REKAPITULASI
Harga
Volum Jumlah Harga
No Uraian Pekerjaan Satuan ( Rp )
e ( Rp )
I PEKERJAAN PENDAHULUAN
Catatan :
Mutu beton : fc' = 22,5 Mpa (camp. 1: 2: 3)
1 Betom sloof 15x20cm & ring balk 1.18 m3 2,701,360.00 3,187,604.80
2 Beton kolom praktis 15x15cm 1.56 m³ 2,041,540.00 3,184,802.40
Sub 6,372,407.20
Jumlah
V PEKERJAAN PASANGAN DAN
PLESTERAN
1 Pasang dinding HEBEL/CELCON 200.48 m² 48,000.00 9,623,040.00
2 Plesteran dinding camp. 1pc:5psr 343.08 m² 15,040.00 5,159,923.20
3 Sponengan 217.78 m1 3,370.00 733,918.60
Sub 15,516,881.80
VI PEKERJAAN LANTAI DAN PLAFOND Jumlah
PENUTUP ATAP
1 Keramik lantai 30x30 cm (setara platinum) 41.90 m² 75,730.00 3,173,087.00
2 Keramik lantai km 20x20 (setara platinum) 2.25 m² 65,230.00 146,767.50
3 Keramik dinding km 20x25 cm (setara 9.00 m² 73,480.00 661,320.00
4 platinum)
Plin keramik 10x30cm (setara platinum) 44.99 m1 25,243.33 1,135,697.42
5 Plafond gypsumboard t=9mm rangka kayu 57.41 m² 72,500.00 4,162,225.00
6 List plafond gypsum 63.44 m' 17,500.00 1,110,200.00
6 List plank kayu (25 tebal 2cm) 14.86 m' 28,870.00 429,008.20
7 Rangka atap (kuda2, usuk, reng kayu 64.08 m² 142,940.00 9,159,595.20
7 kalimantan)
Penutup atap(genteng keramik KIA) 64.08 m² 90,750.00 5,815,260.00
8 Bubungan 25.80 m' 70,590.00 1,821,222.00
Sub 27,614,382.32
Jumlah
VI PEKERJAAN FINISHING
I
1 Cat dinding tembok dalam catylac 343.08 m² 12,500.00 4,288,500.00
2 Cat langit-langit 57.41 m² 9,500.00 545,395.00
Sub 4,833,895.00
Jumlah
VI SALURAN KELILING AIR HUJAN
II
1 Saluran air hujan U 20 6.00 m' 124,320.00 745,920.00
Sub 745,920.00
Jumlah Harga
Volum Jumlah Harga
No Uraian Pekerjaan Satuan ( Rp )
e
( Rp )
IX PEKERJAAN PINTU JENDELA DAN
KANOPI
1 Pek. Pintu P1 kayu Sengon finishing melamin 3.000 unit 1,566,000.00 4,698,000.00
2 Pek. Pintu P2 kayu Sengon finishing melamin 1.000 unit 1,566,000.00 1,566,000.00
3 Pek. Pintu PVC P3 murico 1.000 unit 225,000.00 225,000.00
4 Jendela J1 kayu Sengon finishing melamin 5.000 unit 749,225.00 3,746,125.00
5 Kanopi polycarbonate (rangka hollow 9.000 m² 425,000.00 3,825,000.00
stainless stell)
Sub 14,060,125.00
X PEKERJAAN MEKANIKAL & ELEKTRIKAL Jumlah
A Pekerjaan elektrikal
B Pekerjaan Mekanikal
8 2.775
4 2.775
15 1.48
15 0.74
UPAH TENAGA
I. Bahan Dasar
1 BATU KALI Pecah '10/15 m³ Rp 72,500.00
2 KERIKIL Timbun m³ Rp 60,000.00
Sawur/Koral m³ Rp 90,000.00
Beton '0.5/1 m³ Rp 180,000.00
Beton '1/2 m³ Rp 160,000.00
Beton '2/3 m³ Rp 110,000.00
3 BATU BATA lokal buah Rp 500.00
4 PASIR Urug m³ Rp 65,000.00
Pasang m³ Rp 95,000.00
Beton m³ Rp 115,000.00
5 TANAH Padas m³ Rp 60,000.00
Liat m³ Rp 70,000.00
6 KAPUR Pasang m³ Rp 225,000.00
Semen Merah m³ Rp 150,000.00
7 PORTLAND CEMENT
Gresik 40 kg kg Rp 1,300.00
Gresik 50 kg kg Rp 1,300.00
Semen Putih 40 kg kg Rp 2,000.00
Semen Putih 50 kg kg Rp 2,000.00
Semen warna kg Rp 8,000.00
V. Bahan Cetak
1 BUIS BETON Ø
Ø 10 cm - 100 cm bh Rp 23,094.50
Ø 20 cm - 100 cm bh Rp 41,990.00
Ø 30 cm - 100 cm bh Rp 54,587.00
Ø 50 cm - 100 cm bh Rp 78,731.25
Ø 60 cm - 100 cm bh Rp 86,079.50
U 70 cm - 100 cm bh Rp 125,970.00
U 10 cm - 100 cm bh Rp 13,856.70
U 15 cm - 100 cm bh Rp 17,845.75
U 20 cm - 100 cm bh Rp 23,094.50
U 30 cm - 100 cm bh Rp 28,343.25
U 50 cm - 100 cm bh Rp 33,592.00
V. Bahan Besi
1 BESI BETON
Besi Beton Polos U 24 kg Rp 13,000.00
Besi Beton Ulir U 32 kg Rp 13,000.00
2 BESI PLAT
Besi Strip kg Rp 9,500.00
2 KAWAT
- Ikat beton/bendrat kg Rp 16,000.00
2 RANGKA HOLLOW
Hollow silver 4 x 4 cm btg Rp 35,000.00
3 mm m² Rp 53,000.00
5 mm m² Rp 65,000.00
2 ES KABUR
3 mm m² Rp 58,000.00
5 mm m² Rp 75,000.00
3 RAY BAND
5 mm m² Rp 59,000.00
8 mm m² Rp 67,000.00
4 KACA NAKO
5 mm per daun Rp 8,000.00
PENGGANTUNG
Rod (pj. 3,6 m') bh Rp 4,500.00
Suspention clip bh Rp 2,500.00
Paku Sekrup kg Rp 12,000.00
Repet dos Rp 7,500.00
XII. Lain-Lain
1 Water proofing setara SIKA kg Rp 45,000.00
2 Minyak begesting ltr Rp 10,000.00
3 Air ltr Rp 75.00
Alat Berat
1 Dump truck kapasitas 4 m³ per jam Rp 150,000.00
2 Wheel loader per jam Rp 225,000.00
3 AMP per jam Rp 2,500,000.00
4 Genset per jam Rp 250,000.00
5 Asphalt Finisher per jam Rp 150,000.00
6 Tandem Roller per jam Rp 120,000.00
7 P. Tyre Roller per jam Rp 155,000.00
8 Stamper per jam Rp 50,000.00
9 Alat bantu ls Rp 2,000.00
BATU KALIPecah '10/15
KERIKILTimbun
Sawur/Koral
Beton '0.5/1
Beton '1/2
Beton '2/3
BATU BATAlokal
PASIRUrug
Pasang
Beton
TANAHPadas
Liat
KAPURPasang
Semen Merah
PORTLAND CEMENT
Gresik 40 kg
Gresik 50 kg
Semen Putih 40 kg
Semen Putih 50 kg
Semen warna
Genteng kodok
POLYCARBONAT
Polycarbonat
JATIPapan
Balok/ pesagen
KAMPERPapan
Balok/ pesagen
KRUINGPapan
Balok/ pesagen
MERANTIPapan
Balok/ pesagen
LANANPapan
Balok/ pesagen
BENGKIRAIPapan
Balok/ pesagen
DOLKEN
Sedang dia 8 - 10 x 400 cm
Kecil dia 6 - 7 x 400 cm
Besar dia 10 - 12 x 400 cm
Kayu cetakan
Kayu bakar
Formite/penjaga jarak/spacer
PLYWOOD
Ukuran 9 mm
V. Bahan Cetak
BUIS BETON Ø
Ø10 cm - 100 cm
Ø20 cm - 100 cm
Ø30 cm - 100 cm
Ø50 cm - 100 cm
Ø60 cm - 100 cm
U70 cm - 100 cm
U10 cm - 100 cm
U15 cm - 100 cm
U20 cm - 100 cm
U30 cm - 100 cm
U50 cm - 100 cm
V. Bahan Besi
BESI BETON
Besi Beton Polos U 24
Besi Beton Ulir U 32
BESI PLAT
Besi Strip
KAWAT
- Ikat beton/bendrat
RANGKA HOLLOW
Hollow silver 4 x 4 cm
POLOS
3 mm
5 mm
ES KABUR
3 mm
5 mm
RAY BAND
5 mm
8 mm
KACA NAKO
5 mm
KUNCI TANAM
Union : 1 X slag
Union : 1 X slag
Yale :
Yale :
Kuda :
Engsel angin
Kupu-kupu biasa
Nylon kupu-kupu
Espagnoled -
Grendel Tanamdalam negeri
Grendel biasa
Kait angin
Door stop
PEDOMAN :
- SNI 2836 - 2008 - Pekerjaan Fondasi
- SNI 7394 - 2008 - Pekerjaan Beton
- SNI 6897 - 2008 - Pekerjaan Dinding
- SNI 2837 - 2008 - Pekerjaan Plesteran
- SNI 7395 - 2008 - Pekerjaan Penutup Lantai Dinding
- SNI 7393 - 2008 - Pekerjaan Besi Aluminium
- SNI 2839 - 2008 - Pekerjaan Langit-Langit
- SNI 3434 - 2008 - Pekerjaan Kayu
- SNI 2835 - 2008 - Pekerjaan Tanah
I PEKERJAAN PERSIAPAN
1 1 m2 Pembersihan Lapangan Rp 19,500.00
4 1 m2 Acian Rp 420,700.00