13 RGL - KU - FO - 6 - 24 J-RGL-KU-FO-6-24 J-RGL-KU-FO-6-24 REGEL KABEL UDARA FIBER OPTIK KAPASITAS 6-24 CORE Mtr 550 550
14 RGL - KU - FO - 48 - 96 M-RGL-KU-FO-48-96 M-RGL-KU-FO-48-96 REGEL KABEL UDARA FIBER OPTIK KAPASITAS 48-96 CORE Mtr - -
14 RGL - KU - FO - 48 - 96 J-RGL-KU-FO-48-96 J-RGL-KU-FO-48-96 REGEL KABEL UDARA FIBER OPTIK KAPASITAS 48-96 CORE Mtr 550 550
1 S - KTTL - 10 M-S-KTTL-10 M-S-KTTL-10 PENYAMBUNGAN LURUS / CAB. KTTL KAP 10 (Tidak termasuk material Unit 5,760 5,760
alat sambung)
1 Paket-5
Rincian Harga Satuan dan Bill Of Quantity
Pekerjaan Pengadaan dan Pemasangan Quality Enhancement (QE) Akses
PAKET-5 PROPINSI BANTEN, JAWA BARAT, JAWA TENGAH, DIY & JAWA TIMUR
HARGA SATUAN
NO. ITEM DESIGNATOR MATERIAL DESIGNATOR JASA DESIGNATOR DESIGNATOR URAIAN PEKERJAAN SAT HARGA SATUAN
MATERIAL JASA
1 S - KTTL - 10 J-S-KTTL-10 J-S-KTTL-10 PENYAMBUNGAN LURUS / CAB. KTTL KAP 10 (Tidak termasuk material Unit 123,580 123,580
alat sambung)
3 S - KTTL - 30 J-S-KTTL-30 J-S-KTTL-30 PENYAMBUNGAN LURUS / CAB. KTTL KAP 30 (Tidak termasuk material Unit 144,040 144,040
alat sambung)
4 S - KTTL - 40 M-S-KTTL-40 M-S-KTTL-40 PENYAMBUNGAN LURUS / CAB. KTTL KAP 40 (Tidak termasuk material Unit 22,840 22,840
alat sambung)
4 S - KTTL - 40 J-S-KTTL-40 J-S-KTTL-40 PENYAMBUNGAN LURUS / CAB. KTTL KAP 40 (Tidak termasuk material Unit 134,830 134,830
alat sambung)
PENYAMBUNGAN LURUS / CAB. KTTL KAP 50 (Tidak termasuk material
5 S - KTTL - 50 M-S-KTTL-50 M-S-KTTL-50 alat sambung) Unit 28,490 28,490
6 S - KTTL - 60 M-S-KTTL-60 M-S-KTTL-60 PENYAMBUNGAN LURUS / CAB. KTTL KAP 60 (Tidak termasuk material Unit 34,150 34,150
alat sambung)
6 S - KTTL - 60 J-S-KTTL-60 J-S-KTTL-60 PENYAMBUNGAN LURUS / CAB. KTTL KAP 60 (Tidak termasuk material Unit 140,450 140,450
alat sambung)
PENYAMBUNGAN LURUS / CAB. KTTL KAP 80 (Tidak termasuk material
7 S - KTTL - 80 M-S-KTTL-80 M-S-KTTL-80 alat sambung) Unit 45,560 45,560
8 S - KTTL - 100 M-S-KTTL-100 M-S-KTTL-100 PENYAMBUNGAN LURUS / CAB. KTTL KAP 100 (Tidak termasuk material Unit 56,870 56,870
alat sambung)
8 S - KTTL - 100 J-S-KTTL-100 J-S-KTTL-100 PENYAMBUNGAN LURUS / CAB. KTTL KAP 100 (Tidak termasuk material Unit 162,930 162,930
alat sambung)
9 S - KTTL - 200 M-S-KTTL-200 M-S-KTTL-200 PENYAMBUNGAN LURUS / CAB. KTTL KAP 200 (Tidak termasuk material Unit 113,750 113,750
alat sambung)
PENYAMBUNGAN LURUS / CAB. KTTL KAP 200 (Tidak termasuk material
9 S - KTTL - 200 J-S-KTTL-200 J-S-KTTL-200 alat sambung) Unit 207,810 207,810
0 AKSES, RELOK UTILITAS, RECOVERY -
II 0 PENYAMBUNGAN LURUS / CABANG KABEL UDARA MENGGUNAKAN -
UC DAN PANAS KERUT BERIKUT CONNECTOR
1 S - KU - 10 M-S-KU-10 M-S-KU-10 PENYAMBUNGAN LURUS / CAB. KU KAP 10 (Tidak termasuk material Unit 5,760 5,760
alat sambung)
1 S - KU - 10 J-S-KU-10 J-S-KU-10 PENYAMBUNGAN LURUS / CAB. KU KAP 10 (Tidak termasuk material Unit 95,470 95,470
alat sambung)
2 S - KU - 20 M-S-KU-20 M-S-KU-20 PENYAMBUNGAN LURUS / CAB. KU KAP 20 (Tidak termasuk material Unit 11,420 11,420
alat sambung)
2 S - KU - 20 J-S-KU-20 J-S-KU-20 PENYAMBUNGAN LURUS / CAB. KU KAP 20 (Tidak termasuk material Unit 96,670 96,670
alat sambung)
PENYAMBUNGAN LURUS / CAB. KU KAP 30 (Tidak termasuk material
3 S - KU - 30 M-S-KU-30 M-S-KU-30 alat sambung) Unit 17,070 17,070
4 S - KU - 40 M-S-KU-40 M-S-KU-40 PENYAMBUNGAN LURUS / CAB. KU KAP 40 (Tidak termasuk material Unit 22,840 22,840
alat sambung)
4 S - KU - 40 J-S-KU-40 J-S-KU-40 PENYAMBUNGAN LURUS / CAB. KU KAP 40 (Tidak termasuk material Unit 112,340 112,340
alat sambung)
5 S - KU - 50 M-S-KU-50 M-S-KU-50 PENYAMBUNGAN LURUS / CAB. KU KAP 50 (Tidak termasuk material Unit 28,490 28,490
alat sambung)
PENYAMBUNGAN LURUS / CAB. KU KAP 50 (Tidak termasuk material
5 S - KU - 50 J-S-KU-50 J-S-KU-50 alat sambung) Unit 130,030 130,030
6 S - KU - 60 J-S-KU-60 J-S-KU-60 PENYAMBUNGAN LURUS / CAB. KU KAP 60 (Tidak termasuk material Unit 123,580 123,580
alat sambung)
7 S - KU - 80 M-S-KU-80 M-S-KU-80 PENYAMBUNGAN LURUS / CAB. KU KAP 80 (Tidak termasuk material Unit 45,560 45,560
alat sambung)
PENYAMBUNGAN LURUS / CAB. KU KAP 80 (Tidak termasuk material
7 S - KU - 80 J-S-KU-80 J-S-KU-80 alat sambung) Unit 140,450 140,450
8 S - KU - 100 J-S-KU-100 J-S-KU-100 PENYAMBUNGAN LURUS / CAB. KU KAP 100 (Tidak termasuk material Unit 151,690 151,690
alat sambung)
0 AKSES, RELOKASI ALPRO BROADBAND, RELOK UTILITAS, RECOVERY -
III PEMASANGAN / PENYAMBUNGAN KABEL -
1 S - URAT KABEL M-S-URATKABEL M-S-URATKABEL PENYAMBUNGAN URAT KABEL Per Pair - -
1 S - URAT KABEL J-S-URATKABEL J-S-URATKABEL PENYAMBUNGAN URAT KABEL Per Pair 740 - 740
2 P - KTL M-P-KTL M-P-KTL PENYUNTIKAN KABEL TANAM LANGSUNG Unit - -
2 P - KTL J-P-KTL J-P-KTL PENYUNTIKAN KABEL TANAM LANGSUNG Unit 129,200 - 129,200
3 T- ROUTE - KABEL M-T-ROUTE-KABEL M-T-ROUTE-KABEL PEMBUATAN / PEMASANGAN TANDA ROUTE KABEL Unit 45,560 45,560
3 T- ROUTE - KABEL J-T-ROUTE-KABEL J-T-ROUTE-KABEL PEMBUATAN / PEMASANGAN TANDA ROUTE KABEL Unit 12,440 12,440
4 TEST 1- K- SEKUNDER M-TEST1-K-SEKUNDER M-TEST1-K-SEKUNDER PENGETESAN KABEL TERPASANG SEKUNDER UNTUK TES PERTAMA Per Pair - -
4 TEST 1- K- SEKUNDER J-TEST1-K-SEKUNDER J-TEST1-K-SEKUNDER PENGETESAN KABEL TERPASANG SEKUNDER UNTUK TES PERTAMA Per Pair 1,200 - 1,200
0 AKSES, RELOK UTILITAS, RECOVERY -
IV PENGADAAN CONNECTOR & ARESTOR -
1 C - UY2 M-C-UY2 M-C-UY2 CONNECTOR UY 2 Bh 440 440
1 C - UY2 J-C-UY2 J-C-UY2 CONNECTOR UY 2 Bh - -
2 C - BW M-C-BW M-C-BW CONNECTOR BW (BLUEWIRE) Bh 440 440 -
2 C - BW J-C-BW J-C-BW CONNECTOR BW (BLUEWIRE) Bh - -
3 ARESTOR - LSA M-ARESTOR-LSA M-ARESTOR-LSA ARESTOR LSA PLUS (10"") - KRONE PROFILE Bh 86,130 86,130 -
3 ARESTOR - LSA J-ARESTOR-LSA J-ARESTOR-LSA ARESTOR LSA PLUS (10"") - KRONE PROFILE Bh - -
0 AKSES, RELOKASI ALPRO BROADBAND, RELOK UTILITAS, RECOVERY -
V GALIAN TEMPAT SAMBUNGAN KABEL -
PEKERJAAN GALIAN, PENGURUGAN KEMBALI DAN PERBAIKAN
1 BC-TR-0.4 M-BC-TR-0.4 M-BC-TR-0.4 KEMBALI, PENGISIAN PASIR, WARNING TAPE DAN TANDA RUTE KABEL Mtr - -
SERTA TEMPAT SAMBUNG KEDALAMAN 0.4 METER
PEKERJAAN GALIAN, PENGURUGAN KEMBALI DAN PERBAIKAN
1 BC-TR-0.4 J-BC-TR-0.4 J-BC-TR-0.4 KEMBALI, PENGISIAN PASIR, WARNING TAPE DAN TANDA RUTE KABEL Mtr 19,000 - 19,000
SERTA TEMPAT SAMBUNG KEDALAMAN 0.4 METER
PEKERJAAN GALIAN, PENGURUGAN KEMBALI DAN PERBAIKAN
2 BC-TR-0.6 M-BC-TR-0.6 M-BC-TR-0.6 KEMBALI, PENGISIAN PASIR, WARNING TAPE DAN TANDA RUTE KABEL Mtr - -
SERTA TEMPAT SAMBUNG, KEDALAMAN 0,6 METER
PEKERJAAN GALIAN, PENGURUGAN KEMBALI DAN PERBAIKAN
2 BC-TR-0.6 J-BC-TR-0.6 J-BC-TR-0.6 KEMBALI, PENGISIAN PASIR, WARNING TAPE DAN TANDA RUTE KABEL Mtr 22,550 - 22,550
SERTA TEMPAT SAMBUNG, KEDALAMAN 0,6 METER
PEKERJAAN GALIAN, PENGURUGAN KEMBALI DAN PERBAIKAN
3 BC-TR-1 M-BC-TR-1 M-BC-TR-1 KEMBALI, PENGISIAN PASIR, WARNING TAPE DAN TANDA RUTE KABEL Mtr - -
SERTA TEMPAT SAMBUNG, KEDALAMAN 1 METER
PEKERJAAN GALIAN, PENGURUGAN KEMBALI DAN PERBAIKAN
3 BC-TR-1 J-BC-TR-1 J-BC-TR-1 KEMBALI, PENGISIAN PASIR, WARNING TAPE DAN TANDA RUTE KABEL Mtr 30,917 - 30,917
SERTA TEMPAT SAMBUNG, KEDALAMAN 1 METER
2 Paket-5
Rincian Harga Satuan dan Bill Of Quantity
Pekerjaan Pengadaan dan Pemasangan Quality Enhancement (QE) Akses
PAKET-5 PROPINSI BANTEN, JAWA BARAT, JAWA TENGAH, DIY & JAWA TIMUR
HARGA SATUAN
NO. ITEM DESIGNATOR MATERIAL DESIGNATOR JASA DESIGNATOR DESIGNATOR URAIAN PEKERJAAN SAT HARGA SATUAN
MATERIAL JASA
PEKERJAAN GALIAN, PENGURUGAN KEMBALI DAN PERBAIKAN
4 BC-TR-2 M-BC-TR-2 M-BC-TR-2 KEMBALI, PENGISIAN PASIR, WARNING TAPE DAN TANDA RUTE KABEL Mtr - -
SERTA TEMPAT SAMBUNG, KEDALAMAN 1,2 METER
PEKERJAAN GALIAN, PENGURUGAN KEMBALI DAN PERBAIKAN
4 BC-TR-2 J-BC-TR-2 J-BC-TR-2 KEMBALI, PENGISIAN PASIR, WARNING TAPE DAN TANDA RUTE KABEL Mtr 35,313 - 35,313
SERTA TEMPAT SAMBUNG, KEDALAMAN 1,2 METER
PEKERJAAN GALIAN, PENGURUGAN KEMBALI DAN PERBAIKAN
5 BC-TR-3 M-BC-TR-3 M-BC-TR-3 KEMBALI, PENGISIAN PASIR, WARNING TAPE DAN TANDA RUTE KABEL Mtr - -
SERTA TEMPAT SAMBUNG, KEDALAMAN 1,3 METER
PEKERJAAN GALIAN, PENGURUGAN KEMBALI DAN PERBAIKAN
5 BC-TR-3 J-BC-TR-3 J-BC-TR-3 KEMBALI, PENGISIAN PASIR, WARNING TAPE DAN TANDA RUTE KABEL Mtr 37,192 - 37,192
SERTA TEMPAT SAMBUNG, KEDALAMAN 1,3 METER
PEKERJAAN GALIAN, PENGURUGAN KEMBALI DAN PERBAIKAN
6 BC-TR-4 M-BC-TR-4 M-BC-TR-4 KEMBALI, PENGISIAN PASIR, WARNING TAPE DAN TANDA RUTE KABEL Mtr - -
SERTA TEMPAT SAMBUNG, KEDALAMAN 1,4 METER
PEKERJAAN GALIAN, PENGURUGAN KEMBALI DAN PERBAIKAN
6 BC-TR-4 J-BC-TR-4 J-BC-TR-4 KEMBALI, PENGISIAN PASIR, WARNING TAPE DAN TANDA RUTE KABEL Mtr 39,420 - 39,420
SERTA TEMPAT SAMBUNG, KEDALAMAN 1,4 METER
PEKERJAAN GALIAN, PENGURUGAN KEMBALI DAN PERBAIKAN
7 BC-TR-5 M-BC-TR-5 M-BC-TR-5 KEMBALI, PENGISIAN PASIR, WARNING TAPE DAN TANDA RUTE KABEL Mtr - -
SERTA TEMPAT SAMBUNG KEDALAMAN 1,5 METER
PEKERJAAN GALIAN, PENGURUGAN KEMBALI DAN PERBAIKAN
7 BC-TR-5 J-BC-TR-5 J-BC-TR-5 KEMBALI, PENGISIAN PASIR, WARNING TAPE DAN TANDA RUTE KABEL Mtr 41,500 - 41,500
SERTA TEMPAT SAMBUNG KEDALAMAN 1,5 METER
0 AKSES, RELOK UTILITAS, RECOVERY -
VI PEKERJAAN OVERBURG -
1 OPC - UG211 M-OPC-UG211 M-OPC-UG211 OVERBURG PLUS CONNECTOR UG 211 Pair 5,330 5,330
1 OPC - UG211 J-OPC-UG211 J-OPC-UG211 OVERBURG PLUS CONNECTOR UG 211 Pair 3,410 3,410
0 -
D PENGADAAN DAN PENARIKAN DROP WIRE & JUMPER WIRE -
0 AKSES, RELOK UTILITAS, RECOVERY, MIGRASI PARSIAL -
I PENGADAAN DAN PENARIKAN DROP WIRE & JUMPER WIRE -
1 TRK - DW M-TRK-DW M-TRK-DW PENARIKAN DROP WIRE Mtr 1,390 1,390
1 J-TRK-DW J-TRK-DW PENARIKAN DROP WIRE Mtr 180 180
2 BKR - DW M-BKR-DW M-BKR-DW PEMBONGKARAN DROP WIRE Mtr - -
2 BKR - DW J-BKR-DW J-BKR-DW PEMBONGKARAN DROP WIRE Mtr 280 - 280
3 RGL - DW M-RGL-DW M-RGL-DW REGEL DROP WIRE Mtr - -
3 RGL - DW J-RGL-DW J-RGL-DW REGEL DROP WIRE Mtr 280 - 280
4 CO - DW M-CO-DW M-CO-DW CUT OVER DROP WIRE Ssl - -
4 CO - DW J-CO-DW J-CO-DW CUT OVER DROP WIRE Ssl 280 - 280
PENGADAAN DAN PEMASANGAN DW GUIDE PVC DIA 1,5" T.2MM
5 DW - GUIDE - 1,5" M-DW-GUIDE-1,5" M-DW-GUIDE-1,5" P.1,2M Unit 14,250 14,250
5 DW - GUIDE - 1,5" J-DW-GUIDE-1,5" J-DW-GUIDE-1,5" PENGADAAN DAN PEMASANGAN DW GUIDE PVC DIA 1,5" T.2MM Unit 4,700 4,700
P.1,2M
6 PPVC - DW - 2K M-PPVC-DW-2K M-PPVC-DW-2K PIPA PVC PELINDUNG DW + KLEM (2 BUAH) Bh 32,410 32,410 -
6 PPVC - DW - 2K J-PPVC-DW-2K J-PPVC-DW-2K PIPA PVC PELINDUNG DW + KLEM (2 BUAH) Bh - -
7 TRK - JW M-TRK-JW M-TRK-JW PENGADAAN DAN PENARIKAN JUMPER WIRE Mtr 980 980
7 TRK - JW J-TRK-JW J-TRK-JW PENGADAAN DAN PENARIKAN JUMPER WIRE Mtr 280 280
0 -
E RUMAH KABEL -
0 AKSES, RELOK UTILITAS, RECOVERY -
I PEMASANGAN & PEMBONGKARAN RUMAH KABEL -
1 PP - RK M-PP-RK M-PP-RK PENGADAAN & PEMASANGAN RK KOSONG BERIKUT PONDASI, PATOK Unit 13,640,350 13,640,350
PENGAMAN (4 Bh)
1 PP - RK J-PP-RK J-PP-RK PENGADAAN & PEMASANGAN RK KOSONG BERIKUT PONDASI, PATOK Unit 1,111,970 1,111,970
PENGAMAN (4 Bh)
2 BKR - RK M-BKR-RK M-BKR-RK PEMBONGKARAN RUMAH KABEL BERIKUT PATOK PENGAMAN Unit - -
2 BKR - RK J-BKR-RK J-BKR-RK PEMBONGKARAN RUMAH KABEL BERIKUT PATOK PENGAMAN Unit 140,450 - 140,450
3 CT - RK - 1600 M-CT-RK-1600 M-CT-RK-1600 PENGECATAN RK KAP 1600" (DENGAN LABEL & LOGO) Unit 170,510 170,510
3 CT - RK - 1600 J-CT-RK-1600 J-CT-RK-1600 PENGECATAN RK KAP 1600" (DENGAN LABEL & LOGO) Unit 190,763 190,763
4 CT - RK - 1800 M-CT-RK-1800 M-CT-RK-1800 PENGECATAN RK KAP 1800" (DENGAN LABEL & LOGO) Unit 170,510 170,510
4 CT - RK - 1800 J-CT-RK-1800 J-CT-RK-1800 PENGECATAN RK KAP 1800" (DENGAN LABEL & LOGO) Unit 195,095 195,095
5 CT- RK 2400 M-CT-RK2400 M-CT-RK2400 PENGECATAN RK KAP 2400" ( DENGAN LABEL & LOGO ) Unit 170,510 170,510
5 CT- RK 2400 J-CT-RK2400 J-CT-RK2400 PENGECATAN RK KAP 2400" ( DENGAN LABEL & LOGO ) Unit 208,090 208,090
6 CT- RK 4800 M-CT-RK4800 M-CT-RK4800 PENGECATAN RK KAP 4800" ( DENGAN LABEL & LOGO ) Unit 170,510 170,510
6 CT- RK 4800 J-CT-RK4800 J-CT-RK4800 PENGECATAN RK KAP 4800" ( DENGAN LABEL & LOGO ) Unit 260,070 260,070
7 BKR - PS - JW - RK M-BKR-PS-JW-RK M-BKR-PS-JW-RK BONGKAR PASANG JUMPER WIRE DI RK sst - -
7 BKR - PS - JW - RK J-BKR-PS-JW-RK J-BKR-PS-JW-RK BONGKAR PASANG JUMPER WIRE DI RK sst 2,120 - 2,120
8 P - PK - RK M-P-PK-RK M-P-PK-RK PERBAIKAN PONDASI DAN KERAMIK YANG RUSAK DI RK Bh - -
8 P - PK - RK J-P-PK-RK J-P-PK-RK PERBAIKAN PONDASI DAN KERAMIK YANG RUSAK DI RK Bh 520,040 - 520,040
9 P - KB M-P-KB M-P-KB PEMBERSIHAN KABINET TERMASUK MODUL DAN PERKABELAN Bh - -
9 P - KB J-P-KB J-P-KB PEMBERSIHAN KABINET TERMASUK MODUL DAN PERKABELAN Bh 104,040 - 104,040
10 P - ASS - RK - L M-P-ASS-RK-L M-P-ASS-RK-L PEMASANGAN ASSESORIES PADA RK (TERMASUK LABELING) Bh - -
10 P - ASS - RK - L J-P-ASS-RK-L J-P-ASS-RK-L PEMASANGAN ASSESORIES PADA RK (TERMASUK LABELING) Bh 78,060 - 78,060
11 P - CO - RK M-P-CO-RK M-P-CO-RK PENYAMBUNGAN CUT OVER KT/KU TERMASUK JUMPER DI RK Pair - -
11 P - CO - RK J-P-CO-RK J-P-CO-RK PENYAMBUNGAN CUT OVER KT/KU TERMASUK JUMPER DI RK Pair 1,570 - 1,570
12 TK - RK - 10 M-TK-RK-10 M-TK-RK-10 TERMINASI KABEL DI RK SETIAP KAP. 10 PAIR (LSA HIGHBAND) Bh 39,800 39,800
12 TK - RK - 10 J-TK-RK-10 J-TK-RK-10 TERMINASI KABEL DI RK SETIAP KAP. 10 PAIR (LSA HIGHBAND) Bh 10,970 10,970
13 PAR - KAB M-PAR-KAB M-PAR-KAB PARAFINISASI KABINET (M+J) Bh - -
13 PAR - KAB J-PAR-KAB J-PAR-KAB PARAFINISASI KABINET (M+J) Bh 176,850 - 176,850
0 AKSES, RELOK UTILITAS, RECOVERY -
II PENGADAAN DAN PEMASANGAN BACK MOUNT FRAME -
1 BMF - 11 M-BMF-11 M-BMF-11 BACK MOUNT FRAME 11 WAY Bh 86,130 86,130 -
1 BMF - 11 J-BMF-11 J-BMF-11 BACK MOUNT FRAME 11 WAY Bh - -
2 BMF - 31 M-BMF-31 M-BMF-31 BACK MOUNT FRAME 31 WAY Bh 258,160 258,160 -
2 BMF - 31 J-BMF-31 J-BMF-31 BACK MOUNT FRAME 31 WAY Bh - -
0 AKSES, RELOK UTILITAS, RECOVERY -
III PENGADAAN TERMINAL BLOK BROAD BAND (JELLY) -
1 TB - BB 10 P M-TB-BB10P M-TB-BB10P TERMINAL BLOK BROAD BAND (JELLY) 10 PAIR Bh 40,780 40,780 -
1 TB - BB 10 P J-TB-BB10P J-TB-BB10P TERMINAL BLOK BROAD BAND (JELLY) 10 PAIR Bh - -
PENGADAAN & PEMASANGAN TERMINAL BLOK DI MDF KAP 100 PAIR
2 PPTB - MDF 100 P M-PPTB-MDF100P M-PPTB-MDF100P DENGAN PENGAMAN TERMASUK INSERTION TOOLS Bh 1,250,460 1,250,460
2 PPTB - MDF 100 P J-PPTB-MDF100P J-PPTB-MDF100P PENGADAAN & PEMASANGAN TERMINAL BLOK DI MDF KAP 100 PAIR Bh 26,080 26,080
DENGAN PENGAMAN TERMASUK INSERTION TOOLS
3 PPTB - MDF 100 P - A M-PPTB-MDF100P-A M-PPTB-MDF100P-A PENGADAAN & PEMASANGAN TERMINAL BLOK DI RK KAP 100 PAIR Bh 1,136,710 1,136,710
DENGAN PENGAMAN TERMASUK INSERTION TOOLS DAN ARESTOR
3 PPTB - MDF 100 P - A J-PPTB-MDF100P-A J-PPTB-MDF100P-A PENGADAAN & PEMASANGAN TERMINAL BLOK DI RK KAP 100 PAIR Bh 52,070 52,070
DENGAN PENGAMAN TERMASUK INSERTION TOOLS DAN ARESTOR
0 -
F PENGADAAN DAN PEMASANGAN DP DAN BERIKUT PELABELAN -
0 AKSES, RELOK UTILITAS, RECOVERY -
I PENGADAAN DAN PEMASANGAN DP DINDING/TIANG– MODULAR -
SYSTEM (BERIKUT PELABELAN )
1 PP - DP10 - MSL M-PP-DP10-MSL M-PP-DP10-MSL DP KAP 10" MODULAR SYSTEM Bh 335,370 335,370
1 PP - DP10 - MSL J-PP-DP10-MSL J-PP-DP10-MSL DP KAP 10" MODULAR SYSTEM Bh 61,840 61,840
2 PP - DP20 - MSL M-PP-DP20-MSL M-PP-DP20-MSL DP KAP 20" MODULAR SYSTEM Bh 403,550 403,550
2 PP - DP20 - MSL J-PP-DP20-MSL J-PP-DP20-MSL DP KAP 20" MODULAR SYSTEM Bh 74,190 74,190
3 PP - DP30 - MSL M-PP-DP30-MSL M-PP-DP30-MSL DP KAP 30" MODULAR SYSTEM Bh 511,540 511,540
3 Paket-5
Rincian Harga Satuan dan Bill Of Quantity
Pekerjaan Pengadaan dan Pemasangan Quality Enhancement (QE) Akses
PAKET-5 PROPINSI BANTEN, JAWA BARAT, JAWA TENGAH, DIY & JAWA TIMUR
HARGA SATUAN
NO. ITEM DESIGNATOR MATERIAL DESIGNATOR JASA DESIGNATOR DESIGNATOR URAIAN PEKERJAAN SAT HARGA SATUAN
MATERIAL JASA
3 PP - DP30 - MSL J-PP-DP30-MSL J-PP-DP30-MSL DP KAP 30" MODULAR SYSTEM Bh 98,880 98,880
4 PP - DP40 - MSL M-PP-DP40-MSL M-PP-DP40-MSL DP KAP 40" MODULAR SYSTEM Bh 596,790 596,790
4 PP - DP40 - MSL J-PP-DP40-MSL J-PP-DP40-MSL DP KAP 40" MODULAR SYSTEM Bh 123,580 123,580
0 AKSES, RELOK UTILITAS, RECOVERY -
PENGADAAN DAN PEMASANGAN DP FIBER – DINDING/TIANG
II 0 ( TERMASUK BMF DAN TERMINAL HIGH BAND - BERIKUT -
PELABELAN )
1 PP - DP10 - FL M-PP-DP10-FL M-PP-DP10-FL DP FIBER KAP 10" Bh 427,480 427,480
1 PP - DP10 - FL J-PP-DP10-FL J-PP-DP10-FL DP FIBER KAP 10" Bh 87,640 87,640
2 PP - DP20 - FL M-PP-DP20-FL M-PP-DP20-FL DP FIBER KAP 20" Bh 478,590 478,590
2 PP - DP20 - FL J-PP-DP20-FL J-PP-DP20-FL DP FIBER KAP 20" Bh 98,880 98,880
3 PP - DP40 - FL M-PP-DP40-FL M-PP-DP40-FL DP FIBER KAP 40" Bh 648,880 648,880
3 PP - DP40 - FL J-PP-DP40-FL J-PP-DP40-FL DP FIBER KAP 40" Bh 134,830 134,830
4 PP - DP60 - FL M-PP-DP60-FL M-PP-DP60-FL DP FIBER KAP 60" Bh 767,310 767,310
4 PP - DP60 - FL J-PP-DP60-FL J-PP-DP60-FL DP FIBER KAP 60" Bh 168,550 168,550
0 AKSES, RELOK UTILITAS, RECOVERY -
PENGADAAN DAN PEMASANGAN DP – DINDING ( TERMASUK BMF
III 0 DAN TERMINAL HIGH BAND BERIKUT PELABELAN ) -
1 PP - DP100 - DL M-PP-DP100-DL M-PP-DP100-DL DP DINDING KAP. 100 PAIR LENGKAP Set 682,050 682,050
1 PP - DP100 - DL J-PP-DP100-DL J-PP-DP100-DL DP DINDING KAP. 100 PAIR LENGKAP Set 92,160 92,160
2 PP - DP200 - DL M-PP-DP200-DL M-PP-DP200-DL DP DINDING KAP. 200 PAIR LENGKAP Set 1,193,590 1,193,590
2 PP - DP200 - DL J-PP-DP200-DL J-PP-DP200-DL DP DINDING KAP. 200 PAIR LENGKAP Set 117,960 117,960
3 PP - DP300 - DL M-PP-DP300-DL M-PP-DP300-DL DP DINDING KAP. 300 PAIR LENGKAP Set 2,159,790 2,159,790
3 PP - DP300 - DL J-PP-DP300-DL J-PP-DP300-DL DP DINDING KAP. 300 PAIR LENGKAP Set 168,550 168,550
4 PP - DP400 - DL M-PP-DP400-DL M-PP-DP400-DL DP DINDING KAP. 400 PAIR LENGKAP Set 2,443,940 2,443,940
4 PP - DP400 - DL J-PP-DP400-DL J-PP-DP400-DL DP DINDING KAP. 400 PAIR LENGKAP Set 258,410 258,410
0 AKSES, RELOK UTILITAS, RECOVERY -
IV 0 PENGADAAN, PEMASANGAN DAN TERMINASI DP – PILAR GALVANIS -
( BERIKUT PELABELAN )
1 PPT - DP10 - PL M-PPT-DP10-PL M-PPT-DP10-PL DP PILAR KAP 10 Bh 483,160 483,160
1 PPT - DP10 - PL J-PPT-DP10-PL J-PPT-DP10-PL DP PILAR KAP 10 Bh 87,640 87,640
2 PPT - DP20 - PL M-PPT-DP20-PL M-PPT-DP20-PL DP PILAR KAP 20 Bh 522,960 522,960
2 PPT - DP20 - PL J-PPT-DP20-PL J-PPT-DP20-PL DP PILAR KAP 20 Bh 140,450 140,450
0 AKSES, RELOK UTILITAS, RECOVERY -
V 0 PEMASANGAN DISTRIBUTION POINT (DP) -
1 P - DPKT - T 10 - 60 M-P-DPKT-T10-60 M-P-DPKT-T10-60 PEMASANGAN DP, BERIKUT R PIPE & TERMINAL STRIP CATUAN KT Unit 261,530 261,530
PADA TIANG KAP. 10 S/D 60
1 P - DPKT - T 10 - 60 J-P-DPKT-T10-60 J-P-DPKT-T10-60 PEMASANGAN DP, BERIKUT R PIPE & TERMINAL STRIP CATUAN KT Unit 56,220 56,220
PADA TIANG KAP. 10 S/D 60
PEMASANGAN DP, BERIKUT R PIPE & TERMINAL STRIP CATUAN KT
2 P - DPKT - D 10 - 60 M-P-DPKT-D10-60 M-P-DPKT-D10-60 PADA DINDING KAP. 10 S/D 60 Unit 261,530 261,530
3 P - DPKU - T 10 - 60 M-P-DPKU-T10-60 M-P-DPKU-T10-60 PEMASANGAN DP, TERM.STRIP CATUAN KU PADA TIANG KAP. 10 S/D Unit 221,730 221,730
60
3 P - DPKU - T 10 - 60 J-P-DPKU-T10-60 J-P-DPKU-T10-60 PEMASANGAN DP, TERM.STRIP CATUAN KU PADA TIANG KAP. 10 S/D Unit 73,080 73,080
60
4 P - DPKU - D 10 - 60 M-P-DPKU-D10-60 M-P-DPKU-D10-60 PEMASANGAN DP, TERM.STRIP CATUAN KU PADA DINDING KAP. 10 Unit 221,730 221,730
S/D 60
4 P - DPKU - D 10 - 60 J-P-DPKU-D10-60 J-P-DPKU-D10-60 PEMASANGAN DP, TERM.STRIP CATUAN KU PADA DINDING KAP. 10 Unit 73,080 73,080
S/D 60
5 P - DP - D 100 - 400 M-P-DM-P-D100-400 M-P-DM-P-D100-400 PEMASANGAN DP, TERM.STRIP CATUAN KU/KT PADA DINDING KAP. Unit 568,410 568,410
100 S/D 400
5 P - DP - D 100 - 400 J-P-DJ-P-D100-400 J-P-DJ-P-D100-400 PEMASANGAN DP, TERM.STRIP CATUAN KU/KT PADA DINDING KAP. Unit 168,550 168,550
100 S/D 400
0 -
G TERMINASI KABEL DI DP -
0 AKSES, RELOK UTILITAS, RECOVERY -
TERMINASI KABEL -
1 TK - DPW - TS10 M-TK-DPW-TS10 M-TK-DPW-TS10 TERMINASI KABEL DI DP (WALL) SISTIM TEKAN SISIP KAP. 10 Unit - -
1 TK - DPW - TS10 J-TK-DPW-TS10 J-TK-DPW-TS10 TERMINASI KABEL DI DP (WALL) SISTIM TEKAN SISIP KAP. 10 Unit 50,590 - 50,590
2 TK - DPW - TS20 M-TK-DPW-TS20 M-TK-DPW-TS20 TERMINASI KABEL DI DP (WALL) SISTIM TEKAN SISIP KAP. 20 Unit - -
2 TK - DPW - TS20 J-TK-DPW-TS20 J-TK-DPW-TS20 TERMINASI KABEL DI DP (WALL) SISTIM TEKAN SISIP KAP. 20 Unit 51,700 - 51,700
3 TK - DPW - TS40 M-TK-DPW-TS40 M-TK-DPW-TS40 TERMINASI KABEL DI DP (WALL) SISTIM TEKAN SISIP KAP. 40 Unit - -
3 TK - DPW - TS40 J-TK-DPW-TS40 J-TK-DPW-TS40 TERMINASI KABEL DI DP (WALL) SISTIM TEKAN SISIP KAP. 40 Unit 73,080 - 73,080
4 TK - DPW - TS60 M-TK-DPW-TS60 M-TK-DPW-TS60 TERMINASI KABEL DI DP (WALL) SISTIM TEKAN SISIP KAP. 60 Unit - -
4 TK - DPW - TS60 J-TK-DPW-TS60 J-TK-DPW-TS60 TERMINASI KABEL DI DP (WALL) SISTIM TEKAN SISIP KAP. 60 Unit 84,320 - 84,320
5 TK - DPW - TS80 M-TK-DPW-TS80 M-TK-DPW-TS80 TERMINASI KABEL DI DP (WALL) SISTIM TEKAN SISIP KAP. 80 Unit - -
5 TK - DPW - TS80 J-TK-DPW-TS80 J-TK-DPW-TS80 TERMINASI KABEL DI DP (WALL) SISTIM TEKAN SISIP KAP. 80 Unit 95,470 - 95,470
6 TK - DPW - TS100 M-TK-DPW-TS100 M-TK-DPW-TS100 TERMINASI KABEL DI DP (WALL) SISTIM TEKAN SISIP KAP. 100 Unit - -
6 TK - DPW - TS100 J-TK-DPW-TS100 J-TK-DPW-TS100 TERMINASI KABEL DI DP (WALL) SISTIM TEKAN SISIP KAP. 100 Unit 112,340 - 112,340
7 TK - DPW - TS200 M-TK-DPW-TS200 M-TK-DPW-TS200 TERMINASI KABEL DI DP (WALL) SISTIM TEKAN SISIP KAP. 200 Unit - -
7 TK - DPW - TS200 J-TK-DPW-TS200 J-TK-DPW-TS200 TERMINASI KABEL DI DP (WALL) SISTIM TEKAN SISIP KAP. 200 Unit 157,310 - 157,310
8 TK - DPW - TS300 M-TK-DPW-TS300 M-TK-DPW-TS300 TERMINASI KABEL DI DP (WALL) SISTIM TEKAN SISIP KAP. 300 Unit - -
8 TK - DPW - TS300 J-TK-DPW-TS300 J-TK-DPW-TS300 TERMINASI KABEL DI DP (WALL) SISTIM TEKAN SISIP KAP. 300 Unit 213,440 - 213,440
9 TK - DPW - TS400 M-TK-DPW-TS400 M-TK-DPW-TS400 TERMINASI KABEL DI DP (WALL) SISTIM TEKAN SISIP KAP. 400 Unit - -
9 TK - DPW - TS400 J-TK-DPW-TS400 J-TK-DPW-TS400 TERMINASI KABEL DI DP (WALL) SISTIM TEKAN SISIP KAP. 400 Unit 258,410 - 258,410
10 TK - DPD - 10 M-TK-DPD-10 M-TK-DPD-10 TERMINASI KABEL DI DP(TIANG) KAP. 10 Unit -
10 TK - DPD - 10 J-TK-DPD-10 J-TK-DPD-10 TERMINASI KABEL DI DP(TIANG) KAP. 10 Unit 50,590 - 50,590
11 TK - DPD - 20 M-TK-DPD-20 M-TK-DPD-20 TERMINASI KABEL DI DP(TIANG) KAP. 20 Unit -
11 TK - DPD - 20 J-TK-DPD-20 J-TK-DPD-20 TERMINASI KABEL DI DP(TIANG) KAP. 20 Unit 56,220 - 56,220
12 TK - DPD - 40 M-TK-DPD-40 M-TK-DPD-40 TERMINASI KABEL DI DP(TIANG) KAP. 40 Unit - -
12 TK - DPD - 40 J-TK-DPD-40 J-TK-DPD-40 TERMINASI KABEL DI DP(TIANG) KAP. 40 Unit 73,080 - 73,080
13 TK - DPP - TS10 M-TK-DPP-TS10 M-TK-DPP-TS10 TERMINASI KABEL DI DP(PILAR) SISTIM TEKAN SISIP KAP. 10 Unit - -
13 TK - DPP - TS10 J-TK-DPP-TS10 J-TK-DPP-TS10 TERMINASI KABEL DI DP(PILAR) SISTIM TEKAN SISIP KAP. 10 Unit 46,080 - 46,080
14 TK - DPP - TS20 M-TK-DPP-TS20 M-TK-DPP-TS20 TERMINASI KABEL DI DP(PILAR) SISTIM TEKAN SISIP KAP. 20 Unit - -
14 TK - DPP - TS20 J-TK-DPP-TS20 J-TK-DPP-TS20 TERMINASI KABEL DI DP(PILAR) SISTIM TEKAN SISIP KAP. 20 Unit 50,590 - 50,590
0 -
H ALUR KABEL -
0 AKSES, RELOKASI ALPRO BROADBAND, RELOK UTILITAS, RECOVERY -
I PEMBUATAN ROUTE KABEL TANAM LANGSUNG -
1 PR - KT - 1,10 M-PR-KT-1,10 M-PR-KT-1,10 PEMBUATAN ROUTE KABEL TANAM LSG SELUBUNG PASIR+DEKSTEEN Mtr - -
KEDALAMAN 1,10 M
1 PR - KT - 1,10 J-PR-KT-1,10 J-PR-KT-1,10 PEMBUATAN ROUTE KABEL TANAM LSG SELUBUNG PASIR+DEKSTEEN Mtr 74,190 - 74,190
KEDALAMAN 1,10 M
PEMBUATAN ROUTE/ALUR KBL TANAM LSG - 0,80 M' SELUBUNG
2 PR - KT - 0,80 M-PR-KT-0,80 M-PR-KT-0,80 PASIR+DEKSTEEN Mtr - -
3 PR - KT - 0,60 M-PR-KT-0,60 M-PR-KT-0,60 PEMBUATAN ROUTE/ALUR KBL TANAM LSG - 0,60 M' SELUBUNG Mtr - -
PASIR+DEKSTEEN
3 PR - KT - 0,60 J-PR-KT-0,60 J-PR-KT-0,60 PEMBUATAN ROUTE/ALUR KBL TANAM LSG - 0,60 M' SELUBUNG Mtr 28,110 - 28,110
PASIR+DEKSTEEN
4 PR - KT - 1,00 M-PR-KT-1,00 M-PR-KT-1,00 PEMBUATAN ROUTE/ALUR KBL TANAM LSG - 1,00 M' SELUBUNG Mtr - -
PASIR+DEKSTEEN
PEMBUATAN ROUTE/ALUR KBL TANAM LSG - 1,00 M' SELUBUNG
4 PR - KT - 1,00 J-PR-KT-1,00 J-PR-KT-1,00 PASIR+DEKSTEEN Mtr 52,810 - 52,810
0 AKSES, RELOKASI ALPRO BROADBAND, RELOK UTILITAS, RECOVERY -
II LINTASAN PARIT KABEL SEKUNDER -
4 Paket-5
Rincian Harga Satuan dan Bill Of Quantity
Pekerjaan Pengadaan dan Pemasangan Quality Enhancement (QE) Akses
PAKET-5 PROPINSI BANTEN, JAWA BARAT, JAWA TENGAH, DIY & JAWA TIMUR
HARGA SATUAN
NO. ITEM DESIGNATOR MATERIAL DESIGNATOR JASA DESIGNATOR DESIGNATOR URAIAN PEKERJAAN SAT HARGA SATUAN
MATERIAL JASA
LINTASAN PARIT KABEL SEKUNDER 1 PIPA GALVANIS MEDIUM ø 3"
1 LP - KS 1 - 3/3,2 M-LP-KS1-3/3,2 M-LP-KS1-3/3,2 tebal 3,2 mm Mtr - -
1 LP - KS 1 - 3/3,2 J-LP-KS1-3/3,2 J-LP-KS1-3/3,2 LINTASAN PARIT KABEL SEKUNDER 1 PIPA GALVANIS MEDIUM ø 3" Mtr 207,810 - 207,810
tebal 3,2 mm
2 LP - KS 2 - 3/3,2 M-LP-KS2-3/3,2 M-LP-KS2-3/3,2 LINTASAN PARIT KABEL SEKUNDER 2 PIPA GALVANIS MEDIUM ø 3" Mtr - -
tebal 3,2 mm
LINTASAN PARIT KABEL SEKUNDER 2 PIPA GALVANIS MEDIUM ø 3"
2 LP - KS 2 - 3/3,2 J-LP-KS2-3/3,2 J-LP-KS2-3/3,2 tebal 3,2 mm Mtr 292,050 - 292,050
3 LP - KS 1 - 5/3,8 J-LP-KS1-5/3,8 J-LP-KS1-5/3,8 LINTASAN PARIT KABEL SEKUNDER 1 PIPA GALVANIS MEDIUM DIA 5"- Mtr 367,890 - 367,890
3,8 MM.
4 LP - KS 2 - 5/3,8 M-LP-KS2-5/3,8 M-LP-KS2-5/3,8 LINTASAN PARIT KABEL SEKUNDER 2 PIPA GALVANIS MEDIUM DIA 5"- Mtr - -
3,8 MM.
4 LP - KS 2 - 5/3,8 J-LP-KS2-5/3,8 J-LP-KS2-5/3,8 LINTASAN PARIT KABEL SEKUNDER 2 PIPA GALVANIS MEDIUM DIA 5"- Mtr 696,430 - 696,430
3,8 MM.
LINTASAN PARIT KABEL SEKUNDER 3 PIPA GALVANIS MEDIUM DIA 5"-
5 LP - KS 3 - 5 /3,8 M-LP-KS3-5/3,8 M-LP-KS3-5/3,8 3,8 MM. Mtr - -
2 PRC - 2 - 4/5,5 J-PRC-2-4/5,5 J-PRC-2-4/5,5 PEMBUATAN ROUTE CROSSING 2 PIPA PVC DIA. 4" TEBAL 5,5 MM Mtr 146,070 - 146,070
KEDALAMAN - 1,10 M'
3 PRC - 4 - 4/5,5 M-PRC-4-4/5,5 M-PRC-4-4/5,5 PEMBUATAN ROUTE CROSSING 4 PIPA PVC DIA. 4" TEBAL 5,5 MM Mtr - -
KEDALAMAN - 1,10 M'
3 PRC - 4 - 4/5,5 J-PRC-4-4/5,5 J-PRC-4-4/5,5 PEMBUATAN ROUTE CROSSING 4 PIPA PVC DIA. 4" TEBAL 5,5 MM Mtr 196,570 - 196,570
KEDALAMAN - 1,10 M'
PEMBUATAN ROUTE CROSSING 6 PIPA PVC DIA. 4" TEBAL 5,5 MM
4 PRC - 6 - 4/5,5 M-PRC-6-4/5,5 M-PRC-6-4/5,5 KEDALAMAN - 1,10 M' Mtr - -
4 PRC - 6 - 4/5,5 J-PRC-6-4/5,5 J-PRC-6-4/5,5 PEMBUATAN ROUTE CROSSING 6 PIPA PVC DIA. 4" TEBAL 5,5 MM Mtr 308,910 - 308,910
KEDALAMAN - 1,10 M'
0 AKSES, RELOKASI ALPRO BROADBAND, RELOK UTILITAS, RECOVERY -
V IJIN TRACE -
1 IT M-IT M-IT IJIN TRACE Mtr - -
1 IT J-IT J-IT IJIN TRACE Mtr 13,550 - 13,550
0 -
I TIANG TELEPON -
0 AKSES, RELOKASI ALPRO BROADBAND, RELOK UTILITAS, RECOVERY -
I PENGADAAN DAN PEMASANGAN TIANG TELEPON BERIKUT PONDASI -
1 TT - 7 M-TT-7 M-TT-7 TIANG TELEPON T-7 Btg 1,200,000 1,200,000
1 TT - 7 J-TT-7 J-TT-7 TIANG TELEPON T-7 Btg 229,165 229,165
2 TT - 9 M-TT-9 M-TT-9 TIANG TELEPON T-9 Btg 1,900,000 1,900,000
2 TT - 9 J-TT-9 J-TT-9 TIANG TELEPON T-9 Btg 231,683 231,683
3 PT- TT - 7 M-PT-TT-7 M-PT-TT-7 PENGECATAN TIANG TELEPON TUNGGAL 7 M DAN 9 M Btg 28,490 28,490
3 PT- TT - 7 J-PT-TT-7 J-PT-TT-7 PENGECATAN TIANG TELEPON TUNGGAL 7 M DAN 9 M Btg 11,240 11,240
4 PB - TT - 7/9 M-PB-TT-7/9 M-PB-TT-7/9 PEMBONGKARAN/PENGGESERAN TIANG TELEPON TUNGGAL 7 M DAN Btg - -
9M
4 PB - TT - 7/9 J-PB-TT-7/9 J-PB-TT-7/9 PEMBONGKARAN/PENGGESERAN TIANG TELEPON TUNGGAL 7 M DAN Btg 95,470 - 95,470
9M
5 PC - TT - 7/9 M-PC-TT-7/9 M-PC-TT-7/9 PENGECORAN TIANG TELEPON TUNGGAL 7 M DAN 9M Btg 130,390 130,390
5 PC - TT - 7/9 J-PC-TT-7/9 J-PC-TT-7/9 PENGECORAN TIANG TELEPON TUNGGAL 7 M DAN 9M Btg 52,070 52,070
6 PU-AS M-PU-AS M-PU-AS PENGADAAN & PEMASANGAN ACCESSORIES TIANG 7 M DAN 9 M Btg 29,206 29,206
6 PU-AS J-PU-AS J-PU-AS PENGADAAN & PEMASANGAN ACCESSORIES TIANG 7 M DAN 9 M Btg 38,441 38,441
7 MTT - RL - 7/9 M-MTT-RL-7/9 M-MTT-RL-7/9 MENEGAKKAN TIANG BESI MIRING RUTE LURUS (DW/KU) Btg - -
7 MTT - RL - 7/9 J-MTT-RL-7/9 J-MTT-RL-7/9 MENEGAKKAN TIANG BESI MIRING RUTE LURUS (DW/KU) Btg 20,830 - 20,830
8 MTT - RS - 7/9 M-MTT-RS-7/9 M-MTT-RS-7/9 MENEGAKKAN TIANG BESI MIRING RUTE SUDUT (DW/KU) Btg - -
8 MTT - RS - 7/9 J-MTT-RS-7/9 J-MTT-RS-7/9 MENEGAKKAN TIANG BESI MIRING RUTE SUDUT (DW/KU) Btg 26,080 - 26,080
PENGADAAN DAN PEMASANGAN TIANG KAYU KERAS 7 METER,
9 PU-W7 M-PU-W7 M-PU-W7 BERIKUT CAT, COR PONDASI ATAU KLEM TUMPUAN KE DINDING Btg 1,360,000 1,360,000
TAMBATAN MENGGUNAKAN KAYU BESERTA MUR MAUT YANG SESUAI
LENGKAP DENGAN ASSESORIES
1 RP - GM - 1,25 J-RP-GJ-1,25 J-RP-GJ-1,25 RISER PIPA 1,25" GALVANIS MEDIUM UTK KABEL TURUN/NAIK Unit 33,730 33,730
CATUAN KT/KU PADA TIANG/DINDING
2 RP - GM - 1,50 M-RP-GM-1,50 M-RP-GM-1,50 RISER PIPA 1,50" GALVANIS MEDIUM UTK KABEL TURUN/NAIK Unit 233,040 233,040
CATUAN KT/KU PADA TIANG/DINDING
5 Paket-5
Rincian Harga Satuan dan Bill Of Quantity
Pekerjaan Pengadaan dan Pemasangan Quality Enhancement (QE) Akses
PAKET-5 PROPINSI BANTEN, JAWA BARAT, JAWA TENGAH, DIY & JAWA TIMUR
HARGA SATUAN
NO. ITEM DESIGNATOR MATERIAL DESIGNATOR JASA DESIGNATOR DESIGNATOR URAIAN PEKERJAAN SAT HARGA SATUAN
MATERIAL JASA
RISER PIPA 1,50" GALVANIS MEDIUM UTK KABEL TURUN/NAIK
2 RP - GM - 1,50 J-RP-GJ-1,50 J-RP-GJ-1,50 CATUAN KT/KU PADA TIANG/DINDING Unit 39,350 39,350
3 RP - GM - 2 M-RP-GM-2 M-RP-GM-2 RISER PIPA 2,00" GALVANIS MEDIUM UTK KABEL TURUN/NAIK Unit 352,440 352,440
CATUAN KT/KU PADA TIANG/DINDING
3 RP - GM - 2 J-RP-GJ-2 J-RP-GJ-2 RISER PIPA 2,00" GALVANIS MEDIUM UTK KABEL TURUN/NAIK Unit 44,970 44,970
CATUAN KT/KU PADA TIANG/DINDING
4 KRP - 2 M-KRP-2 M-KRP-2 KLEM RISER PIPE 2"" Bh 8,050 8,050 -
4 KRP - 2 J-KRP-2 J-KRP-2 KLEM RISER PIPE 2"" Bh - -
5I-3 M-I-3 M-I-3 ISOLASI 3 M Bh 17,070 17,070 -
5I-3 J-I-3 J-I-3 ISOLASI 3 M Bh - -
6 KM M-KM M-KM KAIN MAJUN Kg 8,590 8,590 -
6 KM J-KM J-KM KAIN MAJUN Kg - -
7 S - CLAMP M-S-CLAMP M-S-CLAMP S-CLAMP PADA TIANG Bh 20,500 20,500
7 S - CLAMP J-S-CLAMP J-S-CLAMP S-CLAMP PADA TIANG Bh 12,000 12,000
8 SUS - CAP M-SUS-CAP M-SUS-CAP SUSPENSION CAPIT Bh 34,000 34,000
8 SUS - CAP J-SUS-CAP J-SUS-CAP SUSPENSION CAPIT Bh 14,000 14,000
0 AKSES, RELOKASI ALPRO BROADBAND, RELOK UTILITAS, RECOVERY -
III 0 PEMASANGAN TEMBERANG -
1 PT - TUNJANG M-PT-TUNJANG M-PT-TUNJANG PEMASANGAN TEMBERANG TUNJANG Unit - -
1 PT - TUNJANG J-PT-TUNJANG J-PT-TUNJANG PEMASANGAN TEMBERANG TUNJANG Unit 106,720 - 106,720
2 PT- TARIK M-PT-TARIK M-PT-TARIK PEMASANGAN TEMBERANG TARIK Unit - -
2 PT- TARIK J-PT-TARIK J-PT-TARIK PEMASANGAN TEMBERANG TARIK Unit 112,340 - 112,340
3 PT - LABRANG M-PT-LABRANG M-PT-LABRANG PEMASANGAN TEMBERANG LABRANG Unit - -
3 PT - LABRANG J-PT-LABRANG J-PT-LABRANG PEMASANGAN TEMBERANG LABRANG Unit 247,170 - 247,170
0 AKSES, RELOKASI ALPRO BROADBAND, RELOK UTILITAS, RECOVERY, MIGRASI PA -
IV PENGADAAN DAN PEMASANGAN SPAN WARTEL -
1 SW - BG - 3/8" M-SW-BG-3/8" M-SW-BG-3/8" SPAN WARTEL DAN BULDOG GRIP 3/8" Bh 15,990 15,990
1 SW - BG - 3/8" J-SW-BG-3/8" J-SW-BG-3/8" SPAN WARTEL DAN BULDOG GRIP 3/8" Bh 9,030 9,030
2 SW - BG - 5/8" M-SW-BG-5/8" M-SW-BG-5/8" SPAN WARTEL DAN BULDOG GRIP 5/8" Bh 19,900 19,900
2 SW - BG - 5/8" J-SW-BG-5/8" J-SW-BG-5/8" SPAN WARTEL DAN BULDOG GRIP 5/8" Bh 14,100 14,100
0 AKSES, RELOKASI ALPRO BROADBAND, RELOK UTILITAS, RECOVERY, MIGRASI PA -
V 0 PENGADAAN DAN PEMASANGAN PIPA GUIDE -
1 PG - 2" M-PG-2" M-PG-2" PIPA GUIDE DIA 2” Btg 20,440 20,440 -
1 PG - 2" J-PG-2" J-PG-2" PIPA GUIDE DIA 2” Btg - -
2 G - RING M-G-RING M-G-RING GUIDE RING Bh 5,220 5,220 -
2 G - RING J-G-RING J-G-RING GUIDE RING Bh - -
0 -
J ASSECORIES -
0 AKSES, RELOKASI ALPRO BROADBAND, RELOK UTILITAS, RECOVERY -
I PENGADAAN DAN PEMASANGAN END CAP -
1 EC - 4-10 M-EC-4-10 M-EC-4-10 END CAP UKURAN 4-10 Bh 2,940 2,940
1 EC - 4-10 J-EC-4-10 J-EC-4-10 END CAP UKURAN 4-10 Bh 650 650
2 EC - 9-20 M-EC-9-20 M-EC-9-20 END CAP UKURAN 9-20 Bh 4,020 4,020
2 EC - 9-20 J-EC-9-20 J-EC-9-20 END CAP UKURAN 9-20 Bh 1,200 1,200
3 EC - 16-32 M-EC-16-32 M-EC-16-32 END CAP UKURAN 16-32 Bh 5,760 5,760
3 EC - 16-32 J-EC-16-32 J-EC-16-32 END CAP UKURAN 16-32 Bh 1,200 1,200
4 EC - 26-52 M-EC-26-52 M-EC-26-52 END CAP UKURAN 26-52 Bh 8,590 8,590
4 EC - 26-52 J-EC-26-52 J-EC-26-52 END CAP UKURAN 26-52 Bh 1,660 1,660
5 EC - 44-75 M-EC-44-75 M-EC-44-75 END CAP UKURAN 44-75 Bh 11,960 11,960
5 EC - 44-75 J-EC-44-75 J-EC-44-75 END CAP UKURAN 44-75 Bh 2,300 2,300
6 EC - 75-105 M-EC-75-105 M-EC-75-105 END CAP UKURAN 75-105 Bh 14,790 14,790
6 EC - 75-105 J-EC-75-105 J-EC-75-105 END CAP UKURAN 75-105 Bh 2,860 2,860
0 AKSES, RELOKASI ALPRO BROADBAND, RELOK UTILITAS, RECOVERY -
II 0 PENGADAAN SEALING TAPE -
1 S - T - UC 3-5 / 4-6 M-S-T-UC3-5/4-6 M-S-T-UC3-5/4-6 SEALING TAPE UC 3-5 / 4-6 Bh 71,230 71,230 -
1 S - T - UC 3-5 / 4-6 J-S-T-UC3-5/4-6 J-S-T-UC3-5/4-6 SEALING TAPE UC 3-5 / 4-6 Bh - -
2 S - T - UC 6-9 / 7-15 M-S-T-UC6-9/7-15 M-S-T-UC6-9/7-15 SEALING TAPE UC 6-9 / 7-15 Bh 125,060 125,060 -
2 S - T - UC 6-9 / 7-15 J-S-T-UC6-9/7-15 J-S-T-UC6-9/7-15 SEALING TAPE UC 6-9 / 7-15 Bh - -
3 S - T - UC 8-18 / 8-28 M-S-T-UC8-18/8-28 M-S-T-UC8-18/8-28 SEALING TAPE UC 8-18 / 8-28 Bh 315,580 315,580 -
3 S - T - UC 8-18 / 8-28 J-S-T-UC8-18/8-28 J-S-T-UC8-18/8-28 SEALING TAPE UC 8-18 / 8-28 Bh - -
0 AKSES, RELOKASI ALPRO BROADBAND, RELOK UTILITAS, RECOVERY -
III 0 PENGADAAN SEALING CORD -
1 S - C - UC 3-5 / 4-6 M-S-C-UC3-5/4-6 M-S-C-UC3-5/4-6 SEALING CORD UC 3-5 / 4-6 Bh 51,650 51,650
1 S - C - UC 3-5 / 4-6 J-S-C-UC3-5/4-6 J-S-C-UC3-5/4-6 SEALING CORD UC 3-5 / 4-6 Bh - -
2 S - C - UC 6-9 / 7-15 M-S-C-UC6-9/7-15 M-S-C-UC6-9/7-15 SEALING CORD UC 6-9 / 7-15 Bh 126,250 126,250
2 S - C - UC 6-9 / 7-15 J-S-C-UC6-9/7-15 J-S-C-UC6-9/7-15 SEALING CORD UC 6-9 / 7-15 Bh - -
3 S - C - UC 8-18 / 8-28 M-S-C-UC8-18/8-28 M-S-C-UC8-18/8-28 SEALING CORD UC 8-18 / 8-28 Bh 160,620 160,620
3 S - C - UC 8-18 / 8-28 J-S-C-UC8-18/8-28 J-S-C-UC8-18/8-28 SEALING CORD UC 8-18 / 8-28 Bh - -
0 AKSES, RELOKASI ALPRO BROADBAND, RELOK UTILITAS, RECOVERY -
IV PENGADAAN SEALING PASTA -
1 SEAL - P M-SEAL-P M-SEAL-P SEALING PASTA Tube 28,490 28,490
1 SEAL - P J-SEAL-P J-SEAL-P SEALING PASTA Tube - -
0 AKSES, RELOKASI ALPRO BROADBAND, RELOK UTILITAS, RECOVERY -
V 0 PENGADAAN SILICA GEL -
1 S - GEL M-S-GEL M-S-GEL SILICA GEL Kg 52,520 52,520 -
1 S - GEL J-S-GEL J-S-GEL SILICA GEL Kg - -
0 -
K 0 PENDATAAN KABEL -
0 AKSES, RELOKASI ALPRO BROADBAND, RELOK UTILITAS, RECOVERY, MIGRASI PA -
I 0 DATA AWAL KABEL SEKUNDER -
1 DTA - S - EK M-DTA-S-EK M-DTA-S-EK DATA AWAL KABEL SEKUNDER EKSISTING Pair - -
1 DTA - S - EK J-DTA-S-EK J-DTA-S-EK DATA AWAL KABEL SEKUNDER EKSISTING Pair 920 - 920
0 -
L GROUNDING -
0 AKSES, PERANGKAT AKTIF, RELOKASI ALPRO BROADBAND, RELOK UTILITAS, REC -
I PENGADAAN DAN PEMASANGAN GROUNDING -
PENGADAAN DAN PEMASANGAN GROUNDING 1 TITIK ROD PADA DP
1 GB-G1 M-GB-G1 M-GB-G1 /KOTAK PEMBAGI DENGAN TAHANAN MAKS 3 OHM Unit 796,747 796,747
1 GB-G1 J-GB-G1 J-GB-G1 PENGADAAN DAN PEMASANGAN GROUNDING 1 TITIK ROD PADA DP Unit 388,168 388,168
/KOTAK PEMBAGI DENGAN TAHANAN MAKS 3 OHM
2 GB-G3 M-GB-G3 M-GB-G3 PENGADAAN DAN PEMASANGAN GROUNDING 3 TITIK ROD PADA RK Unit 2,400,000 2,400,000
DENGAN TAHANAN MAKS 1 OHM
PENGADAAN DAN PEMASANGAN GROUNDING 3 TITIK ROD PADA RK
2 GB-G3 J-GB-G3 J-GB-G3 DENGAN TAHANAN MAKS 1 OHM Unit 450,000 450,000
0 -
M 0 MANHOLE & HANDHOLE -
0 AKSES, RELOKASI ALPRO BROADBAND, RELOK UTILITAS, RECOVERY, MIGRASI PA -
I 0 PEMBERSIHAN / PENGURASAN MANHOLE & HANDHOLE -
1 P - M - H1/H2 M-P-M-H1/H2 M-P-M-H1/H2 PEMBERSIHAN MANHOLE H1/H2 Bh - -
1 P - M - H1/H2 J-P-J-H1/H2 J-P-J-H1/H2 PEMBERSIHAN MANHOLE H1/H2 Bh 252,790 - 252,790
2 P - M - H3/H4 M-P-M-H3/H4 M-P-M-H3/H4 PEMBERSIHAN MANHOLE H3/H4 Bh - -
2 P - M - H3/H4 J-P-J-H3/H4 J-P-J-H3/H4 PEMBERSIHAN MANHOLE H3/H4 Bh 348,260 - 348,260
3P-H-1 M-P-H-1 M-P-H-1 PEMBERSIHAN HANHOLE TYPE 1 (120 cm x 100 cm x 160 cm) Bh - -
3P-H-1 J-P-H-1 J-P-H-1 PEMBERSIHAN HANHOLE TYPE 1 (120 cm x 100 cm x 160 cm) Bh 44,970 - 44,970
4P-H-2 M-P-H-2 M-P-H-2 PEMBERSIHAN HANHOLE TYPE 2 (180 cm x 100 cm x 160 cm ) Bh - -
4P-H-2 J-P-H-2 J-P-H-2 PEMBERSIHAN HANHOLE TYPE 2 (180 cm x 100 cm x 160 cm ) Bh 56,220 - 56,220
6 Paket-5
Rincian Harga Satuan dan Bill Of Quantity
Pekerjaan Pengadaan dan Pemasangan Quality Enhancement (QE) Akses
PAKET-5 PROPINSI BANTEN, JAWA BARAT, JAWA TENGAH, DIY & JAWA TIMUR
HARGA SATUAN
NO. ITEM DESIGNATOR MATERIAL DESIGNATOR JASA DESIGNATOR DESIGNATOR URAIAN PEKERJAAN SAT HARGA SATUAN
MATERIAL JASA
0 AKSES, RELOKASI ALPRO BROADBAND, RELOK UTILITAS, RECOVERY, MIGRASI PA -
II 0 PEMBUATAN/ PENGGANTIAN/ PENINGGIAN MANHOLE & HANDHOLE -
PEKERJAAN PEMBUATAN HANDHOLE TYPE HH1 UKURAN DIMENSI
1 HH1 M-HH1 M-HH1 DALAM (P X L X T = 120X100X160) COR BETON 1 : 2 : 3, DIPASANG DI Unit 3,026,863 3,026,863
PINGGIR JALAN DEPAN RK
PEKERJAAN PEMBUATAN HANDHOLE TYPE HH1 UKURAN DIMENSI
1 HH1 J-HH1 J-HH1 DALAM (P X L X T = 120X100X160) COR BETON 1 : 2 : 3, DIPASANG DI Unit 1,466,159 1,466,159
PINGGIR JALAN DEPAN RK
PEKERJAAN PEMBUATAN HANDHOLE TYPE HH2 UKURAN DIMENSI
2 HH2 M-HH2 M-HH2 DALAM (P X L X T = 180X100X160) COR BETON 1 : 2 : 3, DIPASANG Unit 3,970,053 3,970,053
DIPINGGIR JALAN DISEPANJANG RUTE/ALUR KABEL
PEKERJAAN PEMBUATAN HANDHOLE TYPE HH2 UKURAN DIMENSI
2 HH2 J-HH2 J-HH2 DALAM (P X L X T = 180X100X160) COR BETON 1 : 2 : 3, DIPASANG Unit 1,767,293 1,767,293
DIPINGGIR JALAN DISEPANJANG RUTE/ALUR KABEL
7 Paket-5
Rincian Harga Satuan dan Bill Of Quantity
Pekerjaan Pengadaan dan Pemasangan Quality Enhancement (QE) Akses
PAKET-5 PROPINSI BANTEN, JAWA BARAT, JAWA TENGAH, DIY & JAWA TIMUR
HARGA SATUAN
NO. ITEM DESIGNATOR MATERIAL DESIGNATOR JASA DESIGNATOR DESIGNATOR URAIAN PEKERJAAN SAT HARGA SATUAN
MATERIAL JASA
4 FTM-Lab J-FTM-LAB J-FTM-LAB PELABELAN CORE Core 2,270 - 2,270
5 FTM-Msr-Core M-FTM-MSR-CORE M-FTM-MSR-CORE PENGUKURAN CORE Core - -
5 FTM-Msr-Core J-FTM-MSR-CORE J-FTM-MSR-CORE PENGUKURAN CORE Core 14,600 - 14,600
6 FTM-Grd M-FTM-GRD M-FTM-GRD PEMELIHARAAN/PENGUKURAN GROUNDING NODE Titik - -
6 FTM-Grd J-FTM-GRD J-FTM-GRD PEMELIHARAAN/PENGUKURAN GROUNDING NODE Titik 36,470 - 36,470
7 FTM-Log M-FTM-LOG M-FTM-LOG MELENGKAPI LOGBOOK set - -
7 FTM-Log J-FTM-LOG J-FTM-LOG MELENGKAPI LOGBOOK set 9,950 - 9,950
8 TFM-Dush M-FTM-DUSH M-FTM-DUSH PEMASANGAN DUSH CUP Unit 200 200
8 TFM-Dush J-FTM-DUSH J-FTM-DUSH PEMASANGAN DUSH CUP Unit 40 40
9 FTM-PC M-FTM-PC M-FTM-PC PERAPIHAN PATCH CORE pcs - -
9 FTM-PC J-FTM-PC J-FTM-PC PERAPIHAN PATCH CORE pcs 2,490 - 2,490
10 FTM - Clean M-FTM-CLEAN M-FTM-CLEAN PEMBERSIHAN RAK FTM DAN TRAY CABLE unit - -
10 FTM - Clean J-FTM-CLEAN J-FTM-CLEAN PEMBERSIHAN RAK FTM DAN TRAY CABLE unit 14,930 - 14,930
11 FTM-VA-Port M-FTM-VA-PORT M-FTM-VA-PORT VALIDASI PORT FTM Port - -
11 FTM-VA-Port J-FTM-VA-PORT J-FTM-VA-PORT VALIDASI PORT FTM Port 9,250 - 9,250
0 AKSES, RELOKASI ALPRO BROADBAND, RELOK UTILITAS, RECOVERY -
V ODC -
1 ODC-LY M-ODC-LY M-ODC-LY PEREMAJAAN/UPDATE LAYOUT KABINET Node - -
1 ODC-LY J-ODC-LY J-ODC-LY PEREMAJAAN/UPDATE LAYOUT KABINET Node 9,950 - 9,950
2 ODC-Lab M-ODC-LAB M-ODC-LAB PELABELAN CORE Core - -
2 ODC-Lab J-ODC-LAB J-ODC-LAB PELABELAN CORE Core 2,270 - 2,270
3 ODC-Msr-Core M-ODC-MSR-CORE M-ODC-MSR-CORE PENGUKURAN CORE Core - -
3 ODC-Msr-Core J-ODC-MSR-CORE J-ODC-MSR-CORE PENGUKURAN CORE Core 14,660 - 14,660
4 ODC-Grd M-ODC-GRD M-ODC-GRD PEMELIHARAAN/PENGUKURAN GROUNDING NODE Titik - -
4 ODC-Grd J-ODC-GRD J-ODC-GRD PEMELIHARAAN/PENGUKURAN GROUNDING NODE Titik 36,470 - 36,470
5 ODC-Log M-ODC-LOG M-ODC-LOG MELENGKAPI LOGBOOK NODE Node - -
5 ODC-Log J-ODC-LOG J-ODC-LOG MELENGKAPI LOGBOOK NODE Node 9,950 - 9,950
6 ODC-Splt M-ODC-SPLT M-ODC-SPLT PENGECEKAN DAN PEMELIHARAAN SPLITTER Unit - -
6 ODC-Splt J-ODC-SPLT J-ODC-SPLT PENGECEKAN DAN PEMELIHARAAN SPLITTER Unit 10,560 - 10,560
7 ODC-Dush M-ODC-DUSH M-ODC-DUSH PEMASANGAN DUSH CUP Unit 200 200
7 ODC-Dush J-ODC-DUSH J-ODC-DUSH PEMASANGAN DUSH CUP Unit 40 40
8 ODC-PC M-ODC-PC M-ODC-PC PERAPIHAN PATCH CORE pcs - -
8 ODC-PC J-ODC-PC J-ODC-PC PERAPIHAN PATCH CORE pcs 2,490 - 2,490
9 ODC-Key M-ODC-KEY M-ODC-KEY PENGGANTIAN KUNCI NODE UKURAN 70MM Node 355,920 355,920
9 ODC-Key J-ODC-KEY J-ODC-KEY PENGGANTIAN KUNCI NODE UKURAN 70MM Node 21,540 21,540
10 ODC-Key M-ODC-BELT M-ODC-BELT PEMASANGAN SABUK (70MM X 3MM) Node 254,230 254,230
10 ODC-Key J-ODC-BELT J-ODC-BELT PEMASANGAN SABUK (70MM X 3MM) Node 21,540 21,540
11 ODC-Safe M-ODS-SAFE-144 M-ODS-SAFE-144 PEMASANGAN KERANGKENG ODC 144 (TERMASUK KUNCI UKURAN 70M Node 1,728,740 1,728,740
11 ODC-Safe J-ODS-SAFE-144 J-ODS-SAFE-144 PEMASANGAN KERANGKENG ODC 144 (TERMASUK KUNCI UKURAN 70M Node 603,250 603,250
12 ODC-Safe M-ODS-SAFE-288 M-ODS-SAFE-288 PEMASANGAN KERANGKENG ODC 288 (TERMASUK KUNCI UKURAN 70 Node 1,932,120 1,932,120
12 ODC-Safe J-ODS-SAFE-288 J-ODS-SAFE-288 PEMASANGAN KERANGKENG ODC 288 (TERMASUK KUNCI UKURAN 70 Node 646,340 646,340
13 ODC-Koord M-ODC-KOORD M-ODC-KOORD MENGUKUR KOORDINAT DAN MENYERAHKANNYA KE TELKOM Node - -
13 ODC-Koord J-ODC-KOORD J-ODC-KOORD MENGUKUR KOORDINAT DAN MENYERAHKANNYA KE TELKOM Node 11,100 - 11,100
14 ODC - REP M-ODC-REP M-ODC-REP PENGGANTIAN ODC KONVENSIONAL DENGAN ODC SPLINTER Unit - -
14 ODC - REP J-ODC-REP J-ODC-REP PENGGANTIAN ODC KONVENSIONAL DENGAN ODC SPLINTER Unit 2,500,000 - 2,500,000
15 ODC - Va - Port M-ODC-VA-PORT M-ODC-VA-PORT VALIDASI PORT ODC Port - -
15 ODC - Va - Port J-ODC-VA-PORT J-ODC-VA-PORT VALIDASI PORT ODC Port 9,250 - 9,250
16 ODC-PP M-ODC-PP M-ODC-PP PEMBONGKARAN ODC BERIKUT PATOK PENGAMAN Set - -
16 ODC-PP J-ODC-PP J-ODC-PP PEMBONGKARAN ODC BERIKUT PATOK PENGAMAN Set 3,400,000 - 3,400,000
17 ODC - Cat Kabinet M-ODC-CATKABIM-NET M-ODC-CATKABIM-NET PENGECATAN ULANG KABINET m2 300,000 300,000
17 ODC - Cat Kabinet J-ODC-CATKABIJ-NET J-ODC-CATKABIJ-NET PENGECATAN ULANG KABINET m2 27,500 27,500
18 ODC- Cat Ddk KAB M-ODC-CATDDKKAB M-ODC-CATDDKKAB PENGECATAN DUDUKAN KABINET m2 77,000 77,000
18 ODC- Cat Ddk KAB J-ODC-CATDDKKAB J-ODC-CATDDKKAB PENGECATAN DUDUKAN KABINET m2 27,500 27,500
PENGADAAN DAN PEMASANGAN RISER PIPE UNTUK PENGAMAN KABEL
20 ODC-P-3-IN M-ODC-P-3-IN M-ODC-P-3-IN OPTIK KE ODC POLE / TITIK NAIK KU DIAMATER 3 INCH PANJANG 3 Unit 130,000 130,000
METER
PENGADAAN DAN PEMASANGAN RISER PIPE UNTUK PENGAMAN KABEL
20 ODC-P-3-IN J-ODC-P-3-IN J-ODC-P-3-IN OPTIK KE ODC POLE / TITIK NAIK KU DIAMATER 3 INCH PANJANG 3 Unit 58,000 58,000
METER
PENGADAAN DAN PEMASANGAN RISER PIPE UNTUK PENGAMAN KABEL
21 ODC-P-4-IN M-ODC-P-4-IN M-ODC-P-4-IN OPTIK KE ODC POLE / TITIK NAIK KU DIAMATER 4 INCH PANJANG 3 Unit 200,000 200,000
METER
PENGADAAN DAN PEMASANGAN RISER PIPE UNTUK PENGAMAN KABEL
21 ODC-P-4-IN J-ODC-P-4-IN J-ODC-P-4-IN OPTIK KE ODC POLE / TITIK NAIK KU DIAMATER 4 INCH PANJANG 3 Unit 58,000 58,000
METER
0 AKSES, RELOKASI ALPRO BROADBAND, RELOK UTILITAS, RECOVERY -
VI ODP/OTB -
1 ODP-Clean M-ODP-CLEAN M-ODP-CLEAN PEMELIHARAAN/PERAPIHAN/PEMBERSIHAN/(CAT UTK DOME) LUAR-DA Unit - -
1 ODP-Clean J-ODP-CLEAN J-ODP-CLEAN PEMELIHARAAN/PERAPIHAN/PEMBERSIHAN/(CAT UTK DOME) LUAR-DA Unit 10,560 - 10,560
2 ODP-Grd M-ODP-GRD M-ODP-GRD PEMELIHARAAN & PENGUKURAN GROUNDING Unit - -
2 ODP-Grd J-ODP-GRD J-ODP-GRD PEMELIHARAAN & PENGUKURAN GROUNDING Unit 36,470 - 36,470
3 ODP-Lab M-ODP-LAB M-ODP-LAB PELABELAN NAMA ODP Unit - -
3 ODP-Lab J-ODP-LAB J-ODP-LAB PELABELAN NAMA ODP Unit 5,010 - 5,010
4 ODP-Dush M-ODP-DUSH M-ODP-DUSH PEMASANGAN DUSH CUP Unit 200 200
4 ODP-Dush J-ODP-DUSH J-ODP-DUSH PEMASANGAN DUSH CUP Unit 40 40
5 ODP-Term M-ODP-TERM M-ODP-TERM PERAPIHAN TERMINASI ODP Unit - -
5 ODP-Term J-ODP-TERM J-ODP-TERM PERAPIHAN TERMINASI ODP Unit 2,490 - 2,490
6 ODP-Spl M-ODP-SPL M-ODP-SPL PENGECEKAN DAN PEMELIHARAAN SPLITTER Unit - -
6 ODP-Spl J-ODP-SPL J-ODP-SPL PENGECEKAN DAN PEMELIHARAAN SPLITTER Unit 10,560 - 10,560
7 ODP-Key M-ODP-KEY M-ODP-KEY PENGGANTIAN KUNCI ODP Buah 25,420 25,420
7 ODP-Key J-ODP-KEY J-ODP-KEY PENGGANTIAN KUNCI ODP Buah 10,340 10,340
8 ODP-Tiang M-ODP-TIANG M-ODP-TIANG PENGECATAN BRANDING TIANG WARNA MERAH SILVER Batang - -
8 ODP-Tiang J-ODP-TIANG J-ODP-TIANG PENGECATAN BRANDING TIANG WARNA MERAH SILVER Batang 17,240 - 17,240
9 ODP-Label M-ODP-LABEL M-ODP-LABEL RE-LABELING ODP Node - -
9 ODP-Label J-ODP-LABEL J-ODP-LABEL RE-LABELING ODP Node 5,010 - 5,010
10 ODP-Koord M-ODP-KOORD M-ODP-KOORD MENGUKUR KOORDINAT DAN MENYERAHKANNYA KE TELKOM Node - -
10 ODP-Koord J-ODP-KOORD J-ODP-KOORD MENGUKUR KOORDINAT DAN MENYERAHKANNYA KE TELKOM Node 11,100 - 11,100
11 ODP - Va - Port M-ODP-VA-PORT M-ODP-VA-PORT VALIDASI PORT ODP Port - -
11 ODP - Va - Port J-ODP-VA-PORT J-ODP-VA-PORT VALIDASI PORT ODP Port 9,250 - 9,250
12 ODP - Lbl - Core M-ODP-LBL-CORE M-ODP-LBL-CORE PELABELAN DROP CORE DI PORT SPLITTER Core - -
12 ODP - Lbl - Core J-ODP-LBL-CORE J-ODP-LBL-CORE PELABELAN DROP CORE DI PORT SPLITTER Core 5,010 - 5,010
13 ODP - SBK M-ODP-SBK M-ODP-SBK PENGADAAN DAN PEMASANGAN SABUK ODP Bh 18,000 18,000
13 ODP - SBK J-ODP-SBK J-ODP-SBK PENGADAAN DAN PEMASANGAN SABUK ODP Bh 12,000 12,000
8 Paket-5
Rincian Harga Satuan dan Bill Of Quantity
Pekerjaan Pengadaan dan Pemasangan Quality Enhancement (QE) Akses
PAKET-5 PROPINSI BANTEN, JAWA BARAT, JAWA TENGAH, DIY & JAWA TIMUR
HARGA SATUAN
NO. ITEM DESIGNATOR MATERIAL DESIGNATOR JASA DESIGNATOR DESIGNATOR URAIAN PEKERJAAN SAT HARGA SATUAN
MATERIAL JASA
PENGADAAN DAN PEMASANGAN ODP TYPE SOLID KAP 16 CORE
ADAPTOR SC/UPC TERDIRI DARI 2 BOX SPLITER (TERMASUK 2 SPLITER
15 ODP-Solid-PB-16 M-ODP-SOLID-PB-16 M-ODP-SOLID-PB-16 1:8) BESERTA ACCESSORIES, BERIKUT PELABELANDAN PENEMPELAN QR Bh 1,555,000 1,555,000
CODE (DISEDIAKAN OLEH TELKOM)
PENGADAAN DAN PEMASANGAN ODP TYPE SOLID KAP 16 CORE
15 ODP-Solid-PB-16 J-ODP-SOLID-PB-16 J-ODP-SOLID-PB-16 ADAPTOR SC/UPC TERDIRI DARI 2 BOX SPLITER (TERMASUK 2 SPLITER Bh 150,000 150,000
1:8) BESERTA ACCESSORIES, BERIKUT PELABELANDAN PENEMPELAN QR
CODE (DISEDIAKAN OLEH TELKOM)
PENGADAAN DAN PEMASANGAN OTB TERMASUK ADAPTER (SC
16 TC-SM-12 M-TC-SM-12 M-TC-SM-12 CONNECTOR), PIGTAIL DAN PROTECTION SLEEVE PADA CASSETTE/BOX Unit 922,452 922,452
16 TC-SM-12 J-TC-SJ-12 J-TC-SJ-12 PENGADAAN DAN PEMASANGAN OTB TERMASUK ADAPTER (SC Unit 705,930 705,930
CONNECTOR), PIGTAIL DAN PROTECTION SLEEVE PADA CASSETTE/BOX
17 TC-SM-24 M-TC-SM-24 M-TC-SM-24 IDEM 24 CORE Unit 1,296,849 1,296,849
17 TC-SM-24 J-TC-SJ-24 J-TC-SJ-24 IDEM 24 CORE Unit 1,411,860 1,411,860
18 TC-SM-48 M-TC-SM-48 M-TC-SM-48 IDEM 48 CORE Unit 2,643,375 2,643,375
18 TC-SM-48 J-TC-SJ-48 J-TC-SJ-48 IDEM 48 CORE Unit 2,823,720 2,823,720
19 TC-SM-96 M-TC-SM-96 M-TC-SM-96 IDEM 96 CORE Unit 4,797,000 4,797,000
19 TC-SM-96 J-TC-SJ-96 J-TC-SJ-96 IDEM 96 CORE Unit 5,647,440 5,647,440
0 AKSES, RELOKASI ALPRO BROADBAND, RELOK UTILITAS, RECOVERY, MIGRASI PA -
VII DROP CORE -
1 DC-Protec M-DC-PROTEC M-DC-PROTEC PASANG PELINDUNG LAYANG-LAYANG Rute 1,530 1,530
1 DC-Protec J-DC-PROTEC J-DC-PROTEC PASANG PELINDUNG LAYANG-LAYANG Rute 540 540
2 DC - BKR M-DC-BKR M-DC-BKR PEMBONGKARAN DROP CORE (TIDAK TERMASUK VALIDASI) Mtr - -
2 DC - BKR J-DC-BKR J-DC-BKR PEMBONGKARAN DROP CORE (TIDAK TERMASUK VALIDASI) Mtr 280 - 280
3 DC - DUCT - G657 - 1 M-DC-DUCT-G657-1 M-DC-DUCT-G657-1 PENGADAAN DAN PEMASANGAN DROP CABLE FO DUCT /UNDER Mtr 4,560 4,560
GROUND 1 CORE SINGLE MODE, G.657
3 DC - DUCT - G657 - 1 J-DC-DUCT-G657-1 J-DC-DUCT-G657-1 PENGADAAN DAN PEMASANGAN DROP CABLE FO DUCT /UNDER Mtr 2,800 2,800
GROUND 1 CORE SINGLE MODE, G.657
4 DC -DUCT - G657 - 2 M-DC-DUCT-G657-2 M-DC-DUCT-G657-2 PENGADAAN DAN PEMASANGAN DROP CABLE FO DUCT /UNDER Mtr 6,400 6,400
GROUND 2 CORE SINGLE MODE, G.657
4 DC -DUCT - G657 - 2 J-DC-DUCT-G657-2 J-DC-DUCT-G657-2 PENGADAAN DAN PEMASANGAN DROP CABLE FO DUCT /UNDER Mtr 2,800 2,800
GROUND 2 CORE SINGLE MODE, G.657
5 DC - AE - G657-1 M-DC-AE-G657-1 M-DC-AE-G657-1 PENGADAAN DAN PEMASANGAN DROP CABLE FO ATAS TANAH / Mtr 4,560 4,560
AERIAL 1 CORE SINGLE MODE G.657
PENGADAAN DAN PEMASANGAN DROP CABLE FO ATAS TANAH /
5 DC - AE - G657-1 J-DC-AE-G657-1 J-DC-AE-G657-1 AERIAL 1 CORE SINGLE MODE G.657 Mtr 2,800 2,800
6 DC - AE - G657-2 J-DC-AE-G657-2 J-DC-AE-G657-2 PENGADAAN DAN PEMASANGAN DROP CABLE FO ATAS TANAH / Mtr 2,800 2,800
AERIAL 2 CORE SINGLE MODE G.657
7 DC - SBG M-DC-SBG M-DC-SBG PENYAMBUNGAN DROP CABLE FO SINGLE MODE KAP 1 CORE DENGAN Core - -
CARA FUSION SPLICE TERMASUK HEAT-STRINK
PENYAMBUNGAN DROP CABLE FO SINGLE MODE KAP 1 CORE DENGAN
7 DC - SBG J-DC-SBG J-DC-SBG CARA FUSION SPLICE TERMASUK HEAT-STRINK Core 55,886 - 55,886
8 DC - SOC M-DC-SOC M-DC-SOC PENGADAAN DAN PEMASANGAN ADAPTOR SPLICE ON CONNECTOR (SOC Pcs 52,000 52,000
8 DC - SOC J-DC-SOC J-DC-SOC PENGADAAN DAN PEMASANGAN ADAPTOR SPLICE ON CONNECTOR (SOC Pcs 55,886 55,886
9 Paket-5
Rincian Harga Satuan dan Bill Of Quantity
Pekerjaan Pengadaan dan Pemasangan Quality Enhancement (QE) Akses
PAKET-5 PROPINSI BANTEN, JAWA BARAT, JAWA TENGAH, DIY & JAWA TIMUR
HARGA SATUAN
NO. ITEM DESIGNATOR MATERIAL DESIGNATOR JASA DESIGNATOR DESIGNATOR URAIAN PEKERJAAN SAT HARGA SATUAN
MATERIAL JASA
26 NE-MS-Isnt J-NE-MS-ISNT J-NE-MS-ISNT PENGECEKAN DAN PENGUATAN BAUT DALAM PERANGKAT Unit 10,570 - 10,570
PEKERJAAN PEMBONGKARAN PERANGKAT AKTIF (MSAN, OAN, ONU,
27 NE-MS-BKR M-NE-MS-BKR M-NE-MS-BKR RDSLAM) BESERTA PATOK PENGAMAN DAN PERAPIHAN KEMBALI Unit - -
LOKASI BEKAS PEMBONGKARAN
PEKERJAAN PEMBONGKARAN PERANGKAT AKTIF (MSAN, OAN, ONU,
27 NE-MS-BKR J-NE-MS-BKR J-NE-MS-BKR RDSLAM) BESERTA PATOK PENGAMAN DAN PERAPIHAN KEMBALI Unit 3,400,000 - 3,400,000
LOKASI BEKAS PEMBONGKARAN
IX TAMBAHAN -
0 AKSES, PERANGKAT AKTIF, RELOKASI ALPRO BROADBAND, RELOK UTILITAS, REC -
1 PIGTAIL M-PIGTAIL M-PIGTAIL PENGADAAN DAN PEMASANGAN PIGTAIL (SC/FC) Pcs 16,000 16,000
1 PIGTAIL J-PIGTAIL J-PIGTAIL PENGADAAN DAN PEMASANGAN PIGTAIL (SC/FC) Pcs 55,886 55,886
3 DC-OF-SM-655C M-DC-OF-SM-655C M-DC-OF-SM-655C PENGADAAN DAN PEMASANGAN KABEL DUCT FIBER OPTIK SINGLE Meter 60,000 60,000
MODE 144 CORE G 655 C
PENGADAAN DAN PEMASANGAN KABEL DUCT FIBER OPTIK SINGLE
3 DC-OF-SM-655C J-DC-OF-SJ-655C J-DC-OF-SJ-655C MODE 144 CORE G 655 C Meter 3,306 3,306
0 AKSES, PERANGKAT AKTIF, RELOKASI ALPRO BROADBAND, RELOK UTILITAS, RE -
PENGKLEMAN HDPE TYPE STICK DI DINDING BETON DENGAN KLEM
4 KLEM HDPE M-KLEMHDPE M-KLEMHDPE KETEBALAN 2MM LEBAR 2,5 CM MENGGUNAKAN DYNABOLT Unit 11,500 11,500
TERMASUK REKONDISI ATAU PERBAIKAN KERUSAKAN
PENGKLEMAN HDPE TYPE STICK DI DINDING BETON DENGAN KLEM
4 KLEM HDPE J-KLEMHDPE J-KLEMHDPE KETEBALAN 2MM LEBAR 2,5 CM MENGGUNAKAN DYNABOLT Unit 2,300 2,300
TERMASUK REKONDISI ATAU PERBAIKAN KERUSAKAN
0 AKSES, RELOKASI ALPRO BROADBAND, RELOK UTILITAS, RECOVERY -
5 MPOS M-MPOS M-MPOS MARKING POS (SSI PPJF) Unit 55,000 55,000
5 MPOS J-MPOS J-MPOS MARKING POS (SSI PPJF) Unit 15,599 15,599
0 AKSES, RELOKASI ALPRO BROADBAND, RELOK UTILITAS, RECOVERY, MIGRASI PA -
6 PL - RING M-PL-RING M-PL-RING PENGADAAN DAN PEMASANGAN POLE STRAP RING Bh 32,100 32,100
6 PL - RING J-PL-RING J-PL-RING PENGADAAN DAN PEMASANGAN POLE STRAP RING Bh 12,000 12,000
7 PL - TYPE - J M-PL-TYPE-J M-PL-TYPE-J PENGADAAN DAN PEMASANGAN POLE STRAP TYPE J Bh 35,000 35,000
7 PL - TYPE - J J-PL-TYPE-J J-PL-TYPE-J PENGADAAN DAN PEMASANGAN POLE STRAP TYPE J Bh 12,000 12,000
0 AKSES, RELOKASI ALPRO BROADBAND, RELOK UTILITAS, RECOVERY -
8 DD-ROD M-DD-ROD M-DD-ROD RODING DUCT, PEKERJAAN PEMBERSIHAN PADA ROUTE DUCT YANG Meter - -
KOSONG/RODING DUCT EXISTING
8 DD-ROD J-DD-ROD J-DD-ROD RODING DUCT, PEKERJAAN PEMBERSIHAN PADA ROUTE DUCT YANG Meter 1,922 - 1,922
KOSONG/RODING DUCT EXISTING
0 AKSES, PERANGKAT AKTIF, RELOKASI ALPRO BROADBAND, RELOK UTILITAS, RE -
9 FTM-BC-8F-10 M-FTM-BC-8F-10 M-FTM-BC-8F-10 FO CORD BUNDLED CABLE 8F, DENGAN CONNECTOR SATU SISI Unit 423,621 423,621
SC/LC/FC (L=10M), DAN SPLICING DI SISI LAINNYA
FO CORD BUNDLED CABLE 8F, DENGAN CONNECTOR SATU SISI
9 FTM-BC-8F-10 J-FTJ-BC-8F-10 J-FTJ-BC-8F-10 SC/LC/FC (L=10M), DAN SPLICING DI SISI LAINNYA Unit 451,000 451,000
10 FTM-BC-8F-1 M-FTM-BC-8F-1 M-FTM-BC-8F-1 TAMBAHAN PANJANG CORD BUNDLED CABLE 8F Meter 6,511 6,511
10 FTM-BC-8F-1 J-FTJ-BC-8F-1 J-FTJ-BC-8F-1 TAMBAHAN PANJANG CORD BUNDLED CABLE 8F Meter 1,000 1,000
0 AKSES, RELOKASI ALPRO BROADBAND, RELOK UTILITAS, RECOVERY, MIGRASI PA -
PENGADAAN DAN PEMASANGAN DUCT CABLE PENANGGAL DIAMETER
11 DCD-PVC-1 M-DCD-PVC-1 M-DCD-PVC-1 PIPA PVC 1 INCH (CLASS AW) 1 PIPA Meter 12,656 12,656
PENGADAAN DAN PEMASANGAN DUCT CABLE PENANGGAL DIAMETER
11 DCD-PVC-1 J-DCD-PVC-1 J-DCD-PVC-1 PIPA PVC 1 INCH (CLASS AW) 1 PIPA Meter 1,544 1,544
0 AKSES, RELOK UTILITAS, RECOVERY -
12 S-DUCT- 400 M-S-DUCT-400 M-S-DUCT-400 PERBAIKAN KABEL PRIMER (KABEL DUCT) KAP. 400" pair 297,000 297,000
12 S-DUCT- 400 J-S-DUCT-400 J-S-DUCT-400 PERBAIKAN KABEL PRIMER (KABEL DUCT) KAP. 400" pair 643,750 643,750
13 S-DUCT- 600 M-S-DUCT-600 M-S-DUCT-600 PERBAIKAN KABEL PRIMER (KABEL DUCT) KAP. 600" pair 445,500 445,500
13 S-DUCT- 600 J-S-DUCT-600 J-S-DUCT-600 PERBAIKAN KABEL PRIMER (KABEL DUCT) KAP. 600" pair 965,625 965,625
14 S-DUCT- 800 M-S-DUCT-800 M-S-DUCT-800 PERBAIKAN KABEL PRIMER (KABEL DUCT) KAP. 800" pair 594,000 594,000
14 S-DUCT- 800 J-S-DUCT-800 J-S-DUCT-800 PERBAIKAN KABEL PRIMER (KABEL DUCT) KAP. 800" pair 1,200,000 1,200,000
15 S-DUCT- 1000 M-S-DUCT-1000 M-S-DUCT-1000 PERBAIKAN KABEL PRIMER (KABEL DUCT) KAP. 1000" pair 742,500 742,500
15 S-DUCT- 1000 J-S-DUCT-1000 J-S-DUCT-1000 PERBAIKAN KABEL PRIMER (KABEL DUCT) KAP. 1000" pair 1,600,000 1,600,000
16 S-DUCT- 1400 M-S-DUCT-1400 M-S-DUCT-1400 PERBAIKAN KABEL PRIMER (KABEL DUCT) KAP. 1400" pair 1,039,500 1,039,500
16 S-DUCT- 1400 J-S-DUCT-1400 J-S-DUCT-1400 PERBAIKAN KABEL PRIMER (KABEL DUCT) KAP. 1400" pair 2,250,000 2,250,000
10 Paket-5
BERITA ACARA REKONSILASI
QE RECOVERY BULAN JANUARI 2022
Pada hari ini …............... Tanggal ….......................... Bulan …........................ Tahun Dua Ribu Dua Puluh Dua,
bertempat di Kantor Operasional PT Telekomunikasi Indonesia, telah dilaksanakan Rekonsiliasi Pekerjaan QE
RECOVERY BULAN JANUARI 2022 dengan rincian sebagai berikut :
Demikian hasil rekonsiliasi ini ditandatangani para pihak dan berlaku mengikat, akan dijadikan sebagai dasar untuk
proses pembayaran dan merupakan bagian yang tidak terpisahkan dengan lampiran Berita Acara Rekonsiliasi.
HARGA SATUAN
NO. MATERIAL JASA URAIAN PEKERJAAN SAT
DESIGNATOR DESIGNATOR
ITEM DESIGNATOR
MATERIAL JASA
A PENGADAAN DAN PENARIKAN KABEL
I PENGADAAN DAN PENARIKAN KABEL TANAH TANAM LANGSUNG
PENGADAAN DAN PEMASANGAN KABEL UDARA FIBER OPTIK SINGLE MODE 12 CORE G 652
6 M-AC-OF-SM-24-SC J-AC-OF-SM-24-SC Mtr 15,767 4,571
D, "EASY TO SPLIT"
3 J-CO-OF PEKERJAAN CUT OVER KABEL SERAT OPTIK Core - 56,510
30 M-PS-1-4-ODC J-PS-1-4-ODC PENGADAAN PASSIVE SPLITTER 1:4, TYPE MODULAR SC/UPC, FOR ODC, TERMASUK PIGTAIL Pcs 245,000 32,341
PENGADAAN DAN PEMASANGAN ODP TYPE SOLID KAP 8 CORE ADAPTOR SC/UPC TERDIRI
14 ODP-Solid-PB-8 M-ODP-SOLID-PB-8 J-ODP-SOLID-PB-8 DARI 1 BOX SPLITER (TERMASUK 1 SPLITER 1:8), 1 BOX DUMMY BESERTA ACCESSORIES, Bh 1,200,000 150,000
BERIKUT PELABELAN DAN PENEMPELAN QR CODE (DISEDIAKAN OLEH TELKOM)
29 M-PC-APC-655-2 J-PC-APC-655-2 PENGADAAN PATCH CORD 2 METER, (FC/LC/SC-APC TO FC/LC/SC-APC), G.655C pcs 35,210 2,888
30 M-PC-APC-657-2 J-PC-APC-657-2 PENGADAAN PATCH CORD 2 METER, (FC/LC/SC-APC TO FC/LC/SC-APC), G.657 pcs 36,521 2,888
MATERIAL
JASA
JUMLAH M + J
PPn 10%
TOTAL JUMLAH
1 2