BILL OF QUANTITY

KESEPAKATAN HARGA SATUAN (KHS) PEKERJAAN NORMALISASI JARINGAN TEGANGAN MENENGAH (JTM), GARDU DISTRIBUSI, JARINGAN
TEGANGAN RENDAH (JTR) DAN SAMBUNGAN RUMAH (SR) DI PT PLN (PERSERO) UP3 SUMBA

DOKUMEN TENDER NOMOR : 003.RKS/DAN.01.03/200400/2021


TANGGAL : Monday, August 16, 2021
JENIS MATERIAL VOL. HARGA SATUAN
BAHAN HARGA BAGIAN (Rp)
NO NAMA MATERIAL SAT. PERKIRAAN (Rp) UPAH (Rp) BAHAN (Rp) UPAH (Rp)
1 2 3 4 5 6=4*3 7=5*3
I MATERIAL UTAMA
1 Tiang besi 12 meter 200 daN btg 12,527 PLN 380,000 PLN 4,760,260,000
2 Tiang besi 11 meter 156 daN btg 1 PLN 269,200 PLN 269,200
3 Tiang besi 9 mtr 100 daN btg 5,477 PLN 220,100 PLN 1,205,487,700
4 Tiang besi 7 mtr 100 daN btg 1 PLN 220,100 PLN 220,100
5 Isolator tumpu 20 kV bh 35,182 PLN 28,100 PLN 988,614,200
6 Isolator tarik 20 kV set 11,877 PLN 31,700 PLN 376,500,900
7 Cut out 20 kV (polimer) set 729 PLN 39,900 PLN 29,087,100
8 Fuselink 2 A ­30 A bh 729 51,000 1,800 37,179,000 1,312,200
9 Lightning Arrester 24 kV (polimer) set 1,514 PLN 38,800 PLN 58,743,200
10 Trafo 3 phs 25 kVA ­20 kV bh 1 PLN 836,400 PLN 836,400
11 Trafo 3 phs 50 kVA ­20 kV bh 136 PLN 986,800 PLN 134,204,800
12 Trafo 3 phs 100 kVA ­20 kV bh 1 PLN 1,221,800 PLN 1,221,800
13 Pemasangan Konduktor AAAC 70 mm² kms 1 PLN 3,515,700 PLN 3,515,700
14 Pemasangan Konduktor AAAC 150 mm² kms 1 PLN 5,238,000 PLN 5,238,000
15 Pemasangan Konduktor AAAC/S 70 mm² kms 528.00 PLN 4,647,600 PLN 2,453,932,800
16 Pemasangan Konduktor AAAC/S 150 mm² kms 1 PLN 7,832,200 PLN 7,832,200
17 LVTC 3x35+1x25 mm² kms 529 PLN 2,241,300 PLN 1,185,647,700
18 LVTC 3x35+1x35 mm² kms 1 PLN 2,241,300 PLN 2,241,300
19 LVTC 3x50+1x35 mm² kms 1 PLN 2,863,000 PLN 2,863,000
20 LVTC 3x50+1x50 mm² kms 1 PLN 2,863,000 PLN 2,863,000
21 LVTC 3x70+1x50 mm² kms 1 PLN 3,848,100 PLN 3,848,100
22 LVTC 3x70+1x70 mm² kms 1 PLN 3,848,100 PLN 3,848,100
23 LVTC 3x95+1x70 mm² kms 1 PLN 4,810,200 PLN 4,810,200
24 LVTC 3x95+1x95 mm² kms 1 PLN 4,810,200 PLN 4,810,200
JUMLAH MATERIAL UTAMA 37,179,000 11,238,207,900

II MATERIAL NON UTAMA


1 Perlengkapan druck schoor TM (Tiang Besi) set 1,379 743,500 175,300 1,025,286,500 241,738,700
2 Perlengkapan kontramast TM (Tiang Besi) set 186 1,316,000 349,300 244,776,000 64,969,800
3 Treck schoor (Standar) 17kN TM (Tiang set 3,054 683,000 237,000 2,085,882,000 723,798,000
4 Besi)
Treck schoor tolak pinggang TM (Tiang set 1 1,208,000 212,100 1,208,000 212,100
5 Besi)
Perlengkapan druck schoor TR set 596 733,500 175,300 437,166,000 104,478,800
6 Perlengkapan kontramast TR set 54 1,266,000 349,300 68,364,000 18,862,200
7 Treck schoor standar TR set 1,252 703,000 237,000 880,156,000 296,724,000
8 Treck schoor tolak pinggang TR set 1 1,108,000 212,100 1,108,000 212,100
9 Cross Arm UNP 10 Balance atau Unbalance ­
Tiang Besi :
a. Type A1 UNP 100 x 50 x 5 x2000 (5mm) set 7,815 810,000 91,200 6,330,150,000 712,728,000
b. Type A2 UNP 100 x 50 x 5 x2000 (5mm) set 1,783 1,871,000 179,500 3,335,993,000 320,048,500
c. Type A3 UNP 100 x 50 x 5 x2000 (5mm) set 2,148 1,871,000 182,700 4,018,908,000 392,439,600
e. Type B3 UNP 100 x 50 x 5 x2500 (5mm) set 111 1,930,000 232,100 214,230,000 25,763,100
10 Rangka Dudukan u/.trafo 3 phs 1 tiang set 136 3,257,000 354,100 442,952,000 48,157,600
11 Rangka Dudukan u/.trafo 3 phs 2 tiang set 1 8,400,000 498,000 8,400,000 498,000
12 Cross Arm type A1 Unbalance set 136 685,000 88,700 93,160,000 12,063,200
13 Cross Arm u/ dudukan CO/Arester 1 tiang set 272 685,000 85,500 186,320,000 23,256,000
14 Cross Arm u/ dudukan CO/Arester 2 tiang set 1 1,200,000 89,500 1,200,000 89,500
15 LV Board 3 phs 1 tiang set 93 PLN 400,000 PLN 37,200,000
16 LV Board 3 phs 2 tiang set 1 PLN 437,400 PLN 437,400
17 Kabel NYY 50 mm² mtr 1 PLN 3,900 PLN 3,900
18 Kabel NYY 70 mm² mtr 14,688 PLN 6,000 PLN 88,128,000
19 Kabel NYY 95 mm² mtr 1 PLN 7,800 PLN 7,800
20 Kabel NYY 120 mm² mtr 1 PLN 9,800 PLN 9,800
21 Kabel NYY 150 mm² mtr 1 PLN 10,700 PLN 10,700
Pipa Inlet/Outlet Medium B+Invoring 2" set
22 1 3,627,000 126,400 3,627,000 126,400
Galvanize + elbow Galvanize
Pipa Inlet/Outlet Medium B+Invoring 2,5" set
23 1 3,567,000 128,000 3,567,000 128,000
Galvanize + elbow Galvanize
Pipa Inlet/Outlet Medium B+Invoring 3" set
24 136 4,017,000 128,000 546,312,000 17,408,000
Galvanize + elbow Galvanize
25 CCO 10/16 ­10/16 mm² + Cover bh 1 18,000 16,100 18,000 16,100
26 CCO 25 ­35 mm² + Cover bh 1,536 19,700 16,100 30,259,200 24,729,600
27 CCO 25/35 ­50/70 mm² + Cover bh 1 22,200 18,100 22,200 18,100
28 CCO 50 ­70 mm² + Cover bh 1 25,300 18,100 25,300 18,100
29 CCO 50/70 ­120/150 mm² + Cover bh 1 31,200 18,100 31,200 18,100
30 CCO 50/70 ­150/240 mm² + Cover bh 1 38,200 18,100 38,200 18,100
31 CCO 120 ­150 mm² + Cover bh 1 39,500 18,100 39,500 18,100
32 H. Type Conector 50­70/ 50­70 mm² bh 6,724 30,500 17,700 205,082,000 119,014,800
33 H. Type Conector 70­150/ 70­150 mm² bh 1 56,000 18,500 56,000 18,500
34 Aluminium Binding Wire mtr 1 21,300 6,300 21,300 6,300
35 Pengikat Top Ties Semi Konduktor 70 mm² bh 24,346 117,200 9,500 2,853,351,200 231,287,000
36 Pengikat Side Ties Semi Konduktor 70 mm² bh 9,795 113,800 9,500 1,114,671,000 93,052,500
37 Pengikat Top Ties Semi Konduktor 150 mm² bh 1 132,200 9,500 132,200 9,500
38 Pengikat Side Ties Semi Konduktor 150 mm² bh 1 121,700 9,500 121,700 9,500
39 Joint sleeve tension 35 mm² + isolasi bh 2,006 33,500 21,900 67,201,000 43,931,400
40 Joint sleeve tension 50 mm² + isolasi bh 1 47,900 21,900 47,900 21,900
41 Joint sleeve tension 70 mm² + isolasi bh 2,047 67,500 21,900 138,172,500 44,829,300
42 Joint sleeve tension 150 mm² + isolasi bh 1 86,200 21,900 86,200 21,900
43 Joint Sleves 35 mm² non tension + isolasi bh 1 26,200 21,300 26,200 21,300
44 Joint Sleves 50 mm² non tension + isolasi bh 1 28,300 21,900 28,300 21,900
45 Joint Sleves 70 mm² non tension + isolasi bh 1 31,000 21,900 31,000 21,900
46 Joint Sleves 95 mm² non tension + isolasi bh 1 34,500 21,900 34,500 21,900
47 Joint Sleves 50­35 mm² non tension + isolasi bh 1 20,700 21,900 20,700 21,900
48 Joint Sleves 70­35 mm² non tension + isolasi bh 1 21,300 21,900 21,300 21,900
49 Joint Sleves 70­50 mm² non tension + isolasi bh 1 24,000 21,900 24,000 21,900
50 Joint Sleves 95­50 mm² non tension + isolasi bh 1 32,500 21,900 32,500 21,900
51 Joint Sleves 95­70 mm² non tension + isolasi bh 1 33,700 21,900 33,700 21,900
52 Penghalang panjat set 10,962 273,000 17,500 2,992,626,000 191,835,000
53 Tanda kilat kecil untuk Jaringan 20 kV set 10,962 133,000 18,600 1,457,946,000 203,893,200
54 Tanda kilat besar untuk Jaringan 20 kV set 136 109,400 19,700 14,878,400 2,679,200
55 Suspension Assembly 25­50 set 7,667 108,350 26,900 830,719,450 206,242,300
56 Suspension Assembly 50­70 set 1 108,350 27,000 108,350 27,000
57 Large Angle Assembly 25­50 set 3,137 173,950 34,500 545,681,150 108,226,500
58 Large Angle Assembly 50­70 set 1 173,950 34,400 173,950 34,400
59 Fixed Dead End Assembly 25­50 set 708 113,950 30,400 80,676,600 21,523,200
60 Fixed Dead End Assembly 50­70 set 1 113,950 30,800 113,950 30,800
61 Adjustable Dead End Assembly 25­50 set 1 133,950 31,300 133,950 31,300
62 Adjustable Dead End Assembly 50­70 set 1 133,950 31,400 133,950 31,400
63 Bundle End Protection set 595 90,950 27,200 54,115,250 16,184,000
64 Sepatu Kabel AL­CU 35 mm² bh 1 41,000 8,800 41,000 8,800
65 Sepatu Kabel AL­CU 50 mm² bh 1 55,600 8,800 55,600 8,800
66 Sepatu Kabel AL­CU 70 mm² bh 3,220 78,000 8,800 251,160,000 28,336,000
67 Sepatu Kabel AL­CU 150 mm² bh 1 114,100 8,800 114,100 8,800
68 Sepatu Kabel CU 35 mm² bh 1 36,200 8,700 36,200 8,700
69 Sepatu Kabel CU 50 mm² bh 1 49,800 8,700 49,800 8,700
70 Sepatu Kabel CU 70 mm² bh 1,912 64,700 8,700 123,706,400 16,634,400
71 Sepatu Kabel CU 150 mm² bh 1 133,000 8,900 133,000 8,900
72 Sepatu Kabel AL 35 mm² bh 1 18,200 8,700 18,200 8,700
73 Sepatu Kabel AL 50 mm² bh 1 21,300 8,700 21,300 8,700
74 Sepatu Kabel AL 70 mm² bh 1 23,400 8,700 23,400 8,700
75 Sepatu Kabel AL 150 mm² bh 1 54,500 8,700 54,500 8,700
76 Joint bimetal (35­35 mm²) + heat shrink bh 1 52,000 17,600 52,000 17,600
77 Joint bimetal (50­35 mm²) + heat shrink bh 1 57,100 18,700 57,100 18,700
78 Joint bimetal (50­50 mm²) + heat shrink bh 1 61,600 18,700 61,600 18,700
79 Joint bimetal (50­70 mm²) + heat shrink bh 1 66,900 19,200 66,900 19,200
80 Joint bimetal (50­95 mm²) + heat shrink bh 1 67,300 19,200 67,300 19,200
81 Joint bimetal (70­35 mm²) + heat shrink bh 1,088 69,400 19,200 75,507,200 20,889,600
82 Joint bimetal (70­50 mm²) + heat shrink bh 1 74,500 19,200 74,500 19,200
83 Joint bimetal (70­70 mm²) + heat shrink bh 1 81,000 19,200 81,000 19,200
84 Joint bimetal (70­95 mm²) + heat shrink bh 1 91,300 19,200 91,300 19,200
85 Joint bimetal (95­70 mm²) + heat shrink bh 1 95,300 19,200 95,300 19,200
86 Joint bimetal (95­95 mm²) + heat shrink bh 1 103,800 19,200 103,800 19,200
87 Joint bimetal (95­120 mm²) + heat shrink bh 1 129,500 19,200 129,500 19,200
88 Joint bimetal (150­120 mm²) + heat shrink bh 1 173,700 19,200 173,700 19,200
89 Pondasi Lantai Kerja Trafo Cantol (0,24 M3) bh 136 1,683,000 153,300 228,888,000 20,848,800
90 Pondasi Lantai Kerja Trafo Portal (0,5 M3) bh 1 2,415,000 327,100 2,415,000 327,100
91 Beton kaki tiang TM (0,223 M3) set 12,527 187,000 105,500 2,342,549,000 1,321,598,500
92 Beton kaki tiang TR (0,099 M3) btg 5,477 99,000 47,400 542,223,000 259,609,800
93 Semen Konduktif pail 2,443 1,015,000 57,900 2,479,645,000 141,449,700
94 Arde TM (3 Ohm) ­
a. One core Earthing Conductor 50 mm² CU mtr 11,530 74,800 6,100 862,444,000 70,333,000
b. Electroda Tembaga 5/8" 2,5 meter btg 1,537 199,000 16,100 305,863,000 24,745,700
c. Connector CU (BC 50mm² ke Electroda) bh 1,537 49,800 8,200 76,542,600 12,603,400
d. Pipa Besi Galv. Med D = 5/8" , 6 meter bh 769 89,200 12,600 68,594,800 9,689,400
e. Link 25x25 bh 3,843 4,400 400 16,909,200 1,537,200
f. Stopping Buckle bh 3,843 5,700 400 21,905,100 1,537,200
g. Stainless Steel Strip 20x0,7 mm bh 3,843 13,000 400 49,959,000 1,537,200
h. Sepatu Kabel CU 50 mm² bh 3,075 49,800 8,700 153,135,000 26,752,500
95 Arde TR (5 Ohm) ­
a. One core Earthing Conductor 50 mm² CU mtr 20,190 74,800 6,100 1,510,212,000 123,159,000
b. Electroda Tembaga 5/8" 2,5 meter btg 2,019 199,000 16,100 401,781,000 32,505,900
c. Connector CU (BC 50mm² ke Electroda) bh 2,019 49,800 8,200 100,546,200 16,555,800
d. Pipa Besi Galv. Med D = 5/8" , 6 meter bh 2,019 89,200 12,600 180,094,800 25,439,400
e. Link 25x25 bh 6,057 4,400 400 26,650,800 2,422,800
f. Stopping Buckle bh 6,057 5,700 400 34,524,900 2,422,800
g. Stainless Steel Strip 20x0,7 mm bh 6,057 13,000 400 78,741,000 2,422,800
h. Sepatu Kabel CU 50 mm² bh 4,038 49,800 8,700 201,092,400 35,130,600
JUMLAH MATERIAL NON 40,452,391,800 6,636,276,700
UTAMA
III PEKERJAAN PERSIAPAN
UP3 KUPANG
1 Angkutan Material
Kota Kupang m3 1 329,300 329,300
Kab Kupang m3 730 428,700 312,951,000
Kab TTS m3 653 591,100 385,988,300
Kab TTU m3 43 794,200 34,150,600
Gudang Kab Belu m3 1 875,800 875,800
PLN UP3
Kupang Kab. Malaka m3 1 895,800 895,800
Kab Rote Ndao m3 1 1,173,900 1,173,900
Kab. Sabu Raijua m3 1 1,621,000 1,621,000
Kab Alor (P. Alor) m3 1,186 2,068,100 2,452,766,600
Kab Alor (P. Sekitar Alor) m3 1 3,558,500 3,558,500
Gudang Kota Kupang m3 1 1,621,000 1,621,000
PLN Alor Kab Alor (P. Alor) m3 1 1,621,000
1,621,000
Kab Alor (P. Sekitar Alor) m3 1 1,621,000 1,621,000
2 Angkutan Tiang Besi (12 mtr 200 daN) -
Kota Kupang btg 1 264,000 264,000
Kab Kupang btg 2280 320,100 729,828,000
Kab TTS btg 4274 419,700 1,793,797,800
Kab TTU btg 179 526,800 94,297,200
Gudang
PLN UP3
Kupang
2

Gudang Kab Belu btg 1 570,400 570,400


PLN UP3
Kupang Kab Malaka btg 1 583,600 583,600
Kab Rote Ndao btg 1 737,800 737,800
Kab. Sabu Raijua btg 1 988,000 988,000
Kab Alor (P. Alor) btg 4,440 1,420,000 6,304,800,000
Kab Alor (P. Sekitar Alor) btg 1 2,255,800 2,255,800
PLN ULP Kab TTU btg 1 403,800 403,800
Atambua Kab Belu btg 1 286,100
286,100
Kab Malaka btg 1 370,800 370,800
PLN ULP Kab Alor (P. Alor) btg 1 292,100 292,100
Kalabahi Kab Alor (P. Sekitar Alor) btg 1 743,300
743,300
PLN ULP Kab Rote Ndao (Pulau Rote) btg 1 264,000 264,000
Rote Kab Rote Ndao (Pulau sekitar btg 1 598,900
598,900
Ndao
PLN Sub Rote)
Sabu btg 1 264,000 264,000
ULP Raijua btg 1 737,800
737,800
Sabu
3 Angkutan Tiang Besi (11 mtr 156 daN) btg -
Kota Kupang btg 1 240,100 240,100
Kab Kupang btg 1 279,600 279,600
Kab TTS btg 1 338,500 338,500
Kab TTU btg 1 418,600 418,600
Gudang Kab Belu btg 1 459,000 459,000
PLN UP3
Kupang Kab Malaka btg 1 459,000 459,000
Kab Rote Ndao btg 1 577,700 577,700
Kab. Sabu Raijua btg 1 756,200 756,200
Kab Alor (P. Alor) btg 1 1,115,900 1,115,900
Kab Alor (P. Sekitar Alor) btg 1 1,712,100 1,712,100
PLN ULP Kab TTU btg 1 333,900 333,900
Atambua Kab Belu btg 1 255,700
255,700
Kab Malaka btg 1 310,000 310,000
PLN ULP Kab Alor (P. Alor) btg 1 259,400 259,400
Kalabahi Kab Alor (P. Sekitar Alor) btg 1 577,700
577,700
PLN ULP Kab Rote Ndao (Pulau Rote) btg 1 240,100 240,100
Rote Kab Rote Ndao (Pulau sekitar btg 1 478,400
478,400
Ndao
PLN Sub Rote)
Sabu btg 1 240,100 240,100
ULP Raijua btg 1 577,700
577,700
Sabu
4 Angkutan Tiang Besi (9 mtr 100 daN) btg -
Kota Kupang btg 1 206,000 206,000
Kab Kupang btg 1026 223,500 229,311,000
Kab TTS btg 1047 255,400 267,403,800
Kab TTU btg 38 289,400 10,997,200
Gudang Kab Belu btg 1 302,600 302,600
PLN UP3
Kupang Kab Malaka btg 1 307,300 307,300
Kab Rote Ndao btg 1 355,100 355,100
Kab. Sabu Raijua btg 1 433,300 433,300
Kab Alor (P. Alor) btg 2072 513,300 1,063,557,600
Kab Alor (P. Sekitar Alor) btg 1 774,600 774,600
PLN ULP Kab TTU btg 1 252,000 252,000
Atambua Kab Belu btg 1 213,400
213,400
Kab Malaka btg 1 240,900 240,900
PLN ULP Kab Alor (P. Alor) btg 1 215,200 215,200
Kalabahi Kab Alor (P. Sekitar Alor) btg 1 355,100
355,100
PLN ULP Kab Rote Ndao (Pulau Rote) btg 1 206,000 206,000
Rote Kab Rote Ndao (Pulau sekitar btg 1 310,900
310,900
Ndao Rote)
PLN Sub Sabu btg 1 206,000 206,000
ULP Raijua btg 1 355,100
355,100
Sabu
UP3 SUMBA
1 Angkutan Material -
Gudang Kab Sumba Timur m3 454 291,800 132,477,200
PLN UP3 Kab Sumba Barat Daya m3 163 105,363,200
646,400
Sumba
Kab Sumba Tengah m3 104 660,200 68,660,800
1
Gudang
PLN UP3
Sumba

Kab Sumba Barat m3 304 569,300 173,067,200


Kab Sumba Timur m3 1 646,400 646,400
Gudang Kab Sumba Barat Daya m3 1 291,800 291,800
Waikelo Kab Sumba Tengah m3 1 646,400 646,400
Kab Sumba Barat m3 1 569,300 569,300
2 Angkutan Tiang Besi (12 mtr 200 daN) btg -
Gudang Kab Sumba Timur btg 1449 286,800 415,573,200
PLN UP3 Kab Sumba Barat Daya btg 414 258,211,800
623,700
Sumba
Kab Sumba Tengah btg 394 693,300 273,160,200
Kab Sumba Barat btg 912 562,500 513,000,000
PLN ULP Kab Sumba Timur btg 1 623,700 623,700
Sumba Jaya Kab Sumba Barat Daya btg 1 286,800
286,800
(Waikelo)
Kab Sumba Barat btg 1 433,900 433,900
Kab Sumba Tengah btg 1 429,900 429,900
3 Angkutan Tiang Besi (11 mtr 156 daN) btg -
Gudang Kab Sumba Timur btg 1 225,100 225,100
PLN UP3 Kab Sumba Barat Daya btg 1 216,600
216,600
Sumba
Kab Sumba Tengah btg 1 236,000 236,000
Kab Sumba Barat btg 1 175,900 175,900
PLN ULP Kab Sumba Timur btg 1 216,600 216,600
Sumba Jaya Kab Sumba Barat Daya btg 1 216,300
216,300
(Waikelo)
Kab Sumba Barat btg 1 285,200 285,200
Kab Sumba Tengah btg 1 292,800 292,800
4 Angkutan Tiang Besi (9 mtr 100 daN) btg -
Gudang Kab Sumba Timur btg 452 185,900 84,026,800
PLN UP3 Kab Sumba Barat Daya btg 293 74,041,100
252,700
Sumba
Kab Sumba Tengah btg 129 246,600 31,811,400
Kab Sumba Barat btg 432 238,300 102,945,600
PLN ULP Kab Sumba Timur btg 1 249,500 249,500
Sumba Jaya Kab Sumba Barat Daya btg 1 184,600
184,600
(Waikelo)
Kab Sumba Barat btg 1 210,700 210,700
Kab Sumba Tengah btg 1 213,300 213,300
5 Perabasan Trase kms 1,057 2,088,400 2,207,438,800
JUMLAH PEKERJAAN 18,163,318,100
PERSIAPAN
IV PEKERJAAN FINISHING
1 Foto dokumentasi lbr 5,083 ­ 5,000 ­ 25,415,000
2 Gambar revisi lbr 437 ­ 145,000 ­ 63,365,000
3 Penomoran tiang btg 13,677 7,500 7,800 102,577,500 106,680,600
4 Pengecatan tiang 14 mtr btg 1 280,000 105,600 280,000 105,600
5 Pengecatan tiang 13 mtr btg 1 210,000 97,000 210,000 97,000
6 Pengecatan tiang 12 mtr btg 12,527 181,000 89,300 2,267,387,000 1,118,661,100
7 Pengecatan tiang 11 mtr btg 1 166,000 81,700 166,000 81,700
8 Pengecatan tiang 9 mtr btg 5,477 99,000 48,800 542,223,000 267,277,600
9 Percobaan / testing JTM kms 527.520 ­ 800,000 ­ 422,016,000
10 Percobaan / testing Gardu lot 136 ­ 855,000 ­ 116,280,000
11 Percobaan / testing JTR kms 529.130 ­ 700,000 ­ 370,391,000
12 Tagging Jaringan (Tiang dan Konstruksi) Titik 18,140 ­ 50,000 907,000,000
JUMLAH PEKERJAAN 2,912,843,500 3,397,370,600
V PEKERJAAN FINISHING
LAINNYA
1 Jasa Pembongkaran = 60% x harga jasa Lot 1
2 pemasangan
Jasa Penggantian = Jasa Pembongkaran + Lot 1
3 Jasa Pemasangan
Pelurusan Tiang Miring = 30% x harga Lot 1
4 Pengangkutantiang
pemasangan Retur Material ke Gudang Lot 1
5 Area =untuk
Khusus 60 pengangkutan
% x Jasa Pengangkutan
material dari Kantor
PLN (ULP, Sub­ULP, KJ) terdekat ke lokasi
pekerjaan atau sebaliknya dihitung berdasarkan jarak
tempuh dibandingkan
dengan o gkos angkut (apab la retur dih tung 60%)
yang ada pada lokasi unit tersebut
6 Khusus Pengangkutan untuk Pekerjaan NON LISDES dari Gudang PLN menuju Lokasi
Pekerjaan, apabila pekerjaan dilapangan hanya membutuhkan volume tiang kurang dari 60% (enam
puluh persen) dari kapasitas angkut kendaraan maka harga angkutan kendaraan dihitung 60%
(enam puluh persen) dari kapasitas angkut kendaraan. Misal, Tiang 12 meter diangkut dari Gudang
PLN ke Lokasi "A" sebanyak 3 buah tiang, maka perhitungan pembayarannya adalah harga
angkutan Tiang 12 meter x 6, karena 60% kapasitas angkut kendaraan roda 6 untuk tiang 12 meter
adalah sebanyak 6 buah tiang.

a. Untuk kendaraan roda 8 diasumsikan kapasitas daya angkut adalah 6 tiang 14 meter, (60% = 4
buah tiang ukuran 14 meter)
b. Untuk kendaraan roda 6 diasumsikan kapasitas daya angkut adalah 6 tiang 13 meter, (60% = 4
buah tiang ukuran 13 meter)
c. Untuk kendaraan roda 6 diasumsikan kapasitas daya angkut adalah 10 tiang 12 meter, (60% = 6
buah tiang ukuran 12 meter)
d. Untuk kendaraan roda 6 diasumsikan kapasitas daya angkut adalah 14 tiang 11 meter, (60% = 8
buah tiang ukuran 11 meter)
e. Untuk kendaraan roda 6 diasumsikan kapasitas daya angkut adalah 18 tiang 9 meter, (60% = 11
buah tiang ukuran 9 meter)
Jumlah Material 43,402,414,300
Jumlah Jasa 39,435,173,300
Jumlah Material dan Jasa 82,837,587,600
PPn 10 % 8,283,758,760
Jumlah Total 91,121,346,360
Terbilang : Sembilan Puluh Satu Milyar Seratus Dua Puluh Satu Juta Tiga Ratus Empat Puluh Enam Ribu Tiga Ratus Enam Puluh Ruiah

Makassar, 24 Januari 2022


DIREKTUR
PT. TRIFA ADIMUKA BUANA

ZULFADLY
ARDU DISTRIBUSI, JARINGAN
UMBA

JUMLAH
HARGA (Rp)
8= 6 + 7

4,760,260,000
269,200
1,205,487,700
220,100
988,614,200
376,500,900
29,087,100
38,491,200
58,743,200
836,400
134,204,800
1,221,800
3,515,700
5,238,000
2,453,932,800
7,832,200
1,185,647,700
2,241,300
2,863,000
2,863,000
3,848,100
3,848,100
4,810,200
4,810,200
11,275,386,900

1,267,025,200
309,745,800
2,809,680,000
1,420,100
541,644,800
87,226,200
1,176,880,000
1,320,100
-

7,042,878,000
3,656,041,500
4,411,347,600
239,993,100
491,109,600
8,898,000
105,223,200
209,576,000
1,289,500
37,200,000
437,400
3,900
88,128,000
7,800
9,800
10,700

3,753,400

3,695,000

563,720,000

34,100
54,988,800
40,300
43,400
49,300
56,300
57,600
324,096,800
74,500
27,600
3,084,638,200
1,207,723,500
141,700
131,200
111,132,400
69,800
183,001,800
108,100
47,500
50,200
52,900
56,400
42,600
43,200
45,900
54,400
55,600
3,184,461,000
1,661,839,200
17,557,600
1,036,961,750
135,350
653,907,650
208,350
102,199,800
144,750
165,250
165,350
70,299,250
49,800
64,400
279,496,000
122,900
44,900
58,500
140,340,800
141,900
26,900
30,000
32,100
63,200
69,600
75,800
80,300
86,100
86,500
96,396,800
93,700
100,200
110,500
114,500
123,000
148,700
192,900
249,736,800
2,742,100
3,664,147,500
801,832,800
2,621,094,700
-
932,777,000
330,608,700
89,146,000
78,284,200
18,446,400
23,442,300
51,496,200
179,887,500
-
1,633,371,000
434,286,900
117,102,000
205,534,200
29,073,600
36,947,700
81,163,800
236,223,000
47,088,668,500

329,300
312,951,000
385,988,300
34,150,600
875,800
895,800
1,173,900
1,621,000
2,452,766,600
3,558,500
1,621,000
1,621,000
1,621,000
-
264,000
729,828,000
1,793,797,800
94,297,200
570,400
583,600
737,800
988,000
6,304,800,000
2,255,800
403,800
286,100
370,800
292,100
743,300
264,000
598,900
264,000
737,800
-
240,100
279,600
338,500
418,600
459,000
459,000
577,700
756,200
1,115,900
1,712,100
333,900
255,700
310,000
259,400
577,700
240,100
478,400
240,100
577,700
-
206,000
229,311,000
267,403,800
10,997,200
302,600
307,300
355,100
433,300
1,063,557,600
774,600
252,000
213,400
240,900
215,200
355,100
206,000
310,900
206,000
355,100

-
132,477,200
105,363,200
68,660,800
173,067,200
646,400
291,800
646,400
569,300
-
415,573,200
258,211,800
273,160,200
513,000,000
623,700
286,800
433,900
429,900
-
225,100
216,600
236,000
175,900
216,600
216,300
285,200
292,800
-
84,026,800
74,041,100
31,811,400
102,945,600
249,500
184,600
210,700
213,300
2,207,438,800
18,163,318,100

25,415,000
63,365,000
209,258,100
385,600
307,000
3,386,048,100
247,700
809,500,600
422,016,000
116,280,000
370,391,000
907,000,000
6,310,214,100
43,402,414,300
39,435,173,300
82,837,587,600
8,283,758,760
91,121,346,360
m Puluh Ruiah
ANALISA HARGA SATUAN
MATERIAL JARINGAN TEGANGAN MENENGAH & GARDU
No Satua Volu Harga Harga Satuan
Material n me Pokok

(Rp) (Rp)
1 2 3 4 5 6=4x5

I PERLENGKAPAN DRUCKSCHOOR JTM SET 1

1 Pole Band Galvanis 1/2 - 5" (sesuai diameter Tiang Segmen C / buah 1 65,000 65,000
2 atas)
Pole Band Galvanis 2/2 - 5" (sesuai diameter Tiang Segmen C / buah 2 65,000 130,000
3 atas)
Pole Band Galvanis 2/2 - 7" (sesuai diameter Tiang Segmen B / buah 1 70,000 70,000
4 tengah)
Pole Band Galvanis 2/2 - 8" (sesuai diameter Tiang Segmen A / buah 1 70,000 70,000
5 bawah)
Pipa Galvanise diameter 2" Panjang 2000 mm batang 1 200,000 200,000
6 UNP 100x50x5x200 mm u/stop druck batang 1 150,000 150,000
7 Bolt & Nut M.16 x 50 (5/8"x50mm) buah 9 6,500 58,500
JUMLAH 743,500

II KONTRAMAST JTM SET 1

1 Galv. Steel Stranded Wire 70 mm meter 26.00 25,000 650,000


2 Pole Band Galvanis 2/2 - 5" (sesuai diameter Tiang Segmen C / buah 2 65,000 130,000
3 atas)
Bolt & Nut M.16 x 50 (5/8"x50mm) buah 4 6,500 26,000
4 Spanschroef 3/4" / Turn Buckle 50 KN buah 2 40,000 80,000
5 Guy isolator /tui isolator buah 2 40,000 80,000
6 Wire clip/Cross By 70 mm² buah 6 5,000 30,000
7 Stay rood diameter 16 mm² (0,6") Panjang =1800 mm (Anker) buah 1 85,000 85,000
8 Cousen Galv / guy wire thimble 70 mm² Set 4 35,000 140,000
9 Beton Block 40 cmx 40 cm x10 cm buah 1 50,000 50,000
10 U-Bolt 19 mm with nut+plat 120x50x5 u/beton blok Set 1 45,000 45,000
JUMLAH 1,316,000

III TRECKSCHOOR JTM (STANDAR) SET 1

1 Galv. Steel Stranded Wire 70mm Mtr 15.00 25,000 375,000


2 Pole Band Galvanis 2/2 - 5" (sesuai diameter Tiang Segmen C / Set 1 50,000 50,000
3 atas)
Bolt & Nut M.16 x 50 (5/8"x50mm) Bh 2 6,500 13,000
4 Spanschroef 3/4" / Turn Buckle 50 KN Bh 1 40,000 40,000
5 Guy isolator /tui isolator Bh 1 40,000 40,000
6 Wire clip/Cross By 70 mm² Bh 4 5,000 20,000
7 Stay rood diameter 16 mm² (0,6") Panjang =1800 mm (Anker) Btg 1 50,000 50,000
8 Cousen Galv / guy wire thimble 70 mm² Set 2 15,000 30,000
9 Beton Block 40 cmx 40 cm x10 cm Bh 1 50,000 50,000
10 U-Bolt 19 mm with nut+plat 120x50x5 u/beton blok Set 1 15,000 15,000
JUMLAH 683,000

IV TRECKSCHOOR JTM (TOLAK PINGGANG) SET 1

1 Galv. Steel Stranded Wire 70 mm Mtr 14.00 25,000 350,000


2 Pole Band Galvanis 2/2 - 5" (sesuai diameter Tiang Segmen C / Set 1 65,000 65,000
3 atas)
Bolt & Nut M.16 x 50 (5/8"x50mm) Bh 2 6,500 13,000
4 Spanschroef 3/4" / Turn Buckle 50 KN Bh 1 40,000 40,000
5 Guy isolator /tui isolator Bh 1 40,000 40,000
6 Wire clip/Cross By 70 mm² Bh 12 5,000 60,000
7 Stay rood diameter 16 mm² (0,6") Panjang =2200 mm (Anker) Btg 1 85,000 85,000
8 Cousen Galv / guy wire thimble 70 mm² Bh 4 35,000 140,000
9 Beton Block 40 cmx 40 cm x10 cm Bh 1 50,000 50,000
10 U-Bolt 19 mm with nut+plat 120x50x5 u/beton blok Set 1 45,000 45,000
11 Anchor rod clamp + bolt & nut M 16x75 Bh 1 120,000 120,000
12 Pipa Galvanise diameter 2" tebal 1,8mm Panjang 1,80 meter Bh 1 200,000 200,000
JUMLAH 1,208,000
CROSS ARM A1 BALANCE (Single Support on Single
V SET 1
Pole)
1 Besi UNP 100x50x5x2000mm Btg 1 450,000 450,000
2 Pole Band Galvanis 1/2 - 5" (sesuai diameter Tiang Segmen C / Bh 1 60,000 60,000
3 atas)
Pole Band Galvanis 2/2 - 5" (sesuai diameter Tiang Segmen C / Set 1 60,000 60,000
4 atas)
Arm Tie Brace (Besi L. 50x4x1270 mm) / Adaptor Btg 1 60,000 60,000
5 Steel plat type II (6x100x12) Bh 2 25,000 50,000
6 Bolt & Nut M.16 x 70 (5/8"x70mm) Bh 5 12,000 60,000
7 Bolt & Nut M.16 x 140 (5/8"x140mm) Bh 2 35,000 70,000
JUMLAH 810,000
CROSS ARM A2 BALANCE (Double Support on Single
VI SET 1
Pole)
1 Besi UNP 100x50x5x2000mm Btg 2 450,000 900,000
2 Pole Band Galvanis 2/2 - 5" (sesuai diameter Tiang Segmen C / Bh 2 50,000 100,000
3 atas)
Steel plat type I (6x100x37.5) Bh 4 50,000 200,000
4 Steel plat type II (6x100x12) Bh 4 50,000 200,000
5 Arm Tie (Besi L. 50x4x1270 mm) Btg 1 25,000 25,000
6 Bolt & Nut M.16 x 70 (5/8"x70mm) Bh 3 12,000 36,000
7 Bolt & Nut M.16 x 140 (5/8"x140mm) Bh 8 25,000 200,000
8 Bolt & Nut M.16 x 300 (5/8"x300mm) Bh 6 35,000 210,000
JUMLAH 1,871,000

VII CROSS ARM A3 BALANCE SET 1

1 Besi UNP 100x50x5x2000mm Btg 2 450,000 900,000


2 Pole Band Galvanis 2/2 - 5" (sesuai diameter Tiang Segmen C / Bh 2 50,000 100,000
3 atas)
Steel plat type I (6x100x37.5) Bh 4 50,000 200,000
4 Steel plat type II (6x100x12) Bh 4 50,000 200,000
5 Arm Tie (Besi L. 50x4x1270 mm) Btg 1 25,000 25,000
6 Bolt & Nut M.16 x 70 (5/8"x70mm) Bh 3 12,000 36,000
7 Bolt & Nut M.16 x 140 (5/8"x140mm) Bh 8 25,000 200,000
8 Bolt & Nut M.16 x 300 (5/8"x300mm) Bh 6 35,000 210,000
JUMLAH 1,871,000

VIII CROSS ARM B3 (Double Support on Double Pole) SET 1

1 Besi UNP 100x50x5x2200mm batang 2 500,000 1,000,000


2 Pole Band Galvanis 2/2 - 5" (sesuai diameter Tiang Segmen C / buah 2 60,000 120,000
3 atas)
Steel plat type I (6x100x37.5) buah 6 35,000 210,000
4 Bolt & Nut M.16 x 140 (5/8"x140mm) buah 12 35,000 420,000
5 Bolt & Nut M.16 x 200 (5/8"x200mm) buah 4 45,000 180,000
JUMLAH 1,930,000

IX CROSS ARM u/ DUDUKAN CUT OUT 1 TIANG SET 1

1 Besi UNP 100x50x5x2000mm Btg 1 550,000 550,000


2 Pole Band Galvanis 1/2 - 5" (sesuai diameter Tiang Segmen C / Bh 1 65,000 65,000
3 atas)
Bolt & Nut M.16 x 140 (5/8"x140mm) Bh 2 35,000 70,000
JUMLAH 685,000
X CROSS ARM u/ DUDUKAN L. ARRESTER 1 TIANG SET 1

1 Besi UNP 100x50x5x2000mm Btg 1 550,000 550,000


2 Pole Band Galvanis 1/2 - 5" (sesuai diameter Tiang Segmen C / Bh 1 65,000 65,000
3 atas)
Bolt & Nut M.16 x 140 (5/8"x140mm) Bh 2 35,000 70,000
JUMLAH 685,000

XI PENGHALANG PANJAT SET 1

1 Pole Band Galvanis 2/2 - 8" (sesuai diameter Tiang Segmen A / buah 1 65,000 65,000
2 bawah)
Besi beton diameter 10 mm2 meter 2.00 85,000 170,000
3 Bolt & Nut M.16 x 50 (5/8"x50mm) buah 2 6,500 13,000
4 Las ls 1 10,000 10,000
5 Cat Dasar ls 1 15,000 15,000
JUMLAH 273,000

XII TANDA KILAT KECIL u/ JTM + GARDU CANTOL SET 1

1 Pole Band Galvanis 2/2 - 5" (sesuai diameter Tiang Segmen C / buah 1 65,000 65,000
2 atas)
Plat Alumunium Tebal 1 mm uk. 150x200 mm buah 1 40,000 40,000
3 Mur baut diameter 1/2" panjang 40mm buah 2 6,500 13,000
4 Cat Dasar+cat merah+Hitam, Putih, Bronze ls 1 15,000 15,000
JUMLAH 133,000
TANDA KILAT BESAR u/ GARDU DISTRIBUSI
XIII SET 1
(PORTAL)
1 Plat Besi tebal = 1,5 mm uk. 640x640 buah 1 70,000 70,000
2 Stainless Steel Strip 20x0,7 mm meter 1 13,000 13,000
3 Stoping Buckle buah 2 5,700 11,400
4 Cat Dasar+cat merah+Hitam, Putih, Bronze ls 1 15,000 15,000
JUMLAH 109,400

XIV ARDE u/ L. ARRESTER JTM SET 1

1 Elektroda Tembaga 5/8" Panjang = 2,5 meter buah 2 199,000 398,000


2 BC 50mm CU meter 15.00 74,800 1,122,000
3 Pipa Galvanise diamtr. 1/2" Panjang 6 meter batang 1 89,200 89,200
4 Stainless Steel Strip 4 titik meter 4 13,000 52,000
5 Connector CU 35-50mm buah 1 49,800 49,800
6 Stoping Buckle buah 4 5,700 22,800
7 Link 25x25 buah 4 4,400 17,600
8 Sepatu Kabel CU 50mm2 buah 2 49,800 99,600
JUMLAH 1,851,000
ARDE u/ L. ARRESTER + BODY TRAFO + BODY
XV SET 1
PHBTR ("di KOPEL")
1 Elektroda Tembaga 5/8" Panjang = 2,5 meter buah 2 199,000 398,000
2 BC 50mm CU meter 16.00 74,800 1,196,800
3 Pipa Galvanise diamtr. 1/2" Panjang 6 meter batang 1 89,200 89,200
4 Stainless Steel Strip 4 titik meter 4 13,000 52,000
5 Connector CU 35-50mm buah 3 49,800 149,400
6 Stoping Buckle buah 4 5,700 22,800
7 Link 25x25 buah 4 4,400 17,600
8 Sepatu Kabel CU 50mm2 buah 2 49,800 99,600
JUMLAH 2,025,400
ARDE TR u/ TITIK NETRAL SEKUNDER TRAFO (pada
XVI SET 1
PHB)
1 Elektroda Tembaga 5/8" Panjang = 2,5 meter buah 1 199,000 199,000
2 BC 50mm CU meter 2.00 74,800 149,600
3 Pipa Galvanise diamtr. 1/2" Panjang 1,5 meter batang 1 89,200 89,200
4 Sepatu Kabel CU 50mm2 buah 2 49,800 99,600
JUMLAH 537,400
RANGKA DUDUKAN TRAFO DISTRIBUSI 3 PH 1
XVII SET 1
TIANG
1 Besi UNP 100x50x5x1500 mm galv (Pegangan Tiang) batang 2 500,000 1,000,000
2 Besi UNP 100x50x5x 800 mm galv (dudukan trafo) batang 2 350,000 700,000
3 Besi UNP 100x50x5x 600 mm galv (dudukan trafo kanan kiri) batang 2 300,000 600,000
4 Arm Tie Galvanis 50x50x5x1000 mm batang 2 150,000 300,000
5 Arm Tie Galvanis 50x50x5x1200 mm (arah sisi letak Trafo) batang 2 150,000 300,000
6 Bolt & Nut M.16 x 300 (5/8"x300mm) buah 2 35,000 70,000
7 Bolt & Nut M.16 x 50 (5/8"x50mm) buah 18 6,500 117,000
8 Pole Band Galv. 2/2 - 7" (sesuai diam. Tiang Segmen B buah 1 85,000 85,000
9 /tengah)
Pole Bandu/ Galv.
Penahan
1/2 Arm
- 7" Tie
(sesuai diam. Tg. Segmen B /tengah) buah 1 85,000 85,000
u/ Penahan dudukan tr JUMLAH 3,257,000

XVIII DUDUKAN LV BOARD / PHB TR 1 TIANG 2 JURUSAN SET 1

1 Besi UNP 100x50x5x 800 mm galv batang 2 350,000 700,000


2 Pole Band 1/2 - 8" (sesuai diameter Tiang Segmen A / bawah) buah 2 85,000 170,000
3 Bolt & Nut M.16 x 50 (5/8"x50mm) buah 4 6,500 26,000
JUMLAH 896,000
PIPA INLET & OUTLET MEDIUM B + INVORING 2" 1
XIX SET 1
TIANG 2 JURUSAN
1 Pipa 2" Medium B Galvanis Panjang = 6 meter u/ Inlet batang 1 400,000 400,000
2 Pipa 2" Medium B Galvanis Panjang = 6 meter u/ Outlet batang 2 400,000 800,000
3 L. Bow pipa PVC 2" u/ bagian atas buah 3 300,000 900,000
4 L. Bow pipa Besi 2" u/ bagian bawah buah 3 300,000 900,000
5 Pole Band 1/2 - 8" (sesuai diam. Tiang. Segmen A /bawah) u/ buah 2 85,000 170,000
6 pegangan pipa1/2
Klem Beugel bawah
2" pegangan UNP penahan pipa buah 2 85,000 170,000
7 Bolt & Nut M.16 x 50 (5/8"x50mm) buah 18 6,500 117,000
8 Besi UNP 100x50x5x 600 mm galv (pemegang Pipa) batang 2 85,000 170,000
JUMLAH 3,627,000
PIPA INLET & OUTLET MEDIUM B + INVORING 2,5" 1
XX SET 1
TIANG 2 JURUSAN
1 Pipa 2,5" Medium B Galvanis Panajng = 6 meter u/ Inlet batang 1 500,000 500,000
2 Pipa 2,5" Medium B Galvanis Panajng = 6 meter u/ Outlet batang 2 500,000 1,000,000
3 L. Bow pipa PVC 2,5" u/ bagian atas buah 3 240,000 720,000
4 L. Bow pipa Besi 2,5" u/ bagian bawah buah 3 240,000 720,000
5 Pole Band 1/2 - 8" (sesuai diam. Tiang. Segmen A /bawah) u/ buah 2 85,000 170,000
6 pegangan pipa1/2
Klem Beugel bawah
2" pegangan UNP penahan pipa buah 2 85,000 170,000
7 Bolt & Nut M.16 x 50 (5/8"x50mm) buah 18 6,500 117,000
8 Besi UNP 100x50x5x 600 mm galv (pemegang Pipa) batang 2 85,000 170,000
JUMLAH 3,567,000
PIPA INLET & OUTLET MEDIUM B + INVORING 3" 1
XXI SET 1
TIANG 2 JURUSAN
1 Pipa 3" Medium B Galvanis Panajng = 6 meter u/ Inlet batang 1 650,000 650,000
2 Pipa 3" Medium B Galvanis Panajng = 6 meter u/ Outlet batang 2 650,000 1,300,000
3 L. Bow pipa PVC 3" u/ bagian atas buah 3 240,000 720,000
4 L. Bow pipa Besi 3" u/ bagian bawah buah 3 240,000 720,000
5 Pole Band 1/2 - 8" (sesuai diam. Tiang. Segmen A /bawah) u/ buah 2 85,000 170,000
6 pegangan pipa1/2
Klem Beugel bawah
2" pegangan UNP penahan pipa buah 2 85,000 170,000
7 Bolt & Nut M.16 x 50 (5/8"x50mm) buah 18 6,500 117,000
8 Besi UNP 100x50x5x 600 mm galv (pemegang Pipa) batang 2 85,000 170,000
JUMLAH 4,017,000
PERHITUNGAN HARGA BAHAN PONDASI COR
BETON per M3
1. Semen (PC) uk/ 50 kg zak 8.300 75,000 622,500
2. Kerikil Beton m3 0.830 150,000 124,500
3. Pasir Pasangan m3 0.540 150,000 81,000
4. Seng Cor lbr 0.300 45,000 13,500
JUMLAH HARGA BAHAN PONDASI 841,500

XXII Beton Kaki Tiang Besi 12 Meter 200 daN (0,223 M3 x Harga batang 1 187,655 187,000
Bahan Kaki
XXIII Beton Pondasi)
Tiang Besi 11 Meter 156 daN (0,118 M3 x Harga batang 1 99,297 99,000
Bahan Pondasi)
XXIV Beton Lantai Kerja Gardu Cantol (1 Tiang) 120x100x10cm ls 1 1,683,000 1,683,000
(0,269M3
PERHITUNGANx Harga Bahan
HARGA Pondasi)
BAHAN CAT TIANG BESI per
M2
1. Cat dasar kg 0.100 90,000 9,000
2. Minyak Cat liter 0.050 60,000 3,000
3. Cat besi kg 0.150 150,000 22,500
4. Kuas buah 0.100 10,000 1,000
JUMLAH 35,500
HARGA BAHAN
XXV Pengecatan Tiang Besi 12 Meter 200 daN (5,118 x Harga batang CAT1TIANG
181,689 181,000
Bahan Cat) Tiang Besi 11 Meter 156 daN (4,691 x Harga
XXVI Pengecatan batang 1 166,531 166,000
Bahan Cat)
ANALISA HARGA SATUAN
MATERIAL JARINGAN TEGANGAN RENDAH
No Satua Volu Harga Harga Satuan
Material n me Pokok
(Rp) (Rp)
1 2 3 4 5 6=4x5
I SUSPENSION ASSEMBLY 25 - 70mm set 1
1 Suspension Clamp buah 1 50,000 50,000
2 Pole Bracket buah 1 11,000 11,000
3 Stainless Steel Strip meter 1.75 13,000 22,750
4 Stoping Buckle buah 2 5,700 11,400
5 Plastik Strap buah 3 4,400 13,200
JUMLAH 108,350
II LARGE ANGLE ASSEMBLY 25 - 70 mm2 set 1

1 Strain Clamp 50 - 70 buah 2 60,000 120,000


2 Pole Bracket buah 1 11,000 11,000
3 Stainless Steel Strip meter 1.75 13,000 22,750
4 Stoping Buckle buah 2 5,700 11,400
5 Plastik Strap buah 2 4,400 8,800
JUMLAH 173,950
III FIXED DEAD END ASSEMBLY 25 - 70 mm2 set 1

1 Strain Clamp 50 - 70 buah 1 60,000 60,000


2 Pole Bracket buah 1 11,000 11,000
3 Stainless Steel Strip meter 1.75 13,000 22,750
4 Stoping Buckle buah 2 5,700 11,400
5 Plastik Strap buah 2 4,400 8,800
JUMLAH 113,950
IV ADJUSTABLE DEAD END ASSEMBLY 25 - 70 mm2 set 1

1 Strain Clamp 50 - 70 buah 1 60,000 60,000


2 Pole Bracket buah 1 11,000 11,000
3 Stainless Steel Strip meter 1.75 13,000 22,750
4 Stoping Buckle buah 2 5,700 11,400
5 Plastik Strap buah 2 4,400 8,800
6 Turn Buckle / Spanschroef buah 1 20,000 20,000
JUMLAH 133,950
V BUNDLE END PROTECTION ASSEMBLY set 1

1 Pipa PVC 2" 50cm buah 1 20,000 20,000


2 Stainless Steel Strip meter 1.75 13,000 22,750
3 Stoping Buckle buah 2 5,700 11,400
4 Link 25x25 buah 2 4,400 8,800
5 End Cap buah 4 7,000 28,000
JUMLAH 90,950
VI ARDE TR (5 OHM) set 1

1 Elektroda Tembaga 5/8" Panjang = 2,5 meter buah 1 199,000 199,000


2 BC 50mm CU meter 10.00 74,800 748,000
3 Pipa Galvanise diamtr. 1/2" Panjang 6 meter batang 1 89,200 89,200
4 Stainless Steel Strip 4 titik meter 4.00 13,000 52,000
5 Connector CU 35-50mm buah 1 49,800 49,800
6 Stoping Buckle buah 4 5,700 22,800
7 Link 25x25 buah 4 4,400 17,600
8 Sepatu Kabel CU 50mm2 buah 1 49,800 49,800
JUMLAH 1,228,200
VII PERLENGKAPAN DRUCKSCHOOR JTR set 1
1 Pole Band Galvanis 1/2 diameter 3" buah 1 65,000 65,000
2 Pole Band Galvanis 2/2 diameter 3" buah 2 65,000 130,000
3 Pole Band Galvanis 2/2 diameter 5" buah 2 65,000 130,000
4 Pipa Galvanise diameter 2" Panjang 1200 mm batang 1 200,000 200,000
5 UNP 100x50x5x175 mm u/stop druck batang 1 150,000 150,000
6 Bolt & Nut +plat & spring plat M.16 x 50mm galv buah 9 6,500 58,500
JUMLAH 733,500
VIII KONTRAMAST JTR set 1

1 Galv. Steel Stranded Wire 35 mm meter 24.00 25,000 600,000


2 Pole Band Galvanis 2/2 - 3" (sesuai diameter Tiang Segmen C / buah 2 65,000 130,000
3 atas)
Bolt & Nut M.16 x 50 (5/8"x50mm) buah 4 6,500 26,000
4 Spanschroef 5/8" / Turn Buckle 17 KN buah 2 40,000 80,000
5 Guy isolator /tui isolator TR buah 2 40,000 80,000
6 Wire clip/Cross By 35mm² buah 6 5,000 30,000
7 Stay rood diameter 16 mm² (0,6") Panjang =1800 mm (Anker) buah 1 85,000 85,000
8 Cousen Galv / guy wire thimble 35 mm² Set 4 35,000 140,000
9 Beton Block 40 cmx 40 cm x10 cm buah 1 50,000 50,000
10 U-Bolt 16 mm with nut+plat 120x50x5 u/beton blok Set 1 45,000 45,000
JUMLAH 1,266,000
IX TRECKSCHOOR JTR (STANDAR) set 1

1 Galv. Steel Stranded Wire 35 mm meter 11.00 25,000 275,000


2 Pole Band Galvanis 2/2 - 3" (sesuai diameter Tiang Segmen C / buah 1 65,000 65,000
3 atas)
Bolt & Nut M.16 x 50 (5/8"x50mm) buah 2 6,500 13,000
4 Spanschroef 5/8" / Turn Buckle 17 KN buah 1 40,000 40,000
5 Guy isolator /tui isolator TR buah 1 40,000 40,000
6 Wire clip/Cross By 35mm² buah 4 5,000 20,000
7 Stay rood diameter 16 mm² (0,6") Panjang =1800 mm (Anker) buah 1 85,000 85,000
8 Cousen Galv / guy wire thimble 35 mm² Set 2 35,000 70,000
9 Beton Block 40 cmx 40 cm x10 cm buah 1 50,000 50,000
10 U-Bolt 16 mm with nut+plat 120x50x5 u/beton blok Set 1 45,000 45,000
JUMLAH 703,000

X TRECKSCHOOR JTR (TOLAK PINGGANG) set 1

1 Galv. Steel Stranded Wire 35 mm Mtr 10.00 25,000 250,000


2 Pole Band Galvanis 2/2 - 3" (sesuai diameter Tiang Segmen C / Set 1 65,000 65,000
3 atas)
Bolt & Nut M.16 x 50 (5/8"x50mm) Bh 2 6,500 13,000
4 Spanschroef 5/8" / Turn Buckle 17 KN Bh 1 40,000 40,000
5 Guy isolator /tui isolator Bh 1 40,000 40,000
6 Wire clip/Cross By 35mm² Bh 12 5,000 60,000
7 Stay rood diameter 16 mm² (0,6") Panjang =2200 mm (Anker) Btg 1 85,000 85,000
8 Cousen Galv / guy wire thimble 35 mm² Bh 4 35,000 140,000
9 Beton Block 40 cmx 40 cm x10 cm Bh 1 50,000 50,000
10 U-Bolt 19 mm with nut+plat 120x50x5 u/beton blok Set 1 45,000 45,000
11 Anchor rod clamp + bolt & nut M 16x75 Bh 1 120,000 120,000
12 Pipa Galvanise diameter 2" tebal 1,8mm Panjang 1,50 meter Bh 1 200,000 200,000
JUMLAH 1,108,000
PERHITUNGAN HARGA BAHAN PONDASI COR BETON
per M3
1. Semen (PC) uk/ 50 kg zak 8.300 75,000 622,500
2. Kerikil Beton m3 0.830 500,000 415,000
3. Pasir Pasangan m3 0.540 500,000 270,000
4. Seng Cor lbr 0.300 65,000 19,500
HARGA BAHAN PONDASI 1,327,000

XI Beton Kaki Tiang Tiang Besi 9 Meter 100 daN (0,093 M3 x batang 1 123,411 123,000
Bahan Pondasi)
PERHITUNGAN HARGA BAHAN CAT TIANG BESI per M2

1. Cat dasar kg 0.100 90,000 9,000


2. Minyak Cat liter 0.050 60,000 3,000
3. Cat besi kg 0.150 150,000 22,500
4. Kuas buah 0.100 10,000 1,000
HARGA BAHAN CAT TIANG 35,500

XII Pengecatan Tiang Besi 9 Meter 100 daN (2,814 x Bahan batang 1 99,897 99,000
Cat)
TANGGAL : 27 April 2020
NAMA KONTRAKTOR : PT. Dondo Jaya Perkasa TANDA TANGAN KONTRAKTOR :

DAFTAR ISIAN 19.1 : TKDN Gabungan Barang dan Jasa untuk Material Lansung (Bahan Baku)
Nama Penyedia Barang / Jasa : PT. Dondo Jaya Perkasa
Alamat : Jln. Sanrangan 9 No. 8 Makassar
Nama Pekerjaan : Kesepakatan Harga Satuan Pengadaan dan Pemasangan Pekerjaan Konstruksi Jaringan Distribusi Listrik Perdesaan
Zona Kupang dan Sumba
Pemilik Pekerjaan : PT PLN (PERSERO) UNIT INDUK WILAYAH NUSA TENGGARA TIMUR
No. Dokumen : 003.RKS/DAN.01.03/200000/2020 Tanggal 13 April 2020
Pemasok / Biaya TKDN
TKDN Harga Satuan (Ribu
No. Uraian Spesifikasi Negara Jumlah Satuan Barang
Asal (%) Rp) (%)
KDN KLN TOTAL
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

(5)x(6)x(8) DN+LN
(100%-(5))x(6)x(8)

1 Material Lansung See RKS Indonesia 1 Lot


100% 2,912,843,500 2,912,843,500 - 2,912,843,500 3.52%
(Bahan Baku)
Material Lansung (Bahan Baku) SUB TOTAL 2,912,843,500 - 2,912,843,500
Ket : Kolom (9) DN : Kolom (5) x kolom (6) x kolom (8)
Kolom (9) LN : (1 - Kolom (5)) x kolom (6) x kolom (8)
TANGGAL : 27 April 2020
NAMA KONTRAKTOR : PT. Dondo Jaya Perkasa TANDA TANGAN KONTRAKTOR :

DAFTAR ISIAN 19.2 : TKDN Gabungan Barang dan Jasa untuk Peralatan (Barang Jadi)
Nama Penyedia Barang / Jasa : PT. Dondo Jaya Perkasa
Alamat : Jln. Sanrangan 9 No. 8 Makassar
Nama Pekerjaan : Kesepakatan Harga Satuan Pengadaan dan Pemasangan Pekerjaan Konstruksi Jaringan Distribusi Listrik Perdesaan
Zona Kupang dan Sumba
Pemilik Pekerjaan : PT PLN (PERSERO) UNIT INDUK WILAYAH NUSA TENGGARA TIMUR
No. Dokumen : 003.RKS/DAN.01.03/200000/2020 Tanggal 13 April 2020
Pemasok / Biaya TKDN
No. Uraian Spesifikasi Negara TKDN Jumlah Satuan Harga Satuan Barang
(%) (Ribu Rp)
Asal KDN KLN TOTAL
(%)
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

(5)x(6)x(8) (100%- DN+LN


(5))x(6)x(8)
1 Peralatan (Barang Jadi) See RKS Indonesia 100% 1 Lot 40,489,570,800 40,489,570,800 - 40,489,570,800 48.88%
- - -
Peralatan (Barang Jadi) SUB TOTAL 40,489,570,800 - 40,489,570,800
Ket : Kolom (9) DN : Kolom (5) x kolom (6) x kolom (8)
Kolom (9) LN : (1 - Kolom (5)) x kolom (6) x kolom (8)
TANGGAL : 27 April 2020
NAMA KONTRAKTOR : PT. Dondo Jaya Perkasa TANDA TANGAN KONTRAKTOR :

DAFTAR ISIAN 19.3 : TKDN Gabungan Barang dan Jasa untuk Manajemen Proyek dan Perekayasaan
Nama Penyedia Barang / Jasa : PT. Dondo Jaya Perkasa
Alamat : Jln. Sanrangan 9 No. 8 Makassar
Nama Pekerjaan : Kesepakatan Harga Satuan Pengadaan dan Pemasangan Pekerjaan Konstruksi Jaringan Distribusi Listrik Perdesaan
Zona Kupang dan Sumba
Pemilik Pekerjaan : PT PLN (PERSERO) UNIT INDUK WILAYAH NUSA TENGGARA TIMUR
No. Dokumen : 003.RKS/DAN.01.03/200000/2020 Tanggal 13 April 2020
Pemasok / Biaya TKDN
Harga Satuan
No. Uraian Spesifikasi Negara TKDN Jumlah Satuan Barang
(%) (Ribu Rp)
Asal KDN KLN TOTAL
(%)
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

(5)x(6)x(8) DN+LN
(100%-(5))x(6)x(8)
1 Manajemen Proyek dan Perekayasaan See RKS Indonesia 100% 1 lot 3,397,370,600 3,397,370,600 - 3,397,370,600 4.10%

Manajemen Proyek dan Perekayasaan SUB TOTAL 3,397,370,600 - 3,397,370,600


Ket : Kolom (9) DN : Kolom (5) x kolom (6) x kolom (8)
Kolom (9) LN : (1 - Kolom (5)) x kolom (6) x kolom (8)
TANGGAL : 27 April 2020
NAMA KONTRAKTOR : PT. Dondo Jaya Perkasa TANDA TANGAN KONTRAKTOR :

DAFTAR ISIAN 19.4 : TKDN Gabungan Barang dan Jasa untuk AlatKerja/Fasilitas Kerja
Nama Penyedia Barang / Jasa : PT. Dondo Jaya Perkasa
Alamat : Jln. Sanrangan 9 No. 8 Makassar
Nama Pekerjaan : Kesepakatan Harga Satuan Pengadaan dan Pemasangan Pekerjaan Konstruksi Jaringan Distribusi Listrik Perdesaan
Zona Kupang dan Sumba
Pemilik Pekerjaan : PT PLN (PERSERO) UNIT INDUK WILAYAH NUSA TENGGARA TIMUR
No. Dokumen : 003.RKS/DAN.01.03/200000/2020 Tanggal 13 April 2020
Pemasok / Biaya TKDN
Harga Satuan
No. Uraian Spesifikasi Negara TKDN Jumlah Satuan Barang
(%) (Ribu Rp)
Asal KDN KLN TOTAL
(%)
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

(5)x(6)x(8) DN+LN
(100%-(5))x(6)x(8)
1 Alat Kerja/Fasilitas Kerja See RKS Indonesia 100% 1 lot 18,163,318,100 18,163,318,100 - 18,163,318,100 21.93%

Alat Kerja / Fasilitas Kerja SUB TOTAL 18,163,318,100 - 18,163,318,100


Ket : Kolom (9) DN : Kolom (5) x kolom (6) x kolom (8)
Kolom (9) LN : (1 - Kolom (5)) x kolom (6) x kolom (8)
TANGGAL : 27 April 2020
NAMA KONTRAKTOR : PT. Dondo Jaya Perkasa TANDA TANGAN KONTRAKTOR :

DAFTAR ISIAN 19.5 : TKDN Gabungan Barang dan Jasa untuk Konstruksi/Fabrikasi
Nama Penyedia Barang / Jasa : PT. Dondo Jaya Perkasa
Alamat : Jln. Sanrangan 9 No. 8 Makassar
Nama Pekerjaan : Kesepakatan Harga Satuan Pengadaan dan Pemasangan Pekerjaan Konstruksi Jaringan Distribusi Listrik Perdesaan
Zona Kupang dan Sumba
Pemilik Pekerjaan : PT PLN (PERSERO) UNIT INDUK WILAYAH NUSA TENGGARA TIMUR
No. Dokumen : 003.RKS/DAN.01.03/200000/2020 Tanggal 13 April 2020
Pemasok / Biaya TKDN
Harga Satuan
No. Uraian Spesifikasi Negara TKDN Jumlah Satuan Barang
(%) (Ribu Rp)
Asal KDN KLN TOTAL
(%)
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

(5)x(6)x(8) DN+LN
(100%-(5))x(6)x(8)
1 Konstruksi / fabrikasi See RKS Indonesia 100% 1 lot 6,636,276,700 6,636,276,700 - 6,636,276,700 8.01%

Konstruksi / Fabrikasi SUB TOTAL 6,636,276,700 - 6,636,276,700


Ket : Kolom (9) DN : Kolom (5) x kolom (6) x kolom (8)
Kolom (9) LN : (1 - Kolom (5)) x kolom (6) x kolom (8)
TANGGAL : 27 April 2020
NAMA KONTRAKTOR : PT. Dondo Jaya Perkasa TANDA TANGAN KONTRAKTOR :

DAFTAR ISIAN 19.5 : TKDN Gabungan Barang dan Jasa untuk Jasa Umum
Nama Penyedia Barang / Jasa : PT. Dondo Jaya Perkasa
Alamat : Jln. Sanrangan 9 No. 8 Makassar
Nama Pekerjaan : Kesepakatan Harga Satuan Pengadaan dan Pemasangan Pekerjaan Konstruksi Jaringan Distribusi Listrik Perdesaan
Zona Kupang dan Sumba
Pemilik Pekerjaan : PT PLN (PERSERO) UNIT INDUK WILAYAH NUSA TENGGARA TIMUR
No. Dokumen : 003.RKS/DAN.01.03/200000/2020 Tanggal 13 April 2020
Pemasok / Biaya TKDN
Harga Satuan
No. Uraian Spesifikasi Negara TKDN Jumlah Satuan Barang
(%) (Ribu Rp)
Asal KDN KLN TOTAL
(%)
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

(5)x(6)x(8) DN+LN
(100%-(5))x(6)x(8)
1 Konstruksi / fabrikasi See RKS Indonesia 100% 1 lot 11,238,207,900 11,238,207,900 - 11,238,207,900 13.57%

Jasa Umum SUB TOTAL 11,238,207,900 - 11,238,207,900


Ket : Kolom (9) DN : Kolom (5) x kolom (6) x kolom (8)
Kolom (9) LN : (1 - Kolom (5)) x kolom (6) x kolom (8)
DAFTAR ISIAN 19.7 : Rekapitulasi Penilaian TKDN Gabungan Barang dan Jasa

A. Nama Penyedia Barang / Jasa : PT. Dondo Jaya Perkasa


B. Alamat : Jl. Sanrangan 9 No.10 Makassar
C. Nama Pekerjaan : Kesepakatan Harga Satuan Pengadaan dan Pemasangan Pekerjaan Konstruksi
Jaringan Distribusi Listrik Perdesaan Zona Kupang dan Sumba
D. Pemilik Pekerjaan : PT PLN (Persero) Unit Induk Wilayah Nusa Tenggara Timur
E. No. Dokumen : 003.RKS/DAN.01.03/200000/2020 Tanggal 13 April 2020
Nilai Gabungan Barang dan Jasa
TKDN (%)
Ribu (Rp)
Uraian
KDN KLN Total
Barang /Jasa Gabungan
Ribu Rp %KDN
(1) (2) (3) (4) (5) (6) (7)
Barang
I.
Material Langsung 2,912,843,500 - 2,912,843,500 100% 2,912,843,500 3.52%
(Bahan Baku)
II.
Peralatan (Barang 40,489,570,800 - 40,489,570,800 100% 40,489,570,800 48.88%
Jadi)
F. Sub Total Barang 43,402,414,300 43,402,414,300 43,402,414,300 52%
III.
Manajemen Proyek 3,397,370,600 - 3,397,370,600 100% 3,397,370,600 4%
dan Perekayasaan
IV.
Alat Kerja / Fasilitas 18,163,318,100 - 18,163,318,100 100% 18,163,318,100 22%
Kerja
V.
Konstruksi dan 6,636,276,700 - 6,636,276,700 100% 6,636,276,700 8%
Fabrikasi
VI. Jasa Umum 11,238,207,900 - 11,238,207,900 100% 11,238,207,900 14%
G. Sub Total Jasa 39,435,173,300 - 39,435,173,300 39,435,173,300 48%
H. Total Biaya (F+G) 82,837,587,600 82,837,587,600 82,837,587,600 100%