HARGA
NO URAIAN PEKERJAAN QTY JUMLAH (Rp)
SATUAN (Rp)
1 PEKERJAAN PERSIAPAN
Pembersihan Lokasi Awal dan Akhir Ls 1 300,000.00 300,000.00
Pengukuran dan Pemasangan Bowplank Ls 1 300,000.00 300,000.00
Pembuatan Papan Nama Kegiatan Unit 1 300,000.00 300,000.00
Rencana Kesehatan dan Keselamatan Kerja (RK3) Ls 1 1,100,000.00 1,100,000.00
2 PEKERJAAN TANAH DAN PONDASI
Galian Tanah Pondasi Batu Gunung M3 6.6 88,275.00 582,615.00
Urugan Kembali Bekas Galian M3 2.2 63,250.00 139,150.00
Urugan Tanah Bawah Lantai M3 4.8 195,250.00 937,200.00
Urugan Pasir Alas Pondasi M3 0.6 167,310.00 100,386.00
Urugan Pasir Bawah Lantai M3 1.2 167,310.00 200,772.00
Pondasi Batu Gunung M3 4.88 929,473.00 4,535,828.24
3 PEKERJAAN BETON BERTULANG
Sloof (SL) 15/20 cm M3 0.48 5,430,405.00 2,606,594.40
Kolom Praktis (KP) 11/11 cm M 18 125,016.00 2,250,288.00
Ring Balok Praktis (RB) 11/15 cm M 16 159,830.00 2,557,280.00
Top Gevel (TG) 11/11 M 6.34 125,016.00 792,601.44
PEKERJAAN PASANGAN
Pasangan Batu Bata 1 4 M2 44.86 149,485.00 6,705,897.10
Plesteran 1 4 M2 89.72 75,752.00 6,796,469.44
Acian Pada Beton Bertulang M2 3.2 46,637.00 149,238.40
List Profil M 32 22,567.00 722,144.00
Lubang Ventilasi Bh 4 20,000.00 80,000.00
4 PEKERJAAN LANTAI
Lantai Beton Cor 1 3 5 T = 5 cm dihaluskan M3 1.06 1,204,867.00 1,277,159.02
5 PEKERJAAN ATAP DAN PLAFOND
Pemasangan Kuda - kuda kayu M3 0.35 11,013,420.00 3,854,697.00
Pemasangan Gording M3 0.25 9,977,132.00 2,494,283.00
Atap Seng BJLS T. 0,20 mm Cat pabrik tampa sambung M2 42.6 129,663.00 5,523,643.80
Rabung Atap Seng Primadeck M 6 65,000.00 390,000.00
Rangka Plafond M2 31.86 176,748.00 5,631,191.28
Plafond Multiplek 4 mm M2 31.86 67,812.00 2,160,490.32
Listplank Papan 2/23 cm M 24.96 65,000.00 1,622,400.00
6 PEKERJAAN PINTU DAN JENDELA
Perkayuan Kusen Pintu dan Ventilasi M3 0.16 12,295,580.00 1,967,292.80
Daun Pintu (P1) + Cat Lengkap Terpasang Unit 1 1,500,000.00 1,500,000.00
Jendela (J1) + Cat Lengkap Terpasang Unit 2 1,270,000.00 2,540,000.00
7 PEKERJAAN PENGECATAN
Cat Dinding dalam setara avitek M2 41.9 37,328.00 1,564,043.20
Cat Dinding Luar dengan Cat Acrylic (Sunguard ) M2 51.22 65,213.00 3,340,209.86
Cat Plafond setara avitex M2 31.86 37,328.00 1,189,270.08
Cat Listplank Kayu M2 5.74 58,172.00 333,907.28
Page 1 of 10
HARGA
NO URAIAN PEKERJAAN QTY JUMLAH (Rp)
SATUAN (Rp)
TOTAL 74,565,756.81
PEMBULATAN 74,565,000.00
Page 2 of 10
LAMPIRAN BAP KLARIFIKASI DAN NEGOISASI TEKNIS DAN BIAYA
1 PEKERJAAN PERSIAPAN
Pembersihan Lokasi Awal dan Akhir Ls 1 300,000.00 300,000.00 300,000.00 300,000.00 300,000.00 300,000.00
Pengukuran dan Pemasangan Bowplank Ls 1 300,000.00 300,000.00 300,000.00 300,000.00 300,000.00 300,000.00
Pembuatan Papan Nama Kegiatan Unit 1 300,000.00 300,000.00 300,000.00 300,000.00 300,000.00 300,000.00
Rencana Kesehatan dan Keselamatan Kerja (RK3) Ls 1 1,221,500.00 1,221,500.00 1,100,000.00 1,100,000.00 1,100,000.00 1,100,000.00
2 PEKERJAAN TANAH DAN PONDASI
Galian Tanah Pondasi Batu Gunung M3 6.6 88,275.00 582,615.00 88,275.00 582,615.00 88,275.00 582,615.00
Urugan Kembali Bekas Galian M3 2.2 63,250.00 139,150.00 63,250.00 139,150.00 63,250.00 139,150.00
Urugan Tanah Bawah Lantai M3 4.8 195,250.00 937,200.00 195,250.00 937,200.00 195,250.00 937,200.00
Urugan Pasir Alas Pondasi M3 0.6 167,310.00 100,386.00 167,310.00 100,386.00 167,310.00 100,386.00
Urugan Pasir Bawah Lantai M3 1.2 167,310.00 200,772.00 167,310.00 200,772.00 167,310.00 200,772.00
Pondasi Batu Gunung M3 4.88 929,473.00 4,535,828.24 929,473.00 4,535,828.24 929,473.00 4,535,828.24
3 PEKERJAAN BETON BERTULANG
Sloof (SL) 15/20 cm M3 0.48 5,430,405.00 2,606,594.40 5,430,405.00 2,606,594.40 5,430,405.00 2,606,594.40
Kolom Praktis (KP) 11/11 cm M 18 125,016.00 2,250,288.00 125,016.00 2,250,288.00 125,016.00 2,250,288.00
Ring Balok Praktis (RB) 11/15 cm M 16 159,830.00 2,557,280.00 159,830.00 2,557,280.00 159,830.00 2,557,280.00
Top Gevel (TG) 11/11 M 6.34 125,016.00 792,601.44 125,016.00 792,601.44 125,016.00 792,601.44
PEKERJAAN PASANGAN
Pasangan Batu Bata 1 4 M2 44.86 149,485.00 6,705,897.10 149,485.00 6,705,897.10 149,485.00 6,705,897.10
Plesteran 1 4 M2 89.72 75,752.00 6,796,469.44 75,752.00 6,796,469.44 75,752.00 6,796,469.44
Acian Pada Beton Bertulang M2 3.2 46,637.00 149,238.40 46,637.00 149,238.40 46,637.00 149,238.40
List Profil M 32 22,567.00 722,144.00 22,567.00 722,144.00 22,567.00 722,144.00
Lubang Ventilasi Bh 4 20,000.00 80,000.00 20,000.00 80,000.00 20,000.00 80,000.00
4 PEKERJAAN LANTAI
Lantai Beton Cor 1 3 5 T = 5 cm dihaluskan M3 1.06 1,204,867.00 1,277,159.02 1,204,867.00 1,277,159.02 1,204,867.00 1,277,159.02
5 PEKERJAAN ATAP DAN PLAFOND
Pemasangan Kuda - kuda kayu M3 0.35 11,013,420.00 3,854,697.00 11,013,420.00 3,854,697.00 11,013,420.00 3,854,697.00
Pemasangan Gording M3 0.25 9,977,132.00 2,494,283.00 9,977,132.00 2,494,283.00 9,977,132.00 2,494,283.00
Atap Seng BJLS T. 0,20 mm Cat pabrik tampa sambung M2 42.6 129,663.00 5,523,643.80 129,663.00 5,523,643.80 129,663.00 5,523,643.80
Rabung Atap Seng Primadeck M 6 65,000.00 390,000.00 65,000.00 390,000.00 65,000.00 390,000.00
Rangka Plafond M2 31.86 176,748.00 5,631,191.28 176,748.00 5,631,191.28 176,748.00 5,631,191.28
Plafond Multiplek 4 mm M2 31.86 67,812.00 2,160,490.32 67,812.00 2,160,490.32 67,812.00 2,160,490.32
Listplank Papan 2/23 cm M 24.96 65,000.00 1,622,400.00 65,000.00 1,622,400.00 65,000.00 1,622,400.00
6 PEKERJAAN PINTU DAN JENDELA
Perkayuan Kusen Pintu dan Ventilasi M3 0.16 12,295,580.00 1,967,292.80 12,295,580.00 1,967,292.80 12,295,580.00 1,967,292.80
Daun Pintu (P1) + Cat Lengkap Terpasang Unit 1 1,500,000.00 1,500,000.00 1,500,000.00 1,500,000.00 1,500,000.00 1,500,000.00
Jendela (J1) + Cat Lengkap Terpasang Unit 2 1,270,000.00 2,540,000.00 1,270,000.00 2,540,000.00 1,270,000.00 2,540,000.00
7 PEKERJAAN PENGECATAN
Page 3 of 10
HPS PENAWARAN NEGOISASI
NO URAIAN PEKERJAAN QTY
HARGA HARGA HARGA
JUMLAH (Rp) JUMLAH (Rp) JUMLAH (Rp)
SATUAN (Rp) SATUAN (Rp) SATUAN (Rp)
Cat Dinding dalam setara avitek M2 41.9 37,328.00 1,564,043.20 37,328.00 1,564,043.20 37,328.00 1,564,043.20
Cat Dinding Luar dengan Cat Acrylic (Sunguard ) M2 51.22 65,213.00 3,340,209.86 65,213.00 3,340,209.86 65,213.00 3,340,209.86
Cat Plafond setara avitex M2 31.86 37,328.00 1,189,270.08 37,328.00 1,189,270.08 37,328.00 1,189,270.08
Cat Listplank Kayu M2 5.74 58,172.00 333,907.28 58,172.00 333,907.28 58,172.00 333,907.28
8 PEKERJAAN INSTALASI LISTRIK
Box Zakering MCB Bh 1 200,000.00 200,000.00 200,000.00 200,000.00 200,000.00 200,000.00
Lampu Hemat Energi 18 Watt + Viting tempel Bh 3 78,000.00 234,000.00 78,000.00 234,000.00 78,000.00 234,000.00
Pekerjaan Titik Api/Cahaya + Instalasi Bh 5 120,000.00 600,000.00 120,000.00 600,000.00 120,000.00 600,000.00
Stop Kontak Bh 2 66,000.00 132,000.00 66,000.00 132,000.00 66,000.00 132,000.00
Saklar Triple Bh 1 76,000.00 76,000.00 76,000.00 76,000.00 76,000.00 76,000.00
Page 4 of 10
BERITA ACARA KLARIFIKASI DAN NEGOISASI TEKNIS DAN BIAYA
Pada Hari ini Kamis Tanggal Tiga Puluh Bulan Juni Tahun Dua Ribu Dua Puluh Dua, kami yang
bertanda tangan dibawah ini Pejabat Pengadaan Dinas Pendidikan dan Kebudayaan Kota Sabang Tahun
Anggaran 2022, telah melakukan Klarifikasi dan Negoisasi terhadap dokomen Penawaran yang tersebut
dibawah ini :
Demikian Berita Acara ini dibuat dengan benar untuk dipergunakan sebagaimana mestinya