Rencana Anggaran Biaya

RUAMH BANTUAN PASCA GEMPA BUMI DI


SERAM BAIGIAN BARAT (SBB)
ESTIMATE ESTIMATE (EE)
KODE HARGA
JUMLAH HARGA
NO. URAIAN VOLUME SAT. SATUAN
(Rp.)
ANALISA (Rp.)
1 PEMATANGAN LAHAN
PEKERJAAN PERSIAPAN
1. Pembersian Lapangan 288.00 M2 An. 01 16,500.00 4,752,000.00
2. Pemasangan Bowplan 288.00 M2 An. 02 74,520.00 21,461,760.00
3. Pembangunan Direksiket 18.00 M2 An. 03 683,103.94 12,295,870.93
38,509,630.93
2 PEKERJAAN TANAH
PEKERJAAN GALIAN & PEMADATAN
1 . Galian Pondasi Batu Kali 15.60 M3 An. 04 59,438.00 927,232.80
2 . Urugan Tanah Bekas Galian 7.80 M3 An. 05 21,670.00 169,026.00
3 . Pemadatan Tanah Dalam 34.56 M3 An. 05 314,745.00 10,877,587.20
4 . Pemadatan Pasir Bawah Lantai 14.40 M3 An. 06 261,500.00 3,765,600.00
15,739,446.00
3 PEKERJAAN PLESTERAN DAN BETON
1. Coor lantai dalam ruangan 14.40 M3 An. 10 1,749,000.00 25,185,600.00
2. Plesteran lantai 1 : 3 288.00 M2 An. 08 84,560.00 24,353,280.00
3. Acian lantai 288.00 M2 An. 09 35,020.00 10,085,760.00
59,624,640.00
4 PEKERJAAN KUDA-KUDA DAN ATAP
1 . Kuda-kuda Kayu Klas II (balok 5/10cm) 1.08 M3 - 3,100,000.00 3,340,715.00
2 . Rangka Skor / pengunci Kuda-kuda kayu klas II (balok 4/10cm) 0.41 M3 - 3,100,000.00 1,270,535.00
3 Gordingkayu klas II (balok 5/7 cm) 2.00 M3 - 3,100,000.00 6,206,200.00
4 . Nook kayu klas II (balok 5/7cm) 0.13 M3 - 3,100,000.00 403,000.00
5 . Atap Zink BJLS 0.02mm 210.60 M2 - 135,000.00 28,431,000.00
6 . Atap Zink Licin Bumbungan BJLS 0.02mm 26.00 M' - 55,000.00 1,430,000.00
7 . Liesplan papan klas II 0.53 M2 - 3,100,000.00 1,627,500.00
42,708,950.00
5 PEKERJAAN STRUKTUR KAYU
1 . Kolom kayu klas II (balok 10/10cm) 1.72 M3 - 3,100,000.00 5,316,500.00
2 . Balok pengunci atas kayu klas II (balok 5/10cm) 1.32 M3 - 3,100,000.00 4,092,000.00
3 Balok pengunci tengah kayu klas II (balok 5/10cm) 1.32 M3 - 3,100,000.00 4,092,000.00
4 Balok pengunci bawah kayu klas II (balok 5/10cm) 1.32 M3 - 3,100,000.00 4,092,000.00
5 . Kolom pintu dan jendela kayu klas II (balok 5/10cm) 0.84 M3 - 3,100,000.00 2,604,000.00
6 . Pasangan dinding papan kayu klas II 1.89 M3 - 3,250,000.00 6,146,400.00
7 . Pasangan dinding Tripleks 6 mm 91.55 M2 - 95,000.00 8,697,478.00
8 . Pasangan dinding zink licin penutup samping atap 46.04 M2 - 85,000.00 3,913,434.00
35,040,378.00
6 PEKERJAAN PINTU DAN JENDELA
1. Kusen Pintu Daun Pintu (lengkap acsesories) 12.00 Pasang - 500,000.00 6,000,000.00
2. Kusen jendela dan Jendela (lengkap acsesories) + Bingkai Kaca 5mm 12.00 Pasang - 350,000.00 4,200,000.00
10,200,000.00
7 PEKERJAAN INSTALASI LISTRIK ( Elektrikal)
Instalasi Titik Cahaya
1 . Titik Nyala/ Lampu 32.00 Ttk - 150,000.00 4,800,000.00
2 . Lampu Philips 18 watt 16.00 Bh An. 11 91,530.00 1,464,480.00
3 . Stop Kontak 16.00 Bh An. 12 61,530.00 984,480.00
4 . Saklar Tunggal 16.00 Bh An. 13 56,530.00 904,480.00
5 . Kable NYY 4 x 16 2.00 Rol - 1,800,000.00 3,600,000.00
6 . Kable NYM 3 x 2,5 1.00 Rol - 1,300,000.00 1,300,000.00
7 . MCB 4.00 Set An. 14 343,935.50 1,375,742.00
14,429,182.00
TOTAL JUMLAH …………………. ( OK. ) 216,252,226.93