PT.

TIGA BINTANG TEHNIK


KONTRAKTOR DAN INSTALATUR
Alamat: Jln.Ekonomi Reremi Manokwari
PAPUA BARAT

PEMBANGUNAN GARDU DISTRIBUSI CONROL 3 PHASE


PT PLN (Persero) UIW PPB -UP2K PAPUA BARAT -UP3 MANOKWARI
MEMTUBEY,SRUBEY,JUUK,HIMUT DAN MEMUD DISTRIK ANGGI KABUPATEN PEGUNUNGAN ARFAK PROVINSI PAPUA BARAT

TYPE : CANTOL
JENIS : 3 PHASA
VOLUME : 1 / 25 UNIT/KVA
HARGA SATUAN JUMLAH HARGA JUMLAH HARGA
NO. URAIAN PEKERJAAN/MATERIAL SAT. VOL.
MATERIAL JASA MATERIAL JASA KESELURUHAN
A MATERIAL DISTRIBUSI UTAMA
1 Trafo Distribusi 3 Phasa 50 kVA Unit 1 4.250.000 4.250.000 4.250.000
2 Tiang Besi 12 Meter 200 daN Btg 1 970.000 970.000 970.000
3 Isolator Tarik 20 kV Set 1 82.900 82.900 82.900
5 Lightning Arrester 20 kV Set 1 165.500 165.500 165.500
6 Fuse Cut Out 20 kV Set 1 156.200 156.200 156.200
- - -
B MATERIAL PELENGKAP/ACCESSORIES - - -
1 Dudukan Trafo Cantol Set 1 3.996.300 754.300 3.996.300 754.300 4.750.600
- Travers UNP 10/5 mm2 - 2000 MM btg 2 815.000 296.000 1.630.000 592.000 2.222.000
- U-Bolt Bh 5 86.300 - 431.500 - 431.500
- LNP Breace 50.50.5-1000 mm + bolt Btg 4 126.500 - 506.000 - 506.000
- Arm Band type-I set 5 103.500 - 517.500 - 517.500
- Double Arm Bolt M16-350 mm bh 12 69.000 - 828.000 - 828.000
- Adaptor Supporting Insulator bh 1 117.840 16.500 117.840 16.500 134.340
2 Al Binding wire PVC Counded (Hitam) mtr 3 9.000 16.500 27.000 49.500 76.500
3 Clamp Type H Compresion bh 12 17.700 34.600 212.400 415.200 627.600
4 LV Panel Bagi TR 2 group unit 4 2.950.000 11.800.000 11.800.000
- Travers UNP 10/5 mm2 - 2,4 Mtr (dudukan LV Panel) set 4 1.543.200 - 6.172.800 - 6.172.800
Kabel NYY 1x70 mm2 mtr 150 43.990 6.598.500 6.598.500
- Protection/Bushing Trafo,LA & FCO set 1 1.020.000 412.200 1.020.000 412.200 1.432.200
5 Schoen Cable Bimetal Al Cu (LA&FCO) bh 12 75.300 - 903.600 - 903.600
6 - Schoen Cable CU (Trafo & Rak TR) bh 16 81.000 - 1.296.000 - 1.296.000
7 Pipa Pelindung Kabel set - -
- Pipa Galvanised 3" btg 12 891.300 503.100 10.695.600 6.037.200 16.732.800
-Kaniel/Elbow 3" bh 9 150.000 - 1.350.000 - 1.350.000
- Pegangan Pipa UNP 8/5 + Beugel btg 8 290.900 - 2.327.200 - 2.327.200
8 Pentanahan Trafo, Arrester & Panel TR set 3 - 1.293.700 - 3.881.100 3.881.100
- Kawat BC 50 mm mtr 50 103.800 - 5.190.000 - 5.190.000
- Stainlees Steel Strip + Stoping beugle mtr 24,0 24.600 - 590.400 - 590.400
- Pipa Pelindung Arde 1/2" 6mm btg 3 155.300 - 465.900 - 465.900
- Ground Rod 2,10 mtr - Scond Cable btg 3 1.132.800 - 3.398.400 - 3.398.400
- LNP 50,50,5-4000 mm btg 3 302.500 154.400 907.500 463.200 1.370.700
9 Penghalang Panjat unit 1 132.300 17.100 132.300 17.100 149.400
10 Tanda Kilat 20 V (Besar) Bh 2 109.300 45.800 218.600 91.600 310.200
11 Pondasi Gardu Cantol & Lantai Kerja Ttk 1 1.293.750 413.500 1.293.750 413.500 1.707.250
12 Pengecatan Tiang ; Ttk 1 - 51.800 - 51.800 51.800
- Cat Hitam Kg 0,8 92.000 - 73.600 - 73.600
- Cat Perak/Silver Kg 3,2 92.000 - 294.400 - 294.400
Jumlah 44.596.590 37.218.300 81.814.890