RAB LAA Dipo Manggarai
RAB LAA Dipo Manggarai
I PEKERJAAN PERSIAPAN
I.1 Penjagaan kearnanan Lokasi Pekerjaan
UPAH
1 oh @ Rp. 5,000,000 = Rp. 5,000,000
Jumlah = Rp. 5,000,000
I.2 Ongkos Angkut Bongkar/Muat Material LAA
UPAH
1.00 unit Sewa Truk cap. 4 ton / hari @ Rp. 2,000,000 = Rp. 2,000,000
20.00 ltr Solar / hari @ Rp. 6,000 = Rp. 120,000
Jumlah = Rp. 2,120,000
Page 3 of 26
Bahan
1.00 Set Concrete Foundation @ Rp. 4,714,300 = Rp. 4,714,300
1.00 Bh Concrete pole 35-C-75-13 @ Rp. 10,214,300 = Rp. 10,214,300
1.00 Bh Pole number plate @ Rp. 314,300 = Rp. 314,300
Jumlah = Rp. 15,242,900
UPAH
0.30 oh Tenaga Ahli @ Rp. 285,700 = Rp. 85,710
0.33 oh Supervisor @ Rp. 214,300 = Rp. 70,719
0.90 oh Teknisi @ Rp. 214,300 = Rp. 192,870
4.00 oh Pembantu Teknisi @ Rp. 125,700 = Rp. 502,800
6.00 oh Pekerja @ Rp. 130,000 = Rp. 780,000
1.00 shift Sewa mobil Crane (capacity 7-8 Ton) @ Rp. 15,714,300 = Rp. 15,714,300
1.00 shift Sewa Truck crane (capacity 5 Ton) @ Rp. 9,428,500 = Rp. 9,428,500
Jumlah = Rp. 26,774,899
II.2 Pemasangan Konstruksi V-Truss Beam
a. Pemasangan Konstruksi V-Truss Beam 9-12m
UPAH
0.30 oh Tenaga Ahli @ Rp. 285,700 = Rp. 85,710
0.30 oh Supervisor @ Rp. 214,300 = Rp. 64,290
1.20 oh Teknisi @ Rp. 214,300 = Rp. 257,160
1.44 oh Pembantu Teknisi @ Rp. 125,700 = Rp. 181,008
4.40 oh Pekerja @ Rp. 130,000 = Rp. 572,000
1.00 shift Sewa mobil Crane (capacity 7-8 Ton) @ Rp. 15,714,300 = Rp. 15,714,300
1.00 shift Sewa Truck crane (capacity 5 Ton) @ Rp. 9,428,500 = Rp. 9,428,500
Jumlah = Rp. 26,302,968
BAHAN :
1.00 set V-Truss Beam L=9-12m @ Rp. 36,457,200 = Rp. 36,457,200
4.00 set Pole Band V1 @ Rp. 754,300 = Rp. 3,017,200
Jumlah = Rp. 39,474,400
b. Pemasangan Konstruksi V-Truss Beam 15-17m
UPAH
0.30 oh Tenaga Ahli @ Rp. 285,700 = Rp. 85,710
0.30 oh Supervisor @ Rp. 214,300 = Rp. 64,290
1.20 oh Teknisi @ Rp. 214,300 = Rp. 257,160
1.44 oh Pembantu Teknisi @ Rp. 125,700 = Rp. 181,008
4.40 oh Pekerja @ Rp. 130,000 = Rp. 572,000
1.00 shift Sewa mobil Crane (capacity 7-8 Ton) @ Rp. 15,714,300 = Rp. 15,714,300
1.00 shift Sewa Truck crane (capacity 5 Ton) @ Rp. 9,428,500 = Rp. 9,428,500
Jumlah = Rp. 26,302,968
BAHAN :
1.00 set V-Truss Beam L=15-17m @ Rp. 51,857,200 = Rp. 51,857,200
4.00 set Pole Band V1 @ Rp. 25,200 = Rp. 100,800
Jumlah = Rp. 51,958,000
c. Pemasangan Konstruksi V-Truss Beam 19-21m
UPAH
0.30 oh Tenaga Ahli @ Rp. 285,700 = Rp. 85,710
0.30 oh Supervisor @ Rp. 214,300 = Rp. 64,290
1.20 oh Teknisi @ Rp. 214,300 = Rp. 257,160
1.44 oh Pembantu Teknisi @ Rp. 125,700 = Rp. 181,008
4.40 oh Pekerja @ Rp. 130,000 = Rp. 572,000
1.00 shift Sewa mobil Crane (capacity 7-8 Ton) @ Rp. 15,714,300 = Rp. 15,714,300
1.00 shift Sewa Truck crane (capacity 5 Ton) @ Rp. 9,428,500 = Rp. 9,428,500
Jumlah = Rp. 26,302,968
BAHAN :
1.00 set V-Truss Beam L=19-21m @ Rp. 63,642,800 = Rp. 63,642,800
4.00 set Pole Band V1 @ Rp. 754,300 = Rp. 3,017,200
Jumlah = Rp. 66,660,000
II.3 Pemasangan Konstruksi Span Beam /Tensioning Beam
UPAH
1.00 oh Tenaga Ahli @ Rp. 285,700 = Rp. 285,700
1.00 oh Supervisor @ Rp. 214,300 = Rp. 214,300
2.00 oh Teknisi @ Rp. 214,300 = Rp. 428,600
2.00 oh Pembantu Teknisi @ Rp. 125,700 = Rp. 251,400
4.00 oh Pekerja @ Rp. 130,000 = Rp. 520,000
1.00 shift Sewa mobil Crane (capacity 7-8 Ton) @ Rp. 15,714,300 = Rp. 15,714,300
1.00 shift Sewa Truck crane (capacity 5 Ton) @ Rp. 9,428,500 = Rp. 9,428,500
Page 4 of 26
Jumlah = Rp. 26,842,800
BAHAN :
1.00 set Tensioning Beam @ Rp. 33,000,000 = Rp. 33,000,000
4.00 set Pole Band V1 @ Rp. 754,300 = Rp. 3,017,200
Jumlah = Rp. 36,017,200
Page 5 of 26
II.4 Pemasangan Cantilever Single Angle
UPAH
1.00 oh Tenaga Ahli @ Rp. 285,700 = Rp. 285,700
1.00 oh Supervisor @ Rp. 214,300 = Rp. 214,300
2.00 oh Teknisi @ Rp. 214,300 = Rp. 428,600
2.00 oh Pembantu Teknisi @ Rp. 125,700 = Rp. 251,400
4.00 oh Pekerja @ Rp. 130,000 = Rp. 520,000
Jumlah = Rp. 1,700,000
BAHAN :
1.00 set Cantilever single @ Rp. 3,928,500 = Rp. 3,928,500
1.00 set Pole Band D3 @ Rp. 779,500 = Rp. 779,500
1.00 set Pole Band D1+ @ Rp. 452,500 = Rp. 452,500
Jumlah = Rp. 5,160,500
II.5 Pemasangan Angle Frame single dengan Splice Arm
UPAH
0.60 oh Supervisor @ Rp. 214,300 = Rp. 128,580
1.20 oh Teknisi @ Rp. 214,300 = Rp. 257,160
2.40 oh Pembantu Teknisi @ Rp. 125,700 = Rp. 301,680
7.20 oh Pekerja @ Rp. 130,000 = Rp. 936,000
Jumlah = Rp. 1,623,420
BAHAN :
1.00 set Angle Frame with splice arm @ Rp. 3,614,300 3,614,300
1.00 set Triangle bolt 90x90 @ Rp. 150,800 150,800
1.00 set Feeder wire suspension U type @ Rp. 213,700 213,700
1.00 set Suspension type insulator 180EP @ Rp. 702,200 702,200
1.00 set Suspension type insulator 180C @ Rp. 865,300 865,300
Jumlah = Rp. 5,546,300
II.6 Pemasangan Drop Arm
UPAH
0.60 oh Supervisor @ Rp. 214,300 = Rp. 128,580
0.60 oh Teknisi @ Rp. 214,300 = Rp. 128,580
2.40 oh Pembantu Teknisi @ Rp. 125,700 = Rp. 301,680
4.80 oh Pekerja @ Rp. 130,000 = Rp. 624,000
Jumlah = Rp. 1,182,840
BAHAN :
1.00 set Drop Arm @ Rp. 1,382,800 1,382,800
1.00 set Triangle bolt 90x90 @ Rp. 150,800 150,800
1.00 set Insulator Fitting @ Rp. 628,500 628,500
Jumlah = Rp. 2,162,100
II.7 Pemasangan Splice Arm Ground Wire for V- Truss
UPAH
1.00 oh Supervisor @ Rp. 214,300 = Rp. 214,300
2.00 oh Teknisi @ Rp. 214,300 = Rp. 428,600
2.00 oh Pembantu Teknisi @ Rp. 125,700 = Rp. 251,400
2.00 oh Pekerja @ Rp. 130,000 = Rp. 260,000
Jumlah = Rp. 1,154,300
BAHAN :
1.00 set Splice arm for Ground wire @ Rp. 1,100,000 1,100,000
4.00 set Triangle bolt 90x90 @ Rp. 150,800 603,200
1.00 set Line guard for ST 55 mm² @ Rp. 117,800 117,800
1.00 set Suspension Fitting for Ground wire (ST 55 mm²) @ Rp. 339,500 339,500
Jumlah = Rp. 2,160,500
II.8 Pemasangan Splice Arm GW. (pada tiang beton, tiang konstruksi)
UPAH
1.00 oh Supervisor @ Rp. 214,300 = Rp. 214,300
2.00 oh Teknisi @ Rp. 214,300 = Rp. 428,600
2.00 oh Pembantu Teknisi @ Rp. 125,700 = Rp. 251,400
2.00 oh Pekerja @ Rp. 130,000 = Rp. 260,000
Jumlah = Rp. 1,154,300
BAHAN :
1.00 set Splice arm for Ground wire @ Rp. 1,100,000 = Rp. 1,100,000
4.00 set Pole band type D 1 + @ Rp. 452,500 = Rp. 1,810,000
1.00 set Line guard for ST 55 mm² @ Rp. 117,800 = Rp. 117,800
1.00 set Suspension Fitting for Ground wire (ST 55 mm²) @ Rp. 339,500 = Rp. 339,500
Jumlah = Rp. 3,367,300
II.9 Pemasangan Guy Anchor type Single
UPAH
Page 6 of 26
0.50 oh Supervisor @ Rp. 214,300 = Rp. 107,150
0.50 oh Teknisi @ Rp. 214,300 = Rp. 107,150
2.00 oh Pembantu Teknisi @ Rp. 125,700 = Rp. 251,400
2.00 oh Pekerja @ Rp. 130,000 = Rp. 260,000
Jumlah = Rp. 725,700
BAHAN :
1.00 Set Guy Anchor No.1 @ Rp. 314,300 = Rp. 314,300
1.00 Set Guy rod Ø 19 L = 2500 @ Rp. 490,300 = Rp. 490,300
1.00 Set Guy thimble for ST. 55mm2 x 2w @ Rp. 62,800 = Rp. 62,800
4.00 Set Wire clips for 2x55 @ Rp. 163,500 = Rp. 654,000
15.00 mtr Galvanized Steel Stranded Wire (GSW) ST 55 mm² @ Rp. 23,800 = Rp. 357,000
1.00 Set Wire terminal WTS 55mm2 @ Rp. 326,800 = Rp. 326,800
1.00 Set Suspension Insulator type 180 C @ Rp. 865,300 = Rp. 865,300
1.00 Set Connecting Rod d. 16x1500 @ Rp. 333,200 = Rp. 333,200
1.00 Set Pole band tipe B1 @ Rp. 314,300 = Rp. 314,300
Jumlah = Rp. 3,718,000
II.10 Pemasangan Guy Anchor type double(V) ST 90mm2
UPAH
1.00 oh Tenaga Ahli @ Rp. 285,700 = Rp. 285,700
1.13 oh Supervisor @ Rp. 214,300 = Rp. 242,159
1.50 oh Teknisi @ Rp. 214,300 = Rp. 321,450
6.00 oh Pembantu Teknisi @ Rp. 125,700 = Rp. 754,200
15.00 oh Pekerja @ Rp. 130,000 = Rp. 1,950,000
Jumlah = Rp. 3,553,509
BAHAN :
1.00 bh Guy Anchor no.2 @ Rp. 440,000 = Rp. 440,000
1.00 bh Guy rod Ø 25 x 3000mm with Guy Thimble for GSW 90mm2 x 1w @ Rp. 628,500 = Rp. 628,500
6.00 bh Wire Clip for ST.90mm2 @ Rp. 113,200 = Rp. 679,200
30.00 mtr GSW ST.90mm2 @ Rp. 37,000 = Rp. 1,110,000
2.00 bh Connecting Fitting H-type 9x50x100 @ Rp. 314,300 = Rp. 628,600
2.00 bh GSW Strands Compression Fitting for 90mm2 @ Rp. 319,000 = Rp. 638,000
2.00 bh Suspension Insulator 180C @ Rp. 865,300 = Rp. 1,730,600
2.00 set Connecting Rod dia.19 L=1500 @ Rp. 396,000 = Rp. 792,000
2.00 set Pole Band B2 @ Rp. 408,500 = Rp. 817,000
Jumlah = Rp. 7,463,900
Page 7 of 26
Jumlah = Rp. 577,433
BAHAN :
1.00 bh Insulator suspension fitting type L for L.80x80x8 @ Rp. 339,500 = Rp. 339,500
1.00 bh Pull off Pulley one type @ Rp. 477,700 = Rp. 477,700
1.00 bh Thimble circle type for CU22mm2-CU38mm2 @ Rp. 75,500 = Rp. 75,500
1.00 bh Thimble for pull off @ Rp. 25,200 = Rp. 25,200
Page 8 of 26
1.00 bh Suspension type insulator 180EP @ Rp. 702,200 = Rp. 702,200
1.00 bh Suspension type insulator 180C @ Rp. 865,300 = Rp. 865,300
3.00 mtr Kawat BC 35 mm² @ Rp. 78,500 = Rp. 235,500
Jumlah = Rp. 2,720,900
III.4 Pemasangan Pipe Pull off type tarik
UPAH
0.33 oh Supervisor @ Rp. 214,300 = Rp. 70,719
0.68 oh Teknisi @ Rp. 214,300 = Rp. 145,724
0.70 oh Pembantu Teknisi @ Rp. 125,700 = Rp. 87,990
2.10 oh Pekerja @ Rp. 130,000 = Rp. 273,000
Jumlah = Rp. 577,433
BAHAN :
1.00 bh Pull off fitting bowed type @ Rp. 3,928,500 = Rp. 3,928,500
1.00 bh Suspension type insulator 180EP @ Rp. 702,200 = Rp. 702,200
1.00 bh Suspension type insulator 180C @ Rp. 865,300 = Rp. 865,300
3.00 mtr Kawat BC 35 mm² @ Rp. 78,500 = Rp. 235,500
Jumlah = Rp. 5,731,500
III.5 Pemasangan Steady Brace
UPAH
0.30 oh Supervisor @ Rp. 214,300 = Rp. 64,290
0.60 oh Teknisi @ Rp. 214,300 = Rp. 128,580
1.24 oh Pembantu Teknisi @ Rp. 125,700 = Rp. 155,868
3.20 oh Pekerja @ Rp. 130,000 = Rp. 416,000
Jumlah = Rp. 764,738
BAHAN :
1.00 bh Steady brace @ Rp. 1,257,200 = Rp. 1,257,200
1.00 bh Support Fitting for steady brace @ Rp. 471,500 = Rp. 471,500
Jumlah = Rp. 1,728,700
III.6 Pemasangan Automatic Tensioning Device (ATD) type Spring
UPAH
1.00 oh Tenaga Ahli @ Rp. 285,700 = Rp. 285,700
1.00 oh Supervisor @ Rp. 214,300 = Rp. 214,300
1.00 oh Teknisi @ Rp. 214,300 = Rp. 214,300
8.00 oh Pembantu Teknisi @ Rp. 125,700 = Rp. 1,005,600
10.90 oh Pekerja @ Rp. 130,000 = Rp. 1,417,000
Jumlah = Rp. 3,136,900
BAHAN :
2.00 set Pole band tipe B2 @ Rp. 408,500 = Rp. 817,000
1.00 set Automatic Tension Device Spring Type @ Rp. 34,885,700 = Rp. 34,885,700
1.00 set Strap 9 x 50 x 200 @ Rp. 75,500 = Rp. 75,500
2.00 set Turbuckle, L = 400 @ Rp. 5,028,500 = Rp. 10,057,000
2.00 set Connecting rod Ø 16 L = 1000 mm @ Rp. 251,500 = Rp. 503,000
2.00 set Connecting rod Ø 16 L = 2000 mm @ Rp. 396,000 = Rp. 792,000
4.00 set Suspension Insulator type 180 C @ Rp. 865,300 = Rp. 3,461,200
1.00 set Wire Connection Fitting, BS 90 @ Rp. 364,500 = Rp. 364,500
1.00 set Wire Terminal WTS 110 @ Rp. 574,500 = Rp. 574,500
0.50 set Stainless steel wired d. 5 mm2 @ Rp. 78,500 = Rp. 39,250
Jumlah = Rp. 51,569,650
III.7 Pemasangan Hanger Bar
UPAH
0.12 oh Teknisi @ Rp. 214,300 = Rp. 25,716
0.15 oh Pembantu Teknisi @ Rp. 125,700 = Rp. 18,855
0.31 oh Pekerja @ Rp. 130,000 = Rp. 40,300
Jumlah = Rp. 84,871
BAHAN :
1 bh Hanger Bar, SUS304 2x15x4000mm @ Rp. 220,000 = Rp. 220,000
1 bh Hanger Ear, A - Type Ear only, for GT110mm² @ Rp. 326,800 = Rp. 326,800
Jumlah = Rp. 546,800
III.8 Pemasangan Feeding Branch
UPAH
0.50 oh Tenaga Ahli @ Rp. 285,700 = Rp. 142,850
0.50 oh Supervisor @ Rp. 214,300 = Rp. 107,150
1.10 oh Teknisi @ Rp. 214,300 = Rp. 235,730
3.20 oh Pembantu Teknisi @ Rp. 125,700 = Rp. 402,240
8.10 oh Pekerja @ Rp. 130,000 = Rp. 1,053,000
Jumlah = Rp. 1,940,970
BAHAN :
1.00 bh Separator for feeding branch @ Rp. 408,500 = Rp. 408,500
2.00 bh Connector clamp for CU 300-CU 185mm 2B @ Rp. 1,068,500 = Rp. 2,137,000
2.00 bh Arm feeding Branch @ Rp. 738,500 = Rp. 1,477,000
2.00 bh Suspension Insulator type 180 EP @ Rp. 702,200 = Rp. 1,404,400
2.00 bh Suspension Insulator type 180 C @ Rp. 865,300 = Rp. 1,730,600
1.00 set Feeder ear for Y-feeding branch @ Rp. 5,280,000 = Rp. 5,280,000
Page 9 of 26
Jumlah = Rp. 12,437,500
III.9 Pemasangan Grounding Device
UPAH
3.00 oh Teknisi @ Rp. 214,300 = Rp. 642,900
6.00 oh Pembantu Teknisi @ Rp. 125,700 = Rp. 754,200
12.00 oh Pekerja @ Rp. 130,000 = Rp. 1,560,000
Jumlah = Rp. 2,957,100
BAHAN :
3.00 bh Paralel tap connector @ Rp. 119,500 = Rp. 358,500
1.00 Set Grounding rod, Ø16 L=1500 @ Rp. 793,500 = Rp. 793,500
1.00 mtr Marker of earthing stake @ Rp. 476,200 = Rp. 476,200
4.00 Set Stainless steel band with adjusting fitting @ Rp. 77,800 = Rp. 311,200
Jumlah = Rp. 1,939,400
III.10 Pemasangan Semboyan LAA
UPAH
0.50 oh Supervisor @ Rp. 214,300 = Rp. 107,150
1.00 oh Teknisi @ Rp. 214,300 = Rp. 214,300
1.50 oh Pembantu Teknisi @ Rp. 125,700 = Rp. 188,550
2.00 oh Pekerja @ Rp. 130,000 = Rp. 260,000
Jumlah = Rp. 770,000
BAHAN :
1.00 bh Semboyan @ Rp. 158,700 = Rp. 158,700
4.00 bh Triangle bolt @ Rp. 167,200 = Rp. 668,800
Jumlah = Rp. 827,500
III.11 Pemasangan DS (Disconnecting Switch) type Lever
UPAH
4.00 oh Tenaga Ahli @ Rp. 285,700 = Rp. 1,142,800
8.00 oh Supervisor @ Rp. 214,300 = Rp. 1,714,400
8.00 oh Teknisi @ Rp. 214,300 = Rp. 1,714,400
16.00 oh Pembantu Teknisi @ Rp. 125,700 = Rp. 2,011,200
40.00 oh Pekerja @ Rp. 130,000 = Rp. 5,200,000
Jumlah = Rp. 11,782,800
BAHAN :
1.00 bh DS - lever operated type 1500 Vdc 3000 A @ Rp. 48,480,000 = Rp. 48,480,000
Jumlah = Rp. 48,480,000
IV PENGADAAN & PEMASANGAN KAWAT (WIRE)
Page 10 of 26
UPAH
- Persiapan pekerjaan
1.00 oh Supervisor @ Rp. 214,300 = Rp. 214,300
1.00 oh Teknisi @ Rp. 214,300 = Rp. 214,300
3.00 oh Pembantu Teknisi @ Rp. 125,700 = Rp. 377,100
9.60 oh Pekerja @ Rp. 130,000 = Rp. 1,248,000
Jumlah = Rp. 2,053,700
- Pelaksanaan pekerjaan
0.50 oh Tenaga Ahli @ Rp. 285,700 = Rp. 142,850
2.00 oh Supervisor @ Rp. 214,300 = Rp. 428,600
6.75 oh Teknisi @ Rp. 214,300 = Rp. 1,446,525
9.00 oh Pembantu Teknisi @ Rp. 125,700 = Rp. 1,131,300
15.00 oh Pekerja @ Rp. 130,000 = Rp. 1,950,000
Jumlah = Rp. 5,099,275
Jumlah Jasa /km Rp. 7,152,975
Jasa / mtr Rp. 7,153
BAHAN :
1 mtr GSW 90mm2 (Stranded 7x4.00mm, S-lay) @ Rp. 37,000 = Rp. 37,000
Jumlah = Rp. 37,000
d Uji Tensi Kawat Messenger
UPAH
- Persiapan pekerjaan
0.50 oh Supervisor @ Rp. 214,300 = Rp. 107,150
1.50 oh Teknisi @ Rp. 214,300 = Rp. 321,450
3.00 oh Pembantu Teknisi @ Rp. 125,700 = Rp. 377,100
6.00 oh Pekerja @ Rp. 130,000 = Rp. 780,000
Jumlah = Rp. 1,585,700
- Pelaksanaan pekerjaan
0.50 oh Tenaga Ahli @ Rp. 285,700 = Rp. 142,850
0.50 oh Supervisor @ Rp. 214,300 = Rp. 107,150
1.50 oh Teknisi @ Rp. 214,300 = Rp. 321,450
3.75 oh Pembantu Teknisi @ Rp. 125,700 = Rp. 471,375
7.50 oh Pekerja @ Rp. 130,000 = Rp. 975,000
Jumlah = Rp. 2,017,825
Jumlah Jasa /set Rp. 3,603,525
e Memindahkan pematian Messenger ke pematian permanen
UPAH
- Persiapan pekerjaan
0.25 oh Supervisor @ Rp. 214,300 = Rp. 53,575
0.50 oh Teknisi @ Rp. 214,300 = Rp. 107,150
0.50 oh Pembantu Teknisi @ Rp. 125,700 = Rp. 62,850
3.00 oh Pekerja @ Rp. 130,000 = Rp. 390,000
Jumlah = Rp. 613,575
- Pelaksanaan pekerjaan
0.50 oh Tenaga Ahli @ Rp. 285,700 = Rp. 142,850
0.50 oh Supervisor @ Rp. 214,300 = Rp. 107,150
3.00 oh Teknisi @ Rp. 214,300 = Rp. 642,900
3.00 oh Pembantu Teknisi @ Rp. 125,700 = Rp. 377,100
6.00 oh Pekerja @ Rp. 130,000 = Rp. 780,000
Jumlah = Rp. 2,050,000
Jumlah Jasa /set Rp. 2,663,575
f Adjusting Messenger
UPAH
- Persiapan pekerjaan
0.50 oh Supervisor @ Rp. 214,300 = Rp. 107,150
1.00 oh Teknisi @ Rp. 214,300 = Rp. 214,300
6.00 oh Pembantu Teknisi @ Rp. 125,700 = Rp. 754,200
7.50 oh Pekerja @ Rp. 130,000 = Rp. 975,000
Jumlah = Rp. 2,050,650
- Pelaksanaan pekerjaan
1.50 oh Tenaga Ahli @ Rp. 285,700 = Rp. 428,550
4.00 oh Supervisor @ Rp. 214,300 = Rp. 857,200
16.00 oh Teknisi @ Rp. 214,300 = Rp. 3,428,800
20.00 oh Pembantu Teknisi @ Rp. 125,700 = Rp. 2,514,000
45.00 oh Pekerja @ Rp. 130,000 = Rp. 5,850,000
Jumlah = Rp. 13,078,550
Jumlah Jasa /km Rp. 15,129,200
Jasa / mtr Rp. 15,130
Page 11 of 26
- Persiapan pekerjaan
0.50 oh Teknisi @ Rp. 214,300 = Rp. 107,150
0.75 oh Pembantu Teknisi @ Rp. 125,700 = Rp. 94,275
3.00 oh Pekerja @ Rp. 130,000 = Rp. 390,000
Jumlah = Rp. 591,425
- Pelaksanaan pekerjaan
0.50 oh Tenaga Ahli @ Rp. 285,700 = Rp. 142,850
0.75 oh Supervisor @ Rp. 214,300 = Rp. 160,725
0.75 oh Teknisi @ Rp. 214,300 = Rp. 160,725
1.50 oh Pembantu Teknisi @ Rp. 125,700 = Rp. 188,550
4.50 oh Pekerja @ Rp. 130,000 = Rp. 585,000
Jumlah = Rp. 1,237,850
Jumlah Jasa /set Rp. 1,829,275
b Pasang hak gantung sementara
UPAH
- Persiapan pekerjaan
0.25 oh Teknisi @ Rp. 214,300 = Rp. 53,575
0.25 oh Pembantu Teknisi @ Rp. 125,700 = Rp. 31,425
1.00 oh Pekerja @ Rp. 130,000 = Rp. 130,000
Jumlah = Rp. 215,000
- Pelaksanaan pekerjaan
1.00 oh Supervisor @ Rp. 214,300 = Rp. 214,300
2.00 oh Teknisi @ Rp. 214,300 = Rp. 428,600
2.00 oh Pembantu Teknisi @ Rp. 125,700 = Rp. 251,400
4.00 oh Pekerja @ Rp. 130,000 = Rp. 520,000
Jumlah = Rp. 1,414,300
Jumlah Jasa /km Rp. 1,629,300
Jasa / mtr Rp. 1,630
BAHAN :
0.5 kg Kawat ikat/Bendrat @ Rp. 7,800 = Rp. 3,900
Jumlah = Rp. 3,900
Jasa / mtr Rp. 4
c Wiring Kawat Trolley baru
UPAH
- Persiapan pekerjaan
1.00 oh Supervisor @ Rp. 214,300 = Rp. 214,300
1.00 oh Teknisi @ Rp. 214,300 = Rp. 214,300
3.00 oh Pembantu Teknisi @ Rp. 125,700 = Rp. 377,100
20.00 oh Pekerja @ Rp. 130,000 = Rp. 2,600,000
Jumlah = Rp. 3,405,700
- Pelaksanaan pekerjaan
4.00 oh Tenaga Ahli @ Rp. 285,700 = Rp. 1,142,800
4.00 oh Supervisor @ Rp. 214,300 = Rp. 857,200
10.00 oh Teknisi @ Rp. 214,300 = Rp. 2,143,000
10.00 oh Pembantu Teknisi @ Rp. 125,700 = Rp. 1,257,000
30.00 oh Pekerja @ Rp. 130,000 = Rp. 3,900,000
Jumlah = Rp. 9,300,000
- Merapihkan alat kerja
1.00 oh Supervisor @ Rp. 214,300 = Rp. 214,300
2.00 oh Teknisi @ Rp. 214,300 = Rp. 428,600
3.00 oh Pembantu Teknisi @ Rp. 125,700 = Rp. 377,100
10.00 oh Pekerja @ Rp. 130,000 = Rp. 1,300,000
Jumlah = Rp. 2,320,000
Jumlah Jasa /km Rp. 15,025,700
Jasa / mtr Rp. 15,026
BAHAN :
1 mtr Kawat Trolley @ Rp. 341,000 = Rp. 341,000
Jumlah = Rp. 341,000
d Uji Tensi Kawat Trolley baru
UPAH
- Persiapan pekerjaan
0.50 oh Supervisor @ Rp. 214,300 = Rp. 107,150
1.00 oh Teknisi @ Rp. 214,300 = Rp. 214,300
3.00 oh Pembantu Teknisi @ Rp. 125,700 = Rp. 377,100
6.40 oh Pekerja @ Rp. 130,000 = Rp. 832,000
Jumlah = Rp. 1,530,550
- Pelaksanaan pekerjaan
0.50 oh Tenaga Ahli @ Rp. 285,700 = Rp. 142,850
0.50 oh Supervisor @ Rp. 214,300 = Rp. 107,150
1.50 oh Teknisi @ Rp. 214,300 = Rp. 321,450
3.75 oh Pembantu Teknisi @ Rp. 125,700 = Rp. 471,375
7.50 oh Pekerja @ Rp. 130,000 = Rp. 975,000
Page 12 of 26
Jumlah = Rp. 2,017,825
Jumlah Jasa /set Rp. 3,548,375
e Memindahkan kawat trolley baru ke pematian permanen
UPAH
- Persiapan pekerjaan
0.25 oh Supervisor @ Rp. 214,300 = Rp. 53,575
0.50 oh Teknisi @ Rp. 214,300 = Rp. 107,150
0.50 oh Pembantu Teknisi @ Rp. 125,700 = Rp. 62,850
3.00 oh Pekerja @ Rp. 130,000 = Rp. 390,000
Jumlah = Rp. 613,575
Page 13 of 26
- Pelaksanaan pekerjaan
0.50 oh Tenaga Ahli @ Rp. 285,700 = Rp. 142,850
0.50 oh Supervisor @ Rp. 214,300 = Rp. 107,150
3.00 oh Teknisi @ Rp. 214,300 = Rp. 642,900
3.00 oh Pembantu Teknisi @ Rp. 125,700 = Rp. 377,100
6.00 oh Pekerja @ Rp. 130,000 = Rp. 780,000
Jumlah = Rp. 2,050,000
Jumlah Jasa /set Rp. 2,663,575
f Adjusting Kawat trolley
UPAH
- Persiapan pekerjaan
0.25 oh Supervisor @ Rp. 214,300 = Rp. 53,575
0.25 oh Teknisi @ Rp. 214,300 = Rp. 53,575
0.50 oh Pembantu Teknisi @ Rp. 125,700 = Rp. 62,850
3.00 oh Pekerja @ Rp. 130,000 = Rp. 390,000
Jumlah = Rp. 560,000
- Pelaksanaan pekerjaan
1.00 oh Tenaga Ahli @ Rp. 285,700 = Rp. 285,700
2.00 oh Supervisor @ Rp. 214,300 = Rp. 428,600
6.00 oh Teknisi @ Rp. 214,300 = Rp. 1,285,800
6.00 oh Pembantu Teknisi @ Rp. 125,700 = Rp. 754,200
12.00 oh Pekerja @ Rp. 130,000 = Rp. 1,560,000
Jumlah = Rp. 4,314,300
Jumlah Jasa /km Rp. 4,874,300
Jasa / mtr Rp. 4,875
Page 14 of 26
8.00 oh Pekerja @ Rp. 130,000 = Rp. 1,040,000
1.00 shift Sewa mobil Crane (capacity 7-8 Ton) @ Rp. 15,714,300 = Rp. 15,714,300
1.00 shift Sewa Truck crane (capacity 5 Ton) @ Rp. 9,428,500 = Rp. 9,428,500
Jumlah = Rp. 31,337,000
Jumlah Jasa /km Rp. 31,337,000
Jasa / mtr Rp. 31,337
BAHAN :
1 mtr Galvanized Steel Stranded Wire (GSW) ST 55 mm² @ Rp. 23,800 = Rp. 23,800
Jumlah = Rp. 23,800
IV.5 Penyambungan Kawat Feeder
UPAH
1.00 oh Tenaga Ahli @ Rp. 285,700 = Rp. 285,700
1.00 oh Supervisor @ Rp. 214,300 = Rp. 214,300
1.00 oh Teknisi @ Rp. 214,300 = Rp. 214,300
4.00 oh Pembantu Teknisi @ Rp. 125,700 = Rp. 502,800
10.00 oh Pekerja @ Rp. 130,000 = Rp. 1,300,000
Jumlah = Rp. 2,517,100
BAHAN :
1 set Compression parallel sleeve 300-300 @ Rp. 1,728,500 = Rp. 1,728,500
Jumlah = Rp. 1,728,500
V REMOVAL & RELOCATION
V.1 Pembongkaran Konstruksi tiang pole
UPAH
0.30 oh Tenaga Ahli @ Rp. 285,700 = Rp. 85,710
0.30 oh Supervisor @ Rp. 214,300 = Rp. 64,290
1.20 oh Teknisi @ Rp. 214,300 = Rp. 257,160
1.44 oh Pembantu Teknisi @ Rp. 125,700 = Rp. 181,008
4.40 oh Pekerja @ Rp. 130,000 = Rp. 572,000
0.50 shift Sewa mobil Crane (capacity 7-8 Ton) @ Rp. 15,714,300 = Rp. 7,857,150
0.50 shift Sewa Truck crane (capacity 5 Ton) @ Rp. 9,428,500 = Rp. 4,714,250
Jumlah = Rp. 13,731,568
V.2 Pembongkaran Konstruksi V-Truss
UPAH
0.30 oh Tenaga Ahli @ Rp. 285,700 = Rp. 85,710
0.30 oh Supervisor @ Rp. 214,300 = Rp. 64,290
1.20 oh Teknisi @ Rp. 214,300 = Rp. 257,160
1.44 oh Pembantu Teknisi @ Rp. 125,700 = Rp. 181,008
4.40 oh Pekerja @ Rp. 130,000 = Rp. 572,000
1.00 shift Sewa mobil Crane (capacity 7-8 Ton) @ Rp. 15,714,300 = Rp. 15,714,300
1.00 shift Sewa Truck crane (capacity 5 Ton) @ Rp. 9,428,500 = Rp. 9,428,500
Jumlah = Rp. 26,302,968
V.3 Pembongkaran Angle Frame
UPAH
1.00 oh Tenaga Ahli @ Rp. 285,700 = Rp. 285,700
0.50 oh Supervisor @ Rp. 214,300 = Rp. 107,150
1.20 oh Teknisi @ Rp. 214,300 = Rp. 257,160
1.44 oh Pembantu Teknisi @ Rp. 125,700 = Rp. 181,008
6.00 oh Pekerja @ Rp. 130,000 = Rp. 780,000
Jumlah = Rp. 1,611,018
V.4 Pembongkaran Pipa Steadying Equipment
UPAH
1.00 oh Tenaga Ahli @ Rp. 285,700 = Rp. 285,700
1.00 oh Supervisor @ Rp. 214,300 = Rp. 214,300
2.00 oh Teknisi @ Rp. 214,300 = Rp. 428,600
2.00 oh Pembantu Teknisi @ Rp. 125,700 = Rp. 251,400
7.00 oh Pekerja @ Rp. 130,000 = Rp. 910,000
Jumlah = Rp. 2,090,000
V.5 Pembongkaran Guy Anchor type Double
UPAH
1.00 oh Tenaga Ahli @ Rp. 285,700 = Rp. 285,700
1.00 oh Supervisor @ Rp. 214,300 = Rp. 214,300
1.00 oh Teknisi @ Rp. 214,300 = Rp. 214,300
4.00 oh Pembantu Teknisi @ Rp. 125,700 = Rp. 502,800
6.00 oh Pekerja @ Rp. 130,000 = Rp. 780,000
Jumlah = Rp. 1,997,100
V.6 Relokasi Messenger Wire ke Isolator new
UPAH
0.00 oh Tenaga Ahli @ Rp. 285,700 = Rp. -
1.00 oh Supervisor @ Rp. 214,300 = Rp. 214,300
1.00 oh Teknisi @ Rp. 214,300 = Rp. 214,300
4.00 oh Pembantu Teknisi @ Rp. 125,700 = Rp. 502,800
8.00 oh Pekerja @ Rp. 130,000 = Rp. 1,040,000
Page 15 of 26
Jumlah = Rp. 1,971,400
V.7 Relokasl Contact Wire ke Pull off baru
UPAH
0.00 oh Tenaga Ahli @ Rp. 285,700 = Rp. -
1.00 oh Supervisor @ Rp. 214,300 = Rp. 214,300
1.00 oh Teknisi @ Rp. 214,300 = Rp. 214,300
Page 16 of 26
4.00 oh Pembantu Teknisi @ Rp. 125,700 = Rp. 502,800
8.00 oh Pekerja @ Rp. 130,000 = Rp. 1,040,000
Jumlah = Rp. 1,971,400
V.8 Relokasi Feeder Wire ke Angle Frame baru
UPAH
0.00 oh Tenaga Ahli @ Rp. 285,700 = Rp. -
1.00 oh Supervisor @ Rp. 214,300 = Rp. 214,300
1.00 oh Teknisi @ Rp. 214,300 = Rp. 214,300
4.00 oh Pembantu Teknisi @ Rp. 125,700 = Rp. 502,800
8.00 oh Pekerja @ Rp. 130,000 = Rp. 1,040,000
Jumlah = Rp. 1,971,400
V.9 Relokasi Ground Wire ST 55 ke Splice Arm baru
UPAH
0.00 oh Tenaga Ahli @ Rp. 285,700 = Rp. -
1.00 oh Supervisor @ Rp. 214,300 = Rp. 214,300
1.00 oh Teknisi @ Rp. 214,300 = Rp. 214,300
4.00 oh Pembantu Teknisi @ Rp. 125,700 = Rp. 502,800
8.00 oh Pekerja @ Rp. 130,000 = Rp. 1,040,000
Jumlah = Rp. 1,971,400
VI PEKERJAAN PENYELESAIAN
VI.1 Pembuatan As Built Drawing
UPAH
0.00 oh Tenaga Ahli @ Rp. 285,700 = Rp. -
5.00 oh Supervisor @ Rp. 214,300 = Rp. 1,071,500
5.00 oh Teknisi @ Rp. 214,300 = Rp. 1,071,500
5.00 oh Pembantu Teknisi @ Rp. 125,700 = Rp. 628,500
5.00 oh Pekerja @ Rp. 130,000 = Rp. 650,000
Jumlah = Rp. 3,421,500
Page 17 of 26
NO MATERIAL SATUAN
I Harga Upah
1 Tenaga Ahli Oh
2 Supervisor Oh
3 Teknisi Oh
4 Pembantu Teknisi Oh
5 Pekerja Oh
II Harga material/Bahan
1 Concrete pole Btg
2 V-Truss Beam L=9-12m Set
3 V-Truss Beam L=15-17m Set
4 V-Truss Beam L=19-21m Set
5 Tensioning Beam Set
6 Cantilever single Set
7 Angle Frame with splice arm Set
8 Drop Arm Set
9 Splice arm for Ground wire Set
10 Pole Band V1 Set
11 Pole Band D3 Set
12 Pole Band D1+ Set
13 Kawat ikat/Bendrat M
14 Besi Beton U24 kg
15 GSW 90mm2 (Stranded 7x4.00mm, S-lay) Set
16 Kawat Trolley m
17 Feeder Wire m
18 Angle Frame single wire set
19 Triangle bolt 100x100 set
20 Triangle bolt 90x90 set
21 Feeder wire suspension U type untuk Cu 300x2 set
22 Insulator Fitting set
23 Line guard for ST 55 mm² set
24 Suspension Fitting for Ground wire (ST 55 mm²) set
25 Suspension type insulator 180EP set
26 Suspension type insulator 180C set
27 Hanger Bar, SUS304 2x15x4000mm set
28 Hanger Ear, A - Type Ear only, for GT110mm² set
29 Insulator suspension fitting type L for L.80x80x8 set
30 Pull off Pulley one type set
31 Thimble circle type for CU22mm2-CU38mm2 set
32 Thimble for pull off set
33 Suspension type insulator 180EP set
34 Suspension type insulator 180C set
35 Kawat BC 35 mm² Meter
36 Steady brace set
37 Support Fitting for steady brace set
38 Separator for feeding branch set
39 Connector clamp for CU 300-CU 185mm 2B set
40 Arm feeding Branch set
41 Suspension Insulator type 180 EP set
42 Suspension Insulator type 180 C set
43 Feeder ear for Y-feeding branch set
44 Guy Anchor no.1 set
45 Guy Anchor no.2 set
46 Guy rod Ø 19 L = 2500 set
47 Guy thimble for ST. 55mm2 x 2w set
48 Wire clips for 2x55 set
49 Galvanized Steel Stranded Wire (GSW) ST 55 mm² m
50 Wire terminal WTS 55mm2 set
51 Connecting Rod d. 16x1500 set
52 Pole band tipe B1 set
53 Guy rod Ø 25 x 3000mm with Guy Thimble for GSW 90mm2 x 1w set
54 Wire Clip for ST.90mm2 set
55 GSW ST.90mm2 m
56 Connecting Fitting H-type 9x50x100 set
57 GSW Strands Compression Fitting for 90mm2 set
58 Suspension Insulator 180C set
59 Connecting Rod dia.19 L=1500 set
60 Pole Band B2 set
61 Strap 6 x 50 x 100 set
62 Strap 9x60x100mm set
63 Insulator 250 EPJ set
64 Anchor fitting for Cu.300 mm2 set
65 Thimble for ST. 90 mm2 set
66 Insulator suspension fitting, type L for steel angle bh
67 Steam Insulator for 1500 Vdc bh
68 Instalation fitting for Dropper strap Ø 48,6 bh
69 Dropper strap bh
70 Pipe steadying equipment Ø 48,6, L= 3200 bh
71 Pull off fitting bowed type set
72 Kawat BC 35 mm² m
73 Automatic Tension Device Spring Type set
74 Strap 9 x 50 x 200 set
75 Strap 9x60x100mm set
76 Turbuckle, L = 400 set
77 Connecting rod Ø 16 L = 1000 mm set
78 Connecting rod Ø 16 L = 2000 mm set
79 Suspension Insulator type 180 C set
80 Wire Connection Fitting, BS 90 set
81 Wire Terminal WTS 110 set
82 Stainless steel wired d. 5 mm2 set
83 Paralel tap connector bh
84 Grounding rod, Ø16 L=1500 Set
85 Marker of earthing stake mtr
86 Stainless steel band with adjusting fitting Set
87 Semboyan Set
88 Compression parallel sleeve 300-300 Set
89 Automatic Tensioning Device Pulley + Bracket + Rectangular + Yoke set
90 Pole band tipe B2 set
91 Pole band tipe TK1 set
92 Connecting rod Ø 16 L = 2000 mm set
93 Connecting rod Ø 16 L = 1000 mm set
94 Trunbuckle, L= 600 set
95 Suspension Insulator type 180 C set
96 wire terminal WTS 110 set
97 Wire Connection Fitting, BS 90 set
98 Suspension Insulator 180EP set
99 Suspension Insulator 180C set
100 wire terminal WTS 110 set
101 Wire Connection Fitting, BS 90 set
102 Connector Clamp for ST 90-CU 100mm 2B set
103 Connector Clamp for ST 90-CU 40mm 1B set
104 Feed Ear 3B, Cu 100mm2 L=1000mm (T-M) set
105 Wire Protector set
106 Concrete Foundation set
107 Pole number plate set
108 Sewa mobil Crane (capacity 7-8 Ton) shift
109 Sewa Truck crane (capacity 5 Ton) shift
0.7
HARGA
2,756,064,000