NO
Uraian Pekerjaan
A
1
2
B
1
2
3
4
5
6
7
8
C
1
2
3
4
5
6
D
1
2
3
4
5
E
1
2
3
F
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
Vol
Per
Sat
Sat
Volume Total
2
1
1
2
2
2
2
6
9
6
4
SET
SET
SET
BH
BH
BH
BH
BH
MT
MT
BH
2
1
2
2
3
3
3
25
BH
BH
BH
BH
BH
MT
2
2
3
3
3
25
8
1
3
1
7
MT
BH
BH
BH
8
1
1
1
7
1
2
1
SET
BH
BH
1
2
1
1
2
40
20
8
2
2
1
4
2
1
8
2
4
4
2
4
20
2
SET
BH
MT
MT
BH
BH
BH
BH
BH
BH
BH
BH
BH
BH
BH
BH
BH
BH
MT
1
2
40
20
8
2
2
1
4
2
1
8
2
4
4
2
4
20
2
2
2
2
2
6
9
6
4
RENCANA TIANG TR
NO
Uraian Pekerjaan
3
1
2
BH
BH
BH
1
1
2
BH
Vol
Per
Sat
Sat
Volume Total
1
1
Set
Set
5
5
A
1
2
TIANG TR 1
PEMASANGAN TIANG BETON
TIANG BETON 9 METER 200 dAN
PONDASI
ACCESSORIES
Set
Suspension clamp
Set
3
4
5
6
2
2
3
2
Pcs
Pcs
Pcs
Pcs
10
10
10
10
A
1
2
TIANG TR 3
PEMASANGAN TIANG BETON
TIANG BETON 9 METER 200 dAN
PONDASI
1
1
Set
Set
13
13
1
1
2
4
1
3
Set
Set
Pcs
Pcs
Pcs
Pcs
13
13
26
52
13
39
1
1
Set
Set
4
4
1
1
1
1
4
4
5
4
4
Set
Set
Set
Set
Pcs
Pcs
Pcs
Pcs
pcs
4
4
4
4
16
16
20
16
16
Set
B
1
2
3
4
5
6
A
1
2
B
1
2
3
4
5
6
7
8
9
A
1
ACCESSORIES
Tension bracket
Strain clamp
Stainless steel strip 0,75 mtr
Plastic strap
Stopping buckle
Bundle cond.conector 70/50/50/35`
TIANG TR 6
PEMASANGAN TIANG BETON
TIANG BETON 9 METER 200 dAN
PONDASI
ACCESSORIES
Suspension clamp bracket
Suspension clamp
Tension bracket
Strain clamp
Stainless steel strip 0,75 mtr
Stopping buckle
Plastic strap
Bundle cond.conector 70/50/50/35
Protectip plastic strap 0,5 mtr
TIANG TR 2
PEMASANGAN TIANG BETON
TIANG BETON 9 METER 200 dAN
2
B
3
4
PONDASI
ACCESSORIES
Stainless steel strip 0,75 mtr
Stopping buckle
Set
2
2
Pcs
Pcs
10
10
Plastic strap
Pcs
15
Tension bracket
Set
Vol
Per
Sat
Sat
Volume Total
set
1
1
2
1
3
2
2
3
Pcs
Pcs
Pcs
Pcs
Pcs
mtr
mtr
Pcs
7
7
14
7
21
14
14
21
Set
6
2
3
Pcs
Pcs
Pcs
6
2
3
2
2
2
6
Pcs
mtr
mtr
Pcs
2
2
2
6
Set
1
2
3
Pcs
Pcs
Pcs
1
2
3
Uraian Pekerjaan
TIANG TM 1
PEMASANGAN TIANG BETON
TIANG BETON 11 METER 350 dAN
ACCESSORIES
Cross arm 2000 (type tumpu)
Arm tie type 750 pipe
Bolt & nut M 16x400+washer (double arm)
Bolt & nut M 16x50 / M16x120+washer
20 KV pin (pin post) insulator +steel pin
Alluminium binding wire 3,2 mm
Aluminium tape 4,0 mm
Pre formed top tie 240/150/70/35
TIANG TM 3
PEMASANGAN TIANG BETON
TIANG BETON 11 METER 350 dAN
ACCESSORIES
20 KV Pin / Pin Post Insulator + Steel Pin
Cross Arm type -2000 ( tumpu )
Bolt & Nut M16x400 + Washer (Double Arm)
Arm Tie Type 750 Pipe O 3/4"
Alluminium Binding Wire 3,2 mm
Alluminium Tape 4,0 mm
Preformet Top Tie 240/150/70/35 Sqmm
TIANG TM 2
PEMASANGAN TIANG BETON
TIANG BETON 11 METER 350 dAN
ACCESSORIES
1
2
3
4
5
6
7
1
1
1
2
Pcs
Pcs
Pcs
Pcs
1
1
1
2
8
9
10
11
12
4
3
3
3
4
Pcs
Pcs
Pcs
Pcs
Mt
4
3
3
3
4
13
Mt
Uraian Pekerjaan
Pemasangan Lampu
Lampu PJU 150 Watt
Accecoris Lampu
Ignitor
kapasitor
induktor
klem
Ballast PJU
timer (merk theben)
Armatur
Tiang Single Side
Poto cell
Tiang Double Side
Vol
Per
Satuan Volume Total
Satua
n
46
bh
25
46
46
46
46
92
92
46
42
8
2
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
46
46
46
46
92
92
46
42
8
2
Satua
n
bh
1
1
bh
bh
NO
Material
Pompa
1
1
1
1
10
5
5
5
5
1
3
1440
736
bh
bh
bh
bh
m
m
m
m
m
bh
bh
m
m
Uraian Pekerjaan
Sat
Volume Total
2
1
1
2
2
2
2
6
9
6
4
SET
SET
SET
BH
BH
BH
BH
BH
MT
MT
BH
2
1
2
2
3
3
3
25
BH
BH
BH
BH
BH
MT
2
2
3
3
3
25
8
1
3
1
7
MT
BH
BH
BH
8
1
1
1
7
1
2
SET
BH
1
2
2
2
2
2
6
9
6
4
3
F
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
H
1
BH
SET
BH
MT
MT
BH
BH
BH
BH
BH
BH
BH
BH
BH
BH
BH
BH
BH
BH
MT
BH
BH
BH
1
2
40
20
8
2
2
1
4
2
1
8
2
4
4
2
4
20
2
1
1
2
BH
Uraian Pekerjaan
TIANG TR 1
PEMASANGAN TIANG BETON
TIANG BETON 9 METER 200 dAN
PONDASI
ACCESSORIES
Suspension clamp bracket
Suspension clamp
Stainless steel strip 0,75 mtr
Stopping buckle
Plastic strap
Protectip plastic strap 0,5 mtr
TIANG TR 3
PEMASANGAN TIANG BETON
TIANG BETON 9 METER 200 dAN
PONDASI
ACCESSORIES
Tension bracket
Strain clamp
Stainless steel strip 0,75 mtr
Plastic strap
Stopping buckle
Bundle cond.conector 70/50/50/35`
TIANG TR 6
PEMASANGAN TIANG BETON
TIANG BETON 9 METER 200 dAN
PONDASI
Sat
Volume Total
1
1
Set
Set
5
5
1
1
2
2
3
2
Set
Set
Pcs
Pcs
Pcs
Pcs
5
5
10
10
10
10
1
1
Set
Set
13
13
1
1
2
4
1
3
Set
Set
Pcs
Pcs
Pcs
Pcs
13
13
26
52
13
39
1
1
Set
Set
4
4
B
1
2
3
4
5
6
7
8
9
A
1
2
B
3
4
5
6
ACCESSORIES
Suspension clamp bracket
Suspension clamp
Tension bracket
Strain clamp
Stainless steel strip 0,75 mtr
Stopping buckle
Plastic strap
Bundle cond.conector 70/50/50/35
Protectip plastic strap 0,5 mtr
TIANG TR 2
PEMASANGAN TIANG BETON
TIANG BETON 9 METER 200 dAN
PONDASI
ACCESSORIES
Stainless steel strip 0,75 mtr
Stopping buckle
Plastic strap
Tension bracket
1
1
1
1
4
4
5
4
4
Set
Set
Set
Set
Pcs
Pcs
Pcs
Pcs
pcs
4
4
4
4
16
16
20
16
16
1
1
Set
Set
5
5
2
2
3
1
Pcs
Pcs
Pcs
Set
10
10
15
5
Uraian Pekerjaan
TIANG TM 1
PEMASANGAN TIANG BETON
TIANG BETON 11 METER 350 dAN
ACCESSORIES
Cross arm 2000 (type tumpu)
Arm tie type 750 pipe
Bolt & nut M 16x400+washer (double a
Bolt & nut M 16x50 / M16x120+washer
20 KV pin (pin post) insulator +steel pin
Alluminium binding wire 3,2 mm
Aluminium tape 4,0 mm
Pre formed top tie 240/150/70/35
TIANG TM 3
PEMASANGAN TIANG BETON
TIANG BETON 11 METER 350 dAN
ACCESSORIES
20 KV Pin / Pin Post Insulator + Steel Pin
Cross Arm type -2000 ( tumpu )
Bolt & Nut M16x400 + Washer (Double
Arm Tie Type 750 Pipe O 3/4"
Alluminium Binding Wire 3,2 mm
Alluminium Tape 4,0 mm
Preformet Top Tie 240/150/70/35 Sqmm
Sat
Volume Total
set
1
1
2
1
3
2
2
3
Pcs
Pcs
Pcs
Pcs
Pcs
mtr
mtr
Pcs
7
7
14
7
21
14
14
21
Set
6
2
3
2
2
2
6
Pcs
Pcs
Pcs
Pcs
mtr
mtr
Pcs
6
2
3
2
2
2
6
A
1
1
2
3
4
5
6
7
8
9
10
11
12
13
TIANG TM 2
PEMASANGAN TIANG BETON
TIANG BETON 11 METER 350 dAN
ACCESSORIES
CROSS ARM NP.10 - 2500 mm
CROSS ARM NP.10 - 2000 mm
ARM TIE TYPE L 50 x 900 mm / 750 m
ARM TIE BAND 3"-6"
D0UBLE ARM BAND 6"-8"
BOLT & NUT M.16 X 50 mm
BOLT & NUT M.16 X 400 mm
PIN POST ISOLATOR 20 KV
SUSPENSION INSULATOR 20KV Lengka
BOLT & NUT M.16 x 140 mm
LINE TAP CONNECTOR 70-150 mm2
ALL BINDING WIRE 20 mm2
ALL TAPE 4 mm2
Set
1
2
3
1
1
1
2
4
3
3
3
4
2
Pcs
Pcs
Pcs
Pcs
Pcs
Pcs
Pcs
Pcs
Pcs
Pcs
Pcs
Mt
Mt
1
2
3
1
1
1
2
4
3
3
3
4
2
Uraian Pekerjaan
Pemasangan Lampu
Lampu PJU 150 Watt
Accecoris Lampu
Ignitor
kapasitor
induktor
klem
Ballast PJU
Tali Lampu
timer (merk theben)
Vol Per
Satuan
Satuan
Volume Total
46
bh
25
46
46
46
46
92
92
92
bh
bh
bh
bh
bh
mtr
bh
46
46
46
46
92
92
92
Tiang
GTT B4C2D1A1
B4C2D1A1 -B4CAD1A2
B4C2D1A2-B4C2D1A2B1
B4C2D1A1-B4C2D2A1
B4C2D1A2-B4C2D2A2
B4C2D1A1-B4C2D1C1
B4C2D1C1-B4C2D1C2
B4C2D2A1-B4C2D2C1
B4C2D2C1-B4CAD2C2
GTT-B4C2A1
B4C2A1-B4C2A2
B4C2A2-B4C2A1D1
B4C2A1-B4C2C1D1
B4C2C1D1-B4C2C2D1
B4C2C2D1-B4C2C2
B4C2C1D1-B4C2C1D1D2
B4C2C1D1D2-B4C2C1D2
B4C2C2-B4C2C2B1
GTT- B4C2B1A1
B4C2B1A1-B4C2B1A1D1
Jarak (m)
50
48
11
30
48
48
48
48
48
20
48
11
48
48
11
30
48
30
46
11
Andongan
0.2
0.2
0.2
0.2
0.2
0.2
0.2
0.2
0.2
0.2
0.2
0.2
0.2
0.2
0.2
0.2
0.2
0.2
0.2
0.2
Total (m)
60
57.6
13.2
36
57.6
57.6
57.6
57.6
57.6
24
57.6
13.2
57.6
57.6
13.2
36
57.6
36
55.2
13.2
B4C2B1A1-B4C2B1A2
B4C2B1A2-B4C2BIA2D1
B4C2B1A1-B4C2B2A1
B4C2B2A1-B4C2B2A2
B4C2B1A1-B4C2B1C1
B4C2B1C1-B4C2B1C2
B4C2B1C2-B4C2B2C2
48
11
30
48
48
48
48
0.2
0.2
0.2
0.2
0.2
0.2
0.2
Material
Pompa
MCB 3 Fasa, 25 A, 400 V
Kontaktor, AC3, 400V, 32 A
TOR 16-24 A, 600 V
Unbalance Voltage Relay, 400 V
MCB 1 Fasa, 2 A, 400 V
Push Button 1 NO + 1 NC
Selector Switch
Kabel NYY (5x2.5)mm2
Kabel NYA 2.5 mm2 Merah
Kabel NYA 2.5 mm2 Kuning
Kabel NYA 2.5 mm2 Hitam
Kabel NYA 2.5 mm2 Biru
Floatless Switch
Lampu Pilot
Jumlah
Satuan
1
1
1
1
1
1
1
10
5
5
5
5
1
3
bh
bh
bh
bh
bh
bh
bh
m
m
m
m
m
bh
bh
1440
736
m
m
Kabel
A3C-S 35 mm2
NFA 2X-T 3x35 mm2 + 1x25 mm2
57.6
13.2
36
57.6
57.6
57.6
57.6