DOKUMEN PENGADAAN
No. DP.018.J/APBN-DM/LISDES-J/2012
No.
URAIAN PEKERJAAN
I.
Spesifikasi Tehnik
SPLN
Kabel
SQM
AAAC
70 mm
SPLN 41-8
10,650 Kms
II.
ACSR
70 mm
SPLN 42-10
0,225 Kms
III.
SPLN 42-10
2,250 Kms
IV.
Terbilang :
Twisted 3x35+25mm
NYY
50 kVA
SPLN D3 ; 2007
Volume
Material
1 UNIT
50 KVA
JUMLAH
PPN 10 %
TOTAL
DIBULATKAN
Jambi,
.. 2012
Penawar,
PT./CV.
Nama jelas
Jabatan
Total
DOKUMEN PENGADAAN
: No. DP.018.J/APBN-DM/LISDES-J/2012
I.
NO
I.1
1
2
3
URAIAN PEKERJAAN
MATERIAL UTAMA
Konduktor AAAC 70 mm
Isolator Tumpu 20 KV
Isolator Tarik 20 KV + Strain Clamp
STN
VOLUME
Mtr
Bh
Set
32.908
758
138
Set
Set
Set
Set
Set
Set
Set
Set
Set
Set
Set
Set
Set
Set
Set
Set
Set
135
55
1
22
1
25
33
32
213
1
10,650 KMS
HARGA SATUAN
BAHAN
UPAH
(Rp.)
(Rp.)
JUMLAH HARGA
BAHAN
UPAH
(Rp.)
(Rp.)
TOTAL
(Rp.)
JUMLAH I.1
I.2
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
I.3
II.
T/M3
24,20
JUMLAH I.2
TOTALI. =JUMLAH I.1+JUMLAH I.2
II.1
1
2
3
URAIAN PEKERJAAN
MATERIAL UTAMA
Konduktor ACSR 70 mm
Isolator Tumpu 20 KV
Isolator Tarik 20 KV + Strain Clamp
STN
VOLUME
Mtr
Bh
Set
710
6
12
JUMLAH II.1
II.2
1
2
3
4
5
6
7
8
9
10
11
12
13
14
II.3
20,00
4,50
1,50
0,225
0,0196
0,225
0,0196
120,00
7,59
1,00
14.824,16
14,82416
4,00
0,59
0,225 KMS
HARGA SATUAN
BAHAN
UPAH
(Rp.)
(Rp.)
JUMLAH HARGA
BAHAN
UPAH
(Rp.)
(Rp.)
TOTAL
(Rp.)
DOKUMEN PENGADAAN
: No. DP.018.J/APBN-DM/LISDES-J/2012
III.
NO
III.1
1
MATERIAL UTAMA
TIC NFA2X-T 3x35 + 1x25 mm
STN
VOLUME
Mtr
2.362
Set
Set
Set
Set
Set
Set
Set
Set
Set
Set
Set
Rol
Bh
32
11
2
2
9
2
-
2,250 KMS
HARGA SATUAN
BAHAN
UPAH
(Rp.)
(Rp.)
JUMLAH HARGA
BAHAN
UPAH
(Rp.)
(Rp.)
TOTAL
(Rp.)
JUMLAH HARGA
BAHAN
UPAH
(Rp.)
(Rp.)
TOTAL
(Rp.)
JUMLAH III.1
III.2
1
2
3
4
5
6
7
8
9
10
11
12
13
14
III.3
IV.
NO
IV.1
1
T/M3
2,83
JUMLAH III.2
TOTAL III. =JUMLAH III.1+JUMLAH III.2
STN
1 UNIT
VOLUME
Bh
Set
Bh
Set
Mtr
Bh
Bh
Set
Bh
Bh
Mtr
Mtr
Bh
Bh
M3
Set
Bh
1
3
3
9
6
3
1
1
2
36
72
8
8
1
2
2
0,25
2
9
T/M3
0,96
HARGA SATUAN
BAHAN
UPAH
(Rp.)
(Rp.)
JUMLAH IV.1
IV.2
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
IV.3
Set
Set
Set
No.
URAIAN PEKERJAAN
TM. 1
- Cross Arm Type 2.000 UNP.8
- Arm Tie Type 810 (Besi L.50.50.5)
- Double Bolt & Nut M.16 x 300 mm + Washer
- Bolt & Nut M.16 x 50 mm + Washer
- Alluminium Bending Wire 20 mm
- Single Arm Tie Band
S
T
N
HARGA SATUAN
BAHAN
UPAH
(Rp.)
(Rp.)
VOLUME
Btg
Btg
Set
Bh
Mtr
Set
1
2
1
2
6
1
Jumlah
TM. 3
- Cross Arm Type 2.000 UNP.8
- Arm Tie Type 810 (Besi L.50.50.5)
- Double Bolt & Nut M.16 x 300 mm + Washer
- Bolt & Nut M.16 x 50 mm + Washer
- Alluminium Bending Wire 20 mm
- Double Arm Tie Band
Btg
Btg
Set
Set
Mtr
Set
2
4
3
4
12
1
Jumlah
TM. 4
- Cross Arm Type 2.000, UNP.8
- Arm Tie Type 810 (Besi L.50.50.5)
- Double Bolt & Nut M.16 x 300 mm + Washer
- Bolt & Nut M.16 x 50 mm + Washer
- Double Arm Tie Band
Btg
Btg
Set
Set
Set
2
4
3
4
1
Jumlah
TM. 4.X
- Alluminium Bending Wire 20 mm
- Joint Sleeve 35 - 70 mm
Mtr
Bh
2
3
Jumlah
TM. 5
- Cross Arm Type 2.000, UNP. 8
- Arm Tie Type 810 (Besi L.50.50.5)
- Double Bolt & Nut M.16 x 300 mm + Washer
- Bolt & Nut M.16 x 50 mm + Washer
- Alluminium Binding Wire
- Joint Sleeve 35 - 70 mm
- Double Arm Tie Band
Btg
Btg
Set
Bh
Mtr
Bh
Set
2
4
3
4
2
3
1
Jumlah
TM. 8
- Cross Arm 2.000, UNP.8
- Arm Tie Type 810 (Besi L.50.50.5)
- Double Bolt & Nut M.16 x 300 mm + Washer
- Bolt & Nut M.16 x 50 mm + Washer
- Alluminium Binding Wire
- Joint Sleve 70 mm
- Bolt & Nut M.16 x 250 mm + Washer
- Double Arm Tie Band
- Double Arm Band
Btg
Btg
Set
Set
Mtr
Bh
Bh
Set
Set
3
6
3
6
8
3
1
1
1
Jumlah
TM. 8.X
- Cross Arm 2.000, UNP.8
- Arm Tie Type 810 (Besi L.50.50.5)
- Double Bolt & Nut M.16 x 300 mm + Washer
- Bolt & Nut M.16 x 50 mm + Washer
- Alluminium Binding Wire
- Joint Sleve 70 mm
- Double Arm Tie Band
- Double Arm Band
Btg
Btg
Set
Set
Mtr
Bh
Bh
Set
2
4
2
4
2
3
1
1
Jumlah
JUMLAH
HARGA
(Rp.)
No.
URAIAN PEKERJAAN
TM. 10
- Cross Arm Type 2.000, UNP.8
- Arm Tie Type 810 (Besi L.50.50.5)
- Double Bolt & Nut M.16 x 300 mm + Washer
- Bolt & Nut M.16 x 50 mm + Washer
- Alluminium Binding Wire
- Joint Sleve 70 mm
- Double Arm Tie Band
- Double Arm Band
S
T
N
HARGA SATUAN
BAHAN
UPAH
(Rp.)
(Rp.)
VOLUME
Btg
Btg
Set
Bh
Mtr
Bh
Set
Set
4
8
5
8
4
3
2
1
Jumlah
Btg
Btg
Set
Bh
Mtr
Bh
Set
Set
2
4
2
4
4
3
1
1
Jumlah
10
Btg
Btg
Set
Bh
Mtr
Bh
Set
Set
4
4
2
16
12
3
2
2
Jumlah
11
Mtr
Set
Bh
Bh
Bh
Set
14
1
1
1
4
1
Jumlah
12
Mtr
Set
Bh
Bh
Bh
Set
30
1
2
1
6
2
Jumlah
13
Bayonet TM
- Pipa Galvanis 4"
- Double Band 10" 4"
- Bolt and Nut M.16x50 + washer
Mtr
Set
Bh
3
2
3
Jumlah
JUMLAH
HARGA
(Rp.)
:
:
DOKUMEN PENGADAAN
No. DP.018.J/APBN-DM/LISDES-J/2012
NO.
URAIAN PEKERJAAN
1 TR. 1
- Plastis Strap
- Stoping Buckle
- Stainless Steel Strip @ 0,75 mtr
- Suspension Clamp
- Suspension Clamp Bracket
S
N
T
HARGA SATUAN
BAHAN
UPAH
(Rp.)
(Rp.)
VOLUME
Bh
Bh
Bh
Set
Set
3
2
2
1
1
Jumlah
2 TR. 2
- Plastis Strap
- Stoping Buckle
- Stainless Steel Strip @ 0,75 mtr
- Strain Clamp
- Tension Bracket
Bh
Bh
Bh
Set
Set
3
2
2
2
1
Jumlah
3 TR. 3
- Turn Buckle
- Dead End Tubes
- Link
- PVC 2" = 50 cm
- Plastis Strap
- Stoping Buckle
- Stainless Steel Strip @ 0,75 mtr
- Strain Clamp
- Tension Bracket
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Set
Set
1
4
2
1
2
4
4
1
1
Jumlah
4 TR. 4
- Tap Connector 25-50 mm
- Plastis Strap
- Stoping Buckle
- Stainless Steel Strip @ 0,75 mtr
- Strain Clamp
- Tension Bracket
Bh
Bh
Bh
Bh
Set
Set
8
6
4
4
2
2
Jumlah
5 TR. 5
- Plastis Strap
- Stoping Buckle
- Stainless Steel Strip @ 0,75 mtr
- Strain Clamp
- Tension Bracket
Bh
Bh
Bh
Set
Set
4
4
4
2
2
Jumlah
6 TR. 6
- Tap Connector 25-50 mm
- Plastis Strap
- Stoping Buckle
- Stainless Steel Strip @ 0,75 mtr
- Strain Clamp
- Tension Bracket
- Suspension Clamp
- Suspension Clamp Bracket
Bh
Bh
Bh
Bh
Set
Set
Set
Set
4
4
4
4
1
1
1
1
Jumlah
7 TR. 6.A
- Tap Connector 25-50 mm
- Plastis Strap
- Stoping Buckle
- Stainless Steel Strip @ 0,75 mtr
- Strain Clamp
- Tension Bracket
Bh
Bh
Set
Bh
Set
Set
4
4
4
4
3
2
Jumlah
JUMLAH
HARGA
(Rp.)
NO.
URAIAN PEKERJAAN
8 TR. 7
- Tap Connector 25-50 mm
- Plastis Strap
- Stoping Buckle
- Stainless Steel Strip @ 0,75 mtr
- Strain Clamp
- Tension Bracket
S
N
T
HARGA SATUAN
BAHAN
UPAH
(Rp.)
(Rp.)
VOLUME
Bh
Bh
Bh
Bh
Set
Set
4
2
2
2
1
1
Jumlah
Set
Mtr
Bh
Bh
Bh
1
3
1
1
2
Jumlah
Bh
Bh
Set
Bh
Btg
Mtr
Set
Set
3
3
1
3
0,5
9
1
1
Jumlah
11 Perlengkapan GW - TR.
- Galvanis Stell Wire 22 mm
- Patok Schoor UNP 8 Rod Stay
- Wire Clip
- Spanschroef / Turn Bucle 1 / 2"
- Double Guy Wire Band
Mtr
Set
Bh
Bh
Bh
14
1
4
1
1
Jumlah
Mtr
Set
Bh
Bh
Bh
30
1
6
2
2
Jumlah
JUMLAH
HARGA
(Rp.)
:
:
:
No.
U R AIAN
1. a.
b.
c.
d.
2. a.
b.
c.
d.
3. a.
b.
4. a.
b.
5.
6.
STN
VOLUME
Btg
Lot
Lot
0,333
1,000
1,000
Btg
Lot
Lot
0,417
1,000
1,000
Btg
Lot
Lot
0,500
1,000
1,000
Btg
Lot
Lot
0,033
1,000
1,000
Btg
Lot
Lot
0,333
1,000
1,000
Btg
Lot
Lot
0,417
1,000
1,000
Btg
Lot
Lot
0,133
1,000
1,000
Btg
Lot
Lot
0,100
1,000
1,000
Btg
Lot
Lot
0,135
1,000
1,000
Btg
Lot
Lot
0,150
1,000
1,000
Btg
Set
Lot
Lot
0,120
3,000
1,000
1,000
Btg
Set
Lot
Lot
0,120
4,000
1,000
1,000
Btg
Lot
Lot
0,055
1,000
1,000
Btg
Buah
Lot
0,160
1,000
1,000
HRG SATUAN
( Rp. )
JUMLAH
( Rp.)
No.
U R AIAN
7.
8.
9.
a.
STN
VOLUME
Buah
Btg
Lot
Lot
2,000
0,125
1,000
1,000
Buah
Btg
Lot
Lot
4,000
0,125
1,000
1,000
RAK TR :
RAK TR GARDU CANTOL - 2 (DUA) JURUSAN :
- Besi Plat 1,2 mm (120 x 240 cm)
- Besi Siku L.50.50.5
- Besi Plat Strip 50.5
- NH Fuse. 160 A + Holder
- Plat Copper (50x5x4)
- Isolator mika u/Netral
- Kunci
- Engsel.
- Besi UNP 8 Type 600
- Single Arm band
- Bolt & Nut M.16 - 50 mm.
- Galvanis
- Biaya pembuatan
- Pengecatan.
Lbr
Btg
Btg
Set
Btg
Buah
Buah
Buah
Btg
Set
Buah
Lot
Lot
Lot
1,300
1,600
1,200
6,000
0,500
2,000
1,000
4,000
0,200
2,000
4,000
1,000
1,000
1,000
Lbr
Btg
Btg
Set
Set
Btg
Mtr
Bh
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Mtr
Lot
Lot
2,000
1,820
1,350
0,000
12,000
0,500
3,000
6,000
24,000
1,000
4,000
1,000
1,000
1,000
2,000
3,000
1,000
1,000
Btg
Set
Lot
Lot
0,417
2,000
1,000
1,000
Btg
Set
Set
Lot
Lot
0,833
2,000
2,000
1,000
1,000
Btg
Btg
Buah
Lot
Lot
0,215
0,112
3,000
1,000
1,000
c.
10. a.
HRG SATUAN
( Rp. )
JUMLAH
( Rp.)
No.
U R AIAN
b.
c.
d.
11.
a.
b.
STN
VOLUME
Btg
Bh
Lot
Lot
0,055
2,000
1,000
1,000
INVORING 3".
- Pipa 3".
- Plat 1,2 mm.
- Biaya pembuatan
Btg
Lbr
Lot
0,025
0,018
1,000
INVORING 2".
- Pipa 2".
- Plat 1,2 mm.
- Biaya pembuatan
Btg
Lbr
Lot
0,025
0,010
1,000
Zak
M3
M3
Org
Org
Org
Org
8,300
0,830
0,540
6,000
1,000
0,000
0,300
BEKISTING u/ 1 M3 BETON :
- Papan Kayu
- Paku
- Pekerja.
- Tukang kayu
- Kepala Tukang
- Mandor
- Pek.Bongkar Cetakan
M3
Kg
Org
Org
Org
Org
Org
0,400
4,000
5,000
2,000
0,500
0,100
0,000
Btg
Mtr
Buah
Buah
Btg
Btg
Buah
Buah
Buah
1,000
20,000
1,000
2,000
2,000
0,500
3,000
3,000
3,000
Bh
Lbr
Buah
Kg
Kg
Kg
Lot
1,000
0,010
3,000
0,085
0,085
0,009
1,000
Btg
Btg
set
Buah
Buah
set
Lot
Lot
0,683
1,000
1,000
2,000
9,000
2,000
1,000
1,000
13.
14.
GROUNDING ROD.
a. GROUNDING GARDU
- Pipa 1,5" 6 meter.
- BC 50 m.
- Bolt M.16 - 50 mm.
- Terminal Lug. 50 mm2
- Timah.
- Pipa Galvanis 1/2"
- Klem Steinless Steel @ 0,75 mtr
- Link.
- Stoping Buckle
HRG SATUAN
( Rp. )
JUMLAH
( Rp.)
No.
U R AIAN
15. a.
b.
c.
16.
17.
18.
20.
21.
22.
23.
24.
STN
VOLUME
Btg
Set
1,000
1,000
Btg
Set
1,000
1,000
1,000
1,000
1,000
2,000
M3
0,250
M3
0,150
M3
0,940
Btg
Lot
Lot
0,160
1,000
1,000
1
-
Kg
Ltr
Kg
Lbr
Hari
Hari
Hari
0,018
0,027
0,355
1,000
0,250
0,015
0,038
Lbr
Kg
Kg
Kg
Hari
Hari
Hari
3,000
0,021
0,021
0,435
0,250
0,015
0,375
m2
6,320
Btg
Lot
Lot
0,400
1,000
1,000
Btg
Bh
Lot
Lot
0,055
2,000
1,000
1,000
Btg
Bh
Lot
Lot
0,110
2,000
1,000
1,000
Btg
Bh
Lot
Lot
0,052
2,000
1,000
1,000
1 M2 PENGECATAN RAK TR
- Amplas
- Dempul
- Cat Dasar
- Cat Besi
- Pekerja
- Mandor
- Tukang
HRG SATUAN
( Rp. )
JUMLAH
( Rp.)
No.
U R AIAN
25. a.
b.
c.
d.
e.
f.
g.
h.
STN
VOLUME
Btg
Set
Lot
Lot
0,180
12,000
1,000
1,000
Btg
Set
Lot
Lot
0,184
12,000
1,000
1,000
Btg
Set
Lot
Lot
0,188
12,000
1,000
1,000
Btg
Set
Lot
Lot
0,240
16,000
1,000
1,000
Btg
Set
Lot
Lot
0,244
16,000
1,000
1,000
Btg
Set
Lot
Lot
0,248
16,000
1,000
1,000
Btg
Set
Lot
Lot
0,036
2,000
1,000
1,000
Btg
Set
Lot
Lot
0,044
2,000
1,000
1,000
HRG SATUAN
( Rp. )
JUMLAH
( Rp.)
No.
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
URAIAN PEKERJAAN
STN
VOLUME
HO
HO
HO
0,042
0,125
0,250
HO
HO
HO
0,030
0,120
0,120
HO
HO
HO
0,010
0,025
0,250
HO
HO
HO
0,003
0,009
0,007
Isolator Tumpu 20 KV
- Mandor
- Tukang
- Pekerja
HO
HO
HO
0,011
0,044
0,044
Isolator Tarik 20 KV
- Mandor
- Tukang
- Pekerja
HO
HO
HO
0,019
0,074
0,074
HO
HO
HO
0,005
0,020
0,020
HO
HO
HO
0,010
0,025
0,025
HO
HO
HO
0,030
0,120
0,120
HO
HO
HO
0,010
0,040
0,040
HO
HO
HO
0,005
0,020
0,010
HO
HO
HO
0,033
0,150
0,080
HO
HO
HO
0,011
0,250
0,015
HO
HO
HO
0,010
0,250
0,020
HO
HO
HO
0,300
0,130
0,120
HARGA
SATUAN
(Rp.)
JUMLAH
HARGA
(Rp.)
URAIAN PEKERJAAN
No.
16.
17.
18.
20.
21.
22.
23.
24.
25.
26.
27.
28.
29.
30.
STN
VOLUME
HO
HO
HO
0,030
0,030
0,150
HO
HO
HO
0,027
0,054
0,081
HO
HO
HO
0,030
0,120
0,120
HO
HO
HO
0,042
0,125
0,250
HO
HO
HO
0,030
0,120
0,120
HO
HO
HO
0,030
0,120
0,120
HO
HO
HO
0,622
1,500
1,555
HO
HO
HO
0,003
0,019
0,008
HO
HO
HO
0,004
0,024
0,008
HO
HO
HO
0,005
0,030
0,010
HO
HO
HO
0,007
0,040
0,013
HO
HO
HO
0,026
0,077
0,077
HO
HO
HO
0,020
0,100
0,100
Pasang LBS
- Mandor
- Tukang
- Pekerja
HO
HO
HO
1,000
6,000
4,000
HARGA
SATUAN
(Rp.)
JUMLAH
HARGA
(Rp.)
No.
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
:
:
:
URAIAN PEKERJAAN
STN
VOLUME
HO
HO
HO
0,003
0,010
0,010
HO
HO
HO
0,003
0,010
0,010
HO
HO
HO
0,003
0,010
0,010
HO
HO
HO
0,013
0,039
0,039
HO
HO
HO
0,013
0,039
0,039
HO
HO
HO
0,013
0,039
0,039
HO
HO
HO
0,013
0,039
0,039
HO
HO
HO
0,005
0,020
0,020
HO
HO
HO
0,003
0,008
0,008
Link / Buah
- Mandor
- Tukang
- Pekerja
HO
HO
HO
0,003
0,010
0,010
HO
HO
HO
0,016
0,050
0,050
HO
HO
HO
0,005
0,016
0,016
HO
HO
HO
0,020
0,070
0,070
HO
HO
HO
0,003
0,018
0,018
HO
HO
HO
0,007
0,025
0,025
HARGA
SATUAN
(Rp.)
JUMLAH
HARGA
(Rp.)
No.
16.
17.
17.
18.
19.
20.
21.
22.
23.
24.
25.
26.
27.
URAIAN PEKERJAAN
STN
VOLUME
HO
HO
HO
0,003
0,009
0,009
HO
HO
HO
0,020
0,020
0,020
HO
HO
HO
0,004
0,020
0,010
HO
HO
HO
0,020
0,150
0,070
Thimble / Buah
- Mandor
- Tukang
- Pekerja
HO
HO
HO
0,002
0,011
0,006
HO
HO
HO
0,004
0,020
0,015
HO
HO
HO
0,006
0,034
0,017
HO
HO
HO
0,008
0,045
0,022
HO
HO
HO
0,008
0,045
0,022
LVTC 3 X 70 + 1 X 50 mm2
- Mandor
- Tukang
- Pekerja
HO
HO
HO
0,005
0,020
0,030
LVTC 3 X 35 + 1 X 25 mm2
- Mandor
- Tukang
- Pekerja
HO
HO
HO
0,003
0,010
0,015
HO
HO
HO
0,003
0,010
0,015
HO
HO
HO
0,023
0,077
0,077
LVTC 3 X 25 + 1 X 25 mm2
- Mandor
- Tukang
- Pekerja
Joint Compresion / Buah
- Mandor
- Tukang
- Pekerja
/ Mtr
HARGA
SATUAN
(Rp.)
JUMLAH
HARGA
(Rp.)
No.
I.
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
URAIAN PEKERJAAN
STN
VOLUME
HO
HO
HO
1,000
3,000
3,000
HO
HO
HO
1,000
6,000
4,000
HO
HO
HO
1,000
8,000
5,000
HO
HO
HO
0,067
0,200
0,200
HO
HO
HO
0,067
0,200
0,200
HO
HO
HO
0,010
0,040
0,040
HO
HO
HO
0,042
0,125
0,250
HO
HO
HO
0,030
0,120
0,120
HO
HO
HO
0,250
0,750
0,750
HO
HO
HO
1,000
1,000
3,000
HO
HO
HO
1,000
3,000
4,000
HARGA
SATUAN
(Rp.)
JUMLAH
HARGA
(Rp.)
No.
12.
13.
14.
15.
16.
URAIAN PEKERJAAN
STN
VOLUME
HO
HO
HO
1,000
2,000
2,000
HO
HO
HO
0,011
0,044
0,048
HO
HO
HO
0,010
0,040
0,040
HO
HO
HO
0,167
0,167
0,333
GROUNDING
Pentanahan / (Set)
- Mandor
- Tukang
- Pekerja
HO
HO
HO
0,157
0,600
0,600
HARGA
SATUAN
(Rp.)
JUMLAH
HARGA
(Rp.)
1.
U R AIAN
STN
VOLUME
M3
Btg
Kg
0,005
0,250
0,020
HRG SATUAN
( Rp. )
Jumlah
Pembulatan
2.
M3
1,200
Jumlah
Pembulatan
3.
Zak
M3
M3
8,300
0,830
0,540
Jumlah
Pembulatan
4.
Zak
M3
M3
5,625
0,910
0,540
Jumlah
Pembulatan
5.
0,400
4,000
Jumlah
Pembulatan
6.
Kg
Kg
110,000
2,000
Jumlah
Pembulatan
7.
Kg
2,250
Jumlah
Pembulatan
8.
1,000
1,000
1,000
Jumlah
Pembulatan
9.
Mtr
Set
Bh
Bh
Bh
Set
72,000
1,000
1,000
1,000
4,000
1,000
Jumlah
Pembulatan
10.
M3
Kg
M2
Jam
Ls
0,106
0,189
1,247
0,007
1,000
Jumlah
Pembulatan
10.
TIANG MONOPOLE / KG
- Besi Pipa / Plat
- Biaya Galvanis
Kg
Kg
1,000
1,000
Jumlah
Pembulatan
JUMLAH
( Rp.)
1.
U R AIAN
STN
VOLUME
Org
Org
0,750
0,025
HRG SATUAN
( Rp. )
Jumlah
Pembulatan
2.
Org
Org
0,100
0,010
Jumlah
Pembulatan
3.
Org
Org
0,250
0,010
Jumlah
Pembulatan
4.
Org
Org
Org
Org
0,100
1,000
0,300
6,000
Jumlah
Pembulatan
5.
Org
Org
Org
Org
0,050
0,500
0,300
6,000
Jumlah
Pembulatan
6.
0,330
3,300
0,200
4,000
Jumlah
Pembulatan
7.
Org
Org
Org
3,000
9,000
9,000
Jumlah
Pembulatan
8.
Kg
2,250
Jumlah
Pembulatan
9.
1,000
1,000
1,000
Jumlah
Pembulatan
10.
Mtr
Set
Bh
Bh
Bh
Set
72,000
1,000
1,000
1,000
4,000
1,000
Jumlah
Pembulatan
JUMLAH
( Rp.)
11.
U R AIAN
STN
VOLUME
Org
Org
Org
0,0099
0,0050
0,0017
HRG SATUAN
( Rp. )
Jumlah
Pembulatan
12.
Org
Org
Org
Org
0,0060
0,0600
0,0040
0,0600
Jumlah
Pembulatan
JUMLAH
( Rp.)