Mobile Phone. 087 762 019 111 / 087 767 688 999
IV PEKERJAAN BETON
1 Bet. Dinding Kolam 5,1 M3 Rp 3,500,000 Rp 17,850,000
2 Bet. Lantai Kolam 3,0 M3 Rp 3,500,000 Rp 10,500,000
3 Bet. Ruang Mesin 2,4 M3 Rp 2,500,000 Rp 6,000,000
3
4 Bet. Rabatan Lantai Kerja 1,5 M Rp 950,000 Rp 1,425,000
Sub Total Rp 35,775,000
V ACCESSORIES
1 Maindrin 1,0 UNIT - Rp 650,000
2 Wall Illet 3,0 UNIT Rp 250,000 Rp 750,000
3 Skimmer 1,0 UNIT - Rp 750,000
4 Lampu LED 12 Watt 1,0 UNIT - Rp 1,200,000
5 Travo 12 Volt 1,0 UNIT - Rp 450,000
Sub Total Rp 3,800,000
VOLUM
NO URAIAN PEKERJAAN SATUAN HARGA SATUAN HARGA TOTAL
E
VI PEKERJAAN MESIN
1 Pompa DAB 3/4 Hp 1,0 UNIT - Rp 7,500,000
2 Filter DAB 5 450 T 1,0 UNIT - Rp 8,000,000
Sub Total Rp 15,500,000