PEKERJAAN PEMBUATAN POS SATPAM DAN PORTAL

RUMAH SAKIT UMUM SRI PAMELA

No Uraian Pekerjaan Vol Satuan Harga Satuan Jumlah Harga

I Pekerjaan pembuatan pos satpam dan portal


batu bata 650 bh 570 370,000
Semen @40 kg 14 sak 58,000 812,000
Pasir kali 3 mtr 98,000 294,000
Krikil 2 mtr 350,000 700,000
seng spandek 24 mtr 45,000 1,080,000
Rabung spandek 6 lbr 66,000 396,000
Paku seng 3 inch 1 ktk 54,000 54,000
Besi beton 10 mm 6 btg 87,000 522,000
Besi beton 6 mm 8 btg 65,000 520,000
Kawat beton 0,5 kg 25,000 25,000
Broti 2 x 3 x 16 meranti 5 btg 98,000 490,000
broti 2 x 4x 16 meranti 1 btg 132,000 132,000
Resplang GRC 4 lbr 60,000 240,000
Cat air 5 kg 40,000 200,000
Kuas 4 inch 1 bh 44,000 44,000
kuas 2 inch 1 bh 35,000 35,000
Car minyak 2 kg 62,000 124,000
Paku 3 inch 0,5 kg 12,000 12,000
Paku 2 inch 0,5 kg 12,000 12,000
Paku 2 1/2 inch 0,5 kg 12,000 12,000
Pipa besi 2 1/2 inch 1 btg 480,000 480,000
Besi strip 12 mm 1 btg 525,000 525,000
Baut 16 mm P 15 cm 6 bh 15,000 90,000
Tali tambang 5mm 10 mtr 8,000 80,000
Kabel nym 1 x 2,5 mm 30 mtr 12,000 360,000
saklar 1 bh 15,000 15,000
Stop kontak 1 bh 16,000 16,000
Bola lampu 1 bh 28,000 28,000

Total 7,668,000
N PEMASANGAN BATU KESING TAMAN
AH SAKIT UMUM SRI PAMELA

KONSEP
No Uraian Pekerjaan Vol Satuan Jumlah Harga

A Pekerjaan Batu Kesing Taman


- Bahan
Batu Bata 400 bh 308,000
Semen @ 40 Kg 6 zak 381,942
Pasir Kali 1.5 m³ 225,000
Harga Satuan
Cat Minyak ( Putih ) 18 Kg 1,159,200
Cat Minyak ( Biru ) 17 Kg 1,094,800
Cat Minyak ( Hitam ) 5 Kg 322,000
Thinner 20 Ltr 770 266,660
Kuas 2" 7 bh 63,657 102,900
TOTAL 150,000 3,860,502
Terbilang " Tiga Juta Delapan Ratus Enam Puluh Ribu Lima Ratus Dua " 64,400
64,400
64,400 2018
13,333
Diperiksa Oleh : 14,700

Tebing Tinggi,
R.M. Nainggolan
Kasi Keuangan / Teknik / Umum Dibuat Oleh :
Di Setujui Oleh :

M. Ilham, Nst
dr. Syahrizal.Srg, M.Kes Kepala ISPRS
Kepala RSU Sri Pamela