I PEKERJAAN PERSIAPAN
1 Pek.Persiapan 1.00 Ls 750,000.00 750,000.00
2 Alat Bantu Kerja/Perancah Kerja 1.00 Ls 1,250,000.00 1,250,000.00
Sub Total I 2,000,000.00
II PEKERJAAN TANAH
1 Pek. Galian Tanah Saluran Kabel 1714.00 M3 10,000.00 17,140,000.00
2 Pek. Urugan Pasir Kembali 1714.00 M3 6,000.00 10,284,000.00
Sub Total II 27,424,000.00
TOTAL 459,010,000.00
Zaldy Syahruddin
Direktur