Anda di halaman 1dari 1

RAB PEKERJAAN KRIS ( Kelas Rawat Inap Standart ) RUANG PINANG

RUMAH SAKIT UMUM SRI PAMELA

No Uraian Pekerjaan Vol Satuan Harga Satuan Jumlah Harga

I Pekerjaan Pendahuluan
Bongkaran Plaster Dinding 1 m³ 245,000 245,000

Sub Total 245,000


II Pekerjaan Sentral Oksigen dan Nurse Call
Sentral Oksigen 1 lot 11,725,000 11,725,000
Sistem Alarm Oksigen 1 lot 13,860,000 13,860,000
Outlet Oksigen + Flow Meter + Stop Kontak dan Wall duck 17 set 5,119,000 87,023,000
Regulator Oksigen 17 set 825,000 14,025,000
NC Sistem 30 Gates 1 set 8,000,000 8,000,000
Nurse Call + Instalasi 17 set 421,000 7,157,000
Bell Kamar Mandi + Instalasi 4 set 280,000 1,120,000
Hallway Display 2 set 4,500,000 9,000,000

Sub Total 151,910,000


III Pekerjaan Instalasi Listrik dan AC
Bola Lampu XL 45W 17 bh 67,000 1,139,000
Sakelar Tunggal ( Voltama ) 3 set 23,000 69,000
Fitting Lampu 6 bh 16,700 100,200
Kabel NYM 2 x 1,5 mm ( Lestari ) 3 roll 420,000 1,260,000
Kabel NYA 2,5 mm ( Praba ) 1 roll 621,000 621,000
Pipa 17 mm P. 5 Meter 12 btg 13,000 156,000
MCB Schneider 32 Ampere + Box 4 bh 148,000 592,000
AC Split 1 PK AUX 6 unit 4,325,000 25,950,000

Sub Total 29,887,200


IV Pekerjaan Pengecatan Dinding
Cat Air Danabryte Cream 50 kg 44,000 2,200,000
Kuas 4" 4 bh 37,500 150,000
Pasir 1 m³ 167,000 167,000
Semen @40 kg 6 zak 67,000 402,000
Cat Minyak 6 kg 64,000 384,000
Thinner 3 ltr 22,500 67,500
Semen Putih 10 kg 7,500 75,000

Sub Total 3,445,500


IV Pekerjaan Lain - Lain
Hygrometer Thermoter HTC - 1 4 bh 316,000 1,264,000
Pegangan Kamar mandi Stainless 40 cm 4 bh 128,000 512,000

Sub Total 1,776,000


TOTAL 187,018,700
UPAH KERJA 28,297,805
TOTAL + UPAH KERJA 215,316,505
PPN ( 11% ) 23,684,816
TOTAL BIAYA 239,001,321