PERHITUNGAN
UNTUK LEMBUR HARI PERTAMA JAM LEMBUR*1,5*1/173*GAJI POKOK
UNTUK LEMBUR HARI KEDUA JAM LEMBUR*2*1/173*GAJI POKOK
PENGAJUAN PROJECT TRIA MAHAN CITY TANGGAL 21 MEI 2022
4 PASIR 1 RIT SUPPLIER ANGGA (6,29 M3) UNTUK TM2 5 UNIT 6.29 120,000 754,800
5 PASIR 1 RIT SUPPLIER ANGGA (6,29 M3) UNTUK SIRING 6.29 120,000 754,800
6 PASIR 2 RIT SUPPLIER ANGGA (12,58 M3) UNTUK TALUD 12.58 120,000 1,509,600
7 PASIR 1 RIT SUPPLIER ANGGA ( 6,29 M3) UNTUK TM1 6.29 120,000 754,800
8 BUNGA BANK PEMBANGUNAN 1 8,800,000 8,800,000
9 MATERAI 100 BH 100 10,000 1,000,000
INSENTIF SALES INTERNAL ATAS PENCAIRAN AKAD KONSUMEN
10 1 4,000,000 4,000,000
AN ILHAM IRAWAN
INSENTIF SALES INTERNAL ATAS PENCAIRAN AKAD KONSUMEN
11 1 4,000,000 4,000,000
AN SULTAN RAFLI PASAI
INSENTIF SALES AGENCY HARLEI ATAS PENCAIRAN AKAD
12 1 5,000,000 5,000,000
KONSUMEN AN ERLANGGA
13 PENGEMBALIAN NILAI SUBKON 2 UNIT TMP (BLOK C6, C5) 2 28,533,726 57,067,452
NO URAIAN NOMINAL
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
JUMLAH -
NO URAIAN NOMINAL
1 KAYU KASAU I/2 KUBIK 750,000
2 PAPAN 1/2 KUBIK 750,000
3 PAKU 4 INC 5 KG 80,000
4 PAKU 2 INC 5KG 80,000
5 EMBER 6 30,000
6 BATA 14000 7,000,000
7 TANAH TIMBUN 8 RIT 9 JANUARI 2021 1,160,000
8 SAVING DANA UNTUK MATERIAL 20,000,000
JUMLAH 29,850,000
NO URAIAN NOMINAL
1 PENYERAHAN DANA KE RADJA MANDALA 2 UNIT MHR 186,660,075
NO URAIAN NOMINAL
1 Pantry 994,500
2
3
4
5
JUMLAH 994,500
PERHITUNGAN
UNTUK LE JAM LEMBUR*1,5*1/173*GAJI POKOK
UNTUK LEMJAM LEMBUR*2*1/173*GAJI POKOK
PENGAJUAN MRR TANGGAL 22 MEI 2021
NO URAIAN NOMINAL
1
2
JUMLAH -
NO URAIAN NOMINAL
1 KWH LISTRIK BLOK B 11 1,650,000
2
JUMLAH 1,650,000
NO URAIAN NOMINAL
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
JUMLAH -