Anda di halaman 1dari 2

PENGAJUAN KAS PROYEK

NAMA PROYEK : SPOTWASH MOTOR


PERIODE : 6 Junii 2023
LOKASI : CIKUPA - TANGERANG

NO URAIAN VOL. SAT HARGA SATUAN TOTAL REALISASI


1 BIAYA OVERHEAD PROYEK - -
1 Listrik Proyek 1 ls 100,000 100,000
2 Listrik Kontrakan 1 bln 50,000 50,000
3 Bensin eceran Untuk Motor & Pembersih Koas koas 5 ltr 12,000 60,000

TOTAL BIAYA OVERHEAD PROYEK 210,000


2 BIAYA ALAT - ALAT
1
2
TOTAL BIAYA ALAT-ALAT -
3 BIAYA MATRIAL
A. BIAYA MATRIAL UMUM
1 Pasir untuk Jalan Depan& Pasang keramik area cucian 3 bh 240,000 720,000
2 semen PC Untuk Cor jalan Depan Pasang Keramik area cucian 10 zak 50,000 500,000
3 Selisih Harga Cakar Ayam ( Beda ukuran 50x50) 5 bh 40,000 200,000
4 Roda Pagar kurang 2 bh 2 bh 60,000 120,000
5 Paku Campur 5 kg 20,000 100,000
6 Tee 4" Saluran Depan 1 bh 25,000 25,000
7 Reducer 4"x3" saluran depan 1 bh 25,000 25,000
8 Knee 1¼ 6 bh 5,000 30,000
9 Knee 3 " Saluran Talng Depan 5 bh 18,000 90,000
10 Bendrat 2 kg 25,000 50,000
11 Plastik Cor untuk Tutup Neon Box Depan 5 m 10,000 50,000
12 Assesories Urinoir ( Breket & seal Donat merk Toto Ori) 1 bh 400,000 400,000 Talangan
13 Besi Hollow 50x50 Untuk rangka Banner 2 btg 227,000 454,000 Talangan
14 Besi Plat Buat Pagar 1 lbr 595,000 595,000 Talangan
15 Cat Zincromat 1 ltr 75,000 75,000
16 Thiner 2 ltr 40,000 80,000
17 Keramik Kamar Dinding K. mandi ( perubahan Letak Orinoir ) 1 dus 55,000 55,000
18 Cat Dasar/ wall sealer Tembok Vinilex @5kg 1 kg 118,000 118,000
19 Cat minyak Biru Nippon Paint 2.5 ltr 235,000 587,500
20 Cat minyak Coklat jotun 1 ltr 100,000 100,000
21 Koas 2 " 2 bh 18,000 36,000
22 Compound 10 kg 5,000 50,000
23 Kawat Las 1 kg 50,000 50,000
24 Roofing 1 ls 50,000 50,000
25 Lem Pipa Pvc 1 klg 75,000 75,000
26 Dempul isamu kecil 2 klg 28,000 56,000
TOTAL BIAYA MATRIAL SIPIL 4,691,500
B. BIAYA MATRIAL KHUSUS

TOTAL BIAYA MATRIAL BAJA -


TOTAL BIAYA MATRIAL 4,691,500
4 BIAYA UPAH/GAJI - -
1 Upah pekerja tukang 3 orng 1 ls 9,540,000 9,540,000 absen terlampr

TOTAL BIAYA UPAH/GAJI 9,540,000


5 BIAYA LAIN-LAIN - -

TOTAL BIAYA LAIN-LAIN -


GRAND TOTAL 14,441,500

Note : Tangerang, 6 Juni 2023

Disetujui, Diperiksa, Yang Membuat,

(……....…………...) (…………....………...) ( Munir )


ABSENSI HARIAN PEKERJA

PROYEK : SPOTHWASH
LOKASI : CIKUPA - TANGERANG
PERIODE : 28 MEI SD 14 JUNI 2023

MEI - JUNI 2023 Jml Jml Upah Upah Sub Total Sub Total
Total
No Nama Pekerja 28 29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Hari Lembur Harian Lembur/Jam Harian Lembur

H L H L H L H L H L H L H L H L H L H L H L H L H L H L H L H L H L H L

1 Pidin Tukang 1 - 1 - 1 - 1 - 1 - 1 - 1 - 2 - 1 - 1 1 1 1 1 1 1 1 - 1 19 - 180,000 - 3,420,000 - 3,420,000

- - - - - - - - - - - - - - - - - - - - - - - - -

2 Wawam/keling Tukang 1 - 1 - 1 - 1 - 1 - 1 - 1 - 2 - 1 - 1 1 1 1 1 1 1 1 - 1 19 180,000 - 3,420,000 - 3,420,000

3 Dirto Tukang 1 - 1 - 1 - 1 - 1 - 1 - 1 - 2 - 1 - 1 2 1 1 1 1 1 1 - 1 20 180,000 - 3,600,000 - 3,600,000

TOTAL 10,440,000

Kasbon U.Makan Pidin cs 900,000

Sisa 9,540,000

Cikupa , 12 Juni 2023

Munir