RENCANA ANGGARAN BIAYA PEMASANGAN PANEL 4 UNIT

NO QTY NAMA BARANG HARGA SATUAN JUMLAH


1 1 unit Panel Piramid 80 X 60 X 20 Rp 1,100,000 Rp 1,100,000
2 3 unit Panel Piramid 60 X 50 X 20 Rp 990,000 Rp 2,970,000
3 3 BUAH NFB 60 AMP Rp 770,000 Rp 2,310,000
4 1 BUAH MCB 3P 35 A Rp 495,000 Rp 495,000
5 1 BUAH MCB 3P 25 A Rp 495,000 Rp 495,000
6 4 BUAH MCB 3P 20 A Rp 495,000 Rp 1,980,000
7 3 BUAH MCB 3P 16 A Rp 495,000 Rp 1,485,000
8 54 BUAH MCB 1P 16 A Rp 66,000 Rp 3,564,000
9 10 BUAH MCB 3P 10 A Rp 66,000 Rp 660,000
10 14 BTG kabel duct 50 x 50 cm Rp 82,500 Rp 1,155,000
11 3 BTG kabel duct 100 x 50 cm Rp 165,000 Rp 495,000
12 1 ROL kabel NYM 2 X 1,5 mm Rp 412,500 Rp 412,500
13 2 ROL kabel NYM 3 X 2,5 mm Rp 990,000 Rp 1,980,000
14 1 BUAH mangkok MCB 3P Rp 27,500 Rp 27,500
15 1 BUAH timer tebben Rp 550,000 Rp 550,000
16 1 BUAH kontaktor Rp 550,000 Rp 550,000
17 150 MTR kabel twist 4 x 10 Rp 17,600 Rp 2,640,000
18 1 ROL flexibel Rp 550,000 Rp 550,000
19 25 BTG pipa candult 20 mm Rp 16,500 Rp 412,500
20 3 BTG sisir 3P Rp 110,000 Rp 330,000
21 1 PK klem pipa Rp 93,500 Rp 93,500
22 1 PK socket pipa Rp 93,500 Rp 93,500
23 3 BUAH CT 100/5A Rp 93,500 Rp 280,500
24 12 BUAH FUSE SEKERING Rp 33,000 Rp 396,000
25 1 BUAH VOLT METER Rp 82,500 Rp 82,500
26 3 BUAH AMPERE METER Rp 82,500 Rp 247,500
27 12 BUAH PILOT LAMP VOLT Rp 16,500 Rp 198,000
28 4 BTG REL MCB Rp 55,000 Rp 220,000
29 15 BTG TREY 3 X 3 mm Rp 55,000 Rp 825,000
30 20 MTR CABLE NYYHY 10 MM Rp 27,500 Rp 550,000
31 20 MTR CABLE NYYHY 6 MM Rp 22,000 Rp 440,000
32 50 MTR CABLE NYYHY 0,75 MM Rp 4,400 Rp 220,000
33 4 BUAH TERMINAL NETRAL Rp 77,000 Rp 308,000
34 4 BUAH TERMINAL GROUND Rp 77,000 Rp 308,000
35 20 MTR CABLE BC 16 MM Rp 44,000 Rp 880,000
36 4 BUAH EARTING ROAD 1,8 METER Rp 66,000 Rp 264,000
37 4 BUAH PARALEL GROUP Rp 27,500 Rp 110,000
38 4 PK SKUN 2,5 MM (RSTN) Rp 82,500 Rp 330,000
39 4 PK SKUN 1,5 MM (RSTN) Rp 82,500 Rp 330,000
40 140 BUAH SKUN 6 MM Rp 5,500 Rp 770,000
41 24 BUAH SKUN 16 MM Rp 8,800 Rp 211,200
42 5 BUAH SKUN 25 MM Rp 13,200 Rp 66,000
43 30 BUAH SKUN 10 MM Rp 5,500 Rp 165,000
44 25 BUAH KLIP Rp 1,100 Rp 27,500
45 4 PK CABLE SPIRAL Rp 93,500 Rp 374,000
46 8 PK CABLE TIS KECIL Rp 22,000 Rp 176,000
47 4 PK CABLE TIS BESAR Rp 27,500 Rp 110,000
48 4 PK SOLASI WARNA (RSTN) Rp 13,200 Rp 52,800
49 1 BUAH SELECTOR 3P Rp 93,500 Rp 93,500
50 30 BUAH SEKRUP +BAUT 2 MM Rp 2,200 Rp 66,000
51 2 DUS PAKU BETON 1/2 " (INCHI) Rp 22,000 Rp 44,000
52 2 DUS PAKU BETON 1 " (INCHI) Rp 22,000 Rp 44,000
53 4 BUAH RAMSET 12 MM Rp 3,300 Rp 13,200
54 12 BUAH RAMSET 10 MM Rp 3,300 Rp 39,600
55 50 BUAH PAKU RIFET Rp 550 Rp 27,500
56 1 BUAH MATA BOR BESI 6 MM Rp 38,500 Rp 38,500
57 1 BUAH MATA BOR BESI 10 MM Rp 49,500 Rp 49,500
58 1 BUAH MATA BOR TEMBOK 12 MM Rp 38,500 Rp 38,500
59 2 BUAH RESIBON Rp 16,500 Rp 33,000
TOTAL Rp 32,777,800
JASA PEMASANGAN PANEL 11222200
44000000
RENCANA ANGGARAN BIAYA PEMASANGAN PANEL 3 UNIT
NO QTY NAMA BARANG HARGA SATUAN JUMLAH
1 1 unit Panel Piramid 80 X 60 X 20 Rp 1,000,000 Rp 1,000,000
2 2 unit Panel Piramid 60 X 50 X 20 Rp 900,000 Rp 1,800,000
3 2 BUAH NFB 60 AMP Rp 700,000 Rp 1,400,000
4 1 BUAH MCB 3P 35 A Rp 450,000 Rp 450,000
5 1 BUAH MCB 3P 25 A Rp 450,000 Rp 450,000
6 3 BUAH MCB 3P 20 A Rp 450,000 Rp 1,350,000
7 3 BUAH MCB 3P 16 A Rp 450,000 Rp 1,350,000
8 39 BUAH MCB 1P 16 A Rp 60,000 Rp 2,340,000
9 6 BUAH MCB 3P 10 A Rp 60,000 Rp 360,000
10 14 BTG kabel duct 50 x 50 cm Rp 75,000 Rp 1,050,000
11 3 BTG kabel duct 100 x 50 cm Rp 150,000 Rp 450,000
12 1 ROL kabel NYM 3 X 2,5 mm Rp 900,000 Rp 900,000
13 1 BUAH mangkok MCB 3P Rp 25,000 Rp 25,000
14 150 MTR kabel twist 4 x 10 Rp 16,000 Rp 2,400,000
15 2 BTG sisir 3P Rp 100,000 Rp 200,000
16 3 BUAH CT 100/5A Rp 85,000 Rp 255,000
17 9 BUAH FUSE SEKERING Rp 30,000 Rp 270,000
18 1 BUAH VOLT METER Rp 75,000 Rp 75,000
19 3 BUAH AMPERE METER Rp 75,000 Rp 225,000
20 9 BUAH PILOT LAMP VOLT Rp 15,000 Rp 135,000
21 3 BTG REL MCB Rp 50,000 Rp 150,000
22 12 BTG TREY 3 X 3 mm Rp 50,000 Rp 600,000
23 10 MTR CABLE NYYHY 10 MM Rp 25,000 Rp 250,000
24 10 MTR CABLE NYYHY 6 MM Rp 20,000 Rp 200,000
25 50 MTR CABLE NYYHY 0,75 MM Rp 4,000 Rp 200,000
26 3 BUAH TERMINAL NETRAL Rp 70,000 Rp 210,000
27 3 BUAH TERMINAL GROUND Rp 70,000 Rp 210,000
28 20 MTR CABLE BC 16 MM Rp 40,000 Rp 800,000
29 3 BUAH EARTING ROAD 1,8 METER Rp 60,000 Rp 180,000
30 3 BUAH PARALEL GROUP Rp 25,000 Rp 75,000
31 4 PK SKUN 2,5 MM (RSTN) Rp 75,000 Rp 300,000
32 4 PK SKUN 1,5 MM (RSTN) Rp 75,000 Rp 300,000
33 100 BUAH SKUN 6 MM Rp 5,000 Rp 500,000
34 24 BUAH SKUN 16 MM Rp 8,000 Rp 192,000
35 5 BUAH SKUN 25 MM Rp 12,000 Rp 60,000
36 30 BUAH SKUN 10 MM Rp 5,000 Rp 150,000
37 25 BUAH KLIP Rp 1,000 Rp 25,000
38 4 PK CABLE SPIRAL Rp 85,000 Rp 340,000
39 8 PK CABLE TIS KECIL Rp 20,000 Rp 160,000
40 4 PK CABLE TIS BESAR Rp 25,000 Rp 100,000
41 4 PK SOLASI WARNA (RSTN) Rp 12,000 Rp 48,000
42 1 BUAH SELECTOR 3P Rp 85,000 Rp 85,000
43 20 BUAH SEKRUP +BAUT 2 MM Rp 2,000 Rp 40,000
44 2 DUS PAKU BETON 1/2 " (INCHI) Rp 20,000 Rp 40,000
45 2 DUS PAKU BETON 1 " (INCHI) Rp 20,000 Rp 40,000
46 4 BUAH RAMSET 12 MM Rp 3,000 Rp 12,000
47 12 BUAH RAMSET 10 MM Rp 3,000 Rp 36,000
48 50 BUAH PAKU RIFET Rp 500 Rp 25,000
49 1 BUAH MATA BOR BESI 6 MM Rp 35,000 Rp 35,000
50 1 BUAH MATA BOR BESI 10 MM Rp 45,000 Rp 45,000
51 1 BUAH MATA BOR TEMBOK 12 MM Rp 35,000 Rp 35,000
52 2 BUAH RESIBON Rp 15,000 Rp 30,000
TOTAL Rp 21,958,000