RAB

HARGA
No. MATERIAL/BAHAN VOLUME SAT. JUMLAH KETERANGAN
SATUAN
I. PEKERJAAN CAT
1 Cat QLuc 1529 Soft White (18kg) 1 Pail 300.000 300.000
2 VENILEX 939 Yellow Sunset / 938 Honey Yellow (5 kg) 1 Pail 200.000 200.000
3 Cat AVIAN Caramel Apple 333 (0,9 liter) 2 Pail 80.000 160.000
4 Kuas 4" Merk eterna 1 Unit 25.000 25.000
5 Kuas 2" Merk eterna 1 Unit 12.000 12.000
6 Kuas Rol 1 Unit 20.000 20.000
7 Amplas Kasar 5 Lbr 3.000 15.000
TOTAL I 732.000
II. PEKERJAAN COR PELANTARAN CUCI & DEPAN PINTU WC
1 Semen @ 50 Kg/Zak (Merk conch) 9 Zak 74.000 666.000
TOTAL II 666.000
III. PEKERJAAN PIPA PEMBUNGAN & PIPA AIR BERSIH DARI KOLAM
1 Pipa 3/4" Rucika JIS AW P=4 Mtr (air bersih) 3 Btg 62.000 186.000
2 Kran 3/4" 2 Pc 15.000 30.000
3 Sok Drat Dalam (SDD) 3/4" 3 Pc 5.000 15.000
4 Sok Drat Luar (SDL) 3/4" 1 Pc 5.000 5.000
5 Socket 3/4" 3 Pc 3.000 9.000
6 TEE AW RUCIKA 3/4" 1 Pc 5.000 5.000
7 ELBOW 3/4" 8 Pc 5.000 40.000
9 Pipa Dia. 3" x 4 m ( C ) u/pembuangan air limbah 2 Btg 70.000 140.000
10 Elbow 3" 90derajat 5 Btg 22.000 110.000
TOTAL III 540.000
IV. PEKERJAAN PINTU KAMAR TIDUR
1 GRC ( Suryabord ) 2 Kp 63.000,00 126.000
2 Kayu 4/6 klas 2 utk. Tarikan angin 4 Btg 14.000,00 56.000
3 Engsel Pintu 4" 2 Psg 25.000,00 50.000
4 Kunci Pintu ( T ) Merk Kodai 2 Set 95.000,00 190.000
TOTAL IV 422.000
V. PEKERJAAN PERBAIKAN TERAS
1 Kayu 4/8 campuran 6 Btg 42.000,00 252.000
2 Paku 3" 1 kg 25.000,00 25.000
3 Paku 2" 1 kg 25.000,00 25.000
TOTAL V 302.000
TOTAL KESELURUHAN (I+II+III+IV+V) 2.662.000