RENCANA ANGGARAN BIAYA PENYAMBUNGAN LISTRIK BARU 82500 VA

NO.PARTS/ HARGA HARGA


Kode U R A I A N NORMALISASI STN VOL SATUAN 2019 PIHAK MAT. PLN BIAYA YANG DIPERLUKAN PIHAK REKANAN
2019 (Rp.) ( Rp. )
( Rp )
Perkiraan
PLN III MATERIAL JASA JUMLAH TOTAL
I. Material Yang Akan Dipasang
TIANG TM
1 Tiang Beton 12 Mtr - 350 daN 3030077 Btg 2 7,120,000.00 I 14,240,000 #NA# - -
2 Cross Arm Steel 100 x 50 x 5 x 2000 mm Galvanis 3040035 Btg 9 580,160.00 I 5,221,440 #NA# - -
3 Pin Post Insulator 20 kV 3070151 Bh 6 193,000.00 I 1,158,000 #NA# - -
4 Supension Insulator 20 Kv, 2 Disc (Lengkap Accs) 3070031 Set 12 335,000.00 I 4,020,000 #NA# - -
5 Ligthning Arrester 24 KV, 10 kA ( POLIMER ) 2090032 Bh 3 740,000.00 I 2,220,000 #NA# - -
6 Kawat AAAC 70 mm² 3050081 Mtr 450 9,500.00 I 4,275,000 #NA# - -
7 Trafo Dist. 3 Phasa 20 KV 100 KVA 1030007 Unit 1 40,470,000.00 I 40,470,000 #NA# - -
8 Kabel TR NYY 4 x 95 mm², 0,6/1 KV 3110181 Mtr 40 244,198.00 I 9,767,920 #NA# - -
TOTAL BIAYA MATERIAL 81,372,360
II. URAIAN PEKERJAAN -
A.KELOMPOK JTM -
a.1 TIANG TM -
1 Pengorekan Lubang Tiang Beton 12m - 350 dAN 3 110500 I 331,500 #NA# - -
2 Pemasangan Konstruksi C 1 1 33280 I 33,280 #NA# - -
3 Pemasangan Konstruksi C 4 1 125190 I 125,190 #NA# - -
4 Pemasangan Konstruksi C 7 1 83460 I 83,460 #NA#
5 Mendirikan Tiang Beton 12 - 350 daN 3 411431 I 1,234,293 #NA#
6 Pemasangan Trafo Distribusi 100 KVA, 3 Phasa, 20 KV/400 V 1 681235 I 681,235 #NA#
TOTAL BIAYA JASA 2,488,958
Jumlah Total I+II 83,861,318
III Kabel NYFGBY 4X70 MM Mtr 170 497000 84,490,000
Biaya Penyambungan Baru(BP) I 83,000,000
Uang Jaminan Langganan I 11,750,000
SLO ( SERTIKAT LAIK OPERASI ) I 2,500,000
Jasa CV I 25,750,000
Jumlah 207,490,000
PPN 10% 20,749,000
Jumlah Total 228,239,000
Jumlah Total I+II+III 312,100,318
Jumlah Penawaran Terbilang : Dua Ratus Sembilan Belas Juta Tujuh Ratus Sembilan Puluh Ribu Rupiah

CV. AKAR JAYA


18 Februari 2019 18 Februari 2019
11 Maret 2019 21 20 Februari 2019
18 Februari 2019
Andi Hardiansyah 19 Februari 2019
Direktur 20 Februari 2019
21 Februari 2019
22 Februari 2019
23 Februari 2019
24 Februari 2019
25 Februari 2019
26 Februari 2019
27 Februari 2019
28 Februari 2019
01 Maret 2019
02 Maret 2019
03 Maret 2019
04 Maret 2019
05 Maret 2019
06 Maret 2019
07 Maret 2019
08 Maret 2019
09 Maret 2019
10 Maret 2019
11 Maret 2019
12 Maret 2019
Nomor : 003/LP/DS/II/2019
Lampiran : -
Kepada Yth : Project Manager PT. Waskita Karya ( Persero ) Tbk Zona I
RENCANA ANGGARAN BIAYA PENGGANTIAN KABEL SUTM MENJADI SKTM 20KV

NO.PARTS/ HARGA HARGA


Kode U R A I A N NORMALISA STN VOL SATUAN 2019 P I H A K MAT. PLN BIAYA YANG DIPERLUKAN PIHAK REKANAN
SI 2019 (Rp.) ( Rp. )

Perkiraan ( Rp )
PLN III MATERIAL JASA
I. Material Yang Akan Dipasang

1 Kabel XLPE 3 x 240 mm² 20 KV (NA2XSEYBY) 0003110015 Mtr 348 566,400

2 Cross Arm Steel 100 x 50 x 5 x 2400 mm Galvanis 3040035 Btg 4 580,360.00


3 Jointing Kit 3 M 20 KV 3 x 240 - 400 mm² 0003120369 Set 4 5,309,500

4 Supension Insulator 20 Kv, 2 Disc (Lengkap Accs) 3070031 Set 24 335,000.00


5 Ligthning Arrester 24 KV, 10 kA ( POLIMER ) 2090032 Bh 3 740,000.00
6 Terminating 1 x 240 - 400 mm², 20 KV, ID 0003150008 Set 4 5,250,000

7 Pipa GALVANIS 6M X 4'' 1030007 Unit 4 447,000.00

TOTAL BIAYA MATERIAL -

II. URAIAN PEKERJAAN -

A.KELOMPOK JTM -
1 Pengorekan / Penimbunan Con Blok u/KJTM untuk 1 Jalur Kabel
MTR 300 64700
( Uk. Kedalaman 1,2 Mtr x Lebar 0,4 Mtr) -

2 Upah Kerja Pemasangan Kontruksi dan Pemasangan kabel Set


1 25700000
3 Biaya Pemadaman Listrik 20 kv Double Feeder hr 2 14000000

TOTAL BIAYA JASA

III Jumlah I+II


PPH 2%
Jumlah Total I+II+III

Jumlah Penawaran Terbilang : Tiga Ratus Enam Juta Dua Ratus Dua Puluh Delapan Ribu Enam Ratus Lima Puluh Satu Rupiah.

CV. AKAR JAYA

Andi Hardiansyah
Direktur
DIPERLUKAN PIHAK REKANAN

JUMLAH TOTAL

197,107,200
2,321,440
21,238,000
8,040,000.00
2,220,000
21,000,000
1,788,000
-
253,714,640.00

19,410,000.00

25,700,000.00
28,000,000.00
-

73,110,000.00

326,824,640.00
6,536,492.80
333,361,132.80