Anda di halaman 1dari 4

RINCIAN MATERIAL KEMAJUAN PHISIK PEKERJAAN

PEKERJAAN : PEMASANGAN JARINGAN SUTR


: TC 3 X 70 + 1 X 50 mm
: TERSEBAR PT. PLN ( Persero ) Area Malang
Surat Perjanjian Pihak Pertama No. : 0250.Pj/613/AREA - MLG/2013
Surat Perjanjian Pihak Kedua No. : 0013/SPK/ML - MLG/viI/2013 VOLUME : 3000 Ms
SUMBER DANA : SKKI 01 / SAR / MAL / I / 2013 LOKASI : TERSEBAR PT. PLN ( Persero ) Area Malang

VOLUME VOLUME
NO. URAIAN PEKERJAAN SAT. REALISASI
KONTRAK K.TMB K.KRG KENDALA KETERANGAN

I SUTR 3000 3160


Perencanaan tidak sesuai
dengan realisasi, Realisasi
sesuai kebutuhan lokasi
II TIANG BETTON
1 Tiang betton 9 - 200 daN + E 24 18 6
2 Tiang betton 9 - 200 daN 42 50 8
3 Tiang betton 7 - 100 daN 8 1 7

III POLE ACCESSORIES


GROUNDING DALAM 24 18 6
1 Ground Rod 1.5 mtr + Clamp 24 18 6
2 AAAC 70 sqmm 48 36 12
3 Line Tap Connector 50 - 70 mm type G 24 18 6
4 Terminal Lug 70 mm - AI / CU 48 0 48
5 Terminal Lug 70 mm - AI / CU 0 36 36
6 Bolt M.12 + Washer 48 36 12

IV POLE SUPPORTER
1 Pemasangan Guy Wire Murni 30 34 4
3 Pemasangan Strut Pole 8 2 6

V MATERIAL POLE SUPPORTER


1 Preformed Termination 35 mm 60 68 8
2 Galvanized Steel Wire 35 mm 300 340 40
3 Beton Block 40 X 40 X 10 30 34 4
4 U - Bolt + Steel Plate 30 34 4
5 Guy Wire Rod 5/8 " ( 15 mm ) - 1.800 mm 30 34 4
6 Square Washer 16 8 12
7 Single Guy Wire Band 62 34 28
8 Strut Tie 1200 - Pipe 2" 8 2 6
9 Pipa Pelindung 3/4 " - 2000 30 34 4
10 Single Arm Band 8 2 6
11 Guy Wire Timble 30 34 4
12 Turn Buckle TM ( 5/8" ) 30 34 4
13 Wire Clip 30 34 4
14 Bolt & Nut M. 16 X 50 148 79 69
15 Strut Arm TR 8 2 6

VI POLE TOP ARRANGMENT


1 Pemasangan TR - 1 24 30 6
2 Pemasangan TR - 2 14 26 12
3 Pemasangan TR - 3 24 14 10
4 Pemasangan TR - 6 5 2 3
5 Pemasangan TR - 7 20 16 4

VII MATERIAL POLE TOP ARRANGMENT


1 Small Angle Assembly ( SAA ) 29 31 2
2 Large Angle Assembly ( LAA ) 14 26 12
3 Dead End Assembly ( DEA ) 49 32 17
4 Bundled End Assembly ( BEA ) 24 14 10
5 Crmpresion Connector for Allmunium 70 75 51 24
6 Crmpresion Connector for Allmunium 50 25 17 8

VII CONDUCTOR ACCESORIIES


1 TC 3 X 70 + 1 X 50 sqmm 3060 3160 100
2 Pondasi Type A 10 7 3
3 Stanless Steel Strip 197 176 21

PENGANGKUTAN MATERIAL Ton/m3 9.448 9.532 0.084

Mengetahui/Diperiksa :
PT. PLN (PERSERO) AREA MALANG CV. MULIA
PENGAWAS
BAMBANG SISWANTO MUHLIS FANANI
A T PENYAMBUNGAN Direktur
RENCANA KERJA / S - CURVE
NO. NOTA DINAS : 0013/SPK/ML - MLG/vii/2013
NO.KONTRAK : 0250.Pj/613/AREA - MLG/2013
PEKERJAAN : PEMASANGAN JARINGAN SUTR
: TC 3 X 70 + 1 X 50 mm
LOKASI : TERSEBAR PT. PLN ( Persero ) Area Malang
PELAKSANA : CV. MULIA

Prosentase
NO URAIAN SAT. VOL Rupiah
(%)

A PERSIAPAN
1 Pemesanan Bahan / Pabrikan & Galvanized LS
2 Perijinan LS
3 Asuransi ( Tenaga kerja / Material ) LS
4 Pemeriksaan Kwalitas Barang LS
5 Persetujuan Pelaksanaan Pekerjaan LS
6 Pelaporan Pekerjaan LS

B PELAKSANAAN
I SUTR
1 Tiang betton 9 - 200 daN + E B 18 51,165,360 21.0%
2 Tiang betton 9 - 200 daN B 50 138,236,200 58.0%
3 Tiang betton 7 - 100 daN B 1 1,501,272 11.0% 90.0%

III POLE ACCESSORIES


GROUNDING DALAM S 18
1 Ground Rod 1.5 mtr + Clamp S 18 2,155,662 0.9%
2 AAAC 70 sqmm M 36 452,304 0.8%
3 Line Tap Connector 50 - 70 mm type G B 18 52,200 1.2%
4 Terminal Lug 70 mm - AI / CU B 0
5 Terminal Lug 70 mm - AI / CU B 36 1,900,656 0.8%
6 Bolt M.12 + Washer B 36 183,024 0.2%
3.90%
IV POLE SUPPORTER
1 Pemasangan Guy Wire Murni S 34 18,351,092 0.5% 0.5%
3 Pemasangan Strut Pole S 2 810,798 0.4% 0.4%

VI POLE TOP ARRANGMENT


1 Pemasangan TR - 1 S 30 2,217,900 0.9%
2 Pemasangan TR - 2 S 26 2,158,702 0.9%
3 Pemasangan TR - 3 S 14 2,553,320 0.10%
4 Pemasangan TR - 6 S 2 388,876 0.3%
5 Pemasangan TR - 7 S 16 1,980,640 0.8%
3%

VII CONDUCTOR ACCESORIIES


1 TC 3 X 70 + 1 X 50 sqmm mtr 3160 2,970,400 0.15%
2 Pondasi Type A mtr 7 7,589,295 0.30%
3 Stanless Steel Strip mtr 176 2,722,720 0.70%
1.15%
FINISHING
1 PENGANGKUTAN MATERIAL Ton/m3 9.532 2,685,106 1.0% 1.0%

JUMLAH 240,075,527 100%

PPN 10 % 24,007,552

JUMLAH 264,083,079

Dibulatkan 264,083,079
RENCANA KERJA / S - CURVE
NO. NOTA DINAS : 1075/041/MA-MLG/2013 Tgl. 1 Oktober 2013
NO.KONTRAK : 309.Pj/631/AREA-MLG/2013 Tgl. 23 September 2013
PEKERJAAN : PEMASANGAN SUTM & GTT KHUSUS 2 TIANG
LOKASI : PENGGILINGAN BATU SINAR JAYA JL. BARAN PAGEDANGAN GONDANGLEGI
PELAKSANA : CV. TOMAH JAYA

Bulan Oktober Nopember


Prosentase
Tgl. Mulai 1 8 15 22 1 8 15 22
NO URAIAN SAT. VOL Rupiah Jumlah KETERANGAN
Tgl. Akhir 7 14 21 31 7 14 21 30
(%)
Minggu ke I II III IV I II III IV

A PERSIAPAN
1 Pemesanan Bahan / Pabrikan & Galvanized LS
2 Perijinan LS
3 Asuransi ( Tenaga kerja / Material ) LS
4 Pemeriksaan Kwalitas Barang LS
5 Persetujuan Pelaksanaan Pekerjaan LS
6 Pelaporan Pekerjaan LS

B PELAKSANAAN
I SUTM
1 Tiang Beton BH 1 5,868,650 11.54 % 11.54

2 Pole Suporter SET - 100%

3 Pole Top Arrangement SET 2 5,506,114 10.83 % 10.83

4 Konstruksi Grounding untu GW Clamp SET -


5 Anti Clambing + Danger Plate SET 1 57,708 0.11 % 0.11

6 Conduktor Acsesories KMS 0.06 -


7 AAAC-S 150 sqmm ( SPLN ) MS 184 250,240 0.49 % 11,682,712 75% 0.49

22.97 % 22.97 %
II GTT
1 Transformator UNIT 1 10,153,083 19.97 % 8.07 11.90

2 Tiang Beton BH 2 14,675,754 28.86 % 28.86

3 Pole Top Arrangement SET 2 5,506,114 10.83 % 50% 10.83

4 Conduktor & Acsesories Gardu Cantol SET 1 1,083,509 2.13% 2.13

5 Grounding Dalam SET 2 709,270 1.39 % 1.39

6 Rangka Dudukan Trafo & APP Type Khusus SET 1 5,049,000 9.93 % 9.93

7 Kabel M 34 920,380 1.81 % 1.81

8 Pondasi GTT SET 1 635,250 1.25 % 38,732,360 25% 1.25

76.17 % 76.17 %
FINISHING
1 PENGANGKUTAN MATERIAL Ton/m 1.418 432,446 0.85 % 0.85 % 0.45 0.40

JUMLAH 50,415,072 100% 100% 0%

0.00 0.00 11.54 28.86 40.26 17.69 1.65


PPN 10 % 5,041,507 SASARAN MINGGUAN

0.00 0.00 11.54 40.40 80.66 98.35 11.54


JUMLAH 55,456,579 KOMULATIVE

Dibulatkan 43,463,000

Mengetahui, PELAKSANA
PENGAWAS PEKERJAAN CV. TOMAH JAYA

TRIKORO BUDI PRANYOTO NARKHOLIS S.

Anda mungkin juga menyukai