RENCANA UNTUK GARDU TRAFO TIANG (GTT)

NO

Uraian Pekerjaan

A
1
2
B
1
2
3
4
5
6
7
8
C
1
2
3
4
5
6
D
1
2
3
4
5
E
1
2
3
F
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19

PEMASANGAN TIANG BETON


TIANG BETON 14 METER 350 dAN
PONDASI
KONSTRUKSI TM.1 Untuk GTT.
ARM TIE BAND 8"
CROSS ARM NP..10 - 1800 MM
BOLT & NUT M.16 x 50 MM
ARM TIE TYPE 750 MM
ISOLATOR TUMPU 20KV
ALL BINDING WIRE 3,2 MM
ALL TAP 4mm
BOLT & NUT M.16 x 400 MM
CONDUKTOR + PROTECTION
CROSS ARM NP. 10 - 2500 MM
DOUBLE ARM BAND 8"
LINE TAP/H.TYPE CONNECTOR 70-150MM2
LIGHTNING ARRESTER 24 KV 15 kA
MDU
CUT OUT 20KV 12,5 kA+FUSE LINK 10A
MDU
N Y A 25 MM2 DRAAD U/ JAMPER + ARRESTER
GROUNDING TRAFO
BC DRAAD 50 MM2
AARDINGSPIJPEN 1,5" - 5,50 MT
GROUND ROD 16 MM 2,5 MT
GASPIJP 1"-1,5 MT U/ PELINDUNG AARDE
COPPER TUBE 50 mm + CLAMP
RANGKA TEMPAT DUDUK
RANGKA TEMPAT DUDUK TRAFO LENGKAP
JATIHOUTEN PLANKEN 50X200X2500 MM
JATIHOUTEN BESCHERMLAT 2000 MM
LV. PANEL
LV PANEL 2GRP 630A (UML/43,43A,43B/PJ/93)
CROSS ARM NP. 6,5-2500 MM u/ LV.PANEL
NYY 1x( 3 x 70 mm2 )
Kabel Copper Twisted Cable 4 ( 1 x 50 mm2 )
COPER TUBE / KABEL SCHOEN 150 MM2
GEGALV GASPIJ 2" - 6 METER
L BOUW 2" u/SALURAN KELUARAN BAWAH
L BOUW 3" u/SALURAN MASUK BAWAH
L BOUW PVC 2" u/SALURAN KELUARAN ATAS
L BOUW PVC 3" u/SALURAN MASUK ATAS
GEGALV GASPIJ 3" - 6 METER
COPER TUBE / KABEL SCHOEN 70 MM2
COPER TUBE / KABEL SCHOEN 50 MM2
BESI KANAL NP.6,5-750 MM
KLEMBEUGEL 2" U/GASPIJ
KLEMBEUGEL 3" U/GASPIJ
KLEMBEUGEL 10"
BOLT & NUT M.16X50 MM
BC DRAAD 50 MM2

Vol
Per
Sat

Sat

Volume Total

2
1
1
2
2
2
2
6
9
6
4

SET
SET
SET
BH
BH
BH
BH
BH
MT
MT
BH

2
1

2
2
3
3
3
25

BH
BH
BH
BH
BH
MT

2
2
3
3
3
25

8
1
3
1
7

MT
BH
BH
BH

8
1
1
1
7

1
2
1

SET
BH
BH

1
2
1

1
2
40
20
8
2
2
1
4
2
1
8
2
4
4
2
4
20
2

SET
BH
MT
MT
BH
BH
BH
BH
BH
BH
BH
BH
BH
BH
BH
BH
BH
BH
MT

1
2
40
20
8
2
2
1
4
2
1
8
2
4
4
2
4
20
2

2
2
2
2
6
9
6
4

20 GROUND ROD 16 MM 2,5 MT


21 GASPIJP 1"-1,5 MT U/ PELINDUNG AARDE
22 COPPER TUBE 50 mm + CLAMP
H TRANSFORMER SETTING
1 TRANSFORMATOR TRAFINDO 200 KVA 20kV/400V.

RENCANA TIANG TR
NO

Uraian Pekerjaan

3
1
2

BH
BH
BH

1
1
2

BH

Vol
Per
Sat

Sat

Volume Total

1
1

Set
Set

5
5

A
1
2

TIANG TR 1
PEMASANGAN TIANG BETON
TIANG BETON 9 METER 200 dAN
PONDASI

ACCESSORIES

Suspension clamp bracket

Set

Suspension clamp

Set

3
4
5
6

Stainless steel strip 0,75 mtr


Stopping buckle
Plastic strap
Protectip plastic strap 0,5 mtr

2
2
3
2

Pcs
Pcs
Pcs
Pcs

10
10
10
10

A
1
2

TIANG TR 3
PEMASANGAN TIANG BETON
TIANG BETON 9 METER 200 dAN
PONDASI

1
1

Set
Set

13
13

1
1
2
4
1
3

Set
Set
Pcs
Pcs
Pcs
Pcs

13
13
26
52
13
39

1
1

Set
Set

4
4

1
1
1
1
4
4
5
4
4

Set
Set
Set
Set
Pcs
Pcs
Pcs
Pcs
pcs

4
4
4
4
16
16
20
16
16

Set

B
1
2
3
4
5
6
A
1
2
B
1
2
3
4
5
6
7
8
9
A
1

ACCESSORIES
Tension bracket
Strain clamp
Stainless steel strip 0,75 mtr
Plastic strap
Stopping buckle
Bundle cond.conector 70/50/50/35`
TIANG TR 6
PEMASANGAN TIANG BETON
TIANG BETON 9 METER 200 dAN
PONDASI
ACCESSORIES
Suspension clamp bracket
Suspension clamp
Tension bracket
Strain clamp
Stainless steel strip 0,75 mtr
Stopping buckle
Plastic strap
Bundle cond.conector 70/50/50/35
Protectip plastic strap 0,5 mtr
TIANG TR 2
PEMASANGAN TIANG BETON
TIANG BETON 9 METER 200 dAN

2
B
3
4

PONDASI
ACCESSORIES
Stainless steel strip 0,75 mtr
Stopping buckle

Set

2
2

Pcs
Pcs

10
10

Plastic strap

Pcs

15

Tension bracket

Set

Vol
Per
Sat

Sat

Volume Total

set

1
1
2
1
3
2
2
3

Pcs
Pcs
Pcs
Pcs
Pcs
mtr
mtr
Pcs

7
7
14
7
21
14
14
21

Set

6
2
3

Pcs
Pcs
Pcs

6
2
3

2
2
2
6

Pcs
mtr
mtr
Pcs

2
2
2
6

Set

1
2
3

Pcs
Pcs
Pcs

1
2
3

RENCANA UNTUK TIANG TM


NO
A
1
B
2
3
4
5
6
7
8
9
A
1
B
1
2
3
4
5
6
7
A
1

Uraian Pekerjaan
TIANG TM 1
PEMASANGAN TIANG BETON
TIANG BETON 11 METER 350 dAN
ACCESSORIES
Cross arm 2000 (type tumpu)
Arm tie type 750 pipe
Bolt & nut M 16x400+washer (double arm)
Bolt & nut M 16x50 / M16x120+washer
20 KV pin (pin post) insulator +steel pin
Alluminium binding wire 3,2 mm
Aluminium tape 4,0 mm
Pre formed top tie 240/150/70/35
TIANG TM 3
PEMASANGAN TIANG BETON
TIANG BETON 11 METER 350 dAN
ACCESSORIES
20 KV Pin / Pin Post Insulator + Steel Pin
Cross Arm type -2000 ( tumpu )
Bolt & Nut M16x400 + Washer (Double Arm)
Arm Tie Type 750 Pipe O 3/4"
Alluminium Binding Wire 3,2 mm
Alluminium Tape 4,0 mm
Preformet Top Tie 240/150/70/35 Sqmm
TIANG TM 2
PEMASANGAN TIANG BETON
TIANG BETON 11 METER 350 dAN
ACCESSORIES

1
2
3

CROSS ARM NP.10 - 2500 mm


CROSS ARM NP.10 - 2000 mm
ARM TIE TYPE L 50 x 900 mm / 750 mm

4
5
6
7

ARM TIE BAND 3"-6"


D0UBLE ARM BAND 6"-8"
BOLT & NUT M.16 X 50 mm
BOLT & NUT M.16 X 400 mm

1
1
1
2

Pcs
Pcs
Pcs
Pcs

1
1
1
2

8
9
10
11
12

PIN POST ISOLATOR 20 KV


MDU
SUSPENSION INSULATOR 20KV Lengkap
BOLT & NUT M.16 x 140 mm
LINE TAP CONNECTOR 70-150 mm2
ALL BINDING WIRE 20 mm2

4
3
3
3
4

Pcs
Pcs
Pcs
Pcs
Mt

4
3
3
3
4

13

ALL TAPE 4 mm2

Mt

RENCANA UNTUK PENERANGAN JALAN UMUM


NO

Uraian Pekerjaan
Pemasangan Lampu
Lampu PJU 150 Watt
Accecoris Lampu
Ignitor
kapasitor
induktor
klem
Ballast PJU
timer (merk theben)
Armatur
Tiang Single Side
Poto cell
Tiang Double Side

Vol
Per
Satuan Volume Total
Satua
n
46

bh

25

46
46
46
46
92
92
46
42
8
2

bh
bh
bh
bh
bh
bh
bh
bh
bh
bh

46
46
46
46
92
92
46
42
8
2

RENCANA UNTUK KOMPONEN PANEL POMPA


Jumlah

Satua
n

MCB 3 Fasa, 25 A, 400 V

bh

Kontaktor, AC3, 400V, 32 A


TOR 16-24 A, 600 V

1
1

bh
bh

NO

Material

Pompa

Unbalance Voltage Relay, 400 V


MCB 1 Fasa, 2 A, 400 V
Push Button 1 NO + 1 NC
Selector Switch
Kabel NYY (5x2.5)mm2
Kabel NYA 2.5 mm2 Merah
Kabel NYA 2.5 mm2 Kuning
Kabel NYA 2.5 mm2 Hitam
Kabel NYA 2.5 mm2 Biru
Floatless Switch
Lampu Pilot
A3C-S 35 mm2
NFA 2X-T 3x35 mm2 + 1x25 mm2

1
1
1
1
10
5
5
5
5
1
3
1440
736

bh
bh
bh
bh
m
m
m
m
m
bh
bh
m
m

DAFTAR KEBUTUHAN MATERIAL GARDU TRAFO TIANG (GTT)


NO
A
1
2
B
1
2
3
4
5
6
7
8
C
1
2
3
4
5
6
D
1
2
3
4
5
E
1
2

Uraian Pekerjaan

Vol Per Sat

PEMASANGAN TIANG BETON


TIANG BETON 14 METER 350 dAN
PONDASI
KONSTRUKSI TM.1 Untuk GTT.
ARM TIE BAND 8"
CROSS ARM NP..10 - 1800 MM
BOLT & NUT M.16 x 50 MM
ARM TIE TYPE 750 MM
ISOLATOR TUMPU 20KV
ALL BINDING WIRE 3,2 MM
ALL TAP 4mm
BOLT & NUT M.16 x 400 MM
CONDUKTOR + PROTECTION
CROSS ARM NP. 10 - 2500 MM
DOUBLE ARM BAND 8"
LINE TAP/H.TYPE CONNECTOR 70-150
LIGHTNING ARRESTER 24 KV 15 kA
CUT OUT 20KV 12,5 kA+FUSE LINK 10A
N Y A 25 MM2 DRAAD U/ JAMPER + AR
GROUNDING TRAFO
BC DRAAD 50 MM2
AARDINGSPIJPEN 1,5" - 5,50 MT
GROUND ROD 16 MM 2,5 MT
GASPIJP 1"-1,5 MT U/ PELINDUNG AARD
COPPER TUBE 50 mm + CLAMP
RANGKA TEMPAT DUDUK
RANGKA TEMPAT DUDUK TRAFO LENGKA
JATIHOUTEN PLANKEN 50X200X2500 M

Sat

Volume Total

2
1
1
2
2
2
2
6
9
6
4

SET
SET
SET
BH
BH
BH
BH
BH
MT
MT
BH

2
1

2
2
3
3
3
25

BH
BH
BH
BH
BH
MT

2
2
3
3
3
25

8
1
3
1
7

MT
BH
BH
BH

8
1
1
1
7

1
2

SET
BH

1
2

2
2
2
2
6
9
6
4

3
F
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
H
1

JATIHOUTEN BESCHERMLAT 2000 MM


1
LV. PANEL
LV PANEL 2GRP 630A (UML/43,43A,43B/
1
CROSS ARM NP. 6,5-2500 MM u/ LV.PA
2
NYY 1x( 3 x 70 mm2 )
40
Kabel Copper Twisted Cable 4 ( 1 x 50
20
COPER TUBE / KABEL SCHOEN 150 MM
8
GEGALV GASPIJ 2" - 6 METER
2
L BOUW 2" u/SALURAN KELUARAN BA
2
L BOUW 3" u/SALURAN MASUK BAWAH
1
L BOUW PVC 2" u/SALURAN KELUARAN
4
L BOUW PVC 3" u/SALURAN MASUK ATA
2
GEGALV GASPIJ 3" - 6 METER
1
COPER TUBE / KABEL SCHOEN 70 MM2
8
COPER TUBE / KABEL SCHOEN 50 MM2
2
BESI KANAL NP.6,5-750 MM
4
KLEMBEUGEL 2" U/GASPIJ
4
KLEMBEUGEL 3" U/GASPIJ
2
KLEMBEUGEL 10"
4
BOLT & NUT M.16X50 MM
20
BC DRAAD 50 MM2
2
GROUND ROD 16 MM 2,5 MT
3
GASPIJP 1"-1,5 MT U/ PELINDUNG AARD
1
COPPER TUBE 50 mm + CLAMP
2
TRANSFORMER SETTING
TRANSFORMATOR TRAFINDO 200 KVA 20kV/400V.

BH

SET
BH
MT
MT
BH
BH
BH
BH
BH
BH
BH
BH
BH
BH
BH
BH
BH
BH
MT
BH
BH
BH

1
2
40
20
8
2
2
1
4
2
1
8
2
4
4
2
4
20
2
1
1
2

BH

DAFTAR KEBUTUHAN MATERIAL TIANG TR


NO
A
1
2
B
1
2
3
4
5
6
A
1
2
B
1
2
3
4
5
6
A
1
2

Uraian Pekerjaan
TIANG TR 1
PEMASANGAN TIANG BETON
TIANG BETON 9 METER 200 dAN
PONDASI
ACCESSORIES
Suspension clamp bracket
Suspension clamp
Stainless steel strip 0,75 mtr
Stopping buckle
Plastic strap
Protectip plastic strap 0,5 mtr
TIANG TR 3
PEMASANGAN TIANG BETON
TIANG BETON 9 METER 200 dAN
PONDASI
ACCESSORIES
Tension bracket
Strain clamp
Stainless steel strip 0,75 mtr
Plastic strap
Stopping buckle
Bundle cond.conector 70/50/50/35`
TIANG TR 6
PEMASANGAN TIANG BETON
TIANG BETON 9 METER 200 dAN
PONDASI

Vol Per Sat

Sat

Volume Total

1
1

Set
Set

5
5

1
1
2
2
3
2

Set
Set
Pcs
Pcs
Pcs
Pcs

5
5
10
10
10
10

1
1

Set
Set

13
13

1
1
2
4
1
3

Set
Set
Pcs
Pcs
Pcs
Pcs

13
13
26
52
13
39

1
1

Set
Set

4
4

B
1
2
3
4
5
6
7
8
9
A
1
2
B
3
4
5
6

ACCESSORIES
Suspension clamp bracket
Suspension clamp
Tension bracket
Strain clamp
Stainless steel strip 0,75 mtr
Stopping buckle
Plastic strap
Bundle cond.conector 70/50/50/35
Protectip plastic strap 0,5 mtr
TIANG TR 2
PEMASANGAN TIANG BETON
TIANG BETON 9 METER 200 dAN
PONDASI
ACCESSORIES
Stainless steel strip 0,75 mtr
Stopping buckle
Plastic strap
Tension bracket

1
1
1
1
4
4
5
4
4

Set
Set
Set
Set
Pcs
Pcs
Pcs
Pcs
pcs

4
4
4
4
16
16
20
16
16

1
1

Set
Set

5
5

2
2
3
1

Pcs
Pcs
Pcs
Set

10
10
15
5

DAFTAR KEBUTUHAN MATERIAL TIANG TM


NO
A
1
B
2
3
4
5
6
7
8
9
A
1
B
1
2
3
4
5
6
7

Uraian Pekerjaan
TIANG TM 1
PEMASANGAN TIANG BETON
TIANG BETON 11 METER 350 dAN
ACCESSORIES
Cross arm 2000 (type tumpu)
Arm tie type 750 pipe
Bolt & nut M 16x400+washer (double a
Bolt & nut M 16x50 / M16x120+washer
20 KV pin (pin post) insulator +steel pin
Alluminium binding wire 3,2 mm
Aluminium tape 4,0 mm
Pre formed top tie 240/150/70/35
TIANG TM 3
PEMASANGAN TIANG BETON
TIANG BETON 11 METER 350 dAN
ACCESSORIES
20 KV Pin / Pin Post Insulator + Steel Pin
Cross Arm type -2000 ( tumpu )
Bolt & Nut M16x400 + Washer (Double
Arm Tie Type 750 Pipe O 3/4"
Alluminium Binding Wire 3,2 mm
Alluminium Tape 4,0 mm
Preformet Top Tie 240/150/70/35 Sqmm

Vol Per Sat

Sat

Volume Total

set

1
1
2
1
3
2
2
3

Pcs
Pcs
Pcs
Pcs
Pcs
mtr
mtr
Pcs

7
7
14
7
21
14
14
21

Set

6
2
3
2
2
2
6

Pcs
Pcs
Pcs
Pcs
mtr
mtr
Pcs

6
2
3
2
2
2
6

A
1
1
2
3
4
5
6
7
8
9
10
11
12
13

TIANG TM 2
PEMASANGAN TIANG BETON
TIANG BETON 11 METER 350 dAN
ACCESSORIES
CROSS ARM NP.10 - 2500 mm
CROSS ARM NP.10 - 2000 mm
ARM TIE TYPE L 50 x 900 mm / 750 m
ARM TIE BAND 3"-6"
D0UBLE ARM BAND 6"-8"
BOLT & NUT M.16 X 50 mm
BOLT & NUT M.16 X 400 mm
PIN POST ISOLATOR 20 KV
SUSPENSION INSULATOR 20KV Lengka
BOLT & NUT M.16 x 140 mm
LINE TAP CONNECTOR 70-150 mm2
ALL BINDING WIRE 20 mm2
ALL TAPE 4 mm2

Set

1
2
3
1
1
1
2
4
3
3
3
4
2

Pcs
Pcs
Pcs
Pcs
Pcs
Pcs
Pcs
Pcs
Pcs
Pcs
Pcs
Mt
Mt

1
2
3
1
1
1
2
4
3
3
3
4
2

DAFTAR KEBUTUHAN MATERIAL PENERANGAN JALAN UMUM


NO
A

Uraian Pekerjaan
Pemasangan Lampu
Lampu PJU 150 Watt
Accecoris Lampu
Ignitor
kapasitor
induktor
klem
Ballast PJU
Tali Lampu
timer (merk theben)

Vol Per
Satuan

Satuan

Volume Total

46

bh

25

46
46
46
46
92
92
92

bh
bh
bh
bh
bh
mtr
bh

46
46
46
46
92
92
92

DAFTAR KEBUTUHAN KABEL TR 220/380 V


GRUP

Tiang
GTT B4C2D1A1
B4C2D1A1 -B4CAD1A2
B4C2D1A2-B4C2D1A2B1
B4C2D1A1-B4C2D2A1
B4C2D1A2-B4C2D2A2
B4C2D1A1-B4C2D1C1
B4C2D1C1-B4C2D1C2
B4C2D2A1-B4C2D2C1
B4C2D2C1-B4CAD2C2
GTT-B4C2A1
B4C2A1-B4C2A2
B4C2A2-B4C2A1D1
B4C2A1-B4C2C1D1
B4C2C1D1-B4C2C2D1
B4C2C2D1-B4C2C2
B4C2C1D1-B4C2C1D1D2
B4C2C1D1D2-B4C2C1D2
B4C2C2-B4C2C2B1
GTT- B4C2B1A1
B4C2B1A1-B4C2B1A1D1

Jarak (m)
50
48
11
30
48
48
48
48
48
20
48
11
48
48
11
30
48
30
46
11

Andongan
0.2
0.2
0.2
0.2
0.2
0.2
0.2
0.2
0.2
0.2
0.2
0.2
0.2
0.2
0.2
0.2
0.2
0.2
0.2
0.2

Total (m)
60
57.6
13.2
36
57.6
57.6
57.6
57.6
57.6
24
57.6
13.2
57.6
57.6
13.2
36
57.6
36
55.2
13.2

B4C2B1A1-B4C2B1A2
B4C2B1A2-B4C2BIA2D1
B4C2B1A1-B4C2B2A1
B4C2B2A1-B4C2B2A2
B4C2B1A1-B4C2B1C1
B4C2B1C1-B4C2B1C2
B4C2B1C2-B4C2B2C2

48
11
30
48
48
48
48

0.2
0.2
0.2
0.2
0.2
0.2
0.2

DAFTAR KEBUTUHAN MATERIAL KOMPONEN PANEL POMPA


NO
A

Material
Pompa
MCB 3 Fasa, 25 A, 400 V
Kontaktor, AC3, 400V, 32 A
TOR 16-24 A, 600 V
Unbalance Voltage Relay, 400 V
MCB 1 Fasa, 2 A, 400 V
Push Button 1 NO + 1 NC
Selector Switch
Kabel NYY (5x2.5)mm2
Kabel NYA 2.5 mm2 Merah
Kabel NYA 2.5 mm2 Kuning
Kabel NYA 2.5 mm2 Hitam
Kabel NYA 2.5 mm2 Biru
Floatless Switch
Lampu Pilot

Jumlah

Satuan

1
1
1
1
1
1
1
10
5
5
5
5
1
3

bh
bh
bh
bh
bh
bh
bh
m
m
m
m
m
bh
bh

1440
736

m
m

Kabel
A3C-S 35 mm2
NFA 2X-T 3x35 mm2 + 1x25 mm2

57.6
13.2
36
57.6
57.6
57.6
57.6