Anda di halaman 1dari 1

KABUPATEN SEMARANG

25
DAFTAR KOMPONEN UTAMA PANEL POMPA
PINTU PANEL
I. BAGIAN DALAM

TIMER RELAY WLC.2 2 2 2 1. TERMINAL KABEL 4 P, 30 AMP : 3 bh


2. NO FUSE BREAKER 1 PHASE 20 AMP : 1 bh PEMERINTAH KABUPATEN SEMARANG
3. MCB 1 PHASE 2 AMP X 3 : 3 bh
6 7 7 V A 4. WLC SUMUR 220 VOLT : 2 bh
DINAS PEKERJAAN UMUM
5. CURRENT TRANSFORMATOR (CT 50/5) : 1 bh JL. KH Hasyim Ashari No. 3 Ungaran
NFB MCB WLC.1

Box panel CT
8 9
1 3
MAN AUTO
6.
7.
TIMER PENGATUR JAM OPERASIONAL / HARI
WLC TOWER 220 VOLT
: 1 bh
: 1 bh KEGIATAN
5 4 7
8. MAGNETED CONTACTOR 220 VOLT / 2 X 25 A : 1 bh
2 333
Pabrikasi 9.
10.
TERMAL OVERLOAD 12 S/D 18 A
BAHAN PENDUKUNG :
- Kabel Dack 5 x 4,5
: 3 bh

: 1 bat
PENGELOLAAN DAN PENGEMBANGAN SISTEM
PENYEDIAAN AIR MINUM (SPAM) DI DAERAH
KABUPATEN/KOTA
100 1 1
- Kabel Skun Power Type kolom 16 mm
- Kabel Skun Jaringan Kontrol 4 mm
: 30 bh
: 50 bh SUB KEGIATAN
6 ON 6 OFF - Kabel Power dan Kontrol : 10 m' PENINGKATAN SPAM JARINGAN PERPIPAAN DI
- Kabel Power dan Kontrol : 50 m' KAWASAN PERDESAAN

II. BAGIAN PINTU PEKERJAAN


1. VOLT METER SKALA 0 S/D 500 VOLT : 1 bh PENINGKATAN SPAM DUSUN KALEGEN
STABILISER 2. PILOT LAMP RST COLOR 220 VOLT : 3 bh DESA DERSANSARI KEC. SURUH
3. AMPERE METER CT 50 / A : 3 bh
4. PILOT LAMP STAR : 2 bh
5. SELECTOR SWITCH ON / OFF MAN / AUTO : 1 bh
LOKASI
6. SWITCH BOTTON ON & OFF : 2 bh DUSUN KALEGEN DESA DERSANSARI
KEC. SURUH

50 80 KABUPATEN SEMARANG

PANEL POWER & POMPA MENGETAHUI


KEPALA BIDANG CIPTA KARYA
DPU KAB. SEMARANG

Pipa GI 1" JAR


N
IGAN
CONTROL Dr. R. AGUNG PANGARSO, ST. MT.
Zinc Alun NIP. 19760608 200501 1 005
A VOLT MENYETUJUI
O
W
TW
C
LE
R W
S
U
M
CL
U
R PEJABAT PEMBUAT KOMITMEN
2 2 BIDANG CIPTA KARYA
A
M
J4M
2E
R
IT A
U
O
T
a
T a
T S
C
T
W
HI DPU KAB. SEMARANG
O
LA
D
V
E
R cT cT
M
A
N
b
T
7 b
T 7
100
DIDIK RIYADI, ST
O
F NIP. 19780912 200501 1 007

DIPERIKSA
80 JAR
N
IGAN
TENAGA O
N 1C
. TIM TEKNIS
BIDANG CIPTA KARYA

C1 MAGNETIC CONTACTOR

130
Pipa GI 2" MCB THERMAL OVER LOAD
KIKY FITRIANASARI, ST ELFRIEDHA PRAWINDHORA, SE
NFB KETUA SEKRETARIS
7 8
2A
.
KONSULTAN PERENCANA
CAPASITOR R
A
E
Y
L 1M
C
.

2 1A
. CV. MITRA DESIGN
TERMINAL KABEL WLC

80 MUJI PRIYONO, ST
KE POMPA Direktur

JUDUL GAMBAR SKALA


TIANG BOX PANEL GROUNDING DETAIL BOX PANEL

DIAGRAM PANEL POMPA TANGGAL NOMOR GAMBAR


3
JUMLAH LEMBAR

Anda mungkin juga menyukai