SUB KEGIATAN : PEMBANGUAN , REHABILITASI DAN PEMELIHARAAN JARINGAN IRIGASI USAHA TANI
SUBTOTAL B. Rp -
NO. URAIAN PEKERJAAN VOL. SAT. HARGA SATUAN JUMLAH
PEKERJAAN
C. UPAH
1. Pekerja 128.00 OH Rp. 130,000.00 Rp. 16,640,000.00
2. Tukang 28.00 OH Rp. 170,000.00 Rp. 4,760,000.00
3. Biaya Pengeboran air tanah Dalam 2.00 Ttk Rp. 20,820,900.00 Rp. 41,641,800.00
Pajak PPh 4% Rp. 1,665,672.00
Dibuat Oleh,
Mengetahui,
SUB KEGIATAN : PEMBANGUAN , REHABILITASI DAN PEMELIHARAAN JARINGAN IRIGASI USAHA TANI
NO. URAIAN PEKERJAAN KEBUTUHAN RELISASI PENGAJU JUMLAH SAT. HARGA SATUAN JUMLAH
AN KOMULA PEKERJAAN
TIF
A. BAHAN #NAME?
1. Tandon fiber 5000 ltr 8.00 - 4.00 4.00 Bh Rp. 6,500,000.00 Rp. 26,000,000.00
3. Testik PVC 1" 12.00 - 8.00 8.00 Bh Rp. 25,000.00 Rp. 200,000.00
4. Elbow PVC 1'' 4.00 - 4.00 4.00 Btg Rp. 25,000.00 Rp. 100,000.00
7. Tali Gantungan Pompa 4.00 - 3.00 3.00 Rol Rp. 90,000.00 Rp. 270,000.00
8. Lem Pipa 8.00 - 4.00 4.00 Ltr Rp. 6,500.00 Rp. 26,000.00
9. Pompa Celup 2.00 - 1.00 1.00 Unit Rp. 3,500,000.00 Rp. 3,500,000.00
11. Balok 10/10 Kayu ulin 3.52 - 2.00 2.00 M³ Rp. 5,000,000.00 Rp. 10,000,000.00
12. Balok 5/10 Kayu ulin 8.80 - 5.00 5.00 M³ Rp. 5,000,000.00 Rp. 25,000,000.00
13. Balok 5/10 Meranti 1.41 - 0.71 0.71 M³ Rp. 3,000,000.00 Rp. 2,115,000.00
14. Papan 2.5/20 kayu Ulin 2.49 - 1.25 1.25 M³ Rp. 5,500,000.00 Rp. 6,847,500.00
15. Atap seng Soka 157.00 - 78.50 78.50 Lbr Rp. 69,030.00 Rp. 5,418,855.00
16. Bubung 32.00 - 16.00 16.00 Lbr Rp. 40,000.00 Rp. 640,000.00
18. Paku Ulin 40.00 - 25.00 25.00 Kg Rp. 30,000.00 Rp. 750,000.00
19. Paku Seng 8.00 - 5.00 5.00 Kg Rp. 20,000.00 Rp. 100,000.00
B. ALAT
1. - - - - - 0 Rp - Rp -
2. Rp -
3. Rp -
4. Rp -
5. Rp -
SUBTOTAL B. Rp -
NO. URAIAN PEKERJAAN KEBUTUHAN RELISASI PENGAJU JUMLAH SAT. HARGA SATUAN JUMLAH
AN KOMULA PEKERJAAN
TIF
C. UPAH
Pajak PPh 4% Rp -
D. LAIN - LAIN
2. - - - - 0 Rp - Rp -
3. - - - - 0 Rp - Rp -
4. Rp -
5. Rp -
Dibuat Oleh,
Mengetahui,
SUB KEGIATAN : PEMBANGUAN , REHABILITASI DAN PEMELIHARAAN JARINGAN IRIGASI USAHA TANI
NO. URAIAN PEKERJAAN KEBUTUHA RELISASI PENGAJU JUMLAH SAT. HARGA SATUAN JUMLAH
N AN KOMULATIF PEKERJAAN
A. BAHAN #NAME?
1. Tandon fiber 5000 ltr 8.00 4.00 4.00 8.00 Bh Rp. 6,500,000.00 Rp. 26,000,000.00
2. Stopkran 1" 22.00 10.00 12.00 22.00 Bh Rp. 110,000.00 Rp. 1,320,000.00
3. Testik PVC 1" 12.00 8.00 4.00 12.00 Bh Rp. 25,000.00 Rp. 100,000.00
5. Pipa PVC AW 1” 251.00 73.00 178.00 251.00 Btg Rp. 41,600.00 Rp. 7,404,800.00
7. Tali Gantungan Pompa 4.00 3.00 1.00 4.00 Rol Rp. 90,000.00 Rp. 90,000.00
8. Lem Pipa 8.00 4.00 4.00 8.00 Ltr Rp. 6,500.00 Rp. 26,000.00
9. Pompa Celup 2.00 1.00 1.00 2.00 Unit Rp. 3,500,000.00 Rp. 3,500,000.00
10. Genset Yamaha EF 2.600 1.00 - 1.00 1.00 Unit Rp. 8,187,100.00 Rp. 8,187,100.00
11. Balok 10/10 Kayu ulin 3.52 2.00 1.52 3.52 M³ Rp. 5,000,000.00 Rp. 7,600,000.00
12. Balok 5/10 Kayu ulin 8.80 5.00 3.80 8.80 M³ Rp. 5,000,000.00 Rp. 19,000,000.00
13. Balok 5/10 Meranti 1.41 0.71 0.70 1.41 M³ Rp. 3,000,000.00 Rp. 2,100,000.00
14. Papan 2.5/20 kayu Ulin 2.49 1.25 1.25 2.50 M³ Rp. 5,500,000.00 Rp. 6,875,000.00
15. Atap seng Soka 157.00 78.50 78.50 157.00 Lbr Rp. 69,030.00 Rp. 5,418,855.00
16. Bubung 32.00 16.00 16.00 32.00 Lbr Rp. 40,000.00 Rp. 640,000.00
17. Baut 136.00 95.70 38.00 133.70 Bh Rp. 3,500.00 Rp. 133,000.00
18. Paku Ulin 40.00 25.00 15.00 40.00 Kg Rp. 30,000.00 Rp. 450,000.00
19. Paku Seng 8.00 5.00 3.00 8.00 Kg Rp. 20,000.00 Rp. 60,000.00
B. ALAT
1. - - - - - 0 Rp - Rp -
2. Rp -
3. Rp -
4. Rp -
5. Rp -
SUBTOTAL B. Rp -
NO. URAIAN PEKERJAAN KEBUTUHA RELISASI PENGAJU JUMLAH SAT. HARGA SATUAN JUMLAH
N AN KOMULATIF PEKERJAAN
C. UPAH
3. Biaya Pengeboran air tanah Dalam 2.00 - 2.00 2.00 Ttk Rp. 20,820,900.00 Rp. 41,641,800.00
D. LAIN - LAIN
1. Prasasti Kegiatan 1.00 0.19 0.81 1.00 Bh Rp. 25,084.00 Rp. 25,084.00
2. - - - - 0 Rp - Rp -
3. - - - - 0 Rp - Rp -
4. Rp -
5. Rp -
Dibuat Oleh,
Mengetahui,