Perancangan Balok Persegi Tulangan Rangkap Data - Data
Elemen Balok 20/35 (R4)
Section Ujung (-) Tengah (+) Ujung (-) d' = 50 mm Mu (KNm) 37.583 21.114 37.284 Es = 200000 N/mm Mu/Φ(KNm) 46.979 26.393 46.605 f'c = 25 Mpa β1 0.850 0.850 0.850 fy = 400 Mpa ab 0.510 d 0.510 d 0.510 d Φ = 0.8 a 0.383 d 0.383 d 0.383 d b = 0.5 d 2 2 2 Mn (KNm) 6.574 bd 6.574 bd 6.574 bd d (mm) 242.551 200.142 241.907 b (mm) 121.276 100.071 120.953 d (diambil) 300.000 300.000 300.000 b (diambil) 200.000 200.000 200.000 Mu (KNm) 37.583 21.114 37.284 Mu/Φ(KNm) 46.979 26.393 46.605 a 114.750 114.75 114.75 M1 (KNm) 118.325 118.325 118.325 Mn > Mu/Φ(KNm) OKE OKE OKE A1 (mm2) 1219.219 1219.219 1219.219 M2 (KNm) -71.346 -91.933 -71.720 c (mm) 135.000 135.000 135.000 ε' 0.002 0.002 0.002 εy 0.002 0.002 0.002 kontrol ε' > εy Beton Hancur Beton Hancur Beton Hancur A2=A' (mm2) -713.464 -919.327 -717.202 A (mm2) 505.754 299.892 502.017 Tulangan Tarik 5 D 16 5 D 16 5 D 16 As Tulangan (Ast) 1004.800 1004.800 1004.800 Kontrol OKE OKE OKE Tulangan Tekan 2 D 16 2 D 16 2 D 16 As Tulangan (A') 401.920 401.920 401.920 Kontrol OKE OKE OKE 210.000 210.000 210.000 Astmin (mm2) 187.500 187.500 187.500 Kontrol OKE OKE OKE
Analisis Balok Persegi Tulangan Rangkap Data - Data
Elemen Balok 20/35 (R4) Section Ujung (-) Tengah (+) Ujung (-) d' = 50 mm Mu (KNm) 37.583 21.114 37.284 Es = 200000 N/mm Mu/Φ(KNm) 46.979 26.393 46.605 f'c = 25 Mpa d (diambil) 300.000 300.000 300.000 fy = 400 Mpa b (diambil) 200.000 200.000 200.000 Φ = 0.8 Ast (mm2) 1004.800 1004.800 1004.800 b = 0.5 d A' (mm2) 401.920 401.920 401.920 β1 0.850 0.850 0.850 ab (mm) 153.000 153.000 153.000 Cs (N) 160768.000 160768.000 160768.000 Ts (N) 401920.000 401920.000 401920.000 Persamaan Keseimbangan : Cc + Cs = Ts Cc (N) 4250 a 4250 a 4250 a a (mm) 56.742 56.742 56.742 c (mm) 66.755 66.755 66.755 ε' (Tekan) 0.0008 0.0008 0.0008 εy 0.0020 0.0020 0.0020 kontrol ε' > εy Beton Hancur Beton Hancur Beton Hancur ε' (Tarik) 0.0105 0.0105 0.0105 εy 0.0020 0.0020 0.0020 kontrol ε' > εy Tulangan Leleh Tulangan Leleh Tulangan Leleh Kontro a < ab Tulangan Liat Tulangan Liat Tulangan Liat Kemampuan Nominal Balok : Cs (N) 160768.000 160768.000 160768.000 Cc (N) 241152.000 241152.000 241152.000 Mn 105.696 105.696 105.696 Mu = Φ.Mn 84.557 84.557 84.557 Kontrol OKE OKE OKE
Perancangan Tulangan Geser Data - Data
Vu 47.920 KN f'c = 25 Mpa Vu/Φ 63.893 KN fy = 240 Mpa d 300.000 mm Φ = 0.75 b 200.000 mm Vc 50.000 KN Vs 13.893 KN Kontrol syarat : Desain ulang dimensi balok FAILED Hitung Vs dan s < 300 mm dan s < d/4 FAILED Hitung Vs dan s < 600 mm dan s < d/2 FAILED Hitung Vs Minimum FAILED Tidak Perlu Tul. Geser (Vs Minimum) OKE dimensi Tulangan Ø 10 mm As Tulangan 78.500 mm2 Av 157.000 mm2 S hitung s = 3.Av.fy/ b daerah 1 565.200 mm s = 3.Av.fy / b daerah 2 565.200 mm S diambil daerah 1 150.000 mm daerah 2 200.000 mm
Analsis Tulangan Geser daerah 1
dimensi Tulangan Ø 10 mm As Tulangan 78.500 mm2 Av 157.000 mm2 Vs = Av.fy.d / s Vs = 75.360 KN Vc = ( √f'c/6).b.d Vc = 50.000 KN Vn = Vc + Vs Vn = 125.360 KN Vu = Φ.Vn Vu = 94.020 KN Kontrol Vu > Vu awal OKE Analsis Tulangan Geser daerah 2 dimensi Tulangan Ø 10 mm As Tulangan 78.500 mm2 Av 157.000 mm2 Vs = Av.fy.d / s Vs = 56.520 KN Vc = ( √f'c/6).b.d Vc = 50.000 KN Vn = Vc + Vs Vn = 106.520 KN Vu = Φ.Vn Vu = 79.890 KN Kontrol Vu > Vu awal OKE