No Uraian Pekerjaan Sat Vol Harga Satuan Jumlah harga
(Rp) (Rp) I Harga Bahan 1 Kosen C btg 6 175,000 1,050,000 2 Kosen M btg 6 175,000 1,050,000 3 Kosen 1/2 m btg 3 180,000 540,000 4 Pop Paret btg 9 75,000 675,000 5 Pop 1/2 m btg 9 150,000 1,350,000 6 Karet C glg 15 50,000 750,000 7 Tiang Polos btg 9 100,000 900,000 8 Kaca 1x2 meter kpg 12 200,000 2,400,000 9 Wastafel bh 2 800,000 1,600,000 Total Rp 10,315,000 Upah Pekerjaan Rp 1,035,000 Sub Total Rp 11,350,000