTM 3 Fasa SC9 Unit 45,200
34 sc9-nUpah Pasang Konst. JTM 3 Fasa SC9-N Unit 34,300
35 sc9' Upah Pasang Konst. JTM 3 Fasa SC9' Unit 34,300
36 sc10 Upah Pasang Konst. JTM 3 Fasa SC10 Unit 34,300
37 sc10-Upah Pasang Konst. JTM 3 Fasa SC10-N Unit 34,300
38 sc10' Upah Pasang Konst. JTM 3 Fasa SC10' Unit 34,300
39 sc11 Upah Pasang Konst. JTM 3 Fasa SC11 Unit 34,300
40 sc11-Upah Pasang Konst. JTM 3 Fasa SC11-N Unit 15,600
41 sc11' Upah Pasang Konst. JTM 3 Fasa SC11' Unit 15,600
AKSESORIES JARINGAN -
1 cm2- Jasa Pemasangan CM2-11 Unit 39,000
2 cm2- Jasa Pemasangan CM2-11M Unit 39,000
3 cm2- Jasa Pemasangan CM2-12 Unit 8,500
4 cm2-1Jasa Pemasangan CM2-12A Unit 11,700
5 cm2- Jasa Pemasangan CM2-15 Unit 101,400
6 cm3- Jasa Pemasangan CM3-16 Unit 897,000
7 cm5- Jasa Pemasangan CM5-2 Unit 17,900
8 cm5- Jasa Pemasangan CM5-3 Unit 15,600
9 cm5- Jasa Pemasangan CM5-4 Unit 16,300

4 - 120
KO HARGA
NO URAIAN SAT KETERANGAN
DE SATUAN
10 cm5- Jasa Pemasangan CM5-5 Unit 17,900
11 cm5- Jasa Pemasangan CM5-6 Unit 42,100
12 cm5- Jasa Pemasangan CM5-8 Unit 32,700
13 cm5- Jasa Pemasangan CM5-9 Unit 42,100
14 cm5- Upah Pasang Acc.Jar CM5-10 Unit 42,100
15 cm5- Jasa Pemasangan CM5-12 Unit 31,900
16 cm5- Jasa Pemasangan CM5-13 Unit 31,900
17 cm5- Jasa Pemasangan CM5-16 Unit 38,200
18 cm5- Jasa Pemasangan CM5-20 Unit 31,900
19 cm5- Jasa Pasang CM5-24 (RECL. 3 PHASA 20 kV) Unit 2,500,000
20 p12c-Jasa Pemasangan P12C-1 Unit 24,100
21 p12c-Jasa Pemasangan P12C-2 Unit 35,100
22 ce1-1Jasa Pemasangan CE1-1 Unit 24,100
23 ce1-2Jasa Pemasangan CE1-2 Unit 24,100
24 ce1-3Jasa Pemasangan CE1-3 Unit 24,100
25 ce2-1Jasa Pemasangan CE2-1 Unit 32,700
26 ce2-2Jasa Pemasangan CE2-2 Unit 32,700
27 ce2-3Jasa Pemasangan CE2-3 Unit 29,600
28 ce5-1Jasa Pemasangan CE5-1 Unit 95,900
29 ce5-2Jasa Pemasangan CE5-2 Unit 95,900
30 ce6-1Jasa Pemasangan CE6-1 Unit 35,100
31 m8-bJasa Pasang LVCB empat jurusan 1 tiang lengkap M8-B1 Unit 550,000
32 sm2-1Jasa Pemasangan SM2-11 Unit 43,600
33 sm2- Jasa Pemasangan SM2-11M Unit 50,700
34 sm2-1Jasa Pemasangan SM2-12 Unit 9,300
35 sm2-1Jasa Pemasangan SM2-12A Unit 12,400
36 sm2-1Jasa Pemasangan SM2-15 Unit 127,100
37 sm3-1Jasa Pemasangan SM3-16 Unit 1,200,000
38 sm5-2Jasa Pemasangan SM5-2 Unit 17,900
39 sm5-3Jasa Pemasangan SM5-3 Unit 15,600
40 sm5-4Jasa Pemasangan SM5-4 Unit 17,900
41 sm5-5Jasa Pemasangan SM5-5 Unit 17,900
42 sm5-6Jasa Pemasangan SM5-6 Unit 45,200
43 sm5-8Jasa Pemasangan SM5-8 Unit 3,300
44 sm5-9Jasa Pemasangan SM5-9 Unit 45,200
45 sm5-1Upah Pasang Acc.Jar SM5-10 Unit 45,200
46 sm5-1Jasa Pemasangan SM5-12 Unit 33,500
47 sm5-1Jasa Pemasangan SM5-13 Unit 33,500
48 sm5-1Jasa Pemasangan SM5-16 Unit 39,700
49 sm5-2Jasa Pemasangan SM5-20 Unit 33,500
50 sm5-2Jasa Pasang SM5-24 (RECL. 3 PHASA 20 kV) Unit 2,900,000
51 p12s-Jasa Pemasangan P12S-1 Unit 24,100
52 p12s-Jasa Pemasangan P12S-2 Unit 35,100
53 se1-1Jasa Pemasangan SE1-1 Unit 24,100
54 se1-2Jasa Pemasangan SE1-2 Unit 24,100
55 se1-3Jasa Pemasangan SE1-3 Unit 24,100
56 se2-1Jasa Pemasangan SE2-1 Unit 32,700
57 se2-2Jasa Pemasangan SE2-2 Unit 32,700
58 se2-3Jasa Pemasangan SE2-3 Unit 29,600
59 se5-1Jasa Pemasangan SE5-1 Unit 95,900
60 se5-2Jasa Pemasangan SE5-2 Unit 95,900
61 se6-1Jasa Pemasangan SE6-1 Unit 35,100
62 f1-2 Upah Pasang Acc.Jar F1-2 Unit 27,300
63 f1-3 Upah Pasang Acc.Jar F1-3 Unit 25,000
64 fdg Upah Pasang Acc.Jar FDG Unit 580,000
65 p4 Upah Pasang Acc.Jar Penghalang Panjat Unit 7,800
66 m8-a Upah Pasang Acc.Jar LVCB 2 Jurusan Unit 460,000
67 m8-a Upah Pasang Acc.Jar LVCB 2 Jurusan (M8-A2) Unit 460,000

5 - 120
KO HARGA
NO URAIAN SAT KETERANGAN
DE SATUAN
68 sec3pUpah Pasang Acc.Jar Sectionalizer 3 Fasa Unit 2,600,000
69 m8-bJasa Pasang LVCB empat jurusan lengkap M8-B2 Unit 630,000
70 jpds Upah Pasang Acc.Jar Disconecting Switch Unit 1,100,000
71 vangnUpah Pasang Acc.Jar Konstruksi Vangnet Unit 124,800
72 jarva Upah Pembuatan & Pasang Acc.Jar Jaring Vangnet Per 1 m 9,300
KONSTRUKSI JTM 1 PHASA - 3 PHASA -
1 cb1 Upah Pasang Konst. JTM 1-3 Fasa CB1 Unit 23,400
2 cb1-aUpah Pasang Konst. JTM 1-3 Fasa CB1-A Unit 23,400
3 cb2 Upah Pasang Konst. JTM 1-3 Fasa CB2 Unit 27,300
4 cb3 Upah Pasang Konst. JTM 1-3 Fasa CB3 Unit 27,300
5 cb4 Upah Pasang Konst. JTM 1-3 Fasa CB4 Unit 32,700
6 cb5 Upah Pasang Konst. JTM 1-3 Fasa CB5 Unit 76,400
7 sb1 Upah Pasang Konst. JTM 1-3 Fasa SB1 Unit 23,400
8 sb1-aUpah Pasang Konst. JTM 1-3 Fasa SB1-A Unit 23,400
9 sb2 Upah Pasang Konst. JTM 1-3 Fasa SB2 Unit 27,300
10 sb3 Upah Pasang Konst. JTM 1-3 Fasa SB3 Unit 27,300
11 sb4 Upah Pasang Konst. JTM 1-3 Fasa SB4 Unit 32,700
12 sb5 Upah Pasang Konst. JTM 1-3 Fasa SB5 Unit 76,400
KONSTRUKSI JTM DOUBLE CIRCUIT -
1 dc-c1Upah Pasang Konst. JTM Double Circuit DC-C1V Unit 102,100
2 dc-c1Upah Pasang Konst. JTM Double Circuit DC-C1-1V Unit 102,100
3 dc-c1Upah Pasang Konst. JTM Double Circuit DC-C1-1VN Unit 103,700
4 dc-c1Upah Pasang Konst. JTM Double Circuit DC-C1-1H Unit 103,700
5 dc-c1Upah Pasang Konst. JTM Double Circuit DC-C1-AHN Unit 103,700
6 dc-c2Upah Pasang Konst. JTM Double Circuit DC-C2-1V Unit 124,800
7 dc-c2Upah Pasang Konst. JTM Double Circuit DC-C2-AH Unit 124,800
8 dc-c2Upah Pasang Konst. JTM Double Circuit DC-C2-AHN Unit 127,100
9 dc-c2Upah Pasang Konst. JTM Double Circuit DC-C2-AVN Unit 127,100
10 dc-c2Upah Pasang Konst. JTM Double Circuit DC-C2-1BN Unit 128,700
11 dc-c4Upah Pasang Konst. JTM Double Circuit DC-C4-N Unit 131,000
12 dc-c7Upah Pasang Konst. JTM Double Circuit DC-C7-N Unit 155,200
13 dc-c8Upah Pasang Konst. JTM Double Circuit DC-C8 Unit 258,900
14 dc-c8Upah Pasang Konst. JTM Double Circuit DC-C8-N Unit 258,900
SKUTM/SKTM -
1 db1 Upah Pasang Konst. SKUTM DB01 (Suspension Assembly) Unit 15,600
2 db2 Upah Pasang Konst. SKUTM DB02 (Small Angle Assembly) Unit 23,400
3 db3 Upah Pasang Konst. SKUTM DB03 (Medium Angle Assembly) Unit 31,200
4 db4 Upah Pasang Konst. SKUTM DB04 (Large Angle Assembly) Unit 25,700
5 db5 Upah Pasang Konst. SKUTM DB05 (Adjustable Dead End Assembly) Unit 37,400
6 db6 Upah Pasang Konst. SKUTM DB06 (Fixed Dead End Assembly)) Unit 28,800
PENGHANTAR TM PER 50 M -
1 3x240Upah Pasang Penghantar TM A3C 3x240 + 1x150mm² Per 50 m 335,000
2 3x240Upah Pasang Penghantar TM A3C 3x240 + 1x120mm² Per 50 m 335,000
3 3x150Upah Pasang Penghantar TM A3C 3x150 + 1x150mm² Per 50 m 249,600
4 3x150Upah Pasang Penghantar TM A3C 3x150 + 1x70mm² Per 50 m 249,600
5 3x70+Upah Pasang Penghantar TM A3C 3x70 + 1x70mm² Per 50 m 226,200
6 3x70+Upah Pasang Penghantar TM A3C 3x70 + 1x50mm² Per 50 m 210,600
7 3x70+Upah Pasang Penghantar TM A3C 3x70 + 1x35mm² Per 50 m 210,600
8 3x35+Upah Pasang Penghantar TM A3C 3x35 + 1x35mm² Per 50 m 171,600
9 1x150Upah Pasang Penghantar TM A3C 1x150 + 1x70mm² Per 50 m 171,600
10 1x120Upah Pasang Penghantar TM A3C 1x120 + 1x70mm² Per 50 m 171,600
11 1x70+Upah Pasang Penghantar TM A3C 1x70 + 1x70mm² Per 50 m 163,800
12 1x70+Upah Pasang Penghantar TM A3C 1x70 + 1x50mm² Per 50 m 163,800
13 1x70+Upah Pasang Penghantar TM A3C 1x70 + 1x35mm² Per 50 m 140,400
14 1x35+Upah Pasang Penghantar TM A3C 1x35 + 1x35mm² Per 50 m 101,400
15 3x240Upah Pasang Penghantar TM A3C 3x240mm² Per 50 m 280,000
16 3x150Upah Pasang Penghantar TM A3C 3x150mm² Per 50 m 230,000
17 3x70jUpah Pasang Penghantar TM A3C 3x70mm² Per 50 m 179,400

6 - 120
KO HARGA
NO URAIAN SAT KETERANGAN
DE SATUAN
18 3x35jUpah Pasang Penghantar TM A3C 3x35mm² Per 50 m 117,000
19 2x240Upah Pasang Penghantar TM A3C 2x240mm² Per 50 m 195,000
20 2x150Upah Pasang Penghantar TM A3C 2x150mm² Per 50 m 171,600
21 2x70jUpah Pasang Penghantar TM A3C 2x70mm² Per 50 m 128,700
22 2x35jUpah Pasang Penghantar TM A3C 2x35mm² Per 50 m 97,500
23 1x240Upah Pasang Penghantar TM A3C 1x240mm² Per 50 m 93,600
24 1x150Upah Pasang Penghantar TM A3C 1x150mm² Per 50 m 89,700
25 1x70jUpah Pasang Penghantar TM A3C 1x70mm² Per 50 m 70,200
26 1x50jUpah Pasang Penghantar TM A3C 1x50mm² Per 50 m 70,200
27 1x35jUpah Pasang Penghantar TM A3C 1x35mm² Per 50 m 54,600
28 3x240Upah Pasang Penghantar TM A3CS 3x240 + 1x150mm² Per 50 m 400,000
29 3x240Upah Pasang Penghantar TM A3CS 3x240 + 1x120mm² Per 50 m 400,000
30 3x150Upah Pasang Penghantar TM A3CS 3x150 + 1x150mm² Per 50 m 295,600
31 3x150Upah Pasang Penghantar TM A3CS 3x150 + 1x70mm² Per 50 m 295,600
32 3x70+Upah Pasang Penghantar TM A3CS 3x70 + 1x70mm² Per 50 m 259,500
33 3x70+Upah Pasang Penghantar TM A3CS 3x70 + 1x50mm² Per 50 m 241,000
34 3x70+Upah Pasang Penghantar TM A3CS 3x70 + 1x35mm² Per 50 m 241,000
35 3x35+Upah Pasang Penghantar TM A3CS 3x35 + 1x35mm² Per 50 m 187,200
36 1x150Upah Pasang Penghantar TM A3CS 1x150 + 1x70mm² Per 50 m 220,000
37 1x120Upah Pasang Penghantar TM A3CS 1x120 + 1x70mm² Per 50 m 200,000
38 1x70+Upah Pasang Penghantar TM A3CS 1x70 + 1x70mm² Per 50 m 175,000
39 1x70+Upah Pasang Penghantar TM A3CS 1x70 + 1x50mm² Per 50 m 175,000
40 1x70+Upah Pasang Penghantar TM A3CS 1x70 + 1x35mm² Per 50 m 151,300
41 1x35+Upah Pasang Penghantar TM A3CS 1x35 + 1x35mm² Per 50 m 114,600
42 3x240Upah Pasang Penghantar TM A3CS 3x240mm² Per 50 m 300,000
43 3x150Upah Pasang Penghantar TM A3CS 3x150mm² Per 50 m 230,000
44 3x70aUpah Pasang Penghantar TM A3CS 3x70mm² Per 50 m 200,000
45 3x35aUpah Pasang Penghantar TM A3CS 3x35mm² Per 50 m 151,300
46 2x240Upah Pasang Penghantar TM A3CS 2x240mm² Per 50 m 220,000
47 2x150Upah Pasang Penghantar TM A3CS 2x150mm² Per 50 m 205,500
48 2x70aUpah Pasang Penghantar TM A3CS 2x70mm² Per 50 m 151,300
49 2x35aUpah Pasang Penghantar TM A3CS 2x35mm² Per 50 m 115,300
50 1x240Upah Pasang Penghantar TM A3CS 1x240mm² Per 50 m 117,000
51 1x150Upah Pasang Penghantar TM A3CS 1x150mm² Per 50 m 107,600
52 1x70aUpah Pasang Penghantar TM A3CS 1x70mm² Per 50 m 97,300
53 1x50aUpah Pasang Penghantar TM A3CS 1x50mm² Per 50 m 97,300
54 1x35aUpah Pasang Penghantar TM A3CS 1x35mm² Per 50 m 79,300
55 3x240Upah Pasang Kabel MVTIC 3 x 240 + N 95 mm² Per 50 m 292,500
PENGHANTAR TM PER KMS -
1 3x24 Upah Pasang Penghantar TM A3C 3x240 + 1x150mm² Per Kms Per Kms 6,500,000
2 3x24 Upah Pasang Penghantar TM A3C 3x240 + 1x120mm² Per Kms Per Kms 6,500,000
3 3x15 Upah Pasang Penghantar TM A3C 3x150 + 1x150mm² Per Kms Per Kms 4,500,000
4 3x15 Upah Pasang Penghantar TM A3C 3x150 + 1x70mm² Per Kms Per Kms 4,500,000
5 3x70 Upah Pasang Penghantar TM A3C 3x70 + 1x70mm² Per Kms Per Kms 4,200,000
6 3x70 Upah Pasang Penghantar TM A3C 3x70 + 1x50mm² Per Kms Per Kms 4,200,000
7 3x70 Upah Pasang Penghantar TM A3C 3x70 + 1x35mm² Per Kms Per Kms 4,200,000
8 3x35 Upah Pasang Penghantar TM A3C 3x35 + 1x35mm² Per Kms Per Kms 3,200,000
9 1x15 Upah Pasang Penghantar TM A3C 1x150 + 1x70mm² Per Kms Per Kms 3,200,000
10 1x12 Upah Pasang Penghantar TM A3C 1x120 + 1x70mm² Per Kms Per Kms 3,200,000
11 1x70 Upah Pasang Penghantar TM A3C 1x70 + 1x70mm² Per Kms Per Kms 3,100,000
12 1x70 Upah Pasang Penghantar TM A3C 1x70 + 1x50mm² Per Kms Per Kms 3,100,000
13 1x70 Upah Pasang Penghantar TM A3C 1x70 + 1x35mm² Per Kms Per Kms 2,808,000
14 1x35 Upah Pasang Penghantar TM A3C 1x35 + 1x35mm² Per Kms Per Kms 2,028,000
15 3x240Upah Pasang Penghantar TM A3C 3x240mm² Per Kms Per Kms 5,694,000
16 3x150Upah Pasang Penghantar TM A3C 3x150mm² Per Kms Per Kms 4,680,000
17 3x70jUpah Pasang Penghantar TM A3C 3x70mm² Per Kms Per Kms 3,588,000
18 3x35jUpah Pasang Penghantar TM A3C 3x35mm² Per Kms Per Kms 2,340,000
19 2x240Upah Pasang Penghantar TM A3C 2x240mm² Per Kms Per Kms 3,900,000

7 - 120
KO HARGA
NO URAIAN SAT KETERANGAN
DE SATUAN
20 2x150Upah Pasang Penghantar TM A3C 2x150mm² Per Kms Per Kms 3,432,000
21 2x70jUpah Pasang Penghantar TM A3C 2x70mm² Per Kms Per Kms 2,574,000
22 2x35jUpah Pasang Penghantar TM A3C 2x35mm² Per Kms Per Kms 1,950,000
23 1x240Upah Pasang Penghantar TM A3C 1x240mm² Per Kms Per Kms 1,872,000
24 1x150Upah Pasang Penghantar TM A3C 1x150mm² Per Kms Per Kms 1,794,000
25 1x70jUpah Pasang Penghantar TM A3C 1x70mm² Per Kms Per Kms 1,404,000
26 1x50jUpah Pasang Penghantar TM A3C 1x50mm² Per Kms Per Kms 1,404,000
27 1x35jUpah Pasang Penghantar TM A3C 1x35mm² Per Kms Per Kms 1,092,000
28 3x240Upah Pasang Penghantar TM A3CS 3x240 + 1x150mm² Per Kms Per Kms 8,065,200
29 3x240Upah Pasang Penghantar TM A3CS 3x240 + 1x120mm² Per Kms Per Kms 8,065,200
30 3x150Upah Pasang Penghantar TM A3CS 3x150 + 1x150mm² Per Kms Per Kms 5,500,000
31 3x150Upah Pasang Penghantar TM A3CS 3x150 + 1x70mm² Per Kms Per Kms 5,500,000
32 3x70+Upah Pasang Penghantar TM A3CS 3x70 + 1x70mm² Per Kms Per Kms 5,500,000
33 3x70+Upah Pasang Penghantar TM A3CS 3x70 + 1x50mm² Per Kms Per Kms 4,820,400
34 3x70+Upah Pasang Penghantar TM A3CS 3x70 + 1x35mm² Per Kms Per Kms 4,820,400
35 3x35+Upah Pasang Penghantar TM A3CS 3x35 + 1x35mm² Per Kms Per Kms 3,744,000
36 1x150Upah Pasang Penghantar TM A3CS 1x150 + 1x70mm² Per Kms Per Kms 4,461,600
37 1x120Upah Pasang Penghantar TM A3CS 1x120 + 1x70mm² Per Kms Per Kms 4,126,200
38 1x70+Upah Pasang Penghantar TM A3CS 1x70 + 1x70mm² Per Kms Per Kms 3,748,600
39 1x70+Upah Pasang Penghantar TM A3CS 1x70 + 1x50mm² Per Kms Per Kms 3,748,600
40 1x70+Upah Pasang Penghantar TM A3CS 1x70 + 1x35mm² Per Kms Per Kms 3,027,900
41 1x35+Upah Pasang Penghantar TM A3CS 1x35 + 1x35mm² Per Kms Per Kms 2,293,200
42 3x240Upah Pasang Penghantar TM A3CS 3x240mm² Per Kms Per Kms 6,630,000
43 3x150Upah Pasang Penghantar TM A3CS 3x150mm² Per Kms Per Kms 5,191,600
44 3x70aUpah Pasang Penghantar TM A3CS 3x70mm² Per Kms Per Kms 4,470,900
45 3x35aUpah Pasang Penghantar TM A3CS 3x35mm² Per Kms Per Kms 3,027,900
46 2x240Upah Pasang Penghantar TM A3CS 2x240mm² Per Kms Per Kms 4,470,900
47 2x150Upah Pasang Penghantar TM A3CS 2x150mm² Per Kms Per Kms 4,110,600
48 2x70aUpah Pasang Penghantar TM A3CS 2x70mm² Per Kms Per Kms 3,027,900
49 2x35aUpah Pasang Penghantar TM A3CS 2x35mm² Per Kms Per Kms 2,307,200
50 1x240Upah Pasang Penghantar TM A3CS 1x240mm² Per Kms Per Kms 2,341,500
51 1x150Upah Pasang Penghantar TM A3CS 1x150mm² Per Kms Per Kms 2,152,800
52 1x70aUpah Pasang Penghantar TM A3CS 1x70mm² Per Kms Per Kms 1,946,800
53 1x50aUpah Pasang Penghantar TM A3CS 1x50mm² Per Kms Per Kms 1,946,800
54 1x35aUpah Pasang Penghantar TM A3CS 1x35mm² Per Kms Per Kms 1,586,500
55 3x240Upah Pasang Kabel MVTIC 3 x 240 + N 95 mm² Per Kms Per 50 m 5,850,000
KONSTRUKSI JTR -
1 cj2 Upah Pasang Konst. JTR CJ2 Unit 15,400
2 cj3 Upah Pasang Konst. JTR CJ3 Unit 15,900
3 cj4 Upah Pasang Konst. JTR CJ4 Unit 21,400
4 cj4a Upah Pasang Konst. JTR CJ4-A Unit 11,600
5 cj5 Jasa Pemasangan CJ5 Unit 17,800
6 cj6 Jasa Pemasangan CJ6 Unit 21,400
7 cj6x Jasa Pemasangan CJ6-X Unit 17,800
8 cj7 Jasa Pemasangan CJ7 Unit 27,600
9 cj8 Jasa Pemasangan CJ8 Unit 17,800
10 cj10 Jasa Pemasangan CJ10 Unit 29,300
11 bdcj5Jasa Pemasangan CJ5T Unit 15,600
12 bdcj6Jasa Pemasangan CJ6T Unit 21,900
13 bdcj7Jasa Pemasangan CJ7T Unit 16,300
14 cmj6tJasa Pemasangan MJ6-T Unit 11,700
15 sj2 Upah Pasang Konst. JTR SJ2 Unit 15,400
16 sj3 Upah Pasang Konst. JTR SJ3 Unit 15,900
17 sj4 Upah Pasang Konst. JTR SJ4 Unit 21,400
18 sj4a Upah Pasang Konst. JTR SJ4-A Unit 11,600
19 sj5 Jasa Pemasangan SJ5 Unit 17,800
20 sj6 Jasa Pemasangan SJ6 Unit 21,400
21 sj6x Jasa Pemasangan SJ6X Unit 17,800

8 - 120
KO HARGA
NO URAIAN SAT KETERANGAN
DE SATUAN
22 sj7 Jasa Pemasangan SJ7 Unit 27,600
23 sj8 Jasa Pemasangan SJ8 Unit 17,800
24 sj10 Jasa Pemasangan SJ10 Unit 29,300
25 j5-t Jasa Pemasangan J5-T Unit 15,600
26 j6-t Jasa Pemasangan J6-T Unit 21,900
27 j7-t Jasa Pemasangan J7-T Unit 16,300
28 mj6-tJasa Pemasangan MJ6-T Unit 11,700
29 b13b Upah Pasang Konst. JTR B13-B Unit 15,400
30 b13d Upah Pasang Konst. JTR B13-D Unit 15,400
31 b15b Upah Pasang Konst. JTR B15-B Unit 15,900
32 b15d Upah Pasang Konst. JTR B15-D Unit 15,900
33 b16b Upah Pasang Konst. JTR B16-B Unit 21,400
34 b16d Upah Pasang Konst. JTR B16-D Unit 21,400
35 b71b Upah Pasang Konst. JTR B71-B Unit 17,200
PENARIKAN HANTARAN JTR u/50 METER -
1 3x70+Upah Pasang Penghantar TR A3C 3x70 + 1x35mm² per 50 m 179,400
2 2x70+Upah Pasang Penghantar TR A3C 2x70 + 1x70mm² per 50 m 156,000
3 2x70+Upah Pasang Penghantar TR A3C 2x70 + 1x35mm² per 50 m 156,000
4 2x70jUpah Pasang Penghantar TR A3C 2x70mm² per 50 m 101,400
5 2x55+Upah Pasang Penghantar TR A3C 2x55 + 1x35mm² per 50 m 105,300
6 2x55jUpah Pasang Penghantar TR A3C 2x55mm² per 50 m 92,000
7 2x35jUpah Pasang Penghantar TR A3C 2x35mm² per 50 m 78,000
8 tx642Upah Pasang Penghantar TR TX # 6 ,4 , 2 per 50 m 54,900
9 tx14 Upah Pasang Penghantar TR TX # 1 / 0 & # 4/ 0 per 50 m 65,200
10 qx642Upah Pasang Penghantar TR QX # 6, 4, 2 per 50 m 61,000
11 qx24 Upah Pasang Penghantar TR QX # 2 / 0 & 4 / 0 per 50 m 79,600
12 lvtc3 Upah Pasang Penghantar TR LVTC 3x70 + 1x50mm² per 50 m 168,700
13 lvtc3 Upah Pasang Penghantar TR LVTC 3x50 + 1x35mm² per 50 m 127,000
14 lvtc3 Upah Pasang Penghantar TR LVTC 3x35 + 1x35mm² per 50 m 92,000
15 lvtc2 Upah Pasang Penghantar TR LVTC 2x70 + 1x50mm² per 50 m 135,300
16 lvtc2 Upah Pasang Penghantar TR LVTC 2x50 + 1x50mm² per 50 m 109,800
17 lvtc2 Upah Pasang Penghantar TR LVTC 2x50 + 1x35mm² per 50 m 109,800
18 lvtc2 Upah Pasang Penghantar TR LVTC 2x35 + 1x35mm² per 50 m 92,000
19 lvtc2 Upah Pasang Penghantar TR LVTC 2x25 + 1x25mm² per 50 m 92,000
PENGHANTAR TR PER KMS -
1 psgtr Upah Pasang Penghantar TR A3C 3x70 + 1x35mm² Per Kms Per Kms 3,588,000
2 psgtr Upah Pasang Penghantar TR A3C 2x70 + 1x70mm² Per Kms Per Kms 3,120,000
3 psgtr Upah Pasang Penghantar TR A3C 2x70 + 1x35mm² Per Kms Per Kms 3,120,000
4 psgtr Upah Pasang Penghantar TR A3C 2x70mm² Per Kms Per Kms 2,028,000
5 psgtr Upah Pasang Penghantar TR A3C 2x55 + 1x35mm² Per Kms Per Kms 2,106,000
6 psgtr Upah Pasang Penghantar TR A3C 2x55mm² Per Kms Per Kms 1,840,800
7 psgtr Upah Pasang Penghantar TR A3C 2x35mm² Per Kms Per Kms 1,560,000
8 psgtr Upah Pasang Penghantar TR TX # 6 ,4 , 2 Per Kms Per Kms 1,098,200
9 psgtr Upah Pasang Penghantar TR TX # 1 / 0 & # 4/ 0 Per Kms Per Kms 1,304,100
10 psgtr Upah Pasang Penghantar TR QX # 6, 4, 2 Per Kms Per Kms 1,221,400
11 psgtr Upah Pasang Penghantar TR QX # 2 / 0 & 4 / 0 Per Kms Per Kms 1,592,700
12 psgtr Upah Pasang Penghantar TR LVTC 3x70 + 1x50mm² Per Kms Per Kms 3,375,800
13 psgtr Upah Pasang Penghantar TR LVTC 3x50 + 1x35mm² Per Kms Per Kms 2,541,200
14 psgtr Upah Pasang Penghantar TR LVTC 3x35 + 1x35mm² Per Kms Per Kms 1,840,800
15 psgtr Upah Pasang Penghantar TR LVTC 2x70 + 1x50mm² Per Kms Per Kms 2,706,600
16 psgtr Upah Pasang Penghantar TR LVTC 2x50 + 1x50mm² Per Kms Per Kms 2,196,400
17 psgtr Upah Pasang Penghantar TR LVTC 2x50 + 1x35mm² Per Kms Per Kms 2,196,400
18 psgtr Upah Pasang Penghantar TR LVTC 2x35 + 1x35mm² Per Kms Per Kms 1,840,800
19 psgtr Upah Pasang Penghantar TR LVTC 2x25 + 1x25mm² Per Kms Per Kms 1,840,800
SAMBUNGAN RUMAH (SR) -
1 sr1.1 Upah Pasang Sambungan Rumah 1 Fasa Unit 19,500
2 sr1.2 Upah Pasang Sambungan Rumah 3 Fasa Unit 47,000
3 sr1 Upah Pasang SR + APP 1 Fasa Unit 39,000

9 - 120
KO HARGA
NO URAIAN SAT KETERANGAN
DE SATUAN
4 sr3 Upah Pasang SR + APP 3 Fasa Unit 78,000
5 srappUpah Pasang SR + APP 3 Fasa + Wiring Unit 429,000
6 srappUpah Pasang APP TM + Wiring Unit 585,000
7 jpkubUpah Pasang Cubicle Unit 936,000
8 bpkwUpah Bongkar & Pasang Kwh Meter Elektronik, serta Wiring Pengujian Unit 2,278,600
9 sr3pt upah pasang SR/APP 3 phasa daya 105 kVA sd 197 kVA Unit 179,400
10 sr3pt upah pasang SR/APP 3 phasa daya 53 kVA sd 82,5 kVA Unit 179,400
11 sr3pt upah pasang SR/APP 3 phasa daya 6 kVA sd 41,5 kVA Unit 140,400
12 sr1pt upah pasang SLTR 1 phasa daya 13.900 VA sd 22.000 VA Unit 109,200
13 sr1pt upah pasang SLTR 1 phasa daya 22.001 VA sd 44.000 VA Unit 109,200
TRAFO DISTRIBUSI -
1 251p Jasa Trafo 1 Phasa 25 KVA (CG105/106/136) Unit 268,200
2 501p Jasa Trafo 1 Phasa 50 KVA (CG105/106/136) Unit 268,200
3 502p Jasa Trafo 1 Phasa 50 KVA (CG107) Unit 445,300
4 503p3Jasa Trafo 3 Phasa 50 KVA 1 tiang (CG 312 A) Unit 780,000
5 1003pJasa Trafo 3 Phasa 100 KVA 1 tiang (CG 312 A) Unit 1,950,000
6 503p3Jasa Trafo 3 Phasa 50 KVA 2 tiang (CG 313) Unit 1,247,200
7 1003pJasa Trafo 3 Phasa 100 KVA 2 tiang (CG 313) Unit 2,340,000
8 1603pJasa Trafo 3 Phasa 160 KVA 2 tiang (CG 313) Unit 2,496,000
9 2003pJasa Trafo 3 Phasa 200 KVA 2 tiang (CG 313) Unit 2,730,000
KABEL TANAH -
1 jp70oUpah Pasang Terminating Kabel 1 x 70 mm² OD Unit 117,000
2 jp3x7Upah Pasang Terminating Kabel 3 x 70 mm² ID Unit 280,800
3 jp3x7Upah Pasang Terminating Kabel 3 x 70 mm² OD Unit 312,000
4 jp95i Upah Pasang Terminating Kabel 3 x 95 mm² ID Unit 280,800
5 jp95oUpah Pasang Terminating Kabel 3 x 95 mm² OD Unit 312,000
6 jp3x1Upah Pasang Terminating Kabel 3 x 150 mm² ID Unit 323,700
7 jp3x1Upah Pasang Terminating Kabel 3 x 150 mm² OD Unit 331,500
8 jp3x2Upah Pasang Terminating Kabel 3 x 240 mm² ID Unit 327,600
9 jp3x2Upah Pasang Terminating Kabel 3 x 240 mm² OD Unit 374,400
10 jpter Upah Pasang Terminating Kabel 3 x 300 mm² ID Unit 327,600
11 jpter Upah Pasang Terminating Kabel 3 x 300 mm² OD Unit 374,400

12 Upah Pasang Sepatu kabel bimetal 240 - 300 mm² (2 lubang)


jpska Unit 7,000

13 Upah Pasang Sepatu kabel bimetal 150 mm² (2 lubang)


jpska Unit 6,200

14 Upah Pasang Kabel Tanah XLPE 3 x 300 mm² (three core) Per 50 m 253,900
jpxlp

15 Upah Pasang Kabel Tanah XLPE 3 x 240 mm² (three core)


jptxl Per 50 m 253,900
16 jpnyyUpah Pasang Kabel NYY 1 x 70 mm² Per 1 m 600
17 jpnyyUpah Pasang Kabel NYY 1 x 150 mm² Per 1 m 700
18 jpna1Upah Pasang Kabel NA2XS2Y 20 KV 3 x 150 mm² Per 1 m 9,300
19 jpna9Upah Pasang Kabel NA2XS2Y 20 KV 3 x 95 mm² Per 1 m 9,300
20 jpna7Upah Pasang Kabel NA2XS2Y 20 KV 3 x 70 mm² Per 1 m 9,300
21 jpna1Upah Pasang Kabel NA2XS2Y 20 KV 1 x 70 mm² Per 1 m 4,293
22 jpgaliGalian Kabel - m³ Per m³ 101,400
PEMBUATAN SALURAN KABEL GI -
A PEMBUATAN SALURAN KABEL OUTDOOR -
1 pp1 Persiapan Pekerjaan ls 282,000
2 pp2 Pemasangan Bouwplank m2 15,600
3 pp3 Galian Tanah m3 23,400
4 pp4 Pembuangan Tanah m3 23,400
B PEMBUATAN GALIAN TANAH
1 pp10 Galian Tanah keras sedalam 1 meter Mtr 54,600
2 pp11 Urugan Pasir Dipadatkan m3 97,500
3 pp12 Urugan Tanah Dipadatkan m3 51,700
4 pp13 Pembuangan sisa tanah Mtr 23,400

10 - 120
KO HARGA
NO URAIAN SAT KETERANGAN
DE SATUAN
5 pp14 Pekerjaan Aspal Mtr 46,800
HARGA SATUAN DASAR SEWA ALAT BERAT -
1 alatbeHydraulic Excavator (Komatsu) jam 130,400
2 alatbeBulldozer, 4 jam/hari jam 191,100
3 alatbeLoader Komatsu jam 120,900
4 alatbeDump Truk 3.5 ton jam 144,300
5 alatbeMesin Gilas 8-10ton jam 97,600
6 alatbeTandem Roller jam 120,900
7 alatbeMotor Grader 5jam/hari jam 144,300
8 alatbeAir Compressor jam 46,800
9 alatbeTamper/ Vibrator Plate jam 74,100
10 alatbeJack Hammer jam 74,100
11 alatbeRoller vibrator self 7 ton jam 74,100
12 alatbeConcrete Mixer jam 17,625
13 alatbeConcrete Vibrator jam 17,625
14 alatbeWater tank truck jam 156,000
HARGA SATUAN DASAR PEKERJA BANGUNAN -
1 pekerPekerja OH 56,400
2 pekerTukang Gali OH 58,500
3 pekerKepala Tukang Batu OH 70,200
4 pekerTukang Batu OH 58,500
5 pekerKepala Tukang Kayu OH 70,200
6 pekerTukang Kayu OH 58,500
7 pekerKepala Tukang Besi OH 70,200
8 pekerTukang Besi OH 58,500
9 pekerKepala Tukang Cat OH 70,200
10 pekerTukang Cat OH 58,500
11 pekerTukang Aspal OH 57,340
12 pekerMandor/ Pengawas OH 78,000
13 pekerInstalator OH 77,550
14 pekerPembantu Instalator OH 70,200
15 pekerTukang Babat Rumput OH
16 pekerKepala Tukang Pipa OH 70,200
17 pekerTukang Pipa OH 58,500
18 pekerOperator Alat Besar OH 66,300
19 pekerPembantu Operator OH 58,500
20 pekerTukang Las OH 58,500
LAIN-LAIN -

1 Sertifikasi Laik Operasi


ll1 Lot - Sesuai realisasi pekerjaan
2 ll2 Transportasi Rit 78,000
3 ll3 Rabas-Rabas Pohon Kms 282,000
4 ll4 Tebang Pohon Pohon 23,400
5 ll5 Potong Pohon Pohon 23,400
6 ll6 Pengepresan CCO Bh 7,000
7 ll7 Pengepresan Joint Sleve Bh 7,000
8 ll8 Penegakan Tiang Miring Bh 27,300
JASA PASANG + ANGKUT + ASURANSI TIANG BETON -
1 C7-10Upah Pasang Tiang Beton 7M-100 daN Btg 156,000
2 C7-1 Upah Pasang Tiang Beton 7M-100 daN+E Btg 156,000
3 C9-10Upah Pasang Tiang Beton 9M-100 daN Btg 195,000
4 C9-1 Upah Pasang Tiang Beton 9M-100 daN+E Btg 195,000
5 C9-20Upah Pasang Tiang Beton 9M-200 daN Btg 195,000
6 C9-2 Upah Pasang Tiang Beton 9M-200 daN+E Btg 214,500
7 C11-2Upah Pasang Tiang Beton 11M-200 daN Btg 507,000
8 C11- Upah Pasang Tiang Beton 11M-200 daN+E Btg 507,000
9 C11-3Upah Pasang Tiang Beton 11M-350 daN Btg 538,200
10 C11- Upah Pasang Tiang Beton 11M-350 daN+E Btg 538,200

11 - 120
KO HARGA
NO URAIAN SAT KETERANGAN
DE SATUAN
11 C11- Tiang Beton 11M-350 daN+E+BC Btg 692,662
12 C12-2Upah Pasang Tiang Beton 12M-200 daN Btg 538,200
13 C12- Upah Pasang Tiang Beton 12M-200 daN+E Btg 538,200
14 C12-3Upah Pasang Tiang Beton 12M-350 daN Btg 538,200
15 C12- Upah Pasang Tiang Beton 12M-350 daN+E Btg 538,200
16 C12- Tiang Beton 12M-350 daN+E+BC Btg 856,283
17 C12-5Upah Pasang Tiang Beton 12M-500 daN Btg 778,400
18 C12- Upah Pasang Tiang Beton 12M-500 daN+E Btg 778,400
19 C13-3Upah Pasang Tiang Beton 13M-350 daN Btg 778,400
20 C13- Upah Pasang Tiang Beton 13M-350 daN+E Btg 778,400
21 C13-5Upah Pasang Tiang Beton 13M-500 daN Btg 778,400
22 C13- Upah Pasang Tiang Beton 13M-500 daN+E Btg 778,400
23 C14-3Upah Pasang Tiang Beton 14M-350 daN Btg 780,000
24 C14- Upah Pasang Tiang Beton 14M-350 daN+E Btg 780,000
25 C14- Tiang Beton 14M-350 daN+E+BC Btg 1,155,865
26 C14-5Upah Pasang Tiang Beton 14M-500 daN Btg 780,000
27 C14- Upah Pasang Tiang Beton 14M-500 daN+E Btg 780,000
UPAH BONGKAR KONSTRUKSI JTR -
1 bongkUpah Bongkar Konst. JTR J2 Unit 8,500
2 bongkUpah Bongkar Konst. JTR J3 Unit 9,300
3 bongkUpah Bongkar Konst. JTR J4 Unit 12,400
4 bongkUpah Bongkar Konst. JTR J4-A Unit 6,200
5 bongkUpah Bongkar Konst. JTR J5 Unit 10,100
6 bongkUpah Bongkar Konst. JTR J6 Unit 12,400
7 bongkUpah Bongkar Konst. JTR J6-X Unit 12,916
8 bongkUpah Bongkar Konst. JTR J7 Unit 16,300
9 bongkUpah Bongkar Konst. JTR J8 Unit 10,100
10 bongkUpah Bongkar Konst. JTR J10 Unit 17,100
11 bongkUpah Bongkar Konst. JTR J5-T Unit 9,300
12 bongkUpah Bongkar Konst. JTR J6-T Unit 12,400
13 bongkUpah Bongkar Konst. JTR J7-T Unit 9,300
14 bongkUpah Bongkar Konst. JTR MJ6-T Unit 7,000
15 bongkUpah Bongkar Konst. JTR B13-B Unit 8,500
16 bongkUpah Bongkar Konst. JTR B13-D Unit 8,500
17 bongkUpah Bongkar Konst. JTR B15-B Unit 9,300
18 bongkUpah Bongkar Konst. JTR B15-D Unit 9,300
19 bongkUpah Bongkar Konst. JTR B16-B Unit 12,400
20 bongkUpah Bongkar Konst. JTR B16-D Unit 12,400
21 bongkUpah Bongkar Konst. JTR B71-B Unit 10,200
UPAH BONGKAR KONSTRUKSI JTM 1 FASA -
1 bongkUpah Bongkar Konst. JTM 1 Fasa A1 Unit 22,600
2 bongkUpah Bongkar Konst. JTM 1 Fasa A1-N Unit 22,600
3 bongkUpah Bongkar Konst. JTM 1 Fasa A1-PN Unit 22,600
4 bongkUpah Bongkar Konst. JTM 1 Fasa A1-P Unit 22,600
5 bongkUpah Bongkar Konst. JTM 1 Fasa A1' Unit 9,300
6 bongkUpah Bongkar Konst. JTM 1 Fasa A1-P' Unit 9,300
7 bongkUpah Bongkar Konst. JTM 1 Fasa A2 Unit 35,100
8 bongkUpah Bongkar Konst. JTM 1 Fasa A2-N Unit 35,100
9 bongkUpah Bongkar Konst. JTM 1 Fasa A2' Unit 18,700
10 bongkUpah Bongkar Konst. JTM 1 Fasa A3 Unit 30,400
11 bongkUpah Bongkar Konst. JTM 1 Fasa A3-N Unit 30,400
12 bongkUpah Bongkar Konst. JTM 1 Fasa A3' Unit 19,500
13 bongkUpah Bongkar Konst. JTM 1 Fasa A4 Unit 32,700
14 bongkUpah Bongkar Konst. JTM 1 Fasa A4-N Unit 32,700
15 bongkUpah Bongkar Konst. JTM 1 Fasa A4' Unit 31,900
16 bongkUpah Bongkar Konst. JTM 1 Fasa A5 Unit 15,600
17 bongkUpah Bongkar Konst. JTM 1 Fasa A5-N Unit 15,600
18 bongkUpah Bongkar Konst. JTM 1 Fasa A5-1 Unit 17,100

12 - 120
KO HARGA
NO URAIAN SAT KETERANGAN
DE SATUAN
19 bongkUpah Bongkar Konst. JTM 1 Fasa A5-2 Unit 17,100
20 bongkUpah Bongkar Konst. JTM 1 Fasa A5-3 Unit 17,100
21 bongkUpah Bongkar Konst. JTM 1 Fasa A5-4 Unit 17,100
22 bongkUpah Bongkar Konst. JTM 1 Fasa A5' Unit 14,800
23 bongkUpah Bongkar Konst. JTM 1 Fasa A5-1' Unit 14,000
24 bongkUpah Bongkar Konst. JTM 1 Fasa A5-2' Unit 14,000
25 bongkUpah Bongkar Konst. JTM 1 Fasa A5-3' Unit 14,000
26 bongkUpah Bongkar Konst. JTM 1 Fasa A5-4' Unit 14,000
27 bongkUpah Bongkar Konst. JTM 1 Fasa A6 Unit 29,600
28 bongkUpah Bongkar Konst. JTM 1 Fasa A6-N Unit 29,600
29 bongkUpah Bongkar Konst. JTM 1 Fasa A6' Unit 28,000
30 bongkUpah Bongkar Konst. JTM 1 Fasa A7 Unit 17,100
31 bongkUpah Bongkar Konst. JTM 1 Fasa A7-A Unit 17,100
32 bongkUpah Bongkar Konst. JTM 1 Fasa A8 Unit 29,600
33 bongkUpah Bongkar Konst. JTM 1 Fasa A8-A Unit 29,600
34 bongkUpah Bongkar Konst. JTM 1 Fasa A9 Unit 22,600
35 bongkUpah Bongkar Konst. JTM 1 Fasa A9-N Unit 22,600
UPAH BONGKAR KONSTRUKSI JTM 1 FASA MENJADI 3 FASA -
1 bongkUpah Bongkar Konst. JTM 1-3 Fasa B1 Unit 15,600
2 bongkUpah Bongkar Konst. JTM 1-3 Fasa B1-A Unit 15,600
3 bongkUpah Bongkar Konst. JTM 1-3 Fasa B2 Unit 15,600
4 bongkUpah Bongkar Konst. JTM 1-3 Fasa B3 Unit 15,600
5 bongkUpah Bongkar Konst. JTM 1-3 Fasa B4 Unit 11,700
6 bongkUpah Bongkar Konst. JTM 1-3 Fasa B5 Unit 21,000
UPAH BONGKAR KONSTRUKSI JTM 3 FASA -
1 bongkUpah Bongkar Konst. JTM 3 Fasa C1 Unit 31,200
2 bongkUpah Bongkar Konst. JTM 3 Fasa C1-N Unit 31,200
3 bongkUpah Bongkar Konst. JTM 3 Fasa C1-1 Unit 28,800
4 bongkUpah Bongkar Konst. JTM 3 Fasa C1-1N Unit 28,800
5 bongkUpah Bongkar Konst. JTM 3 Fasa C1-A Unit 33,500
6 bongkUpah Bongkar Konst. JTM 3 Fasa C1' Unit 30,400
7 bongkUpah Bongkar Konst. JTM 3 Fasa C1-1' Unit 32,700
8 bongkUpah Bongkar Konst. JTM 3 Fasa C1-A' Unit 32,700
9 bongkUpah Bongkar Konst. JTM 3 Fasa C2 Unit 33,500
10 bongkUpah Bongkar Konst. JTM 3 Fasa C2-1 Unit 38,200
11 bongkUpah Bongkar Konst. JTM 3 Fasa C2-A Unit 39,000
12 bongkUpah Bongkar Konst. JTM 3 Fasa C2-N Unit 39,000
13 bongkUpah Bongkar Konst. JTM 3 Fasa C2' Unit 39,000
14 bongkUpah Bongkar Konst. JTM 3 Fasa C2-1' Unit 39,000
15 bongkUpah Bongkar Konst. JTM 3 Fasa C2-A' Unit 39,000
16 bongkUpah Bongkar Konst. JTM 3 Fasa C3 Unit 39,000
17 bongkUpah Bongkar Konst. JTM 3 Fasa C3-VN Unit 39,000
18 bongkUpah Bongkar Konst. JTM 3 Fasa C3' Unit 38,200
19 bongkUpah Bongkar Konst. JTM 3 Fasa C4-1 Unit 70,200
20 bongkUpah Bongkar Konst. JTM 3 Fasa C5-1 Unit 39,000
21 bongkUpah Bongkar Konst. JTM 3 Fasa C7 Unit 39,000
22 bongkUpah Bongkar Konst. JTM 3 Fasa C7-1 Unit 47,500
23 bongkUpah Bongkar Konst. JTM 3 Fasa C7-N Unit 39,000
24 bongkUpah Bongkar Konst. JTM 3 Fasa C7' Unit 35,800
25 bongkUpah Bongkar Konst. JTM 3 Fasa C7-1' Unit 38,200
26 bongkUpah Bongkar Konst. JTM 3 Fasa C8 Unit 79,100
27 bongkUpah Bongkar Konst. JTM 3 Fasa C8-A Unit 81,000
28 bongkUpah Bongkar Konst. JTM 3 Fasa C8-AN Unit 79,100
29 bongkUpah Bongkar Konst. JTM 3 Fasa C8' Unit 73,200
30 bongkUpah Bongkar Konst. JTM 3 Fasa C8-A' Unit 79,700
31 bongkUpah Bongkar Konst. JTM 3 Fasa C9 Unit 33,300
32 bongkUpah Bongkar Konst. JTM 3 Fasa C9-N Unit 33,300
33 bongkUpah Bongkar Konst. JTM 3 Fasa C9' Unit 32,200

13 - 120
KO HARGA
NO URAIAN SAT KETERANGAN
DE SATUAN
34 bongkUpah Bongkar Konst. JTM 3 Fasa C10 Unit 42,100
35 bongkUpah Bongkar Konst. JTM 3 Fasa C10-N Unit 42,100
36 bongkUpah Bongkar Konst. JTM 3 Fasa C10' Unit 38,400
37 bongkUpah Bongkar Konst. JTM 3 Fasa C11 Unit 38,700
38 bongkUpah Bongkar Konst. JTM 3 Fasa C11-N Unit 38,700
39 bongkUpah Bongkar Konst. JTM 3 Fasa C11' Unit 37,900
UPAH BONGKAR KONSTRUKSI JTM DOUBLE CIRCUIT -
1 bongkUpah Bongkar Konst. JTM Double Circuit DC-C1V Unit 61,600
2 bongkUpah Bongkar Konst. JTM Double Circuit DC-C1-1V Unit 61,600
3 bongkUpah Bongkar Konst. JTM Double Circuit DC-C1-1H Unit 65,100
4 bongkUpah Bongkar Konst. JTM Double Circuit DC-C1-AHN Unit 65,100
5 bongkUpah Bongkar Konst. JTM Double Circuit DC-C2-1V Unit 77,400
6 bongkUpah Bongkar Konst. JTM Double Circuit DC-C2-AH Unit 76,400
7 bongkUpah Bongkar Konst. JTM Double Circuit DC-C2-AHN Unit 76,400
8 bongkUpah Bongkar Konst. JTM Double Circuit DC-C2-1BN Unit 77,400
9 bongkUpah Bongkar Konst. JTM Double Circuit DC-C4-N Unit 78,700
10 bongkUpah Bongkar Konst. JTM Double Circuit DC-C7-N Unit 92,800
11 bongkUpah Bongkar Konst. JTM Double Circuit DC-C8 Unit 155,600
12 bongkUpah Bongkar Konst. JTM Double Circuit DC-C8-N Unit 155,600
UPAH BONGKAR AKSESORIES JARINGAN -
1 bong Upah Bongkar Acc.Jar M2-11 Unit 25,700
2 bong Upah Bongkar Acc.Jar M2-11M Unit 30,400
3 bong Upah Bongkar Acc.Jar M2-12 Unit 5,400
4 bongkUpah Bongkar Acc.Jar M2-12A Unit 7,000
5 bong Upah Bongkar Acc.Jar M2-15 Unit 80,900
6 bong Upah Bongkar Acc.Jar M3-16 Unit 780,000
7 bong Upah Bongkar Acc.Jar M5-2 Unit 10,900
8 bong Upah Bongkar Acc.Jar M5-3 Unit 9,300
9 bong Upah Bongkar Acc.Jar M5-4 Unit 10,900
10 bong Upah Bongkar Acc.Jar M5-5 Unit 10,900
11 bong Upah Bongkar Acc.Jar M5-6 Unit 27,300
12 bong Upah Bongkar Acc.Jar M5-8 Unit 19,500
13 bong Upah Bongkar Acc.Jar M5-9 Unit 27,300
14 bong Upah Bongkar Acc.Jar M5-10 Unit 27,300
15 bong Upah Bongkar Acc.Jar M5-12 Unit 19,500
16 bong Upah Bongkar Acc.Jar M5-13 Unit 19,500
17 bong Upah Bongkar Acc.Jar M5-16 Unit 23,400
18 bong Upah Bongkar Acc.Jar M5-20 Unit 19,500
19 bong Upah Bongkar Acc.Jar M5-24 Unit 1,797,900
20 bongkUpah Bongkar Acc.Jar P12C-1 Unit 14,000
21 bongkUpah Bongkar Acc.Jar P12C-2 Unit 21,000
22 bongkUpah Bongkar Acc.Jar P12S-1 Unit 14,000
23 bongkUpah Bongkar Acc.Jar P12S-2 Unit 21,000
24 bongkUpah Bongkar Acc.Jar E1-1 Unit 14,000
25 bongkUpah Bongkar Acc.Jar E1-2 Unit 14,000
26 bongkUpah Bongkar Acc.Jar E1-3 Unit 14,000
27 bongkUpah Bongkar Acc.Jar E2-1 Unit 19,500
28 bongkUpah Bongkar Acc.Jar E2-2 Unit 19,500
29 bongkUpah Bongkar Acc.Jar E2-3 Unit 17,100
30 bongkUpah Bongkar Acc.Jar E5-1 Unit 57,700
31 bongkUpah Bongkar Acc.Jar E5-2 Unit 57,700
32 bongkUpah Bongkar Acc.Jar E6-1 Unit 21,000
33 bongkUpah Bongkar Acc.Jar F1-2 Unit 16,300
34 bongkUpah Bongkar Acc.Jar F1-3 Unit 18,700
35 bongkUpah Bongkar Acc.Jar FDG Unit 353,300
36 bongkUpah Bongkar Acc.Jar Penghalang Panjat Unit 4,600
37 bongkUpah Bongkar Acc.Jar LVCB 2 Jurusan Unit 281,500
38 bongkUpah Bongkar Acc.Jar Sectionalizer 3 Fasa Unit 1,609,100

14 - 120
KO HARGA
NO URAIAN SAT KETERANGAN
DE SATUAN
39 bongkUpah Bongkar Acc.Jar LVCB 4 Jurusan Unit 381,400
40 bongkUpah Bongkar Acc.Jar Disconecting Switch Unit 702,000
41 bongkUpah Bongkar Acc.Jar Konstruksi Vangnet Unit 83,400
42 bongkUpah Bongkar Acc.Jar Jaring Vangnet Per 1 m 6,200
UPAH BONGKAR PENGHANTAR TM -

1 Upah Bongkar Penghantar TM A3C 3x240 + 1x150mm²


bongk Per 50 m 217,600

2 Upah Bongkar Penghantar TM A3C 3x240 + 1x120mm²


bongk Per 50 m 217,600

3 Upah Bongkar Penghantar TM A3C 3x150 + 1x150mm²


bongk Per 50 m 168,400
4 bongkUpah Bongkar Penghantar TM A3C 3x150 + 1x70mm² Per 50 m 159,900
5 bongkUpah Bongkar Penghantar TM A3C 3x70 + 1x70mm² Per 50 m 135,700
6 bongkUpah Bongkar Penghantar TM A3C 3x70 + 1x50mm² Per 50 m 131,800
7 bongkUpah Bongkar Penghantar TM A3C 3x70 + 1x35mm² Per 50 m 131,800
8 bongkUpah Bongkar Penghantar TM A3C 3x35 + 1x35mm² Per 50 m 111,500
9 bongkUpah Bongkar Penghantar TM A3C 1x150 + 1x70mm² Per 50 m 125,500
10 bongkUpah Bongkar Penghantar TM A3C 1x120 + 1x70mm² Per 50 m 122,400
11 bongkUpah Bongkar Penghantar TM A3C 1x70 + 1x70mm² Per 50 m 100,600
12 bongkUpah Bongkar Penghantar TM A3C 1x70 + 1x50mm² Per 50 m 100,600
13 bongkUpah Bongkar Penghantar TM A3C 1x70 + 1x35mm² Per 50 m 89,700
14 bongkUpah Bongkar Penghantar TM A3C 1x35 + 1x35mm² Per 50 m 67,000
15 bongkUpah Bongkar Penghantar TM A3C 3x240mm² Per 50 m 178,600
16 bongkUpah Bongkar Penghantar TM A3C 3x150mm² Per 50 m 140,400
17 bongkUpah Bongkar Penghantar TM A3C 3x70mm² Per 50 m 119,300
18 bongkUpah Bongkar Penghantar TM A3C 3x35mm² Per 50 m 89,700
19 bongkUpah Bongkar Penghantar TM A3C 2x240mm² Per 50 m 124,800
20 bongkUpah Bongkar Penghantar TM A3C 2x150mm² Per 50 m 111,500
21 bongkUpah Bongkar Penghantar TM A3C 2x70mm² Per 50 m 81,900
22 bongkUpah Bongkar Penghantar TM A3C 2x35mm² Per 50 m 68,600
23 bongkUpah Bongkar Penghantar TM A3C 1x240mm² Per 50 m 63,100
24 bongkUpah Bongkar Penghantar TM A3C 1x150mm² Per 50 m 58,500
25 bongkUpah Bongkar Penghantar TM A3C 1x70mm² Per 50 m 5,200
26 bongkUpah Bongkar Penghantar TM A3C 1x50mm² Per 50 m 52,200
27 bongkUpah Bongkar Penghantar TM A3C 1x35mm² Per 50 m 46,000

28 Upah Bongkar Penghantar TM A3CS 3x240 + 1x150mm²


bongk Per 50 m 241,800

29 Upah Bongkar Penghantar TM A3CS 3x240 + 1x120mm²


bongk Per 50 m 241,800

30 Upah Bongkar Penghantar TM A3CS 3x150 + 1x150mm²


bongk Per 50 m 177,000

31 Upah Bongkar Penghantar TM A3CS 3x150 + 1x70mm²


bongk Per 50 m 177,000
32 bongkUpah Bongkar Penghantar TM A3CS 3x70 + 1x70mm² Per 50 m 155,200
33 bongkUpah Bongkar Penghantar TM A3CS 3x70 + 1x50mm² Per 50 m 144,300
34 bongkUpah Bongkar Penghantar TM A3CS 3x70 + 1x35mm² Per 50 m 144,300
35 bongkUpah Bongkar Penghantar TM A3CS 3x35 + 1x35mm² Per 50 m 112,300

36 Upah Bongkar Penghantar TM A3CS 1x150 + 1x70mm²


bongk Per 50 m 133,300

37 Upah Bongkar Penghantar TM A3CS 1x120 + 1x70mm²


bongk Per 50 m 123,200
38 bongkUpah Bongkar Penghantar TM A3CS 1x70 + 1x70mm² Per 50 m 112,300
39 bongkUpah Bongkar Penghantar TM A3CS 1x70 + 1x50mm² Per 50 m 112,300
40 bongkUpah Bongkar Penghantar TM A3CS 1x70 + 1x35mm² Per 50 m 90,400
41 bongkUpah Bongkar Penghantar TM A3CS 1x35 + 1x35mm² Per 50 m 69,100
42 bongkUpah Bongkar Penghantar TM A3CS 3x240mm² Per 50 m 198,900
43 bongkUpah Bongkar Penghantar TM A3CS 3x150mm² Per 50 m 155,200
44 bongkUpah Bongkar Penghantar TM A3CS 3x70mm² Per 50 m 133,300

15 - 120
KO HARGA
NO URAIAN SAT KETERANGAN
DE SATUAN
45 bongkUpah Bongkar Penghantar TM A3CS 3x35mm² Per 50 m 90,400
46 bongkUpah Bongkar Penghantar TM A3CS 2x240mm² Per 50 m 133,300
47 bongkUpah Bongkar Penghantar TM A3CS 2x150mm² Per 50 m 123,200
48 bongkUpah Bongkar Penghantar TM A3CS 2x70mm² Per 50 m 90,700
49 bongkUpah Bongkar Penghantar TM A3CS 2x35mm² Per 50 m 68,600
50 bongkUpah Bongkar Penghantar TM A3CS 1x240mm² Per 50 m 70,200
51 bongkUpah Bongkar Penghantar TM A3CS 1x150mm² Per 50 m 63,900
52 bongkUpah Bongkar Penghantar TM A3CS 1x70mm² Per 50 m 57,700
53 bongkUpah Bongkar Penghantar TM A3CS 1x50mm² Per 50 m 57,700
54 bongkUpah Bongkar Penghantar TM A3CS 1x35mm² Per 50 m 47,500
55 bongkUpah Bongkar Kabel MVTIC 3 x 240 + N 95 mm² Per 50 m 145,800
UPAH BONGKAR PENGHANTAR TR -
1 bongkUpah Bongkar Penghantar TR A3C 3x70 + 1x35mm² Per 50 m 131,000
2 bongkUpah Bongkar Penghantar TR A3C 2x70 + 1x70mm² Per 50 m 109,200
3 bongkUpah Bongkar Penghantar TR A3C 2x70 + 1x35mm² Per 50 m 100,600
4 bongkUpah Bongkar Penghantar TR A3C 2x70mm² Per 50 m 74,100
5 bongkUpah Bongkar Penghantar TR A3C 2x55 + 1x35mm² Per 50 m 79,461
6 bongkUpah Bongkar Penghantar TR A3C 2x55mm² Per 50 m 55,300
7 bongkUpah Bongkar Penghantar TR A3C 2x35mm² Per 50 m 50,700
8 bongkUpah Bongkar Penghantar TR TX # 6 ,4 , 2 Per 50 m 32,700
9 bongkUpah Bongkar Penghantar TR TX # 1 / 0 & # 4/ 0 Per 50 m 39,000
10 bongkUpah Bongkar Penghantar TR QX # 6, 4, 2 Per 50 m 36,600
11 bongkUpah Bongkar Penghantar TR QX # 2 / 0 & 4 / 0 Per 50 m 47,500
12 bongkUpah Bongkar Penghantar TR LVTC 3x70 + 1x50mm² Per 50 m 100,600
13 bongkUpah Bongkar Penghantar TR LVTC 3x50 + 1x35mm² Per 50 m 75,600
14 bongkUpah Bongkar Penghantar TR LVTC 3x35 + 1x35mm² Per 50 m 55,300
15 bongkUpah Bongkar Penghantar TR LVTC 2x70 + 1x50mm² Per 50 m 81,100
16 bongkUpah Bongkar Penghantar TR LVTC 2x50 + 1x50mm² Per 50 m 65,500
17 bongkUpah Bongkar Penghantar TR LVTC 2x50 + 1x35mm² Per 50 m 65,500
18 bongkUpah Bongkar Penghantar TR LVTC 2x35 + 1x35mm² Per 50 m 55,300
19 bongkUpah Bongkar Penghantar TR LVTC 2x25 + 1x25mm² Per 50 m 55,300
UPAH BONGKAR PENGHANTAR TM PER KMS -

1 Upah Bongkar Penghantar TM A3C 3x240 + 1x150mm² Per Kms


bongk Per Kms 4,500,000

2 Upah Bongkar Penghantar TM A3C 3x240 + 1x120mm² Per Kms


bongk Per Kms 4,500,000

3 Upah Bongkar Penghantar TM A3C 3x150 + 1x150mm² Per Kms


bongk Per Kms 3,500,000

4 Upah Bongkar Penghantar TM A3C 3x150 + 1x70mm² Per Kms


bongk Per Kms 3,198,000

5 Upah Bongkar Penghantar TM A3C 3x70 + 1x70mm² Per Kms


bongk Per Kms 2,714,400

6 Upah Bongkar Penghantar TM A3C 3x70 + 1x50mm² Per Kms


bongk Per Kms 2,636,400

7 Upah Bongkar Penghantar TM A3C 3x70 + 1x35mm² Per Kms


bongk Per Kms 2,636,400

8 Upah Bongkar Penghantar TM A3C 3x35 + 1x35mm² Per Kms


bongk Per Kms 2,230,800

9 Upah Bongkar Penghantar TM A3C 1x150 + 1x70mm² Per Kms


bongk Per Kms 2,511,600

10 Upah Bongkar Penghantar TM A3C 1x120 + 1x70mm² Per Kms


bongk Per Kms 2,449,200

11 Upah Bongkar Penghantar TM A3C 1x70 + 1x70mm² Per Kms


bongk Per Kms 2,012,400

12 Upah Bongkar Penghantar TM A3C 1x70 + 1x50mm² Per Kms


bongk Per Kms 2,012,400

13 Upah Bongkar Penghantar TM A3C 1x70 + 1x35mm² Per Kms


bongk Per Kms 1,794,000

16 - 120
KO HARGA
NO URAIAN SAT KETERANGAN
DE SATUAN

14 Upah Bongkar Penghantar TM A3C 1x35 + 1x35mm² Per Kms


bongk Per Kms 1,341,600

15 Upah Bongkar Penghantar TM A3C 3x240mm² Per Kms


bongk Per Kms 3,572,400

16 Upah Bongkar Penghantar TM A3C 3x150mm² Per Kms


bongk Per Kms 2,808,000
17 bongkUpah Bongkar Penghantar TM A3C 3x70mm² Per Kms Per Kms 2,386,800
18 bongkUpah Bongkar Penghantar TM A3C 3x35mm² Per Kms Per Kms 1,794,000

19 Upah Bongkar Penghantar TM A3C 2x240mm² Per Kms


bongk Per Kms 2,496,000

20 Upah Bongkar Penghantar TM A3C 2x150mm² Per Kms


bongk Per Kms 2,230,800
21 bongkUpah Bongkar Penghantar TM A3C 2x70mm² Per Kms Per Kms 1,638,000
22 bongkUpah Bongkar Penghantar TM A3C 2x35mm² Per Kms Per Kms 1,372,800

23 Upah Bongkar Penghantar TM A3C 1x240mm² Per Kms


bongk Per Kms 1,263,600

24 Upah Bongkar Penghantar TM A3C 1x150mm² Per Kms


bongk Per Kms 1,170,000
25 bongkUpah Bongkar Penghantar TM A3C 1x70mm² Per Kms Per Kms 1,045,200
26 bongkUpah Bongkar Penghantar TM A3C 1x50mm² Per Kms Per Kms 1,045,200
27 bongkUpah Bongkar Penghantar TM A3C 1x35mm² Per Kms Per Kms 920,400

28 Upah Bongkar Penghantar TM A3CS 3x240 + 1x150mm² Per Kms


bongk Per Kms 4,600,000

29 Upah Bongkar Penghantar TM A3CS 3x240 + 1x120mm² Per Kms


bongk Per Kms 4,600,000

30 Upah Bongkar Penghantar TM A3CS 3x150 + 1x150mm² Per Kms


bongk Per Kms 3,541,200

31 Upah Bongkar Penghantar TM A3CS 3x150 + 1x70mm² Per Kms


bongk Per Kms 3,541,200

32 Upah Bongkar Penghantar TM A3CS 3x70 + 1x70mm² Per Kms


bongk Per Kms 3,104,400

33 Upah Bongkar Penghantar TM A3CS 3x70 + 1x50mm² Per Kms


bongk Per Kms 2,800,000

34 Upah Bongkar Penghantar TM A3CS 3x70 + 1x35mm² Per Kms


bongk Per Kms 2,800,000

35 Upah Bongkar Penghantar TM A3CS 3x35 + 1x35mm² Per Kms


bongk Per Kms 2,246,400

36 Upah Bongkar Penghantar TM A3CS 1x150 + 1x70mm² Per Kms


bongk Per Kms 2,667,600

37 Upah Bongkar Penghantar TM A3CS 1x120 + 1x70mm² Per Kms


bongk Per Kms 2,464,800

38 Upah Bongkar Penghantar TM A3CS 1x70 + 1x70mm² Per Kms


bongk Per Kms 2,246,400

39 Upah Bongkar Penghantar TM A3CS 1x70 + 1x50mm² Per Kms


bongk Per Kms 2,246,400

40 Upah Bongkar Penghantar TM A3CS 1x70 + 1x35mm² Per Kms


bongk Per Kms 1,809,600

41 Upah Bongkar Penghantar TM A3CS 1x35 + 1x35mm² Per Kms


bongk Per Kms 1,383,700

42 Upah Bongkar Penghantar TM A3CS 3x240mm² Per Kms


bongk Per Kms 3,979,500

43 Upah Bongkar Penghantar TM A3CS 3x150mm² Per Kms


bongk Per Kms 3,104,400

44 Upah Bongkar Penghantar TM A3CS 3x70mm² Per Kms


bongk Per Kms 2,667,600

17 - 120
KO HARGA
NO URAIAN SAT KETERANGAN
DE SATUAN

45 Upah Bongkar Penghantar TM A3CS 3x35mm² Per Kms


bongk Per Kms 1,809,600

46 Upah Bongkar Penghantar TM A3CS 2x240mm² Per Kms


bongk Per Kms 2,400,000

47 Upah Bongkar Penghantar TM A3CS 2x150mm² Per Kms


bongk Per Kms 2,200,000

48 Upah Bongkar Penghantar TM A3CS 2x70mm² Per Kms


bongk Per Kms 1,815,800

49 Upah Bongkar Penghantar TM A3CS 2x35mm² Per Kms


bongk Per Kms 1,372,800

50 Upah Bongkar Penghantar TM A3CS 1x240mm² Per Kms


bongk Per Kms 1,404,000

51 Upah Bongkar Penghantar TM A3CS 1x150mm² Per Kms


bongk Per Kms 1,279,200

52 Upah Bongkar Penghantar TM A3CS 1x70mm² Per Kms


bongk Per Kms 1,154,400

53 Upah Bongkar Penghantar TM A3CS 1x50mm² Per Kms


bongk Per Kms 1,154,400

54 Upah Bongkar Penghantar TM A3CS 1x35mm² Per Kms


bongk Per Kms 951,600

55 Upah Bongkar Kabel MVTIC 3 x 240 + N 95 mm² Per Kms


bongk Per 50 m 3,510,000
UPAH BONGKAR PENGHANTAR TR PER KMS -

1 Upah Bongkar Penghantar TR A3C 3x70 + 1x35mm² Per Kms


bongk Per Kms 2,620,800

2 Upah Bongkar Penghantar TR A3C 2x70 + 1x70mm² Per Kms


bongk Per Kms 2,184,000

3 Upah Bongkar Penghantar TR A3C 2x70 + 1x35mm² Per Kms


bongk Per Kms 2,012,400
4 bongkUpah Bongkar Penghantar TR A3C 2x70mm² Per Kms Per Kms 1,482,000

5 Upah Bongkar Penghantar TR A3C 2x55 + 1x35mm² Per Kms


bongk Per Kms 1,311,800
6 bongkUpah Bongkar Penghantar TR A3C 2x55mm² Per Kms Per Kms 1,107,600
7 bongkUpah Bongkar Penghantar TR A3C 2x35mm² Per Kms Per Kms 1,014,000
8 bongkUpah Bongkar Penghantar TR TX # 6 ,4 , 2 Per Kms Per Kms 655,200

9 Upah Bongkar Penghantar TR TX # 1 / 0 & # 4/ 0 Per Kms


bongk Per Kms 780,000
10 bongkUpah Bongkar Penghantar TR QX # 6, 4, 2 Per Kms Per Kms 733,200

11 Upah Bongkar Penghantar TR QX # 2 / 0 & 4 / 0 Per Kms


bongk Per Kms 951,600

12 Upah Bongkar Penghantar TR LVTC 3x70 + 1x50mm² Per Kms


bongk Per Kms 1,800,000

13 Upah Bongkar Penghantar TR LVTC 3x50 + 1x35mm² Per Kms


bongk Per Kms 1,513,200

14 Upah Bongkar Penghantar TR LVTC 3x35 + 1x35mm² Per Kms


bongk Per Kms 1,107,600

15 Upah Bongkar Penghantar TR LVTC 2x70 + 1x50mm² Per Kms


bongk Per Kms 1,400,000

16 Upah Bongkar Penghantar TR LVTC 2x50 + 1x50mm² Per Kms


bongk Per Kms 1,200,000

17 Upah Bongkar Penghantar TR LVTC 2x50 + 1x35mm² Per Kms


bongk Per Kms 1,200,000

18 Upah Bongkar Penghantar TR LVTC 2x35 + 1x35mm² Per Kms


bongk Per Kms 1,107,600

19 Upah Bongkar Penghantar TR LVTC 2x25 + 1x25mm² Per Kms


bongk Per Kms 1,107,600
UPAH BONGKAR TRAFO DISTRIBUSI -
1 bongkUpah Bongkar Trafo 1 Fasa 25 KVA + Bracket Unit 160,600

18 - 120
KO HARGA
NO URAIAN SAT KETERANGAN
DE SATUAN
2 bongkUpah Bongkar Trafo 1 Fasa 50 KVA + Bracket Unit 156,000
3 bongkUpah Bongkar Trafo 1 Fasa 50 KVA 1 Tiang Unit 266,700
4 bongkUpah Bongkar Trafo 3 Fasa 50 KVA 1 Tiang Unit 547,500
5 bongkUpah Bongkar Trafo 3 Fasa 100 KVA 1 Tiang Unit 1,368,900
6 bongkUpah Bongkar Trafo 3 Fasa 50 KVA 2 Tiang Unit 748,000
7 bongkUpah Bongkar Trafo 3 Fasa 100 KVA 2 Tiang Unit 1,711,300
8 bongkUpah Bongkar Trafo 3 Fasa 160 KVA 2 Tiang Unit 1,757,300
9 bongkUpah Bongkar Trafo 3 Fasa 200 KVA 2 Tiang Unit 1,918,000
UPAH BONGKAR TIANG BETON -
1 bong Upah Bongkar Tiang Beton 7M-100 daN Btg 93,600
2 bongkUpah Bongkar Tiang Beton 7M-100 daN+E Btg 93,600
3 bong Upah Bongkar Tiang Beton 9M-100 daN Btg 117,000
4 bongkUpah Bongkar Tiang Beton 9M-100 daN+E Btg 117,000
5 bong Upah Bongkar Tiang Beton 9M-200 daN Btg 117,000
6 bongkUpah Bongkar Tiang Beton 9M-200 daN+E Btg 128,700
7 bong Upah Bongkar Tiang Beton 11M-200 daN Btg 304,200
8 bongkUpah Bongkar Tiang Beton 11M-200 daN+E Btg 304,200
9 bong Upah Bongkar Tiang Beton 11M-350 daN Btg 310,000
10 bongkUpah Bongkar Tiang Beton 11M-350 daN+E Btg 310,000
11 bongkUpah Bongkar Tiang Beton 11M-350 daN+E+BC Btg 310,000
12 bong Upah Bongkar Tiang Beton 12M-200 daN Btg 310,000
13 bongkUpah Bongkar Tiang Beton 12M-200 daN+E Btg 310,000
14 bong Upah Bongkar Tiang Beton 12M-350 daN Btg 310,000
15 bongkUpah Bongkar Tiang Beton 12M-350 daN+E Btg 310,000
16 bongkUpah Bongkar Tiang Beton 12M-350 daN+E+BC Btg 430,000
17 bong Upah Bongkar Tiang Beton 12M-500 daN Btg 430,000
18 bongkUpah Bongkar Tiang Beton 12M-500 daN+E Btg 430,000
19 bong Upah Bongkar Tiang Beton 13M-350 daN Btg 430,000
20 bongkUpah Bongkar Tiang Beton 13M-350 daN+E Btg 430,000
21 bong Upah Bongkar Tiang Beton 13M-500 daN Btg 430,000
22 bongkUpah Bongkar Tiang Beton 13M-500 daN+E Btg 430,000
23 bong Upah Bongkar Tiang Beton 14M-350 daN Btg 440,000
24 bongkUpah Bongkar Tiang Beton 14M-350 daN+E Btg 440,000
25 bongkUpah Bongkar Tiang Beton 14M-350 daN+E+BC Btg 440,000
26 bong Upah Bongkar Tiang Beton 14M-500 daN Btg 440,000
27 bongkUpah Bongkar Tiang Beton 14M-500 daN+E Btg 440,000
UPAH BONGKAR KABEL TANAH -
1 bongkUpah Bongkar Terminating Kabel 1 x 70 mm² OD Unit 70,200
2 bongkUpah Bongkar Terminating Kabel 3 x 70 mm² ID Unit 168,400
3 bongkUpah Bongkar Terminating Kabel 3 x 70 mm² OD Unit 187,200
4 bongkUpah Bongkar Terminating Kabel 3 x 95 mm² ID Unit 168,400
5 bongkUpah Bongkar Terminating Kabel 3 x 95 mm² OD Unit 187,200
6 bongkUpah Bongkar Terminating Kabel 3 x 150 mm² ID Unit 194,200
7 bongkUpah Bongkar Terminating Kabel 3 x 150 mm² OD Unit 198,900
8 bongkUpah Bongkar Terminating Kabel 3 x 240 mm² ID Unit 196,500
9 bongkUpah Bongkar Terminating Kabel 3 x 240 mm² OD Unit 224,600
10 bongkUpah Bongkar Terminating Kabel 3 x 300 mm² ID Unit 196,500
11 bongkUpah Bongkar Terminating Kabel 3 x 300 mm² OD Unit 224,600

12 Upah Bongkar Sepatu kabel bimetal 240 - 300 mm² (2 lubang)


bongk Unit 4,200

13 Upah Bongkar Sepatu kabel bimetal 150 mm² (2 lubang)


bongk Unit 3,700

14 Upah Bongkar Kabel Tanah XLPE 3 x 300 mm² (three core)


bongk Per 50 m 152,300

15 Upah Bongkar Kabel Tanah XLPE 3 x 240 mm² (three core)


bongk Per 50 m 152,300
16 bongkUpah Bongkar Kabel NYY 1 x 70 mm² Per 1 m 390

19 - 120
KO HARGA
NO URAIAN SAT KETERANGAN
DE SATUAN
17 bongkUpah Bongkar Kabel NYY 1 x 150 mm² Per 1 m 500
18 bongkUpah Bongkar Kabel NA2XS2Y 20 KV 3 x 150 mm² Per 1 m 5,600
19 bongkUpah Bongkar Kabel NA2XS2Y 20 KV 3 x 95 mm² Per 1 m 5,600
20 bongkUpah Bongkar Kabel NA2XS2Y 20 KV 3 x 70 mm² Per 1 m 5,600
21 bongkUpah Bongkar Kabel NA2XS2Y 20 KV 1 x 70 mm² Per 1 m 2,576
22 bongkGalian Kabel - m³ Per m³ 60,800
UPAH BONGKAR SAMBUNGAN RUMAH -
1 bongkUpah Bongkar Sambungan Rumah 1 Fasa Unit 11,700
2 bongkUpah Bongkar Sambungan Rumah 3 Fasa Unit 28,200
3 bongkUpah Bongkar SR + APP 1 Fasa Unit 23,400
4 bongkUpah Bongkar SR + APP 3 Fasa Unit 46,800
5 bongkUpah Bongkar SR + APP 3 Fasa + Wiring Unit 350,000
6 bongkUpah Bongkar APP TM + Wiring Unit 350,000
7 bongkUpah Bongkar Cubicle Unit 702,000

PT SEKAWAN TRIYASA SOLUSINDO PT PLN (PERSERO) AREA SURAKARTA


DIREKTUR MANAJER

SUKRISNO TRISNO RAHARJO MUNDHAKIR

20 - 120
PT. PLN (PER PT. PLN (PERSERO) DISTRIBUSI JAWA TENGAH & DI YOGYAKARTA Lampiran Perjanjian :
AREA SURAKARTA Nomor I : 0060.PJ/HKM.00.01/SKA/2018
Nomor II : 31.08/PD-PLN/STS/2018
DISTRIBUSI JAWA TENGAH DAN D.I. YOGYAKARTA
LAMPIRAN PERJANJIAN
HARGA SATUAN MATERIAL
PEMBANGUNAN JARINGAN DISTRIBUSI UNTUK PB / PD AREA SURAKARTA
ZONA 3 - RAYON SRAGEN DAN RAYON SUMBERLAWANG

NO. KODE NAMA BARANG SAT HARGA SATUAN KET

I MATERIAL DISTRIBUSI UTAMA


A ALAT PENGUKUR DAN PEMBATAS
1 kwhmpb1p5/60pKWH MPB; 1P;230V;5(60)A;1;2W Bh PLN
2 kwh1p5/20g KWH Meter 1 Fasa 230V; 5/20A; CLS2; 2W Bh PLN
3 kwh1p20/60g KWH Meter 1 Fasa 230V; 20/60A; CLS2; 2W Bh PLN
4 kwhe1p5/40p KWH Elektronik; 1P; 2W; 230 V; 5(40) A; kls 1 (combo); register drum Bh PLN
5 kwhe1p5/100p KWH Elektronik; 1P; 2W; 230 V; 5(100) A; kls 1 termasuk modem GPRS Bh PLN
6 kwhe1pmodempKWH Elektronik; 1P; 3W; 230 V; kls 1 termasuk modem GPRS u/ MTD Bh PLN
7 kwh1p50/100p KWH Meter 1 Fasa 230V; 50/100A; CLS2; 2W Bh PLN
8 kwh3p50/10p KWH Elektronik; 3P; 4W; 230/400V; 5(10) A; Class 1 Bh PLN
9 kwh3p50/80p KWH Elektronik; 3P; 4W; 230/400 V; 5(80) A; Class 1 Bh PLN
10 mpb3p50/80p KWH MPB; 3P; 4W; 230/400 V; 5(80) A; Class 1 Bh PLN
11 kwh3p5/20stg KWH Meter 3 Fasa 230/400V; 5/20A; CLS2; 4W Bh PLN
12 kwh3p20/60stg KWH Meter 3 Fasa 230/400V; 20/60A; CLS2; 4W Bh PLN
13 kwh3p50/100stgKWH Meter 3 Fasa 230/400V; 50/100A; CLS2; 4W Bh PLN
14 kwh3p5/10 KWH Elektronik; 3P; 4W; 57,7/100 - 230/400 V; 5(10) A; Class 0.5s Bh PLN
15 mof3p Metering Out Fit 3 Ph, 20 KV Unit PLN
16 mof1p Metering Out Fit 1 Ph, 20 KV Unit PLN
17 gsm GSM Modem Unit PLN
18 cttmod2 CT TM out door (ratio 10/5 s.d. 400/5) Class 0.2s Bh PLN
19 pttmod PT out door (ratio 20.000/v3 : 100/v3) Class 0.2s Bh PLN
20 pttmid PT in door (ratio 20.000/v3 : 100/v3) Class 0.2s Bh PLN
21 cttmid10-1000 CT TM in door tipe Blok (rasio 10/5-5 s.d 1000/5-5) Class 0.2s Bh PLN
22 cttmid50-100 CT TM in door tipe Ring (ratio 50/5-5 s.d 100/5-5) Class 0.2s Bh PLN
23 cttr50 CT TR ; Burden 5 VA; 50/5 A - 300/5 A Class 0.5s Bh PLN
24 cttr100 CT TR ; Burden 5 VA; 100/5 A Class 0.5s Bh PLN
25 mcb2 MCB 1 Fasa 2 A Bh PLN
26 mcb4 MCB 1 Fasa 4 A Bh PLN
27 mcb6 MCB 1 Fasa 6 A Bh PLN
28 mcb10 MCB 1 Fasa 10 A Bh PLN
29 mcb16 MCB 1 Fasa 16 A Bh PLN
30 mcb20 MCB 1 Fasa 20 A Bh PLN
31 mcb25 MCB 1 Fasa 25 A Bh PLN
32 mcb35 MCB 1 Fasa 35 A Bh PLN
33 mcb50 MCB 1 Fasa 50 A Bh PLN
34 mccb1p100 MCCB 1 Phasa 250 V, Tp PLN 100 A Lengkap Bh PLN
35 mccb1p80 MCCB 1 Phasa 250 V, Tp PLN 80 A Lengkap Bh PLN
36 mccb1p63 MCCB 1 Phasa 250 V, Tp PLN 63 A Lengkap Bh PLN
37 mccb1p40 MCCB 1 Fasa 40 A Bh PLN
38 mcb3p10 MCB 3 Fasa 10 A Bh PLN
39 mcb3p16 MCB 3 Fasa 16 A Bh PLN
40 mcb3p20 MCB 3 Fasa 20 A Bh PLN
41 mcb3p25 MCB 3 Fasa 25 A Bh PLN
42 mcb3p35 MCB 3 Fasa 35 A Bh PLN

B KOTAK APP
1 smart197 Smart Box Tidak Langsung Daya 197 kVA MCCB 300 A Unit PLN
2 smart164 Smart Box Tidak Langsung Daya 164 kVA MCCB 250 A Unit PLN
3 smart147 Smart Box Tidak Langsung Daya 147 kVA MCCB 225 A Unit PLN
4 smart131 Smart Box Tidak Langsung Daya 131 kVA MCCB 200 A Unit PLN
5 smart105 Smart Box Tidak Langsung Daya 105 kVA MCCB 160 A Unit PLN
6 smart82 Smart Box Tidak Langsung Daya 82.5 kVA MCCB 125 A Unit PLN
7 smart66 Smart Box Tidak Langsung Daya 66 kVA MCCB 100 A Unit PLN
8 smart53 Smart Box Tidak Langsung Daya 53 kVA MCCB 80 A Unit PLN
9 smart00 Smart Box Tidak Langsung Daya TM Unit PLN
10 smart41 Smart Box Langsung Daya 41.5 kVA MCCB 63 A Unit PLN
11 smart33 Smart Box Langsung Daya 33 kVA MCCB 50 A Unit PLN
12 smart23 Smart Box Langsung Daya 23 kVA MCCB 35 A Unit PLN
13 smart16 Smart Box Langsung Daya 16.5 kVA MCCB 25 A Unit PLN
14 smart13 Smart Box Langsung Daya 13.2 kVA MCCB 20 A Unit PLN
15 smart10 Smart Box Langsung Daya 10.6 kVA MCCB 16 A Unit PLN

21 - 120
NO. KODE NAMA BARANG SAT HARGA SATUAN KET

16 smart6 Smart Box Langsung Daya 6.6 kVA MCCB 10 A Unit PLN
17 smart3.9 Smart Box Langsung Daya 3.9 kVA MCCB 6 A Unit PLN
18 ktypeI Kotak APP Type I Lipat,lengkap Bh 63,000
19 ktypeIII Kotak APP Type III Lipat,lengkap Bh 259,025
20 ktypeIV Kotak APP TR Type IV Tanpa Topi,lengkap Set 5,918,000
21 ktypeIc Kotak APP TR Type I A Single Tarif, lengkap Set 7,304,000
22 kadtl Kotak APP TR Double Tarif, lengkap Bh 7,575,000
23 kapptm Kotak APP TM , lengkap Bh 5,838,481
24 aapp36 Kotak APP 1 Fasa OA KAS I Set 61,000
25 aapp37 Kotak APP 3 Fasa OA KAS III Set 297,000

22 - 120
NO. KODE NAMA BARANG SAT HARGA SATUAN KET

C KUBIKEL PELANGGAN
1 cubicle1 Air Insulated LBS Motorized;24KV;630A;Min-16KA Cell PLN
2 cubicle2 Air Insulated CBOG Motorized+Metering;20KV;630A;Min-16KA Cell PLN
3 cubicle3 Air Insulated LBS Manual;24KV;630A;Min-16KA Cell PLN
4 cubicle4 Fully Gas Insulated LBS Motorized;24KV;630A;Min-16KA Cell PLN
5 cubicle5 Fully Gas Insulated CBOG Motorized+Metering;20KV;630A;Min-16KA Cell PLN
6 cubicle6 Fully Gas Insulated LBS Manual24KV;630A;Min-16KA Cell PLN

D KUBIKEL GARDU INDUK


1 cubicle7 Metaclad;Outgoing;20kV;630A;25kA - GI Cell PLN
2 cubicle8 Metaclad;Couple;20kV;2000A;25kA - GI Cell PLN

E TRAFO DISTRIBUSI
1 t1-50 Trafo 1 Fasa CSP 50 kVA Bh PLN
2 t3-50 Trafo 3 Fasa 50 kVA Bh PLN
3 t3-100 Trafo 3 Fasa 100 kVA Bh PLN
4 t3-160 Trafo 3 Fasa 160 kVA Bh PLN
5 t3-200 Trafo 3 Fasa 200 kVA Bh PLN
6 t3-250 Trafo 3 Fasa 250 KVA Bh PLN
7 t3-315 Trafo 3 Fasa 315 KVA Bh PLN
8 t3-400 Trafo 3 Fasa 400 KVA Bh PLN
9 t3-500 Trafo 3 Fasa 500 KVA Bh PLN
10 lvcb2-250a LVCB 2 Jurusan 250 A MCCB Bh PLN
11 lvcb2-250a1 LVCB 2 Jurusan 250 A LBS Bh PLN
12 lvcb2-400a LVCB 2 Jurusan 400 A LBS Bh PLN
13 lvcb4 LVCB 4 Jurusan 400 A LBS Bh PLN

F PEMBATAS
1 fco100 FCO Polymer Bh PLN
2 fl2 Fuse Link 2 A Bh 30,000
3 fl3 Fuse Link 3 A Bh 30,000
4 fl4 Fuse Link 4 A Bh 30,000
5 fl6 Fuse Link 6 A Bh 30,000
6 fl8 Fuse Link 8 A Bh 33,000
7 fl10 Fuse Link 10 A Bh 33,000
8 fl12 Fuse Link 12 A Bh 33,000
9 fl15 Fuse Link 15 A Bh 34,000
10 fl16 Fuse Link 16 A Bh 34,000
11 fl20 Fuse Link 20 A Bh 34,000
12 fl25 Fuse Link 25 A Bh 40,000
13 fl30 Fuse Link 30 A Bh 40,000
14 fl50 Fuse Link 50 A Bh 50,000
15 fl60 Fuse Link 60 A Bh 50,000
16 fl65 Fuse Link 65 A Bh 58,000
17 fl80 Fuse Link 80 A Bh 65,000
18 fl100 Fuse Link 100 A Bh 70,000
19 ntfuse002560 NT Fuse 63 - 100 A Size 00, 25 - 160 A Bh 28,000
20 ntfuse0 NT Fuse 63 - 100 A Size 0, 50 - 160 A Bh 30,000
21 ntfuse63A0 NT Fuse 63 A Size 0 Bh 30,000
22 ntfuse80A0 NT Fuse 80 A Size 0 Bh 30,000
23 ntfuse100A0 NT Fuse 100 A Size 0 Bh 30,000
24 ntfuse1 NT Fuse 63 - 100 A Lengkap size 1, 63 - 250 A Bh 40,000
25 ntfuse2 NT Fuse 63 - 100 A Lengkap size 2, 250 - 400 A Bh 73,900
26 ntfuse3 NT Fuse 63 - 100 A Lengkap size 3, 425 - 630 A Bh 93,600
27 ntfuse4 NT Fuse 63 - 100 A Lengkap size 4, 800 - 1250 A Bh 335,000
28 nhfh00 NH Fuse Holder Size 00, 25 - 160 A Bh 44,500
29 nhfh0 NH Fuse Holder Size 0, 50 - 160 A Bh 53,600
30 nhfh1 NH Fuse Holder Size 1, 63 - 250 A Bh 91,200
31 nhfh2 NH Fuse Holder Size 2, 250 - 400 A Bh 130,000
32 nhfh3 NH Fuse Holder Size 3, 425 - 630 A Bh 200,000
33 nhfh4 NH Fuse Holder Size 4, 800 - 1250 A Bh 500,000
34 nhfp NH Fuse Puller Size 00-4 Bh 29,700

G ALAT PEMISAH
1 absw Load Break Switch Set PLN
2 absw2 Load Break Switch - 3 Way Set PLN
3 absw1 ABSW 20 KV Set PLN
4 ds Disconnecting Switch 20 kV - 630 A Set PLN
5 recl1 Recloser Lengkap Dengan PT Set PLN

H LIGHTNING ARESTER
1 lac24/5ka Lighting Arester (CERAMIC) 24 KV, 5 KA Bh PLN
2 lac24/10ka1 Lightning Arester (Ceramic) 24 KV, 10 KA Bh PLN

23 - 120
NO. KODE NAMA BARANG SAT HARGA SATUAN KET

3 lac18/10ka Lightning Arester (Polymer) 18 KV, 10 KA Bh PLN


4 lac21/10ka Lightning Arester (Polymer) 21 KV, 10 KA Bh PLN
5 lac24/10ka Lightning Arester (Polymer) 24 KV, 10 KA Bh PLN
6 lac18/5ka Lightning Arester (Ceramic) 18 KV, 5 KA Bh PLN
7 dla5ka Disconnector Lightning Arester 5 KA Bh PLN
8 dla10ka Disconnector Lightning Arester 10 KA Bh PLN
9 mca Multi Chamber Arrester Bh PLN

I KAPASITOR
1 cap Capasitor 3 x 300 KVAR komplit dengan kontrol Set 220,428,000
2 m1 Micro Capasitor Controller Bh 27,230,000
3 m2 Current Sensor Bh 19,447,900

J TIANG BETON
1 C7-100 Tiang Beton 7M-100 daN Btg PLN
2 C7-100E Tiang Beton 7M-100 daN+E Btg PLN
3 C9-100 Tiang Beton 9M-100 daN Btg PLN
4 C9-100E Tiang Beton 9M-100 daN+E Btg PLN
5 C9-200 Tiang Beton 9M-200 daN Btg PLN
6 C9-200E Tiang Beton 9M-200 daN+E Btg PLN
7 C11-200 Tiang Beton 11M-200 daN Btg PLN
8 C11-200E Tiang Beton 11M-200 daN+E Btg PLN
9 C11-350 Tiang Beton 11M-350 daN Btg PLN
10 C11-350E Tiang Beton 11M-350 daN+E Btg PLN
11 C11-350E-BC Tiang Beton 11M-350 daN+E+BC Btg PLN
12 C12-200 Tiang Beton 12M-200 daN Btg PLN
13 C12-200E Tiang Beton 12M-200 daN+E Btg PLN
14 C12-350 Tiang Beton 12M-350 daN Btg PLN
15 C12-350E Tiang Beton 12M-350 daN+E Btg PLN
16 C12-350E-BC Tiang Beton 12M-350 daN+E+BC Btg PLN
17 C12-500 Tiang Beton 12M-500 daN Btg PLN
18 C12-500E Tiang Beton 12M-500 daN+E Btg PLN
19 C13-350 Tiang Beton 13M-350 daN Btg PLN
20 C13-350E Tiang Beton 13M-350 daN+E Btg PLN
21 C13-500 Tiang Beton 13M-500 daN Btg PLN
22 C13-500E Tiang Beton 13M-500 daN+E Btg PLN
23 C14-350 Tiang Beton 14M-350 daN Btg PLN
24 C14-350E Tiang Beton 14M-350 daN+E Btg PLN
25 C14-350E-BC Tiang Beton 14M-350 daN+E+BC Btg PLN
26 C14-500 Tiang Beton 14M-500 daN Btg PLN
27 C14-500E Tiang Beton 14M-500 daN+E Btg PLN
28 notiang Penomoran Tiang Btg 8,000
29 panjat Penghalang Panjat dan Papan Peringatan Set 115,000

K ISOLATOR
1 ss Isolator Tumpu (Line Post) 20 KV Bh PLN
2 ls Isolator Tumpu (Pin Post) 20 KV Bh PLN
3 s1 Isolator Tarik ( Porcelain ) 20 KV + Primary Dead End Clamp 70-150 mm² Set PLN
4 sk2 Isolator Tarik ( Porcelain ) 20 KV + Primary Dead End Clamp 150-240 mm² Set PLN
5 s Isolator Tarik ( Polymer ) 20 KV + Primary Dead End Clamp 70-150 mm² Set PLN
6 sk Isolator Tarik ( Polymer ) 20 KV + Primary Dead End Clamp 150-240 mm² Set PLN

L PENGHANTAR KAWAT
1 aaac25 AAAC 25 mm² Mtr PLN
2 aaac35 AAAC 35 mm² Mtr PLN
3 aaac50 AAAC 50 mm² Mtr PLN
4 aaac70 AAAC 70 mm² Mtr PLN
5 aaac150 AAAC 150 mm² Mtr PLN
6 aaac240 AAAC 240 mm² Mtr PLN
7 aaacs70 AAAC/S 70 mm² Mtr PLN
8 aaacs150 AAAC/S 150 mm² Mtr PLN
9 aaacs240 AAAC/S 240 mm² Mtr PLN
10 acsr70 ACSR 70 mm² Mtr PLN
11 acsr150 ACSR 150 mm² Mtr PLN
12 acsr240 ACSR 240 mm² Mtr PLN

M PENGHANTAR KABEL
1 nfa2x-t2x35+n2NFA2X-T 3 x 35 + N 25 mm² Mtr PLN
2 nfa2x-t2x35+n5NFA2X-T 2 x 35 + N 50 mm² Mtr PLN
3 nfa2x-t2x70+n5NFA2X-T 2 x 70 + N 50 mm² Mtr PLN
4 nfa2x-t3x70+n5NFA2X-T 3 x 70 + N 50 mm² Mtr PLN
5 nfa2x2x10 NFA2X 2 x 10 mm² Mtr PLN
6 nfa2x2x16 NFA2X 2 x 16 mm² Mtr PLN

24 - 120
NO. KODE NAMA BARANG SAT HARGA SATUAN KET

7 nfa2x2x25 NFA2X 2 x 25 mm² Mtr PLN


8 nfa2x4x10 NFA2X 4 x 10 mm² Mtr PLN
9 nfa2x4x16 NFA2X 4 x 16 mm² Mtr PLN
10 nfa2x4x25 NFA2X 4 x 25 mm² Mtr PLN
11 nfa2x4x70 NFA2X 4 x 70 mm² Mtr PLN
12 nyfgby4x4 Kabel NYFGBY 4 x 4 mm² Mtr PLN
13 nyfgby4x6 Kabel NYFGBY 4 x 6 mm² Mtr PLN
14 nyfgby4x16 Kabel NYFGBY 4 x 16 mm² Mtr PLN
15 nyfgby4x50 Kabel NYFGBY 4 x 50 mm² Mtr PLN
16 nyfgby4x70 Kabel NYFGBY 4 x 70 mm² Mtr PLN
17 nyfgby4x95 Kabel NYFGBY 4 x 95 mm² Mtr PLN
18 nyfgby4x150 Kabel NYFGBY 4 x 150 mm² Mtr PLN
19 nyy1x70 Kabel NYY 1 x 70 mm² Mtr PLN
20 nyy1x95 Kabel NYY 1 x 95 mm² Mtr PLN
21 nyy1x150 Kabel NYY 1 x 150 mm² Mtr PLN
22 nyy1x240 Kabel NYY 1 x 240 mm² Mtr PLN
23 nyy4x25 Kabel NYY 4 x 25 mm² Mtr PLN
24 nyy4x35 Kabel NYY 4 x 35 mm² Mtr PLN
25 nyy4x70 Kabel NYY 4 x 70 mm² Mtr PLN
26 nyy4x95 Kabel NYY 4 x 95 mm² Mtr PLN
27 na2xsy1x70 Kabel NA2XSY 20 KV, 1 x 70 mm² Mtr PLN
28 na2xsy1x95 Kabel NA2XSY 20 KV, 1 x 95 mm² Mtr PLN
29 na2xsy1x150 Kabel NA2XSY 20 KV, 1 x 150 mm² Mtr PLN
30 na2xsy1x240 Kabel NA2XSY 20 KV, 1 x 240 mm² Mtr PLN
31 na2xsy1x300 Kabel NA2XSY 20 KV, 1 x 300 mm² Mtr PLN
32 na2xs2y1x70 Kabel NA2XS2Y 20 KV, 1 x 70 mm² Mtr PLN
33 na2xs2y1x120 Kabel NA2XS2Y 20 KV, 1 x 120 mm² Mtr PLN
34 na2xs2y1x150 Kabel NA2XS2Y 20 KV, 1 x 150 mm² Mtr PLN
35 na2xs2y1x240 Kabel NA2XS2Y 20 KV, 1 x 240 mm² Mtr PLN
36 na2xs2y1x300 Kabel NA2XS2Y 20 KV, 1 x 300 mm² Mtr PLN
37 na2xsefgby3x15Kabel NA2XSEFGbY 20 KV, 3 x 150 mm² Mtr PLN
38 na2xseyby3x150Kabel NA2XSEYBY 20 KV, 3 x 150 mm2 Mtr PLN
39 na2xseyby3x240Kabel NA2XSEYBY 20 KV, 3 x 240 mm² Mtr PLN
40 na2xseyby3x300Kabel NA2XSEYBY 20 KV, 3 x 300 mm² Mtr PLN
41 na2xceyby3x24 Kabel NA2XCEYBY 20 KV, 3 x 240 mm² Mtr PLN
42 na2xceyby3x30 Kabel NA2XCEYBY 20 KV, 3 x 300 mm² Mtr PLN
43 nyaf2.5 Kabel NYA Fleksibel 2.5 mm² Mtr PLN
44 nyaf4 Kabel NYA Fleksibel 4 mm² Mtr PLN
45 nyaf6 Kabel NYA Fleksibel 6 mm² Mtr PLN
46 nyaf10 Kabel NYA Fleksibel 10 mm² Mtr PLN
47 nyaf16 Kabel NYA Fleksibel 16 mm² Mtr PLN
48 nym2x2.5 Kabel NYM 2 x 2.5 mm² Mtr PLN
49 nym3x2.5 Kabel NYM 3 x 2.5 mm² Mtr PLN
50 nym2x4 Kabel NYM 2 x 4 mm² Mtr PLN
51 nym3x4 Kabel NYM 3 x 4 mm² Mtr PLN
52 mvtic3x150 MVTIC 3 x 150 + N 95 mm² Mtr PLN
53 mvtic3x240 MVTIC 3 x 240 + N 95 mm² Mtr PLN

N SEPATU KABEL
1 al/cur35 Sepatu Kabel AL/CU Ring-35 mm² Bh 27,000
2 al/cur50 Sepatu Kabel AL/CU Ring-50 mm² Bh 30,000
3 al/cur70 Sepatu Kabel AL/CU Ring-70 mm² Bh 40,000
4 al/cur95 Sepatu Kabel AL/CU Ring-95 mm² Bh 50,000
5 al/cur120 Sepatu Kabel AL/CU Ring-120 mm² Bh 70,000
6 al/cur150 Sepatu Kabel AL/CU Ring-150 mm² Bh 80,000
7 al/cur185 Sepatu Kabel AL/CU Ring-185 mm² Bh 83,200
8 al/cur240 Sepatu Kabel AL/CU Ring-240 mm² Bh 98,000
9 al/cur300 Sepatu Kabel AL/CU Ring-300 mm² Bh 120,000
10 al/cuk35 Sepatu Kabel AL/CU Kepala-35 mm² Bh 39,100
11 al/cuk50 Sepatu Kabel AL/CU Kepala-50 mm² Bh 48,800
12 al/cuk70 Sepatu Kabel AL/CU Kepala-70 mm² Bh 51,600
13 al/cuk95 Sepatu Kabel AL/CU Kepala-95 mm² Bh 54,200
14 al/cuk120 Sepatu Kabel AL/CU Kepala-120 mm² Bh 68,300
15 al/cuk150 Sepatu Kabel AL/CU Kepala-150 mm² Bh 77,300
16 al/cuk185 Sepatu Kabel AL/CU Kepala-185 mm² Bh 108,000
17 al/cuk240 Sepatu Kabel AL/CU Kepala-240 mm² Bh 97,500
18 al/cul2150 Sepatu Kabel AL/CU 2 Lubang 150 mm² Bh 120,800
19 al/cul2240 Sepatu Kabel AL/CU 2 Lubang 240 mm² Bh 130,000
20 al/al35 Sepatu Kabel AL/AL-25 mm² Bh 13,500
21 al/al50 Sepatu Kabel AL/AL-50 mm² Bh 17,100
22 al/al70 Sepatu Kabel AL/AL-70 mm² Bh 18,900
23 al/al95 Sepatu Kabel AL/AL-95 mm² Bh 20,400
24 al/al120 Sepatu Kabel AL/AL-120 mm² Bh 27,800

25 - 120
NO. KODE NAMA BARANG SAT HARGA SATUAN KET

25 al/al150 Sepatu Kabel AL/AL-150 mm² Bh 36,200


26 al/al240 Sepatu Kabel AL/AL-240 mm² Bh 60,200
27 cu/cu25 Sepatu Kabel CU/CU-25 mm² Bh 18,000
28 cu/cu35 Sepatu Kabel CU/CU-35 mm² Bh 20,100
29 cu/cu50 Sepatu Kabel CU/CU-50 mm² Bh 29,900
30 cu/cu70 Sepatu Kabel CU/CU-70 mm² Bh 39,100
31 cu/cu95 Sepatu Kabel CU/CU-95 mm² Bh 48,300
32 cu/cu150 Sepatu Kabel CU/CU 150 mm2 Bh 79,500
33 cu/cu240 Sepatu Kabel CU/CU 240 mm2 Bh 130,000
34 al/cul2r240-300 Sepatu Kabel AL/CU 2 Lubang 240-300 mm² Bh 132,000

O AKSESORIES APP
1 aapp1 Kawat segel Roll PLN
2 aapp2 Timah Segel Kg PLN
3 aapp2.1 Service Wedge Clamp 6-16 mm² Set 3,000
4 aapp2.2 Service Wedge Clamp 6-25 mm² Set 2,000
5 aapp2.3 Service Wedge Clamp 6, 10, 16, 25 mm² Set 3,200
6 aapp6 Strain Hook Clamp 1 ½" Set 9,000
7 aapp7 Strain Hook Ekor Babi Set 4,700
8 aapp8 Loden Manset 0.8 Kg Bh 46,000
9 aapp9 Protective Cup 1 ½" Bh 12,000
10 aapp10 Protective Cup Plastik 1 ½" Bh 4,100
11 aapp11 Tap Connector Kedap Air ( 6-25 / 6-25 ) mm² Set 6,900
12 aapp12 Tap Connector Kedap Air ( 35-70 / 35-70 ) mm² Set 12,400
13 aapp13 Tap Connector Kedap Air ( 6-25 / 35-70 ) mm² Set 10,800
14 aapp14 Tap Connector Berbadan Logam ( 6-25 / 6-25 ) mm² Set 17,900
15 aapp15 Tap Connector Berbadan Logam ( 35-70 / 35-70 ) mm² Set 19,600
16 aapp16 Tap Connector Berbadan Logam ( 6-25 / 35-70 ) mm² Set 19,600
17 aapp17 Connector Bimetal 16-6 mm² Set 14,400
18 aapp18 Connector Bimetal 16-10 mm² Set 14,400
19 aapp19 Connector Bimetal 16-16 mm² Set 14,400
20 aapp20 Connector Bimetal 50-50 mm² Set 48,100
21 aapp21 Connector Bimetal 70-35 mm² Set 48,100
22 aapp22 Connector Bimetal 50-70 mm² Set 48,100
23 aapp23 Connector Bimetal 70-70 mm² Set 50,600
24 aapp24 Connector Bimetal 95-70 mm² Set 54,100
25 aapp25 Connector Bimetal 70-50 mm² Set 64,700
26 aapp26 Connector Bimetal 70-95 mm² Set 60,000
27 aapp27 Connector Bimetal 120-70 mm² Set 50,000
28 aapp28 Connector Bimetal 70-120 mm² Set 62,000
29 aapp29 Connector Bimetal 120-120 mm² Set 80,000
30 aapp30 Pole Bracket Three Way 3"-4" Set 23,200
31 aapp32 Pole Bracket Three Way 8"-9" Set 26,600
32 aapp32.1 Pole Bracket Two Way 6"-7" Set 14,400
33 aapp32.2 Pole Bracket Two Way 8"-9" Set 29,200
34 aapp33 Pole Attachment Fitting / L bracket Set 4,400
35 aapp34 Fixing Collar Set 4,400
36 aapp35.1 Bimetalic Connector AL/AL 70-70 mm² Set 8,300
37 aapp38 Klem Bugel 1 1/2" untuk tiang atap Set 4,800
38 aapp39 Gas Pipe 1 1/2" x 6 m Btg 44,717
39 aapp39.1 Gas Pipe 1 ½" x 1.5 Meter Btg 32,000

P AKSESORIES TM
1 hw1 Armour Rod # for 35 mm² Set 25,000
2 hw2 Armour Rod # for 50 mm² Set 25,000
3 hw3 Armour Rod # for 70 mm² Set 40,200
4 hw4 Armour Rod # for 150 mm² Set 58,800
5 hw5 Armour Rod # for 240 mm² Set 80,000
6 hw6 Armour Tape ¼" wide Mtr 4,300
7 hw7 Bimetalic Connector 35 - 240 mm² Bh 36,100
8 hw8 Ball Clevis Socket Eyes Bh 56,500
9 hw9 Bolt Double Arming ⅝ " x 16 - 24" Bh 25,100
10 hw10 Bolt Double Arming ⅝" x 10" Bh 23,500
11 hw11 Bolt Double Arming ⅝" x 12" Bh 23,500
12 hw12 Bolt Double Arming ⅝" x 14" Bh 23,500
13 hw13 Bolt Double Up Side ⅝" x (14 - 22") Bh 27,400
14 hw14 Bolt Double Up Side ⅝" x 10" Bh 25,100
15 hw15 Bolt Double Up Side ⅝" x 12" Bh 25,100
16 hw16 Bolt Double Up Side ⅝" x 9" Bh 23,500
17 hw17 Bolt Double Up Side ⅝" x 8" Bh 23,500
18 hw18 Bolt Machine / Bolt cariage ½" x ¾" Bh 2,900
19 hw19 Bolt Machine ⅝" x (14 - 22") Bh 14,000
20 hw20 Bolt Machine ⅝" x 10" Bh 9,400

26 - 120
NO. KODE NAMA BARANG SAT HARGA SATUAN KET

21 hw21 Bolt Machine ⅝" x 12" Bh 9,400


22 hw22 Bolt Machine ⅝" x 8" Bh 9,400
23 hw23 Bolt Machine ⅝" x 9" Bh 9,400
24 hw24 Bolt Single Up Side ⅝" x 10" Bh 25,100
25 hw25 Bolt Single Up Side ⅝" x 12" Bh 25,100
26 hw26 Bolt Single Up Side ⅝" x 8" Bh 24,300
27 hw27 Bolt Single Up Side ⅝" x 9" Bh 24,300
28 hw28 Brace Steel 550 mm Bh 19,400
29 hw29 Brace Steel 770 mm Bh 25,900
30 hw30 Brace Steel 1.262 mm Bh 58,800
31 hw31 Bracket Extension for cut out Bh 40,000
32 hw32 Bracket Secondary / Bracket insulated Bh 7,400
33 hw33 Bracket band segment,vertikal plat ( Hot dip galvanis ) Bh 235,500
34 hw33.1 Bracket Transformer cluster and adapter Bh 196,200
35 hw34 Center Bracket 6 KN Bh 54,100
36 hw35 Center Bracket 12.5 KN Bh 54,100
37 hw36 Clevis Swinging Secondary Bh 9,400
38 hw37 Compresion Conector H type 150 mm² / 240 mm² Bh 28,200
39 hw38 Compresion Conector H type 240 mm² / 240 mm² Bh 29,800
40 hw39 Compresion Conector H type 50 mm² / 70 mm² Bh 14,100
41 hw40 Compresion Conector H type 70 mm² / 150 mm² Bh 20,400
42 hw41 Compresion Conector H type 70 mm² / 70 mm² Bh 20,400
43 hw42 Compresion Terminal Lug 35 mm² Bh 6,600
44 hw43 Compresion Terminal Lug 50 mm² Bh 6,600
45 hw44 Compresion Terminal Lug 70 mm² Bh 9,400
46 hw45 Compresion Terminal Lug 150 mm² Bh 9,400
47 hw46 Compresion Terminal Lug 240 mm² Bh 14,100
48 hw47 Cross Arm Steel 1.500 mm ( UNSP 10 ) galvanis Bh 170,000
49 hw48 Cross Arm Steel 2.000 mm ( UNSP 10 ) galvanis Bh 230,000
50 hw49 Cross Arm Steel 3.000 mm ( UNSP 10 ) galvanis Bh 350,000
51 hw50 Cross Arm Clevis Bh 29,800
52 hw51 Dead End Assembly Bh 45,500
53 hw52 Expanding Anchor 8.000 lbs Bh 70,600
54 hw53 Expanding Anchor 10.000 lbs Bh 70,600
55 hw54 Fixed Dead Assembly 25-35 mm² Bh 45,500
56 hw55 Fixed Dead Assembly 50-70 mm² Bh 51,000
57 hw56 Adjustable Dead End Assembly 25-35 mm² Bh 64,300
58 hw57 Adjustable Dead End Assembly 50-70 mm² Bh 74,500
59 hw58 Blundle protection Set 35-70 mm² Bh 51,000
60 hw59 Compression Joint LVTC+ Heat Shrink 35 Bh 14,100
61 hw60 Compression Joint LVTC+ Heat Shrink 50 Bh 16,400
62 hw61 Compression Joint LVTC+ Heat Shrink 70 Bh 21,100
63 hw62 Compression Joint LVTC+ Heat Shrink 150 Bh 29,800
64 hw63 Compression Joint LVTC+ Heat Shrink 240 Bh 29,800
65 hw64 Frefomed guy wire 22 mm² Bh 21,100
66 hw65 Frefomed guy wire 35 mm² Bh 25,100
67 hw66 Frefomed guy wire 70 mm² Bh 29,400
68 hw198 Ground rod & Washer Bh 5,800
69 hw68 Ground rod ⅝" x 8" Copper Weld Bh 125,000
70 hw69 Ground rod ⅝" x 8" Galvanis Bh 115,000
71 hw70 Ground wire Cu 16 mm² Mtr 14,100
72 hw71 Ground wire Cu 25 mm² Mtr 25,900
73 hw72 Ground wire Cu 50 mm² Mtr 47,800
74 hw197 Clamp Ground Rod ⅝" Bh 3,100
75 hw73 Grounding Iron Plate Form Plat / Eart safety mats Bh 706,500
76 hw74 Guy Attachment / Guy hok Bh 5,800
77 hw75 Guy Wire 22 mm² Mtr 5,800
78 hw76 Guy Wire 35 mm² Mtr 8,600
79 hw77 Guy Wire 70 mm² Mtr 16,400
80 hw78 Hot Line Clamp ( 35mm² s/d 70 mm² ) Bh 53,300
81 hw79 Hot Line Clamp ( 150mm² s/d 240 mm² ) Bh 105,900
82 hw183 Insulating Tape Bh 2,900
83 hw80 Joint sleeve 35 mm² Bh 21,900
84 hw81 Joint sleeve 50 mm² Bh 21,900
85 hw82 Joint sleeve 70 mm² Bh 29,800
86 hw83 Joint sleeve 150 mm² Bh 47,100
87 hw84 Joint sleeve 240 mm² Bh 47,100
88 aapp40 Kawat Bendrad 6 mm² Mtr 3,200
89 aapp41 Kawat Las Bh 3,200
90 hw85 Kousen Bh 3,100
91 hw86 Large Angle Assembly 25-35 mm² Bh 62,800
92 hw87 Large Angle Assembly 50-70 mm² Bh 62,800
93 hw88 Lock Nut ⅝" Bh 7,000

27 - 120
NO. KODE NAMA BARANG SAT HARGA SATUAN KET

94 hw89 Loop Dead End Clamp / LC ( 35 s/d 240 ) mm² Bh 18,000


95 hw90 Live Line Connector 240 mm² Bh 82,400
96 hw91 Live Line Connector 150 mm² Bh 82,400
97 hw92 Live Line Connector 70 mm² Bh 82,400
98 hw93 Nut Timble eye ⅝" Bh 7,800
99 hw94 Oval Eye Bolt ⅝" x 8" Bh 11,700
100 hw95 Oval Eye Bolt ⅝" x 9" Bh 11,700
101 hw96 Oval Eye Bolt ⅝" x ( 14" s/d 22" ) Bh 14,900
102 hw97 Oval Eye Bolt ⅝" x 10" Bh 11,700
103 hw98 Oval Eye Bolt ⅝" x 12" Bh 11,700
104 hw99 Oval Eye Nut ⅝" Bh 13,300
105 hw100 Parallel group clamp AL/AL 25-70 mm² Bh 13,300
106 hw101 Parallel group clamp AL/AL 70-150 mm² Bh 21,900
107 hw102 Parallel group clamp AL/AL 150-240 mm² Bh 29,800
108 hw103 Pin adapter Insulator Bh 25,100
109 hw171 Pipa Pralon 2 1/2" Bh 49,400
110 hw172 Pipa Pralon 3" Bh 58,800
111 hw174 Knee Pipe 2 ½" Bh 5,700
112 hw175 Knee Pipe 3" Bh 5,700
113 hw177 Spiral Pralon 2 ½" Mtr 39,200
114 hw178 Spiral Pralon 3" Mtr 49,400
115 hw195 Pipe Cap Galvanis 2 ½" Bh 28,200
116 hw196 Pipe Galvanis 2" 6' Bh 94,200
117 hw104 Plastic Strap for Clamping Bh 1,500
118 hw200 Plat Besi 4 mm x 4 cm x 8 cm Bh 35,300
119 hw105 Pole Band Double Rack 3" atau 3 ½" Bh 21,100
120 hw106 Pole Band Double Rack 4" atau 4 ½" Bh 21,100
121 hw107 Pole Band Double Rack 5" atau 5 ½" Bh 25,100
122 hw108 Pole Band Double Rack 6" atau 6 ½" Bh 25,100
123 hw109 Pole Band Double Rack 7" atau 7 ½" Bh 30,600
124 hw110 Pole Band Double Rack 8" atau 8 ½" Bh 30,600
125 hw111 Pole Band Double Rack 9" atau 12" Bh 31,400
126 hw112 Pole Band Double Up Side 3" atau 3 ½" Bh 23,500
127 hw113 Pole Band Double Up Side 4" atau 4 ½" Bh 27,400
128 hw114 Pole Band Double Up Side 5" atau 5 ½" Bh 28,200
129 hw115 Pole Band Double Up Side 6" atau 6 ½" Bh 29,800
130 hw116 Pole Band Double Up Side 7" atau 7 ½" Bh 42,300
131 hw117 Pole Band Double Up Side 8" atau 8 ½" Bh 47,800
132 hw118 Pole Band Double Up Side 9" atau 12" Bh 47,800
133 hw119 Pole Band Single Rack 3" atau 3 ½" Bh 19,600
134 hw120 Pole Band Single Rack 4" atau 4 ½" Bh 19,600
135 hw121 Pole Band Single Rack 5" atau 5 ½" Bh 19,600
136 hw122 Pole Band Single Rack 6" atau 6 ½" Bh 19,600
137 hw123 Pole Band Single Rack 7" atau 7 ½" Bh 24,300
138 hw124 Pole Band Single Rack 8" atau 8 ½" Bh 24,300
139 hw125 Pole Band Single Rack 9" atau 12" Bh 26,600
140 hw126 Pole Band Single Up Side 3" atau 3 ½" Bh 22,700
141 hw127 Pole Band Single Up Side 4" atau 4 ½" Bh 25,900
142 hw128 Pole Band Single Up Side 5" atau 5 ½" Bh 25,900
143 hw129 Pole Band Single Up Side 6" atau 6 ½" Bh 29,000
144 hw130 Pole Band Single Up Side 7" atau 7 ½" Bh 36,000
145 hw131 Pole Band Single Up Side 8" atau 8 ½" Bh 36,000
146 hw132 Pole Band Single Up Side 9" atau 12" Bh 36,000
147 hw133 Primary Angle Clamp ( 35 s/d 70 ) mm² Bh 25,000
148 hw134 Primary Angle Clamp ( 150 s/d 240 ) mm² Bh 40,800
149 hw135 Primary Dead End Clamp ( 35 s/d 70 ) mm² Bh 53,000
150 hw136 Primary Dead End Clamp ( 70 s/d 150 ) mm² Bh 53,000
151 hw137 Primary Dead End Clamp ( 150 s/d 240 ) mm² Bh 62,800
152 hw138 Rod Anchor ¾" x 8' Bh 74,500
153 hw139 Rod Anchor ⅝" x 7' Bh 61,200
154 hw140 Schackle Anchor ⅝" Bh 10,200
155 hw141 Side Bracket Bh 51,000
156 hw185 Split Plastic Sleve ( Tutup Kabel ) Bh 1,800
157 hw142 Spool Insulator ANSI 53 - 2 Bh 10,200
158 hw143 Spool Insulator ANSI 53 - 4 Bh 15,700
159 hw144 Stainless Steel Strap 20 x 0.7 mm Mtr 10,200
160 hw147 Steel L 70 x 70 x 7 x 780 mm galvanis Bh 70,600
161 hw145 Steel L 70 x 70 x 7 x 1.000 mm galvanis Bh 78,500
162 hw145.1 Steel L 70 x 70 x 7 x 1.250 mm galvanis Bh 78,500
163 hw146 Steel L 70 x 70 x 7 x 1.682 mm galvanis Bh 149,100
164 hw145.2 Steel L 70 x 70 x 7 x 3.000 mm galvanis Bh 149,100
165 hw145.3 Steel Channel C NP 8 x 1.750 Bh 157,000
166 hw145.4 Steel Channel C NP 8 x 1.250 Bh 157,000

28 - 120
NO. KODE NAMA BARANG SAT HARGA SATUAN KET

167 hw145.5 Steel Channel C NP 8 x 1.390 Bh 157,000


168 hw148 Stopping Buckle / Yokes Bh 1,400
169 hw149 Strain Clamp A3C, ACSR 25-70 mm² Bh 33,700
170 hw150 Strain Clamp A3C, ACSR 70-150 mm² Bh 51,000
171 hw151 Strain Clamp A3C, ACSR 150-240 mm² Bh 74,500
172 hw152 Strain Clamp A3C, ACSR 240-400 mm² Bh 74,500
173 hw153 Suspension / Small Angle Assembly Bh 43,100
174 hw154 Suspension Clamp AL Bh 13,300
175 hw155 Suspension Clamp Plastic Bh 6,600
176 hw156 Suspension Clamp Bracket / Pole Bracket Bh 14,900
177 hw158.1 Strain Clamp Wedge 25-70 mm² Bh 21,100
178 hw158.2 Strain Clamp Wedge 70-150 mm² Bh 21,100
179 hw159 Tap connector ( 35 s/d 70 ) mm² Bh 4,700
180 hw160 Tap connector ( 35 s/d 150 ) mm² Bh 8,600
181 hw161 Tap connector ( 70 s/d 150 ) mm² Bh 11,700
182 hw162 Tap connector ( 70 s/d 240 ) mm² Bh 17,200
183 hw163 Tension Bracket Bh 13,300
184 hw164 Link Bh 1,400
185 hw165 Plastic Strap / Cable Ties Bh 1,400
186 hw166 Three Bolt Clamp Bh 25,100
187 hw167 Tie Wire # 4 / Alluminium bonding wire # 20 Mtr 3,100
188 hw199 U Bolt Connector Bh 27,400
189 hw168 Washer Round ⅜" Bh 1,100
190 hw169 Washer Square 2 ¼" Bh 1,100

Q AKSESORIES KABEL TANAH


1 p1.1 Terminating kabel 1 x 70 mm² OD Set 863,500
2 p10 Terminating kabel 1 x 95 mm2 ID Set 1,020,500
3 p12 Terminating kabel 1 x 95 mm2 OD Set 1,373,700
4 p6 Terminating kabel 1 x 240 mm2 ID Set 1,059,700
5 p8 Terminating kabel 1 x 240 mm2 OD Set 1,413,000
6 p2 Terminating kabel 1 x 300 mm2 ID Set 1,059,700
7 p4 Terminating kabel 1 x 300 mm2 OD Set 1,413,000
8 p4.1 Terminating kabel 3 x 70 mm² ID Set 1,177,500
9 p4.2 Terminating kabel 3 x 70 mm² OD Set 1,413,000
10 p9 Terminating kabel 3 x 95 mm2 ID Set 1,177,500
11 p11 Terminating kabel 3 x 95 mm2 OD Set 1,413,000
12 p11.1 Terminating kabel 3 x 150 mm² ID Set 1,413,000
13 p11.2 Terminating kabel 3 x 150 mm² OD Set 1,648,500
14 p5 Terminating kabel 3 x 240 mm2 ID Set 1,805,500
15 p7 Terminating kabel 3 x 240 mm2 OD Set 2,198,000
16 p1 Terminating kabel 3 x 300 mm2 ID Set 1,570,000
17 p3 Terminating kabel 3 x 300 mm2 OD Set 1,805,500
18 p13 Jointing Raychem 24 kV 3 x 300 mm2 (Armoured) OD Set 1,648,500
19 p14 Jointing Raychem 24 kV 3 x 1 x 300 mm2 (Armoured) ID Set 1,884,000
20 p15 Jointing Raychem 24 kV 3 x 240 mm2 (Armoured) OD Set 1,648,500
21 p16 Jointing Raychem 24 kV 3 x 1 x 240 mm2 (Armoured) ID Set 1,884,000
22 p17 Jointing Raychem 24 kV 3 x 95 mm2 (Armoured) OD Set 1,648,500
23 p18 Jointing Raychem 24 kV 3 x 1 x 95 mm2 (Armoured) ID Set 1,884,000
24 p19 Suplement kit XLPE-PILC 3 x 150-240 Set 1,907,500
25 p20 Suplement kit XLPE-PILC 3 x 300-400 Set 2,983,000
26 p21 Suplement kit XLPE-PILC 3 x 150-240 (IJKA) Set 5,377,200
27 p22 Klem beugel bevesteging 8 x 6" Bh 23,500
28 p25 Klem beugel 7/8" Bh 7,800
29 p25.1 Pipa PVC ½" Bh 4,300
30 p25.2 Pipa PVC ¾" panjang 4 meter Bh 12,500
31 p25.3 Pipa PVC 3" panjang 4 meter Bh 58,800
32 p23 Pipa PVC 6" panjang 4 meter Bh 94,200
33 p23.1 Pipa Besi Galvanis 3" Tebal 4 mm Panjang 6 Meter Bh 235,500
34 p24 Pipa Shock PVC Bh 14,100
35 p26 Tanda Urutan phasa untuk kabel Bh 6,200
36 p27 Stainless steel strap Bh 3,589
37 p27.1 Tanda Kabel TM Bh 7,800

R SKUTM/SKTM
1 skutm24 Strap For Clamping, Type Insulator Bh 11,700
2 skutm25 Suspension Clamp Bh 14,100
3 skutm31 U-Bolt Bh 20,000
4 skutm29 Fixation Device Bh 63,500
5 skutm30 Pole Band Bh 36,800
6 skutm26 Yoke Bh 22,700
7 skutm27 Shackle Bh 8,600
8 skutm10 Parralel Groove Clamp Bh 47,800

29 - 120
NO. KODE NAMA BARANG SAT HARGA SATUAN KET

9 skutm11 Strain Clamp Bolted Type Bh 30,600


10 skutm12 Turn Buckle Bh 58,800
11 skutm13 Strain Hinge Bh 37,600
12 skutm17 H Type Connector 50/50 mm² Cu Bh 25,100
13 skutm02 Cooper Strip 50 mm² Insulated Ground Colour Bh 21,900
14 skutm03 PVC Pipe 150 mm² Bh 35,300
15 skutm06 Protective Plastic Bh 2,100
16 skutm05 Link 50 x 25 mm Bh 2,100
17 skutm04 Strapping Buckle Bh 3,700
18 skutm08 Stainless Steel Strap 20 x 71 Bh 3,000
19 skutm01 Terminal Lug For 50 mm² CU Conductor Bh 98,100
20 skutm07 Stainless Steel Bolt 12 x 45 Bh 10,900
21 skutm15 Set Of Cable Terminator For 3x150aac+90 st Bh 44,700
22 skutm18 Terminal Lug For 150 mm² CU conductor Bh 23,500
23 skutm19 H Type Connector Bh 12,100
24 skutm20 Three Pole Outdoor Terminator For 3x240 mm² AL XLPE U/G CABLE Bh 2,983,000
25 skutm22 Support Assembly For TIC Terminator Bh 22,000
26 skutm23 Single Support On Single Pole 2000mm Bh 314,000

S PEMBUATAN SALURAN KABEL GI


1 skgi1 Urugan Pasir Padat m3 117,700
2 skgi2 Pembuatan Lantai Kerja m3 314,000
3 skgi3 Pembuatan Beton Bertulang K225 m3 1,962,500
4 skgi4 Pembuatan Tutup Beton Bertulang K225 m3 1,962,500
5 skgi5 Besi Siku 70 untuk Tray Kabel Power pcs 179,450

T PEMBUATAN GALIAN TANAH


1 hw201 Mur Baut Ring Plat Ring Per Stainless Steel Ukuran 19 mm Bh 9,400

U HARGA SATUAN DASAR BAHAN


1 bahan1 Pasir Urug darat Bh 74,500
2 bahan2 Pasir Pasang Bh 144,045
3 bahan3 Pasir beton Bh 160,050
4 bahan4 Sirtu Bh 140,165
5 bahan5 Split Bh 223,700
6 bahan6 Batu pecah (split 1-2cm) Bh 176,600
7 bahan7 Batu pecah (split 2-3cm) Bh 176,600
8 bahan8 Semen 3 roda (50kg) Bh 43,100
9 bahan9 Semen 3 roda Bh 1,504
10 bahan10 Besi beton bulat Bh 8,600
11 bahan11 Besi beton ulir Bh 9,800
12 bahan12 Besi beton ulir (ton) Bh 9,800,000
13 bahan13 Batu Bata Merah Bh 600
14 bahan14 Batu Kali Belah Bh 171,787
15 bahan15 Kayu Kamper balok Bh 406,600
16 bahan16 Kayu kruing 8 x 12 x 400 Bh 290,400
17 bahan17 Kayu meranti (Kelas 3) Bh 125,600
18 bahan18 Dolken 7-10 Bh 157,000
19 bahan19 Plywood Sugkat Bh 117,700
20 bahan20 Paku ukuran 5-10cm Bh 11,700
21 bahan21 Minyak bekisting (plus oil) Bh 3,100
22 bahan22 sheet pile CCSP Bh 7,800
23 bahan23 kawat beton Bh 14,100
24 bahan24 Aspal AC 60-70 Bh 16,296
25 bahan25 Kayu bakar Bh 174,600
26 bahan26 Tanah timbunan Bh 39,200

PT SEKAWAN TRIYASA SOLUSINDO PT PLN (PERSERO) AREA SURAKARTA


DIREKTUR MANAJER

SUKRISNO TRISNO RAHARJO MUNDHAKIR

30 - 120
PT. PLN (PERSERO)
DISTRIBUSI JAWA TENGAH DAN D.I. YOGYAKARTA
AREA SURAKARTA

ANALISA PER UNIT KONSTRUKSI


PEKERJAAN PEMBANGUNAN JARINGAN DISTRIBUSI 20 KV
TAHUN ANGGARAN 2018

HARGA SATUAN BIAYA YANG DIPERLUKAN


NO. PERINCUAN PER UNIT KONSTRUKSI STN VOL MATERIAL MATERIAL TOTAL
JASA/UPAH JASA/UPAH
MDU HARDWARE MDU HARDWARE
PRIMARY LINE 1 PHASA
1 CA1 Unit 1
1 Isolator Tumpu (Line Post) 20 KV Bh 1 PLN PLN - - -
2 Bolt Machine ⅝" x 10" Bh 2 9,400 - 18,800 - 18,800
3 Center Bracket 12.5 KN Bh 1 54,100 - 54,100 - 54,100
4 Lock Nut ⅝" Bh 2 7,000 - 14,000 - 14,000
5 Pole Band Single Up Side 7" atau 7 ½" Bh 1 36,000 - 36,000 - 36,000
6 Spool Insulator ANSI 53 - 2 Bh 1 10,200 - 10,200 - 10,200
7 Tie Wire # 4 / Alluminium bonding wire # 20 Mtr 2.6 3,100 - 8,060 - 8,060
8 Washer Square 2 ¼" Bh 2 1,100 - 2,200 - 2,200
9 Upah Pasang Konst. JTM 1 Fasa CA1 Unit 1 30,000 - - 30,000 30,000
Sub Jumlah CA1 - 143,360 30,000 173,360
2 CA1' Unit 1
1 Isolator Tumpu (Line Post) 20 KV Bh 1 PLN PLN - - -
2 Bolt Machine ⅝" x 10" Bh 2 9,400 - 18,800 - 18,800
3 Center Bracket 12.5 KN Bh 1 54,100 - 54,100 - 54,100
4 Lock Nut ⅝" Bh 2 7,000 - 14,000 - 14,000
5 Tie Wire # 4 / Alluminium bonding wire # 20 Mtr 1.8 3,100 - 5,580 - 5,580
6 Washer Square 2 ¼" Bh 2 1,100 - 2,200 - 2,200
7 Upah Pasang Konst. JTM 1 Fasa CA1' Unit 1 12,000 - - 12,000 12,000
Sub Jumlah CA1' - 94,680 12,000 106,680
3 CA1-N Unit 1
1 Isolator Tumpu (Line Post) 20 KV Bh 1 PLN PLN - - -
2 Bolt Machine ⅝" x 10" Bh 1 9,400 - 9,400 - 9,400
3 Lock Nut ⅝" Bh 2 7,000 - 14,000 - 14,000
4 Pole Band Single Rack 7" atau 7 ½" Bh 1 24,300 - 24,300 - 24,300
5 Pole Band Single Up Side 7" atau 7 ½" Bh 1 36,000 - 36,000 - 36,000
6 Side Bracket Bh 1 51,000 - 51,000 - 51,000
7 Spool Insulator ANSI 53 - 2 Bh 1 10,200 - 10,200 - 10,200
8 Tie Wire # 4 / Alluminium bonding wire # 20 Mtr 2.6 3,100 - 8,060 - 8,060
9 Washer Square 2 ¼" Bh 3 1,100 - 3,300 - 3,300
10 Upah Pasang Konst. JTM 1 Fasa CA1-N Unit 1 30,000 - - 30,000 30,000
Sub Jumlah CA1-N - 156,260 30,000 186,260
4 CA1-PN Unit 1
1 Isolator Tumpu (Line Post) 20 KV Bh 1 PLN PLN - - -
2 Bolt Machine ⅝" x 10" Bh 1 9,400 - 9,400 - 9,400
3 Bracket Secondary / Bracket insulated Bh 1 7,400 - 7,400 - 7,400
4 Lock Nut ⅝" Bh 2 7,000 - 14,000 - 14,000
5 Pole Band Single Rack 7" atau 7 ½" Bh 2 24,300 - 48,600 - 48,600
6 Side Bracket Bh 1 51,000 - 51,000 - 51,000
7 Spool Insulator ANSI 53 - 2 Bh 1 10,200 - 10,200 - 10,200
8 Tie Wire # 4 / Alluminium bonding wire # 20 Mtr 2.6 3,100 - 8,060 - 8,060
9 Washer Square 2 ¼" Bh 3 1,100 - 3,300 - 3,300
10 Upah Pasang Konst. JTM 1 Fasa CA1-PN Unit 1 30,000 - - 30,000 30,000
Sub Jumlah CA1-PN - 151,960 30,000 181,960
5 CA1-P Unit 1
1 Isolator Tumpu (Line Post) 20 KV Bh 1 PLN PLN - - -
2 Bolt Machine ⅝" x 10" Bh 2 9,400 - 18,800 - 18,800
3 Bracket Secondary / Bracket insulated Bh 1 7,400 - 7,400 - 7,400
4 Center Bracket 12.5 KN Bh 1 54,100 - 54,100 - 54,100
5 Lock Nut ⅝" Bh 2 7,000 - 14,000 - 14,000
6 Pole Band Single Rack 7" atau 7 ½" Bh 1 24,300 - 24,300 - 24,300
7 Spool Insulator ANSI 53 - 2 Bh 1 10,200 - 10,200 - 10,200
8 Tie Wire # 4 / Alluminium bonding wire # 20 Mtr 2.6 3,100 - 8,060 - 8,060
9 Washer Square 2 ¼" Bh 2 1,100 - 2,200 - 2,200
10 Upah Pasang Konst. JTM 1 Fasa CA1-P Unit 1 30,000 30,000 - 30,000 30,000 60,000
Sub Jumlah CA1-P - 169,060 30,000 199,060
6 CA1-P' Unit 1
1 Isolator Tumpu (Line Post) 20 KV Bh 1 PLN PLN - - -
2 Bolt Machine ⅝" x 10" Bh 2 9,400 - 18,800 - 18,800
3 Center Bracket 12.5 KN Bh 1 54,100 - 54,100 - 54,100
4 Lock Nut ⅝" Bh 2 7,000 - 14,000 - 14,000
5 Tie Wire # 4 / Alluminium bonding wire # 20 Mtr 1.8 3,100 - 5,580 - 5,580
6 Washer Square 2 ¼" Bh 2 1,100 - 2,200 - 2,200
7 Upah Pasang Konst. JTM 1 Fasa CA1-P' Unit 1 12,000 - - 12,000 12,000
Sub Jumlah CA1-P' - 94,680 12,000 106,680
7 CA2 Unit 1
1 Isolator Tumpu (Line Post) 20 KV Bh 2 PLN PLN - - -
2 Bolt Machine ⅝" x 10" Bh 2 9,400 - 18,800 - 18,800
3 Bracket Secondary / Bracket insulated Bh 1 7,400 - 7,400 - 7,400
4 Center Bracket 12.5 KN Bh 2 54,100 - 108,200 - 108,200
5 Lock Nut ⅝" Bh 2 7,000 - 14,000 - 14,000
6 Pole Band Single Rack 7" atau 7 ½" Bh 1 24,300 - 24,300 - 24,300
7 Spool Insulator ANSI 53 - 2 Bh 1 10,200 - 10,200 - 10,200
8 Tie Wire # 4 / Alluminium bonding wire # 20 Mtr 4.4 3,100 - 13,640 - 13,640
9 Washer Square 2 ¼" Bh 2 1,100 - 2,200 - 2,200
10 Upah Pasang Konst. JTM 1 Fasa CA2 Unit 1 53,000 - - 53,000 53,000

31 TO 120
PT. PLN (PERSERO)
DISTRIBUSI JAWA TENGAH DAN D.I. YOGYAKARTA
AREA SURAKARTA

ANALISA PER UNIT KONSTRUKSI


PEKERJAAN PEMBANGUNAN JARINGAN DISTRIBUSI 20 KV
TAHUN ANGGARAN 2018

HARGA SATUAN BIAYA YANG DIPERLUKAN


NO. PERINCUAN PER UNIT KONSTRUKSI STN VOL MATERIAL MATERIAL TOTAL
JASA/UPAH JASA/UPAH
MDU HARDWARE MDU HARDWARE
Sub Jumlah CA2 - 198,740 53,000 251,740
8 CA2' Unit 1
1 Isolator Tumpu (Line Post) 20 KV Bh 2 PLN PLN - - -

32 TO 120
PT. PLN (PERSERO)
DISTRIBUSI JAWA TENGAH DAN D.I. YOGYAKARTA
AREA SURAKARTA

ANALISA PER UNIT KONSTRUKSI


PEKERJAAN PEMBANGUNAN JARINGAN DISTRIBUSI 20 KV
TAHUN ANGGARAN 2018

HARGA SATUAN BIAYA YANG DIPERLUKAN


NO. PERINCUAN PER UNIT KONSTRUKSI STN VOL MATERIAL MATERIAL TOTAL
JASA/UPAH JASA/UPAH
MDU HARDWARE MDU HARDWARE
2 Bolt Machine ⅝" x 10" Bh 2 9,400 - 18,800 - 18,800
3 Center Bracket 12.5 KN Bh 2 54,100 - 108,200 - 108,200
4 Lock Nut ⅝" Bh 2 7,000 - 14,000 - 14,000
5 Tie Wire # 4 / Alluminium bonding wire # 20 Mtr 3.6 3,100 - 11,160 - 11,160
6 Washer Square 2 ¼" Bh 2 1,100 - 2,200 - 2,200
7 Upah Pasang Konst. JTM 1 Fasa CA2' Unit 1 28,800 - - 28,800 28,800
Sub Jumlah CA2' - 154,360 28,800 183,160
9 CA2-N Unit 1
1 Isolator Tumpu (Pin Post) 20 KV Bh 2 PLN PLN - - -
2 Bolt Double Arming ⅝" x 14" Bh 1 23,500 - 23,500 - 23,500
3 Bolt Machine / Bolt cariage ½" x ¾" Bh 2 2,900 - 5,800 - 5,800
4 Bolt Machine ⅝" x 10" Bh 1 9,400 - 9,400 - 9,400
5 Brace Steel 550 mm Bh 2 19,400 - 38,800 - 38,800
6 Bracket Secondary / Bracket insulated Bh 1 7,400 - 7,400 - 7,400
7 Cross Arm Steel 1.500 mm ( UNSP 10 ) galvanis Bh 2 170,000 - 340,000 - 340,000
8 Lock Nut ⅝" Bh 3 7,000 - 21,000 - 21,000
9 Pole Band Double Rack 7" atau 7 ½" Bh 1 30,600 - 30,600 - 30,600
10 Pole Band Single Rack 7" atau 7 ½" Bh 1 24,300 - 24,300 - 24,300
11 Spool Insulator ANSI 53 - 2 Bh 1 10,200 - 10,200 - 10,200
12 Tie Wire # 4 / Alluminium bonding wire # 20 Mtr 4.4 3,100 - 13,640 - 13,640
13 Washer Square 2 ¼" Bh 6 1,100 - 6,600 - 6,600
14 Upah Pasang Konst. JTM 1 Fasa CA2-N Unit 1 53,000 - - 53,000 53,000
Sub Jumlah CA2-N - 531,240 53,000 584,240
10 CA3 Unit 1
1 Isolator Tarik ( Polymer ) 20 KV + Primary Dead End C Set 1 PLN PLN - - -
2 Armour Rod # for 70 mm² Set 2 40,200 - 80,400 - 80,400
3 Clevis Swinging Secondary Bh 1 9,400 - 9,400 - 9,400
4 Lock Nut ⅝" Bh 2 7,000 - 14,000 - 14,000
5 Oval Eye Bolt ⅝" x 10" Bh 2 11,700 - 23,400 - 23,400
6 Primary Angle Clamp ( 35 s/d 70 ) mm² Bh 1 25,000 - 25,000 - 25,000
7 Schackle Anchor ⅝" Bh 1 10,200 - 10,200 - 10,200
8 Spool Insulator ANSI 53 - 4 Bh 1 15,700 - 15,700 - 15,700
9 Tie Wire # 4 / Alluminium bonding wire # 20 Mtr 0.8 3,100 - 2,480 - 2,480
10 Washer Square 2 ¼" Bh 2 1,100 - 2,200 - 2,200
11 Upah Pasang Konst. JTM 1 Fasa CA3 Unit 1 46,800 - - 46,800 46,800
Sub Jumlah CA3 - 182,780 46,800 229,580
11 CA3' Unit 1
1 Isolator Tarik ( Polymer ) 20 KV + Primary Dead End C Set 1 PLN PLN - - -
2 Armour Rod # for 70 mm² Set 1 40,200 - 40,200 - 40,200
3 Lock Nut ⅝" Bh 1 7,000 - 7,000 - 7,000
4 Oval Eye Bolt ⅝" x 10" Bh 1 11,700 - 11,700 - 11,700
5 Primary Angle Clamp ( 35 s/d 70 ) mm² Bh 1 25,000 - 25,000 - 25,000
6 Schackle Anchor ⅝" Bh 1 10,200 - 10,200 - 10,200
7 Washer Square 2 ¼" Bh 1 1,100 - 1,100 - 1,100
8 Upah Pasang Konst. JTM 1 Fasa CA3' Unit 1 27,300 - - 27,300 27,300
Sub Jumlah CA3' - 95,200 27,300 122,500
12 CA3-N Unit 1
1 Isolator Tarik ( Polymer ) 20 KV + Primary Dead End C Set 1 PLN PLN - - -
2 Armour Rod # for 70 mm² Set 2 40,200 - 80,400 - 80,400
3 Clevis Swinging Secondary Bh 1 9,400 - 9,400 - 9,400
4 Lock Nut ⅝" Bh 1 7,000 - 7,000 - 7,000
5 Oval Eye Bolt ⅝" x 10" Bh 1 11,700 - 11,700 - 11,700
6 Oval Eye Nut ⅝" Bh 1 13,300 - 13,300 - 13,300
7 Pole Band Single Rack 7" atau 7 ½" Bh 1 24,300 - 24,300 - 24,300
8 Primary Angle Clamp ( 35 s/d 70 ) mm² Bh 1 25,000 - 25,000 - 25,000
9 Schackle Anchor ⅝" Bh 1 10,200 - 10,200 - 10,200
10 Spool Insulator ANSI 53 - 4 Bh 1 15,700 - 15,700 - 15,700
11 Tie Wire # 4 / Alluminium bonding wire # 20 Mtr 0.8 3,100 - 2,480 - 2,480
12 Washer Square 2 ¼" Bh 1 1,100 - 1,100 - 1,100
13 Upah Pasang Konst. JTM 1 Fasa CA3-N Unit 1 46,800 - - 46,800 46,800
Sub Jumlah CA3-N - 200,580 46,800 247,380
13 CA4 Unit 1
1 Isolator Tarik ( Polymer ) 20 KV + Primary Dead End C Set 2 PLN PLN - - -
2 Armour Tape ¼" wide Mtr 2 4,300 - 8,600 - 8,600
3 Clevis Swinging Secondary Bh 2 9,400 - 18,800 - 18,800
4 Compresion Conector H type 70 mm² / 70 mm² Bh 2 20,400 - 40,800 - 40,800
5 Lock Nut ⅝" Bh 2 7,000 - 14,000 - 14,000
6 Loop Dead End Clamp / LC ( 35 s/d 240 ) mm² Bh 4 18,000 - 72,000 - 72,000
7 Oval Eye Bolt ⅝" x 10" Bh 2 11,700 - 23,400 - 23,400
8 Oval Eye Nut ⅝" Bh 2 13,300 - 26,600 - 26,600
9 Pole Band Single Rack 7" atau 7 ½" Bh 2 24,300 - 48,600 - 48,600
10 Schackle Anchor ⅝" Bh 2 10,200 - 20,400 - 20,400
11 Spool Insulator ANSI 53 - 4 Bh 2 15,700 - 31,400 - 31,400
12 Washer Square 2 ¼" Bh 2 1,100 - 2,200 - 2,200
13 Upah Pasang Konst. JTM 1 Fasa CA4 Unit 1 50,700 - - 50,700 50,700
Sub Jumlah CA4 - 306,800 50,700 357,500
14 CA4' Unit 1
1 Isolator Tarik ( Polymer ) 20 KV + Primary Dead End C Set 2 PLN PLN - - -

33 TO 120
PT. PLN (PERSERO)
DISTRIBUSI JAWA TENGAH DAN D.I. YOGYAKARTA
AREA SURAKARTA

ANALISA PER UNIT KONSTRUKSI


PEKERJAAN PEMBANGUNAN JARINGAN DISTRIBUSI 20 KV
TAHUN ANGGARAN 2018

HARGA SATUAN BIAYA YANG DIPERLUKAN


NO. PERINCUAN PER UNIT KONSTRUKSI STN VOL MATERIAL MATERIAL TOTAL
JASA/UPAH JASA/UPAH
MDU HARDWARE MDU HARDWARE
2 Compresion Conector H type 70 mm² / 70 mm² Bh 1 20,400 - 20,400 - 20,400
3 Lock Nut ⅝" Bh 1 7,000 - 7,000 - 7,000

34 TO 120
PT. PLN (PERSERO)
DISTRIBUSI JAWA TENGAH DAN D.I. YOGYAKARTA
AREA SURAKARTA

ANALISA PER UNIT KONSTRUKSI


PEKERJAAN PEMBANGUNAN JARINGAN DISTRIBUSI 20 KV
TAHUN ANGGARAN 2018

HARGA SATUAN BIAYA YANG DIPERLUKAN


NO. PERINCUAN PER UNIT KONSTRUKSI STN VOL MATERIAL MATERIAL TOTAL
JASA/UPAH JASA/UPAH
MDU HARDWARE MDU HARDWARE
4 Oval Eye Bolt ⅝" x 10" Bh 1 11,700 - 11,700 - 11,700
5 Oval Eye Nut ⅝" Bh 1 13,300 - 13,300 - 13,300
6 Pole Band Single Rack 7" atau 7 ½" Bh 1 24,300 - 24,300 - 24,300
7 Schackle Anchor ⅝" Bh 2 10,200 - 20,400 - 20,400
8 Washer Square 2 ¼" Bh 1 1,100 - 1,100 - 1,100
9 Upah Pasang Konst. JTM 1 Fasa CA4' Unit 1 50,700 - - 50,700 50,700
Sub Jumlah CA4' - 98,200 50,700 148,900
15 CA4-N Unit 1
1 Isolator Tarik ( Polymer ) 20 KV + Primary Dead End C Set 2 PLN PLN - - -
2 Armour Tape ¼" wide Mtr 2 4,300 - 8,600 - 8,600
3 Clevis Swinging Secondary Bh 2 9,400 - 18,800 - 18,800
4 Compresion Conector H type 70 mm² / 70 mm² Bh 2 20,400 - 40,800 - 40,800
5 Lock Nut ⅝" Bh 2 7,000 - 14,000 - 14,000
6 Loop Dead End Clamp / LC ( 35 s/d 240 ) mm² Bh 4 18,000 - 72,000 - 72,000
7 Oval Eye Bolt ⅝" x 10" Bh 2 11,700 - 23,400 - 23,400
8 Oval Eye Nut ⅝" Bh 2 13,300 - 26,600 - 26,600
9 Pole Band Single Rack 7" atau 7 ½" Bh 2 24,300 - 48,600 - 48,600
10 Schackle Anchor ⅝" Bh 2 10,200 - 20,400 - 20,400
11 Spool Insulator ANSI 53 - 4 Bh 2 15,700 - 31,400 - 31,400
12 Washer Square 2 ¼" Bh 2 1,100 - 2,200 - 2,200
13 Upah Pasang Konst. JTM 1 Fasa CA4-N Unit 1 50,700 - - 50,700 50,700
Sub Jumlah CA4-N - 306,800 50,700 357,500
16 CA5 Unit 1
1 Isolator Tarik ( Polymer ) 20 KV + Primary Dead End C Set 1 PLN PLN - - -
2 Armour Tape ¼" wide Mtr 1 4,300 - 4,300 - 4,300
3 Clevis Swinging Secondary Bh 1 9,400 - 9,400 - 9,400
4 Lock Nut ⅝" Bh 2 7,000 - 14,000 - 14,000
5 Loop Dead End Clamp / LC ( 35 s/d 240 ) mm² Bh 2 18,000 - 36,000 - 36,000
6 Oval Eye Bolt ⅝" x 10" Bh 2 11,700 - 23,400 - 23,400
7 Schackle Anchor ⅝" Bh 1 10,200 - 10,200 - 10,200
8 Spool Insulator ANSI 53 - 4 Bh 1 15,700 - 15,700 - 15,700
9 Washer Square 2 ¼" Bh 2 1,100 - 2,200 - 2,200
10 Upah Pasang Konst. JTM 1 Fasa CA5 Unit 1 20,000 - - 20,000 20,000
Sub Jumlah CA5 - 115,200 20,000 135,200
17 CA5' Unit 1
1 Isolator Tarik ( Polymer ) 20 KV + Primary Dead End C Set 1 PLN PLN - - -
2 Lock Nut ⅝" Bh 1 7,000 - 7,000 - 7,000
3 Oval Eye Bolt ⅝" x 10" Bh 1 11,700 - 11,700 - 11,700
4 Schackle Anchor ⅝" Bh 1 10,200 - 10,200 - 10,200
5 Washer Square 2 ¼" Bh 1 1,100 - 1,100 - 1,100
6 Upah Pasang Konst. JTM 1 Fasa CA5' Unit 1 18,000 - - 18,000 18,000
Sub Jumlah CA5' - 30,000 18,000 48,000
18 CA5-N Unit 1
1 Isolator Tarik ( Polymer ) 20 KV + Primary Dead End C Set 1 PLN PLN - - -
2 Armour Tape ¼" wide Mtr 1 4,300 - 4,300 - 4,300
3 Clevis Swinging Secondary Bh 1 9,400 - 9,400 - 9,400
4 Lock Nut ⅝" Bh 2 7,000 - 14,000 - 14,000
5 Loop Dead End Clamp / LC ( 35 s/d 240 ) mm² Bh 2 18,000 - 36,000 - 36,000
6 Oval Eye Bolt ⅝" x 10" Bh 2 11,700 - 23,400 - 23,400
7 Schackle Anchor ⅝" Bh 1 10,200 - 10,200 - 10,200
8 Spool Insulator ANSI 53 - 4 Bh 1 15,700 - 15,700 - 15,700
9 Washer Square 2 ¼" Bh 2 1,100 - 2,200 - 2,200
10 Upah Pasang Konst. JTM 1 Fasa CA5-N Unit 1 20,000 - - 20,000 20,000
Sub Jumlah CA5-N - 115,200 20,000 135,200
19 CA5-1 Unit 1
1 Isolator Tarik ( Polymer ) 20 KV + Primary Dead End C Set 1 PLN PLN - - -
2 Armour Tape ¼" wide Mtr 1 4,300 - 4,300 - 4,300
3 Clevis Swinging Secondary Bh 1 9,400 - 9,400 - 9,400
4 Compresion Conector H type 70 mm² / 70 mm² Bh 2 20,400 - 40,800 - 40,800
5 Lock Nut ⅝" Bh 1 7,000 - 7,000 - 7,000
6 Loop Dead End Clamp / LC ( 35 s/d 240 ) mm² Bh 2 18,000 - 36,000 - 36,000
7 Oval Eye Bolt ⅝" x 10" Bh 1 11,700 - 11,700 - 11,700
8 Oval Eye Nut ⅝" Bh 1 13,300 - 13,300 - 13,300
9 Pole Band Single Rack 7" atau 7 ½" Bh 1 24,300 - 24,300 - 24,300
10 Spool Insulator ANSI 53 - 4 Bh 1 15,700 - 15,700 - 15,700
11 Washer Square 2 ¼" Bh 1 1,100 - 1,100 - 1,100
12 Upah Pasang Konst. JTM 1 Fasa CA5-1 Unit 1 20,000 - - 20,000 20,000
Sub Jumlah CA5-1 - 163,600 20,000 183,600
20 CA5-1' Unit 1
1 Isolator Tarik ( Polymer ) 20 KV + Primary Dead End C Set 1 PLN PLN - - -
2 Compresion Conector H type 70 mm² / 70 mm² Bh 1 20,400 - 20,400 - 20,400
3 Lock Nut ⅝" Bh 1 7,000 - 7,000 - 7,000
4 Oval Eye Bolt ⅝" x 10" Bh 1 11,700 - 11,700 - 11,700
5 Washer Square 2 ¼" Bh 1 1,100 - 1,100 - 1,100
6 Upah Pasang Konst. JTM 1 Fasa CA5-1' Unit 1 18,000 - - 18,000 18,000
Sub Jumlah CA5-1' - 40,200 18,000 58,200
21 CA5-2 Unit 1

35 TO 120
PT. PLN (PERSERO)
DISTRIBUSI JAWA TENGAH DAN D.I. YOGYAKARTA
AREA SURAKARTA

ANALISA PER UNIT KONSTRUKSI


PEKERJAAN PEMBANGUNAN JARINGAN DISTRIBUSI 20 KV
TAHUN ANGGARAN 2018

HARGA SATUAN BIAYA YANG DIPERLUKAN


NO. PERINCUAN PER UNIT KONSTRUKSI STN VOL MATERIAL MATERIAL TOTAL
JASA/UPAH JASA/UPAH
MDU HARDWARE MDU HARDWARE
1 Isolator Tarik ( Polymer ) 20 KV + Primary Dead End C Set 1 PLN PLN - - -
2 Armour Tape ¼" wide Mtr 1 4,300 - 4,300 - 4,300
3 Clevis Swinging Secondary Bh 1 9,400 - 9,400 - 9,400

36 TO 120
PT. PLN (PERSERO)
DISTRIBUSI JAWA TENGAH DAN D.I. YOGYAKARTA
AREA SURAKARTA

ANALISA PER UNIT KONSTRUKSI


PEKERJAAN PEMBANGUNAN JARINGAN DISTRIBUSI 20 KV
TAHUN ANGGARAN 2018

HARGA SATUAN BIAYA YANG DIPERLUKAN


NO. PERINCUAN PER UNIT KONSTRUKSI STN VOL MATERIAL MATERIAL TOTAL
JASA/UPAH JASA/UPAH
MDU HARDWARE MDU HARDWARE
4 Compresion Conector H type 70 mm² / 70 mm² Bh 2 20,400 - 40,800 - 40,800
5 Lock Nut ⅝" Bh 1 7,000 - 7,000 - 7,000
6 Loop Dead End Clamp / LC ( 35 s/d 240 ) mm² Bh 2 18,000 - 36,000 - 36,000
7 Oval Eye Bolt ⅝" x 10" Bh 2 11,700 - 23,400 - 23,400
8 Oval Eye Nut ⅝" Bh 2 13,300 - 26,600 - 26,600
9 Pole Band Single Rack 7" atau 7 ½" Bh 1 24,300 - 24,300 - 24,300
10 Schackle Anchor ⅝" Bh 2 10,200 - 20,400 - 20,400
11 Spool Insulator ANSI 53 - 4 Bh 1 15,700 - 15,700 - 15,700
12 Washer Square 2 ¼" Bh 1 1,100 - 1,100 - 1,100
13 Upah Pasang Konst. JTM 1 Fasa CA5-2 Unit 1 20,000 - - 20,000 20,000
Sub Jumlah CA5-2 - 209,000 20,000 229,000
22 CA5-2' Unit 1
1 Isolator Tarik ( Polymer ) 20 KV + Primary Dead End C Set 1 PLN PLN - - -
2 Compresion Conector H type 70 mm² / 70 mm² Bh 1 20,400 - 20,400 - 20,400
3 Lock Nut ⅝" Bh 1 7,000 - 7,000 - 7,000
4 Oval Eye Bolt ⅝" x 10" Bh 2 11,700 - 23,400 - 23,400
5 Oval Eye Nut ⅝" Bh 1 13,300 - 13,300 - 13,300
6 Schackle Anchor ⅝" Bh 2 10,200 - 20,400 - 20,400
7 Washer Square 2 ¼" Bh 1 1,100 - 1,100 - 1,100
8 Upah Pasang Konst. JTM 1 Fasa CA5-2' Unit 1 18,000 - - 18,000 18,000
Sub Jumlah CA5-2' - 85,600 18,000 103,600
23 CA5-3 Unit 1
1 Isolator Tarik ( Polymer ) 20 KV + Primary Dead End C Set 1 PLN PLN - - -
2 Armour Tape ¼" wide Mtr 1 4,300 - 4,300 - 4,300
3 Clevis Swinging Secondary Bh 1 9,400 - 9,400 - 9,400
4 Compresion Conector H type 70 mm² / 70 mm² Bh 2 20,400 - 40,800 - 40,800
5 Loop Dead End Clamp / LC ( 35 s/d 240 ) mm² Bh 2 18,000 - 36,000 - 36,000
6 Oval Eye Nut ⅝" Bh 2 13,300 - 26,600 - 26,600
7 Pole Band Single Rack 7" atau 7 ½" Bh 2 24,300 - 48,600 - 48,600
8 Schackle Anchor ⅝" Bh 1 10,200 - 10,200 - 10,200
9 Spool Insulator ANSI 53 - 4 Bh 1 15,700 - 15,700 - 15,700
10 Upah Pasang Konst. JTM 1 Fasa CA5-3 Unit 1 20,000 - - 20,000 20,000
Sub Jumlah CA5-3 - 191,600 20,000 211,600
24 CA5-3' Unit 1
1 Isolator Tarik ( Polymer ) 20 KV + Primary Dead End C Set 1 PLN PLN - - -
2 Compresion Conector H type 70 mm² / 70 mm² Bh 1 20,400 - 20,400 - 20,400
3 Oval Eye Nut ⅝" Bh 1 13,300 - 13,300 - 13,300
4 Pole Band Single Rack 7" atau 7 ½" Bh 1 24,300 - 24,300 - 24,300
5 Schackle Anchor ⅝" Bh 1 10,200 - 10,200 - 10,200
6 Upah Pasang Konst. JTM 1 Fasa CA5-3' Unit 1 18,000 - - 18,000 18,000
Sub Jumlah CA5-3' - 68,200 18,000 86,200
25 CA5-4 Unit 1
1 Isolator Tarik ( Polymer ) 20 KV + Primary Dead End C Set 1 PLN PLN - - -
2 Isolator Tumpu (Line Post) 20 KV Bh 1 PLN PLN - - -
3 Armour Tape ¼" wide Mtr 1 4,300 - 4,300 - 4,300
4 Bolt Machine ⅝" x 10" Bh 2 9,400 - 18,800 - 18,800
5 Center Bracket 12.5 KN Bh 1 54,100 - 54,100 - 54,100
6 Clevis Swinging Secondary Bh 1 9,400 - 9,400 - 9,400
7 Compresion Conector H type 70 mm² / 70 mm² Bh 2 20,400 - 40,800 - 40,800
8 Lock Nut ⅝" Bh 2 7,000 - 14,000 - 14,000
9 Loop Dead End Clamp / LC ( 35 s/d 240 ) mm² Bh 2 18,000 - 36,000 - 36,000
10 Oval Eye Nut ⅝" Bh 2 13,300 - 26,600 - 26,600
11 Pole Band Single Rack 7" atau 7 ½" Bh 2 24,300 - 48,600 - 48,600
12 Schackle Anchor ⅝" Bh 1 10,200 - 10,200 - 10,200
13 Spool Insulator ANSI 53 - 4 Bh 1 15,700 - 15,700 - 15,700
14 Tie Wire # 4 / Alluminium bonding wire # 20 Mtr 2.6 3,100 - 8,060 - 8,060
15 Washer Square 2 ¼" Bh 2 1,100 - 2,200 - 2,200
16 Upah Pasang Konst. JTM 1 Fasa CA5-4 Unit 1 20,000 - - 20,000 20,000
Sub Jumlah CA5-4 - 288,760 20,000 308,760
26 CA5-4' Unit 1
1 Isolator Tarik ( Polymer ) 20 KV + Primary Dead End C Set 1 PLN PLN - - -
2 Isolator Tumpu (Line Post) 20 KV Bh 1 PLN PLN - - -
3 Bolt Machine ⅝" x 10" Bh 2 9,400 - 18,800 - 18,800
4 Center Bracket 12.5 KN Bh 1 54,100 - 54,100 - 54,100
5 Compresion Conector H type 70 mm² / 70 mm² Bh 1 20,400 - 20,400 - 20,400
6 Lock Nut ⅝" Bh 2 7,000 - 14,000 - 14,000
7 Oval Eye Nut ⅝" Bh 1 13,300 - 13,300 - 13,300
8 Pole Band Single Rack 7" atau 7 ½" Bh 1 24,300 - 24,300 - 24,300
9 Schackle Anchor ⅝" Bh 1 10,200 - 10,200 - 10,200
10 Tie Wire # 4 / Alluminium bonding wire # 20 Mtr 1.8 3,100 - 5,580 - 5,580
11 Washer Square 2 ¼" Bh 2 1,100 - 2,200 - 2,200
12 Upah Pasang Konst. JTM 1 Fasa CA5-4' Unit 1 18,000 - - 18,000 18,000
Sub Jumlah CA5-4' - 162,880 18,000 180,880
27 CA6 Unit 1
1 Isolator Tarik ( Polymer ) 20 KV + Primary Dead End C Set 2 PLN PLN - - -
2 Armour Tape ¼" wide Mtr 2 4,300 - 8,600 - 8,600
3 Clevis Swinging Secondary Bh 2 9,400 - 18,800 - 18,800
4 Loop Dead End Clamp / LC ( 35 s/d 240 ) mm² Bh 4 18,000 - 72,000 - 72,000

37 TO 120
PT. PLN (PERSERO)
DISTRIBUSI JAWA TENGAH DAN D.I. YOGYAKARTA
AREA SURAKARTA

ANALISA PER UNIT KONSTRUKSI


PEKERJAAN PEMBANGUNAN JARINGAN DISTRIBUSI 20 KV
TAHUN ANGGARAN 2018

HARGA SATUAN BIAYA YANG DIPERLUKAN


NO. PERINCUAN PER UNIT KONSTRUKSI STN VOL MATERIAL MATERIAL TOTAL
JASA/UPAH JASA/UPAH
MDU HARDWARE MDU HARDWARE
5 Oval Eye Bolt ⅝" x 10" Bh 1 11,700 - 11,700 - 11,700
6 Oval Eye Nut ⅝" Bh 3 13,300 - 39,900 - 39,900

38 TO 120
PT. PLN (PERSERO)
DISTRIBUSI JAWA TENGAH DAN D.I. YOGYAKARTA
AREA SURAKARTA

ANALISA PER UNIT KONSTRUKSI


PEKERJAAN PEMBANGUNAN JARINGAN DISTRIBUSI 20 KV
TAHUN ANGGARAN 2018

HARGA SATUAN BIAYA YANG DIPERLUKAN


NO. PERINCUAN PER UNIT KONSTRUKSI STN VOL MATERIAL MATERIAL TOTAL
JASA/UPAH JASA/UPAH
MDU HARDWARE MDU HARDWARE
7 Pole Band Double Rack 7" atau 7 ½" Bh 1 30,600 - 30,600 - 30,600
8 Schackle Anchor ⅝" Bh 2 10,200 - 20,400 - 20,400
9 Spool Insulator ANSI 53 - 4 Bh 2 15,700 - 31,400 - 31,400
10 Washer Square 2 ¼" Bh 1 1,100 - 1,100 - 1,100
11 Upah Pasang Konst. JTM 1 Fasa CA6 Unit 1 38,000 - - 38,000 38,000
Sub Jumlah CA6 - 234,500 38,000 272,500
28 CA6' Unit 1
1 Isolator Tarik ( Polymer ) 20 KV + Primary Dead End C Set 2 PLN PLN - - -
2 Oval Eye Bolt ⅝" x 10" Bh 1 11,700 - 11,700 - 11,700
3 Oval Eye Nut ⅝" Bh 1 13,300 - 13,300 - 13,300
4 Schackle Anchor ⅝" Bh 2 10,200 - 20,400 - 20,400
5 Washer Square 2 ¼" Bh 1 1,100 - 1,100 - 1,100
6 Upah Pasang Konst. JTM 1 Fasa CA6' Unit 1 38,000 - - 38,000 38,000
Sub Jumlah CA6' - 46,500 38,000 84,500
29 CA6-N Unit 1
1 Isolator Tarik ( Polymer ) 20 KV + Primary Dead End C Set 2 PLN PLN - - -
2 Armour Tape ¼" wide Mtr 2 4,300 - 8,600 - 8,600
3 Clevis Swinging Secondary Bh 2 9,400 - 18,800 - 18,800
4 Loop Dead End Clamp / LC ( 35 s/d 240 ) mm² Bh 4 18,000 - 72,000 - 72,000
5 Oval Eye Bolt ⅝" x 10" Bh 1 11,700 - 11,700 - 11,700
6 Oval Eye Nut ⅝" Bh 3 13,300 - 39,900 - 39,900
7 Pole Band Double Rack 7" atau 7 ½" Bh 1 30,600 - 30,600 - 30,600
8 Schackle Anchor ⅝" Bh 2 10,200 - 20,400 - 20,400
9 Spool Insulator ANSI 53 - 4 Bh 2 15,700 - 31,400 - 31,400
10 Washer Square 2 ¼" Bh 1 1,100 - 1,100 - 1,100
11 Upah Pasang Konst. JTM 1 Fasa CA6-N Unit 1 38,000 - - 38,000 38,000
Sub Jumlah CA6-N - 234,500 38,000 272,500
30 CA7 Unit 1
1 Isolator Tarik ( Polymer ) 20 KV + Primary Dead End C Set 1 PLN PLN - - -
2 Armour Tape ¼" wide Mtr 1 4,300 - 4,300 - 4,300
3 Bolt Double Arming ⅝" x 14" Bh 2 23,500 - 47,000 - 47,000
4 Bolt Machine / Bolt cariage ½" x ¾" Bh 4 2,900 - 11,600 - 11,600
5 Bolt Machine ⅝" x 10" Bh 1 9,400 - 9,400 - 9,400
6 Brace Steel 770 mm Bh 4 25,900 - 103,600 - 103,600
7 Clevis Swinging Secondary Bh 1 9,400 - 9,400 - 9,400
8 Cross Arm Steel 2.000 mm ( UNSP 10 ) galvanis Bh 2 230,000 - 460,000 - 460,000
9 Lock Nut ⅝" Bh 5 7,000 - 35,000 - 35,000
10 Loop Dead End Clamp / LC ( 35 s/d 240 ) mm² Bh 2 18,000 - 36,000 - 36,000
11 Oval Eye Nut ⅝" Bh 2 13,300 - 26,600 - 26,600
12 Pole Band Double Rack 7" atau 7 ½" Bh 1 30,600 - 30,600 - 30,600
13 Schackle Anchor ⅝" Bh 1 10,200 - 10,200 - 10,200
14 Spool Insulator ANSI 53 - 4 Bh 1 15,700 - 15,700 - 15,700
15 Washer Square 2 ¼" Bh 10 1,100 - 11,000 - 11,000
16 Upah Pasang Konst. JTM 1 Fasa CA7 Unit 1 21,000 - - 21,000 21,000
Sub Jumlah CA7 - 810,400 21,000 831,400
31 CA7-A Unit 1
1 Isolator Tarik ( Polymer ) 20 KV + Primary Dead End C Set 1 PLN PLN - - -
2 Armour Tape ¼" wide Mtr 1 4,300 - 4,300 - 4,300
3 Bolt Double Arming ⅝" x 14" Bh 2 23,500 - 47,000 - 47,000
4 Bolt Machine / Bolt cariage ½" x ¾" Bh 4 2,900 - 11,600 - 11,600
5 Bolt Machine ⅝" x 10" Bh 1 9,400 - 9,400 - 9,400
6 Brace Steel 550 mm Bh 4 19,400 - 77,600 - 77,600
7 Clevis Swinging Secondary Bh 1 9,400 - 9,400 - 9,400
8 Cross Arm Steel 1.500 mm ( UNSP 10 ) galvanis Bh 2 170,000 - 340,000 - 340,000
9 Lock Nut ⅝" Bh 5 7,000 - 35,000 - 35,000
10 Loop Dead End Clamp / LC ( 35 s/d 240 ) mm² Bh 2 18,000 - 36,000 - 36,000
11 Oval Eye Nut ⅝" Bh 2 13,300 - 26,600 - 26,600
12 Pole Band Double Rack 7" atau 7 ½" Bh 1 30,600 - 30,600 - 30,600
13 Schackle Anchor ⅝" Bh 1 10,200 - 10,200 - 10,200
14 Spool Insulator ANSI 53 - 4 Bh 1 15,700 - 15,700 - 15,700
15 Washer Square 2 ¼" Bh 10 1,100 - 11,000 - 11,000
16 Upah Pasang Konst. JTM 1 Fasa CA7-A Unit 1 21,000 - - 21,000 21,000
Sub Jumlah CA7-A - 664,400 21,000 685,400
32 CA8 Unit 1
1 Isolator Tarik ( Polymer ) 20 KV + Primary Dead End C Set 2 PLN PLN - - -
2 Armour Tape ¼" wide Mtr 2 4,300 - 8,600 - 8,600
3 Bolt Double Arming ⅝" x 14" Bh 2 23,500 - 47,000 - 47,000
4 Bolt Machine / Bolt cariage ½" x ¾" Bh 4 2,900 - 11,600 - 11,600
5 Bolt Machine ⅝" x 10" Bh 1 9,400 - 9,400 - 9,400
6 Brace Steel 770 mm Bh 4 25,900 - 103,600 - 103,600
7 Clevis Swinging Secondary Bh 2 9,400 - 18,800 - 18,800
8 Cross Arm Steel 2.000 mm ( UNSP 10 ) galvanis Bh 2 230,000 - 460,000 - 460,000
9 Lock Nut ⅝" Bh 5 7,000 - 35,000 - 35,000
10 Loop Dead End Clamp / LC ( 35 s/d 240 ) mm² Bh 4 18,000 - 72,000 - 72,000
11 Oval Eye Nut ⅝" Bh 4 13,300 - 53,200 - 53,200
12 Pole Band Double Rack 7" atau 7 ½" Bh 1 30,600 - 30,600 - 30,600
13 Schackle Anchor ⅝" Bh 2 10,200 - 20,400 - 20,400
14 Spool Insulator ANSI 53 - 4 Bh 2 15,700 - 31,400 - 31,400

39 TO 120
PT. PLN (PERSERO)
DISTRIBUSI JAWA TENGAH DAN D.I. YOGYAKARTA
AREA SURAKARTA

ANALISA PER UNIT KONSTRUKSI


PEKERJAAN PEMBANGUNAN JARINGAN DISTRIBUSI 20 KV
TAHUN ANGGARAN 2018

HARGA SATUAN BIAYA YANG DIPERLUKAN


NO. PERINCUAN PER UNIT KONSTRUKSI STN VOL MATERIAL MATERIAL TOTAL
JASA/UPAH JASA/UPAH
MDU HARDWARE MDU HARDWARE
15 Washer Square 2 ¼" Bh 10 1,100 - 11,000 - 11,000
16 Upah Pasang Konst. JTM 1 Fasa CA8 Unit 1 40,000 - - 40,000 40,000
Sub Jumlah CA8 - 912,600 40,000 952,600
33 CA8-A Unit 1
1 Isolator Tarik ( Polymer ) 20 KV + Primary Dead End C Set 2 PLN PLN - - -
2 Armour Tape ¼" wide Mtr 2 4,300 - 8,600 - 8,600
3 Bolt Double Arming ⅝" x 14" Bh 2 23,500 - 47,000 - 47,000
4 Bolt Machine / Bolt cariage ½" x ¾" Bh 4 2,900 - 11,600 - 11,600
5 Bolt Machine ⅝" x 10" Bh 1 9,400 - 9,400 - 9,400
6 Brace Steel 550 mm Bh 4 19,400 - 77,600 - 77,600
7 Clevis Swinging Secondary Bh 2 9,400 - 18,800 - 18,800
8 Cross Arm Steel 1.500 mm ( UNSP 10 ) galvanis Bh 2 170,000 - 340,000 - 340,000
9 Lock Nut ⅝" Bh 5 7,000 - 35,000 - 35,000
10 Loop Dead End Clamp / LC ( 35 s/d 240 ) mm² Bh 4 18,000 - 72,000 - 72,000
11 Oval Eye Nut ⅝" Bh 4 13,300 - 53,200 - 53,200
12 Pole Band Double Rack 7" atau 7 ½" Bh 1 30,600 - 30,600 - 30,600
13 Schackle Anchor ⅝" Bh 2 10,200 - 20,400 - 20,400
14 Spool Insulator ANSI 53 - 4 Bh 2 15,700 - 31,400 - 31,400
15 Washer Square 2 ¼" Bh 10 1,100 - 11,000 - 11,000
16 Upah Pasang Konst. JTM 1 Fasa CA8-A Unit 1 40,000 - - 40,000 40,000
Sub Jumlah CA8-A - 766,600 40,000 806,600
34 CA9 Unit 1
1 Isolator Tumpu (Pin Post) 20 KV Bh 4 PLN PLN - - -
2 Bolt Double Arming ⅝" x 14" Bh 2 23,500 - 47,000 - 47,000
3 Bolt Machine / Bolt cariage ½" x ¾" Bh 4 2,900 - 11,600 - 11,600
4 Bolt Machine ⅝" x 10" Bh 1 9,400 - 9,400 - 9,400
5 Brace Steel 770 mm Bh 4 25,900 - 103,600 - 103,600
6 Cross Arm Steel 2.000 mm ( UNSP 10 ) galvanis Bh 2 230,000 - 460,000 - 460,000
7 Lock Nut ⅝" Bh 5 7,000 - 35,000 - 35,000
8 Pole Band Double Rack 7" atau 7 ½" Bh 1 30,600 - 30,600 - 30,600
9 Tie Wire # 4 / Alluminium bonding wire # 20 Mtr 8 3,100 - 24,800 - 24,800
10 Spool Insulator ANSI 53 - 2 Bh 2 10,200 - 20,400 - 20,400
11 Washer Square 2 ¼" Bh 10 1,100 - 11,000 - 11,000
12 Upah Pasang Konst. JTM 1 Fasa CA9 Unit 1 30,000 - - 30,000 30,000
Sub Jumlah CA9 - 753,400 30,000 783,400
35 CA9-N Unit 1
1 Isolator Tumpu (Pin Post) 20 KV Bh 1 PLN PLN - - -
2 Bolt Machine / Bolt cariage ½" x ¾" Bh 1 2,900 - 2,900 - 2,900
3 Bolt Machine ⅝" x 10" Bh 1 9,400 - 9,400 - 9,400
4 Brace Steel 550 mm Bh 1 19,400 - 19,400 - 19,400
5 Cross Arm Steel 1.500 mm ( UNSP 10 ) galvanis Bh 1 170,000 - 170,000 - 170,000
6 Lock Nut ⅝" Bh 1 7,000 - 7,000 - 7,000
7 Pole Band Single Rack 7" atau 7 ½" Bh 1 24,300 - 24,300 - 24,300
8 Pole Band Single Up Side 7" atau 7 ½" Bh 1 36,000 - 36,000 - 36,000
9 Spool Insulator ANSI 53 - 4 Bh 1 15,700 - 15,700 - 15,700
10 Tie Wire # 4 / Alluminium bonding wire # 20 Mtr 2.6 3,100 - 8,060 - 8,060
11 Washer Square 2 ¼" Bh 2 1,100 - 2,200 - 2,200
12 Upah Pasang Konst. JTM 1 Fasa CA9-N Unit 1 30,000 - - 30,000 30,000
Sub Jumlah CA9-N - 294,960 30,000 324,960

40 TO 120
PT. PLN (PERSERO) DISTRIBUSI JAWA TENGAH & DI YOGYAKARTA Lampiran Perjanjian :
AREA SURAKARTA Nomor I : 0060.PJ/HKM.00.01/SKA/2018
Nomor II : 31.08/PD-PLN/STS/2018

LAMPIRAN PERJANJIAN
PEMBANGUNAN JARINGAN DISTRIBUSI UNTUK PB / PD AREA SURAKARTA
ZONA 3 - RAYON SRAGEN DAN RAYON SUMBERLAWANG

HARGA SATUAN JUMLAH


NO KODE KONSTRUKSI SAT VOL TOTAL
HARDWARE JASA HARDWARE JASA
PASANG TIANG BETON
1 C7-100 Tiang Beton 7M-100 daN Btg - - 156,000 - - -
2 C7-100E Tiang Beton 7M-100 daN+E Btg - - 156,000 - - -
3 C9-100 Tiang Beton 9M-100 daN Btg - - 195,000 - - -
4 C9-100E Tiang Beton 9M-100 daN+E Btg - - 195,000 - - -
5 C9-200 Tiang Beton 9M-200 daN Btg - - 195,000 - - -
6 C9-200E Tiang Beton 9M-200 daN+E Btg - - 214,500 - - -
7 C11-200 Tiang Beton 11M-200 daN Btg - - 507,000 - - -
8 C11-200E Tiang Beton 11M-200 daN+E Btg - - 507,000 - - -
9 C11-350 Tiang Beton 11M-350 daN Btg - - 538,200 - - -
10 C11-350E Tiang Beton 11M-350 daN+E Btg - - 538,200 - - -
11 C11-350E-BC Tiang Beton 11M-350 daN+E+BC Btg - - 692,662 - - -
12 C12-200 Tiang Beton 12M-200 daN Btg - - 538,200 - - -
13 C12-200E Tiang Beton 12M-200 daN+E Btg - - 538,200 - - -
14 C12-350 Tiang Beton 12M-350 daN Btg - - 538,200 - - -
15 C12-350E Tiang Beton 12M-350 daN+E Btg - - 538,200 - - -
16 C12-350E-BC Tiang Beton 12M-350 daN+E+BC Btg - - 856,283 - - -
17 C12-500 Tiang Beton 12M-500 daN Btg - - 778,400 - - -
18 C12-500E Tiang Beton 12M-500 daN+E Btg - - 778,400 - - -
19 C13-350 Tiang Beton 13M-350 daN Btg - - 778,400 - - -
20 C13-350E Tiang Beton 13M-350 daN+E Btg - - 778,400 - - -
21 C13-500 Tiang Beton 13M-500 daN Btg - - 778,400 - - -
22 C13-500E Tiang Beton 13M-500 daN+E Btg - - 778,400 - - -
23 C14-350 Tiang Beton 14M-350 daN Btg - - 780,000 - - -
24 C14-350E Tiang Beton 14M-350 daN+E Btg - - 780,000 - - -
25 C14-350E-BC Tiang Beton 14M-350 daN+E+BC Btg - - 1,155,865 - - -
26 C14-500 Tiang Beton 14M-500 daN Btg - - 780,000 - - -
27 C14-500E Tiang Beton 14M-500 daN+E Btg - - 780,000 - - -
28 notiang Penomoran Tiang Btg 19 8,000 - 152,000 - 152,000
29 panjat Penghalang Panjat dan Papan Peringatan Set 19 115,000 - 2,185,000 - 2,185,000
jtiang Pasang Tiang Beton Btg 38 2,337,000 - 2,337,000
BONGKAR TIANG BETON
1 bongkar7m100 Upah Bongkar Tiang Beton 7M-100 daN Btg - - 93,600 - - -
2 bongkar7m100e Upah Bongkar Tiang Beton 7M-100 daN+E Btg - - 93,600 - - -
3 bongkar9m100 Upah Bongkar Tiang Beton 9M-100 daN Btg 1 - 117,000 - 117,000 117,000
4 bongkar9m100e Upah Bongkar Tiang Beton 9M-100 daN+E Btg 1 - 117,000 - 117,000 117,000
5 bongkar9m200 Upah Bongkar Tiang Beton 9M-200 daN Btg 1 - 117,000 - 117,000 117,000
6 bongkar9m200e Upah Bongkar Tiang Beton 9M-200 daN+E Btg 1 - 128,700 - 128,700 128,700
7 bongkar11m200 Upah Bongkar Tiang Beton 11M-200 daN Btg 1 - 304,200 - 304,200 304,200
8 bongkar11m200e Upah Bongkar Tiang Beton 11M-200 daN+E Btg 1 - 304,200 - 304,200 304,200
9 bongkar11m350 Upah Bongkar Tiang Beton 11M-350 daN Btg 1 - 310,000 - 310,000 310,000
10 bongkar11m350e Upah Bongkar Tiang Beton 11M-350 daN+E Btg 1 - 310,000 - 310,000 310,000
11 bongkar11m350ebc Upah Bongkar Tiang Beton 11M-350 daN+E+BC Btg 1 - 310,000 - 310,000 310,000
12 bongkar12m200 Upah Bongkar Tiang Beton 12M-200 daN Btg 1 - 310,000 - 310,000 310,000
13 bongkar12m200e Upah Bongkar Tiang Beton 12M-200 daN+E Btg 1 - 310,000 - 310,000 310,000
14 bongkar12m350 Upah Bongkar Tiang Beton 12M-350 daN Btg 1 - 310,000 - 310,000 310,000
15 bongkar12m350e Upah Bongkar Tiang Beton 12M-350 daN+E Btg 1 - 310,000 - 310,000 310,000
16 bongkar12m350ebc Upah Bongkar Tiang Beton 12M-350 daN+E+BC Btg 1 - 430,000 - 430,000 430,000
17 bongkar12m500 Upah Bongkar Tiang Beton 12M-500 daN Btg 1 - 430,000 - 430,000 430,000
18 bongkar12m500e Upah Bongkar Tiang Beton 12M-500 daN+E Btg 1 - 430,000 - 430,000 430,000
19 bongkar13m350 Upah Bongkar Tiang Beton 13M-350 daN Btg 1 - 430,000 - 430,000 430,000
20 bongkar13m350e Upah Bongkar Tiang Beton 13M-350 daN+E Btg 1 - 430,000 - 430,000 430,000
21 bongkar13m500 Upah Bongkar Tiang Beton 13M-500 daN Btg 1 - 430,000 - 430,000 430,000
22 bongkar13m500e Upah Bongkar Tiang Beton 13M-500 daN+E Btg 1 - 430,000 - 430,000 430,000
23 bongkar14m350 Upah Bongkar Tiang Beton 14M-350 daN Btg 1 - 440,000 - 440,000 440,000
24 bongkar14m350e Upah Bongkar Tiang Beton 14M-350 daN+E Btg 1 - 440,000 - 440,000 440,000
25 bongkar14m350ebc Upah Bongkar Tiang Beton 14M-350 daN+E+BC Btg 1 - 440,000 - 440,000 440,000
26 bongkar14m500 Upah Bongkar Tiang Beton 14M-500 daN Btg 1 - 440,000 - 440,000 440,000
27 bongkar14m500e Upah Bongkar Tiang Beton 14M-500 daN+E Btg - - 440,000 - - -
jbongkartiang Bongkar Tiang Beton Btg 24 - 8,028,100 8,028,100
CA
1 kca1 Err:504 Unit 7 Err:504 Err:504 Err:504 Err:504 Err:504
2 kca1' Err:504 Unit - Err:504 Err:504 Err:504 Err:504 Err:504
3 kca1-n Err:504 Unit - Err:504 Err:504 Err:504 Err:504 Err:504
4 kca1-pn Err:504 Unit - Err:504 Err:504 Err:504 Err:504 Err:504
5 kca1-p Err:504 Unit - Err:504 Err:504 Err:504 Err:504 Err:504
6 kca1-p' Err:504 Unit - Err:504 Err:504 Err:504 Err:504 Err:504
7 kca2 Err:504 Unit 7 Err:504 Err:504 Err:504 Err:504 Err:504
8 kca2' Err:504 Unit - Err:504 Err:504 Err:504 Err:504 Err:504
9 kca2-n Err:504 Unit - Err:504 Err:504 Err:504 Err:504 Err:504
10 kca3 Err:504 Unit - Err:504 Err:504 Err:504 Err:504 Err:504
11 kca3' Err:504 Unit 7 Err:504 Err:504 Err:504 Err:504 Err:504
12 kca3-n Err:504 Unit - Err:504 Err:504 Err:504 Err:504 Err:504
13 kca4 Err:504 Unit 7 Err:504 Err:504 Err:504 Err:504 Err:504
14 kca4' Err:504 Unit - Err:504 Err:504 Err:504 Err:504 Err:504
15 kca4-n Err:504 Unit - Err:504 Err:504 Err:504 Err:504 Err:504
Page 41 of 120
HARGA SATUAN JUMLAH
NO KODE KONSTRUKSI SAT VOL TOTAL
HARDWARE JASA HARDWARE JASA
16 kca5 Err:504 Unit 7 Err:504 Err:504 Err:504 Err:504 Err:504
17 kca5' Err:504 Unit - Err:504 Err:504 Err:504 Err:504 Err:504
18 kca5-n Err:504 Unit - Err:504 Err:504 Err:504 Err:504 Err:504
19 kca5-1 Err:504 Unit 7 Err:504 Err:504 Err:504 Err:504 Err:504
20 kca5-1' Err:504 Unit - Err:504 Err:504 Err:504 Err:504 Err:504
21 kca5-2 Err:504 Unit 7 Err:504 Err:504 Err:504 Err:504 Err:504
22 kca5-2' Err:504 Unit - Err:504 Err:504 Err:504 Err:504 Err:504
23 kca5-3 Err:504 Unit - Err:504 Err:504 Err:504 Err:504 Err:504
24 kca5-3' Err:504 Unit - Err:504 Err:504 Err:504 Err:504 Err:504
25 kca5-4 Err:504 Unit - Err:504 Err:504 Err:504 Err:504 Err:504
26 kca5-4' Err:504 Unit - Err:504 Err:504 Err:504 Err:504 Err:504
27 kca6 Err:504 Unit 7 Err:504 Err:504 Err:504 Err:504 Err:504
28 kca6' Err:504 Unit - Err:504 Err:504 Err:504 Err:504 Err:504
29 kca6-n Err:504 Unit - Err:504 Err:504 Err:504 Err:504 Err:504
30 kca7 Err:504 Unit - Err:504 Err:504 Err:504 Err:504 Err:504
31 kca7-a Err:504 Unit - Err:504 Err:504 Err:504 Err:504 Err:504
32 kca8 Err:504 Unit - Err:504 Err:504 Err:504 Err:504 Err:504
33 kca8-a Err:504 Unit - Err:504 Err:504 Err:504 Err:504 Err:504
34 kca9 Err:504 Unit - Err:504 Err:504 Err:504 Err:504 Err:504
35 kca9-n Err:504 Unit - Err:504 Err:504 Err:504 Err:504 Err:504
jca CA Unit 56 Err:504 Err:504 Err:504
SA
1 ksa1 SA1 Unit - 162,460 30,000 - - -
2 ksa1' SA1' Unit - 108,280 15,000 - - -
3 ksa1-n SA1-N Unit - 153,860 30,000 - - -
4 ksa1-pn SA1-PN Unit - 149,560 30,000 - - -
5 ksa1-p SA1-P Unit - 152,660 30,000 - - -
6 ksa1-p' SA1-P' Unit - 108,280 15,000 - - -
7 ksa2 SA2 Unit - 224,940 53,000 - - -
8 ksa2' SA2' Unit - 180,560 28,800 - - -
9 ksa2-n SA2-N Unit - 543,240 53,000 - - -
10 ksa3 SA3 Unit - 218,380 46,800 - - -
11 ksa3' SA3' Unit - 113,000 27,300 - - -
12 ksa3-n SA3-N Unit - 218,380 46,800 - - -
13 ksa4 SA4 Unit - 342,400 50,700 - - -
14 ksa4' SA4' Unit - 116,000 50,700 - - -
15 ksa4-n SA4-N Unit - 342,400 50,700 - - -
16 ksa5 SA5 Unit - 150,800 20,000 - - -
17 ksa5' SA5' Unit - 47,800 18,000 - - -
18 ksa5-n SA5-N Unit - 150,800 20,000 - - -
19 ksa5-1 SA5-1 Unit - 191,600 20,000 - - -
20 ksa5-1' SA5-1' Unit - 68,200 18,000 - - -
21 ksa5-2 SA5-2 Unit - 226,800 20,000 - - -
22 ksa5-2' SA5-2' Unit - 103,400 18,000 - - -
23 ksa5-3 SA5-3 Unit - 191,600 20,000 - - -
24 ksa5-3' SA5-3' Unit - 68,200 18,000 - - -
25 ksa5-4 SA5-4 Unit - 302,360 20,000 - - -
26 ksa5-4' SA5-4' Unit - 176,480 18,000 - - -
27 ksa6 SA6 Unit - 265,600 42,900 - - -
28 ksa6' SA6' Unit - 77,600 42,900 - - -
29 ksa6-n SA6-N Unit - 265,600 42,900 - - -
30 ksa7 SA7 Unit - 824,600 23,400 - - -
31 ksa7-a SA7-A Unit - 678,600 23,400 - - -
32 ksa8 SA8 Unit - 912,800 42,900 - - -
33 ksa8-a SA8-A Unit - 766,800 42,900 - - -
34 ksa9 SA9 Unit - 750,040 31,200 - - -
35 ksa9-n SA9-N Unit - 304,360 31,200 - - -
jsa SA Unit - - - -
CB
1 kcb1 CB-1 Unit 8 341,660 23,400 2,733,280 187,200 2,920,480
2 kcb1-a CB1-A Unit - 134,160 23,400 - - -
3 kcb2 CB-2 Unit 8 730,520 27,300 5,844,160 218,400 6,062,560
4 kcb3 CB-3 Unit - 844,960 27,300 - - -
5 kcb4 CB-4 Unit 8 1,591,660 32,700 12,733,280 261,600 12,994,880
6 kcb5 CB-5 Unit 8 741,200 76,400 5,929,600 611,200 6,540,800
jcb CB Unit 32 27,240,320 1,278,400 28,518,720
SB
1 ksb1 SB-1 Unit - 355,460 23,400 - - -
2 ksb1-a SB1-A Unit - 174,360 23,400 - - -
3 ksb2 SB-2 Unit - 758,720 27,300 - - -
4 ksb3 SB-3 Unit - 873,160 27,300 - - -
5 ksb4 SB-4 Unit - 1,633,860 32,700 - - -
6 ksb5 SB-5 Unit - 769,400 76,400 - - -
jsb SB Unit - - - -
CC
1 kcc1 CC1 Unit 8 289,320 34,300 2,314,560 274,400 2,588,960
2 kcc1' CC1' Unit - 240,640 15,600 - - -
3 kcc1-n CC1-N Unit - 358,520 34,300 - - -
4 kcc1-1 CC1-1 Unit 8 395,920 34,300 3,167,360 274,400 3,441,760
5 kcc1-1' CC1-1' Unit 8 349,720 55,300 2,797,760 442,400 3,240,160
6 kcc1-1n CC1-1N Unit - 395,920 34,300 - - -
7 kcc1-a CC1-A Unit 8 469,220 15,600 3,753,760 124,800 3,878,560
8 kcc1-a' CC1-A' Unit - 423,340 55,300 - - -
9 kcc2 CC2 Unit - 285,020 28,800 - - -
10 kcc2' CC2' Unit - 240,640 52,200 - - -

Page 42 of 120
HARGA SATUAN JUMLAH
NO KODE KONSTRUKSI SAT VOL TOTAL
HARDWARE JASA HARDWARE JASA
11 kcc2-n CC2-N Unit - 349,820 28,800 - - -
12 kcc2-1 CC2-1 Unit - 701,760 48,300 - - -
13 kcc2-1' CC2-1' Unit - 704,880 49,900 - - -
14 kcc2-1n CC2-1N Unit - 742,260 52,200 - - -
15 kcc2-a CC2-A Unit 8 896,460 48,300 7,171,680 386,400 7,558,080
16 kcc2-a' CC2-A' Unit - 884,880 23,400 - - -
17 kcc3 CC3 Unit - 576,380 23,400 - - -
18 kcc3' CC3' Unit - 452,400 24,900 - - -
19 kcc3-vn CC3-VN Unit - 611,980 24,900 - - -
20 kcc4-1 CC4-1 Unit - 647,400 24,900 - - -
21 kcc5-1 CC5-1 Unit - 252,000 24,900 - - -
22 kcc7 CC7 Unit 8 874,200 21,800 6,993,600 174,400 7,168,000
23 kcc7' CC7' Unit - 771,200 21,800 - - -
24 kcc7-1 CC7-1 Unit 8 874,200 21,800 6,993,600 174,400 7,168,000
25 kcc7-1' CC7-1' Unit - 1,001,200 21,800 - - -
26 kcc7-1n CC7-1N Unit - 884,800 21,800 - - -
27 kcc8 CC8 Unit 8 1,273,540 44,400 10,188,320 355,200 10,543,520
28 kcc8' CC8' Unit - 1,055,740 24,900 - - -
29 kcc8-n CC8-N Unit - 1,529,240 44,400 - - -
30 kcc8-a CC8-A Unit 8 1,931,260 44,400 15,450,080 355,200 15,805,280
31 kcc8-a' CC8-A' Unit - 1,699,260 45,200 - - -
32 kcc8-an CC8-AN Unit - 1,931,260 24,900 - - -
33 kcc9 CC9 Unit 8 575,120 45,200 4,600,960 361,600 4,962,560
34 kcc9' CC9' Unit - 530,740 34,300 - - -
35 kcc9-n CC9-N Unit - 486,020 34,300 - - -
36 kcc10 CC10 Unit 8 630,320 34,300 5,042,560 274,400 5,316,960
37 kcc10' CC10' Unit - 561,640 34,300 - - -
38 kcc10-n CC10-N Unit - 583,720 34,300 - - -
39 kcc11 CC11 Unit 8 1,214,860 34,300 9,718,880 274,400 9,993,280
40 kcc11' CC11' Unit - 1,170,480 15,600 - - -
41 kcc11-n CC11-N Unit - 1,592,820 15,600 - - -
jcc CC Unit 96 78,193,120 3,472,000 81,665,120
SC
1 ksc1 SC1 Unit - 373,320 34,300 - - -
2 ksc1' SC1' Unit - 324,640 15,600 - - -
3 ksc1-n SC1-N Unit - 409,320 34,300 - - -
4 ksc1-1 SC1-1 Unit - 409,720 34,300 - - -
5 ksc1-1' SC1-1' Unit - 361,040 50,000 - - -
6 ksc1-1n SC1-1N Unit - 409,720 34,300 - - -
7 ksc1-a SC1-A Unit - 526,420 15,600 - - -
8 ksc1-a' SC1-A' Unit - 477,740 50,000 - - -
9 ksc2 SC2 Unit - 369,020 28,800 - - -
10 ksc2' SC2' Unit - 324,640 52,200 - - -
11 ksc2-n SC2-N Unit - 405,020 52,200 - - -
12 ksc2-1 SC2-1 Unit - 774,760 48,300 - - -
13 ksc2-1' SC2-1' Unit - 726,080 49,900 - - -
14 ksc2-1n SC2-1N Unit - 775,260 48,300 - - -
15 ksc2-a SC2-A Unit - 985,660 28,800 - - -
16 ksc2-a' SC2-A' Unit - 941,280 23,400 - - -
17 ksc3 SC3 Unit - 629,780 23,400 - - -
18 ksc3' SC3' Unit - 505,800 24,900 - - -
19 ksc3-vn SC3-VN Unit - 629,780 24,900 - - -
20 ksc4-1 SC4-1 Unit - 745,200 24,900 - - -
21 ksc5-1 SC5-1 Unit - 323,200 24,900 - - -
22 ksc7 SC7 Unit - 920,200 21,800 - - -
23 ksc7' SC7' Unit - 817,200 21,800 - - -
24 ksc7-1 SC7-1 Unit - 1,150,200 21,800 - - -
25 ksc7-1' SC7-1' Unit - 1,047,200 21,800 - - -
26 ksc7-1n SC7-1N Unit - 930,800 21,800 - - -
27 ksc8 SC8 Unit - 1,345,940 44,400 - - -
28 ksc8' SC8' Unit - 1,093,040 24,900 - - -
29 ksc8-n SC8-N Unit - 1,315,240 24,900 - - -
30 ksc8-a SC8-A Unit - 1,995,060 44,400 - - -
31 ksc8-a' SC8-A' Unit - 1,759,260 45,200 - - -
32 ksc8-an SC8-AN Unit - 1,995,060 44,400 - - -
33 ksc9 SC9 Unit - 575,320 45,200 - - -
34 ksc9' SC9' Unit - 460,340 34,300 - - -
35 ksc9-n SC9-N Unit - 426,320 34,300 - - -
36 ksc10 SC10 Unit - 616,920 34,300 - - -
37 ksc10' SC10' Unit - 572,540 34,300 - - -
38 ksc10-n SC10-N Unit - 594,620 34,300 - - -
39 ksc11 SC11 Unit - 1,088,160 34,300 - - -
40 ksc11' SC11' Unit - 1,043,780 15,600 - - -
41 ksc11-n SC11-N Unit - 1,626,220 15,600 - - -
jsc SC Unit - - - -
ABSW / LBS
1 klbs LBS Unit - 2,357,600 2,500,000 - - -
2 kcm3-16 ABSW Unit 2 763,800 897,000 1,527,600 1,794,000 3,321,600
jabsw Pasang ABSW/LBS Unit 2 1,527,600 1,794,000 3,321,600
DC
1 kdc-c1v DC-C1V Unit - 655,760 102,100 - - -
2 kdc-c1-1v DC-C1-1V Unit - 965,760 102,100 - - -
3 kdc-c1-1vn DC-C1-1VN Unit 3 965,760 103,700 2,897,280 311,100 3,208,380
4 kdc-c1-1h DC-C1-1H Unit 3 890,760 103,700 2,672,280 311,100 2,983,380
5 kdc-c1-ahn DC-C1-AHN Unit - 890,760 103,700 - - -

Page 43 of 120
HARGA SATUAN JUMLAH
NO KODE KONSTRUKSI SAT VOL TOTAL
HARDWARE JASA HARDWARE JASA
6 kdc-c2-1v DC-C2-1V Unit 3 2,032,540 124,800 6,097,620 374,400 6,472,020
7 kdc-c2ah DC-C2AH Unit 3 1,625,540 124,800 4,876,620 374,400 5,251,020
8 kdc-c2ahn DC-C2AHN Unit - 1,806,840 127,100 - - -
9 kdc-c2avn DC-C2AVN Unit - 2,032,540 127,100 - - -
10 kdc-c2-1bn DC-C2-1BN Unit - 1,401,420 128,700 - - -
11 kdc-c4n DC-C4N Unit - 1,446,700 131,000 - - -
12 kdc-c7n DC-C7N Unit - 2,109,900 155,200 - - -
13 kdc-c8 DC-C8 Unit 3 2,366,260 258,900 7,098,780 776,700 7,875,480
14 kdc-c8n DC-C8N Unit - 2,366,260 258,900 - - -
jdc DC Unit 15 23,642,580 2,147,700 25,790,280
DB SKUTM
1 kdb01 DB 01 Unit 2 194,600 15,600 389,200 31,200 420,400
2 kdb02 DB 02 Unit 2 231,400 23,400 462,800 46,800 509,600
3 kdb03 DB 03 Unit 2 251,400 31,200 502,800 62,400 565,200
4 kdb04 DB 04 Unit 2 573,600 25,700 1,147,200 51,400 1,198,600
5 kdb05 DB 05 Unit 2 536,900 37,400 1,073,800 74,800 1,148,600
6 kdb06 DB 06 Unit 2 4,570,400 28,800 9,140,800 57,600 9,198,400
jdb DB Unit 12 12,716,600 324,200 13,040,800
RECLOSER
1 m5-24 (240) RECLOSER Unit - 2,345,200 2,500,000 - - -
jrec Pasang Recloser Unit - - - -
P12
1 kp12c-1 P12C-1 Unit 2 251,000 24,100 502,000 48,200 550,200
2 kp12c-2 P12C-2 Unit 2 528,000 35,100 1,056,000 70,200 1,126,200
3 kp12s-1 P12S-1 Unit - 260,600 24,100 - - -
4 kp12s-2 P12S-2 Unit - 568,200 35,100 - - -
jp12 P12 Unit 4 1,558,000 118,400 1,676,400
F
1 kf1-2 F1-2 Unit 2 134,900 27,300 269,800 54,600 324,400
2 kf1-3 F1-3 Unit 2 148,200 25,000 296,400 50,000 346,400
3 kfdg FDG Unit - 193,000 580,000 - - -
jf F Unit 4 566,200 104,600 670,800
E
1 kce1-1 (7m) CE1-1 (7M) Unit - 107,100 24,100 - - -
2 kce1-1 (9m) CE1-1 (9M) Unit - 118,700 24,100 - - -
3 kce1-1 (11m) CE1-1 (11M) Unit - 130,300 24,100 - - -
4 kce1-1 (12m) CE1-1 (12M) Unit - 136,100 24,100 - - -
5 kce1-2 (7m) CE1-2 (7M) Unit - 126,700 24,100 - - -
6 kce1-2 (9m) CE1-2 (9M) Unit 7 143,900 24,100 1,007,300 168,700 1,176,000
7 kce1-2 (11m) CE1-2 (11M) Unit 7 161,100 24,100 1,127,700 168,700 1,296,400
8 kce1-2 (12m) CE1-2 (12M) Unit - 169,700 24,100 - - -
9 kce1-2 (13m) CE1-2 (13M) Unit - 178,300 24,100 - - -
10 kce1-2 (14m) CE1-2 (14M) Unit - 186,900 24,100 - - -
11 kce1-3 (9m) CE1-3 (9M) Unit - 214,100 24,100 - - -
12 kce1-3 (11m) CE1-3 (11M) Unit - 246,900 24,100 - - -
13 kce1-3 (12m) CE1-3 (12M) Unit 7 263,300 24,100 1,843,100 168,700 2,011,800
14 kce1-3 (13m) CE1-3 (13M) Unit - 279,700 24,100 - - -
15 kce1-3 (14m) CE1-3 (14M) Unit 7 296,100 24,100 2,072,700 168,700 2,241,400
16 kce2-1 CE2-1 Unit - 202,800 32,700 - - -
17 kce2-2 CE2-2 Unit 7 258,800 32,700 1,811,600 228,900 2,040,500
18 kce2-3 CE2-3 Unit 7 414,800 29,600 2,903,600 207,200 3,110,800
19 kce5-1 CE5-1 Unit - 630,400 95,900 - - -
20 kce5-2 CE5-2 Unit - 798,400 95,900 - - -
21 kce6-1 CE6-1 Unit - 372,000 35,100 - - -
22 kse1-1 (7m) SE1-1 (7M) Unit - 120,900 24,100 - - -
23 kse1-1 (9m) SE1-1 (9M) Unit - 132,500 24,100 - - -
24 kse1-1 (11m) SE1-1 (11M) Unit - 144,100 24,100 - - -
25 kse1-1 (12m) SE1-1 (12M) Unit - 149,900 24,100 - - -
26 kse1-2 (7m) SE1-2 (7M) Unit - 140,500 24,100 - - -
27 kse1-2 (9m) SE1-2 (9M) Unit - 157,700 24,100 - - -
28 kse1-2 (11m) SE1-2 (11M) Unit - 157,700 24,100 - - -
29 kse1-2 (12m) SE1-2 (12M) Unit - 183,500 24,100 - - -
30 kse1-2 (13m) SE1-2 (13M) Unit - 192,100 24,100 - - -
31 kse1-2 (14m) SE1-2 (14M) Unit - 200,700 24,100 - - -
32 kse1-3 (9m) SE1-3 (9M) Unit - 227,900 24,100 - - -
33 kse1-3 (11m) SE1-3 (11M) Unit - 260,700 24,100 - - -
34 kse1-3 (12m) SE1-3 (12M) Unit - 277,100 24,100 - - -
35 kse1-3 (13m) SE1-3 (13M) Unit - 293,500 24,100 - - -
36 kse1-3 (14m) SE1-3 (14M) Unit - 309,900 24,100 - - -
37 kse2-1 SE2-1 Unit - 230,400 32,700 - - -
38 kse2-2 SE2-2 Unit - 286,400 32,700 - - -
39 kse2-3 SE2-3 Unit - 442,400 29,600 - - -
40 kse5-1 SE5-1 Unit - 630,400 95,900 - - -
41 kse5-2 SE5-2 Unit - 630,400 95,900 - - -
42 kse6-1 SE6-1 Unit - 386,900 35,100 - - -
je E Unit 42 10,766,000 1,110,900 11,876,900
M
1 kcm2-11 CM2-11 Unit 5 193,850 39,000 969,250 195,000 1,164,250
2 kcm2-11m CM2-11M Unit 5 397,810 39,000 1,989,050 195,000 2,184,050
3 kcm2-12 CM2-12 Unit 5 53,180 8,500 265,900 42,500 308,400
4 kcm2-12a CM2-12A Unit 5 56,000 11,700 280,000 58,500 338,500
5 kcm2-15 CM2-15 Unit 5 1,783,800 101,400 8,919,000 507,000 9,426,000
6 kcm5-2 CM5-2 Unit 5 108,880 17,900 544,400 89,500 633,900
7 kcm5-3 CM5-3 Unit 5 30,600 15,600 153,000 78,000 231,000
8 kcm5-4 CM5-4 Unit 5 36,180 16,300 180,900 81,500 262,400
Page 44 of 120
HARGA SATUAN JUMLAH
NO KODE KONSTRUKSI SAT VOL TOTAL
HARDWARE JASA HARDWARE JASA
9 kcm5-5 CM5-5 Unit 5 7,780 17,900 38,900 89,500 128,400
10 kcm5-6 CM5-6 Unit 5 29,800 42,100 149,000 210,500 359,500
11 kcm5-8 CM5-8 Unit 5 23,000 32,700 115,000 163,500 278,500
12 kcm5-9 CM5-9 Unit 5 79,400 42,100 397,000 210,500 607,500
13 kcm5-12 CM5-12 Unit 5 181,600 31,900 908,000 159,500 1,067,500
14 kcm5-13 CM5-13 Unit 5 67,000 31,900 335,000 159,500 494,500
15 kcm5-16 CM5-16 Unit 5 361,600 38,200 1,808,000 191,000 1,999,000
16 kcm5-20 CM5-20+ Unit - 23,500 31,900 - - -
17 ksm2-11 SM2-11 Unit - 193,850 43,600 - - -
18 ksm2-11m SM2-11M Unit - 397,810 50,700 - - -
19 ksm2-12 SM2-12 Unit - 53,180 9,300 - - -
20 ksm2-12a SM2-12A Unit - 56,000 12,400 - - -
21 ksm2-15 SM2-15 Unit - 1,783,800 127,100 - - -
22 ksm5-2 SM5-2 Unit - 149,080 17,900 - - -
23 ksm5-3 SM5-3 Unit - 30,600 15,600 - - -
24 ksm5-4 SM5-4 Unit - 36,180 17,900 - - -
25 ksm5-5 SM5-5 Unit - 7,780 17,900 - - -
26 ksm5-6 SM5-6 Unit - 29,800 45,200 - - -
27 ksm5-8 SM5-8 Unit - 54,100 3,300 - - -
28 ksm5-9 SM5-9 Unit - 79,400 45,200 - - -
29 ksm5-12 SM5-12 Unit - 194,300 33,500 - - -
30 ksm5-13 SM5-13 Unit - 81,900 33,500 - - -
31 ksm5-16 SM5-16 Unit - 374,300 39,700 - - -
32 ksm5-20 SM5-20 Unit - 23,500 33,500 - - -
jm M Unit 75 17,052,400 2,431,000 19,483,400
JTR
1 kcj5 CJ5 Unit 8 38,880 17,800 311,040 142,400 453,440
2 kcj6 CJ6 Unit 8 85,200 21,400 681,600 171,200 852,800
3 kcj6x CJ6X Unit 8 78,700 17,800 629,600 142,400 772,000
4 kcj7 CJ7 Unit 8 87,580 27,600 700,640 220,800 921,440
5 kcj8 CJ8 Unit 8 38,880 17,800 311,040 142,400 453,440
6 kcj10 CJ10 Unit - 43,080 29,300 - - -
7 kj5-t J5-T Unit - 56,200 15,600 - - -
8 kj6-t J6-T Unit - 58,600 21,900 - - -
9 kj7-t J7-T Unit - 75,900 16,300 - - -
10 kmj6-t MJ6-T Unit - 16,300 11,700 - - -
11 ksj5 SJ5 Unit 8 54,980 17,800 439,840 142,400 582,240
12 ksj6 SJ6 Unit 8 103,000 21,400 824,000 171,200 995,200
13 ksj6x SJ6X Unit - 78,700 17,800 - - -
14 ksj7 SJ7 Unit 8 105,380 27,600 843,040 220,800 1,063,840
15 ksj8 SJ8 Unit - 48,680 17,800 - - -
16 ksj10 SJ10 Unit - 44,380 29,300 - - -
17 kj5-t J5-T Unit 8 56,200 15,600 449,600 124,800 574,400
18 kj6-t J6-T Unit 8 58,600 21,900 468,800 175,200 644,000
19 kj7-t J7-T Unit 8 75,900 16,300 607,200 130,400 737,600
20 kmj6-t MJ6-T Unit 8 16,300 11,700 130,400 93,600 224,000
jjtr JTR Unit 96 6,396,800 1,877,600 8,274,400
TRAFO
1 CG105/106/136-50 CG105/106/136-50 KVA 1 PHASA Unit 2 832,700 268,200 1,665,400 536,400 2,201,800
2 CG107-50 CG107-50 KVA 1 PHASA DENGAN SRANDANG Unit - 2,180,200 445,300 - - -
3 CG312A-50 CG312A-50 KVA 3 PHASA 1 TIANG Unit 2 3,881,300 780,000 7,762,600 1,560,000 9,322,600
4 CG312A-100 CG312A-100 KVA 3 PHASA Unit 2 3,881,300 1,950,000 7,762,600 3,900,000 11,662,600
5 CG313-100 CG313-100 KVA 3 PHASA Unit - 4,470,700 2,340,000 - - -
6 CG313-160 CG313-160 KVA 3 PHASA Unit - 4,470,700 2,496,000 - - -
7 CG313-200 CG313-200 KVA 3 PHASA Unit 2 4,470,700 2,730,000 8,941,400 5,460,000 14,401,400
8 kM8-A1 M8-A1 Unit - 1,942,500 460,000 - - -
9 kM8-A2 M8-A2 Unit - 3,219,500 460,000 - - -
10 KM8-B1 M8-B1 Unit - 3,972,500 550,000 - - -
11 KM8-B2 M8-B2 Unit - 4,537,700 630,000 - - -
jtrafo Pasang Trafo Unit 8 26,132,000 11,456,400 37,588,400
SR/APP
1 1ph bangunan PEMASANGAN APP 1PHS DI BANGUNAN Unit - 112,900 - - - -
2 3ph bangunan PEMASANGAN APP 3PHS DI BANGUNAN Unit - 129,900 - - - -
3 1ph(25)a1 PEMASANGAN APP DI TIANG Unit - 348,800 - - - -
4 1ph(63)a1 SR+APP 1PHASA 13,9 kVA LANGSUNG Unit 3 - 109,200 - 327,600 327,600
5 1ph(80)a1 SR+APP 1PHASA 17,6 kVA LANGSUNG Unit 3 - 109,200 - 327,600 327,600
6 3ph(100)a1 SR+APP 1PHASA 22 Kva LANGSUNG Unit 3 - 109,200 - 327,600 327,600
7 1ph(63)a1taklangsung SR+APP 1PHASA 13,9 kVA TAK LANGSUNG Unit 3 - 109,200 - 327,600 327,600
8 1ph(80)a1taklangsung SR+APP 1PHASA 17,6 kVA TAK LANGSUNG Unit 3 - 109,200 - 327,600 327,600
9 1ph(100)a1taklangsung SR+APP 1PHASA 22 kVA TAK LANGSUNG Unit 3 - 109,200 - 327,600 327,600
10 3ph(10)a1langsung SR+APP 3PHASA 6,6 kVA LANGSUNG Unit 3 - 140,400 - 421,200 421,200
11 3ph(16)a1langsung SR+APP 3PHASA 10,6 kVA LANGSUNG Unit 3 - 140,400 - 421,200 421,200
12 3ph(20)a1langsung SR+APP 3PHASA 13,2 kVA LANGSUNG Unit 3 - 140,400 - 421,200 421,200
13 3ph(25)a1langsung SR+APP 3PHASA 16,5 kVA LANGSUNG Unit 3 - 140,400 - 421,200 421,200
14 3ph(35)a1langsung SR+APP 3PHASA 23 Kva LANGSUNG Unit 3 - 140,400 - 421,200 421,200
15 app3ph(50)klangsung APP 3PHASA 33 Kva LANGSUNG Unit 3 - 140,400 - 421,200 421,200
16 app3ph(63)klangsung APP 3PHASA 41,5 Kva LANGSUNG Unit 3 - 140,400 - 421,200 421,200
17 app3ph(80)ktaklangsung APP 3PHASA 53 Kva TAK LANGSUNG Unit 3 - 179,400 - 538,200 538,200
18 app3ph(100)ktaklangsung APP 3PHASA 66 Kva TAK LANGSUNG Unit 3 - 179,400 - 538,200 538,200
19 app3ph(125)ktaklangsung APP 3PHASA 82,5 Kva TAK LANGSUNG Unit 3 - 179,400 - 538,200 538,200
20 105kvataklangsung APP 3PHASA 105 Kva TAK LANGSUNG Unit 3 - 179,400 - 538,200 538,200
21 131-ktaklangsung APP 3PHASA 131 Kva TAK LANGSUNG Unit 3 - 179,400 - 538,200 538,200
22 147-ktaklangsung APP 3PHASA 147 Kva TAK LANGSUNG Unit 3 - 179,400 - 538,200 538,200
23 164-ktaklangsung APP 3PHASA 164 Kva TAK LANGSUNG Unit 3 - 179,400 - 538,200 538,200
24 197-ktaklangsung APP 3PHASA 197 Kva TAK LANGSUNG Unit 3 - 179,400 - 538,200 538,200

Page 45 of 120
HARGA SATUAN JUMLAH
NO KODE KONSTRUKSI SAT VOL TOTAL
HARDWARE JASA HARDWARE JASA
25 240 KVA PENGUKURAN TM 240 kVA Outdoor Unit 3 5,765,380 429,000 17,296,140 1,287,000 18,583,140
26 345kva PENGUKURAN TM 345 kVA Outdoor Unit 3 5,765,380 429,000 17,296,140 1,287,000 18,583,140
27 555kva PENGUKURAN TM 555 kVA Outdoor Unit - 5,768,380 429,000 - - -
28 690kva PENGUKURAN TM 690 kVA Outdoor Unit - 5,768,380 429,000 - - -
29 865kva PENGUKURAN TM 865 kVA Outdoor Unit - 5,786,380 429,000 - - -
30 >690kva PENGUKURAN TM >555 kVA Kubikel Unit 2 5,058,610 3,718,100 10,117,220 7,436,200 17,553,420
japp Pasang APP Unit 71 44,709,500 19,229,800 63,939,300
VANGNET
1 VANGNET1 KONSTRUKSI VANGNET Unit 1 1,863,200 124,800 1,863,200 124,800 1,988,000
2 CG107-50 CM2-11M Unit 1 795,620 39,000 795,620 39,000 834,620
3 JARVANG1 PEMBUATAN JARINGAN VANGNET Unit 1 83,200 9,300 83,200 9,300 92,500
jvangnet Vangnet Unit 3 2,742,020 173,100 2,915,120
KABEL POWER
1 PASANG KABEL POWER PEMASANGAN KABEL POWER Unit 1 8,411,500 2,435,400 8,411,500 2,435,400 10,846,900
2 ARESTER PEMASANGAN ARESTER DI RISEPOOL Unit 1 89,400 126,300 89,400 126,300 215,700
3 kcm2-11m CM2-11M Unit 1 1,274,820 78,000 1,274,820 78,000 1,352,820
4 outdoor PEMBUATAN SALURAN KABEL OUTDOOR Unit 1 1,189,030 395,880 1,189,030 395,880 1,584,910
5 galiantanah PEMBUATAN GALIAN TANAH Unit 1 - 296,220 - 296,220 296,220
jkabelpower Pasang Kabel Power Unit 5 10,964,750 3,331,800 14,296,550
KONDUKTOR
1 3x240+150jtm Upah Pasang Penghantar TM A3C 3x240 + 1x150mm² Per 50 m 4 335,000 - 1,340,000 1,340,000
2 3x240+120jtm Upah Pasang Penghantar TM A3C 3x240 + 1x120mm² Per 50 m 4 335,000 - 1,340,000 1,340,000
3 3x150+150jtm Upah Pasang Penghantar TM A3C 3x150 + 1x150mm² Per 50 m 4 249,600 - 998,400 998,400
4 3x150+70jtm Upah Pasang Penghantar TM A3C 3x150 + 1x70mm² Per 50 m 4 249,600 - 998,400 998,400
5 3x70+70jtm Upah Pasang Penghantar TM A3C 3x70 + 1x70mm² Per 50 m 4 226,200 - 904,800 904,800
6 3x70+50jtm Upah Pasang Penghantar TM A3C 3x70 + 1x50mm² Per 50 m 4 210,600 - 842,400 842,400
7 3x70+35jtm Upah Pasang Penghantar TM A3C 3x70 + 1x35mm² Per 50 m 4 210,600 - 842,400 842,400
8 3x35+35jtm Upah Pasang Penghantar TM A3C 3x35 + 1x35mm² Per 50 m 4 171,600 - 686,400 686,400
9 1x150+70jtm Upah Pasang Penghantar TM A3C 1x150 + 1x70mm² Per 50 m 4 171,600 - 686,400 686,400
10 1x120+70jtm Upah Pasang Penghantar TM A3C 1x120 + 1x70mm² Per 50 m 4 171,600 - 686,400 686,400
11 1x70+70jtm Upah Pasang Penghantar TM A3C 1x70 + 1x70mm² Per 50 m 4 163,800 - 655,200 655,200
12 1x70+50jtm Upah Pasang Penghantar TM A3C 1x70 + 1x50mm² Per 50 m 4 163,800 - 655,200 655,200
13 1x70+35jtm Upah Pasang Penghantar TM A3C 1x70 + 1x35mm² Per 50 m 4 140,400 - 561,600 561,600
14 1x35+35jtm Upah Pasang Penghantar TM A3C 1x35 + 1x35mm² Per 50 m 4 101,400 - 405,600 405,600
15 3x240jtm Upah Pasang Penghantar TM A3C 3x240mm² Per 50 m 4 280,000 - 1,120,000 1,120,000
16 3x150jtm Upah Pasang Penghantar TM A3C 3x150mm² Per 50 m 4 230,000 - 920,000 920,000
17 3x70jtm Upah Pasang Penghantar TM A3C 3x70mm² Per 50 m 4 179,400 - 717,600 717,600
18 3x35jtm Upah Pasang Penghantar TM A3C 3x35mm² Per 50 m 4 117,000 - 468,000 468,000
19 2x240jtm Upah Pasang Penghantar TM A3C 2x240mm² Per 50 m 4 195,000 - 780,000 780,000
20 2x150jtm Upah Pasang Penghantar TM A3C 2x150mm² Per 50 m 4 171,600 - 686,400 686,400
21 2x70jtm Upah Pasang Penghantar TM A3C 2x70mm² Per 50 m 4 128,700 - 514,800 514,800
22 2x35jtm Upah Pasang Penghantar TM A3C 2x35mm² Per 50 m 4 97,500 - 390,000 390,000
23 1x240jtm Upah Pasang Penghantar TM A3C 1x240mm² Per 50 m 4 93,600 - 374,400 374,400
24 1x150jtm Upah Pasang Penghantar TM A3C 1x150mm² Per 50 m 4 89,700 - 358,800 358,800
25 1x70jtm Upah Pasang Penghantar TM A3C 1x70mm² Per 50 m 4 70,200 - 280,800 280,800
26 1x50jtm Upah Pasang Penghantar TM A3C 1x50mm² Per 50 m 4 70,200 - 280,800 280,800
27 1x35jtm Upah Pasang Penghantar TM A3C 1x35mm² Per 50 m 4 54,600 - 218,400 218,400
28 3x240+150a3cs Upah Pasang Penghantar TM A3CS 3x240 + 1x150mm² Per 50 m - 400,000 - - -
29 3x240+120a3cs Upah Pasang Penghantar TM A3CS 3x240 + 1x120mm² Per 50 m - 400,000 - - -
30 3x150+150a3cs Upah Pasang Penghantar TM A3CS 3x150 + 1x150mm² Per 50 m - 295,600 - - -
31 3x150+70a3cs Upah Pasang Penghantar TM A3CS 3x150 + 1x70mm² Per 50 m - 295,600 - - -
32 3x70+70a3cs Upah Pasang Penghantar TM A3CS 3x70 + 1x70mm² Per 50 m - 259,500 - - -
33 3x70+50a3cs Upah Pasang Penghantar TM A3CS 3x70 + 1x50mm² Per 50 m - 241,000 - - -
34 3x70+35a3cs Upah Pasang Penghantar TM A3CS 3x70 + 1x35mm² Per 50 m - 241,000 - - -
35 3x35+35a3cs Upah Pasang Penghantar TM A3CS 3x35 + 1x35mm² Per 50 m - 187,200 - - -
36 1x150+70a3cs Upah Pasang Penghantar TM A3CS 1x150 + 1x70mm² Per 50 m - 220,000 - - -
37 1x120+70a3cs Upah Pasang Penghantar TM A3CS 1x120 + 1x70mm² Per 50 m - 200,000 - - -
38 1x70+70a3cs Upah Pasang Penghantar TM A3CS 1x70 + 1x70mm² Per 50 m - 175,000 - - -
39 1x70+50a3cs Upah Pasang Penghantar TM A3CS 1x70 + 1x50mm² Per 50 m - 175,000 - - -
40 1x70+35a3cs Upah Pasang Penghantar TM A3CS 1x70 + 1x35mm² Per 50 m - 151,300 - - -
41 1x35+35a3cs Upah Pasang Penghantar TM A3CS 1x35 + 1x35mm² Per 50 m - 114,600 - - -
42 3x240a3cs Upah Pasang Penghantar TM A3CS 3x240mm² Per 50 m - 300,000 - - -
43 3x150a3cs Upah Pasang Penghantar TM A3CS 3x150mm² Per 50 m - 230,000 - - -
44 3x70a3cs Upah Pasang Penghantar TM A3CS 3x70mm² Per 50 m - 200,000 - - -
45 3x35a3cs Upah Pasang Penghantar TM A3CS 3x35mm² Per 50 m - 151,300 - - -
46 2x240a3cs Upah Pasang Penghantar TM A3CS 2x240mm² Per 50 m - 220,000 - - -
47 2x150a3cs Upah Pasang Penghantar TM A3CS 2x150mm² Per 50 m - 205,500 - - -
48 2x70a3cs Upah Pasang Penghantar TM A3CS 2x70mm² Per 50 m - 151,300 - - -
49 2x35a3cs Upah Pasang Penghantar TM A3CS 2x35mm² Per 50 m - 115,300 - - -
50 1x240a3cs Upah Pasang Penghantar TM A3CS 1x240mm² Per 50 m - 117,000 - - -
51 1x150a3cs Upah Pasang Penghantar TM A3CS 1x150mm² Per 50 m - 107,600 - - -
52 1x70a3cs Upah Pasang Penghantar TM A3CS 1x70mm² Per 50 m - 97,300 - - -
53 1x50a3cs Upah Pasang Penghantar TM A3CS 1x50mm² Per 50 m - 97,300 - - -
54 1x35a3cs Upah Pasang Penghantar TM A3CS 1x35mm² Per 50 m - 79,300 - - -
55 3x240+95mvtic Upah Pasang Kabel MVTIC 3 x 240 + N 95 mm² Per 50 m - 292,500 - - -
56 3x240+150jtmkms Upah Pasang Penghantar TM A3C 3x240 + 1x150mm² Per Kms Per Kms - 6,500,000 - - -
57 3x240+120jtmkms Upah Pasang Penghantar TM A3C 3x240 + 1x120mm² Per Kms Per Kms - 6,500,000 - - -
58 3x150+150jtmkms Upah Pasang Penghantar TM A3C 3x150 + 1x150mm² Per Kms Per Kms - 4,500,000 - - -
59 3x150+70jtmkms Upah Pasang Penghantar TM A3C 3x150 + 1x70mm² Per Kms Per Kms - 4,500,000 - - -
60 3x70+70jtmkms Upah Pasang Penghantar TM A3C 3x70 + 1x70mm² Per Kms Per Kms - 4,200,000 - - -
61 3x70+50jtmkms Upah Pasang Penghantar TM A3C 3x70 + 1x50mm² Per Kms Per Kms - 4,200,000 - - -
62 3x70+35jtmkms Upah Pasang Penghantar TM A3C 3x70 + 1x35mm² Per Kms Per Kms - 4,200,000 - - -
63 3x35+35jtmkms Upah Pasang Penghantar TM A3C 3x35 + 1x35mm² Per Kms Per Kms - 3,200,000 - - -
64 1x150+70jtmkms Upah Pasang Penghantar TM A3C 1x150 + 1x70mm² Per Kms Per Kms - 3,200,000 - - -
65 1x120+70jtmkms Upah Pasang Penghantar TM A3C 1x120 + 1x70mm² Per Kms Per Kms - 3,200,000 - - -

Page 46 of 120
HARGA SATUAN JUMLAH
NO KODE KONSTRUKSI SAT VOL TOTAL
HARDWARE JASA HARDWARE JASA
66 1x70+70jtmkms Upah Pasang Penghantar TM A3C 1x70 + 1x70mm² Per Kms Per Kms - 3,100,000 - - -
67 1x70+50jtmkms Upah Pasang Penghantar TM A3C 1x70 + 1x50mm² Per Kms Per Kms - 3,100,000 - - -
68 1x70+35jtmkms Upah Pasang Penghantar TM A3C 1x70 + 1x35mm² Per Kms Per Kms - 2,808,000 - - -
69 1x35+35jtmkms Upah Pasang Penghantar TM A3C 1x35 + 1x35mm² Per Kms Per Kms - 2,028,000 - - -
70 3x240jtmkms Upah Pasang Penghantar TM A3C 3x240mm² Per Kms Per Kms - 5,694,000 - - -
71 3x150jtmkms Upah Pasang Penghantar TM A3C 3x150mm² Per Kms Per Kms - 4,680,000 - - -
72 3x70jtmkms Upah Pasang Penghantar TM A3C 3x70mm² Per Kms Per Kms - 3,588,000 - - -
73 3x35jtmkms Upah Pasang Penghantar TM A3C 3x35mm² Per Kms Per Kms - 2,340,000 - - -
74 2x240jtmkms Upah Pasang Penghantar TM A3C 2x240mm² Per Kms Per Kms - 3,900,000 - - -
75 2x150jtmkms Upah Pasang Penghantar TM A3C 2x150mm² Per Kms Per Kms - 3,432,000 - - -
76 2x70jtmkms Upah Pasang Penghantar TM A3C 2x70mm² Per Kms Per Kms - 2,574,000 - - -
77 2x35jtmkms Upah Pasang Penghantar TM A3C 2x35mm² Per Kms Per Kms - 1,950,000 - - -
78 1x240jtmkms Upah Pasang Penghantar TM A3C 1x240mm² Per Kms Per Kms - 1,872,000 - - -
79 1x150jtmkms Upah Pasang Penghantar TM A3C 1x150mm² Per Kms Per Kms - 1,794,000 - - -
80 1x70jtmkms Upah Pasang Penghantar TM A3C 1x70mm² Per Kms Per Kms - 1,404,000 - - -
81 1x50jtmkms Upah Pasang Penghantar TM A3C 1x50mm² Per Kms Per Kms - 1,404,000 - - -
82 1x35jtmkms Upah Pasang Penghantar TM A3C 1x35mm² Per Kms Per Kms - 1,092,000 - - -
83 3x240+150a3cskms Upah Pasang Penghantar TM A3CS 3x240 + 1x150mm² Per Kms Per Kms - 8,065,200 - - -
84 3x240+120a3cskms Upah Pasang Penghantar TM A3CS 3x240 + 1x120mm² Per Kms Per Kms - 8,065,200 - - -
85 3x150+150a3cskms Upah Pasang Penghantar TM A3CS 3x150 + 1x150mm² Per Kms Per Kms - 5,500,000 - - -
86 3x150+70a3cskms Upah Pasang Penghantar TM A3CS 3x150 + 1x70mm² Per Kms Per Kms - 5,500,000 - - -
87 3x70+70a3cskms Upah Pasang Penghantar TM A3CS 3x70 + 1x70mm² Per Kms Per Kms - 5,500,000 - - -
88 3x70+50a3cskms Upah Pasang Penghantar TM A3CS 3x70 + 1x50mm² Per Kms Per Kms - 4,820,400 - - -
89 3x70+35a3cskms Upah Pasang Penghantar TM A3CS 3x70 + 1x35mm² Per Kms Per Kms - 4,820,400 - - -
90 3x35+35a3cskms Upah Pasang Penghantar TM A3CS 3x35 + 1x35mm² Per Kms Per Kms - 3,744,000 - - -
91 1x150+70a3cskms Upah Pasang Penghantar TM A3CS 1x150 + 1x70mm² Per Kms Per Kms - 4,461,600 - - -
92 1x120+70a3cskms Upah Pasang Penghantar TM A3CS 1x120 + 1x70mm² Per Kms Per Kms - 4,126,200 - - -
93 1x70+70a3cskms Upah Pasang Penghantar TM A3CS 1x70 + 1x70mm² Per Kms Per Kms - 3,748,600 - - -
94 1x70+50a3cskms Upah Pasang Penghantar TM A3CS 1x70 + 1x50mm² Per Kms Per Kms - 3,748,600 - - -
95 1x70+35a3cskms Upah Pasang Penghantar TM A3CS 1x70 + 1x35mm² Per Kms Per Kms - 3,027,900 - - -
96 1x35+35a3cskms Upah Pasang Penghantar TM A3CS 1x35 + 1x35mm² Per Kms Per Kms - 2,293,200 - - -
97 3x240a3cskms Upah Pasang Penghantar TM A3CS 3x240mm² Per Kms Per Kms - 6,630,000 - - -
98 3x150a3cskms Upah Pasang Penghantar TM A3CS 3x150mm² Per Kms Per Kms - 5,191,600 - - -
99 3x70a3cskms Upah Pasang Penghantar TM A3CS 3x70mm² Per Kms Per Kms - 4,470,900 - - -
100 3x35a3cskms Upah Pasang Penghantar TM A3CS 3x35mm² Per Kms Per Kms - 3,027,900 - - -
101 2x240a3cskms Upah Pasang Penghantar TM A3CS 2x240mm² Per Kms Per Kms - 4,470,900 - - -
102 2x150a3cskms Upah Pasang Penghantar TM A3CS 2x150mm² Per Kms Per Kms - 4,110,600 - - -
103 2x70a3cskms Upah Pasang Penghantar TM A3CS 2x70mm² Per Kms Per Kms - 3,027,900 - - -
104 2x35a3cskms Upah Pasang Penghantar TM A3CS 2x35mm² Per Kms Per Kms - 2,307,200 - - -
105 1x240a3cskms Upah Pasang Penghantar TM A3CS 1x240mm² Per Kms Per Kms - 2,341,500 - - -
106 1x150a3cskms Upah Pasang Penghantar TM A3CS 1x150mm² Per Kms Per Kms - 2,152,800 - - -
107 1x70a3cskms Upah Pasang Penghantar TM A3CS 1x70mm² Per Kms Per Kms - 1,946,800 - - -
108 1x50a3cskms Upah Pasang Penghantar TM A3CS 1x50mm² Per Kms Per Kms - 1,946,800 - - -
109 1x35a3cskms Upah Pasang Penghantar TM A3CS 1x35mm² Per Kms Per Kms - 1,586,500 - - -
110 3x240+95mvtickms Upah Pasang Kabel MVTIC 3 x 240 + N 95 mm² Per Kms Per 50 m - 5,850,000 - - -
111 3x70+35jtr Upah Pasang Penghantar TR A3C 3x70 + 1x35mm² per 50 m - 179,400 - - -
112 2x70+70jtr Upah Pasang Penghantar TR A3C 2x70 + 1x70mm² per 50 m - 156,000 - - -
113 2x70+35jtr Upah Pasang Penghantar TR A3C 2x70 + 1x35mm² per 50 m - 156,000 - - -
114 2x70jtr Upah Pasang Penghantar TR A3C 2x70mm² per 50 m - 101,400 - - -
115 2x55+35jtr Upah Pasang Penghantar TR A3C 2x55 + 1x35mm² per 50 m - 105,300 - - -
116 2x55jtr Upah Pasang Penghantar TR A3C 2x55mm² per 50 m - 92,000 - - -
117 2x35jtr Upah Pasang Penghantar TR A3C 2x35mm² per 50 m - 78,000 - - -
118 tx642 Upah Pasang Penghantar TR TX # 6 ,4 , 2 per 50 m - 54,900 - - -
119 tx14 Upah Pasang Penghantar TR TX # 1 / 0 & # 4/ 0 per 50 m - 65,200 - - -
120 qx642 Upah Pasang Penghantar TR QX # 6, 4, 2 per 50 m - 61,000 - - -
121 qx24 Upah Pasang Penghantar TR QX # 2 / 0 & 4 / 0 per 50 m - 79,600 - - -
122 lvtc3x70+50 Upah Pasang Penghantar TR LVTC 3x70 + 1x50mm² per 50 m 3 168,700 - 506,100 506,100
123 lvtc3x50+35 Upah Pasang Penghantar TR LVTC 3x50 + 1x35mm² per 50 m 3 127,000 - 381,000 381,000
124 lvtc3x35+35 Upah Pasang Penghantar TR LVTC 3x35 + 1x35mm² per 50 m 3 92,000 - 276,000 276,000
125 lvtc2x70+50 Upah Pasang Penghantar TR LVTC 2x70 + 1x50mm² per 50 m 3 135,300 - 405,900 405,900
126 lvtc2x50+50 Upah Pasang Penghantar TR LVTC 2x50 + 1x50mm² per 50 m 3 109,800 - 329,400 329,400
127 lvtc2x50+35 Upah Pasang Penghantar TR LVTC 2x50 + 1x35mm² per 50 m 3 109,800 - 329,400 329,400
128 lvtc2x35+35 Upah Pasang Penghantar TR LVTC 2x35 + 1x35mm² per 50 m 3 92,000 - 276,000 276,000
129 lvtc2x25+25 Upah Pasang Penghantar TR LVTC 2x25 + 1x25mm² per 50 m 3 92,000 - 276,000 276,000
130 psgtra3c3x70+35kms Upah Pasang Penghantar TR A3C 3x70 + 1x35mm² Per Kms Per Kms 3 3,588,000 - 10,764,000 10,764,000
131 psgtra3c2x70+70kms Upah Pasang Penghantar TR A3C 2x70 + 1x70mm² Per Kms Per Kms 3 3,120,000 - 9,360,000 9,360,000
132 psgtra3c3x70+35kms Upah Pasang Penghantar TR A3C 3x70 + 1x35mm² Per Kms Per Kms 3 3,588,000 - 10,764,000 10,764,000
133 psgtra3c2x70kms Upah Pasang Penghantar TR A3C 2x70mm² Per Kms Per Kms 3 2,028,000 - 6,084,000 6,084,000
134 psgtra3c2x55+35kms Upah Pasang Penghantar TR A3C 2x55 + 1x35mm² Per Kms Per Kms 3 2,106,000 - 6,318,000 6,318,000
135 psgtra3c2x55+35kms Upah Pasang Penghantar TR A3C 2x55 + 1x35mm² Per Kms Per Kms 3 2,106,000 - 6,318,000 6,318,000
136 psgtra3c2x55kms Upah Pasang Penghantar TR A3C 2x35mm² Per Kms Per Kms 3 1,560,000 - 4,680,000 4,680,000
137 psgtrtx642kms Upah Pasang Penghantar TR TX # 6 ,4 , 2 Per Kms Per Kms - 1,098,200 - - -
138 psgtrtx14kms Upah Pasang Penghantar TR TX # 1 / 0 & # 4/ 0 Per Kms Per Kms - 1,304,100 - - -
139 psgtrqx642kms Upah Pasang Penghantar TR QX # 6, 4, 2 Per Kms Per Kms - 1,221,400 - - -
140 psgtrqx14kms Upah Pasang Penghantar TR QX # 2 / 0 & 4 / 0 Per Kms Per Kms - 1,592,700 - - -
141 psgtrlvtc3x70+50kms Upah Pasang Penghantar TR LVTC 3x70 + 1x50mm² Per Kms Per Kms - 3,375,800 - - -
142 psgtrlvtc3x50+35kms Upah Pasang Penghantar TR LVTC 3x50 + 1x35mm² Per Kms Per Kms - 2,541,200 - - -
143 psgtrlvtc3x35+35kms Upah Pasang Penghantar TR LVTC 3x35 + 1x35mm² Per Kms Per Kms - 1,840,800 - - -
144 psgtrlvtc2x70+50kms Upah Pasang Penghantar TR LVTC 2x70 + 1x50mm² Per Kms Per Kms - 2,706,600 - - -
145 psgtrlvtc2x50+50kms Upah Pasang Penghantar TR LVTC 2x50 + 1x50mm² Per Kms Per Kms - 2,196,400 - - -
146 psgtrlvtc2x50+35kms Upah Pasang Penghantar TR LVTC 2x50 + 1x35mm² Per Kms Per Kms - 2,196,400 - - -
147 psgtrlvtc2x35+35kms Upah Pasang Penghantar TR LVTC 2x35 + 1x35mm² Per Kms Per Kms - 1,840,800 - - -
148 psgtrlvtc2x25+25kms Upah Pasang Penghantar TR LVTC 2x25 + 1x25mm² Per Kms Per Kms - 1,840,800 - - -
149 jp70od Upah Pasang Terminating Kabel 1 x 70 mm² OD Unit 1 117,000 - 117,000 117,000
150 jp3x70id Upah Pasang Terminating Kabel 3 x 70 mm² ID Unit 1 280,800 - 280,800 280,800
151 jp3x70od Upah Pasang Terminating Kabel 3 x 70 mm² OD Unit 1 312,000 - 312,000 312,000
Page 47 of 120
HARGA SATUAN JUMLAH
NO KODE KONSTRUKSI SAT VOL TOTAL
HARDWARE JASA HARDWARE JASA
152 jp95id Upah Pasang Terminating Kabel 3 x 95 mm² ID Unit 1 280,800 - 280,800 280,800
153 jp95od Upah Pasang Terminating Kabel 3 x 95 mm² OD Unit 1 312,000 - 312,000 312,000
154 jp3x150id Upah Pasang Terminating Kabel 3 x 150 mm² ID Unit 1 323,700 - 323,700 323,700
155 jp3x150od Upah Pasang Terminating Kabel 3 x 150 mm² OD Unit 1 331,500 - 331,500 331,500
156 jp3x240id Upah Pasang Terminating Kabel 3 x 240 mm² ID Unit 1 327,600 - 327,600 327,600
157 jp3x240od Upah Pasang Terminating Kabel 3 x 240 mm² OD Unit 1 374,400 - 374,400 374,400
158 jpter300id Upah Pasang Terminating Kabel 3 x 300 mm² ID Unit 1 327,600 - 327,600 327,600
159 jpter300od Upah Pasang Terminating Kabel 3 x 300 mm² OD Unit 1 374,400 - 374,400 374,400
160 jpskabel240-300 Upah Pasang Sepatu kabel bimetal 240 - 300 mm² (2 lubang) Unit - 7,000 - - -
161 jpskabel150 Upah Pasang Sepatu kabel bimetal 150 mm² (2 lubang) Unit - 6,200 - - -
162 jpxlpe3x300 Upah Pasang Kabel Tanah XLPE 3 x 300 mm² (three core) Per 50 m - 253,900 - - -
163 jptxlpe240 Upah Pasang Kabel Tanah XLPE 3 x 240 mm² (three core) Per 50 m - 253,900 - - -
164 jpnyy70 Upah Pasang Kabel NYY 1 x 70 mm² Per 1 m - 600 - - -
165 jpnyy150 Upah Pasang Kabel NYY 1 x 150 mm² Per 1 m - 700 - - -
166 jpna150 Upah Pasang Kabel NA2XS2Y 20 KV 3 x 150 mm² Per 1 m 2 9,300 - 18,600 18,600
167 jpna95 Upah Pasang Kabel NA2XS2Y 20 KV 3 x 95 mm² Per 1 m 2 9,300 - 18,600 18,600
168 jpna70 Upah Pasang Kabel NA2XS2Y 20 KV 3 x 70 mm² Per 1 m 2 9,300 - 18,600 18,600
169 jpna1x70 Upah Pasang Kabel NA2XS2Y 20 KV 1 x 70 mm² Per 1 m 2 4,293 - 8,586 8,586
170 jpgalian Galian Kabel - m³ Per m³ - 101,400 - - -
jkonduktor Pasang Konduktor 172 - 79,207,186 79,207,186
HARGA SATUAN DASAR SEWA ALAT BERAT
1 alatberat1 Hydraulic Excavator (Komatsu) jam - 130,400 - - -
2 alatberat2 Bulldozer, 4 jam/hari jam - 191,100 - - -
3 alatberat3 Loader Komatsu jam - 120,900 - - -
4 alatberat4 Dump Truk 3.5 ton jam - 144,300 - - -
5 alatberat5 Mesin Gilas 8-10ton jam - 97,600 - - -
6 alatberat6 Tandem Roller jam - 120,900 - - -
7 alatberat7 Motor Grader 5jam/hari jam - 144,300 - - -
8 alatberat8 Air Compressor jam - 46,800 - - -
9 alatberat9 Tamper/ Vibrator Plate jam - 74,100 - - -
10 alatberat10 Jack Hammer jam - 74,100 - - -
11 alatberat11 Roller vibrator self 7 ton jam - 74,100 - - -
12 alatberat12 Concrete Mixer jam - 17,625 - - -
13 alatberat13 Concrete Vibrator jam - 17,625 - - -
14 alatberat14 Water tank truck jam - 156,000 - - -
jsewaalat Sewa Alat Berat jam - - - -
HARGA SATUAN DASAR PEKERJA BANGUNAN
1 pekerja1 Pekerja OH - 56,400 - - -
2 pekerja2 Tukang Gali OH - 58,500 - - -
3 pekerja3 Kepala Tukang Batu OH - 70,200 - - -
4 pekerja4 Tukang Batu OH - 58,500 - - -
5 pekerja5 Kepala Tukang Kayu OH - 70,200 - - -
6 pekerja6 Tukang Kayu OH - 58,500 - - -
7 pekerja7 Kepala Tukang Besi OH - 70,200 - - -
8 pekerja8 Tukang Besi OH - 58,500 - - -
9 pekerja9 Kepala Tukang Cat OH - 70,200 - - -
10 pekerja10 Tukang Cat OH - 58,500 - - -
11 pekerja11 Tukang Aspal OH - 57,340 - - -
12 pekerja12 Mandor/ Pengawas OH - 78,000 - - -
13 pekerja13 Instalator OH - 77,550 - - -
14 pekerja14 Pembantu Instalator OH - 70,200 - - -
15 pekerja15 Tukang Babat Rumput OH - - - - -
16 pekerja16 Kepala Tukang Pipa OH - 70,200 - - -
17 pekerja17 Tukang Pipa OH - 58,500 - - -
18 pekerja18 Operator Alat Besar OH - 66,300 - - -
19 pekerja19 Pembantu Operator OH - 58,500 - - -
20 pekerja20 Tukang Las OH - 58,500 - - -
jpekerja Pekerja Bangunan OH - - - -
LAIN-LAIN
1 ll1 Sertifikasi Laik Operasi Lot - - - - -
2 ll2 Transportasi Rit - 78,000 - - -
3 ll3 Rabas-Rabas Pohon Kms - 282,000 - - -
4 ll4 Tebang Pohon Pohon - 23,400 - - -
5 ll5 Potong Pohon Pohon - 23,400 - - -
6 ll6 Pengepresan CCO Bh - 7,000 - - -
7 ll7 Pengepresan Joint Sleve Bh - 7,000 - - -
8 ll8 Penegakan Tiang Miring Bh - 27,300 - - -
jlain2 Lain-Lain - - - -
BONGKAR KONSTRUKSI JTR
1 bongkarj2 Upah Bongkar Konst. JTR J2 Unit - 8,500 - - -
2 bongkarj3 Upah Bongkar Konst. JTR J3 Unit - 9,300 - - -
3 bongkarj4 Upah Bongkar Konst. JTR J4 Unit - 12,400 - - -
4 bongkarj4a Upah Bongkar Konst. JTR J4-A Unit - 6,200 - - -
5 bongkarj5 Upah Bongkar Konst. JTR J5 Unit - 10,100 - - -
6 bongkarj6 Upah Bongkar Konst. JTR J6 Unit - 12,400 - - -
7 bongkarj6x Upah Bongkar Konst. JTR J6-X Unit - 12,916 - - -
8 bongkarj7 Upah Bongkar Konst. JTR J7 Unit - 16,300 - - -
9 bongkarj8 Upah Bongkar Konst. JTR J8 Unit - 10,100 - - -
10 bongkarj10 Upah Bongkar Konst. JTR J10 Unit - 17,100 - - -
11 bongkarj5t Upah Bongkar Konst. JTR J5-T Unit - 9,300 - - -
12 bongkarj6t Upah Bongkar Konst. JTR J6-T Unit - 12,400 - - -
13 bongkarj7t Upah Bongkar Konst. JTR J7-T Unit - 9,300 - - -
14 bongkarmj6t Upah Bongkar Konst. JTR MJ6-T Unit - 7,000 - - -
15 bongkarb13b Upah Bongkar Konst. JTR B13-B Unit - 8,500 - - -
16 bongkarb13d Upah Bongkar Konst. JTR B13-D Unit - 8,500 - - -

Page 48 of 120
HARGA SATUAN JUMLAH
NO KODE KONSTRUKSI SAT VOL TOTAL
HARDWARE JASA HARDWARE JASA
17 bongkarb15b Upah Bongkar Konst. JTR B15-B Unit - 9,300 - - -
18 bongkarb15d Upah Bongkar Konst. JTR B15-D Unit - 9,300 - - -
19 bongkarb16b Upah Bongkar Konst. JTR B16-B Unit - 12,400 - - -
20 bongkarb16d Upah Bongkar Konst. JTR B16-D Unit - 12,400 - - -
21 bongkarb71b Upah Bongkar Konst. JTR B71-B Unit - 10,200 - - -
jbongkarjtr Bongkar Konstruksi JTR Unit - - - -
BONGKAR KONSTRUKSI JTM 1 FASA
1 bongkara1 Upah Bongkar Konst. JTM 1 Fasa A1 Unit - 22,600 - - -
2 bongkara1n Upah Bongkar Konst. JTM 1 Fasa A1-N Unit - 22,600 - - -
3 bongkara1pn Upah Bongkar Konst. JTM 1 Fasa A1-PN Unit - 22,600 - - -
4 bongkara1p Upah Bongkar Konst. JTM 1 Fasa A1-P Unit - 22,600 - - -
5 bongkarai' Upah Bongkar Konst. JTM 1 Fasa A1' Unit - 9,300 - - -
6 bongkara1p' Upah Bongkar Konst. JTM 1 Fasa A1-P' Unit - 9,300 - - -
7 bongkara2 Upah Bongkar Konst. JTM 1 Fasa A2 Unit - 35,100 - - -
8 bongkara2n Upah Bongkar Konst. JTM 1 Fasa A2-N Unit - 35,100 - - -
9 bongkara2' Upah Bongkar Konst. JTM 1 Fasa A2' Unit - 18,700 - - -
10 bongkara3 Upah Bongkar Konst. JTM 1 Fasa A3 Unit - 30,400 - - -
11 bongkara3n Upah Bongkar Konst. JTM 1 Fasa A3-N Unit - 30,400 - - -
12 bongkara3' Upah Bongkar Konst. JTM 1 Fasa A3' Unit - 19,500 - - -
13 bongkara4 Upah Bongkar Konst. JTM 1 Fasa A4 Unit - 32,700 - - -
14 bongkara4n Upah Bongkar Konst. JTM 1 Fasa A4-N Unit - 32,700 - - -
15 bongkara4' Upah Bongkar Konst. JTM 1 Fasa A4' Unit - 31,900 - - -
16 bongkara5 Upah Bongkar Konst. JTM 1 Fasa A5 Unit - 15,600 - - -
17 bongkara5n Upah Bongkar Konst. JTM 1 Fasa A5-N Unit - 15,600 - - -
18 bongkara51 Upah Bongkar Konst. JTM 1 Fasa A5-1 Unit - 17,100 - - -
19 bongkara52 Upah Bongkar Konst. JTM 1 Fasa A5-2 Unit - 17,100 - - -
20 bongkara53 Upah Bongkar Konst. JTM 1 Fasa A5-3 Unit - 17,100 - - -
21 bongkara54 Upah Bongkar Konst. JTM 1 Fasa A5-4 Unit - 17,100 - - -
22 bongkara55 Upah Bongkar Konst. JTM 1 Fasa A5' Unit - 14,800 - - -
23 bongkara51' Upah Bongkar Konst. JTM 1 Fasa A5-1' Unit - 14,000 - - -
24 bongkara52' Upah Bongkar Konst. JTM 1 Fasa A5-2' Unit - 14,000 - - -
25 bongkara53' Upah Bongkar Konst. JTM 1 Fasa A5-3' Unit - 14,000 - - -
26 bongkara54' Upah Bongkar Konst. JTM 1 Fasa A5-4' Unit - 14,000 - - -
27 bongkara6 Upah Bongkar Konst. JTM 1 Fasa A6 Unit - 29,600 - - -
28 bongkara6n Upah Bongkar Konst. JTM 1 Fasa A6-N Unit - 29,600 - - -
29 bongkara6' Upah Bongkar Konst. JTM 1 Fasa A6' Unit - 28,000 - - -
30 bongkara7 Upah Bongkar Konst. JTM 1 Fasa A7 Unit - 17,100 - - -
31 bongkara7a Upah Bongkar Konst. JTM 1 Fasa A7-A Unit - 17,100 - - -
32 bongkara8 Upah Bongkar Konst. JTM 1 Fasa A8 Unit - 29,600 - - -
33 bongkara8a Upah Bongkar Konst. JTM 1 Fasa A8-A Unit - 29,600 - - -
34 bongkara9 Upah Bongkar Konst. JTM 1 Fasa A9 Unit - 22,600 - - -
35 bongkara9n Upah Bongkar Konst. JTM 1 Fasa A9-N Unit - 22,600 - - -
jbongkartm1ph Bongkar Konstruksi JTM 1 Phasa Unit - - - -
BONGKAR KONSTRUKSI JTM 1 FASA KE 3 FASA
1 bongkarb1 Upah Bongkar Konst. JTM 1-3 Fasa B1 Unit - 15,600 - - -
2 bongkarb1a Upah Bongkar Konst. JTM 1-3 Fasa B1-A Unit - 15,600 - - -
3 bongkarb2 Upah Bongkar Konst. JTM 1-3 Fasa B2 Unit - 15,600 - - -
4 bongkarb3 Upah Bongkar Konst. JTM 1-3 Fasa B3 Unit - 15,600 - - -
5 bongkarb4 Upah Bongkar Konst. JTM 1-3 Fasa B4 Unit - 11,700 - - -
6 bongkarb5 Upah Bongkar Konst. JTM 1-3 Fasa B5 Unit - 21,000 - - -
jbongkartm1phke2p Bongkar Konstruksi JTM 1 Phasa ke 3 Phasa Unit - - - -
BONGKAR KONSTRUKSI JTM 3 FASA
1 bongkarc1 Upah Bongkar Konst. JTM 3 Fasa C1 Unit - 31,200 - - -
2 bongkarc1n Upah Bongkar Konst. JTM 3 Fasa C1-N Unit - 31,200 - - -
3 bongkarc11 Upah Bongkar Konst. JTM 3 Fasa C1-1 Unit - 28,800 - - -
4 bongkarc11n Upah Bongkar Konst. JTM 3 Fasa C1-1N Unit - 28,800 - - -
5 bongkarc1a Upah Bongkar Konst. JTM 3 Fasa C1-A Unit - 33,500 - - -
6 bongkarc1' Upah Bongkar Konst. JTM 3 Fasa C1' Unit - 30,400 - - -
7 bongkarc11' Upah Bongkar Konst. JTM 3 Fasa C1-1' Unit - 32,700 - - -
8 bongkarc1a' Upah Bongkar Konst. JTM 3 Fasa C1-A' Unit - 32,700 - - -
9 bongkarc2 Upah Bongkar Konst. JTM 3 Fasa C2 Unit - 33,500 - - -
10 bongkarc21 Upah Bongkar Konst. JTM 3 Fasa C2-1 Unit - 38,200 - - -
11 bongkarc2a Upah Bongkar Konst. JTM 3 Fasa C2-A Unit - 39,000 - - -
12 bongkarc2n Upah Bongkar Konst. JTM 3 Fasa C2-N Unit - 39,000 - - -
13 bongkarc2' Upah Bongkar Konst. JTM 3 Fasa C2' Unit - 39,000 - - -
14 bongkarc21' Upah Bongkar Konst. JTM 3 Fasa C2-1' Unit - 39,000 - - -
15 bongkarc2a' Upah Bongkar Konst. JTM 3 Fasa C2-A' Unit - 39,000 - - -
16 bongkarc3 Upah Bongkar Konst. JTM 3 Fasa C3 Unit - 39,000 - - -
17 bongkarc3vn Upah Bongkar Konst. JTM 3 Fasa C3-VN Unit - 39,000 - - -
18 bongkarc3' Upah Bongkar Konst. JTM 3 Fasa C3' Unit - 38,200 - - -
19 bongkarc41 Upah Bongkar Konst. JTM 3 Fasa C4-1 Unit - 70,200 - - -
20 bongkarc51 Upah Bongkar Konst. JTM 3 Fasa C5-1 Unit - 39,000 - - -
21 bongkarc7 Upah Bongkar Konst. JTM 3 Fasa C7 Unit - 39,000 - - -
22 bongkarc71 Upah Bongkar Konst. JTM 3 Fasa C7-1 Unit - 47,500 - - -
23 bongkarc7n Upah Bongkar Konst. JTM 3 Fasa C7-N Unit - 39,000 - - -
24 bongkarc7' Upah Bongkar Konst. JTM 3 Fasa C7' Unit - 35,800 - - -
25 bongkarc71' Upah Bongkar Konst. JTM 3 Fasa C7-1' Unit - 38,200 - - -
26 bongkarc8 Upah Bongkar Konst. JTM 3 Fasa C8 Unit - 79,100 - - -
27 bongkarc8a Upah Bongkar Konst. JTM 3 Fasa C8-A Unit - 81,000 - - -
28 bongkarc8an Upah Bongkar Konst. JTM 3 Fasa C8-AN Unit - 79,100 - - -
29 bongkarc8' Upah Bongkar Konst. JTM 3 Fasa C8' Unit - 73,200 - - -
30 bongkarc8a' Upah Bongkar Konst. JTM 3 Fasa C8-A' Unit - 79,700 - - -
31 bongkarc9 Upah Bongkar Konst. JTM 3 Fasa C9 Unit - 33,300 - - -
32 bongkarc9n Upah Bongkar Konst. JTM 3 Fasa C9-N Unit - 33,300 - - -
33 bongkarc9' Upah Bongkar Konst. JTM 3 Fasa C9' Unit - 32,200 - - -

Page 49 of 120
HARGA SATUAN JUMLAH
NO KODE KONSTRUKSI SAT VOL TOTAL
HARDWARE JASA HARDWARE JASA
34 bongkarc10 Upah Bongkar Konst. JTM 3 Fasa C10 Unit - 42,100 - - -
35 bongkarc10n Upah Bongkar Konst. JTM 3 Fasa C10-N Unit - 42,100 - - -
36 bongkarc10' Upah Bongkar Konst. JTM 3 Fasa C10' Unit - 38,400 - - -
37 bongkarc11 Upah Bongkar Konst. JTM 3 Fasa C1-1 Unit - 28,800 - - -
38 bongkarc11n Upah Bongkar Konst. JTM 3 Fasa C1-1N Unit - 28,800 - - -
39 bongkarc11' Upah Bongkar Konst. JTM 3 Fasa C1-1' Unit - 32,700 - - -
jbongkarjtm3phasa Bongkar Konstruksi JTM 3 Phasa Unit - - - -
BONGKAR AKSESORIS JARINGAN
1 bongkarm211 Upah Bongkar Acc.Jar M2-11 Unit - 25,700 - - -
2 bongkarm211m Upah Bongkar Acc.Jar M2-11M Unit - 30,400 - - -
3 bongkarm212 Upah Bongkar Acc.Jar M2-12 Unit - 5,400 - - -
4 bongkarm212a Upah Bongkar Acc.Jar M2-12A Unit - 7,000 - - -
5 bongkarm215 Upah Bongkar Acc.Jar M2-15 Unit - 80,900 - - -
6 bongkarm316 Upah Bongkar Acc.Jar M3-16 Unit - 780,000 - - -
7 bongkarm52 Upah Bongkar Acc.Jar M5-2 Unit - 10,900 - - -
8 bongkarm53 Upah Bongkar Acc.Jar M5-3 Unit - 9,300 - - -
9 bongkarm54 Upah Bongkar Acc.Jar M5-4 Unit - 10,900 - - -
10 bongkarm55 Upah Bongkar Acc.Jar M5-5 Unit - 10,900 - - -
11 bongkarm56 Upah Bongkar Acc.Jar M5-6 Unit - 27,300 - - -
12 bongkarm58 Upah Bongkar Acc.Jar M5-8 Unit - 19,500 - - -
13 bongkarm59 Upah Bongkar Acc.Jar M5-9 Unit - 27,300 - - -
14 bongkarm510 Upah Bongkar Acc.Jar M5-10 Unit - 27,300 - - -
15 bongkarm512 Upah Bongkar Acc.Jar M5-12 Unit - 19,500 - - -
16 bongkarm513 Upah Bongkar Acc.Jar M5-13 Unit - 19,500 - - -
17 bongkarm516 Upah Bongkar Acc.Jar M5-16 Unit - 23,400 - - -
18 bongkarm520 Upah Bongkar Acc.Jar M5-20 Unit - 19,500 - - -
19 bongkarm524 Upah Bongkar Acc.Jar M5-24 Unit - 1,797,900 - - -
20 bongkarp12c1 Upah Bongkar Acc.Jar P12C-1 Unit - 14,000 - - -
21 bongkarp12c2 Upah Bongkar Acc.Jar P12C-2 Unit - 21,000 - - -
22 bongkarp12s1 Upah Bongkar Acc.Jar P12S-1 Unit - 14,000 - - -
23 bongkarp12s2 Upah Bongkar Acc.Jar P12S-2 Unit - 21,000 - - -
24 bongkare11 Upah Bongkar Acc.Jar E1-1 Unit - 14,000 - - -
25 bongkare12 Upah Bongkar Acc.Jar E1-2 Unit - 14,000 - - -
26 bongkare13 Upah Bongkar Acc.Jar E1-3 Unit - 14,000 - - -
27 bongkare21 Upah Bongkar Acc.Jar E2-1 Unit - 19,500 - - -
28 bongkare22 Upah Bongkar Acc.Jar E2-2 Unit - 19,500 - - -
29 bongkare23 Upah Bongkar Acc.Jar E2-3 Unit - 17,100 - - -
30 bongkare51 Upah Bongkar Acc.Jar E5-1 Unit - 57,700 - - -
31 bongkare52 Upah Bongkar Acc.Jar E5-2 Unit - 57,700 - - -
32 bongkare61 Upah Bongkar Acc.Jar E6-1 Unit - 21,000 - - -
33 bongkarf12 Upah Bongkar Acc.Jar F1-2 Unit - 16,300 - - -
34 bongkarf13 Upah Bongkar Acc.Jar F1-3 Unit - 18,700 - - -
35 bongkarfdg Upah Bongkar Acc.Jar FDG Unit - 353,300 - - -
36 bongkarpanjat Upah Bongkar Acc.Jar Penghalang Panjat Unit - 4,600 - - -
37 bongkarlvcb2 Upah Bongkar Acc.Jar LVCB 2 Jurusan Unit - 281,500 - - -
38 bongkarsection Upah Bongkar Acc.Jar Sectionalizer 3 Fasa Unit - 1,609,100 - - -
39 bongkarlvcb4 Upah Bongkar Acc.Jar LVCB 4 Jurusan Unit - 381,400 - - -
40 bongkards Upah Bongkar Acc.Jar Disconecting Switch Unit - 702,000 - - -
41 bongkarvangnet Upah Bongkar Acc.Jar Konstruksi Vangnet Unit - 83,400 - - -
42 bongkarvangnet1 Upah Bongkar Acc.Jar Jaring Vangnet Per 1 m - 6,200 - - -
jbongkaraksesos Bongkar Aksesoris Jaringan Unit - - - -
BONGKAR PENGHANTAR TM
1 bongkar3x240+150a3c Upah Bongkar Penghantar TM A3C 3x240 + 1x150mm² Per 50 m - 217,600 - - -
2 bongkar3x240+120a3c Upah Bongkar Penghantar TM A3C 3x240 + 1x120mm² Per 50 m - 217,600 - - -
3 bongkar3x150+150a3c Upah Bongkar Penghantar TM A3C 3x150 + 1x150mm² Per 50 m - 168,400 - - -
4 bongkar3x150+70a3c Upah Bongkar Penghantar TM A3C 3x150 + 1x70mm² Per 50 m - 159,900 - - -
5 bongkar3x70+70a3c Upah Bongkar Penghantar TM A3C 3x70 + 1x70mm² Per 50 m - 135,700 - - -
6 bongkar3x70+50a3c Upah Bongkar Penghantar TM A3C 3x70 + 1x50mm² Per 50 m - 131,800 - - -
7 bongkar3x70+35a3c Upah Bongkar Penghantar TM A3C 3x70 + 1x35mm² Per 50 m - 131,800 - - -
8 bongkar3x35+35a3c Upah Bongkar Penghantar TM A3C 3x35 + 1x35mm² Per 50 m - 111,500 - - -
9 bongkar1x150+70a3c Upah Bongkar Penghantar TM A3C 1x150 + 1x70mm² Per 50 m - 125,500 - - -
10 bongkar1x120+70a3c Upah Bongkar Penghantar TM A3C 1x120 + 1x70mm² Per 50 m - 122,400 - - -
11 bongkar1x70+70a3c Upah Bongkar Penghantar TM A3C 1x70 + 1x70mm² Per 50 m - 100,600 - - -
12 bongkar1x70+50a3c Upah Bongkar Penghantar TM A3C 1x70 + 1x50mm² Per 50 m - 100,600 - - -
13 bongkar1x70+35a3c Upah Bongkar Penghantar TM A3C 1x70 + 1x35mm² Per 50 m - 89,700 - - -
14 bongkar1x35+35a3c Upah Bongkar Penghantar TM A3C 1x35 + 1x35mm² Per 50 m - 67,000 - - -
15 bongkar3x240a3c Upah Bongkar Penghantar TM A3C 3x240mm² Per 50 m - 178,600 - - -
16 bongkar3x150a3c Upah Bongkar Penghantar TM A3C 3x150mm² Per 50 m - 140,400 - - -
17 bongkar3x70a3c Upah Bongkar Penghantar TM A3C 3x70mm² Per 50 m - 119,300 - - -
18 bongkar3x35a3c Upah Bongkar Penghantar TM A3C 3x35mm² Per 50 m - 89,700 - - -
19 bongkar2x240a3c Upah Bongkar Penghantar TM A3C 2x240mm² Per 50 m - 124,800 - - -
20 bongkar2x150a3c Upah Bongkar Penghantar TM A3C 2x150mm² Per 50 m - 111,500 - - -
21 bongkar2x70a3c Upah Bongkar Penghantar TM A3C 2x70mm² Per 50 m - 81,900 - - -
22 bongkar2x35a3c Upah Bongkar Penghantar TM A3C 2x35mm² Per 50 m - 68,600 - - -
23 bongkar1x240a3c Upah Bongkar Penghantar TM A3C 1x240mm² Per 50 m - 63,100 - - -
24 bongkar1x150a3c Upah Bongkar Penghantar TM A3C 1x150mm² Per 50 m - 58,500 - - -
25 bongkar1x70a3c Upah Bongkar Penghantar TM A3C 1x70mm² Per 50 m - 5,200 - - -
26 bongkar1x50a3c Upah Bongkar Penghantar TM A3C 1x50mm² Per 50 m - 52,200 - - -
27 bongkar1x35a3c Upah Bongkar Penghantar TM A3C 1x35mm² Per 50 m - 46,000 - - -
28 bongkar3x240+150a3cs Upah Bongkar Penghantar TM A3CS 3x240 + 1x150mm² Per 50 m - 241,800 - - -
29 bongkar3x240+120a3cs Upah Bongkar Penghantar TM A3CS 3x240 + 1x120mm² Per 50 m - 241,800 - - -
30 bongkar3x150+150a3cs Upah Bongkar Penghantar TM A3CS 3x150 + 1x150mm² Per 50 m - 177,000 - - -
31 bongkar3x150+70a3cs Upah Bongkar Penghantar TM A3CS 3x150 + 1x70mm² Per 50 m - 177,000 - - -
32 bongkar3x70+70a3cs Upah Bongkar Penghantar TM A3CS 3x70 + 1x70mm² Per 50 m - 155,200 - - -
33 bongkar3x70+50a3cs Upah Bongkar Penghantar TM A3CS 3x70 + 1x50mm² Per 50 m - 144,300 - - -

Page 50 of 120
HARGA SATUAN JUMLAH
NO KODE KONSTRUKSI SAT VOL TOTAL
HARDWARE JASA HARDWARE JASA
34 bongkar3x70+35a3cs Upah Bongkar Penghantar TM A3CS 3x70 + 1x35mm² Per 50 m - 144,300 - - -
35 bongkar3x35+35a3cs Upah Bongkar Penghantar TM A3CS 3x35 + 1x35mm² Per 50 m - 112,300 - - -
36 bongkar1x150+70a3cs Upah Bongkar Penghantar TM A3CS 1x150 + 1x70mm² Per 50 m - 133,300 - - -
37 bongkar1x120+70a3cs Upah Bongkar Penghantar TM A3CS 1x120 + 1x70mm² Per 50 m - 123,200 - - -
38 bongkar1x70+70a3cs Upah Bongkar Penghantar TM A3CS 1x70 + 1x70mm² Per 50 m - 112,300 - - -
39 bongkar1x70+50a3cs Upah Bongkar Penghantar TM A3CS 1x70 + 1x50mm² Per 50 m - 112,300 - - -
40 bongkar1x70+35a3cs Upah Bongkar Penghantar TM A3CS 1x70 + 1x35mm² Per 50 m - 90,400 - - -
41 bongkar1x35+35a3cs Upah Bongkar Penghantar TM A3CS 1x35 + 1x35mm² Per 50 m - 69,100 - - -
42 bongkar3x240a3cs Upah Bongkar Penghantar TM A3CS 3x240mm² Per 50 m - 198,900 - - -
43 bongkar3x150a3cs Upah Bongkar Penghantar TM A3CS 3x150mm² Per 50 m - 155,200 - - -
44 bongkar3x70a3cs Upah Bongkar Penghantar TM A3CS 3x70mm² Per 50 m - 133,300 - - -
45 bongkar3x35a3cs Upah Bongkar Penghantar TM A3CS 3x35mm² Per 50 m - 90,400 - - -
46 bongkar2x240a3cs Upah Bongkar Penghantar TM A3CS 2x240mm² Per 50 m - 133,300 - - -
47 bongkar2x150a3cs Upah Bongkar Penghantar TM A3CS 2x150mm² Per 50 m - 123,200 - - -
48 bongkar2x70a3cs Upah Bongkar Penghantar TM A3CS 2x70mm² Per 50 m - 90,700 - - -
49 bongkar2x35a3cs Upah Bongkar Penghantar TM A3CS 2x35mm² Per 50 m - 68,600 - - -
50 bongkar1x240a3cs Upah Bongkar Penghantar TM A3CS 1x240mm² Per 50 m - 70,200 - - -
51 bongkar1x150a3cs Upah Bongkar Penghantar TM A3CS 1x150mm² Per 50 m - 63,900 - - -
52 bongkar1x70a3cs Upah Bongkar Penghantar TM A3CS 1x70mm² Per 50 m - 57,700 - - -
53 bongkar1x50a3cs Upah Bongkar Penghantar TM A3CS 1x50mm² Per 50 m - 57,700 - - -
54 bongkar1x35a3cs Upah Bongkar Penghantar TM A3CS 1x35mm² Per 50 m - 47,500 - - -
55 bongkar3x240+95mvtic Upah Bongkar Kabel MVTIC 3 x 240 + N 95 mm² Per 50 m - 145,800 - - -
jbongkartm50m Bongkar Penghantar TM per 50m Per 50 m - - - -
BONGKAR PENGHANTAR TR
1 bongkartr3x70+35 Upah Bongkar Penghantar TR A3C 3x70 + 1x35mm² Per 50 m - 131,000 - - -
2 bongkartr2x70+70 Upah Bongkar Penghantar TR A3C 2x70 + 1x70mm² Per 50 m - 109,200 - - -
3 bongkartr2x70+35 Upah Bongkar Penghantar TR A3C 2x70 + 1x35mm² Per 50 m - 100,600 - - -
4 bongkartr2x70 Upah Bongkar Penghantar TR A3C 2x70mm² Per 50 m - 74,100 - - -
5 bongkartr2x55+35 Upah Bongkar Penghantar TR A3C 2x55 + 1x35mm² Per 50 m - 79,461 - - -
6 bongkartr2x55 Upah Bongkar Penghantar TR A3C 2x55mm² Per 50 m - 55,300 - - -
7 bongkartr2x35 Upah Bongkar Penghantar TR A3C 2x35mm² Per 50 m - 50,700 - - -
8 bongkartrtx642 Upah Bongkar Penghantar TR TX # 6 ,4 , 2 Per 50 m - 32,700 - - -
9 bongkartrtx14 Upah Bongkar Penghantar TR TX # 1 / 0 & # 4/ 0 Per 50 m - 39,000 - - -
10 bongkartrqx642 Upah Bongkar Penghantar TR QX # 6, 4, 2 Per 50 m - 36,600 - - -
11 bongkartrqx24 Upah Bongkar Penghantar TR QX # 2 / 0 & 4 / 0 Per 50 m - 47,500 - - -
12 bongkartrlvtc3x70+50 Upah Bongkar Penghantar TR LVTC 3x70 + 1x50mm² Per 50 m - 100,600 - - -
13 bongkartrlvtc3x50+35 Upah Bongkar Penghantar TR LVTC 3x50 + 1x35mm² Per 50 m - 75,600 - - -
14 bongkartrlvtc3x35+35 Upah Bongkar Penghantar TR LVTC 3x35 + 1x35mm² Per 50 m - 55,300 - - -
15 bongkartrlvtc2x70+50 Upah Bongkar Penghantar TR LVTC 2x70 + 1x50mm² Per 50 m - 81,100 - - -
16 bongkartrlvtc2x50+50 Upah Bongkar Penghantar TR LVTC 2x50 + 1x50mm² Per 50 m - 65,500 - - -
17 bongkartrlvtc2x50+35 Upah Bongkar Penghantar TR LVTC 2x50 + 1x35mm² Per 50 m - 65,500 - - -
18 bongkartrlvtc2x35+35 Upah Bongkar Penghantar TR LVTC 2x35 + 1x35mm² Per 50 m - 55,300 - - -
19 bongkartrlvtc2x25+25 Upah Bongkar Penghantar TR LVTC 2x25 + 1x25mm² Per 50 m - 55,300 - - -
jbongkartr Bongkar Penghantar TR per 50m Per 50 m - - - -
BONGKAR PENGHANTAR TM PER KMS
1 bongkara3c3x240+150kms Upah Bongkar Penghantar TM A3C 3x240 + 1x150mm² Per Kms Per Kms 1 4,500,000 - 4,500,000 4,500,000
2 bongkara3c3x240+120kms Upah Bongkar Penghantar TM A3C 3x240 + 1x120mm² Per Kms Per Kms 1 4,500,000 - 4,500,000 4,500,000
3 bongkara3c3x150+150kms Upah Bongkar Penghantar TM A3C 3x150 + 1x150mm² Per Kms Per Kms 1 3,500,000 - 3,500,000 3,500,000
4 bongkara3c3x150+70kms Upah Bongkar Penghantar TM A3C 3x150 + 1x70mm² Per Kms Per Kms 1 3,198,000 - 3,198,000 3,198,000
5 bongkara3c3x70+70kms Upah Bongkar Penghantar TM A3C 3x70 + 1x70mm² Per Kms Per Kms 1 2,714,400 - 2,714,400 2,714,400
6 bongkara3c3x70+50kms Upah Bongkar Penghantar TM A3C 3x70 + 1x50mm² Per Kms Per Kms 1 2,636,400 - 2,636,400 2,636,400
7 bongkara3c3x70+35kms Upah Bongkar Penghantar TM A3C 3x70 + 1x35mm² Per Kms Per Kms 1 2,636,400 - 2,636,400 2,636,400
8 bongkara3c3x35+35kms Upah Bongkar Penghantar TM A3C 3x35 + 1x35mm² Per Kms Per Kms 1 2,230,800 - 2,230,800 2,230,800
9 bongkara3c1x150+70kms Upah Bongkar Penghantar TM A3C 1x150 + 1x70mm² Per Kms Per Kms 1 2,511,600 - 2,511,600 2,511,600
10 bongkara3c1x120+70kms Upah Bongkar Penghantar TM A3C 1x120 + 1x70mm² Per Kms Per Kms 1 2,449,200 - 2,449,200 2,449,200
11 bongkara3c1x70+70kms Upah Bongkar Penghantar TM A3C 1x70 + 1x70mm² Per Kms Per Kms 1 2,012,400 - 2,012,400 2,012,400
12 bongkara3c1x70+50kms Upah Bongkar Penghantar TM A3C 1x70 + 1x50mm² Per Kms Per Kms 1 2,012,400 - 2,012,400 2,012,400
13 bongkara3c1x70+35kms Upah Bongkar Penghantar TM A3C 1x70 + 1x35mm² Per Kms Per Kms 1 1,794,000 - 1,794,000 1,794,000
14 bongkara3c1x35+35kms Upah Bongkar Penghantar TM A3C 1x35 + 1x35mm² Per Kms Per Kms 1 1,341,600 - 1,341,600 1,341,600
15 bongkara3c3x240kms Upah Bongkar Penghantar TM A3C 3x240mm² Per Kms Per Kms 1 3,572,400 - 3,572,400 3,572,400
16 bongkara3c3x150kms Upah Bongkar Penghantar TM A3C 3x150mm² Per Kms Per Kms 1 2,808,000 - 2,808,000 2,808,000
17 bongkara3c3x70kms Upah Bongkar Penghantar TM A3C 3x70mm² Per Kms Per Kms 1 2,386,800 - 2,386,800 2,386,800
18 bongkara3c3x35kms Upah Bongkar Penghantar TM A3C 3x35mm² Per Kms Per Kms 1 1,794,000 - 1,794,000 1,794,000
19 bongkara3c2x240kms Upah Bongkar Penghantar TM A3C 2x240mm² Per Kms Per Kms 1 2,496,000 - 2,496,000 2,496,000
20 bongkara3c2x150kms Upah Bongkar Penghantar TM A3C 2x150mm² Per Kms Per Kms 1 2,230,800 - 2,230,800 2,230,800
21 bongkara3c2x70kms Upah Bongkar Penghantar TM A3C 2x70mm² Per Kms Per Kms 1 1,638,000 - 1,638,000 1,638,000
22 bongkara3c2x35kms Upah Bongkar Penghantar TM A3C 2x35mm² Per Kms Per Kms 1 1,372,800 - 1,372,800 1,372,800
23 bongkara3c1x240kms Upah Bongkar Penghantar TM A3C 1x240mm² Per Kms Per Kms 1 1,263,600 - 1,263,600 1,263,600
24 bongkara3c1x150kms Upah Bongkar Penghantar TM A3C 1x150mm² Per Kms Per Kms 1 1,170,000 - 1,170,000 1,170,000
25 bongkara3c1x70kms Upah Bongkar Penghantar TM A3C 1x70mm² Per Kms Per Kms 1,045,200 - - -
26 bongkara3c1x50kms Upah Bongkar Penghantar TM A3C 1x50mm² Per Kms Per Kms 1,045,200 - - -
27 bongkara3c1x35kms Upah Bongkar Penghantar TM A3C 1x35mm² Per Kms Per Kms 920,400 - - -
28 bongkara3cs3x240+150kms Upah Bongkar Penghantar TM A3CS 3x240 + 1x150mm² Per Kms Per Kms 4,600,000 - - -
29 bongkara3c3sx240+120kms Upah Bongkar Penghantar TM A3CS 3x240 + 1x120mm² Per Kms Per Kms 4,600,000 - - -
30 bongkara3c3sx150+150kms Upah Bongkar Penghantar TM A3CS 3x150 + 1x150mm² Per Kms Per Kms 3,541,200 - - -
31 bongkara3cs3x150+70kms Upah Bongkar Penghantar TM A3CS 3x150 + 1x70mm² Per Kms Per Kms 3,541,200 - - -
32 bongkara3cs3x70+70kms Upah Bongkar Penghantar TM A3CS 3x70 + 1x70mm² Per Kms Per Kms 3,104,400 - - -
33 bongkara3cs3x70+50kms Upah Bongkar Penghantar TM A3CS 3x70 + 1x50mm² Per Kms Per Kms 2,800,000 - - -
34 bongkara3cs3x70+35kms Upah Bongkar Penghantar TM A3CS 3x70 + 1x35mm² Per Kms Per Kms 2,800,000 - - -
35 bongkara3cs3x35+35kms Upah Bongkar Penghantar TM A3CS 3x35 + 1x35mm² Per Kms Per Kms 2,246,400 - - -
36 bongkara3cs1x150+70kms Upah Bongkar Penghantar TM A3CS 1x150 + 1x70mm² Per Kms Per Kms 2,667,600 - - -
37 bongkara3cs1x120+70kms Upah Bongkar Penghantar TM A3CS 1x120 + 1x70mm² Per Kms Per Kms 2,464,800 - - -
38 bongkara3cs1x70+70kms Upah Bongkar Penghantar TM A3CS 1x70 + 1x70mm² Per Kms Per Kms 2,246,400 - - -
39 bongkara3cs1x70+50kms Upah Bongkar Penghantar TM A3CS 1x70 + 1x50mm² Per Kms Per Kms 2,246,400 - - -
40 bongkara3cs1x70+35kms Upah Bongkar Penghantar TM A3CS 1x70 + 1x35mm² Per Kms Per Kms 1,809,600 - - -

Page 51 of 120
HARGA SATUAN JUMLAH
NO KODE KONSTRUKSI SAT VOL TOTAL
HARDWARE JASA HARDWARE JASA
41 bongkara3cs1x35+35kms Upah Bongkar Penghantar TM A3CS 1x35 + 1x35mm² Per Kms Per Kms 1,383,700 - - -
42 bongkara3cs3x240kms Upah Bongkar Penghantar TM A3CS 3x240mm² Per Kms Per Kms 3,979,500 - - -
43 bongkara3cs3x150kms Upah Bongkar Penghantar TM A3CS 3x150mm² Per Kms Per Kms 3,104,400 - - -
44 bongkara3cs3x70kms Upah Bongkar Penghantar TM A3CS 3x70mm² Per Kms Per Kms - 2,667,600 - - -
45 bongkara3cs3x35kms Upah Bongkar Penghantar TM A3CS 3x35mm² Per Kms Per Kms - 1,809,600 - - -
46 bongkara3cs2x240kms Upah Bongkar Penghantar TM A3CS 2x240mm² Per Kms Per Kms - 2,400,000 - - -
47 bongkara3cs2x150kms Upah Bongkar Penghantar TM A3CS 2x150mm² Per Kms Per Kms - 2,200,000 - - -
48 bongkara3cs2x70kms Upah Bongkar Penghantar TM A3CS 2x70mm² Per Kms Per Kms - 1,815,800 - - -
49 bongkara3cs2x35kms Upah Bongkar Penghantar TM A3CS 2x35mm² Per Kms Per Kms - 1,372,800 - - -
50 bongkara3cs1x240kms Upah Bongkar Penghantar TM A3CS 1x240mm² Per Kms Per Kms - 1,404,000 - - -
51 bongkara3cs1x150kms Upah Bongkar Penghantar TM A3CS 1x150mm² Per Kms Per Kms - 1,279,200 - - -
52 bongkara3cs1x70kms Upah Bongkar Penghantar TM A3CS 1x70mm² Per Kms Per Kms - 1,154,400 - - -
53 bongkara3cs1x50kms Upah Bongkar Penghantar TM A3CS 1x50mm² Per Kms Per Kms - 1,154,400 - - -
54 bongkara3cs1x35kms Upah Bongkar Penghantar TM A3CS 1x35mm² Per Kms Per Kms - 951,600 - - -
55 bongkarmvtic3x240+35kms Upah Bongkar Kabel MVTIC 3 x 240 + N 95 mm² Per Kms Per 50 m - 3,510,000 - - -
jbongkartmkms Bongkar Penghantar TM per kms 24 - 58,769,600 58,769,600
BONGKAR PENGHANTAR TR PER KMS
1 bongkartra3c3x70+35kms Upah Bongkar Penghantar TR A3C 3x70 + 1x35mm² Per Kms Per Kms - 2,620,800 - - -
2 bongkartra3c2x70+70kms Upah Bongkar Penghantar TR A3C 2x70 + 1x70mm² Per Kms Per Kms - 2,184,000 - - -
3 bongkartra3c2x70+35kms Upah Bongkar Penghantar TR A3C 2x70 + 1x35mm² Per Kms Per Kms - 2,012,400 - - -
4 bongkartra3c2x70kms Upah Bongkar Penghantar TR A3C 2x70mm² Per Kms Per Kms - 1,482,000 - - -
5 bongkartra3c2x55+35kms Upah Bongkar Penghantar TR A3C 2x55 + 1x35mm² Per Kms Per Kms - 1,311,800 - - -
6 bongkartra3c2x55kms Upah Bongkar Penghantar TR A3C 2x55mm² Per Kms Per Kms - 1,107,600 - - -
7 bongkartra3c2x35kms Upah Bongkar Penghantar TR A3C 2x35mm² Per Kms Per Kms - 1,014,000 - - -
8 bongkartrtx642kms Upah Bongkar Penghantar TR TX # 6 ,4 , 2 Per Kms Per Kms - 655,200 - - -
9 bongkartrtx14kms Upah Bongkar Penghantar TR TX # 1 / 0 & # 4/ 0 Per Kms Per Kms - 780,000 - - -
10 bongkartrqx642kms Upah Bongkar Penghantar TR QX # 6, 4, 2 Per Kms Per Kms - 733,200 - - -
11 bongkartrqx24kms Upah Bongkar Penghantar TR QX # 2 / 0 & 4 / 0 Per Kms Per Kms - 951,600 - - -
12 bongkartrlvtc3x70+50kms Upah Bongkar Penghantar TR LVTC 3x70 + 1x50mm² Per Kms Per Kms - 1,800,000 - - -
13 bongkartrlvtc3x50+35kms Upah Bongkar Penghantar TR LVTC 3x50 + 1x35mm² Per Kms Per Kms - 1,513,200 - - -
14 bongkartrlvtc3x35+35kms Upah Bongkar Penghantar TR LVTC 3x35 + 1x35mm² Per Kms Per Kms - 1,107,600 - - -
15 bongkartrlvtc2x70+50kms Upah Bongkar Penghantar TR LVTC 2x70 + 1x50mm² Per Kms Per Kms - 1,400,000 - - -
16 bongkartrlvtc2x50+50kms Upah Bongkar Penghantar TR LVTC 2x50 + 1x50mm² Per Kms Per Kms - 1,200,000 - - -
17 bongkartrlvtc2x50+35kms Upah Bongkar Penghantar TR LVTC 2x50 + 1x35mm² Per Kms Per Kms - 1,200,000 - - -
18 bongkartrlvtc2x35+35kms Upah Bongkar Penghantar TR LVTC 2x35 + 1x35mm² Per Kms Per Kms - 1,107,600 - - -
19 bongkartrlvtc2x25+25kms Upah Bongkar Penghantar TR LVTC 2x25 + 1x25mm² Per Kms Per Kms - 1,107,600 - - -
jbongkartrkms Bongkar Penghantar TR per kms per kms - - - -
BONGKAR TRAFO DISTRIBUSI
1 bongkar1p25kva Upah Bongkar Trafo 1 Fasa 25 KVA + Bracket Unit 2 160,600 - 321,200 321,200
2 bongkar1p50kva Upah Bongkar Trafo 1 Fasa 50 KVA + Bracket Unit 2 156,000 - 312,000 312,000
3 bongkar1p50kva1tiang Upah Bongkar Trafo 1 Fasa 50 KVA 1 Tiang Unit 2 266,700 - 533,400 533,400
4 bongkar3p50kva1tiang Upah Bongkar Trafo 3 Fasa 50 KVA 1 Tiang Unit 2 547,500 - 1,095,000 1,095,000
5 bongkar3p100kva1tiang Upah Bongkar Trafo 3 Fasa 100 KVA 1 Tiang Unit 2 1,368,900 - 2,737,800 2,737,800
6 bongkar3p50kva2tiang Upah Bongkar Trafo 3 Fasa 50 KVA 2 Tiang Unit 2 748,000 - 1,496,000 1,496,000
7 bongkar3p100kva2tiang Upah Bongkar Trafo 3 Fasa 100 KVA 2 Tiang Unit 2 1,711,300 - 3,422,600 3,422,600
8 bongkar3p160kva2tiang Upah Bongkar Trafo 3 Fasa 160 KVA 2 Tiang Unit 2 1,757,300 - 3,514,600 3,514,600
9 bongkar3p200kva2tiang Upah Bongkar Trafo 3 Fasa 200 KVA 2 Tiang Unit 2 1,918,000 - 3,836,000 3,836,000
jbongkartrafo Bongkar Trafo Distribusi Unit 18 - 17,268,600 17,268,600
BONGKAR KABEL TANAH
1 bongkarterminat1x70od Upah Bongkar Terminating Kabel 1 x 70 mm² OD Unit - 70,200 - - -
2 bongkarterminat3x70id Upah Bongkar Terminating Kabel 3 x 70 mm² ID Unit - 168,400 - - -
3 bongkarterminat3x70od Upah Bongkar Terminating Kabel 3 x 70 mm² OD Unit - 187,200 - - -
4 bongkarterminat3x95id Upah Bongkar Terminating Kabel 3 x 95 mm² ID Unit - 168,400 - - -
5 bongkarterminat3x95od Upah Bongkar Terminating Kabel 3 x 95 mm² OD Unit - 187,200 - - -
6 bongkarterminat3x150id Upah Bongkar Terminating Kabel 3 x 150 mm² ID Unit - 194,200 - - -
7 bongkarterminat3x150od Upah Bongkar Terminating Kabel 3 x 150 mm² OD Unit - 198,900 - - -
8 bongkarterminat3x240id Upah Bongkar Terminating Kabel 3 x 240 mm² ID Unit - 196,500 - - -
9 bongkarterminat3x240od Upah Bongkar Terminating Kabel 3 x 240 mm² OD Unit - 224,600 - - -
10 bongkarterminat3x300id Upah Bongkar Terminating Kabel 3 x 300 mm² ID Unit - 196,500 - - -
11 bongkarterminat3x300od Upah Bongkar Terminating Kabel 3 x 300 mm² OD Unit - 224,600 - - -
12 bongkarsepatu240-300 Upah Bongkar Sepatu kabel bimetal 240 - 300 mm² (2 lubang) Unit - 4,200 - - -
13 bongkarsepatu150 Upah Bongkar Sepatu kabel bimetal 150 mm² (2 lubang) Unit - 3,700 - - -
14 bongkarxlpe3x300 Upah Bongkar Kabel Tanah XLPE 3 x 300 mm² (three core) Per 50 m - 152,300 - - -
15 bongkarxlpe3x240 Upah Bongkar Kabel Tanah XLPE 3 x 240 mm² (three core) Per 50 m - 152,300 - - -
16 bongkarnyy1x70 Upah Bongkar Kabel NYY 1 x 70 mm² Per 1 m - 390 - - -
17 bongkarnyy1x150 Upah Bongkar Kabel NYY 1 x 150 mm² Per 1 m - 500 - - -
18 bongkarna2xs2y3x150 Upah Bongkar Kabel NA2XS2Y 20 KV 3 x 150 mm² Per 1 m - 5,600 - - -
19 bongkarna2xs2y3x95 Upah Bongkar Kabel NA2XS2Y 20 KV 3 x 95 mm² Per 1 m - 5,600 - - -
20 bongkarna2xs2y3x70 Upah Bongkar Kabel NA2XS2Y 20 KV 3 x 70 mm² Per 1 m - 5,600 - - -
21 bongkarna2xs2y1x70 Upah Bongkar Kabel NA2XS2Y 20 KV 1 x 70 mm² Per 1 m - 2,576 - - -
22 bongkargalian Galian Kabel - m³ Per m³ - 60,800 - - -
jbongkarktanah Bongkar Kabel Tanah - - - -
BONGKAR SAMBUNGAN RUMAH
1 bongkarsr1p Upah Bongkar Sambungan Rumah 1 Fasa Unit 2 11,700 - 23,400 23,400
2 bongkarsr3p Upah Bongkar Sambungan Rumah 3 Fasa Unit - 28,200 - - -
3 bongkarsrapp1p Upah Bongkar SR + APP 1 Fasa Unit - 23,400 - - -
4 bongkarsrapp3p Upah Bongkar SR + APP 3 Fasa Unit - 46,800 - - -
5 bongkarsrapp3p+wiring Upah Bongkar SR + APP 3 Fasa + Wiring Unit - 350,000 - - -
6 bongkarapptm+wiring Upah Bongkar APP TM + Wiring Unit - 350,000 - - -
7 bongkarcubicle Upah Bongkar Cubicle Unit - 702,000 - - -
jbongkarsr Bongkar Sambungan Rumah Unit 2 - 23,400 23,400
JUMLAH Err:504 Err:504 Err:504
PPN 10 % Err:504 Err:504 Err:504
TOTAL Err:504 Err:504 Err:504

Page 52 of 120
HARGA SATUAN JUMLAH
NO KODE KONSTRUKSI SAT VOL TOTAL
HARDWARE JASA HARDWARE JASA

Terbilang : " Lima ratus Tiga puluh Sembilan juta Delapan ratus Empat puluh Enam ribu Empat ratus Dua puluh Empat Rupiah "

PT SEKAWAN TRIYASA SOLUSINDO PT PLN (PERSERO) AREA SURAKARTA


DIREKTUR MANAJER

SUKRISNO TRISNO RAHARJO MUNDHAKIR

Page 53 of 120
PT. PLN (PERSERO)
DISTRIBUSI JAWA TENGAH DAN D.I. YOGYAKARTA
#REF!

ANALISA PER UNIT KONSTRUKSI


PEKERJAAN PEMBANGUNAN JARINGAN DISTRIBUSI 20 KV
#REF!

HARGA SATUAN BIAYA YANG DIPERLUKAN


NO. PERINCUAN PER UNIT KONSTRUKSI STN VOL MATERIAL MATERIAL TOTAL
JASA/UPAH JASA/UPAH
MDU HARDWARE MDU HARDWARE
PRIMARY LINE 1 PHASA
1 SA1 Unit 1
1 Isolator Tumpu (Line Post) 20 KV Bh 1 PLN PLN - - -
2 Center Bracket 12.5 KN Bh 1 54,100 - 54,100 - 54,100
3 Pole Band Single Rack 7" atau 7 ½" Bh 2 24,300 - 48,600 - 48,600
4 Pole Band Single Up Side 7" atau 7 ½" Bh 1 36,000 - 36,000 - 36,000
5 Spool Insulator ANSI 53 - 4 Bh 1 15,700 - 15,700 - 15,700
6 Tie Wire # 4 / Alluminium bonding wire # 20 Mtr 2.6 3,100 - 8,060 - 8,060
7 Upah Pasang Konst. JTM 1 Fasa SA1 Unit 1 30,000 - - 30,000 30,000
Sub Jumlah SA1 - 162,460 30,000 192,460
2 SA1' Unit 1
1 Isolator Tumpu (Line Post) 20 KV Bh 1 PLN PLN - - -
2 Center Bracket 12.5 KN Bh 1 54,100 - 54,100 - 54,100
3 Pole Band Single Rack 7" atau 7 ½" Bh 2 24,300 - 48,600 - 48,600
4 Tie Wire # 4 / Alluminium bonding wire # 20 Mtr 1.8 3,100 - 5,580 - 5,580
5 Upah Pasang Konst. JTM 1 Fasa SA1' Unit 1 15,000 - - 15,000 15,000
Sub Jumlah SA1' - 108,280 15,000 123,280
3 SA1-N Unit 1
1 Isolator Tumpu (Line Post) 20 KV Bh 1 PLN PLN - - -
2 Pole Band Single Rack 7" atau 7 ½" Bh 2 24,300 - 48,600 - 48,600
3 Pole Band Single Up Side 7" atau 7 ½" Bh 1 36,000 - 36,000 - 36,000
4 Side Bracket Bh 1 51,000 - 51,000 - 51,000
5 Spool Insulator ANSI 53 - 2 Bh 1 10,200 - 10,200 - 10,200
6 Tie Wire # 4 / Alluminium bonding wire # 20 Mtr 2.6 3,100 - 8,060 - 8,060
7 Upah Pasang Konst. JTM 1 Fasa SA1-N Unit 1 30,000 - - 30,000 30,000
Sub Jumlah SA1-N - 153,860 30,000 183,860
4 SA1-PN Unit 1
1 Isolator Tumpu (Line Post) 20 KV Bh 1 PLN PLN - - -
2 Bracket Secondary / Bracket insulated Bh 1 7,400 - 7,400 - 7,400
3 Pole Band Single Rack 7" atau 7 ½" Bh 3 24,300 - 72,900 - 72,900
4 Side Bracket Bh 1 51,000 - 51,000 - 51,000
5 Spool Insulator ANSI 53 - 2 Bh 1 10,200 - 10,200 - 10,200
6 Tie Wire # 4 / Alluminium bonding wire # 20 Mtr 2.6 3,100 - 8,060 - 8,060
7 Upah Pasang Konst. JTM 1 Fasa SA1-PN Unit 1 30,000 - - 30,000 30,000
Sub Jumlah SA1-PN - 149,560 30,000 179,560
5 SA1-P Unit 1
1 Isolator Tumpu (Line Post) 20 KV Bh 1 PLN PLN - - -
2 Bracket Secondary / Bracket insulated Bh 1 7,400 - 7,400 - 7,400
3 Center Bracket 12.5 KN Bh 1 54,100 - 54,100 - 54,100
4 Pole Band Single Rack 7" atau 7 ½" Bh 3 24,300 - 72,900 - 72,900
5 Spool Insulator ANSI 53 - 2 Bh 1 10,200 - 10,200 - 10,200
6 Tie Wire # 4 / Alluminium bonding wire # 20 Mtr 2.6 3,100 - 8,060 - 8,060
7 Upah Pasang Konst. JTM 1 Fasa SA1-P Unit 1 30,000 - - 30,000 30,000
Sub Jumlah SA1-P - 152,660 30,000 182,660
6 SA1-P' unit 1
1 Isolator Tumpu (Line Post) 20 KV Bh 1 PLN PLN - - -
2 Center Bracket 12.5 KN Bh 1 54,100 - 54,100 - 54,100
3 Pole Band Single Rack 7" atau 7 ½" Bh 2 24,300 - 48,600 - 48,600
4 Tie Wire # 4 / Alluminium bonding wire # 20 Mtr 1.8 3,100 - 5,580 - 5,580
5 Upah Pasang Konst. JTM 1 Fasa SA1-P' Unit 1 15,000 - - 15,000 15,000
Sub Jumlah SA1-P' - 108,280 15,000 123,280
7 SA2 Unit 1
1 Isolator Tumpu (Line Post) 20 KV Bh 2 PLN PLN - - -
2 Bracket Secondary / Bracket insulated Bh 1 7,400 - 7,400 - 7,400
3 Center Bracket 12.5 KN Bh 2 54,100 - 108,200 - 108,200
4 Pole Band Double Rack 7" atau 7 ½" Bh 2 30,600 - 61,200 - 61,200
5 Pole Band Single Rack 7" atau 7 ½" Bh 1 24,300 - 24,300 - 24,300
6 Spool Insulator ANSI 53 - 2 Bh 1 10,200 - 10,200 - 10,200
7 Tie Wire # 4 / Alluminium bonding wire # 20 Mtr 4.4 3,100 - 13,640 - 13,640
8 Upah Pasang Konst. JTM 1 Fasa SA2 Unit 1 53,000 - - 53,000 53,000
Sub Jumlah SA2 - 224,940 53,000 277,940
8 SA2' Unit 1
1 Isolator Tumpu (Line Post) 20 KV Bh 2 PLN PLN - - -
2 Center Bracket 12.5 KN Bh 2 54,100 - 108,200 - 108,200
3 Pole Band Double Rack 7" atau 7 ½" Bh 2 30,600 - 61,200 - 61,200
4 Tie Wire # 4 / Alluminium bonding wire # 20 Mtr 3.6 3,100 - 11,160 - 11,160
5 Upah Pasang Konst. JTM 1 Fasa SA2' Unit 1 28,800 - - 28,800 28,800
Sub Jumlah SA2' - 180,560 28,800 209,360
PT. PLN (PERSERO)
DISTRIBUSI JAWA TENGAH DAN D.I. YOGYAKARTA
#REF!

ANALISA PER UNIT KONSTRUKSI


PEKERJAAN PEMBANGUNAN JARINGAN DISTRIBUSI 20 KV
#REF!

HARGA SATUAN BIAYA YANG DIPERLUKAN


NO. PERINCUAN PER UNIT KONSTRUKSI STN VOL MATERIAL MATERIAL TOTAL
JASA/UPAH JASA/UPAH
MDU HARDWARE MDU HARDWARE
9 SA2-N Unit 1
1 Isolator Tumpu (Pin Post) 20 KV Bh 2 PLN PLN - - -
2 Bolt Double Arming ⅝" x 14" Bh 1 23,500 - 23,500 - 23,500
3 Bolt Machine / Bolt cariage ½" x ¾" Bh 2 2,900 - 5,800 - 5,800
4 Brace Steel 550 mm Bh 2 19,400 - 38,800 - 38,800
5 Bracket Secondary / Bracket insulated Bh 1 7,400 - 7,400 - 7,400
6 Cross Arm Steel 1.500 mm ( UNSP 10 ) galvanis Bh 2 170,000 - 340,000 - 340,000
7 Lock Nut ⅝" Bh 2 7,000 - 14,000 - 14,000
8 Pole Band Double Rack 7" atau 7 ½" Bh 2 30,600 - 61,200 - 61,200
9 Pole Band Single Rack 7" atau 7 ½" Bh 1 24,300 - 24,300 - 24,300
10 Spool Insulator ANSI 53 - 2 Bh 1 10,200 - 10,200 - 10,200
11 Tie Wire # 4 / Alluminium bonding wire # 20 Mtr 4.4 3,100 - 13,640 - 13,640
12 Washer Square 2 ¼" Bh 4 1,100 - 4,400 - 4,400
13 Upah Pasang Konst. JTM 1 Fasa SA2-N Unit 1 53,000 - - 53,000 53,000
Sub Jumlah SA2-N - 543,240 53,000 596,240
10 SA3 Unit 1
1 Isolator Tarik ( Polymer ) 20 KV + Primary Dead E Set 1 PLN PLN - - -
2 Armour Rod # for 70 mm² Set 2 40,200 - 80,400 - 80,400
3 Clevis Swinging Secondary Bh 1 9,400 - 9,400 - 9,400
4 Oval Eye Nut ⅝" Bh 2 13,300 - 26,600 - 26,600
5 Pole Band Single Rack 7" atau 7 ½" Bh 2 24,300 - 48,600 - 48,600
6 Primary Angle Clamp ( 35 s/d 70 ) mm² Bh 1 25,000 - 25,000 - 25,000
7 Schackle Anchor ⅝" Bh 1 10,200 - 10,200 - 10,200
8 Spool Insulator ANSI 53 - 4 Bh 1 15,700 - 15,700 - 15,700
9 Tie Wire # 4 / Alluminium bonding wire # 20 Mtr 0.8 3,100 - 2,480 - 2,480
10 Upah Pasang Konst. JTM 1 Fasa SA3 Unit 1 46,800 - - 46,800 46,800
Sub Jumlah SA3 - 218,380 46,800 265,180
11 SA3' Unit 1
1 Isolator Tarik ( Polymer ) 20 KV + Primary Dead E Set 1 PLN PLN - - -
2 Armour Rod # for 70 mm² Set 1 40,200 - 40,200 - 40,200
3 Oval Eye Nut ⅝" Bh 1 13,300 - 13,300 - 13,300
4 Pole Band Single Rack 7" atau 7 ½" Bh 1 24,300 - 24,300 - 24,300
5 Primary Angle Clamp ( 35 s/d 70 ) mm² Bh 1 25,000 - 25,000 - 25,000
6 Schackle Anchor ⅝" Bh 1 10,200 - 10,200 - 10,200
7 Upah Pasang Konst. JTM 1 Fasa SA3' Unit 1 27,300 - - 27,300 27,300
Sub Jumlah SA3' - 113,000 27,300 140,300
12 SA3-N Unit 1
1 Isolator Tarik ( Polymer ) 20 KV + Primary Dead E Set 1 PLN PLN - - -
2 Armour Rod # for 70 mm² Set 2 40,200 - 80,400 - 80,400
3 Clevis Swinging Secondary Bh 1 9,400 - 9,400 - 9,400
4 Oval Eye Nut ⅝" Bh 2 13,300 - 26,600 - 26,600
5 Pole Band Single Rack 7" atau 7 ½" Bh 2 24,300 - 48,600 - 48,600
6 Primary Angle Clamp ( 35 s/d 70 ) mm² Bh 1 25,000 - 25,000 - 25,000
7 Schackle Anchor ⅝" Bh 1 10,200 - 10,200 - 10,200
8 Spool Insulator ANSI 53 - 4 Bh 1 15,700 - 15,700 - 15,700
9 Tie Wire # 4 / Alluminium bonding wire # 20 Mtr 0.8 3,100 - 2,480 - 2,480
10 Upah Pasang Konst. JTM 1 Fasa SA3-N Unit 1 46,800 - - 46,800 46,800
Sub Jumlah SA3-N - 218,380 46,800 265,180
13 SA4 Unit 1
1 Isolator Tarik ( Polymer ) 20 KV + Primary Dead E Set 2 PLN PLN - - -
2 Armour Tape ¼" wide Mtr 2 4,300 - 8,600 - 8,600
3 Clevis Swinging Secondary Bh 2 9,400 - 18,800 - 18,800
4 Compresion Conector H type 70 mm² / 70 mm² Bh 2 20,400 - 40,800 - 40,800
5 Loop Dead End Clamp / LC ( 35 s/d 240 ) mm² Bh 4 18,000 - 72,000 - 72,000
6 Oval Eye Nut ⅝" Bh 4 13,300 - 53,200 - 53,200
7 Pole Band Single Rack 7" atau 7 ½" Bh 4 24,300 - 97,200 - 97,200
8 Schackle Anchor ⅝" Bh 2 10,200 - 20,400 - 20,400
9 Spool Insulator ANSI 53 - 4 Bh 2 15,700 - 31,400 - 31,400
10 Upah Pasang Konst. JTM 1 Fasa SA4 Unit 1 50,700 - - 50,700 50,700
Sub Jumlah SA4 - 342,400 50,700 393,100
14 SA4' Unit 1
1 Isolator Tarik ( Polymer ) 20 KV + Primary Dead E Set 2 PLN PLN - - -
2 Compresion Conector H type 70 mm² / 70 mm² Bh 1 20,400 - 20,400 - 20,400
3 Oval Eye Nut ⅝" Bh 2 13,300 - 26,600 - 26,600
4 Pole Band Single Rack 7" atau 7 ½" Bh 2 24,300 - 48,600 - 48,600
5 Schackle Anchor ⅝" Bh 2 10,200 - 20,400 - 20,400
6 Upah Pasang Konst. JTM 1 Fasa SA4' Unit 1 50,700 - - 50,700 50,700
Sub Jumlah SA4' - 116,000 50,700 166,700
PT. PLN (PERSERO)
DISTRIBUSI JAWA TENGAH DAN D.I. YOGYAKARTA
#REF!

ANALISA PER UNIT KONSTRUKSI


PEKERJAAN PEMBANGUNAN JARINGAN DISTRIBUSI 20 KV
#REF!

HARGA SATUAN BIAYA YANG DIPERLUKAN


NO. PERINCUAN PER UNIT KONSTRUKSI STN VOL MATERIAL MATERIAL TOTAL
JASA/UPAH JASA/UPAH
MDU HARDWARE MDU HARDWARE
15 SA4-N Unit 1
1 Isolator Tarik ( Polymer ) 20 KV + Primary Dead E Set 2 PLN PLN - - -
2 Armour Tape ¼" wide Mtr 2 4,300 - 8,600 - 8,600
3 Clevis Swinging Secondary Bh 2 9,400 - 18,800 - 18,800
4 Compresion Conector H type 70 mm² / 70 mm² Bh 2 20,400 - 40,800 - 40,800
5 Loop Dead End Clamp / LC ( 35 s/d 240 ) mm² Bh 4 18,000 - 72,000 - 72,000
6 Oval Eye Nut ⅝" Bh 4 13,300 - 53,200 - 53,200
7 Pole Band Single Rack 7" atau 7 ½" Bh 4 24,300 - 97,200 - 97,200
8 Schackle Anchor ⅝" Bh 2 10,200 - 20,400 - 20,400
9 Spool Insulator ANSI 53 - 4 Bh 2 15,700 - 31,400 - 31,400
10 Upah Pasang Konst. JTM 1 Fasa SA4-N Unit 1 50,700 - - 50,700 50,700
Sub Jumlah SA4-N - 342,400 50,700 393,100
16 SA5 Unit 1
1 Isolator Tarik ( Polymer ) 20 KV + Primary Dead E Set 1 PLN PLN - - -
2 Armour Tape ¼" wide Mtr 1 4,300 - 4,300 - 4,300
3 Clevis Swinging Secondary Bh 1 9,400 - 9,400 - 9,400
4 Loop Dead End Clamp / LC ( 35 s/d 240 ) mm² Bh 2 18,000 - 36,000 - 36,000
5 Oval Eye Nut ⅝" Bh 2 13,300 - 26,600 - 26,600
6 Pole Band Single Rack 7" atau 7 ½" Bh 2 24,300 - 48,600 - 48,600
7 Schackle Anchor ⅝" Bh 1 10,200 - 10,200 - 10,200
8 Spool Insulator ANSI 53 - 4 Bh 1 15,700 - 15,700 - 15,700
9 Upah Pasang Konst. JTM 1 Fasa SA5 Unit 1 20,000 - - 20,000 20,000
Sub Jumlah SA5 - 150,800 20,000 170,800
17 SA5' Unit 1
1 Isolator Tarik ( Polymer ) 20 KV + Primary Dead E Set 1 PLN PLN - - -
2 Oval Eye Nut ⅝" Bh 1 13,300 - 13,300 - 13,300
3 Pole Band Single Rack 7" atau 7 ½" Bh 1 24,300 - 24,300 - 24,300
4 Schackle Anchor ⅝" Bh 1 10,200 - 10,200 - 10,200
5 Upah Pasang Konst. JTM 1 Fasa SA5' Unit 1 18,000 - - 18,000 18,000
- - -
Sub Jumlah SA5' - 47,800 18,000 65,800
18 SA5-N Unit 1
1 Isolator Tarik ( Polymer ) 20 KV + Primary Dead E Set 1 PLN PLN - - -
2 Armour Tape ¼" wide Mtr 1 4,300 - 4,300 - 4,300
3 Clevis Swinging Secondary Bh 1 9,400 - 9,400 - 9,400
4 Loop Dead End Clamp / LC ( 35 s/d 240 ) mm² Bh 2 18,000 - 36,000 - 36,000
5 Oval Eye Nut ⅝" Bh 2 13,300 - 26,600 - 26,600
6 Pole Band Single Rack 7" atau 7 ½" Bh 2 24,300 - 48,600 - 48,600
7 Schackle Anchor ⅝" Bh 1 10,200 - 10,200 - 10,200
8 Spool Insulator ANSI 53 - 4 Bh 1 15,700 - 15,700 - 15,700
9 Upah Pasang Konst. JTM 1 Fasa SA5-N Unit 1 20,000 - - 20,000 20,000
Sub Jumlah SA5-N - 150,800 20,000 170,800
19 SA5-1 Unit 1
1 Isolator Tarik ( Polymer ) 20 KV + Primary Dead E Set 1 PLN PLN - - -
2 Armour Tape ¼" wide Mtr 1 4,300 - 4,300 - 4,300
3 Clevis Swinging Secondary Bh 1 9,400 - 9,400 - 9,400
4 Compresion Conector H type 70 mm² / 70 mm² Bh 2 20,400 - 40,800 - 40,800
5 Loop Dead End Clamp / LC ( 35 s/d 240 ) mm² Bh 2 18,000 - 36,000 - 36,000
6 Oval Eye Nut ⅝" Bh 2 13,300 - 26,600 - 26,600
7 Pole Band Single Rack 7" atau 7 ½" Bh 2 24,300 - 48,600 - 48,600
8 Schackle Anchor ⅝" Bh 1 10,200 - 10,200 - 10,200
9 Spool Insulator ANSI 53 - 4 Bh 1 15,700 - 15,700 - 15,700
10 Upah Pasang Konst. JTM 1 Fasa SA5-1 Unit 1 20,000 - - 20,000 20,000
Sub Jumlah SA5-1 - 191,600 20,000 211,600
20 SA5-1' Unit 1
1 Isolator Tarik ( Polymer ) 20 KV + Primary Dead E Set 1 PLN PLN - - -
2 Compresion Conector H type 70 mm² / 70 mm² Bh 1 20,400 - 20,400 - 20,400
3 Oval Eye Nut ⅝" Bh 1 13,300 - 13,300 - 13,300
4 Pole Band Single Rack 7" atau 7 ½" Bh 1 24,300 - 24,300 - 24,300
5 Schackle Anchor ⅝" Bh 1 10,200 - 10,200 - 10,200
6 Upah Pasang Konst. JTM 1 Fasa SA5-1' Unit 1 18,000 - - 18,000 18,000
Sub Jumlah SA5-1' - 68,200 18,000 86,200
PT. PLN (PERSERO)
DISTRIBUSI JAWA TENGAH DAN D.I. YOGYAKARTA
#REF!

ANALISA PER UNIT KONSTRUKSI


PEKERJAAN PEMBANGUNAN JARINGAN DISTRIBUSI 20 KV
#REF!

HARGA SATUAN BIAYA YANG DIPERLUKAN


NO. PERINCUAN PER UNIT KONSTRUKSI STN VOL MATERIAL MATERIAL TOTAL
JASA/UPAH JASA/UPAH
MDU HARDWARE MDU HARDWARE
21 SA5-2 Unit 1
1 Isolator Tarik ( Polymer ) 20 KV + Primary Dead E Set 1 PLN PLN - - -
2 Armour Tape ¼" wide Mtr 1 4,300 - 4,300 - 4,300
3 Clevis Swinging Secondary Bh 1 9,400 - 9,400 - 9,400
4 Compresion Conector H type 70 mm² / 70 mm² Bh 2 20,400 - 40,800 - 40,800
5 Loop Dead End Clamp / LC ( 35 s/d 240 ) mm² Bh 2 18,000 - 36,000 - 36,000
6 Oval Eye Bolt ⅝" x 10" Bh 1 11,700 - 11,700 - 11,700
7 Oval Eye Nut ⅝" Bh 3 13,300 - 39,900 - 39,900
8 Pole Band Single Rack 7" atau 7 ½" Bh 2 24,300 - 48,600 - 48,600
9 Schackle Anchor ⅝" Bh 2 10,200 - 20,400 - 20,400
10 Spool Insulator ANSI 53 - 4 Bh 1 15,700 - 15,700 - 15,700
11 Upah Pasang Konst. JTM 1 Fasa SA5-2 Unit 1 20,000 - - 20,000 20,000
Sub Jumlah SA5-2 - 226,800 20,000 246,800
22 SA5-2' Unit 1
1 Isolator Tarik ( Polymer ) 20 KV + Primary Dead E Set 1 PLN PLN - - -
2 Compresion Conector H type 70 mm² / 70 mm² Bh 1 20,400 - 20,400 - 20,400
3 Oval Eye Bolt ⅝" x 10" Bh 1 11,700 - 11,700 - 11,700
4 Oval Eye Nut ⅝" Bh 2 13,300 - 26,600 - 26,600
5 Pole Band Single Rack 7" atau 7 ½" Bh 1 24,300 - 24,300 - 24,300
6 Schackle Anchor ⅝" Bh 2 10,200 - 20,400 - 20,400
7 Upah Pasang Konst. JTM 1 Fasa SA5-2' Unit 1 18,000 - - 18,000 18,000
Sub Jumlah SA5-2' - 103,400 18,000 121,400
23 SA5-3 Unit 1
1 Isolator Tarik ( Polymer ) 20 KV + Primary Dead E Set 1 PLN PLN - - -
2 Armour Tape ¼" wide Mtr 1 4,300 - 4,300 - 4,300
3 Clevis Swinging Secondary Bh 1 9,400 - 9,400 - 9,400
4 Compresion Conector H type 70 mm² / 70 mm² Bh 2 20,400 - 40,800 - 40,800
5 Loop Dead End Clamp / LC ( 35 s/d 240 ) mm² Bh 2 18,000 - 36,000 - 36,000
6 Oval Eye Nut ⅝" Bh 2 13,300 - 26,600 - 26,600
7 Pole Band Single Rack 7" atau 7 ½" Bh 2 24,300 - 48,600 - 48,600
8 Schackle Anchor ⅝" Bh 1 10,200 - 10,200 - 10,200
9 Spool Insulator ANSI 53 - 4 Bh 1 15,700 - 15,700 - 15,700
10 Upah Pasang Konst. JTM 1 Fasa SA5-3 Unit 1 20,000 - - 20,000 20,000
Sub Jumlah SA5-3 - 191,600 20,000 211,600
24 SA5-3' Unit 1
1 Isolator Tarik ( Polymer ) 20 KV + Primary Dead E Set 1 PLN PLN - - -
2 Compresion Conector H type 70 mm² / 70 mm² Bh 1 20,400 - 20,400 - 20,400
3 Oval Eye Nut ⅝" Bh 1 13,300 - 13,300 - 13,300
4 Pole Band Single Rack 7" atau 7 ½" Bh 1 24,300 - 24,300 - 24,300
5 Schackle Anchor ⅝" Bh 1 10,200 - 10,200 - 10,200
6 Upah Pasang Konst. JTM 1 Fasa SA5-3' Unit 1 18,000 - - 18,000 18,000
Sub Jumlah SA5-3' - 68,200 18,000 86,200
25 SA5-4 Unit 1
1 Isolator Tarik ( Polymer ) 20 KV + Primary Dead E Set 1 PLN PLN - - -
2 Isolator Tumpu (Line Post) 20 KV Bh 1 PLN PLN - - -
3 Armour Tape ¼" wide Mtr 1 4,300 - 4,300 - 4,300
4 Center Bracket 12.5 KN Bh 1 54,100 - 54,100 - 54,100
5 Clevis Swinging Secondary Bh 1 9,400 - 9,400 - 9,400
6 Compresion Conector H type 70 mm² / 70 mm² Bh 2 20,400 - 40,800 - 40,800
7 Loop Dead End Clamp / LC ( 35 s/d 240 ) mm² Bh 2 18,000 - 36,000 - 36,000
8 Oval Eye Nut ⅝" Bh 2 13,300 - 26,600 - 26,600
9 Pole Band Single Rack 7" atau 7 ½" Bh 4 24,300 - 97,200 - 97,200
10 Schackle Anchor ⅝" Bh 1 10,200 - 10,200 - 10,200
11 Spool Insulator ANSI 53 - 4 Bh 1 15,700 - 15,700 - 15,700
12 Tie Wire # 4 / Alluminium bonding wire # 20 Mtr 2.6 3,100 - 8,060 - 8,060
13 Upah Pasang Konst. JTM 1 Fasa SA5-4 Unit 1 20,000 - - 20,000 20,000
Sub Jumlah SA5-4 - 302,360 20,000 322,360
26 SA5-4' Unit 1
1 Isolator Tarik ( Polymer ) 20 KV + Primary Dead E Set 1 PLN PLN - - -
2 Isolator Tumpu (Line Post) 20 KV Bh 1 PLN PLN - - -
3 Center Bracket 12.5 KN Bh 1 54,100 - 54,100 - 54,100
4 Compresion Conector H type 70 mm² / 70 mm² Bh 1 20,400 - 20,400 - 20,400
5 Oval Eye Nut ⅝" Bh 1 13,300 - 13,300 - 13,300
6 Pole Band Single Rack 7" atau 7 ½" Bh 3 24,300 - 72,900 - 72,900
7 Schackle Anchor ⅝" Bh 1 10,200 - 10,200 - 10,200
8 Tie Wire # 4 / Alluminium bonding wire # 20 Mtr 1.8 3,100 - 5,580 - 5,580
9 Upah Pasang Konst. JTM 1 Fasa SA5-4' Unit 1 18,000 - - 18,000 18,000
Sub Jumlah SA5-4' - 176,480 18,000 194,480
PT. PLN (PERSERO)
DISTRIBUSI JAWA TENGAH DAN D.I. YOGYAKARTA
#REF!

ANALISA PER UNIT KONSTRUKSI


PEKERJAAN PEMBANGUNAN JARINGAN DISTRIBUSI 20 KV
#REF!

HARGA SATUAN BIAYA YANG DIPERLUKAN


NO. PERINCUAN PER UNIT KONSTRUKSI STN VOL MATERIAL MATERIAL TOTAL
JASA/UPAH JASA/UPAH
MDU HARDWARE MDU HARDWARE
27 SA6 Unit 1
1 Isolator Tarik ( Polymer ) 20 KV + Primary Dead E Set 2 PLN PLN - - -
2 Armour Tape ¼" wide Mtr 2 4,300 - 8,600 - 8,600
3 Clevis Swinging Secondary Bh 2 9,400 - 18,800 - 18,800
4 Loop Dead End Clamp / LC ( 35 s/d 240 ) mm² Bh 4 18,000 - 72,000 - 72,000
5 Oval Eye Nut ⅝" Bh 4 13,300 - 53,200 - 53,200
6 Pole Band Double Rack 7" atau 7 ½" Bh 2 30,600 - 61,200 - 61,200
7 Schackle Anchor ⅝" Bh 2 10,200 - 20,400 - 20,400
8 Spool Insulator ANSI 53 - 4 Bh 2 15,700 - 31,400 - 31,400
9 Upah Pasang Konst. JTM 1 Fasa SA6 Unit 1 42,900 - - 42,900 42,900
Sub Jumlah SA6 - 265,600 42,900 308,500
28 SA6' Unit 1
1 Isolator Tarik ( Polymer ) 20 KV + Primary Dead E Set 2 PLN PLN - - -
2 Oval Eye Nut ⅝" Bh 2 13,300 - 26,600 - 26,600
3 Pole Band Double Rack 7" atau 7 ½" Bh 1 30,600 - 30,600 - 30,600
4 Schackle Anchor ⅝" Bh 2 10,200 - 20,400 - 20,400
5 Upah Pasang Konst. JTM 1 Fasa SA6' Unit 1 42,900 - - 42,900 42,900
Sub Jumlah SA6' - 77,600 42,900 120,500
29 SA6-N Unit 1
1 Isolator Tarik ( Polymer ) 20 KV + Primary Dead E Set 2 PLN PLN - - -
2 Armour Tape ¼" wide Mtr 2 4,300 - 8,600 - 8,600
3 Clevis Swinging Secondary Bh 2 9,400 - 18,800 - 18,800
4 Loop Dead End Clamp / LC ( 35 s/d 240 ) mm² Bh 4 18,000 - 72,000 - 72,000
5 Oval Eye Nut ⅝" Bh 4 13,300 - 53,200 - 53,200
6 Pole Band Double Rack 7" atau 7 ½" Bh 2 30,600 - 61,200 - 61,200
7 Schackle Anchor ⅝" Bh 2 10,200 - 20,400 - 20,400
8 Spool Insulator ANSI 53 - 4 Bh 2 15,700 - 31,400 - 31,400
9 Upah Pasang Konst. JTM 1 Fasa SA6-N Unit 1 42,900 - - 42,900 42,900
Sub Jumlah SA6-N - 265,600 42,900 308,500
30 SA7 Unit 1
1 Isolator Tarik ( Polymer ) 20 KV + Primary Dead E Set 1 PLN PLN - - -
2 Armour Tape ¼" wide Mtr 1 4,300 - 4,300 - 4,300
3 Bolt Double Arming ⅝" x 14" Bh 2 23,500 - 47,000 - 47,000
4 Bolt Machine / Bolt cariage ½" x ¾" Bh 4 2,900 - 11,600 - 11,600
5 Brace Steel 770 mm Bh 4 25,900 - 103,600 - 103,600
6 Clevis Swinging Secondary Bh 1 9,400 - 9,400 - 9,400
7 Cross Arm Steel 2.000 mm ( UNSP 10 ) galvanis Bh 2 230,000 - 460,000 - 460,000
8 Lock Nut ⅝" Bh 4 7,000 - 28,000 - 28,000
9 Loop Dead End Clamp / LC ( 35 s/d 240 ) mm² Bh 2 18,000 - 36,000 - 36,000
10 Oval Eye Nut ⅝" Bh 2 13,300 - 26,600 - 26,600
11 Pole Band Double Rack 7" atau 7 ½" Bh 2 30,600 - 61,200 - 61,200
12 Schackle Anchor ⅝" Bh 1 10,200 - 10,200 - 10,200
13 Spool Insulator ANSI 53 - 4 Bh 1 15,700 - 15,700 - 15,700
14 Washer Square 2 ¼" Bh 10 1,100 - 11,000 - 11,000
15 Upah Pasang Konst. JTM 1 Fasa SA7 Unit 1 23,400 - - 23,400 23,400
Sub Jumlah SA7 - 824,600 23,400 848,000
31 SA7-A Unit 1
1 Isolator Tarik ( Polymer ) 20 KV + Primary Dead E Set 1 PLN PLN - - -
2 Armour Tape ¼" wide Mtr 1 4,300 - 4,300 - 4,300
3 Bolt Double Arming ⅝" x 14" Bh 2 23,500 - 47,000 - 47,000
4 Bolt Machine / Bolt cariage ½" x ¾" Bh 4 2,900 - 11,600 - 11,600
5 Brace Steel 550 mm Bh 4 19,400 - 77,600 - 77,600
6 Clevis Swinging Secondary Bh 1 9,400 - 9,400 - 9,400
7 Cross Arm Steel 1.500 mm ( UNSP 10 ) galvanis Bh 2 170,000 - 340,000 - 340,000
8 Lock Nut ⅝" Bh 4 7,000 - 28,000 - 28,000
9 Loop Dead End Clamp / LC ( 35 s/d 240 ) mm² Bh 2 18,000 - 36,000 - 36,000
10 Oval Eye Nut ⅝" Bh 2 13,300 - 26,600 - 26,600
11 Pole Band Double Rack 7" atau 7 ½" Bh 2 30,600 - 61,200 - 61,200
12 Schackle Anchor ⅝" Bh 1 10,200 - 10,200 - 10,200
13 Spool Insulator ANSI 53 - 4 Bh 1 15,700 - 15,700 - 15,700
14 Washer Square 2 ¼" Bh 10 1,100 - 11,000 - 11,000
15 Upah Pasang Konst. JTM 1 Fasa SA7-A Unit 1 23,400 - - 23,400 23,400
Sub Jumlah SA7-A - 678,600 23,400 702,000
PT. PLN (PERSERO)
DISTRIBUSI JAWA TENGAH DAN D.I. YOGYAKARTA
#REF!

ANALISA PER UNIT KONSTRUKSI


PEKERJAAN PEMBANGUNAN JARINGAN DISTRIBUSI 20 KV
#REF!

HARGA SATUAN BIAYA YANG DIPERLUKAN


NO. PERINCUAN PER UNIT KONSTRUKSI STN VOL MATERIAL MATERIAL TOTAL
JASA/UPAH JASA/UPAH
MDU HARDWARE MDU HARDWARE
32 SA8 Unit 1
1 Isolator Tarik ( Polymer ) 20 KV + Primary Dead E Set 2 PLN PLN - - -
2 Armour Tape ¼" wide Mtr 2 4,300 - 8,600 - 8,600
3 Bolt Double Arming ⅝" x 14" Bh 2 23,500 - 47,000 - 47,000
4 Bolt Machine / Bolt cariage ½" x ¾" Bh 4 2,900 - 11,600 - 11,600
5 Brace Steel 770 mm Bh 4 25,900 - 103,600 - 103,600
6 Clevis Swinging Secondary Bh 2 9,400 - 18,800 - 18,800
7 Cross Arm Steel 2.000 mm ( UNSP 10 ) galvanis Bh 2 230,000 - 460,000 - 460,000
8 Lock Nut ⅝" Bh 2 7,000 - 14,000 - 14,000
9 Loop Dead End Clamp / LC ( 35 s/d 240 ) mm² Bh 4 18,000 - 72,000 - 72,000
10 Oval Eye Nut ⅝" Bh 4 13,300 - 53,200 - 53,200
11 Pole Band Double Rack 7" atau 7 ½" Bh 2 30,600 - 61,200 - 61,200
12 Schackle Anchor ⅝" Bh 2 10,200 - 20,400 - 20,400
13 Spool Insulator ANSI 53 - 4 Bh 2 15,700 - 31,400 - 31,400
14 Washer Square 2 ¼" Bh 10 1,100 - 11,000 - 11,000
15 Upah Pasang Konst. JTM 1 Fasa SA8 Unit 1 42,900 - - 42,900 42,900
Sub Jumlah SA8 - 912,800 42,900 955,700
33 SA8-A Unit 1
1 Isolator Tarik ( Polymer ) 20 KV + Primary Dead E Set 2 PLN PLN - - -
2 Armour Tape ¼" wide Mtr 2 4,300 - 8,600 - 8,600
3 Bolt Double Arming ⅝" x 14" Bh 2 23,500 - 47,000 - 47,000
4 Bolt Machine / Bolt cariage ½" x ¾" Bh 4 2,900 - 11,600 - 11,600
5 Brace Steel 550 mm Bh 4 19,400 - 77,600 - 77,600
6 Clevis Swinging Secondary Bh 2 9,400 - 18,800 - 18,800
7 Cross Arm Steel 1.500 mm ( UNSP 10 ) galvanis Bh 2 170,000 - 340,000 - 340,000
8 Lock Nut ⅝" Bh 2 7,000 - 14,000 - 14,000
9 Loop Dead End Clamp / LC ( 35 s/d 240 ) mm² Bh 4 18,000 - 72,000 - 72,000
10 Oval Eye Nut ⅝" Bh 4 13,300 - 53,200 - 53,200
11 Pole Band Double Rack 7" atau 7 ½" Bh 2 30,600 - 61,200 - 61,200
12 Schackle Anchor ⅝" Bh 2 10,200 - 20,400 - 20,400
13 Spool Insulator ANSI 53 - 4 Bh 2 15,700 - 31,400 - 31,400
14 Washer Square 2 ¼" Bh 10 1,100 - 11,000 - 11,000
15 Upah Pasang Konst. JTM 1 Fasa SA8-A Unit 1 42,900 - - 42,900 42,900
Sub Jumlah SA8-A - 766,800 42,900 809,700
34 SA9 Unit 1
1 Isolator Tumpu (Pin Post) 20 KV Bh 2 PLN PLN - - -
2 Bolt Double Arming ⅝" x 14" Bh 2 23,500 - 47,000 - 47,000
3 Bolt Machine / Bolt cariage ½" x ¾" Bh 4 2,900 - 11,600 - 11,600
4 Brace Steel 770 mm Bh 4 25,900 - 103,600 - 103,600
5 Cross Arm Steel 2.000 mm ( UNSP 10 ) galvanis Bh 2 230,000 - 460,000 - 460,000
6 Lock Nut ⅝" Bh 6 7,000 - 42,000 - 42,000
7 Pole Band Double Rack 7" atau 7 ½" Bh 2 30,600 - 61,200 - 61,200
8 Tie Wire # 4 / Alluminium bonding wire # 20 Mtr 4.4 3,100 - 13,640 - 13,640
9 Washer Square 2 ¼" Bh 10 1,100 - 11,000 - 11,000
10 Upah Pasang Konst. JTM 1 Fasa SA9 Unit 1 31,200 - - 31,200 31,200
Sub Jumlah SA9 - 750,040 31,200 781,240
35 SA9-N Unit 1
1 Isolator Tumpu (Pin Post) 20 KV Bh 1 PLN PLN - - -
2 Bolt Machine / Bolt cariage ½" x ¾" Bh 1 2,900 - 2,900 - 2,900
3 Brace Steel 550 mm Bh 1 19,400 - 19,400 - 19,400
4 Cross Arm Steel 1.500 mm ( UNSP 10 ) galvanis Bh 1 170,000 - 170,000 - 170,000
5 Lock Nut ⅝" Bh 1 7,000 - 7,000 - 7,000
6 Pole Band Single Rack 7" atau 7 ½" Bh 2 24,300 - 48,600 - 48,600
7 Pole Band Single Up Side 7" atau 7 ½" Bh 1 36,000 - 36,000 - 36,000
8 Spool Insulator ANSI 53 - 2 Bh 1 10,200 - 10,200 - 10,200
9 Tie Wire # 4 / Alluminium bonding wire # 20 Mtr 2.6 3,100 - 8,060 - 8,060
10 Washer Square 2 ¼" Bh 2 1,100 - 2,200 - 2,200
11 Upah Pasang Konst. JTM 1 Fasa SA9-N Unit 1 31,200 - - 31,200 31,200
Sub Jumlah SA9-N - 304,360 31,200 335,560
PT. PLN (PERSERO)
DISTRIBUSI JAWA TENGAH DAN D.I. YOGYAKARTA
AREA SURAKARTA

ANALISA PER UNIT KONSTRUKSI


PEKERJAAN PEMBANGUNAN JARINGAN DISTRIBUSI 20 KV
#REF!

HARGA SATUAN BIAYA YANG DIPERLUKAN


NO. PERINCUAN PER UNIT KONSTRUKSI STN VOL MATERIAL MATERIAL TOTAL
JASA/UPAH JASA/UPAH
MDU HARDWARE MDU HARDWARE
PRIMARY LINE 1-3 PHASA
1 CB-1 Unit 1
1 Isolator Tumpu (Pin Post) 20 KV Bh 2 PLN PLN - - -
2 Bolt Machine / Bolt cariage ½" x ¾" Bh 2 2,900 - 5,800 - 5,800
3 Bolt Machine ⅝" x 10" Bh 1 9,400 - 9,400 - 9,400
4 Brace Steel 770 mm Bh 2 25,900 - 51,800 - 51,800
5 Cross Arm Steel 2.000 mm ( UNSP 10 ) galvanis Bh 1 230,000 - 230,000 - 230,000
6 Lock Nut ⅝" Bh 1 7,000 - 7,000 - 7,000
7 Pole Band Single Rack 7" atau 7 ½" Bh 1 24,300 - 24,300 - 24,300
8 Tie Wire # 4 / Alluminium bonding wire # 20 Mtr 3.6 3,100 - 11,160 - 11,160
9 Washer Square 2 ¼" Bh 2 1,100 - 2,200 - 2,200
10 Upah Pasang Konst. JTM 1-3 Fasa CB1 Unit 1 23,400 - - 23,400 23,400
Sub Jumlah CB-1 - 341,660 23,400 365,060
2 CB1-A Unit 1
1 Isolator Tumpu (Pin Post) 20 KV Bh 2 PLN PLN - - -
2 Side Bracket Bh 2 51,000 - 102,000 - 102,000
3 Bolt Machine ⅝" x 10" Bh 2 9,400 - 18,800 - 18,800
4 Tie Wire # 4 / Alluminium bonding wire # 20 Mtr 3.6 3,100 - 11,160 - 11,160
5 Washer Square 2 ¼" Bh 2 1,100 - 2,200 - 2,200
6 Upah Pasang Konst. JTM 1-3 Fasa CB1-A Unit 1 23,400 - - 23,400 23,400
Sub Jumlah CB1-A - 134,160 23,400 157,560
3 CB-2 unit 1
1 Isolator Tumpu (Pin Post) 20 KV Bh 4 PLN PLN - - -
2 Bolt Double Arming ⅝" x 14" Bh 2 23,500 - 47,000 - 47,000
3 Bolt Machine / Bolt cariage ½" x ¾" Bh 4 2,900 - 11,600 - 11,600
4 Bolt Machine ⅝" x 10" Bh 1 9,400 - 9,400 - 9,400
5 Brace Steel 770 mm Bh 4 25,900 - 103,600 - 103,600
6 Cross Arm Steel 2.000 mm ( UNSP 10 ) galvanis Bh 2 230,000 - 460,000 - 460,000
7 Lock Nut ⅝" Bh 5 7,000 - 35,000 - 35,000
8 Pole Band Double Rack 7" atau 7 ½" Bh 1 30,600 - 30,600 - 30,600
9 Tie Wire # 4 / Alluminium bonding wire # 20 Mtr 7.2 3,100 - 22,320 - 22,320
10 Washer Square 2 ¼" Bh 10 1,100 - 11,000 - 11,000
11 Upah Pasang Konst. JTM 1-3 Fasa CB2 Unit 1 27,300 - - 27,300 27,300
Sub Jumlah CB-2 - 730,520 27,300 757,820
4 CB-3 Unit 1
1 Isolator Tarik ( Polymer ) 20 KV + Primary Dead E Set 4 PLN PLN - - -
2 Isolator Tumpu (Pin Post) 20 KV Bh 2 PLN PLN - - -
3 Bolt Double Arming ⅝" x 14" Bh 2 23,500 - 47,000 - 47,000
4 Bolt Machine / Bolt cariage ½" x ¾" Bh 4 2,900 - 11,600 - 11,600
5 Bolt Machine ⅝" x 10" Bh 1 9,400 - 9,400 - 9,400
6 Brace Steel 770 mm Bh 4 25,900 - 103,600 - 103,600
7 Compresion Conector H type 240 mm² / 240 mm² Bh 2 29,800 - 59,600 - 59,600
8 Cross Arm Steel 2.000 mm ( UNSP 10 ) galvanis Bh 2 230,000 - 460,000 - 460,000
9 Lock Nut ⅝" Bh 1 7,000 - 7,000 - 7,000
10 Oval Eye Nut ⅝" Bh 4 13,300 - 53,200 - 53,200
11 Pole Band Double Rack 7" atau 7 ½" Bh 1 30,600 - 30,600 - 30,600
12 Schackle Anchor ⅝" Bh 4 10,200 - 40,800 - 40,800
13 Tie Wire # 4 / Alluminium bonding wire # 20 Mtr 3.6 3,100 - 11,160 - 11,160
14 Washer Square 2 ¼" Bh 10 1,100 - 11,000 - 11,000
15 Upah Pasang Konst. JTM 1-3 Fasa CB3 Unit 1 27,300 - - 27,300 27,300
Sub Jumlah CB-3 - 844,960 27,300 872,260
5 CB-4 Unit 1
1 Isolator Tarik ( Polymer ) 20 KV + Primary Dead E Set 4 PLN PLN - - -
2 Isolator Tumpu (Line Post) 20 KV Bh 2 PLN PLN - - -
3 Bolt Double Arming ⅝" x 14" Bh 4 23,500 - 94,000 - 94,000
4 Bolt Machine / Bolt cariage ½" x ¾" Bh 8 2,900 - 23,200 - 23,200
5 Bolt Machine ⅝" x 10" Bh 1 9,400 - 9,400 - 9,400
6 Brace Steel 770 mm Bh 8 25,900 - 207,200 - 207,200
7 Compresion Conector H type 240 mm² / 240 mm² Bh 2 29,800 - 59,600 - 59,600
8 Cross Arm Steel 2.000 mm ( UNSP 10 ) galvanis Bh 4 230,000 - 920,000 - 920,000
9 Lock Nut ⅝" Bh 5 7,000 - 35,000 - 35,000
10 Oval Eye Nut ⅝" Bh 4 13,300 - 53,200 - 53,200
11 Pole Band Double Rack 7" atau 7 ½" Bh 3 30,600 - 91,800 - 91,800
12 Pole Band Single Rack 7" atau 7 ½" Bh 1 24,300 - 24,300 - 24,300
13 Schackle Anchor ⅝" Bh 4 10,200 - 40,800 - 40,800
14 Tie Wire # 4 / Alluminium bonding wire # 20 Mtr 3.6 3,100 - 11,160 - 11,160
15 Washer Square 2 ¼" Bh 20 1,100 - 22,000 - 22,000
16 Upah Pasang Konst. JTM 1-3 Fasa CB4 Unit 1 32,700 - - 32,700 32,700
Sub Jumlah CB-4 - 1,591,660 32,700 1,624,360
6 CB-5 Unit 1
1 Isolator Tarik ( Polymer ) 20 KV + Primary Dead E Set 2 PLN PLN - - -
2 Bolt Double Arming ⅝" x 14" Bh 2 23,500 - 47,000 - 47,000
3 Bolt Machine / Bolt cariage ½" x ¾" Bh 4 2,900 - 11,600 - 11,600
4 Bolt Machine ⅝" x 10" Bh 1 9,400 - 9,400 - 9,400
5 Brace Steel 770 mm Bh 4 25,900 - 103,600 - 103,600
6 Cross Arm Steel 2.000 mm ( UNSP 10 ) galvanis Bh 2 230,000 - 460,000 - 460,000
7 Lock Nut ⅝" Bh 3 7,000 - 21,000 - 21,000
8 Oval Eye Nut ⅝" Bh 2 13,300 - 26,600 - 26,600
9 Pole Band Double Rack 7" atau 7 ½" Bh 1 30,600 - 30,600 - 30,600
10 Schackle Anchor ⅝" Bh 2 10,200 - 20,400 - 20,400
11 Washer Square 2 ¼" Bh 10 1,100 - 11,000 - 11,000
PT. PLN (PERSERO)
DISTRIBUSI JAWA TENGAH DAN D.I. YOGYAKARTA
AREA SURAKARTA

ANALISA PER UNIT KONSTRUKSI


PEKERJAAN PEMBANGUNAN JARINGAN DISTRIBUSI 20 KV
#REF!

HARGA SATUAN BIAYA YANG DIPERLUKAN


NO. PERINCUAN PER UNIT KONSTRUKSI STN VOL MATERIAL MATERIAL TOTAL
JASA/UPAH JASA/UPAH
MDU HARDWARE MDU HARDWARE
12 Upah Pasang Konst. JTM 1-3 Fasa CB5 Unit 1 76,400 - - 76,400 76,400
Sub Jumlah CB-5 - 741,200 76,400 817,600
PT. PLN (PERSERO)
DISTRIBUSI JAWA TENGAH DAN D.I. YOGYAKARTA
AREA SURAKARTA

ANALISA PER UNIT KONSTRUKSI


PEKERJAAN PEMBANGUNAN JARINGAN DISTRIBUSI 20 KV
#REF!

HARGA SATUAN BIAYA YANG DIPERLUKAN


NO. PERINCUAN PER UNIT KONSTRUKSI STN VOL MATERIAL MATERIAL TOTAL
JASA/UPAH JASA/UPAH
MDU HARDWARE MDU HARDWARE
PRIMARY LINE 1-3 PHASA
1 SB-1 Unit 1
1 Isolator Tumpu (Pin Post) 20 KV Bh 2 PLN PLN - - -
2 Bolt Machine / Bolt cariage ½" x ¾" Bh 2 2,900 - 5,800 - 5,800
3 Brace Steel 770 mm Bh 2 25,900 - 51,800 - 51,800
4 Cross Arm Steel 2.000 mm ( UNSP 10 ) galvanis Bh 1 230,000 - 230,000 - 230,000
5 Lock Nut ⅝" Bh 1 7,000 - 7,000 - 7,000
6 Pole Band Single Rack 7" atau 7 ½" Bh 2 24,300 - 48,600 - 48,600
7 Tie Wire # 4 / Alluminium bonding wire # 20 Mtr 3.6 3,100 - 11,160 - 11,160
8 Washer Square 2 ¼" Bh 1 1,100 - 1,100 - 1,100
9 Upah Pasang Konst. JTM 1-3 Fasa SB1 Unit 1 23,400 - - 23,400 23,400
Sub Jumlah SB-1 - 355,460 23,400 378,860
2 SB1-A Unit 1
1 Isolator Tumpu (Pin Post) 20 KV Bh 2 PLN PLN - - -
2 Side Bracket Bh 2 51,000 - 102,000 - 102,000
3 Pole Band Double Rack 7" atau 7 ½" Bh 2 30,600 - 61,200 - 61,200
4 Tie Wire # 4 / Alluminium bonding wire # 20 Mtr 3.6 3,100 - 11,160 - 11,160
5 Upah Pasang Konst. JTM 1-3 Fasa SB1-A Unit 1 23,400 - - 23,400 23,400
Sub Jumlah SB1-A - 174,360 23,400 197,760
3 SB-2 unit 1
1 Isolator Tumpu (Pin Post) 20 KV Bh 4 PLN PLN - - -
2 Bolt Double Arming ⅝" x 14" Bh 2 23,500 - 47,000 - 47,000
3 Bolt Machine / Bolt cariage ½" x ¾" Bh 4 2,900 - 11,600 - 11,600
4 Brace Steel 770 mm Bh 4 25,900 - 103,600 - 103,600
5 Cross Arm Steel 2.000 mm ( UNSP 10 ) galvanis Bh 2 230,000 - 460,000 - 460,000
6 Lock Nut ⅝" Bh 6 7,000 - 42,000 - 42,000
7 Pole Band Double Rack 7" atau 7 ½" Bh 2 30,600 - 61,200 - 61,200
8 Tie Wire # 4 / Alluminium bonding wire # 20 Mtr 7.2 3,100 - 22,320 - 22,320
9 Washer Square 2 ¼" Bh 10 1,100 - 11,000 - 11,000
10 Upah Pasang Konst. JTM 1-3 Fasa SB2 Unit 1 27,300 - - 27,300 27,300
Sub Jumlah SB-2 - 758,720 27,300 786,020
4 SB-3 Unit 1
1 Isolator Tarik ( Polymer ) 20 KV + Primary Dead E Set 4 PLN PLN - - -
2 Isolator Tumpu (Pin Post) 20 KV Bh 2 PLN PLN - - -
3 Bolt Double Arming ⅝" x 14" Bh 2 23,500 - 47,000 - 47,000
4 Bolt Machine / Bolt cariage ½" x ¾" Bh 4 2,900 - 11,600 - 11,600
5 Brace Steel 770 mm Bh 4 25,900 - 103,600 - 103,600
6 Compresion Conector H type 240 mm² / 240 mm² Bh 2 29,800 - 59,600 - 59,600
7 Cross Arm Steel 2.000 mm ( UNSP 10 ) galvanis Bh 2 230,000 - 460,000 - 460,000
8 Lock Nut ⅝" Bh 2 7,000 - 14,000 - 14,000
9 Oval Eye Nut ⅝" Bh 4 13,300 - 53,200 - 53,200
10 Pole Band Double Rack 7" atau 7 ½" Bh 2 30,600 - 61,200 - 61,200
11 Schackle Anchor ⅝" Bh 4 10,200 - 40,800 - 40,800
12 Tie Wire # 4 / Alluminium bonding wire # 20 Mtr 3.6 3,100 - 11,160 - 11,160
13 Washer Square 2 ¼" Bh 10 1,100 - 11,000 - 11,000
14 Upah Pasang Konst. JTM 1-3 Fasa SB3 Unit 1 27,300 - - 27,300 27,300
Sub Jumlah SB-3 - 873,160 27,300 900,460
5 SB-4 Unit 1
1 Isolator Tarik ( Polymer ) 20 KV + Primary Dead E Set 4 PLN PLN - - -
2 Isolator Tumpu (Line Post) 20 KV Bh 2 PLN PLN - - -
3 Bolt Double Arming ⅝" x 14" Bh 4 23,500 - 94,000 - 94,000
4 Bolt Machine / Bolt cariage ½" x ¾" Bh 8 2,900 - 23,200 - 23,200
5 Brace Steel 770 mm Bh 8 25,900 - 207,200 - 207,200
6 Compresion Conector H type 240 mm² / 240 mm² Bh 2 29,800 - 59,600 - 59,600
7 Cross Arm Steel 2.000 mm ( UNSP 10 ) galvanis Bh 4 230,000 - 920,000 - 920,000
8 Lock Nut ⅝" Bh 8 7,000 - 56,000 - 56,000
9 Oval Eye Nut ⅝" Bh 4 13,300 - 53,200 - 53,200
10 Pole Band Double Rack 7" atau 7 ½" Bh 4 30,600 - 122,400 - 122,400
11 Pole Band Single Rack 7" atau 7 ½" Bh 1 24,300 - 24,300 - 24,300
12 Schackle Anchor ⅝" Bh 4 10,200 - 40,800 - 40,800
13 Tie Wire # 4 / Alluminium bonding wire # 20 Mtr 3.6 3,100 - 11,160 - 11,160
14 Washer Square 2 ¼" Bh 20 1,100 - 22,000 - 22,000
15 Upah Pasang Konst. JTM 1-3 Fasa SB4 Unit 1 32,700 - - 32,700 32,700
Sub Jumlah SB-4 - 1,633,860 32,700 1,666,560
6 SB-5 Unit 1
1 Isolator Tarik ( Polymer ) 20 KV + Primary Dead E Set 2 PLN PLN - - -
2 Bolt Double Arming ⅝" x 14" Bh 2 23,500 - 47,000 - 47,000
3 Bolt Machine / Bolt cariage ½" x ¾" Bh 4 2,900 - 11,600 - 11,600
4 Brace Steel 770 mm Bh 4 25,900 - 103,600 - 103,600
5 Cross Arm Steel 2.000 mm ( UNSP 10 ) galvanis Bh 2 230,000 - 460,000 - 460,000
6 Lock Nut ⅝" Bh 4 7,000 - 28,000 - 28,000
7 Oval Eye Nut ⅝" Bh 2 13,300 - 26,600 - 26,600
8 Pole Band Double Rack 7" atau 7 ½" Bh 2 30,600 - 61,200 - 61,200
9 Schackle Anchor ⅝" Bh 2 10,200 - 20,400 - 20,400
10 Washer Square 2 ¼" Bh 10 1,100 - 11,000 - 11,000
11 Upah Pasang Konst. JTM 1-3 Fasa SB5 Unit 1 76,400 - - 76,400 76,400
Sub Jumlah SB-5 - 769,400 76,400 845,800
PT. PLN (PERSERO)
DISTRIBUSI JAWA TENGAH DAN D.I. YOGYAKARTA
AREA SURAKARTA

ANALISA PER UNIT KONSTRUKSI


PEKERJAAN PEMBANGUNAN JARINGAN DISTRIBUSI 20 KV
#REF!

HARGA SATUAN BIAYA YANG DIPERLUKAN


NO. PERINCUAN PER UNIT KONSTRUKSI STN VOL MATERIAL MATERIAL TOTAL
JASA/UPAH JASA/UPAH
MDU HARDWARE MDU HARDWARE
PRIMARY LINE 3 PHASA
1 CC1 Unit 1
1 Isolator Tumpu (Line Post) 20 KV Bh 3 PLN PLN - - -
2 Bolt Machine ⅝" x 10" Bh 4 9,400 - 37,600 - 37,600
3 Center Bracket 12.5 KN Bh 1 54,100 - 54,100 - 54,100
4 Lock Nut ⅝" Bh 4 7,000 - 28,000 - 28,000
5 Pole Band Single Up Side 7" atau 7 ½" Bh 1 36,000 - 36,000 - 36,000
6 Side Bracket Bh 2 51,000 - 102,000 - 102,000
7 Spool Insulator ANSI 53 - 2 Bh 1 10,200 - 10,200 - 10,200
8 Tie Wire # 4 / Alluminium bonding wire # 20 Mtr 6.2 3,100 - 19,220 - 19,220
9 Washer Square 2 ¼" Bh 2 1,100 - 2,200 - 2,200
10 Upah Pasang Konst. JTM 3 Fasa CC1 Unit 1 34,300 - - 34,300 34,300
Sub Jumlah CC1 - 289,320 34,300 323,620
2 CC1' Unit 1
1 Isolator Tumpu (Line Post) 20 KV Bh 3 PLN PLN - - -
2 Bolt Machine ⅝" x 10" Bh 4 9,400 - 37,600 - 37,600
3 Center Bracket 12.5 KN Bh 1 54,100 - 54,100 - 54,100
4 Lock Nut ⅝" Bh 4 7,000 - 28,000 - 28,000
5 Side Bracket Bh 2 51,000 - 102,000 - 102,000
6 Tie Wire # 4 / Alluminium bonding wire # 20 Mtr 5.4 3,100 - 16,740 - 16,740
7 Washer Square 2 ¼" Bh 2 1,100 - 2,200 - 2,200
8 Upah Pasang Konst. JTM 3 Fasa CC1' Unit 1 15,600 - - 15,600 15,600
Sub Jumlah CC1' - 240,640 15,600 256,240
3 CC1-N Unit 1
1 Isolator Tumpu (Line Post) 20 KV Bh 3 PLN PLN - - -
2 Bolt Machine ⅝" x 10" Bh 4 9,400 - 37,600 - 37,600
3 Center Bracket 12.5 KN Bh 1 54,100 - 54,100 - 54,100
4 Lock Nut ⅝" Bh 6 7,000 - 42,000 - 42,000
5 Pole Band Single Rack 7" atau 7 ½" Bh 2 24,300 - 48,600 - 48,600
6 Pole Band Single Up Side 7" atau 7 ½" Bh 1 36,000 - 36,000 - 36,000
7 Side Bracket Bh 2 51,000 - 102,000 - 102,000
8 Spool Insulator ANSI 53 - 2 Bh 1 10,200 - 10,200 - 10,200
9 Tie Wire # 4 / Alluminium bonding wire # 20 Mtr 6.2 3,100 - 19,220 - 19,220
10 Washer Square 2 ¼" Bh 8 1,100 - 8,800 - 8,800
11 Upah Pasang Konst. JTM 3 Fasa CC1-N Unit 1 34,300 - - 34,300 34,300
Sub Jumlah CC1-N - 358,520 34,300 392,820
4 CC1-1 Unit 1
1 Isolator Tumpu (Pin Post) 20 KV Bh 3 PLN PLN - - -
2 Bolt Machine ⅝" x 10" Bh 1 9,400 - 9,400 - 9,400
3 Bolt Machine / Bolt cariage ½" x ¾" Bh 2 2,900 - 5,800 - 5,800
4 Brace Steel 770 mm Bh 2 25,900 - 51,800 - 51,800
5 Cross Arm Steel 2.000 mm ( UNSP 10 ) galvanis Bh 1 230,000 - 230,000 - 230,000
6 Lock Nut ⅝" Bh 1 7,000 - 7,000 - 7,000
7 Pole Band Single Rack 7" atau 7 ½" Bh 1 24,300 - 24,300 - 24,300
8 Pole Band Single Up Side 7" atau 7 ½" Bh 1 36,000 - 36,000 - 36,000
9 Spool Insulator ANSI 53 - 2 Bh 1 10,200 - 10,200 - 10,200
10 Tie Wire # 4 / Alluminium bonding wire # 20 Mtr 6.2 3,100 - 19,220 - 19,220
11 Washer Square 2 ¼" Bh 2 1,100 - 2,200 - 2,200
12 Upah Pasang Konst. JTM 3 Fasa CC1-1 Unit 1 34,300 - - 34,300 34,300
Sub Jumlah CC1-1 - 395,920 34,300 430,220
5 CC1-1' Unit 1
1 Isolator Tumpu (Pin Post) 20 KV Bh 3 PLN PLN - - -
2 Bolt Machine ⅝" x 10" Bh 1 9,400 - 9,400 - 9,400
3 Bolt Machine / Bolt cariage ½" x ¾" Bh 2 2,900 - 5,800 - 5,800
4 Brace Steel 770 mm Bh 2 25,900 - 51,800 - 51,800
5 Cross Arm Steel 2.000 mm ( UNSP 10 ) galvanis Bh 1 230,000 - 230,000 - 230,000
6 Lock Nut ⅝" Bh 1 7,000 - 7,000 - 7,000
7 Pole Band Single Rack 7" atau 7 ½" Bh 1 24,300 - 24,300 - 24,300
8 Tie Wire # 4 / Alluminium bonding wire # 20 Mtr 6.2 3,100 - 19,220 - 19,220
9 Washer Square 2 ¼" Bh 2 1,100 - 2,200 - 2,200
10 Upah Pasang Konst. JTM 3 Fasa CC1-1' Unit 1 55,300 - - 55,300 55,300
Sub Jumlah CC1-1' - 349,720 55,300 405,020
6 CC1-1N Unit 1
1 Isolator Tumpu (Pin Post) 20 KV Bh 3 PLN PLN - - -
2 Bolt Machine ⅝" x 10" Bh 1 9,400 - 9,400 - 9,400
3 Bolt Machine / Bolt cariage ½" x ¾" Bh 2 2,900 - 5,800 - 5,800
4 Brace Steel 770 mm Bh 2 25,900 - 51,800 - 51,800
5 Cross Arm Steel 2.000 mm ( UNSP 10 ) galvanis Bh 1 230,000 - 230,000 - 230,000
6 Lock Nut ⅝" Bh 1 7,000 - 7,000 - 7,000
7 Pole Band Single Rack 7" atau 7 ½" Bh 1 24,300 - 24,300 - 24,300
8 Pole Band Single Up Side 7" atau 7 ½" Bh 1 36,000 - 36,000 - 36,000
9 Spool Insulator ANSI 53 - 2 Bh 1 10,200 - 10,200 - 10,200
10 Tie Wire # 4 / Alluminium bonding wire # 20 Mtr 6.2 3,100 - 19,220 - 19,220
11 Washer Square 2 ¼" Bh 2 1,100 - 2,200 - 2,200
12 Upah Pasang Konst. JTM 3 Fasa CC1-1N Unit 1 34,300 - - 34,300 34,300
Sub Jumlah CC1-1N - 395,920 34,300 430,220
PT. PLN (PERSERO)
DISTRIBUSI JAWA TENGAH DAN D.I. YOGYAKARTA
AREA SURAKARTA

ANALISA PER UNIT KONSTRUKSI


PEKERJAAN PEMBANGUNAN JARINGAN DISTRIBUSI 20 KV
#REF!

HARGA SATUAN BIAYA YANG DIPERLUKAN


NO. PERINCUAN PER UNIT KONSTRUKSI STN VOL MATERIAL MATERIAL TOTAL
JASA/UPAH JASA/UPAH
MDU HARDWARE MDU HARDWARE
7 CC1-A Unit 1
1 Isolator Tumpu (Line Post) 20 KV Bh 1 PLN PLN - - -
2 Isolator Tumpu (Pin Post) 20 KV Bh 2 PLN PLN - - -
3 Bolt Machine ⅝" x 10" Bh 3 9,400 - 28,200 - 28,200
4 Bolt Machine / Bolt cariage ½" x ¾" Bh 2 2,900 - 5,800 - 5,800
5 Bolt Single Up Side ⅝" x 10" Bh 1 25,100 - 25,100 - 25,100
6 Brace Steel 550 mm Bh 2 19,400 - 38,800 - 38,800
7 Center Bracket 12.5 KN Bh 1 54,100 - 54,100 - 54,100
8 Cross Arm Steel 2.000 mm ( UNSP 10 ) galvanis Bh 1 230,000 - 230,000 - 230,000
9 Lock Nut ⅝" Bh 4 7,000 - 28,000 - 28,000
10 Pole Band Single Rack 7" atau 7 ½" Bh 1 24,300 - 24,300 - 24,300
11 Spool Insulator ANSI 53 - 2 Bh 1 10,200 - 10,200 - 10,200
12 Tie Wire # 4 / Alluminium bonding wire # 20 Mtr 6.2 3,100 - 19,220 - 19,220
13 Washer Square 2 ¼" Bh 5 1,100 - 5,500 - 5,500
14 Upah Pasang Konst. JTM 3 Fasa CC1-A Unit 1 15,600 - - 15,600 15,600
Sub Jumlah CC1-A - 469,220 15,600 484,820
8 CC1-A' Unit 1
1 Isolator Tumpu (Line Post) 20 KV Bh 1 PLN PLN - - -
2 Isolator Tumpu (Pin Post) 20 KV Bh 2 PLN PLN - - -
3 Bolt Machine ⅝" x 10" Bh 3 9,400 - 28,200 - 28,200
4 Bolt Machine / Bolt cariage ½" x ¾" Bh 2 2,900 - 5,800 - 5,800
5 Brace Steel 550 mm Bh 2 19,400 - 38,800 - 38,800
6 Center Bracket 12.5 KN Bh 1 54,100 - 54,100 - 54,100
7 Cross Arm Steel 2.000 mm ( UNSP 10 ) galvanis Bh 1 230,000 - 230,000 - 230,000
8 Lock Nut ⅝" Bh 3 7,000 - 21,000 - 21,000
9 Pole Band Single Rack 7" atau 7 ½" Bh 1 24,300 - 24,300 - 24,300
10 Tie Wire # 4 / Alluminium bonding wire # 20 Mtr 5.4 3,100 - 16,740 - 16,740
11 Washer Square 2 ¼" Bh 4 1,100 - 4,400 - 4,400
12 Upah Pasang Konst. JTM 3 Fasa CC1-A' Unit 1 55,300 - - 55,300 55,300
Sub Jumlah CC1-A' - 423,340 55,300 478,640
9 CC2 Unit 1
1 Isolator Tumpu (Line Post) 20 KV Bh 3 PLN PLN - - -
2 Bolt Machine ⅝" x 10" Bh 4 9,400 - 37,600 - 37,600
3 Bracket Secondary / Bracket insulated Bh 1 7,400 - 7,400 - 7,400
4 Center Bracket 12.5 KN Bh 1 54,100 - 54,100 - 54,100
5 Lock Nut ⅝" Bh 4 7,000 - 28,000 - 28,000
6 Pole Band Single Rack 7" atau 7 ½" Bh 1 24,300 - 24,300 - 24,300
7 Side Bracket Bh 2 51,000 - 102,000 - 102,000
8 Spool Insulator ANSI 53 - 2 Bh 1 10,200 - 10,200 - 10,200
9 Tie Wire # 4 / Alluminium bonding wire # 20 Mtr 6.2 3,100 - 19,220 - 19,220
10 Washer Square 2 ¼" Bh 2 1,100 - 2,200 - 2,200
11 Upah Pasang Konst. JTM 3 Fasa CC2 Unit 1 28,800 - - 28,800 28,800
Sub Jumlah CC2 - 285,020 28,800 313,820
10 CC2' Unit 1
1 Isolator Tumpu (Line Post) 20 KV Bh 3 PLN PLN - - -
2 Bolt Machine ⅝" x 10" Bh 4 9,400 - 37,600 - 37,600
3 Center Bracket 12.5 KN Bh 1 54,100 - 54,100 - 54,100
4 Lock Nut ⅝" Bh 4 7,000 - 28,000 - 28,000
5 Side Bracket Bh 2 51,000 - 102,000 - 102,000
6 Tie Wire # 4 / Alluminium bonding wire # 20 Mtr 5.4 3,100 - 16,740 - 16,740
7 Washer Square 2 ¼" Bh 2 1,100 - 2,200 - 2,200
8 Upah Pasang Konst. JTM 3 Fasa CC2' Unit 1 52,200 - - 52,200 52,200
Sub Jumlah CC2' - 240,640 52,200 292,840
11 CC2-N Unit 1
1 Isolator Tumpu (Line Post) 20 KV Bh 3 PLN PLN - - -
2 Bolt Machine ⅝" x 10" Bh 4 9,400 - 37,600 - 37,600
3 Bracket Secondary / Bracket insulated Bh 1 7,400 - 7,400 - 7,400
4 Center Bracket 12.5 KN Bh 1 54,100 - 54,100 - 54,100
5 Lock Nut ⅝" Bh 6 7,000 - 42,000 - 42,000
6 Pole Band Single Rack 7" atau 7 ½" Bh 3 24,300 - 72,900 - 72,900
7 Side Bracket Bh 2 51,000 - 102,000 - 102,000
8 Spool Insulator ANSI 53 - 2 Bh 1 10,200 - 10,200 - 10,200
9 Tie Wire # 4 / Alluminium bonding wire # 20 Mtr 6.2 3,100 - 19,220 - 19,220
10 Washer Square 2 ¼" Bh 4 1,100 - 4,400 - 4,400
11 Upah Pasang Konst. JTM 3 Fasa CC2-N Unit 1 28,800 - - 28,800 28,800
Sub Jumlah CC2-N - 349,820 28,800 378,620
12 CC2-1 Unit 1
1 Isolator Tumpu (Pin Post) 20 KV Bh 6 PLN PLN - - -
2 Bolt Machine ⅝" x 10" Bh 1 9,400 - 9,400 - 9,400
3 Bolt Double Arming ⅝" x 14" Bh 2 23,500 - 47,000 - 47,000
4 Bolt Machine / Bolt cariage ½" x ¾" Bh 4 2,900 - 11,600 - 11,600
5 Brace Steel 770 mm Bh 2 25,900 - 51,800 - 51,800
6 Cross Arm Steel 2.000 mm ( UNSP 10 ) galvanis Bh 2 230,000 - 460,000 - 460,000
7 Lock Nut ⅝" Bh 1 7,000 - 7,000 - 7,000
8 Pole Band Double Rack 7" atau 7 ½" Bh 1 30,600 - 30,600 - 30,600
9 Pole Band Single Up Side 7" atau 7 ½" Bh 1 36,000 - 36,000 - 36,000
10 Spool Insulator ANSI 53 - 2 Bh 1 10,200 - 10,200 - 10,200
11 Tie Wire # 4 / Alluminium bonding wire # 20 Mtr 11.6 3,100 - 35,960 - 35,960
12 Washer Square 2 ¼" Bh 2 1,100 - 2,200 - 2,200
13 Upah Pasang Konst. JTM 3 Fasa CC2-1 Unit 1 48,300 - - 48,300 48,300
PT. PLN (PERSERO)
DISTRIBUSI JAWA TENGAH DAN D.I. YOGYAKARTA
AREA SURAKARTA

ANALISA PER UNIT KONSTRUKSI


PEKERJAAN PEMBANGUNAN JARINGAN DISTRIBUSI 20 KV
#REF!

HARGA SATUAN BIAYA YANG DIPERLUKAN


NO. PERINCUAN PER UNIT KONSTRUKSI STN VOL MATERIAL MATERIAL TOTAL
JASA/UPAH JASA/UPAH
MDU HARDWARE MDU HARDWARE
Sub Jumlah CC2-1 - 701,760 48,300 750,060
13 CC2-1' Unit 1
1 Isolator Tumpu (Pin Post) 20 KV Bh 6 PLN PLN - - -
2 Bolt Double Arming ⅝" x 14" Bh 2 23,500 - 47,000 - 47,000
3 Bolt Machine ⅝" x 10" Bh 1 9,400 - 9,400 - 9,400
4 Bolt Machine / Bolt cariage ½" x ¾" Bh 4 2,900 - 11,600 - 11,600
5 Cross Arm Steel 2.000 mm ( UNSP 10 ) galvanis Bh 2 230,000 - 460,000 - 460,000
6 Lock Nut ⅝" Bh 1 7,000 - 7,000 - 7,000
7 Pole Band Double Rack 7" atau 7 ½" Bh 1 30,600 - 30,600 - 30,600
8 Brace Steel 770 mm Bh 4 25,900 - 103,600 - 103,600
9 Tie Wire # 4 / Alluminium bonding wire # 20 Mtr 10.8 3,100 - 33,480 - 33,480
10 Washer Square 2 ¼" Bh 2 1,100 - 2,200 - 2,200
11 Upah Pasang Konst. JTM 3 Fasa CC2-1' Unit 1 49,900 - - 49,900 49,900
Sub Jumlah CC2-1' - 704,880 49,900 754,780
PT. PLN (PERSERO)
DISTRIBUSI JAWA TENGAH DAN D.I. YOGYAKARTA
AREA SURAKARTA

ANALISA PER UNIT KONSTRUKSI


PEKERJAAN PEMBANGUNAN JARINGAN DISTRIBUSI 20 KV
#REF!

HARGA SATUAN BIAYA YANG DIPERLUKAN


NO. PERINCUAN PER UNIT KONSTRUKSI STN VOL MATERIAL MATERIAL TOTAL
JASA/UPAH JASA/UPAH
MDU HARDWARE MDU HARDWARE
14 CC2-1N Unit 1
1 Isolator Tumpu (Pin Post) 20 KV Bh 6 PLN PLN - - -
2 Bolt Double Arming ⅝" x 14" Bh 2 23,500 - 47,000 - 47,000
3 Bolt Machine ⅝" x 10" Bh 3 9,400 - 28,200 - 28,200
4 Bolt Machine / Bolt cariage ½" x ¾" Bh 4 2,900 - 11,600 - 11,600
5 Spool Insulator ANSI 53 - 2 Bh 1 10,200 - 10,200 - 10,200
6 Cross Arm Steel 2.000 mm ( UNSP 10 ) galvanis Bh 2 230,000 - 460,000 - 460,000
7 Bracket Secondary / Bracket insulated Bh 1 7,400 - 7,400 - 7,400
8 Pole Band Double Rack 7" atau 7 ½" Bh 1 30,600 - 30,600 - 30,600
9 Brace Steel 770 mm Bh 4 25,900 - 103,600 - 103,600
10 Tie Wire # 4 / Alluminium bonding wire # 20 Mtr 11.6 3,100 - 35,960 - 35,960
11 Washer Square 2 ¼" Bh 7 1,100 - 7,700 - 7,700
12 Upah Pasang Konst. JTM 3 Fasa CC2-1N Unit 1 52,200 - - 52,200 52,200
Sub Jumlah CC2-1N - 742,260 52,200 794,460
15 CC2-A Unit 1
1 Isolator Tumpu (Line Post) 20 KV Bh 2 PLN PLN - - -
2 Isolator Tumpu (Pin Post) 20 KV Bh 4 PLN PLN - - -
3 Bolt Double Arming ⅝" x 14" Bh 2 23,500 - 47,000 - 47,000
4 Bolt Machine ⅝" x 10" Bh 4 9,400 - 37,600 - 37,600
5 Bolt Machine / Bolt cariage ½" x ¾" Bh 4 2,900 - 11,600 - 11,600
6 Brace Steel 550 mm Bh 4 19,400 - 77,600 - 77,600
7 Bracket Secondary / Bracket insulated Bh 1 7,400 - 7,400 - 7,400
8 Center Bracket 12.5 KN Bh 2 54,100 - 108,200 - 108,200
9 Cross Arm Steel 2.000 mm ( UNSP 10 ) galvanis Bh 2 230,000 - 460,000 - 460,000
10 Lock Nut ⅝" Bh 8 7,000 - 56,000 - 56,000
11 Pole Band Double Rack 7" atau 7 ½" Bh 1 30,600 - 30,600 - 30,600
12 Spool Insulator ANSI 53 - 2 Bh 1 10,200 - 10,200 - 10,200
13 Tie Wire # 4 / Alluminium bonding wire # 20 Mtr 11.6 3,100 - 35,960 - 35,960
14 Washer Square 2 ¼" Bh 13 1,100 - 14,300 - 14,300
15 Upah Pasang Konst. JTM 3 Fasa CC2-A Unit 1 48,300 - - 48,300 48,300
Sub Jumlah CC2-A - 896,460 48,300 944,760
16 CC2-A' Unit 1
1 Isolator Tumpu (Line Post) 20 KV Bh 2 PLN PLN - - -
2 Isolator Tumpu (Pin Post) 20 KV Bh 4 PLN PLN - - -
3 Bolt Double Arming ⅝" x 14" Bh 2 23,500 - 47,000 - 47,000
4 Bolt Machine ⅝" x 10" Bh 3 9,400 - 28,200 - 28,200
5 Bolt Machine / Bolt cariage ½" x ¾" Bh 4 2,900 - 11,600 - 11,600
6 Brace Steel 770 mm Bh 4 25,900 - 103,600 - 103,600
7 Center Bracket 12.5 KN Bh 2 54,100 - 108,200 - 108,200
8 Cross Arm Steel 2.000 mm ( UNSP 10 ) galvanis Bh 2 230,000 - 460,000 - 460,000
9 Lock Nut ⅝" Bh 7 7,000 - 49,000 - 49,000
10 Pole Band Double Rack 7" atau 7 ½" Bh 1 30,600 - 30,600 - 30,600
11 Tie Wire # 4 / Alluminium bonding wire # 20 Mtr 10.8 3,100 - 33,480 - 33,480
12 Washer Square 2 ¼" Bh 12 1,100 - 13,200 - 13,200
13 Upah Pasang Konst. JTM 3 Fasa CC2-A' Unit 1 23,400 - - 23,400 23,400
Sub Jumlah CC2-A' - 884,880 23,400 908,280
17 CC3 Unit 1
1 Isolator Tarik ( Polymer ) 20 KV + Primary Dead E Set 3 PLN PLN - - -
2 Armour Rod # for 150 mm² Set 1 58,800 - 58,800 - 58,800
3 Armour Rod # for 240 mm² Set 3 80,000 - 240,000 - 240,000
4 Clevis Swinging Secondary Bh 1 9,400 - 9,400 - 9,400
5 Lock Nut ⅝" Bh 3 7,000 - 21,000 - 21,000
6 Oval Eye Bolt ⅝" x 10" Bh 3 11,700 - 35,100 - 35,100
7 Oval Eye Nut ⅝" Bh 1 13,300 - 13,300 - 13,300
8 Pole Band Single Rack 7" atau 7 ½" Bh 1 24,300 - 24,300 - 24,300
9 Primary Angle Clamp ( 150 s/d 240 ) mm² Bh 3 40,800 - 122,400 - 122,400
10 Schackle Anchor ⅝" Bh 3 10,200 - 30,600 - 30,600
11 Spool Insulator ANSI 53 - 4 Bh 1 15,700 - 15,700 - 15,700
12 Tie Wire # 4 / Alluminium bonding wire # 20 Mtr 0.8 3,100 - 2,480 - 2,480
13 Washer Square 2 ¼" Bh 3 1,100 - 3,300 - 3,300
14 Upah Pasang Konst. JTM 3 Fasa CC3 Unit 1 23,400 - - 23,400 23,400
Sub Jumlah CC3 - 576,380 23,400 599,780
18 CC3' Unit 1
1 Isolator Tarik ( Polymer ) 20 KV + Primary Dead E Set 3 PLN PLN - - -
2 Armour Rod # for 240 mm² Set 3 80,000 - 240,000 - 240,000
3 Lock Nut ⅝" Bh 3 7,000 - 21,000 - 21,000
4 Oval Eye Bolt ⅝" x 10" Bh 3 11,700 - 35,100 - 35,100
5 Primary Angle Clamp ( 150 s/d 240 ) mm² Bh 3 40,800 - 122,400 - 122,400
6 Schackle Anchor ⅝" Bh 3 10,200 - 30,600 - 30,600
7 Washer Square 2 ¼" Bh 3 1,100 - 3,300 - 3,300
8 Upah Pasang Konst. JTM 3 Fasa CC3' Unit 1 24,900 - - 24,900 24,900
Sub Jumlah CC3' - 452,400 24,900 477,300
19 CC3-VN Unit 1
1 Isolator Tarik ( Polymer ) 20 KV + Primary Dead E Set 3 PLN PLN - - -
2 Armour Rod # for 150 mm² Set 1 58,800 - 58,800 - 58,800
3 Armour Rod # for 240 mm² Set 3 80,000 - 240,000 - 240,000
4 Clevis Swinging Secondary Bh 1 9,400 - 9,400 - 9,400
5 Lock Nut ⅝" Bh 1 7,000 - 7,000 - 7,000
6 Oval Eye Bolt ⅝" x 10" Bh 1 11,700 - 11,700 - 11,700
7 Oval Eye Nut ⅝" Bh 3 13,300 - 39,900 - 39,900
8 Pole Band Single Rack 7" atau 7 ½" Bh 3 24,300 - 72,900 - 72,900
PT. PLN (PERSERO)
DISTRIBUSI JAWA TENGAH DAN D.I. YOGYAKARTA
AREA SURAKARTA

ANALISA PER UNIT KONSTRUKSI


PEKERJAAN PEMBANGUNAN JARINGAN DISTRIBUSI 20 KV
#REF!

HARGA SATUAN BIAYA YANG DIPERLUKAN


NO. PERINCUAN PER UNIT KONSTRUKSI STN VOL MATERIAL MATERIAL TOTAL
JASA/UPAH JASA/UPAH
MDU HARDWARE MDU HARDWARE
9 Primary Angle Clamp ( 150 s/d 240 ) mm² Bh 3 40,800 - 122,400 - 122,400
10 Schackle Anchor ⅝" Bh 3 10,200 - 30,600 - 30,600
11 Spool Insulator ANSI 53 - 4 Bh 1 15,700 - 15,700 - 15,700
12 Tie Wire # 4 / Alluminium bonding wire # 20 Mtr 0.8 3,100 - 2,480 - 2,480
13 Washer Square 2 ¼" Bh 1 1,100 - 1,100 - 1,100
14 Upah Pasang Konst. JTM 3 Fasa CC3-VN Unit 1 24,900 - - 24,900 24,900
Sub Jumlah CC3-VN - 611,980 24,900 636,880
PT. PLN (PERSERO)
DISTRIBUSI JAWA TENGAH DAN D.I. YOGYAKARTA
AREA SURAKARTA

ANALISA PER UNIT KONSTRUKSI


PEKERJAAN PEMBANGUNAN JARINGAN DISTRIBUSI 20 KV
#REF!

HARGA SATUAN BIAYA YANG DIPERLUKAN


NO. PERINCUAN PER UNIT KONSTRUKSI STN VOL MATERIAL MATERIAL TOTAL
JASA/UPAH JASA/UPAH
MDU HARDWARE MDU HARDWARE
20 CC4-1 Unit 1
1 Isolator Tarik ( Polymer ) 20 KV + Primary Dead E Set 6 PLN PLN - - -
2 Armour Tape ¼" wide Mtr 2 4,300 - 8,600 - 8,600
3 Clevis Swinging Secondary Bh 2 9,400 - 18,800 - 18,800
4 Compresion Conector H type 240 mm² / 240 mm² Bh 4 29,800 - 119,200 - 119,200
5 Lock Nut ⅝" Bh 4 7,000 - 28,000 - 28,000
6 Loop Dead End Clamp / LC ( 35 s/d 240 ) mm² Bh 4 18,000 - 72,000 - 72,000
7 Oval Eye Bolt ⅝" x ( 14" s/d 22" ) Bh 4 14,900 - 59,600 - 59,600
8 Oval Eye Bolt ⅝" x 10" Bh 4 11,700 - 46,800 - 46,800
9 Oval Eye Nut ⅝" Bh 6 13,300 - 79,800 - 79,800
10 Pole Band Single Rack 7" atau 7 ½" Bh 4 24,300 - 97,200 - 97,200
11 Schackle Anchor ⅝" Bh 8 10,200 - 81,600 - 81,600
12 Spool Insulator ANSI 53 - 4 Bh 2 15,700 - 31,400 - 31,400
13 Washer Square 2 ¼" Bh 4 1,100 - 4,400 - 4,400
14 Upah Pasang Konst. JTM 3 Fasa CC4-1 Unit 1 24,900 - - 24,900 24,900
Sub Jumlah CC4-1 - 647,400 24,900 672,300
21 CC5-1 Unit 1
1 Isolator Tarik ( Polymer ) 20 KV + Primary Dead E Set 3 PLN PLN - - -
2 Armour Tape ¼" wide Mtr 1 4,300 - 4,300 - 4,300
3 Clevis Swinging Secondary Bh 1 9,400 - 9,400 - 9,400
4 Lock Nut ⅝" Bh 4 7,000 - 28,000 - 28,000
5 Loop Dead End Clamp / LC ( 35 s/d 240 ) mm² Bh 2 18,000 - 36,000 - 36,000
6 Oval Eye Bolt ⅝" x ( 14" s/d 22" ) Bh 2 14,900 - 29,800 - 29,800
7 Oval Eye Bolt ⅝" x 10" Bh 4 11,700 - 46,800 - 46,800
8 Oval Eye Nut ⅝" Bh 2 13,300 - 26,600 - 26,600
9 Schackle Anchor ⅝" Bh 5 10,200 - 51,000 - 51,000
10 Spool Insulator ANSI 53 - 4 Bh 1 15,700 - 15,700 - 15,700
11 Washer Square 2 ¼" Bh 4 1,100 - 4,400 - 4,400
12 Upah Pasang Konst. JTM 3 Fasa CC5-1 Unit 1 24,900 - - 24,900 24,900
Sub Jumlah CC5-1 - 252,000 24,900 276,900
22 CC7 Unit 1
1 Isolator Tarik ( Polymer ) 20 KV + Primary Dead E Set 3 PLN PLN - - -
2 Armour Tape ¼" wide Mtr 1 4,300 - 4,300 - 4,300
3 Bolt Double Arming ⅝" x 14" Bh 2 23,500 - 47,000 - 47,000
4 Bolt Machine ⅝" x 10" Bh 1 9,400 - 9,400 - 9,400
5 Bolt Machine / Bolt cariage ½" x ¾" Bh 4 2,900 - 11,600 - 11,600
6 Brace Steel 770 mm Bh 4 25,900 - 103,600 - 103,600
7 Clevis Swinging Secondary Bh 1 9,400 - 9,400 - 9,400
8 Cross Arm Steel 2.000 mm ( UNSP 10 ) galvanis Bh 2 230,000 - 460,000 - 460,000
9 Lock Nut ⅝" Bh 4 7,000 - 28,000 - 28,000
10 Loop Dead End Clamp / LC ( 35 s/d 240 ) mm² Bh 2 18,000 - 36,000 - 36,000
11 Oval Eye Bolt ⅝" x 10" Bh 1 11,700 - 11,700 - 11,700
12 Oval Eye Nut ⅝" Bh 3 13,300 - 39,900 - 39,900
13 Pole Band Double Rack 7" atau 7 ½" Bh 1 30,600 - 30,600 - 30,600
14 Pole Band Single Rack 7" atau 7 ½" Bh 1 24,300 - 24,300 - 24,300
15 Schackle Anchor ⅝" Bh 3 10,200 - 30,600 - 30,600
16 Spool Insulator ANSI 53 - 4 Bh 1 15,700 - 15,700 - 15,700
17 Washer Square 2 ¼" Bh 11 1,100 - 12,100 - 12,100
18 Upah Pasang Konst. JTM 3 Fasa CC7 Unit 1 21,800 - - 21,800 21,800
Sub Jumlah CC7 - 874,200 21,800 896,000
23 CC7' Unit 1
1 Isolator Tarik ( Polymer ) 20 KV + Primary Dead E Set 3 PLN PLN - - -
2 Bolt Double Arming ⅝" x 14" Bh 2 23,500 - 47,000 - 47,000
3 Bolt Machine ⅝" x 10" Bh 1 9,400 - 9,400 - 9,400
4 Bolt Machine / Bolt cariage ½" x ¾" Bh 4 2,900 - 11,600 - 11,600
5 Brace Steel 770 mm Bh 4 25,900 - 103,600 - 103,600
6 Cross Arm Steel 2.000 mm ( UNSP 10 ) galvanis Bh 2 230,000 - 460,000 - 460,000
7 Lock Nut ⅝" Bh 4 7,000 - 28,000 - 28,000
8 Oval Eye Bolt ⅝" x 10" Bh 1 11,700 - 11,700 - 11,700
9 Oval Eye Nut ⅝" Bh 2 13,300 - 26,600 - 26,600
10 Pole Band Double Rack 7" atau 7 ½" Bh 1 30,600 - 30,600 - 30,600
11 Schackle Anchor ⅝" Bh 3 10,200 - 30,600 - 30,600
12 Washer Square 2 ¼" Bh 11 1,100 - 12,100 - 12,100
13 Upah Pasang Konst. JTM 3 Fasa CC7' Unit 1 21,800 - - 21,800 21,800
Sub Jumlah CC7' - 771,200 21,800 793,000
PT. PLN (PERSERO)
DISTRIBUSI JAWA TENGAH DAN D.I. YOGYAKARTA
AREA SURAKARTA

ANALISA PER UNIT KONSTRUKSI


PEKERJAAN PEMBANGUNAN JARINGAN DISTRIBUSI 20 KV
#REF!

HARGA SATUAN BIAYA YANG DIPERLUKAN


NO. PERINCUAN PER UNIT KONSTRUKSI STN VOL MATERIAL MATERIAL TOTAL
JASA/UPAH JASA/UPAH
MDU HARDWARE MDU HARDWARE
24 CC7-1 Unit 1
1 Isolator Tarik ( Polymer ) 20 KV + Primary Dead E Set 3 PLN PLN - - -
2 Armour Tape ¼" wide Mtr 1 4,300 - 4,300 - 4,300
3 Bolt Double Arming ⅝" x 14" Bh 2 23,500 - 47,000 - 47,000
4 Bolt Machine ⅝" x 10" Bh 1 9,400 - 9,400 - 9,400
5 Bolt Machine / Bolt cariage ½" x ¾" Bh 4 2,900 - 11,600 - 11,600
6 Clevis Swinging Secondary Bh 1 9,400 - 9,400 - 9,400
7 Cross Arm Steel 2.000 mm ( UNSP 10 ) galvanis Bh 2 230,000 - 460,000 - 460,000
8 Lock Nut ⅝" Bh 4 7,000 - 28,000 - 28,000
9 Loop Dead End Clamp / LC ( 35 s/d 240 ) mm² Bh 2 18,000 - 36,000 - 36,000
10 Oval Eye Bolt ⅝" x 10" Bh 1 11,700 - 11,700 - 11,700
11 Oval Eye Nut ⅝" Bh 3 13,300 - 39,900 - 39,900
12 Pole Band Double Rack 7" atau 7 ½" Bh 1 30,600 - 30,600 - 30,600
13 Pole Band Single Rack 7" atau 7 ½" Bh 1 24,300 - 24,300 - 24,300
14 Schackle Anchor ⅝" Bh 3 10,200 - 30,600 - 30,600
15 Spool Insulator ANSI 53 - 4 Bh 1 15,700 - 15,700 - 15,700
16 Brace Steel 770 mm Bh 4 25,900 - 103,600 - 103,600
17 Washer Square 2 ¼" Bh 11 1,100 - 12,100 - 12,100
18 Upah Pasang Konst. JTM 3 Fasa CC7-1 Unit 1 21,800 - - 21,800 21,800
Sub Jumlah CC7-1 - 874,200 21,800 896,000
25 CC7-1' Unit 1
1 Isolator Tarik ( Polymer ) 20 KV + Primary Dead E Set 3 PLN PLN - - -
2 Bolt Double Arming ⅝" x 14" Bh 2 23,500 - 47,000 - 47,000
3 Bolt Machine ⅝" x 10" Bh 1 9,400 - 9,400 - 9,400
4 Bolt Machine / Bolt cariage ½" x ¾" Bh 4 2,900 - 11,600 - 11,600
5 Cross Arm Steel 2.000 mm ( UNSP 10 ) galvanis Bh 3 230,000 - 690,000 - 690,000
6 Lock Nut ⅝" Bh 4 7,000 - 28,000 - 28,000
7 Oval Eye Bolt ⅝" x 10" Bh 1 11,700 - 11,700 - 11,700
8 Oval Eye Nut ⅝" Bh 2 13,300 - 26,600 - 26,600
9 Pole Band Double Rack 7" atau 7 ½" Bh 1 30,600 - 30,600 - 30,600
10 Schackle Anchor ⅝" Bh 3 10,200 - 30,600 - 30,600
11 Brace Steel 770 mm Bh 4 25,900 - 103,600 - 103,600
12 Washer Square 2 ¼" Bh 11 1,100 - 12,100 - 12,100
13 Upah Pasang Konst. JTM 3 Fasa CC7-1' Unit 1 21,800 - - 21,800 21,800
Sub Jumlah CC7-1' - 1,001,200 21,800 1,023,000
26 CC7-1N Unit 1
1 Isolator Tarik ( Polymer ) 20 KV + Primary Dead E Set 3 PLN PLN - - -
2 Armour Tape ¼" wide Mtr 1 4,300 - 4,300 - 4,300
3 Bolt Double Arming ⅝" x 14" Bh 3 23,500 - 70,500 - 70,500
4 Bolt Machine ⅝" x 10" Bh 1 9,400 - 9,400 - 9,400
5 Bolt Machine / Bolt cariage ½" x ¾" Bh 4 2,900 - 11,600 - 11,600
6 Brace Steel 770 mm Bh 4 25,900 - 103,600 - 103,600
7 Clevis Swinging Secondary Bh 1 9,400 - 9,400 - 9,400
8 Cross Arm Steel 2.000 mm ( UNSP 10 ) galvanis Bh 2 230,000 - 460,000 - 460,000
9 Lock Nut ⅝" Bh 5 7,000 - 35,000 - 35,000
10 Loop Dead End Clamp / LC ( 35 s/d 240 ) mm² Bh 2 18,000 - 36,000 - 36,000
11 Oval Eye Bolt ⅝" x 10" Bh 1 11,700 - 11,700 - 11,700
12 Oval Eye Nut ⅝" Bh 3 13,300 - 39,900 - 39,900
13 Pole Band Double Rack 7" atau 7 ½" Bh 1 30,600 - 30,600 - 30,600
14 Schackle Anchor ⅝" Bh 3 10,200 - 30,600 - 30,600
15 Spool Insulator ANSI 53 - 4 Bh 1 15,700 - 15,700 - 15,700
16 Washer Square 2 ¼" Bh 15 1,100 - 16,500 - 16,500
17 Upah Pasang Konst. JTM 3 Fasa CC7-N Unit 1 21,800 - - 21,800 21,800
Sub Jumlah CC7-1N - 884,800 21,800 906,600
27 CC8 Unit 1
1 Isolator Tumpu (Line Post) 20 KV Bh 1 PLN PLN - - -
2 Isolator Tumpu (Pin Post) 20 KV Bh 2 PLN PLN - - -
3 Isolator Tarik ( Polymer ) 20 KV + Primary Dead E Set 6 PLN PLN - - -
4 Armour Tape ¼" wide Mtr 2 4,300 - 8,600 - 8,600
5 Bolt Double Arming ⅝" x 14" Bh 2 23,500 - 47,000 - 47,000
6 Bolt Machine ⅝" x 10" Bh 3 9,400 - 28,200 - 28,200
7 Bolt Machine / Bolt cariage ½" x ¾" Bh 4 2,900 - 11,600 - 11,600
8 Brace Steel 770 mm Bh 4 25,900 - 103,600 - 103,600
9 Center Bracket 12.5 KN Bh 1 54,100 - 54,100 - 54,100
10 Clevis Swinging Secondary Bh 2 9,400 - 18,800 - 18,800
11 Compresion Conector H type 240 mm² / 240 mm² Bh 4 29,800 - 119,200 - 119,200
12 Cross Arm Steel 2.000 mm ( UNSP 10 ) galvanis Bh 2 230,000 - 460,000 - 460,000
13 Lock Nut ⅝" Bh 3 7,000 - 21,000 - 21,000
14 Loop Dead End Clamp / LC ( 35 s/d 240 ) mm² Bh 4 18,000 - 72,000 - 72,000
15 Oval Eye Bolt ⅝" x 10" Bh 3 11,700 - 35,100 - 35,100
16 Oval Eye Nut ⅝" Bh 9 13,300 - 119,700 - 119,700
17 Pole Band Double Rack 7" atau 7 ½" Bh 1 30,600 - 30,600 - 30,600
18 Schackle Anchor ⅝" Bh 8 10,200 - 81,600 - 81,600
19 Spool Insulator ANSI 53 - 4 Bh 2 15,700 - 31,400 - 31,400
20 Tie Wire # 4 / Alluminium bonding wire # 20 Mtr 5.4 3,100 - 16,740 - 16,740
21 Washer Square 2 ¼" Bh 13 1,100 - 14,300 - 14,300
22 Upah Pasang Konst. JTM 3 Fasa CC8 Unit 1 44,400 - - 44,400 44,400
Sub Jumlah CC8 - 1,273,540 44,400 1,317,940
28 CC8' Unit 1
1 Isolator Tumpu (Line Post) 20 KV Bh 1 PLN PLN - - -
2 Isolator Tumpu (Pin Post) 20 KV Bh 2 PLN PLN - - -
PT. PLN (PERSERO)
DISTRIBUSI JAWA TENGAH DAN D.I. YOGYAKARTA
AREA SURAKARTA

ANALISA PER UNIT KONSTRUKSI


PEKERJAAN PEMBANGUNAN JARINGAN DISTRIBUSI 20 KV
#REF!

HARGA SATUAN BIAYA YANG DIPERLUKAN


NO. PERINCUAN PER UNIT KONSTRUKSI STN VOL MATERIAL MATERIAL TOTAL
JASA/UPAH JASA/UPAH
MDU HARDWARE MDU HARDWARE
3 Isolator Tarik ( Polymer ) 20 KV + Primary Dead E Set 6 PLN PLN - - -
4 Bolt Double Arming ⅝" x 14" Bh 2 23,500 - 47,000 - 47,000
5 Bolt Machine ⅝" x 10" Bh 3 9,400 - 28,200 - 28,200
6 Bolt Machine / Bolt cariage ½" x ¾" Bh 4 2,900 - 11,600 - 11,600
7 Brace Steel 770 mm Bh 4 25,900 - 103,600 - 103,600
8 Center Bracket 12.5 KN Bh 1 54,100 - 54,100 - 54,100
9 Compresion Conector H type 240 mm² / 240 mm² Bh 3 29,800 - 89,400 - 89,400
10 Cross Arm Steel 2.000 mm ( UNSP 10 ) galvanis Bh 2 230,000 - 460,000 - 460,000
11 Lock Nut ⅝" Bh 3 7,000 - 21,000 - 21,000
12 Oval Eye Bolt ⅝" x 10" Bh 3 11,700 - 35,100 - 35,100
13 Oval Eye Nut ⅝" Bh 7 13,300 - 93,100 - 93,100
14 Schackle Anchor ⅝" Bh 8 10,200 - 81,600 - 81,600
15 Tie Wire # 4 / Alluminium bonding wire # 20 Mtr 5.4 3,100 - 16,740 - 16,740
16 Washer Square 2 ¼" Bh 13 1,100 - 14,300 - 14,300
17 Upah Pasang Konst. JTM 3 Fasa CC8' Unit 1 24,900 - - 24,900 24,900
Sub Jumlah CC8' - 1,055,740 24,900 1,080,640
PT. PLN (PERSERO)
DISTRIBUSI JAWA TENGAH DAN D.I. YOGYAKARTA
AREA SURAKARTA

ANALISA PER UNIT KONSTRUKSI


PEKERJAAN PEMBANGUNAN JARINGAN DISTRIBUSI 20 KV
#REF!

HARGA SATUAN BIAYA YANG DIPERLUKAN


NO. PERINCUAN PER UNIT KONSTRUKSI STN VOL MATERIAL MATERIAL TOTAL
JASA/UPAH JASA/UPAH
MDU HARDWARE MDU HARDWARE
29 CC8-N Unit 1
1 Isolator Tumpu (Line Post) 20 KV Bh 1 PLN PLN - - -
2 Isolator Tumpu (Pin Post) 20 KV Bh 2 PLN PLN - - -
3 Isolator Tarik ( Polymer ) 20 KV + Primary Dead E Set 6 PLN PLN - - -
4 Armour Tape ¼" wide Mtr 2 4,300 - 8,600 - 8,600
5 Bolt Double Arming ⅝" x 14" Bh 4 23,500 - 94,000 - 94,000
6 Bolt Machine ⅝" x 10" Bh 1 9,400 - 9,400 - 9,400
7 Bolt Machine / Bolt cariage ½" x ¾" Bh 4 2,900 - 11,600 - 11,600
8 Center Bracket 12.5 KN Bh 1 54,100 - 54,100 - 54,100
9 Clevis Swinging Secondary Bh 2 9,400 - 18,800 - 18,800
10 Compresion Conector H type 240 mm² / 240 mm² Bh 4 29,800 - 119,200 - 119,200
11 Cross Arm Steel 3.000 mm ( UNSP 10 ) galvanis Bh 2 350,000 - 700,000 - 700,000
12 Lock Nut ⅝" Bh 3 7,000 - 21,000 - 21,000
13 Loop Dead End Clamp / LC ( 35 s/d 240 ) mm² Bh 4 18,000 - 72,000 - 72,000
14 Oval Eye Nut ⅝" Bh 8 13,300 - 106,400 - 106,400
15 Pole Band Double Rack 7" atau 7 ½" Bh 1 30,600 - 30,600 - 30,600
16 Pole Band Single Rack 7" atau 7 ½" Bh 2 24,300 - 48,600 - 48,600
17 Schackle Anchor ⅝" Bh 6 10,200 - 61,200 - 61,200
18 Spool Insulator ANSI 53 - 4 Bh 2 15,700 - 31,400 - 31,400
19 Brace Steel 770 mm Bh 4 25,900 - 103,600 - 103,600
20 Tie Wire # 4 / Alluminium bonding wire # 20 Mtr 5.4 3,100 - 16,740 - 16,740
21 Washer Square 2 ¼" Bh 20 1,100 - 22,000 - 22,000
22 Upah Pasang Konst. JTM 3 Fasa CC8-N Unit 1 44,400 - - 44,400 44,400
Sub Jumlah CC8-N - 1,529,240 44,400 1,573,640
30 CC8-A Unit 1
1 Isolator Tumpu (Line Post) 20 KV Bh 1 PLN PLN - - -
2 Isolator Tumpu (Pin Post) 20 KV Bh 1 PLN PLN - - -
3 Isolator Tarik ( Polymer ) 20 KV + Primary Dead E Set 6 PLN PLN - - -
4 Armour Tape ¼" wide Mtr 2 4,300 - 8,600 - 8,600
5 Bolt Double Arming ⅝" x 14" Bh 4 23,500 - 94,000 - 94,000
6 Bolt Machine / Bolt cariage ½" x ¾" Bh 8 2,900 - 23,200 - 23,200
7 Bolt Machine ⅝" x 10" Bh 1 9,400 - 9,400 - 9,400
8 Brace Steel 770 mm Bh 8 25,900 - 207,200 - 207,200
9 Clevis Swinging Secondary Bh 2 9,400 - 18,800 - 18,800
10 Compresion Conector H type 240 mm² / 240 mm² Bh 4 29,800 - 119,200 - 119,200
11 Cross Arm Steel 2.000 mm ( UNSP 10 ) galvanis Bh 4 230,000 - 920,000 - 920,000
12 Loop Dead End Clamp / LC ( 35 s/d 240 ) mm² Bh 4 18,000 - 72,000 - 72,000
13 Lock Nut ⅝" Bh 9 7,000 - 63,000 - 63,000
14 Oval Eye Bolt ⅝" x 10" Bh 2 11,700 - 23,400 - 23,400
15 Oval Eye Nut ⅝" Bh 6 13,300 - 79,800 - 79,800
16 Pole Band Double Rack 7" atau 7 ½" Bh 3 30,600 - 91,800 - 91,800
17 Pole Band Single Rack 7" atau 7 ½" Bh 3 24,300 - 72,900 - 72,900
18 Schackle Anchor ⅝" Bh 6 10,200 - 61,200 - 61,200
19 Spool Insulator ANSI 53 - 4 Bh 2 15,700 - 31,400 - 31,400
20 Tie Wire # 4 / Alluminium bonding wire # 20 Mtr 3.6 3,100 - 11,160 - 11,160
21 Washer Square 2 ¼" Bh 22 1,100 - 24,200 - 24,200
22 Upah Pasang Konst. JTM 3 Fasa CC8-A Unit 1 44,400 - - 44,400 44,400
Sub Jumlah CC8-A - 1,931,260 44,400 1,975,660
31 CC8-A' Unit 1
1 Isolator Tumpu (Line Post) 20 KV Bh 1 PLN PLN - - -
2 Isolator Tumpu (Pin Post) 20 KV Bh 1 PLN PLN - - -
3 Isolator Tarik ( Polymer ) 20 KV + Primary Dead E Set 6 PLN PLN - - -
4 Bolt Double Arming ⅝" x 14" Bh 4 23,500 - 94,000 - 94,000
5 Bolt Machine / Bolt cariage ½" x ¾" Bh 8 2,900 - 23,200 - 23,200
6 Bolt Machine ⅝" x 10" Bh 1 9,400 - 9,400 - 9,400
7 Brace Steel 770 mm Bh 8 25,900 - 207,200 - 207,200
8 Compresion Conector H type 240 mm² / 240 mm² Bh 3 29,800 - 89,400 - 89,400
9 Cross Arm Steel 2.000 mm ( UNSP 10 ) galvanis Bh 4 230,000 - 920,000 - 920,000
10 Lock Nut ⅝" Bh 6 7,000 - 42,000 - 42,000
11 Oval Eye Bolt ⅝" x 10" Bh 1 11,700 - 11,700 - 11,700
12 Oval Eye Nut ⅝" Bh 5 13,300 - 66,500 - 66,500
13 Pole Band Double Rack 7" atau 7 ½" Bh 3 30,600 - 91,800 - 91,800
14 Pole Band Single Rack 7" atau 7 ½" Bh 2 24,300 - 48,600 - 48,600
15 Schackle Anchor ⅝" Bh 6 10,200 - 61,200 - 61,200
16 Tie Wire # 4 / Alluminium bonding wire # 20 Mtr 3.6 3,100 - 11,160 - 11,160
17 Washer Square 2 ¼" Bh 21 1,100 - 23,100 - 23,100
18 Upah Pasang Konst. JTM 3 Fasa CC8-A' Unit 1 45,200 - - 45,200 45,200
Sub Jumlah CC8-A' - 1,699,260 45,200 1,744,460
PT. PLN (PERSERO)
DISTRIBUSI JAWA TENGAH DAN D.I. YOGYAKARTA
AREA SURAKARTA

ANALISA PER UNIT KONSTRUKSI


PEKERJAAN PEMBANGUNAN JARINGAN DISTRIBUSI 20 KV
#REF!

HARGA SATUAN BIAYA YANG DIPERLUKAN


NO. PERINCUAN PER UNIT KONSTRUKSI STN VOL MATERIAL MATERIAL TOTAL
JASA/UPAH JASA/UPAH
MDU HARDWARE MDU HARDWARE
32 CC8-AN Unit 1
1 Isolator Tumpu (Line Post) 20 KV Bh 1 PLN PLN - - -
2 Isolator Tumpu (Pin Post) 20 KV Bh 1 PLN PLN - - -
3 Isolator Tarik ( Polymer ) 20 KV + Primary Dead E Set 6 PLN PLN - - -
4 Armour Tape ¼" wide Mtr 2 4,300 - 8,600 - 8,600
5 Bolt Double Arming ⅝" x 14" Bh 4 23,500 - 94,000 - 94,000
6 Bolt Machine / Bolt cariage ½" x ¾" Bh 8 2,900 - 23,200 - 23,200
7 Bolt Machine ⅝" x 10" Bh 1 9,400 - 9,400 - 9,400
8 Brace Steel 770 mm Bh 8 25,900 - 207,200 - 207,200
9 Clevis Swinging Secondary Bh 2 9,400 - 18,800 - 18,800
10 Compresion Conector H type 240 mm² / 240 mm² Bh 4 29,800 - 119,200 - 119,200
11 Cross Arm Steel 2.000 mm ( UNSP 10 ) galvanis Bh 4 230,000 - 920,000 - 920,000
12 Loop Dead End Clamp / LC ( 35 s/d 240 ) mm² Bh 4 18,000 - 72,000 - 72,000
13 Lock Nut ⅝" Bh 9 7,000 - 63,000 - 63,000
14 Oval Eye Bolt ⅝" x 10" Bh 2 11,700 - 23,400 - 23,400
15 Oval Eye Nut ⅝" Bh 6 13,300 - 79,800 - 79,800
16 Pole Band Double Rack 7" atau 7 ½" Bh 3 30,600 - 91,800 - 91,800
17 Pole Band Single Rack 7" atau 7 ½" Bh 3 24,300 - 72,900 - 72,900
18 Schackle Anchor ⅝" Bh 6 10,200 - 61,200 - 61,200
19 Spool Insulator ANSI 53 - 4 Bh 2 15,700 - 31,400 - 31,400
20 Tie Wire # 4 / Alluminium bonding wire # 20 Mtr 3.6 3,100 - 11,160 - 11,160
21 Washer Square 2 ¼" Bh 22 1,100 - 24,200 - 24,200
22 Upah Pasang Konst. JTM 3 Fasa CC8-AN Unit 1 24,900 - - 24,900 24,900
Sub Jumlah CC8-AN - 1,931,260 24,900 1,956,160
33 CC9 Unit 1
1 Isolator Tumpu (Line Post) 20 KV Bh 1 PLN PLN - - -
2 Isolator Tumpu (Pin Post) 20 KV Bh 2 PLN PLN - - -
3 Bolt Machine / Bolt cariage ½" x ¾" Bh 1 2,900 - 2,900 - 2,900
4 Bolt Machine ⅝" x 10" Bh 3 9,400 - 28,200 - 28,200
5 Bracket Secondary / Bracket insulated Bh 1 7,400 - 7,400 - 7,400
6 Center Bracket 12.5 KN Bh 1 54,100 - 54,100 - 54,100
7 Cross Arm Steel 2.000 mm ( UNSP 10 ) galvanis Bh 1 230,000 - 230,000 - 230,000
8 Lock Nut ⅝" Bh 3 7,000 - 21,000 - 21,000
9 Pole Band Single Rack 7" atau 7 ½" Bh 2 24,300 - 48,600 - 48,600
10 Spool Insulator ANSI 53 - 2 Bh 1 10,200 - 10,200 - 10,200
11 Steel L 70 x 70 x 7 x 1.682 mm galvanis Bh 1 149,100 - 149,100 - 149,100
12 Tie Wire # 4 / Alluminium bonding wire # 20 Mtr 6.2 3,100 - 19,220 - 19,220
13 Washer Square 2 ¼" Bh 4 1,100 - 4,400 - 4,400
14 Upah Pasang Konst. JTM 3 Fasa CC9 Unit 1 45,200 - - 45,200 45,200
Sub Jumlah CC9 - 575,120 45,200 620,320
34 CC9' Unit 1
1 Isolator Tumpu (Line Post) 20 KV Bh 1 PLN PLN - - -
2 Isolator Tumpu (Pin Post) 20 KV Bh 2 PLN PLN - - -
3 Bolt Machine / Bolt cariage ½" x ¾" Bh 1 2,900 - 2,900 - 2,900
4 Bolt Machine ⅝" x 10" Bh 3 9,400 - 28,200 - 28,200
5 Center Bracket 12.5 KN Bh 1 54,100 - 54,100 - 54,100
6 Cross Arm Steel 2.000 mm ( UNSP 10 ) galvanis Bh 1 230,000 - 230,000 - 230,000
7 Lock Nut ⅝" Bh 3 7,000 - 21,000 - 21,000
8 Pole Band Single Rack 7" atau 7 ½" Bh 1 24,300 - 24,300 - 24,300
9 Steel L 70 x 70 x 7 x 1.682 mm galvanis Bh 1 149,100 - 149,100 - 149,100
10 Tie Wire # 4 / Alluminium bonding wire # 20 Mtr 5.4 3,100 - 16,740 - 16,740
11 Washer Square 2 ¼" Bh 4 1,100 - 4,400 - 4,400
12 Upah Pasang Konst. JTM 3 Fasa CC9' Unit 1 34,300 - - 34,300 34,300
Sub Jumlah CC9' - 530,740 34,300 565,040
PT. PLN (PERSERO)
DISTRIBUSI JAWA TENGAH DAN D.I. YOGYAKARTA
AREA SURAKARTA

ANALISA PER UNIT KONSTRUKSI


PEKERJAAN PEMBANGUNAN JARINGAN DISTRIBUSI 20 KV
#REF!

HARGA SATUAN BIAYA YANG DIPERLUKAN


NO. PERINCUAN PER UNIT KONSTRUKSI STN VOL MATERIAL MATERIAL TOTAL
JASA/UPAH JASA/UPAH
MDU HARDWARE MDU HARDWARE
35 CC9-N Unit 1
1 Isolator Tumpu (Pin Post) 20 KV Bh 3 PLN PLN - - -
2 Bolt Machine / Bolt cariage ½" x ¾" Bh 1 2,900 - 2,900 - 2,900
3 Bolt Machine ⅝" x 10" Bh 1 9,400 - 9,400 - 9,400
4 Bracket Secondary / Bracket insulated Bh 1 7,400 - 7,400 - 7,400
5 Cross Arm Steel 2.000 mm ( UNSP 10 ) galvanis Bh 1 230,000 - 230,000 - 230,000
6 Lock Nut ⅝" Bh 1 7,000 - 7,000 - 7,000
7 Pole Band Single Rack 7" atau 7 ½" Bh 2 24,300 - 48,600 - 48,600
8 Spool Insulator ANSI 53 - 2 Bh 1 10,200 - 10,200 - 10,200
9 Steel L 70 x 70 x 7 x 1.682 mm galvanis Bh 1 149,100 - 149,100 - 149,100
10 Tie Wire # 4 / Alluminium bonding wire # 20 Mtr 6.2 3,100 - 19,220 - 19,220
11 Washer Square 2 ¼" Bh 2 1,100 - 2,200 - 2,200
12 Upah Pasang Konst. JTM 3 Fasa CC9-N Unit 1 34,300 - - 34,300 34,300
Sub Jumlah CC9-N - 486,020 34,300 520,320
36 CC10 Unit 1
1 Isolator Tumpu (Pin Post) 20 KV Bh 3 PLN PLN - - -
2 Bolt Single Up Side ⅝" x 8" Bh 1 24,300 - 24,300 - 24,300
3 Bolt Machine / Bolt cariage ½" x ¾" Bh 1 2,900 - 2,900 - 2,900
4 Bolt Machine ⅝" x 10" Bh 1 9,400 - 9,400 - 9,400
5 Bracket Secondary / Bracket insulated Bh 1 7,400 - 7,400 - 7,400
6 Cross Arm Steel 3.000 mm ( UNSP 10 ) galvanis Bh 1 350,000 - 350,000 - 350,000
7 Lock Nut ⅝" Bh 1 7,000 - 7,000 - 7,000
8 Pole Band Single Rack 7" atau 7 ½" Bh 2 24,300 - 48,600 - 48,600
9 Spool Insulator ANSI 53 - 2 Bh 1 10,200 - 10,200 - 10,200
10 Steel L 70 x 70 x 7 x 1.682 mm galvanis Bh 1 149,100 - 149,100 - 149,100
11 Tie Wire # 4 / Alluminium bonding wire # 20 Mtr 6.2 3,100 - 19,220 - 19,220
12 Washer Square 2 ¼" Bh 2 1,100 - 2,200 - 2,200
13 Upah Pasang Konst. JTM 3 Fasa CC10 Unit 1 34,300 - - 34,300 34,300
Sub Jumlah CC10 - 630,320 34,300 664,620
37 CC10' Unit 1
1 Isolator Tumpu (Pin Post) 20 KV Bh 3 PLN PLN - - -
2 Bolt Machine / Bolt cariage ½" x ¾" Bh 1 2,900 - 2,900 - 2,900
3 Bolt Machine ⅝" x 10" Bh 1 9,400 - 9,400 - 9,400
4 Cross Arm Steel 3.000 mm ( UNSP 10 ) galvanis Bh 1 350,000 - 350,000 - 350,000
5 Lock Nut ⅝" Bh 1 7,000 - 7,000 - 7,000
6 Pole Band Single Rack 7" atau 7 ½" Bh 1 24,300 - 24,300 - 24,300
7 Steel L 70 x 70 x 7 x 1.682 mm galvanis Bh 1 149,100 - 149,100 - 149,100
8 Tie Wire # 4 / Alluminium bonding wire # 20 Mtr 5.4 3,100 - 16,740 - 16,740
9 Washer Square 2 ¼" Bh 2 1,100 - 2,200 - 2,200
10 Upah Pasang Konst. JTM 3 Fasa CC10' Unit 1 34,300 - - 34,300 34,300
Sub Jumlah CC10' - 561,640 34,300 595,940
38 CC10-N Unit 1
1 Isolator Tumpu (Pin Post) 20 KV Bh 3 PLN PLN - - -
2 Bolt Machine / Bolt cariage ½" x ¾" Bh 1 2,900 - 2,900 - 2,900
3 Bolt Machine ⅝" x 10" Bh 2 9,400 - 18,800 - 18,800
4 Cross Arm Steel 3.000 mm ( UNSP 10 ) galvanis Bh 1 350,000 - 350,000 - 350,000
5 Lock Nut ⅝" Bh 1 7,000 - 7,000 - 7,000
6 Pole Band Single Rack 7" atau 7 ½" Bh 1 24,300 - 24,300 - 24,300
7 Spool Insulator ANSI 53 - 2 Bh 1 10,200 - 10,200 - 10,200
8 Steel L 70 x 70 x 7 x 1.682 mm galvanis Bh 1 149,100 - 149,100 - 149,100
9 Tie Wire # 4 / Alluminium bonding wire # 20 Mtr 6.2 3,100 - 19,220 - 19,220
10 Washer Square 2 ¼" Bh 2 1,100 - 2,200 - 2,200
11 Upah Pasang Konst. JTM 3 Fasa CC10-N Unit 1 34,300 - - 34,300 34,300
Sub Jumlah CC10-N - 583,720 34,300 618,020
39 CC11 Unit 1
1 Isolator Tumpu (Pin Post) 20 KV Bh 6 PLN PLN - - -
2 Bolt Double Arming ⅝" x 14" Bh 2 23,500 - 47,000 - 47,000
3 Bolt Machine / Bolt cariage ½" x ¾" Bh 2 2,900 - 5,800 - 5,800
4 Bolt Machine ⅝" x 10" Bh 1 9,400 - 9,400 - 9,400
5 Bracket Secondary / Bracket insulated Bh 1 7,400 - 7,400 - 7,400
6 Cross Arm Steel 3.000 mm ( UNSP 10 ) galvanis Bh 2 350,000 - 700,000 - 700,000
7 Lock Nut ⅝" Bh 5 7,000 - 35,000 - 35,000
8 Pole Band Double Rack 7" atau 7 ½" Bh 1 30,600 - 30,600 - 30,600
9 Pole Band Single Rack 7" atau 7 ½" Bh 1 24,300 - 24,300 - 24,300
10 Spool Insulator ANSI 53 - 2 Bh 1 10,200 - 10,200 - 10,200
11 Steel L 70 x 70 x 7 x 1.682 mm galvanis Bh 2 149,100 - 298,200 - 298,200
12 Tie Wire # 4 / Alluminium bonding wire # 20 Mtr 11.6 3,100 - 35,960 - 35,960
13 Washer Square 2 ¼" Bh 10 1,100 - 11,000 - 11,000
14 Upah Pasang Konst. JTM 3 Fasa CC11 Unit 1 34,300 - - 34,300 34,300
Sub Jumlah CC11 - 1,214,860 34,300 1,249,160
PT. PLN (PERSERO)
DISTRIBUSI JAWA TENGAH DAN D.I. YOGYAKARTA
AREA SURAKARTA

ANALISA PER UNIT KONSTRUKSI


PEKERJAAN PEMBANGUNAN JARINGAN DISTRIBUSI 20 KV
#REF!

HARGA SATUAN BIAYA YANG DIPERLUKAN


NO. PERINCUAN PER UNIT KONSTRUKSI STN VOL MATERIAL MATERIAL TOTAL
JASA/UPAH JASA/UPAH
MDU HARDWARE MDU HARDWARE
40 CC11' Unit 1
1 Isolator Tumpu (Pin Post) 20 KV Bh 6 PLN PLN - - -
2 Bolt Double Arming ⅝" x 14" Bh 2 23,500 - 47,000 - 47,000
3 Bolt Machine / Bolt cariage ½" x ¾" Bh 2 2,900 - 5,800 - 5,800
4 Bolt Machine ⅝" x 10" Bh 1 9,400 - 9,400 - 9,400
5 Cross Arm Steel 3.000 mm ( UNSP 10 ) galvanis Bh 2 350,000 - 700,000 - 700,000
6 Lock Nut ⅝" Bh 5 7,000 - 35,000 - 35,000
7 Pole Band Double Rack 7" atau 7 ½" Bh 1 30,600 - 30,600 - 30,600
8 Steel L 70 x 70 x 7 x 1.682 mm galvanis Bh 2 149,100 - 298,200 - 298,200
9 Tie Wire # 4 / Alluminium bonding wire # 20 Mtr 10.8 3,100 - 33,480 - 33,480
10 Washer Square 2 ¼" Bh 10 1,100 - 11,000 - 11,000
11 Upah Pasang Konst. JTM 3 Fasa CC11' Unit 1 15,600 - - 15,600 15,600
Sub Jumlah CC11' - 1,170,480 15,600 1,186,080
41 CC11-N Unit 1
1 Isolator Tumpu (Pin Post) 20 KV Bh 3 PLN PLN - - -
2 Isolator Tarik ( Polymer ) 20 KV + Primary Dead E Set 6 PLN PLN - - -
3 Armour Tape ¼" wide Mtr 2 4,300 - 8,600 - 8,600
4 Bolt Double Arming ⅝" x 14" Bh 4 23,500 - 94,000 - 94,000
5 Bolt Machine / Bolt cariage ½" x ¾" Bh 2 2,900 - 5,800 - 5,800
6 Bolt Machine ⅝" x 10" Bh 1 9,400 - 9,400 - 9,400
7 Clevis Swinging Secondary Bh 2 9,400 - 18,800 - 18,800
8 Compresion Conector H type 240 mm² / 240 mm² Bh 4 29,800 - 119,200 - 119,200
9 Cross Arm Steel 3.000 mm ( UNSP 10 ) galvanis Bh 2 350,000 - 700,000 - 700,000
10 Lock Nut ⅝" Bh 1 7,000 - 7,000 - 7,000
11 Loop Dead End Clamp / LC ( 35 s/d 240 ) mm² Bh 4 18,000 - 72,000 - 72,000
12 Oval Eye Nut ⅝" Bh 8 13,300 - 106,400 - 106,400
13 Pole Band Double Rack 7" atau 7 ½" Bh 1 30,600 - 30,600 - 30,600
14 Schackle Anchor ⅝" Bh 6 10,200 - 61,200 - 61,200
15 Spool Insulator ANSI 53 - 2 Bh 2 10,200 - 20,400 - 20,400
16 Steel L 70 x 70 x 7 x 1.682 mm galvanis Bh 2 149,100 - 298,200 - 298,200
17 Tie Wire # 4 / Alluminium bonding wire # 20 Mtr 6.2 3,100 - 19,220 - 19,220
18 Washer Square 2 ¼" Bh 20 1,100 - 22,000 - 22,000
19 Upah Pasang Konst. JTM 3 Fasa CC11-N Unit 1 15,600 - - 15,600 15,600
Sub Jumlah CC11-N - 1,592,820 15,600 1,608,420
PT. PLN (PERSERO)
DISTRIBUSI JAWA TENGAH DAN D.I. YOGYAKARTA
AREA SURAKARTA

ANALISA PER UNIT KONSTRUKSI


PEKERJAAN PEMBANGUNAN JARINGAN DISTRIBUSI 20 KV
#REF!

HARGA SATUAN BIAYA YANG DIPERLUKAN


NO. PERINCUAN PER UNIT KONSTRUKSI STN VOL MATERIAL MATERIAL TOTAL
JASA/UPAH JASA/UPAH
MDU HARDWARE MDU HARDWARE
PRIMARY LINE 3 PHASA
1 SC1 Unit 1
1 Isolator Tumpu (Line Post) 20 KV Bh 3 PLN PLN - - -
2 Center Bracket 12.5 KN Bh 1 54,100 - 54,100 - 54,100
3 Lock Nut ⅝" Bh 6 7,000 - 42,000 - 42,000
4 Pole Band Double Rack 7" atau 7 ½" Bh 2 30,600 - 61,200 - 61,200
5 Pole Band Single Rack 7" atau 7 ½" Bh 2 24,300 - 48,600 - 48,600
6 Pole Band Single Up Side 7" atau 7 ½" Bh 1 36,000 - 36,000 - 36,000
7 Side Bracket Bh 2 51,000 - 102,000 - 102,000
8 Spool Insulator ANSI 53 - 2 Bh 1 10,200 - 10,200 - 10,200
9 Tie Wire # 4 / Alluminium bonding wire # 20 Mtr 6.2 3,100 - 19,220 - 19,220
10 Upah Pasang Konst. JTM 3 Fasa SC1 Unit 1 34,300 - - 34,300 34,300
Sub Jumlah SC1 - 373,320 34,300 407,620
2 SC1' Unit 1
1 Isolator Tumpu (Line Post) 20 KV Bh 3 PLN PLN - - -
2 Center Bracket 12.5 KN Bh 1 54,100 - 54,100 - 54,100
3 Lock Nut ⅝" Bh 6 7,000 - 42,000 - 42,000
4 Pole Band Double Rack 7" atau 7 ½" Bh 2 30,600 - 61,200 - 61,200
5 Pole Band Single Rack 7" atau 7 ½" Bh 2 24,300 - 48,600 - 48,600
6 Side Bracket Bh 2 51,000 - 102,000 - 102,000
7 Tie Wire # 4 / Alluminium bonding wire # 20 Mtr 5.4 3,100 - 16,740 - 16,740
8 Upah Pasang Konst. JTM 3 Fasa SC1' Unit 1 15,600 - - 15,600 15,600
Sub Jumlah SC1' - 324,640 15,600 340,240
3 SC1-N Unit 1
1 Isolator Tumpu (Line Post) 20 KV Bh 3 PLN PLN - - -
2 Center Bracket 12.5 KN Bh 1 54,100 - 54,100 - 54,100
3 Lock Nut ⅝" Bh 6 7,000 - 42,000 - 42,000
4 Pole Band Single Rack 7" atau 7 ½" Bh 6 24,300 - 145,800 - 145,800
5 Pole Band Single Up Side 7" atau 7 ½" Bh 1 36,000 - 36,000 - 36,000
6 Side Bracket Bh 2 51,000 - 102,000 - 102,000
7 Spool Insulator ANSI 53 - 2 Bh 1 10,200 - 10,200 - 10,200
8 Tie Wire # 4 / Alluminium bonding wire # 20 Mtr 6.2 3,100 - 19,220 - 19,220
9 Upah Pasang Konst. JTM 3 Fasa SC1-N Unit 1 34,300 - - 34,300 34,300
Sub Jumlah SC1-N - 409,320 34,300 443,620
4 SC1-1 Unit 1
1 Isolator Tumpu (Pin Post) 20 KV Bh 3 PLN PLN - - -
2 Bolt Machine / Bolt cariage ½" x ¾" Bh 2 2,900 - 5,800 - 5,800
3 Brace Steel 770 mm Bh 2 25,900 - 51,800 - 51,800
4 Cross Arm Steel 2.000 mm ( UNSP 10 ) galvanis Bh 1 230,000 - 230,000 - 230,000
5 Lock Nut ⅝" Bh 1 7,000 - 7,000 - 7,000
6 Pole Band Single Rack 7" atau 7 ½" Bh 2 24,300 - 48,600 - 48,600
7 Pole Band Single Up Side 7" atau 7 ½" Bh 1 36,000 - 36,000 - 36,000
8 Spool Insulator ANSI 53 - 2 Bh 1 10,200 - 10,200 - 10,200
9 Tie Wire # 4 / Alluminium bonding wire # 20 Mtr 6.2 3,100 - 19,220 - 19,220
10 Washer Square 2 ¼" Bh 1 1,100 - 1,100 - 1,100
11 Upah Pasang Konst. JTM 3 Fasa SC1-1 Unit 1 34,300 - - 34,300 34,300
Sub Jumlah SC1-1 - 409,720 34,300 444,020
5 SC1-1' Unit 1
1 Isolator Tumpu (Pin Post) 20 KV Bh 3 PLN PLN - - -
2 Bolt Machine / Bolt cariage ½" x ¾" Bh 2 2,900 - 5,800 - 5,800
3 Brace Steel 770 mm Bh 2 25,900 - 51,800 - 51,800
4 Cross Arm Steel 2.000 mm ( UNSP 10 ) galvanis Bh 1 230,000 - 230,000 - 230,000
5 Lock Nut ⅝" Bh 1 7,000 - 7,000 - 7,000
6 Pole Band Single Rack 7" atau 7 ½" Bh 2 24,300 - 48,600 - 48,600
7 Tie Wire # 4 / Alluminium bonding wire # 20 Mtr 5.4 3,100 - 16,740 - 16,740
8 Washer Square 2 ¼" Bh 1 1,100 - 1,100 - 1,100
9 Upah Pasang Konst. JTM 3 Fasa SC1-1' Unit 1 50,000 - - 50,000 50,000
Sub Jumlah SC1-1' - 361,040 50,000 411,040
6 SC1-1N Unit 1
1 Isolator Tumpu (Pin Post) 20 KV Bh 3 PLN PLN - - -
2 Bolt Machine / Bolt cariage ½" x ¾" Bh 2 2,900 - 5,800 - 5,800
3 Brace Steel 770 mm Bh 2 25,900 - 51,800 - 51,800
4 Cross Arm Steel 2.000 mm ( UNSP 10 ) galvanis Bh 1 230,000 - 230,000 - 230,000
5 Lock Nut ⅝" Bh 1 7,000 - 7,000 - 7,000
6 Pole Band Single Rack 7" atau 7 ½" Bh 2 24,300 - 48,600 - 48,600
7 Pole Band Single Up Side 7" atau 7 ½" Bh 1 36,000 - 36,000 - 36,000
8 Spool Insulator ANSI 53 - 2 Bh 1 10,200 - 10,200 - 10,200
9 Tie Wire # 4 / Alluminium bonding wire # 20 Mtr 6.2 3,100 - 19,220 - 19,220
10 Washer Square 2 ¼" Bh 1 1,100 - 1,100 - 1,100
11 Upah Pasang Konst. JTM 3 Fasa SC1-1N Unit 1 34,300 - - 34,300 34,300
Sub Jumlah SC1-1N - 409,720 34,300 444,020
PT. PLN (PERSERO)
DISTRIBUSI JAWA TENGAH DAN D.I. YOGYAKARTA
AREA SURAKARTA

ANALISA PER UNIT KONSTRUKSI


PEKERJAAN PEMBANGUNAN JARINGAN DISTRIBUSI 20 KV
#REF!

HARGA SATUAN BIAYA YANG DIPERLUKAN


NO. PERINCUAN PER UNIT KONSTRUKSI STN VOL MATERIAL MATERIAL TOTAL
JASA/UPAH JASA/UPAH
MDU HARDWARE MDU HARDWARE
7 SC1-A Unit 1
1 Isolator Tumpu (Line Post) 20 KV Bh 1 PLN PLN - - -
2 Isolator Tumpu (Pin Post) 20 KV Bh 2 PLN PLN - - -
3 Bolt Machine / Bolt cariage ½" x ¾" Bh 2 2,900 - 5,800 - 5,800
4 Brace Steel 770 mm Bh 2 25,900 - 51,800 - 51,800
5 Center Bracket 12.5 KN Bh 1 54,100 - 54,100 - 54,100
6 Cross Arm Steel 2.000 mm ( UNSP 10 ) galvanis Bh 1 230,000 - 230,000 - 230,000
7 Lock Nut ⅝" Bh 3 7,000 - 21,000 - 21,000
8 Pole Band Single Rack 7" atau 7 ½" Bh 4 24,300 - 97,200 - 97,200
9 Pole Band Single Up Side 7" atau 7 ½" Bh 1 36,000 - 36,000 - 36,000
10 Spool Insulator ANSI 53 - 2 Bh 1 10,200 - 10,200 - 10,200
11 Tie Wire # 4 / Alluminium bonding wire # 20 Mtr 6.2 3,100 - 19,220 - 19,220
12 Washer Square 2 ¼" Bh 1 1,100 - 1,100 - 1,100
13 Upah Pasang Konst. JTM 3 Fasa SC1-A Unit 1 15,600 - - 15,600 15,600
Sub Jumlah SC1-A - 526,420 15,600 542,020
8 SC1-A' Unit 1
1 Isolator Tumpu (Line Post) 20 KV Bh 1 PLN PLN - - -
2 Isolator Tumpu (Pin Post) 20 KV Bh 2 PLN PLN - - -
3 Bolt Machine / Bolt cariage ½" x ¾" Bh 2 2,900 - 5,800 - 5,800
4 Brace Steel 770 mm Bh 2 25,900 - 51,800 - 51,800
5 Center Bracket 12.5 KN Bh 1 54,100 - 54,100 - 54,100
6 Cross Arm Steel 2.000 mm ( UNSP 10 ) galvanis Bh 1 230,000 - 230,000 - 230,000
7 Lock Nut ⅝" Bh 3 7,000 - 21,000 - 21,000
8 Pole Band Single Rack 7" atau 7 ½" Bh 4 24,300 - 97,200 - 97,200
9 Tie Wire # 4 / Alluminium bonding wire # 20 Mtr 5.4 3,100 - 16,740 - 16,740
10 Washer Square 2 ¼" Bh 1 1,100 - 1,100 - 1,100
11 Upah Pasang Konst. JTM 3 Fasa SC1-A' Unit 1 50,000 - - 50,000 50,000
Sub Jumlah SC1-A' - 477,740 50,000 527,740
9 SC2 Unit 1
1 Isolator Tumpu (Line Post) 20 KV Bh 3 PLN PLN - - -
2 Bracket Secondary / Bracket insulated Bh 1 7,400 - 7,400 - 7,400
3 Center Bracket 12.5 KN Bh 1 54,100 - 54,100 - 54,100
4 Lock Nut ⅝" Bh 6 7,000 - 42,000 - 42,000
5 Pole Band Double Rack 7" atau 7 ½" Bh 2 30,600 - 61,200 - 61,200
6 Pole Band Single Rack 7" atau 7 ½" Bh 3 24,300 - 72,900 - 72,900
7 Side Bracket Bh 2 51,000 - 102,000 - 102,000
8 Spool Insulator ANSI 53 - 2 Bh 1 10,200 - 10,200 - 10,200
9 Tie Wire # 4 / Alluminium bonding wire # 20 Mtr 6.2 3,100 - 19,220 - 19,220
10 Upah Pasang Konst. JTM 3 Fasa SC2 Unit 1 28,800 - - 28,800 28,800
Sub Jumlah SC2 - 369,020 28,800 397,820
10 SC2' Unit 1
1 Isolator Tumpu (Line Post) 20 KV Bh 3 PLN PLN - - -
2 Center Bracket 12.5 KN Bh 1 54,100 - 54,100 - 54,100
3 Lock Nut ⅝" Bh 6 7,000 - 42,000 - 42,000
4 Pole Band Double Rack 7" atau 7 ½" Bh 2 30,600 - 61,200 - 61,200
5 Pole Band Single Rack 7" atau 7 ½" Bh 2 24,300 - 48,600 - 48,600
6 Side Bracket Bh 2 51,000 - 102,000 - 102,000
7 Tie Wire # 4 / Alluminium bonding wire # 20 Mtr 5.4 3,100 - 16,740 - 16,740
8 Upah Pasang Konst. JTM 3 Fasa SC2' Unit 1 52,200 - - 52,200 52,200
Sub Jumlah SC2' - 324,640 52,200 376,840
11 SC2-N Unit 1
1 Isolator Tumpu (Line Post) 20 KV Bh 3 PLN PLN - - -
2 Bracket Secondary / Bracket insulated Bh 1 7,400 - 7,400 - 7,400
3 Center Bracket 12.5 KN Bh 1 54,100 - 54,100 - 54,100
4 Lock Nut ⅝" Bh 6 7,000 - 42,000 - 42,000
5 Pole Band Single Rack 7" atau 7 ½" Bh 7 24,300 - 170,100 - 170,100
6 Side Bracket Bh 2 51,000 - 102,000 - 102,000
7 Spool Insulator ANSI 53 - 2 Bh 1 10,200 - 10,200 - 10,200
8 Tie Wire # 4 / Alluminium bonding wire # 20 Mtr 6.2 3,100 - 19,220 - 19,220
9 Upah Pasang Konst. JTM 3 Fasa SC2-N Unit 1 52,200 - - 52,200 52,200
Sub Jumlah SC2-N - 405,020 52,200 457,220
12 SC2-1 Unit 1
1 Isolator Tumpu (Pin Post) 20 KV Bh 6 PLN PLN - - -
2 Bolt Double Arming ⅝" x 14" Bh 2 23,500 - 47,000 - 47,000
3 Bolt Machine / Bolt cariage ½" x ¾" Bh 4 2,900 - 11,600 - 11,600
4 Cross Arm Steel 2.000 mm ( UNSP 10 ) galvanis Bh 2 230,000 - 460,000 - 460,000
5 Lock Nut ⅝" Bh 1 7,000 - 7,000 - 7,000
6 Pole Band Double Rack 7" atau 7 ½" Bh 2 30,600 - 61,200 - 61,200
7 Pole Band Single Up Side 7" atau 7 ½" Bh 1 36,000 - 36,000 - 36,000
8 Spool Insulator ANSI 53 - 2 Bh 1 10,200 - 10,200 - 10,200
9 Brace Steel 770 mm Bh 4 25,900 - 103,600 - 103,600
10 Tie Wire # 4 / Alluminium bonding wire # 20 Mtr 11.6 3,100 - 35,960 - 35,960
11 Washer Square 2 ¼" Bh 2 1,100 - 2,200 - 2,200
12 Upah Pasang Konst. JTM 3 Fasa SC2-1 Unit 1 48,300 - - 48,300 48,300
Sub Jumlah SC2-1 - 774,760 48,300 823,060
13 SC2-1' Unit 1
1 Isolator Tumpu (Pin Post) 20 KV Bh 6 PLN PLN - - -
2 Bolt Double Arming ⅝" x 14" Bh 2 23,500 - 47,000 - 47,000
3 Bolt Machine / Bolt cariage ½" x ¾" Bh 4 2,900 - 11,600 - 11,600
4 Cross Arm Steel 2.000 mm ( UNSP 10 ) galvanis Bh 2 230,000 - 460,000 - 460,000
PT. PLN (PERSERO)
DISTRIBUSI JAWA TENGAH DAN D.I. YOGYAKARTA
AREA SURAKARTA

ANALISA PER UNIT KONSTRUKSI


PEKERJAAN PEMBANGUNAN JARINGAN DISTRIBUSI 20 KV
#REF!

HARGA SATUAN BIAYA YANG DIPERLUKAN


NO. PERINCUAN PER UNIT KONSTRUKSI STN VOL MATERIAL MATERIAL TOTAL
JASA/UPAH JASA/UPAH
MDU HARDWARE MDU HARDWARE
5 Lock Nut ⅝" Bh 1 7,000 - 7,000 - 7,000
6 Pole Band Double Rack 7" atau 7 ½" Bh 2 30,600 - 61,200 - 61,200
7 Brace Steel 770 mm Bh 4 25,900 - 103,600 - 103,600
8 Tie Wire # 4 / Alluminium bonding wire # 20 Mtr 10.8 3,100 - 33,480 - 33,480
9 Washer Square 2 ¼" Bh 2 1,100 - 2,200 - 2,200
10 Upah Pasang Konst. JTM 3 Fasa SC2-1' Unit 1 49,900 - - 49,900 49,900
Sub Jumlah SC2-1' - 726,080 49,900 775,980
PT. PLN (PERSERO)
DISTRIBUSI JAWA TENGAH DAN D.I. YOGYAKARTA
AREA SURAKARTA

ANALISA PER UNIT KONSTRUKSI


PEKERJAAN PEMBANGUNAN JARINGAN DISTRIBUSI 20 KV
#REF!

HARGA SATUAN BIAYA YANG DIPERLUKAN


NO. PERINCUAN PER UNIT KONSTRUKSI STN VOL MATERIAL MATERIAL TOTAL
JASA/UPAH JASA/UPAH
MDU HARDWARE MDU HARDWARE
14 SC2-1N Unit 1
1 Isolator Tumpu (Pin Post) 20 KV Bh 6 PLN PLN - - -
2 Spool Insulator ANSI 53 - 2 Bh 1 10,200 - 10,200 - 10,200
3 Bolt Double Arming ⅝" x 14" Bh 2 23,500 - 47,000 - 47,000
4 Bolt Machine / Bolt cariage ½" x ¾" Bh 4 2,900 - 11,600 - 11,600
5 Bracket Secondary / Bracket insulated Bh 1 7,400 - 7,400 - 7,400
6 Cross Arm Steel 2.000 mm ( UNSP 10 ) galvanis Bh 2 230,000 - 460,000 - 460,000
7 Pole Band Double Rack 7" atau 7 ½" Bh 3 30,600 - 91,800 - 91,800
8 Brace Steel 770 mm Bh 4 25,900 - 103,600 - 103,600
9 Tie Wire # 4 / Alluminium bonding wire # 20 Mtr 11.6 3,100 - 35,960 - 35,960
10 Washer Square 2 ¼" Bh 7 1,100 - 7,700 - 7,700
11 Upah Pasang Konst. JTM 3 Fasa SC2-1n Unit 1 48,300 - - 48,300 48,300
Sub Jumlah SC2-1N - 775,260 48,300 823,560
15 SC2-A Unit 1
1 Isolator Tumpu (Line Post) 20 KV Bh 2 PLN PLN - - -
2 Isolator Tumpu (Pin Post) 20 KV Bh 4 PLN PLN - - -
3 Bolt Double Arming ⅝" x 14" Bh 2 23,500 - 47,000 - 47,000
4 Bolt Machine / Bolt cariage ½" x ¾" Bh 4 2,900 - 11,600 - 11,600
5 Brace Steel 550 mm Bh 4 19,400 - 77,600 - 77,600
6 Bracket Secondary / Bracket insulated Bh 1 7,400 - 7,400 - 7,400
7 Center Bracket 12.5 KN Bh 2 54,100 - 108,200 - 108,200
8 Cross Arm Steel 2.000 mm ( UNSP 10 ) galvanis Bh 2 230,000 - 460,000 - 460,000
9 Lock Nut ⅝" Bh 10 7,000 - 70,000 - 70,000
10 Pole Band Double Rack 7" atau 7 ½" Bh 4 30,600 - 122,400 - 122,400
11 Pole Band Single Rack 7" atau 7 ½" Bh 1 24,300 - 24,300 - 24,300
12 Spool Insulator ANSI 53 - 2 Bh 1 10,200 - 10,200 - 10,200
13 Tie Wire # 4 / Alluminium bonding wire # 20 Mtr 11.6 3,100 - 35,960 - 35,960
14 Washer Square 2 ¼" Bh 10 1,100 - 11,000 - 11,000
15 Upah Pasang Konst. JTM 3 Fasa SC2-A Unit 1 28,800 - - 28,800 28,800
Sub Jumlah SC2-A - 985,660 28,800 1,014,460
16 SC2-A' Unit 1
1 Isolator Tumpu (Line Post) 20 KV Bh 2 PLN PLN - - -
2 Isolator Tumpu (Pin Post) 20 KV Bh 4 PLN PLN - - -
3 Bolt Double Arming ⅝" x 14" Bh 2 23,500 - 47,000 - 47,000
4 Bolt Machine / Bolt cariage ½" x ¾" Bh 4 2,900 - 11,600 - 11,600
5 Brace Steel 550 mm Bh 4 19,400 - 77,600 - 77,600
6 Center Bracket 12.5 KN Bh 2 54,100 - 108,200 - 108,200
7 Cross Arm Steel 2.000 mm ( UNSP 10 ) galvanis Bh 2 230,000 - 460,000 - 460,000
8 Lock Nut ⅝" Bh 10 7,000 - 70,000 - 70,000
9 Pole Band Double Rack 7" atau 7 ½" Bh 4 30,600 - 122,400 - 122,400
10 Tie Wire # 4 / Alluminium bonding wire # 20 Mtr 10.8 3,100 - 33,480 - 33,480
11 Washer Square 2 ¼" Bh 10 1,100 - 11,000 - 11,000
12 Upah Pasang Konst. JTM 3 Fasa SC2-A' Unit 1 23,400 - - 23,400 23,400
Sub Jumlah SC2-A' - 941,280 23,400 964,680
17 SC3 Unit 1
1 Isolator Tarik ( Polymer ) 20 KV + Primary Dead E Set 3 PLN PLN - - -
2 Armour Rod # for 150 mm² Set 1 58,800 - 58,800 - 58,800
3 Armour Rod # for 240 mm² Set 3 80,000 - 240,000 - 240,000
4 Clevis Swinging Secondary Bh 1 9,400 - 9,400 - 9,400
5 Oval Eye Nut ⅝" Bh 4 13,300 - 53,200 - 53,200
6 Pole Band Single Rack 7" atau 7 ½" Bh 4 24,300 - 97,200 - 97,200
7 Primary Angle Clamp ( 150 s/d 240 ) mm² Bh 3 40,800 - 122,400 - 122,400
8 Schackle Anchor ⅝" Bh 3 10,200 - 30,600 - 30,600
9 Spool Insulator ANSI 53 - 4 Bh 1 15,700 - 15,700 - 15,700
10 Tie Wire # 4 / Alluminium bonding wire # 20 Mtr 0.8 3,100 - 2,480 - 2,480
11 Upah Pasang Konst. JTM 3 Fasa SC3 Unit 1 23,400 - - 23,400 23,400
Sub Jumlah SC3 - 629,780 23,400 653,180
18 SC3' Unit 1
1 Isolator Tarik ( Polymer ) 20 KV + Primary Dead E Set 3 PLN PLN - - -
2 Armour Rod # for 240 mm² Set 3 80,000 - 240,000 - 240,000
3 Oval Eye Nut ⅝" Bh 3 13,300 - 39,900 - 39,900
4 Pole Band Single Rack 7" atau 7 ½" Bh 3 24,300 - 72,900 - 72,900
5 Primary Angle Clamp ( 150 s/d 240 ) mm² Bh 3 40,800 - 122,400 - 122,400
6 Schackle Anchor ⅝" Bh 3 10,200 - 30,600 - 30,600
7 Upah Pasang Konst. JTM 3 Fasa SC3' Unit 1 24,900 - - 24,900 24,900
Sub Jumlah SC3' - 505,800 24,900 530,700
19 SC3-VN Unit 1
1 Isolator Tarik ( Polymer ) 20 KV + Primary Dead E Set 3 PLN PLN - - -
2 Armour Rod # for 150 mm² Set 1 58,800 - 58,800 - 58,800
3 Armour Rod # for 240 mm² Set 3 80,000 - 240,000 - 240,000
4 Clevis Swinging Secondary Bh 1 9,400 - 9,400 - 9,400
5 Oval Eye Nut ⅝" Bh 4 13,300 - 53,200 - 53,200
6 Pole Band Single Rack 7" atau 7 ½" Bh 4 24,300 - 97,200 - 97,200
7 Primary Angle Clamp ( 150 s/d 240 ) mm² Bh 3 40,800 - 122,400 - 122,400
8 Schackle Anchor ⅝" Bh 3 10,200 - 30,600 - 30,600
9 Spool Insulator ANSI 53 - 4 Bh 1 15,700 - 15,700 - 15,700
10 Tie Wire # 4 / Alluminium bonding wire # 20 Mtr 0.8 3,100 - 2,480 - 2,480
11 Upah Pasang Konst. JTM 3 Fasa SC3-VN Unit 1 24,900 - - 24,900 24,900
Sub Jumlah SC3-VN - 629,780 24,900 654,680
20 SC4-1 Unit 1
PT. PLN (PERSERO)
DISTRIBUSI JAWA TENGAH DAN D.I. YOGYAKARTA
AREA SURAKARTA

ANALISA PER UNIT KONSTRUKSI


PEKERJAAN PEMBANGUNAN JARINGAN DISTRIBUSI 20 KV
#REF!

HARGA SATUAN BIAYA YANG DIPERLUKAN


NO. PERINCUAN PER UNIT KONSTRUKSI STN VOL MATERIAL MATERIAL TOTAL
JASA/UPAH JASA/UPAH
MDU HARDWARE MDU HARDWARE
1 Isolator Tarik ( Polymer ) 20 KV + Primary Dead E Set 6 PLN PLN - - -
2 Armour Tape ¼" wide Mtr 2 4,300 - 8,600 - 8,600
3 Clevis Swinging Secondary Bh 2 9,400 - 18,800 - 18,800
4 Compresion Conector H type 240 mm² / 240 mm² Bh 4 29,800 - 119,200 - 119,200
5 Loop Dead End Clamp / LC ( 35 s/d 240 ) mm² Bh 4 18,000 - 72,000 - 72,000
6 Oval Eye Bolt ⅝" x ( 14" s/d 22" ) Bh 4 14,900 - 59,600 - 59,600
7 Oval Eye Nut ⅝" Bh 12 13,300 - 159,600 - 159,600
8 Pole Band Single Rack 7" atau 7 ½" Bh 8 24,300 - 194,400 - 194,400
9 Schackle Anchor ⅝" Bh 8 10,200 - 81,600 - 81,600
10 Spool Insulator ANSI 53 - 4 Bh 2 15,700 - 31,400 - 31,400
11 Upah Pasang Konst. JTM 3 Fasa SC4-1 Unit 1 24,900 - - 24,900 24,900
Sub Jumlah SC4-1 - 745,200 24,900 770,100
21 SC5-1 Unit 1
1 Isolator Tarik ( Polymer ) 20 KV + Primary Dead E Set 3 PLN PLN - - -
2 Armour Tape ¼" wide Mtr 1 4,300 - 4,300 - 4,300
3 Clevis Swinging Secondary Bh 1 9,400 - 9,400 - 9,400
4 Loop Dead End Clamp / LC ( 35 s/d 240 ) mm² Bh 2 18,000 - 36,000 - 36,000
5 Oval Eye Bolt ⅝" x ( 14" s/d 22" ) Bh 2 14,900 - 29,800 - 29,800
6 Oval Eye Nut ⅝" Bh 6 13,300 - 79,800 - 79,800
7 Pole Band Single Rack 7" atau 7 ½" Bh 4 24,300 - 97,200 - 97,200
8 Schackle Anchor ⅝" Bh 5 10,200 - 51,000 - 51,000
9 Spool Insulator ANSI 53 - 4 Bh 1 15,700 - 15,700 - 15,700
10 Upah Pasang Konst. JTM 3 Fasa SC5-1 Unit 1 24,900 - - 24,900 24,900
Sub Jumlah SC5-1 - 323,200 24,900 348,100
22 SC7 Unit 1
1 Isolator Tarik ( Polymer ) 20 KV + Primary Dead E Set 3 PLN PLN - - -
2 Armour Tape ¼" wide Mtr 1 4,300 - 4,300 - 4,300
3 Bolt Double Arming ⅝" x 14" Bh 2 23,500 - 47,000 - 47,000
4 Bolt Machine / Bolt cariage ½" x ¾" Bh 4 2,900 - 11,600 - 11,600
5 Brace Steel 770 mm Bh 4 25,900 - 103,600 - 103,600
6 Clevis Swinging Secondary Bh 1 9,400 - 9,400 - 9,400
7 Cross Arm Steel 2.000 mm ( UNSP 10 ) galvanis Bh 2 230,000 - 460,000 - 460,000
8 Lock Nut ⅝" Bh 4 7,000 - 28,000 - 28,000
9 Loop Dead End Clamp / LC ( 35 s/d 240 ) mm² Bh 2 18,000 - 36,000 - 36,000
10 Oval Eye Nut ⅝" Bh 4 13,300 - 53,200 - 53,200
11 Pole Band Double Rack 7" atau 7 ½" Bh 2 30,600 - 61,200 - 61,200
12 Pole Band Single Rack 7" atau 7 ½" Bh 2 24,300 - 48,600 - 48,600
13 Schackle Anchor ⅝" Bh 3 10,200 - 30,600 - 30,600
14 Spool Insulator ANSI 53 - 4 Bh 1 15,700 - 15,700 - 15,700
15 Washer Square 2 ¼" Bh 10 1,100 - 11,000 - 11,000
16 Upah Pasang Konst. JTM 3 Fasa SC7 Unit 1 21,800 - - 21,800 21,800
Sub Jumlah SC7 - 920,200 21,800 942,000
23 SC7' Unit 1
1 Isolator Tarik ( Polymer ) 20 KV + Primary Dead E Set 3 PLN PLN - - -
2 Bolt Double Arming ⅝" x 14" Bh 2 23,500 - 47,000 - 47,000
3 Bolt Machine / Bolt cariage ½" x ¾" Bh 4 2,900 - 11,600 - 11,600
4 Brace Steel 770 mm Bh 4 25,900 - 103,600 - 103,600
5 Cross Arm Steel 2.000 mm ( UNSP 10 ) galvanis Bh 2 230,000 - 460,000 - 460,000
6 Lock Nut ⅝" Bh 4 7,000 - 28,000 - 28,000
7 Oval Eye Nut ⅝" Bh 3 13,300 - 39,900 - 39,900
8 Pole Band Double Rack 7" atau 7 ½" Bh 2 30,600 - 61,200 - 61,200
9 Pole Band Single Rack 7" atau 7 ½" Bh 1 24,300 - 24,300 - 24,300
10 Schackle Anchor ⅝" Bh 3 10,200 - 30,600 - 30,600
11 Washer Square 2 ¼" Bh 10 1,100 - 11,000 - 11,000
12 Upah Pasang Konst. JTM 3 Fasa SC7' Unit 1 21,800 - - 21,800 21,800
Sub Jumlah SC7' - 817,200 21,800 839,000
24 SC7-1 Unit 1
1 Isolator Tarik ( Polymer ) 20 KV + Primary Dead E Set 3 PLN PLN - - -
2 Armour Tape ¼" wide Mtr 1 4,300 - 4,300 - 4,300
3 Bolt Double Arming ⅝" x 14" Bh 2 23,500 - 47,000 - 47,000
4 Bolt Machine / Bolt cariage ½" x ¾" Bh 4 2,900 - 11,600 - 11,600
5 Clevis Swinging Secondary Bh 1 9,400 - 9,400 - 9,400
6 Cross Arm Steel 2.000 mm ( UNSP 10 ) galvanis Bh 3 230,000 - 690,000 - 690,000
7 Lock Nut ⅝" Bh 4 7,000 - 28,000 - 28,000
8 Loop Dead End Clamp / LC ( 35 s/d 240 ) mm² Bh 2 18,000 - 36,000 - 36,000
9 Oval Eye Nut ⅝" Bh 4 13,300 - 53,200 - 53,200
10 Pole Band Double Rack 7" atau 7 ½" Bh 2 30,600 - 61,200 - 61,200
11 Pole Band Single Rack 7" atau 7 ½" Bh 2 24,300 - 48,600 - 48,600
12 Schackle Anchor ⅝" Bh 3 10,200 - 30,600 - 30,600
13 Spool Insulator ANSI 53 - 4 Bh 1 15,700 - 15,700 - 15,700
14 Brace Steel 770 mm Bh 4 25,900 - 103,600 - 103,600
15 Washer Square 2 ¼" Bh 10 1,100 - 11,000 - 11,000
16 Upah Pasang Konst. JTM 3 Fasa SC7-1 Unit 1 21,800 - - 21,800 21,800
Sub Jumlah SC7-1 - 1,150,200 21,800 1,172,000
25 SC7-1' Unit 1
1 Isolator Tarik ( Polymer ) 20 KV + Primary Dead E Set 3 PLN PLN - - -
2 Bolt Double Arming ⅝" x 14" Bh 2 23,500 - 47,000 - 47,000
3 Bolt Machine / Bolt cariage ½" x ¾" Bh 4 2,900 - 11,600 - 11,600
4 Cross Arm Steel 2.000 mm ( UNSP 10 ) galvanis Bh 3 230,000 - 690,000 - 690,000
5 Lock Nut ⅝" Bh 4 7,000 - 28,000 - 28,000
6 Oval Eye Nut ⅝" Bh 3 13,300 - 39,900 - 39,900
PT. PLN (PERSERO)
DISTRIBUSI JAWA TENGAH DAN D.I. YOGYAKARTA
AREA SURAKARTA

ANALISA PER UNIT KONSTRUKSI


PEKERJAAN PEMBANGUNAN JARINGAN DISTRIBUSI 20 KV
#REF!

HARGA SATUAN BIAYA YANG DIPERLUKAN


NO. PERINCUAN PER UNIT KONSTRUKSI STN VOL MATERIAL MATERIAL TOTAL
JASA/UPAH JASA/UPAH
MDU HARDWARE MDU HARDWARE
7 Pole Band Double Rack 7" atau 7 ½" Bh 2 30,600 - 61,200 - 61,200
8 Pole Band Single Rack 7" atau 7 ½" Bh 1 24,300 - 24,300 - 24,300
9 Schackle Anchor ⅝" Bh 3 10,200 - 30,600 - 30,600
10 Brace Steel 770 mm Bh 4 25,900 - 103,600 - 103,600
11 Washer Square 2 ¼" Bh 10 1,100 - 11,000 - 11,000
12 Upah Pasang Konst. JTM 3 Fasa SC7-1' Unit 1 21,800 - - 21,800 21,800
Sub Jumlah SC7-1' - 1,047,200 21,800 1,069,000
26 SC7-1N Unit 1
1 Isolator Tarik ( Polymer ) 20 KV + Primary Dead E Set 3 PLN PLN - - -
2 Armour Tape ¼" wide Mtr 1 4,300 - 4,300 - 4,300
3 Bolt Double Arming ⅝" x 14" Bh 3 23,500 - 70,500 - 70,500
4 Bolt Machine / Bolt cariage ½" x ¾" Bh 4 2,900 - 11,600 - 11,600
5 Brace Steel 770 mm Bh 4 25,900 - 103,600 - 103,600
6 Clevis Swinging Secondary Bh 1 9,400 - 9,400 - 9,400
7 Cross Arm Steel 2.000 mm ( UNSP 10 ) galvanis Bh 2 230,000 - 460,000 - 460,000
8 Lock Nut ⅝" Bh 5 7,000 - 35,000 - 35,000
9 Loop Dead End Clamp / LC ( 35 s/d 240 ) mm² Bh 2 18,000 - 36,000 - 36,000
10 Oval Eye Nut ⅝" Bh 4 13,300 - 53,200 - 53,200
11 Pole Band Double Rack 7" atau 7 ½" Bh 2 30,600 - 61,200 - 61,200
12 Pole Band Single Rack 7" atau 7 ½" Bh 1 24,300 - 24,300 - 24,300
13 Schackle Anchor ⅝" Bh 3 10,200 - 30,600 - 30,600
14 Spool Insulator ANSI 53 - 4 Bh 1 15,700 - 15,700 - 15,700
15 Washer Square 2 ¼" Bh 14 1,100 - 15,400 - 15,400
16 Upah Pasang Konst. JTM 3 Fasa SC7-N Unit 1 21,800 - - 21,800 21,800
Sub Jumlah SC7-1N - 930,800 21,800 952,600
27 SC8 Unit 1
1 Isolator Tumpu (Line Post) 20 KV Bh 1 PLN PLN - - -
2 Isolator Tumpu (Pin Post) 20 KV Bh 2 PLN PLN - - -
3 Isolator Tarik ( Polymer ) 20 KV + Primary Dead E Set 6 PLN PLN - - -
4 Armour Tape ¼" wide Mtr 2 4,300 - 8,600 - 8,600
5 Bolt Double Arming ⅝" x 14" Bh 2 23,500 - 47,000 - 47,000
6 Bolt Machine / Bolt cariage ½" x ¾" Bh 4 2,900 - 11,600 - 11,600
7 Brace Steel 770 mm Bh 4 25,900 - 103,600 - 103,600
8 Center Bracket 12.5 KN Bh 1 54,100 - 54,100 - 54,100
9 Clevis Swinging Secondary Bh 2 9,400 - 18,800 - 18,800
10 Compresion Conector H type 240 mm² / 240 mm² Bh 4 29,800 - 119,200 - 119,200
11 Cross Arm Steel 2.000 mm ( UNSP 10 ) galvanis Bh 2 230,000 - 460,000 - 460,000
12 Lock Nut ⅝" Bh 2 7,000 - 14,000 - 14,000
13 Loop Dead End Clamp / LC ( 35 s/d 240 ) mm² Bh 4 18,000 - 72,000 - 72,000
14 Oval Eye Bolt ⅝" x 10" Bh 3 11,700 - 35,100 - 35,100
15 Oval Eye Nut ⅝" Bh 9 13,300 - 119,700 - 119,700
16 Pole Band Double Rack 7" atau 7 ½" Bh 3 30,600 - 91,800 - 91,800
17 Pole Band Single Rack 7" atau 7 ½" Bh 2 24,300 - 48,600 - 48,600
18 Schackle Anchor ⅝" Bh 8 10,200 - 81,600 - 81,600
19 Spool Insulator ANSI 53 - 4 Bh 2 15,700 - 31,400 - 31,400
20 Tie Wire # 4 / Alluminium bonding wire # 20 Mtr 5.4 3,100 - 16,740 - 16,740
21 Washer Square 2 ¼" Bh 11 1,100 - 12,100 - 12,100
22 Upah Pasang Konst. JTM 3 Fasa SC8 Unit 1 44,400 - - 44,400 44,400
Sub Jumlah SC8 - 1,345,940 44,400 1,390,340
PT. PLN (PERSERO)
DISTRIBUSI JAWA TENGAH DAN D.I. YOGYAKARTA
AREA SURAKARTA

ANALISA PER UNIT KONSTRUKSI


PEKERJAAN PEMBANGUNAN JARINGAN DISTRIBUSI 20 KV
#REF!

HARGA SATUAN BIAYA YANG DIPERLUKAN


NO. PERINCUAN PER UNIT KONSTRUKSI STN VOL MATERIAL MATERIAL TOTAL
JASA/UPAH JASA/UPAH
MDU HARDWARE MDU HARDWARE
28 SC8' Unit 1
1 Isolator Tumpu (Line Post) 20 KV Bh 1 PLN PLN - - -
2 Isolator Tumpu (Pin Post) 20 KV Bh 2 PLN PLN - - -
3 Isolator Tarik ( Polymer ) 20 KV + Primary Dead E Set 6 PLN PLN - - -
4 Bolt Double Arming ⅝" x 14" Bh 2 23,500 - 47,000 - 47,000
5 Bolt Machine / Bolt cariage ½" x ¾" Bh 4 2,900 - 11,600 - 11,600
6 Brace Steel 770 mm Bh 4 25,900 - 103,600 - 103,600
7 Center Bracket 12.5 KN Bh 1 54,100 - 54,100 - 54,100
8 Compresion Conector H type 240 mm² / 240 mm² Bh 3 29,800 - 89,400 - 89,400
9 Cross Arm Steel 2.000 mm ( UNSP 10 ) galvanis Bh 2 230,000 - 460,000 - 460,000
10 Lock Nut ⅝" Bh 2 7,000 - 14,000 - 14,000
11 Oval Eye Nut ⅝" Bh 7 13,300 - 93,100 - 93,100
12 Pole Band Double Rack 7" atau 7 ½" Bh 2 30,600 - 61,200 - 61,200
13 Pole Band Single Rack 7" atau 7 ½" Bh 2 24,300 - 48,600 - 48,600
14 Schackle Anchor ⅝" Bh 8 10,200 - 81,600 - 81,600
15 Tie Wire # 4 / Alluminium bonding wire # 20 Mtr 5.4 3,100 - 16,740 - 16,740
16 Washer Square 2 ¼" Bh 11 1,100 - 12,100 - 12,100
17 Upah Pasang Konst. JTM 3 Fasa SC8' Unit 1 24,900 - - 24,900 24,900
Sub Jumlah SC8' - 1,093,040 24,900 1,117,940
29 SC8-N Unit 1
1 Isolator Tumpu (Line Post) 20 KV Bh 1 PLN PLN - - -
2 Isolator Tumpu (Pin Post) 20 KV Bh 2 PLN PLN - - -
3 Isolator Tarik ( Polymer ) 20 KV + Primary Dead E Set 6 PLN PLN - - -
4 Armour Tape ¼" wide Mtr 2 4,300 - 8,600 - 8,600
5 Bolt Double Arming ⅝" x 14" Bh 4 23,500 - 94,000 - 94,000
6 Bolt Machine / Bolt cariage ½" x ¾" Bh 4 2,900 - 11,600 - 11,600
7 Center Bracket 12.5 KN Bh 1 54,100 - 54,100 - 54,100
8 Clevis Swinging Secondary Bh 2 9,400 - 18,800 - 18,800
9 Compresion Conector H type 240 mm² / 240 mm² Bh 4 29,800 - 119,200 - 119,200
10 Cross Arm Steel 2.000 mm ( UNSP 10 ) galvanis Bh 2 230,000 - 460,000 - 460,000
11 Lock Nut ⅝" Bh 4 7,000 - 28,000 - 28,000
12 Loop Dead End Clamp / LC ( 35 s/d 240 ) mm² Bh 4 18,000 - 72,000 - 72,000
13 Oval Eye Nut ⅝" Bh 8 13,300 - 106,400 - 106,400
14 Pole Band Double Rack 7" atau 7 ½" Bh 2 30,600 - 61,200 - 61,200
15 Pole Band Single Rack 7" atau 7 ½" Bh 2 24,300 - 48,600 - 48,600
16 Schackle Anchor ⅝" Bh 6 10,200 - 61,200 - 61,200
17 Spool Insulator ANSI 53 - 4 Bh 2 15,700 - 31,400 - 31,400
18 Brace Steel 770 mm Bh 4 25,900 - 103,600 - 103,600
19 Tie Wire # 4 / Alluminium bonding wire # 20 Mtr 5.4 3,100 - 16,740 - 16,740
20 Washer Square 2 ¼" Bh 18 1,100 - 19,800 - 19,800
21 Upah Pasang Konst. JTM 3 Fasa SC8-N Unit 1 24,900 - - 24,900 24,900
Sub Jumlah SC8-N - 1,315,240 24,900 1,340,140
30 SC8-A Unit 1
1 Isolator Tumpu (Line Post) 20 KV Bh 1 PLN PLN - - -
2 Isolator Tumpu (Pin Post) 20 KV Bh 1 PLN PLN - - -
3 Isolator Tarik ( Polymer ) 20 KV + Primary Dead E Set 6 PLN PLN - - -
4 Armour Tape ¼" wide Mtr 2 4,300 - 8,600 - 8,600
5 Bolt Double Arming ⅝" x 14" Bh 4 23,500 - 94,000 - 94,000
6 Bolt Machine / Bolt cariage ½" x ¾" Bh 8 2,900 - 23,200 - 23,200
7 Brace Steel 770 mm Bh 8 25,900 - 207,200 - 207,200
8 Clevis Swinging Secondary Bh 2 9,400 - 18,800 - 18,800
9 Compresion Conector H type 240 mm² / 240 mm² Bh 4 29,800 - 119,200 - 119,200
10 Cross Arm Steel 2.000 mm ( UNSP 10 ) galvanis Bh 4 230,000 - 920,000 - 920,000
11 Loop Dead End Clamp / LC ( 35 s/d 240 ) mm² Bh 4 18,000 - 72,000 - 72,000
12 Lock Nut ⅝" Bh 8 7,000 - 56,000 - 56,000
13 Oval Eye Nut ⅝" Bh 8 13,300 - 106,400 - 106,400
14 Pole Band Double Rack 7" atau 7 ½" Bh 4 30,600 - 122,400 - 122,400
15 Pole Band Single Rack 7" atau 7 ½" Bh 5 24,300 - 121,500 - 121,500
16 Schackle Anchor ⅝" Bh 6 10,200 - 61,200 - 61,200
17 Spool Insulator ANSI 53 - 4 Bh 2 15,700 - 31,400 - 31,400
18 Tie Wire # 4 / Alluminium bonding wire # 20 Mtr 3.6 3,100 - 11,160 - 11,160
19 Washer Square 2 ¼" Bh 20 1,100 - 22,000 - 22,000
20 Upah Pasang Konst. JTM 3 Fasa SC8-A Unit 1 44,400 - - 44,400 44,400
Sub Jumlah SC8-A - 1,995,060 44,400 2,039,460
PT. PLN (PERSERO)
DISTRIBUSI JAWA TENGAH DAN D.I. YOGYAKARTA
AREA SURAKARTA

ANALISA PER UNIT KONSTRUKSI


PEKERJAAN PEMBANGUNAN JARINGAN DISTRIBUSI 20 KV
#REF!

HARGA SATUAN BIAYA YANG DIPERLUKAN


NO. PERINCUAN PER UNIT KONSTRUKSI STN VOL MATERIAL MATERIAL TOTAL
JASA/UPAH JASA/UPAH
MDU HARDWARE MDU HARDWARE
31 SC8-A' Unit 1
1 Isolator Tumpu (Line Post) 20 KV Bh 1 PLN PLN - - -
2 Isolator Tumpu (Pin Post) 20 KV Bh 1 PLN PLN - - -
3 Isolator Tarik ( Polymer ) 20 KV + Primary Dead E Set 6 PLN PLN - - -
4 Bolt Double Arming ⅝" x 14" Bh 4 23,500 - 94,000 - 94,000
5 Bolt Machine / Bolt cariage ½" x ¾" Bh 8 2,900 - 23,200 - 23,200
6 Brace Steel 770 mm Bh 8 25,900 - 207,200 - 207,200
7 Compresion Conector H type 240 mm² / 240 mm² Bh 3 29,800 - 89,400 - 89,400
8 Cross Arm Steel 2.000 mm ( UNSP 10 ) galvanis Bh 4 230,000 - 920,000 - 920,000
9 Lock Nut ⅝" Bh 8 7,000 - 56,000 - 56,000
10 Oval Eye Nut ⅝" Bh 6 13,300 - 79,800 - 79,800
11 Pole Band Double Rack 7" atau 7 ½" Bh 4 30,600 - 122,400 - 122,400
12 Pole Band Single Rack 7" atau 7 ½" Bh 3 24,300 - 72,900 - 72,900
13 Schackle Anchor ⅝" Bh 6 10,200 - 61,200 - 61,200
14 Tie Wire # 4 / Alluminium bonding wire # 20 Mtr 3.6 3,100 - 11,160 - 11,160
15 Washer Square 2 ¼" Bh 20 1,100 - 22,000 - 22,000
16 Upah Pasang Konst. JTM 3 Fasa SC8-A' Unit 1 45,200 - - 45,200 45,200
Sub Jumlah SC8-A' - 1,759,260 45,200 1,804,460
32 SC8-AN Unit 1
1 Isolator Tumpu (Line Post) 20 KV Bh 1 PLN PLN - - -
2 Isolator Tumpu (Pin Post) 20 KV Bh 1 PLN PLN - - -
3 Isolator Tarik ( Polymer ) 20 KV + Primary Dead E Set 6 PLN PLN - - -
4 Armour Tape ¼" wide Mtr 2 4,300 - 8,600 - 8,600
5 Bolt Double Arming ⅝" x 14" Bh 4 23,500 - 94,000 - 94,000
6 Bolt Machine / Bolt cariage ½" x ¾" Bh 8 2,900 - 23,200 - 23,200
7 Brace Steel 770 mm Bh 8 25,900 - 207,200 - 207,200
8 Clevis Swinging Secondary Bh 2 9,400 - 18,800 - 18,800
9 Compresion Conector H type 240 mm² / 240 mm² Bh 4 29,800 - 119,200 - 119,200
10 Cross Arm Steel 2.000 mm ( UNSP 10 ) galvanis Bh 4 230,000 - 920,000 - 920,000
11 Loop Dead End Clamp / LC ( 35 s/d 240 ) mm² Bh 4 18,000 - 72,000 - 72,000
12 Lock Nut ⅝" Bh 8 7,000 - 56,000 - 56,000
13 Oval Eye Nut ⅝" Bh 8 13,300 - 106,400 - 106,400
14 Pole Band Double Rack 7" atau 7 ½" Bh 4 30,600 - 122,400 - 122,400
15 Pole Band Single Rack 7" atau 7 ½" Bh 5 24,300 - 121,500 - 121,500
16 Schackle Anchor ⅝" Bh 6 10,200 - 61,200 - 61,200
17 Spool Insulator ANSI 53 - 4 Bh 2 15,700 - 31,400 - 31,400
18 Tie Wire # 4 / Alluminium bonding wire # 20 Mtr 3.6 3,100 - 11,160 - 11,160
19 Washer Square 2 ¼" Bh 20 1,100 - 22,000 - 22,000
20 Upah Pasang Konst. JTM 3 Fasa SC8-AN Unit 1 44,400 - - 44,400 44,400
Sub Jumlah SC8-AN - 1,995,060 44,400 2,039,460
33 SC9 Unit 1
1 Isolator Tumpu (Line Post) 20 KV Bh 1 PLN PLN - - -
2 Isolator Tumpu (Pin Post) 20 KV Bh 2 PLN PLN - - -
3 Bracket Secondary / Bracket insulated Bh 1 7,400 - 7,400 - 7,400
4 Center Bracket 12.5 KN Bh 1 54,100 - 54,100 - 54,100
5 Cross Arm Steel 2.000 mm ( UNSP 10 ) galvanis Bh 1 230,000 - 230,000 - 230,000
6 Lock Nut ⅝" Bh 1 7,000 - 7,000 - 7,000
7 Pole Band Single Rack 7" atau 7 ½" Bh 4 24,300 - 97,200 - 97,200
8 Spool Insulator ANSI 53 - 2 Bh 1 10,200 - 10,200 - 10,200
9 Steel L 70 x 70 x 7 x 1.682 mm galvanis Bh 1 149,100 - 149,100 - 149,100
10 Tie Wire # 4 / Alluminium bonding wire # 20 Mtr 6.2 3,100 - 19,220 - 19,220
11 Washer Square 2 ¼" Bh 1 1,100 - 1,100 - 1,100
12 Upah Pasang Konst. JTM 3 Fasa SC9 Unit 1 45,200 - - 45,200 45,200
Sub Jumlah SC9 - 575,320 45,200 620,520
34 SC9' Unit 1
1 Isolator Tumpu (Line Post) 20 KV Bh 1 PLN PLN - - -
2 Isolator Tumpu (Pin Post) 20 KV Bh 2 PLN PLN - - -
3 Center Bracket 12.5 KN Bh 1 54,100 - 54,100 - 54,100
4 Cross Arm Steel 2.000 mm ( UNSP 10 ) galvanis Bh 1 230,000 - 230,000 - 230,000
5 Lock Nut ⅝" Bh 1 7,000 - 7,000 - 7,000
6 Pole Band Single Rack 7" atau 7 ½" Bh 3 24,300 - 72,900 - 72,900
7 Steel L 70 x 70 x 7 x 1.000 mm galvanis Bh 1 78,500 - 78,500 - 78,500
8 Tie Wire # 4 / Alluminium bonding wire # 20 Mtr 5.4 3,100 - 16,740 - 16,740
9 Washer Square 2 ¼" Bh 1 1,100 - 1,100 - 1,100
10 Upah Pasang Konst. JTM 3 Fasa SC9' Unit 1 34,300 - - 34,300 34,300
Sub Jumlah SC9' - 460,340 34,300 494,640
35 SC9-N Unit 1
1 Isolator Tumpu (Pin Post) 20 KV Bh 3 PLN PLN - - -
2 Bracket Secondary / Bracket insulated Bh 1 7,400 - 7,400 - 7,400
3 Cross Arm Steel 2.000 mm ( UNSP 10 ) galvanis Bh 1 230,000 - 230,000 - 230,000
4 Lock Nut ⅝" Bh 1 7,000 - 7,000 - 7,000
5 Pole Band Single Rack 7" atau 7 ½" Bh 3 24,300 - 72,900 - 72,900
6 Spool Insulator ANSI 53 - 2 Bh 1 10,200 - 10,200 - 10,200
7 Steel L 70 x 70 x 7 x 1.000 mm galvanis Bh 1 78,500 - 78,500 - 78,500
8 Tie Wire # 4 / Alluminium bonding wire # 20 Mtr 6.2 3,100 - 19,220 - 19,220
9 Washer Square 2 ¼" Bh 1 1,100 - 1,100 - 1,100
10 Upah Pasang Konst. JTM 3 Fasa SC9-N Unit 1 34,300 - - 34,300 34,300
Sub Jumlah SC9-N - 426,320 34,300 460,620
36 SC10 Unit 1
1 Isolator Tumpu (Pin Post) 20 KV Bh 3 PLN PLN - - -
2 Bracket Secondary / Bracket insulated Bh 1 7,400 - 7,400 - 7,400
PT. PLN (PERSERO)
DISTRIBUSI JAWA TENGAH DAN D.I. YOGYAKARTA
AREA SURAKARTA

ANALISA PER UNIT KONSTRUKSI


PEKERJAAN PEMBANGUNAN JARINGAN DISTRIBUSI 20 KV
#REF!

HARGA SATUAN BIAYA YANG DIPERLUKAN


NO. PERINCUAN PER UNIT KONSTRUKSI STN VOL MATERIAL MATERIAL TOTAL
JASA/UPAH JASA/UPAH
MDU HARDWARE MDU HARDWARE
3 Cross Arm Steel 3.000 mm ( UNSP 10 ) galvanis Bh 1 350,000 - 350,000 - 350,000
4 Lock Nut ⅝" Bh 1 7,000 - 7,000 - 7,000
5 Pole Band Single Rack 7" atau 7 ½" Bh 3 24,300 - 72,900 - 72,900
6 Spool Insulator ANSI 53 - 2 Bh 1 10,200 - 10,200 - 10,200
7 Steel L 70 x 70 x 7 x 1.682 mm galvanis Bh 1 149,100 - 149,100 - 149,100
8 Tie Wire # 4 / Alluminium bonding wire # 20 Mtr 6.2 3,100 - 19,220 - 19,220
9 Washer Square 2 ¼" Bh 1 1,100 - 1,100 - 1,100
10 Upah Pasang Konst. JTM 3 Fasa SC10 Unit 1 34,300 - - 34,300 34,300
Sub Jumlah SC10 - 616,920 34,300 651,220
37 SC10' Unit 1
1 Isolator Tumpu (Pin Post) 20 KV Bh 3 PLN PLN - - -
2 Cross Arm Steel 3.000 mm ( UNSP 10 ) galvanis Bh 1 350,000 - 350,000 - 350,000
3 Lock Nut ⅝" Bh 1 7,000 - 7,000 - 7,000
4 Pole Band Single Rack 7" atau 7 ½" Bh 2 24,300 - 48,600 - 48,600
5 Steel L 70 x 70 x 7 x 1.682 mm galvanis Bh 1 149,100 - 149,100 - 149,100
6 Tie Wire # 4 / Alluminium bonding wire # 20 Mtr 5.4 3,100 - 16,740 - 16,740
7 Washer Square 2 ¼" Bh 1 1,100 - 1,100 - 1,100
8 Upah Pasang Konst. JTM 3 Fasa SC10' Unit 1 34,300 - - 34,300 34,300
Sub Jumlah SC10' - 572,540 34,300 606,840
38 SC10-N Unit 1
1 Isolator Tumpu (Pin Post) 20 KV Bh 3 PLN PLN - - -
2 Bolt Machine ⅝" x 10" Bh 1 9,400 - 9,400 - 9,400
3 Cross Arm Steel 3.000 mm ( UNSP 10 ) galvanis Bh 1 350,000 - 350,000 - 350,000
4 Lock Nut ⅝" Bh 1 7,000 - 7,000 - 7,000
5 Pole Band Single Rack 7" atau 7 ½" Bh 2 24,300 - 48,600 - 48,600
6 Spool Insulator ANSI 53 - 2 Bh 1 10,200 - 10,200 - 10,200
7 Steel L 70 x 70 x 7 x 1.682 mm galvanis Bh 1 149,100 - 149,100 - 149,100
8 Tie Wire # 4 / Alluminium bonding wire # 20 Mtr 6.2 3,100 - 19,220 - 19,220
9 Washer Square 2 ¼" Bh 1 1,100 - 1,100 - 1,100
10 Upah Pasang Konst. JTM 3 Fasa SC10-N Unit 1 34,300 - - 34,300 34,300
Sub Jumlah SC10-N - 594,620 34,300 628,920
39 SC11 Unit 1
1 Isolator Tumpu (Pin Post) 20 KV Bh 6 PLN PLN - - -
2 Bolt Double Arming ⅝" x 14" Bh 2 23,500 - 47,000 - 47,000
3 Bracket Secondary / Bracket insulated Bh 1 7,400 - 7,400 - 7,400
4 Cross Arm Steel 3.000 mm ( UNSP 10 ) galvanis Bh 2 350,000 - 700,000 - 700,000
5 Lock Nut ⅝" Bh 6 7,000 - 42,000 - 42,000
6 Pole Band Double Rack 7" atau 7 ½" Bh 2 30,600 - 61,200 - 61,200
7 Pole Band Single Rack 7" atau 7 ½" Bh 1 24,300 - 24,300 - 24,300
8 Spool Insulator ANSI 53 - 2 Bh 1 10,200 - 10,200 - 10,200
9 Steel L 70 x 70 x 7 x 1.682 mm galvanis Bh 1 149,100 - 149,100 - 149,100
10 Tie Wire # 4 / Alluminium bonding wire # 20 Mtr 11.6 3,100 - 35,960 - 35,960
11 Washer Square 2 ¼" Bh 10 1,100 - 11,000 - 11,000
12 Upah Pasang Konst. JTM 3 Fasa SC11 Unit 1 34,300 - - 34,300 34,300
Sub Jumlah SC11 - 1,088,160 34,300 1,122,460
40 SC11' Unit 1
1 Isolator Tumpu (Pin Post) 20 KV Bh 6 PLN PLN - - -
2 Bolt Double Arming ⅝" x 14" Bh 2 23,500 - 47,000 - 47,000
3 Cross Arm Steel 3.000 mm ( UNSP 10 ) galvanis Bh 2 350,000 - 700,000 - 700,000
4 Lock Nut ⅝" Bh 6 7,000 - 42,000 - 42,000
5 Pole Band Double Rack 7" atau 7 ½" Bh 2 30,600 - 61,200 - 61,200
6 Steel L 70 x 70 x 7 x 1.682 mm galvanis Bh 1 149,100 - 149,100 - 149,100
7 Tie Wire # 4 / Alluminium bonding wire # 20 Mtr 10.8 3,100 - 33,480 - 33,480
8 Washer Square 2 ¼" Bh 10 1,100 - 11,000 - 11,000
9 Upah Pasang Konst. JTM 3 Fasa SC11' Unit 1 15,600 - - 15,600 15,600
Sub Jumlah SC11' - 1,043,780 15,600 1,059,380
PT. PLN (PERSERO)
DISTRIBUSI JAWA TENGAH DAN D.I. YOGYAKARTA
AREA SURAKARTA

ANALISA PER UNIT KONSTRUKSI


PEKERJAAN PEMBANGUNAN JARINGAN DISTRIBUSI 20 KV
#REF!

HARGA SATUAN BIAYA YANG DIPERLUKAN


NO. PERINCUAN PER UNIT KONSTRUKSI STN VOL MATERIAL MATERIAL TOTAL
JASA/UPAH JASA/UPAH
MDU HARDWARE MDU HARDWARE
41 SC11-N Unit 1
1 Isolator Tumpu (Pin Post) 20 KV Bh 3 PLN PLN - - -
2 Isolator Tarik ( Polymer ) 20 KV + Primary Dead E Set 6 PLN PLN - - -
3 Armour Tape ¼" wide Mtr 2 4,300 - 8,600 - 8,600
4 Bolt Double Arming ⅝" x 14" Bh 4 23,500 - 94,000 - 94,000
5 Clevis Swinging Secondary Bh 2 9,400 - 18,800 - 18,800
6 Compresion Conector H type 240 mm² / 240 mm² Bh 4 29,800 - 119,200 - 119,200
7 Cross Arm Steel 3.000 mm ( UNSP 10 ) galvanis Bh 2 350,000 - 700,000 - 700,000
8 Lock Nut ⅝" Bh 2 7,000 - 14,000 - 14,000
9 Loop Dead End Clamp / LC ( 35 s/d 240 ) mm² Bh 4 18,000 - 72,000 - 72,000
10 Oval Eye Nut ⅝" Bh 8 13,300 - 106,400 - 106,400
11 Pole Band Double Rack 7" atau 7 ½" Bh 2 30,600 - 61,200 - 61,200
12 Schackle Anchor ⅝" Bh 6 10,200 - 61,200 - 61,200
13 Spool Insulator ANSI 53 - 4 Bh 2 15,700 - 31,400 - 31,400
14 Steel L 70 x 70 x 7 x 1.682 mm galvanis Bh 2 149,100 - 298,200 - 298,200
15 Tie Wire # 4 / Alluminium bonding wire # 20 Mtr 6.2 3,100 - 19,220 - 19,220
16 Washer Square 2 ¼" Bh 20 1,100 - 22,000 - 22,000
17 Upah Pasang Konst. JTM 3 Fasa SC11-N Unit 1 15,600 - - 15,600 15,600
Sub Jumlah SC11-N - 1,626,220 15,600 1,641,820
PT. PLN (PERSERO)
DISTRIBUSI JAWA TENGAH DAN D.I. YOGYAKARTA
AREA SURAKARTA

ANALISA PER UNIT KONSTRUKSI


PEKERJAAN PEMBANGUNAN JARINGAN DISTRIBUSI 20 KV
#REF!

HARGA SATUAN BIAYA YANG DIPERLUKAN


NO. PERINCUAN PER UNIT KONSTRUKSI STN VOL MATERIAL MATERIAL TOTAL
JASA/UPAH JASA/UPAH
MDU HARDWARE MDU HARDWARE
1 LBS Unit 1
1 Load Break Switch Set 1 PLN PLN - - -
2 Disconnecting Switch 20 kV - 630 A Set 1.0 PLN PLN - - -
3 Cross Arm Steel 3.000 mm ( UNSP 10 ) galvanis Bh 1 350,000 - 350,000 - 350,000
4 Brace Steel 1.262 mm Bh 6 58,800 - 352,800 - 352,800
5 Pole Band Double Rack 8" atau 8 ½" Bh 10 30,600 - 306,000 - 306,000
6 AAAC 240 mm² Mtr 12 PLN PLN - - -
7 Sepatu Kabel AL/CU Kepala-240 mm² Bh 12 97,500 - 1,170,000 - 1,170,000
8 Compresion Conector H type 240 mm² / 240 mm² Bh 6 29,800 - 178,800 - 178,800
9 Jasa Pasang CM5-24 (RECL. 3 PHASA 20 kV) Unit 1 2,500,000 - - 2,500,000 2,500,000
Sub Jumlah LBS - 2,357,600 2,500,000 4,857,600
2 ABSW Unit 1
1 ABSW 20 KV Set 1 PLN PLN - - -
2 AAAC 240 mm² Mtr 12.0 PLN PLN - - -
3 Sepatu Kabel AL/CU Kepala-240 mm² Bh 6 97,500 - 585,000 - 585,000
4 Compresion Conector H type 240 mm² / 240 mm² Bh 6 29,800 - 178,800 - 178,800
5 Jasa Pemasangan CM3-16 Unit 1 897,000 - - 897,000 897,000
Sub Jumlah ABSW - 763,800 897,000 1,660,800
PT. PLN (PERSERO)
DISTRIBUSI JAWA TENGAH DAN D.I. YOGYAKARTA
AREA SURAKARTA

ANALISA PER UNIT KONSTRUKSI


PEKERJAAN PEMBANGUNAN JARINGAN DISTRIBUSI 20 KV
#REF!

HARGA SATUAN BIAYA YANG DIPERLUKAN


NO. PERINCUAN PER UNIT KONSTRUKSI STN VOL MATERIAL MATERIAL TOTAL
JASA/UPAH JASA/UPAH
MDU HARDWARE MDU HARDWARE
PRIMARY LINE 3 PHASA (DOUBLE CIRCUIT)
1 DC-C1V Unit 1
1 Isolator Tumpu (Line Post) 20 KV Bh 6 PLN PLN - - -
2 Lock Nut ⅝" Bh 12 7,000 - 84,000 - 84,000
3 Pole Band Double Rack 7" atau 7 ½" Bh 6 30,600 - 183,600 - 183,600
4 Pole Band Single Up Side 7" atau 7 ½" Bh 1 36,000 - 36,000 - 36,000
5 Side Bracket Bh 6 51,000 - 306,000 - 306,000
6 Spool Insulator ANSI 53 - 2 Bh 1 10,200 - 10,200 - 10,200
7 Tie Wire # 4 / Alluminium bonding wire # 20 Mtr 11.6 3,100 - 35,960 - 35,960
8 Upah Pasang Konst. JTM Double Circuit DC-C1V Unit 1 102,100 - - 102,100 102,100
Sub Jumlah DC-C1V - 655,760 102,100 757,860
2 DC-C1-1V Unit 1
1 Isolator Tumpu (Pin Post) 20 KV Bh 6 PLN PLN - - -
2 Bolt Machine / Bolt cariage ½" x ¾" Bh 4 2,900 - 11,600 - 11,600
3 Brace Steel 770 mm Bh 2 25,900 - 51,800 - 51,800
4 Cross Arm Steel 2.000 mm ( UNSP 10 ) galvanis Bh 1 230,000 - 230,000 - 230,000
5 Brace Steel 1.262 mm Bh 2 58,800 - 117,600 - 117,600
6 Cross Arm Steel 3.000 mm ( UNSP 10 ) galvanis Bh 1 350,000 - 350,000 - 350,000
7 Lock Nut ⅝" Bh 3 7,000 - 21,000 - 21,000
8 Pole Band Single Rack 7" atau 7 ½" Bh 4 24,300 - 97,200 - 97,200
9 Pole Band Single Up Side 7" atau 7 ½" Bh 1 36,000 - 36,000 - 36,000
10 Spool Insulator ANSI 53 - 2 Bh 1 10,200 - 10,200 - 10,200
11 Tie Wire # 4 / Alluminium bonding wire # 20 Mtr 11.6 3,100 - 35,960 - 35,960
12 Washer Square 2 ¼" Bh 4 1,100 - 4,400 - 4,400
13 Upah Pasang Konst. JTM Double Circuit DC-C1-1V Unit 1 102,100 - - 102,100 102,100
Sub Jumlah DC-C1-1V - 965,760 102,100 1,067,860
3 DC-C1-1VN Unit 1
1 Isolator Tumpu (Pin Post) 20 KV Bh 6 PLN PLN - - -
2 Bolt Machine / Bolt cariage ½" x ¾" Bh 4 2,900 - 11,600 - 11,600
3 Brace Steel 770 mm Bh 2 25,900 - 51,800 - 51,800
4 Cross Arm Steel 2.000 mm ( UNSP 10 ) galvanis Bh 1 230,000 - 230,000 - 230,000
5 Brace Steel 1.262 mm Bh 2 58,800 - 117,600 - 117,600
6 Cross Arm Steel 3.000 mm ( UNSP 10 ) galvanis Bh 1 350,000 - 350,000 - 350,000
7 Lock Nut ⅝" Bh 3 7,000 - 21,000 - 21,000
8 Pole Band Single Rack 7" atau 7 ½" Bh 4 24,300 - 97,200 - 97,200
9 Pole Band Single Up Side 7" atau 7 ½" Bh 1 36,000 - 36,000 - 36,000
10 Spool Insulator ANSI 53 - 2 Bh 1 10,200 - 10,200 - 10,200
11 Tie Wire # 4 / Alluminium bonding wire # 20 Mtr 11.6 3,100 - 35,960 - 35,960
12 Washer Square 2 ¼" Bh 4 1,100 - 4,400 - 4,400
13 Upah Pasang Konst. JTM Double Circuit DC-C1-1VN Unit 1 103,700 - - 103,700 103,700
Sub Jumlah DC-C1-1VN - 965,760 103,700 1,069,460
4 DC-C1-1H Unit 1
1 Isolator Tumpu (Pin Post) 20 KV Bh 6 PLN PLN - - -
2 Bolt Machine / Bolt cariage ½" x ¾" Bh 4 2,900 - 11,600 - 11,600
3 Center Bracket 12.5 KN Bh 1 54,100 - 54,100 - 54,100
4 Brace Steel 770 mm Bh 4 25,900 - 103,600 - 103,600
5 Cross Arm Steel 2.000 mm ( UNSP 10 ) galvanis Bh 2 230,000 - 460,000 - 460,000
6 Lock Nut ⅝" Bh 4 7,000 - 28,000 - 28,000
7 Pole Band Single Rack 7" atau 7 ½" Bh 6 24,300 - 145,800 - 145,800
8 Pole Band Single Up Side 7" atau 7 ½" Bh 1 36,000 - 36,000 - 36,000
9 Spool Insulator ANSI 53 - 2 Bh 1 10,200 - 10,200 - 10,200
10 Tie Wire # 4 / Alluminium bonding wire # 20 Mtr 11.6 3,100 - 35,960 - 35,960
11 Washer Square 2 ¼" Bh 5 1,100 - 5,500 - 5,500
12 Upah Pasang Konst. JTM Double Circuit DC-C1-1H Unit 1 103,700 - - 103,700 103,700
Sub Jumlah DC-C1-1H - 890,760 103,700 994,460
5 DC-C1-AHN Unit 1
1 Isolator Tumpu (Pin Post) 20 KV Bh 6 PLN PLN - - -
2 Bolt Machine / Bolt cariage ½" x ¾" Bh 4 2,900 - 11,600 - 11,600
3 Center Bracket 12.5 KN Bh 1 54,100 - 54,100 - 54,100
4 Brace Steel 770 mm Bh 4 25,900 - 103,600 - 103,600
5 Cross Arm Steel 2.000 mm ( UNSP 10 ) galvanis Bh 2 230,000 - 460,000 - 460,000
6 Lock Nut ⅝" Bh 4 7,000 - 28,000 - 28,000
7 Pole Band Single Rack 7" atau 7 ½" Bh 6 24,300 - 145,800 - 145,800
8 Pole Band Single Up Side 7" atau 7 ½" Bh 1 36,000 - 36,000 - 36,000
9 Spool Insulator ANSI 53 - 2 Bh 1 10,200 - 10,200 - 10,200
10 Tie Wire # 4 / Alluminium bonding wire # 20 Mtr 11.6 3,100 - 35,960 - 35,960
11 Washer Square 2 ¼" Bh 5 1,100 - 5,500 - 5,500
12 Upah Pasang Konst. JTM Double Circuit DC-C1-AHN Unit 1 103,700 - - 103,700 103,700
Sub Jumlah DC-C1-AHN - 890,760 103,700 994,460
6 DC-C2-1V Unit 1
1 Isolator Tumpu (Pin Post) 20 KV Bh 12 PLN PLN - - -
2 Bolt Double Arming ⅝" x 12" Bh 6 23,500 - 141,000 - 141,000
3 Bolt Machine / Bolt cariage ½" x ¾" Bh 8 2,900 - 23,200 - 23,200
4 Bracket Secondary / Bracket insulated Bh 1 7,400 - 7,400 - 7,400
5 Brace Steel 770 mm Bh 4 25,900 - 103,600 - 103,600
6 Cross Arm Steel 2.000 mm ( UNSP 10 ) galvanis Bh 2 230,000 - 460,000 - 460,000
7 Brace Steel 1.262 mm Bh 4 58,800 - 235,200 - 235,200
8 Cross Arm Steel 3.000 mm ( UNSP 10 ) galvanis Bh 2 350,000 - 700,000 - 700,000
9 Lock Nut ⅝" Bh 15 7,000 - 105,000 - 105,000
10 Pole Band Double Rack 7" atau 7 ½" Bh 4 30,600 - 122,400 - 122,400
11 Pole Band Single Rack 7" atau 7 ½" Bh 1 24,300 - 24,300 - 24,300
12 Spool Insulator ANSI 53 - 2 Bh 1 10,200 - 10,200 - 10,200
13 Tie Wire # 4 / Alluminium bonding wire # 20 Mtr 22.4 3,100 - 69,440 - 69,440
14 Washer Square 2 ¼" Bh 28 1,100 - 30,800 - 30,800
15 Upah Pasang Konst. JTM Double Circuit DC-C2-1V Unit 1 124,800 - - 124,800 124,800
Sub Jumlah DC-C2-1V - 2,032,540 124,800 2,157,340
PT. PLN (PERSERO)
DISTRIBUSI JAWA TENGAH DAN D.I. YOGYAKARTA
AREA SURAKARTA

ANALISA PER UNIT KONSTRUKSI


PEKERJAAN PEMBANGUNAN JARINGAN DISTRIBUSI 20 KV
#REF!

HARGA SATUAN BIAYA YANG DIPERLUKAN


NO. PERINCUAN PER UNIT KONSTRUKSI STN VOL MATERIAL MATERIAL TOTAL
JASA/UPAH JASA/UPAH
MDU HARDWARE MDU HARDWARE
7 DC-C2AH Unit 1
1 Isolator Tumpu (Pin Post) 20 KV Bh 12 PLN PLN - - -
2 Bolt Double Arming ⅝" x 12" Bh 5 23,500 - 117,500 - 117,500
3 Bolt Machine / Bolt cariage ½" x ¾" Bh 8 2,900 - 23,200 - 23,200
4 Brace Steel 770 mm Bh 1 25,900 - 25,900 - 25,900
5 Bracket Secondary / Bracket insulated Bh 1 7,400 - 7,400 - 7,400
6 Center Bracket 12.5 KN Bh 2 54,100 - 108,200 - 108,200
7 Cross Arm Steel 2.000 mm ( UNSP 10 ) galvanis Bh 4 230,000 - 920,000 - 920,000
8 Lock Nut ⅝" Bh 15 7,000 - 105,000 - 105,000
9 Pole Band Double Rack 7" atau 7 ½" Bh 6 30,600 - 183,600 - 183,600
10 Pole Band Single Rack 7" atau 7 ½" Bh 1 24,300 - 24,300 - 24,300
11 Spool Insulator ANSI 53 - 2 Bh 1 10,200 - 10,200 - 10,200
12 Tie Wire # 4 / Alluminium bonding wire # 20 Mtr 22.4 3,100 - 69,440 - 69,440
13 Washer Square 2 ¼" Bh 28 1,100 - 30,800 - 30,800
14 Upah Pasang Konst. JTM Double Circuit DC-C2-AH Unit 1 124,800 - - 124,800 124,800
Sub Jumlah DC-C2AH - 1,625,540 124,800 1,750,340
8 DC-C2AHN Unit 1
1 Isolator Tumpu (Pin Post) 20 KV Bh 12 PLN PLN - - -
2 Bolt Double Arming ⅝" x 12" Bh 5 23,500 - 117,500 - 117,500
3 Bolt Machine / Bolt cariage ½" x ¾" Bh 8 2,900 - 23,200 - 23,200
4 Brace Steel 770 mm Bh 8 25,900 - 207,200 - 207,200
5 Bracket Secondary / Bracket insulated Bh 1 7,400 - 7,400 - 7,400
6 Center Bracket 12.5 KN Bh 2 54,100 - 108,200 - 108,200
7 Cross Arm Steel 2.000 mm ( UNSP 10 ) galvanis Bh 4 230,000 - 920,000 - 920,000
8 Lock Nut ⅝" Bh 15 7,000 - 105,000 - 105,000
9 Pole Band Double Rack 7" atau 7 ½" Bh 6 30,600 - 183,600 - 183,600
10 Pole Band Single Rack 7" atau 7 ½" Bh 1 24,300 - 24,300 - 24,300
11 Spool Insulator ANSI 53 - 2 Bh 1 10,200 - 10,200 - 10,200
12 Tie Wire # 4 / Alluminium bonding wire # 20 Mtr 22.4 3,100 - 69,440 - 69,440
13 Washer Square 2 ¼" Bh 28 1,100 - 30,800 - 30,800
14 Upah Pasang Konst. JTM Double Circuit DC-C2-AHN Unit 1 127,100 - - 127,100 127,100
Sub Jumlah DC-C2AHN - 1,806,840 127,100 1,933,940
9 DC-C2AVN Unit 1
1 Isolator Tumpu (Pin Post) 20 KV Bh 12 PLN PLN - - -
2 Bolt Double Arming ⅝" x 12" Bh 6 23,500 - 141,000 - 141,000
3 Bolt Machine / Bolt cariage ½" x ¾" Bh 8 2,900 - 23,200 - 23,200
4 Bracket Secondary / Bracket insulated Bh 1 7,400 - 7,400 - 7,400
5 Brace Steel 770 mm Bh 4 25,900 - 103,600 - 103,600
6 Cross Arm Steel 2.000 mm ( UNSP 10 ) galvanis Bh 2 230,000 - 460,000 - 460,000
7 Brace Steel 1.262 mm Bh 4 58,800 - 235,200 - 235,200
8 Cross Arm Steel 3.000 mm ( UNSP 10 ) galvanis Bh 2 350,000 - 700,000 - 700,000
9 Lock Nut ⅝" Bh 15 7,000 - 105,000 - 105,000
10 Pole Band Double Rack 7" atau 7 ½" Bh 4 30,600 - 122,400 - 122,400
11 Pole Band Single Rack 7" atau 7 ½" Bh 1 24,300 - 24,300 - 24,300
12 Spool Insulator ANSI 53 - 2 Bh 1 10,200 - 10,200 - 10,200
13 Tie Wire # 4 / Alluminium bonding wire # 20 Mtr 22.4 3,100 - 69,440 - 69,440
14 Washer Square 2 ¼" Bh 28 1,100 - 30,800 - 30,800
15 Upah Pasang Konst. JTM Double Circuit DC-C2-AVN Unit 1 127,100 - - 127,100 127,100
Sub Jumlah DC-C2AVN - 2,032,540 127,100 2,159,640
10 DC-C2-1BN Unit 1
1 Isolator Tarik ( Polymer ) 20 KV + Primary Dead E Set 2 PLN PLN - - -
2 Isolator Tumpu (Pin Post) 20 KV Bh 8 PLN PLN - - -
3 Bolt Double Arming ⅝" x 14" Bh 4 23,500 - 94,000 - 94,000
4 Bolt Machine / Bolt cariage ½" x ¾" Bh 4 2,900 - 11,600 - 11,600
5 Bracket Secondary / Bracket insulated Bh 1 7,400 - 7,400 - 7,400
6 Brace Steel 1.262 mm Bh 4 58,800 - 235,200 - 235,200
7 Cross Arm Steel 3.000 mm ( UNSP 10 ) galvanis Bh 2 350,000 - 700,000 - 700,000
8 Lock Nut ⅝" Bh 9 7,000 - 63,000 - 63,000
9 Oval Eye Bolt ⅝" x 8" Bh 2 11,700 - 23,400 - 23,400
10 Pole Band Double Rack 7" atau 7 ½" Bh 2 30,600 - 61,200 - 61,200
11 Pole Band Single Rack 7" atau 7 ½" Bh 1 24,300 - 24,300 - 24,300
12 Primary Angle Clamp ( 150 s/d 240 ) mm² Bh 2 40,800 - 81,600 - 81,600
13 Schackle Anchor ⅝" Bh 2 10,200 - 20,400 - 20,400
14 Spool Insulator ANSI 53 - 2 Bh 1 10,200 - 10,200 - 10,200
15 Tie Wire # 4 / Alluminium bonding wire # 20 Mtr 15.2 3,100 - 47,120 - 47,120
16 Washer Square 2 ¼" Bh 20 1,100 - 22,000 - 22,000
17 Upah Pasang Konst. JTM Double Circuit DC-C2-1BN Unit 1 128,700 - - 128,700 128,700
Sub Jumlah DC-C2-1BN - 1,401,420 128,700 1,530,120
11 DC-C4N Unit 1
1 Isolator Tarik ( Polymer ) 20 KV + Primary Dead E Set 6 PLN PLN - - -
2 Armour Tape ¼" wide Mtr 2.0 4,300 - 8,600 - 8,600
3 Bolt Double Arming ⅝" x 12" Bh 6 23,500 - 141,000 - 141,000
4 Bolt Machine / Bolt cariage ½" x ¾" Bh 4 2,900 - 11,600 - 11,600
5 Clevis Swinging Secondary Bh 2 9,400 - 18,800 - 18,800
6 Brace Steel 1.262 mm Bh 4 58,800 - 235,200 - 235,200
PT. PLN (PERSERO)
DISTRIBUSI JAWA TENGAH DAN D.I. YOGYAKARTA
AREA SURAKARTA

ANALISA PER UNIT KONSTRUKSI


PEKERJAAN PEMBANGUNAN JARINGAN DISTRIBUSI 20 KV
#REF!

HARGA SATUAN BIAYA YANG DIPERLUKAN


NO. PERINCUAN PER UNIT KONSTRUKSI STN VOL MATERIAL MATERIAL TOTAL
JASA/UPAH JASA/UPAH
MDU HARDWARE MDU HARDWARE
7 Cross Arm Steel 3.000 mm ( UNSP 10 ) galvanis Bh 2 350,000 - 700,000 - 700,000
8 Lock Nut ⅝" Bh 6 7,000 - 42,000 - 42,000
9 Loop Dead End Clamp / LC ( 35 s/d 240 ) mm² Bh 2 18,000 - 36,000 - 36,000
10 Oval Eye Nut ⅝" Bh 7 13,300 - 93,100 - 93,100
11 Pole Band Double Rack 7" atau 7 ½" Bh 1 30,600 - 30,600 - 30,600
12 Pole Band Single Rack 7" atau 7 ½" Bh 1 24,300 - 24,300 - 24,300
13 Schackle Anchor ⅝" Bh 6 10,200 - 61,200 - 61,200
14 Spool Insulator ANSI 53 - 4 Bh 1 15,700 - 15,700 - 15,700
15 Washer Square 2 ¼" Bh 26 1,100 - 28,600 - 28,600
16 Upah Pasang Konst. JTM Double Circuit DC-C4-N Unit 1 131,000 - - 131,000 131,000
Sub Jumlah DC-C4N - 1,446,700 131,000 1,577,700
12 DC-C7N Unit 1
1 Isolator Tarik ( Polymer ) 20 KV + Primary Dead E Set 6 PLN PLN - - -
2 Armour Tape ¼" wide Mtr 1.0 4,300 - 4,300 - 4,300
3 Bolt Double Arming ⅝" x 12" Bh 6 23,500 - 141,000 - 141,000
4 Bolt Machine / Bolt cariage ½" x ¾" Bh 8 2,900 - 23,200 - 23,200
5 Clevis Swinging Secondary Bh 1 9,400 - 9,400 - 9,400
6 Brace Steel 770 mm Bh 4 25,900 - 103,600 - 103,600
7 Cross Arm Steel 2.000 mm ( UNSP 10 ) galvanis Bh 2 230,000 - 460,000 - 460,000
8 Brace Steel 1.262 mm Bh 4 58,800 - 235,200 - 235,200
9 Cross Arm Steel 3.000 mm ( UNSP 10 ) galvanis Bh 2 350,000 - 700,000 - 700,000
10 Lock Nut ⅝" Bh 9 7,000 - 63,000 - 63,000
11 Loop Dead End Clamp / LC ( 35 s/d 240 ) mm² Bh 2 18,000 - 36,000 - 36,000
12 Oval Eye Nut ⅝" Bh 6 13,300 - 79,800 - 79,800
13 Pole Band Double Rack 7" atau 7 ½" Bh 4 30,600 - 122,400 - 122,400
14 Pole Band Single Rack 7" atau 7 ½" Bh 1 24,300 - 24,300 - 24,300
15 Schackle Anchor ⅝" Bh 6 10,200 - 61,200 - 61,200
16 Spool Insulator ANSI 53 - 4 Bh 1 15,700 - 15,700 - 15,700
17 Washer Square 2 ¼" Bh 28 1,100 - 30,800 - 30,800
18 Upah Pasang Konst. JTM Double Circuit DC-C7-N Unit 1 155,200 - - 155,200 155,200
Sub Jumlah DC-C7N - 2,109,900 155,200 2,265,100
13 DC-C8 Unit 1
1 Isolator Tarik ( Polymer ) 20 KV + Primary Dead E Set 12 PLN PLN - - -
2 Isolator Tumpu (Line Post) 20 KV Bh 1 PLN PLN - - -
3 Isolator Tumpu (Pin Post) 20 KV Bh 5 PLN PLN - - -
4 Bolt Double Arming ⅝" x 12" Bh 5 23,500 - 117,500 - 117,500
5 Bolt Machine / Bolt cariage ½" x ¾" Bh 8 2,900 - 23,200 - 23,200
6 Bracket Secondary / Bracket insulated Bh 1 7,400 - 7,400 - 7,400
7 Center Bracket 12.5 KN Bh 1 54,100 - 54,100 - 54,100
8 Brace Steel 770 mm Bh 4 25,900 - 103,600 - 103,600
9 Cross Arm Steel 2.000 mm ( UNSP 10 ) galvanis Bh 2 230,000 - 460,000 - 460,000
10 Brace Steel 1.262 mm Bh 4 58,800 - 235,200 - 235,200
11 Cross Arm Steel 3.000 mm ( UNSP 10 ) galvanis Bh 2 350,000 - 700,000 - 700,000
12 Loop Dead End Clamp / LC ( 35 s/d 240 ) mm² Bh 5 18,000 - 90,000 - 90,000
13 Oval Eye Nut ⅝" Bh 12 13,300 - 159,600 - 159,600
14 Pole Band Double Rack 7" atau 7 ½" Bh 4 30,600 - 122,400 - 122,400
15 Pole Band Single Rack 7" atau 7 ½" Bh 4 24,300 - 97,200 - 97,200
16 Schackle Anchor ⅝" Bh 12 10,200 - 122,400 - 122,400
17 Spool Insulator ANSI 53 - 2 Bh 1 10,200 - 10,200 - 10,200
18 Tie Wire # 4 / Alluminium bonding wire # 20 Mtr 11.6 3,100 - 35,960 - 35,960
19 Washer Square 2 ¼" Bh 25 1,100 - 27,500 - 27,500
20 Upah Pasang Konst. JTM Double Circuit DC-C8 Unit 1 258,900 - - 258,900 258,900
Sub Jumlah DC-C8 - 2,366,260 258,900 2,625,160
14 DC-C8N Unit 1
1 Isolator Tarik ( Polymer ) 20 KV + Primary Dead E Set 12 PLN PLN - - -
2 Isolator Tumpu (Line Post) 20 KV Bh 1 PLN PLN - - -
3 Isolator Tumpu (Pin Post) 20 KV Bh 5 PLN PLN - - -
4 Bolt Double Arming ⅝" x 12" Bh 5 23,500 - 117,500 - 117,500
5 Bolt Machine / Bolt cariage ½" x ¾" Bh 8 2,900 - 23,200 - 23,200
6 Bracket Secondary / Bracket insulated Bh 1 7,400 - 7,400 - 7,400
7 Center Bracket 12.5 KN Bh 1 54,100 - 54,100 - 54,100
8 Brace Steel 770 mm Bh 4 25,900 - 103,600 - 103,600
9 Cross Arm Steel 2.000 mm ( UNSP 10 ) galvanis Bh 2 230,000 - 460,000 - 460,000
10 Brace Steel 1.262 mm Bh 4 58,800 - 235,200 - 235,200
11 Cross Arm Steel 3.000 mm ( UNSP 10 ) galvanis Bh 2 350,000 - 700,000 - 700,000
12 Loop Dead End Clamp / LC ( 35 s/d 240 ) mm² Bh 5 18,000 - 90,000 - 90,000
13 Oval Eye Nut ⅝" Bh 12 13,300 - 159,600 - 159,600
14 Pole Band Double Rack 7" atau 7 ½" Bh 4 30,600 - 122,400 - 122,400
15 Pole Band Single Rack 7" atau 7 ½" Bh 4 24,300 - 97,200 - 97,200
16 Schackle Anchor ⅝" Bh 12 10,200 - 122,400 - 122,400
17 Spool Insulator ANSI 53 - 2 Bh 1 10,200 - 10,200 - 10,200
18 Tie Wire # 4 / Alluminium bonding wire # 20 Mtr 11.6 3,100 - 35,960 - 35,960
19 Washer Square 2 ¼" Bh 25 1,100 - 27,500 - 27,500
20 Upah Pasang Konst. JTM Double Circuit DC-C8-N Unit 1 258,900 - - 258,900 258,900
Sub Jumlah DC-C8N - 2,366,260 258,900 2,625,160
PT. PLN (PERSERO)
DISTRIBUSI JAWA TENGAH DAN D.I. YOGYAKARTA
AREA SURAKARTA

RENCANA ANGGARAN BIAYA


HARGA MATERIAL BIAYA YANG DIPERLUKAN JUMLAH BIAYA
NO. PERINCIAN PER UNIT KONSTRUKSI STN VOL SATUAN
MDU MATERIAL JASA/UPAH JUMLAH (Rp.)
(Rp.)
(Rp.) (Rp.) (Rp.) (Rp.)
1 2 3 4 5 6 7 8 9=7+8 10=6+9
SKUTM
1 DB 01 Unit 1
1 Strap For Clamping, Type Insulator Bh 2 11,700 23,400 23,400 23,400
2 Suspension Clamp Bh 1 14,100 14,100 14,100 14,100
3 U-Bolt Bh 1 20,000 20,000 20,000 20,000
4 Fixation Device Bh 1 63,500 63,500 63,500 63,500
5 Pole Band Bh 2 36,800 73,600 73,600 73,600
6 Upah Pasang Konst. SKUTM DB01 (Suspension Assembly) Unit 1 15,600 15,600 15,600 15,600
Sub Jumlah DB 01 - 194,600 15,600 210,200 210,200
2 DB 02 Unit 1
1 Strap For Clamping, Type Insulator Bh 2 11,700 23,400 23,400 23,400
2 Suspension Clamp Bh 2 14,100 28,200 28,200 28,200
3 Yoke Bh 1 22,700 22,700 22,700 22,700
4 U-Bolt Bh 1 20,000 20,000 20,000 20,000
5 Fixation Device Bh 1 63,500 63,500 63,500 63,500
6 Pole Band Bh 2 36,800 73,600 73,600 73,600
7 Upah Pasang Konst. SKUTM DB02 (Small Angle Assembly) Unit 1 23,400 23,400 23,400 23,400
Sub Jumlah DB 02 - 231,400 23,400 254,800 254,800
3 DB 03 Unit 1
1 Strap For Clamping, Type Insulator Bh 2 11,700 23,400 23,400 23,400
2 Suspension Clamp Bh 2 14,100 28,200 28,200 28,200
3 Yoke Bh 1 22,700 22,700 22,700 22,700
4 U-Bolt Bh 2 20,000 40,000 40,000 40,000
5 Fixation Device Bh 1 63,500 63,500 63,500 63,500
6 Pole Band Bh 2 36,800 73,600 73,600 73,600
7 Upah Pasang Konst. SKUTM DB03 (Medium Angle Assembly) Unit 1 31,200 31,200 31,200 31,200
Sub Jumlah DB 03 - 251,400 31,200 282,600 282,600
4 DB 04 Unit 1
1 Strap For Clamping, Type Insulator Bh 2 11,700 23,400 23,400 23,400
2 Parralel Groove Clamp Bh 2 47,800 95,600 95,600 95,600
3 Strain Clamp Bolted Type Bh 2 30,600 61,200 61,200 61,200
4 Turn Buckle Bh 2 58,800 117,600 117,600 117,600
5 Strain Hinge Bh 2 37,600 75,200 75,200 75,200
6 Fixation Device Bh 2 63,500 127,000 127,000 127,000
7 Pole Band Bh 2 36,800 73,600 73,600 73,600
8 Upah Pasang Konst. SKUTM DB04 (Large Angle Assembly) Unit 1 25,700 25,700 25,700 25,700
Sub Jumlah DB 04 - 573,600 25,700 599,300 599,300
5 DB 05 Unit 1
1 H Type Connector 50/50 mm² Cu Bh 2 25,100 50,200 50,200 50,200
2 Cooper Strip 50 mm² Insulated Ground Colour Bh 3 21,900 65,700 65,700 65,700
3 PVC Pipe 150 mm² Bh 1 35,300 35,300 35,300 35,300
4 Protective Plastic Bh 6 2,100 12,600 12,600 12,600
5 Link 50 x 25 mm Bh 6 2,100 12,600 12,600 12,600
6 Strapping Buckle Bh 6 3,700 22,200 22,200 22,200
7 Stainless Steel Strap 20 x 71 Bh 1 3,000 3,000 3,000 3,000
8 Strap For Clamping, Type Insulator Bh 2 11,700 23,400 23,400 23,400
9 Parralel Groove Clamp Bh 1 47,800 47,800 47,800 47,800
10 Strain Clamp Bolted Type Bh 1 30,600 30,600 30,600 30,600
11 Turn Buckle Bh 1 58,800 58,800 58,800 58,800
12 Strain Hinge Bh 1 37,600 37,600 37,600 37,600
13 Fixation Device Bh 1 63,500 63,500 63,500 63,500
14 Pole Band Bh 2 36,800 73,600 73,600 73,600
15 Upah Pasang Konst. SKUTM DB05 (Adjustable Dead End Assembly) Unit 1 37,400 37,400 37,400 37,400
Sub Jumlah DB 05 - 536,900 37,400 574,300 574,300
6 DB 06 Unit 1
1 Terminal Lug For 50 mm² CU Conductor Bh 2 98,100 196,200 196,200 196,200
2 Cooper Strip 50 mm² Insulated Ground Colour Bh 6 21,900 131,400 131,400 131,400
3 PVC Pipe 150 mm² Bh 1 35,300 35,300 35,300 35,300
4 Strapping Buckle Bh 6 3,700 22,200 22,200 22,200
5 Link 50 x 25 mm Bh 6 2,100 12,600 12,600 12,600
6 Protective Plastic Bh 1 2,100 2,100 2,100 2,100
7 Stainless Steel Strap 20 x 71 Bh 6 3,000 18,000 18,000 18,000
8 Stainless Steel Bolt 12 x 45 Bh 8 10,900 87,200 87,200 87,200
9 Strap For Clamping, Type Insulator Bh 1 11,700 11,700 11,700 11,700
10 Parralel Groove Clamp Bh 1 47,800 47,800 47,800 47,800
11 Strain Clamp Bolted Type Bh 1 30,600 30,600 30,600 30,600
12 Turn Buckle Bh 1 58,800 58,800 58,800 58,800
13 Strain Hinge Bh 1 37,600 37,600 37,600 37,600
14 Fixation Device Bh 1 63,500 63,500 63,500 63,500
15 Pole Band Bh 2 36,800 73,600 73,600 73,600
16 Set Of Cable Terminator For 3x150aac+90 st Bh 1 44,700 44,700 44,700 44,700
17 Lightning Arester (Polymer) 18 KV, 10 KA Bh 3 PLN PLN - PLN
18 H Type Connector 50/50 mm² Cu Bh 8 25,100 200,800 200,800 200,800
19 Terminal Lug For 150 mm² CU conductor Bh 6 23,500 141,000 141,000 141,000
20 H Type Connector Bh 3 12,100 36,300 36,300 36,300
21 Three Pole Outdoor Terminator For 3x240 mm² AL XLPE U/G CABLE Bh 1 2,983,000 2,983,000 2,983,000 2,983,000
22 Support Assembly For TIC Terminator Bh 1 22,000 22,000 22,000 22,000
23 Single Support On Single Pole 2000mm Bh 1 314,000 314,000 314,000 314,000
24 Upah Pasang Konst. SKUTM DB06 (Fixed Dead End Assembly)) Unit 1 28,800 28,800 28,800 28,800
Sub Jumlah DB 06 - 4,570,400 28,800 4,599,200 4,599,200
PT. PLN (PERSERO)
DISTRIBUSI JAWA TENGAH DAN D.I. YOGYAKARTA
AREA SURAKARTA

ANALISA PER UNIT KONSTRUKSI


PEKERJAAN PEMBANGUNAN JARINGAN DISTRIBUSI 20 KV
#REF!

HARGA SATUAN BIAYA YANG DIPERLUKAN


NO. PERINCUAN PER UNIT KONSTRUKSI STN VOL MATERIAL MATERIAL TOTAL
JASA/UPAH JASA/UPAH
MDU HARDWARE MDU HARDWARE
1 RECLOSER Unit 1
1 Recloser Lengkap Dengan PT Set 1 PLN PLN - - -
Auxiliary Supply dan Battery Charger
2 Disconnecting Switch 20 kV - 630 A Set 1 PLN PLN - - -
3 Brace Steel 1.262 mm Bh 4 58,800 235,200 - 235,200
4 AAAC 240 mm² Mtr 12 PLN PLN - - -
5 Sepatu Kabel AL/CU Kepala-240 mm² Bh 12 97,500 - 1,170,000 - 1,170,000
6 Compresion Conector H type 240 mm² / 240 mm² Bh 6 29,800 - 178,800 - 178,800
7 Cross Arm Steel 3.000 mm ( UNSP 10 ) galvanis Bh 2 350,000 - 700,000 - 700,000
8 Pole Band Double Rack 8" atau 8 ½" Bh 2 30,600 - 61,200 - 61,200
9 Jasa Pasang CM5-24 (RECL. 3 PHASA 20 kV) Unit 1 2,500,000 - 2,500,000 2,500,000
Sub Jumlah RECLOSER - 2,345,200 2,500,000 4,845,200
PT. PLN (PERSERO)
DISTRIBUSI JAWA TENGAH DAN D.I. YOGYAKARTA
AREA SURAKARTA

ANALISA PER UNIT KONSTRUKSI


PEKERJAAN PEMBANGUNAN JARINGAN DISTRIBUSI 20 KV
#REF!

HARGA SATUAN BIAYA YANG DIPERLUKAN


NO. PERINCUAN PER UNIT KONSTRUKSI STN VOL MATERIAL MATERIAL TOTAL
JASA/UPAH JASA/UPAH
MDU HARDWARE MDU HARDWARE
1 P12C-1 Unit 1
1 Cross Arm Steel 2.000 mm ( UNSP 10 ) galvanis Bh 1 230,000 - 230,000 - 230,000
2 Bolt Machine ⅝" x 10" Bh 2 9,400 - 18,800 - 18,800
3 Washer Square 2 ¼" Bh 2 1,100 - 2,200 - 2,200
4 Jasa Pemasangan P12C-1 Unit 1 24,100 - - 24,100 24,100
Sub Jumlah P12C-1 - 251,000 24,100 275,100
2 P12C-2 Unit 1
1 Cross Arm Steel 2.000 mm ( UNSP 10 ) galvanis Bh 2 230,000 - 460,000 - 460,000
2 Bolt Machine ⅝" x 10" Bh 2 9,400 - 18,800 - 18,800
3 Washer Square 2 ¼" Bh 2 1,100 - 2,200 - 2,200
4 Bolt Double Arming ⅝" x 14" Bh 2 23,500 - 47,000 - 47,000
5 Jasa Pemasangan P12C-2 Unit 1 35,100 - - 35,100 35,100
Sub Jumlah P12C-2 - 528,000 35,100 563,100
3 P12S-1 Unit 1
1 Cross Arm Steel 2.000 mm ( UNSP 10 ) galvanis Bh 1 230,000 - 230,000 - 230,000
2 Pole Band Double Rack 7" atau 7 ½" Bh 1 30,600 - 30,600 - 30,600
3 Jasa Pemasangan P12S-1 Unit 1 24,100 - - 24,100 24,100

Sub Jumlah P12S-1 - 260,600 24,100 284,700


4 P12S-2 Unit 1
1 Cross Arm Steel 2.000 mm ( UNSP 10 ) galvanis Bh 2 230,000 - 460,000 - 460,000
2 Pole Band Double Rack 7" atau 7 ½" Bh 2 30,600 - 61,200 - 61,200
3 Bolt Double Arming ⅝" x 14" Bh 2 23,500 - 47,000 - 47,000
4 Jasa Pemasangan P12S-2 Unit 1 35,100 - - 35,100 35,100

Sub Jumlah P12S-2 - 568,200 35,100 603,300


PT. PLN (PERSERO)
DISTRIBUSI JAWA TENGAH DAN D.I. YOGYAKARTA
AREA SURAKARTA

ANALISA PER UNIT KONSTRUKSI


PEKERJAAN PEMBANGUNAN JARINGAN DISTRIBUSI 20 KV
#REF!

HARGA SATUAN BIAYA YANG DIPERLUKAN


NO. PERINCUAN PER UNIT KONSTRUKSI STN VOL MATERIAL MATERIAL TOTAL
JASA/UPAH JASA/UPAH
MDU HARDWARE MDU HARDWARE
1 F1-2 Unit 1 - - -
1 Expanding Anchor 8.000 lbs Bh 1 70,600 - 70,600 - 70,600
2 Rod Anchor ⅝" x 7' Bh 1 61,200 - 61,200 - 61,200
3 Kousen Bh 1 3,100 - 3,100 - 3,100
4 Upah Pasang Acc.Jar F1-2 Unit 1 27,300 - - 27,300 27,300
Sub Jumlah F1-2 - 134,900 27,300 162,200
2 F1-3 Unit 1
1 Expanding Anchor 10.000 lbs Bh 1 70,600 - 70,600 - 70,600
2 Rod Anchor ¾" x 8' Bh 1 74,500 - 74,500 - 74,500
3 Kousen Bh 1 3,100 - 3,100 - 3,100
4 Upah Pasang Acc.Jar F1-3 Unit 1 25,000 - - 25,000 25,000
Sub Jumlah F1-3 - 148,200 25,000 173,200
3 FDG Unit 1
1 Tiang Beton 11M-200 daN+E Btg 1 PLN PLN - - -
2 Pole Band Double Rack 7" atau 7 ½" Bh 4 30,600 - 122,400 - 122,400
3 Plat Besi 4 mm x 4 cm x 8 cm Bh 2 35,300 - 70,600 - 70,600
4 Upah Pasang Acc.Jar FDG Unit 1 580,000 - - 580,000 580,000
Sub Jumlah FDG - 193,000 580,000 773,000
PT. PLN (PERSERO)
DISTRIBUSI JAWA TENGAH DAN D.I. YOGYAKARTA
AREA SURAKARTA

ANALISA PER UNIT KONSTRUKSI


PEKERJAAN PEMBANGUNAN JARINGAN DISTRIBUSI 20 KV
#REF!

HARGA SATUAN BIAYA YANG DIPERLUKAN


NO. PERINCUAN PER UNIT KONSTRUKSI STN VOL MATERIAL MATERIAL TOTAL
JASA/UPAH JASA/UPAH
MDU HARDWARE MDU HARDWARE
1 CE1-1 (7M) Unit 1
1 Bolt Machine ⅝" x 10" Bh 1 9,400 - 9,400 - 9,400
2 Guy Attachment / Guy hok Bh 1 5,800 - 5,800 - 5,800
3 Guy Wire 22 mm² Mtr 7 5,800 - 40,600 - 40,600
4 Three Bolt Clamp Bh 2 25,100 - 50,200 - 50,200
5 Washer Square 2 ¼" Bh 1 1,100 - 1,100 - 1,100
6 Jasa Pemasangan CE1-1 Unit 1 24,100 - - 24,100 24,100
Sub Jumlah CE1-1 (7M) - 107,100 24,100 131,200
2 CE1-1 (9M) Unit 1
1 Bolt Machine ⅝" x 10" Bh 1 9,400 - 9,400 - 9,400
2 Guy Attachment / Guy hok Bh 1 5,800 - 5,800 - 5,800
3 Guy Wire 22 mm² Mtr 9 5,800 - 52,200 - 52,200
4 Three Bolt Clamp Bh 2 25,100 - 50,200 - 50,200
5 Washer Square 2 ¼" Bh 1 1,100 - 1,100 - 1,100
6 Jasa Pemasangan CE1-1 Unit 1 24,100 - - 24,100 24,100
Sub Jumlah CE1-1 (9M) - 118,700 24,100 142,800
3 CE1-1 (11M) Unit 1
1 Bolt Machine ⅝" x 10" Bh 1 9,400 - 9,400 - 9,400
2 Guy Attachment / Guy hok Bh 1 5,800 - 5,800 - 5,800
3 Guy Wire 22 mm² Mtr 11 5,800 - 63,800 - 63,800
4 Three Bolt Clamp Bh 2 25,100 - 50,200 - 50,200
5 Washer Square 2 ¼" Bh 1 1,100 - 1,100 - 1,100
6 Jasa Pemasangan CE1-1 Unit 1 24,100 - - 24,100 24,100
Sub Jumlah CE1-1 (11M) - 130,300 24,100 154,400
4 CE1-1 (12M) Unit 1
1 Bolt Machine ⅝" x 10" Bh 1 9,400 - 9,400 - 9,400
2 Guy Attachment / Guy hok Bh 1 5,800 - 5,800 - 5,800
3 Guy Wire 22 mm² Mtr 12 5,800 - 69,600 - 69,600
4 Three Bolt Clamp Bh 2 25,100 - 50,200 - 50,200
5 Washer Square 2 ¼" Bh 1 1,100 - 1,100 - 1,100
6 Jasa Pemasangan CE1-1 Unit 1 24,100 - - 24,100 24,100
Sub Jumlah CE1-1 (12M) - 136,100 24,100 160,200
5 CE1-2 (7M) Unit 1
1 Bolt Machine ⅝" x 10" Bh 1 9,400 - 9,400 - 9,400
2 Guy Attachment / Guy hok Bh 1 5,800 - 5,800 - 5,800
3 Guy Wire 35 mm² Mtr 7 8,600 - 60,200 - 60,200
4 Three Bolt Clamp Bh 2 25,100 - 50,200 - 50,200
5 Washer Square 2 ¼" Bh 1 1,100 - 1,100 - 1,100
6 Jasa Pemasangan CE1-2 Unit 1 24,100 - - 24,100 24,100
Sub Jumlah CE1-2 (7M) - 126,700 24,100 150,800
6 CE1-2 (9M) Unit 1
1 Bolt Machine ⅝" x 10" Bh 1 9,400 - 9,400 - 9,400
2 Guy Attachment / Guy hok Bh 1 5,800 - 5,800 - 5,800
3 Guy Wire 35 mm² Mtr 9 8,600 - 77,400 - 77,400
4 Three Bolt Clamp Bh 2 25,100 - 50,200 - 50,200
5 Washer Square 2 ¼" Bh 1 1,100 - 1,100 - 1,100
6 Jasa Pemasangan CE1-2 Unit 1 24,100 - - 24,100 24,100
Sub Jumlah CE1-2 (9M) - 143,900 24,100 168,000
7 CE1-2 (11M) Unit 1
1 Bolt Machine ⅝" x 10" Bh 1 9,400 - 9,400 - 9,400
2 Guy Attachment / Guy hok Bh 1 5,800 - 5,800 - 5,800
3 Guy Wire 35 mm² Mtr 11 8,600 - 94,600 - 94,600
4 Three Bolt Clamp Bh 2 25,100 - 50,200 - 50,200
5 Washer Square 2 ¼" Bh 1 1,100 - 1,100 - 1,100
6 Jasa Pemasangan CE1-2 Unit 1 24,100 - - 24,100 24,100
Sub Jumlah CE1-2 (11M) - 161,100 24,100 185,200
8 CE1-2 (12M) Unit 1
1 Bolt Machine ⅝" x 10" Bh 1 9,400 - 9,400 - 9,400
2 Guy Attachment / Guy hok Bh 1 5,800 - 5,800 - 5,800
3 Guy Wire 35 mm² Mtr 12 8,600 - 103,200 - 103,200
4 Three Bolt Clamp Bh 2 25,100 - 50,200 - 50,200
5 Washer Square 2 ¼" Bh 1 1,100 - 1,100 - 1,100
6 Jasa Pemasangan CE1-2 Unit 1 24,100 - - 24,100 24,100
Sub Jumlah CE1-2 (12M) - 169,700 24,100 193,800
9 CE1-2 (13M) Unit 1
1 Bolt Machine ⅝" x 10" Bh 1 9,400 - 9,400 - 9,400
2 Guy Attachment / Guy hok Bh 1 5,800 - 5,800 - 5,800
3 Guy Wire 35 mm² Mtr 13 8,600 - 111,800 - 111,800
4 Three Bolt Clamp Bh 2 25,100 - 50,200 - 50,200
5 Washer Square 2 ¼" Bh 1 1,100 - 1,100 - 1,100
6 Jasa Pemasangan CE1-2 Unit 1 24,100 - - 24,100 24,100
Sub Jumlah CE1-2 (13M) - 178,300 24,100 202,400
PT. PLN (PERSERO)
DISTRIBUSI JAWA TENGAH DAN D.I. YOGYAKARTA
AREA SURAKARTA

ANALISA PER UNIT KONSTRUKSI


PEKERJAAN PEMBANGUNAN JARINGAN DISTRIBUSI 20 KV
#REF!

HARGA SATUAN BIAYA YANG DIPERLUKAN


NO. PERINCUAN PER UNIT KONSTRUKSI STN VOL MATERIAL MATERIAL TOTAL
JASA/UPAH JASA/UPAH
MDU HARDWARE MDU HARDWARE
10 CE1-2 (14M) Unit 1
1 Bolt Machine ⅝" x 10" Bh 1 9,400 - 9,400 - 9,400
2 Guy Attachment / Guy hok Bh 1 5,800 - 5,800 - 5,800
3 Guy Wire 35 mm² Mtr 14 8,600 - 120,400 - 120,400
4 Three Bolt Clamp Bh 2 25,100 - 50,200 - 50,200
5 Washer Square 2 ¼" Bh 1 1,100 - 1,100 - 1,100
6 Jasa Pemasangan CE1-2 Unit 1 24,100 - - 24,100 24,100
Sub Jumlah CE1-2 (14M) - 186,900 24,100 211,000
11 CE1-3 (9M) Unit 1
1 Bolt Machine ⅝" x 10" Bh 1 9,400 - 9,400 - 9,400
2 Guy Attachment / Guy hok Bh 1 5,800 - 5,800 - 5,800
3 Guy Wire 70 mm² Mtr 9 16,400 - 147,600 - 147,600
4 Three Bolt Clamp Bh 2 25,100 - 50,200 - 50,200
5 Washer Square 2 ¼" Bh 1 1,100 - 1,100 - 1,100
6 Jasa Pemasangan CE1-3 Unit 1 24,100 - - 24,100 24,100
Sub Jumlah CE1-3 (9M) - 214,100 24,100 238,200
12 CE1-3 (11M) Unit 1
1 Bolt Machine ⅝" x 10" Bh 1 9,400 - 9,400 - 9,400
2 Guy Attachment / Guy hok Bh 1 5,800 - 5,800 - 5,800
3 Guy Wire 70 mm² Mtr 11 16,400 - 180,400 - 180,400
4 Three Bolt Clamp Bh 2 25,100 - 50,200 - 50,200
5 Washer Square 2 ¼" Bh 1 1,100 - 1,100 - 1,100
6 Jasa Pemasangan CE1-3 Unit 1 24,100 - - 24,100 24,100
Sub Jumlah CE1-3 (11M) - 246,900 24,100 271,000
13 CE1-3 (12M) Unit 1
1 Bolt Machine ⅝" x 10" Bh 1 9,400 - 9,400 - 9,400
2 Guy Attachment / Guy hok Bh 1 5,800 - 5,800 - 5,800
3 Guy Wire 70 mm² Mtr 12 16,400 - 196,800 - 196,800
4 Three Bolt Clamp Bh 2 25,100 - 50,200 - 50,200
5 Washer Square 2 ¼" Bh 1 1,100 - 1,100 - 1,100
6 Jasa Pemasangan CE1-3 Unit 1 24,100 - - 24,100 24,100
Sub Jumlah CE1-3 (12M) - 263,300 24,100 287,400
14 CE1-3 (13M) Unit 1
1 Bolt Machine ⅝" x 10" Bh 1 9,400 - 9,400 - 9,400
2 Guy Attachment / Guy hok Bh 1 5,800 - 5,800 - 5,800
3 Guy Wire 70 mm² Mtr 13 16,400 - 213,200 - 213,200
4 Three Bolt Clamp Bh 2 25,100 - 50,200 - 50,200
5 Washer Square 2 ¼" Bh 1 1,100 - 1,100 - 1,100
6 Jasa Pemasangan CE1-3 Unit 1 24,100 - - 24,100 24,100
Sub Jumlah CE1-3 (13M) - 279,700 24,100 303,800
15 CE1-3 (14M) Unit 1
1 Bolt Machine ⅝" x 10" Bh 1 9,400 - 9,400 - 9,400
2 Guy Attachment / Guy hok Bh 1 5,800 - 5,800 - 5,800
3 Guy Wire 70 mm² Mtr 14 16,400 - 229,600 - 229,600
4 Three Bolt Clamp Bh 2 25,100 - 50,200 - 50,200
5 Washer Square 2 ¼" Bh 1 1,100 - 1,100 - 1,100
6 Jasa Pemasangan CE1-3 Unit 1 24,100 - - 24,100 24,100
Sub Jumlah CE1-3 (14M) - 296,100 24,100 320,200
16 CE2-1 Unit 1
1 Bolt Machine ⅝" x 10" Bh 2 9,400 - 18,800 - 18,800
2 Guy Wire 22 mm² Mtr 20 5,800 - 116,000 - 116,000
3 Nut Timble eye ⅝" Bh 2 7,800 - 15,600 - 15,600
4 Three Bolt Clamp Bh 2 25,100 - 50,200 - 50,200
5 Washer Square 2 ¼" Bh 2 1,100 - 2,200 - 2,200
6 Jasa Pemasangan CE2-1 Unit 1 32,700 - - 32,700 32,700
Sub Jumlah CE2-1 - 202,800 32,700 235,500
17 CE2-2 Unit 1
1 Bolt Machine ⅝" x 10" Bh 2 9,400 - 18,800 - 18,800
2 Guy Wire 35 mm² Mtr 20 8,600 - 172,000 - 172,000
3 Nut Timble eye ⅝" Bh 2 7,800 - 15,600 - 15,600
4 Three Bolt Clamp Bh 2 25,100 - 50,200 - 50,200
5 Washer Square 2 ¼" Bh 2 1,100 - 2,200 - 2,200
6 Jasa Pemasangan CE2-2 Unit 1 32,700 - - 32,700 32,700
Sub Jumlah CE2-2 - 258,800 32,700 291,500
18 CE2-3 Unit 1
1 Bolt Machine ⅝" x 10" Bh 2 9,400 - 18,800 - 18,800
2 Guy Wire 70 mm² Mtr 20 16,400 - 328,000 - 328,000
3 Nut Timble eye ⅝" Bh 2 7,800 - 15,600 - 15,600
4 Three Bolt Clamp Bh 2 25,100 - 50,200 - 50,200
5 Washer Square 2 ¼" Bh 2 1,100 - 2,200 - 2,200
6 Jasa Pemasangan CE2-3 Unit 1 29,600 - - 29,600 29,600
Sub Jumlah CE2-3 - 414,800 29,600 444,400
19 CE5-1 Unit 1
1 Bolt Machine ⅝" x 10" Bh 3 9,400 - 28,200 - 28,200
2 Bolt Double Arming ⅝ " x 16 - 24" Bh 2 25,100 - 50,200 - 50,200
3 Guy Wire 22 mm² Mtr 60 5,800 - 348,000 - 348,000
4 Nut Timble eye ⅝" Bh 6 7,800 - 46,800 - 46,800
5 Three Bolt Clamp Bh 6 25,100 - 150,600 - 150,600
6 Washer Square 2 ¼" Bh 6 1,100 - 6,600 - 6,600
7 Jasa Pemasangan CE5-1 Unit 1 95,900 - - 95,900 95,900
Sub Jumlah CE5-1 - 630,400 95,900 726,300
20 CE5-2 Unit 1
1 Bolt Machine ⅝" x 10" Bh 3 9,400 - 28,200 - 28,200
2 Bolt Double Arming ⅝ " x 16 - 24" Bh 2 25,100 - 50,200 - 50,200
3 Guy Wire 35 mm² Mtr 60 8,600 - 516,000 - 516,000
4 Nut Timble eye ⅝" Bh 6 7,800 - 46,800 - 46,800
5 Three Bolt Clamp Bh 6 25,100 - 150,600 - 150,600
PT. PLN (PERSERO)
DISTRIBUSI JAWA TENGAH DAN D.I. YOGYAKARTA
AREA SURAKARTA

ANALISA PER UNIT KONSTRUKSI


PEKERJAAN PEMBANGUNAN JARINGAN DISTRIBUSI 20 KV
#REF!

HARGA SATUAN BIAYA YANG DIPERLUKAN


NO. PERINCUAN PER UNIT KONSTRUKSI STN VOL MATERIAL MATERIAL TOTAL
JASA/UPAH JASA/UPAH
MDU HARDWARE MDU HARDWARE
6 Washer Square 2 ¼" Bh 6 1,100 - 6,600 - 6,600
7 Jasa Pemasangan CE5-2 Unit 1 95,900 - - 95,900 95,900
Sub Jumlah CE5-2 - 798,400 95,900 894,300
21 CE6-1 Unit 1
1 Bolt Machine ⅝" x 10" Bh 1 9,400 - 9,400 - 9,400
2 Pole Band Single Rack 7" atau 7 ½" Bh 1 24,300 - 24,300 - 24,300
3 Pipe Cap Galvanis 2 ½" Bh 2 28,200 - 56,400 - 56,400
4 Pipe Galvanis 2" 6' Bh 1 94,200 - 94,200 - 94,200
5 U Bolt Connector Bh 1 27,400 - 27,400 - 27,400
6 Guy Attachment / Guy hok Bh 1 5,800 - 5,800 - 5,800
7 Guy Wire 35 mm² Mtr 12 8,600 - 103,200 - 103,200
8 Three Bolt Clamp Bh 2 25,100 - 50,200 - 50,200
9 Washer Square 2 ¼" Bh 1 1,100 - 1,100 - 1,100
10 Jasa Pemasangan CE6-1 Unit 1 35,100 - - 35,100 35,100
Sub Jumlah CE6-1 - 372,000 35,100 407,100
PT. PLN (PERSERO)
DISTRIBUSI JAWA TENGAH DAN D.I. YOGYAKARTA
AREA SURAKARTA

ANALISA PER UNIT KONSTRUKSI


PEKERJAAN PEMBANGUNAN JARINGAN DISTRIBUSI 20 KV
#REF!

HARGA SATUAN BIAYA YANG DIPERLUKAN


NO. PERINCUAN PER UNIT KONSTRUKSI STN VOL MATERIAL MATERIAL TOTAL
JASA/UPAH JASA/UPAH
MDU HARDWARE MDU HARDWARE
22 SE1-1 (7M) Unit 1
1 Guy Attachment / Guy hok Bh 1 5,800 - 5,800 - 5,800
2 Guy Wire 22 mm² Mtr 7 5,800 - 40,600 - 40,600
3 Pole Band Single Rack 7" atau 7 ½" Bh 1 24,300 - 24,300 - 24,300
4 Three Bolt Clamp Bh 2 25,100 - 50,200 - 50,200
5 Jasa Pemasangan SE1-1 Unit 1 24,100 - - 24,100 24,100
Sub Jumlah SE1-1 (7M) - 120,900 24,100 145,000
23 SE1-1 (9M) Unit 1
1 Guy Attachment / Guy hok Bh 1 5,800 - 5,800 - 5,800
2 Guy Wire 22 mm² Mtr 9 5,800 - 52,200 - 52,200
3 Pole Band Single Rack 7" atau 7 ½" Bh 1 24,300 - 24,300 - 24,300
4 Three Bolt Clamp Bh 2 25,100 - 50,200 - 50,200
5 Jasa Pemasangan SE1-1 Unit 1 24,100 - - 24,100 24,100
Sub Jumlah SE1-1 (9M) - 132,500 24,100 156,600
24 SE1-1 (11M) Unit 1
1 Guy Attachment / Guy hok Bh 1 5,800 - 5,800 - 5,800
2 Guy Wire 22 mm² Mtr 11 5,800 - 63,800 - 63,800
3 Pole Band Single Rack 7" atau 7 ½" Bh 1 24,300 - 24,300 - 24,300
4 Three Bolt Clamp Bh 2 25,100 - 50,200 - 50,200
5 Jasa Pemasangan SE1-1 Unit 1 24,100 - - 24,100 24,100
Sub Jumlah SE1-1 (11M) - 144,100 24,100 168,200
25 SE1-1 (12M) Unit 1
1 Guy Attachment / Guy hok Bh 1 5,800 - 5,800 - 5,800
2 Guy Wire 22 mm² Mtr 12 5,800 - 69,600 - 69,600
3 Pole Band Single Rack 7" atau 7 ½" Bh 1 24,300 - 24,300 - 24,300
4 Three Bolt Clamp Bh 2 25,100 - 50,200 - 50,200
5 Jasa Pemasangan SE1-1 Unit 1 24,100 - - 24,100 24,100
Sub Jumlah SE1-1 (12M) - 149,900 24,100 174,000
26 SE1-2 (7M) Unit 1
1 Guy Attachment / Guy hok Bh 1 5,800 - 5,800 - 5,800
2 Guy Wire 35 mm² Mtr 7 8,600 - 60,200 - 60,200
3 Pole Band Single Rack 7" atau 7 ½" Bh 1 24,300 - 24,300 - 24,300
4 Three Bolt Clamp Bh 2 25,100 - 50,200 - 50,200
5 Jasa Pemasangan SE1-2 Unit 1 24,100 - - 24,100 24,100
Sub Jumlah SE1-2 (7M) - 140,500 24,100 164,600
27 SE1-2 (9M) Unit 1
1 Guy Attachment / Guy hok Bh 1 5,800 - 5,800 - 5,800
2 Guy Wire 35 mm² Mtr 9 8,600 - 77,400 - 77,400
3 Pole Band Single Rack 7" atau 7 ½" Bh 1 24,300 - 24,300 - 24,300
4 Three Bolt Clamp Bh 2 25,100 - 50,200 - 50,200
5 Jasa Pemasangan SE1-2 Unit 1 24,100 - - 24,100 24,100
Sub Jumlah SE1-2 (9M) - 157,700 24,100 181,800
28 SE1-2 (11M) Unit 1
1 Guy Attachment / Guy hok Bh 1 5,800 - 5,800 - 5,800
2 Guy Wire 35 mm² Mtr 9 8,600 - 77,400 - 77,400
3 Pole Band Single Rack 7" atau 7 ½" Bh 1 24,300 - 24,300 - 24,300
4 Three Bolt Clamp Bh 2 25,100 - 50,200 - 50,200
5 Jasa Pemasangan SE1-2 Unit 1 24,100 - - 24,100 24,100
Sub Jumlah SE1-2 (11M) - 157,700 24,100 181,800
29 SE1-2 (12M) Unit 1
1 Guy Attachment / Guy hok Bh 1 5,800 - 5,800 - 5,800
2 Guy Wire 35 mm² Mtr 12 8,600 - 103,200 - 103,200
3 Pole Band Single Rack 7" atau 7 ½" Bh 1 24,300 - 24,300 - 24,300
4 Three Bolt Clamp Bh 2 25,100 - 50,200 - 50,200
5 Jasa Pemasangan SE1-2 Unit 1 24,100 - - 24,100 24,100
Sub Jumlah SE1-2 (12M) - 183,500 24,100 207,600
30 SE1-2 (13M) Unit 1
1 Guy Attachment / Guy hok Bh 1 5,800 - 5,800 - 5,800
2 Guy Wire 35 mm² Mtr 13 8,600 - 111,800 - 111,800
3 Pole Band Single Rack 7" atau 7 ½" Bh 1 24,300 - 24,300 - 24,300
4 Three Bolt Clamp Bh 2 25,100 - 50,200 - 50,200
5 Jasa Pemasangan SE1-2 Unit 1 24,100 - - 24,100 24,100
Sub Jumlah SE1-2 (13M) - 192,100 24,100 216,200
31 SE1-2 (14M) Unit 1
1 Guy Attachment / Guy hok Bh 1 5,800 - 5,800 - 5,800
2 Guy Wire 35 mm² Mtr 14 8,600 - 120,400 - 120,400
3 Pole Band Single Rack 7" atau 7 ½" Bh 1 24,300 - 24,300 - 24,300
4 Three Bolt Clamp Bh 2 25,100 - 50,200 - 50,200
5 Jasa Pemasangan SE1-2 Unit 1 24,100 - - 24,100 24,100
Sub Jumlah SE1-2 (14M) - 200,700 24,100 224,800
32 SE1-3 (9M) Unit 1
1 Guy Attachment / Guy hok Bh 1 5,800 - 5,800 - 5,800
2 Guy Wire 70 mm² Mtr 9 16,400 - 147,600 - 147,600
3 Pole Band Single Rack 7" atau 7 ½" Bh 1 24,300 - 24,300 - 24,300
4 Three Bolt Clamp Bh 2 25,100 - 50,200 - 50,200
5 Jasa Pemasangan SE1-3 Unit 1 24,100 - - 24,100 24,100
Sub Jumlah SE1-3 (9M) - 227,900 24,100 252,000
PT. PLN (PERSERO)
DISTRIBUSI JAWA TENGAH DAN D.I. YOGYAKARTA
AREA SURAKARTA

ANALISA PER UNIT KONSTRUKSI


PEKERJAAN PEMBANGUNAN JARINGAN DISTRIBUSI 20 KV
#REF!

HARGA SATUAN BIAYA YANG DIPERLUKAN


NO. PERINCUAN PER UNIT KONSTRUKSI STN VOL MATERIAL MATERIAL TOTAL
JASA/UPAH JASA/UPAH
MDU HARDWARE MDU HARDWARE
33 SE1-3 (11M) Unit 1
1 Guy Attachment / Guy hok Bh 1 5,800 - 5,800 - 5,800
2 Guy Wire 70 mm² Mtr 11 16,400 - 180,400 - 180,400
3 Pole Band Single Rack 7" atau 7 ½" Bh 1 24,300 - 24,300 - 24,300
4 Three Bolt Clamp Bh 2 25,100 - 50,200 - 50,200
5 Jasa Pemasangan SE1-3 Unit 1 24,100 - - 24,100 24,100
Sub Jumlah SE1-3 (11M) - 260,700 24,100 284,800
34 SE1-3 (12M) Unit 1
1 Guy Attachment / Guy hok Bh 1 5,800 - 5,800 - 5,800
2 Guy Wire 70 mm² Mtr 12 16,400 - 196,800 - 196,800
3 Pole Band Single Rack 7" atau 7 ½" Bh 1 24,300 - 24,300 - 24,300
4 Three Bolt Clamp Bh 2 25,100 - 50,200 - 50,200
5 Jasa Pemasangan SE1-3 Unit 1 24,100 - - 24,100 24,100
Sub Jumlah SE1-3 (12M) - 277,100 24,100 301,200
35 SE1-3 (13M) Unit 1
1 Guy Attachment / Guy hok Bh 1 5,800 - 5,800 - 5,800
2 Guy Wire 70 mm² Mtr 13 16,400 - 213,200 - 213,200
3 Pole Band Single Rack 7" atau 7 ½" Bh 1 24,300 - 24,300 - 24,300
4 Three Bolt Clamp Bh 2 25,100 - 50,200 - 50,200
5 Jasa Pemasangan SE1-3 Unit 1 24,100 - - 24,100 24,100
Sub Jumlah SE1-3 (13M) - 293,500 24,100 317,600
36 SE1-3 (14M) Unit 1
1 Guy Attachment / Guy hok Bh 1 5,800 - 5,800 - 5,800
2 Guy Wire 70 mm² Mtr 14 16,400 - 229,600 - 229,600
3 Pole Band Single Rack 7" atau 7 ½" Bh 1 24,300 - 24,300 - 24,300
4 Three Bolt Clamp Bh 2 25,100 - 50,200 - 50,200
5 Jasa Pemasangan SE1-3 Unit 1 24,100 - - 24,100 24,100
Sub Jumlah SE1-3 (14M) - 309,900 24,100 334,000
37 SE2-1 Unit 1
1 Guy Wire 22 mm² Mtr 20 5,800 - 116,000 - 116,000
2 Nut Timble eye ⅝" Bh 2 7,800 - 15,600 - 15,600
3 Pole Band Single Rack 7" atau 7 ½" Bh 2 24,300 - 48,600 - 48,600
4 Three Bolt Clamp Bh 2 25,100 - 50,200 - 50,200
5 Jasa Pemasangan SE2-1 Unit 1 32,700 - - 32,700 32,700
Sub Jumlah SE2-1 - 230,400 32,700 263,100
38 SE2-2 Unit 1
1 Guy Wire 35 mm² Mtr 20 8,600 - 172,000 - 172,000
2 Nut Timble eye ⅝" Bh 2 7,800 - 15,600 - 15,600
3 Pole Band Single Rack 7" atau 7 ½" Bh 2 24,300 - 48,600 - 48,600
4 Three Bolt Clamp Bh 2 25,100 - 50,200 - 50,200
5 Jasa Pemasangan SE2-2 Unit 1 32,700 - - 32,700 32,700
Sub Jumlah SE2-2 - 286,400 32,700 319,100
39 SE2-3 Unit 1
1 Guy Wire 70 mm² Mtr 20 16,400 - 328,000 - 328,000
2 Nut Timble eye ⅝" Bh 2 7,800 - 15,600 - 15,600
3 Pole Band Single Rack 7" atau 7 ½" Bh 2 24,300 - 48,600 - 48,600
4 Three Bolt Clamp Bh 2 25,100 - 50,200 - 50,200
5 Jasa Pemasangan SE2-3 Unit 1 29,600 - - 29,600 29,600
Sub Jumlah SE2-3 - 442,400 29,600 472,000
40 SE5-1 Unit 1
1 Bolt Machine ⅝" x 10" Bh 3 9,400 - 28,200 - 28,200
2 Bolt Double Arming ⅝ " x 16 - 24" Bh 2 25,100 - 50,200 - 50,200
3 Guy Wire 22 mm² Mtr 60 5,800 - 348,000 - 348,000
4 Nut Timble eye ⅝" Bh 6 7,800 - 46,800 - 46,800
5 Three Bolt Clamp Bh 6 25,100 - 150,600 - 150,600
6 Washer Square 2 ¼" Bh 6 1,100 - 6,600 - 6,600
7 Jasa Pemasangan SE5-1 Unit 1 95,900 - - 95,900 95,900
Sub Jumlah SE5-1 - 630,400 95,900 726,300
41 SE5-2 Unit 1
1 Bolt Machine ⅝" x 10" Bh 3 9,400 - 28,200 - 28,200
2 Bolt Double Arming ⅝ " x 16 - 24" Bh 2 25,100 - 50,200 - 50,200
3 Guy Wire 22 mm² Mtr 60 5,800 - 348,000 - 348,000
4 Nut Timble eye ⅝" Bh 6 7,800 - 46,800 - 46,800
5 Three Bolt Clamp Bh 6 25,100 - 150,600 - 150,600
6 Washer Square 2 ¼" Bh 6 1,100 - 6,600 - 6,600
7 Jasa Pemasangan SE5-2 Unit 1 95,900 - - 95,900 95,900
Sub Jumlah SE5-2 - 630,400 95,900 726,300
42 SE6-1 Unit 1
1 Pole Band Single Rack 7" atau 7 ½" Bh 2 24,300 - 48,600 - 48,600
2 Pipe Cap Galvanis 2 ½" Bh 2 28,200 - 56,400 - 56,400
3 Pipe Galvanis 2" 6' Bh 1 94,200 - 94,200 - 94,200
4 U Bolt Connector Bh 1 27,400 - 27,400 - 27,400
5 Guy Attachment / Guy hok Bh 1 5,800 - 5,800 - 5,800
6 Guy Wire 35 mm² Mtr 12 8,600 - 103,200 - 103,200
7 Three Bolt Clamp Bh 2 25,100 - 50,200 - 50,200
8 Washer Square 2 ¼" Bh 1 1,100 - 1,100 - 1,100
9 Jasa Pemasangan SE6-1 Unit 1 35,100 - - 35,100 35,100
Sub Jumlah SE6-1 - 386,900 35,100 422,000
PT. PLN (PERSERO)
DISTRIBUSI JAWA TENGAH DAN D.I. YOGYAKARTA
AREA SURAKARTA

ANALISA PER UNIT KONSTRUKSI


PEKERJAAN PEMBANGUNAN JARINGAN DISTRIBUSI 20 KV
#REF!

HARGA SATUAN BIAYA YANG DIPERLUKAN


NO. PERINCUAN PER UNIT KONSTRUKSI STN VOL MATERIAL MATERIAL TOTAL
JASA/UPAH JASA/UPAH
MDU HARDWARE MDU HARDWARE
1 CM2-11 Unit 1
1 Bimetalic Connector 35 - 240 mm² Bh 1 36,100 - 36,100 - 36,100
2 Ground rod & Washer Bh 2 5,800 - 11,600 - 11,600
3 Ground rod ⅝" x 8" Copper Weld Bh 1 125,000 - 125,000 - 125,000
4 Ground wire Cu 16 mm² Mtr 1.5 14,100 - 21,150 - 21,150
5 Jasa Pemasangan CM2-11 Unit 1 39,000 - - 39,000 39,000
Sub Jumlah CM2-11 - 193,850 39,000 232,850
2 CM2-11M Unit 1
1 Bimetalic Connector 35 - 240 mm² Bh 1 36,100 - 36,100 - 36,100
2 Ground rod & Washer Bh 2 5,800 - 11,600 - 11,600
3 Ground rod ⅝" x 8" Copper Weld Bh 1 125,000 - 125,000 - 125,000
4 Ground wire Cu 16 mm² Mtr 10 14,100 - 141,000 - 141,000
5 Pipa PVC ½" Bh 5.5 4,300 - 23,650 - 23,650
6 Stainless Steel Strap 20 x 0.7 mm Mtr 4.8 10,200 - 48,960 - 48,960
7 Stopping Buckle / Yokes Bh 6 1,400 - 8,400 - 8,400
8 Clamp Ground Rod ⅝" Bh 1 3,100 - 3,100 - 3,100
9 Jasa Pemasangan CM2-11M Unit 1 39,000 - - 39,000 39,000
Sub Jumlah CM2-11M - 397,810 39,000 436,810
3 CM2-12 Unit 1
1 Bimetalic Connector 35 - 240 mm² Bh 1 36,100 - 36,100 - 36,100
2 Ground rod & Washer Bh 1 5,800 - 5,800 - 5,800
3 Ground wire Cu 16 mm² Mtr 0.8 14,100 - 11,280 - 11,280
4 Jasa Pemasangan CM2-12 Unit 1 8,500 - - 8,500 8,500
Sub Jumlah CM2-12 - 53,180 8,500 61,680
4 CM2-12A Unit 1
1 Bimetalic Connector 35 - 240 mm² Bh 1 36,100 - 36,100 - 36,100
2 Ground rod & Washer Bh 1 5,800 - 5,800 - 5,800
3 Ground wire Cu 16 mm² Mtr 1 14,100 - 14,100 - 14,100
4 Jasa Pemasangan CM2-12A Unit 1 11,700 - - 11,700 11,700
Sub Jumlah CM2-12A - 56,000 11,700 67,700
5 CM2-15 Unit 1
1 Pole Band Double Up Side 9" atau 12" Bh 1 47,800 - 47,800 - 47,800
2 Pole Band Double Up Side 7" atau 7 ½" Bh 2 42,300 - 84,600 - 84,600
3 Bimetalic Connector 35 - 240 mm² Bh 2 36,100 - 72,200 - 72,200
4 Ground rod & Washer Bh 2 5,800 - 11,600 - 11,600
5 Ground rod ⅝" x 8" Copper Weld Bh 4 125,000 - 500,000 - 500,000
6 Ground wire Cu 50 mm² Mtr 7 47,800 - 334,600 - 334,600
7 Grounding Iron Plate Form Plat / Eart safety mats Bh 1 706,500 - 706,500 - 706,500
8 Clamp Ground Rod ⅝" Bh 4 3,100 - 12,400 - 12,400
9 Compresion Conector H type 50 mm² / 70 mm² Bh 1 14,100 - 14,100 - 14,100
10 Jasa Pemasangan CM2-15 Unit 1 101,400 - - 101,400 101,400
Sub Jumlah CM2-15 - 1,783,800 101,400 1,885,200
6 CM5-2 Unit 1
1 Isolator Tumpu (Line Post) 20 KV Bh 1 PLN PLN - - -
2 Bolt Machine ⅝" x 10" Bh 2 9,400 - 18,800 - 18,800
3 Center Bracket 12.5 KN Bh 1 54,100 - 54,100 - 54,100
4 Compresion Terminal Lug 240 mm² Bh 2 14,100 - 28,200 - 28,200
5 Tie Wire # 4 / Alluminium bonding wire # 20 Mtr 1.8 3,100 - 5,580 - 5,580
6 Washer Square 2 ¼" Bh 2 1,100 - 2,200 - 2,200
7 Jasa Pemasangan CM5-2 Unit 1 17,900 - - 17,900 17,900
Sub Jumlah CM5-2 - 108,880 17,900 126,780
7 CM5-3 Unit 1
1 Pole Band Double Rack 7" atau 7 ½" Bh 1 30,600 - 30,600 - 30,600
2 Jasa Pemasangan CM5-3 Unit 1 15,600 - - 15,600 15,600
Sub Jumlah CM5-3 - 30,600 15,600 46,200
8 CM5-4 Unit 1
1 Isolator Tumpu (Line Post) 20 KV Bh 1 PLN PLN - - -
2 Pole Band Double Rack 7" atau 7 ½" Bh 1 30,600 - 30,600 - 30,600
3 Tie Wire # 4 / Alluminium bonding wire # 20 Mtr 1.8 3,100 - 5,580 - 5,580
4 Jasa Pemasangan CM5-4 Unit 1 16,300 - - 16,300 16,300
Sub Jumlah CM5-4 - 36,180 16,300 52,480
9 CM5-5 Unit 1
1 Isolator Tumpu (Pin Post) 20 KV Bh 1 PLN PLN - - -
2 Tie Wire # 4 / Alluminium bonding wire # 20 Mtr 1.8 3,100 - 5,580 - 5,580
3 Washer Square 2 ¼" Bh 2 1,100 - 2,200 - 2,200
4 Jasa Pemasangan CM5-5 Unit 1 17,900 - - 17,900 17,900
Sub Jumlah CM5-5 - 7,780 17,900 25,680
PT. PLN (PERSERO)
DISTRIBUSI JAWA TENGAH DAN D.I. YOGYAKARTA
AREA SURAKARTA

ANALISA PER UNIT KONSTRUKSI


PEKERJAAN PEMBANGUNAN JARINGAN DISTRIBUSI 20 KV
#REF!

HARGA SATUAN BIAYA YANG DIPERLUKAN


NO. PERINCUAN PER UNIT KONSTRUKSI STN VOL MATERIAL MATERIAL TOTAL
JASA/UPAH JASA/UPAH
MDU HARDWARE MDU HARDWARE
10 CM5-6 Unit 1
1 Compresion Conector H type 240 mm² / 240 mm² Bh 1 29,800 - 29,800 - 29,800
2 AAAC 240 mm² Mtr 1 PLN PLN - - -
3 Lightning Arester (Polymer) 18 KV, 10 KA Bh 1 PLN PLN - - -
4 Jasa Pemasangan CM5-6 Unit 1 42,100 - - 42,100 42,100
Sub Jumlah CM5-6 - 29,800 42,100 71,900
11 CM5-8 Unit 1
1 Isolator Tarik ( Polymer ) 20 KV + Primary Dead E Set 1 PLN PLN - - -
2 Oval Eye Bolt ⅝" x 10" Bh 1 11,700 - 11,700 - 11,700
3 Schackle Anchor ⅝" Bh 1 10,200 - 10,200 - 10,200
4 Washer Square 2 ¼" Bh 1 1,100 - 1,100 - 1,100
5 Jasa Pemasangan CM5-8 Unit 1 32,700 - - 32,700 32,700
Sub Jumlah CM5-8 - 23,000 32,700 55,700
12 CM5-9 Unit 1
1 FCO Polymer Bh 1 PLN PLN - - -
2 Fuse Link 100 A Bh 1 70,000 - 70,000 - 70,000
3 Compresion Terminal Lug 70 mm² Bh 1 9,400 - 9,400 - 9,400
4 Jasa Pemasangan CM5-9 Unit 1 42,100 - - 42,100 42,100
Sub Jumlah CM5-9 - 79,400 42,100 121,500
13 CM5-12 Unit 1
1 Bolt Machine ⅝" x 10" Bh 1 9,400 - 9,400 - 9,400
2 Cross Arm Steel 1.500 mm ( UNSP 10 ) galvanis Bh 1 170,000 - 170,000 - 170,000
3 Washer Square 2 ¼" Bh 2 1,100 - 2,200 - 2,200
4 Jasa Pemasangan CM5-12 Unit 1 31,900 - - 31,900 31,900
Sub Jumlah CM5-12 - 181,600 31,900 213,500
14 CM5-13 Unit 1
1 Bolt Machine ⅝" x 10" Bh 1 9,400 - 9,400 - 9,400
2 Brace Steel 770 mm Bh 2 25,900 - 51,800 - 51,800
3 Bolt Machine / Bolt cariage ½" x ¾" Bh 2 2,900 - 5,800 - 5,800
4 Jasa Pemasangan CM5-13 Unit 1 31,900 - - 31,900 31,900
Sub Jumlah CM5-13 - 67,000 31,900 98,900
15 CM5-16 Unit 1
1 Bolt Machine ⅝" x 10" Bh 1 9,400 - 9,400 - 9,400
2 Cross Arm Steel 3.000 mm ( UNSP 10 ) galvanis Bh 1 350,000 - 350,000 - 350,000
3 Washer Square 2 ¼" Bh 2 1,100 - 2,200 - 2,200
4 Jasa Pemasangan CM5-16 Unit 1 38,200 - - 38,200 38,200
Sub Jumlah CM5-16 - 361,600 38,200 399,800
16 CM5-20+ Unit 1
1 Isolator Tarik ( Polymer ) 20 KV + Primary Dead E Set 1 PLN PLN - - -
2 Oval Eye Nut ⅝" Bh 1 13,300 - 13,300 - 13,300
3 Schackle Anchor ⅝" Bh 1 10,200 - 10,200 - 10,200
4 Jasa Pemasangan CM5-20 Unit 1 31,900 - - 31,900 31,900
Sub Jumlah CM5-20+ - 23,500 31,900 55,400
17 SM2-11 Unit 1
1 Ground rod ⅝" x 8" Copper Weld Bh 1 125,000 - 125,000 - 125,000
2 Bimetalic Connector 35 - 240 mm² Bh 1 36,100 - 36,100 - 36,100
3 Ground wire Cu 16 mm² Mtr 1.5 14,100 - 21,150 - 21,150
4 Ground rod & Washer Bh 2 5,800 - 11,600 - 11,600
5 Jasa Pemasangan SM2-11 Unit 1 43,600 - - 43,600 43,600
Sub Jumlah SM2-11 - 193,850 43,600 237,450
18 SM2-11M Unit 1
1 Ground rod ⅝" x 8" Copper Weld Bh 1 125,000 - 125,000 - 125,000
2 Bimetalic Connector 35 - 240 mm² Bh 1 36,100 - 36,100 - 36,100
3 Clamp Ground Rod ⅝" Bh 1 3,100 - 3,100 - 3,100
4 Ground wire Cu 16 mm² Mtr 10 14,100 - 141,000 - 141,000
5 Ground rod & Washer Bh 2 5,800 - 11,600 - 11,600
6 Pipa PVC ½" Bh 5.5 4,300 - 23,650 - 23,650
7 Stopping Buckle / Yokes Bh 6 1,400 - 8,400 - 8,400
8 Stainless Steel Strap 20 x 0.7 mm Mtr 4.8 10,200 - 48,960 - 48,960
9 Jasa Pemasangan SM2-11M Unit 1 50,700 - - 50,700 50,700
Sub Jumlah SM2-11M - 397,810 50,700 448,510
19 SM2-12 Unit 1
1 Bimetalic Connector 35 - 240 mm² Bh 1 36,100 - 36,100 - 36,100
2 Ground wire Cu 16 mm² Mtr 0.8 14,100 - 11,280 - 11,280
3 Ground rod & Washer Bh 1 5,800 - 5,800 - 5,800
4 Jasa Pemasangan SM2-12 Unit 1 9,300 - - 9,300 9,300
Sub Jumlah SM2-12 - 53,180 9,300 62,480
20 SM2-12A Unit 1
1 Bimetalic Connector 35 - 240 mm² Bh 1 36,100 - 36,100 - 36,100
2 Ground wire Cu 16 mm² Mtr 1 14,100 - 14,100 - 14,100
3 Ground rod & Washer Bh 1 5,800 - 5,800 - 5,800
4 Jasa Pemasangan SM2-12A Unit 1 12,400 - - 12,400 12,400
Sub Jumlah SM2-12A - 56,000 12,400 68,400
21 SM2-15 Unit 1
1 Pole Band Double Up Side 9" atau 12" Bh 1 47,800 - 47,800 - 47,800
2 Pole Band Double Up Side 7" atau 7 ½" Bh 2 42,300 - 84,600 - 84,600
3 Ground rod ⅝" x 8" Copper Weld Bh 4 125,000 - 500,000 - 500,000
4 Clamp Ground Rod ⅝" Bh 4 3,100 - 12,400 - 12,400
5 Bimetalic Connector 35 - 240 mm² Bh 2 36,100 - 72,200 - 72,200
6 Ground wire Cu 50 mm² Mtr 7 47,800 - 334,600 - 334,600
7 Ground rod & Washer Bh 2 5,800 - 11,600 - 11,600
8 Grounding Iron Plate Form Plat / Eart safety mats Bh 1 706,500 - 706,500 - 706,500
9 Compresion Conector H type 50 mm² / 70 mm² Bh 1 14,100 - 14,100 - 14,100
10 Jasa Pemasangan SM2-15 Unit 1 127,100 - - 127,100 127,100
Sub Jumlah SM2-15 - 1,783,800 127,100 1,910,900
22 SM5-2 Unit 1
1 Isolator Tumpu (Line Post) 20 KV Bh 1 PLN PLN - - -
PT. PLN (PERSERO)
DISTRIBUSI JAWA TENGAH DAN D.I. YOGYAKARTA
AREA SURAKARTA

ANALISA PER UNIT KONSTRUKSI


PEKERJAAN PEMBANGUNAN JARINGAN DISTRIBUSI 20 KV
#REF!

HARGA SATUAN BIAYA YANG DIPERLUKAN


NO. PERINCUAN PER UNIT KONSTRUKSI STN VOL MATERIAL MATERIAL TOTAL
JASA/UPAH JASA/UPAH
MDU HARDWARE MDU HARDWARE
2 Center Bracket 12.5 KN Bh 1 54,100 - 54,100 - 54,100
3 Pole Band Double Rack 7" atau 7 ½" Bh 2 30,600 - 61,200 - 61,200
4 Tie Wire # 4 / Alluminium bonding wire # 20 Mtr 1.8 3,100 - 5,580 - 5,580
5 Compresion Terminal Lug 240 mm² Bh 2 14,100 - 28,200 - 28,200
6 Jasa Pemasangan SM5-2 Unit 1 17,900 - - 17,900 17,900
Sub Jumlah SM5-2 - 149,080 17,900 166,980
23 SM5-3 Unit 1
1 Pole Band Double Rack 7" atau 7 ½" Bh 1 30,600 - 30,600 - 30,600
2 Jasa Pemasangan SM5-3 Unit 1 15,600 - - 15,600 15,600
Sub Jumlah SM5-3 - 30,600 15,600 46,200
24 SM5-4 Unit 1
1 Isolator Tumpu (Line Post) 20 KV Bh 1 PLN PLN - - -
2 Pole Band Double Rack 7" atau 7 ½" Bh 1 30,600 - 30,600 - 30,600
3 Tie Wire # 4 / Alluminium bonding wire # 20 Mtr 1.8 3,100 - 5,580 - 5,580
4 Jasa Pemasangan SM5-4 Unit 1 17,900 - - 17,900 17,900
Sub Jumlah SM5-4 - 36,180 17,900 54,080
25 SM5-5 Unit 1
1 Isolator Tumpu (Line Post) 20 KV Bh 1 PLN PLN - - -
2 Washer Square 2 ¼" Bh 2 1,100 - 2,200 - 2,200
3 Tie Wire # 4 / Alluminium bonding wire # 20 Mtr 1.8 3,100 - 5,580 - 5,580
4 Jasa Pemasangan SM5-5 Unit 1 17,900 - - 17,900 17,900
Sub Jumlah SM5-5 - 7,780 17,900 25,680
26 SM5-6 Unit 1
1 Compresion Conector H type 240 mm² / 240 mm² Bh 1 29,800 - 29,800 - 29,800
2 AAAC 240 mm² Mtr 1 PLN PLN - - -
3 Lightning Arester (Polymer) 24 KV, 10 KA Bh 1 PLN PLN - - -
4 Jasa Pemasangan SM5-6 Unit 1 45,200 - - 45,200 45,200
Sub Jumlah SM5-6 - 29,800 45,200 75,000
27 SM5-8 Unit 1
1 Isolator Tarik ( Polymer ) 20 KV + Primary Dead E Set 1 PLN PLN - - -
2 Pole Band Double Rack 7" atau 7 ½" Bh 1 30,600 - 30,600 - 30,600
3 Schackle Anchor ⅝" Bh 1 10,200 - 10,200 - 10,200
4 Oval Eye Nut ⅝" Bh 1 13,300 - 13,300 - 13,300
5 Jasa Pemasangan SM5-8 Unit 1 3,300 - - 3,300 3,300
Sub Jumlah SM5-8 - 54,100 3,300 57,400
28 SM5-9 Unit 1
1 FCO Polymer Bh 1 PLN PLN - - -
2 Fuse Link 100 A Bh 1 70,000 - 70,000 - 70,000
3 Compresion Terminal Lug 70 mm² Bh 1 9,400 - 9,400 - 9,400
4 Jasa Pemasangan SM5-9 Unit 1 45,200 - - 45,200 45,200
Sub Jumlah SM5-9 - 79,400 45,200 124,600
29 SM5-12 Unit 1
1 Pole Band Single Rack 7" atau 7 ½" Bh 1 24,300 - 24,300 - 24,300
2 Cross Arm Steel 1.500 mm ( UNSP 10 ) galvanis Bh 1 170,000 - 170,000 - 170,000
3 Jasa Pemasangan SM5-12 Unit 1 33,500 - - 33,500 33,500
Sub Jumlah SM5-12 - 194,300 33,500 227,800
30 SM5-13 Unit 1
1 Pole Band Single Rack 7" atau 7 ½" Bh 1 24,300 - 24,300 - 24,300
2 Brace Steel 770 mm Bh 2 25,900 - 51,800 - 51,800
3 Bolt Machine / Bolt cariage ½" x ¾" Bh 2 2,900 - 5,800 - 5,800
4 Jasa Pemasangan SM5-13 Unit 1 33,500 - - 33,500 33,500
Sub Jumlah SM5-13 - 81,900 33,500 115,400
31 SM5-16 Unit 1
1 Pole Band Single Rack 7" atau 7 ½" Bh 1 24,300 - 24,300 - 24,300
2 Cross Arm Steel 3.000 mm ( UNSP 10 ) galvanis Bh 1 350,000 - 350,000 - 350,000
3 Jasa Pemasangan SM5-16 Unit 1 39,700 - - 39,700 39,700
Sub Jumlah SM5-16 - 374,300 39,700 414,000
PT. PLN (PERSERO)
DISTRIBUSI JAWA TENGAH DAN D.I. YOGYAKARTA
AREA SURAKARTA

ANALISA PER UNIT KONSTRUKSI


PEKERJAAN PEMBANGUNAN JARINGAN DISTRIBUSI 20 KV
#REF!

HARGA SATUAN BIAYA YANG DIPERLUKAN


NO. PERINCUAN PER UNIT KONSTRUKSI STN VOL MATERIAL MATERIAL TOTAL
JASA/UPAH JASA/UPAH
MDU HARDWARE MDU HARDWARE
32 SM5-20 Unit 1
1 Isolator Tarik ( Polymer ) 20 KV + Primary Dead E Set 1 PLN PLN - - -
2 Schackle Anchor ⅝" Bh 1 10,200 - 10,200 - 10,200
3 Oval Eye Nut ⅝" Bh 1 13,300 - 13,300 - 13,300
4 Jasa Pemasangan SM5-20 Unit 1 33,500 - - 33,500 33,500
Sub Jumlah SM5-20 - 23,500 33,500 57,000
PT. PLN (PERSERO)
DISTRIBUSI JAWA TENGAH DAN D.I. YOGYAKARTA
AREA SURAKARTA

ANALISA PER UNIT KONSTRUKSI


PEKERJAAN PEMBANGUNAN JARINGAN DISTRIBUSI 20 KV
#REF!

HARGA SATUAN BIAYA YANG DIPERLUKAN


NO. PERINCUAN PER UNIT KONSTRUKSI STN VOL MATERIAL MATERIAL TOTAL
JASA/UPAH JASA/UPAH
MDU HARDWARE MDU HARDWARE
SECUNDARY CONDUCTOR / CABEL
1 CJ5 Unit 1
1 Bolt Double Up Side ⅝" x 10" Bh 1 25,100 - 25,100 - 25,100
2 Spool Insulator ANSI 53 - 2 Bh 1 10,200 - 10,200 - 10,200
3 Tie Wire # 4 / Alluminium bonding wire # 20 Mtr 0.8 3,100 - 2,480 - 2,480
4 Washer Square 2 ¼" Bh 1 1,100 - 1,100 - 1,100
5 Jasa Pemasangan CJ5 Unit 1 17,800 - - 17,800 17,800
Sub Jumlah CJ5 - 38,880 17,800 56,680
2 CJ6 Unit 1
1 Armour Tape ¼" wide Mtr 1 4,300 - 4,300 - 4,300
2 Clevis Swinging Secondary Bh 1 9,400 - 9,400 - 9,400
3 Lock Nut ⅝" Bh 1 7,000 - 7,000 - 7,000
4 Loop Dead End Clamp / LC ( 35 s/d 240 ) mm² Bh 2 18,000 - 36,000 - 36,000
5 Oval Eye Bolt ⅝" x 10" Bh 1 11,700 - 11,700 - 11,700
6 Spool Insulator ANSI 53 - 4 Bh 1 15,700 - 15,700 - 15,700
7 Washer Square 2 ¼" Bh 1 1,100 - 1,100 - 1,100
8 Jasa Pemasangan CJ6 Unit 1 21,400 - - 21,400 21,400
Sub Jumlah CJ6 - 85,200 21,400 106,600
3 CJ6X Unit 1
1 Armour Tape ¼" wide Mtr 1 4,300 - 4,300 - 4,300
2 Clevis Swinging Secondary Bh 1 9,400 - 9,400 - 9,400
3 Loop Dead End Clamp / LC ( 35 s/d 240 ) mm² Bh 2 18,000 - 36,000 - 36,000
4 Oval Eye Nut ⅝" Bh 1 13,300 - 13,300 - 13,300
5 Spool Insulator ANSI 53 - 4 Bh 1 15,700 - 15,700 - 15,700
6 Jasa Pemasangan CJ6-X Unit 1 17,800 - - 17,800 17,800
Sub Jumlah CJ6X - 78,700 17,800 96,500
4 CJ7 Unit 1
1 Armour Rod # for 70 mm² Set 1 40,200 - 40,200 - 40,200
2 Clevis Swinging Secondary Bh 1 9,400 - 9,400 - 9,400
3 Lock Nut ⅝" Bh 1 7,000 - 7,000 - 7,000
4 Oval Eye Bolt ⅝" x 10" Bh 1 11,700 - 11,700 - 11,700
5 Spool Insulator ANSI 53 - 4 Bh 1 15,700 - 15,700 - 15,700
6 Tie Wire # 4 / Alluminium bonding wire # 20 Mtr 0.8 3,100 - 2,480 - 2,480
7 Washer Square 2 ¼" Bh 1 1,100 - 1,100 - 1,100
8 Jasa Pemasangan CJ7 Unit 1 27,600 - - 27,600 27,600
Sub Jumlah CJ7 - 87,580 27,600 115,180
5 CJ8 Unit 1
1 Bolt Single Up Side ⅝" x 10" Bh 1 25,100 - 25,100 - 25,100
2 Spool Insulator ANSI 53 - 2 Bh 1 10,200 - 10,200 - 10,200
3 Tie Wire # 4 / Alluminium bonding wire # 20 Mtr 0.8 3,100 - 2,480 - 2,480
4 Washer Square 2 ¼" Bh 1 1,100 - 1,100 - 1,100
5 Jasa Pemasangan CJ8 Unit 1 17,800 - - 17,800 17,800
Sub Jumlah CJ8 - 38,880 17,800 56,680
6 CJ10 Unit 1
1 Bolt Machine ⅝" x 10" Bh 1 9,400 - 9,400 - 9,400
2 Bracket Secondary / Bracket insulated Bh 1 7,400 - 7,400 - 7,400
3 Lock Nut ⅝" Bh 1 7,000 - 7,000 - 7,000
4 Spool Insulator ANSI 53 - 4 Bh 1 15,700 - 15,700 - 15,700
5 Tie Wire # 4 / Alluminium bonding wire # 20 Mtr 0.8 3,100 - 2,480 - 2,480
6 Washer Square 2 ¼" Bh 1 1,100 - 1,100 - 1,100
7 Jasa Pemasangan CJ10 Unit 1 29,300 - - 29,300 29,300
Sub Jumlah CJ10 - 43,080 29,300 72,380
7 J5-T Unit 1
1 Plastic Strap for Clamping Bh 1 1,500 - 1,500 - 1,500
2 Stainless Steel Strap 20 x 0.7 mm Mtr 1 10,200 - 10,200 - 10,200
3 Stopping Buckle / Yokes Bh 1 1,400 - 1,400 - 1,400
4 Suspension / Small Angle Assembly Bh 1 43,100 - 43,100 - 43,100
5 Jasa Pemasangan CJ5T Unit 1 15,600 - - 15,600 15,600
Sub Jumlah J5-T - 56,200 15,600 71,800
8 J6-T Unit 1
1 Dead End Assembly Bh 1 45,500 - 45,500 - 45,500
2 Plastic Strap for Clamping Bh 1 1,500 - 1,500 - 1,500
3 Stainless Steel Strap 20 x 0.7 mm Mtr 1 10,200 - 10,200 - 10,200
4 Stopping Buckle / Yokes Bh 1 1,400 - 1,400 - 1,400
5 Jasa Pemasangan CJ6T Unit 1 21,900 - - 21,900 21,900
Sub Jumlah J6-T - 58,600 21,900 80,500
9 J7-T Unit 1
1 Large Angle Assembly 50-70 mm² Bh 1 62,800 - 62,800 - 62,800
2 Plastic Strap for Clamping Bh 1 1,500 - 1,500 - 1,500
3 Stainless Steel Strap 20 x 0.7 mm Mtr 1 10,200 - 10,200 - 10,200
4 Stopping Buckle / Yokes Bh 1 1,400 - 1,400 - 1,400
5 Jasa Pemasangan CJ7T Unit 1 16,300 - - 16,300 16,300
Sub Jumlah J7-T - 75,900 16,300 92,200
10 MJ6-T Unit 1
1 Insulating Tape Bh 1 2,900 - 2,900 - 2,900
2 Split Plastic Sleve ( Tutup Kabel ) Bh 1 1,800 - 1,800 - 1,800
3 Stainless Steel Strap 20 x 0.7 mm Mtr 1 10,200 - 10,200 - 10,200
4 Stopping Buckle / Yokes Bh 1 1,400 - 1,400 - 1,400
5 Jasa Pemasangan MJ6-T Unit 1 11,700 - - 11,700 11,700
PT. PLN (PERSERO)
DISTRIBUSI JAWA TENGAH DAN D.I. YOGYAKARTA
AREA SURAKARTA

ANALISA PER UNIT KONSTRUKSI


PEKERJAAN PEMBANGUNAN JARINGAN DISTRIBUSI 20 KV
#REF!

HARGA SATUAN BIAYA YANG DIPERLUKAN


NO. PERINCUAN PER UNIT KONSTRUKSI STN VOL MATERIAL MATERIAL TOTAL
JASA/UPAH JASA/UPAH
MDU HARDWARE MDU HARDWARE

Sub Jumlah MJ6-T - 16,300 11,700 28,000


11 SJ5 Unit 1
1 Pole Band Double Up Side 7" atau 7 ½" Bh 1 42,300 - 42,300 - 42,300
2 Spool Insulator ANSI 53 - 2 Bh 1 10,200 - 10,200 - 10,200
3 Tie Wire # 4 / Alluminium bonding wire # 20 Mtr 0.8 3,100 - 2,480 - 2,480
4 Jasa Pemasangan SJ5 Unit 1 17,800 - - 17,800 17,800
Sub Jumlah SJ5 - 54,980 17,800 72,780
12 SJ6 Unit 1
1 Armour Tape ¼" wide Mtr 1 4,300 - 4,300 - 4,300
2 Clevis Swinging Secondary Bh 1 9,400 - 9,400 - 9,400
3 Loop Dead End Clamp / LC ( 35 s/d 240 ) mm² Bh 2 18,000 - 36,000 - 36,000
4 Oval Eye Nut ⅝" Bh 1 13,300 - 13,300 - 13,300
5 Pole Band Single Rack 7" atau 7 ½" Bh 1 24,300 - 24,300 - 24,300
6 Spool Insulator ANSI 53 - 4 Bh 1 15,700 - 15,700 - 15,700
7 Jasa Pemasangan SJ6 Unit 1 21,400 - - 21,400 21,400
Sub Jumlah SJ6 - 103,000 21,400 124,400
13 SJ6X Unit 1
1 Armour Tape ¼" wide Mtr 1 4,300 - 4,300 - 4,300
2 Clevis Swinging Secondary Bh 1 9,400 - 9,400 - 9,400
3 Loop Dead End Clamp / LC ( 35 s/d 240 ) mm² Bh 2 18,000 - 36,000 - 36,000
4 Oval Eye Nut ⅝" Bh 1 13,300 - 13,300 - 13,300
5 Spool Insulator ANSI 53 - 4 Bh 1 15,700 - 15,700 - 15,700
6 Jasa Pemasangan SJ6X Unit 1 17,800 - - 17,800 17,800
Sub Jumlah SJ6X - 78,700 17,800 96,500
14 SJ7 Unit 1
1 Armour Rod # for 70 mm² Set 1 40,200 - 40,200 - 40,200
2 Clevis Swinging Secondary Bh 1 9,400 - 9,400 - 9,400
3 Oval Eye Nut ⅝" Bh 1 13,300 - 13,300 - 13,300
4 Pole Band Single Rack 7" atau 7 ½" Bh 1 24,300 - 24,300 - 24,300
5 Spool Insulator ANSI 53 - 4 Bh 1 15,700 - 15,700 - 15,700
6 Tie Wire # 4 / Alluminium bonding wire # 20 Mtr 0.8 3,100 - 2,480 - 2,480
7 Jasa Pemasangan SJ7 Unit 1 27,600 - - 27,600 27,600
Sub Jumlah SJ7 - 105,380 27,600 132,980
PT. PLN (PERSERO)
DISTRIBUSI JAWA TENGAH DAN D.I. YOGYAKARTA
AREA SURAKARTA

ANALISA PER UNIT KONSTRUKSI


PEKERJAAN PEMBANGUNAN JARINGAN DISTRIBUSI 20 KV
#REF!

HARGA SATUAN BIAYA YANG DIPERLUKAN


NO. PERINCUAN PER UNIT KONSTRUKSI STN VOL MATERIAL MATERIAL TOTAL
JASA/UPAH JASA/UPAH
MDU HARDWARE MDU HARDWARE
15 SJ8 Unit 1
1 Pole Band Single Up Side 7" atau 7 ½" Bh 1 36,000 - 36,000 - 36,000
2 Spool Insulator ANSI 53 - 2 Bh 1 10,200 - 10,200 - 10,200
3 Tie Wire # 4 / Alluminium bonding wire # 20 Mtr 0.8 3,100 - 2,480 - 2,480
4 Jasa Pemasangan SJ8 Unit 1 17,800 - - 17,800 17,800
Sub Jumlah SJ8 - 48,680 17,800 66,480
16 SJ10 Unit 1
1 Bracket Secondary / Bracket insulated Bh 1 7,400 - 7,400 - 7,400
2 Pole Band Single Rack 7" atau 7 ½" Bh 1 24,300 - 24,300 - 24,300
3 Spool Insulator ANSI 53 - 2 Bh 1 10,200 - 10,200 - 10,200
4 Tie Wire # 4 / Alluminium bonding wire # 20 Mtr 0.8 3,100 - 2,480 - 2,480
5 Jasa Pemasangan SJ10 Unit 1 29,300 - - 29,300 29,300
Sub Jumlah SJ10 - 44,380 29,300 73,680
17 SJ5T Unit 1
1 Plastic Strap for Clamping Bh 1 1,500 - 1,500 - 1,500
2 Stainless Steel Strap 20 x 0.7 mm Mtr 1 10,200 - 10,200 - 10,200
3 Stopping Buckle / Yokes Bh 1 1,400 - 1,400 - 1,400
4 Suspension / Small Angle Assembly Bh 1 43,100 - 43,100 - 43,100
5 Jasa Pemasangan J5-T Unit 1 15,600 - - 15,600 15,600
Sub Jumlah SJ5T - 56,200 15,600 71,800
18 SJ6T Unit 1
1 Plastic Strap for Clamping Bh 1 1,500 - 1,500 - 1,500
2 Stainless Steel Strap 20 x 0.7 mm Mtr 1 10,200 - 10,200 - 10,200
3 Stopping Buckle / Yokes Bh 1 1,400 - 1,400 - 1,400
4 Dead End Assembly Bh 1 45,500 - 45,500 - 45,500
5 Jasa Pemasangan J6-T Unit 1 21,900 - - 21,900 21,900
Sub Jumlah SJ6T - 58,600 21,900 80,500
19 SJ7T Unit 1
1 Plastic Strap for Clamping Bh 1 1,500 - 1,500 - 1,500
2 Stainless Steel Strap 20 x 0.7 mm Mtr 1 10,200 - 10,200 - 10,200
3 Stopping Buckle / Yokes Bh 1 1,400 - 1,400 - 1,400
4 Large Angle Assembly 50-70 mm² Bh 1 62,800 - 62,800 - 62,800
5 Jasa Pemasangan J7-T Unit 1 16,300 - - 16,300 16,300
Sub Jumlah SJ7T - 75,900 16,300 92,200
20 MJ6T Unit 1
1 Stainless Steel Strap 20 x 0.7 mm Mtr 1 10,200 - 10,200 - 10,200
2 Split Plastic Sleve ( Tutup Kabel ) Bh 1 1,800 - 1,800 - 1,800
3 Stopping Buckle / Yokes Bh 1 1,400 - 1,400 - 1,400
4 Insulating Tape Bh 1 2,900 - 2,900 - 2,900
5 Jasa Pemasangan MJ6-T Unit 1 11,700 - - 11,700 11,700
Sub Jumlah MJ6T - 16,300 11,700 28,000
PT. PLN (PERSERO)
DISTRIBUSI JAWA TENGAH DAN D.I. YOGYAKARTA
AREA SURAKARTA

ANALISA PER UNIT KONSTRUKSI


PEKERJAAN PEMBANGUNAN JARINGAN DISTRIBUSI 20 KV
#REF!

HARGA SATUAN BIAYA YANG DIPERLUKAN


NO. PERINCUAN PER UNIT KONSTRUKSI STN VOL MATERIAL MATERIAL TOTAL
JASA/UPAH JASA/UPAH
MDU HARDWARE MDU HARDWARE
TRAFO DISTRIBUSI
1 CG105/106/136-50 KVA 1 PHASA Unit 1
1 Trafo 1 Fasa CSP 50 kVA Bh 1 PLN PLN - - -
2 Compresion Terminal Lug 70 mm² Bh 2 9,400 - 18,800 - 18,800
3 Armour Rod # for 70 mm² Set 1 40,200 - 40,200 - 40,200
4 Bracket band segment,vertikal plat ( Hot dip galvanis ) Bh 2 235,500 - 471,000 - 471,000
5 Compresion Conector H type 70 mm² / 70 mm² Bh 3 20,400 - 61,200 - 61,200
6 Ground wire Cu 16 mm² Mtr 2 14,100 - 28,200 - 28,200
7 Hot Line Clamp ( 35mm² s/d 70 mm² ) Bh 1 53,300 - 53,300 - 53,300
8 Sepatu Kabel AL/CU Ring-70 mm² Bh 4 40,000 - 160,000 - 160,000
9 AAAC 70 mm² Mtr 2.0 PLN PLN - - -
10 NFA2X-T 3 x 70 + N 50 mm² Mtr 2.0 PLN PLN - - -
11 Jasa Trafo 1 Phasa 50 KVA (CG105/106/136) Unit 1 268,200 - - 268,200 268,200
Sub Jumlah CG105/106/136-50 KVA 1 PHASA - 832,700 268,200 1,100,900
2 CG107-50 KVA 1 PHASA DENGAN SRANDANG Unit 1
1 Trafo 1 Fasa CSP 50 kVA Bh 1 PLN PLN - - -
2 Pole Band Single Rack 7" atau 7 ½" Bh 1 24,300 - 24,300 - 24,300
3 Pole Band Double Rack 8" atau 8 ½" Bh 1 30,600 - 30,600 - 30,600
4 Bracket band segment,vertikal plat ( Hot dip galvanis ) Bh 2 235,500 - 471,000 - 471,000
5 Compresion Conector H type 70 mm² / 70 mm² Bh 3 20,400 - 61,200 - 61,200
6 Steel L 70 x 70 x 7 x 1.682 mm galvanis Bh 2 149,100 - 298,200 - 298,200
7 Hot Line Clamp ( 150mm² s/d 240 mm² ) Bh 1 105,900 - 105,900 - 105,900
8 Sepatu Kabel AL/CU Ring-70 mm² Bh 4 40,000 - 160,000 - 160,000
9 AAAC 70 mm² Mtr 3 PLN PLN - - -
10 NFA2X-T 3 x 70 + N 50 mm² Mtr 2 PLN PLN - - -
11 FCO Polymer Bh 1 PLN PLN - - -
12 Fuse Link 4 A Bh 1 30,000 - 30,000 - 30,000
13 Bolt Machine / Bolt cariage ½" x ¾" Bh 10 2,900 - 29,000 - 29,000
14 Cross Arm Steel 1.500 mm ( UNSP 10 ) galvanis Bh 3 170,000 - 510,000 - 510,000
15 Cross Arm Steel 2.000 mm ( UNSP 10 ) galvanis Bh 2 230,000 - 460,000 - 460,000
16 Jasa Trafo 1 Phasa 50 KVA (CG107) Unit 1 445,300 - - 445,300 445,300
Sub Jumlah CG107-50 KVA 1 PHASA DENGAN SRANDANG - 2,180,200 445,300 2,625,500
3 CG312A-50 KVA 3 PHASA 1 TIANG Unit 1
1 Trafo 3 Fasa 50 kVA Bh 1 PLN PLN - - -
2 AAAC 70 mm² Mtr 9.0 PLN PLN - - -
3 NFA2X-T 3 x 70 + N 50 mm² Mtr 3.0 PLN PLN - - -
4 Lightning Arester (Polymer) 24 KV, 10 KA Bh 3 PLN PLN - - -
5 FCO Polymer Bh 3 PLN PLN - - -
6 Fuse Link 4 A Bh 3 30,000 - 90,000 - 90,000
7 Sepatu Kabel AL/CU Ring-70 mm² Bh 13 40,000 - 520,000 - 520,000
8 Bolt Machine / Bolt cariage ½" x ¾" Bh 22 2,900 - 63,800 - 63,800
9 Bracket band segment,vertikal plat ( Hot dip galvanis ) Bh 1 235,500 - 235,500 - 235,500
10 Compresion Conector H type 70 mm² / 70 mm² Bh 3 20,400 - 61,200 - 61,200
11 Cross Arm Steel 1.500 mm ( UNSP 10 ) galvanis Bh 5 170,000 - 850,000 - 850,000
12 Cross Arm Steel 2.000 mm ( UNSP 10 ) galvanis Bh 4 230,000 - 920,000 - 920,000
13 Hot Line Clamp ( 150mm² s/d 240 mm² ) Bh 3 105,900 - 317,700 - 317,700
14 Pole Band Double Rack 8" atau 8 ½" Bh 2 30,600 - 61,200 - 61,200
15 Pole Band Single Rack 7" atau 7 ½" Bh 1 24,300 - 24,300 - 24,300
16 Steel L 70 x 70 x 7 x 1.682 mm galvanis Bh 4 149,100 - 596,400 - 596,400
17 Steel L 70 x 70 x 7 x 780 mm galvanis Bh 2 70,600 - 141,200 - 141,200
18 Jasa Trafo 3 Phasa 50 KVA 1 tiang (CG 312 A) Unit 1 780,000 - - 780,000 780,000
Sub Jumlah CG312A-50 KVA 3 PHASA 1 TIANG - 3,881,300 780,000 4,661,300
4 CG312A-100 KVA 3 PHASA Unit 1
1 Trafo 3 Fasa 100 kVA Bh 1 PLN PLN - - -
2 AAAC 70 mm² Mtr 9.0 PLN PLN - - -
3 NFA2X-T 3 x 70 + N 50 mm² Mtr 3.0 PLN PLN - - -
4 Lightning Arester (Polymer) 24 KV, 10 KA Bh 3 PLN PLN - - -
5 FCO Polymer Bh 3 PLN PLN - - -
6 Fuse Link 6 A Bh 3 30,000 - 90,000 - 90,000
7 Sepatu Kabel AL/CU Ring-70 mm² Bh 13 40,000 - 520,000 - 520,000
8 Bolt Machine / Bolt cariage ½" x ¾" Bh 22 2,900 - 63,800 - 63,800
9 Bracket band segment,vertikal plat ( Hot dip galvanis ) Bh 1 235,500 - 235,500 - 235,500
10 Compresion Conector H type 70 mm² / 70 mm² Bh 3 20,400 - 61,200 - 61,200
11 Cross Arm Steel 1.500 mm ( UNSP 10 ) galvanis Bh 5 170,000 - 850,000 - 850,000
12 Cross Arm Steel 2.000 mm ( UNSP 10 ) galvanis Bh 4 230,000 - 920,000 - 920,000
13 Hot Line Clamp ( 150mm² s/d 240 mm² ) Bh 3 105,900 - 317,700 - 317,700
14 Pole Band Double Rack 8" atau 8 ½" Bh 2 30,600 - 61,200 - 61,200
15 Pole Band Single Rack 7" atau 7 ½" Bh 1 24,300 - 24,300 - 24,300
16 Steel L 70 x 70 x 7 x 1.682 mm galvanis Bh 4 149,100 - 596,400 - 596,400
17 Steel L 70 x 70 x 7 x 780 mm galvanis Bh 2 70,600 - 141,200 - 141,200
18 Jasa Trafo 3 Phasa 100 KVA 1 tiang (CG 312 A) Unit 1 1,950,000 - - 1,950,000 1,950,000
Sub Jumlah CG312A-100 KVA 3 PHASA - 3,881,300 1,950,000 5,831,300
PT. PLN (PERSERO)
DISTRIBUSI JAWA TENGAH DAN D.I. YOGYAKARTA
AREA SURAKARTA

ANALISA PER UNIT KONSTRUKSI


PEKERJAAN PEMBANGUNAN JARINGAN DISTRIBUSI 20 KV
#REF!

HARGA SATUAN BIAYA YANG DIPERLUKAN


NO. PERINCUAN PER UNIT KONSTRUKSI STN VOL MATERIAL MATERIAL TOTAL
JASA/UPAH JASA/UPAH
MDU HARDWARE MDU HARDWARE
5 CG313-100 KVA 3 PHASA Unit 1
1 Trafo 3 Fasa 100 kVA Bh 1 PLN PLN - - -
2 AAAC 70 mm² Mtr 9.0 PLN PLN - - -
3 NFA2X-T 3 x 70 + N 50 mm² Mtr 3.0 PLN PLN - - -
4 Lightning Arester (Polymer) 24 KV, 10 KA Bh 3 PLN PLN - - -
5 FCO Polymer Bh 3 PLN PLN - - -
6 Fuse Link 6 A Bh 3 30,000 - 90,000 - 90,000
7 Sepatu Kabel AL/CU Ring-70 mm² Bh 13 40,000 - 520,000 - 520,000
8 Bolt Machine / Bolt cariage ½" x ¾" Bh 28 2,900 - 81,200 - 81,200
9 Bracket band segment,vertikal plat ( Hot dip galvanis ) Bh 2 235,500 - 471,000 - 471,000
10 Compresion Conector H type 70 mm² / 70 mm² Bh 3 20,400 - 61,200 - 61,200
11 Cross Arm Steel 2.000 mm ( UNSP 10 ) galvanis Bh 5 230,000 - 1,150,000 - 1,150,000
12 Cross Arm Steel 3.000 mm ( UNSP 10 ) galvanis Bh 4 350,000 - 1,400,000 - 1,400,000
13 Hot Line Clamp ( 150mm² s/d 240 mm² ) Bh 3 105,900 - 317,700 - 317,700
14 Pole Band Single Rack 7" atau 7 ½" Bh 2 24,300 - 48,600 - 48,600
15 Pole Band Single Rack 8" atau 8 ½" Bh 2 24,300 - 48,600 - 48,600
16 Steel L 70 x 70 x 7 x 780 mm galvanis Bh 4 70,600 - 282,400 - 282,400
17 Jasa Trafo 3 Phasa 100 KVA 2 tiang (CG 313) Unit 1 2,340,000 - - 2,340,000 2,340,000
Sub Jumlah CG313-100 KVA 3 PHASA - 4,470,700 2,340,000 6,810,700
6 CG313-160 KVA 3 PHASA Unit 1
1 Trafo 3 Fasa 160 kVA Bh 1 PLN PLN - - -
2 AAAC 70 mm² Mtr 9.0 PLN PLN - - -
3 NFA2X-T 3 x 70 + N 50 mm² Mtr 3.0 PLN PLN - - -
4 Lightning Arester (Polymer) 24 KV, 10 KA Bh 3 PLN PLN - - -
5 FCO Polymer Bh 3 PLN PLN - - -
6 Fuse Link 6 A Bh 3 30,000 - 90,000 - 90,000
7 Sepatu Kabel AL/CU Ring-70 mm² Bh 13 40,000 - 520,000 - 520,000
8 Bolt Machine / Bolt cariage ½" x ¾" Bh 28 2,900 - 81,200 - 81,200
9 Bracket band segment,vertikal plat ( Hot dip galvanis ) Bh 2 235,500 - 471,000 - 471,000
10 Compresion Conector H type 70 mm² / 70 mm² Bh 3 20,400 - 61,200 - 61,200
11 Cross Arm Steel 2.000 mm ( UNSP 10 ) galvanis Bh 5 230,000 - 1,150,000 - 1,150,000
12 Cross Arm Steel 3.000 mm ( UNSP 10 ) galvanis Bh 4 350,000 - 1,400,000 - 1,400,000
13 Hot Line Clamp ( 150mm² s/d 240 mm² ) Bh 3 105,900 - 317,700 - 317,700
14 Pole Band Single Rack 7" atau 7 ½" Bh 2 24,300 - 48,600 - 48,600
15 Pole Band Single Rack 8" atau 8 ½" Bh 2 24,300 - 48,600 - 48,600
16 Steel L 70 x 70 x 7 x 780 mm galvanis Bh 4 70,600 - 282,400 - 282,400
17 Jasa Trafo 3 Phasa 160 KVA 2 tiang (CG 313) Unit 1 2,496,000 - - 2,496,000 2,496,000
Sub Jumlah CG313-160 KVA 3 PHASA - 4,470,700 2,496,000 6,966,700
7 CG313-200 KVA 3 PHASA Unit 1
1 Trafo 3 Fasa 200 kVA Bh 1 PLN PLN - - -
2 AAAC 70 mm² Mtr 9.0 PLN PLN - - -
3 NFA2X-T 3 x 70 + N 50 mm² Mtr 3.0 PLN PLN - - -
4 Lightning Arester (Polymer) 24 KV, 10 KA Bh 3 PLN PLN - - -
5 FCO Polymer Bh 3 PLN PLN - - -
6 Fuse Link 6 A Bh 3 30,000 - 90,000 - 90,000
7 Sepatu Kabel AL/CU Ring-70 mm² Bh 13 40,000 - 520,000 - 520,000
8 Bolt Machine / Bolt cariage ½" x ¾" Bh 28 2,900 - 81,200 - 81,200
9 Bracket band segment,vertikal plat ( Hot dip galvanis ) Bh 2 235,500 - 471,000 - 471,000
10 Compresion Conector H type 70 mm² / 70 mm² Bh 3 20,400 - 61,200 - 61,200
11 Cross Arm Steel 2.000 mm ( UNSP 10 ) galvanis Bh 5 230,000 - 1,150,000 - 1,150,000
12 Cross Arm Steel 3.000 mm ( UNSP 10 ) galvanis Bh 4 350,000 - 1,400,000 - 1,400,000
13 Hot Line Clamp ( 150mm² s/d 240 mm² ) Bh 3 105,900 - 317,700 - 317,700
14 Pole Band Single Rack 7" atau 7 ½" Bh 2.0 24,300 - 48,600 - 48,600
15 Pole Band Single Rack 8" atau 8 ½" Bh 2 24,300 - 48,600 - 48,600
16 Steel L 70 x 70 x 7 x 780 mm galvanis Bh 4 70,600 - 282,400 - 282,400
17 Jasa Trafo 3 Phasa 200 KVA 2 tiang (CG 313) Unit 1 2,730,000 - - 2,730,000 2,730,000
Sub Jumlah CG313-200 KVA 3 PHASA - 4,470,700 2,730,000 7,200,700
8 M8-A1 Unit 1
1 LVCB 2 Jurusan 250 A MCCB Bh 1 PLN PLN - - -
2 Kabel NYY 1 x 70 mm² Mtr 68.0 PLN PLN - - -
3 Bolt Machine / Bolt cariage ½" x ¾" Bh 4 2,900 - 11,600 - 11,600
4 Bolt Machine ⅝" x 8" Bh 10 9,400 - 94,000 - 94,000
5 Cross Arm Steel 1.500 mm ( UNSP 10 ) galvanis Bh 1 170,000 - 170,000 - 170,000
6 Cross Arm Steel 2.000 mm ( UNSP 10 ) galvanis Bh 1 230,000 - 230,000 - 230,000
7 Pole Band Double Rack 3" atau 3 ½" Bh 9 21,100 - 189,900 - 189,900
8 Pole Band Double Rack 7" atau 7 ½" Bh 1 30,600 - 30,600 - 30,600
9 Pole Band Double Rack 8" atau 8 ½" Bh 2 30,600 - 61,200 - 61,200
10 Pipa Pralon 2 1/2" Bh 2 49,400 - 98,800 - 98,800
11 Pipa Pralon 3" Bh 1 58,800 - 58,800 - 58,800
12 Knee Pipe 2 ½" Bh 2 5,700 - 11,400 - 11,400
13 Knee Pipe 3" Bh 1 5,700 - 5,700 - 5,700
14 Spiral Pralon 2 ½" Mtr 3.0 39,200 - 117,600 - 117,600
15 Spiral Pralon 3" Mtr 1.5 49,400 - 74,100 - 74,100
16 Sepatu Kabel CU/CU-70 mm² Bh 16 39,100 - 625,600 - 625,600
17 Compresion Conector H type 70 mm² / 70 mm² Bh 8 20,400 - 163,200 - 163,200
18 Upah Pasang Acc.Jar LVCB 2 Jurusan Unit 1 460,000 - - 460,000 460,000
Sub Jumlah M8-A1 - 1,942,500 460,000 2,402,500
9 M8-A2 Unit 1
1 LVCB 2 Jurusan 400 A LBS Bh 1 PLN PLN - - -
2 Kabel NYY 1 x 150 mm² Mtr 68.0 PLN PLN - - -
3 Bolt Machine / Bolt cariage ½" x ¾" Bh 4 2,900 - 11,600 - 11,600
4 Bolt Machine ⅝" x 8" Bh 14 9,400 - 131,600 - 131,600
5 Cross Arm Steel 1.500 mm ( UNSP 10 ) galvanis Bh 1 170,000 - 170,000 - 170,000
6 Cross Arm Steel 3.000 mm ( UNSP 10 ) galvanis Bh 2 350,000 - 700,000 - 700,000
7 Pole Band Double Rack 3" atau 3 ½" Bh 6 21,100 - 126,600 - 126,600
8 Pole Band Double Rack 7" atau 7 ½" Bh 3 30,600 - 91,800 - 91,800
9 Pole Band Double Rack 8" atau 8 ½" Bh 4 30,600 - 122,400 - 122,400
10 Pipa Pralon 2 1/2" Bh 2 49,400 - 98,800 - 98,800
11 Pipa Pralon 3" Bh 1 58,800 - 58,800 - 58,800
12 Knee Pipe 2 ½" Bh 2 5,700 - 11,400 - 11,400
13 Knee Pipe 3" Bh 1 5,700 - 5,700 - 5,700
14 Spiral Pralon 2 ½" Mtr 4.0 39,200 - 156,800 - 156,800
15 Spiral Pralon 3" Mtr 2.0 49,400 - 98,800 - 98,800
PT. PLN (PERSERO)
DISTRIBUSI JAWA TENGAH DAN D.I. YOGYAKARTA
AREA SURAKARTA

ANALISA PER UNIT KONSTRUKSI


PEKERJAAN PEMBANGUNAN JARINGAN DISTRIBUSI 20 KV
#REF!

HARGA SATUAN BIAYA YANG DIPERLUKAN


NO. PERINCUAN PER UNIT KONSTRUKSI STN VOL MATERIAL MATERIAL TOTAL
JASA/UPAH JASA/UPAH
MDU HARDWARE MDU HARDWARE
16 Sepatu Kabel CU/CU 150 mm2 Bh 16 79,500 - 1,272,000 - 1,272,000
17 Compresion Conector H type 70 mm² / 150 mm² Bh 8 20,400 - 163,200 - 163,200
18 Upah Pasang Acc.Jar LVCB 2 Jurusan (M8-A2) Unit 1 460,000 - - 460,000 460,000
Sub Jumlah M8-A2 - 3,219,500 460,000 3,679,500
PT. PLN (PERSERO)
DISTRIBUSI JAWA TENGAH DAN D.I. YOGYAKARTA
AREA SURAKARTA

ANALISA PER UNIT KONSTRUKSI


PEKERJAAN PEMBANGUNAN JARINGAN DISTRIBUSI 20 KV
#REF!

HARGA SATUAN BIAYA YANG DIPERLUKAN


NO. PERINCUAN PER UNIT KONSTRUKSI STN VOL MATERIAL MATERIAL TOTAL
JASA/UPAH JASA/UPAH
MDU HARDWARE MDU HARDWARE
10 M8-B1 Unit 1
1 LVCB 4 Jurusan 400 A LBS Bh 1 PLN PLN - - -
2 Kabel NYY 1 x 150 mm² Mtr 68.0 PLN PLN - - -
3 Bolt Machine / Bolt cariage ½" x ¾" Bh 4.0 2,900 - 11,600 - 11,600
4 Bolt Machine ⅝" x 8" Bh 10 9,400 - 94,000 - 94,000
5 Cross Arm Steel 1.500 mm ( UNSP 10 ) galvanis Bh 1 170,000 - 170,000 - 170,000
6 Cross Arm Steel 2.000 mm ( UNSP 10 ) galvanis Bh 2 230,000 - 460,000 - 460,000
7 Pole Band Double Rack 3" atau 3 ½" Bh 15 21,100 - 316,500 - 316,500
8 Pole Band Double Rack 7" atau 7 ½" Bh 1 30,600 - 30,600 - 30,600
9 Pole Band Double Rack 8" atau 8 ½" Bh 2 30,600 - 61,200 - 61,200
10 Pipa Pralon 2 1/2" Bh 4 49,400 - 197,600 - 197,600
11 Pipa Pralon 3" Bh 1 58,800 - 58,800 - 58,800
12 Knee Pipe 2 ½" Bh 4 5,700 - 22,800 - 22,800
13 Knee Pipe 3" Bh 1 5,700 - 5,700 - 5,700
14 Spiral Pralon 2 ½" Mtr 6.0 39,200 - 235,200 - 235,200
15 Spiral Pralon 3" Mtr 1.5 49,400 - 74,100 - 74,100
16 Sepatu Kabel CU/CU 150 mm2 Bh 24 79,500 - 1,908,000 - 1,908,000
17 Compresion Conector H type 70 mm² / 150 mm² Bh 16 20,400 - 326,400 - 326,400
18 Jasa Pasang LVCB empat jurusan 1 tiang lengkap M8-B1 Unit 1 550,000 - - 550,000 550,000
Sub Jumlah M8-B1 - 3,972,500 550,000 4,522,500
11 M8-B2 Unit 1
1 LVCB 4 Jurusan 400 A LBS Bh 1 PLN PLN - - -
2 Kabel NYY 1 x 150 mm² Mtr 68.0 PLN PLN - - -
3 Bolt Machine / Bolt cariage ½" x ¾" Bh 4.0 2,900 - 11,600 - 11,600
4 Bolt Machine ⅝" x 8" Bh 20 9,400 - 188,000 - 188,000
5 Cross Arm Steel 1.500 mm ( UNSP 10 ) galvanis Bh 2 170,000 - 340,000 - 340,000
6 Cross Arm Steel 3.000 mm ( UNSP 10 ) galvanis Bh 2 350,000 - 700,000 - 700,000
7 Pole Band Double Rack 3" atau 3 ½" Bh 15 21,100 - 316,500 - 316,500
8 Pole Band Double Rack 7" atau 7 ½" Bh 2 30,600 - 61,200 - 61,200
9 Pole Band Double Rack 8" atau 8 ½" Bh 3 30,600 - 91,800 - 91,800
10 Pipa Pralon 2 1/2" Bh 4 49,400 - 197,600 - 197,600
11 Pipa Pralon 3" Bh 1 58,800 - 58,800 - 58,800
12 Knee Pipe 2 ½" Bh 4 5,700 - 22,800 - 22,800
13 Knee Pipe 3" Bh 1 5,700 - 5,700 - 5,700
14 Spiral Pralon 2 ½" Mtr 6 39,200 - 235,200 - 235,200
15 Spiral Pralon 3" Mtr 1.5 49,400 - 74,100 - 74,100
16 Sepatu Kabel CU/CU 150 mm2 Bh 24 79,500 - 1,908,000 - 1,908,000
17 Compresion Conector H type 70 mm² / 150 mm² Bh 16 20,400 - 326,400 - 326,400
18 Jasa Pasang LVCB empat jurusan lengkap M8-B2 Unit 1 630,000 - - 630,000 630,000
Sub Jumlah M8-B2 - 4,537,700 630,000 5,167,700
ANALISA PER UNIT KONSTRUKSI
PEKERJAAN PEMBANGUNAN JARINGAN DISTRIBUSI 20 KV
#REF!

HARGA SATUAN BIAYA YANG DIPERLUKAN


NO. PERINCUAN PER UNIT KONSTRUKSI STN VOL MATERIAL MATERIAL TOTAL
JASA/UPAH JASA/UPAH
MDU HARDWARE MDU HARDWARE
SLP + SMP + APP
1 PEMASANGAN APP 1PHS DI BANGUNAN Unit 1
SLP + SMP
1 Strain Hook Clamp 1 ½" Set 1 9,000 - 9,000 - 9,000
2 Klem Bugel 1 1/2" untuk tiang atap Set 1 4,800 - 4,800 - 4,800
3 Gas Pipe 1 ½" x 1.5 Meter Btg 1 32,000 - 32,000 - 32,000
4 Protective Cup Plastik 1 ½" Bh 1 4,100 - 4,100 - 4,100
5 Loden Manset 0.8 Kg Bh 1 46,000 - 46,000 - 46,000
6 Service Wedge Clamp 6, 10, 16, 25 mm² Set 1 3,200 - 3,200 - 3,200
7 Tap Connector Kedap Air ( 6-25 / 6-25 ) mm² Set 2 6,900 - 13,800 - 13,800
Sub Jumlah PEMASANGAN APP 1PHS DI BANGUNAN - 112,900 - 112,900
2 PEMASANGAN APP 3PHS DI BANGUNAN Unit 1
SLP + SMP
1 Strain Hook Clamp 1 ½" Set 1 9,000 - 9,000 - 9,000
2 Klem Bugel 1 1/2" untuk tiang atap Set 1 4,800 - 4,800 - 4,800
3 Gas Pipe 1 ½" x 1.5 Meter Btg 1 32,000 - 32,000 - 32,000
4 Protective Cup Plastik 1 ½" Bh 1 4,100 - 4,100 - 4,100
5 Loden Manset 0.8 Kg Bh 1 46,000 - 46,000 - 46,000
6 Service Wedge Clamp 6, 10, 16, 25 mm² Set 2 3,200 - 6,400 - 6,400
7 Tap Connector Kedap Air ( 6-25 / 6-25 ) mm² Set 4 6,900 - 27,600 - 27,600
Sub Jumlah PEMASANGAN APP 3PHS DI BANGUNAN - 129,900 - 129,900
3 PEMASANGAN APP DI TIANG Unit 1
SLP + SMP
1 Bolt Machine / Bolt cariage ½" x ¾" Bh 4 2,900 - 11,600 - 11,600
2 Cross Arm Steel 2.000 mm ( UNSP 10 ) galvanis Bh 1 230,000 - 230,000 - 230,000
3 Pole Band Single Rack 8" atau 8 ½" Bh 2 24,300 - 48,600 - 48,600
4 Dead End Assembly Bh 1 45,500 - 45,500 - 45,500
5 Plastic Strap for Clamping Bh 1 1,500 - 1,500 - 1,500
6 Stainless Steel Strap 20 x 0.7 mm Mtr 1 10,200 - 10,200 - 10,200
7 Stopping Buckle / Yokes Bh 1 1,400 - 1,400 - 1,400
Sub Jumlah PEMASANGAN APP DI TIANG - 348,800 - 348,800
4 SR+APP 1PHASA 13,9 kVA LANGSUNG Unit 1
SLP + SMP
1 KWH Meter 1 Fasa 230V; 50/100A; CLS2; 2W Bh 1 PLN PLN - - -
2 MCCB 1 Phasa 250 V, Tp PLN 63 A Lengkap Bh 1 PLN PLN - - -
3 Kotak APP Type III Lipat,lengkap Bh 1 PLN PLN - - -
4 NFA2X 2 x 25 mm² Mtr 35 PLN PLN - - -
5 upah pasang SLTR 1 phasa daya 13.900 VA sd 22.000 VA Unit 1 109,200 - - 109,200 109,200
Sub Jumlah SR+APP 1PHASA 13,9 kVA LANGSUNG - - 109,200 109,200
5 SR+APP 1PHASA 17,6 kVA LANGSUNG Unit 1
SLP + SMP
1 KWH Meter 1 Fasa 230V; 50/100A; CLS2; 2W Bh 1 PLN PLN - - -
2 MCCB 1 Phasa 250 V, Tp PLN 80 A Lengkap Bh 1 PLN PLN - - -
3 Kotak APP Type III Lipat,lengkap Bh 1 PLN PLN - - -
4 NFA2X 2 x 25 mm² Mtr 35 PLN PLN - - -
5 upah pasang SLTR 1 phasa daya 13.900 VA sd 22.000 VA Unit 1 109,200 - - 109,200 109,200
Sub Jumlah SR+APP 1PHASA 17,6 kVA LANGSUNG - - 109,200 109,200
6 SR+APP 1PHASA 22 Kva LANGSUNG Unit 1
SLP + SMP
1 KWH Meter 1 Fasa 230V; 50/100A; CLS2; 2W Bh 1 PLN PLN - - -
2 MCCB 1 Phasa 250 V, Tp PLN 100 A Lengkap Bh 1 PLN PLN - - -
3 Kotak APP Type III Lipat,lengkap Bh 1 PLN PLN - - -
4 NFA2X 2 x 25 mm² Mtr 35 PLN PLN - - -
5 upah pasang SLTR 1 phasa daya 13.900 VA sd 22.000 VA Unit 1 109,200 - - 109,200 109,200
Sub Jumlah SR+APP 1PHASA 22 Kva LANGSUNG - - 109,200 109,200
ANALISA PER UNIT KONSTRUKSI
PEKERJAAN PEMBANGUNAN JARINGAN DISTRIBUSI 20 KV
#REF!

HARGA SATUAN BIAYA YANG DIPERLUKAN


NO. PERINCUAN PER UNIT KONSTRUKSI STN VOL MATERIAL MATERIAL TOTAL
JASA/UPAH JASA/UPAH
MDU HARDWARE MDU HARDWARE
7 SR+APP 1PHASA 13,9 kVA TAK LANGSUNG Unit 1
SLP + SMP
1 KWH Meter 1 Fasa 230V; 5/20A; CLS2; 2W Bh 1 PLN PLN - - -
2 MCCB 1 Phasa 250 V, Tp PLN 63 A Lengkap Bh 1 PLN PLN - - -
3 Kotak APP Type III Lipat,lengkap Bh 1 PLN PLN - - -
4 CT TR ; Burden 5 VA; 100/5 A Class 0.5s Bh 1 PLN PLN - - -
5 NFA2X 2 x 25 mm² Mtr 35 PLN PLN - - -
6 upah pasang SLTR 1 phasa daya 13.900 VA sd 22.000 VA Unit 1 109,200 - - 109,200 109,200
Sub Jumlah SR+APP 1PHASA 13,9 kVA TAK LANGSUNG - - 109,200 109,200
8 SR+APP 1PHASA 17,6 kVA TAK LANGSUNG Unit 1
SLP + SMP
1 KWH Meter 1 Fasa 230V; 5/20A; CLS2; 2W Bh 1 PLN PLN - - -
2 MCCB 1 Phasa 250 V, Tp PLN 80 A Lengkap Bh 1 PLN PLN - - -
3 Kotak APP Type III Lipat,lengkap Bh 1 PLN PLN - - -
4 CT TR ; Burden 5 VA; 100/5 A Class 0.5s Bh 1 PLN PLN - - -
5 NFA2X 2 x 25 mm² Mtr 35 PLN PLN - - -
6 upah pasang SLTR 1 phasa daya 13.900 VA sd 22.000 VA Unit 1 109,200 - - 109,200 109,200
Sub Jumlah SR+APP 1PHASA 17,6 kVA TAK LANGSUNG - - 109,200 109,200
9 SR+APP 1PHASA 22 kVA TAK LANGSUNG Unit 1
SLP + SMP
1 KWH Meter 1 Fasa 230V; 5/20A; CLS2; 2W Bh 1 PLN PLN - - -
2 MCCB 1 Phasa 250 V, Tp PLN 100 A Lengkap Bh 1 PLN PLN - - -
3 Kotak APP Type III Lipat,lengkap Bh 1 PLN PLN - - -
4 CT TR ; Burden 5 VA; 100/5 A Class 0.5s Bh 1 PLN PLN - - -
5 NFA2X 2 x 25 mm² Mtr 35 PLN PLN - - -
6 upah pasang SLTR 1 phasa daya 13.900 VA sd 22.000 VA Unit 1 109,200 - - 109,200 109,200
Sub Jumlah SR+APP 1PHASA 22 kVA TAK LANGSUNG - - 109,200 109,200
ANALISA PER UNIT KONSTRUKSI
PEKERJAAN PEMBANGUNAN JARINGAN DISTRIBUSI 20 KV
#REF!

HARGA SATUAN BIAYA YANG DIPERLUKAN


NO. PERINCUAN PER UNIT KONSTRUKSI STN VOL MATERIAL MATERIAL TOTAL
JASA/UPAH JASA/UPAH
MDU HARDWARE MDU HARDWARE
10 SR+APP 3PHASA 6,6 kVA LANGSUNG Unit 1
SLP + SMP
1 KWH MPB; 3P; 4W; 230/400 V; 5(80) A; Class 1 Bh 1 PLN PLN - - -
2 Smart Box Langsung Daya 6.6 kVA MCCB 10 A Unit 1 PLN PLN - - -
3 NFA2X 4 x 10 mm² Mtr 35 PLN PLN - - -
4 upah pasang SR/APP 3 phasa daya 6 kVA sd 41,5 kVA Unit 1 140,400 - - 140,400 140,400
Sub Jumlah SR+APP 3PHASA 6,6 kVA LANGSUNG - - 140,400 140,400
11 SR+APP 3PHASA 10,6 kVA LANGSUNG Unit 1
SLP + SMP
1 KWH MPB; 3P; 4W; 230/400 V; 5(80) A; Class 1 Bh 1 PLN PLN - - -
2 Smart Box Langsung Daya 10.6 kVA MCCB 16 A Unit 1 PLN PLN - - -
3 NFA2X 4 x 16 mm² Mtr 35 PLN PLN - - -
4 upah pasang SR/APP 3 phasa daya 6 kVA sd 41,5 kVA Unit 1 140,400 - - 140,400 140,400
Sub Jumlah SR+APP 3PHASA 10,6 kVA LANGSUNG - - 140,400 140,400
12 SR+APP 3PHASA 13,2 kVA LANGSUNG Unit 1
SLP + SMP
1 KWH MPB; 3P; 4W; 230/400 V; 5(80) A; Class 1 Bh 1 PLN PLN - - -
2 Smart Box Langsung Daya 13.2 kVA MCCB 20 A Unit 1 PLN PLN - - -
3 NFA2X 4 x 16 mm² Mtr 35 PLN PLN - - -
4 upah pasang SR/APP 3 phasa daya 6 kVA sd 41,5 kVA Unit 1 140,400 - - 140,400 140,400
Sub Jumlah SR+APP 3PHASA 13,2 kVA LANGSUNG - - 140,400 140,400
13 SR+APP 3PHASA 16,5 kVA LANGSUNG Unit 1
SLP + SMP
1 KWH MPB; 3P; 4W; 230/400 V; 5(80) A; Class 1 Bh 1 PLN PLN - - -
2 Smart Box Langsung Daya 16.5 kVA MCCB 25 A Unit 1 PLN PLN - - -
3 NFA2X 4 x 16 mm² Mtr 35 PLN PLN - - -
4 upah pasang SR/APP 3 phasa daya 6 kVA sd 41,5 kVA Unit 1 140,400 - - 140,400 140,400
Sub Jumlah SR+APP 3PHASA 16,5 kVA LANGSUNG - - 140,400 140,400
ANALISA PER UNIT KONSTRUKSI
PEKERJAAN PEMBANGUNAN JARINGAN DISTRIBUSI 20 KV
#REF!

HARGA SATUAN BIAYA YANG DIPERLUKAN


NO. PERINCUAN PER UNIT KONSTRUKSI STN VOL MATERIAL MATERIAL TOTAL
JASA/UPAH JASA/UPAH
MDU HARDWARE MDU HARDWARE
14 SR+APP 3PHASA 23 Kva LANGSUNG Unit 1
SLP + SMP
1 KWH MPB; 3P; 4W; 230/400 V; 5(80) A; Class 1 Bh 1 PLN PLN - - -
2 Smart Box Langsung Daya 23 kVA MCCB 35 A Unit 1 PLN PLN - - -
3 NFA2X 4 x 16 mm² Mtr 35 PLN PLN - - -
4 upah pasang SR/APP 3 phasa daya 6 kVA sd 41,5 kVA Unit 1 140,400 - - 140,400 140,400
Sub Jumlah SR+APP 3PHASA 23 Kva LANGSUNG - - 140,400 140,400
15 APP 3PHASA 33 Kva LANGSUNG Unit 1
1 KWH MPB; 3P; 4W; 230/400 V; 5(80) A; Class 1 Bh 1 PLN PLN - - -
2 Smart Box Langsung Daya 33 kVA MCCB 50 A Unit 1 PLN PLN - - -
3 GSM Modem Unit 1 PLN PLN - - -
4 Kabel NYY 4 x 35 mm² Mtr 35 PLN PLN - - -
5 upah pasang SR/APP 3 phasa daya 6 kVA sd 41,5 kVA Unit 1 140,400 - - 140,400 140,400
Sub Jumlah APP 3PHASA 33 Kva LANGSUNG - - 140,400 140,400
16 APP 3PHASA 41,5 Kva LANGSUNG Unit 1
1 KWH Elektronik; 3P; 4W; 230/400 V; 5(80) A; Class 1 Bh 1 PLN PLN - - -
2 Smart Box Langsung Daya 41.5 kVA MCCB 63 A Unit 1 PLN PLN - - -
3 GSM Modem Unit 1 PLN PLN - - -
4 Kabel NYY 4 x 35 mm² Mtr 35 PLN PLN - - -
5 upah pasang SR/APP 3 phasa daya 6 kVA sd 41,5 kVA Unit 1 140,400 - - 140,400 140,400
Sub Jumlah APP 3PHASA 41,5 Kva LANGSUNG - - 140,400 140,400
17 APP 3PHASA 53 Kva TAK LANGSUNG Unit 1
1 KWH Elektronik; 3P; 4W; 230/400V; 5(10) A; Class 1 Bh 1 PLN PLN - - -
2 Smart Box Tidak Langsung Daya 53 kVA MCCB 80 A Unit 1 PLN PLN - - -
3 GSM Modem Unit 1 PLN PLN - - -
4 Kabel NYY 4 x 35 mm² Mtr 35 PLN PLN - - -
5 upah pasang SR/APP 3 phasa daya 53 kVA sd 82,5 kVA Unit 1 179,400 - - 179,400 179,400
Sub Jumlah APP 3PHASA 53 Kva TAK LANGSUNG - - 179,400 179,400
18 APP 3PHASA 66 Kva TAK LANGSUNG Unit 1
1 KWH Elektronik; 3P; 4W; 230/400V; 5(10) A; Class 1 Bh 1 PLN PLN - - -
2 Smart Box Tidak Langsung Daya 66 kVA MCCB 100 A Unit 1 PLN PLN - - -
3 GSM Modem Unit 1 PLN PLN - - -
4 Kabel NYY 4 x 70 mm² Mtr 35 PLN PLN - - -
5 upah pasang SR/APP 3 phasa daya 53 kVA sd 82,5 kVA Unit 1 179,400 - - 179,400 179,400
Sub Jumlah APP 3PHASA 66 Kva TAK LANGSUNG - - 179,400 179,400
19 APP 3PHASA 82,5 Kva TAK LANGSUNG Unit 1
1 KWH Elektronik; 3P; 4W; 230/400V; 5(10) A; Class 1 Bh 1 PLN PLN - - -
2 Smart Box Tidak Langsung Daya 82.5 kVA MCCB 125 A Unit 1 PLN PLN - - -
3 GSM Modem Unit 1 PLN PLN - - -
4 Kabel NYY 4 x 70 mm² Mtr 35 PLN PLN - - -
5 upah pasang SR/APP 3 phasa daya 53 kVA sd 82,5 kVA Unit 1 179,400 - - 179,400 179,400
Sub Jumlah APP 3PHASA 82,5 Kva TAK LANGSUNG - - 179,400 179,400
20 APP 3PHASA 105 Kva TAK LANGSUNG Unit 1
1 KWH Elektronik; 3P; 4W; 230/400V; 5(10) A; Class 1 Bh 1 PLN PLN - - -
2 Smart Box Tidak Langsung Daya 105 kVA MCCB 160 A Unit 1 PLN PLN - - -
3 GSM Modem Unit 1 PLN PLN - - -
4 Kabel NYY 4 x 70 mm² Mtr 35 PLN PLN - - -
5 upah pasang SR/APP 3 phasa daya 105 kVA sd 197 kVA Unit 1 179,400 - - 179,400 179,400
Sub Jumlah APP 3PHASA 105 Kva TAK LANGSUNG - - 179,400 179,400
21 APP 3PHASA 131 Kva TAK LANGSUNG Unit 1
1 KWH Elektronik; 3P; 4W; 230/400V; 5(10) A; Class 1 Bh 1 PLN PLN - - -
2 Smart Box Tidak Langsung Daya 131 kVA MCCB 200 A Unit 1 PLN PLN - - -
3 GSM Modem Unit 1 PLN PLN - - -
4 Kabel NYY 4 x 70 mm² Mtr 35 PLN PLN - - -
5 upah pasang SR/APP 3 phasa daya 105 kVA sd 197 kVA Unit 1 179,400 - - 179,400 179,400
Sub Jumlah APP 3PHASA 131 Kva TAK LANGSUNG - - 179,400 179,400
ANALISA PER UNIT KONSTRUKSI
PEKERJAAN PEMBANGUNAN JARINGAN DISTRIBUSI 20 KV
#REF!

HARGA SATUAN BIAYA YANG DIPERLUKAN


NO. PERINCUAN PER UNIT KONSTRUKSI STN VOL MATERIAL MATERIAL TOTAL
JASA/UPAH JASA/UPAH
MDU HARDWARE MDU HARDWARE
22 APP 3PHASA 147 Kva TAK LANGSUNG Unit 1
1 KWH Elektronik; 3P; 4W; 230/400V; 5(10) A; Class 1 Bh 1 PLN PLN - - -
2 Smart Box Tidak Langsung Daya 164 kVA MCCB 250 A Unit 1 PLN PLN - - -
3 GSM Modem Unit 1 PLN PLN - - -
4 Kabel NYY 4 x 95 mm² Mtr 35 PLN PLN - - -
5 upah pasang SR/APP 3 phasa daya 105 kVA sd 197 kVA Unit 1 179,400 - - 179,400 179,400
Sub Jumlah APP 3PHASA 147 Kva TAK LANGSUNG - - 179,400 179,400
23 APP 3PHASA 164 Kva TAK LANGSUNG Unit 1
1 KWH Elektronik; 3P; 4W; 230/400V; 5(10) A; Class 1 Bh 1 PLN PLN - - -
2 Smart Box Tidak Langsung Daya 164 kVA MCCB 250 A Unit 1 PLN PLN - - -
3 GSM Modem Unit 1 PLN PLN - - -
4 Kabel NYY 4 x 95 mm² Mtr 35 PLN PLN - - -
5 upah pasang SR/APP 3 phasa daya 105 kVA sd 197 kVA Unit 1 179,400 - - 179,400 179,400
Sub Jumlah APP 3PHASA 164 Kva TAK LANGSUNG - - 179,400 179,400
24 APP 3PHASA 197 Kva TAK LANGSUNG Unit 1
1 KWH Elektronik; 3P; 4W; 230/400V; 5(10) A; Class 1 Bh 1 PLN PLN - - -
2 Smart Box Tidak Langsung Daya 197 kVA MCCB 300 A Unit 1 PLN PLN - - -
3 GSM Modem Unit 1 PLN PLN - - -
4 Kabel NYY 4 x 95 mm² Mtr 35 PLN PLN - - -
5 upah pasang SR/APP 3 phasa daya 105 kVA sd 197 kVA Unit 1 179,400 - - 179,400 179,400
Sub Jumlah APP 3PHASA 197 Kva TAK LANGSUNG - - 179,400 179,400
ANALISA PER UNIT KONSTRUKSI
PEKERJAAN PEMBANGUNAN JARINGAN DISTRIBUSI 20 KV
#REF!

HARGA SATUAN BIAYA YANG DIPERLUKAN


NO. PERINCUAN PER UNIT KONSTRUKSI STN VOL MATERIAL MATERIAL TOTAL
JASA/UPAH JASA/UPAH
MDU HARDWARE MDU HARDWARE
25 PENGUKURAN TM 240 kVA Outdoor 1
A CT/PT TM
1 AAAC 70 mm² Mtr 28.0 PLN PLN - - -
2 Lightning Arester (Polymer) 18 KV, 10 KA Bh 3 PLN PLN - - -
3 CT TM out door (ratio 10/5 s.d. 400/5) Class 0.2s Bh 3 PLN PLN - - -
4 PT out door (ratio 20.000/v3 : 100/v3) Class 0.2s Bh 3 PLN PLN - - -
5 FCO Polymer Bh 3 PLN PLN - - -
6 Isolator Tumpu (Pin Post) 20 KV Bh 3 PLN PLN - - -
7 Fuse Link 10 A Bh 3 33,000 - 99,000 - 99,000
8 Sepatu Kabel AL/CU Ring-70 mm² Bh 18 40,000 - 720,000 - 720,000
9 Bimetalic Connector 35 - 240 mm² Bh 4 36,100 - 144,400 - 144,400
10 Bolt Machine / Bolt cariage ½" x ¾" Bh 32 2,900 - 92,800 - 92,800
11 Bracket band segment,vertikal plat ( Hot dip galvanis ) Bh 4 235,500 - 942,000 - 942,000
12 Compresion Conector H type 70 mm² / 70 mm² Bh 6 20,400 - 122,400 - 122,400
13 Cross Arm Steel 1.500 mm ( UNSP 10 ) galvanis Bh 2 170,000 - 340,000 - 340,000
14 Cross Arm Steel 3.000 mm ( UNSP 10 ) galvanis Bh 6 350,000 - 2,100,000 - 2,100,000
15 Ground wire Cu 16 mm² Mtr 12.0 14,100 - 169,200 - 169,200
16 Hot Line Clamp ( 150mm² s/d 240 mm² ) Bh 3 105,900 - 317,700 - 317,700
17 Pole Band Double Rack 7" atau 7 ½" Bh 4 30,600 - 122,400 - 122,400
18 Steel L 70 x 70 x 7 x 780 mm galvanis Bh 4 70,600 - 282,400 - 282,400
19 Tie Wire # 4 / Alluminium bonding wire # 20 Mtr 4.8 3,100 - 14,880 - 14,880
B. APP
1 KWH Elektronik; 3P; 4W; 57,7/100 - 230/400 V; 5(10) A; Class 0.5sBh 1 PLN PLN - - -
2 GSM Modem Unit 1 PLN PLN - - -
3 Kotak APP TM , lengkap Bh 1 PLN PLN - - -
4 Bolt Machine ⅝" x 8" Bh 4 9,400 - 37,600 - 37,600
5 Cross Arm Steel 2.000 mm ( UNSP 10 ) galvanis Bh 1 230,000 - 230,000 - 230,000
6 Pole Band Double Rack 8" atau 8 ½" Bh 1 30,600 - 30,600 - 30,600
7 Upah Pasang SR + APP 3 Fasa + Wiring Unit 1 429,000 - - 429,000 429,000
Sub Jumlah PENGUKURAN TM 240 kVA Outdoor - 5,765,380 429,000 6,194,380
26 PENGUKURAN TM 345 kVA Outdoor 1
A CT/PT TM
1 AAAC 70 mm² Mtr 28.0 PLN PLN - - -
2 Lightning Arester (Polymer) 18 KV, 10 KA Bh 3 PLN PLN - - -
3 CT TM out door (ratio 10/5 s.d. 400/5) Class 0.2s Bh 3 PLN PLN - - -
4 PT out door (ratio 20.000/v3 : 100/v3) Class 0.2s Bh 3 PLN PLN - - -
5 FCO Polymer Bh 3 PLN PLN - - -
6 Isolator Tumpu (Pin Post) 20 KV Bh 3 PLN PLN - - -
7 Fuse Link 10 A Bh 3 33,000 - 99,000 - 99,000
8 Sepatu Kabel AL/CU Ring-70 mm² Bh 18 40,000 - 720,000 - 720,000
9 Bimetalic Connector 35 - 240 mm² Bh 4 36,100 - 144,400 - 144,400
10 Bolt Machine / Bolt cariage ½" x ¾" Bh 32 2,900 - 92,800 - 92,800
11 Bracket band segment,vertikal plat ( Hot dip galvanis ) Bh 4 235,500 - 942,000 - 942,000
12 Compresion Conector H type 70 mm² / 70 mm² Bh 6 20,400 - 122,400 - 122,400
13 Cross Arm Steel 1.500 mm ( UNSP 10 ) galvanis Bh 2 170,000 - 340,000 - 340,000
14 Cross Arm Steel 3.000 mm ( UNSP 10 ) galvanis Bh 6 350,000 - 2,100,000 - 2,100,000
15 Ground wire Cu 16 mm² Mtr 12.0 14,100 - 169,200 - 169,200
16 Hot Line Clamp ( 150mm² s/d 240 mm² ) Bh 3 105,900 - 317,700 - 317,700
17 Pole Band Double Rack 7" atau 7 ½" Bh 4 30,600 - 122,400 - 122,400
18 Steel L 70 x 70 x 7 x 780 mm galvanis Bh 4 70,600 - 282,400 - 282,400
19 Tie Wire # 4 / Alluminium bonding wire # 20 Mtr 4.8 3,100 - 14,880 - 14,880
B. APP
1 KWH Elektronik; 3P; 4W; 57,7/100 - 230/400 V; 5(10) A; Class 0.5sBh 1 PLN PLN - - -
2 GSM Modem Unit 1 PLN PLN - - -
3 Kotak APP TM , lengkap Bh 1 PLN PLN - - -
4 Bolt Machine ⅝" x 8" Bh 4 9,400 - 37,600 - 37,600
5 Cross Arm Steel 2.000 mm ( UNSP 10 ) galvanis Bh 1 230,000 - 230,000 - 230,000
6 Pole Band Double Rack 8" atau 8 ½" Bh 1 30,600 - 30,600 - 30,600
7 Upah Pasang SR + APP 3 Fasa + Wiring Unit 1 429,000 - - 429,000 429,000
Sub Jumlah PENGUKURAN TM 345 kVA Outdoor - 5,765,380 429,000 6,194,380
ANALISA PER UNIT KONSTRUKSI
PEKERJAAN PEMBANGUNAN JARINGAN DISTRIBUSI 20 KV
#REF!

HARGA SATUAN BIAYA YANG DIPERLUKAN


NO. PERINCUAN PER UNIT KONSTRUKSI STN VOL MATERIAL MATERIAL TOTAL
JASA/UPAH JASA/UPAH
MDU HARDWARE MDU HARDWARE
27 PENGUKURAN TM 555 kVA Outdoor 1
A. CT/PT TM
1 AAAC 70 mm² Mtr 28.0 PLN PLN - - -
2 Lightning Arester (Polymer) 18 KV, 10 KA Bh 3 PLN PLN - - -
3 CT TM out door (ratio 10/5 s.d. 400/5) Class 0.2s Bh 3 PLN PLN - - -
4 PT out door (ratio 20.000/v3 : 100/v3) Class 0.2s Bh 3 PLN PLN - - -
5 FCO Polymer Bh 3 PLN PLN - - -
6 Isolator Tumpu (Pin Post) 20 KV Bh 3 PLN PLN - - -
7 Fuse Link 16 A Bh 3 34,000 - 102,000 - 102,000
8 Sepatu Kabel AL/CU Ring-70 mm² Bh 18 40,000 - 720,000 - 720,000
9 Bimetalic Connector 35 - 240 mm² Bh 4 36,100 - 144,400 - 144,400
10 Bolt Machine / Bolt cariage ½" x ¾" Bh 32 2,900 - 92,800 - 92,800
11 Bracket band segment,vertikal plat ( Hot dip galvanis ) Bh 4 235,500 - 942,000 - 942,000
12 Compresion Conector H type 70 mm² / 70 mm² Bh 6 20,400 - 122,400 - 122,400
13 Cross Arm Steel 1.500 mm ( UNSP 10 ) galvanis Bh 2 170,000 - 340,000 - 340,000
14 Cross Arm Steel 3.000 mm ( UNSP 10 ) galvanis Bh 6 350,000 - 2,100,000 - 2,100,000
15 Ground wire Cu 16 mm² Mtr 12.0 14,100 - 169,200 - 169,200
16 Hot Line Clamp ( 150mm² s/d 240 mm² ) Bh 3 105,900 - 317,700 - 317,700
17 Pole Band Double Rack 7" atau 7 ½" Bh 4 30,600 - 122,400 - 122,400
18 Steel L 70 x 70 x 7 x 780 mm galvanis Bh 4 70,600 - 282,400 - 282,400
19 Tie Wire # 4 / Alluminium bonding wire # 20 Mtr 4.8 3,100 - 14,880 - 14,880
B. APP
1 KWH Elektronik; 3P; 4W; 57,7/100 - 230/400 V; 5(10) A; Class 0.5sBh 1 PLN PLN - - -
2 GSM Modem Unit 1 PLN PLN - - -
3 Kotak APP TM , lengkap Bh 1 PLN PLN - - -
4 Bolt Machine ⅝" x 8" Bh 4 9,400 - 37,600 - 37,600
5 Cross Arm Steel 2.000 mm ( UNSP 10 ) galvanis Bh 1 230,000 - 230,000 - 230,000
6 Pole Band Double Rack 8" atau 8 ½" Bh 1 30,600 - 30,600 - 30,600
7 Upah Pasang SR + APP 3 Fasa + Wiring Unit 1 429,000 - - 429,000 429,000
Sub Jumlah PENGUKURAN TM 555 kVA Outdoor - 5,768,380 429,000 6,197,380
28 PENGUKURAN TM 690 kVA Outdoor 1
A. CT/PT TM
1 AAAC 70 mm² Mtr 28.0 PLN PLN - - -
2 Lightning Arester (Polymer) 18 KV, 10 KA Bh 3 PLN PLN - - -
3 CT TM out door (ratio 10/5 s.d. 400/5) Class 0.2s Bh 3 PLN PLN - - -
4 PT out door (ratio 20.000/v3 : 100/v3) Class 0.2s Bh 3 PLN PLN - - -
5 FCO Polymer Bh 3 PLN PLN - - -
6 Isolator Tumpu (Pin Post) 20 KV Bh 3 PLN PLN - - -
7 Fuse Link 20 A Bh 3 34,000 - 102,000 - 102,000
8 Sepatu Kabel AL/CU Ring-70 mm² Bh 18 40,000 - 720,000 - 720,000
9 Bimetalic Connector 35 - 240 mm² Bh 4 36,100 - 144,400 - 144,400
10 Bolt Machine / Bolt cariage ½" x ¾" Bh 32 2,900 - 92,800 - 92,800
11 Bracket band segment,vertikal plat ( Hot dip galvanis ) Bh 4 235,500 - 942,000 - 942,000
12 Compresion Conector H type 70 mm² / 70 mm² Bh 6 20,400 - 122,400 - 122,400
13 Cross Arm Steel 1.500 mm ( UNSP 10 ) galvanis Bh 2 170,000 - 340,000 - 340,000
14 Cross Arm Steel 3.000 mm ( UNSP 10 ) galvanis Bh 6 350,000 - 2,100,000 - 2,100,000
15 Ground wire Cu 16 mm² Mtr 12.0 14,100 - 169,200 - 169,200
16 Hot Line Clamp ( 150mm² s/d 240 mm² ) Bh 3 105,900 - 317,700 - 317,700
17 Pole Band Double Rack 7" atau 7 ½" Bh 4 30,600 - 122,400 - 122,400
18 Steel L 70 x 70 x 7 x 780 mm galvanis Bh 4 70,600 - 282,400 - 282,400
19 Tie Wire # 4 / Alluminium bonding wire # 20 Mtr 4.8 3,100 - 14,880 - 14,880
B. APP
1 KWH Elektronik; 3P; 4W; 57,7/100 - 230/400 V; 5(10) A; Class 0.5sBh 1 PLN PLN - - -
2 GSM Modem Unit 1 PLN PLN - - -
3 Kotak APP TM , lengkap Bh 1 PLN PLN - - -
4 Bolt Machine ⅝" x 8" Bh 4 9,400 - 37,600 - 37,600
5 Cross Arm Steel 2.000 mm ( UNSP 10 ) galvanis Bh 1 230,000 - 230,000 - 230,000
6 Pole Band Double Rack 8" atau 8 ½" Bh 1 30,600 - 30,600 - 30,600
7 Upah Pasang SR + APP 3 Fasa + Wiring Unit 1 429,000 - - 429,000 429,000
Sub Jumlah PENGUKURAN TM 690 kVA Outdoor - 5,768,380 429,000 6,197,380
ANALISA PER UNIT KONSTRUKSI
PEKERJAAN PEMBANGUNAN JARINGAN DISTRIBUSI 20 KV
#REF!

HARGA SATUAN BIAYA YANG DIPERLUKAN


NO. PERINCUAN PER UNIT KONSTRUKSI STN VOL MATERIAL MATERIAL TOTAL
JASA/UPAH JASA/UPAH
MDU HARDWARE MDU HARDWARE
29 PENGUKURAN TM 865 kVA Outdoor 1
A. CT/PT TM
1 AAAC 70 mm² Mtr 28.0 PLN PLN - - -
2 Lightning Arester (Polymer) 18 KV, 10 KA Bh 3 PLN PLN - - -
3 CT TM out door (ratio 10/5 s.d. 400/5) Class 0.2s Bh 3 PLN PLN - - -
4 PT out door (ratio 20.000/v3 : 100/v3) Class 0.2s Bh 3 PLN PLN - - -
5 FCO Polymer Bh 3 PLN PLN - - -
6 Isolator Tumpu (Pin Post) 20 KV Bh 3 PLN PLN - - -
7 Fuse Link 25 A Bh 3 40,000 - 120,000 - 120,000
8 Sepatu Kabel AL/CU Ring-70 mm² Bh 18 40,000 - 720,000 - 720,000
9 Bimetalic Connector 35 - 240 mm² Bh 4 36,100 - 144,400 - 144,400
10 Bolt Machine / Bolt cariage ½" x ¾" Bh 32 2,900 - 92,800 - 92,800
11 Bracket band segment,vertikal plat ( Hot dip galvanis ) Bh 4 235,500 - 942,000 - 942,000
12 Compresion Conector H type 70 mm² / 70 mm² Bh 6 20,400 - 122,400 - 122,400
13 Cross Arm Steel 1.500 mm ( UNSP 10 ) galvanis Bh 2 170,000 - 340,000 - 340,000
14 Cross Arm Steel 3.000 mm ( UNSP 10 ) galvanis Bh 6 350,000 - 2,100,000 - 2,100,000
15 Ground wire Cu 16 mm² Mtr 12.0 14,100 - 169,200 - 169,200
16 Hot Line Clamp ( 150mm² s/d 240 mm² ) Bh 3 105,900 - 317,700 - 317,700
17 Pole Band Double Rack 7" atau 7 ½" Bh 4 30,600 - 122,400 - 122,400
18 Steel L 70 x 70 x 7 x 780 mm galvanis Bh 4 70,600 - 282,400 - 282,400
19 Tie Wire # 4 / Alluminium bonding wire # 20 Mtr 4.8 3,100 - 14,880 - 14,880
B. APP
1 KWH Elektronik; 3P; 4W; 57,7/100 - 230/400 V; 5(10) A; Class 0.5sBh 1 PLN PLN - - -
2 GSM Modem Unit 1 PLN PLN - - -
3 Kotak APP TM , lengkap Bh 1 PLN PLN - - -
4 Bolt Machine ⅝" x 8" Bh 4 9,400 - 37,600 - 37,600
5 Cross Arm Steel 2.000 mm ( UNSP 10 ) galvanis Bh 1 230,000 - 230,000 - 230,000
6 Pole Band Double Rack 8" atau 8 ½" Bh 1 30,600 - 30,600 - 30,600
7 Upah Pasang SR + APP 3 Fasa + Wiring Unit 1 429,000 - - 429,000 429,000
Sub Jumlah PENGUKURAN TM 865 kVA Outdoor - 5,786,380 429,000 6,215,380
30 PENGUKURAN TM >555 kVA Kubikel 1
A. KUBIKEL
PEMASANGAN KUBIKEL
1 Air Insulated LBS Motorized;24KV;630A;Min-16KA Cell 1.0 PLN PLN - - -
2 Air Insulated CBOG Motorized+Metering;20KV;630A;Min-16KA Cell 1 PLN PLN - - -
3 Upah Pasang Cubicle Unit 1 936,000 - - 936,000 936,000
B. PEMASANGAN DS
1 Disconnecting Switch 20 kV - 630 A Set 1 PLN PLN - - -
2 Cross Arm Steel 2.000 mm ( UNSP 10 ) galvanis Bh 2 230,000 - 460,000 - 460,000
3 Brace Steel 770 mm Bh 4 25,900 - 103,600 - 103,600
4 Bolt Double Arming ⅝" x 14" Bh 2 23,500 - 47,000 - 47,000
5 Upah Pasang Acc.Jar Disconecting Switch Unit 1 1,100,000 - - 1,100,000 1,100,000
C. PEMASANGAN ARRESTER
1 Lightning Arester (Polymer) 24 KV, 10 KA Bh 3 PLN PLN - - -
2 Compresion Conector H type 150 mm² / 240 mm² Bh 3 28,200 - 84,600 - 84,600
3 Compresion Conector H type 70 mm² / 70 mm² Bh 1 20,400 - 20,400 - 20,400
4 Sepatu Kabel AL/CU Kepala-70 mm² Bh 6 51,600 - 309,600 - 309,600
5 AAAC 70 mm² Mtr 4.0 PLN PLN - - -
6 Jasa Pemasangan CM5-6 Unit 3 42,100 - - 126,300 126,300
D. PEMASANGAN GROUNDING
1 Ground rod ⅝" x 8" Copper Weld Bh 1 125,000 - 125,000 - 125,000
2 Bimetalic Connector 35 - 240 mm² Bh 1 36,100 - 36,100 - 36,100
3 Clamp Ground Rod ⅝" Bh 1 3,100 - 3,100 - 3,100
4 Ground wire Cu 16 mm² Mtr 10 14,100 - 141,000 - 141,000
5 Ground rod & Washer Bh 2 5,800 - 11,600 - 11,600
6 Pipa PVC ½" Bh 5.5 4,300 - 23,650 - 23,650
7 Stopping Buckle / Yokes Bh 6 1,400 - 8,400 - 8,400
8 Stainless Steel Strap 20 x 0.7 mm Mtr 4.8 10,200 - 48,960 - 48,960
9 Jasa Pemasangan CM2-11M Unit 1 39,000 - - 39,000 39,000
E. PEMASANGAN KABEL
1 Kabel NA2XSY 20 KV, 1 x 95 mm² Mtr 150 PLN PLN - - -
2 Kabel NYY 1 x 70 mm² Mtr 50 PLN PLN - - -
3 AAAC 70 mm² Mtr 12 PLN PLN - - -
4 Compresion Conector H type 150 mm² / 240 mm² Bh 3 28,200 - 84,600 - 84,600
5 Terminating kabel 3 x 95 mm2 ID Set 1 1,177,500 - 1,177,500 - 1,177,500
6 Terminating kabel 3 x 95 mm2 OD Set 1 1,413,000 - 1,413,000 - 1,413,000
7 Sepatu Kabel AL/CU Ring-70 mm² Bh 3 40,000 - 120,000 - 120,000
8 Sepatu Kabel AL/CU Kepala-95 mm² Bh 9 54,200 - 487,800 - 487,800
9 Pole Band Double Rack 7" atau 7 ½" Bh 2 30,600 - 61,200 - 61,200
10 Stainless Steel Strap 20 x 0.7 mm Mtr 3 10,200 - 30,600 - 30,600
11 Stopping Buckle / Yokes Bh 3 1,400 - 4,200 - 4,200
12 Washer Square 2 ¼" Bh 4 1,100 - 4,400 - 4,400
13 Pipa PVC 6" panjang 4 meter Bh 2 94,200 - 188,400 - 188,400
14 Pipa Shock PVC Bh 1 14,100 - 14,100 - 14,100
15 Klem beugel 7/8" Bh 4 7,800 - 31,200 - 31,200
16 Tanda Urutan phasa untuk kabel Bh 3 6,200 - 18,600 - 18,600
17 Upah Pasang Kabel NA2XS2Y 20 KV 3 x 95 mm² Per 1 m 50 9,300 - - 465,000 465,000
18 Upah Pasang Kabel NYY 1 x 70 mm² Per 1 m 50 600 - - 30,000 30,000
19 Upah Pasang Terminating Kabel 3 x 95 mm² ID Unit 1 280,800 - - 280,800 280,800
20 Upah Pasang Terminating Kabel 3 x 95 mm² OD Unit 1 312,000 - - 312,000 312,000
F. APP TM DAN PS
1 KWH Elektronik; 3P; 4W; 57,7/100 - 230/400 V; 5(10) A; Class 0.5sBh 1 PLN PLN - - -
2 GSM Modem Unit 1 PLN PLN - - -
3 Bolt Machine / Bolt cariage ½" x ¾" Bh 4 PLN PLN - - -
4 Smart Box Tidak Langsung Daya TM Unit 1 PLN PLN - - -
5 Pole Band Single Rack 8" atau 8 ½" Bh 2 PLN PLN - - -
6 KWH Meter 1 Fasa 230V; 5/20A; CLS2; 2W Bh 1 PLN PLN - - -
7 Cross Arm Steel 2.000 mm ( UNSP 10 ) galvanis Bh 1 PLN PLN - - -
ANALISA PER UNIT KONSTRUKSI
PEKERJAAN PEMBANGUNAN JARINGAN DISTRIBUSI 20 KV
#REF!

HARGA SATUAN BIAYA YANG DIPERLUKAN


NO. PERINCUAN PER UNIT KONSTRUKSI STN VOL MATERIAL MATERIAL TOTAL
JASA/UPAH JASA/UPAH
MDU HARDWARE MDU HARDWARE
8 MCB 1 Fasa 10 A Bh 1 PLN PLN - - -
9 NFA2X 2 x 10 mm² Mtr 35 PLN PLN - - -
10 Upah Pasang SR + APP 3 Fasa + Wiring Unit 1 429,000 - - 429,000 429,000

Sub Jumlah PENGUKURAN TM >555 kVA Kubikel - 5,058,610 3,718,100 8,776,710


PT. PLN (PERSERO)
DISTRIBUSI JAWA TENGAH DAN D.I. YOGYAKARTA
AREA SURAKARTA

ANALISA PER UNIT KONSTRUKSI


PEKERJAAN PEMBANGUNAN JARINGAN DISTRIBUSI 20 KV
#REF!

HARGA SATUAN BIAYA YANG DIPERLUKAN


NO. PERINCUAN PER UNIT KONSTRUKSI STN VOL MATERIAL MATERIAL TOTAL
JASA/UPAH JASA/UPAH
MDU HARDWARE MDU HARDWARE
1 KONSTRUKSI VANGNET 1
1 Pole Band Double Rack 7" atau 7 ½" Bh 4 30,600 - 122,400 - 122,400
2 Cross Arm Steel 3.000 mm ( UNSP 10 ) galvanis Bh 4 350,000 - 1,400,000 - 1,400,000
3 Bolt Double Arming ⅝" x 10" Bh 4 23,500 - 94,000 - 94,000
4 Brace Steel 1.262 mm Bh 4 58,800 - 235,200 - 235,200
5 Bolt Machine / Bolt cariage ½" x ¾" Bh 4 2,900 - 11,600 - 11,600
6 Upah Pasang Acc.Jar Konstruksi Vangnet Unit 1 124,800 - - 124,800 124,800
Sub Jumlah KONSTRUKSI VANGNET - 1,863,200 124,800 1,988,000
2 CM2-11M Unit 1
1 Bimetalic Connector 35 - 240 mm² Bh 2 36,100 - 72,200 - 72,200
2 Ground rod & Washer Bh 4 5,800 - 23,200 - 23,200
3 Ground rod ⅝" x 8" Copper Weld Bh 2 125,000 - 250,000 - 250,000
4 Ground wire Cu 16 mm² Mtr 20 14,100 - 282,000 - 282,000
5 Pipa PVC ½" Bh 11 4,300 - 47,300 - 47,300
6 Stainless Steel Strap 20 x 0.7 mm Mtr 9.6 10,200 - 97,920 - 97,920
7 Stopping Buckle / Yokes Bh 12 1,400 - 16,800 - 16,800
8 Clamp Ground Rod ⅝" Bh 2 3,100 - 6,200 - 6,200
9 Jasa Pemasangan CM2-11M Unit 1 39,000 - - 39,000 39,000
Sub Jumlah CM2-11M - 795,620 39,000 834,620
3 PEMBUATAN JARINGAN VANGNET Unit 1
1 Kawat Bendrad 6 mm² Mtr 25 3,200 - 80,000 - 80,000
2 Kawat Las Bh 1.0 3,200 - 3,200 - 3,200
3 Upah Pembuatan & Pasang Acc.Jar Jaring Vangnet Per 1 1 9,300 - - 9,300 9,300
Sub Jumlah PEMBUATAN JARINGAN VANGNET - 83,200 9,300 92,500
PT. PLN (PERSERO)
DISTRIBUSI JAWA TENGAH DAN D.I. YOGYAKARTA
AREA SURAKARTA

ANALISA PER UNIT KONSTRUKSI


PEKERJAAN PEMBANGUNAN JARINGAN DISTRIBUSI 20 KV
#REF!

HARGA SATUAN BIAYA YANG DIPERLUKAN


NO. PERINCUAN PER UNIT KONSTRUKSI STN VOL MATERIAL MATERIAL TOTAL
JASA/UPAH JASA/UPAH
MDU HARDWARE MDU HARDWARE

1 PEMASANGAN KABEL POWER Unit 1


1 Terminating kabel 3 x 300 mm2 ID Set 1 1,570,000 - 1,570,000 - 1,570,000
2 Terminating kabel 3 x 300 mm2 OD Set 1 1,805,500 - 1,805,500 - 1,805,500
3 Sepatu Kabel AL/CU 2 Lubang 240 mm² Bh 6 130,000 - 780,000 - 780,000
4 Sepatu Kabel AL/CU 2 Lubang 150 mm² Bh 2 120,800 - 241,600 - 241,600
5 Jointing Raychem 24 kV 3 x 1 x 300 mm2 (Armoured) IDSet 1 1,884,000 - 1,884,000 - 1,884,000
6 Jointing Raychem 24 kV 3 x 300 mm2 (Armoured) OD Set 1 1,648,500 - 1,648,500 - 1,648,500
7 Kabel NA2XSEYBY 20 KV, 3 x 300 mm² Mtr 300 PLN PLN - - -
8 Kabel NYY 1 x 95 mm² Mtr 300 PLN PLN - - -
9 Pipa PVC 6" panjang 4 meter Bh 1.0 94,200 - 94,200 - 94,200
10 Tanda Urutan phasa untuk kabel Bh 3.0 6,200 - 18,600 - 18,600
11 Pole Band Single Up Side 4" atau 4 ½" Bh 1.0 25,900 - 25,900 - 25,900
12 Pole Band Single Up Side 7" atau 7 ½" Bh 1.0 36,000 - 36,000 - 36,000
13 Pole Band Single Up Side 9" atau 12" Bh 2.0 36,000 - 72,000 - 72,000
14 AAAC/S 240 mm² Mtr 6.0 PLN PLN - - -
15 Compresion Conector H type 240 mm² / 240 mm² Bh 6.0 29,800 - 178,800 - 178,800
16 Mur Baut Ring Plat Ring Per Stainless Steel Ukuran 19 m Bh 6.0 9,400 - 56,400 - 56,400
17 Upah Pasang Terminating Kabel 3 x 300 mm² ID Unit 1 327,600 - - 327,600 327,600
18 Upah Pasang Terminating Kabel 3 x 300 mm² OD Unit 1 374,400 - - 374,400 374,400
19 Upah Pasang Kabel Tanah XLPE 3 x 240 mm² (three corePer 50 6 253,900 - - 1,523,400 1,523,400
20 Upah Pasang Kabel NYY 1 x 150 mm² Per 1 300 700 - - 210,000 210,000
Sub Jumlah PEMASANGAN KABEL POWER - 8,411,500 2,435,400 10,846,900
2 PEMASANGAN ARESTER DI RISEPOOL Unit 1
1 Compresion Conector H type 240 mm² / 240 mm² Bh 3 29,800 - 89,400 - 89,400
2 AAAC/S 70 mm² Mtr 6 PLN PLN - - -
3 Lightning Arester (Polymer) 24 KV, 10 KA Bh 3 PLN PLN - - -
4 Jasa Pemasangan CM5-6 Unit 3 42,100 - - 126,300 126,300
Sub Jumlah PEMASANGAN ARESTER DI RISEPOOL - 89,400 126,300 215,700
3 CM2-11M Unit 2
1 Ground rod ⅝" x 8" Copper Weld Bh 2.0 125,000 - 250,000 - 250,000
2 Bimetalic Connector 35 - 240 mm² Bh 2 36,100 - 72,200 - 72,200
3 Clamp Ground Rod ⅝" Bh 2 3,100 - 6,200 - 6,200
4 Ground wire Cu 25 mm² Mtr 28 25,900 - 725,200 - 725,200
5 Ground rod & Washer Bh 4 5,800 - 23,200 - 23,200
6 Pipa PVC ½" Bh 11.0 4,300 - 47,300 - 47,300
7 Stopping Buckle / Yokes Bh 12 1,400 - 16,800 - 16,800
8 Stainless Steel Strap 20 x 0.7 mm Mtr 9.6 10,200 - 97,920 - 97,920
9 Sepatu Kabel CU/CU-25 mm² Bh 2.0 18,000 - 36,000 - 36,000
10 Jasa Pemasangan CM2-11M Unit 2 39,000 - - 78,000 78,000
Sub Jumlah CM2-11M - 1,274,820 78,000 1,352,820
4 PEMBUATAN SALURAN KABEL OUTDOOR Unit 1
1 Persiapan Pekerjaan ls 1 282,000 - - 282,000 282,000
2 Pemasangan Bouwplank m2 1 15,600 - - 15,600 15,600
3 Galian Tanah m3 2.10 23,400 - - 49,140 49,140
4 Pembuangan Tanah m3 2.10 23,400 - - 49,140 49,140
5 Urugan Pasir Padat m3 0.15 117,700 - 17,655 - 17,655
6 Pembuatan Lantai Kerja m3 0.15 314,000 - 47,100 - 47,100
7 Pembuatan Beton Bertulang K225 m3 0.24 1,962,500 - 471,000 - 471,000
8 Pembuatan Tutup Beton Bertulang K225 m3 0.15 1,962,500 - 294,375 - 294,375
9 Besi Siku 70 untuk Tray Kabel Power pcs 2 179,450 - 358,900 - 358,900
Sub Jumlah PEMBUATAN SALURAN KABEL OUTDOOR - 1,189,030 395,880 1,584,910
PT. PLN (PERSERO)
DISTRIBUSI JAWA TENGAH DAN D.I. YOGYAKARTA
AREA SURAKARTA

ANALISA PER UNIT KONSTRUKSI


PEKERJAAN PEMBANGUNAN JARINGAN DISTRIBUSI 20 KV
#REF!

HARGA SATUAN BIAYA YANG DIPERLUKAN


NO. PERINCUAN PER UNIT KONSTRUKSI STN VOL MATERIAL MATERIAL TOTAL
JASA/UPAH JASA/UPAH
MDU HARDWARE MDU HARDWARE

5 PEMBUATAN GALIAN TANAH Unit 1


1 Galian Tanah keras sedalam 1 meter Mtr 2 54,600 - - 109,200 109,200
2 Urugan Pasir Dipadatkan m3 0.4 97,500 - - 39,000 39,000
3 Urugan Tanah Dipadatkan m3 0.6 51,700 - - 31,020 31,020
4 Pembuangan sisa tanah Mtr 1 23,400 - - 23,400 23,400
5 Pekerjaan Aspal Mtr 2 46,800 - - 93,600 93,600
Sub Jumlah PEMBUATAN GALIAN TANAH - - 296,220 296,220