Anda di halaman 1dari 3

DAFTAR HARGA TUKANG

PEKERJAAN : PEMBANGUNAN RUMAH KELUARGA AHMAD ANDONG

LOKASI : DESA WAILEGI HALMAHERA TENGAH

HARGA JUMLAH
NO. URAIAN PEKERJAAN VOL SAT SATUAN HARGA
( Rp ) ( Rp )
2 3 4 5 (3x5)

A PEKERJAAN BOPLANG 1.00 Ls 2,000,000.00 2,000,000.00


B. PEKERJAAN GALIAN PONDASI 245.00 m2 150,000.00 36,750,000.00
C. PEKERJAAN GALIAN CAKAR AYAM 25.00 Titik 350,000.00 8,750,000.00
D. PEKERJAAN BEKISTING 1.00 Ls 45,000,000.00 45,000,000.00
E PEKERJAAN PENGECORAN KESELURUHAN 1.00 Ls 55,000,000.00 55,000,000.00
F PEKERJAAN PEMADATAN TANAH / TIMBUNAN 1.00 Ls 8,000,000.00 8,000,000.00
G PEKERJAAN FLOORAN LANTAI 1.00 Ls 15,000,000.00 15,000,000.00
H PEKERJAAN PEMASANGAN TELA 910.00 m2 60,000.00 54,600,000.00
I PEKERJAAN PLESTER ACI 1820.00 m2 80,000.00 145,600,000.00
J PEKERJAAN KUSEN + DAUN JENDELA 1.00 Ls 5,000,000.00 5,000,000.00
K PEMBESIAN KESELURUHAN 1.00 Ls 40,000,000.00 40,000,000.00
L PEKERJAAN SEPITANK 1.00 Ls 5,000,000.00 5,000,000.00
M PEKERJAAN BAJA RINGAN 316.00 M2 80,000.00 25,280,000.00
N PEKERJAAN KERAMIK LANTAI 415.00 M2 60,000.00 24,900,000.00
O PEKERJAAN KERAMIK KAMAR MANDI 7.00 UNIT 3,000,000.00 21,000,000.00
P PEKERJAAN MEJA DAPUR 1 UNIT 1.00 Ls 4,000,000.00 4,000,000.00
Q PEKERJAAN LISTRIK KESELURUHAN 1.00 Ls 10,000,000.00 10,000,000.00
R PEKERJAAN INSTALASI AIR BERSIH + KOTOR 1.00 Ls 8,620,000.00 8,620,000.00
S PEKERJAAN OPENINGAN KESELURUHAN 1.00 Ls 25,000,000.00 25,000,000.00
T PEKERJAAN ORNAMEN CAMPURAN HALUS + TALI AER 1.00 Ls 15,000,000.00 15,000,000.00
U PEKERJAAN LEMBAR SERI KESELURUHAN 1.00 Ls 4,000,000.00 4,000,000.00
V PEKERJAAN PLAFON 415.00 M2 100,000.00 41,500,000.00
W PEKERJAAN PENGECATAN 1.00 Ls 25,000,000.00 25,000,000.00

PEKERJAAN FINISHING (AREA TAMAN, AREA BERMAIN ANAK, AREA


X 1.00 Ls 25,000,000.00 25,000,000.00
DALAM DLL, AREA LUAR DLL, LANTAI 2 DLL

Y PEKERJAAN BONGKAR RUMAH 1.00 Ls 25,000,000.00 25,000,000.00


Jumlah Total 675,000,000.00
PEKERJAAN TAMBAHAN
A PEKERJAAN PEMASANGAN TELA (LANTAI I) 110.00 m2 60,000.00 6,600,000.00
B PEKERJAAN PLESTER ACI (LANTAI I) 220.00 m2 80,000.00 17,600,000.00
C PEKERJAAN BESI MALL PENGECORAN 1.00 Ls 4,000,000.00 4,000,000.00
D PEKERJAAN PENGECORAN 26.10 m2 518,000.00 13,519,800.00
E PEKERJAAN PENGECORAN (Plafon) 26.10 m2 100,000.00 2,610,000.00
F PEKERJAAN DINDING PAGAR DEPAN RUMAH (Dinding) 8.37 m2 140,000.00 1,171,800.00
G PEKERJAAN DINDING PAGAR DEPAN RUMAH (Batu Angin) 6.75 m2 80,000.00 540,000.00
H PEKERJAAN ATAP RUBAH JADI KAYU +40.000 316.00 m2 40,000.00 12,640,000.00
I PEKERJAAN DINDING STENGAH LEGER KAMAR MANDI 3.61 m2 140,000.00 505,750.00

Jumlah Total 59,187,350.00


GRAND TOTAL 734,187,350.00
HARGA
NO. URAIAN PEKERJAAN VOL SAT SATUAN
( Rp )
2 3 4 5

A PEKERJAAN RUMAH
- Pekerjaan Cat Tembok 42.24 m2 25,000.00
- Pekerjaan Kanopi Rumah 17.40 m 120,000.00
- Pekerjaan Meja Dapur 1.00 LS 2,500,000.00
B PEKERJAAN CAFÉ
- Bongkar Pasang Atap 42.80 m2 130,000.00
- Bongkar Pasang Plafon 31.01 m2 100,000.00
- Cat Tembok 49.89 m2 25,000.00
Jumlah Total
JUMLAH
HARGA
( Rp )
(3x5)

1,056,000.00
2,088,000.00
2,500,000.00

5,564,000.00
3,101,000.00
1,247,250.00
15,556,250.00

Anda mungkin juga menyukai