Data Teknis
fc' : 15 mpa
fy : 240 mpa
Data Pembebanan Didasarkan Pedoman Pembebanan Indonesia untuk Gedung 1983
Wd : Berat Sendiri : 288 Kg/m2
Berat Keramik : 12 Kg/m2
Berat spesi 42 Kg/m2
Wl : Berat Pekerja : 250 Kg/m2
:
Wdl : 1.2 Wd + 1.6 Wl : 810,4 Kg/m2
Mu Mu Jarak
m ρmin ρmax ρ Perlu ρterpakai Ast Øtul Jarak a Mn Mu< ØMn
KNm bd² Terpakai
Mlx 2,482 0,269298 18,82353 0,005833 0,569581 0,001134 0,005833 560 8 89,71429 100 9,456941 11,00516 OK
Mly 2,482 0,320487 18,82353 0,005833 0,569581 0,001353 0,005833 513,3333 8 97,87013 100 9,456941 10,04055 OK
Mtx 5,063 0,549368 18,82353 0,005833 0,569581 0,002341 0,005833 560 8 89,71429 100 9,456941 11,00516 OK
Mty 5,063 0,653793 18,82353 0,005833 0,569581 0,002798 0,005833 513,3333 8 97,87013 100 9,456941 10,04055 OK
Mtix 1,241 0,134649 18,82353 0,005833 0,569581 0,000564 0,005833 560 8 89,71429 100 9,456941 11,00516 OK
Mtiy 1,241 0,160243 18,82353 0,005833 0,569581 0,000672 0,005833 513,3333 8 97,87013 100 9,456941 10,04055 OK
PERHITUNGAN BALOK LANTAI 1
Data Teknis
fc' : 15 mpa
fy : 240 mpa
mm2 mm m
Pondasi Tepi Portal A
A-9 0,005833 0,56958 0,00409 0,005833333 3010 16,00 0,100