Cimalaka m3 Rp 260,000
Cimalaka m3 Rp 260,000
Cimalaka kg Rp 186
Cimalaka m3 Rp 180,000
Cuci Crusher m3 Rp 550,000
Cuci Crusher kg Rp 400
Cimalaka m3 Rp 100,000
bh Rp 13,000
bh Rp 5,000
0.8 m Rp 22,000
0.6 m Rp 20,000
m' Rp 7,500
lbr Rp 520,000
bh Rp 180
bh Rp 200
bh Rp 8,798
bh Rp 4,500
0,75 x 600 m
28 - 40 m Rp 7,500
10 mm bh Rp 2,000
10 x 16 bh Rp 200
GRC 4 m lbr Rp 43,000
Vinilon m Rp 80,000
Vinilon m Rp 49,000
Vinilon m Rp 24,000
Vinilon m Rp 10,000
Vinilon m Rp 6,500
m Rp 60,000
FB1700-70 bh Rp 4,310,000
CW637J / SW637JP bh Rp 3,260,000
LW810CJ bh Rp 1,160,000
L652D bh Rp 2,338,000
TX471SPN bh Rp 1,880,000
TX432SDN bh Rp 1,970,000
TX120LX bh Rp 2,510,000
THX20NB bh Rp 312,000
LW896J bh Rp 1,430,000
TX116LX bh Rp 4,400,000
TX606KRS bh Rp 1,250,000
T23B13 bh Rp 333,000
TX1DA bh Rp 386,000
TX701C3B bh Rp 612,000
TX720AB bh Rp 132,000
MODENA - MAGGIORE KS9101F WP bh Rp 6,150,000
Kaca Tempered 10mm m2 Rp 1,400,000
Setara Penguin bh Rp 3,300,000
Grundfos JPD 5-61 unit Rp 6,208,000
Pompa Air Shimizu PS-230 BIT unit Rp 800,000
Wika Solar SR150S1 unit Rp 17,900,000
EIXO Global EXG 210 309 unit Rp 700,000
DOMH12108F bh Rp 85,000.00
bh Rp 22,000
bh Rp 20,000
bh Rp 42,000
setara phillips bh Rp 60,000
setara phillips bh Rp 60,000
bh
bh
m
bh
bh
bh
bh
bh
3 x 1.5 mm m Rp 13,000
3 x 1.5 mm m Rp 11,000
btg Rp 13,000
bh Rp 3,150,000
TX277S Rp 207,000
T53DSN Rp 26,000
TX215C Rp 110,000
TC505S Rp 450,000
TEN40ANV900/TN78-9V911 Rp 6,650,000
TX809LV2 Rp 4,400,000
TX709AV7
TN78-9V900
NO. URAIAN / NAMA JENIS BARANG SPESIFIKASI
Kepala Tukang
Tukang
Pekerja Setengah Terampil
Pekerja
SATUAN HARGA
Oh Rp 110,000
Oh Rp 175,000
Oh Rp 150,000
Oh Rp 125,000
Oh 175,000
Oh 150,000
Oh 140,000
Oh 125,000
NO. URAIAN / NAMA JENIS BARANG SPESIFIKASI SATUAN
1 Concrete Mixer 0.3-0.6 M3 (10.0 HP, 0.3 M) 10.0 HP, 0.3 M HARI
HARGA
Rp 406,666.67
NO. URAIAN KOEF SAT
A B C D
B Tenaga
Pekerja 0.008 Oh
Tukang Kayu 0.008 Oh
Kepala Tukang Kayu 0.008 Oh
Kepala Tukang Kayu 0.008 Oh
C PERALATAN
D VOLUME m
D Jumlah (A+B+C)
E Overhead & Profit 15%
F Harga Satuan Pekerjaan
Volume 0.00 m
1 Kaso 5/7 m3
2 Paku kg
3 Papan m3
TOTAL BIAYA BAHAN
VOLUME 0.00 m
1 Pekerja Oh
2 Tukang Kayu Oh
3 Kepala Tukang Kayu Oh
3 Kepala Tukang Kayu Oh
TOTAL BIAYA UPAH
HARGA SAT
HARGA SAT upah JUMLAH matrial JUMLAH upah TOTAL harga
matrial
E F G=(CXE) H = (C X F ) I=(G+H)
Rp 1,600,000 Rp 3,200
Rp 18,000 Rp 36
Rp 900,000 Rp 4,500
Rp 125,000 Rp 1,000
Rp 150,000 Rp 1,200
Rp 175,000 Rp 1,400
Rp 110,000 Rp 880
Rp - Rp -
Rp 12,216
Rp 1,832
Rp 14,048
HAN BAHAN
0 Rp 1,600,000 Rp -
0 Rp 18,000 Rp -
0 Rp 900,000 Rp -
TOTAL Rp -
Rp -
UTUHAN BAHAN
UHAN UPAH
0 Rp 125,000 Rp -
0 Rp 150,000 Rp -
0 Rp 175,000 Rp -
0.000 Rp 110,000 Rp -
TOTAL Rp -
Rp -
A B C D E F H=(CXE) I = (C X F ) K=(H+I+J)
B Tenaga
Tukang 1.000 oh Rp 150,000 Rp 150,000
C PERALATAN
D VOLUME m3 Rp -
B Tenaga
Tukang 0.450 oh Rp 150,000 Rp 67,500
C PERALATAN
D VOLUME m3 Rp -
B Tenaga
Tukang 0.300 oh Rp 150,000 Rp 45,000
C PERALATAN
D VOLUME m3 Rp - Rp -
VOLUME 0 m TOTAL Rp -
VOLUME 0 m3 TOTAL Rp -
VOLUME 0 m3 TOTAL Rp -
A B C D
1 1 m3 Membuat Beton Mutu fc = 19,3 Mpa (K 225), Slump (12 ± 2) cm, w/c = 0,58
A Bahan
Semen 200 kg
Pasir Cor /kg 1,030 kg
Split 2/3 /kg 1,050 kg
B Tenaga
Pekerja 4.000 oh
Tukang 0.800 oh
Kepala Tukang 0.750 oh
Mandor 0.500 oh
D VOLUME m3
E Jumlah (A+B+C)
F Overhead & Profit 15%
G Harga Satuan Pekerjaan
B Tenaga
Pekerja 0.010 Oh
Tukang 0.020 Oh
Kepala Tukang 0.0100 Oh
Mandor 0.0010 Oh
C PERALATAN
D VOLUME KG
E Jumlah (A+B+C)
F Overhead & Profit 15%
G Harga Satuan Pekerjaan
3 1 m2 Pasang Bekisting
A Bahan
Papan 0.060 m3
Paku 0.300 kg
B Tenaga
Pekerja 0.300 Oh
Tukang 0.200 Oh
Kepala Tukang 0.0100 Oh
Mandor 0.0010 Oh
C PERALATAN
D VOLUME m2
E Jumlah (A)
2 x pakai (A x 50%) 50%
Jumlah (B+C)
F Overhead & Profit 15%
G Harga Satuan Pekerjaan
1 1 m3 Membuat Beton Mutu fc = 19,3 Mpa (K 225), Slump (12 ± 2) cm, w/c = 0,58
Bahan
Semen 200 kg
Pasir Cor /kg 1,030 kg
Split 2/3 /kg 1,050 kg
VOLUME 0.00 m2
VOLUME 0 m2
3 1 m2 Pasang Bekisting
Bahan
Papan 0.06 m3
Paku 0.3 kg
VOLUME 0 m2
1 Semen kg
2 Pasir Cor /kg kg
3 Split 2/3 /kg kg
4 Besi beton kg
5 Kawat kg
6 Papan m3
7 Paku kg
TOTAL BIAYA BAHAN
A 1 m3 Membuat Beton Mutu fc = 19,3 Mpa (K 225), Slump (12 ± 2) cm, w/c = 0,58
Tenaga
Pekerja 4.000 Oh
Tukang Batu 0.800 Oh
Kepala Tukang 0.750 Oh
Mandor 0.5 oh
VOLUME 0 m2
VOLUME 0 m2
VOLUME 0 m2
1 Pekerja Oh
2 Tukang Oh
3 Tukang Batu Oh
4 Mandor Oh
TOTAL BIAYA UPAH
HARGA SAT matrial HARGA SAT upah HARGA SAT alat JUMLAH matrial JUMLAH upah
E F G H=(CXE) I = (C X F )
Rp 911,286 Rp 806,250
Rp 1,500 Rp 300,000
Rp 186 Rp 191,286
Rp 400 Rp 420,000
Rp 125,000 Rp 500,000
Rp 150,000 Rp 120,000
Rp 175,000 Rp 131,250
Rp 110,000 Rp 55,000
Rp - Rp -
Rp 15,505 Rp 6,110
Rp 11,500 Rp 12,305
Rp 20,000 Rp 3,200
Rp 125,000 Rp 1,250
Rp 150,000 Rp 3,000
Rp 175,000 Rp 1,750
Rp 110,000 Rp 110
Rp - Rp -
Rp 59,400 Rp 69,360
Rp 900,000 Rp 54,000
Rp 18,000 Rp 5,400
Rp 125,000 Rp 37,500
Rp 150,000 Rp 30,000
Rp 175,000 Rp 1,750
Rp 110,000 Rp 110
Rp - Rp -
AN BAHAN
0 Rp 1,500 Rp -
0 Rp 186 Rp -
0 Rp 400 Rp -
TOTAL Rp -
0 Rp 11,500 Rp -
0 Rp 20,000 Rp -
TOTAL Rp -
0 Rp 900,000 Rp -
0 Rp 18,000 Rp -
TOTAL Rp -
Rp -
TUHAN BAHAN
HAN UPAH
0 Rp 125,000 Rp -
0 Rp 150,000 Rp -
0 Rp 175,000 Rp -
0 Rp 110,000 Rp -
TOTAL Rp -
0 Rp 125,000 Rp -
0 Rp 150,000 Rp -
0 Rp 175,000 Rp -
0 Rp 110,000 Rp -
TOTAL Rp -
0 Rp 125,000 Rp -
0 Rp 150,000 Rp -
0 Rp 175,000 Rp -
0 Rp 110,000 Rp -
TOTAL Rp -
Rp -
J = (C X G ) K=(H+I+J)
Rp 1,717,536
Rp 1,717,536
Rp 257,630
Rp 1,975,166
Rp 21,615
Rp 21,615
Rp 3,242
Rp 24,857
Rp 128,760
Rp 128,760
Rp 64,380
Rp 193,140
Rp 38,628
Rp 231,768
NO. URAIAN KOEF SAT
A B C D
1 1 m3 Membuat Beton Mutu fc = 19,3 Mpa (K 225), Slump (12 ± 2) cm, w/c = 0,58
A Bahan
Semen 313 kg
Pasir Cor /kg 1,010 kg
Split 2/3 /kg 1,300 kg
B Tenaga
Pekerja 0.800 oh
Tukang Batu 0.400 oh
Kepala Tukang 0.070 oh
Mandor 0.050 oh
D VOLUME m3
E Jumlah (A+B+C)
F Overhead & Profit 15%
G Harga Satuan Pekerjaan
B Tenaga
Pekerja 0.020 Oh
Tukang 0.020 Oh
Kepala Tukang 0.010 Oh
Mandor 0.001 Oh
C PERALATAN
D VOLUME KG
E Jumlah (A+B+C)
F Overhead & Profit 15%
G Harga Satuan Pekerjaan
B Tenaga
Pekerja 0.520 Oh
Tukang 0.260 Oh
Kepala Tukang 0.0300 Oh
Mandor 0.0200 Oh
C PERALATAN
D VOLUME m2
E Jumlah (A)
2 x pakai (A x 50%) 50%
Jumlah (B+C)
F Overhead & Profit 15%
G Harga Satuan Pekerjaan
1 1 m3 Membuat Beton Mutu fc = 19,3 Mpa (K 225), Slump (12 ± 2) cm, w/c = 0,58
Bahan
Semen 313 kg
Pasir Cor /kg 1,010 kg
Split 2/3 /kg 1,300 kg
VOLUME 0 m3
VOLUME 0 m2
VOLUME 0 m2
1 Semen kg
2 Pasir Cor /kg kg
3 Split 2/3 /kg kg
4 Besi beton kg
5 Kawat kg
6 Papan m3
7 Paku kg
TOTAL BIAYA BAHAN
A 1 m3 Membuat Beton Mutu fc = 19,3 Mpa (K 225), Slump (12 ± 2) cm, w/c = 0,58
Tenaga
Pekerja 0.8 oh
Tukang Batu 0.4 oh
Kepala Tukang 0.07 oh
Mandor 0.05 oh
VOLUME 0 m3
VOLUME 0 m2
VOLUME 0 m2
1 Pekerja oh
2 Tukang oh
3 Kepala Tukang oh
4 Mandor oh
TOTAL BIAYA UPAH
HARGA SAT matrial HARGA SAT upah HARGA SAT alat JUMLAH matrial JUMLAH upah
E F G H=(CXE) I = (C X F )
Rp 1,177,071 Rp 177,750
Rp 1,500 Rp 469,500
Rp 186 Rp 187,571
Rp 400 Rp 520,000
Rp 125,000 Rp 100,000
Rp 150,000 Rp 60,000
Rp 175,000 Rp 12,250
110,000 Rp 5,500
Rp - Rp -
Rp 15,400 Rp 7,430
Rp 11,500 Rp 13,800
Rp 20,000 Rp 1,600
Rp 125,000 Rp 2,500
Rp 150,000 Rp 3,000
Rp 175,000 Rp 1,820
Rp 110,000 Rp 110
Rp - Rp -
Rp 45,900 Rp 111,450
Rp 900,000 Rp 40,500
Rp 18,000 Rp 5,400
Rp 125,000 Rp 65,000
Rp 150,000 Rp 39,000
Rp 175,000 Rp 5,250
Rp 110,000 Rp 2,200
Rp - Rp -
AN BAHAN
0 Rp 1,500 Rp -
0 Rp 186 Rp -
0 Rp 400 Rp -
TOTAL Rp -
0 Rp 11,500 Rp -
0 Rp 20,000 Rp -
TOTAL Rp -
0 Rp 900,000 Rp -
0 Rp 18,000 Rp -
TOTAL Rp -
Rp -
TUHAN BAHAN
HAN UPAH
0.00 Rp 125,000 Rp -
0.00 Rp 150,000 Rp -
0.00 Rp 175,000 Rp -
0.00 Rp 110,000 Rp -
TOTAL Rp -
0.000 Rp 125,000 Rp -
0.000 Rp 150,000 Rp -
0.000 Rp 175,000 Rp -
0.000 Rp 110,000 Rp -
TOTAL Rp -
0.00 Rp 125,000 Rp -
0.00 Rp 150,000 Rp -
0.00 Rp 175,000 Rp -
0.00 Rp 110,000 Rp -
TOTAL Rp -
Rp -
J = (C X G ) K=(H+I+J)
Rp 1,354,821
Rp 1,354,821
Rp 203,223
Rp 1,558,045
Rp 22,830
Rp 22,830
Rp 3,425
Rp 26,255
Rp 157,350
Rp 45,900
Rp 22,950
Rp 111,450
Rp 20,160
Rp 154,560
NO. URAIAN KOEF SAT
A B C D
1 1 m3 Membuat Beton Mutu fc = 19,3 Mpa (K 225), Slump (12 ± 2) cm, w/c = 0,58
A Bahan
Semen 120 kg
Pasir Cor /kg 800 kg
Split 2/3 /kg 900 kg
B Tenaga
Pekerja 1.500 oh
Tukang 0.500 oh
Kepala Tukang 0.200 oh
Mandor 0.100 oh
D VOLUME m3
E Jumlah (A+B+C)
F Overhead & Profit 15%
G Harga Satuan Pekerjaan
B Tenaga
Pekerja 0.020 Oh
Tukang 0.020 Oh
Kepala Tukang 0.0100 Oh
Mandor 0.0010 Oh
C PERALATAN
D VOLUME kg
E Jumlah (A+B+C)
F Overhead & Profit 15%
G Harga Satuan Pekerjaan
B Tenaga
Pekerja 0.400 Oh
Tukang Kayu 0.200 Oh
Kepala Tukang 0.020 Oh
Mandor 0.010 Oh
C PERALATAN
D VOLUME
D Jumlah (A)
2 x pakai (A x 50%) 50%
Jumlah (B+C)
E Overhead & Profit 15%
F Harga Satuan Pekerjaan
1 1 m3 Membuat Beton Mutu fc = 19,3 Mpa (K 225), Slump (12 ± 2) cm, w/c = 0,58
Bahan
Semen 120 kg
Pasir Cor /kg 800 kg
Split 2/3 /kg 900 kg
VOLUME 0 m2
VOLUME 0 m2
VOLUME 0 m2
1 Semen kg
2 Pasir Cor /kg kg
3 Split 2/3 /kg kg
4 Besi beton kg
5 Kawat kg
7 Paku kg
9 Papan m3
TOTAL BIAYA BAHAN
A 1 m3 Membuat Beton Mutu fc = 19,3 Mpa (K 225), Slump (12 ± 2) cm, w/c = 0,58
Tenaga
Pekerja 1.500 Oh
Tukang 0.500 Oh
Kepala Tukang 0.200 Oh
Mandor 0.1 oh
VOLUME 0 m2
VOLUME 0 m2
VOLUME 0 m2
1 Pekerja Oh
2 Tukang Oh
3 Kepala Tukang Oh
Mandor Oh
TOTAL BIAYA UPAH
HARGA SAT matrial HARGA SAT upah HARGA SAT alat JUMLAH matrial JUMLAH upah
E F G H=(CXE) I = (C X F )
Rp 688,571 Rp 308,500
Rp 1,500 Rp 180,000
Rp 186 Rp 148,571
Rp 400 Rp 360,000
Rp 125,000 Rp 187,500
Rp 150,000 Rp 75,000
Rp 175,000 Rp 35,000
Rp 110,000 Rp 11,000
Rp - Rp -
Rp 15,505 Rp 7,360
Rp 11,500 Rp 12,305
Rp 20,000 Rp 3,200
Rp 125,000 Rp 2,500
Rp 150,000 Rp 3,000
Rp 175,000 Rp 1,750
Rp 110,000 Rp 110
Rp - Rp -
Rp 47,700 Rp 84,600
Rp 18,000 Rp 7,200
Rp 900,000 Rp 40,500
Rp 125,000 Rp 50,000
Rp 150,000 Rp 30,000
Rp 175,000 Rp 3,500
Rp 110,000 Rp 1,100
Rp - Rp -
AN BAHAN
0 Rp 1,500 Rp -
0 Rp 186 Rp -
0 Rp 400 Rp -
TOTAL Rp -
0 Rp 11,500 Rp -
0 Rp 20,000 Rp -
TOTAL Rp -
0 Rp 18,000 Rp -
0 Rp 900,000 Rp -
TOTAL Rp -
Rp -
TUHAN BAHAN
HAN UPAH
0.00 Rp 125,000 Rp -
0.00 Rp 150,000 Rp -
0.00 Rp 175,000 Rp -
0.00 Rp 110,000 Rp -
TOTAL Rp -
0.00 Rp 125,000 Rp -
0.00 Rp 150,000 Rp -
0.00 Rp 175,000 Rp -
0.00 Rp 110,000 Rp -
TOTAL Rp -
0.00 Rp 125,000 Rp -
0.00 Rp 150,000 Rp -
0.00 Rp 175,000 Rp -
0.00 Rp 110,000 Rp -
TOTAL Rp -
Rp -
J = (C X G ) K=(H+I+J)
Rp 997,071
Rp 997,071
Rp 149,561
Rp 1,146,632
Rp 22,865
Rp 22,865
Rp 3,430
Rp 26,295
Rp 132,300
Rp 47,700
Rp 23,850
Rp 84,600
Rp 16,268
Rp 124,718
NO. URAIAN KOEF SAT
A B C D
1 1 m3 Membuat Beton Mutu fc = 19,3 Mpa (K 225), Slump (12 ± 2) cm, w/c = 0,58
A Bahan
Semen 280 kg
Pasir Cor /kg 1,010 kg
Split 2/3 /kg 1,400 kg
B Tenaga
Pekerja 7.000 oh
Tukang 6.000 oh
Kepala Tukang 1.000 oh
Mandor 0.050 oh
D VOLUME m3
E Jumlah (A+B+C)
F Overhead & Profit 15%
G Harga Satuan Pekerjaan
B Tenaga
Pekerja 0.007 Oh
Tukang 0.007 Oh
Kepala Tukang 0.0007 Oh
Mandor 0.0007 Oh
C PERALATAN
D VOLUME kg
E Jumlah (A+B+C)
F Overhead & Profit 15%
G Harga Satuan Pekerjaan
B Tenaga
Pekerja 0.400 Oh
Tukang 0.200 Oh
Kepala Tukang 0.010 Oh
Mandor 0.001 Oh
C PERALATAN
D VOLUME m2
D Jumlah (A)
2 x pakai (A x 50%) 50%
Jumlah (B+C)
E Overhead & Profit 15%
F Harga Satuan Pekerjaan
1 1 m3 Membuat Beton Mutu fc = 19,3 Mpa (K 225), Slump (12 ± 2) cm, w/c = 0,58
Bahan
Semen 280 kg
Pasir Cor /kg 1,010 kg
Split 2/3 /kg 1,400 kg
VOLUME 0.00 m2
VOLUME 0 kg
5 1 m2 Pasang Bekisting untuk Balok 2 X Pakai
Bahan
Paku 0.400 kg
Balok Kayu Uk 8/12 (m3) 0.018 m3
Papan 0.045 m3
VOLUME 0.0 m2
1 Semen kg
2 Pasir Cor /kg kg
3 Split 2/3 /kg kg
4 Besi beton kg
5 Kawat kg
7 Paku kg
8 Balok Kayu Uk 8/12 (m3) m3
9 Papan m3
TOTAL BIAYA BAHAN
A 1 m3 Membuat Beton Mutu fc = 19,3 Mpa (K 225), Slump (12 ± 2) cm, w/c = 0,58
Tenaga
Pekerja 7.000 Oh
Tukang Batu 6.000 Oh
Kepala Tukang 1.000 Oh
Mandor 0.050 Oh
VOLUME 0.00 m2
VOLUME 0 kg
VOLUME 0.0 m2
1 Pekerja Oh
2 Tukang Oh
3 Kepala Tukang Oh
3 Mandor Oh
TOTAL BIAYA UPAH
HARGA SAT matrial HARGA SAT upah HARGA SAT alat JUMLAH matrial JUMLAH upah
E F G H=(CXE) I = (C X F )
Rp 1,167,571 Rp 1,955,500
Rp 1,500 Rp 420,000
Rp 186 Rp 187,571
Rp 400 Rp 560,000
Rp 125,000 Rp 875,000
Rp 150,000 Rp 900,000
Rp 175,000 Rp 175,000
Rp 110,000 Rp 5,500
Rp - Rp -
Rp 15,505 Rp 2,125
Rp 11,500 Rp 12,305
Rp 20,000 Rp 3,200
Rp 125,000 Rp 875
Rp 150,000 Rp 1,050
Rp 175,000 Rp 123
Rp 110,000 Rp 77
Rp - Rp -
Rp 90,900 Rp 81,860
Rp 18,000 Rp 7,200
Rp 2,400,000 Rp 43,200
Rp 900,000 Rp 40,500
Rp 125,000 Rp 50,000
Rp 150,000 Rp 30,000
Rp 175,000 Rp 1,750
Rp 110,000 Rp 110
Rp - Rp -
AN BAHAN
0 Rp 1,500 Rp -
0 Rp 186 Rp -
0 Rp 400 Rp -
TOTAL Rp -
0 Rp 11,500 Rp -
0 Rp 20,000 Rp -
TOTAL Rp -
0 Rp 18,000 Rp -
0 Rp 2,400,000 Rp -
0 Rp 900,000 Rp -
TOTAL Rp -
Rp -
TUHAN BAHAN
HAN UPAH
0 Rp 125,000 Rp -
0 Rp 150,000 Rp -
0 Rp 175,000 Rp -
0 Rp 110,000 Rp -
TOTAL Rp -
0 Rp 125,000 Rp -
0 Rp 150,000 Rp -
0 Rp 175,000 Rp -
0 Rp 110,000 Rp -
TOTAL Rp -
0 Rp 125,000 Rp -
0 Rp 150,000 Rp -
0 Rp 175,000 Rp -
0 Rp 110,000 Rp -
TOTAL Rp -
Rp -
J = (C X G ) K=(H+I+J)
Rp 3,123,071
Rp -
Rp 3,123,071
Rp 468,461
Rp 3,591,532
Rp 17,630
Rp 17,630
Rp 2,644
Rp 20,274
Rp 172,760
Rp 90,900
Rp 45,450
Rp 81,860
Rp 19,097
Rp 146,407
NO. URAIAN KOEF SAT
A B C D
1 1 m3 Membuat Beton Mutu fc = 19,3 Mpa (K 225), Slump (12 ± 2) cm, w/c = 0,58
A Bahan
Semen Tiga Roda 50 kg (kg) 371 kg
Pasir Beton per kg 698 kg
Batu Pecah/Split uk. 2 - 3 cm per kg 1,047 kg
B Tenaga
Pekerja 1.650 oh
Tukang Batu 0.275 oh
Kepala Tukang 0.028 oh
D VOLUME m3
E Jumlah (A+B+C)
F Overhead & Profit 15%
G Harga Satuan Pekerjaan
B Tenaga
Pekerja 0.007 Oh
Tukang Besi 0.007 Oh
Kepala Tukang 0.0007 Oh
C PERALATAN
D VOLUME kg
E Jumlah (A+B+C)
F Overhead & Profit 15%
G Harga Satuan Pekerjaan
B Tenaga
Pekerja 0.660 Oh
Tukang Kayu 0.330 Oh
Kepala Tukang 0.033 Oh
C PERALATAN
D VOLUME
D Jumlah (A)
2 x pakai (A x 50%) 50%
Jumlah (B+C)
E Overhead & Profit 15%
F Harga Satuan Pekerjaan
1 1 m3 Membuat Beton Mutu fc = 19,3 Mpa (K 225), Slump (12 ± 2) cm, w/c = 0,58
Bahan
Semen Tiga Roda 50 kg (kg) 371 kg
Pasir Beton per kg 698 kg
Batu Pecah/Split uk. 2 - 3 cm per kg 1,047 kg
VOLUME 0 m2
VOLUME 0 m2
VOLUME 0 0
A 1 m3 Membuat Beton Mutu fc = 19,3 Mpa (K 225), Slump (12 ± 2) cm, w/c = 0,58
Tenaga
Pekerja 1.650 Oh
Tukang Batu 0.275 Oh
Kepala Tukang 0.028 Oh
VOLUME 0 m2
VOLUME 0 m2
VOLUME 0 0
1 Pekerja Oh
2 Tukang Oh
3 Kepala Tukang Oh
TOTAL BIAYA UPAH
HARGA SAT matrial HARGA SAT upah HARGA SAT alat JUMLAH matrial JUMLAH upah
E F G H=(CXE) I = (C X F )
Rp 1,104,929 Rp 250,580
Rp 1,500 Rp 556,500
Rp 186 Rp 129,629
Rp 400 Rp 418,800
Rp 125,000 Rp 206,250
Rp 150,000 Rp 41,250
Rp 110,000 Rp 3,080
Rp - Rp -
Rp 15,505 Rp 2,002
Rp 11,500 Rp 12,305
Rp 20,000 Rp 3,200
Rp 125,000 Rp 875
Rp 150,000 Rp 1,050
Rp 110,000 Rp 77
Rp - Rp -
Rp 145,700 Rp 135,630
Rp 1,600,000 Rp 64,000
Rp 18,000 Rp 7,200
Rp 2,400,000 Rp 36,000
Rp 110,000 Rp 38,500
Rp 125,000 Rp 82,500
Rp 150,000 Rp 49,500
Rp 110,000 Rp 3,630
Rp - Rp -
AN BAHAN
0 Rp 1,500 Rp -
0 Rp 186 Rp -
0 Rp 400 Rp -
TOTAL Rp -
0 Rp 11,500 Rp -
0 Rp 20,000 Rp -
TOTAL Rp -
0 Rp 1,600,000 Rp -
0 Rp 18,000 Rp -
0 Rp 2,400,000 Rp -
0 Rp 110,000 Rp -
TOTAL Rp -
Rp -
TUHAN BAHAN
HAN UPAH
0 Rp 125,000 Rp -
0 Rp 150,000 Rp -
0 Rp 110,000 Rp -
TOTAL Rp -
0 Rp 125,000 Rp -
0 Rp 150,000 Rp -
0 Rp 110,000 Rp -
TOTAL Rp -
0 Rp 125,000 Rp -
0 Rp 150,000 Rp -
0 Rp 110,000 Rp -
TOTAL Rp -
Rp -
Rp -
JUMLAH alat TOTAL harga
J = (C X G ) K=(H+I+J)
Rp 1,355,509
Rp -
Rp 1,355,509
Rp 203,326
Rp 1,558,835
Rp 17,507
Rp 17,507
Rp 2,626
Rp 20,133
Rp 281,330
Rp 145,700
Rp 72,850
Rp 135,630
Rp 31,272
Rp 239,752
NO. URAIAN KOEF SAT
A B C D
1 1 m3 Membuat Beton Mutu fc = 19,3 Mpa (K 225), Slump (12 ± 2) cm, w/c = 0,58
A Bahan
Semen 280 kg
Pasir Cor /kg 1,010 kg
Split 2/3 /kg 1,400 kg
B Tenaga
Pekerja 5.000 oh
Tukang 4.000 oh
Kepala Tukang 1.000 oh
Mandor 0.050 oh
D VOLUME m3
E Jumlah (A+B+C)
F Overhead & Profit 15%
G Harga Satuan Pekerjaan
B Tenaga
Pekerja 0.007 Oh
Tukang 0.007 Oh
Kepala Tukang 0.0007 Oh
Mandor 0.0007 Oh
C PERALATAN
D VOLUME kg
E Jumlah (A+B+C)
F Overhead & Profit 15%
G Harga Satuan Pekerjaan
B Tenaga
Pekerja 0.400 Oh
Tukang 0.200 Oh
Kepala Tukang 0.010 Oh
Mandor 0.001 Oh
C PERALATAN
D VOLUME m2
D Jumlah (A)
2 x pakai (A x 50%) 50%
Jumlah (B+C)
E Overhead & Profit 15%
F Harga Satuan Pekerjaan
1 1 m3 Membuat Beton Mutu fc = 19,3 Mpa (K 225), Slump (12 ± 2) cm, w/c = 0,58
Bahan
Semen 280 kg
Pasir Cor /kg 1,010 kg
Split 2/3 /kg 1,400 kg
VOLUME 0.00 m2
VOLUME 0 kg
5 1 m2 Pasang Bekisting untuk Balok 2 X Pakai
Bahan
Paku 0.400 kg
Balok Kayu Uk 8/12 (m3) 0.018 m3
Papan 0.045 m3
VOLUME 0.0 m2
1 Semen kg
2 Pasir Cor /kg kg
3 Split 2/3 /kg kg
4 Besi beton kg
5 Kawat kg
7 Paku kg
8 Balok Kayu Uk 8/12 (m3) m3
9 Papan m3
TOTAL BIAYA BAHAN
A 1 m3 Membuat Beton Mutu fc = 19,3 Mpa (K 225), Slump (12 ± 2) cm, w/c = 0,58
Tenaga
Pekerja 5.000 Oh
Tukang Batu 4.000 Oh
Kepala Tukang 1.000 Oh
Mandor 0.050 Oh
VOLUME 0.00 m2
VOLUME 0 kg
VOLUME 0.0 m2
1 Pekerja Oh
2 Tukang Oh
3 Kepala Tukang Oh
3 Mandor Oh
TOTAL BIAYA UPAH
HARGA SAT matrial HARGA SAT upah HARGA SAT alat JUMLAH matrial JUMLAH upah
E F G H=(CXE) I = (C X F )
Rp 1,167,571 Rp 1,405,500
Rp 1,500 Rp 420,000
Rp 186 Rp 187,571
Rp 400 Rp 560,000
Rp 125,000 Rp 625,000
Rp 150,000 Rp 600,000
Rp 175,000 Rp 175,000
Rp 110,000 Rp 5,500
Rp - Rp -
Rp 15,505 Rp 2,125
Rp 11,500 Rp 12,305
Rp 20,000 Rp 3,200
Rp 125,000 Rp 875
Rp 150,000 Rp 1,050
Rp 175,000 Rp 123
Rp 110,000 Rp 77
Rp - Rp -
Rp 90,900 Rp 81,860
Rp 18,000 Rp 7,200
Rp 2,400,000 Rp 43,200
Rp 900,000 Rp 40,500
Rp 125,000 Rp 50,000
Rp 150,000 Rp 30,000
Rp 175,000 Rp 1,750
Rp 110,000 Rp 110
Rp - Rp -
AN BAHAN
0 Rp 1,500 Rp -
0 Rp 186 Rp -
0 Rp 400 Rp -
TOTAL Rp -
0 Rp 11,500 Rp -
0 Rp 20,000 Rp -
TOTAL Rp -
0 Rp 18,000 Rp -
0 Rp 2,400,000 Rp -
0 Rp 900,000 Rp -
TOTAL Rp -
Rp -
TUHAN BAHAN
HAN UPAH
0 Rp 125,000 Rp -
0 Rp 150,000 Rp -
0 Rp 175,000 Rp -
0 Rp 110,000 Rp -
TOTAL Rp -
0 Rp 125,000 Rp -
0 Rp 150,000 Rp -
0 Rp 175,000 Rp -
0 Rp 110,000 Rp -
TOTAL Rp -
0 Rp 125,000 Rp -
0 Rp 150,000 Rp -
0 Rp 175,000 Rp -
0 Rp 110,000 Rp -
TOTAL Rp -
Rp -
J = (C X G ) K=(H+I+J)
Rp 2,573,071
Rp -
Rp 2,573,071
Rp 385,961
Rp 2,959,032
Rp 17,630
Rp 17,630
Rp 2,644
Rp 20,274
Rp 172,760
Rp 90,900
Rp 45,450
Rp 81,860
Rp 19,097
Rp 146,407
NO. URAIAN KOEF SAT
A B C D
1 1 m3 Membuat Beton Mutu fc = 19,3 Mpa (K 225), Slump (12 ± 2) cm, w/c = 0,58
A Bahan
Semen Tiga Roda 50 kg (kg) 371 kg
Pasir Beton per kg 698 kg
Batu Pecah/Split uk. 2 - 3 cm per kg 1,047 kg
B Tenaga
Pekerja 1.650 oh
Tukang Batu 0.275 oh
Kepala Tukang 0.028 oh
D VOLUME m3
E Jumlah (A+B+C)
F Overhead & Profit 15%
G Harga Satuan Pekerjaan
B Tenaga
Pekerja 0.007 Oh
Tukang Besi 0.007 Oh
Kepala Tukang 0.0007 Oh
C PERALATAN
D VOLUME
E Jumlah (A+B+C)
F Overhead & Profit 15%
G Harga Satuan Pekerjaan
B Tenaga
Pekerja 0.660 Oh
Tukang Kayu 0.330 Oh
Kepala Tukang 0.033 Oh
C PERALATAN
D VOLUME
D Jumlah (A)
2 x pakai (A x 50%) 50%
Jumlah (B+C)
E Overhead & Profit 15%
F Harga Satuan Pekerjaan
1 1 m3 Membuat Beton Mutu fc = 19,3 Mpa (K 225), Slump (12 ± 2) cm, w/c = 0,58
Bahan
Semen Tiga Roda 50 kg (kg) 371 kg
Pasir Beton per kg 698 kg
Batu Pecah/Split uk. 2 - 3 cm per kg 1,047 kg
VOLUME 0.000 m2
VOLUME 0 kg
VOLUME 0 m2
A 1 m3 Membuat Beton Mutu fc = 19,3 Mpa (K 225), Slump (12 ± 2) cm, w/c = 0,58
Tenaga
Pekerja 1.650 Oh
Tukang Batu 0.275 Oh
Kepala Tukang 0.028 Oh
VOLUME 0 m2
VOLUME 0 kg
VOLUME 0 m2
1 Pekerja Oh
2 Tukang Oh
3 Kepala Tukang Oh
TOTAL BIAYA UPAH
HARGA SAT matrial HARGA SAT upah HARGA SAT alat JUMLAH matrial JUMLAH upah
E F G H=(CXE) I = (C X F )
Rp 1,104,929 Rp 250,580
Rp 1,500 Rp 556,500
Rp 186 Rp 129,629
Rp 400 Rp 418,800
Rp 125,000 Rp 206,250
Rp 150,000 Rp 41,250
Rp 110,000 Rp 3,080
Rp - Rp -
Rp 15,505 Rp 2,002
Rp 11,500 Rp 12,305
Rp 20,000 Rp 3,200
Rp 125,000 Rp 875
Rp 150,000 Rp 1,050
Rp 110,000 Rp 77
Rp - Rp -
Rp 154,900 Rp 135,630
Rp 1,600,000 Rp 64,000
Rp 18,000 Rp 7,200
Rp 2,400,000 Rp 43,200
Rp 900,000 Rp 40,500
Rp 125,000 Rp 82,500
Rp 150,000 Rp 49,500
Rp 110,000 Rp 3,630
Rp - Rp -
AN BAHAN
0 Rp 1,500 Rp -
0 Rp 186 Rp -
0 Rp 400 Rp -
TOTAL Rp -
0 Rp 11,500 Rp -
0 Rp 20,000 Rp -
TOTAL Rp -
0 Rp 1,600,000 Rp -
0 Rp 18,000 Rp -
0 Rp 2,400,000 Rp -
0 Rp 900,000 Rp -
TOTAL Rp -
Rp -
TUHAN BAHAN
HAN UPAH
0 Rp 125,000 Rp -
0 Rp 150,000 Rp -
0 Rp 110,000 Rp -
TOTAL Rp -
0 Rp 125,000 Rp -
0 Rp 150,000 Rp -
0 Rp 110,000 Rp -
TOTAL Rp -
0 Rp 125,000 Rp -
0 Rp 150,000 Rp -
0 Rp 110,000 Rp -
TOTAL Rp -
Rp -
J = (C X G ) K=(H+I+J)
Rp 1,355,509
Rp -
Rp 1,355,509
Rp 203,326
Rp 1,558,835
Rp 17,507
Rp 17,507
Rp 2,626
Rp 20,133
Rp 290,530
Rp 154,900
Rp 77,450
Rp 135,630
Rp 31,962
Rp 245,042
NO. URAIAN KOEF SAT
A B C D
1 1 m3 Membuat Beton Mutu fc = 19,3 Mpa (K 225), Slump (12 ± 2) cm, w/c = 0,58
A Bahan
Semen Tiga Roda 50 kg (kg) 371 kg
Pasir Beton per kg 698 kg
Batu Pecah/Split uk. 2 - 3 cm per kg 1,047 kg
B Tenaga
Pekerja 1.650 oh
Tukang Batu 0.275 oh
Kepala Tukang 0.028 oh
D VOLUME m3
E Jumlah (A+B+C)
F Overhead & Profit 15%
G Harga Satuan Pekerjaan
B Tenaga
Pekerja 0.007 Oh
Tukang Besi 0.007 Oh
Kepala Tukang 0.0007 Oh
C PERALATAN
D VOLUME KG
E Jumlah (A+B+C)
F Overhead & Profit 15%
G Harga Satuan Pekerjaan
B Tenaga
Pekerja 0.660 Oh
Tukang Kayu 0.330 Oh
Kepala Tukang 0.033 Oh
C PERALATAN
D VOLUME
D Jumlah (A)
2 x pakai (A x 50%) 50%
Jumlah (B+C)
E Overhead & Profit 15%
F Harga Satuan Pekerjaan
1 1 m3 Membuat Beton Mutu fc = 19,3 Mpa (K 225), Slump (12 ± 2) cm, w/c = 0,58
Bahan
Semen Tiga Roda 50 kg (kg) 371 kg
Pasir Beton per kg 698 kg
Batu Pecah/Split uk. 2 - 3 cm per kg 1,047 kg
VOLUME 0 m2
VOLUME 0 m2
VOLUME 0 0
A 1 m3 Membuat Beton Mutu fc = 19,3 Mpa (K 225), Slump (12 ± 2) cm, w/c = 0,58
Tenaga
Pekerja 1.650 Oh
Tukang Batu 0.275 Oh
Kepala Tukang 0.028 Oh
VOLUME 0 m2
VOLUME 0 m2
VOLUME 0 0
1 Pekerja Oh
2 Tukang Oh
3 Kepala Tukang Oh
TOTAL BIAYA UPAH
HARGA SAT matrial HARGA SAT upah HARGA SAT alat JUMLAH matrial JUMLAH upah
E F G H=(CXE) I = (C X F )
Rp 1,104,929 Rp 250,580
Rp 1,500 Rp 556,500
Rp 186 Rp 129,629
Rp 400 Rp 418,800
Rp 125,000 Rp 206,250
Rp 150,000 Rp 41,250
Rp 110,000 Rp 3,080
Rp - Rp -
Rp 15,505 Rp 2,002
Rp 11,500 Rp 12,305
Rp 20,000 Rp 3,200
Rp 125,000 Rp 875
Rp 150,000 Rp 1,050
Rp 110,000 Rp 77
Rp - Rp -
Rp 145,700 Rp 135,630
Rp 1,600,000 Rp 64,000
Rp 18,000 Rp 7,200
Rp 2,400,000 Rp 36,000
Rp 110,000 Rp 38,500
Rp 125,000 Rp 82,500
Rp 150,000 Rp 49,500
Rp 110,000 Rp 3,630
Rp - Rp -
AN BAHAN
0 Rp 1,500 Rp -
0 Rp 186 Rp -
0 Rp 400 Rp -
TOTAL Rp -
0 Rp 11,500 Rp -
0 Rp 20,000 Rp -
TOTAL Rp -
0 Rp 1,600,000 Rp -
0 Rp 18,000 Rp -
0 Rp 2,400,000 Rp -
0 Rp 110,000 Rp -
TOTAL Rp -
Rp -
TUHAN BAHAN
HAN UPAH
0 Rp 125,000 Rp -
0 Rp 150,000 Rp -
0 Rp 110,000 Rp -
TOTAL Rp -
0 Rp 125,000 Rp -
0 Rp 150,000 Rp -
0 Rp 110,000 Rp -
TOTAL Rp -
0 Rp 125,000 Rp -
0 Rp 150,000 Rp -
0 Rp 110,000 Rp -
TOTAL Rp -
Rp -
Rp -
JUMLAH alat TOTAL harga
J = (C X G ) K=(H+I+J)
Rp 1,355,509
Rp -
Rp 1,355,509
Rp 203,326
Rp 1,558,835
Rp 17,507
Rp 17,507
Rp 2,626
Rp 20,133
Rp 281,330
Rp 145,700
Rp 72,850
Rp 135,630
Rp 31,272
Rp 239,752
NO. URAIAN
A B
B Tenaga
Pekerja
Tukang Almunium
Kepala Tukang
C VOLUME
D Jumlah (A+B+C)
E Overhead & Profit
F Harga Satuan Pekerjaan
B Tenaga
Pekerja
Tukang Besi
Kepala Tukang
C VOLUME
D Jumlah (A+B+C)
E Overhead & Profit
F Harga Satuan Pekerjaan
VOLUME
VOLUME
NO JENIS BAHAN
VOLUME
VOLUME
NO JENIS UPAH
1 Pekerja
2 Tukang
4 Kepala Tukang
TOTAL BIAYA UPAH
KOEF SAT HARGA SAT matrial HARGA SAT upah JUMLAH matrial JUMLAH upah
C D E F G=(CXE) H = (C X F )
Rp 254,120 Rp 25,050
Rp - Rp -
15%
Rp - Rp -
15%
0.0 TOTAL Rp -
1.488 m 0 Rp 22,000 Rp -
2.232 m 0 Rp 20,000 Rp -
1.6 bh 0 Rp 4,500 Rp -
3.6 m 0 Rp 7,500 Rp -
0 TOTAL Rp -
BAHAN Rp -
0 m2 TOTAL Rp -
0.2 Oh 0 Rp 125,000 Rp -
0.225 Oh 0 Rp 150,000 Rp -
0.010 Oh 0 Rp 175,000 Rp -
0 0 TOTAL Rp -
UPAH Rp -
I=(G+H)
Rp 279,170
Rp 279,170
Rp 41,876
Rp 321,046
Rp 172,076
Rp 172,076
Rp 25,811
Rp 197,887
0
NO. URAIAN KOEF
A B C
1 m2 Pasangan Bata Ringan setara CELCON BLOK tebal 10 cm, ukr. 60x20x10 cm; standard
A Bahan
Bata Ringan / Hebel t = 10 cm Biasa 9.00
Mortar Utama (MU-380) Perekat Bata Ringan per Kg 4.00
B Tenaga
Pekerja 0.200
Tukang Batu 0.100
Kepala Tukang 0.010
D VOLUME
D Jumlah (A+B+C)
E Overhead & Profit 15%
F Harga Satuan Pekerjaan
1 1 m2 Pasangan Bata Ringan setara CELCON BLOK tebal 10 cm, ukr. 60x20x10 cm; standard
Bahan
Bata Ringan / Hebel t = 10 cm Biasa 9.0
Mortar Utama (MU-380) Perekat Bata Ringan per Kg 4.0
VOLUME 0
I 1 m2 Pasangan Bata Ringan setara CELCON BLOK tebal 10 cm, ukr. 60x20x10 cm; standard
Tenaga
Pekerja 0.200
Tukang Batu 0.100
Kepala Tukang 0.010
VOLUME 0
1 Pekerja Oh
2 Tukang Batu Oh
3 Kepala Tukang Oh
TOTAL BIAYA UPAH
SAT HARGA SAT matrial HARGA SAT upah HARGA SAT alat JUMLAH matrial
D E F G G=(CXE)
bh Rp 8,434 Rp 75,904
kg Rp 2,375 Rp 9,500
Oh Rp 125,000
Oh Rp 150,000
Oh Rp 175,000
m2 Rp -
KEBUTUHAN BAHAN
bh 0 Rp 8,434 Rp -
kg 0 Rp 2,375 Rp -
m2 TOTAL Rp -
N Rp -
SI KEBUTUHAN BAHAN
KEBUTUHAN UPAH
Oh 0.0 Rp 125,000 Rp -
Oh 0.0 Rp 150,000 Rp -
Oh 0.0 Rp 175,000 Rp -
m2 TOTAL Rp -
Rp -
H = (C X F ) J = (C X G ) I=(G+H)
Rp 41,750 Rp 127,154
Rp 25,000
Rp 15,000
Rp 1,750
Rp -
Rp 127,154
Rp 19,073
Rp 146,227
NO. URAIAN KOEF SAT
A B C D
B Tenaga
Pekerja 0.260 Oh
Tukang Batu 0.200 Oh
Kepala Tukang 0.020 Oh
C PERALATAN
D VOLUME m2
D Jumlah (A+B+C)
E Overhead & Profit 15%
F Harga Satuan Pekerjaan
B Tenaga
Pekerja 0.200 Oh
Tukang Batu 0.100 Oh
Kepala Tukang 0.010 Oh
C PERALATAN
D VOLUME m2
D Jumlah (A+B+C)
E Overhead & Profit 15%
F Harga Satuan Pekerjaan
B Tenaga
Pekerja 0.3500 Oh
Tukang Batu 0.0120 Oh
Kepala Tukang 0.0012 Oh
C PERALATAN
D VOLUME
D Jumlah (A+B+C)
E Overhead & Profit 15%
F Harga Satuan Pekerjaan
B Tenaga
Tukang Batu 0.2833 Oh
Kepala Tukang 0.0100 Oh
C PERALATAN
D VOLUME m2
D Jumlah (A+B+C)
E Overhead & Profit 15%
F Harga Satuan Pekerjaan
B 1 m2 Pasangan Acian
Bahan
Semen Tiga Roda 4.000 kg
VOLUME 0 m2
C 1 m2 Screed Lantai
Bahan
Semen Tiga Roda 50 kg (kg) 17.560 kg
Pasir Pasang 0.035 m3
VOLUME 0 0
D 1 m2 Waterproofing Coating
Bahan
SikaTop 107 Seal per kg 3.850 kg
VOLUME 0 m2
VOLUME 0 m2
B 1 m2 Pasangan Acian
Tenaga
Pekerja 0.200 Oh
Tukang Batu 0.100 Oh
Kepala Tukang 0.010 Oh
VOLUME 0 m2
D 1 m2 Screed Lantai
Tenaga
Pekerja 0.3500 Oh
Tukang Batu 0.0120 Oh
Kepala Tukang 0.0012 Oh
VOLUME 0 0
E 1 m2 Waterproofing Coating
Tenaga
Tukang Batu 0.2833 Oh
Kepala Tukang 0.0100 Oh
VOLUME 0 m2
1 Pekerja Oh
2 Tukang Oh
3 Kepala Tukang Oh
TOTAL BIAYA UPAH
HARGA SAT matrial HARGA SAT upah HARGA SAT alat JUMLAH matrial JUMLAH upah
E F G G=(CXE) H = (C X F )
Rp 23,612 Rp 64,700
Rp 1,500 Rp 15,552
Rp 260,000 Rp 8,060
Rp 125,000 Rp 32,500
Rp 150,000 Rp 30,000
Rp 110,000 Rp 2,200
Rp - Rp -
Rp 6,000 Rp 41,100
Rp 1,500 Rp 6,000
Rp 125,000 Rp 25,000
Rp 150,000 Rp 15,000
Rp 110,000 Rp 1,100
Rp - Rp -
Rp 35,440 Rp 45,682
Rp 1,500 Rp 26,340
Rp 260,000 Rp 9,100
Rp 125,000 Rp 43,750
Rp 150,000 Rp 1,800
Rp 110,000 Rp 132
Rp - Rp -
Rp 69,300 Rp 43,595
Rp 18,000 Rp 69,300
Rp 150,000 Rp 42,495
Rp 110,000 Rp 1,100
Rp - Rp -
TUHAN BAHAN
0 Rp 1,500 Rp -
0 Rp 260,000 Rp -
TOTAL Rp -
0 Rp 1,500 Rp -
TOTAL Rp -
0 Rp 1,500 Rp -
0 Rp 260,000 Rp -
TOTAL Rp -
0 Rp 18,000 Rp -
TOTAL Rp -
Rp -
EBUTUHAN BAHAN
UTUHAN UPAH
TOTAL Rp -
0 Rp 125,000 Rp -
0 Rp 150,000 Rp -
0 Rp 110,000 Rp -
TOTAL Rp -
0 Rp 125,000 Rp -
0 Rp 150,000 Rp -
0 Rp 110,000 Rp -
TOTAL Rp -
0 Rp 150,000 Rp -
0 Rp 110,000 Rp -
TOTAL Rp -
Rp -
J = (C X G ) I=(G+H)
Rp 88,312
Rp 88,312
Rp 13,247
Rp 101,559
Rp 47,100
Rp 47,100
Rp 7,065
Rp 54,165
Rp 81,122
Rp 81,122
Rp 12,168
Rp 93,290
Rp 112,895
Rp 112,895
Rp 16,934
Rp 129,829
NO. URAIAN KOEF
A B C
B Tenaga
Pekerja 0.4
Tukang Kayu 0.05
Kepala Tukang 0.003
C PERALATAN
D VOLUME
D Jumlah (A+B+C)
E Overhead & Profit 15%
F Harga Satuan Pekerjaan
B Tenaga
Pekerja 0.06
Tukang Kayu 0.06
Kepala Tukang 0.01
C PERALATAN
D VOLUME
D Jumlah (A+B+C)
E Overhead & Profit 15%
F Harga Satuan Pekerjaan
DAFTAR KEBUTUHAN BAHAN
PEK. ` KOEF
VOLUME 0
VOLUME 0
VOLUME 0
VOLUME 0
1 Pekerja Oh
2 Tukang Oh
3 Kepala Tukang Oh
TOTAL BIAYA UPAH
SAT HARGA SAT matrial HARGA SAT upah JUMLAH matrial JUMLAH upah
D E F G=(CXE) H = (C X F )
Rp 75,700 Rp 57,830
Oh Rp 125,000 Rp 50,000
Oh Rp 150,000 Rp 7,500
Oh Rp 110,000 Rp 330
Rp - Rp -
Rp 10,035 Rp 18,450
m Rp 8,500 Rp 8,925
Kg Rp 37,000 Rp 1,110
OH Rp 130,000 Rp 7,800
OH Rp 160,000 Rp 9,600
OH Rp 175,000 Rp 1,050
Rp - Rp -
KEBUTUHAN BAHAN
lbr 0 Rp 70,000 Rp -
btg 0 Rp 27,000 Rp -
bh 0 Rp 2,000 Rp -
bh 0 Rp 200 Rp -
TOTAL Rp -
m 0 Rp 8,500 Rp -
Kg 0 Rp 37,000 Rp -
TOTAL Rp -
N Rp -
SI KEBUTUHAN BAHAN
KEBUTUHAN UPAH
KEBUTUHAN HARGA SATUAN
SAT HARGA UPAH
( VOL.* KOEF) UPAH
Oh 0 Rp 125,000 Rp -
Oh 0 Rp 150,000 Rp -
Oh 0 Rp 110,000 Rp -
TOTAL Rp -
OH 0 Rp 125,000 Rp -
OH 0 Rp 150,000 Rp -
OH 0 Rp 110,000 Rp -
TOTAL Rp -
Rp -
I=(G+H)
Rp 133,530
Rp 133,530
Rp 20,030
Rp 153,560
Rp 28,485
Rp 28,485
Rp 4,273
Rp 32,758
NO. URAIAN KOEF
A B C
B Tenaga
Pekerja 0.3000
Tukang Batu 0.200
Kepala Tukang 0.0120
C PERALATAN
D VOLUME
D Jumlah (A+B+C)
E Overhead & Profit 15%
F Harga Satuan Pekerjaan
B Tenaga
Pekerja 0.300
Tukang Batu 0.200
Kepala Tukang 0.012
C PERALATAN
D VOLUME
D Jumlah (A+B+C)
E Overhead & Profit 15%
F Harga Satuan Pekerjaan
B Tenaga
Pekerja 0.3000
Tukang Batu 0.1500
Kepala Tukang 0.0150
C PERALATAN
D VOLUME
D Jumlah (A+B+C)
E Overhead & Profit 15%
F Harga Satuan Pekerjaan
PEK. ` KOEF
VOLUME 0
VOLUME 0
VOLUME 0
VOLUME 0
C 1 m² Pasang Keramik Lantai Kamar Mandi
Tenaga
Pekerja 0.3
Tukang Batu 0.200
Kepala Tukang 0.012
VOLUME 0
VOLUME 0
1 Pekerja oh
2 Tukang Batu oh
3 Kepala Tukang oh
TOTAL BIAYA UPAH
SAT HARGA SAT matrial HARGA SAT upah JUMLAH matrial JUMLAH upah
D E F G=(CXE) H = (C X F )
Rp 197,100 Rp 68,820
bh Rp 45,000 Rp 139,500
kg Rp 1,500 Rp 14,400
m3 Rp 260,000 Rp 11,700
kg Rp 21,000 Rp 31,500
Oh Rp 125,000 Rp 37,500
Oh Rp 150,000 Rp 30,000
Oh Rp 110,000 Rp 1,320
Rp - Rp -
Rp 89,200 Rp 68,820
bh Rp 10,000 Rp 31,000
kg Rp 1,500 Rp 15,000
m3 Rp 260,000 Rp 11,700
kg Rp 21,000 Rp 31,500
Oh Rp 125,000 Rp 37,500
Oh Rp 150,000 Rp 30,000
Oh Rp 110,000 Rp 1,320
m2 Rp - Rp -
Rp 179,370 Rp 61,650
bh Rp 20,000 Rp 120,000
kg Rp 1,500 Rp 13,950
m3 Rp 260,000 Rp 4,680
kg Rp 21,000 Rp 40,740
Oh Rp 125,000 Rp 37,500
Oh Rp 150,000 Rp 22,500
Oh Rp 110,000 Rp 1,650
m2 Rp - Rp -
KEBUTUHAN BAHAN
bh 0 Rp 45,000 Rp -
kg 0 Rp 1,500 Rp -
m3 0 Rp 260,000 Rp -
kg 0 Rp 21,000 Rp -
TOTAL Rp -
bh 0 Rp 10,000 Rp -
kg 0 Rp 1,500 Rp -
m3 0 Rp 260,000 Rp -
kg 0 Rp 21,000 Rp -
TOTAL Rp -
bh 0 Rp 20,000 Rp -
kg 0 Rp 1,500 Rp -
m3 0 Rp 260,000 Rp -
kg 0 Rp 21,000 Rp -
TOTAL Rp -
Rp -
R KEBUTUHAN UPAH
Oh 0 Rp 125,000 Rp -
Oh 0 Rp 150,000 Rp -
Oh 0 Rp 110,000 Rp -
0 TOTAL Rp -
Oh 0 Rp 125,000 Rp -
Oh 0 Rp 150,000 Rp -
Oh 0 Rp 110,000 Rp -
TOTAL Rp -
Oh 0 Rp 125,000 Rp -
Oh 0 Rp 150,000 Rp -
Oh 0 Rp 110,000 Rp -
0 TOTAL Rp -
Rp -
I=(G+H)
Rp 265,920
223
Rp 265,920
Rp 39,888
Rp 305,808
Rp 158,020
4.95
2.625
5.18
12.755
Rp 158,020
Rp 23,703
Rp 181,723
Rp 241,020
16.8 8.4 7.77
18.48 10.15 11.97
33.6 16.87 18.06
68.53
Rp 241,020
Rp 36,153
Rp 277,173
NO. URAIAN KOEF
A B C
1 m² Pengecatan Tembok Baru ( 1 Plamir, 1 Lapis Cat Dasar, 2 Lapis Cat Penutup ) Setara ICI/Dulux E
A Bahan
Cat Dasar Altex Primer 0.100
Cat Tembok (interior) 0.260
B Tenaga
Pekerja 0.0200
Tukang Cat 0.063
Kepala Tukang 0.0063
C PERALATAN
D VOLUME
D Jumlah (A+B+C)
E Overhead & Profit 15%
F Harga Satuan Pekerjaan
1 m² Pengecatan Plafon (1 Lapis Cat Dasar, 2 Lapis Cat Penutup ) Setara Altex
A Bahan
Cat Plafon Naturtone 0.120
B Tenaga
Pekerja 0.0200
Tukang Cat 0.063
C PERALATAN
D VOLUME
D Jumlah (A+B+C)
E Overhead & Profit 15%
F Harga Satuan Pekerjaan
A 1 m² Pengecatan Tembok Baru ( 1 Plamir, 1 Lapis Cat Dasar, 2 Lapis Cat Penutup ) Setara ICI/Dulux E
Bahan
Cat Dasar Altex Primer 0.1
Cat Tembok (interior) 0.26
VOLUME 0.0
D 1 m² Pengecatan Plafon (1 Lapis Cat Dasar, 2 Lapis Cat Penutup ) Setara Altex
Bahan
Cat Plafon Naturtone 0.12
VOLUME 0.0
A 1 m² Pengecatan Tembok Baru ( 1 Plamir, 1 Lapis Cat Dasar, 2 Lapis Cat Penutup ) Setara ICI/Dulux E
Tenaga
Pekerja 0.0200
Tukang Cat 0.0630
Kepala Tukang 0.0063
VOLUME 0.0
B 1 m² Pengecatan Plafon (1 Lapis Cat Dasar, 2 Lapis Cat Penutup ) Setara Altex
Tenaga
Pekerja 0.0200
Tukang Cat 0.0630
VOLUME 0.0
1 Pekerja Oh
2 Tukang Oh
3 Kepala Tukang Oh
TOTAL BIAYA UPAH
SAT HARGA SAT matrial HARGA SAT upah JUMLAH matrial JUMLAH upah
D E F G=(CXE) H = (C X F )
kg Rp 42,500 Rp 4,250
kg Rp 56,667 Rp 14,733
Oh Rp 125,000 Rp 2,500
Oh Rp 150,000 Rp 9,450
Oh Rp 110,000 Rp 693
m2 Rp - Rp -
kg Rp 35,000 4200
Oh Rp 125,000 Rp 2,500
Oh Rp 150,000 Rp 9,450
m2 Rp - Rp -
EBUTUHAN BAHAN
KEBUTUHAN HARGA SATUAN
SAT HARGA BAHAN
( VOL.* KOEF) BAHAN
apis Cat Penutup ) Setara ICI/Dulux Exterior
kg 0 Rp 42,500 Rp -
kg 0 Rp 56,667 Rp -
m2 TOTAL Rp -
) Setara Altex
kg 0 Rp 35,000 Rp -
TOTAL Rp -
Rp -
I KEBUTUHAN BAHAN
EBUTUHAN UPAH
Oh 0 Rp 125,000 Rp -
Oh 0 Rp 150,000 Rp -
Oh 0 Rp 110,000 Rp -
m2 TOTAL Rp -
) Setara Altex
Oh 0 Rp 125,000 Rp -
Oh 0 Rp 150,000 Rp -
m2 TOTAL Rp -
Rp -
I=(G+H)
Rp 31,626
Rp 31,626
Rp 4,744
Rp 36,370
Rp 16,150
Rp 16,150
Rp 2,423
Rp 18,573
JML KEBUTUHAN HARGA SATUAN
NO JENIS BAHAN SATUAN HARGA BAHAN
BAHAN BAHAN
1 Pipa Rucika, dia 1/2 tebal 22 mm, type AW per m' m 0 Rp 6,500 Rp -
2 Perlengkapan @35 % x Pipa PVC - 0 Rp 6,500 Rp -
3 Pemasangan 1 m' Pipa PVC tipe AW Ø 1" m 0 Rp 10,000 Rp -
4 Perlengkapan @35 % x Pipa PVC - 0 Rp 10,000 Rp -
5 Pemasangan 1 m' Pipa PVC tipe AW Ø 2" m 0 Rp 24,000 Rp -
6 Perlengkapan @35 % x Pipa PVC - 0 Rp 24,000 Rp -
7 Pemasangan 1 m' Pipa PVC tipe AW Ø 3" m 0 Rp 49,000 Rp -
8 Perlengkapan @35 % x Pipa PVC - 0 Rp 49,000 Rp -
9 Pemasangan 1 m' Pipa PVC tipe AW Ø 4" m 0 Rp 80,000 Rp -
10 Perlengkapan @35 % x Pipa PVC - 0 Rp 80,000 Rp -
11 Pipa Air Panas 3/4 m 0 Rp 40,000.00 Rp -
12 Perlengkapan @35 % x Pipa 3/4 - 0 Rp 40,000.00 Rp -
15 Shower Kran & Hand TX432SDN bh 0 Rp 1,970,000 Rp -
16 Closet Duduk Toto CW637J/SW637JP bh 0 Rp 3,260,000 Rp -
17 TX277S bh 0 Rp 207,000 Rp -
18 T53DSN bh 0 Rp 26,000 Rp -
19 TX215C bh 0 Rp 110,000 Rp -
20 TC505S bh 0 Rp 450,000 Rp -
21 Jet Shower Toto THX20NB bh 0 Rp 312,000 Rp -
22 Wastafel Toto LW896J bh 0 Rp 2,338,000 Rp -
23 Kran TX116LRSN bh 0 Rp 2,720,000 Rp -
24 TX809LV5 bh 0 Rp 60,000 Rp -
25 Kran Sink TX606KRS bh 0 Rp 1,250,000 Rp -
26 Kran T23B13 bh 0 Rp 333,000 Rp -
27 Floor Drain TX1DA bh 0 Rp 386,000 Rp -
28 Sink MODENA - MAGGIORE KS5110 bh 0 Rp 2,100,000 Rp -
29 Kaca Tempered 10mm m2 0 Rp 1,400,000 Rp -
30 Torn Setara Penguin unit 0 Rp 3,300,000 Rp -
31 Pompa Air (Hisap) Grundfos JPD 5-61 unit 0 Rp 6,208,000 Rp -
32 Pompa Air Shimizu PS-230 BIT unit 0 Rp 800,000 Rp -
TOTAL BIAYA BAHAN Rp -
RENCANA ANGGARAN BIAYA
NO URAIAN PEKERJAAN SPESIFIKASI TEKNIS VOLUME SATUAN HARGA SATUAN ( Rp. ) JUMLAH HARGA ( Rp. ) BOBOT (%)
A PEKERJAAN PERSIAPAN
1 Pemasangan Bowplank - 0.0 m Rp 12,216 Rp - #DIV/0!
Sub Total A Rp - #DIV/0!
B PEKERJAAN TANAH DAN PONDASI
1 Pek. Galian Tanah Pondasi Manual 0.0 m3 Rp 150,000 Rp - #DIV/0!
2 Pek. Urugan Tanah Kembali Manual 0.0 m3 Rp 67,500 Rp - #DIV/0!
3 Pek. Pasir Urug
- Bawah Pondasi Pasir urug m3 Rp 396,000 Rp - #DIV/0!
- Bawah Lantai Pasir urug m3 Rp 396,000 Rp - #DIV/0!
4 Pek. Pondasi Telapak
- Beton K-225 Site Mix K225 0.0 m3 Rp 1,717,536 Rp - #DIV/0!
- Pembesian Besi U24 0.0 kg Rp 21,615 Rp - #DIV/0!
- Bekisting Papan cor 0.0 m2 Rp 257,520 Rp - #DIV/0!
5 Pek. Sloof Beton (15/20)
- Beton K-225 Site Mix K225 0.0 m3 Rp 1,717,536 Rp - #DIV/0!
- Pembesian Besi U24 0.0 kg Rp 21,615 Rp - #DIV/0!
- Bekisting Papan cor 0.0 m2 Rp 257,520 Rp - #DIV/0!
Sub Total B Rp - #DIV/0!
C PEKERJAAN STRUKTUR
1 Pek. Kolom
- Beton K-225 Site Mix K225 0.0 m3 Rp 997,071 Rp - #DIV/0!
- Pembesian Besi U24 0.0 kg Rp 22,865 Rp - #DIV/0!
- Bekisting Papan cor 0.0 m2 Rp 108,450 Rp - #DIV/0!
2 Pek. Balok
- Beton K-225 Site Mix K225 0.0 m3 Rp 3,123,071 Rp - #DIV/0!
- Pembesian Besi U24 0.0 kg Rp 17,630 Rp - #DIV/0!
- Bekisting Papan cor 0.0 m2 Rp 127,310 Rp - #DIV/0!
3 Pek. Plat Lantai T = 12cm
- Beton K-225 Site Mix K225 0.0 m3 Rp 1,355,509 Rp - #DIV/0!
- Pembesian Besi U24 0.0 kg Rp 17,507 Rp - #DIV/0!
- Bekisting Multiplek 0.0 m2 Rp 208,480 Rp - #DIV/0!
4 Pek. Atap Beton T = 8cm
- Beton K-225 Site Mix K225 0.0 m3 Rp 997,071 Rp - #DIV/0!
- Pembesian Besi U24 0.0 kg Rp 22,865 Rp - #DIV/0!
- Bekisting Multiplek 0.0 m2 Rp 208,480 Rp - #DIV/0!
5 Pek. Ring Balok
- Beton K-225 Site Mix K225 0.0 m3 Rp 997,071 Rp - #DIV/0!
- Pembesian Besi U24 0.0 kg Rp 22,865 Rp - #DIV/0!
- Bekisting Papan cor 0.0 m2 Rp 213,080 Rp - #DIV/0!
6 Pek. Balok Lintel
- Beton K-225 Site Mix K225 0.0 m3 Rp 997,071 Rp - #DIV/0!
- Pembesian Besi U24 0.0 kg Rp 22,865 Rp - #DIV/0!
- Bekisting Papan cor 0.0 m2 Rp 213,080 Rp - #DIV/0!
Sub Total C Rp - #DIV/0!
D PEKERJAAN DINDING
1 Pasangan Dinding Bata Ringan Hebel 10 cm 0.0 m2 Rp 127,154 Rp - #DIV/0!
2 Pek. Plester Dinding Tebal 2 cm 0.0 m2 Rp 88,312 Rp - #DIV/0!
3 Pek. Acian Dinding Acian abu 0.0 m2 Rp 47,100 Rp - #DIV/0!
4 Pek. Screed Lantai Plester 1 : 5 0.0 m2 Rp 81,122 Rp - #DIV/0!
5 Pek. Waterproofing Coating SikaTop 0.0 m3 Rp 112,895 Rp - #DIV/0!
Sub Total D Rp - #DIV/0!
E PEKERJAAN ATAP DAN PENUTUP
1 Kuda-kuda Rangka Atap Baja Ringan Baja ringan 0.75 0.0 m2 Rp 172,076 Rp - #DIV/0!
2 Pasang Atap Alderon Genteng Glasur Morando 0.0 m2 Rp 279,170 Rp - #DIV/0!
Sub Total E Rp - #DIV/0!
F PEKERJAAN PLAFON
1 Plafon + Rangka Interior Gypsum Jayaboard 9mm Rangka Hollow 0.0 m2 Rp 133,530 Rp - #DIV/0!
2 List Plafon Shadow Line 0.0 m Rp 35,000 Rp - #DIV/0!
Sub Total F Rp - #DIV/0!
G PEKERJAAN LANTAI
1 Pasangan Homogeneus Tile 60x60 Polished Setara Roman 0.0 m2 Rp 265,920 Rp - #DIV/0!
2 Pasangan Keramik 30x30 Unpolished (Area Kamar Mandi) Setara KIA 0.0 m2 Rp 158,020 Rp - #DIV/0!
3 Pasangan Keramik dinding 30x60 Setara KIA 0.0 m2 Rp 241,020 Rp - #DIV/0!
Sub Total G Rp - #DIV/0!
H PEKERJAAN KUSEN PINTU & JENDELA
1 Kusen/Pintu tipe P1 unit Rp - #DIV/0!
2 Kusen/Pintu tipe P2 unit Rp - #DIV/0!
10 Kusen/Jendela Tipe J1 unit Rp - #DIV/0!
11 Kusen/Jendela Tipe J2 unit Rp - #DIV/0!
12 Kusen/Jendela Tipe J3 unit Rp - #DIV/0!
13 Kusen/Jendela Tipe J4 unit Rp - #DIV/0!
Sub Total H Rp - #DIV/0!
I PEKERJAAN PENGECATAN
1 Pek. Pengecatan Dinding Eksterior dan Interior Setara Dulux 0.0 m2 Rp 31,626 Rp - #DIV/0!
2 Pek. Pengecatan Plafon Setara Altex 0.0 m2 Rp 16,150 Rp - #DIV/0!
Sub Total I Rp - #DIV/0!
J PEKERJAAN PLUMBING & SANITAIR
1 Instalasi Pipa PVC AW 4" Setara Rucika 0.0 m Rp 154,375 Rp - #DIV/0!
2 Instalasi Pipa PVC AW 3" Setara Rucika 0.0 m Rp 106,325 Rp - #DIV/0!
3 Instalasi Pipa PVC AW 2" Setara Rucika 0.0 m Rp 57,450 Rp - #DIV/0!
4 Instalasi Pipa PVC AW 1" Setara Rucika 0.0 m Rp 29,000 Rp - #DIV/0!
5 Instalasi Pipa PVC AW 1/2" Setara Rucika 0.0 m Rp 23,575 Rp - #DIV/0!
6 Instalasi Pipa Air Panas PPR 3/4" Setara Wavin 0.0 m Rp 75,500 Rp - #DIV/0!
7 Pemasangan Shower (Kran + Hand) TOTO TX432SDN 0.0 bh Rp 1,970,000 Rp - #DIV/0!
8 Pemasangan Closet Duduk TOTO CW637J/SW637JP 0.0 bh Rp 4,245,650 Rp - #DIV/0!
9 Pemasangan Jet Shower TOTO THX20NB 0.0 bh Rp 482,000 Rp - #DIV/0!
10 Pemasangan Washtafel + Aksesoris (Kamar Utama) TOTO LW896J 0.0 bh Rp 5,288,000 Rp - #DIV/0!
11 Pemasangan Kran Sink TOTO TX606KRS 0.0 bh Rp 1,275,650 Rp - #DIV/0!
12 Pemasangan Kran TOTO T23B13 0.0 bh Rp 358,650 Rp - #DIV/0!
13 Pemasangan Floor Drain TOTO TX1DA 0.0 bh Rp 404,250 Rp - #DIV/0!
14 Pemasangan Sink MODENA - MAGGIORE KS920IF 0.0 bh Rp 2,119,000 Rp - #DIV/0!
15 Pemasangan Kaca Tempered (Area Shower) Kaca Tempered 10mm 0.0 m2 Rp 1,680,300 Rp - #DIV/0!
16 Pemasangan Torn Air 550 ltr Setara Penguin 0.0 bh Rp 3,325,650 Rp - #DIV/0!
17 Pemasangan Pompa Air (Hisap) Grundfos JPD 5-61 0.0 bh Rp 6,233,650 Rp - #DIV/0!
18 Pemasangan Pompa Air pendorong Shimizu PS-230 BIT 0.0 bh Rp 825,650 Rp - #DIV/0!
19 Pemasangan Pemanas Air Solahart Wika Solar bh Rp 18,000,000 Rp - #DIV/0!
Sub Total J Rp - #DIV/0!
K PEKERJAAN LISTRIK
1 Pemasangan Stop Kontak setara brocco titik Rp - #DIV/0!
2 Pemasangan Saklar Tungaal setara brocco titik Rp - #DIV/0!
3 Pemasangan Saklar Ganda setara brocco titik Rp - #DIV/0!
4 Pemasangan Lampu Downlight 3'' setara philips titik Rp - #DIV/0!
5 Pemasangan Lampu Baret setara philips titik Rp - #DIV/0!
6 Pemasangan Lampu Gantung setara philips titik Rp - #DIV/0!
7 Pemasangan Lampu Sorot - titik Rp - #DIV/0!
8 Pemasangan Outlet TV setara philips titik Rp - #DIV/0!
10 Pemasangan Penangkal petir - unit Rp - #DIV/0!
11 Pemasangan MCB & MCB Box - unit Rp - #DIV/0!
12 Pemasangan Daya Listrik Baru 2200 Watt unit Rp - #DIV/0!
Sub Total K Rp - #DIV/0!
TOTAL Rp - #DIV/0!
REKAPITULASI KEBUTUHAN UPAH
NO URAIAN PEKERJAAN VOLUME SATUAN HARGA SATUAN ( Rp. ) JUMLAH HARGA ( Rp. )
A PEKERJAAN PERSIAPAN
1 Pemasangan Bowplank 0.00 m Rp 4,480 Rp -
Sub Total A Rp -
B PEKERJAAN TANAH DAN PONDASI
1 Pek. Galian Tanah Pondasi 0.00 m3 Rp 150,000 Rp -
2 Pek. Urugan Tanah Kembali 0.00 m3 Rp 67,500 Rp -
3 Pek. Pasir Urug
- Bawah Pondasi 0.00 m3 Rp 45,000 Rp -
- Bawah Lantai 0.00 m3 Rp 45,000 Rp -
4 Pek. Pondasi Telapak
- Beton K-225 0.00 m3 Rp 806,250 Rp -
- Pembesian 0.00 Rp 6,110 Rp -
- Bekisting 0.00 Rp 69,360 Rp -
5 Pek. Sloof Beton (15/20)
- Beton K-225 0.00 m2 Rp 177,750 Rp -
- Pembesian 0.00 Rp 7,430 Rp -
- Bekisting 0.00 m3 Rp 111,450 Rp -
Sub Total B Rp -
C PEKERJAAN STRUKTUR
1 Pek. Kolom
- Beton K-225 0.00 m3 Rp 308,500 Rp -
- Pembesian 0.00 kg Rp 7,360 Rp -
- Bekisting 0.00 m2 Rp 84,600 Rp -
2 Pek. Balok Lintel
- Beton K-225 0.00 m3 Rp 1,955,500 Rp -
- Pembesian 0.00 kg Rp 2,125 Rp -
- Bekisting 0.00 m2 Rp 81,860 Rp -
3 Pek. Plat Lantai T = 12 cm
- Beton K-225 0.00 m3 Rp 250,580 Rp -
- Pembesian 0.00 kg Rp 2,002 Rp -
- Bekisting 0.00 m2 Rp 135,630 Rp -
4 Pek. Atap Beton T = 10 cm
- Beton K-225 0.00 m3 Rp 250,580 Rp -
- Pembesian 0.00 kg Rp 2,002 Rp -
- Bekisting 0.00 m2 Rp 135,630 Rp -
5 Pek. Ring Balok
- Beton K-225 0.00 m3 Rp 1,405,500 Rp -
- Pembesian 0.00 kg Rp 2,002 Rp -
- Bekisting 0.00 m2 Rp 81,860 Rp -
6 Pek. Balok Lintel
- Beton K-225 0.00 m3 Rp 1,405,500 Rp -
- Pembesian 0.00 kg Rp 2,002 Rp -
- Bekisting 0.00 m2 Rp 135,630 Rp -
Sub Total C Rp -
D PEKERJAAN DINDING
1 Pasangan Dinding Bata Ringan 0.00 m2 Rp 41,750 Rp -
2 Pek. Plester Dinding 0.00 m2 Rp 64,700 Rp -
3 Pek. Acian Dinding 0.00 m2 Rp 41,100 Rp -
4 Pek. Screed Lantai 0.00 m2 Rp 45,682 Rp -
Sub Total D Rp -
E PEKERJAAN ATAP DAN PENUTUP
1 Kuda-kuda Rangka Atap Baja Ringan 0.00 m2 Rp 60,500 Rp -
2 Pasang Atap Alderon 0.00 m2 Rp 25,050 Rp -
Sub Total E Rp -
F PEKERJAAN PLAFON
1 Plafon + Rangka Interior 0 m2 Rp 57,830 Rp -
2 List Plafon 0 m Rp 10,000 Rp -
Sub Total F Rp -
G PEKERJAAN LANTAI
1 Pasangan Homogeneus Tile 60x60 Polished 0.00 m2 Rp 68,820 Rp -
2 Pasangan Keramik 30x30 Unpolished (Area Kamar Mandi) 0.00 m2 Rp 68,820 Rp -
3 Pasangan Keramik dinding 30x60 0.00 m2 Rp 61,650 Rp -
Sub Total G Rp -
H PEKERJAAN PENGECATAN
1 Pek. Pengecatan Dinding Eksterior dan Interior 0.00 m2 Rp 12,643 Rp -
2 Pek. Pengecatan Plafon 0.00 m2 Rp 11,950 Rp -
Sub Total H Rp -
I PEKERJAAN PLUMBING & SANITAIR
1 Instalasi Pipa PVC AW 4" 0.00 m Rp 30,375 Rp -
2 Instalasi Pipa PVC AW 3" 0.00 m Rp 30,375 Rp -
3 Instalasi Pipa PVC AW 2" 0.00 m Rp 20,250 Rp -
4 Instalasi Pipa PVC AW 1" 0.00 m Rp 13,500 Rp -
5 Instalasi Pipa PVC AW 1/2" 0.00 m Rp 13,500 Rp -
6 Instalasi Pipa Air Panas PPR 3/4" 0.00 m Rp 13,500 Rp -
7 Pemasangan Shower (Kran + Hand) 0.00 bh Rp 280,300 Rp -
8 Pemasangan Closet Duduk 0.00 bh Rp 192,650 Rp -
9 Pemasangan Jet Shower 0.00 bh Rp 170,000 Rp -
10 Pemasangan Washtafel + Aksesoris (Kamar Utama) 0.00 bh Rp 170,000 Rp -
11 Pemasangan Kran Sink 0.00 bh Rp 25,650 Rp -
12 Pemasangan Kran 0.00 bh Rp 25,650 Rp -
13 Pemasangan Floor Drain 0.00 bh Rp 18,250 Rp -
14 Pemasangan Sink 0.00 bh Rp 19,000 Rp -
15 Pemasangan Kaca Tempered (Area Shower) 0.00 m2 Rp 280,300 Rp -
16 Pemasangan Torn Air 550 ltr 0.00 bh Rp 25,650 Rp -
17 Pemasangan Pompa Air (Hisap) 0.00 bh Rp 25,650 Rp -
18 Pemasangan Pompa Air pendorong 0.00 bh Rp 25,650 Rp -
Sub Total I Rp -
TOTAL Rp -
REKAPITULASI KEBUTUHAN BAHAN
JUMLAH KEBUTUHAN
NO JENIS BAHAN SATUAN SPESIFIKASI HARGA SATUAN BAHAN HARGA BAHAN
BAHAN
TOTAL #DIV/0!
REKAPITULASI TOTAL ANGGARAN BIAYA
NO ITEM HARGA
1 Rekapitulasi Kebutuhan Upah Rp -
2 Rekapitulasi Kebutuhan Bahan Rp -
3 Rekapitulasi Pekerjaan Sub Kontrak Rp -
JUMLAH Rp -