Perancangan Balok Persegi Tulangan Rangkap Data - Data

Elemen Balok 20/35 (R4)


Section Ujung (-) Tengah (+) Ujung (-) d' = 50 mm
Mu (KNm) 37.583 21.114 37.284 Es = 200000 N/mm
Mu/Φ(KNm) 46.979 26.393 46.605 f'c = 25 Mpa
β1 0.850 0.850 0.850 fy = 400 Mpa
ab 0.510 d 0.510 d 0.510 d Φ = 0.8
a 0.383 d 0.383 d 0.383 d b = 0.5 d
2 2 2
Mn (KNm) 6.574 bd 6.574 bd 6.574 bd
d (mm) 242.551 200.142 241.907
b (mm) 121.276 100.071 120.953
d (diambil) 300.000 300.000 300.000
b (diambil) 200.000 200.000 200.000
Mu (KNm) 37.583 21.114 37.284
Mu/Φ(KNm) 46.979 26.393 46.605
a 114.750 114.75 114.75
M1 (KNm) 118.325 118.325 118.325
Mn > Mu/Φ(KNm) OKE OKE OKE
A1 (mm2) 1219.219 1219.219 1219.219
M2 (KNm) -71.346 -91.933 -71.720
c (mm) 135.000 135.000 135.000
ε' 0.002 0.002 0.002
εy 0.002 0.002 0.002
kontrol ε' > εy Beton Hancur Beton Hancur Beton Hancur
A2=A' (mm2) -713.464 -919.327 -717.202
A (mm2) 505.754 299.892 502.017
Tulangan Tarik 5 D 16 5 D 16 5 D 16
As Tulangan (Ast) 1004.800 1004.800 1004.800
Kontrol OKE OKE OKE
Tulangan Tekan 2 D 16 2 D 16 2 D 16
As Tulangan (A') 401.920 401.920 401.920
Kontrol OKE OKE OKE
210.000 210.000 210.000
Astmin (mm2)
187.500 187.500 187.500
Kontrol OKE OKE OKE

Analisis Balok Persegi Tulangan Rangkap Data - Data


Elemen Balok 20/35 (R4)
Section Ujung (-) Tengah (+) Ujung (-) d' = 50 mm
Mu (KNm) 37.583 21.114 37.284 Es = 200000 N/mm
Mu/Φ(KNm) 46.979 26.393 46.605 f'c = 25 Mpa
d (diambil) 300.000 300.000 300.000 fy = 400 Mpa
b (diambil) 200.000 200.000 200.000 Φ = 0.8
Ast (mm2) 1004.800 1004.800 1004.800 b = 0.5 d
A' (mm2) 401.920 401.920 401.920
β1 0.850 0.850 0.850
ab (mm) 153.000 153.000 153.000
Cs (N) 160768.000 160768.000 160768.000
Ts (N) 401920.000 401920.000 401920.000
Persamaan Keseimbangan : Cc + Cs = Ts
Cc (N) 4250 a 4250 a 4250 a
a (mm) 56.742 56.742 56.742
c (mm) 66.755 66.755 66.755
ε' (Tekan) 0.0008 0.0008 0.0008
εy 0.0020 0.0020 0.0020
kontrol ε' > εy Beton Hancur Beton Hancur Beton Hancur
ε' (Tarik) 0.0105 0.0105 0.0105
εy 0.0020 0.0020 0.0020
kontrol ε' > εy Tulangan Leleh Tulangan Leleh Tulangan Leleh
Kontro a < ab Tulangan Liat Tulangan Liat Tulangan Liat
Kemampuan Nominal Balok :
Cs (N) 160768.000 160768.000 160768.000
Cc (N) 241152.000 241152.000 241152.000
Mn 105.696 105.696 105.696
Mu = Φ.Mn 84.557 84.557 84.557
Kontrol OKE OKE OKE

Perancangan Tulangan Geser Data - Data


Vu 47.920 KN f'c = 25 Mpa
Vu/Φ 63.893 KN fy = 240 Mpa
d 300.000 mm Φ = 0.75
b 200.000 mm
Vc 50.000 KN
Vs 13.893 KN
Kontrol syarat :
Desain ulang dimensi balok FAILED
Hitung Vs dan s < 300 mm dan s < d/4 FAILED
Hitung Vs dan s < 600 mm dan s < d/2 FAILED
Hitung Vs Minimum FAILED
Tidak Perlu Tul. Geser (Vs Minimum) OKE
dimensi Tulangan Ø 10 mm
As Tulangan 78.500 mm2
Av 157.000 mm2
S hitung s = 3.Av.fy/ b daerah 1 565.200 mm
s = 3.Av.fy / b daerah 2 565.200 mm
S diambil daerah 1 150.000 mm
daerah 2 200.000 mm

Analsis Tulangan Geser daerah 1


dimensi Tulangan Ø 10 mm
As Tulangan 78.500 mm2
Av 157.000 mm2
Vs = Av.fy.d / s Vs = 75.360 KN
Vc = ( √f'c/6).b.d Vc = 50.000 KN
Vn = Vc + Vs Vn = 125.360 KN
Vu = Φ.Vn Vu = 94.020 KN
Kontrol Vu > Vu awal OKE
Analsis Tulangan Geser daerah 2
dimensi Tulangan Ø 10 mm
As Tulangan 78.500 mm2
Av 157.000 mm2
Vs = Av.fy.d / s Vs = 56.520 KN
Vc = ( √f'c/6).b.d Vc = 50.000 KN
Vn = Vc + Vs Vn = 106.520 KN
Vu = Φ.Vn Vu = 79.890 KN
Kontrol Vu > Vu awal OKE