Tahun Anggaran
Perangkat Daerah
Program
Kegiatan
Volume
Lokasi Kegiatan
Sumber Dana
:
:
:
:
:
:
:
NO
URAIAN KEGIATAN
I
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
II
1
2
3
4
5
6
7
8
9
10
11
12
13
14
2016
Dinas Bina Marga Dan Pengelolaan Sumber Daya Air
PEMBANGUNAN JALAN DAN JEMBATAN
Pemindahan Tiang Listrik Sepanjang Jalan Sisi Utara Kalimalang
VOLUME
K. ANALISA
5,00
18,00
17,00
3,00
5,00
69,00
30,00
30,00
69,00
6,00
6,00
23,00
23,00
6,00
15,00
30,00
6,00
253,00
23,00
2.846,00
23,00
115,00
115,00
115,00
bh
bh
set
set
set
bh
set
set
bh
bh
bh
bh
bh
bh
bh
bh
bh
mt
btg
mtr
btg
mtr
bh
bh
15,00
set
3,00
set
3,00
2,00
23,00
23,00
15,00
23,00
0,93
5,00
18,00
15,00
3,00
3,00
2,00
23,00
1,00
1,00
set
set
bh
bh
bh
bh
kms
set
set
set
set
set
set
gw
bh
bh
7,00
21,00
7,00
24,00
63,00
7,00
10,00
2,00
18,00
6,00
2,00
1.248,00
76,00
7,00
bh
bh
bh
bh
mtr
set
set
set
set
set
mtr
bh
btg
mtr
HARGA SATUAN (
Rp )
BIAYA ( Rp )
JUMLAH ( Rp )
15
16
17
18
19
20
68,00
68,00
68,00
7,00
24,00
7,00
bh
bh
bh
bh
bh
bh
21
18,00
bh
22
6,00
bh
23
2,00
bh
24
2,00
bh
6,00
1,20
6,00
35,00
18,00
6,00
2,00
1,00
bh
kms
bh
gw
bh
bh
bh
bh
6,00
98,00
2,00
92,00
500,00
15,00
bh
bh
bh
bh
bh
m
3,00
9,00
3,00
9,00
60,00
3,00
3,00
45,00
18,00
18,00
3,00
9,00
3,00
3,00
3,00
6,00
12,00
9,00
9,00
3,00
3,00
9,00
180,00
24,00
360,00
24,00
24,00
150,00
30,00
30,00
3,00
3,00
set
bh
set
bh
m
set
btg
mt
bh
bh
btg
bh
set
bh
bh
btg
bh
bh
bh
bh
bh
bh
mtr
bh
mtr
bh
bh
mtr
bh
bh
set
set
3,00
3,00
3,00
set
bh
bh
1,00
6,00
2,00
3,00
30,00
set
bh
set
bh
m
25
26
27
28
29
30
31
32
33
34
35
36
37
38
III
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
GARDU CANTOL
Rangka Gardu Cantol
Isolator Tumpu type Pin Post
Travers Tumpu UNP 10 - 1,800 mm
Polymer Arrester 24 KV 10 KA
BC Rara 50 mm
Earthing road 16 x 2500 sqmm + klem
Pipa galvanis 0,75 " x 3 m u/pelindung Ardhe
A3C 70 mm ( u/Jamper )
CCO 150/70
Sepatu Kabel Bie Metal / cu 70 mm
Pipa pelindung kabel 5" + kenie
Klem Begel 5"
Lemari bagi 2 jurusan tiang beton 250 A
KWH MD1/M1D lengkap
Tiang beton 11/350 daN + E ( terpasang )
Pipa pelindung kabel 4" + kenie
Klem Begel 4"
Cut Out 20 KV
Fuse Link 12 A
Tanda kilat kecil untuk tiang TM
Penghalang Panjat
Top Ties 150 mm
Kabel TR NYY 1 x 150 mm2
Sepatu Kabel cu 150 mm
Kabel TR NYY 1 x 70 mm2
Sepatu Kabel cu 70 mm
Joint sleve bimetal AI/Cu 70/70 mm2
Stailess Steel Strip
Link 25 x 25
Stoping Buckle
Pentanahan gardu Cantol
Psg rangka gardu Cantol
Psg hardware gardu Cantol ( PHB TR, Pipa,
Pengaatan TM/TR/TM-18 )
Pasang Pondasi Gardu Cantol 1 PC : 2 PS : 3 Kr
Bongkar Gardu Cantol
IV
1
2
3
4
5
GARDU PORTAL
Rangka Gardu Cantol
Isolator Tumpu type Pin Post
Travers Tumpu UNP 10 - 1,800 mm
Polymer Arrester 24 KV 10 KA
BC Rara 50 mm
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
V
1
2
3
4
5
6
TRAFO
Bongkar Trafo 400 kVA
Bongkar Trafo 160 kVA
Bongkar Trafo 100 kVA
Pasang Trafo 400 kVA
Pasang Trafo 160 kVA
Pasang Trafo 100 kVA
VI
1
2
3
4
5
6
7
LAIN - LAIN
Bongkar Pasang GSW
Bongkar Pasang Kabel Optik (3-5 jalur)
Biaya Pengawasan/Supervisi
Rp KWH tidak terjual (total KWH x Rp/KWH)
Biaya Penjagaan sehari-semalam
Angkutan Pick Up
Foto Dokumentasi
2,00
2,00
15,00
6,00
6,00
1,00
3,00
1,00
1,00
2,00
4,00
12,00
3,00
3,00
2,00
2,00
1,00
3,00
60,00
8,00
240,00
16,00
16,00
50,00
10,00
10,00
set
btg
mt
bh
bh
btg
bh
set
bh
bh
btg
bh
bh
bh
bh
bh
bh
bh
mtr
bh
mtr
bh
mtr
mtr
bh
bh
1,00
1,00
1,00
1,00
bh
bh
set
set
1,00
1,00
1,00
set
bh
bh
1,00
1,00
2,00
1,00
1,00
2,00
bh
bh
bh
bh
bh
bh
23,00
23,00
14,00
1,00
16,00
14,00
3,00
gw
gw
ho
lot
hr
unit
set
JUMLAH I S/D VI
PPN 10%
JUMLAH TOTAL
DIBULATKAN
Terbilang =
..., . 2016
Penawar,
PT/CV
Direktur