Daftar Harga Satuan

Tenaga & Bahan Bangunan

A. BAHAN BANGUNAN
No Jenis Bahan Satuan Harga
1 Batu kali m3 375,000.00
2 Kayu meranti balok m3
6,188,000.00
3 Kayu meranti papan m3 6,188,000.00
4 Kayu meranti reng m3 6,000,000.00
5 Kayu meranti usuk m3
6,000,000.00
6 Paku 7 cm Kg 12,750.00
7 Paku 12 cm Kg 14,150.00
8 Pasir pasang m3 204,380.00
9 Pasir urug m3 174,500.00
10 Semen PC Tiga Roda 50 Kg Zak 76,500.00
11 Tanah urug m3 128,000.00

B. DAFTAR UPAH
No Jenis Upah Satuan Harga
1 Kepala tukang batu Hari 130,000.00
2 Mandor Hari 164,500.00
3 Mandor' Jam 20,562.50
4 Pekerja Hari 75,000.00
5 Pekerja' Jam 9,375.00
6 Tukang batu Hari 120,000.00
7 Tukang kayu Hari 120,000.00
8 Tukang gali Hari 100,000.00
DAFTAR ANALISA PEKERJAAN
Harga Satuan Harga Upah
No Uraian Pekerjaan
(Rp) (Rp)
1 10 m' Pasang Bowplank
0.090 m³ Kayu Meranti Papan 6,188,000.00
0.047 m³ Kayu Meranti Usuk 6,000,000.00
0.100 kg Paku 7 (Usuk) 12,750.00
0.800 hari Tukang Kayu 120,000.00 96,000.00
0.280 hari Pekerja 75,000.00 21,000.00
0.140 hari Mandor 164,500.00 23,030.00
140,030.00

2 1 m³ Galian Tanah Biasa


0.750 hari Pekerja 75,000.00 56,250.00
0.025 hari Mandor 164,500.00 4,112.50
60,362.50

3 1 m³ Tanah Urug Diratakan


1.200 m³ Tanah Urug 128,000.00
0.250 hari Pekerja 75,000.00 18,750.00
0.010 hari Mandor 164,500.00 1,645.00
20,395.00

4 1 m³ Urugan Pasir Dengan Penyiraman


1.200 m³ Pasir Urug 174,500.00
0.300 hari Pekerja 75,000.00 22,500.00
0.010 hari Mandor 164,500.00 1,645.00
24,145.00

5 1 m³ Pasangan Batu Kosong


1.200 m³ Batu Kali 375,000.00
0.300 m³ Pasir Urug 174,500.00
1.500 hari Pekerja 75,000.00 112,500.00
0.075 hari Mandor 164,500.00 12,337.50
124,837.50

6 1 m³ Pasangan Batu Kali Camp. 1:4


1.200 m³ Batu Kali 375,000.00
2.847 zak Semen PC Tiga Roda 50 Kg 76,500.00
0.537 m³ Pasir Pasang 204,380.00
1.200 hari Tukang Batu 60,000.00 72,000.00
0.120 hari Kepala Tukang Batu 130,000.00 15,600.00
3.600 hari Pekerja 75,000.00 270,000.00
0.180 hari Mandor 164,500.00 29,610.00
387,210.00
RJAAN
Harga Bahan Harga Total
(Rp) (Rp)

556,920.00
282,000.00
1,275.00

840,195.00 980,225.00
1 m' = 98,022.50

- 60,362.50

153,600.00

153,600.00 173,995.00

209,400.00

209,400.00 233,545.00

450,000.00
52,350.00

502,350.00 627,187.50

450,000.00
217,795.50
109,752.06
777,547.56 1,164,757.56
RENCANA ANGGARAN BIAYA

NAMA PEKERJAAN :
LOKASI :
TAHUN :

Harga Jumlah Harga


No Uraian Pekerjaan Kuantitas Satuan
(Rp) (Rp)
1 2 3 4 5 6
I PEK. PERSIAPAN
1 Pembersihan Lapangan 216.000 m² 1,500.00 324,000.00
2 Pas. Papan Bowplank 60.000 m¹ 94,205.03 5,652,301.80
5,976,301.80

II PEK. TANAH
1 Galian Tanah Biasa 475.995 m³ 36,250.00 17,254,818.75
2 Urugan Kembali 190.320 m³ 165,460.00 31,490,347.20
3 Urugan Pasir Lantai dan Pondasi 24.830 m³ 167,835.00 4,167,343.05
52,912,509.00

III PEK. PASANGAN PONDASI


1 Pas. Batu Kosong 33.345 m³ 348,780.00 11,630,069.10
2 Pas. Batu Kali 55.120 m³ 886,758.35 48,878,120.25
60,508,189.35
JUMLAH
NOMOR URAIAN PEKERJAAN
( Rp )
1 2 3
I PEKERJAAN PERSIAPAN 5,976,301.80
II PEKERJAAN TANAH 52,912,509.00
III PEKERJAAN PASANGAN PONDASI 60,508,189.35

JUMLAH (I S/D XI) 119,397,000.15


PPN 10% 11,939,700.02
JUMLAH 131,336,700.17
DIBULATKAN 131,337,000.00
Volume Pekerjaan

No Uraian n Volume
I Pekerjaan Persiapan
1 Pembersihan Lapangan 18 12 216
2 Pas. Papan Bowplank 18 12 30 2 60

II Pekerjaan Tanah
1 Galian Tanah Biasa 7.323 1 7.323 65 475.995
2 Urugan Kembali 1.134 0.33 2.928 65 190.320
3 Urugan Pasir Lantai dan Pondasi 0.382 1 0.382 65 24.83

III Pekerjaan Pasangan Pondasi


1 Pasangan Batu Kosong 0.513 1 0.513 65 33.345
2 Pasangan Batu Kali 0.66 1.46 0.848 65 55.12