Anda di halaman 1dari 6

Biaya Instalasi Listrik Borongan Non Material 2021

A. INSTALASI LISTRIK
No. Deskripsi Satuan Harga (dalam Rp.)
1 Instalasi MCCB ttk 80.000
2 Instalasi RCCB ttk 70.000
3 Instalasi RCB ttk 60.000
4 Instalasi Kabel Toufour ttk 20.000
5 Instalasi Lampu Indoor ttk 40.000
6 Instalasi Lampu Outdoor ttk 45.000
7 Instalasi Lampu Hotel ttk 45.000
8 Instalasi Stop Kontak ttk 40.000
9 Instalasi Line TV, Telp., Data ttk 50.000
10 Instalasi Segala Sensor ttk 55.000
11 Instalasi Alarm, Radar Air ttk 45.000
12 Instalasi Trimmer ttk 45.000
13 Instalasi Arde m1 15.000
B. PENANAMAN DAN BOBOKAN
No. Deskripsi Satuan Harga (dalam Rp.)
1 Penanaman Pipa m1 10.000
2 Penanaman Lembodos titik 5.000
3 Penanaman MCB Box group 20.000
4 Groundingsytem (Pembumian) m1 80.000
C. PEMASANGAN PERANGKAT
No. Deskripsi Satuan Harga (dalam Rp.)
1 MCCB ttk 70.000
2 RCCB ttk 50.000
3 MCB ttk 30.000
4 Saklar Tunggal ttk 5.000
5 Saklar Ganda ttk 10.000
6 Saklar Dimmer ttk 15.000
7 Saklar Tombol (Switch) ttk 15.000
8 Saklar Tarik ttk 20.000
9 Saklar Kutub 2 ttk 10.000
10 Saklar Kutub 3 ttk 15.000
11 Saklar Tukar/ Hotel ttk 25.000
12 Saklar Timmer ttk 25.000
13 Stop Kontak ttk 15.000
14 Line TV, Telp., Data ttk 40.000
15 Fitting Gantung ttk 10.000
16 Fitting Langit2 (Tempel) ttk 15.000
17 Fitting Dinding ttk 20.000
18 Downlight ttk 30.000
19 Downlight ke Beton/ Cor ttk 50.000
20 Downlight Neon ttk 60.000
21 Downlight Neon Beton ttk 75.000
22 Sensor Otomatis Lampu ttk 30.000
23 Radar Air, Alarm ttk 35.000
24 Sensor Detector ttk 50.000

D. PEMASANGAN ELECTRICAL
No. Deskripsi Satuan Harga (dalam Rp.)
1 AC unit 450.000
2 Exhaust Fan unit 80.000
3 Kipas Angin unit 80.000
4 Ceiling Fan unit 70.000
5 Downlight LED ttk 35.000
6 Lampu Gantung ttk 50.000
7 Lampu Baret ttk 30.000
8 Lampu Neon ttk 30.000
9 Lampu Barel/ Selang m 25.000
10 Lampu Dinding ttk 40.000
11 Lampu Spotlight ttk 25.000
12 Lampu Hologen ttk 20.000

CATATAN :
– Instalasi /titik lampu adalah antara dari titik mcb ke titik saklar ke titik lampu
– Untuk Sambungan “lampu seri” ada biaya tambahan Rp. 20.000/ titik
– Apabila downlight tertanam pada beton/cor, akan terdapat biaya tambahan Rp 25.000/
titik
 

Biaya Instalasi Listrik Borongan Beserta Material


Biaya Instalasi Listrik 2021
No. Deskripsi Satuan Merek Harga (dalam Rp.)
Supreme 150.000
1 Instalasi MCCB ttk
Eterna 130.000
Supreme 130.000
2 Instalasi RCCB ttk
Eterna 110.000
Supreme 100.000
3 Instalasi Panel MCB ttk
Eterna 80.000
Supreme 90.000
4 Instalasi Kabel Toufour/ Kabel Induk m1
Eterna 70.000
Supreme NYA 100.000
5 Instalasi Lampu Indoor ttk
Eterna NYA 80.000
Supreme NYA 120.000
Eterna NYA 100.000
Supreme NYM 170.000
6 Instalasi Lampu Outdoor ttk
Eterna NYM 150.000
Supreme NYY 200.000
Eterna NYY 180.000
Supreme NYA 150.000
7 Instalasi Lampu Hotel/ Tukar ttk
Eterna NYA 130.000
Supreme NYA 120.000
8 Instalasi Stop Kontak ttk
Eterna NYA 100.000
9 Instalasi Line TV, Telp., Data, Jack Audio ttk 90.000 – 150.000
Supreme NYA 130.000
10 Instalasi Sensor, Otomatis ttk
Eterna NYA 110.000
Supreme 90.000
11 Instalasi Radar Air m1
Eterna 70.000
Supreme 100.000
12 Instalasi Timmer ttk
Eterna 80.000
Supreme NYA 50.000
13 Instalasi Arde m1
Eterna NYA 30.000
14 Grounding System unit 400.000
Penanaman dan Bobokan
No. Deskripsi Satuan Harga (dalam Rp.)
1 Penanaman Pipa m1 20.000
2 Penanaman Lembodos ttk 10.000
3 Penanaman MCB Box group 70.000
4 Grounding System/ Pembumian m1 500.000 – 1.000.000

Biaya Instalasi Listrik: Pemasangan Perangkat


No. Deskripsi Satuan Harga (dalam Rp.)
1 MCCB ttk 400.000 – 1.000.000
2 RCCB ttk 350.000 – 800.000
3 MCB ttk 50.000 – 100.000
4 Saklar Tunggal ttk 25.000 – 55.000
5 Saklar Ganda ttk 35.000 – 50.000
6 Saklar Dimmer ttk 250.000 – 400.000
7 Saklar Hotel/ Tukar Tunggal ttk 60.000 – 90.000
8 Saklar Hotel/ Tukar Ganda ttk 70.000 – 100.000
9 Saklar Timmer ttk 350.000 – 600.000
10 Stop Kontak ttk 30.000 – 50.000
11 Kombinasi Stop Kontak dan Saklar ttk 40.000 – 80.000
12 Line TV, Telp., Data ttk 60.000 – 100.000
13 Fitting Gantung ttk 25.000 – 35.000
14 Fitting Langit2/ Tempel ttk 30.000 – 60.000
15 Downlight ttk 60.000 – 90.000
16 Sensor Otomatis Lampu ttk 80.000 – 250.000
17 Radar Air ttk 90.000 – 140.000

CATATAN
– Untuk Sambungan “lampu seri” ada biaya tambahan Rp. 50.000 /titik.
– Harga tersebut diatas hanya meterial kabel dengan ukuran :
1. kabel lampu : 1,5
2. kabel stop kontak : 2,5
3. kabel arde : 2,5
4. kabel induk/toufur : 3×4
– Perubahan harga tersebut di atas berdasarkan hal berikut ini ;
1. Merek
2. Jenis
3. Kode seri
4. Model
5. Nilai Watt.
6. Tingkat kesulitan
7. Volume pekerjaan
8. Jarak