Anda di halaman 1dari 15

1 of 3

Project : LINE PJT WP2 AWH


Project Title : SandBlasting Painting
Client : Space Technology
Date : 31 October 2023

SUMMARY BREAKDOWN FINISH COAT ITEM


NON FIRE PROOFING
TAGGING WEIGTH QTY TOTAL FINISH REMARKS
NO ITEM / TYPE
NUMBER ( kg ) (Pcs) ( kg ) COAT
1 TRUSS CN-T011 2,680.52 1 2,680.52 03/10/2023
TRUSS CN-T016 2,921.15 1 2,921.15
BEAM CN-B028 347.35 3 1,042.05
BEAM CN-B024 353.88 3 1,061.64
BEAM CN-B016 351.02 2 702.04
BEAM CN-B027 351.95 1 351.95
BEAM CN-B020 352.84 3 1,058.52
TRUSS CN-T002 2,700.21 1 2,700.21
12,518.08
2 TRUSS CN-T018 2,898.25 1 2,898.25 04/10/2023
TRUSS CN-T005 2,690.18 1 2,690.18
TRUSS CN-T012 2,658.22 1 2,658.22
BEAM CN-B024 353.88 1 353.88
COLUMN CN-C1004 1,616.67 1 1,616.67
10,217.20
3 COLUMN CN-C1004 1,616.67 1 1,616.67 05/10/2023
COLUMN CN-C1002 1,519.36 1 1,519.36
COLUMN CN-C1007 2,175.56 1 2,175.56
BEAM CN-B020 352.84 2 705.68
BEAM CN-B024 353.88 4 1,415.52
COLUMN CN-C1006 2,279.70 1 2,279.70
9,712.49
4 COLUMN CN-C1005 1,519.36 1 1,519.36 06/10/2023
COLUMN CN-C1003 1,616.67 1 1,616.67
BEAM CN-B019 357.43 1 357.43
BEAM CN-B023 359.24 1 359.24
COLUMN CN-C1008 2,279.70 2 4,559.40
BEAM CN-B028 347.35 1 347.35
8,759.45
5 COLUMN CN-C1009 2,175.56 1 2,175.56 07/10/2023
TRUSS CN-T1003 2,578.26 1 2,578.26
BEAM CN-B1002 413.48 1 413.48
BEAM CN-B1006 308.96 1 308.96
BEAM CN-B1011 408.13 2 816.26
TRUSS CN-T1008 2,846.17 1 2,846.17
9,138.69

TOTAL 50,345.91 Kg

Prepared by, Knowledge by, Approved by,


PT.RAMOS PUTRA PERTAMA PT.SPACE TECHNOLOGY PT.SPACE TECHNOLOGY

( JONNER SAMOSIR ) ( ) ( )
2 of 3

Project : LINE PJT WP2 AWH


Project Title : SandBlasting Painting
Client : Space Technology
Date : 31 October 2023

SUMMARY BREAKDOWN FINISH COAT ITEM


NON FIRE PROOFING
TAGGING WEIGTH QTY TOTAL FINISH REMARKS
NO ITEM / TYPE
NUMBER ( kg ) (Pcs) ( kg ) COAT
6 TRUSS CN-T006 2,658.48 1 2,658.48 09/10/2023
TRUSS CN-T1010 2,822.97 1 2,822.97
GIRDER CN-G1002 1,189.11 2 2,378.22
GIRDER CN-G1004 1,189.18 2 2,378.36
GIRDER CN-G1003 744.50 1 744.50
GIRDER CN-G1001 744.22 1 744.22
BEAM CN-B1006 308.96 1 308.96
BEAM CN-B1011 408.13 1 408.13
12,443.84
7 GIRDER CN-G1002 1,189.11 1 1,189.11 10/10/2023
GIRDER CN-G1004 1,189.18 1 1,189.18
BEAM CN-B1006 308.96 3 926.88
BEAM CN-B1003 613.67 1 613.67
BEAM CN-B1011 408.13 1 408.13
BEAM CN-B1001 408.13 3 1,224.39
TRUSS CN-T1001 2,556.94 1 2,556.94
VBRACE CN-VB1001 12.90 1 12.90
VBRACE CN-VB1002 12.90 1 12.90
BEAM CN-B1007 312.79 1 312.79
HBRACE CN-HB018 14.11 1 14.11
8,461.00
8 TRUSS CN-T1004 2,586.95 1 2,586.95 11/10/2023
BEAM CN-B1003 613.67 1 613.67
BEAM CN-B1005 948.18 1 948.18
BEAM CN-B1009 928.59 1 928.59
BEAM CN-B1004 929.00 1 929.00
BEAM CN-B1006 308.96 1 308.96
BEAM CN-B1001 408.13 2 816.26
7,131.61
9 TRUSS CN-T1006 2,823.08 1 2,823.08 12/10/2023
TRUSS CN-T1009 2,854.37 1 2,854.37
BEAM CN-B1009 928.59 1 928.59
BEAM CN-B1010 948.22 1 948.22
HBRACE CN-HB041 17.61 1 17.61
7,571.87
10 BEAM CN-B1004 929.00 1 929.00 13/10/2023
BEAM CN-B1008 613.69 1 613.69
TRUSS CN-T1005 2,556.83 1 2,556.83
TRUSS CN-T1002 2,587.06 1 2,587.06
BEAM CN-B1001 408.13 2 816.26
7,502.84

TOTAL 43,111.16 Kg

Prepared by, Knowledge by, Approved by,


PT.RAMOS PUTRA PERTAMA PT.SPACE TECHNOLOGY PT.SPACE TECHNOLOGY

( JONNER SAMOSIR ) ( ) ( )
3 of 3

Project : LINE PJT WP2 AWH


Project Title : SandBlasting Painting
Client : Space Technology
Date : 16 September 2023

SUMMARY BREAKDOWN FINISH COAT ITEM


NON FIRE PROOFING
TAGGING WEIGTH QTY TOTAL FINISH REMARKS
NO ITEM / TYPE
NUMBER ( kg ) (Pcs) ( kg ) COAT
11 BEAM CN-B1011 408.13 2 816.26 14/10/2023
HBRACE CN-HB1035 45.51 3 136.53
HBRACE CN-HB1033 47.91 3 143.73
HBRACE CN-HB1008 48.14 3 144.42
HBRACE CN-HB1039 19.97 1 19.97
HBRACE CN-HB1007 45.75 3 137.25
HBRACE CN-HB1006 45.67 1 45.67
HBRACE CN-HB1009 47.91 3 143.73
HBRACE CN-HB1010 47.86 1 47.86
HBRACE CN-HB1019 14.94 2 29.88
HBRACE CN-HB1020 14.87 2 29.74
HBRACE CN-HB1014 23.02 3 69.06
HBRACE CN-HB1030 23.26 3 69.78
HBRACE CN-HB1026 17.42 1 17.42
HBRACE CN-HB1005 21.47 3 64.41
HBRACE CN-HB1029 21.79 3 65.37
HBRACE CN-HB1017 17.60 1 17.60
HBRACE CN-HB1003 19.88 3 59.64
HBRACE CN-HB1031 23.23 1 23.23
HBRACE CN-HB1012 20.47 6 122.82
HBRACE CN-HB1037 21.23 3 63.69
HBRACE CN-HB1034 47.86 1 47.86
HBRACE CN-HB1032 48.14 3 144.42
HBRACE CN-HB1025 36.49 1 36.49
HBRACE CN-HB1022 36.83 1 36.83
HBRACE CN-HB1024 36.60 1 36.60
HBRACE CN-HB1021 36.73 1 36.73
HBRACE CN-HB1023 38.50 1 38.50
HBRACE CN-HB1013 22.99 1 22.99
HBRACE CN-HB1004 20.27 3 60.81
HBRACE CN-HB1027 17.36 1 17.36
HBRACE CN-HB1016 17.14 1 17.14
HBRACE CN-HB1028 16.90 1 16.90
HBRACE CN-HB1018 17.65 1 17.65
HBRACE CN-HB1015 21.55 3 64.65
HBRACE CN-HB1038 20.02 3 60.06
HBRACE CN-HB1011 20.41 2 40.82
HBRACE CN-HB1040 19.63 2 39.26
HBRACE CN-HB1041 19.58 1 19.58
HBRACE CN-HB1002 20.21 1 20.21
HBRACE CN-HB1001 19.83 1 19.83
TRUSS CN-T1007 2,854.48 1 2,854.48
BEAM CN-B1012 413.48 1 413.48
HBRACE CN-HB1040 19.63 1 19.63
HBRACE CN-HB1036 45.43 1 45.43

TOTAL 6,395.77 Kg

1 50,345.91
2 43,111.16
3 6,395.77

99,852.84

Prepared by, Knowledge by, Approved by,


PT.RAMOS PUTRA PERTAMA PT.SPACE TECHNOLOGY PT.SPACE TECHNOLOGY

( JONNER SAMOSIR ) ( ) ( )
4 of 4

Project : LINE PJT WP2 AWH


Project Title : SandBlasting Painting
Client : Space Technology
Date : 31 October 2023

SUMMARY BREAKDOWN FINISH COAT ITEM


NON FIRE PROOFING
TAGGING WEIGTH QTY TOTAL FINISH REMARKS
NO ITEM / TYPE
NUMBER ( kg ) (Pcs) ( kg ) COAT

TOTAL 0.00 Kg

1 50,345.91
166,995.23 juli 2 43,111.16
199,524.03 agustus 3 6,395.77
226,715.19 september
99,852.84 oktober

693,087.29 99,852.84
Prepared by, Knowledge by, Approved by,
PT.RAMOS PUTRA PERTAMA PT.SPACE TECHNOLOGY PT.SPACE TECHNOLOGY

( JONNER SAMOSIR ) ( ) ( )
5 of 8

Project : LINE PJT WP2 AWH


Project Title : SandBlasting Painting
Client : Space Technology
Date : 30 September 2023

SUMMARY BREAKDOWN FINISH COAT ITEM


NON FIRE PROOFING
TAGGING WEIGTH QTY TOTAL FINISH REMARKS
NO ITEM / TYPE
NUMBER ( kg ) (Pcs) ( kg ) COAT
14 TRUSS CN-T010 2,661.10 1 2661.1 14/09/2023
HBRACE CN-HB042 42.14 8 337.12
HBRACE CN-HB027 40.14 1 40.14
HBRACE CN-HB028 42.40 9 381.6
HBRACE CN-HB043 41.89 11 460.79
HBRACE CN-HB036 42.72 2 85.44
TRUSS CN-T016 2,921.15 1 2921.15
BEAM CN-B019 357.43 1 357.43
HBRACE CN-HB064 20.93 2 41.86
BEAM CN-B023 359.24 1 359.24
BEAM CN-B024 353.88 1 353.88
BEAM CN-B020 352.84 1 352.84
8,352.59
15 COLUMN CN-C009 1,593.34 1 1593.34 15/09/2023
HBRACE CN-HB038 19.31 4 77.24
HBRACE CN-HB046 17.39 2 34.78
HBRACE CN-HB032 18.85 6 113.1
HBRACE CN-HB030 17.71 2 35.42
HBRACE CN-HB034 19.58 4 78.32
HBRACE CN-HB033 19.13 4 76.52
HBRACE CN-HB025 17.78 2 35.56
HBRACE CN-HB041 17.61 2 35.22
HBRACE CN-HB045 18.40 2 36.8
BEAM CN-B016 351.02 5 1755.1
BEAM CN-B022 903.46 1 903.46
TRUSS CN-T004 2,680.15 1 2680.15
BEAM CN-B028 347.35 1 347.35
HBRACE CN-HB027 40.14 2 80.28
HBRACE CN-HB042 42.14 1 42.14
HBRACE CN-HB035 40.39 4 161.56
HBRACE CN-HB037 40.12 1 40.12
HBRACE CN-HB044 39.63 2 79.26
8,205.72
16 COLUMN CN-C009 1,593.34 1 1593.34 16/09/2023
BEAM CN-B020 352.84 2 705.68
BEAM CN-B028 347.35 1 347.35
TRUSS CN-T016 2,921.15 1 2921.15
BEAM CN-B024 353.88 2 707.76
HBRACE CN-HB024 17.32 3 51.96
GIRDER CN-G015 1,189.92 2 2379.84
8,707.08

TOTAL 25,265.39 Kg

Prepared by, Knowledge by, Approved by,


PT.RAMOS PUTRA PERTAMA PT.SPACE TECHNOLOGY PT.SPACE TECHNOLOGY

( JONNER SAMOSIR ) ( ) ( )
6 of 8

Project : LINE PJT WP2 AWH


Project Title : SandBlasting Painting
Client : Space Technology
Date : 30 September 2023

SUMMARY BREAKDOWN FINISH COAT ITEM


NON FIRE PROOFING
TAGGING WEIGTH QTY TOTAL FINISH REMARKS
NO ITEM / TYPE
NUMBER ( kg ) (Pcs) ( kg ) COAT
17 COLUMN CN-C009 1,593.34 1 1593.34 17/09/2023
BEAM CN-B024 353.88 2 707.76
HBRACE CN-HB032 18.85 7 131.95
HBRACE CN-HB033 19.13 4 76.52
HBRACE CN-HB034 19.58 4 78.32
HBRACE CN-HB038 19.31 4 77.24
HBRACE CN-HB039 19.01 13 247.13
BEAM CN-B020 352.84 2 705.68
TRUSS CN-T010 2,661.10 1 2661.1
HBRACE CN-HB037 40.12 7 280.84
HBRACE CN-HB035 40.39 4 161.56
HBRACE CN-HB044 39.63 5 198.15
HBRACE CN-HB041 17.61 1 17.61
GIRDER CN-G015 1,189.92 1 1189.92
8,127.12
18 COLUMN CN-C009 1,593.34 1 1593.34 18/09/2023
TRUSS CN-T010 2,661.10 1 2661.1
BEAM CN-B020 352.84 2 705.68
BEAM CN-B024 353.88 2 707.76
BEAM CN-B028 347.35 2 694.7
HBRACE CN-HB030 17.71 12 212.52
HBRACE CN-HB046 17.39 12 208.68
HBRACE CN-HB025 17.78 12 213.36
HBRACE CN-HB041 17.61 12 211.32
HBRACE CN-HB032 18.85 1 18.85
7,227.31
19 HBRACE CN-HB045 18.40 12 220.8 19/09/2023
HBRACE CN-HB032 18.85 7 131.95
BEAM CN-B024 353.88 1 353.88
HBRACE CN-HB024 17.32 6 103.92
HBRACE CN-HB039 19.01 1 19.01
HBRACE CN-HB026 18.80 5 94
HBRACE CN-HB040 20.33 1 20.33
HBRACE CN-HB047 16.93 2 33.86
TRUSS CN-T016 2,921.15 1 2921.15
GIRDER CN-G015 1,189.92 2 2379.84
BEAM CN-B018 923.64 1 923.64
BEAM CN-B022 903.46 1 903.46
HBRACE CN-HB036 42.72 6 256.32
HBRACE CN-HB044 39.63 4 158.52
8,520.68

TOTAL 23,875.11 Kg

Prepared by, Knowledge by, Approved by,


PT.RAMOS PUTRA PERTAMA PT.SPACE TECHNOLOGY PT.SPACE TECHNOLOGY

( JONNER SAMOSIR ) ( ) ( )
7of 8

Project : LINE PJT WP2 AWH


Project Title : SandBlasting Painting
Client : Space Technology
Date : 30 September 2023

SUMMARY BREAKDOWN FINISH COAT ITEM


NON FIRE PROOFING
TAGGING WEIGTH QTY TOTAL FINISH REMARKS
NO ITEM / TYPE
NUMBER ( kg ) (Pcs) ( kg ) COAT
20 COLUMN CN-C009 1,593.34 1 1,593.34 20/09/2023
BEAM CN-B026 923.21 1 923.21
BEAM CN-B022 903.46 1 903.46
TRUSS CN-T004 2,680.15 1 2,680.15
BEAM CN-B018 923.64 1 923.64
BEAM CN-B028 347.35 1 347.35
BEAM CN-B016 351.02 1 351.02
7,722.17
21 COLUMN CN-C009 1,593.34 1 1,593.34 21/09/2023
BEAM CN-B016 351.02 1 351.02
BEAM CN-B024 353.88 1 353.88
BEAM CN-B028 347.35 2 694.70
BEAM CN-B020 352.84 2 705.68
GIRDER CN-G015 1,189.92 2 2,379.84
HBRACE CN-HB044 39.63 2 79.26
HBRACE CN-HB043 41.89 1 41.89
TRUSS CN-T004 2,680.15 1 2,680.15
8,879.76
22 COLUMN CN-C009 1,593.34 1 1,593.34 22/09/2023
COLUMN CN-C010 1,495.03 1 1,495.03
TRUSS CN-T010 2,661.10 1 2,661.10
BEAM CN-B015 356.38 1 356.38
BEAM CN-B028 347.35 1 347.35
BEAM CN-B016 351.02 2 702.04
HBRACE CN-HB032 18.85 1 18.85
7,174.09
23 COLUMN CN-C009 1,593.34 1 1,593.34 23/09/2023
TRUSS CN-T010 2,661.10 1 2,661.10
BEAM CN-B022 903.46 1 903.46
BEAM CN-B016 351.02 2 702.04
GIRDER CN-G015 1,189.92 1 1,189.92
HBRACE CN-HB027 40.14 6 240.84
BEAM CN-B024 353.88 1 353.88
7,644.58
24 BEAM CN-B026 923.21 3 2,769.63 25/09/2023
GIRDER CN-G015 1,189.92 1 1,189.92
TRUSS CN-T016 2,921.15 1 2,921.15
HBRACE CN-HB028 42.40 1 42.40
BEAM CN-B020 352.84 1 352.84
7,275.94

TOTAL 38,696.54 Kg

Prepared by, Knowledge by, Approved by,


PT.RAMOS PUTRA PERTAMA PT.SPACE TECHNOLOGY PT.SPACE TECHNOLOGY

( JONNER SAMOSIR ) ( ) ( )
8 of 8

Project : LINE PJT WP2 AWH


Project Title : SandBlasting Painting
Client : Space Technology
Date : 30 September 2023

SUMMARY BREAKDOWN FINISH COAT ITEM


NON FIRE PROOFING
TAGGING WEIGTH QTY TOTAL FINISH REMARKS
NO ITEM / TYPE
NUMBER ( kg ) (Pcs) ( kg ) COAT
25 TRUSS CN-T004 2,680.15 2 5,360.30 26/09/2023
HBRACE CN-HB044 39.63 1 39.63
BEAM CN-B024 353.88 2 707.76
BEAM CN-B021 943.39 1 943.39
7,051.08
26 TRUSS CN-T010 2,661.10 1 2,661.10 27/09/2023
BEAM CN-B017 943.39 1 943.39
GIRDER CN-G015 1,189.92 1 1,189.92
TRUSS CN-T016 2,921.15 1 2,921.15
BEAM CN-B020 352.84 2 705.68
8,421.24
27 BEAM CN-B024 353.88 4 1,415.52 28/09/2023
BEAM CN-B028 347.35 2 694.70
TRUSS CN-T014 2,939.93 1 2,939.93
BEAM CN-B016 351.02 1 351.02
BEAM CN-B020 352.84 2 705.68
6,106.85
28 TRUSS CN-T004 2,680.15 1 2,680.15 29/09/2023
TRUSS CN-T017 2,930.54 1 2,930.54
BEAM CN-B016 351.02 2 702.04
BEAM CN-B020 352.84 3 1,058.52
BEAM CN-B024 353.88 1 353.88
7,725.13
29 TRUSS CN-T010 2,661.10 1 2,661.10 30/09/2023
BEAM CN-B020 352.84 4 1,411.36
TRUSS CN-T008 2,699.95 1 2,699.95
BEAM CN-B024 353.88 1 353.88
BEAM CN-B028 347.35 1 347.35
7,473.64

TOTAL 36,777.94 Kg

1 50,345.91
2 43,111.16
3 0.00
4 6,395.77
5 25,265.39
6 23,875.11
7 38,696.54
8 36,777.94
224,467.82

Prepared by, Knowledge by, Approved by,


PT.RAMOS PUTRA PERTAMA PT.SPACE TECHNOLOGY PT.SPACE TECHNOLOGY

( JONNER SAMOSIR ) ( ) ( )
9 of 11

Project : LINE PJT WP2 AWH


Project Title : SandBlasting Painting
Client : Space Technology
Date : 23 Juni 2023

SUMMARY BREAKDOWN FINISH COAT ITEM


NON FIRE PROOFING
TAGGING WEIGTH QTY TOTAL FINISH REMARKS
NO ITEM / TYPE
NUMBER ( kg ) (Pcs) ( kg ) COAT
10 GIRTH BH-GT088 182.07 1 182.07 12/06/2023
GIRTH BH-GT091 182.07 1 182.07
GIRTH BH-GT096 210.92 1 210.92
GIRTH BH-GT095 210.92 1 210.92
GIRTH BH-GT187 207.67 1 207.67
GIRTH BH-GT079 163.57 1 163.57
GIRTH BH-GT146 206.65 3 619.95
GIRTH BH-GT081 209.74 1 209.74
GIRTH BH-GT072 169.61 1 169.61
GIRTH BH-GT028 161.27 1 161.27
GIRTH BH-GT065 170.44 1 170.44
GIRTH BH-GT082 203.04 1 203.04
GIRTH BH-GT016 82.61 5 413.05
GIRTH BH-GT039 104.55 1 104.55
GIRTH BH-GT115 103.88 1 103.88
GIRTH BH-GT062 86.24 1 86.24
GIRTH BH-GT101 105.91 1 105.91
GIRTH BH-GT156 91.54 1 91.54
GIRTH BH-GT018 76.57 1 76.57
GIRTH BH-GT037 74.11 1 74.11
GIRTH BH-GT010 103.37 7 723.59
GIRTH BH-GT020 177.52 1 177.52
GIRTH BH-GT066 170.44 1 170.44
GIRTH BH-GT135 206.65 1 206.65
GIRTH BH-GT029 150.99 2 301.98
HBRACE BH-HB070 147.90 1 147.90
GIRTH BH-GT135 206.65 1 206.65
GIRTH BH-GT083 205.09 1 205.09
GIRTH BH-GT021 177.52 1 177.52
GIRTH BH-GT006 97.11 2 194.22
GIRTH BH-GT092 171.79 1 171.79
GIRTH BH-GT087 171.79 1 171.79
GIRTH BH-GT075 163.57 1 163.57
GIRTH BH-GT098 128.10 1 128.10
GIRTH BH-GT185 102.69 1 102.69
GIRTH BH-GT186 102.69 4 410.76
GIRTH BH-GT154 102.21 1 102.21
GIRTH BH-GT231 6.52 1 6.52
GIRTH BH-GT234 6.44 1 6.44
GIRTH BH-GT296 10.51 1 10.51

TOTAL 7,533.06 Kg

166,995.23 juli
199,524.03 agustus
226,715.19 september

593,234.45
0.00
Prepared by, Knowledge by, Approved by,
PT.RAMOS PUTRA PERTAMA PT.SPACE TECHNOLOGY PT.SPACE TECHNOLOGY

( JONNER SAMOSIR ) ( ) ( )
10 of 11

Project : LINE PJT WP2 AWH


Project Title : SandBlasting Painting
Client : Space Technology
Date : 23 Juni 2023

SUMMARY BREAKDOWN FINISH COAT ITEM


NON FIRE PROOFING
TAGGING WEIGTH QTY TOTAL FINISH REMARKS
NO ITEM / TYPE
NUMBER ( kg ) (Pcs) ( kg ) COAT
11 GIRTH BH-GT218 48.67 2 97.34 13/06/2023
GIRTH BH-GT219 48.67 8 389.36
GIRTH BH-GT177 49.34 5 246.70
GIRTH BH-GT220 48.67 8 389.36
GIRTH BH-GT221 48.67 10 486.70
GIRTH BH-GT223 48.67 4 194.68
GIRTH BH-GT227 48.58 2 97.16
GIRTH BH-GT247 48.67 1 48.67
GIRTH BH-GT137 50.82 1 50.82
GIRTH BH-GT138 50.82 1 50.82
GIRTH BH-GT214 44.56 1 44.56
GIRTH BH-GT226 48.58 4 194.32
GIRTH BH-GT079 163.57 1 163.57
GIRTH BH-GT169 12.46 1 12.46
GIRTH BH-GT191 9.60 1 9.60
GIRTH BH-GT023 145.86 2 291.72
GIRTH BH-GT114 103.88 3 311.64
GIRTH BH-GT185 102.69 1 102.69
GIRTH BH-GT017 82.61 1 82.61
GIRTH BH-GT016 82.61 1 82.61
GIRTH BH-GT186 102.69 2 205.38
GIRTH BH-GT104 105.95 1 105.95
GIRTH BH-GT133 50.82 1 50.82
GIRTH BH-GT023 145.86 3 437.58
GIRTH BH-GT201 42.50 3 127.50
GIRTH BH-GT159 44.23 1 44.23
GIRTH BH-GT130 75.50 1 75.50
GIRTH BH-GT035 74.11 1 74.11
GIRTH BH-GT150 84.75 1 84.75
GIRTH BH-GT068 69.20 1 69.20
GIRTH BH-GT069 44.33 1 44.33
GIRTH BH-GT157 44.23 1 44.23
GIRTH BH-GT139 50.82 1 50.82
GIRTH BH-GT127 44.66 2 89.32
GIRTH BH-GT043 26.82 1 26.82
GIRTH BH-GT171 25.31 2 50.62
GIRTH BH-GT252 26.82 2 53.64
GIRTH BH-GT259 50.82 1 50.82
GIRTH BH-GT176 25.31 1 25.31
GIRTH BH-GT172 25.31 1 25.31
GIRTH BH-GT283 26.16 1 26.16
GIRTH BH-GT041 26.82 1 26.82
GIRTH BH-GT045 24.77 1 24.77
GIRTH BH-GT044 24.77 1 24.77
TOTAL 5,186.15 Kg
Prepared by, Knowledge by, Approved by,
PT.RAMOS PUTRA PERTAMA PT.SPACE TECHNOLOGY PT.SPACE TECHNOLOGY

( JONNER SAMOSIR ) ( ) ( )
11 of 11

Project : LINE PJT WP2 AWH


Project Title : SandBlasting Painting
Client : Space Technology
Date : 23 Juni 2023

SUMMARY BREAKDOWN FINISH COAT ITEM


NON FIRE PROOFING
TAGGING WEIGTH QTY TOTAL FINISH REMARKS
NO ITEM / TYPE
NUMBER ( kg ) (Pcs) ( kg ) COAT
12 GIRTH BH-GT171 25.31 2 50.62 14/06/2023
GIRTH BH-GT232 6.52 2 13.04
GIRTH BH-GT233 6.52 3 19.56
GIRTH BH-GT235 6.44 2 12.88
GIRTH BH-GT234 6.44 1 6.44
GIRTH BH-GT230 6.52 1 6.52
GIRTH BH-GT191 9.60 1 9.60
GIRTH BH-GT248 12.01 1 12.01
GIRTH BH-GT294 26.82 1 26.82
GIRTH BH-GT174 25.31 1 25.31
GIRTH BH-GT040 26.82 3 80.46
GIRTH BH-GT010 103.37 1 103.37
GIRTH BH-GT216 13.72 1 13.72
HBRACE BH-HB283 19.66 2 39.32
VBRACE BH-VB050 162.18 1 162.18
GIRTH BH-GT156 91.54 1 91.54
581.85
HANDRAIL BH-HR023 75.35 1 75.35 15/06/2023
HANDRAIL BH-HR025 54.41 1 54.41
HANDRAIL BH-HR026 52.17 1 52.17
HANDRAIL BH-HR027 81.16 1 81.16
HANDRAIL BH-HR042 59.17 1 59.17
HANDRAIL BH-HR046 29.74 1 29.74
322.26
30/06/2023
GIRTH BH-GT193 30.16 1 30.16
GIRTH BH-GT 226 48.58 2 97.16
127.32

TOTAL 1,031.43 Kg

1 of 11 13,762.63 Kg
2of 11 17,867.34 Kg
3of 11 44,927.96 Kg
4 of 11 12,966.76 Kg
5 of 11 2,270.60 Kg
6 of 11 3,732.75 Kg
7 of 11 5,861.99 Kg
8 of 11 5,912.58 Kg
9 of 11 7,533.06 Kg
10 of 11 5,186.15 Kg
11 of 11 1,031.43 Kg
121,053.25 Kg

Prepared by, Knowledge by, Approved by,


PT.RAMOS PUTRA PERTAMA PT.SPACE TECHNOLOGY PT.SPACE TECHNOLOGY

( JONNER SAMOSIR ) ( ) ( )
juli 166,995.23
agustus 199,524.03
September 224,467.82

Total 590,987.08
1 50,345.91
2 43,111.16
3 0.00
4 6,395.77
5 25,265.39
6 23,875.11
7 38,696.54
8 36,777.94

Total 224,467.82