PT PLN (PERSERO)

UNIT INDUK WILAYAH KALTIM & KALTARA


UP3 BONTANG

REKAPITULASI RENCANA ANGGARAN BIAYA


GESER TIANG PEMBANGUNAN JEMBATAN DI KANAAN

URAIAN PEKERJAAN VOLUME HARGA JUMLAH


NO. NAMA MATERIAL/BARANG MATERIAL JASA BIAYA
JML STN
SPESIFIKASI TEKNIK (Rp) (Rp) (Rp)

1 PERBAIKAN TIANG KIE (SUTM) 1 Lot 5,322,800 4,704,800 10,027,600


3 GESER TIANG PEMBANGUNAN JEMBATAN DI 1 Lot 546,200 1,377,168 1,923,368
KANAAN (SUTR)

JUMLAH 5,869,000 6,081,968 11,950,968

10 % PPN 586,900 608,197 1,195,097

TOTAL 6,455,900 6,690,165 13,146,065


RENCANA ANGGARAN BIAYA
PERBAIKAN TIANG KIE
(SUTM)

HARGA JUMLAH
VOLUME
NO. URAIAN STN TOTAL SATUAN MATERIAL JASA BIAYA
GBR 1 (Rp) (Rp) (Rp) (Rp)

I Material Utama

1 Tiang Beton 13 mtr 350 daN btg - - 8,038,184 - -


2 Pin Pos Isolator bh - - 244,900 - -

Sub Jumlah I - - -
II Material Non Utama

1 Travers UNP 10 x 200 cm (Galvanis) Lengkap Arm Tie set - - 860,200 - -


2 Top Ties AAACS 150 mm bh - - 62,100 - -
3 Material Treckschoor TM set 2 2 2,661,400 5,322,800 5,322,800
4 Pengadaan Penghalang Panjat set - - 107,500 - -
5 Pengadaan Plat Tanda Bahaya set - - 97,600 - -

Sub Jumlah II 5,322,800 5,322,800


III Upah Kerja

1 Bongkar Pasang Travers dan Arm Tie set - - 551,286 - -


2 Bongkar Pasang Isolator bh (phasa) - - 93,624 - -
3 Perbaikan tiang beton TM btg 1 1 1,544,200 1,544,200 1,544,200
4 Bongkar Pasang Perlink Tiang 3 m set - - 2,562,376 - -
5 Pemasangan Penghalang Panjat set - - 43,600 - -
6 Pemasangan Plat Tanda Bahaya set - - 43,600 - -
7 Pemasangan Treckschoor (lengkap) set 2 2 580,300 1,160,600 1,160,600
8 Jasa sewa crane jam 4 4 500,000 2,000,000 2,000,000

Sub Jumlah III - 4,704,800 4,704,800


IV Upah Pembongkaran
1 Bongkar tiang beton 13 m 350 dAN gwg - - 653,466 - -

Sub Jumlah IV - - -
KETERANGAN HARGA : Jumlah I+II+III+IV 5,322,800 4,704,800 10,027,600
Harga Satuan material : 10 % PPN 532,280 470,480 1,002,760
Mengikuti Harga KHS 2021 (Blm termasuk PPN 10%) Total 5,855,080 5,175,280 11,030,360
Harga bongkar dikali dengan 0,66

1
2
3
4
PT PLN (PERSERO)
UNIT INDUK WILAYAH KALTIM & KALTARA
UP3 BONTANG

RENCANA ANGGARAN DAN BIAYA


PEMASANGAN TRAFO DI SANGATTA SELATAN

VOLUME HARGA JUMLAH


NO URAIAN STN GBR 5 TOTAL SATUAN MATERIAL JASA BIAYA
(Rp) (Rp) (Rp) (Rp)

I Material Utama

1 Tiang Beton 14 Meter 350 daN lkp pasang btg - - PLN PLN PLN
2 Tiang Beton 13 Meter 350 daN lkp Pasang btg - - PLN PLN PLN
3 Tiang Beton 11 Meter 200 daN lkp Pasang btg - - PLN PLN PLN
4 Tranformator 3P 50 kVA 20 kV bh 1 1 PLN PLN PLN
5 Tranformator 3P 100 kVA 20 Kv bh - - PLN PLN PLN
6 Tranformator 3P 160 kVA 20 kV bh - PLN PLN PLN
7 Tranformator 3P 200 kVA 20 kV bh - - PLN PLN PLN
8 Tranformator 3P 250 kVA 20 kV bh - - PLN PLN PLN
Fuse Cut Out 20 KV 100 A (USA) & Fuse Link 20 kV 3 - 8 A ( Tiga set u CO bh 3 3 PLN PLN PLN
9 Trafo )
10 Lightning Arrester 24 kV - 5 Ka (USA) bh 3 3 PLN PLN PLN
11 NYY 150 mm2 mtr 44 44 PLN PLN PLN
12 NYY 95 mm2 / 70 mm2 mtr 72 72 PLN PLN PLN
13 Kabel AAACS 150 mm / 70 mm2 mtr 20 20 PLN PLN PLN
14 Pin post isolator set - - PLN PLN PLN
15 LV Board 250 A lkp 1 pintu 2 Jurusan set 1 1 PLN PLN PLN
16 LV Board 400 A lkp 2 pintu 2 / 4 Jurusan set - - PLN PLN PLN

Sub Jumlah I - - -
II Material Non Utama

1 Bordes Trafo Tiang Tunggal (hotdip galvanis) lkp set 1 1 4,032,100 4,032,100 4,032,100
2 Bordes Trafo Tiang Ganda (hotdip galvanis) lkp set - - 6,236,500 - -
2,343,000
3 Perlengkapan LV Board 2 Jurusan Tiang Tunggal (Pipa & L Bow besi = 3") set 1 1 2,343,000 2,343,000
(Hotdip Galvanis)
-
4 Perlengkapan LV Board 2 Jurusan Tiang Ganda (Pipa & L Bow besi = 3") set - - 3,531,400 -
(Hotdip Galvanis)
-
5 Perlengkapan LV Board 4 Jurusan Tiang Ganda (Pipa & L Bow besi = 3") set - - - -
(Hotdip Galvanis)
2,490,800
6 Travers UNP 10x250 Cm lkp Beugel ,Baut dan Arm Tie u/ CO & Arrester set 2 2 1,245,400 2,490,800
7 SKT 8 sepatu kabel 150 mm bh 4 4 123,600 494,400 494,400
8 SKT 6 sepatu kabel 95 mm bh - - 85,200 - -
9 SKT 5 sepatu kabel 70 mm bh 8 8 61,500 492,000 492,000
10 SKAT 8 Al - Cu 150 mm bh 3 3 75,300 225,900 225,900
11 SKAT 5 Al - Cu 70 mm bh - - 75,300 - -
12 SAT 5T6 konektor Al/Cu 70/95 mm bh 8 8 79,000 632,000 632,000
13 CCO 8T8 konektor AL 150/150 mm bh 3 3 26,100 78,300 78,300
14 Arde 2,75 mtr lkp (Netral JTR & Body Trafo) set 2 2 1,193,200 2,386,400 2,386,400
15 Arde 5,5 mtr lkp (Arrester) set 1 1 1,752,900 1,752,900 1,752,900
16 Plat tanda bahaya (besar) bh 1 1 94,300 94,300 94,300
17 Pondasi cor beton tiang tunggal/trafo set 1 1 - - -
18 Pondasi cor beton tiang ganda/trafo set - - 3,799,800 - -

Sub Jumlah II 15,022,100 - 15,022,100


III Upah dan Jasa

1 Pemasangan Trafo 50 s.d 100 KVA bh 1 1 782,800 782,800 782,800


2 Pemasangan Trafo 160 s.d 250 KVA bh - - - - -
3 Pemasangan cut out + jumper bh 3 3 115,900 347,700 347,700
4 Pemasangan arrester + jumper bh 3 3 115,900 347,700 347,700
5 Pemasangan travers lkp set 2 2 193,200 386,400 386,400
6 Pemasangan bordes trafo tiang Tunggal set 1 1 463,700 463,700 463,700
7 Pemasangan bordes trafo tiang Ganda set - - 772,900 - -
8 Pemasangan LV Board 250 A lkp 1 pintu 2 Jurusan set 1 1 695,600 695,600 695,600
9 Pemasangan LV Board 400 A lkp 2 pintu 2 / 4 Jurusan set - - 772,900 - -
10 pemasangan kabel fooding Input jurusan 1 1 231,800 231,800 231,800
11 pemasangan kabel fooding output jurusan 2 2 231,800 463,600 463,600
12 Pengepresan Gardu titik 26 26 44,300 1,151,800 1,151,800
13 Pemasangan pentanahan arde 2,75 m (lkp pipa cor) set 2 2 231,800 463,600 463,600
14 Pemasangan pentanahan arde 5,5 mtr (lkp pipa cor) set 1 1 331,200 331,200 331,200
15 Transport MDU ke Site ton/m3 3 3 452,900 1,508,157 1,508,157

Sub Jumlah III - 7,174,057 7,174,057


IV Upah Pembongkaran

Sub Jumlah IV - - -
KETERANGAN HARGA : Total I+II+III+IV 15,022,100 7,174,057 22,196,157
Harga Satuan material : PPN 10 % 1,502,210 717,406 2,219,616
Mengikuti Harga KHS 2019 (Blm termasuk PPN 10%) TOTAL 16,524,310 7,891,463 24,415,773
Harga bongkar dikali dengan 0,67

0
MANAJER BAGIAN PERENCANAAN

NUR HIDAYAT
PT PLN (PERSERO)
UNIT INDUK WILAYAH KALTIM & KALTARA
UP3 BONTANG

RENCANA ANGGARAN BIAYA


GESER TIANG PEMBANGUNAN JEMBATAN DI KANAAN
(SUTR)

VOLUME HARGA JUMLAH


No URAIAN STN SATUAN MATERIAL JASA BIAYA
GBR 1 TOTAL
(Rp) (Rp) (Rp) (Rp)
I Material Utama

1 Kabel SUTR TIC 3 x 70 + 1 x 50 mm Mtr 10 10 PLN PLN PLN


2 Kabel SUTR 4 x 35 mm ( untuk Kumis) Mtr - - PLN PLN PLN

Sub Jumlah I - - -
II Material Non Utama

1 Fixed dead end 50-70 mm lkp stainless Set 2 2 88,400 176,800 176,800
2 Large angle assy 50-70 mm lengkap Set - - 126,600 - -
3 Suspension assy 50-70 mm lengkap Set 1 1 73,400 73,400 73,400
4 Bundle Protection Set - - 68,200 - -
5 CCO 5T5 konektor AL 70/70 mm Set 4 4 37,000 148,000 148,000
6 CCO 5T3 konektor AL 70/35 mm Set 4 4 37,000 148,000 148,000

Sub Jumlah II 546,200 - 546,200


III Jasa / Upah

1 Pemasangan Accesories JTR Set 3 3 139,300 417,900 417,900


2 Penarikan Kabel SUTR 70 mm Gwg 2 2 340,000 680,000 680,000
3 Pengepressan TR Titik 8 8 29,500 236,000 236,000
4 Jasa Pemasangan Kumisan Set (3 phas) 1 1 29,500 29,500 29,500
5 Transport MDU ke Site ton/m3 0.03 0 452,900 13,768 13,768

Sub Jumlah Ill 1,377,168 1,377,168


IV Upah Pembongkaran

Sub Jumlah IV - - -
KETERANGAN HARGA : Total I+II+III+lV 546,200 1,377,168 1,923,368
Harga Satuan material : PPN 10 % 54,620 137,717 192,337
Mengikuti Harga KHS 2018 (Blm termasuk PPN 10%) TOTAL 600,820 1,514,885 2,115,705
Harga bongkar dikali dengan 0,67