PT PLN (PERSERO) RAB : SISIP TRAFO OVERLOAD UP3 SAUMLAKI 2022

UNIT INDUK WILAYAH MALUKU DAN MALUKU UTARA


UNIT PELAKSANA PELAYANAN PELANGGAN SAUMLAKI LOKASI : PT. PLN (PERSERO) - UP3 SAUMLAKI
SUMBER DANA :

NO URAIAN PEKERJAAN SAT VOLUME HARGA SATUAN JUMLAH HARGA KET


MATERIAL JASA MATERIAL JASA TOTAL
1 2 3 4 7 8 10 = (6 x 3) 11 = (4 x 3) 13 = (10 + 11 + 12) 14
A. JARINGAN TEGANGAN MENENGAH
I PEMASANGAN MATERIAL
MATERIAL DISTRIBUSI UTAMA ( MDU )
1 Pemasangan Tiang Besi 12 Mtr 200 dAN
- Pemasangan tiang pada tanah cadas btg 8 8,005,000 960,400 64,040,000 7,683,200 71,723,200
2 Konduktor A3C-S 70 mm² mtr 5,250 15,940 2,300 83,685,000 12,075,000 95,760,000
3 Lightining Arrester 20 kV 5 kA bh 0 670,450 103,800 PLN - -
4 Cut Out 20 KV + Fuse Link bh 0 905,550 103,800 PLN - -
3 Isolator Tumpu (Pin Post) + Asesories bh 188 235,600 40,100 44,292,800 7,538,800 51,831,600
4 Isolator Tarik (Suspension) + Asesories set 12 241,000 96,500 2,892,000 1,158,000 4,050,000
MATERIAL PELENGKAP ( AKSESORIS )
1 Kontruksi TM-1 S/B ( Konstruksi T. Penumpu) set 44 1,803,901 292,712 79,371,644 12,879,337 92,250,981
2 Kontruksi TM-2 S/B ( Konstruksi T. Penumpu Ganda) set 1 4,429,821 750,512 4,429,821 750,512 5,180,333
3 Kontruksi TM-5 S/B ( Konstruksi T. Tarik Ganda) set 2 4,610,287 767,104 9,220,574 1,534,208 10,754,782
4 Pelat Tanda Bahaya Pada Tiang TM set 8 189,365 9,085 1,514,920 72,679 1,587,599
5 Penghalang Panjat set 8 183,395 9,085 1,467,159 72,679 1,539,838

LAIN-LAIN
1 Pengecatan Tiang 12 mtr 200 dAN ( 1 tiang = 0,047 m3) btg 8 168,200 138,900 1,345,600 1,111,200 2,456,800
2 Manset Tiang 12 mtr 200 dAN ( 1 tiang = 0,047 m3) m3 0.376 289,800 95,200 108,965 35,795 144,760

JUMLAH 292,368,482 44,911,411 337,279,893


B. JARINGAN TEGANGAN RENDAH
I. PEMASANGAN MATERIAL
1 TR-3A S/B ( Konstruksi T. Awal) set 16 43,530 133,000 696,480 2,128,000 2,824,480

JUMLAH 696,480 2,128,000 2,824,480


C. GARDU DISTRIBUSI
I. PEMASANGAN MATERIAL
MATERIAL DISTRIBUSI UTAMA ( MDU )
1 Trafo 25 KVA; 3 Phase bh 0 PLN 1,368,523 PLN - -
2 Trafo 50 KVA; 3 Phase bh 5 23,274,900 1,877,077 116,374,500 9,385,385 125,759,885
1 Trafo 100 KVA; 3 Phase bh 2 33,366,100 2,189,956 66,732,200 4,379,913 71,112,113
2 Trafo 160 KVA; 3 Phase bh 1 34,416,100 2,193,600 34,416,100 2,193,600 36,609,700
3 Trafo 200 KVA; 3 Phase bh 0 PLN 2,406,200 PLN - -
4 Trafo 250 KVA; 3 Phase bh 0 PLN 2,753,600 PLN - -
2 Lighting Arrester 20 KV - 5 kA (1 set = 3 bh) bh 24 696,700 166,223 16,720,800 3,989,363 20,710,163
3 Cut Out 20 KV + Fuse Link bh 24 905,550 166,223 21,733,200 3,989,363 25,722,563
4 Konduktor AAAC-S 70 mm2 mtr 120 16,110 2,895 1,933,200 347,422 2,280,622
5 Lemari Bagi (LVSB 400 A - 4 Jurusan 3 Phase) bh 3 14,410,000 240,500 14,410,000 721,500 15,131,500
6 Lemari Bagi (LVSB 250 A - 2 Jurusan 3 Phase) bh 5 10,249,000 181,099 51,245,000 905,493 52,150,493
7 Kabel NYY 95 mm2 mtr 288 121,070 10,383 34,868,160 2,990,225 37,858,385
8 Kabel NYY 70 mm2 mtr 576 83,550 7,987 48,124,800 4,600,346 52,725,146
MATERIAL PELENGKAP ( AKSESORIS )
1 Pemasangan Bordes/Dudukan Trafo ( Gd. Cantol ) set - 2,200,440 365,100 - - -
2 Pemasangan Penguat Pipa Opstic ( Gd. Cantol ) set - 1,568,280 295,600 - - -
3 Pemasangan Grounding Arrester ( Gd. Cantol ) set - 1,569,600 148,350 - - -
4 Pemasangan Grounding Body Trafo ( Gd. Cantol ) set - 1,047,750 113,000 - - -
5 Pemasangan Grounding Netral Trafo ( Gd. Cantol ) set - 537,990 42,250 - - -
6 Pemasangan Material Pendukung Gardu Dis ( Gd. Cantol ) set - 3,874,630 1,131,756 - - -
1 Pemasangan Bordes/Dudukan Trafo ( Gd. Portal ) set 8 4,214,997 891,916 33,719,978 7,135,329 40,855,306
2 Pemasangan Penguat Pipa Opstic ( Gd. Portal ) set 8 2,833,566 517,140 22,668,525 4,137,117 26,805,642
3 Pemasangan Grounding Arrester ( Gd. Portal ) set 8 1,166,929 148,104 9,335,428 1,184,829 10,520,257
4 Pemasangan Grounding Body Trafo ( Gd. Portal ) set 8 732,681 112,812 5,861,448 902,498 6,763,946
5 Pemasangan Grounding Netral Trafo ( Gd. Portal ) set 8 333,855 42,180 2,670,836 337,439 3,008,275
6 Pemasangan Material Pendukung Gardu Dis ( Gd. Portal ) set 8 4,161,806 1,288,552 33,294,446 10,308,417 43,602,863

JUMLAH 514,108,621 57,508,238 571,616,859


II PEMBONGKARAN JARINGAN DISTRIBUSI
I PEMBONGKARAN MATERIAL
MATERIAL DISTRIBUSI UTAMA ( MDU )
1 Kabel A3C 70 mm mtr 3850 Pasang Kembali 1,150 Pasang Kembali 4,427,500 4,427,500

MATERIAL PELENGKAP ( AKSESORIS )


1 Kontruksi TM-1 S/B ( Konstruksi T. Penumpu) set 28 KODE 3 146,356 KODE 3 4,097,971 4,097,971
2 Kontruksi TM-2 S/B ( Konstruksi T. Penumpu Ganda ) set 1 KODE3 375,256 KODE3 375,256 375,256
3 Kontruksi TM-5 S/B ( Konstruksi T.Tarik Ganda) set 2 KODE 3 383,552 KODE 3 767,104 767,104

JUMLAH 9,667,831 9,667,831

III BIAYA ANGKUTAN MATERIAL


1 Zona 1 Darat m3/ton 3 - 1,943,472 6,413,458 6,413,458
2 Zona 3 Laut m3/ton 19.8 - 5,753,808 113,925,398 113,925,398
-
IV DOKUMENTASI DAN PELAPORAN -
1 Dokumentasi dan Pelaporan Lot 4 - 1,200,000 - 4,800,000 4,800,000
JUMLAH III - 125,138,856 125,138,856

JUMLAH : 807,173,583 239,354,335 1,046,527,918


PPN 11% : 88,789,094 26,328,977 115,118,071
TOTAL : 895,962,678 265,683,312 1,161,645,989
DIBULATKAN : 895,962,700 265,683,300 1,161,646,000

Saumlaki, Januari 2022


Menyetujui Membuat
MANAGER MB JAR DAN KONS

ROBERT LEIMENA ARDALIN ABDULLAH


PT PLN (PERSERO) RAB : SISIP TRAFO OVERLOAD UP3 SAUMLAKI 2022
UNIT INDUK WILAYAH MALUKU DAN MALUKU UTARA
UNIT PELAKSANA PELAYANAN PELANGGAN SAUMLAKI LOKASI : PT. PLN (PERSERO) - UP3 SAUMLAKI
SUMBER DANA :

NO URAIAN PEKERJAAN SAT VOLUME HARGA SATUAN JUMLAH HARGA KET


MATERIAL JASA MATERIAL JASA TOTAL
1 2 3 4 7 8 10 = (6 x 3) 11 = (4 x 3) 13 = (10 + 11 + 12) 14
B. JARINGAN TEGANGAN MENENGAH
I PEMASANGAN MATERIAL
MATERIAL DISTRIBUSI UTAMA ( MDU )
1 Pemasangan Tiang Besi 12 Mtr 200 dAN
- Pemasangan tiang pada tanah cadas btg 8 8,005,000 960,400 64,040,000 7,683,200 71,723,200
2 Konduktor A3C-S 70 mm² mtr 0 15,940 2,300 - - -
3 Lightining Arrester 20 kV 5 kA bh 0 670,450 103,800 PLN - -
4 Cut Out 20 KV + Fuse Link bh 0 905,550 103,800 PLN - -
3 Isolator Tumpu (Pin Post) + Asesories bh 96 235,600 40,100 22,617,600 3,849,600 26,467,200
4 Isolator Tarik (Suspension) + Asesories set 0 241,000 96,500 - - -
MATERIAL PELENGKAP ( AKSESORIS )
1 Kontruksi TM-1 S/B ( Konstruksi T. Penumpu) set 16 1,803,901 292,712 28,862,416 4,683,395 33,545,811
2 Pelat Tanda Bahaya Pada Tiang TM set 8 189,365 9,085 1,514,920 72,679 1,587,599
3 Penghalang Panjat set 8 183,395 9,085 1,467,159 72,679 1,539,838

LAIN-LAIN
1 Pengecatan Tiang 12 mtr 200 dAN ( 1 tiang = 0,047 m3) btg 8 168,200 138,900 1,345,600 1,111,200 2,456,800
2 Manset Tiang 12 mtr 200 dAN ( 1 tiang = 0,047 m3) m3 0.376 289,800 95,200 108,965 35,795 144,760

JUMLAH 119,956,659 17,508,549 137,465,208


C. JARINGAN TEGANGAN RENDAH
I. PEMASANGAN MATERIAL
1 TR-3A S/B ( Konstruksi T. Awal) set 16 43,530 133,000 696,480 2,128,000 2,824,480

JUMLAH 696,480 2,128,000 2,824,480


D. GARDU DISTRIBUSI
I. PEMASANGAN MATERIAL
MATERIAL DISTRIBUSI UTAMA ( MDU )
1 Trafo 25 KVA; 3 Phase bh 0 PLN 1,368,523 PLN - -
2 Trafo 50 KVA; 3 Phase bh 5 23,274,900 1,877,077 116,374,500 9,385,385 125,759,885
1 Trafo 100 KVA; 3 Phase bh 2 33,366,100 2,189,956 66,732,200 4,379,913 71,112,113
2 Trafo 160 KVA; 3 Phase bh 1 34,416,100 2,193,600 34,416,100 2,193,600 36,609,700
3 Trafo 200 KVA; 3 Phase bh 0 PLN 2,406,200 PLN - -
4 Trafo 250 KVA; 3 Phase bh 0 PLN 2,753,600 PLN - -
2 Lighting Arrester 20 KV - 5 kA (1 set = 3 bh) bh 24 696,700 166,223 16,720,800 3,989,363 20,710,163
3 Cut Out 20 KV + Fuse Link bh 24 905,550 166,223 21,733,200 3,989,363 25,722,563
4 Konduktor AAAC-S 70 mm2 mtr 120 16,110 2,895 1,933,200 347,422 2,280,622
5 Lemari Bagi (LVSB 400 A - 4 Jurusan 3 Phase) bh 3 14,410,000 240,500 14,410,000 721,500 15,131,500
6 Lemari Bagi (LVSB 250 A - 2 Jurusan 3 Phase) bh 5 10,249,000 181,099 51,245,000 905,493 52,150,493
7 Kabel NYY 95 mm2 mtr 288 121,070 10,383 34,868,160 2,990,225 37,858,385
8 Kabel NYY 70 mm2 mtr 576 83,550 7,987 48,124,800 4,600,346 52,725,146
MATERIAL PELENGKAP ( AKSESORIS )
1 Pemasangan Bordes/Dudukan Trafo ( Gd. Cantol ) set - 2,200,440 365,100 - - -
2 Pemasangan Penguat Pipa Opstic ( Gd. Cantol ) set - 1,568,280 295,600 - - -
3 Pemasangan Grounding Arrester ( Gd. Cantol ) set - 1,569,600 148,350 - - -
4 Pemasangan Grounding Body Trafo ( Gd. Cantol ) set - 1,047,750 113,000 - - -
5 Pemasangan Grounding Netral Trafo ( Gd. Cantol ) set - 537,990 42,250 - - -
6 Pemasangan Material Pendukung Gardu Dis ( Gd. Cantol ) set - 3,874,630 1,131,756 - - -
1 Pemasangan Bordes/Dudukan Trafo ( Gd. Portal ) set 8 4,214,997 891,916 33,719,978 7,135,329 40,855,306
2 Pemasangan Penguat Pipa Opstic ( Gd. Portal ) set 8 2,833,566 517,140 22,668,525 4,137,117 26,805,642
3 Pemasangan Grounding Arrester ( Gd. Portal ) set 8 1,166,929 148,104 9,335,428 1,184,829 10,520,257
4 Pemasangan Grounding Body Trafo ( Gd. Portal ) set 8 732,681 112,812 5,861,448 902,498 6,763,946
5 Pemasangan Grounding Netral Trafo ( Gd. Portal ) set 8 333,855 42,180 2,670,836 337,439 3,008,275
6 Pemasangan Material Pendukung Gardu Dis ( Gd. Portal ) set 8 4,161,806 1,288,552 33,294,446 10,308,417 43,602,863

JUMLAH 514,108,621 57,508,238 571,616,859


JUMLAH I 634,761,760 77,144,786 711,906,547

III BIAYA ANGKUTAN MATERIAL


1 Zona 1 Darat m3/ton 3 1,943,472 6,413,458 6,413,458
2 Zona 3 Laut m3/ton 19.5 5,753,808 112,199,256 112,199,256

IV DOKUMENTASI DAN PELAPORAN


1 Dokumentasi dan Pelaporan Lot 4 - 1,200,000 - 4,800,000 4,800,000
JUMLAH III - 123,412,714 123,412,714

JUMLAH : 634,761,760 200,557,500 835,319,260


PPN 11% : 69,823,794 22,061,325 91,885,119
TOTAL : 704,585,554 222,618,825 927,204,379
DIBULATKAN : 704,585,600 222,618,800 927,204,400
Saumlaki, Januari 2022
Menyetujui Membuat
MANAGER MB JAR DAN KONS

ROBERT LEIMENA ARDALIN ABDULLAH


DAFTAR TRAVO OL >80% UP3 SAUMLA

NO NOGARDU UNITUP PENYULANG PHASEGD DAYA


1 OLB2P1 41710 DALAM KOTA SAUMLAKI 3 100
2 MOA002P1 41720 LUAR KOTA MOA 3 100
3 MOA003P1 41720 LUAR KOTA MOA 3 50
4 MOA018P1 41720 DALAM KOTA MOA 3 100
5 MOA025P1 41720 DALAM KOTA MOA 3 50
6 PAPULAP1 41720 PENYULANG WONRELI 1 50
7 SUMPALIP1 41720 PENYULANG WONRELI 1 25
8 TOMRA2P1 41720 FEEDER BARAT SERWARU 3 50
9 OLL1P1 41710 DALAM KOTA SAUMLAKI 3 100
10 BUTIMIAUP1 41720 FEDEER TIMUR SERWARU 3 50
11 LEUNP1 41720 PENYULANG WONRELI 3 25

DAFTAR SPB TRAFO WILAYAH

NO TRAFO (KVA) REN MDU WIL SUDAH DATANG BELUM DATANG


1 250 1 1 0
2 200 5 0 5
3 160 3 1 2
4 100 11 7 4
5 50 11 7 4

DAFTAR SPB LVSB WILAYAH

NO LVSB (A) REN MDU WIL SUDAH DATANG BELUM DATANG


1 400 2 JUR 9 4 5
3 400 4 JUR 19 0 19
L >80% UP3 SAUMLAKI

BEBAN PROSEN KETERANGAN RENCANA SPBJ


91.96 91.96 Sisip Travo 160 kva
95.08 95.08 Sisip Travo 100 kva
55.46 110.92 Sisip Travo 50 kva
95.35 95.35 Sisip Travo 100 kva
tanggal 20 Des 2022
54.75 109.49 Sisip Travo 50 kva
108.29 216.58 Sisip Travo 100 kva (Jaringan 1 Phase)
28.81 115.25 Sisip Travo 50 kva
55.35 110.7 Sisip Travo 50 kva
85.14 85.14 Sisip Travo 100 kva
43.38 86.77 Sisip Travo 100 kva rencana RKAP 2023
20.49 81.97 Sisip Travo 50 kva
JUMLAH STOCK SALDO SAP TRAFO UP3 SAUMLAKI

NO TRAFO (KVA) UNIT KEBUTUHAN TAMBAH


1 250 3 0
2 160 2 0
3 100 5 2
4 50 6 1

JUMLAH STOCK SALDO SAP LVSB UP3 SAUMLAKI

NO LVSB (A) UNIT KEBUTUHAN TAMBAH


1 600 0 0
2 400 0 5
3 250 2 6
KETERANGAN

SUDAH DIPAKAI PASANG BARU


SUDAH DIPAKAI PASANG BARU
UIW : UIW. MMU
UP3 : UP3 TOBELO

DA

NO NOGARDU UNIT PENYULANG ALAMAT PHASE KAPASITAS

1 41610 MLF027 MALIFUT UTARA BOBAWA 3 50


2 41610 TBL089 TOBELO UTARA GORUA 4 3 100
3 41610 TBL077 TOBELO SELATAN TANJUNG NIARA 3 50
4 41610 TBL087 TOBELO UTARA GORUA 2 3 50
5 41610 TBL121 TOBELO UTARA DOKULAMO PASAR 3 50
6 41610 TBL157 TOBELO TOGOLI TIOUA 3 100
7 41610 TLN01 TOLONUO TOLONUO 3 50
8 41610 MLF002 MALIFUT KOTA SAMSUMA 3 50
9 41610 TBL075 TOBELO SELATAN PITU 3 3 50

SALDO SAP UP3 TOBELO SPB M


TRAFO TRAFO
NO JMLH KEBUTUHAN TAMBAH NO
(KVA) (KVA)
1 250 2 0 1 50
2 160 1 0 2 100
3 100 2 0
4 50 6 0
DAFTAR GARDU DISTRIBUSI BEBAN LEBIH DARI 80 PERSEN
BEBAN HASIL UKUR
ARUS KEBUTUHAN TRAFO
TGLUKUR RENCANA TINDAK LANJUT
KVA PROSEN (KVA)

58,63 #VALUE! 9/15/2022 SISIP TRAFO 50


81,77 #VALUE! 11/26/2022 MUTASI TRAFO 250
42,09 #VALUE! 9/10/2022 SISIP TRAFO 50
49,35 #VALUE! 11/26/2022 MUTASI TRAFO 100
41,36 #VALUE! 8/13/2022 MUTASI TRAFO 100
81,01 #VALUE! 10/26/2022 SISIP TRAFO 50
44,47 #VALUE! 7/22/2022 MUTASI TRAFO 100
46,11 #VALUE! 9/25/2022 MANAJEMEN TRAFO
41,02 #VALUE! 8/20/2022 MANAJEMEN TRAFO

SPB MDU TRAFO UP3 TOBELO

JMLH NOMOR KONTRAK


4 0445.SPBJ/DAN.01.01/D17000000/2022
3 0471.SPBJ/DAN.01.01/D17000000/2022
ERSEN
SUMBER NO. PRK NOMOR KONTRAK
ANGGARAN

AI 2022 2022.WMMU.2.008 0051.SPBJ/DAN.01.03/F17100000/2022


AI 2022 2022.WMMU.2.008 0051.SPBJ/DAN.01.03/F17100000/2022
AI 2023
AI 2023
AI 2023
AI 2023
AI 2023
KETERANGAN

On progress pekerjaan
On progress pekerjaan
Rencana Kerja RKAP 2023
Rencana Kerja RKAP 2023
Rencana Kerja RKAP 2023
Rencana Kerja RKAP 2023
Rencana Kerja RKAP 2023
Manuver beban ke trafo terdekat
Manuver beban ke trafo terdekat
SEBELUM PEKERJAAN SETELAH PEKERJAAN
UNIT NO GARDU PROSE
DAYA BEBAN PROSEN DAYA BEBAN
N
TTE 204 50 67.47 135% 160 67.47 42%
TTE 240 50 40.95 81% 50 20.95 42%
50 20 40%
TTE 248 50 48.11 96% 50 20.11 40%
50 28 56%
TTE 313 100 81.83 82% 100 31.83 32%
100 50 50%
TTE 345 100 80.36 80% 100 30.36 30%
100 50 50%
TTE 351 100 81.83 82% 100 51.83 52%
50 30 60%
TTE118 25 20.04 82% 50 20.04 40%
TTE126 50 42.43 85% 50 22.43 45%
50 20 40%
TTE127 200 202.12 101% 200 132.12 66%
100 70 70%
TTE137 50 71.87 144% 160 71.87 45%
TTE15 200 166.83 83% 200 106.83 53%
100 60 60%
TTE171 100 86.32 86% 100 26.32 26%
100 60 60%
TTE18 200 164.75 82% 200 104.75 52%
ULP TERNATE
100 60 60%
TTE214 50 56.19 112% 100 56.19 56%
TTE215 50 42.771 85% 50 22.771 46%
50 20 40%
TTE216 50 44.15 88% 100 44.15 44%
TTE225 100 83.66 84% 100 23.66 24%
100 60 60%
TTE267 50 48.02 96% 50 18.02 36%
50 30 60%
TTE272 160 153.84 96% 160 93.84 59%
100 60 60%
TTE280 100 82.23 82% 100 22.23 22%
100 60 60%
TTE46 160 130.02 81% 160 70.02 44%
100 60 60%
TTE57 160 167.74 105% 160 112.74 70%
100 55 55%
TTE66 160 146.07 92% 160 82.07 51%
100 64 64%
TTE93 200 160.64 80% 200 103.64 52%
100 57 57%
TTE96 25 21.47 86% 50 21.47 43%
KAYOA02 50 54.44 109% 50 29.44 59%
50 25 50%
KAYOA13 25 23.38 94% 25 8.38 34%
ULP SOASIO 50 15 30%
SOA109 50 47.76 96% 100 47.76 48%
ULP SOASIO

SOA60 50 44.26 89% 100 44.26 44%


SOA68 50 48.28 97% 100 48.28 48%
BEG04 50 56.57 113% 50 11.57 23%
100 45 45%
BEG09 50 65.14 130% 50 20.14 40%
100 45 45%
BEG18 50 42.37 85% 50 22.37 45%
50 20 40%
FLH 16 50 40.26 81% 50 30.26 61%
ULP SANANA
25 10 40%
FLH 17 100 94.45 94% 100 69.45 69%
50 25 50%
FLH05 25 13.55 86% 50 13.55 27%
ISD1 50 42.27 85% 50 22.27 45%
50 20 40%
KTA15 50 44.32 89% 50 24.32 49%
50 20 40%
BCN 130 50 59.22 118% 50 33.22 66%
50 26 52%
BCN05 50 45.83 92% 50 22.83 46%
50 23 46%
BCN102 25 44.24 177% 25 14.24 57%
50 30 60%
BCN109 50 81.16 162% 50 31.16 62%
100 50 50%
BCN112 50 54.93 110% 50 28.93 58%
50 26 52%
BCN115 160 142.23 89% 250 142.23 57%
BCN15 25 33.39 134% 25 12.39 50%
50 21 42%
BCN166 250 249.37 100% 250 184.37 74%
100 65 65%
BCN19 50 40.96 82% 50 20.96 42%
50 20 40%
BCN20 100 81.02 81% 100 56.02 56%
50 25 50%
BCN36 100 95.85 96% 100 65.85 66%
50 30 60%
BCN38 100 105.65 106% 160 105.65 66%
ULP BACAN
BCN41 50 52.79 106% 100 52.79 53%

BCN43 50 46.01 92% 50 26.01 52%


50 20 40%
BCN51 100 85.99 86% 100 55.99 56%
50 30 60%

BCN67 50 52.07 105% 100 52.07 52%

BCN74 50 47.06 94% 50 27.06 54%


50 20 40%
BCN77 100 111.35 111% 200 111.35 56%
BCN87 50 40.73 81% 50 20.73 41%
50 20 40%
BCN88 50 40 80% 50 20 40%
50 20 40%
BCN92 100 99.59 100% 100 49.59 50%
100 50 50%
JKO01 50 52.96 106% 50 27.96 56%
50 25 50%
SKT11 25 21.22 85% 25 6.22 25%
UL[P SAKETA
50 15 30%
LW 22 50 48.42 97% 50 28.42 57%
50 20 40%
LW02 50 41.85 83% 50 16.85 34%
50 25 50%
LW06 100 80.08 80% 100 52.08 52%
50 28 56%
LW13 50 42.65 85% 50 32.65 65%
ULP LAIWUI
25 10 40%
LW18 25 30.98 124% 50 30.98 62%
MDPLO 05 50 47.65 95% 50 27.65 55%
50 20 40%
MDPLO03 50 47.23 94% 50 27.23 54%
50 20 40%
MDPLO04 50 49.07 98% 50 29.07 58%
50 20 40%
MGL14 50 53.63 107% 50 27.63 55%
50 26 52%
ULP DOFA MGL15 50 47.81 96% 50 22.81 46%
50 25 50%
MGL17 50 48.64 97% 50 23.64 47%
50 25 50%
BBG 28 50 45.71 91% 100 45.71 46%
BBG 33 100 84.01 84% 100 59.01 59%
50 25 50%
BBG14 25 24.32 97% 25 14.32 57%
25 10 40%
ULP BOBONG BBG15 50 54.36 109% 50 29.36 59%
50 25 50%
BBG17 50 76.94 154% 100 76.94 77%
BBG4 100 88.01 88% 100 63.01 63%
50 25 50%
BBG44 25 20.49 82% 50 20.49 41%
JENIS PEKERJAAN
UPRATING TRAFO BARU 160 KVA
SISIP TRAFO BARU 50 KVA EX TTE 204

SISIP TRAFO BARU 50 KVA

SISIP TRAFO BARU 50 KVA

SISIP TRAFO BARU 50 KVA

SISIP TRAFO BARU 50 KVA EX TTE214


UPRATING TRAFO BARU 50 KVA (TRAFO 25 KVA RETUR KE GUDANG)
SISIP TRAFO BARU 50 KVA EX TTE 137

SISIP TRAFO BARU 100 KVA


UPRATING TRAFO BARU 160 KVA
SISIP TRAFO BARU 100 KVA

UPRATING TRAFO 160 KVA

SISIP TRAFO BARU 100 KVA


UPRATING TRAFO BARU 100 KVA
SISIP TRAFO BARU 50 KVA EX TTE216
UPRATING TRAFO BARU 100 KVA
SISIP TRAFO BARU 100 KVA

SISIP TRAFO BARU 50 KVA

SISIP TRAFO BARU 100 KVA

SISIP TRAFO BARU 100 KVA

SISIP TRAFO BARU 100 KVA

SISIP TRAFO BARU 100 KVA

SISIP TRAFO BARU 100 KVA

SISIP TRAFO BARU 100 KVA


UPRATING TRAFO BARU 50 KVA (TRAFO 25 KVA RETUR KE GUDANG)
SISIP TRAFO BARU 50 KVA

SISIP TRAFO BARU 50 KVA


RELOKASI TRAFO 100 KVA SOA 128 DENGAN TRAFO 50 SOA 109
RELOKASI TRAFO 100 KVA SOA 132 DENGAN TRAFO 50 SOA60
RELOKASI TRAFO 100 KVA SOA 133 DENGAN TRAFO 50 SOA68
SISIP TRAFO BARU 100 KVA

SISIP TRAFO BARU 100 KVA

SISIP TRAFO BARU 50 KVA

SISIP TRAFO BARU 25 KVA EX FLH05

SISIP TRAFO BARU 50 KVA


UPRATING TRAFO BARU 50 KVA
SISIP TRAFO BARU 50 KVA

SISIP TRAFO BARU 50 KVA

SISIP TRAFO BARU 50 KVA

SISIP TRAFO BARU 50 KVA

SISIP TRAFO BARU 50 KVA

SISIP TRAFO BARU 100 KVA

SISIP TRAFO BARU 50 KVA


UPRATING TRAFO BARU 250 KVA
SISIP TRAFO BARU 50 KVA

SISIP TRAFO BARU 100 KVA EX BCN38

SISIP TRAFO BARU 50 KVA

SISIP TRAFO BARU 50 KVA

SISIP TRAFO BARU 50 KVA EX BCN41


UPRATING TRAFO 160 KVA EX BCN115

UPRATING TRAFO 100 KVA

SISIP TRAFO BARU 50 KVA EX BCN67

SISIP TRAFO BARU 50 KVA

UPRATING TRAFO 100 KVA

SISIP TRAFO BARU 50 KVA


SISIP TRAFO BARU 50 KVA
UPRATING TRAFO BARU 200 KVA
SISIP TRAFO BARU 50 KVA

SISIP TRAFO BARU 50 KVA

SISIP TRAFO BARU 100 KVA EX BCN77

SISIP TRAFO BARU 50 KVA

SISIP TRAFO BARU 50 KVA

SISIP TRAFO BARU 50 KVA

SISIP TRAFO BARU 50 KVA

SISIP TRAFO BARU 50 KVA

SISIP TRAFO BARU 25 KVA EX LW18


UPRATING TRAFO BARU 50 KVA
SISIP TRAFO BARU 50 KVA

SISIP TRAFO BARU 50 KVA

SISIP TRAFO BARU 50 KVA

SISIP TRAFO BARU 50 KVA

SISIP TRAFO BARU 50 KVA

SISIP TRAFO BARU 50 KVA


UPRATING TRAFO BARU 100 KVA
SISIP TRAFO BARU 50 KVA

SISIP TRAFO 25 KVA EX BBG44

SISIP TRAFO BARU 50 KVA EX TTE BBG15


UPRATING TRAFO BARU 100 KVA
SISIP TRAFO BARU 50 KVA
UPRATING TRAFO 50 KVA EX BBG28
No Kontrak Ket
0065.SPBJ/DAN.01.02/F17020000/2022 ON PROGRES kebutuhan trafo 2022
KVA
0065.SPBJ/DAN.01.02/F17020000/2022 ON PROGRES
50
100
0065.SPBJ/DAN.01.02/F17020000/2022 ON PROGRES
160
200
0065.SPBJ/DAN.01.02/F17020000/2022 ON PROGRES
250
TOTAL
RENCANA KERJA RKAP 2023

RENCANA KERJA RKAP 2023


RENCANA KERJA RKAP 2023
kebutuhan trafo 2023
RENCANA KERJA RKAP 2023
KVA
50
0065.SPBJ/DAN.01.02/F17020000/2022 ON PROGRES
100
0065.SPBJ/DAN.01.02/F17020000/2022 ON PROGRES 160
200
RENCANA KERJA RKAP 2023
250
TOTAL
0065.SPBJ/DAN.01.02/F17020000/2022 ON PROGRES

0065.SPBJ/DAN.01.02/F17020000/2022 ON PROGRES
kebutuhan trafo 2022 - 2023
0065.SPBJ/DAN.01.02/F17020000/2022 ON PROGRES KVA
50
RENCANA KERJA RKAP 2023
100
RENCANA KERJA RKAP 2023 160
200
RENCANA KERJA RKAP 2023
250
TOTAL
RENCANA KERJA RKAP 2023

RENCANA KERJA RKAP 2023

RENCANA KERJA RKAP 2023

RENCANA KERJA RKAP 2023

RENCANA KERJA RKAP 2023

0065.SPBJ/DAN.01.02/F17020000/2022 ON PROGRES

0065.SPBJ/DAN.01.02/F17020000/2022 ON PROGRES
RENCANA KERJA RKAP 2023
RENCANA KERJA RKAP 2023

RENCANA KERJA RKAP 2023


RENCANA KERJA RKAP 2023
RENCANA KERJA RKAP 2023
RENCANA KERJA RKAP 2023
RENCANA KERJA RKAP 2023

RENCANA KERJA RKAP 2023

RENCANA KERJA RKAP 2023

RENCANA KERJA RKAP 2023

RENCANA KERJA RKAP 2023


RENCANA KERJA RKAP 2023
RENCANA KERJA RKAP 2023

RENCANA KERJA RKAP 2023

RENCANA KERJA RKAP 2023

RENCANA KERJA RKAP 2023

RENCANA KERJA RKAP 2023

RENCANA KERJA RKAP 2023

RENCANA KERJA RKAP 2023


RENCANA KERJA RKAP 2023
RENCANA KERJA RKAP 2023

RENCANA KERJA RKAP 2023

RENCANA KERJA RKAP 2023

RENCANA KERJA RKAP 2023

RENCANA KERJA RKAP 2023


RENCANA KERJA RKAP 2023
SELESAI
0065.SPBJ/DAN.01.02/F17020000/2022 PEKERJAAN/UPDATE
SIMANTRA

RENCANA KERJA RKAP 2023

RENCANA KERJA RKAP 2023

SELESAI
0065.SPBJ/DAN.01.02/F17020000/2022 PEKERJAAN/UPDATE
SIMANTRA

RENCANA KERJA RKAP 2023


RENCANA KERJA RKAP 2023
RENCANA KERJA RKAP 2023
RENCANA KERJA RKAP 2023

RENCANA KERJA RKAP 2023

RENCANA KERJA RKAP 2023

RENCANA KERJA RKAP 2023

0065.SPBJ/DAN.01.02/F17020000/2022 ON PROGRES

RENCANA KERJA RKAP 2023

RENCANA KERJA RKAP 2023

RENCANA KERJA RKAP 2023

RENCANA KERJA RKAP 2023


RENCANA KERJA RKAP 2023
RENCANA KERJA RKAP 2023

RENCANA KERJA RKAP 2023

RENCANA KERJA RKAP 2023

0064.SPBJ/DAN.01.02/F17020000/2022 ON PROGRES

0064.SPBJ/DAN.01.02/F17020000/2022 ON PROGRES

RENCANA KERJA RKAP 2023


RENCANA KERJA RKAP 2023
RENCANA KERJA RKAP 2023

RENCANA KERJA RKAP 2023

RENCANA KERJA RKAP 2023


RENCANA KERJA RKAP 2023
RENCANA KERJA RKAP 2023
RENCANA KERJA RKAP 2023
ebutuhan trafo 2022
JUMLAH
5
7
3
0
0
15

ebutuhan trafo 2023


JUMLAH
31
13
3
1
1
49

ebutuhan trafo 2022 - 2023 Stok Gudang dan SPB UIWMMU 2022 Kebutuhan Total
JUMLAH KVA JUMLAH KVA JUMLAH
36 50 13 50 23
20 100 11 100 9
6 160 5 160 1
1 200 0 200 1
1 250 2 250 -1
64 TOTAL 23 TOTAL 33
UIW : UIW. MMU
UP3 : UP3 SOFIFI
ULP : --- SEMUA ---

DAFTAR GARDU DIST


NO NOGARDU UNIT PENYULANG ALAMAT PHASE

1 41520 IBU038 IBU SELATAN TOGOLA WAYOLI 2 3


2 41520 JLL004 JAILOLO UTARA LOLORI 3
3 41520 JLL018 JAILOLO UTARA PASAR AKEDIRI 3
4 41520 JLL075 JAILOLO SELATAN SARIA 3
5 41530 SFF005 SOFIFI KOTA SOFIFI 3 (BARIKLANA) 3
6 41530 SFF045 SOFIFI EXPRESS MAKO POLAIR 3
7 41530 SFF053 SOFIFI SELATAN NORAMAAKE 1
8 41530 SFF059 SOFIFI SELATAN LOLEO 3
9 41530 SFF067 SOFIFI SELATAN LOKO 1
10 41530 SFF121 SOFIFI UTARA TABADAMAI 3
11 41530 SFF127 SOFIFI UTARA DODINGA 1 (KAMP) 3
12 41530 SFF132 SOFIFI UTARA SONDO-SONDO 1 (TIKUNGAN) 3
13 41530 SFF133 SOFIFI UTARA SONDO-SONDO 2 (LBS) 3
14 41530 SFF138 SOFIFI UTARA BINAGARA 2 (JEMBATAN) 3
15 41540 BL06 BULI KOTA BULI KARYA 4 (MADRASAH) 3
16 41540 BL09 BULI EXPRESS TELUK BULI 3
17 41540 BL11 BULI EXPRESS KTR BALAI DESA BULI 1 3
18 41540 BL20 BULI EXPRESS GELTOLI 1 (TOKO SENTRAL) 3
19 41540 BL27 BULI KOTA SAILAL 2 (SMA) 3
20 41540 LB01 LOLOBATA LOLOBATA 3
21 41540 SBM01 SUBAIM TIMUR BATU RAJA (PLN) 3
22 41540 SBM04 SUBAIM TIMUR BUMI RESTU (PASAR) 3
23 41540 SBM09 SUBAIM TIMUR MEKARSARI (BLOK L/KUBUR) 3
24 41540 SBM10 SUBAIM TIMUR MEKARSARI (MUSHOLAH) 3
25 41540 SBM12 SUBAIM TIMUR DAKAINO (TOWER) 3
26 41540 SBM14 SUBAIM TIMUR DAKAINO (BALAI DESA) 3
27 41540 SBM15 SUBAIM TIMUR RAWAMANGUN (BALAI DESA) 3
28 41540 SBM19 SUBAIM TIMUR SIDOMULYO (BALAI DESA) 3
29 41540 SBM26 SUBAIM TIMUR DODAGA (PANTAI) 3
30 41540 SBM30 SUBAIM TIMUR TOBOINO (BALAI DESA) 3
31 41540 SBM31 SUBAIM TIMUR TOBOINO (KAPOK) 3
32 41540 SBM33 SUBAIM TIMUR WOKA JAYA (MESJID) 3
33 41550 MF11 MAFFA LOLEO TOBARU 3
34 41550 MF18 MAFFA LOLEO WAIRORO INDAH 1 (PUSKESMAS) 1
35 41550 MF19 MAFFA LOLEO WAIRORO INDAH 2 (PENGINAPAN) 3
36 41550 MF22 MAFFA LOLEO TILOPE 3
37 41550 MF23 MAFFA LOLEO LOLEO 3
38 41550 MF25 MAFFA LOLEO KLUTING JAYA 2 (CABANG) 3
39 41550 PT08 PATANI TEPELEO TEPELEO SD 3
40 41550 PT27 PATANI BANEMO BOBANE JAYA 3
41 41550 WD03B WEDA POLRES RUTAN & POLRES 3
42 41550 WD05 WEDA POLRES TV KABEL 3
43 41550 WD10 WEDA POLRES PLN GUNUNG 3
44 41550 WD11 WEDA POLRES PERUM 100 JEMBATAN 3
45 41550 WD12 WEDA UTARA SAGEA 1 (JEMBATAN BESAR) 3
46 41550 WD23 WEDA KOTA KOMPLEKS OM UCU 3
47 41550 WD26 WEDA KOTA PERUM 50 3
48 41550 WD33F WEDA UTARA LELILEF WAIBULEN 3 (BELAKANG MASJID) 3
49 41550 WD41 WEDA UTARA KIYA 3

SALDO SAP UP3 SOFIFI

NO TRAFO (KVA) JMLH


1 250 11
2 160 2
3 100 13
4 50 15
DAFTAR GARDU DISTRIBUSI BEBAN LEBIH DARI 80 PERSEN
BEBAN HASIL
UKUR ARUS RENCANA TINDAK KEBUTUHAN
KAPASITAS TGLUKUR SUMBER ANGGARAN
KVA PROSEN LANJUT TRAFO (KVA)
50 41.59 83.17 6/7/2022 UPRATING 100 KVA AI 2022
50 40.8 81.6 9/12/2022 UPRATING 100 KVA AI 2022
50 42.97 85.93 9/9/2022 SISIP TRAFO 250 KVA AI 2022
50 41.61 83.21 ### SISIP TRAFO 50 KVA AI 2022
50 41.48 82.97 12/8/2022 UPRATING 100 KVA AI 2022
100 83.98 83.98 9/6/2022 UPRATING 250 KVA AI 2022
25 20.35 81.42 6/13/2022 UPRATING 50 KVA AI 2022
50 44.94 89.89 ### UPRATING 100 KVA AI 2022
25 24.3 97.19 ### UPRATING 50 KVA AI 2022
50 45.88 91.75 ### UPRATING 100 KVA AI 2022
50 43.42 86.84 6/5/2022 UPRATING 100 KVA AI 2022
50 43.19 86.39 4/18/2022 UPRATING 100 KVA AI 2022
50 41.12 82.23 9/18/2022 UPRATING 100 KVA AI 2022
50 40.07 80.14 6/19/2022 UPRATING 100 KVA AI 2022
50 43.21 86.42 ### SISIP TRAFO 100 KVA AI 2022
50 47.93 95.86 9/18/2022 SISIP TRAFO 100 KVA AI 2022
100 98.69 98.69 9/12/2022 UPRATING 250 KVA AI 2022
50 61.94 123.88 9/15/2022 UPRATING 100 KVA AI 2022
100 80.37 80.37 9/27/2022 UPRATING 160 KVA AI 2022
50 43.24 86.49 ### UPRATING 100 KVA RENCANA 2023
50 42.4 84.81 8/20/2022 SISIP TRAFO 50 KVA AI 2022
50 43.6 87.19 6/24/2022 SISIP TRAFO 50 KVA RENCANA 2023
50 44.66 89.32 5/14/2022 UPRATING 100 KVA RENCANA 2023
100 99.86 99.86 9/14/2022 UPRATING 250 KVA AI 2022
50 42.22 84.45 5/25/2022 UPRATING 100 KVA RENCANA 2023
50 45.38 90.76 9/25/2022 UPRATING 100 KVA RENCANA 2023
50 41.68 83.37 10/3/2022 SISIP TRAFO 50 KVA RENCANA 2023
50 43.17 86.34 ### SISIP TRAFO 50 KVA RENCANA 2023
25 20.53 82.13 ### UPRATING 50 KVA RENCANA 2023
25 35.58 142.33 ### UPRATING 50 KVA AI 2022
25 25.13 100.51 1/31/2022 UPRATING 50 KVA AI 2022
25 22.02 88.08 6/26/2022 UPRATING 50 KVA AI 2022
25 20.81 83.24 9/23/2022 UPRATING 50 KVA AI 2022
50 53.08 106.15 6/17/2022 UPRATING 100 KVA AI 2022
50 47.55 95.09 6/17/2022 UPRATING 100 KVA AI 2022
50 49.32 98.63 12/9/2022 UPRATING 100 KVA AI 2022
50 52.44 104.87 12/9/2022 UPRATING 100 KVA AI 2022
50 54.38 108.76 6/6/2022 UPRATING 100 KVA AI 2022
50 41.62 83.23 ### UPRATING 100 KVA AI 2022
50 60.07 120.13 7/16/2022 UPRATING 100 KVA AI 2022
50 50 100 11/1/2022 UPRATING 100 KVA AI 2022
100 103.69 103.69 11/6/2022 SISIP TRAFO 50 KVA AI 2022
250 209.61 83.84 9/24/2022 SISIP TRAFO 250 KVA AI 2022
50 41.72 83.44 9/18/2022 UPRATING 100 KVA AI 2022
100 102.39 102.39 12/5/2022 SISIP TRAFO 50 KVA AI 2022
100 86.35 86.35 9/18/2022 SISIP TRAFO 50 KVA AI 2022
100 96.35 96.35 11/2/2022 SISIP TRAFO 50 KVA AI 2022
250 204.44 81.77 ### SISIP TRAFO 50 KVA AI 2022
50 43.08 86.17 12/5/2022 SISIP TRAFO 50 KVA AI 2022

IFI
KEBUTUHAN
TAMBAH
0
0
0
0
NO PRK NO KONTRAK KET

2022.WMMU.2.008 PROSES SPBJ


2022.WMMU.2.008 PROSES SPBJ
2022.WMMU.2.008 PROSES SPBJ
2022.WMMU.2.008 PROSES SPBJ
2022.WMMU.2.008 PROSES SPBJ
2022.WMMU.2.008 PROSES SPBJ
2022.WMMU.2.008 PROSES SPBJ
2022.WMMU.2.008 PROSES SPBJ
2022.WMMU.2.008 PROSES SPBJ
2022.WMMU.2.008 PROSES SPBJ
2022.WMMU.2.008 PROSES SPBJ
2022.WMMU.2.008 PROSES SPBJ
2022.WMMU.2.008 PROSES SPBJ
2022.WMMU.2.008 PROSES SPBJ
2022.WMMU.2.008 PROSES SPBJ
2022.WMMU.2.008 PROSES SPBJ
2022.WMMU.2.008 PROSES SPBJ
2022.WMMU.2.008 PROSES SPBJ
2022.WMMU.2.008 PROSES SPBJ

2022.WMMU.2.008 PROSES SPBJ

2022.WMMU.2.008 PROSES SPBJ

2022.WMMU.2.008 PROSES SPBJ


2022.WMMU.2.008 PROSES SPBJ
2022.WMMU.2.008 PROSES SPBJ
2022.WMMU.2.008 PROSES SPBJ
2022.WMMU.2.008 PROSES SPBJ
2022.WMMU.2.008 PROSES SPBJ
2022.WMMU.2.008 PROSES SPBJ
2022.WMMU.2.008 PROSES SPBJ
2022.WMMU.2.008 PROSES SPBJ
2022.WMMU.2.008 PROSES SPBJ
2022.WMMU.2.008 PROSES SPBJ
2022.WMMU.2.008 PROSES SPBJ
2022.WMMU.2.008 PROSES SPBJ
2022.WMMU.2.008 PROSES SPBJ ON PROGRESS
2022.WMMU.2.008 PROSES SPBJ
2022.WMMU.2.008 PROSES SPBJ ON PROGRESS
2022.WMMU.2.008 PROSES SPBJ
2022.WMMU.2.008 PROSES SPBJ ON PROGRESS
2022.WMMU.2.008 PROSES SPBJ
2022.WMMU.2.008 PROSES SPBJ
UIW : UIW. MMU
UP3 : UP3 AMBON
ULP : --- SEMUA ---

DAFTAR GARDU DIST


NO ULP NO. GARDU PENYULANG

1 AMBON KOTA KTARJL008 RIJALI

2 BAGUALA BGLWY1029 WAYAME 1

3 AMBON KOTA KTAPNG012 KARPAN 2

4 AMBON KOTA KTATNT033 TANTUI ATAS

5 AMBON KOTA KTAAHR001 AHURU

6 BAGUALA BGLWY1013 WAYAME 1

7 AMBON KOTA KTAKP2031 KARPAN 2

8 NUSANIWE NSWWRA006 AHURU

9 BAGUALA LHAEPS011 EKSPRES

10 BAGUALA BGLWH1029 WAIHERU 1

11 BAGUALA BGLWHR2007 WAIHERU 2

12 BAGUALA BGLWY1021 WAYAME 1

13 BAGUALA BGLWY2009 WAYAME 2

14 AMBON KOTA KTAPNG003 KARPAN 2

15 BAGUALA BGLWY2003 WAYAME 2


16 BAGUALA BGLWY1043 WAYAME 1

18 BAGUALA BGLWY2002 WAYAME 2

19 BAGUALA BGLBTN003 BTN

20 AMBON KOTA KTAKP1006 KARPAN 1

21 HITU HTULRE039 HITU

22 AMBON KOTA KTAKDA006 KARPAN 1

23 BAGUALA LHALHA012 LAHA

24 AMBON KOTA NSWKDM002 KARPAN 1

25 AMBON KOTA BGLWY1026 WAYAME 1

26 AMBON KOTA BGLWY1036 WAYAME 1

27 BAGUALA MKOFSV001 SAVANA


DAFTAR GARDU DISTRIBUSI BEBAN LEBIH DARI 80 PERSEN
BEBAN HASIL UKUR ARUS
ALAMAT PHASE KVALAMA
KVA PROSEN

GD 58 TMN MAKAN PHLAWAN 3 200 197.62 98.81

KAMPUNG DUSUN BANDARI (DUSUN - O1) 1 25 23.78 95.11

GD 35A SISIPAN 3 100 92.48 92.48

ARBES - AREMA 3 100 92.47 92.47

GD KEMBANG BUTON 3 50 46.2 92.4

RMH. TIGA DEPAN PUSKESMAS ( A - 55 ) 3 160 144.68 90.42

GD A5.B 3 160 144.02 90.01

SIS RCTI, GUNUNG NONA 3 100 88.31 88.31

LAHA KP BARU SISIPAN ( LAHA - 21 ) 3 100 87.55 87.55

AIR BESAR ( PENGADILAN ) 3 100 87.44 87.44

PASSO LARIER 3 100 86.65 86.65

POKA PEMDA 1 ( PEMDA - I ) 3 160 138.56 86.6

GARDU DEPAN MASJID KOTA JAWA 3 160 137.25 85.78

GD 80 A 3 250 213.1 85.24

KOMPLEKS UNPATTI FAK SOSPOL ( FAK 3 100 84.29 84.29


SOSPOL )
SISIPAN BELAKANG INDOMARET WAILELA 3 100 83.75 83.75
PERCABANGAN KERANJANG

POKA PERUMNAS (PERUMNAS POKA - O1) 3 100 83.25 83.25

BTN WAYAME BLOK V (PASAR) ( WY - O3 ) 3 160 132.88 83.05

GRD KBMT (KEBUN CENGKEH) 3 100 83.01 83.01

SEITH LAPANGAN 3 50 41.38 82.77

BATU GANTUNG 3 160 131.19 81.99

TAWIRI WAILAWA II ( LAHA - 15 ) 3 50 40.89 81.79

GRD 94 GOGA (BT GANTUNG GANEMO) 3 160 130.75 81.72

KAMPUNG TAENO ATAS ( TA - O2 ) 1 25 20.35 81.4

RUMAH TIGA DEPAN BKO 3 100 81 81

WAEKASAR PU 3 50 40.45 80.9

kebutuhan trafo Stok Gudang dan SPB UIWMMU


KVA JUMLAH KVA JUMLAH
50 0 50 7
100 5 100 9
160 9 160 7
200 0 200 0
250 1 250 0
TOTAL 15 TOTAL 23
SEN
TGLUKUR RENCANA TINDAK LANJUT PROSEN SUMBER NO.
BARU ANGGARAN KONTRAK

2/11/2022 Sisip Trafo 160 KVA 54.89% AI 2022

Uprating Trafo ke 50 KVA eks


7/11/2022 Kembang Buton 47.56% AI 2022

16/09/2022 Uprating 160 kva baru 57.80% AI 2022

6/10/2022 Uprating 160 kva baru 57.79% AI 2022

26/10/2022 Uprating Trafo ke 100 KVA eks Arbes 28.88% AI 2022


Arema

31/10/2022 Sisip Trafo 100 KVA 40.19% AI 2022

6/9/2022 Sisip Trafo 100 KVA 40.01% AI 2022

25/10/2022 Sisip Trafo 100 KVA 55.19% AI 2022

24/11/2022 Sisip Trafo 100 KVA 54.72% AI 2022

12/7/2022 Uprating 160 kva baru 54.65% AI 2022

6/7/2022 Uprating 160 kva baru 54.16% AI 2022

18/10/2022 Sisip Trafo 100 KVA eks Passo Larier 53.29% AI 2022

9/11/2022 Uprating 250 kva baru 54.90% AI 2022

Sisip Trafo 100 KVA eks Air Besar


15/09/2022 59.19% AI 2022
(Pengadilan)

1/11/2022 Uprating Trafo ke 160 kva eks Masjid 52.68% AI 2022


Kota Jawa
18/10/2022 Uprating 160 kva baru 52.34% AI 2022

4/11/2022 Uprating 160 kva baru 52.03% AI 2022

11/11/2022 Sisip Trafo 100 KVA 51.11% AI 2022

3/11/2022 Uprating 160 kva baru 51.88% AI 2022

Uprating Trafo 100 KVA eks Sisipan


12/9/2022 Belakang Indomaret 41.38% AI 2022

Sisip Trafo 100 KVA eks KBMT (Kebun


27/10/2022 Cengkeh) 50.46% AI 2022

Uprating Trafo ke 100 KVA eks Poka


28/11/2022 40.89% AI 2022
Perumnas

27/10/2022 Sisip Trafo 100 KVA eks 35A Sisipan 50.29% AI 2022

7/11/2022 Uprating Trafo ke 50 KVA eks Seith 40.70% AI 2022


Lapangan

1/11/2022 Uprating 160 kva baru 50.63% AI 2022

14/10/2022 Uprating Trafo ke 100 kva eks Rumah 40.45% AI 2022


Tiga Depan BKO

B UIWMMU Kebutuhan Total


KVA JUMLAH
50 0
100 0
160 2
200 0
250 1
KETERANGAN

PROSES SPBJ

PROSES SPBJ

PROSES SPBJ

PROSES SPBJ

PROSES SPBJ

PROSES SPBJ

PROSES SPBJ

PROSES SPBJ

PROSES SPBJ

PROSES SPBJ

PROSES SPBJ

PROSES SPBJ

PROSES SPBJ

PROSES SPBJ

PROSES SPBJ
PROSES SPBJ

PROSES SPBJ

PROSES SPBJ

PROSES SPBJ

PROSES SPBJ

PROSES SPBJ

PROSES SPBJ

PROSES SPBJ

PROSES SPBJ

PROSES SPBJ

PROSES SPBJ

KVA
###
###
###
###
###
TOTAL
UIW : UIW. MMU
UP3 : UP3 MASOHI
ULP : --- SEMUA ---

DAFTAR GARDU DISTRIBUSI BEBAN LEBIH


NO NOGARDU UNIT PENYULANG ALAMAT PHASE KVA

1 41410 ATUBA-1 ATUBA JL MIRAN 3 50


2 41410 ATUBA-3 ATUBA JL RUMEON 1 25
3 41410 GSR01-1 GESER JL KMP CINA 3 50
4 41410 HTE06 HOTE JL. WAILOLA 3 100
5 41410 HTE08 HOTE JL. KAMPUNG JAWA LAKUDO 3 100
6 41410 KOT07 BULA KOTA JL. FATOLO 3 50
7 41410 KOT23 BULA KOTA DS.FATOLO 3 50
8 41410 PDP-4 PENDOPO JL. AIR KABUR-KABUR 3 100
9 41410 PDP-6 PENDOPO JL. AIR KABUR-KABUR 3 250
10 41420 KWA07 KAWA PULAU OSI 1 50
11 41420 KWA19 KAWA KAWA BARU01 3 100
12 41420 PKT32 PIRU KOTA GEDUNG PUTIH 3 100
13 41420 WYS20 WAISALA TALAGA NIPA 3 50
14 41430 TTM26 TTIMUR LISABATA TIMUR 3 25
15 41430 TTM29 TTIMUR SAPOLA 3 25
16 41430 TTM31 TTIMUR LABUAN 3 50
17 41430 TTM33 TTIMUR PASANEA 2 3 50
18 41440 KBT10 KOBISONTA JL. TIHUANA 2 1 25
19 41440 SML03 SAMAL JL SPD WAITONIPA 1 1 25
20 41440 SML04 SAMAL JL SPD WAITONIPA 2 3 25
21 41450 RMH06 RUMAHKAY KAMARIAN 01 3 50

DAFTAR TRAFO SPB WILAYAH BAGIAN DISTRIBUSI

KAPASITAS MDU
NO SUDAH DATANG BELUM DATANG
(kVA) WILAYAH
1 50 9 3 6
2 100 9 9 0
3 250 1 1 0

DAFTAR LVSB SPB WILAYAH

MDU
NO LVSB (A) SUDAH DATANG BELUM DATANG
WILAYAH
1 PL-250-2-LBS 22 22 0
2 PL-400-4-LBS 16 0 16
3 PL-630-4-LBS 1 0 1

STOCK SAP TRAFO UP3 MASOHI

NO KAPASITAS JUMLAH
(kVA)
1 50 16
2 100 19
3 160 2
4 200 0
5 250 2

STOCK SAP TRAFO UP3 MASOHI

NO LVSB (A) JUMLAH


1 PL-250-2-LBS 22
2 PL-400-4-LBS 0
3 PL-630-4-LBS 0
RIBUSI BEBAN LEBIH DARI 80 PERSEN
BEBAN HASIL UKUR ARUS KEBUTUHAN TRAFO
SUMBER ANGGARAN TINDAK LANJUT
KVA PROSEN (kVA)
45.09 90.17 50 AI 2022 SISIP DARI KOT07
22.03 88.13 50 AI 2022 UPRATING
41.68 83.37 100 AI 2022 UPRATING
129.21 129.21 100 AI 2022 SISIP
101.15 101.15 100 AI 2022 SISIP
42.92 85.84 100 AI 2022 UPRATING
53.26 106.52 100 AI 2022 UPRATING
82.94 82.94 100 AI 2022 SISIP
211.49 84.6 100 AI 2022 SISIP
40.62 81.23 100 AI 2022 UPRATING
82.22 82.22 50 AI 2022 SISIP DARI KOT23
80.85 80.85 50 AI 2022 SISIP
40.13 80.26 AI 2021 PROSES PEKERJAAN
20.69 82.75 50 AI 2022 UPRATING
20.64 82.56 50 AI 2022 UPRATING
52.85 105.7 50 AI 2022 SISIP
51.69 103.37 50 AI 2022 SISIP
26.33 105.31 AI 2021 SUDAH UPRATING
22.1 88.38 50 AI 2022 UPRATING
20.6 82.39 50 AI 2022 UPRATING
41.23 82.47 50 AI 2022 SISIP
Data Beban Trafo > 80 % UP3 Tual

NO UNIT NOGARDU ALAMAT PENYULANG DAYA BEBAN

1 DOBO PCK020P1 JL. PUNCAK PERTAMINA 160 134.42


2 TUAL KOTA LPT136P1 LPTQ DUMAR DULLAH 50 41.51
3 KUR LOK002P1 DS. LOKWIRIN DALAM KOTA KUR 50 49.57
4 DOBO DPR025P1 JL PEMDA RAYA - KNTR. DPR PERTAMINA 100 86.25
5 TUAL KOTA PRK093P1 BTN KOPERASI OHOITEL 100 87.13
6 TUAL KOTA KFB016P1 WARSTERN LANGGUR 100 82.09
7 TUAL KOTA FIRB.252 DESA FAIR LANGGUR 50 41.94
8 TUAL KOTA UNE118P1 UN PASAR MALAM KOTA 50 53.96
9 DOBO FRA013P2 DS. MARBALI (Y) DURJELA 160 134.23

Kebutuhan
Trafo (KVA)
Trafo
50 0
100 1
160 1
200 0
250 0
400 0
PROSEN PHASE TANGGAL UKUR TINDAK LANJUT

84.01 3 5/29/2022 Sisip Trafo


83.02 3 10/10/2022 Pecah Beban dengan Gardu TPA224
99.14 1 11/6/2022 Uprating Ke 100 kVA
86.25 3 12/5/2022 Uprating Ke 160 kVA
87.13 3 10/13/2022 Perluasan JTR dan Pecah Beban Dengan Gardu BTNB.253
82.09 3 10/21/2022 Perluasan JTR dan Pecah Beban Dengan Gardu STIA197
83.88 3 11/5/2022 Pecah Beban Dengan Gardu FIR086P1
107.92 3 10/16/2022 Pecah Beban Dengan Gardu UN11P1001
83.89 3 5/31/2022 Perbaikan Data Pengukuran

Stok Gudang Stok SAP


3 3
5 5
4 4
1 1
2 2
1 1
KETERANGAN

Selesai Pekerjaan, Pengecekan Data Pengukuran


Selesai Pekerjaan, Pengecekan Data Pengukuran
Rencana Kerja RKAP 2023
Rencana Kerja RKAP 2023
Manuver Beban ke Trafo Terdekat
Manuver Beban ke Trafo Terdekat
Manuver Beban ke Trafo Terdekat
Manuver Beban ke Trafo Terdekat
Pengecekan Data Pengukuran