4.1.1. Pekerjaan atap baja ringan 56.4600 M2 Canal, reng bluescope 125,000.00 7,057,500.00
4.2.1. Pekerjaan genteng beton besar Warna 56.4600 M2 Multiline setara vitoria 90,000.00 5,081,400.00
4.2.2. Pek. nok genteng beton (badan + penutup/ujung + tepi)11.8580 M2 Nok setara victoria 105,000.00 1,245,090.00
6,326,490.00
V. PEKERJAAN PLAFOND
5.1. Rangka Plafond
Rangka hollow
5.1.1. Rangka Plafon Hollow Galvalume 46.3060 M2 45,000.00 2,083,770.00
galvalume 40/40 , 20/20
2,083,770.00
HARGA SATUAN JUMLAH
NO URAIAN PEKERJAAN VOLUME SAT Spesifikasi
(Rp) (Rp)
5.2. Memasang Plafond
5.2.1. Memasang Plafond Gypsum 9 mm 39.2500 M2 setara Jayaboard 80,000.00 3,140,000.00
2
5.2.2. Memasang Plafond GRC 4 mm 7.0560 M setara nusaboard 75,000.00 529,200.00
5.2.3. Memasang Lis Plafond 55.8400 M1 lis 9 cm 25,000.00 1,396,000.00
7.1.4. Pasangan Lantai Kramik 20 x 20 2.2500 M2 mulia tipe Cellica Beige 170,000.00 382,500.00
7.1.5. Pasangan Dinding Keramik 20 x 25 11.4000 M2 mulia tipe Benfica Beige 170,000.00 1,938,000.00
* kusen aluminium 3" 11.2700 M' brown setara aluprima 100,000.00 1,127,000.00
* daun jendela aluminium kaca 5 mm putih 1.0000 Unit Frame aluprima 328,000.00 328,000.00
* jendela aluminium kaca mati 5 mm putih 1.0000 Unit kaca bening 108,167.50 108,167.50
9.1.2 Kusen PJ2 (1 Buah)
* kusen aluminium 3" 7.8000 M' brown setara aluprima 100,000.00 780,000.00
* daun jendela aluminium kaca 5 mm putih 1.0000 Unit Frame aluprima 300,000.00 300,000.00
* jendela aluminium kaca mati 5 mm putih 1.0000 Unit kaca bening 26,162.50 26,162.50
9.1.3 Kusen J1 (1 Buah)
* kusen aluminium 3" 6.7500 M' brown setara aluprima 100,000.00 675,000.00
* daun jendela aluminium kaca 5 mm putih 1.0000 Unit Frame aluprima 536,000.00 536,000.00
* jendela aluminium kaca mati 5 mm putih 1.0000 Unit kaca bening 52,325.00 52,325.00
9.1.4 Kusen P1 (3 Unit)
* kusen aluminium 3" 20.2500 M' brown setara aluprima 100,000.00 2,025,000.00
6,317,655.00
X. PEKERJAAN PENGECATAN
vinilex 1 plamir, 1 cat
10.1. Mengecat Tembok Baru 234.1665 M2 20,000.00 4,683,330.00
dasar, 2 lapis finish
10.2. Mengecat Plafond 46.3060 M2 Vinilex 16,000.00 740,896.00
10.3. Mengecat lis gypsum 55.8400 M' Vinilex 5,000.00 279,200.00
10.4. Mengecat lisplang 18.1000 M' Cat minyak ftalit 12,000.00 217,200.00
5,920,626.00
XI. PEK. INSTALASI DAN SANITASI
11.1. Listrik
11.1.1 Titik lampu bangunan 8.0000 Ttk eterna 2 x 2.5 125,000.00 1,000,000.00
11.1.2 instalasi stop kontak 8.0000 Ttk eterna 2 x 2.5 125,000.00 1,000,000.00
11.1.3 Saklar seri 3.0000 Bh broco 35,000.00 105,000.00
11.1.4 Saklar engle 2.0000 Bh broco 25,000.00 50,000.00
11.1.5 Stop kontak 4.0000 Bh broco 30,000.00 120,000.00
11.1.6 Sparing SR 1.0000 Ttk eterna 3 x 4 115,000.00 115,000.00
11.1.7 Box MCB $ group + MCB 1.0000 lot Presto 120,000.00 120,000.00
11.1.8 Grounding 1.0000 M' 85,000.00 85,000.00
2,595,000.00
HARGA SATUAN JUMLAH
NO URAIAN PEKERJAAN VOLUME SAT Spesifikasi
(Rp) (Rp)
11.2. Sanitair dan Instalasi Air
11.2.1. Pemasangan Kloset duduk 1.0000 Bh Kloset DUTY monoblok 1,200,000.00 1,200,000.00