Uraian
KEGIATAN Pembersihan Beton Koef Volume Sat
242.75 9.00
89.75 5.00
26.86 Persen HOK
31%
M3 1,586,416.67
RENCANA ANGGARAN BIAYA (RAB)
BANTUAN DANA DESA KEPADA PEMERINTAH DESA PEGANDON
KEC. KARANGDADAP KAB.PEKALONGAN TAHUN 2019
KHABIBAH KHAEROZI
Pembersihan Galian sal
P 294 294 294.00
L 1 0.5 0.15
T 1 0.50
V 294 147.00 44.10
212.42
11.03 32% 15
14.55 3
KHABIBAH KHAEROZI
RENCANA ANGGARAN BELANJA (RAB)
BANTUAN DANA DESA KEPADA PEMERINTAH DESA LOGANDENG
KEC. KARANGDADAP KAB.PEKALONGAN TAHUN 2021
Total I 626,250
II PEKERJAAN PAVING PANJANG 60 M'
a. METERIAL/ BAHAN
Paving T = 6 cm 100.00 m2 85,000 8,500,000
Pasir Pasang 6.00 m3 300,000 1,800,000
Pasir Urug 4.00 m3 200,000 800,000
Semen 16.00 sak 68,000 1,088,000
Abu Batu 2.00 m3 410,000 820,000
Pasir Split 3.00 m3 410,000 1,230,000
Sub Total II.a 14,238,000
b. UPAH TENAGA KERJA
Pekerja 31.00 Hok 75,000 2,325,000
Tukang Batu 24.00 Hok 90,000 2,160,000
Mandor 4.00 Hok 100,000 400,000
Tenaga Kebersihan Lahan 40.00 Hok 75,000 3,000,000
Sub Total II.b 7,885,000
TOTAL II ( II.a + II.b ) 22,123,000
JUMLAH TOTAL ( I + II ) 22,749,250
Tujuh Belas Juta Sembilan Ratus Delapan Puluh Delapan Ribu Dua Ratus Rupiah
Logandeng, 16 Desember 2020
Diperiksa Dibuat Oleh :
KEPALA DESA LOGANDENG PELAKSANA TEKNIS KEGIATAN
KECAMATAN KARANGDADAP Ketua
KUSNOTO ADNAN
RENCANA ANGGARAN BIAYA (RAB)
BANTUAN DANA DESA KEPADA PEMERINTAH DESA PEGANDON
KEC. KARANGDADAP KAB.PEKALONGAN TAHUN 2019
KHABIBAH KHAEROZI
t 01/01 )
Pembersihan Galian sal
P 300 300 300.00
L 1 0.5 0.15
T 1 0.50
V 300 150.00 45.00
216.75
11.25 30% 13.5
14.85 0.6875
RENCANA ANGGARAN BIAYA (RAB)
#REF!
#REF!
KHABIBAH KHAEROZI
Pembersihan Galian sal
P 100 100 100.00
L 1 0.5 0.20
T 1 0.50
V 100 50.00 20.00
80.50
5.00 28% 11.4285714286
5.35 2
26341900
(4,761,050)
RENCANA ANGGARAN BIAYA (RAB)
BANTUAN DANA DESA KEPADA PEMERINTAH DESA PEGANDON
KEC. KARANGDADAP KAB.PEKALONGAN TAHUN 2019
KHABIBAH KHAEROZI
145 1.7 246.50 278.50
P L T Vol
1,230,750.00
Uraian Koef Volume
2,051,250.00
17%
Per Meter
81,666.67
RENCANA ANGGARAN BIAYA (RAB)
BANTUAN DANA DESA KEPADA PEMERINTAH DESA PEGANDON
KEC. KARANGDADAP KAB.PEKALONGAN TAHUN 2019
KHABIBAH KHAEROZI
RENCANA ANGGARAN BELANJA (RAB)
BANTUAN DANA DESA KEPADA PEMERINTAH DESA LOGANDENG
KEC. KARANGDADAP KAB.PEKALONGAN TAHUN 2019
KHABIBAH KHAEROZI
Plat Dekker Saluran
KEGIATAN GALIAN PAS. BATU Plat Beton KEGIATAN Perbaikan GALIAN List
alian Tanah
28.125
9.375
18.75
5.63
19.50
9.75
0.98
70.85
8.45
14.14
26.81
4.47
1.35
184.4376
230.547
38.94
6.22
2.90
4.15
1.66
RENCANA ANGGARAN BIAYA (RAB)
BANTUAN DANA DESA KEPADA PEMERINTAH DESA PEGANDON
KEC. KARANGDADAP KAB.PEKALONGAN TAHUN 2019
KHABIBAH KHAEROZI
.
REKAPITULASI DANA DESA 2019 Uraian
165,407,000 330,814,000 330,814,000 BDT
Padat
ALOKASI Karya
NO KEGIATAN REKAP UPAH Tahap 1 Tahap 2 Tahap 3 BUMDES
1 BDT 10,000,000 10,000,000 0% Paving Dk Pegandon Tengah
2 BUMDES 5,000,000 5,000,000 0% Sanitasi Rt 01
3 Paving Dk Pegandon Tengah 22,749,250 7,885,000 17,988,200 35% Sanitasi Rt 04
4 Sanitasi Rt 01 61,790,000 18,735,000 61,790,000 30% Pengaspalan Rt 02
5 Sanitasi Rt 04 27,753,800 7,890,000 27,753,800 28%
6 Pengaspalan Rt 02 42,875,000 7,215,000 42,875,000 17% Pengaspalan Rt 09
7 Pengaspalan Rt 09 118,242,000 22,480,000 118,242,000 19% Sanitasi ketitang
8 Plat 2 unit 32,572,000 10,800,000 32,572,000 33% Plat 2 unit
9 Jamban 60,000,000 20,250,000 60,000,000 34% Jamban
10 Kantor Bumdes Tahap 1 115,000,000 115,000,000 24% Kantor Bumdes Tahap 1
11 Kampung KB 5,000,000 5,000,000 0% Kampung KB
12 Kantor Bumdes Tahap 2 60,576,000 60,576,000 0%
Pelebaran Jembatan 38,448,000 13,050,000 38,448,000 34% Kantor Bumdes Tahap 2
Sal Pejareman Rt 09 61,790,000 18,735,000 61,790,000 30%
RTLH 17 unit 170,000,000 50,700,000 170,000,000 30% Rabat Dk Pegandon kidul
TOTAL 831,796,050 95,255,000 827,035,000 165,407,000 330,814,000 330,814,000 Sal Pejareman Rt 09
Selisih (4,761,050) - - - RTLH 17 unit
TOTAL
21.0%
Rencana Perubahan
10,000,000 10,000,000
5,000,000 5,000,000
17,988,200 17,988,200
61,790,000 61,790,000
27,753,800 27,753,800
42,875,000 42,875,000
48,882,400
118,242,000
69,359,600
32,572,000 32,572,000
60,000,000 60,000,000
115,000,000 115,000,000 Gedung Bumdes
5,000,000 5,000,000
827,035,000 827,035,000 -
RENCANA ANGGARAN BIAYA (RAB)
BANTUAN DANA DESA KEPADA PEMERINTAH DESA PEGANDON
KEC. KARANGDADAP KAB.PEKALONGAN TAHUN 2019
KHABIBAH KHAEROZI
Pembersihan Galian sal
P 300 300 300.00
L 1 0.5 0.15
T 1 0.50
V 300 150.00 45.00
216.75
11.25 30.3% 13.5
14.85 0.6875
RENCANA ANGGARAN BELANJA (RAB)
BANTUAN DANA DESA KEPADA PEMERINTAH DESA PEGANDON
KEC. KARANGDADAP KAB.PEKALONGAN TAHUN 2019
KHABIBAH KHAEROZI
3,400,000
5,100,000
30%
-
RENCANA ANGGARAN BIAYA (RAB)
BANTUAN DANA DESA KEPADA PEMERINTAH DESA PEGANDON
KEC. KARANGDADAP KAB.PEKALONGAN TAHUN 2019
KHABIBAH KHAEROZI
PERHITUNGAN VOLUME Volume Koef Uraian Volume Sat
P L T V A Pembersihan
10 7.5 75.000 75.000 0.2500 pekerja 18.7500 oh
75.000 0.0500 Mandor 3.7500 oh
Galian Tanah
20 0.5 1 10.000 10.000 0.7500 pekerja 7.5000 oh
0 0.5 1 0.000 10.000 0.0200 Mandor 0.2000 oh
Pengurugan Tanah
15 7 0.15 15.750 115.750 1.2000 Sirtu 138.9000 m3
20 10 0.5 100.000 115.750 0.2500 pekerja 28.9375 oh
115.750 0.025 Mandor 2.8938 oh
B Pasangan batu belah 1 : 4 per m3
20 0.35 1.5 10.5 10.5 1.2000 batu belah 15/20 12.6000 m3
=((0.2+0.5)/2) 10.5 3.5400 PC 37.1700 zak
0.35 1.5 0 10.5 0.5200 pasir pasang 5.4600 m3
10.5 1.5000 pekerja 15.7500 oh
10.5 0.7500 tukang batu 7.8750 oh
BOP Max 10.5 0.075 Mandor 0.7875 oh
3,439,280.00 C Pasangan Batu Bata 1 :6
5,158,920.00 35.5 3 106.500 121.5 70.0000 bata 8505.0000 bh
6 2.5 15.000 121.5 0.1664 PC 20.2176 sak
Rekap Material 121.5 0.0490 pasir pasang 5.9535 m3
Sirtu 138.90 121.5 0.3000 pekerja 36.4500 oh
- Batu kali 12.6000 121.5 0.1000 tukang batu 12.1500 oh
Batu Bata 8505.0000 121.5 0.015 Mandor 1.8225 oh
Pasir Pasang 31.4425 D Plesteran
Semen 255.5198 639.000 639.0 0.1248 PC 79.7472 sak
Pasir Beton 5.7000 639.0 0.0270 pasir pasang 17.2530 m3
Kerikil 3.7425 639.0 0.2000 pekerja 127.8000 oh
Keramik 30x30 66.4720 639.0 0.1500 tukang batu 95.8500 oh
semen warna 40.1925 639 0.015 Mandor 9.5850 oh
Besi D10 41.67 D Acian
d6 17.17 639.000 639.0 0.0650 PC 41.5350 sak
Kawat beton 8.7179 639.0 0.1400 pekerja 89.4600 oh
Genteng 2025.0000 639.0 0.1000 tukang batu 63.9000 oh
Kerpus 32.0000 639.0 0.008 Mandor 5.1120 oh
Upah H. Beton Lantai dasar
Pekerja 405.3359 Membuat beton K 225 / m3
Tukang 254.2254 7.5 10 0.1 7.5000 7.4200 PC 55.6500 sak
Mandor 45.8300 7.5000 0.7600 Pasir beton 5.7000 m3
63.90 7.5000 0.4990 Koral beton 3.7425 m3
7.5000 1.6500 pekerja 12.3750 oh
127.80 7.5000 0.2750 tukang batu 2.0625 oh
159.75 7.5000 0.083 Mandor 0.6225 oh
F. Keramik 30 x 30 Polos
8.0 8 7 56 56.0000 0.0450 Pasir pasang 2.5200 m3
3.0 0 56.0000 0.2000 Semen portland 11.2000 zak
0 56.0000 11.8700 Keramik 30x30 cm 66.4720 doz
56.0000 0.6900 Semen Warna 38.6400 kg
56.0000 0.6200 Pekerja 34.7200 HOK
56.0000 0.3500 Tukang batu 19.6000 HOK
56.0000 0.017 Mandor 0.9520 oh
F. Keramik 20 x 20 Polos
8.00 1.5 1.5 2.25 2.2500 0.0450 Pasir pasang 0.1012 m3
405.3359 3.00 2.2500 0.2000 Semen portland 0.4500 zak
254.2254 2.2500 8.8700 Keramik 20x20 cm 1.9958 doz
45.8300 2.2500 0.6900 Semen Warna 1.5525 kg
Galian Tanah
20 0.5 1 10.000 10.000 0.7500 pekerja 7.5000 oh
2.2500 0.6200 Pekerja 1.3950 HOK
24.5% 2.2500 0.3500 Tukang batu 0.7875 HOK
60,576,000 2.2500 0.017 Mandor 0.0383 oh
- Pekerjaan atap
4.5 9 81 81.0000 1.0000 Kayu Usuk btg
(25,576,000) 81.0000 1.0000 Kayu reng btg
175,576,000 81.0000 0.2500 Paku biasa kg
- btg
81.0000 25.0000 Genteng 2025.0000 bh
81.0000 0.1500 Pekerja 12.1500 hok
81.0000 0.0750 Tukang Kayu 6.0750 hok
81 0.008 Mandor 0.6480 oh
Genteng Bumbung
8.0000 4.0000 Genteng bumbung 32.0000 bh
8.0000 0.1600 Semen 10.0000 sak
8.0000 0.0320 Pasir pasang 0.2560 m3
0.065
0.140
0.100
0.008
72 50
25
72
72
18.5
12
10
40+16
c
RENCANA ANGGARAN BELANJA (RAB)
BANTUAN DANA DESA KEPADA PEMERINTAH DESA PEGANDON
KEC. KARANGDADAP KAB.PEKALONGAN TAHUN 2019
KHABIBAH KHAEROZI
Plat Dekker
0.1248 1.01
0.0270 0.22
0.2000 1.62
0.1500 1.21
0.015 0.12
st cor
4.360 17.44
0.520 2.08
0.870 3.48
1.650 6.60
0.275 1.10
0.083 0.33
. Pembesian Plat
227.50 202.02
419.79 372.775
574.795
METERIAL/ BAHAN
53.94
0.0150 8.62
PAH TENAGA KERJA
0.0070 4.02
0.0100 5.75
0.0040 2.30