Anda di halaman 1dari 322

STANDAR HARGA SATUAN BAHAN BANGUNAN DAN UPAH KERJA

PEMERINTAH PROVINSI SULAWESI SELATAN


KABUPATEN MAROS
TAHUN 2020

HARGA BAHAN
NO BAHAN DASAR SATUAN
Wil.I Wil.ll Wil.lll
1 2 3 4 5 6
A BAHAN DASAR
1 Batu Kali
Spilt / Pecah 10-15 Cm M3 235,000 258,500 270,250
Split / Pecah 5-7 Cm M3 312,000 343,200 358,800
Split / Pecah 3-5 Cm M3 290,000 319,000 333,500
2 Batu Merah
Ukuran Besar Buah 1,000 1,100 1,150
Ukuran Kecil Buah 550 605 633
3 Batu Gunung M3 200,000 220,000 230,000
4 Batu Alam
Andesit Biasa M2 220,000 242,000 253,000
Andesit Susun siri M2 230,000 253,000 264,500
Andesit Halus M2 220,000 242,000 253,000
Andesit Gelombang M2 235,000 258,500 270,250
Batu Candi Permukaan Rata M2 190,000 209,000 218,500
Batu Paliman Kuning M2 200,000 220,000 230,000
Batu Hijau Sukabumi M2 175,000 192,500 201,250
Batu Bali Green M2 200,000 220,000 230,000
Batu bali Napoli M2 205,000 225,500 235,750
Paras Jogja M2 210,000 231,000 241,500
Batu Cirebon Beraturan M2 180,000 198,000 207,000
Batu Cirebon Tidak Beraturan M2 100,000 110,000 115,000
5 Tanah Timbunan M3 103,084 113,392 118,546

PASIR
6 Pasir
Maros M3 121,275 133,403 139,466
Bili Bili M3 137,813 151,594 158,484
Pasangan M3 200,000 220,000 230,000
Beton M3 330,000 363,000 379,500
7 Kerikil / Koral Beton M3 333,506 366,857 383,532
8 Sirtu
Sirtu Saring M3 187,425 206,168 215,539
Sirtu Sungai M3 170,888 187,967 196,521
9 Kapur Pasangan M3 242,550 266,805 278,933

SEMEN (PC)
10 Semen
Semen PC (40 kg) zak 55,000 60,500 63,250
Semen PC (50 kg) zak 65,000 71,500 74,750
Semen Putih (50 kg) zak 90,000 99,000 103,500
11 Paving Blok
Paving Blok Mutu K 175 (Tebal 6 cm) M2 65,000 71,500 74,750
Paving Blok Mutu K 175 (Tebal 8 cm) M2 70,000 77,000 80,500
Paving Blok 21 x 10,5 x 6 cm K 225 M2 70,000 77,000 80,500
Paving Blok 21 x 10,5 x 6 cm K 225 M2 75,000 82,500 86,250

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
HARGA BAHAN
NO BAHAN DASAR SATUAN
Wil.I Wil.ll Wil.lll
1 2 3 4 5 6
Paving Blok 21 x 10,5 x 6 cm K 250 M2 66,701 73,371 76,706
Paving Blok 21 x 10,5 x 6 cm K 300 M2 74,970 82,467 86,216
Paving Blok 21 x 10,5 x 6 cm K 350 M2 84,893 93,382 97,626
Paving Blok 21 x 10,5 x 6 cm K 400 M2 110,000 121,000 126,500
Paving Blok 21 x 10,5 x 6 cm K 400 M2 112,179 123,397 129,006
Paving Blok 10 x 10 x 6 cm K 225 (Segi 6) M2 48,510 53,361 55,787
Paving Blok 10 x 10 x 8 cm K 225 (Segi 6) M2 54,574 60,031 62,760
Topi Uskup K 225 (Tebal 6 cm) M2 5,700 6,270 6,555
Topi Uskup K 300 (Tebal 8 cm) M2 6,000 6,600 6,900
Grass Blok 54 x 36 x 10 cm M2 145,530 160,083 167,360
Hollow Brick P2B ( 9 x 19 x 39 )CM M2 36,989 40,688 42,537
Hollow Brick P2K ( 9 x 19 x 39 )CM M2 42,446 46,691 48,813
Kastin K 225 kecil ( 20 x 25 x 50 ) Cm 24,225 26,681 27,893
Kastin K 225 besar ( 25 x 30 x 50 ) Cm 36,383 40,021 41,840
Kastin K 225 ( 15 x 30 x 40 ) Cm 27,563 30,319 31,697
Kastin K 225 ( 15 x 25 x 50 ) Cm 30,319 33,351 34,867
Kastin K 225 ( 15 x 25 x 40 ) Cm 24,806 27,287 28,527
Panel Pra Cetak ( 5 x 40 x 240 ) cm 137,813 151,594 158,484
Tiang Pra Cetak 1.50 m 209,475 230,423 240,896
Tiang Pra Cetak 2.20 m 248,063 272,869 285,272
Tiang Pra Cetak 2.50 m 292,163 321,379 335,987
Tiang Pra Cetak 3.00 m 330,750 363,825 380,363
Tiang Pra Cetak 3.40 m 374,850 412,335 431,078
Tiang Pra Cetak 3.50 m 441,000 485,100 507,150
Bataco ( 40 x 20 x 10 ) 5,513 6,064 6,339
Gorong-Gorong 15 x 1 m 132,300 145,530 152,145
Gorong-Gorong 30 x 1 m 192,938 212,231 221,878
Gorong-Gorong 50 x 1 m 275,625 303,188 316,969
Gorong-Gorong 60 x 1 m 330,750 363,825 380,363
Aspal Beton Miko 879,244 967,168 1,011,130
Aspal Bitumen 11,025 12,128 12,679
Kastin 20 x 25 x 50 12,000 46,200 48,300
Buis Beton ( d = 20 cm ) 225,000 247,500 258,750
Buis Beton ( d = 30 cm ) 280,000 308,000 322,000
Buis Beton ( d = 40 cm ) 360,000 396,000 414,000
Buis Beton ( d = 50 cm ) 430,000 473,000 494,500
Buis Beton ( d = 60 cm ) 500,000 550,000 575,000

B BAHAN KAYU
1 Kayu Kelas 1 Bayam
Balok Gergaji Sawmil m3 11,521,125 12,673,238 13,249,294
Balok Gergaji Shansaw m3 7,882,875 8,671,163 9,065,306
Papan Gergaji Sawmil m3 13,946,625 15,341,288 16,038,619
Papan Gergaji Shansaw m3 8,489,250 9,338,175 9,762,638
2 Kayu Kelas I ( Sappu/Ullin)
Balok Sappu/Ullin m3 12,127,500 13,340,250 13,946,625
3 Kayu Kelas II (Kumera)
Papan Sawmil m3 6,058,500 6,664,350 6,967,275
Balok Shansaw m3 4,410,000 4,851,000 5,071,500
4 Kayu Kelas II
Papan m3 3,969,000 4,365,900 4,564,350
Balok m3 3,638,250 4,002,075 4,183,988

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
HARGA BAHAN
NO BAHAN DASAR SATUAN
Wil.I Wil.ll Wil.lll
1 2 3 4 5 6
5 Kayu Kelas III
Papan m3 2,590,875 2,849,963 2,979,506
Balok m3 2,205,000 2,425,500 2,535,750
6 Kayu Papan Siri Siri Kls I Sappu (Ulin) / Bayam
Uk. 0.80 x 0.06 x 0.01 m lbr 2,756.25 3,031,88 3,170.00
Uk. 1.00 x 0.06 x 0.01 m lbr 2,921.63 3,213,79 3,360.00
Uk. 1.20 x 0.06 x 0.01 m lbr 3,307.50 3,638,25 3,804.00
Uk. 1.25 x 0.06 x 0.01 m lbr 3,858.75 4,244,60 4,438.00
Uk. 1.50 x 0.06 x 0.01 m lbr 4,134.38 4,548.00 4,755.00

C BAHAN LANTAI
1 Tegel PC
PC. Abu abu (20 x 20) cm bh 1,940 2,134 2,231
PC. Abu abu (30 x 30) cm bh 3,274 3,602 3,766
PC. Warna (20 x 20) cm bh 3,638 4,002 4,184
PC. Badak (20 x 20) cm bh 2,789 3,068 3,208
Hollow Brick P2B (9 x 19 x 39) cm M2 36,989 40,668 42,537
Hollow Brick P2K (9 x 19 39) cm M2 42,446 46,691 48,813
Kastin K 225 Kecil (20 x 25 x 50) cm bh 24,255 26,681 27,893
Kastin K 225 Besar (25 x 30 x 50 ) cm bh 36,383 40,021 41,840
Kastin K 225 (15 x 30 x 40 ) cm bh 27,563 30,319 31,697
Kastin K 225 (15 x 25 x 50 ) cm bh 30,319 33,351 34,697
Kastin K225 (15 x 25 x 40 ) cm bh 24,806 27,287 28,527
Panel Pra cetak (5 x 40 x 240 ) cm Lbr 137,813 151,594 158,484
Tiang Pra Cetak 1.50 cm 3 susun 209,475 230,423 240,896
Tiang Pra Cetak 2.20 cm 4 susun 248,063 272,869 285,272
Tiang Pra Cetak 2.50 cm 5 susun 292,163 321,379 335,987
Tiang Pra Cetak 3.00 cm 6 susun 330,750 363,825 380,363
Tiang Pra Cetak 3.40 cm 7 susun 374,850 412,335 431,078
Tiang Pra Cetak 3.50 cm 8 susun 441,000 485,100 507,150
Bataco ( 40 x 20 x 10 ) bh 5,513 6,064 6,339
Gorong - Gorong 15 x 1 m bh 132,300 145,530 152,145
Gorong - Gorong 30 x 1 m bh 192,938 212,231 221,878
Gorong - Gorong 50 x 1 m bh 275,625 303,188 316,969
Gorong - Gorong 60 x 1 m bh 330,750 363,825 380,363
Aspal Beton Mikro ton 879,244 967,268 1,011,130
Aspal Bitumen Kg 11,025 23,238 12,679
Kastin 20 x 25 x 50 Biji 12,000 46,200 48,300
Buis Beton ( d = 20 cm ) M2 225,000 247,500 258,750
Buis Beton ( d = 30 cm ) M2 280,000 308,000 322,000
Buis Beton ( d = 40 cm ) M2 360,000 396,000 414,000
Buis Beton ( d = 50 cm ) M2 430,000 473,000 494,000
Buis Beton ( d = 60 cm ) M2 500,000 550,000 575,000

C BAHAN LANTAI
1 Tegel PC
PC.Abu - Abu ( 20 x 20 ) cm Bh 1,940 2,134 2,231
PC. Abu - Abu (30 x 30 ) cm Bh 3,274 3,602 3,766
Pc. Warna ( 20 x 20 ) cm Bh 3,638 4,002 4,184
Pc. Badak ( 20 x 20 ) cm Bh 2,789 3,068 3,208
PC Badak ( 30 x 30 ) cm Bh 3,153 3,468 4,626

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
HARGA BAHAN
NO BAHAN DASAR SATUAN
Wil.I Wil.ll Wil.lll
1 2 3 4 5 6
PC Wafel ( 20 x 20 ) cm Bh 3,396 3,735 3,905
Pc wafel (30 x 30 ) cm Bh 3,699 4,069 4,254
Plint Pc (15 x 20 ) cm Bh 3,274 3,602 3,766
Plint PC (15 x 30 ) cm Bh 7,519 8,271 8,647
Tegel Mozaik ( 30 x 30 ) cm Bh 8,732 9,605 10,042
2 Tegel Keramik
Putih ( 10 x 20 ) cm dos/m2 47,000 51,700 54,050
Warna (10 x 20 ) cm dos/m2 53,361 58,697 61,365
Putih ( 30 x 30 ) cm kasar dos/m2 53,361 58,697 61,365
Warna (30 x 30) cm dos/m2 60,031 66,034 69,036
Putih (20 x 25)cm dos/m2 53,361 58,697 61,365
Warna (20 x 25)cm dos/m2 56,029 61,632 64,433
Putih (20 x 20)cm dos/m2 53,361 58,697 61,365
Warna (20 x 20) cm dos/m2 56,312 61,944 64,759
Putih polos (setara mulia) 30 x 30 cm dos/m2 45,357 49,893 52,160
Warna (setara essensa) 30 x 30 cm dos/m2 226,784 249,463 260,802
Warna (setara asia ) 30 x 30cm dos/m2 60,031 66,034 69,036
Warna (setara roman) 30 x 60cm dos/m2 181,912 200,104 209,199
Putih (40 x 40) cm dos/m2 77,373 85,111 88,979
Warna (setara asia/lna) 40 x 40cm dos/m2 66,701 73,371 76,706
Warna (Ex. Supermilan) 50 x 50cm dos/m2 90,666 99,733 104,266
Putih (60 x 60)cm dos/m2 187,645 206,410 215,792
Batu alam (20 x 20)cm m2 220,500 242,550 253,575
3 Lantai Acrylic
Tebal 10mm Lbr 2,094,750 2,304,225 2,408,963
Tebal 12mm (2.25 m x 1.2 m) Lbr 2,425,500 2,668,050 2,789,325
Tebal 15 mm Lbr 2,976,750 3,274,425 3,423,263

D BAHAN KACA
Kaca Bening 3 mm m2 99,225 109,148 114,109
Kaca Bening 5 mm m2 132,300 145,530 152,145
Kaca Bening 2 mm m2
Kaca buram 3 mm m2 120,062 132,068 138,072
Kaca buram 5 mm m2 253,575 278,933 291,611
Kaca Ryben 3 mm m2 146,743 161,417 168,754
Kaca Ryben 5 mm m2 220,114 242,126 253,131
Kaca Cermin (3 mm) m2 253,575 278,933 291,611
Kaca Cermin (5mm) m2 330,750 363,825 380,363
Kaca One Way m2 533,610 586,971 623,652
Kaca 8 mm m2 330,750 363,825 380,363
Kaca 10 mm m2 418,950 460,845 481,793
Kaca 12 mm m2 496,125 545,738 570,544
Kaca Nako Lengkap Teralis 7 mata m2 400,474 400,474 400,474

E BAHAN BESI
1 Besi Beton (SI = full )
Ø = 4 mm btg 18,676 20,544 21,478
Ø = 6 mm btg 40,021 44,023 46,024
Ø = 8 mm btg 60,031 66,034 69,036
Ø = 10 mm btg 86,712 95,383 99,718
Ø = 12 mm btg 114,726 126,199 131,935
Ø = 14 mm btg 180,093 198,103 207,107

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
HARGA BAHAN
NO BAHAN DASAR SATUAN
Wil.I Wil.ll Wil.lll
1 2 3 4 5 6
Ø = 16 mm btg 213,444 234,788 245,461
Ø = 19 mm btg 293,486 322,834 337,508
Ø = 20 mm btg 333,506 366,857 383,532
2 Besi Ulir
Ø = 12 mm btg 129,544 142,498 148,975
Ø = 14 mm btg 174,746 192,221 200,958
Ø = 16 mm btg 303,739 334,113 349,300
3 Paku
paku biasa (4-10 cm) Kg 21,344 23,479 24,546
paku asbes Kg 26,681 29,349 30,683
paku seng (payung) RRC Kg 26,681 29,349 30,683
paku sekrup 3 1/2" Kg 22,945 25,240 26,387
Paku sekrup 4" Kg 28,015 30,816 32,217
Paku Payung Berulir 75 mm Kg 33,351 36,686 38,353
Paku Sirap Kg 20,010 22,011 23,012
Paku Beton Hitam dos 26,681 29,349 30,683
Paku Beton Putih dos 13,340 14,674 15,341
Paku Atap Spandek Baja BHHP G 550 biji 2,401 2,641 2,761
Paku Seng RRC Uk 5 cm biji 133.4 147. 74 153. 41
Paku Seng RRC Uk 6 cm biji 166.75 183. 43 191. 76
Paku Beton / Sappu Uk. 5 cm biji 266.86 293. 49 306. 83
Paku Beton / Sappu Uk. 5 cm biji 366.86 403, 55 421. 89
Paku Beton / Sappu Uk. 5 cm biji 500.26 550. 29 575. 30
Paku Beton / Sappu Uk. 5 cm biji 933.82 1,027. 20 1,073. 89
4 Kawat
Beton kg 24,012 26,414 27,614
Nyamuk Mtr 26,681 29,349 30,683
Ayakan Kecil Mtr 19,950 21,945 22,943
Duri Roll 180,093 198,103 207,107
5 Kawat Digalvano
3 mm Kg 24,012 26,414 27,614
4 mm Kg 24,012 26,414 27,614
5 mm Kg 24,012 26,414 27,614
6 Besi Plat
2 mm = 120 x 240 mm Lbr 770,300 847,330 885,845
3 mm = 120 x 240 mm Lbr 836,300 919,930 961,745
besi H 15 cm Pnjang 12 m Btg 5,197,800 5,717,580 5,977,470
7 Besi Strep
30.3 mm = 3 mm btg 24,012.45 26,413.70 27,614.32
35.4 mm = 3 mm btg 26,680.50 29,348.55 30,682.58
46.4 mm = 3 mm btg 42,688.80 46,957.68 49,092.12
40.6 mm = 3 mm btg 38,953.53 42,848.88 44,796.56
50.6 mm = 3 mm btg 49,625.73 54,588.30 57,069.59
60.6 mm = 3 mm btg 58,296.89 64,126.58 67,041.43
8 Besi Siku = 6 m'
30.30.3 btg 100,052 110,057 115,600
40.40.4 btg 166,753 183,428 191,766
40.40.3 btg 280,145 308,160 322,167
50.50.4 btg 182,155 200,371 209,478
50.50.5 btg 188,219 207,041 216,452
60.60.6 btg 103,236 113,659 118,825
70.70.7 btg 121,499 113,649 139,723

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
HARGA BAHAN
NO BAHAN DASAR SATUAN
Wil.I Wil.ll Wil.lll
1 2 3 4 5 6
9 Baja Tralis kg 21,830 24,912 25,104
10 Pipa Besi Kotak Hembos 40 x 40 x 2.60 (pjg = 6) btg 133,403 146,743 153,413
11 Besi Plat Cakar Ayam Uk.1,2 x 2,4 x 2,6 Lbr 1,091,475 1,200,623 1,255,196
12 Kawat las Biasa Kg 23,625 25,988 27,169
13 Kawat las stainless Kg 42,466 46,691 48,813
14 Kawat las listrik Kg 30,450 33,495 35,018
15 Pipa GIP 2,50 medium A m' 25,200 27,720 28,980
16 Besi Siku 30 x 3 x 30 m' 1,470 1,617 1,691
17 Pagar Besi kotak Hembos uk : unit 0 0 0
18 7,5 x 3,75,2,6 Tinggi 1,1. 0 m + biaya Pasang 0 0 0
19 Roda Pintu Besi bh 28,875 31,763 33,206
20 Engsel Pintu Dorong Kupu - Kupu psg 26,250 28,875 301,875
21 Besi Beton Biasa kg 10,694 11,764 12,298
22 Besi Beton Ulir 24 kg 11,885 13,073 13,668
23 Besi Galvanisir #REF! 26,250 28,875 30,188
24 Besi Pagar BRC 90 x 2,40 m m 630,000 693,000 724,500
25 Besi Pagar BRC 100 x 2,40 m Set 656,250 721,875 754,688
26 Besi Pagar BRC 120 x 2,40 m Set 708,750 779,625 815,063
27 Besi Pagar BRC 150 x 2,40 m Set 606,375 667,013 697,331
28 Pintu Pagar BRC 90 x 2,40 m Set 1,050,000 1,155,000 1,207,500
29 Pintu Pagar BRC 120 x 2,40 m Set 1,260,000 1,386,000 1,449,000
30 Pintu Pagar BRC 150 x 2,40 m Set 1,417,500 1,559,250 1,630,125
31 Hollow Galfanis 4/4 Set 6,367 7,004 7,322
32 Besi Strip 4/0.4 (plat Baja) kg 23,042 25,346 26,499
33 Besi Tipe C (Rangka Baja Ringan) 6 Btg 176,300 193,930 202,745
Lebar 10, Tebal 1,8 - 2,00 mm Btg 176,300 193,930 202,745
Lebar 12,5 Tebal 1,8 - 2,00 mm Btg 148,800 163,680 171,120
Lebar 15 Tebal 1,8 - 2,00 mm Btg 220,200 242,220 253,230

F BAHAN ALUMINIUM
1 Aluminium Warna ( 2" x 1" ) 6 mm m' 60,638 66,701 69,733
2 Aluminium Warna ( 3" x 1" ) 6 mm m, 72,765 80,042 83,680
3 Aluminium Warna ( 4" x 1" ) 6 mm m' 93,382 102,720 107,389
4 Baja Ringan Canai Dingin kg 13,893 15,282 15,977
5 Web C75.75 m' 9,738 10,712 11,199
6 Top Span 40 m' 6,064 6,670 6,973
7 ZA, G550 m' 6,270 6,897 7,210
8 Main Truss 1.05 TCT m' 6,570 7,227 7,556
9 Web 0,8 TCT m' 6,470 7,117 7,441
10 Ancor / Seng Pelapis Genteng m' 66,701 73,371 76,706
11 Kusen Rangka Aluminium 4" m' 127,339 140,073 146,440
12 Bingkai Pintu/Jendela Aluminium m' 103,084 113,392 118,546
13 Tarikan Pintu Aluminium bh 37,485 41,234 43,108

G BAHAN PIPA
1 Pipa Besi GIP
Ø 1/2 inch - 6 m
Tbl 1,4 mm btg 73,500 80,850 84,525
Tbl 2,2 mm btg 94,500 103,950 108,675
Tbl 2,6 mm btg 115,500 127,050 132,825
Ø 3/4 " - 6 m
Tbl 2,4 mm btg 126,000 138,600 144,900

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
HARGA BAHAN
NO BAHAN DASAR SATUAN
Wil.I Wil.ll Wil.lll
1 2 3 4 5 6
Tbl 2,6 mm btg 168,000 184,800 193,200
Ø 1 " - 6 m (Tbl 2,4 mm) btg 152,250 167,475 175,088
Ø 1 1 /2 " - 6 m ( Tbl 2,4 mm) btg 183,750 202,125 211,313
Ø 2 " - 6 m (Tbl 2,4 mm) btg 236,250 259,875 271,688
Ø 2 1/2 " - 6 m (Tbl 3 mm) btg 341,250 375,375 392,438
Ø 3 " - 6 m (Tbl 3 mm) btg 393,750 433,125 452,813
2 Pipa Paralon PVC
Ø 1/2 " - 4 m AW btg 18,375 20,213 21,131
Ø 3/4 " - 6 m AW btg 28,875 31,763 33,206
Ø 1 " - 6 m AW btg 45,938 50,531 52,828
Ø 1 1/2 " - 6 m AW btg 55,125 60,638 63,394
Ø 2 " - 6 m AW btg 42,000 46,200 48,300
Ø 2 1/2 " - 6 m AW btg 47,250 51,975 54,338
Ø 3 " - 6m AW btg 52,500 57,750 60,375
Ø 4 " - 6m AW btg 78,750 86,625 90,563
Ø 5 " - 6m AW btg 667,013 733,714 767,064
Ø 6 " - 6m AW btg 1,165,331 1,281,865 1,340,131
Ø 8 " - 6m AW btg 1,876,852 2,064,537 2,158,380
Ø 10 " - 6m AW btg 2,914,966 3,206,462 3,352,211
3 Pipa Paralon PVC (Setara Wavin)
Ø 1/2 " - 4 m AW ( Setara Wavin ) btg 20,010 22,011 23,012
Ø 3/4 " - 4 m AW btg 26,250 28,875 30,188
Ø 1 " - 4 m AW btg 36,018 39,620 41,421
Ø 1 1/2 " - 4 m AW btg 63,350 69,685 72,853
Ø 2 " - 4 m AW btg 80,500 88,500 92,575
Ø 2 1/2 " - 4 m AW btg 126,000 138,600 144,900
Ø 3 " - 4 m AW btg 148,750 163,625 171,063
Ø 4 " - 4 m AW btg 183,050 201,355 210,508
Ø 1 1/2 " - 4 m D btg 41,475 45,623 47,696
Ø2"-4mD btg 51,100 56,210 58,765
Ø 2 1/2 " - 4 m D btg 64,750 71,225 74,463
Ø3"-4mD btg 93,125 91,438 95,594
Ø4"-4mD btg 131,250 144,375 150,938
4 Jenis Batang D Untuk Saluran Pembuangan Air
Ø 1/2 inci - 4 m btg 19,950 21,945 22,943
Ø 3/4 inci - 4 m btg 26,250 28,875 30,188
Ø 1 inci - 4 m btg 36,750 40,425 42,263
Ø 1 1/2 inci - 4 m btg 37,275 41,003 42,866
Ø 2 inci - 4 m btg 53,025 58,328 60,979
Ø 2 1/2 inci - 4 m btg 65,625 72,188 75,469
Ø 3 inci - 4 m btg 84,000 92,400 96,600
Ø 4 inci - 4 m btg 136,500 150,150 156,975
Ø 5 inci - 4 m btg 236,250 259,875 271,688
Ø 6 inci - 4 m btg 278,250 306,075 319,988
Ø 8 inci - 4 m btg 472,500 519,750 543,375
Ø 10 inci - 4 m btg 126,000 138,600 144,900
5 Jenis Baatang C Untuk Instalasi Listrik
Ø 5/8 " - 4 m btg 8,925 91,818 10,264
Ø 3/4 " - 4 m btg 30,561 33,617 35,145
Ø 1"-4m btg 39,657 43,623 45,605
Ø 1 1/2 " - 4 m btg 116,667 128,333 134,167
6 Pipa Sambungan Lurus

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
HARGA BAHAN
NO BAHAN DASAR SATUAN
Wil.I Wil.ll Wil.lll
1 2 3 4 5 6
Ø 2" bh 6,300 6,930 7,245
Ø 3" bh 8,663 9,529 9,962
Ø 1/2 " bh 2,625 2,888 3,019
Ø 2 1/2 " bh 7,613 8,374 8,754
Ø 3/4 " bh 2,888 3,176 3,321
Ø 1" bh 3,335 3,669 3,835
7 Pipa Sambungan L
Ø 1/2 " bh 2,625 2,888 3,019
Ø 3/4 " bh 3,150 3,465 3,623
Ø 1" bh 3,675 4,043 4,226
Ø 2" bh 5,775 60,353 6,641
Ø 2 1/2 " bh 7,613 8,374 8,754
Ø3" bh 10,672 11,739 12,273
Pipa GIP medium A Ø 2" bh 606,375 667,013 697,331
Pipa GIP medium A Ø 3" bh 1,267,875 1,394,663 1,458,056
Pipa GIP medium A Ø 4" bh - - -
Pipa GIP medium B Ø 2" bh 236,250 259,875 281,688
Pipa GIP medium B Ø 3" btg 367,500 404,250 422,625
Pipa GIP medium B Ø 4" btg 472,500 519,750 543,375
Pipa Penguras / Pembuangan Air Bak m - - -

H BAHAN LANGIT - LANGIT Lbr


1 Eternit (100 x 100) cm Lbr 27,125 29,838 31,194
Calsiboard Lbr 69,300 76,230 79,695
WoodPlank 20 x 400 cm ,T = 8 mm Lbr 75,250 82,775 86,538
WoodPlank 30 x 400 cm , T = 8 mm Lbr 94,500 193,950 108,675
2 Tripleks
123 x 244 x 0.2 cm Lbr 49,359 54,295 56,763
124 x 244 x 0.3 cm Lbr 60,031 66,034 69,036
125 x 244 x 0.4 cm Lbr 71,663 - -
126 x 244 x 0.6 cm Lbr 88,200 97,020 101,430
127 x 244 x 0.9 cm Lbr 115,000 127,050 132,825
3 Tripleks Melamin
122 x 244 x 0,3 cm Lbr 106,722 117,394 122,730
Multipleks 12 mm Lbr 203,963 224,359 234,557
Multipleks 10mm Lbr 166,753 183,428 191,766
Multipleks 6 mm Lbr 93,382 102,720 107,389
Multipleks 9 mm Lbr 133,403 146,743 153,413
Tripleks 3 mm Lbr 60,031 66,034 69,063
Tripleks 4 mm Lbr 73,371 80,709 84,377
Tripleks Sungkai Lbr 126,732 139,406 145,742
4 Accounstic ( 40 x 60 ) Lbr 80,042 88,046 92,048
5 Teakwood
122 x 244 x 0,3 cm Lbr 120,062 132,068 138,072
teakwood pintu 90 x 200 cm Tbl 3 mm Lbr 68,250 75,075 78,488
karsiboard Lbr 76,400 84,040 87,860
Les gipsun Lbr 32,200 35,420 37,030
6 Hard Bord (122 x 244) cm Lbr 100,052 110,057 115,060
7 Asbes Plat Harfeks (200 x 100 x 0,3) Lbr 53,000 58,300 60,950
8 List Profil
2 x 3 cm / 4 m btg 12,400 13,640 14,260
3 x 3 cm / 4 m btg 16,400 18,040 18,860

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
HARGA BAHAN
NO BAHAN DASAR SATUAN
Wil.I Wil.ll Wil.lll
1 2 3 4 5 6
4 x 4 cm / 4 m btg 21,200 23,320 24,380
4 x 5 cm / 4 m btg 27,800 28,580 31,970
5 x 5 cm / 4 m btg 27,800 28,580 31,970
9 Plafon PVC Motif tbl 8 mm Lbr 173,423 190,766 199,437
10 Plafon PVC Motif tbl 5 mm Lbr 124,031 136,434 142,636
11 List Profil PVC Besar btg 133,403 146,743 153,413
12 List Profil PVC Sedang btg 128,066 140,873 147,276
13 List Profil PVC Kecil btg 106,722 117,394 122,730
14 Gypsum Board Lbr 66,150 72,765 76,073
15 HPL Polos Lbr 181,913 200,104 209,199
16 HPL Urat Kayu Lbr 203,963 224,359 234,557
17 HPL Art From Lbr 225,225 247,748 259,009

I BAHAN ATAP
1 Genteng
Beton Warna bh 36,625 40,288 42,119
Keramik bh 11,576 12,734 13,313
Asbes Gelombang Lbr 48,753 53,628 56,065
Harfles ( 115 x 85 x 0,5 cm ) Lbr 66,701 73,371 76,706
Karet Pelapis Genteng m2 8,489 9,338 9,763
Asbes Genteng Lbr 33,351 36,686 38,353
Sirap ikat/m2 30,319 33,351 34,867
Atap Metal Lbr 95,200 104,720 109,480
2 Seng Gelombang
BWG 33" (BJLS 0, 20 mm) Kaki 7,519 8,271 8,647
BWG 30" (BJLS 0, 22 mm) Kaki 7,519 8,271 8,647
BWG 31" (BJLS 0, 25 mm) Kaki 10,672 11,739 12,273
BWG 28" (BJLS 0, 35 mm) Kaki 18,434 20,277 21,199
BJLS Licin (0,30 mm 40 x 180) Lbr 54,816 60,298 63,039
BJLS Licin (0,35 mm 40 x 180) Lbr 73,008 80,308 83,959
Setara Genteng Royal Polos bh 2,535 2,788 2,915
Setara Genteng Nusantara Polos bh 2,801 3,082 3,222
Bubungan Setara Royal Polos bh 2,868 3,155 3,298
Bubungan Setara Nusantara Polos bh 2,801 3,082 3,222
3 Seng Superdeck
180 x 70 cm - 10 Kaki Lbr 154,019 169,421 177,122
180 x 70 cm - 8 Kaki Lbr 145,409 159,950 167,220
180 x 70 cm - 7 Kaki Lbr 98,175 107,993 112,901
180 x 70 cm - 6 Kaki Lbr 82,005 90,206 94,306
4 Seng Aluminium Gelombang
SWG 32" 0,27 mm Kaki 8,732 9,605 10,042
SWG 32" 0,31 mm Kaki 9,945 10,939 11,436
SWG 32" 0,38 mm Kaki 11,157 12,273 12,831
Setara Sakura Roof 70 x 80 cm Lbr 46,691 51,360 53,695
Setara Perkasa Roof 80 x 120 cm Lbr 60,031 66,034 69,036
setara rotho Roof 70 x 80 cm Lbr 42,689 46,958 49,092
Setara Multi Roof Licin 80 x 100 cm Lbr 100,052 110,057 115,060
Setara Multi Roof Kasar 80 x 100 cm Lbr 113,392 124,731 130,401
Setara surya Roof Licin 70 x 80 cm Lbr 56,029 61,632 64,433
Setara surya Roof Kasar 70 x 80 cm Lbr 66,701 73,371 76,706
Setara Prisma Roof Lbr 86,712 95,383 99,718
Seng Plastik (Fiber) kaki 15,750 17,325 18,113

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
HARGA BAHAN
NO BAHAN DASAR SATUAN
Wil.I Wil.ll Wil.lll
1 2 3 4 5 6
5 Fiber Semen (Harflex)
Super 240 x 108 x 0,6 cm Lbr 76,646 84,310 88,143
Super 180 x 108 x 0,6 cm Lbr 53,604 58,964 61,644
Ekonomi 240 x 92 x 0,5 cm Lbr 59,667 65,634 68,617
Ekonomi 180 x 92 x 0,5 cm Lbr 52,027 57,230 59,831
Mini 240 x 105 x 0,4 cm Lbr 51,178 56,296 58,855
Mini 180 x 105 x 0,4 cm Lbr 48,753 53,628 56,065
Super 240 x 105 x 0,5 cm Lbr 61,486 67,635 70,709
Super 180 x 105 x 0,4 cm Lbr 54,210 59,613 62,341
6 Nook / bubungan
Beton Warna bh 24,498 26,947 28,172
Keramik bh 15,435 16,979 17,750
Asbes bh 60,880 66,968 70,012
Setara Multi Roof Licin 90 cm Lbr 84,893 93,382 97,626
Multi Roof Kasar 90 cm Lbr 86,625 95,288 99,619
setara sakura roof licin 90 cm Lbr 50,936 56,029 58,576
surya roof licin 40 cm Lbr 31,500 34,650 36,225
setara sakura roof 90 cm Lbr 36,383 40,021 41,840
Alm SWG 28" - 180 cmc Lbr 56,635 62,299 65,131
Alm SWG 28" - 105 cmc Lbr 46,327 50,960 53,276
7 Nok Steel Gelombang
Super - 180 cm bh 39,051 42,956 44,908
Mini - 105 cm bh 29,349 32,283 33,751
Ekonomi - 95 cm bh 22,072 24,279 25,383
8 Nok Steel Rata
Super - 180 cm bh 32,987 36,285 37,935
Mini - 105 cm bh 27,529 30,282 31,659
Ekonomi 95 cm bh 26,923 29,615 30,962
Nok 1/2 Lingkaran bh 46,933 51,627 53,973
Karet Pelapis Genteng roll 525,000 577,500 608,750
Ukuran 55 m 6,306 6,937 7,252,245
Ukuran 90 m 12,370 13,607 14,225
Penangkal Petir set 3,395,700 3,735,270 3,905,055
Spandek Baja BHP Color Bond G 550 m2 234,061 257,467 269,170
Spandek Type G 300 m2 96,414 106,055 110,876
Spandek Baja BHP Zinc Alume G 550 bh 89,744 98,718 103,205
Spandek Polos = 0,25 Lbr 41,344 45,478 47,545
Spandek Polos = 0,3 Lbr 46,856 51,542 53,885
Spandek Polos = 0,35 Lbr 51,818 56,999 59,590
Spandek Polos = 0,4 Lbr 57,330 63,063 65,930
Bitumen Gelombang ( 200 x 95 x 0,3 cm ) Lbr 174,000 191,400 200,100
Bitumen Genteng ( 106 x 40 x 0,3 cm ) Lbr 76,700 84,370 88,205
Nok Bitumen ( 50 x 90 x 0,3 cm ) Lbr 104,800 115,280 120,520
9 Seng Plat
BJLS 0,30 mm 40 x 180 Lbr 54,300 59,730 62,445
BJLS 0,35 mm Lbr 66,300 72,930 76,245
10 Seng Super deck (180 x 70 cm - 10 Kaki) kaki 14,000 15,400 16,100
11 Seng Aluminium Gelombang
SWG 32" 0,27 mm Kaki 10,100 11,110 11,615
SWG 30 0,31 mm Kaki 12,900 14,190 14,835
SWG 28" 0,38 mm Kaki 14,000 15,400 16,100
12 Seng plat (fiber) Kaki 14,500 15,950 16,675

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
HARGA BAHAN
NO BAHAN DASAR SATUAN
Wil.I Wil.ll Wil.lll
1 2 3 4 5 6
13 Karet Pelapis Genteng
Ukuran 55 Mtr 10,200 11,220 11,730
Ukuran 90 Mtr 20,600 22,660 23,690

J. BAHAN PENGGANTUNG
1 Kunci Tanam
Setara Union 1 x slag bh 182,155 200,371 209,478
Setara Union 2 x slag bh 275,537 303,090 316,867
Setara Yale 2 x slag bh 60,638 66,701 69,733
Yale 2 x slag bh 0 0 0
Kunci Bulat (Asli) bh 63,000 69,300 72,450
Kunci Pintu KM/WC Ses (asli) bh 210,000 231,000 241,500
Kunci PINTU Merk Ses (asli) bh 0 0 0
1 Slaq bh 189,500 208,450 217,925
Double Slaq bh 336,800 370,480 387,320
2 Penggantung
Hak Angin Kecil bh 11,157 12,273 12,831
Hak Angin Besar bh 26,250 28,875 30,188
Grendel Kecil Bh 25,710 28,281 29,567
Grendel Besar Bh 34,200 37,620 39,329
Grendel Pintu Double bh 53,361 58,697 61,365
Engsel Pintu Biasa bh 40,021 44,023 46,024
Engsel Jendela Biasa bh 34,685 38,153 39,887
Dppr Holder bh 137,813 151,594 158,484
Expanyolet Tempel / Door Closer (Otomatis) set 275,074 302,581 316,335
Engsel Jendela Kuningan Setara 777 psg 9,338 10,272 10,739
Engsel Daun Pintu Koboi psg 60,031 66,034 69,036
Engsel Engsel Daun Jendela 777 psg 13,340 14,674 15,341
Expanyolet Tanam Daun Pintu (otomatis) bh 31,500 34,650 36,225
Expanyolet Tanam daun pintu psg 26,250 28,875 30,188
Kunci Pintu Aluminium bh 115,000 126,500 132,250

K BAHAN SANITER
1 Kloset Duduk Standar bh 733,714 807,085 843,771
2 Kloset Jongkok Biasa bh 246,795 271,474 283,814
3 Wastafel bh 333,506 366,857 383,532
4 Wastafel Cuci piring Logam bh 233,454 256,800 268,473
5 Pompa Tangan Terpasang bh 347,514 382,265 399,641
6 Pompa Mesin bh 2,001,304 2,201,435 2,301,500
7 Urinoar Setara Ex. KIA/TOTO (Lengkap) bh 2,534,914 2,788,406 2,792,114
8 Bak Mandi Fiber bh 315,000 346,500 362,250
9 Reservoir = 1/2 m3 bh 826,875 909,563 950,906
10 Reservoir = 1 m3 bh 1,200,889 1,320,978 1,381,023
11 Reservoir = 2 m3 bh 2,427,926 2,670,718 2,792,114
12 Kran Air Biasa bh 46,958 51,653 540,001
13 Stop Kran Biasa 1/2-1" bh 60,298 66,328 69,343
14 Stop Krank Pembilas bh 148,838 163,721 171,163
15 Bak Air Fiberglass (Tangki) 1 m3 Unit 1,600,830 1,760,913 1,840,955
16 Bak Air Fiberglass (Tangki) 2 m3 Unit 3,134,959 3,448,455 3,605,203
17 Hand Shower Bh 91,875 101,063 105,656
18 Kloset Duduk Setara Ex Toto/KIA Set 2,401,245 2,641,370 2,761,432
19 Kloset Duduk Setara Ex Toto/KIA Warna Lengkap set 2,401,245 2,641,370 2,761,432

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
HARGA BAHAN
NO BAHAN DASAR SATUAN
Wil.I Wil.ll Wil.lll
1 2 3 4 5 6
20 Kloset Jongkok Setara Ex KIA bh 315,000 346,500 362,250
21 Kontak Sambungan bh 0 0 0
22 Kran Air Stainless Stell bh 53,361 58,697 61,365
23 Krank Air Tarik Merah bh 31,500 34,650 36,225
24 Pintu panil Bayam lbr 0 0 0
25 Pintu Panil PVC bh 210,000 231,000 241,500
26 Pintu Panil WC lbr 266,805 293,486 306,826
27 Tempat Sabun Setara Ex Toto (11 x 11) cm bh 100,052 110,057 115,060
28 Urinoir set 472,500 519,750 543,375
29 Sekat Urinoir Aluminium set 1,041,863 1,146,049 1,109,142
30 Wood Filler kg 49,875 54,863 57,356
31 Wood Stain kg 63,000 69,300 72,450
32 Sending Sealer kg 60,375 66,413 69,431
33 Clear kg 60,375 66,413 69,431

L. BAHAN FINISHING / CAT


1 Cat Tembok/ Plafond
Setara Avitex kg 21,000 23,100 24,150
Setara Metrolite kg 20,010 22,011 23,012
Setara Klimex kg 15,523 17,076 17,852
Setara Vinilex Mowilex kg 16,493 18,143 18,967
Setara Dulux ltr 90,714 99,785 104,321
Cat Dasar Setara Merk Mowilex ltr 49,613 54,574 57,054
Setara Mowilex (Dinding Dalam) ltr 61,365 67,502 70,570
Setara Mowilex (Dinding Luar) ltr 93,382 102,720 107,389
Dempul Kayu kg 20,010 22,011 23,012
Plamur Tembok kg 63,033 70,437 73,638
Waterprofing kg 73,920 81,312 85,008
Setara No Drop kg 55,125 60,638 63,394
2 Cat Kayu
Setara Glotex kg 53,361 58,697 61,365
Setara Avian kg 53,361 58,697 61,365
Palatone ltr 45,721 50,293 52,579
Setara I C I . Dulux kg 80,284 88,312 92,327
Politur kg 53,361 58,697 61,365
Meni Kayu/Besi kg 13,340 14,674 15,341
Minyak Cat Biasa ltr 6,670 7,337 7,671
Thinner A kg 26,681 29,349 30,683
Thinner B kg 24,012 26,414 27,614
Cat Dasar kg 26,681 29,349 30,683
3 Cat Atap
Setara A G A kg 93,382 102,720 107,389
Setara Yoko kg 86,712 95,383 99,718
Lem Seng ltr 97,263 106,989 111,852
Amplas/Kertas Kosong lbr 32,744 36,019 37,656
Residu/Alcater 10 ltr 60,880 66,968 70,012
Setara Lem Fox kg 36,383 40,021 41,840
Realing Stainless Stell m 1,091,475 1,200,623 1,255,196
Tangga Putar Baja m 3,031,875 3,335,063 3,486,656
4 Alco Panel m2 716,625 788,288 824,119

M. BAHAN INSTALASI LISTRIK

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
HARGA BAHAN
NO BAHAN DASAR SATUAN
Wil.I Wil.ll Wil.lll
1 2 3 4 5 6
1 Pipa Union Untuk Kabel
5/8 " - 4m btg 15,766 17,342 18,131
3/4" - 4m btg 27,800 30,580 31,970
1 1/2" - 4m btg 30,319 33,351 34,867
1" - 4 m btg 35,500 39,050 40,825
2 Kabel Listrik
a. Type NYK
1 1/2 mm roll 303,430 333,773 348,945
2 1/2 mm roll 424,705 467,176 488,411
b. Type NYY
2 x 1 1/2 mm roll 643,000 707,300 739,450
2 x 2 1/2 mm roll 869,784 956,763 1,000,252
2 x 4 mm roll 364,068 400,474 418,678
c. Type NYM
2 x 2 1/2 mm m 6,064 6,670 6,973
2 x 3 1/2 mm m 10,308 11,339 11,855
3 Lampu TL Biasa
1 x 20 watt bh 85,135 93,649 97,905
2 x 20 watt bh 133,645 147,010 153,692
1 X 40 watt bh 113,028 124,331 129,983
4 Lampu Pijar
25 watt Bh 6,306 6,937 7,252
40 watt bh 7,519 8,271 8,647
60 watt bh 11,157 12,273 12,831
100 watt bh 11,764 12,940 13,528
Lampu tanam Mercury bh 388,323 427,155 446,571
Lampu Mercuy 20 watt bh 242,550 266,805 278,933
Lampu Downlight Kecil bh 25,468 28,015 29,288
Lampu RM 2 x 20 watt bh 315,315 346,847 362,612
Lampu RM 2 X 36 watt bh 375,953 413,548 432,345
Lampu Setara Sanex SL -14 bh 85,499 94,049 98,324
Lampu SL 25 watt Setara Nasional bh 145,530 160,083 167,360
Lampu SL 9 watt Setara philips bh 61,850 68,035 71,128
Lampu SL 23 watt Setara Nasional bh 103,084 113,392 118,546
Lampu TL 20 watt bh 54,574 60,031 62,760
Lampu TL 1 x 36 watt Setara Philips /Baret bh 133,403 146,743 153,413
Lampu TL 2 x 20 watt bh 84,893 93,382 97,626
Lampu TL GCL 32 watt Setara/Baret bh 194,040 213,444 223,146
Lampu Downlight Besar bh 76,955 84,650 88,498
Lampu LED mtr 66,150 72,762 76,073
Lampu Kotak bh 84,893 93,382 97,626
Lampu TL 2 x 20 watt setar Philips bh 253,575 278,933 291,611
Lampu LED 1 x 50 watt bh 2,142,000 2,142,000 2,142,000
Lampu LED 2 x 30 watt bh 2,402,000 2,402,000 2,402,000
Lampu LED 2 x 40 watt bh 3,986,000 3,986,000 3,986,000
Lampu LED 2 x 50 watt bh 3,376,000 3,376,000 3,376,000
Lampu LED 3 x 40 watt bh 3,895,000 3,895,000 3,895,000
Lampu LED 3 x 50 watt bh 4,284,000 4,284,000 4,284,000
Lampu LED L27 35 Watt bh 205,000 205,000 205,000
Lampu LHE E40 80 watt bh 342,000 342,000 342,000
Lampu LED Bubble 13 watt bh 76,000 76,000 76,000
Lampu LED 20 watt bh 103,000 103,000 103,000

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
HARGA BAHAN
NO BAHAN DASAR SATUAN
Wil.I Wil.ll Wil.lll
1 2 3 4 5 6
Lampu LED 23 watt bh 137,000 137,000 137,000
Lampu LED 27 watt bh 151,000 151,000 151,000
Lampu LED 30 watt bh 151,000 151,000 151,000
Lampu LED 33 watt bh 253,000 253,000 253,000
Lampu LED 40 watt bh 192,000 192,000 192,000
Lampu LHE 42 watt bh 89,000 89,000 89,000
Lampu LHE 45 watt bh 287,000 287,000 287,000
Lampu LHE 85 watt bh 246,000 246,000 246,000
Lamou LED 36 watt bh 130,000 130,000 130,000
Lampu Sorot LED 2 x 50 watt bh 2,187,000 2,187,000 2,187,000
Lampu Sorot LED 2 x 40 watt bh 1,640,000 1,640,000 1,640,000
Lampu Sorot LED 2 x 30 watt bh 1,367,000 1,367,000 1,367,000
Tiang Galvanist 7 meter 1 cabang 3,758,000 3,758,000 3,758,000
Tiang Galvanist 9 meter 1 cabang 4,373,000 4,373,000 4,373,000
Tiang Galvanist 9 meter 2 cabang 6,491,000 6,491,000 6,491,000
Tiang Galvanist oktagonal 12 meter 17,217,000 17,217,000 17,217,000
Kabel Twisted 2 x 10 mm 8,000 8,000 8,000
Kabel Twisted 2 x 16 mm 11,000 11,000 11,000
Kabel NYM 2 x 2,5 mm 12,000 12,000 12,000
Kabel NyYHY 2 x 1,5 mm 11,000 11,000 11,000
Kabel NYYYHY 2 x 2,5 mm 19,000 19,000 19,000
Kabel NYY 2 x 2,5 mm 26,000 26,000 26,000
Kabel NYY 2 x 4 mm 35,000 35,000 35,000
Kabel NYY 2 x 6 mm 48,000 48,000 48,000
Kabel NYFGBY 2 x 4 mm 65,000 65,000 65,000
Kabel NYFGBY 2 x 6 mm 69,000 69,000 69,000
Kabel NYFGBY 3 x 4 mm 55,000 55,000 55,000
Kabel NYFGBY 3 x 6 mm 65,000 65,000 65,000
Kabel NYFGBY 4 x 4 mm 66,000 66,000 66,000
Kabel NYFGBY 4 x 6 mm 85,000 85,000 85,000
Kabel NYA 1x 2,5 mm 11,000 11,000 11,000
Kabel NYAF 1 x 6 mm 13,000 13,000 13,000
Kabel NYAF 1 x 1,5 mm 7,000 7,000 7,000
Panel PHB 20 x 30 x 50 + Tudung 615,000 615,000 615,000
Panel PHB 20 x 40 x 50 + Tudung 752,000 752,000 752,000
Panel PHB 20 x 40 x 60 + Tudung 889,000 889,000 889,000
Kontaktor 25 Ampere 513,000 513,000 513,000
Kontaktor 40 Ampere 1,230,000 1,230,000 1,230,000
Kontaktor 50 Ampere 1,640,000 1,640,000 1,640,000
Timer 670,000 670,000 670,000
Konektor 12,000 12,000 12,000
Servis Kabel 5,000 5,000 5,000
MCB 2 Ampere 76,000 76,000 76,000
MCB 4 Ampere 80,000 80,000 80,000
MCB 6 Ampere 62,000 62,000 62,000
MCB 10 Ampere 62,000 62,000 62,000
MCB 16 Ampere 62,000 62,000 62,000
MCB 25 Ampere 76,000 76,000 76,000
MCB 32 Ampere 78,000 78,000 78,000
MCB 50 Ampere 197,000 197,000 197,000
MCB 25 Ampere 609,000 609,000 609,000
MCB 50 Ampere 684,000 684,000 684,000

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
HARGA BAHAN
NO BAHAN DASAR SATUAN
Wil.I Wil.ll Wil.lll
1 2 3 4 5 6
ISOLASI 11,000 11,000 11,000
FITTING E - 40 35,000 35,000 35,000
FITTING E - 27 21,000 21,000 21,000
FITTING Over 28,000 28,000 28,000
Photo Cell 3 Ampere 117,000 117,000 117,000
Photo Cell 6 Ampere 164,000 164,000 164,000

Rumah Lampu Taman Diameter 30 cm + Dudukan + Fitting set 930,000 930,000 930,000

Rumah Lampu Taman Diameter 40 cm + Dudukan + Fitting set 1,080,000 1,080,000 1,080,000

Lengan Lampu Panjang 1,5 m, diameter 0,5 Inch + Begegl + Baut


set 103,000 103,000 103,000
+ Mur
Lengan Lampu Panjang 1,5 m, diameter 1,5 Inch + Begegl + Baut
set 253,000 253,000 253,000
+ Mur
Lengan Lampu Panjang 2 m, diameter 1,5 Inch + Begegl + Baut +
set 410,000 410,000 410,000
Mur
Lengan Lampu Panjang 3 m, diameter 1,5 Inch + Begegl + Baut +
set 479,000 479,000 479,000
Mur
Begel+ Baut + Mur set 76,000 76,000 76,000
KAP Hijau Fitting bh 28,000 28,000 28,000
Cat Avian kaleng 89,000 89,000 89,000
Thinner kaleng 48,000 48,000 48,000
Kuas 2 1/2 bh 14,000 14,000 14,000
Kawat Las 3,2 x 300 mm Net Weight 5 Kgs dos 185,000 185,000 185,000
Mata Gurinda Potong dos 82,000 82,000 82,000
Baut Drilling screw 12 x 25 mm dos 192,000 192,000 192,000
Yokes bh 3,000 3,000 3,000
Isolator Busbar bh 14,000 14,000 14,000
Arde 13 mm m 848,000 848,000 848,000
Skun Kabel 6 mm bh 3,000 3,000 3,000
Skun Kabel 1,5 mm bh 3,000 3,000 3,000
Kabel Arde 1 x 6 mm m 11,000 11,000 11,000
Klem Arde 13 mm set 14,000 14,000 14,000
Nol Arde + Assoseries set 69,000 69,000 69,000
Ring Stopping Buckle bh 3,000 3,000 3,000
Rel MCB m 28,000 28,000 28,000
Busbar m 137,000 137,000 137,000
Stainless Stell m 11,000 11,000 11,000
5 Shakelar Phase
Tunggal Putih (Setara Broco) bh 16,008 17,608 18,410
Double Putih (Setara Broco) bh 24,498 26,947 28,172
Tripel (Setara Broco) bh 48,510 53,361 55,787
Tunggal Putih (Setara Panasonic) bh 22,585 24,834 25,972
Double Putih (Setara Panasonic) bh 36,515 40,166 41,992
Tripel (Setara Panasonic) bh 59,756 65,731 68,719
6 Stop Kontak
Stop Kontak bh 30,561 33,617 35,145
Stop Kontak AC bh 25,875 28,463 29,756
Stop Kontak TV bh 30,561 33,617 35,145
MCB 32 Amp Setara MG bh 72,756 80,042 83,680
MBC 6 Amp Setara MG bh 66,701 73,371 76,706
7 Zakering Case Lokal Biasa
Lokal 2 Group Automat bh 91,199 100,319 104,879

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
HARGA BAHAN
NO BAHAN DASAR SATUAN
Wil.I Wil.ll Wil.lll
1 2 3 4 5 6
Lokal 3 Group biasa bh 103,326 113,659 118,825
Panil Box (Lengkap) set 54,574 60,031 62,760
Fitting Elips Putih bh 12,370 13,607 14,226
Travo 3 Ampere bh 38,588 42,446 44,376
Travo 10 Ampere bh 60,638 66,701 69,733

N BAHAN PELUMAS
Gemuk (Grease) kg 30,319 33,351 34,867
Olie SAE 90 Ltr 30,561 33,617 35,145
Solar Ltr 5,650 6,215 6,498
Bensin Premium Ltr 6,950 7,645 7,993
Minyak Tanah Ltr 11,246 12,370 12,932

O LAIN - LAIN
Bambu Perancah / Dolken 8 - 10/400 cm btg 14,333 15,766 16,482
PABX5 Line Dan 24 Cabang set 3,759,525 4,135,478 4,323,454
Timer Solder kg 24,255 26,681 27,893
Ijuk ikat/kg 24,255 26,681 27,893
Polytene 125 mikro m2 3,638 4,002 4,184
Kawat Las kg 30,319 33,351 34,867
Minyak Bakesting Ltr 6,112 6,723 7,029
Mur/Baut bh 5,650 6,215 6,498
Sealent tube 14,000 15,400 16,100
Karet Pelapis Kaca m 4,000 4,400 4,600
Rangkal Metal Hollow 40.40.2 mm m 23,100 25,410 26,565
List gypsum m 23,100 25,410 26,565
Kuas bh 7,000 7,700 8,050
Floor Drain bh 27,500 30,250 31,625
Skrup fixer bh 500 550 575
Sealtape m2 39,000 42,900 44,850
Pintu ( Kaca Temper + Acces) bh 9,350,000 10,285,000 10,752,500
Railing Tangga ( Temper Glass + Acces) m2 2,750,000 3,025,000 3,162,500
IPAL (ABR) bh 69,227,273 76,150,000 79,611,364
Manhoel + GT bh 2,886,155 3,152,770 3,296,078
Kabel NYA (2x2.5) mm m2 7,000 7,700 8,050
Klem Kabel No. 10 bh 500 550 575
Inbow Dos bh 3,500 3,850 4,025
Las Dop bh 500 550 575
Isolasi roll 2,000 2,200 2,300
T - Dos 5/8" bh 500 550 575
Floor Deck m2 115,000 126,500 132,250
GRC m2 850,000 935,000 977,500
Besi Baja c/Profil kg 15,750 17,325 18,113
Plafon PVC Motif tbl 7 mm lbr 141,625 155,788 162,869
Font cm 10,000 11,000 11,500
Air ltr 500 550 575

BAHAN JALAN
Aspal kg 18,000 19,800 20,700
Minyak Tanah Ltr 12,000 13,200 13,800
Minyak Solar Ltr 7,500 8,250 8,625
Minyak Pelumas Ltr 35,000 38,500 40,250

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
HARGA BAHAN
NO BAHAN DASAR SATUAN
Wil.I Wil.ll Wil.lll
1 2 3 4 5 6

P Upah Kerja
1 Pekerja Org/Hr 90,000 99,000 103,500
Buruh Org/Hr 80,000 88,000 92,000
Pembantu Masinis Org/Hr 80,000 88,000 92,000
Penjaga Gudang Org/Hr 100,000 110,000 115,000
Penjaga Malam Org/Hr 100,000 110,000 115,000
2 Tukang
Tukang Kayu Org/Hr 130,000 143,000 149,500
Tukang Batu Org/Hr 130,000 143,000 149,500
Tukang Cat Org/Hr 130,000 143,000 149,500
Tukang Listrik Org/Hr 130,000 143,000 149,500
Tukang pipa Org/Hr 130,000 143,000 149,500
Tukang Besi Org/Hr 130,000 143,000 149,500
3 Kepala Tukang
Kepala Tukang Kayu Org/Hr 150,000 165,000 172,500
Kepala Tukang Batu Org/Hr 150,000 165,000 172,500
Kepala Tukang Cat Org/Hr 170,000 187,500 195,500
Kepala Tukang Listrik Org/Hr 150,000 165,000 172,500
Kepala Tukang Pipa Org/Hr 150,000 165,000 172,500
Kepala Tukang Besi Org/Hr 150,000 165,000 172,500
4 Mandor Org/Hr 150,000 165,000 172,500
5 Operator Org/Hr 130,000 143,000 149,500
6 Pembantu operator Org/Hr 100,000 110,000 115,000
7 Sopir / Driver Org/Hr 120,000 132,000 138,000
8 Pembantu Sopir / Driver Org/Hr 90,000 990,000 103,500
9 Mekanik Org/Hr 150,000 165,000 172,500
10 Pembantu Mekanik Org/Hr 90,000 99,000 103,500

1. Wilayah I : Kec. Maros Baru, Turikale, Lau, Bontoa, Mandai, Marusu,


Bantimurung dan Simbang
2. Wilayah II : Kec. Camba, Cenrana, Tanralili, dan Moncongloe
3. Wilayah III : Kec. Mallawa, dan Tompobulu
* Harga ini adalah yang terjangkau kendaraan roda empat, biaya angkut I, II, III

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
1. Wilayah I : Kec. Maros Baru, Turikale, Lau, Bontoa,
Mandai, Marusu,
Bantimurung dan Simbang
2. Wilayah II : Kec. Camba, Cenrana, Tanralili, dan
Moncongloe
3. Wilayah III : Kec. Mallawa, dan Tompobulu
* Harga ini adalah yang terjangkau kendaraan roda empat, bia

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
STANDAR HARGA SATUAN BAHAN BANGUNAN DAN UPAH KERJA
PEMERINTAH PROVINSI SULAWESI SELATAN
KOTA MAKASSAR
TAHUN 2020

NO BAHAN DASAR SPESIFIKASI SATUAN HARGA (Rp)

1 2 3 4 5

A. BAHAN ATAP
1 Genteng Flat Corak / garis/ Natural (tidak dicat) 33x39x20 cm - 10 Bh/M2 Buah 4,400
2 Genteng Flat Corak / garis/ Warna Standar 33x39x20 cm - 10 Bh/M2 Buah 5,800
3 Genteng Flat Corak / garis/ Warna Spesial 33x39x20 cm - 10 Bh/M2 Buah 6,300
4 Genteng Elabana Natural (tidak dicat) 42x33x15 cm - 9 Bh/M2 Buah 4,400
5 Genteng Elabana Warna Standar 42x33x15 cm - 9 Bh/M2 Buah 5,800
6 Genteng Elabana Warna Spesial 42x33x15 cm - 9 Bh/M2 Buah 6,300
7 Genteng Kiat Beton Natural (tidak dicat) 36x32x15 cm - 12 Bh/M2 Buah 4,400
8 Genteng Kiat Beton Warna Standar 36x32x15 cm - 12 Bh/M2 Buah 5,800
9 Genteng Kiat Beton Warna Spesial 36x32x15 cm - 12 Bh/M2 Buah 6,300
10 Genteng Kiat Beton Warna Khusus 36x32x15 cm - 12 Bh/M2 Buah 6,800
11 Genteng Garuda Permata Natural (tidak dicat) 42x33x15 cm - 9 Bh/M2 Buah 4,400
12 Genteng Garuda Permata Warna Standar 42x33x15 cm - 9 Bh/M2 Buah 5,800
13 Genteng Garuda Permata Warna Spesial 42x33x15 cm - 9 Bh/M2 Buah 6,300
14 Genteng Royal Permata Natural (tidak dicat) 38x31x15 cm - 12 Bh/M2 Buah 4,400
15 Genteng Royal Permata Warna Standar 38x31x15 cm - 12 Bh/M2 Buah 5,800
16 Genteng Royal Permata Warna Spesial 38x31x15 cm - 12 Bh/M2 Buah 6,300
17 Nok Genteng Biasa tanpa warna Buah 15,000
18 Nok Genteng Keramik Buah 17,000
19 Atap Genteng Keramik Standar Buah 11,000
20 Atap Genteng Keramik Warna Buah 15,000
21 Nok Segi Natural (tidak dicat) 35x27x15 cm - 3,3 Bh/M' Buah 13,860
22 Nok Segi Warna Standar 35x27x15 cm - 3,3 Bh/M' Buah 19,000
23 Nok Segi Warna Spesial 35x27x15 cm - 3,3 Bh/M' Buah 19,140
24 Nok Segi Warna Khusus 35x27x15 cm - 3,3 Bh/M' Buah 25,000
25 Nok Bulat Natural (tidak dicat) 30x24x15 cm - 3,5 Bh/ M' Buah 14,700
26 Nok Bulat Warna Standar 30x24x15 cm - 3,5 Bh/ M' Buah 18,900
27 Nok Bulat Warna Spesial 30x24x15 cm - 3,5 Bh/ M' Buah 20,300
28 Nok Samping/T.Flat Natural (tidak dicat) 2,5 Bh/ M' Buah 12,500
29 Nok Samping/T.Flat Warna Standar 2,5 Bh/ M' Buah 17,500
30 Nok Samping/T.Flat Warna Spesial 2,5 Bh/ M' Buah 17,250
31 Nok Samping/T.Flat Warna Khusus 2,5 Bh/ M' Buah 20,000
32 Nok Cabang 3/Ujung Natural (tidak dicat) Buah 85,000
33 Nok Cabang 3/Ujung Warna Standar Buah 95,000
34 Nok Cabang 3/Ujung Warna Spesial Buah 115,000
35 Nok Genteng Multi Roof Kasar, pjg 80 cm Buah 57,500
36 Nok Genteng Multi Roof Licin, pjg 80 cm Buah 62,500
37 Nok Genteng Surya, pjg 80 cm Buah 47,500
38 Nok Genteng Sakura, pjg 80 cm Buah 33,000
39 Genteng Metal Multi Roof Kasar pjg. 77, lb. 100 cm Lembar 108,000
40 Genteng Metal Multi Roof Kasar pjg 77, lb. 80 cm Lembar 107,500
41 Genteng Metal Multi Roof Licin pjg 77 lb. 100 cm Lembar 90,000
42 Genteng Metal Multi Roof Licin pjg 77 lb. 80 cm Lembar 90,000
43 Genteng Metal Surya Licin pjg 77 lb, 80 cm Lembar 55,000
44 Genteng Metal Sakura Kasar pjg 77 lb, 80 cm Lembar 76,000
45 Genteng Metal Star Licin pjg 77 lb. 80 cm Lembar 30,000
46 Seng BWG 33 BJLS 0,20 MM kaki 7,200

Harga Satuan Bahan Bangunan dan Upah Kerja Tahun 2020


47 Seng BWG 28 BJLS 0,35 MM kaki 80,000
48 Seng Gelombang bjls 0,35 (6 Kaki) Lembar 80,000
49 Seng Gelombang bjls 0,30 (6 Kaki) Lembar 70,000
50 Seng Gelombang bjls 0,25 (6 Kaki) Lembar 45,600
51 Seng Gelombang bjls 0,20 (7 Kaki) Lembar 49,000
52 Seng Gelombang bjls 0,20 (10 Kaki) Lembar 72,000
53 Seng Plat bjls 0,35 (6 KK) Lembar 85,000
54 Seng Plat bjls 0,30 (6 KK) Lembar 75,000
55 Seng Plat bjls 0,20 (6 KK) Lembar 53,000
56 Seng Fiber KK 18,000
57 Fiber Semen Harflex ( 240x105x0,4 ) Lembar 80,000
58 Eternit Jibesmen 1 m x 1 m Lembar 15,000
59 Eternit Harflex 1 m x 1 m Lembar 18,000
60 Eternit Atrisco 1 m x 1 m Lembar 12,000
61 Karet Lapis Paku Asbes Biji 7,200
62 Karet Talang (50 cm) M 7,500
63 Karet Lapisan Genteng ( 50 cm) M 8,000
64 Karet Lapisan Genteng ( 90 cm) M 13,000
65 Karet Lapisan Genteng Tipis (110 mm) Uk. 1 x 20 m Rol 350,000
66 Karet Lapisan Genteng Tebal (150 mm) Uk. 1 x 20 m Rol 400,000
67 Onduline panjang 2 m + baut Lbr 165,000
68 Nok onduline 1 m Lbr 79,000
69 Ondulclear 95 x 2 m + baut Lbr 320,000

B. BAHAN DASAR
1 Batu Kali M3 350,000
2 Batu kali Belah M3 250,000
3 Batu Gunung M3 350,000
4 Batu gunung Belah 10 - 15 cm M3 250,000
5 Batu Pecah 7 - 10 cm M3 400,000
6 Batu Pecah 5 - 7 cm M3 350,000
7 Batu Pecah 3 - 5 cm M3 350,000
8 Batu Pecah 2 - 3 cm M3 350,000
9 Batu Pecah 1- 2 cm M3 350,000
10 Batu Pecah 0,5 - 1 cm M3 350,000
11 Batu Merah Standar Biji 1,000
12 Bata Ringan M3 900,000
13 Batako 40x20x10 cm - 13 Bh/M2 M2 64,350
14 Roster Beton 20 x 20 cm Biji 25,000
15 Roster Keramik 20 x 20 cm Biji 52,000
16 Roster Keramik 30 x 30 cm Biji 62,000
17 Roster Keramik 20 x 40 cm Biji 62,000
18 Glass Block Biji 30,000
19 Gravel M3 150,000
20 Pasir Kasar/Pasir Beton/Pasir Pasangan M3 225,000
21 Sirtu A M3 260,000
22 Sirtu B M3 260,000
23 Sirtu C M3 260,000
24 Pasir Timbunan M3 160,000
25 Tanah Timbunan M3 200,000
26 Kerikil Sungai M3 325,000
27 Semen (Tonasa 50 kg) PC Zak 65,000
28 Semen (Tonasa 40 kg) PC Zak 48,000
29 Semen Bosowa 40 Kg PC Zak 47,000
30 Semen 3 Roda 40 kg per sak PC Zak 47,000
31 Semen Holcim 40 kg PC Zak 45,000
32 Semen Putih 40 kg per sak Zak 70,000

Harga Satuan Bahan Bangunan dan Upah Kerja Tahun 2020


33 Pigmen Warna Zak 250,000
34 Semen Nat Tegel Kg 20,000
35 Semen Abu Tiga Roda 40 kg Kg 45,000
36 Semen Abu Tiga Roda 50 kg Kg 56,500
37 Semen Putih Tiga Roda 40 kg Kg 114,750
38 Semen Acian Mortar Putih 40 kg Kg 110,250
39 Water Proofing Kg 49,500
40 Paku jembatan Kg 30,000
41 Plastik untuk beton Kg 80,000
42 Batu Kecil Gravel Batu Peca 50 kg Kg 350,000

C. BAHAN BAMBU DAN GORONG - GORONG


1 Bambu - Petung Batang 100,000
2 Bambu - Besar Batang 40,000
3 Bambu - Sedang Batang 30,000
4 Bambu - Kecil Batang 25,000
5 Rotan Pengikat Ikat 35,000
6 Gorong-gorong ᶲ 30/ m Buah 150,000
7 Gorong-gorong ᶲ 40/ m Buah 200,000
8 Gorong-gorong ᶲ 70/ m Buah 300,000
9 Gorong-gorong ᶲ 80/ m Buah 350,000

D BAHAN BESI
1 Angker Mur Baut Kecil Bh 8,700
2 Angker Baut Tinggi 70 cm Bh 71,900
3 Baut Diameter 12 mm x 10 cm (stainless) wf 150 Batang/Biji 78,200
4 Baut Diameter 12 mm x 12,50 cm (stainless) Batang 20,996
5 Baut Diameter 12 mm x 18 cm Batang 13,365
6 Baut Diameter 12 mm x 20 cm Batang 14,074
7 Baut Diameter 12 mm x 25 cm Batang 17,418
8 Baut Diameter 12 mm x 30 cm Batang 19,951
9 Baut Skrup Bh 5,500
10 Baut Baja Bh 25,000
11 Besi Streep 30 x 3 mm M'/ Btg 190,000
12 Besi Hollow 40.60.1,2 mm P = 6 m Btg 183,000
13 Besi Hollow 40.60.1 mm P = 6 m Btg 185,000
14 Besi Hollow 40.40. 2 mm P = 6 m /40.40. 1,8 P = 6 m Btg 190,000
15 Besi Hollow 40.40.1,5 mm P = 6 m Btg 160,000
16 Besi Hollow 40.20.2 mm P =6 m Btg 135,000
17 Besi Hollow 40.20.1,5 mm P =6 m Btg 115,000
18 Besi Hollow 40.20.1,2 mm P = 6 m Btg 95,000
19 Besi Hollow 20.20.1,5 mm P = 6 m Btg 85,000
20 Besi Hollow 2x4 (12x31),0.25mm P=4m Btg 18,000
21 Besi Hollow 2x4 (15x35),0.25mm P=4m Btg 19,000
22 Besi Hollow 2x4 (18x38),0.25mm P=4m Btg 21,000
23 Besi Hollow 2x4 (18x38),0.25mm P=4m Btg 24,000
24 Besi Hollow 2x4 (18x38),0.25mm P=4m Btg 27,000
25 Besi Hollow 2x4 (34x37),0.25mm P=4m Btg 25,000
26 Besi Hollow 2x4 (34x37),0.25mm P=4m Btg 29,000
27 Besi Hollow 2x4 (34x37),0.25mm P=4m Btg 37,000
28 Besi Kanal C 8 cm,0.55mm P=6m Btg 65,000
29 Besi Kanal C 8 cm,0.60mm P=6m (5,7) Btg 71,000
30 Besi Kanal C 8 cm,0.65mm P=6m (7,8) Btg 75,000
31 Besi Kanal C 8 cm,0.70mm P=6m (9,8) Btg 80,000
32 Besi Kanal C 8 cm,0.75mm P=6m (11,8) Btg 85,000
33 Besi Kanal C 8 cm,1mm P=6m (13,8) Btg 116,000
34 Besi Kanal C 8 cm,0.55mm P=5,8m (15,8) Btg 83,000

Harga Satuan Bahan Bangunan dan Upah Kerja Tahun 2020


35 Besi Kanal C 8 cm,0.60mm P=5,8m Btg 69,000
36 Besi Kanal C 8 cm,0.65mm P=5,8m Btg 73,000
37 Besi Kanal C 8 cm,0.70mm P=5,8m ulir 10 full Btg 77,500
38 Besi Kanal C 8 cm,0.75mm P=5,8m Btg 82,500
39 Besi Reng 3cm ,0,4mm p=6m Btg 35,000
40 Besi Reng 3cm ,0,45mm p=6m Btg 37,000
41 Besi Reng 3cm ,0,4mm p=5,8m Btg 34,000
42 Besi Reng 3cm ,0,45mm p=5,8m Btg 36,000
43 Besi Reng 3,8cm ,0,4mm p=6m Btg 47,000
44 Besi Reng 3,8cm ,0,45mm p=6m Btg 52,000
45 Besi Reng 3,8cm ,0,4mm p=5,8m Btg 46,000
46 Besi Reng 3,8cm ,0,45mm p=5,8m Btg 50,500
47 Plat besi kembang 2,3mm M2 790,000
48 Besi metal stud L.76mm (5,8) Batang 70,000
49 Besi siku L.30.30.3/ 2,8 mm ,8 mm Batang 102,500
50 Besi siku L.40.40.4/ 3,8 mm 10 mm Batang 170,000
51 Besi siku L.50.50.5/ 4,8 mm Batang 250,000
52 Besi siku L.60.60.6/ 5,8 mm Batang 450,000
53 Besi siku L.70.70.7/ 6,8 mm Batang 615,000
54 Besi siku L.70.70.6/ 5 mm Batang 522,000
55 Baja siku L. 100. 100. 10 Batang 1,070,000
56 Baja beton polos 6 mm (0,22kg /M') Batang 28,000
57 Baja beton polos 8 mm (0,39kg /M') Batang 48,000
58 Baja beton polos 10 mm (0,62kg /M') Batang 65,000
59 Baja beton polos 12 mm (0,89kg /M') Batang 85,000
60 Besi beton 14 mm (1,21 kg / M') Batang 145,000
61 Besi beton 16 mm (1,39 kg / M') Batang 186,000
62 Besi beton 19 mm (2,23 kg / M') Batang 245,000
63 Besi beton 20 mm (2,46 kg / M') Batang 370,000
64 Besi beton ulir Dia 8 mm (0,39 kg / M') Batang 78,400
65 Besi beton ulir Dia. 16 mm SNI Batang 192,400
66 Besi plat 1,5r 1,2 mm M2 455,000
67 Besi plat 2m (1,8) M2 647,000
68 Besi plat 2,5mm M2 730,000
69 Besi plat 3 m (2,8) M2 910,000
70 Besi plat 3,5 M2 1,300,000
71 Besi plat 4 mm M2 1,400,000
72 Besi plat 4,5mm M2 1,620,000
73 Besi plat 5m(4,8) M2 1,730,000
74 Besi plat 5,5mm M2 1,950,000
75 Besi plat 6 m (5,8) M2 2,050,000
76 Besi plat 8 m (7,8) M2 2,610,000
77 Besi plat 9 m 10 mm (9,8) M2 3,350,000
78 Besi plat T = 12 mm Ukr. 120x240 Lembar 3,763,200
79 Besi plat T = 16 mm Ukr. 120x240 Lembar 4,984,000
80 Besi plat T = 18 mm Ukr. 120x240 Lembar 5,712,000
81 Baja tulangan (polos) U24 6 Batang 33,500
82 Baja tulangan (polos) U24 8 Batang 44,000
83 Baja tulangan (polos) U24 10 Batang 66,000
84 Baja tulangan (polos) U24 12 Batang 100,000
85 Baja tulangan (polos) U24 16 Batang 180,000
86 Baja tulangan (polos) U24 16 Batang 157,000
87 Baja tulang (Ulir) D32,D39 16 Batang 165,000
88 Baja tulang (Ulir) D32,D39 18 Batang 270,000
89 Besi profil H 200x200 P = 12 meter Batang 10,584,000
90 Besi profil H 100x100 P = 12 meter Batang 3,718,400
91 Besi IWF 300 P= 12 meter Batang 7,369,600

Harga Satuan Bahan Bangunan dan Upah Kerja Tahun 2020


92 Besi IWF 200 P= 12 meter Batang 4,216,800
93 Besi IWF 100 P= 6 meter Batang 492,800
94 Beugel Kap V palt Besi Kg 13,800
95 Kawat ikat bell 1roll 20 kg Kg 350,000
96 Kawat dul ( 1Roll =m') Roll 175,000
97 Kawat ram lubang 3,0 cm (rang armonika) M' 35,000
98 Kawat nyamuk plastik rang 1 cm L. 1,20 rang 2 cm M 10,000
99 Kawat nyamuk aluminium M 25,000
100 Kawat nyamuk baja M 35,000
101 Kawat las 2,6 nikko Dos 130,000
102 Kawat saringan pasir / ayakan M 18,000
103 Kawat brojong kg 25,000
104 Karet untuk pintu dan jendela aluminium PVC M'/roll 65,000
105 Door closer set unit 185,000
106 kanopi ploycarbonite + rangka besi tampa biasa 400 M2 575,000
107 kanopi ploycarbonite + rangka besi tampa biasa 500 M2 250,000
108 Lem kayu Dan Karet (Fox) besar ( 800 gr) Tube 15,000
109 Lem karet (fox ) besar 450 10 kg Tube 185,000
110 Lem seng M 16,000
111 Lembaran Atap Ploycarbonite untuk kanopi tebal 6 mm Roll 1,475,000
112 Lembaran Atap Ploycarbonite untuk kanopi tebal 5bmm Roll 3,000,000
113 Paku campuran (5-10 cm) kg 17,000
114 Paku asbes dan karet kg 55,000
115 Paku 5cm 7cm 10cm kg 17,000
116 Paku (1 1/2 - 2 1/2 cm) ( setara paku 2-3cm) kg 20,000
117 Paku 4 cm kg 18,000
118 Paku 2-3 cm kg 19,000
119 Paku sirap (setara paku 2-3 cm ) kg 22,000
120 Paku seng ( 1 kg /dos) kg 50,000
121 Paku skrup besi Hollow - 1000 biji Per Dos (bdrilling 450 b= 4,5 cm) Dos/bgks 175,000
122 Paku skrup gyapsun - 500 biji per dos bungkus Dos/bgks 60,000
123 Paku jembatan kg 14,000
124 Paku beton 5 cm Dos 15,000
125 Paku beton 6 cm Dos 15,000
126 Paku beton 7 cm- 10 cm Dos 15,000
127 Paku payung berulir (1 kg /Dos) kg 35,000
128 Paku Asbes berulir Dos 47,500
129 Paku Asbes biasa Dos 50,000
130 Paku Tripl (setara paku 2-3 cm) kg 25,000
131 Paku Eter (setara paku 2-3 cm) kg 25,000
132 Paku ripet Biji 1,000
133 Skamp (paku tembak hollow aluminium) Buah 25,000
134 Pagar jadi besi M' 400,000
135 Pagar pracetak 5 panel M' 450,000
136 Pagar pracetak 6 panel M' 500,000
137 Pagar pracetak 7 panel M' 574,000
138 Tiang beton untuk 5 daun Buah 240,000
139 Tiang beton untuk 6 daun Buah 288,000
140 Tiang beton untuk 7 daun Buah 336,000
141 Rangka baja ringan 0.75 M2 78,000
142 Spandek 0.25 Silver M 38,000
143 Spandek 0.35 Silver M 52,000
144 Spandek 0.4 Silver M 55,000
145 Spandek 0.45 Silver M 56,000
146 Nok spandek M 45,000
147 Hollow aluminium rangka plafond 0.25 (2x4) Btg 19,000
148 Hollow aluminium rangka plafond 0.3 (2x4/4x4) Btg 30,000

Harga Satuan Bahan Bangunan dan Upah Kerja Tahun 2020


149 Hollow aluminium rangka plafond 40x20x2 mm Btg 24,000
150 Hollow aluminium rangka plafond 40x40x2 mm Btg 21,000
151 Hollow aluminium rangka plafond 40x20x8 mm Btg 65,000
152 Kawat penggantung hollow aluminium Kg 30,000
153 Aluminium 4" brown 6 meter Btg 210,000
154 Aluminium 3" brown 6 meter Btg 125,000
155 Aluminium Slimar 4" brown untuk daun jendela Btg 159,500
156 Aluminium Slimar 3" brown untuk daun jendela Btg 90,000
157 Pas. Kusen aluminium 4" M' 120,000
158 Pas. Daun jendela aluminium + kaca tebal 5 mm + karet dan sealent M2 1,275,600
159 Pas. Daun pintu aluminium panil kaca tebal 5 mm (lengkap accessories) Unit 275,000
160 Pintu KM/WC aluminium (lengkap accessories) lebar 6 cm Unit 250,000
161 Pintu KM/WC PVC (lengkap accessories) lebar 10 cm Unit 230,000
162 Pintu fiberglass KM/WC Lembar 220,000
163 Pintu KM/WC bahan PVC (lengkap accessories) ex Maspion Unit 210,000

E. BAHAN FINISHING :
1 Cat Minyak Afduner 1kg Liter/botol 5,000
2 Cat Kayu Ex Avian (0,9 kg) Kaleng 63,000
3 Cat Minyak Ex Emco Kg 65,000
4 Cat kKayu Ex Mowilex 1kg Kaleng 42,000
5 Cat Minyak Liter 18,000
6 Cat Minyak Super Kaleng 36,000
7 Cat Kayu Dulux 1kg Kg 53,000
8 Cat Dasar 3,5 kg 1kg Kaleng 118,500
9 Cat Dasar Meni 3,5 Kg Kaleng 137,000
10 Cat Meni Glatik 3,5 kg Kaleng 96,000
11 Cat Tenner Kg 28,100
12 Cat Genteng Cap Belmas 1kg Kg 47,000
13 Cat Genteng yoko 4kg Kaleng 100,000
14 Cat Genteng Biasa AGA (4 kg) Kaleng 185,000
15 Cat Genteng Minyak Nippon 2,5 liter Kaleng 200,000
16 Cat Residu/ cloter (10 kg) 30.000/ kg Kaleng 300,000
17 Cat seng Nippon (2,5 kg) Kaleng 70,000
18 Cat Tembok Sahara / Kembang / Postek Aries (25 Kg) Kg 160,000
19 Cat Tembok Wintex / Maxilite (5kg) Kaleng 18,000
20 Cat Tembok ICI Kaleng 160,000
21 Cat Tembok Mowilex (Cat Dalam ) 2,5 Kg soff Kaleng 165,000
22 Cat Tembok Mowilex (Cat Luar ) 2,5 Kg gelap & terang Kaleng 260,000
23 Cat Tembok Aries 5kg Kaleng 65,000
24 Cat Minyak Avian Liter 165,000
25 Cat Tembok Kimex (5kg) Kaleng 121,000
26 Cat Tembok Dulux (luar) 2,5 kg Kaleng 130,000
27 Cat Tembok Warna Kuning , Hitam ,Merah (Belmax) kg 80,000
28 Vernis/Plitur (24 Klg) kg 57,000
29 Cat Altex Kg 132,000
30 Cat Anti Lumut (Aquaseal) (Klg 20kg) Nodrop 20 kg Pail 725,000
31 Cat Anti Lumut (No drop) (Klg 20 kg) Pail 720,000
32 Cat Dasar Glatik kembang 1 kg Kg 30,000
33 Plamur Tembok Boyo Dan Setara (5kg) Kaleng 45,000
34 Minyak Cat (aff Dunner) Liter 8,000
35 Dempul Kayu Cap Kuning / Merah (1 Kg) Kaleng 40,000
36 Dempul Ex Impra Kg 40,000
37 Dempul Ex Isamu Kg 55,000
38 Tenner A ( Ex Avian) super Liter 32,000
39 Minyak Te Botol Liter 8,500
40 Kertas Gosok Lembar 5,000

Harga Satuan Bahan Bangunan dan Upah Kerja Tahun 2020


41 Pewarna Natural Kaleng 95,000
42 pewarna brown Kaleng 70,000
43 Pewarna Ex Impra Kaleng 65,000
44 Wood Filler Ex Impra Kaleng 65,000
45 Clear Kaleng 72,240
46 Clear ex Impra Ltr 60,000
47 Sending kg 60,000
48 Sending ex Impra Ltr 60,000
49 Cat Kayu Ex Dullux Mengkilap Kg 85,000
50 Melamin Ex Impra kg 135,000
51 Cat Air Untuk Genteng, Bataco, Paving Block (AGA) kg 195,000
52 Cat Minyak Untuk Genteng, Bataco, Paving Block (AGA) kg 101,500
53 Kuas 2" (Eterna) Buah 8,000
54 Kuas 3" (Eterna) Buah 12,000
55 Kuas 4" (Eterna) Buah 18,000
56 Bahan Anti Karat Kg 50,000
57 Comice - 20 kg (dingding eksterior ) kg 75,000
58 Comice - 20 kg (dingding interior) kg 57,000
59 Lem Fox Kaleng kg 145,000
60 Lem Efoxi ltr 185,000
61 Perban Conpon Roll/Bh 12,000
62 Bubuk + air pelarut Ex Aqugart untuk Waterproofing kg 27,000
63 Cat Waterproof eks aquaproo- kw.1 kg 160,000
64 Cat waterproof Biasa Liter 132,000
65 Cat Marka Jalan aries gold 5kg kg 67,500
66 Aluminium Composite Panel (ACP) Seven Polyster 0,21 ( indoor) Lembar 475,000
67 Aluminium Composite Panel (ACP) Seven PVDF 0,3 Doft Lembar 694,000
68 Aluminium Composite Panel (ACP) Seven PVDF 0,3 Glossy Lembar 710,000
69 Aluminium Composite Panel (ACP) Seven PVDF 0,3 Metalic Lembar 727,000
70 Aluminium Composite Panel (ACP) Seven PVDF 0,3 Sparking, safron Lembar 739,000
71 Aluminium Composite Panel (ACP) Seven Marble, Wood, Brush Lembar 963,000

F BAHAN KAYU
1 Kayu Kls. I Bayam (balok) Chain Saw M3 13,000,000
2 Kayu Kls. I Bayam (balok) Sawmill M3 15,000,000
3 Kayu Kls. I Ulin (papan) M3 24,200,000
4 Kayu Kls. I Ulin (tiang) M3 25,000,000
5 Kayu Kls. I Bayam (papan) Shain Saw M3 20,000,000
6 Kayu Kls I Bayam(papan) sawmil M3 20,000,000
7 Kayu Klas. II Samarinda (papan)/ Lokal M3 3,750,000
8 Kayu Klas. II Samarinda (balok)/ Lokal M3 3,500,000
9 Kayu Kls. III Kapur (balok)/ Kemiri M3 2,000,000
10 Kayu Kls. III (papan) M3 2,000,000
11 Kayu Mangga/Kemiri (papan) M3 2,500,000
12 Kayu Kumea Balok M3 8,500,000
13 Kayu Kumea Papan M3 9,500,000
14 Kayu lapis Tripleks Lapis Kayu Uk. (0,4 x 122 x 244)cm Lembar 60,000
15 Kayu lapis Tripleks Lapis Kayu Uk. (0,3 x 122 x 244)cm Lembar 50,000
16 Kayu lapis Tripleks Lapis Kayu Uk. (0,6 x 122 x 244)cm Lembar 80,000
17 Kayu lapis Tripleks Lapis Kayu 18 mm Lembar 280,000
18 Kayu lapis Tripleks Lapis Kayu 12 mm Lembar 180,000
19 Kayu lapis Tripleks Lapis Kayu 9 mm Lembar 120,000
20 Kayu lapis Tripleks Lapis Kayu 2 mm Lembar 50,000
21 Kayu lapis Tripleks Lapis Kayu Mewah jati Teakwood 0,3 x 122 x 244 cm Lembar 200,000

G BAHAN PENGGANTUNG
1 Engsel Baja Biji 25,000

Harga Satuan Bahan Bangunan dan Upah Kerja Tahun 2020


Engsel Baja Dumont Biji 165,000
2 Engsel Kuningan 4 Lubang Biji 25,000
Engsel Kuningan 4 Lubang Dumont Biji 77,000
3 Engsel Stainless Steel Psg 45,000
4 Engsel H3 Lubang Psg 15,000
5 Engsel Kupu-kupu Psg 10,000
6 Engsel antik jendela Psg 15,000
7 Engsel Pintu Biasa Merk 777 Psg 15,000
Engsel Pintu Biasa Dumont Psg 77,000
8 Engsel Pintu Lemari Biasa Psg 11,000
Engsel Pintu Lemari Biasa Dakson Psg 60,000
9 Engsel Jendela Biasa Merk 777 Psg 12,500
Engsel Jendela Biasa Dumont Psg 52,000
10 Engsel Jendela Kuningan merk Kuningan Psg 20,000
Engsel Jendela Kuningan merk Dakson Psg 58,000
11 Engsel Pintu 4" SES Bh 35,000
Engsel Pintu 4" Dumont Bh 52,800
12 Engsel Jendela 3" SES Bh 25,000
Engsel Jendela 3" Dumont Bh 52,000
13 Engsel Pintu Kuningan SES Psg 77,000
Engsel Pintu Kuningan Dumont Psg 77,000
14 Gagang Pintu Lemari Bh 25,000
Gagang Pintu Lemari Dakson Bh 34,000
15 Grendel jendela Kuningan Bh 48,000
Grendel jendela Kuningan Dakson Bh 48,000
16 Grendel Pintu Biasa Bh 35,000
Grendel Pintu Biasa Dumont Bh 45,100
17 Grendel Pintu Kuningan/ Vertikal Bh 20,000
18 Grendel Pintu Besar Bh 66,000
19 Grendel Pintu Tanam (Expanyolet) Bh 150,000
20 Kunci Tanam Yale 1 x Putar Bh 663,300
21 Kunci Tanam Yale 2 x Putar Bh 250,000
22 Kunci Tanam Pintu 2 x Putar Besar Biasa Bh 150,000
23 Kunci Tanam Pintu 2 x Putar kecil Biasa Bh 100,000
24 Kunci Tanam Pintu 2 x Putar SES Bh 292,000
25 Hak Angin Kecil Antik Bh 50,000
26 Hak Angin Besar Bh 40,000
Hak Angin Besar Dumont Bh 68,000
27 Hak Angin Kecil Bh 25,000
Hak Angin Kecil Dumont Bh 111,100
28 Kait angin Jendela Alumunium Kualitas 1 Bh 15,700
Kait angin Jendela Alumunium Dumont Bh 171,600
29 Kait angin Jendela Alumunium Biasa Bh 7,500
Kait angin Jendela Alumunium Dumont Bh 92,500

H BAHAN KACA
1 Kaca Bening 3 mm M2 110,000
2 Kaca Bening 5 mm M2 135,000
3 Kaca Bening 6 mm M2 250,000
4 Kaca Bening 8 mm M2 330,000
5 Kaca Bening 10 mm M2 440,000
6 Kaca Ryben Tebal 5 mm M2 140,000
7 Kaca Ryben Tebal 6 mm M2 420,000
8 Kaca Ryben Tebal 3 mm M2 110,000
9 Kaca Ryben Tebal 8 mm M2 575,000
10 Kaca Ryben Tebal 10 mm M2 600,000
11 Jendela Nako (Rangka+ Kaca Tebal 5mm) 0,8 m x 0,2 m 4 lbr terpasang + Stand M2 54,000

Harga Satuan Bahan Bangunan dan Upah Kerja Tahun 2020


12 Kaca Es Buram 5 mm/ 10 mm M2 240,000
13 Kaca Lembaran Bening Tidak Berwarna FL Tebal 2 MM M2 65,000
14 Kaca Lembaran Bening Tidak Berwarna FL Tebal 3 MM M2 155,000
15 Kaca Lembaran Bening Tidak Berwarna FL Tebal 5 MM M2 170,000
Ukuran (1221 x 153) Lembar 185,000
Ukuran (200 x 90) Lembar 185,000
Ukuran (200 x 100) Lembar 215,000
Ukuran (213 x 122) Lembar 270,000
Ukuran (183 x 122) Lembar 215,000
Ukuran (244 x 183) Lembar 485,000
Kaca Lembaran Bening Tidak Berwarna FL Tebal 10 MM M2 2,265,000
16 Kaca Bening 12 mm M2 475,000

I BAHAN SANITER / SALURAN AIR


1 Kloset Duduk Lengkap(putih) Tangki Batu American standart Unit 1,500,000
2 Kloset Duduk Ex KIA Lengkap (warna) Tangki Batu Unit 2,300,000
3 Kloset Duduk ex TOTO Lengkap Accessories warna Putih Unit 2,986,000
4 Kloset Duduk ex TOTO Lengkap Accessories warna gelap Unit 2,700,000
5 Kloset Jongkok KIA Bh 350,000
6 Kloset Jongkok Biasa (American Standar) Bh 285,000
7 Wastafel polos / putih lengkap Bh 650,000
8 Wastafel warna lengkap Bh 660,000
9 Slypon Wastafel Biasa Bh 350,000
10 Urinoir Polos /Putih American Standart Unit 500,000
11 Urinoir ex TOTO (lengkap) Unit 1,400,000
12 Bak Tube Fiber Biasa Bh 225,000
13 Bak Tube Fiber ex TOTO Bh 3,000,000
14 Tangki Air Fiberglass Kap 0,25 M3 Bh 500,000
15 Tangki Air Fiberglass Kap 0,50 M3 Bh 750,000
16 Tangki Air Fiberglass Kap 1 M3 Bh 1,200,000
17 Tangki Air Alumunium Kap 1 M3 Bh 3,350,000
18 Kran Air Kuningan DIA 3/4 Biasa Bh 54,000
19 Kran Air Kuningan DIA 1/2 Biasa Bh 40,000
20 Kran Air Vernrkel DIA 3/4 Biasa Bh 40,000
21 Kran Air Antik DIA 1/2 Bh 230,000
22 Bak Cuci Piring Stain -Kosong Tanpa Saluran Pembuangan & Kran Air Bh 225,000
23 Kran air 2 / Bi / bisa Bh 110,000
24 Seal Tape Bh 5,000
25 Bak Mandi Unit 300,000
26 Kloset Jongkok Biasa Bh 110,000
27 Wallpaper & Penutup Dinding Rol 300,000
28 Foil (Kertas Alumunium Foil) M 160,000
29 Kloset Duduk (Data) Bh 450,000
30 Kloset Jongkok TOTO (Putih) Bh 345,000
31 Toilet Portable Fiberglass 400 liter Unit 21,000,000
32 Toilet Portable Fiberglass 400 liter Unit 26,600,000

J BAHAN LANGIT-LANGIT
1 Teakwood 120 x 240 cm t.3mm Lembar 200,000
2 Triplex 3 mm 120 x 240 cm Lembar 50,000
3 Triplex 4 mm 120 x 240 cm Lembar 60,000
4 Triplex 5 ml Lembar 85,000
5 Triplex 6 mm 120 x 240 cm Lembar 90,000
6 Triplex 7 ml Lembar 135,000
7 Triplex 10 ml Lembar 190,000
8 Triplex 15 ml Lembar 220,000
9 Triplex 20 ml Lembar 265,000

Harga Satuan Bahan Bangunan dan Upah Kerja Tahun 2020


10 Triplex Ukuran Pintu Lembar 125,000
11 Triplex Melamin 120 x 240 cm 3 mm Lembar 110,000
12 Teakwood 120 x 240 cm t.4mm Lembar 150,000
13 Multiplex 120 x 240 cm t. 6 mm Lembar 70,000
14 Multiplex 120 x 240 cm t. 9 mm Lembar 100,000
15 Multiplex 120 x 240 cm t. 12 mm Lembar 165,000
16 Multiplex 120 x 240 cm t. 18 mm Lembar 265,000
17 Gypsum Board 122x244x tebal 9 mm ex Jayaboard untuk Plafond Lembar 75,000
18 Kalsiboard tebal 3,5 mm Lembar 68,000
19 Kalsiboard tebal 4,5 mm Lembar 91,000
20 Kalsiboard tebal 6mm Lembar 127,000
21 Kalsiboard tebal 8 mm Lembar 175,000
22 Kalsiboard tebal 10 mm Lembar 223,000
23 Kalsiboard tebal 20 mm Lembar 594,000
24 Kalisplank 8mm (10cm x 3m) Lembar 26,500
25 Kalisplank 8mm (10cm x 3m) polos Lembar 44,500
26 Kalisplank 8mm (20cm x 3m)jati Lembar 47,000
27 Kalisplank 8mm (30cm x 3m)polos Lembar 66,000
28 Kalisplank 8mm (30cm x 4m)jati Kecil Lembar 68,000
29 Kalisplank 8mm (20cm x 4m)polos Lembar 64,000
30 Kalisplank 8mm (20cm x 4m)cedar Lembar 67,000
31 Lambrizirig t:4mm,(4 M') Lembar 45,000
32 HPL Lembar 220,000
33 Les kayu profil lebar 5 cm ( 4 m' ) Batang 20,000
34 Les kayu profil lebar 3 cm ( 4 m' ) Batang 36,600
35 Les kayu profil lebar 11/2 cm ( 4 m') Batang 20,000
36 Les kayu 1x10x400 cm Btg 57,500
37 Les kayu profil 4x4x400 cm Btg 31,800
38 Les kayu biasa 0,5 x 3 cm Btg 71,100
39 Les gypsum polos Btg 20,000
40 Les gypsum polos Kecil M' 10,000
41 Les gypsum motif Kecil (lebar 7 cm/10 cm) M' 12,500
42 Les gypsum Sedang M' 17,500
43 Les gypsum Lebar 10 cm M' 20,000
44 Les gypsum Lebar 15 cm M' 25,000
45 Les gypsum profil Btg 25,500
46 Bending gypsum Kecil M' 10,000
47 Bending gypsum Sedang M' 15,000
48 Bending gypsum Besar M' 25,000

K BAHAN LANTAI
1 Tegel PC 30 x30 cm Dos 85,000
2 Tegel Motif 30 x30 cm Dos 92,000
3 Tegel Keramik Putih 10 x 20 cm Dos 57,200
4 Tegel Keramik Putih 20 x 20 cm Dos 58,000
5 Tegel Keramik Putih 20 x 25 cm Dos 59,600
6 Tegel Keramik Putih 30 x 30 cm Dos 49,700
7 Tegel Keramik Putih 40 x 40 cm Dos 107,000
8 Tegel Keramik Putih 50 x 50 cm Dos 107,000
9 Tegel Keramik Putih 60 x 60 cm Ex Granito Dos 238,000
10 Tegel Keramik Putih 60 x 60 cm Ex Garuda Dos 160,000
11 Tegel Keramik Putih 30 x 60 cm Ex Granito Dos 263,000
12 Tegel Keramik Warna 60 x 60 cm Ex Granito Top Gress Dos 355,000
13 Tegel Keramik Warna 60 x 60 cm EX Garuda Dos 175,000
14 Tegel Keramik warna 30 x 60 cm Ex Garuda Dos 295,000
15 Tegel Keramik Putih 30 x 60 cm Dos 107,000
16 Tegel Keramik Warna 20 x 20 cm Dos 88,000

Harga Satuan Bahan Bangunan dan Upah Kerja Tahun 2020


17 Tegel Keramik Warna 30 x 30 cm Dos 60,000
18 Tegel Keramik Warna 20 x 25 cm M2 58,000
19 Tegek Keramik Warna 40 x 40 cm M2 65,000
20 Tegek Keramik Warna 50 x 50 cm Dos 114,000
21 Tegek Keramik Warna 60 x 60 cm Dos 138,000
22 Tegek Keramik Warna 30 x 60 cm Dos 200,000
23 Tegel keramik indogress - Homogeneus Tile Ukur. 60x60 Cm(GNS Ruffian) Dos 420,000
24 Tegel keramik indogress - Homogeneus Tile Ukur. 60x60 Cm(Topaz) Dos 319,000
25 Tegel keramik indogress - Homogeneus Tile Ukur. 60x60 Cm(Cottonwood) Dos 345,000
26 Granit Ukuran 60x185 cm dasar putih M2 1,212,200
27 Granit Ukuran 60x185 cm Dasar hitam /63 x 198 cm (sandimas 60x60) M2 800,000
28 Granit Ukuran 30x30 cm Asia tile Dos 50,100
29 Granit Ukuran 40x40 cm Granito Asia Tile Dos 68,000
30 Granit Ukuran 60x60 cm (sandimas) Dos 180,000
31 Kramik WC 20x20 cm Dos 62,000
32 Kramik WC 20x25cm Dos 60,000
33 Kramik WC 30x30 cm Asia Tile Dos 58,000
34 Kramik uku 30x30 cm Dos 501,000
35 Kramik uku 40x40 cm Dos 60,000
36 Kramik Warna ukuran 25x40 cm (accua) Dos 77,000
37 Batu Alam ukuran 10 x 20 cm Polos M2 160,000
38 Batu Alam ukuran 20 x 20 cm Polos 10x30cm M2 193,400
39 Batu alam motif sirip / garis-garis di pahat 10x30 cm 20x40 cm M2 240,600
40 Batu alam motif sirip / garis-garis di pahat 20x40 cm Dos 105,000
41 Batu Alam ukuran 10 x 20 cm Polos / 30x60 CM Polos M2 175,000
42 Marmer Ukuran slabs Type Burito/Acaro/Great I)/100x100 cm Dos 801,500
43 Marmer Ukuran slabs Type Burito/Acaro/Great II Dos 629,800
44 Marmer Ukuran slabs Type Burito/Acaro/Great III Dos 629,000
45 Marmer Ukuran 60 x 60 cm Type Burito/Acaro/Great I Dos 600,000
46 Marmer Ukuran 60 x 60 cm Type Burito/Acaro/Great II Dos 450,000
47 Marmer Ukuran 60 x 60 cm Type Burito/Acaro/Great III Dos 343,500
48 Marmer Ukuran 30 x 30 cm Type Burito/Acaro/Great I Dos 286,300
49 Marmer Ukuran 30 x 30 cm Type Burito/Acaro/Great II Dos 240,500
50 Marmer Ukuran 30 x 30 cm Type Burito/Acaro/Great III Dos 171,800
51 Ubin Lantai dari Tanah Liat diglazur Accura Polos uku. 40 x 40 cm M2 68,000
52 Ubin Lantai dari Tanah Liat diglazur KIA Polos uku. 40 x 40 cm Dos 73,200
53 Ubin Lantai dari Tanah Liat diglazur keramik merk arwana M2 68,000
54 Ubin Lantai dari Tanah Liat diglazur asiatile kw 40x40 cm M2 73,200
55 Ubin Lantai dari Tanah Liat diglazur impresso uku 40x40 cm M2 68,000
56 Ubin Lantai dari Tanah Liat diglazur masterina polos uku. 30 x 30 cm M2 45,000
57 Ubin Lantai dari Tanah Liat diglazur mulia Kw 1 uku. 30 x 30 cm M2 45,000
58 Ubin Lantai dari Tanah Liat diglazur kia polos uku. 30 x 30 cm M2 47,100
59 Ubin Lantai dari Tanah Liat diglazur Asia Tile Kw 1 uku. 30 x 30 cm M2 52,300
60 Ubin Lantai dari Tanah Liat diglazur Impresso Kw 1 uku. 30 x 30 cm M2 50,200
61 Ubin Lantai dari Tanah Liat diglazur Accura Kw 1 uku. 30 x 30 cm M2 47,100
62 Ubin Lantai dari Tanah Liat diglazur Masterina Kw 1 uku. 30 x 30 cm M2 43,900
63 Ubin Lantai dari Tanah Liat diglazur Mulia Kw 1 uku. 30 x 30 cm M2 50,200

L BAHAN LAIN-LAIN
1 Paving Blok Segi Empat 6 cm ( K 225 ) M2 65,800
2 Paving Blok Segi Empat 6 cm ( K 250 ) Standar M2 68,700
3 Paving Blok Segi Empat 6 cm ( K 250 ) Warna M2 140,000
4 Paving Blok Segi Empat 6 cm ( K 300 ) Standar M2 70,700
5 Paving Blok Segi Empat 6 cm ( K 300 ) Warna M2 150,000
6 Paving Blok Segi Empat 8 cm ( K 225 ) Standar M2 83,900
7 Paving Blok Segi Empat 8 cm ( K 225 ) Warna M2 129,000

Harga Satuan Bahan Bangunan dan Upah Kerja Tahun 2020


8 Paving Blok Segi Empat 8 cm ( K 250 ) Standar M2 87,900
9 Paving Blok Segi Empat 8 cm ( K 250 ) Warna M2 169,100
10 Paving Blok Segi Empat 8 cm ( K 300 ) Standar M2 90,200
11 Paving Blok Segi Empat 8 cm ( K 300 ) Warna M2 180,500
12 Paving Blok Segi Empat 8 cm ( K 400 ) Standar M2 97,800
13 Paving Blok Segi Empat 8 cm ( K 400 ) Warna M2 173,000
14 Paving Blok Segi Empat 10 cm ( K 300 ) Standar M2 128,700
15 Paving Blok Segi Empat 10 cm ( K 300 ) Warna M2 179,500
16 Paving Blok Segi Empat 10 cm ( K 400 ) Standar M2 135,800
17 Paving Blok Segi Empat 10 cm ( K 400 ) Warna M2 197,000
18 Paving Blok SegiTiga Uskup 6 cm Biji 6,200
19 Paving Blok SegiTiga Uskup 8 cm Biji 6,800
20 Paving Blok Segi Enam 8 cm ( K 225 ) Standar M2 87,700
21 Paving Blok Segi Enam 8 cm ( K 225 ) Warna M2 132,800
22 Paving Blok Segi Enam 8 cm ( K 300 ) Standar M2 94,000
23 Paving Blok Segi Enam 8 cm ( K 300 ) Warna M2 158,000
24 Paving Blok Segi Enam 8 cm ( K 400 ) Standar M2 101,600
25 Paving Blok Segi Enam 8 cm ( K 400 ) Warna M2 175,000
26 Paving Kombinasi 6 cm ( K 300 ) M2 95,500
27 Paving 20 x 20 8 cm ( K 300 ) M2 107,000
28 1 tegel pedestrian untuk pengarah difabel 30 x 30 Buah 26,200
29 Paving Ubin Motif Balok P28 Cm, L 28 Cm, T 7 Cm Standar Buah 16,400
30 Paving Ubin Motif Balok P28 Cm, L 28 Cm, T 7 Cm Merah/ Hitam Buah 20,800
31 Paving Ubin Motif Balok P28 Cm, L 28 Cm, T 7 Cm Kuning/Hijau/coklat Buah 23,000
32 Paving Ubin Motif Bulat Coin P28 Cm, L 28 Cm, T 7 Cm Standar Buah 16,400
33 Paving Ubin Motif Bulat Coin P28 Cm, L 28 Cm, T 7 Cm Merah/ Hitam Buah 20,800
34 Paving Ubin Motif Bulat Coin P28 Cm, L 28 Cm, T 7 Cm Kuning/Hijau/coklat Buah 23,000
35 Paving Ubin Motif Bulat Coin P28 Cm, L 28 Cm, T 7 Cm Standar Buah 16,400
36 Paving Ubin Motif Bulat Coin P28 Cm, L 28 Cm, T 7 Cm Merah/ Hitam Buah 20,800
37 Paving Ubin Motif Bulat Coin P28 Cm, L 28 Cm, T 7 Cm Kuning/Hijau/coklat Buah 23,000
38 Grass Block 8 cm Standar Bj 30,700
39 Kanstin Type Segi 10-15 x 3 0 x 40 cm - 2,5 Bh/M' M' 87,400
40 Kanstin Type Kotak 10 x 2 0 x 40 cm - 2,5 Bh/M' M' 76,500
41 Kanstin Type Kotak 10 x 2 5 x 50 cm - 2 Bh/M' M' 93,600
42 Kanstin Pracetak 60 x 25 x 15 cm Buah 56,600
43 Kanstin Pracetak Segitiga 40 x 20 x 10 cm Buah 28,700
44 Kanstin Pracetak 15 x 20 x 40 cm Buah 22,000
45 Kanstin Pracetak 15 x 25 x 40 cm Buah 36,400
46 Kanstin Pracetak 15 x 30 x 40 cm Buah 36,400
47 Kanstin Pracetak 15 x 30 x 50 cm Buah 31,000
48 Kanstin Pracetak 12 x 25 x 40 cm Buah 40,100
49 Kanstin Pracetak 25 x 30 x 50 cm Buah 45,000
50 Kanstin Pracetak 22 x 25 x 60 cm Buah 57,300
51 U Ditch L : 20 cm, T: 20 cm, P:60 cm Buah 97,000
52 U Ditch L : 30 cm, T: 40 cm, P:80 cm Buah 192,000
53 U Ditch L : 40 cm, T: 50 cm, P:100 cm Buah 330,000
54 U Ditch L : 50 cm, T: 50 cm, P:100 cm Buah 445,000
55 U Ditch L : 60 cm, T: 60 cm, P:100 cm Buah 575,000
56 U Ditch L : 70 cm, T: 80 cm, P:100 cm Buah 945,000
57 U Ditch L : 80 cm, T: 100 cm, P:100 cm 5 TON Buah 1,737,000
58 U Ditch L : 100 cm, T: 120 cm, P:100 cm 5 TON Buah 2,471,000
59 Gutter Crub 2.5 Bh/M' M' 114,500
60 Topi Uskup T = 6 cm M' 13,500
61 Topi Uskup T = 8 cm 3 Bh/M' M' 15,000
62 Tali Nilon Kg 5,000
63 Aspal Emulsi Kg 14,900
64 Aspal Bitumen Kg 14,900

Harga Satuan Bahan Bangunan dan Upah Kerja Tahun 2020


65 Aspal Curah (ton) Kg 14,900
66 Aspal Drum 1 Drum. 155 kg / Drum kg 1,250,000
67 Aspal cement Kg 14,900
68 B.0 M3 610,000
69 Solar Non Industri Ltr 5,150
70 Solar Industri Ltr 8,500
71 Minyak Pelumas Ltr 40,000
72 Bensin Ltr 6,450
73 Minyak bakesting Ltr 24,000
74 Mortar M3 720,000
75 Filler/abu batu M3 M3 235,000
76 Kerosen/Minyak Tanah Ltr 13,000
77 Beton Mutu K500 M3 1,060,000
78 Beton Mutu K450 M2 1,005,000
79 Beton Mutu K400 M3 955,000
80 Beton Mutu K350 M3 915,000
81 Beton Mutu K300 M3 870,000
82 Beton Mutu K275 M3 800,000
83 Beton Mutu K 250 M3 790,000
84 Beton Mutu K 225 M3 760,000
85 Beton Mutu K175 M3 715,000
86 Beton Mutu K125 M3 640,000
87 Box Culvert L 40 Cm, T 50 Cm, P 100 Cm Tebal : 13 cm Besi Single Buah 1,052,500
88 Box Culvert L 40 Cm, T 50 Cm, P 100 Cm Tebal : 13 cm Besi Double Buah 1,316,800
89 Box Culvert L 50 Cm, T 50 Cm, P 100 Cm Tebal : 14 cm Besi Single Buah 1,229,000
90 Box Culvert L 50 Cm, T 50 Cm, P 100 Cm Tebal : 14 cm Besi Double Buah 1,360,000
91 Box Culvert L 60 Cm, T 60 Cm, P 100 Cm Tebal : 15 cm 5 TON Besi Single Buah 1,762,000
92 Box Culvert L 60 Cm, T 60 Cm, P 100 Cm Tebal : 15 cm Besi Double Buah 1,400,000
93 Box Culvert L 80 Cm, T 80 Cm, P 100 Cm Tebal : 16 cm 5 TON Besi Single Buah 3,717,000
94 Box Culvert L 200 Cm, T 200 Cm, P 100 Cm Tebal : 25 cm 5 TON Besi Single Buah 10,096,000
95 Box Culvert L 200 Cm, T 200 Cm, P 100 Cm Tebal : 25 cm Besi Double Buah 9,927,500
96 Deuker T 6 cm, L 60 cm M' 137,600
97 Deuker T 6 cm, L 80 cm M' 203,300
98 Deuker T 10 cm, L 60 cm M' 234,200
99 Deuker T 10 cm, L 80 cm M' 175,700
100 Deuker T 12 cm, L 60 cm M' 202,400
101 Deuker T 12 cm, L 80 cm M' 269,900
102 Deuker T 15 cm, L 60 cm M' 360,700
103 Deuker T 15 cm, L 80 cm M' 480,900
104 Sewa C. Pump Standard M3 59,000
105 Sewa C. Pump Long Boom M3 125,000
106 Plastik Untuk Beton L.1M P. 40 M =65.000/ L.1,20M P.25 M = 100.000 M2 1,800
107 Kantung Plastik Uk 46 Isi 50 Bungkus 100,000
108 Kantung Plastik Uk 15 Isi 10 Ikat 20,000
109 Aspal (Asphal grade 60/70) Drum 11,000,000
110 Aspal (curah grade 60/70 Lokal) 6 drum 1 Ton 7,500,000
111 Excountener (peti kemas) Ukuran 20 Feet Kondisi 80 % Buah 30,000,000
112 Excountener (peti kemas) Ukuran 40 Feet Kondisi 80 % Buah 45,000,000

U-Ditch (ukuran lain)


113 B600 x H400 x L1200 ; tebal = 70 mm 1.2 M Berat 0,360 ton Buah 583,200
114 B600 x H500 x L1200 ; tebal = 70 mm 1.2 M Berat 0,400 ton Buah 641,100
115 B600 x H600 x L1200 ; tebal = 70 mm 1.2 M Berat 0,440 ton Buah 985,000
116 B600 x H700 x L1200 ; tebal = 70 mm 1.2 M Berat 0,490 ton Buah 1,075,000
117 B600 x H800 x L1200 ; tebal = 70 mm 1.2 M Berat 0,530 ton Buah 1,164,000
118 B800 x B600 x L1200 ; tebal = 70 mm 1.2 M Berat 0,490 ton Buah 891,800
119 B800 x B700 x L1200 ; tebal = 70 mm 1.2 M Berat 0,540 ton Buah 953,500

Harga Satuan Bahan Bangunan dan Upah Kerja Tahun 2020


120 B800 x B800 x L1200 ; tebal = 70 mm 1.2 M Berat 0,580 ton Buah 1,514,000
121 B800 x B1000 x L1200 ; tebal = 70 mm 1.2 M Berat 0,670 ton Buah 1,737,000
122 B1000 x H800 x L1200 ; tebal =100 mm 1.2 M Berat 0,980 ton Buah 1,548,000
123 B1000 x H1000 x L1200 ; tebal =100 mm 1.2 M Berat 1,090 ton Buah 2,471,000
Tutup U-Ditch
124 B600 x L600 : Tebal = 70 mm 0,6 M Berat 0,063 Ton Buah 216,700
125 B800 x L600 : Tebal = 70 mm 0,6 M Berat 0,084 Ton Buah 261,100
126 B1000 x L600 : Tebal = 100 mm 0,6 M Berat 0,150 Ton Buah 332,600
127 B500 x H500 x L1000 : Tebal = 80 mm 1 M Berat 0,468 Buah 1,254,500
RC Panel / Pagar Beton
128 Column Precast Kolom 200 x 200 x 4000 4 M Berat 0,400 Ton Buah 450,000
129 Wall Precast / Dinding 80 x 2920 x 450 2,9 M Berat 0,260 Ton Buah 463,500
130 Paving Blok Segi Empat Ukuran P 21 cm L.10,5 cm 6 cm K 400 M2 65,900
131 Paving Blok Segi Empat Ukuran P 21 cm L.10,5 cm 8 cm K 400 M2 81,600
132 Paving Blok Segi Empat Ukuran P 21 cm L.10,5 cm 10 cm K 400 M2 144,200
133 Hexagon (Segi Enam) Ukuran 6 cm M2 28,300
134 Urug (terima jadi) Ukuran 8 cm M2 38,500
135 Pemasangan M2 15,000

M ALAT BANTU PEMELIHARAAN


1 Sekop Bh 65,000
2 Gerobak Dorong Artco Bh 520,000
3 Betel Bh 30,000
4 Palu Bh 70,000
5 Sendok Semen Bh 25,000
6 Sikat Baja Bh 15,000
7 Cerek Aspal Bh 125,000
8 Garu Bh 15,000
9 Sapu Lidi Bh 5,000
10 Drum Pemasak Aspal Bh 175,000
11 Kayu Bakar M3 54,500
12 Cangkul Bh 60,000
13 Gergaji Kayu Cap Mata Unit 85,000
14 Sekop Sampah Merk VTR Unit 7,500
15 Sekop Cap Mata Bh 83,000
16 Palu / Martil Uk. 1,5 inci Bh 55,000

N BAHAN PIPA DAN SUMUR BOR


1.A PIPA PRALON PVC 1/2 Inci -4M Batang 25,000
( SII ) 3/4 Inci -4M Batang 32,500
1 Inci -4M Batang 42,500
1 1/4 Inci -4M Batang 57,500
1 1/2 Inci -4M Batang 48,000
2 Inci -4M Batang 74,000
2 1/2 Inci -4M Batang 90,000
3 Inci -4M Batang 110,000

1.B. PIPA PRALON uPVC 1/2 " -6M Batang 25,000


3/4 " -6M Batang 45,000
1" -6M Batang 67,500
1 1/4 " -6M Batang 101,000
1 1/2 " -6M Batang 250,000
2" -6M Batang 245,000
3" -6M Batang 502,500
3" -6M Batang 410,000
4" -6M Batang 605,000

Harga Satuan Bahan Bangunan dan Upah Kerja Tahun 2020


2 1/2 " -6M Batang 350,000
Batang 372,000
Batang 285,000
Batang 307,500

3" -6M Batang 525,000


Batang 520,000
Batang 455,500
Batang 425,000

4" -6M Batang 310,000


Batang 756,200
Batang 685,000
Batang 612,500

1C Pipa SUPRALON PVC 1/2" -6M Batang 20,000


Batang 25,000
Batang 20,500

3/4" -6M Batang 30,000


Batang 37,000
Batang 35,000

1" -6M Batang 55,000


Batang 65,000
Batang 35,500

-6M Batang 87,000


Batang 70,000
Batang 63,500

1 1/2" -6M Batang 135,000


Batang 155,000
Batang 127,500
Batang 110,000

2" -6M Batang 220,000


Batang 227,000
Batang 245,000
Batang 185,000
Batang 205,000
Batang 165,000

2 1/2" -6M Batang 307,500


Batang 345,000
Batang 325,000
Batang 345,000
Batang 263,500
Batang 290,000
Batang 225,000
Batang 245,500

3" -6M Batang 435,000


Batang 463,000
Batang 300,000
Batang 330,000
Batang 240,000

Harga Satuan Bahan Bangunan dan Upah Kerja Tahun 2020


Batang 260,000
Batang 318,500
Batang 350,500

4" -6M Batang 658,000


Batang 688,000
Batang 475,000
Batang 510,000
Batang 360,000
Batang 385,000
Batang 480,000
Batang 510,000

1D Pipa MASPION PVC 3/8 " M' 10,000


M' 8,000
M' 7,500
M' 5,000

1/2" M' 15,000


M' 8,500
M' 7,500
-6M M' 6,000

3/4" M' 15,000


M' 10,000
M' 7,500
-6M M' 12,500

1" M' 20,500


M' 18,000
M' 15,000
M' 9,500
-6M M' 10,000

1 1/4" M' 40,500


M' 30,000
M' 15,500
-6M M' 13,500
M' 20,000

1 1/2" M' 52,500


M' 37,500
M' 20,000
-6M M' 18,500
M' 30,000
-6M M' 22,500
M' 25,000

2" M' 65,000


M' 60,000
M' 22,500
-6M M' 40,500
M' 227,500
-6M M' 35,000
M' 23,500
-6M M' 42,500

Harga Satuan Bahan Bangunan dan Upah Kerja Tahun 2020


2 1/2" M' 85,000
M' 87,500
M' 65,000
-6M M' 50,500
M' 80,000
-6M M' 47,500
M' 50,000
-6M M' 35,500
M' 60,000
-6M M' 40,000
M' 55,500
M' 42,500

3" M' 110,500


M' 120,000
M' 955,000
-6M M' 42,500
M' 115,000
-6M M' 235,000
M' 67,500
-6M M' 82,500
-6M M' 55,000
M' 67,500
M' 80,000
4" M' 182,000
M' 170,000
M' 85,500
-6M M' 58,000
M' 150,500
-6M M' 65,000
M' 115,500
-6M M' 50,000
M' 117,500
-6M M' 340,000
M' 98,000
M' 110,500

5" -6M M' 150,000


-6M M' 148,500

6" -6M M' 150,000


-6M M' 200,500
-6M M' 147,500

8" -6M M' 300,000


-6M M' 305,500
-6M M' 245,000
-6M M' 217,500

10" -6M M' 468,500


-6M M' 488,500
-6M M' 388,000
-6M M' 320,000

12" -6M M' 750,000


-6M M' 770,000
-6M M' 612,500

Harga Satuan Bahan Bangunan dan Upah Kerja Tahun 2020


14" -6M M' 998,400
-6M M' 598,400

16" -6M M' 1,269,500


-6M M' 789,500

18" -6M M' 1,590,000


-6M 6M' 990,000

20" -6M M' 2,100,500


-6M M' 1,300,500

24" -6M M' 1,975,000


-6M M' 1,970,500

28" -6M M' 2,880,500

1E Pipa Wavin SNI Wavinsafe 1/2" -4M S - 10 / 10 Bar (1,0 Mpa ) Batang 24,500
3/4" -4M S - 10 / 10 Bar (1,0 Mpa ) Batang 34,500
1" -4M S - 10 / 10 Bar (1,0 Mpa ) Batang 45,000
11/4" -4M S - 10 / 10 Bar (1,0 Mpa ) Batang 65,200
11/2" -6M S - 10 / 10 Bar (1,0 Mpa ) Batang 112,000

2" -6M S - 10 / 12,5 Bar (12,5 Mpa ) Batang 178,000


3" -6M S - 10 / 12,5 Bar (12,5 Mpa ) Batang 358,000
4" -6M S - 10 / 12,5 Bar (12,5 Mpa ) Batang 560,000
6" -6M S - 10 / 12,5 Bar (12,5 Mpa ) Batang 1,150,000

2" -6M S - 12,5 / 10 Bar (1,0 Mpa ) Batang 143,500


3" -6M S - 12,5 / 10 Bar (1,0 Mpa ) Batang 298,500
4" -6M S - 12,5 / 10 Bar (1,0 Mpa ) Batang 440,000
6" -6M S - 12,5 / 10 Bar (1,0 Mpa ) Batang 940,000

11/2" -6M S - 12,5 / 8 Bar (0,8 Mpa ) Batang 98,000

1F Pipa Wavin SNI Wavinlok 2" -6M S - 10 / 12,5 Bar (12,5 Mpa ) Batang 176,500
3" -6M S - 10 / 12,5 Bar (12,5 Mpa ) Batang 376,500
4" -6M S - 10 / 12,5 Bar (12,5 Mpa ) Batang 566,500
6" -6M S - 10 / 12,5 Bar (12,5 Mpa ) Batang 1,176,500
8" -6M S - 10 / 12,5 Bar (12,5 Mpa ) Batang 1,816,500
10" -6M S - 10 / 12,5 Bar (12,5 Mpa ) Batang 2,818,000
12" -6M S - 10 / 12,5 Bar (12,5 Mpa ) Batang 4,488,000
16" -6M S - 10 / 12,5 Bar (12,5 Mpa ) Batang 7,388,000
20" -6M S - 10 / 12,5 Bar (12,5 Mpa ) Batang 11,518,000
24" -6M S - 10 / 12,5 Bar (12,5 Mpa ) Batang 19,050,000

2" -6M S - 12,5 / 10 Bar (1,0 Mpa ) Batang 148,000


3" -6M S - 12,5 / 10 Bar (1,0 Mpa ) Batang 318,000
4" -6M S - 12,5 / 10 Bar (1,0 Mpa ) Batang 448,000
6" -6M S - 12,5 / 10 Bar (1,0 Mpa ) Batang 968,000
8" -6M S - 12,5 / 10 Bar (1,0 Mpa ) Batang 1,478,000
10" -6M S - 12,5 / 10 Bar (1,0 Mpa ) Batang 2,318,000
12" -6M S - 12,5 / 10 Bar (1,0 Mpa ) Batang 3,688,000
16" -6M S - 12,5 / 10 Bar (1,0 Mpa ) Batang 5,911,000
20" -6M S - 12,5 / 10 Bar (1,0 Mpa ) Batang 9,258,000
24" -6M S - 12,5 / 10 Bar (1,0 Mpa ) Batang 15,462,000

Harga Satuan Bahan Bangunan dan Upah Kerja Tahun 2020


1G Pipa GIP ( Galvanis ) 1/2" -6M Batang 175,000
Med.A Super sni 3/4" -6M Batang 220,000
1" -6M Batang 340,000
1 1/4" -6M Batang 430,000
1 1/2" -6M Batang 500,000
2" -6M Batang 675,000
21/2" -6M Batang 875,000
3" -6M Batang 1,150,000
4" -6M Batang 1,800,000
5" -6M Batang 1,655,000
6" -6M Batang 1,852,000
8" -6M Batang 2,855,000
10" -6M Batang 5,555,000
12" -6M Batang 7,115,000
16" -6M Batang 11,125,000

1H Pipa GIP ( Galvanis ) 1/2" -6M Batang 130,000


Med.A 3/4" -6M Batang 170,000
1" -6M Batang 220,000
1 1/4" -6M Batang 280,000
1 1/2" -6M Batang 325,000
2" -6M Batang 400,000
21/2" -6M Batang 510,000
3" -6M Batang 650,000
4" -6M Batang 850,000

1I Pipa GIP ( Galvanis ) 1/2" -6M Batang 85,000


Med.B 3/4" -6M Batang 110,000
1" -6M Batang 175,000
1 1/4" -6M Batang 200,000
1 1/2" -6M Batang 220,000
2" -6M Batang 250,000
21/2" -6M Batang 325,000
3" -6M Batang 425,000
4" -6M Batang 550,000

1J Pipa PE 100 1/2" -6M SDR 17 PN 10 Batang -


3/4" -6M SDR 17 PN 11 Batang -
1" -6M SDR 17 PN 12 Batang -
1 1/4" -6M SDR 17 PN 13 Batang -
1 1/2" -6M SDR 17 PN 14 Batang 28,000
2" -6M SDR 17 PN 15 Batang 45,000
21/2" -6M SDR 17 PN 16 Batang 63,000
3" -6M SDR 17 PN 17 Batang 92,500

2 JENIS "D" UNTUK SALURAN 3/4" -4M Batang 25,000


PEMBUANGAN AIR 1" -4M Batang 32,500
1 1/2" -4M Batang 35,000
2" -4M Batang 40,000
21/2" -4M Batang 53,000
3" -4M Batang 70,000
4" -4M Batang 110,000
5" -4M Batang 180,000
6" -4M Batang 230,000
8" -4M Batang 425,000
10" -4M Batang 700,000

Harga Satuan Bahan Bangunan dan Upah Kerja Tahun 2020


3 PIPA JENIS "C' UNTUK 5/8 Inci -4M Batang 15,000
INSTALASI LISTRIK 3/4 Inci -4M Batang 17,500
PIPA PVC 1/2" (M.P.) Batang 30,500
PIPA PVC 3/4 " (Maspion) Batang 37,000
PIPA PVC 1 " Batang 45,000
PIPA PVC 2 " M' 62,500
PIPA PVC 2 1/2 M' 80,000
PIPA PVC Wavin Kual D(4"x 4 M) Batang 125,000
PIPA PVC Winlon Kual D (4"'x 4 M) Batang 135,000
PIPA PVC vinilon Kual D (4'' x 4 M) Batang 125,000
PIPA PVC Maspion Kual D ( 4"x 4 M) Batang 230,000
Plastik Lembaran dari Polimer Etilena (Polos Lebar 1 M) M' 340,000
Pipa PVC Wavin Kual D (4 x 4 M) Batang 167,000
Pipa PVC Maspion Kual AW ( 4 x 4 M) Batang 415,000
Pipa PVC Maspion Kual D( 4 x 4 M) Batang 205,500
Pipa PVC Wavin AW ( 4 x 4 M) Batang 320,000
Pipa PVC Wavin Kual D (4 x 4 M) Batang 135,000
Pipa PVC Maspion Kual (4 x 4 M) Batang 170,000
Pipa PVC Pravilon 4 Inci Batang 37,500
Pipa PVC Pravilon End 6 Mi Batang 42,500

4 PIPA PVC KLAS B ( PIPA LIMBAH ) SUPRALON


Pipa PVC Klas B RRJ 2" 6M Batang 195,000
Pipa PVC Klas B RRJ 3" 6M Batang 275,000
Pipa PVC Klas B RRJ 4" 6M Batang 348,500

5 AKSESORIS UNTUK PIPA KELAS B SUPRALON


Elbow RRJ 90 2" Bh 37,500
Elbow RRJ 90 3" Bh 4,800
Elbow RRJ 90 4" Bh 75,000
Tee RRJ 2" Bh 48,500
Tee RRJ 3" Bh 52,500
Tee RRJ 4" Bh 110,000
Endcap/ Dop 2" Bh 28,500
Endcap/ Dop 3" Bh 47,500
Endcap/ Dop 4" Bh 48,500

6 Pipa Beton
ᶲ 40 Panjang 110 cm, tebal 7 cm NRCP Pcs 230,000
ᶲ 40 Panjang 110 cm, tebal 7 cm RCP Pcs 295,000
ᶲ 60 Panjang 110 cm, tebal 8 cm NRCP Pcs 372,000
ᶲ 60 Panjang 110 cm, tebal 8 cm RCP Pcs 493,000
ᶲ 80 Panjang 110 cm, tebal 9 cm NRCP Pcs 532,000
ᶲ 80 Panjang 110 cm, tebal 9 cm RCP Pcs 737,000
ᶲ 100 Panjang 110 cm, tebal 10 cm NRCP Pcs 810,000
ᶲ 100 Panjang 110 cm, tebal 10 cm RCP Pcs 1,210,000

7 Pipa Instalasi 5/8 Batang 13,500


8 Pipa Listrik 5/8 Batang 10,000
9 Sambungan Pipa Lurus 1/2 Bh 12,000
10 Sambungan Pipa L 1/2 Bh 3,000
11 Sambungan Pipa Besi 3/4"T Bh 25,000
12 Knee 3/4" Bh 15,500
13 Knee 1" Bh 17,500
14 Knee PVC Diameter 2" Bh 15,000

Harga Satuan Bahan Bangunan dan Upah Kerja Tahun 2020


15 Saringan Pasir M' 27,500
16 Saringan Kotoran Bh 25,000
17 Saringan Kotoran Kamar Mandi - Bahan Plastik (Floor Drain) Bh 15,000
18 Saringan Kotoran Kamar Mandi - Bahan Besi/Kuningan (Floor Drain) Bh 27,500
19 Lem FOX Kg 45,000
20 Lem Pipa PVC Tube 17,500
21 Lem Pipa PVC Kg 72,500
22 Lem Besi - kw 1 Tube 35,000
23 Lem Besi - biasa Tube 25,000
24 Talang PVC Meter 115,000
25 Double Nipple GIV 1/2" Buah 7,500
26 Double Nipple GIV 3/4" Buah 15,000
27 Double Nipple 4" Buah 135,000
28 Doubble Nipple 2" Buah 40,500
29 Dop PVC 3/4" Buah 3,500
30 Dop PVC 1" Buah 7,500
31 Dop PVC 2" Buah 15,000
32 Dop PVC 4" Buah 27,500
33 Elbow GIV 3/4" Buah 20,000
34 Elbow GIV 2" Buah 75,500

O DAFTAR HARGA UNTUK PIPA DAN ALAT BANTU BESI


1 KNEE BESI 1/2" Buah 10,500
3/4" Buah 10,000
1" Buah 15,500

2 PIPA BESI MEDIUM A. SUPER 1/2" Batang 176,500


3/4" Batang 196,500
1" Batang 326,500
2' Batang 56,500
3" Batang 1,216,500
4" Batang 1,586,500

3 PIPA GALVANISIR A. SUPER 1/2" Batang 145,000


3/4" Batang 185,000
1" Batang 300,000
2' Batang 625,500

4 STOP KRAN - BIASA 1/2" Buah 47,500


3/4" Buah 65,000
1" Buah 97,500

5 STOP KRAN - KW.1 1/2" Buah 210,000


3/4" Buah 68,000
1" Buah 115,000

6 TEE 1/2" Buah 9,500


3/4" Buah 17,000

7 V. KNIE 3/4" Buah 15,000


1" Buah 15,500

8 V NEPLE 3/4" Buah 10,000


1" Buah 25,000

9 WATER MUR 1/2" Buah 27,500


10 WATER MUR 3/4" Buah 47,000

Harga Satuan Bahan Bangunan dan Upah Kerja Tahun 2020


11 Pipa Gip 1 1/2" (air bersih) Batang 8,000
12 Pipa Baja Hitam -6M 1/2" tbl=2 mm Batang 218,000
13 Pipa Baja Putih -6M 1/2" tbl=2 mm Batang 280,000
14 Pipa Baja Hitam -6M 3/4" tbl=2 mm Batang 278,000
15 Pipa Baja Putih -6M 3/4" tbl=2 mm Batang 348,000
16 Pipa Baja Hitam -6M 1" tbl=2 mm Batang 347,000
17 Pipa Baja Putih -6M 1" tbl=2 mm Batang 443,000
18 Pipa Baja Hitam -6M 2" tbl=2 mm Batang 640,000
19 Pipa Baja Putih -6M 2" tbl=2 mm Batang 815,000
20 Pipa Baja Hitam -6M 3" tbl=2 mm Batang 1,351,800
21 Pipa Baja Putih -6M 3" tbl=2 mm Batang 1,718,000
22 Pipa Baja Hitam -6M 4" tbl=2 mm Batang 1,828,000
23 Pipa Baja Putih -6M 4" tbl=2 mm Batang 2,230,000
24 Pipa PVP dlm 2" Resapan Batang 65,000
25 Pipa PVP dlm 3" Resapan Batang 157,000
26 Pipa PVP dlm 4" Resapan Batang 289,000

P MATERIAL POMPA
1 Pompa Air Shimiznu130 ( 125 Watt ) Buah 525,000
2 Pompa Air Shimizu 230 ( 200 Watt ) Buah 900,000
3 Pompa Air Panasonik 130 Jak ( 125 Watt ) Buah 560,000
4 Pompa Air Panasonik 200 Jak Buah 615,000
5 Pompa Air Sanyo 137 AC Buah 565,000
6 Pompa Air Sanyo PH 130 AC Buah 1,215,000
7 Pompa Air Wasser 139 EA Buah 2,615,000
8 Pompa Air Lakoni 129 A Buah 520,000
9 Pompa Air Inoto I Hp + Kabel 50 Meter Buah 2,675,000
10 Pompa Air Evak I Hp Buah 5,175,000
11 Pompa Air Franklin I Hp Buah 10,200,000
12 Pompa Wasser 60 Ea Buah 640,000
13 Pompa Wasser 169 EA Buah 960,000
14 Pompa Air Tsutumi 3 Buah 3,500,000
15 Mesin Las Hambatan dari Logam Otomatis (Las Listrik Yanmar TS 155 C 13 H Unit 26,059,200
16 Generator SET ABB Mesin Diesel 8,5 PK Yanmar Unit 19,332,500
17 Generator SET ABB Mesin Diesel 8,5 PK Kubota Unit 18,705,500

Q BAHAN INSTALASI LISTRIK


1 Aram Lampu kap Hijau Bh 75,000
2 Aram Mercury Bh 145,000
3 Balon HPIT 250 W PH Bh 225,000
4 Balon HPIT 400 W PH Bh 250,000
5 Balon HPLN 125 W PH Bh 60,000
6 Balon HQL 80 Watt Osram Bh 50,000
7 Balon Neon panjang TL 40 / 36 W PH Bh 15,000
8 Balon Son T 150 W Bh 150,000
9 Balon Son T 250 W Bh 155,000
10 Balon Son T 400 W Bh 175,000
11 Body HPIT 400 W Lengkap Set 850,000
12 Body Lampu Taman TO-2 Bh 195,000
13 Body Lampu Taman TO-1 Bh 185,000
14 Balon HPLN 250 W Bh 90,000
15 Body Mercury Hannock Bh 700,000
16 Body Balon Son.T Bh 475,000
17 Begel Per Pasang u/tiang beton Bh 75,000
18 Begel Per Pasang u/tiang Besi Bh 75,000
19 Box Panel Meter Bh 22,000
20 Box Panel Distribusi Bh 745,000

Harga Satuan Bahan Bangunan dan Upah Kerja Tahun 2020


21 Contactor 80 A Mitsubishi Bh 975,000
22 Contactor 100 A Mitsubishi Bh 1,300,000
23 Fitting Mercury E 27 Bh 10,000
24 Fitting Lampu Eletra segi Empat Bh 5,000
25 Fitting Lampu Taman E 27 Bh 7,000
26 Fitting Lampu E 40 Bh 30,000
27 Fotosell 6 A Bh 100,000
28 Ignitor HPIT 400 W ( SI.51 ) PH Bh 55,000
29 Injektor 3 Kutub Bh 85,000
30 Injektor SN 58 Bh 65,000
31 Isolasi Kabel Tanah (Bahan Karet) Roll 75,000
32 Isolasi Unibell Roll 8,500
33 Kabel NYA - 1 x 1,5 mm (Eterna) Meter 2,500
34 Kabel NYA - 1 x 1,5 mm (Eterna) Meter 5,000
35 Kabel NYA - 1 x 2,5 mm (Eterna) Meter 4,000
36 Kabel NYA - 1 x 2,5 mm (Eterna) Meter 65,000
37 Kabel NYA - 1 x 2,5 mm (Extrana) Meter 40,000
38 Kabel NYA - 1 x 2,5 mm (Extrana) Meter 12,500
39 Kabel NYY 4 x 10 mm Meter 11,000
40 Kabel NYY 4 x 6 mm Meter 6,500
41 Kabel NYY 2 x 2,5 mm Meter 6,500
42 Kabel WLC NYY 3 x 1,5 mm (Untuk Sumur Bor) Meter 9,000
43 Kabel NYM 2 x 1,5 mm Meter 9,400
44 Kabel NYM 2 x 1,5 mm Meter 75,000
45 Kabel NYM 2 x 1,5 mm Meter 93,750
46 Kabel NYM 2 x 1,5 mm Meter 125,000
47 Kabel NYM 2 x 2,5 mm Meter 4,700
48 Kabel NYM 2 x 2,5 mm Meter 7,000
49 Kabel NYM 2 x 2,5 mm Bh 28,200
50 Kabel NYM 2 x 2,5 mm Bh 55,000
51 Kabel NYFGBY 4 x 6 mm Bh 55,000
52 Kabel NYFGBY 4 x 10 mm Bh 57,500
53 Kabel NYFGBY 4 x 16 mm Bh 57,500
54 Kabel Twistik 2 x 10 mm Bh 70,000
55 Kabel Twistik 2 x 10 mm Bh 30,000
56 Kabel Twistik 2 x 16 mm Bh 60,000
57 Kabel Twistik 2 x 16 mm Bh 67,900
58 Kap E 27 Hijau Bh 26,500
59 Kapasitor HPIT 250 W PH Bh 11,000
60 Kapasitor HPIT 400 W PH Bh 700,000
61 Kapasitor SON T 400 W Bh 5,000
62 Kapasitor SON T 250 W Bh 26,100
63 Kapasitor SON T 150 W Bh 35,000
64 Kapasitor 8 Mf Bh 45,000
65 Kapasitor 25 Mf Bh 185,000
66 Kapasitor 32 Mf Bh 135,000
67 Konektor Double Baut Bh 180,000
68 Konektor Kedap Air 1 Baut Bh 300,000
69 Kontaktor SN 50/80 Ampere Bh 158,000
70 Klem Service Plastik Bh 47,000
71 Kawat Seng Kg 57,000
72 Lampu Hemat Energi 18 W Bh 68,000
73 Lampu Hemat Energi 23 W Bh 18,000
74 Lampu Hemat Energi 85 W Bh 70,000
75 Lampu Hemat Energi 75 W Bh 55,000
76 Lampu Hemat Energi 70 W Bh 60,000
77 Lampu Hemat Energi 65 W Bh 45,000

Harga Satuan Bahan Bangunan dan Upah Kerja Tahun 2020


78 Lampu Hemat Energi 50 W Bh 60,000
79 Lampu LED Hemat Energi 8 W Bh 60,000
80 Lampu LED Hemat Energi 10 W Bh 60,000
81 Lampu LED Hemat Energi 13 W Bh 170,000
82 Lampu Selang Hias Bh 5.00
83 MCB 1 A MG 1 Phase Bh 800,000
84 MCB 2 - 20 A MG 1 Phase Bh 800,000
85 MCB 25 - 32 A MG 1 Phase Bh 800,000
86 MCB 1 A 1 Phase Bh 360,400
87 MCB 6 A 1 Phase Bh 209,000
88 MCB 16 A 1 Phase Bh 26,100
89 MCB 20 A 1 Phase Bh 16,700
90 MCB 50 A 1 Phase Bh 12,500
91 Mour / Baut Bh 26,500
92 NFB 75 A Mitsubishi 3 Phase Bh 15,700
93 NFB 80 A Mitsubishi 3 Phase Bh 2.000
94 NFB 100 A Mitsubishi 3 Phase Bh 2,500
95 Pipa Gip 1 1/2" (listrik) Bh 3,500
96 Rang Lampu Taman TO.2 Bh 6,000
97 Relay lampu Selang Bh 3,000
98 Saklar Engkel In Clipsal Bh 5,000
99 Saklar Engkel In Broco Bh 13,500
100 Saklar Seri II In Clipsal Bh 33,400
101 Terminal Elegram 25mm Papan 150,000
102 Tiang PJU 9 M Galvanis Single David Bh 3,750,000
103 Tiang PJU 9 M Galvanis Double David Bh 4,900,000
104 Tiang besi 7M Bh 2,000,000
105 Tiang besi 9M Bh 2,200,000
106 Tiang Lampu Taman Bh 85,000
107 Timer Sweet Thebend Bh 425,000
108 Travo HPIT 400 Watt Philips Bh 260,000
109 Travo HPLN 125 Watt PH / HQL 80 Watt Bh 300,000
110 Travo Son T 400 W Bh 455,000
111 Travo Son T 250 W Bh 265,000
112 Travo Son T 150 W Bh 250,000
113 Travo TL 40 W PH Bh 41,800
114 Bohlam (Lampu Penerangan) TL Simbat 18 W Pcs 12,000
115 Bohlam (Lampu Penerangan) PCC 23 Watt Ecuat Pcs 41,000
116 Kawat Galbani Baja Berlapis Seng (Kawat Beton (Bindrad) Kg 16,400
117 Kawat Non Galbani Lainnya (Kawat Las) Kg 31,400
118 Kawat Galbani Baja Berlapis Seng (Kawat Beton (Bindrad) Kg 16,700
119 Stop Kontak dan Soket (Broco 2 Saklar) Bh 26,100
120 Control desk / Meja kontrol KWH Meter 450 watt Bh 118,400
121 Control desk / Meja kontrol KWH Meter 450 watt M 118,400
122 Kabel Listrik NYY (2 x 2,5) MM M 9,000
123 Kabel Listrik NYY (1 x 2,5) MM M 5,000
124 Kabel Listrik NYY (3 x 2,5) MM M 20,000
125 Kabel lainnya Eterna (3x2,5) 50 M M 15,000
126 Bohlam (lampu penerangan) Philips Pijar 40 watt Buah 7,500
127 Lampu neon Phlips 40 watt Buah 15,000
128 Lampu neon Phlips TL 40 watt Buah 15,000

R ALAT PENUNJANG INSTALASI LISTRIK


1 Accumulater Cell Tester Bh 223,600
2 Detektor Kabel Bh 9,248,300
3 Helm Proyek Bh 70,000
4 Kaos Tangan Kerja Psng 30,000

Harga Satuan Bahan Bangunan dan Upah Kerja Tahun 2020


5 Kaos Tangan Tegangan Tinggi 20 KV Psng 400,000
6 Kunci Pipa Besar Bh 115,000
7 Linggis Bh 55,000
8 Mantel Parasut Bh 261,300
9 Megger Meter Insulation Tester 3111V Bh 4,290,000
10 Mesin Las Listrik Bh 950,000
11 MultiMeter Sanwa asli Bh 460,000
12 Pakaian Kerja (Cattel Pak) Psng 543,400
13 Palu-Palu Bh 65,000
14 Pisau Cutter Bh 15,000
15 Senter Kepala Bh 95,000
16 Sepatu Kerja (listrik) Psng 480,000
17 Sepatu Tegangan Tinggi 20 KV Psng 500,600
18 Skop Bh 85,000
19 Solder Bh 15,000
20 Tang Ampere 600 A Bh 1,150,000
21 Tang Press Skun Besar Bh 1,100,000
22 Tang Press Skun Kecil Bh 700,000
23 Tangga Aluminium untuk lampu jalan Bh 1,550,000
24 Tangga Bambu 2,5 Meter Bh 78,400
25 Tangga Bambu 5 Meter Bh 135,900
26 Tangga Fiber Bh 6,275,000
27 Tools Kit Set 5,530,000
28 Topi Bh 30,000

S UPAH KERJA
1 Mandor Lapangan O/H 200,000
2 Kepala tukang O/H 173,000
3 Kepala Tukang Listrik O/H 173,000
4 Tukang Batu /Cat O/H 160,000
5 Tukang Kayu / besi O/H 160,000
6 Tukang pasang paving O/H 160,000
7 Pembantu Sopir O/H 133,000
8 Pembantu Mekanik O/H 171,000
9 Pembantu Tukang Listrik O/H 133,000
10 Pembantu Operator O/H 186,000
11 Mekanik O/H 160,000
12 Operator Terlatih O/H 203,000
13 Pekerja O/H 128,700
14 Sopir Terampil O/H 173,000
15 Biaya Pasang Canstein /M' 133,000
16 Biaya Pasang Paving /M2 173,000

Harga Satuan Bahan Bangunan dan Upah Kerja Tahun 2020


STANDAR HARGA SATUAN BAHAN BANGUNAN DAN UPAH KERJA
PEMERINTAH PROVINSI SULAWESI SELATAN
KABUPATEN GOWA
TAHUN 2018
Dalam Rupiah (Rp)

NO BAHAN DASAR SPESIFIKASI SATUAN HARGA

1 2 3 4 5

A HARGA BAHAN
1 Acuan dari kayu M3 3,202,500
2 Agregat halus/ Pasir bersih M3 182,400
3 Alat - alat kerja (3set) /set 262,500
4 Atap Metal Sakura Roof Lbr 43,900
5 Alat Metal Roof Lbr 85,785
6 Atap Surya Roof Lbr 51,500
7 Atap Policarbonat M2 62,280
8 Atap Spandek t = 0.2 L = 75 cm M1 37,000
9 Atap Spandek t = 0.3 L = 75 cm M1 47,000
10 atap spandek t= 0.35 L= 75 cm M1 57,000
11 Genteng Beton buah 12,100
12 Genteng Keramik KIA buah 18,300
13 Genteng Keramik Glazur buah 19,800
14 Genteng Metal berpasir/m 2x4b daun tebal 0.25 jarak reng 38. buah 60,300
15 Bubungan Seng buah 39,900
16 Bubungan Metal Sakura Roof buah 24,500
17 Bubungan Multi Roof buah 53,400
18 Bubungan Nok Genteng Beton buah 29,500
19 Bubungan Surya Roof buah 54,900
20 Nok Genteng Surya Pjg.40 cm buah 39,800
21 Nok Genteng Keramik buah 18,800
22 Nok Genteng Keramik Glazur buah 19,800
23 NOK "C" Colour/ Pcs Tebal 0.25 panjang 75 cm buah 27,100
24 Nat Filler/ tile Grout (bahan pengisi nat-flexible water proofing) kg 19,500
25 Alumnium Composite Panel t= 3 mm (1,22x2,44 M2) Lembar 442,200
26 Alumnium Composite Panel t= 4 mm (1,22x2,44 M ) 2 Lembar 624,200
27 Kusen Aluminium 3" m' 76,000
28 Kusen Aluminium 4" m' 95,000
29 Rangka jendela kosen Aluminium 3" m' 130,000
30 Rangka Pintu kosen Aluminium 4" m' 255,000
31 Kosen + Pintu Aluminium 4" unit 1,680,000
32 Kusen + Pintu PVC TOILET unit 255,000
33 Aluminium Foil single/ roll 50m roll 475,000
34 Baja profil IWF/ CNP kg 14,500
35 Baja gulungan ukuran ringan kg 27,000
36 Baja baut - baut kg 38,600
37 Baja galvanisir kg 48,200
38 Baja struktur kg 21,670
39 Baja paku paku jembatan kg 25,000
40 Batu Bata Merah buah 625
41 Batu Bata Beton Ringan (9 x 19 x 39)cm (150 bh) m3 900,250
42 Batu Bata Beton Ringan (10 x 20 x 60)cm (83 bh) m3 800,250
43 Batu Bata Beton Ringan (7.5 x 20 x 60)cm (111bh) m3 900,250
44 Batu Tela Uk.20x30x10 buah 3,700
45 Batu Batako 20x40x10 buah 4,700

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)

NO BAHAN DASAR SPESIFIKASI SATUAN HARGA

1 2 3 4 5
46 Batu Gunung M 3
154,600
47 Batu Kali Besar/ batu Belah Pondasi M3 154,300
48 Batu Kali Kecil M3 300,000
49 Batu Kerikil Koral M3 262,500
50 Batu Kapur Bongkahan M3 119,500
51 Abu Batu (Batu Pecah/ Split 0,5 - 1 cm) M 3
310,000
52 batu pecah/ Split 1-2 cm M3 265,700
53 Batu Pecah/ Split 2-3 cm M3 257,300
54 Batu pecah 3 - 5 M3 255,200
55 Batu Pecah 5 - 7 M3 221,600
56 Batu Pecah 7 - 10 M3 180,600
57 Batu Pecah 10 - 15 M3 168,000
58 kerikil berpasir alami (Sirtu Royalti) M 3
110,300
59 Kerikil Sirtu M3 125,000
60 Kerikil Sungai Royalti (tidak Disaring) M3 141,500
61 Kerikil Sungai tersaring M3 170,000
62 Bak Air Vibre Glass 'Uk. 55x55x60cm bh 266,000
63 Bak Cuci Stailess Stell 1 mata bh 465,000
64 Bondex/ Floordeck(110cmx700cm) t=0,75mm m 104,000
65 Besi Beton 1/2 Dia. 20 cm bh 50,400
66 Besi U24 (POLOS) kg 15,100
67 Besi U39 (Ulir) kg 15,500
68 besi Dia 6 -12 m bt 31,100
69 besi Dia 8 -12 m bt 49,300
70 besi Dia 10 - 12 m bt 73,100
71 besi Dia 12 -12 m bt 107,000
72 besi ulir dia 13 - 12 m bt 117,300
73 besi ulir dia 16 - 12 m bt 127,500
74 besi ulir dia 19 - 12 m bt 183,600
75 Besi Plat 4' x 8' (0,2x122x244 / 46,7 kg) kg 10,900
76 Besi Tempa m2 370,000
77 Besi Hollow 40.40.0.9 mm P=6 cm bt 67,300
78 Besi Hollow 20.40.0.9 mm P=6 cm bt 58,200
79 Besi Hollow 20x20 - 6m bt 40,800
80 Hollow Alumunium Metal furing rangka Plafond 40x40 4M bt 22,500
81 Hollow Alumunium Metal furing rangka Plafond 20x40 4M bt 16,400
82 Pasangan Rangka Plafond Metal furing 0,4x45x19x4000 m2 77,500
83 Kalsifuring CR 50 x 25 x 4000 (4 M) bt 43,300
84 Kalsifuring CR 38 x 13 x 4000 (4 M) bt 38,800
85 Kalsiscrew 6 x 20 (1500/DOS) dos 134,700
86 Kalsiscrew 8 ~ 10 (1000/DOS) dos 119,300
87 Kalsinail 3~4,5 (kait pada kayu)2000/dos dos 70,900
88 Kawat penggatung hollow aluminium buah 2,100
89 Besi Siku L 40.40.4-(6m) bt 46,000
90 Besi Streep (30x3 mm) bt 37,600
91 Baja Ringan Canal C75.80 sni pj=6 m bt 92,000
92 Baja Ringan Canal C75.75 sni pj=6 m bt 82,000
93 Reng tinggi =28mm T.0,45 pj=6 m bt 37,000
94 Reng tinggi =32mm T.0,45 pj=6 m bt
95 Screw Reng (1 pack/ 1000 pcs) pack 130,000
96 Baut Spandek (1 pack = 500 bh) pack 105,000
97 Pasangan Rangka Atap Baja Ringan m2 183,600

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)

NO BAHAN DASAR SPESIFIKASI SATUAN HARGA

1 2 3 4 5
98 Dynabolt/ pcs 10x80 buah 1,700
99 Roster Beton buah 20,900
100 Roster Kramik buah 63,000
101 Roster kaca/ glassBlock 19x19 buah 31,000
102 Bondex (Floord Deck) t=0,75 m2 110,250
103 Bitumen (Asphalt AC 60/70) kg 13,350
104 Asphalt Curah ton 9,660,000
105 Cat Kayu/ besi (dulux) kg 87,000
106 Cat Kayu/ besi (Avian) kg 56,000
107 Cat tembok KW II/ EX VINILEX (25kg) kg 22,320
108 Cat Tembok KW I/ EX DULUX (5kg) kg 24,700
109 Closet Duduk CW 600 J / SW 660 J Komplit & acc unit 2,250,000
110 Closet Duduk Ex KIA Lengkap (putih) tangki Batu buah 1,617,000
111 Closet jongkok 'type CE 6 ex. Toto unit 300,000
112 dDempul Kayu kg 31,900
113 Dop PVC Ø 4" buah 10,500
114 Dop PVC Ø 3" buah 6,500
115 Dop PVC Ø 2" buah 4,500
116 Door stoper buah 81,200
117 Door Close buah 455,000
118 Elastomer Bearing Pad TYPE 1 (300+350+36) buah 561,800
119 Elastomer Bearing Pad TYPE 2 (300+350+36) buah 730,800
120 Elastomer Bearing Pad TYPE 3 (300+350+36) buah 1,039,500
121 Engsel Jendela pasang 31,800
122 Engsel Pintu 3" buah 35,400
123 Eternit 1 x 1 Tabusmen lbr 19,300
124 Expantion Joint M1 121,300
125 Floot Drain 'TX 1B ex. Toto buah 439,000
126 Flux Oil (untuk emulsi) liter 26,800
127 Aluminium Plat Tipis lembar 10,700
128 Gemuk (Greese) liter 26,900
129 gorong - gorong Beton dia. 30 (tanpa Tulangan) M1 105,000
130 gorong - gorong Beton dia. 40 (tanpa Tulangan) M1 144,400
131 gorong - gorong Beton dia. 60 (tanpa Tulangan) M1 162,100
132 gorong - gorong Beton dia. 80 (tanpa Tulangan) M1 176,800
133 gorong - gorong Beton dia. 100 (tanpa tulangan) M1 236,300
134 GRC / KALSIBOARD 3,5 x1200 x 2400 lembar 67,500
135 GRC / KALSIBOARD 4,5 x1200 x 2400 lembar 68,900
136 Grendel Jendela buah 10,500
137 Grendel Pintu buah 17,000
138 Gypsum Board 9 mm ; uk 120 x 240 cm lembar 67,000
139 Gerobak Dorong unit 340,000
140 Handle Pintu buah 308,700
141 Les Gypsum Polos M 17,900
142 IJUK ikat 21,600
143 Kaca Polos 3 mm M2 127,000
144 kaca Polos 5 mm M2 152,000
145 Kaca Polos 8 mm M 2
202,000
146 Kaca Rayben 3 mm M2 202,000
147 Kaca Rayben 5 mm M2 322,000
148 Kapur Hidrasi M3 179,300
149 Karet Alas Genteng 90 cm M1 8,100

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)

NO BAHAN DASAR SPESIFIKASI SATUAN HARGA

1 2 3 4 5
150 Kait Angin bh 8,100
151 Kawat Beton/ Bindrat kg 25,300
152 Kawat Las kg 27,000
153 Kawat Ram Ayakan M3 30,100
154 Kayu Kls I (Balok) Jati M 3
13,100,000
155 Kayu Kls I (Balok) Sawmil M3 13,755,000
156 Kayu Kls I (Papan) Sawmil (bayam) M3 15,750,000
157 Kayu Kls II (balok) Kamper M3 3,160,000
158 kayu kls II (papan) sawmil M3 3,969,000
159 kayu Kls III (balok) Meranti M3 2,085,000
160 Kayu Kls III (papan) mal 2/30, 2/40 M3 2,291,100
161 Kayu Kls IV/ Balok Mal 4/6 M 3
1,627,500
162 Kayu Dolken dia. 8-10 cm (p=4m) btg 63,000
163 Kayu les Profil 3x3 (4cm) m' 8,300
164 Kayu les Profil 4x4 (4cm) m' 10,000
165 Kayu les Profil 5x5 (4cm) m' 13,200
166 kayu Struktur M3 9,180,000
167 Kayu Bakar M3 186,900
168 Kayu Perancah 5/10-4 Bt 44,700
169 Kayu Balok 3/5 Klas I Bt 62,000
170 kayu Balok 3/5 Klas II Bt 22,000
171 Kayu Balok 4/6 Klas I Bt 102,000
172 Kayu Balok 4/6 Klas II Bt 32,000
173 Kayu Balok 5/7 Klas I Bt 149,000
174 Kayu Balok 5/7 Klas II Bt 47,000
175 Kayu Balok 5/10 Klas I Bt 212,000
176 Kayu Balok 5/10 Klas II Bt 62,000
177 Kayu Balok 5/12 Klas I Bt 307,000
178 Kayu Balok 6/12 Klas I Bt 307,000
179 Kayu Balok 8/12 Klas I 332,000
180 Kayu Papan 2/20 Klas I lembar 242,000
181 Kayu Papan 2/20 Klas II 59,000
182 Kerosine (Minyak Tanah) Liter 12,000
183 Kawat Bronjong 3 mm (1 roll = 50kg) m' 11,000
184 Kawat Bronjong jadi (2x1 x 0,5m) dia. 2,7 mm; 9kg kg 25,500
185 Kawat Bronjong jadi (2x1 x 0,5m) dia. 3 mm; 9kg kg 28,000
186 Kertas Gosok/ Amplas Kayu lembar 7,500
187 Kusen Aluminium 3" Alexindo m' 18,750
188 Klep Diameter 3/4" ex onda buah 40,500
189 Kansteen Beton k.300 (40/30/15) buah 32,000
190 Kran Air SKL 1/2 Inci buah 20,400
191 Kran Dinding type TMN Picarlo buah 61,000
192 Kran Zink 'T 30 AR12NV7N ex. Toto buah 305,000
193 Kran Zink Hwaco 1L Unit 275,000
194 Kunci Tanam Yale 1x putar 132,600
195 Kunci Tanam Yale 2x putar buah 81,600
196 Kwas Cat lembar 20,000
197 Lambriziring t;4 mm (4m') buah 15,000
198 Lampu Hemat Energy 8 Watt buah 60,700
199 Lampu Hemat Energy 14 Watt buah 53,900
200 Lampu Hemat Energy 18 Watt buah 53,800
201 Lampu Hemat Energy 23 Watt buah 66,500
202 Lampu TL 1 x 10 Watt buah 47,300

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)

NO BAHAN DASAR SPESIFIKASI SATUAN HARGA

1 2 3 4 5
203 Lampu TL 1 x 20 Watt buah 52,500
204 Lampu TL 1 x 30 Watt buah 63,000
205 Lampu TL 2 x 18 watt Grille (panasonic) buah 31,500
206 Lampu TL 2 x 36 watt Grille (panasonic) buah 42,000
207 Lem Kayu Fox kg 29,000
208 List Profil 5 cm Gypsum m 25,500
209 List Plafond Datar M1 15,100
210 List Plafond Profil M1 16,700
211 Mesin Jet Pump kap. 250 Watt Groundfoss unit 1,010,000
212 Mesin Pompa Tekan kap. 150 Watt Ground foss unit 650,000
213 Meni Kayu kg 36,750
214 Minyak Pelumas Liter 47,300
215 Mur Baut 5/8 buah 5,500
216 Pagar Brc 240x120 cm m2 409,500
217 Pagar Brc 240x150 cm m2 446,250
218 Pagar Brc 240x190 cm m2 698,250
219 Tiang dia. 1,5" (tinggi = 120 cm) bh 178,500
220 Tiang dia. 1,5" (tinggi = 150 cm) bh 246,750
221 Tiang dia. 1,5" (tinggi = 190 cm) bh 309,750
222 Uclip bh 1,890
223 Pagar Beton Panel 5 susun m 425,000
224 Pagar Beton Panel 6 susun m 495,000
225 Pagar Beton Panel 7 susun m 575,000
226 Paku 8-2cm kg 19,000
227 Paku5-10 cm kg 20,000
228 Paku 1-3 cm kg 22,000
229 Paku Gypsum kg 31,100
230 Paku Klem kg 23,600
231 Paku Ramset buah 1,100
232 Paku seng kg 32,000
233 Paku Skrup buah 650
234 Paku Beton 8-10 dos 16,300
235 Pasir Beton M3 182,400
236 Pasir Pasang M3 183,400
237 Pasir Urug/ Pasir alas/ pengikat pilihan M3 88,200
238 Pelampung otomatis 1/2" buah 56,500
239 Paving Blok Kotak T.8 cm K.250 (44bh/m2) m2 81,000
240 Paving Blok Kotak T.8 cm K.300 (44bh/m2) m2 86,500
241 Paving Blok Kotak T.8 cm K.350 (44bh/m2) m2 92,000
242 Paving Blok Kotak T.8 cm K.250 Colour (44bh/m2) m2 99,700
243 Paving Blok Kotak T.8 cm K.300 Colour (44bh/m2) m2 105,200
244 Paving Blok Kotak T.8 cm K.350 Colour (44bh/m2) m2 110,700
245 Topi Skrup K.300 bh 6,600
246 Paving Blok segi enam K.250 8cm (35bh/m2) m2 92,000
247 Paving Blok segi enam K.300 8cm (35bh/m2) m2 97,500
248 Paving Blok segi enam K.350 8cm (35bh/m2) m2 104,500
249 Paving Blok segi enam K.250 8cm Colour (35bh/m2) m2 114,000
250 Paving Blok segi enam K.300 8cm Colour (35bh/m2) m2 119,500
251 Paving Blok segi enam K.350 8cm Colour (35bh/m2) m2 124,000
252 Pipa Besi GIP dia. 1/2" SNI, t=2,6 mm; p=6 m bt 103,000
253 Pipa Besi GIP dia. 3/4" SNI, t=2,6 mm; p=6 m bt 131,600
254 Pipa Besi GIP dia. 1 1/4" SNI, t=3,2 mm; p=6 m bt 265,200
255 Pipa Besi GIP dia.2" SNI, t=3,3 mm; p=6 m bt 416,200

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)

NO BAHAN DASAR SPESIFIKASI SATUAN HARGA

1 2 3 4 5
256 Pipa Besi GIP dia. 2 1/2" SNI, t=3,3 mm; p=6 m bt 554,900
257 Pipa Besi GIP dia. 3" (medium A), t=2,0 mm; p=6 m bt 530,400
258 Pipa Besi GIP dia. 4" (medium A), t=2,8 mm; p=6 m bt 738,500
259 Pipa Besi GIP dia. 5" (medium A), t=3,0mm; p=6 m bt 1,344,400
260 Pipa Besi GIP dia. 6" (medium A), t=3,6 mm; p=6 m bt 1,596,300
261 Pipa Besi Hitam 1/2" SNI t=2,6 mm; p=6m bt 73,500
262 Pipa Besi Hitam 3/4" SNI t=2,6 mm; p=6 m bt 92,800
263 Pipa Besi Hitam 1 1/4" SNI t=3,0 mm p= 6 m bt 174,400
264 Pipa Besi Hitam 1 1/2" SNI t=3,0 mm p= 6 m bt 203,000
265 Pipa Besi Hitam 2" SNI, t=3,0 mm p= 6 m bt 259,000
266 Pipa Besi Hitam 3" Medium A, t=2,0 mm p= 6 m bt 304,000
267 Pipa Besi Hitam 4" Medium A, t=2,8 mm p= 6 m bt 622,200
268 Pipa Besi Hitam 5" Medium A, t=2,8 mm p= 6 m bt 791,500
269 Pipa PVC dia. 1/2" AW 4m m' 5,250
270 Pipa PVC dia. 3/4" AW 4m m' 7,075
271 pipa PVC dia. 1" AW 4m m' 9,650
272 pipa PVC dia. 2" AW 4m m' 22,250
274 pipa PVC dia. 3" AW 4m m' 22,250
276 pipa PVC dia. 4" AW 4m m' 72,500
279 Plamir Kayu kg 33,500
280 Plamir Tembok dulux dan setara (4kg) kg 25,900
281 Plat Besi lembar 446,300
282 Politur Teak Oil kg 49,800
283 Plastik Tipis m2 6,600
284 Pompa Air Sanyo unit 481,500
285 Pompa tangan buah 428,400
286 Premium liter 6,950
287 Residu/ Minyak bekisting liter 53,700
288 ROOF DRAIN Metal buah 35,000
289 Sambungan Pipa Keni 1 inci PVC buah 4,300
290 Sambungan Pipa Keni 1/2 inci PVC buah 3,300
291 Sambungan Pipa Keni 3/4 inci PVC buah 3,300
292 Sambungan Pipa Keni 2 inci PVC buah 26,800
293 Sambungan Pipa Lurus 1/2 inci PVC buah 4,200
294 Sambungan Pipa L. 1/2 inci PVC buah 4,200
295 Saringan Air Bersih m2 47,300
296 Saringan Air Plastik m2 44,100
297 Sealent tube 10,500
298 Seal Tape buah 14,500
299 Semen @ 50kg Semen Indonesia zak 57,900
300 Semen Warna Semen Indonesia zak 15,000
301 Semen Bosowa @ 40kg zak 47,100
302 Semen Tonasa @ 40kg zak 54,100
303 Semen Warna kg 15,800
304 Sendi dan Roll pasang 6,426,000
305 Seng Gelombang BJLS 0,20 (6 kaki) kaki 8,400
306 Seng Gelombang BJLS 0,25 (6 kaki) kaki 11,100
307 Seng Gelombang BJLS 0,30 (6 kaki) kaki 13,400
308 Seng Gelombang BJLS 0,35 (6 kaki) kaki 14,900
309 Seng Gelombang Kecil kaki 7,300
310 Seng Plat BJLS 0,20 30 cm 6 kk lembar 51,400
311 Seng Plat BJLS 0,22 6kk lembar 56,500
312 Seng Plat BJLS 0,30 6kk lembar 62,100
313 Seng Plat BJLS 0,35 6kk lembar 65,300

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)

NO BAHAN DASAR SPESIFIKASI SATUAN HARGA

1 2 3 4 5
314 Shower Pray type THX 20 NBPIV ex. Toto unit 249,700
315 Shower Set type TX 423SZ ex. Toto unit 686,000
316 Slot tanam buah 91,000
317 Skrup Beton/ fixer buah 1,200
318 Solar Industri (non Subsidi) liter 13,800
319 Solar Subsidi 5,650
320 Stand Nako pasang 141,900
321 Stop Kran dia. 1" ex. Onda buah 71,000
322 Selinder buah 85,000
323 Tanah Urug/ Timbunan M3 90,000
324 Tangki Air Fiber 500 liter Excel buah 675,000
325 Tangki Air Fiber 1000 liter Excel buah 1,150,000
326 Tangki Air Fiber 2000 liter Excel buah 2,996,000
327 Teakwood 120 x 240/ 3mm lembar 95,300
328 Tempat Sabun Trisensa buah 44,000
329 Teep Gip Ø 1/2" buah 7,200
330 Teep Gip Ø 2" buah 27,900
331 Teep Gip Ø 3/4" buah 6,300
332 Teep PVC Ø 1/2" buah 3,300
333 Teep PVC Ø 3/4" buah 3,300
334 Teep PVC Ø 1" buah 4,200
335 Teep PVC Ø 1 1/4" buah 8,100
336 Teep PVC Ø 1 1/2" buah 8,600
337 Teep PVC Ø 2" buah 9,700
338 Teep PVC Ø 3" buah 12,900
339 Teep PVC Ø 4" buah 16,100
340 Tegel Keramik 20 x 20 (25 bh/dos) dos 64,000
341 Tegel Keramik 20 x 25 (20 bh/dos) dos 63,000
342 Tegel Keramik 30 x 30 (11 bh/dos) dos 64,500
343 Tegel Keramik 40 x 40 (6 bh/dos) dos 72,500
344 Tegel Keramik 50 x 50 (4 bh/dos) dos 95,000
345 Tegel Keramik 60 x 60 (3 bh/dos) dos 185,000
346 Tegel Keramik anti Slip 20 x 20 dos 63,000
347 Tegel Keramik anti Slip 30 x 30 dos 63,000
348 Granit Tile ( 40 x 40 cm) isi 6 dos 255,000
349 Granit Tile ( 60 x 60 cm) isi 4 dos 294,300
350 Plint Keramik 8 x 30 cm buah 18,500
351 Plint Granitetile 8 x 40 cm buah 20,000
352 Thinner liter 30,000
353 Tripleks 3 mm (120 x 240 cm) lembar 54,100
354 Tripleks 4 mm (120 x 240 cm) lembar 67,600
355 Tripleks 6 mm (120 x 240 cm) lembar 89,900
356 Tripleks 9 mm (120 x 240 cm) lembar 128,400
357 Taekwood 3 mm lembar 78,750
358 Tempat Sabun 'S 11 N Ex Toto buah 48,000
359 Urinoir unit 1,830,000
360 V.KNIE 3/4" (besi) buah 8,500
361 V.KNIE 1" (besi) buah 11,800
362 V. Neple 3/4" (besi) buah 7,600
363 V. Neple 1" (besi) buah 8,400
364 Vernish liter 45,000
365 Wastafel 'LW 240 CJ ex. Toto, Komplit kran & acc unit 643,500
366 Wood Filler (dulux 4kg) kg 22,000
367 woodplank 400 x 30 cm lembar 76,000

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)

NO BAHAN DASAR SPESIFIKASI SATUAN HARGA

1 2 3 4 5
368 woodplank 400 x 20 cm lembar 66,000
369 waterproofing (5kg) kg 17,200
370 Lakban Foil/ roll roll 13,200
371 Box Panel PVC isi 4 MCB legran buah 170,000
372 Down Light/ PLC 13 W buah 95,000
373 Fitting Plafond + Lampu SL (Panasonic) buah 95,500
374 NYY 2 x 1.5 MM2 m' 7,150
375 NYM 3 x 2.5 MM2 m' 12,372
376 NYM 2 x 2.5 MM2 m' 11,100
377 Outlet TV (broco) buah 51,000
378 Outlet Telephone (Broco) buah 51,000
379 Saklar Tunggal buah 9,000
380 Saklar Ganda buah 37,300
381 Stop Kontak buah 14,200
382 Fitting (elbow, male bush,joint Coupling) buah 18,100
383 pipa dia. 5/8" - 4m (jenis C untuk Instalasi Listrik) bt 10,700
384 pipa dia. 3/4" - 4m (jenis C untuk Instalasi Listrik) bt 34,300
385 Klem Kabel met Clips no.10 buah 180
386 Klem Kabel met Clips no.12 buah 210
387 inbow dos buah 3,800
388 dop PVC 3/4 buah 3,700
389 Seal Tape buah 8,900
390 Isolasi buah 13,500
391 MCB 6 A Legran buah 62,000
392 MCB 4 A Legran buah 67,000
393 Kabel Telephone 4 x 0,5 mm m' 17,600
394 Tee Dus 5/8 bh 12,600
UPAH KERJA
1 Kepala Tukang Org/Hr 137,500
2 Mandor Org/Hr 159,000
3 Mekanik Terampil Org/Hr 137,500
4 Mekanik semi Terampil Org/Hr 116,000
5 Operator terampil Org/Hr 180,500
6 Operator Semi terampil Org/Hr 148,000
7 Pembantu Operator Org/Hr 143,000
8 Sopir Terampil Org/Hr 137,500
9 Sopir Pribadi Org/Hr 137,500
10 Pembantu Sopir Org/Hr 113,000
11 Pekerja Kasar/ Buruh Org/Hr 110,500
12 Pekerja Semi Terampil Org/Hr 113,000
13 Pekerja Terampil/ Pembantu Instalatur Org/Hr 116,000
14 Tukang Batu Org/Hr 132,000
15 Tukang Kayu Org/Hr 132,000
16 Tukang besi Org/Hr 132,000
17 Tukang Cat Org/Hr 132,000
18 Tukang Paving Org/Hr 132,000
19 Tukang Pipa Org/Hr 132,000
20 Tukang Las Org/Hr 132,000
21 Tukang Aluminium Org/Hr 132,000
22 Instalatur Listrik Org/Hr 126,500

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
STANDAR HARGA SATUAN BAHAN BANGUNAN DAN UPAH KERJA
PEMERINTAH PROVINSI SULAWESI SELATAN
KABUPATEN GOWA
TAHUN 2020
Dalam Rupiah (Rp)

NO BAHAN DASAR SPESIFIKASI SATUAN HARGA

1 2 3 4 5

A HARGA BAHAN
1 Acuan dari kayu M3 3,050,000 3,202,500 3,362,700
2 Agregat halus /Pasir Bersih M3 148,500 182,400 200,000
3 Alat - alat kerja ( 3 set ) set/m 250,000 262,500 275,700
4 Atap Metal Sakura Roof Lbr 41,000 43,900 46,100
5 Atap Multi Roof Lbr 90,000 94,295 94,376
6 Atap Surya Roof Lbr 55,000 58,500 55,500
7 Atap Policarbonat M2 58,200 62,280 65,400
8 Atap Spandek t = 0,2 L=75 cm M1 40,000 43,000 47,000
9 Atap Spandek t = 0,3 L=75 cm M1 45,000 47,000 49,000
10 Atap Spandek t = 0,35 L=75 cm M1 55,000 57,000 59,000
11 Genteng Beton buah 11,500 12,100 12,700
12 Genteng Keramik KIA buah 17,500 18,300 19,100
13 Genteng Keramik Glazur buah 19,000 19,800 20,600
14 Genteng Metal Berpasir/m 2x4 daun tebal 0.25 jarak reng 38 buah 56,300 60,300 65,100
15 Bubungan seng buah 38,000 39,900 41,900
16 Bubungan Metal Sakura Roof buah 24,000 24,500 25,000
17 Bubungan Multi Roof buah 55,000 55,600 57,200
18 Bubungan Nok Genteng Beton buah 27,500 29,500 30,900
19 Bubungan Surya Roof buah 54,900 54,900 54,900
20 Nok Genteng Surya ,pjg 40 cm buah 37,600 39,800 41,700
21 Nok Genteng Keramik buah 18,000 18,800 19,600
22 Nok Genteng Keramik Glazur buah 19,000 19,800 20,600
23 NOK " C " Colour/ pcs Tebal 0.25 panjang 75 cm buah 25,300 27,100 29,250
24 Nat Filler/tile grout (bahan pengisi nat-flexible water proofing) kg 19,000 19,500 20,000
25 Alumnium Composite Panel t= 3 mm (1,22x2,44 m2) Lembar 433,500 442,200 451,000
26 Alumnium Composite Panel t= 4 mm (1,22x2,44 m2) Lembar 612,000 624,200 626,700
27 Kusen Aluminium 3″ m' 75,000 76,000 77,000
28 Kusen Aluminium 4″ m' 90,000 95,000 100,000
29 Rangka Jendela Kosen Aluminium 3" m' 125,000 130,000 135,000
30 Rangka Pintu Kosen Aluminium 4" m' 250,000 255,000 260,000
31 Kosen + Pintu Alumunim 4" unit 1,600,000 1,680,000 1,764,000
32 Kusen +Pintu PVC TOILET unit 250,000 255,000 260,100
33 Alumunium foil single/roll 50m roll 465,000 475,000 480,000
34 Baja Profil IWF /CNP kg 13,500 14,500 15,200
35 Baja gulungan ukuran ringan kg 25,000 27,000 28,400
36 Baja baut- baut kg 38,600 38,600 40,600
37 Baja galvanisir kg 46,800 48,200 51,600
38 Baja struktur kg 20,570 21,670 22,670
39 Baja paku - paku jembatan kg 23,800 25,000 26,200
40 Batu Bata Merah buah 600 625 600
41 Batu Bata Beton Ringan (9 x 19 x 39) cm (150 bh) M2 900,000 900,250 900,500
42 Batu Bata Beton Ringan (10 x 20 x 60) cm (83 bh) M2 850,000 899,750 999,000
43 Batu Bata Beton Ringan (7.5 x 20 x 60) cm (111 bh) M2 900,000 900,250 900,500
44 Batu Tela Uk. 20x30x10 buah 3,500 3,700 3,900
45 Batu batako 9 x 19 x 39 B buah 4,950 5,150 5,450
46 Batu Gunung M2 147,200 154,600 400,000
47 Batu Kali Besar / Batu Belah Pondasi M3 146,900 154,300 161,500
48 Batu kali Kecil M3 143,700 300,000 450,000
49 Batu Kerikil Koral M3 275,000 288,750 303,270
50 Batu Kapur Bongkahan M3 111,700 119,500 125,500
51 Abu Batu (Batu Pecah/Split 0,5 - 1 cm) M3 294,300 310,000 325,000
Batu Pecah KG/M3 207 324
52 Batu Pecah/Split 1 - 2 cm (chipping) M3 286,000 299,970 470,000
53 Batu Pecah/Split 2 - 3 cm M3 269,500 283,030 470,000
54 Batu Pecah 3 - 5 M3 267,300 280,720 470,000
55 Batu Pecah 5 - 7 M3 232,100 243,760 255,970
56 Batu Pecah 7 -10 M3 189,200 198,660 208,670
57 Batu Pecah 10 -15 M3 176,000 184,800 194,040
Kerikil
59 Kerikil Berpasir Alami (Sirtu Royalti) M3 105,000 110,300 115,800
60 Kerikil Sirtu M3 115,600 125,000 131,250
61 Kerikil Sungai royalti (tidak disaring) M3 125,000 170,000 178,500
62 Kerikil Sungai Tersaring bh 266,000 266,000 266,000
63 Bak Air Fibre Glass 'uk. 55x55x60 cm bh 216,000 266,000 316,000
64 Bak Cuci Stailess Stell 1 mata m 450,000 465,000 485,000
65 Bondex /Floordeck (110 cmx700 cm) t= 0,75 mm bh 102,000 104,000 106,080
66 Besi Polos dia 6 - 12 m bh 35,000 37,000 38,500
67 Besi Polos dia 8 - 12 m kg 48,000 50,000 51,500
68 Besi Polos dia 10 - 12 m kg 77,500 79,500 81,000
69 Besi Polos dia 12 - 12 m kg 110,000 112,000 113,500
70 Besi ulir Dia.13 - 12 m bt 150,000 152,000 153,500
71 Besi ulir Dia.16 - 12 m bt 210,000 212,000 213,500

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)

NO BAHAN DASAR SPESIFIKASI SATUAN HARGA

1 2 3 4 5
72 Besi ulir Dia.19 - 12 m bt 300,000 302,500 304,500
73 besi ulir Dia.22- 12 m bt 425,000 427,500 429,500
74 besi ulir Dia.25- 12 m bt 525,000 527,500 529,500
75 besi ulir Dia.29- 12 m bt 725,000 727,500 729,500
76 Besi plat 4'x 8' (0,2 x 122 x 244 /46,7 kg) m2 12,000 13,100 14,300
77 Besi Tempa m2 350,000 370,000 390,000
78 Besi Hollow 40.40.1.8 mm P=6 m bt 135,000 136,500 137,200
79 Besi Hollow 20.40 1.8 mm P=6 m bt 95,000 96,500 97,200
80 Besi Hollow 20 x 20 - 6m bt 75,000 76,500 77,200
81 Hollow alumunium metal furing rangka plafond 40x40 4M 0,30 bt 28,000 29,500 32,300
82 Hollow alumunium metal furing rangka plafond 20x40 4M 0,30 bt 25,000 26,000 27,300
83 Pasangan Rangka Plafond Metal Furing 0,4x45x19x4000 bt 104,500 105,000 105,400
84 Kalsifuring CR 50 X 25 X 4000 (4 m) bt 42,400 43,300 44,200
85 Kalsifuring MR 38 X 13 X 4000 (4 m) dos 38,000 38,800 39,600
86 Kalsiscrew 6 x 20 (1500/dos) dos 132,000 134,700 137,400
87 Kalsiscrew 8 ~ `10 (1000/dos) dos 117,000 119,300 121,700
88 Kalsinail 3~4,5 (kait pada kayu) 2000/dos dos 69,500 70,900 72,300
89 Kawat Penggantung Hollow aluminium bh 2,000 2,100 2,200
90 Besi Siku L 40.40.4-(6m) bt 95,000 124,000 125,000
91 Besi Streep (30x3 mm) bt 45,000 45,700 46,500
92 Baja Ringan Canal C75.80 sni pj= 6 m bt 90,000 92,000 97,000
93 Baja Ringan Canal C75.75 sni pj= 6 m bt 80,000 82,000 87,000
94 Reng tinggi =28mm T.0,45 Pj=6 m bt 35,000 37,000 42,000
95 Reng tinggi= 32mm T.0,45 Pj=6 m bt 47,000 49,000 54,000
96 Screw Reng ( 1 pack/1000 pcs ) pack pack 200,000 205,000 210,000
97 Baut spandek (1 pack = 500 bh) pack 250,000 255,000 210,000
98 Pasangan Rangka Atap Baja Ringan M2 186,100 189,800 197,100
99 Dynabolt/pcs 10x80 buah 2,500 2,700 2,800
100 Roster Beton buah 20,000 21,000 22,500
101 Roster keramik 30x30 buah 65,000 68,000 69,000
102 Roster kaca /glassblock 19x38x8 cm buah 19,800 24,800 29,800
103 Bondex (Floord Deck) t=0,75 M2 110,000 115,250 120,700
104 Bitumen ( Asphalt AC 60/70 ) kg/m 13,200 13,350 13,450
105 Asphalt Curah ton 13,500,000 13,900,000 14,250,000
106 Cat kayu/besi (dulux) kg 85,000 87,000 89,000
107 Cat kayu/besi (AVIAN) kg 65,000 68,000 70,000
108 Cat Tembok KW II /EX VINILEX (25kg) kg 23,200 25,200 27,200
109 Cat Tembok KW I /EX DULUX (5 kg) kg 34,000 36,000 38,000
110 Closet Duduk 'CW 600 J / SW 660 J Komplit & acc unit 2,250,000 2,350,000 2,450,000
111 Closet Duduk Ex KIA Lengkap (putih) Tangki unit 1,540,000 1,617,000 1,698,000
112 Closet Jongkok 'type CE 6 ex. Toto unit 300,000 350,000 400,000
113 Dempul Kayu kg 30,300 31,900 33,500
114 Dop PVC Ø 4" buah 20,000 20,500 21,000
115 Dop PVC Ø 3" buah 15,000 15,500 16,000
116 Dop PVCt Ø 2" buah 10,000 10,500 11,000
117 Door Stoper buah 40,000 42,000 45,000
118 Door Close buah 250,000 255,000 260,000
119 Elastomer Bearing Pad TYPE I (300+350+36) buah 535,000 561,800 590,000
120 Elastomer Bearing Pad TYPE 2 (300+350+36) buah 696,000 730,080 767,400
121 Elastomer Bearing Pad TYPE 3 (300+350+36) pasang 990,000 1,039,500 1,091,500
122 Engsel Jendela 3" pasang 29,700 31,800 33,400
123 Engsel Pintu 4" buah 33,000 35,400 37,200
124 Eternit 1 x 1 Tabusmen lembar 18,000 19,300 20,300
125 Expantion Joint M1 115,500 121,300 127,400
126 Floor Drain 'TX 1B ex. Toto buah 414,000 439,000 464,000
127 Flux Oil ( untuk emulsi ) Liter M-063/064 liter 25,000 26,800 28,100
128 Aluminium Plat tipis lembar 10,000 10,700 11,300
129 Gemuk (Greese) liter 25,100 26,900 28,300
130 Gorong - Gorong Beton dia. 30 (tanpa tulangan) M1 100,000 105,000 110,300
131 Gorong - Gorong Beton dia. 40 (tanpa tulangan) M1 137,500 144,400 151,600
132 Gorong - Gorong Beton dia 60 (tanpa tulangan) M1 154,300 162,100 170,200
133 Gorong - Gorong Beton dia 80 (tanpa tulangan) M1 168,400 176,800 185,600
134 Gorong - Gorong Beton dia. 100 (tanpa tulangan) M1 225,000 236,300 248,100
135 GRC / KaLSIBOARD 3,5 x 1200 x 2400 lembar 64,300 67,500 70,900
136 GRC / KaLSIBOARD 4,5 x 1200 x 2400 6 mm lembar 135,000 204,400 207,800
137 Grendel Jendela buah 10,000 10,500 11,100
138 Grendel Pintu buah 16,500 17,000 17,500
139 Gypsum Board 9 mm ; uk 120 x 240 cm lembar 150,000 151,500 152,500
140 Gerobak dorong unit 320,000 340,000 350,000
141 Handle Pintu buah 294,000 308,700 324,135
142 Les gypsum polos buah 17,000 17,900 18,800
143 Ijuk ikat 20,500 21,600 22,600
144 Kaca Polos 3 mm M2 125,000 127,000 129,000
145 Kaca Polos 5 mm M2 150,000 152,000 154,000
146 Kaca Polos 8 mm M2 200,000 202,000 204,000
147 Kaca Rayben 3 mm M2 200,000 202,000 204,000
148 Kaca Rayben 5 mm M3 320,000 322,000 324,000
149 Kapur Hidrasi M3 170,700 179,300 188,300
150 Karet Alas Genteng 90 cm m' 8,000 8,100 8,200
151 Kait angin buah 8,000 8,100 8,200
152 Kawat Beton /Bindrat kg 24,800 25,300 26,500
153 Kawat Las kg 25,200 27,000 28,400

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)

NO BAHAN DASAR SPESIFIKASI SATUAN HARGA

1 2 3 4 5
154 Kawat Ram Ayakan M 28,100 30,100 31,600
Kayu
155 Kayu Kls I (Balok) Sensow M3 9,000,000 9,180,000 9,639,000
156 Kayu Kls I (Balok) Sawmil M3 13,100,000 13,755,000 14,442,800
157 Kayu Kls I ( Papan ) Sawmil (bayam) M3 15,000,000 15,750,000 16,537,500
158 Kayu Kls II (Balok) sawmill M3 3,160,000 3,318,000 3,947,800
159 Kayu Kls II (Papan) sawmill M3 3,780,000 3,969,000 4,167,500
160 Kayu Kls III (Balok) Lokal M3 2,085,000 2,189,300 2,298,800
161 Kayu Kls III (Papan) Mal 2/30, 2/40 M3 2,182,000 2,291,100 2,405,700
162 Kayu Klas IV /Balok Mall 4/6 M3 15,550,000 1,627,500 1,598,700
163 Kayu Dolken dia. 8-10 cm (p=4m) btg 60,000 63,000 65,000
164 Kayu les Profil 3x3 (4m) m' 5,300 8,300 8,700
165 Kayu les Profil 4x4 (4m) m' 6,500 10,000 10,500
166 Kayu les Profil 5x5 (4m) M3 9,000 13,200 13,900
167 Kayu Struktur M3 M-181 M3 9,000,000 9,180,000 9,639,000
168 Kayu Bakar M3 M-070 M3 178,000 186,900 196,300
169 Kayu Perancah 5/10-4 Bt 41,700 44,700 47,000
170 Kayu Balok 3/5 klas I Bt 60,000 62,000 64,000
171 Kayu Balok 3/5 klas II Bt 20,000 22,000 24,000
172 Kayu Balok 4/6 Klas I Bt 100,000 102,000 104,000
173 Kayu Balok 4/6 Klas II Bt 30,000 32,000 34,000
174 Kayu Balok 5/7 Klas I Bt 147,000 149,000 151,000
175 Kayu Balok 5/7 Klas II Bt 45,000 47,000 49,000
176 Kayu Balok 5/10 Klas I Bt 210,000 212,000 214,000
177 Kayu Balok 5/10 Klas II Bt 60,000 62,000 64,000
178 Kayu Balok 5/12 Klas I Bt 305,000 307,000 309,000
179 Kayu Balok 6/12 Klas I Bt 305,000 307,000 309,000
180 Kayu Balok 8/12 Klas I Bt 330,000 332,000 334,000
181 Kayu Papan 2/20 Klas I lembar 240,000 242,000 244,000
182 Kayu Papan 2/20 Klas II lembar 57,000 59,000 61,000
183 Kerosine ( Minyak Tanah ) Liter 10,500 12,000 13,000
184 Kawat Bronjong 3 mm (1 roll = 50 kg) m' 10,500 11,000 11,500
185 Kawat bronjong Jadi (2x1 x 0,5 m) dia 2,7 mm; 12 kg kg 29,250 30,250 31,250
186 Kawat bronjong Jadi (2x1 x 0,5 m) dia 3 mm; 12 kg kg 36,900 37,900 38,900
187 Kertas Gosok /Amplas Kayu lbr 7,000 7,500 8,000
188 Kusen dan Pintu PVC Toilet unit 275,000 285,000 270,000
189 Klep diameter 3/4" ex onda buah 40,000 40,500 41,000
190 Kansteen beton k.300 (10/20/40 cm) pcs 27,500 34,000 35,000
191 Kansteen beton k.300 (18/20/40 cm) pcs 33,000 34,000 34,500
192 Kansteen beton k.300 (15/30/40 cm) pcs 38,500 39,500 40,000
193 Kansteen beton k.300 (16/30/50 cm) pcs 49,500 50,500 51,000
194 Kansteen beton k.300 (15/30/60 cm) pcs 55,000 56,000 56,500
195 Kansteen beton k.300 (15/25/50 cm) pcs 44,000 45,000 45,500
196 Kansteen beton k.300 (15/28/60 cm) pcs 55,000 56,000 56,500
197 Kansteen beton k.300 (22/25/60 cm) pcs 71,500 72,500 73,000
198 Kansteen beton k.300 (25/30/60 cm) pcs 82,500 83,500 84,000
199 Kansteen beton k.300 (15/40/50 cm) pcs 55,000 56,000 56,500
200 Kansteen beton k.300 (20/30/40 cm) pcs 41,250 42,250 42,750
201 Kran Air SKL 1/2 Inci buah 19,000 20,400 21,400
202 Kran Dinding 'type TMN Picarlo buah 56,000 61,000 66,000
203 Kran Zink 'T 30 AR13NV7N ex. Toto buah 300,000 305,000 310,000
204 Kitchenk Zink 'Hwaco 1L unit 250,000 275,000 300,000
205 Kunci Tanam Yale 1x putar set 130,000 132,600 135,300
206 Kunci Tanam Yale 2x putar set 80,000 81,600 83,200
207 Kwas Cat bh 19,500 20,000 21,000
208 Lambriziring t;:4 mm, (4 m’) lbr 14,000 15,000 15,800
209 Lampu hemat energy 8 Watt buah 57,800 60,700 63,700
210 Lampu hemat energy 14 Watt buah 51,300 53,900 56,600
211 Lampu hemat energy 18 Watt buah 51,200 53,800 56,500
212 Lampu hemat energy 23 Watt buah 63,600 66,500 69,800
213 Lampu TL 1 x 10 Watt buah 45,000 47,300 49,700
214 Lampu TL 1 x 20 Watt buah 50,000 52,500 55,200
215 Lampu TL 1 x 40 Watt buah 60,000 63,000 66,200
216 Lampu TL 2 x 18 Watt Grille (panasonic) buah 30,000 31,500 110,300
217 Lampu TL 2 x 36 Watt Grille (panasonic) buah 40,000 42,000 11,030
218 Lem Kayu fox kg 28,000 29,000 30,000
219 List Profil 5 cm Gypsum m 25,000 25,500 26,000
220 List Plafond Datar M1 14,100 15,100 15,900
221 List Plafont Profil M1 15,600 16,700 17,600
222 Mesin Jet Pump kap.250 watt Groundfoss jpd 4-47 unit 3,600,000 3,650,000 3,700,000
223 Mesin Pompa tekan kap. 150 watt Ground foss unit 600,000 650,000 700,000
224 Mesin Pompa Summersible Kapasitas 8 m3/jam Frenklin unit 25,350,000 26,350,000 26,400,000
225 Meni kayu kg 35,000 36,750 37,750
226 Minyak Pelumas Liter M-185 ltr 45,000 47,300 49,700
227 Mur Baut 5/8 buah 5,100 5,500 5,800
228 Pagar Brc 240x120 cm M2 390,000 409,500 418,900
229 Pagar Brc 240x150 cm M2 425,000 446,250 446,250
230 Pagar Brc 240x190 cm M2 665,000 698,250 707,650
231 Tiang dia.1,5" (tinggi = 120 cm) buah 170,000 178,500 187,900
232 Tiang dia.1,5" (tinggi =150 m) bh 235,000 246,750 256,150
233 Tiang dia.1,5" (tinggi =190 cm) buah 295,000 309,750 319,150

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)

NO BAHAN DASAR SPESIFIKASI SATUAN HARGA

1 2 3 4 5
234 Uclip bh 1,800 1,890 11,290
235 Panel Beton Ukuran 5 x 40 x 240 cm lbr 154,000 159,000 162,000
236 Tiang Panel Ukuran 19.5 x 16.5 x 260 cm btg 247,500 252,500 255,500
237 Tiang Panel Ukuran 19.5 x 16.5 x 320 cm btg 258,500 263,500 266,500
238 Tiang Panel Ukuran 19.5 x 16.5 x 380 cm btg 330,000 335,000 338,000
239 Tiang Panel Ukuran 19.5 x 16.5 x 420 cm btg 379,500 384,500 387,500
Paku
240 Paku 8-12 cm kg 20,000 22,000 24,000
241 Paku 5-10 cm kg 20,000 22,000 24,000
242 Paku 1 - 3 cm kg 20,000 22,000 24,000
243 Paku Gypsun kg 45,000 47,000 48,000
244 Paku Klem kg 22,000 23,600 24,700
245 Paku Ramset bh 1,000 1,100 1,200
246 Paku Seng kg 30,000 32,000 33,000
247 Paku Skrup bh 600 650 700
248 Paku Beton 8-10 dos dos 15,500 16,300 17,100
249 Pasir Beton M3 M 041 R M3 170,000 200,000 400,000
250 Pasir Pasang M3 m2 119,500 119,500 119,500
251 Pasir urug/pasir alas/pengikat pilihan M3 84,000 88,200 200,000
252 Pelampung Otomatis bh 125,000 126,500 128,000
Paving Blok
253 Paving Blok Kotak T.6 cm K.300. (44 bh/m2) M2 77,000 81,000 83,500
254 Paving Blok Kotak T.6 cm K.400. (44 bh/m2) M2 82,500 86,500 89,000
255 Paving Blok Kotak T.8 cm K.300. (44 bh/m2) M2 93,500 97,500 100,000
256 Paving Blok Kotak T.8 cm K.400. (44 bh/m2) M2 99,000 103,000 105,500
257 Paving Blok Hexagon 8 CM K = 4 00 M2 99,000 103,000 105,500
258 Paving Blok Kotak T.6 cm K.300. (44 bh/m2) Colour M2 94,000 98,000 106,000
259 Paving Blok Kotak T.6 cm K.400. (44 bh/m2) colour M2 99,500 103,500 10,600
260 Paving Blok Kotak T.8 cm K.300. (44 bh/m2) colour M2 110,500 114,500 117,000
261 Paving Blok Kotak T.8 cm K.400. (44 bh/m2) colour M2 116,000 120,000 122,500
262 Topi Uskup 6 cm K.300. bh 6,600 6,900 7,000
263 Topi Uskup 8 cm K.300. bh 7,700 7,800 8,000
264 Paving Segiempat 30x30x6 cm u/Difable Kuning bh 27,500 27,600 27,800
265 Box Inlet 42X21X17 cm +Tutup Grill 42x21x6' set 275,000 285,000 290,000
Pipa
266 Pipa Besi GIP dia. 1/2" SNI, t= 2,6 mm; p= 6 m bt 110,000 113,000 115,000
267 Pipa Besi GIP dia. 3/4" SNI, t= 2,6 mm; p= 6 m bt 145,000 147,000 150,000
268 Pipa Besi GIP dia. 1 1/4" SNI, t= 3,2 mm; p= 6 m bt 275,000 280,200 285,500
269 Pipa Besi GIP dia. 2" SNI, t= 3,3 mm; p= 6 m bt 408,000 416,200 424,500
270 Pipa Besi GIP dia. 2 1/2" SNI, t= 3,3 mm; p= 6 m bt 544,000 554,900 566,000
271 Pipa GIP Medium A Dia. 75 mm (3") bt 560,000 561,000 562,000
272 Pipa GIP Medium A Dia. 100 mm (4") bt 860,000 861,000 862,000
274 Pipa GIP Medium A Dia. 150 mm (6") bt 1,860,000 1,861,000 1,862,000
276 Pipa GIP Medium A Dia. 200 mm (8") bt 2,860,000 2,861,000 2,862,000
279 Pipa Besi Hitam 1/2" SNI, t = 2,6 mm, P = 6 m bt 72,000 73,500 75,000
280 Pipa Besi Hitam 3/4" SNI, t = 2,6 mm, P = 6 m bt 91,000 92,800 94,700
281 Pipa Besi Hitam 1 1/4" SNI, t = 3,0 mm, P = 6 m bt 171,000 174,400 177,900
282 Pipa Besi Hitam 1 1/2" SNI, t = 3,0 mm, P = 6 m bt 199,000 203,000 207,000
283 Pipa Besi Hitam 2" SNI, t = 3,0 mm, P = 6 m bt 254,000 259,000 264,200
284 Pipa Besi Hitam 3" Medium A, t = 2,0 mm, P = 6 m bt 298,000 304,000 310,000
285 Pipa Besi Hitam 4" Medium A, t = 2,8 mm, P = 6 m bt 610,000 622,200 623,400
286 Pipa Besi Hitam 5" Medium A, t = 2,8 mm, P = 6 m bt 776,000 791,500 807,300
287 Pipa PVC dia. 1/2" AW 4 m bt 25,000 27,000 28,000
288 Pipa PVC dia. 3/4" AW 4 m bt 28,300 30,300 31,300
289 Pipa PVC dia. 1" AW 4 m bt 38,600 40,600 41,600
290 Pipa PVC dia. 2" AW 4m bt 89,000 91,000 92,000
291 Pipa PVC dia. 2" D 4 m bt 53,000 55,000 56,000
292 Pipa PVC dia.3" AW 4m bt 177,500 179,500 180,500
293 Pipa PVC dia.3" D 4m bt 91,000 93,000 94,000
294 Pipa PVC dia. 4" AW 4m bt 290,000 292,000 293,000
295 Pipa PVC dia. 4" D 4m bt 143,000 145,000 146,000
296 Pipa PVC dia. 6" D 4m bt 292,000 302,000 312,000
297 Bend PVC 45 Dia. 75 mm bh 82,500 82,500 83,500
298 Bend PVC 22,5 Dia. 75 mm bh 75,000 750,000 76,000
299 Double Joint Dia. 50 mm bh 157,500 157,500 158,500
300 Double Joint Dia. 75 mm bh 172,500 172,500 173,500
301 Double Joint Dia. 100 mm bh 202,500 202,500 203,500
302 Double Joint Dia. 150 mm bh 412,500 415,000 413,500
303 Double Joint Dia. 200 mm bh 862,500 862,500 863,500
304 Flens Socket Dia. 50 mm bh 157,500 157,500 158,500
305 Flens Socket Dia. 75 mm bh 277,500 277,500 278,500
306 Flens Socket Dia. 100 mm bh 337,500 337,500 338,500
307 Flens Socket Dia. 150 mm bh 565,000 565,000 566,000
308 Flens Socket Dia. 200 mm bh 742,000 742,000 743,000
309 Flens Spigot Dia. 50 mm bh 157,500 157,500 158,500
310 Flens Spigot Dia. 75 mm bh 277,500 277,500 278,500
311 Flens Spigot Dia. 100 mm bh 337,500 337,500 338,500
312 Flens Spigot Dia. 150 mm bh 565,000 565,000 566,000
313 Flens Spigot Dia. 200 mm bh 742,000 742,000 743,000
314 Gate Valve All Flange Dia. 50 mm bh 470,000 470,000 471,000
315 Gate Valve All Flange Dia. 75 mm bh 870,000 871,500 872,500
316 Gate Valve All Flange Dia. 100 mm bh 970,000 970,000 971,000

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)

NO BAHAN DASAR SPESIFIKASI SATUAN HARGA

1 2 3 4 5
317 Gate Valve All Flange Dia. 150 mm bh 1,970,000 1,970,000 1,971,000
318 Gate Valve All Flange Dia. 200 mm bh 2,970,000 2,970,000 2,971,000
319 Karet Packing Dia. 50 mm bh 17,500 17,500 18,500
320 Karet Packing Dia. 75 mm bh 20,000 20,000 21,000
321 Karet Packing Dia. 100 mm bh 25,000 25,000 26,000
322 Karet Packing Dia. 150 mm bh 50,000 50,000 51,000
323 Karet Packing Dia. 200 mm bh 50,000 50,000 51,000
324 Pipa HDPE Dia. 50 mm M' 155,000 155,000 156,000
325 Pipa HDPE Dia. 75 mm M' 315,000 315,000 316,000
326 Pipa HDPE Dia. 100 mm M' 505,000 505,000 506,000
327 Pipa HDPE Dia. 150 mm M' 1,230,000 1,230,000 1,231,000
328 Pipa HDPE Dia. 200 mm M' 375,000 375,000 376,000
329 Pipa PVC RR 12,5 Dia. 50 mm (2") M' 135,000 136,000 137,000
330 Pipa PVC RR 12,5 Dia. 75 mm (3") M' 275,000 276,000 277,000
331 Pipa PVC RR 12,5 Dia. 100 mm (4") M' 375,000 376,000 377,000
332 Pipa PVC RR 12,5 Dia. 150 mm (6") M' 805,000 805,000 806,000
333 Pipa PVC RR 12,5 Dia. 200 mm (8") M' 1,205,000 1,205,000 1,206,000
334 Reduser PVC RR/SC Dia. 75 x 50 mm buah 115,000 115,000 116,000
335 Tee PVC RR/SC Dia. 100 x 100 mm buah 397,500 397,500 398,500
336 Tee PVC RR/SC Dia. 150 x 150 mm buah 500,000 500,000 501,000
337 Tee PVC RR/SC Dia. 200 x 200 mm buah 985,000 985,000 986,000
338 Pipa PVC RR KNEE ELBOW 90 Dia 50 mm (2") buah 672,000 69,200 71,200
339 Pipa PVC RR KNEE ELBOW 45 Dia 50 mm (2") buah 59,600 61,600 63,600
340 Pipa PVC RR KNEE ELBOW 90 Dia 75 mm (3") buah 141,600 143,600 145,600
341 Pipa PVC RR KNEE ELBOW 45 Dia 75 mm (3") buah 122,400 124,400 126,400
342 Ventil Udara Dia. 25 mm buah 750,000 750,000 760,000
343 Valve Cover Dia. 100 mm buah 200,000 200,000 210,000
344 Socket Gip Dia. 25 mm buah 20,000 200,000 30,000
345 Lem Issartplast @ 1/2 kg Klg 65,000 65,000 70,000
346 Plamir Kayu Kg kg 30,500 33,500 36,200
347 Plamur Tembok dulux dan setara (4kg) kg 26,500 27,900 28,900
348 Plat besi lbr 425,000 446,300 468,600
349 Politur Teak Oil kg 46,500 49,800 52,300
350 Plastik Tipis M2 6,200 6,600 6,900
351 Pompa Air Sanyo unit 480,000 500,000 520,000
352 Pompa Tangan buah 400,300 428,400 449,800
353 Premium ltr 6,450 6,450 6,450
354 Residu /minyak bekisting ltr 50,100 53,700 56,300
355 Roof Drain Metal buah 35,000 36,000 37,000
356 Sambungan Pipa Keni 1 Inci PVC buah 4,000 4,300 4,500
357 Sambungan Pipa Keni 1/2 Inci PVC buah 3,000 3,300 3,500
358 Sambungan Pipa Keni 3/4 Inci PVC buah 3,000 3,300 3,500
359 Sambungan Pipa Keni 2 Inci PVC unit 25,500 26,800 28,100
360 Sambungan Pipa lurus 1/2" PVC buah 10,000 10,200 10,400
361 Sambungan Pipa L . 1/2 Inci PVC buah 15,000 15,200 15,400
362 Saringan Air Besi M2 45,000 47,300 49,700
363 Saringan Air Plastik M2 25,000 44,100 46,300
364 Sealent tube buah 10,000 10,500 11,000
365 Seal Tape buah 14,000 14,500 15,500
366 Semen Bosowa @ 50 kg zak 65,000 66,500 69,200
367 Semen Tonasa @ 50 kg zak 70,000 72,900 76,000
368 Semen Bosowa @ 40 kg zak 55,000 57,600 60,000
369 Semen Tonasa @ 40 kg zak 58,000 65,100 66,000
370 Semen kg 14,000 14,580 15,200
371 Semen Warna kg 25,000 25,800 26,600
372 Sendi dan Roll Psg 6,120,000 6,426,000 6,748,000
373 Seng Gelombang BJLS 0,20 (6 kaki) Kaki 8,000 8,400 8,900
374 Seng Gelombang BJLS 0,25 (6 kaki) Kaki 10,600 11,100 11,700
375 Seng Gelombang BJLS 0,30 (6 kaki) Kaki 12,500 13,400 14,100
376 Seng Gelombang BJLS 0,35 (6 kaki) Kaki 13,900 14,900 15,700
377 Seng Gelombang kecil Kaki 7,000 7,300 7,700
378 Seng Plat BJLS 0,20 30 CM 6kk Lmbr 48,000 51,400 54,000
379 Seng Plat BJLS 0,22 6 kk Lmbr 52,800 56,500 59,400
380 Seng Plat BJLS 0,30 6 kk lmbr 58,000 62,100 65,200
381 Seng Plat BJLS 0,35 6 kk lmbr 61,000 65,300 68,600
382 Shower Spray 'type THX 20 NBPIV ex. Toto unit 234,000 249,700 274,700
383 Shower set 'type TX 423 SZ ex. Toto unit 661,000 686,000 711,000
384 Slot Tanam buah 90,000 91,000 92,000
385 Skrup beton / fixer buah 1,100 1,200 1,300
386 Solar Industri (Non Subsidi) ltr 13,100 13,800 14,600
387 Solar Subsidi ltr 5,650 5,650 5,650
388 Stand Nako psg 135,100 141,900 153,300
389 Stop Kran dia. 1" 'ex. Onda buah 67,600 71,000 76,700
390 Selinder buah 84,000 85,000 86,000
391 Tanah Urug/Timbunan M3 87,500 90,000 96,300
392 Tangki Air Fiber 500 liter buah 725,000 750,000 775,000
393 Tangki Air Fiber 1000 liter buah 1,100,000 1,150,000 1,200,000
394 Tangki Air Fiber 2000 liter buah 2,800,000 2,996,000 3,236,000
395 Teakwood 120 x 240 /3 mm lbr 89,000 95,300 103,000
396 Tempat Sabun Trisensa buah 55,000 56,000 57,000
397 Tee Gip Ø 1/2 buah 7,100 7,700 8,200
398 Tee GIP Ø 2 " buah 40,000 42,000 44,000
399 Tee GIP Ø 3/4 " buah 11,100 11,200 11,500

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)

NO BAHAN DASAR SPESIFIKASI SATUAN HARGA

1 2 3 4 5
400 Tee PVC Ø 1/2 " buah 3,000 3,300 3,500
401 Tee PVC Ø 3/4 " buah 3,100 3,300 3,500
402 Tee PVC Ø 1" buah 5,000 5,200 5,400
403 Tee PVC Ø 1 1/4" buah 9,000 9,200 9,400
404 Tee PVC Ø 1 1/2 " buah 12,000 12,200 12,400
405 Tee PVC Ø 2" buah 19,000 19,200 19,400
406 Tee PVC Ø 3" buah 43,000 43,200 43,400
407 Tee PVC Ø 4" buah 35,100 35,300 35,500
408 Tegel Keramik 20 x 20 (25 bh/dos) dus 59,000 69,000 74,000
409 Tegel Keramik 20 x 25 (20 bh/dos) dus 59,000 69,000 74,000
410 Tegel Keramik 30 x 30 (11 bh/dos) dus 59,500 69,500 74,500
411 Tegel Keramik 40 x 40 (6 bh/dos) dus 67,500 77,500 82,500
412 Tegel Keramik 50 x 50 (4 bh/dos) dus 120,000 130,000 135,000
413 Tegel Keramik 60 x 60 (3 bh/dos) dus 180,000 190,000 195,000
414 Tegel Keramik Anti Slip 20 x 20 dus 58,000 63,000 68,000
415 Tegel Keramik Anti Slip 30 x 30 dus 58,000 63,000 68,000
416 Granit Tile (40 x 40 cm) isi 6 dus 250,000 255,000 260,000
417 Granit Tile (60 x 60 cm) isi 4 dus 289,300 294,300 299,300
418 Plint Keramik 8 x 30 cm buah 13,500 18,500 23,500
419 Plint Granitetile 8 x 40 cm buah 15,000 20,000 25,000
420 Thinner ltr 35,000 36,000 37,000
421 Tripleks 3 mm (120 x 240 cm) lbr 53,500 54,100 58,500
422 Tripleks 4 mm (120 x 240 cm) lbr 65,000 67,600 73,000
423 Tripleks 6 mm (120 x 240 cm) lbr 78,800 89,900 97,100
424 Tripleks 9 mm (120 x 240 cm) lbr 130,000 140,000 150,000
425 Tripleks 12 mm (120 x 240 cm) lbr 155,000 165,000 175,000
426 Taekwood 3 mm lbr 75,000 78,750 82,688
427 Tempat Sabun 'S 11 N EX. Toto buah 43,000 48,000 53,000
428 Urinoir unit 1,780,000 1,830,000 1,880,000
429 U-Ditch 30x30x120 cm buah 341,550 347,550 350,550
430 U-Ditch 30x40x120 cm buah 350,900 356,900 359,900
431 U-Ditch 40x40x120 cm buah 480,700 486,700 489,700
432 U-Ditch 40x60x120 cm buah 518,650 524,650 527,650
433 U-Ditch 60x60x120 cm buah 795,950 802,950 805,950
434 U-Ditch 60x80x120 cm buah 999,350 1,005,350 1,008,350
435 U-Ditch 80x80x120 cm buah 1,111,750 1,117,750 1,120,750
436 U-Ditch 80x100x120 cm buah 1,335,750 1,341,750 1,344,750
437 U-Ditch 120x120x120 cm K 250 buah 2,795,540 2,805,540 2,810,540
438 U-Ditch 100x100x120 cm K 300 buah 1,529,000 1,535,000 1,538,000
439 U-Ditch 100x120x120 cm K 300 buah 1,804,000 1,810,000 1,813,000
440 U-Ditch 100x140x120 cm K 300 buah 1,848,000 1,854,000 1,857,000
441 U-Ditch 100x100x120 cm K 350 buah 2,489,300 2,495,300 2,498,300
442 U-Ditch 100x120x120 cm K 350 buah 2,784,100 2,790,100 2,793,100
443 Cover Uditch uk 30x 60 cm t = 6 K300 buah 99,000 105,000 108,000
444 Box Culvert 40 x 40 K 350 buah 1,738,000 1,744,000 1,747,000
445 Box Culvert 60 x 60 K 350 buah 2,244,000 2,250,000 2,253,000
446 Box Culvert 80 x 80 K 350 buah 3,036,000 3,042,000 3,045,000
447 Box Culvert 100 x 100 K 350 buah 4,312,000 4,318,000 4,321,000
448 V. KNIE 3/4" (besi) buah 8,100 8,500 9,200
449 V. KNIE 1" (besi) buah 11,200 11,800 12,800
450 V Neple 3/4" (besi) buah 7,200 7,600 8,200
451 V Neple 1" (besi) buah 8,000 8,400 9,100
452 Vernish ltr 43,000 45,000 47,000
453 Wastafel 'LW 240 CJ ex Toto, Komplit kran & acc unit 643,500 693,500 713,500
454 Wood Filler (dulux 4kg) kg 23,100 24,100 25,100
455 Woodplank 400 x 30 cm lbr 75,000 76,000 77,000
456 Woodplank 400 x 20 cm lbr 65,000 66,000 67,000
457 Waterproofing (5kg) kg 16,700 17,200 17,700
458 Lakban foil / roll roll 12,300 13,200 14,300
459 Box Panel PVC isi 4 MCB legran buah 160,000 170,000 180,000
460 Down Light /PLC 13 W buah 92,000 95,000 97,000
461 Lampu Down LED strip 7 watt m buah 9,900 10,900 11,400
462 Lampu Down LED strip 12 watt buah 14,900 15,900 16,400
463 Lampu LED 3 Watt Merk Philips buah 18,500 19,150 19,650
464 Kabel Telepone 4 x 0,5 mm M' 16,800 17,600 19,000
465 Lampu LED 9 Watt Merk Philips buah 27,500 28,500 29,000
466 Lampu LED 13 Watt Merk Philips buah 38,500 39,500 40,000
467 Lampu LED 15 Watt Merk Philips buah 99,000 100,000 100,500
468 Lampu Down light panasonoc 5 inchi buah 99,000 100,000 100,500
469 Fitting Plafond + Lampu SL (Panasonic) buah 94,500 95,500 96,000
470 NYY 2 x 1.5 MM² M' 16,100 16,200 16,300
471 NYM 3 x 2.5 MM² M' 21,100 21,200 21,300
472 NYM 2 x 2.5 MM² M' 12,100 12,200 12,300
473 Outlet TV (broco) buah 50,000 51,000 52,000
474 Outlet Telephone (broco) buah 50,000 51,000 52,000
475 Saklar Tunggal buah 15,000 15,500 16,000
476 Saklar Ganda buah 19,000 22,000 25,000
477 Stop Kontak buah 15,000 15,200 15,400
478 Fitting ( elbow ,male bush, Joint coupling) buah 17,300 18,100 19,600
479 Pipa dia 5/8"- 4m (jenis C untuk instalasi listrik) Btg 25,000 25,700 26,600
480 Pipa dia. 3/4"-4 m (jenis C untuk instalasi listrik) Btg 13,000 14,300 17,000
481 Klem kabel Meet Clips no.10 buah 170 180 190
482 Klem kabel Meet Clips no.12 buah 200 210 220
483 Inbow dos buah 3,500 3,800 4,100

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)

NO BAHAN DASAR SPESIFIKASI SATUAN HARGA

1 2 3 4 5
484 Dop PVC 3/4:" buah 3,500 3,700 4,000
485 Seal tape buah 8,400 8,900 9,600
486 Isolasi buah 12,500 13,500 14,500
487 MCB 6 A Legran buah 60,000 62,000 64,000
488 MCB 4 A Legran buah 65,000 67,000 69,000
489 Kabel Telepone 4 x 0,5 mm M' 16,800 17,600 19,000
490 Tee Dus 5/8 buah 15,000 15,600 16,200
491 Drymix ( Semen Perekat Instan Bata Ringan ) 40 kg zak 100,000 102,600 105,000
492 Shunda Plafond PVC 0,8 cm x 20 cm buah 34,000 36,000 39,000
493 Panel HPL Polos 120 x 244 cm / Taco lbr 170,000 180,000 190,000
494 Panel HPL Motif 120 x 244 cm / Taco lbr 180,000 190,000 200,000
495 Tegel Precast Tactile Line/Spot 300 x 300 mm buah 25,000 25,400 25,600
496 482 pcs/ 3 m' buah 84,000 85,000 86,000
Tegel
497 Tegel Keramik Dinding 25 x 40 dus 99,000 100,900 114,000
498 Tegel Keramik Dinding 30 x 60 ( Granit ) dus 148,500 158,500 163,500
499 Tegel Keramik Dinding 25 x 40 Motif batu Alam dus 148,500 158,500 163,500
500 Tegel Keramik Dinding 30 x 60 ( Granit Unpholished / Kasar ) dus 233,200 243,200 248,200
501 U-Ditch 50x50x120 cm K 300 buah 644,100 654,100 655,100
502 U-Ditch 30x30x120 cm K 300 buah 297,000 307,000 312,000
503 U-Ditch 30x40x120 cm K 300 buah 374,000 384,000 389,000
504 U-Ditch 40x40x120 cm K 300 buah 418,000 428,000 433,000
505 U-Ditch 40x60x120 cm K 300 buah 451,000 461,000 466,000
506 U-Ditch 60x60x120 cm K 300 buah 693,000 703,000 708,000
507 U-Ditch 60x80x120 cm K 300 buah 869,000 879,000 884,000
508 U-Ditch 80x80x120 cm k 300 buah 1,045,000 1,055,000 1,060,000
509 U-Ditch 80x100x120 cm K 300 buah 1,265,000 1,275,000 1,280,000
510 U-Ditch 80x120x120 cm K 300 buah 1,826,000 1,836,000 1,841,000
511 U-Ditch 100x100x120 cm K 300 buah 1,529,000 1,539,000 1,544,000
512 U-Ditch 100x120x120 cm K 300 buah 1,804,000 1,814,000 1,819,000
513 U-Ditch 100x140x120 cm K 300 buah 1,848,000 1,858,000 1,863,000
514 U-Ditch 100x100x120 cm K 300 buah 2,800,000 2,810,000 2,815,000
515 U-Ditch 120x120x120 cm K 300 buah 2,882,000 2,892,000 2,897,000
516 U-Ditch 120x140x120 cm K 300 buah 3,223,000 3,233,000 3,238,000
517 U-Ditch 120x160x120 cm K 300 buah 3,399,000 3,409,000 3,414,000
518 U-Ditch 150x150x120 cm K 300 buah 3,784,000 3,794,000 3,799,000
519 U-Ditch 150x160x120 cm K 300 buah 3,828,000 2,838,000 3,843,000
520 U-Ditch 50x50x120 cm K 350 buah 678,700 688,700 693,700
521 U-Ditch 50x60x120 cm K 350 buah 752,900 762,900 767,900
522 U-Ditch 50x70x120 cm K 350 buah 837,100 847,100 852,100
523 U-Ditch 60x60x120 cm K 350 buah 992,200 1,002,200 1,007,200
524 U-Ditch 60x70x120 cm K 350 buah 1,082,400 1,092,400 1,097,400
525 U-Ditch 60x80x120 cm K 350 buah 1,172,000 1,182,000 1,187,000
526 U-Ditch 60x100x120 cm K 350 buah 1,358,000 1,368,000 1,373,000
527 U-Ditch 80x80x120 cm K 350 buah 1,525,700 1,535,700 1,540,700
528 U-Ditch 80x90x120 cm K 350 buah 1,640,100 1,650,100 1,655,100
529 U-Ditch 80x100x120 cm K 350 buah 1,750,100 1,760,100 1,765,100
530 U-Ditch 80x120x120 cm K 350 buah 1,975,600 1,976,600 1,981,600
531 U-Ditch 100x100x120 cm K 350 buah 2,489,300 2,499,300 2,504,300
532 U-Ditch 100x120x120 cm K 350 buah 2,784,100 2,794,100 2,799,100
533 U-Ditch 30x30x120 cm K 250 buah 288,090 298,090 303,090
534 U-Ditch 50x50x120 cm K 250 buah 642,785 652,785 657,785
536 Box Culvert 100 x 100 K 350 buah 4,312,000 4,322,000 4,327,000
537 Box Culvert 120 x 120 K 350 buah 5,324,000 5,334,000 5,339,000
538 Box Culvert 150 x 150 K 350 buah 9,515,000 9,525,000 9,530,000
Geotextile
539 Geotextile Woven 150 gr/m2 Rol size 4 m x 200 m M2 6,960 7,960 8,460
540 Shunda Plafond PVC 0,8 cm x 20 cm M2 9,240 10,240 10,740
541 Geotextile Woven 250 gr/m2 Rol size 4 m x 150 m M2 10,920 11,920 12,420
542 Geotextile Woven 300 gr/m2 M2 15,840 16,840 17,340
543 Geotextile Non Woven 150 gr/m2 M2 7,200 8,200 8,700
544 Geotextile Non Woven 200 gr/m2 M2 8,640 9,640 10,140
545 Geotextile Non Woven 250 gr/m2 M2 10,080 11,080 11,580
546 Geotextile Non Woven 300 gr/m2 M2 11,640 12,640 13,140
547 Geotextile Non Woven 350 gr/m2 M2 13,200 14,200 14,700
548 Geotextile Non Woven 400 gr/m2 M2 14,760 15,760 16,260
549 List plafond PVC 1,5 cm( Minimalis warna Putih ) M' 24,000 25,000 25,500
550 List plafond PVC 3 cm ( Minimalis warna Putih ) M' 28,820 29,820 30,320
551 Lampu Down light panasonoc 5 inchi buah 108,000 109,000 109,500
552 Nok Bitumen/Ridge Onduline Monolayer 1 m M2 90,800 95,800 105,800
553 Paku Atau Sekrup Genteng Bitumen buah 1,100 1,600 2,300
Atap Bitumen Bergelombang Monolayer 3 mm (Kemiringan atap
554 minimun 10 - 15 Derajat ) uk 200 x 95 x 0,30 cm jarak gording lbr 178,400 183,400 193,400
atau reng max 45 cm

Atap Bitumen Bergelombang Monolayer 3 mm (Kemiringan atap


555 >15° ) uk 106 x 40 x max 32 cm lbr 57,500 62,500 72,500
Atap Bitumen Bergelombang Monolayer 3 mm (Kemiringan atap
556 >10° ) uk 200 x 95 x 45 cm, jarak Rangka Max 45 cm lbr 165,800 170,800 180,800

B UPAH KERJA
1 Kepala Tukang Org/Hr 147,000 147,000 147,000

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)

NO BAHAN DASAR SPESIFIKASI SATUAN HARGA

1 2 3 4 5
2 Mandor Org/Hr 167,000 167,000 167,000
3 Mekanik Terampil Org/Hr 147,000 147,000 147,000
4 Mekanik Semi Terampil Org/Hr 127,000 127,000 127,000
5 Operator Terampil Org/Hr 188,000 188,000 188,000
6 Operator Semi Terampil Org/Hr 157,000 157,000 157,000
7 Pembantu Operator Org/Hr 152,000 152,000 152,000
8 Sopir Terampil Org/Hr 147,000 147,000 147,000
9 Sopir Pribadi Org/Hr 147,000 147,000 147,000
10 Pembantu Sopir Org/Hr 124,000 124,000 124,000
11 Pekerja Kasar / Buruh Org/Hr 121,000 121,000 121,000
12 Pekerja Semi Terampil Org/Hr 124,000 124,000 124,000
13 Pekerja terampil /pembantu instalatur Org/Hr 126,000 126,000 126,000
14 Tukang Batu Org/Hr 142,000 142,000 142,000
15 Tukang Kayu Org/Hr 142,000 142,000 142,000
16 Tukang Besi Org/Hr 142,000 142,000 142,000
17 Tukang Cat Org/Hr 142,000 142,000 142,000
18 Tukang Listrik Org/Hr 142,000 142,000 142,000
19 Tukang Pipa Org/Hr 142,000 142,000 142,000
20 Tukang Las Org/Hr 142,000 142,000 142,000
21 Tukang Aluminium Org/Hr 142,000 142,000 142,000
22 Instalatur listrik Org/Hr 157,000 157,000 157,000

Zona I Zona II Zona III


Dataraan Dataran Dataran
Rendah Tinggi Kota Tinggi Desa

Ds.
Paladingan,
Desa
Julumate'ne,
Desa Lassa-
lassa, Desa
Ulungan,
Desa
Botolempang
an
Kec. Kec.
Botolempang
Sombaopu an
Ds.
Julumate,
Ds. Lassa-
lassa,
Ds.
Ulujangan,
Ds.
Botolempang
an

Ds
ZONASI Bontolerung,

Kec. Kec. Tinggi Kel. Garassi,


Pallangga Moncong
Kel.
Gantarang,

Kec.
Tinggimonco
ng
Kec. Ds. Manimbahoi
Bontomaran Kec. Parigi
nu Kec. Parigi
Kec. Kec. Ds. Baturappe
Pattallassang Biringbulu Kec. Biringbulu
Ds. Rappolemba
Kel. Cikoro,
Kec. Kec. Ds Rappoala,
Barombong Tompobulu
Desa Tanete,
Kec. Tompobulu
Ds Rappalemba,
Kec. Ds Erelembang,
Kec. Bajeng Tombolopao
Ds Tabinjai,
Kec. Tombolopao
Ds Rannaloe
Kec. Bajeng Kec. Kec. Bungaya
Barat, Kec. Parangloe, Ds Pattalikang
Bontonompo Kec. Bungaya, Kec. Manuju
, Kec. Bonsel Kec. Manuju

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
STANDAR HARGA SATUAN BAHAN BANGUNAN DAN UPAH KERJA
PEMERINTAH PROVINSI SULAWESI SELATAN
KABUPATEN PANGKAJENE DAN KEPULAUAN
TAHUN 2020
Dalam Rupiah (Rp)

NO JENIS BARANG SPESIFIKASI SATUAN HARGA

1 2 3 4 5
1 Batu Kali
- Utuh M3 128,000
- Batu Pecah 10 - 15 cm M3 184,000
- Batu Pecah 7 - 10 cm M3 215,000
- Batu Pecah 5 - 7 cm M3 242,000
- Batu Pecah 3 - 5 cm M3 265,000
- Batu Pecah 2 - 3 cm M3 300,000
- Batu Pecah 1 - 2 cm M3 300,000
- Batu Pecah 0,5 - 1 cm M3 400,000
2 Batu Gunung M3 150,000
3 Tanah Timbunan M3 65,000
Timbunan Pilihan M3 90,000
4 Pasir
- Pasir Urug M3 130,000
- Pasir Pasang M3 150,000
- Pasir Pasang Pilihan M3 185,000
- Pasir Beton M3 180,000
5 Krikil
- Krikil Halus M3 125,000
- Krikil Kasar M3 135,000
6 Sirtu
- Sirtu disaring M3 105,000
- Sirtu tidak disaring M3 100,000
7 Kapur Hidrasi M3 115,500
8 Semen
- Semen Putih Zak 55,000
- Semen Warna Kg -
- Semen Nat Kg -
- Semen Tonasa @ 50 kg Zak 57,000
- Semen Tonasa @ 1 kg Kg 1,140
- Semen Tonasa @ 40 kg Zak 45,000
- Semen Bosowa @ 40 kg Zak -
- Semen Bosowa @ 40 kg Zak -
9 Semen Mortar Untuk Bata Ringan
- Semen MU 100 Kg 3,500
- Semen MU 200 Kg 5,000
- Semen MU 301 Kg 3,000
- Semen MU 380 Kg 5,500
- Semen MU 460 25 Kg Kg 15,000
- Semen MU 408 Kg 10,000
10 Batu Merah Bj 500
11 Bata Ringan M3 1,100,000
12 Paving Blok Mutu (K175)
Uk,10 x 20 cm, Tebal 6 cm M2 -
Uk 10 x 20 cm,Tebal 8 cm M2 -
13 Paving Blok Mutu (K225)
Uk ,10 x 20 cm,Tebal 6 cm M2 -
Uk 10 x 20 cm,Tebal 8 cm M2 -
14 Paving Blok Mutu (K300)
Uk,10 x 20 cm, Tebal 6 cm M2 -
Uk,10 x 20 cm,Tebal 8 cm M2 -
15 Paving Blok Mutu (K400) M2 -
16 Pecahan Mar - Mar M3 -
17 Roster Terawang Bh 11,250
18 Cansteen Beton,Uk. 60 x 30 x 15 Bh -
19 Ijuk Kg 2,500,000
20 Air Kerja Ltr 100

BAHAN ASPAL

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)

NO JENIS BARANG SPESIFIKASI SATUAN HARGA

1 2 3 4 5
1 Aspal Dingin Kg 13,500
2 Aspal Bitumen Kg 13,500
3 Aspal Emulsi (Flux Oil) Kg 13,500

BAHAN KAYU
1 Kayu Kls I (Ulin)
- Balok M3 13,000,000
- Papan M3 17,000,000
2 Kayu Kls I (Bayam)
- Balok M3 10,000,000
- Papan M3 17,000,000
3 Kayu Kls I ( Kumea)
- Balok M3 6,500,000
- Papan M3 7,500,000
4 Kayu Kls II
- Balok M3 3,700,000
- Papan M3 3,700,000
5 Kayu Kls III
- Balok M3 2,000,000
- Papan M3 2,500,000
- Bambu Btg 30,000

BAHAN LANTAI
1 Tegel PC
- PC Abu - Abu 20 x 20 cm Dos 55,000
- PC Abu - Abu 30 x 30 cm Dos 50,000
- PC Warna 20 x 20 cm Dos 55,000
- PC Badak 20 x 20 cm Dos 55,000
Pulin 15 x 20 cm Dos 15,000
Pulin 15 x 30 cm Dos 15,000
2 Tegel Keramik
- Putih 10 x 20 cm Dos 55,000
- Warna 10 x 20 cm Dos 55,000
- Putih 20 x 20 cm Dos 60,000
- Warna 20 x 20 cm Dos 60,000
- Putin 30 x 30 cm Dos 52,000
- Putih 40 x 40 Dos 52,000
- Warna 40 x 40 Dos 70,000
- Polos 60 x 60 Dos 180,000
- Warna 60 x 60 Dos 195,000
- Polos 20 x 60 Dos 140,000
- Warna 20 x 60 Dos 180,000
- Polos 20 x 25 Dos 48,500
BAHAN KACA
1 Kaca Bening 3 mm M2 120,000
2 Kaca Bening 2 mm M2 95,000
3 Kaca Buram 3 mm M2 94,500
4 Kaca Buram 2 mm M2 78,700
5 Riben 3 mm M2 130,000
6 Riben 5 mm M2 165,000
7 Rangka Nako Lengkap trali M2 30,000
BAHAN ALUMINIUM
1 - Aluminium Warna (2x1") M 97,800
2 - Aluminium Warna (3x1") M 182,300
3 - Aluminium Warna (3x2") M 47,200
4 - Aluminium Warna (4X2") M 81,900

BAHAN PIPA
1 PIPA BESI GIP
- Ø 1/2" medium A Batang 200,000
- Ø 3/4" medium A Batang 250,000
- Ø 1" medium A Batang 350,000
- Ø 1,5" medium A Batang 500,000
2 Pipa PVC
- Ø 1/2 Inci - 4 m Batang 22,000
- Ø 3/4 Inci - 4 m Batang 28,000
- Ø 1 Inci - 4 m Batang 37,000
- Ø 1,5 Inci - 4 m AW Batang 45,000

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)

NO JENIS BARANG SPESIFIKASI SATUAN HARGA

1 2 3 4 5
- Ø 2 Inci - 4 m AW Batang 65,000
- Ø 2 1/2 Inci - 4 m AW Batang 95,000
- Ø 3 Inci - 4 m AW Batang 130,000
- Ø 4 Inci - 4 m AW Batang 240,000
3 Pipa PVC Ø 50 (RR) S 12,5 T 10 Bar Batang 160,000
4 Pipa PVC Ø 75 (RR) S 12,5 T 10 Bar Batang 350,000
5 Pipa PVC Ø 100 (RR) S 12,5 T 10 Bar Batang 365,000
6 Pipa PVC Ø 150 (RR) S 12,5 T 10 Bar Batang 792,000
7 Pipa PVC Ø 200 (RR) S 12,5 T 10 Bar Batang 1,331,000
8 Pipa PVC Ø 250 (RR) S 12,5 T 10 Bar Batang 2,082,300
9 Pipa GIP Ø 150 Medium Batang 2,112,000
10 Pipa GIP Ø 250 Medium Batang 5,100,000
11 Pipa GIP Ø 200 Medium Batang 3,600,000
12 Pipa GIP Ø 100 Medium Batang 1,089,000
13 Pipa GIP Ø 75 Medium Batang 855,000
14 Pipa GIP Ø 50 Medium Batang 415,000

BAHAN ASEESSORIES PIPA


1 Flange Bend 45 GIP Ø 250 Bh 825,000
2 Flange Bend 45 GIP Ø 200 Bh 828,000
3 Flange Bend 45 GIP Ø 150 Bh 704,000
4 Flange Bend 45 GIP Ø 100 Bh 335,000
5 Flange Bend 45 GIP Ø 75 Bh 241,000
6 Flange Bend 45 GIP Ø 50 Bh 201,000
7 Flange Bend 90 GIP Ø 200 Bh 1,035,000
8 Bend CI ALL Flange 45 Ø 250 Bh 1,201,950
9 Bend CI ALL Flange 90 Ø 250 Bh 792,000
10 Reducer All Flange Ø 250 x 200 Bh 810,000
11 Reducer All Flange Ø 250 x 150 Bh 585,000
12 Flange Still Ø 250 Bh 575,000
13 Flange Still Ø 200 Bh 293,000
14 Flange Still Ø 150 Bh 162,000
15 Flange Still Ø 100 Bh 123,000
16 Flange Still Ø 75 Bh 96,000
17 Flange Still Ø 50 Bh 58,000
18 Flange Spigot Ø 200 Bh 759,000
19 Flange Spigot Ø 150 Bh 506,000
20 Flange Spigot Ø 100 Bh 310,000
21 Flange Tee Ø 250 x 250 Bh 1,318,500
22 Flange Tee Ø 250 x 50 Bh 994,500
23 Flange Tee Ø 250 x 300 Bh 2,079,000
24 Flange Tee Ø 250 x 75 Bh 1,260,000
25 Flange Tee Ø 200 x 200 x 75 Bh 1,155,000
26 Flange Tee Ø 150 x 150 x 150 Bh 850,000
27 Flange Tee Ø 100 x 100 x 100 Bh 716,000
28 Flange Socked Ø 250 Bh 1,201,500
29 Flange Socked Ø 200 (RRJ) Bh 820,000
30 Flange Socked Ø 150 (RRJ) Bh 500,000
31 Flange Socked Ø 100 (RRJ) Bh 350,000
32 Flange Socked Ø 75 (RRJ) Bh 250,000
33 Flange Socked Ø 50 (RRJ) Bh 170,000
34 Flange Adaptor Ø 250 Bh 1,665,000
35 Flange Loose Ø 50 mm Bh 49,500
36 Flange Loose Ø 200 mm Bh 202,950
37 Flange Loose Ø 250 mm Bh 405,000
38 Floating Valve Ø 250 Bh 1,350,000
39 Fleksibel Joint Ø 250 Bh 2,430,000
40 Fient Krant Ø 50 Bh 728,100
41 Air Realist Valve Ø 200 Bh 342,000
42 Air Realist Valve Ø 250 Bh 585,000
43 Box Streat Ø 200 Bh 81,000
44 Box Streat Ø 250 Bh 90,000
45 DOP Ø 250 Bh 693,000
46 Long Bend 90 PVC Ø 250 (RRJ) Bh 350,100
47 Long Bend 45 PVC Ø 250 (RRJ) Bh 364,500
48 Long Bend 22 PVC Ø 250 (RRJ) Bh 378,000
49 Long Bend 90 PVC Ø 200 (RRJ) Bh 1,391,000
50 Long Bend 45 PVC Ø 200 (RRJ) Bh 1,605,000

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)

NO JENIS BARANG SPESIFIKASI SATUAN HARGA

1 2 3 4 5
51 Long Bend 22 PVC Ø 200 (RRJ) Bh 2,300,000
52 Long Bend 90 PVC Ø 150 (RRJ) Bh 1,016,000
53 Long Bend 45 PVC Ø 150 (RRJ) Bh 1,284,000
54 Long Bend 22 PVC Ø 150 (RRJ) Bh 1,819,000
55 Long Bend 90 PVC Ø 100 (RRJ) Bh 1,414,000
56 Long Bend 45 PVC Ø 100 (RRJ) Bh 997,000
57 Long Bend 22 PVC Ø 100 (RRJ) Bh 850,000
58 Long Bend 90 PVC Ø 75 (RRJ) Bh 695,000
59 Long Bend 45 PVC Ø 75 (RRJ) Bh 602,000
60 Long Bend 22 PVC Ø 75 (RRJ) Bh 511,000
61 Long Bend 90 PVC Ø 50 (RRJ) Bh 299,000
62 Long Bend 45 PVC Ø 50 (RRJ) Bh 223,000
63 Long Bend 22 PVC Ø 50 (RRJ) Bh 190,000
64 Tes Tee PVC 150 x 150 x 150 Bh 969,000
65 Tes Tee PVC 100 x 100 x 100 Bh 646,000
66 Tes Tee PVC 75 x 75 x 75 Bh 483,000
67 Tes Tee PVC 50 x 50 x 50 Bh 323,000
68 Reduser PVC Ø 150 x 100 Bh 241,000
69 Reduser PVC Ø 75x 100 Bh 124,000
70 Gate Valve Ø 250 Bh 5,220,000
71 Gate Valve Ø 200 Bh 2,160,000
72 Gate Valve Ø 100 Bh 1,284,000
73 Gate Valve Ø 75 Bh 1,091,000
74 Gate Valve Ø 50 Bh 909,000
75 Gibeoul Joint Cast Iron PN 10 Ø 75 Bh 187,000
76 Gibeoul Joint Cast Iron PN 10 Ø 100 Bh 251,000
77 Gibeoul Joint Cast Iron PN 10 Ø 150 Bh 342,000
78 Gibeoul Joint Cast Iron PN 10 Ø 250 Bh 1,391,000
79 Elbow PVC Ø 25 Bh 5,000
80 Elbow PVC Ø 3/4 Bh 10,000
81 Stop Krank 1/2" Bh 30,000
82 Atap Kran Bh 20,000
83 Knee GIP Ø 1/2" Bh 6,000
84 Socket GIP Ø 1/2" Bh 5,000
85 Double Neppel Bh 5,000
86 Water Stop W = 300 mm M' 67,500
87 Box Meter Fiber Glass Bh 64,000
88 Isolasi (Tiplon) Bh 5,000
89 Clamp Saddle Ø 50 x 1/2" Bh 30,000
90 Clamp Saddle Ø 100 x 100" Bh 42,000
91 Clamp Saddle Ø 200 Bh 162,000
92 Clamp Pipa Ø 250 Bh 54,000
93 Baut 5/8 x 3" Bh 5,000
94 Baut 3/8 x 3" Bh 3,000
95 Karet Packing Ø 100 Bh 13,200
96 Karet Packing Ø 50 Bh 6,600
97 Menhole Pada Ø 200 mm Bh 267,000
98 Menhole Pada Ø 150 mm Bh 214,000
99 Kawat Las Kg 25,000
100 Lem pipa Bh 15,000
101 Bak Fiber / Polyethy 2 M3 Unit 1,500,000
102 Bak Fiber / Polyethy 3 M3 Unit 3,500,000
103 Bak Fiber / Polyethy 4 M3 Unit 5,000,000
104 Bak Fiber / Polyethy 5 M3 Unit 5,400,000

MEKANIKAL
1 Pompa Air Ø 8" Buah 3,500,000
2 Pompa Air Ø 6" Buah 3,000,000
3 Genset Power Systim 10 KVA Unit 11,550,000
4 Genset Power Systim 5 KVA Unit 5,777,500
BAHAN LANGIT - LANGIT
1 Eternit 100 x 100 Lbr 20,000
2 Tripleks
- 122 x 224 x 0.2 cm Lbr 45,000
- 122 x 224 x 0.3 cm Lbr 55,000
- 122 x 224 x 0.6 cm Lbr 80,000
- 122 x 224 x 0.9 Lbr 115,000
3 Acoustic 40 x 60 Lbr 20,000

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)

NO JENIS BARANG SPESIFIKASI SATUAN HARGA

1 2 3 4 5
4 Teakwoood
- 122 x 224 x 0.3 cm Lbr 115,000
- 80 x 224 x 0.3 cm Lbr 85,000
5 Asbes Plat Harflex
- 200 x 100 x 0.3 cm Lbr 20,000
Gipsum Board
- 240 x 120 x 0.3 cm Lbr 60,000
- 240 x 120 x 0.4 cm Lbr 70,000
- 240 x 120 x 0.9 cm Lbr 80,000
6 Calse Board Lbr 65,000
7 Kalsi Board 6 mm Lbr 130,000
8 List Profil
- 4 x 5 cm M' 15,000
- Lembar Seri M2 82,000
9 Lem Kayu Kg 15,000
10 List profil Gypsum 8 cm M' 15,000
11 Holow Galvalum Rangka Plafond
- Holow Galvalum 2/4 0,4 Kg 20,000
- Holow Galvalum 2/4 0,6 Kg 30,000

BAHAN BESI
1 Besi Tulangan
Besi Tulangan Ulir
-Ø 13 x 12 m Kg 12,000
-Ø 16 x 12 m Kg 8,443
-Ø 19 x 12 m Kg 9,731
Besi Tulangan Polos
-Ø 6 x 12 m Kg 11,000
-Ø 8 x 12 m Kg 10,196
-Ø 10 x 12 m Kg 9,189
-Ø 12 x 12 m Kg 10,928
-Ø 14 x 12 m Kg 11,371
2 Besi Profil
- IWF 150 X 12 m Kg 14,500
- IWF 200 X 12 m Kg 14,500
- IWF 250 X 12 m Kg 14,500
- IWF 300 X 12 m Kg 14,500
- IWF 350 X 12 m Kg 14,484
- IWF 400 X 12 m Kg 14,500
- H Beam 100 x 12 m Kg 15,000
- H Beam 150x 12 m Kg 14,889
- H Beam 200 x 12 m Kg 15,000
- H Beam 250 x 12 m Kg 15,000
- H Beam 300 x 12 m Kg 15,000
- H Beam 350 x 12 m Kg 15,000
- H Beam 400 x 12 m Kg 15,000
- UNP 50 Kg 135,000
- UNP 65 Kg 215,000
- UNP 80 Kg 250,000
- UNP 100 Kg 345,000
- UNP 120 Kg 540,000
- UNP 125 Kg 570,000
- UNP 150 Kg 850,000
- Wiremesh M,8 Kg 10,000
- Wiremesh M.10 Kg 10,500
- Besi Profil Kanal C. 125 x 50 x 20 x 2,3 Kg 9,686
- Besi Profil Kanal C. 150 x 50 x 20 x 3,2 Kg 10,170
3 Kawat
- Kawat Beton Kg 25,000
* Manual Kg 20,000
* Pabrikasi Lbr 350,000
- Kawat Duri Roll 180,000
- Kawat Rang Kg 20,000
- Kawat Las Roll 115,000
4 Paku
- Paku Biasa (5 - 10) cm Kg 20,000
- Paku Biasa (1 - 4) Kg 23,000
- Paku Asbes Kg 30,000

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)

NO JENIS BARANG SPESIFIKASI SATUAN HARGA

1 2 3 4 5
- Paku Seng Kg 50,000
- Paku Skrup 3 1/2" Dos 75,000
- Paku Skrup 4 1/2 " Dos 8,500
- Paku Payung Bernulir Kg 57,000
- Paku 2 cm Dos 22,000
- Paku Beton Dos 15,000
- Rang Nyamuk M2 20,000
5 Besi Plat
- 2 mm = 120 x 240 mm Lb 423,000
- 3 mm = 120 x 240 mm Lb 750,000
- 5 mm = 120 x 240 mm Lb 1,233,000
- 6 mm = 120 x 240 mm Lb 1,575,000
- 8 mm = 120 x 240 mm Lb 2,520,000
6 Besi Strep
- 30.3 mm Btg 16,500
- 35.4 mm Btg 22,000
- 46.4 mm Btg 24,700
- 40.6 mm Btg 27,500
- 50.6 mm Btg 33,000

BAHAN PELUMAS/ BBM


1 Oli Mesin SAE 40 Ltr 33,000
2 Oli Mesin SAE 10 Ltr 49,000
3 Oli Mesin SAE 90 Ltr 31,000
4 Bensin Ltr 6,450
5 Solar Ltr 5,150
6 Solar Industri Ltr 11,338
7 Minyak Tanah Ltr 10,000

Bahan ATAP
1 Genteng
- Beton Bh 4,900
- Keramik Bh 15,000
- Asbes Lbr 16,500
- Harfleks Lbr 9,300
2 Genteng Metal
- Multi Roof Kasar Lbr 90,000
- Multi Roof Halus Lbr
- Bubungan Multi Roff Kasar Lbr 63,000
- Bubungan Multi Roff Halus Lbr 51,000
- Surya Roof Kasar Lbr
- Surya Roof Halus Lbr
- Bubungan Surya Roof Kasar Lbr
- Bubungan Surya Roof Halus Lbr 39,000
- Sakura Roof Kasar Lbr
- Sakura Roof Halus Lbr
- Bubungan Sakura Roff Kasar Lbr 41,000
- Bubungan Sakura Roff Halus Lbr 38,000
3 Asbes Gelombang Kaki 6,000
4 Seng Gelombang
-BWG 34" BJLS 0,20 mm Kaki 7,150
-BWG 34" BJLS 0,22 mm Kaki 7,200
-BWG 34" BJLS 0,30 mm Kaki 8,800
-BWG 34" BJLS 0,35 mm Kaki 9,900
-Atap Metal Sheet Gelombang Kaki 181,000
(Al.Zn Ex. Furmire) T = 0,45 mm
-Atap Spandek 0,35 Natural M' 46,000
-Atap Spandek 0,35 Wana M' 50,000
-Atap Spandek G550 AZ -100 T = 0,5 mm M' 55,000
-Non Spandek G550 AZ -100 T = 0,5 M'
- Atap Zintacum 0,45 M'
- Nok Zincatum 0,45 M'
- Policarbonat M'
5 Seng plat M' 20,000
6 Seng plastik kaki 12,000
7 Besi siku
-30.30.3 Btg 80,000
-40.40.4 Btg 85,000

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)

NO JENIS BARANG SPESIFIKASI SATUAN HARGA

1 2 3 4 5
-50.50.5 Btg 145,000
-60.60.6 Btg 200,000
-70.70.7 Btg 110,200
-40.40.4 Btg 57,700
-50.50.4 Btg 65,600
8 Smar Truss C 75.100 M 24,600
9 Smar Truss C 75.75 M 14,500
10 Profil Reng U 35.30.40 M 6,500
11 Main Truss 1.0.5 TCT M 15,200
12 Web 0.8 TCT M 14,100
13 Acor/Seng Pelapis genteng Roll 110,200
14 Fiber Semen (harflex)
-super 240x108x0.6 c Lbr 36,700
-super 180x108x0.6 c Lbr 26,200
15 Nok / bubungan
-Nok genteng beton Bh 4,700
-Nok genteng asbes Bh 4,200
-Nok genteng Keramik Bh 13,100
16 Karet Pelapis Genteng M1 13,000

BAHAN FINISHING CAT


1 Cat tembok
-Avitex kg 21,000
-Metrolite kg 32,000
-Kimex kg 16,000
-Dulux kg
-Mowilex Interior kg 66,000
-Mowilex Exterior kg 106,000
2 Cat kayu
-Glotex kg 53,000
-Avian kg 62,000
-Platon kg 55,000
-ICI kg 55,000
-politur kg 65,000
-meni kg 30,000
-minyak cat kg 35,000
3 Cat Anto bocor
-no drop kg 48,000
Aqua prof kg 56,000
4 Cap atap
-yoko kg 25,000
-aga kg 90,000
-plamur kg 11,000
-amplas/kertas gosok M 9,000
-Dempul kg 38,000
-Residu kg 5,000
5 Minyak Bikisting Liter 9,000

BAHAN INSTALASI LISTRIK


1 Pipa Union Untuk Kabel
- 5/8-4m Btg 13,000
- 3/4-4m Btg 30,000
- 1"-4m Btg 40,000
- 1,5"-4m Btg 40,000
2 Kabel Listrik
Type NYK
- 1 1/2 mm M' 7,500
- 2 1/2 mm M' 10,000
Type NYK
- 2 x 1 1/2 mm M' 9,500
- 2 x 2 1/2 mm M' 13,000
- 2 x 4 mm M' 18,000
Type 2 x 4 mm
- Kabel NYM (3 x 4) M' 19,000
- Kabel NYM (3 x 2,5) mm M' 12,000
- Kabel NYM (2 x 2,5) mm M' 9,000
3 Lampu TL
- 1 x 20 w Bh 60,000

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)

NO JENIS BARANG SPESIFIKASI SATUAN HARGA

1 2 3 4 5
- 2 x 20 w Bh 200,000
- 1 x 40 w Bh 110,000
- 2 x 40 w Bh 185,000
4 Lampu Pijar
- 25 watt Bh 10,000
- 40 watt Bh 10,000
5 Lampu Sorot
- LED 50 watt Bh 190,000
- LED 140 watt Bh 1,000,000
- LED 300 watt Bh 3,000,000
6 Armatur Lampu Set 650,000
7 Kontraktor
- 20A Bh 650,000
- 32A Bh 650,000
8 Timer Analog Buah 450,000
9 Kilip Kabel Dos 16,000
10 MCB
- 16 A bh 55,000
- 20 A bh 50,000
- 25 A Bh 55,000
11 BOX MCB 40 x 60 Bh 650,000
12 Foto Sell Bh 100,000
13 KWH Meter Listrik
- 5500 Watt PB 8,000,000
- 7700 Watt PB 15,000,000
14 Service Klem Buah 5,000
15 Konektor Buah 15,000
16 Sisir MCB Meter 50,000
17 Rel MCB Meter 25,000
18 Aram Bh 120,000
19 Lamou Taban Mercuri Set 120,000
20 Saklar Phase
- Tunggal Putih (Panasonic) Bh 14,000
- Tunggal Hitam (Panasonic) Bh 28,000
21 Stock Kontak
- Hitam Bh 29,000
- Putih Bh 14,000
22 Skringg Case Lokal Biasa
- Lokal 2 Grup Automatis Bh 5,000
- Lokal 3 Group Biasa Bh 13,000
23 Fitting Bh 12,000
24 Klem Kabel No.10 Bh 17,000
25 Klem ITC (2 x 2 x 0.6) Bh 14,000
26 Klem Kabel No.12 Bh 13,000
27 Inbow Dos Bh 3,000
28 Las Dop Bh 100,000
29 Isolasi Bh 100,000
30 T-Doas 5/8" Bh 100,000
31 Stop Kontak Telfon Bh 100,000
32 Kontak Sambungan Bh 100,000

UPAH KERJA
1 Mandor Hari 100,000
2 Kepala Tukang Hari 130,000
3 Tukang Hari 110,000
4 Pekerja Hari 90,000
5 Mekanik Terampil Hari 105,000
6 Mekanik Tak Terampil Hari 90,000
7 Operator Terampil Hari 170,000
8 Operatpr Tak Terampil Hari 120,000
9 Pembantu Operator Hari 95,000
10 Supir Truck Hari 100,000
11 Pembantu Sopir Hari 80,000

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
STANDAR HARGA SATUAN BAHAN BANGUNAN DAN UPAH KERJA
PEMERINTAH PROVINSI SULAWESI SELATAN
KABUPATEN TAKALAR
TAHUN 2018
Dalam Rupiah (Rp)
NO. BAHAN DASAR SPESIFIKASI SATUAN HARGA

1 2 3 4 5
BAHAN DASAR
1 Batu Gunung M3 216,000
2 Batu Kali Utuh M3 203.000
Belah/Kerak M3 254,000
Gravel M3 191,000
3 Batu Pecah 10 - 15 cm M3 387,000
7 - 10 cm M3 316,200
5 - 10 cm M3 376,600
3 - 5 cm M3 412,800
2 - 3 cm M3 424,200
1 - 2 cm M3 438,200
0,5 - 1 cm M3 475,000
4 Batu Kapur / Batu Karang Buah 139,700
5 Batu Bata Kelas I Buah 1,000
Kelas II M3 650
6 Batu Brojol (untuk brojong) M3 239,000
7 Batu Koral Beton Kali M3 222,000
8 Batu Tempel Hitam M3 125,700
9 Batu Koral Ukuran Besar (Batu Telor) Kg 101,000
10 Filer Kg 2,500
11 Kapur Pasang M3 381,000
12 Kerikil Chipping M3 414,000
13 Kerikil Koral M3 305,000
14 Kerikil Sungai M3 305,000
15 Kerikil Sungai Ayak Tanpa Pasir M3 372,000
16 Krikil/Agregat Kasar M3 344,000
Krikil/Agregat Halus M3 381,000
17 Bahan Agregat Base Kelas A M3 375,000
Kelas B M3 344,000
Kelas C M3 279,000
18 Pasir Urung Timbunan M3 127,000
19 Tanah Timbunan M3 105,000
20 Pasir Beton M3 184,200
21 Pasir Ayak M3 165,100
22 Pasir Batu (Sirtu) M3 155,600
23 Pasir Campuran/Pasangan M3 158,800
24 Sirtu (Tak Ayak) M3 142,900
25 Bahan Timbunan Pilihan M3 114,300
26 Semen : - Tonasa 50 Kg Zak 69,900
40 Kg Zak 57,200
- Bosowa 50 Kg Zak 67,300
40 Kg Zak 54,600
- Tiga Roda 50 Kg Zak 66,700
40 Kg Zak 54,000
- Putih Tiga Roda 40 Kg Zak 98,400
- Holcim 50 kg 70,500
40 kg 57,800
Semen Warna Kg 20,000
27 Readymix Beton Tanpa Pompa (Selang) K500 M3 1,441,000
K400 M3 1,207,000

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)
NO. BAHAN DASAR SPESIFIKASI SATUAN HARGA

1 2 3 4 5
K350 M3 1,105,000
K300 M3 1,067,000
K225 M3 978,000
K175 M3 876,000
28 Cornice Adhesive Aplus (20 Kg) Zak 88,900
29 Gypsum Compound Aplus 200 (20 Kg) Zak 67,300
Gipro (20 Kg) Zak 101,600

BAHAN KAYU
1 Kayu Kelas I (Bayam)
- Balok M3 11,430,000
- Papan M3 27,940,000
2 Kayu Kelas II
- Balok M3 4,191,000
- Papan M3 4,191,000
3 Kayu Kelas III
- Balok M3 2,159,000
- Papan M3 2,159,000
4 Kayu Kelas IV
- Balok M3 1,270,000
- Papan M3 1,270,000
5 Kayu Lapis 4 mm 8" x 4" Lembar 80,000
6 Kayu Lapis 12 mm 8" x 4" Lembar 196,900

BAHAN ATAP :
1 Atap Asbes
- Gelombang Besar 80 x 180 x 5 mm Lembar 43,000
2 Genteng Metal (sakura) Lembar 37,000
3 Genteng Metal (prisma) Multi Roof Lembar 101,600
4 Baja Ringan
- Profil C M 97,800
- Profil U M 88,900
5 Genteng Harflex
- Polos 115 x 85 x 0,5 cm Lembar 48,300
- Warna 115 x 85 x 0,5 cm Lembar 52,100
6 Genteng Lisplank Polos 3 x 0,25 m Lembar 95,300
Genteng Bubungan Beton Buah 38,100
7 Seng Gelombang
- BWG 33" BJLS 0,20 mm Sermani Kaki 8,500
- BWG 32" BJLS 0,30 mm Sermani Kaki 86,800
- BWG 28" BJLS 0,35 mm Sermani Lembar 99,600
- BWG 33" BJLS 0,20 mm Gajah Lembar 8,700
- BWG 32" BJLS 0,30 mm Gajah Lembar 83,600

8 Seng Gelombang Kecil Sermani Kaki 9,000


Gajah Kaki 7,400
9 Seng Plastik Kaki 15,200
Lasercool Kaki 22,600
11 Seng Plat : - BWG 33" BJLS 0,20 mm Lembar 57,800
- BWG 32" BJLS 0,30 mm Lembar 81,900
- BWG 28" BJLS 0,35 mm Lembar 97,200

BAHAN BAMBU
1 Bambu - Besar (Pattung) Batang 47,200
- Sedang (Parring) Batang 33,600
- Kecil Batang 24,100
- Bilik Bambu (Kulit) M2 21,000

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)
NO. BAHAN DASAR SPESIFIKASI SATUAN HARGA

1 2 3 4 5
- Bilik Bambu (Tanpa Kulit) M2 24,100
- Bilik Bambu Hitam Variasi M3 26,300

BAHAN BESI
1 Besi Beton: - 6 mm SNI Batang 21,600
- 8 mm Batang 38,100
- 10 mm Batang 63,500
- 12 mm Batang 95,300
- 14 mm Batang 120,700
- 16 mm Batang 158,800
- 19 mm Batang 235,000
- 22 mm Batang 304,800
- 25 mm Batang 393,700
2 Besi Beton Ukir 13 mm Batang 108,000
3 Besi Plat : - 2 mm 120 x 240 mm Lembar 508,000
- 3 mm 120 x 240 mm Lembar 762,000
4 Besi Siku : - L.30.30.3.3240 mm Batang 69,900
- L.40.40.4 Batang 82,600
- L.50.50.5 Batang 165,100
- L.60.60.6 Batang 292,100
- L.70.70.7 Batang 444,500
5 Besi Strep : - 1,5 cm Batang 22,900
- 2 cm Batang 29,200
6 Kawat : - Ikat Beton Kg 19,100
- Beton Kg 25,500
- Kasa Nyamuk Plastik M2 25,500
- Saringan Plastik Rol 190,500
- Duri 10 Kg/Glng 158,800
- Beronjong Rol 666,800
- Rang : - 0,25 cm M2 27,900
- 0,4 cm M2 27,900
7 Besi Begel/Bantalan (U/ Kuda-kuda) Buah 27,900
8 Besi Profil C a Pipa Besi Meter 10,800
9 Pagar BRC jadi (lengkap tiang) M2 196,900

BAHAN FINISHING KAYU


1 Amplas Halus Untuk Besi Meter 12,700
2 Amplas Kasar Untuk Kayu Meter 12,700
3 Cat Dasar Gelatik 1 Kg/Klg 34,300
4 Dempul Cap Kucing Asli Kg 38,100
5 Lem Aibon Tube 27,900
6 Meni Kayu Yoko 3,5 kg 108,000
Nippon 69,900
7 Minyak Cat / Afdunner 1 Liter 38,500
8 Thinner A / Super 0,7 Liter 26,700
4 Liter 109,200
9 Politur Boyo 0,5 Liter 40,600
10 Teak Oil 1 Liter 24,800
11 Vernis Vernis Klg/0,5 Ltr 58,400

BAHAN KACA
1 Kaca Bening 3 mm Meter 139,700
5 mm Meter 158,800
2 Kaca Riben 3 mm Meter 152,400
5 mm Meter 165,100

BAHAN LANGIT-LANGIT

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)
NO. BAHAN DASAR SPESIFIKASI SATUAN HARGA

1 2 3 4 5

1 Asbes Plat Harlex :


- Selica Board 122 x 244 x 0,4 cm Lembar 69,900
- Gypsum 120 x 250 t=9 mm ex Lembar 76,200
DN
120 x 250 t=9 mm ex Lembar 76,200
Luar
2 Eternit 100 x 100 cm Lembar 25,400
4 mm M2 -
3 Plafond Asbes Semen 3,5 mm M2 66,700
4 Gypsum 9 mm Lembar 76,200
5 Hard Board 120 x 240 cm Lembar 101,600
6 Kalsiboard 122 x 244 cm Lembar 69,900
7 Cornice Adhesive Aplus 20 Kg 88,900
8 tripleks 122 x 244 x 3 mm Lembar 57,200
122 x 244 x 4 mm Lembar 69,900
122 x 244 x 6 mm Lembar 82,600
122 x 244 x 9 mm Lembar 120,700
122 x 244 x 10 mm Lembar 152,400
122 x 244 x 12 mm Lembar 171,500
Untuk Daun Pintu Lembar 141,000
9 Teak Wood - 122 x 244 x 3 mm Asli Lembar 107,000
Jati Lembar 121,000
10 Multiplex 120 x 240 x 18 mm Lembar 318,000
120 x 240 x 12 mm Lembar 191,000
120 x 240 x 9 mm Lembar 146,000

BAHAN LANTAI
1 Tegel :
- Tegel Mozaik Uk : 30 x 30 cm Motif Buah 78,000
Kaca Motif Lembar 109,200
- teralux : 30 x 30 cm Polos Dos 58,400
2 Keramik 25 x 25 cm Dos 76,200
- Putih 30 x 30 cm Dos 54,600
30 x 60 cm Dos 408,900
40 x 40 cm Dos 58,400
50 x 50 cm Dos 111,800
25 x 25 cm Dos 82,600
30 x 30 cm Dos 69,900
30 x 60 cm Dos 461,000
40 x 40 cm Dos 69,900
50 x 50 cm Dos 121,900
3 Granit
- Standar / Biasa 60 x 60 cm Dos 222,300
- Hugo Motif 60 x 60 cm Dos 247,700
- Hugo Hitam 60 x 60 cm Dos 292,100
- Hugo 100 x 100 cm Dos 768,400
- Ezenza Ivory 60 x 60 cm Dos 330,200
- Ezenza Unica Grey 60 x 60 cm Dos 346,700
- Granito Tile Ezenza :
- Polis 60 x 60 cm M² 292,100
60 x 60 cm Dos
60 x 60 cm Dos
- Unpolis 60 x 60 cm M² 273,100
4 Ubin Porselin Merk KIA ( Dekorasi ) 11 x 11 cm Dos 55,200

BAHAN PAKU

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)
NO. BAHAN DASAR SPESIFIKASI SATUAN HARGA

1 2 3 4 5
1 Paku : - Biasa 1 s/d 4 cm Kg 25,400
- Biasa 5 s/d 10 cm Kg 17,800
- Paku Seng Kg 38,700
RRT Kg 31,800
- Paku Sirap Ikat 24,100
- Paku Payung Berulir 75 mm kg 44,500

2 Paku : - Beton Hitam 3 cm Dos 13,000


5 cm Dos 25,000
7 cm Dos 32,000
- Beton Putih 2,5 - 5 cm Dos 19,000
3 Sekrup : 3 1/2 cm kg 20,300
4 cm kg 20,300

BAHAN SANITER
1 Kloset Duduk TOTO Polos Unit/Set 2,642,000
American Standard Unit/Set 1,905,000
Icepol Unit/Set 1,530,000
KIA Unit/Set 1,905,000
2 Kloset Duduk Keramik TOTO Buah 3,181,000
3 Kloset Jongkok KIA Buah 292,100
TOHO Buah 196,900
TOTO Putih Buah 358,100
TOTO Warna Buah 395,000
American Standard Buah 292,100
4 Kloset Jongkok Keramik Standard Buah 285,800
5 Kloset Jongkok
- Global Polos Buah 158,800
Warna Buah 158,800
6 Kran Air
- Kuningan Ø 1/2" Buah 31,800
- Putih Ø 1/2" Buah 22,900
Ø 3/4" Buah 35,600

7 Kran Wastafel (Washer) Ø 1/2" Buah 325,000

8 Kran Taman TAB 5/8" Buah 95,000


9 Septik Tank Fiber Semen : Type a.85 x 98 x 1,2 cm 295,000
Type b. 106 x 115 x 1,2 cm 472,000
10 Urinoar Keramik Standar Buah 191,000
- TOTO Warna Buah 1,054,000
- American Standard Toto U57M Buah 3,181,000
Kecil Buah 870,000
Sedang Buah 1,207,000
11 Wastafel Polos Buah 489,000
Warna Buah 514,000
12 Wastafel Gantung :
- TOTO Keramik Buah 768,000
- American Standard Keramik Buah 445,000
Keramik Set 1,530,000
ICEPOL Set 1,911,000
13 Bak Mandi Fiber Glas 70 x 70 x 66 ( Biasa ) Buah 286,000
70 x 70 x 66 Buah 1,905,000
14 Bak Mandi Reservoir Fibre Glass Kop 1000 Ltr Batang 1,524,000

BETON CETAK
1 Batako Besar 8 x 20 x 30 Buah 3,500
Kecil 8 x 10 x 20 Buah 2,900

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)
NO. BAHAN DASAR SPESIFIKASI SATUAN HARGA

1 2 3 4 5
2 Beton Segaran ( Belah ) 0-1/2 Ø 10 x 100 cm Batang 27,900
3 Besi Beton Kg 22,900
4 Roster Beton Polos 15 x 25 Buah 10,200
15 x 30 Buah 15,200
15 x 40 Buah 19,700
20 x 20 14,600
30 x 30 20,300
5 Roster Bentuk Ketupat 20 x 30 Buah 18,600
6 Roster Motif Kembang 40 x 40 Buah 39,000
7 Sumur Beton (Tidak Pakai Besi) Ø 50 x 50 cm Buah 83,200
Ø 60 x 50 cm Buah 101,100
Ø 80 x 50 cm Buah 116,500
Ø 90 x 50 cm Buah 134,400
Ø 100 x 50 cm Buah 140,800
8 Buis Beton Ø 20 cm Buah 90,200
9 Batu Pinggir Beton 10 x 20 x 35 Buah 14,600
15 x 35 x 50 Buah 74,300
10 Paving Blok K 300 6 cm M2 69,900
8 cm (10 x 20) M2 82,600
11 Paving Blok Warna 6 cm M2 74,300
8 cm M2 87,000
12 Gorong-gorong Beton Ø 20 cm M2 133,000
Ø 30 cm M2 193,000
Ø 50 cm M2 193,000
13 Castin Paving Blok 20 x 25 x 50 M 48,000
CAT BESI / KAYU
1 Cat Meni Kayu :
- Yoko 3,5 kg Kg 108,000
- Nippon 1 kg Kg 66,000
2 Avian Kg 72,400
CAT SENG / GENTENG
1 Yoku 4 Kg/Klg 111,800
2 Nippon 2,5 Liter 236,200

CAT TEMBOK
1 Nippon Paint
- Vinilex 5 Kg 148,600
5 Kg 174,000
25 Kg 711,000
- Avitex 5 Kg 123,200
25 Kg 584,000
- WTB 2,5 Liter 326,000
2 Mowilex (Interior) 2,5 Liter 237,000
3 Mowilex (Exterior) 2,5 Liter 320,000
4 Dulux Weathershield Klg 332,700
5 Metrolite 3 Liter 120,700
16 Liter 558,800
6 No Drop 1 Kg 63,500
4 Kg 222,300
20 Kg 952,500
7 AGA 4 Kg 209,600
8 Super Paragon 4 Kg 177,800
9 Jotun 4 Kg 203,200
25 Kg 666,800

LAIN-LAIN
1 Aspal Bitumen AC 60 / 70 Kg 16,900

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)
NO. BAHAN DASAR SPESIFIKASI SATUAN HARGA

1 2 3 4 5
Aspal Emulsi Kg 11,800
Aspal Curah Kg 16,900
2 Baja Konstruksi 12 Kg 19,700
3 Casting M 32,400
4 Clamp : Ø 1/2" Buah 1,500
Ø 3/4" Buah 1,500
5 Ijuk Ikat 35,000
6 Instalasi Listrik Titik 126,000
7 Kawat Las Dos 171,500
8 Kunci Tanam : - Union 1x Slang Pasang 116,800
2x Slang Pasang 170,200
- Yale 1x Slang Pasang 158,800
2x Slang Pasang 190,500
- Kuda teerbang Pasang 105,400
9 Lem Fox 300 Gr Kaleng 33,000
600 Gr Kaleng 69,900
2,5 Kg Kaleng 188,000
Lem Pipa Tube 12,700
Lem Seng 15,200
10 Penggantung : - Hak Angin Besar Pasang 25,400
- Hak Angin Kecil Pasang 19,100
- Grendel Kecil Pasang 12,700
- Grendel Besar Pasang 19,100
- Grendel Pintu Pasang 19,100
- Engsel Pintu Pasang 32,000
- Engsel Jendela Pasang 25,400

DAFTAR HARGA UNTUK PIPA DAN ALAT BANTU BESI


1 Pipa Galvanis Ø 3" A Batang 698,500
2 Pipa gip Ø 1" A Batang 222,300
Ø 1 1/2" A Batang 349,300
Ø 2 1/2" A Batang 581,700
3 Pipa Besi GIP PHT Dia 1/2 Inch - 6 M Batang 160,000
( Medium ) Dia 3/4 Inch - 6 M Batang 198,100
Dia 1 Inch - 6 M Batang 382,300
Dia 1 1/2 Inch - 6 M Batang 526,000
Dia 2 Inch - 6 M Batang 826,000
Dia 2 1/2 Inch - 6 M Batang 1,061,000
Dia 3 Inch - 6 M Batang 1,361,000
4 Pipa PVC
- Maspion AW Ø 12 " Batang 24,100
Ø 3/4 " Batang 31,800
Ø2" Batang 82,600
Ø3" Batang 160,000
Ø4" Batang 266,700
- Power Max Ø 1/2 " Batang 25,400
Ø 3/4 " Batang 33,000
Ø1" Batang 44,500
Ø 1 1/4 " Batang 67,300
Ø 1 1/2 " Batang 77,900
Ø2" Batang 99,700
Ø 2 1/2 " Batang 145,500
Ø3" Batang 196,200
Ø4" Batang 325,100
Ø5" Batang 538,700
Ø6" Batang 755,700
5 Pipa Paralon PVC Ø 1/2 " - 4 M Batang 36,000
(SII ) Ø 3/4 " - 4 M Batang 42,000

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)
NO. BAHAN DASAR SPESIFIKASI SATUAN HARGA

1 2 3 4 5
Ø1"-4M Batang 61,000
Ø 1 1/4 " - 6 M Batang 78,000
Ø 1 1/2 " - 4 M Batang 104,000
Ø 2"-4M Batang 148,500
Ø 2 1/2 " - 4 M Batang 188,700
Ø3"-4M Batang 270,000
Ø4"-4M Batang 409,000
Ø5"-4M Batang 564,100
Ø6"-4M Batang 821,000
Ø8"-4M Batang 1,273,100
Ø 10 " - 4 M Batang 1,871,000
6 Pipa jenis " C " untuk Saluran Pembuangan air Ø1"-4M Batang 35,800
Ø 1 1/2 " - 4 M Batang 39,700
Ø21"-4M Batang 46,100
Ø 2 1/2 " - 4 M Batang 69,100
Ø3"-4M Batang 84,500
Ø4"-4M Batang 140,800
Ø5"-4M Batang 208,600
Ø6"-4M Batang 289,300
Ø8"-4M Batang 499,200
Ø 10 " - 4 M Batang 794,900
7 Pipa jenis " C " untuk dinding lapis Ø 5/8 " - 4 M Batang 10,200
Ø 3/4 " - 4 M Batang 26,900
Ø1"-4M Batang 33,900
Ø 1 1/2 " - 4 M Batang 38,400
8 Pipa Blue ( Cold ) PN 12.5 16 mm Meter 12,700
20 mm Meter 17,300
25 mm Meter 24,000
32 mm Meter 36,700
40 mm Meter 59,300
9 Pipa Red ( Hot ) PN 12.5 16 mm Meter 22,700
20 mm Meter 31,300
25 mm Meter 42,000
32 mm Meter 50,700
40 mm Meter 84,000

10 Pipa Blue & Red PN 20 16 mm Meter 25,300


20 mm Meter 36,700

25 mm Meter 48,000
11 Pompa Tangan Buah 171,500

12 Tee, Elbow, Sambungan Buah 5,100


-Tee Copper ( air panas ) T 16 Buah 72,800

T 20 Buah 90,600
- Tee Nylon ( air dingin ) T 20 Buah 20,700

T 25 Buah 28,300
T 32 Buah 51,200

- Tee Expander Copper ( air panas ) T 16 Buah 27,100


T 20 Buah 39,100

T 25 Buah 80,400
- Tee Expander Copper ( air panas ) T 16 Buah 8,000

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)
NO. BAHAN DASAR SPESIFIKASI SATUAN HARGA

1 2 3 4 5

T 20 Buah 8,600
T 25 Buah 13,700

- Elbow Copper ( air panas ) L 16 Buah 48,600


L 20 Buah 63,900

L 25 Buah 91,800
- Elbow Nylon ( air dingin ) L 16 Buah 12,400

L 25 Buah 22,000
L 32 Buah 37,800

- Elbow Expander Copper ( air panas ) T 16 Buah 19,400


T 20 Buah 28,300

T 25 Buah 60,700
- Elbow Expander Plastik ( air dingin ) T 16 Buah 8,000

T 20 Buah 8,600
T 25 Buah 13,700

13 Klem 16 mm Buah 600


20 mm Buah 700

25 mm Buah 800
14 Seal Tape Buah 4,400

15 Ring Expander 16 mm Buah 15,600


20 mm Buah 22,000

25 mm Buah 31,400
16 Cotton Plaster Buah 32,100

DAFTAR KELENGKAPAN FIBER SEMEN

1 Eternit Gelombang Mini Uk. Standar : 180 x 80 x Lembar 73,500


Berat Max : 9 Kg
Uk. Standar : 150 x 80
x 0,35 67,600
Berat Max : 7 Kg
Uk. Standar : 210 x 80
x 0,35 87,400
Berat Max : 10 Kg
Uk. Standar : 240 x 80
x 0,35 106,500
Berat Max : 11 Kg
Uk. Standar : 180 x 80
x 0,45 76,500
Berat Max : 9 Kg 22,900
2 Fiber Semen Adrex Gelombang Mini Uk. Standar : 300 x 150 Lembar
x 0,4 25,400

Berat Max : 9 Kg
2 FIBER SEMEN ARDEX GELOMBANG MINI Uk. Standar : 300 x 150
x 0,4 87,400

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)
NO. BAHAN DASAR SPESIFIKASI SATUAN HARGA

1 2 3 4 5
Berat Max : 23 Kg
Uk. Standar : 270 x 150
x 0,4 106,500
Berat Max : 21 Kg
Uk. Standar : 240 x 150
x 0,4 126,000
Berat Max : 18 Kg
Uk. Standar : 240 x 150
x 0,4 116.200
Berat Max : 16 Kg
Uk. Standar : 180 x 150
x 0,4 68,100
Berat Max : 13 Kg
Uk. Standar : 180 x 150
x 0,4 87,600
Berat Max : 11 Kg

3 Fiber Semen Lembaran Rata Uk. Standar : 100 x 100 Lembar


x 0,27 29,500
Berat Max : 4,5 Kg
Uk. Standar : 200 x 100
x 0,30
Berat Max : 9 Kg 87,400
Uk. Standar : 200 x 100 48,800
x 0,30
Berat Max : 9 Kg
TY 90 (INJ) Uk. Standar : 200 x 100 39,100
x 0,30
Berat Max : 6 Kg
Uk. Standar : 200 x 50 53,700
x 0,30
Berat Max : 5 Kg
Uk. Standar : 200 x 40 54,600
x 0,30
Berat Max : 4 Kg
Uk. Standar : 200 x 40 39,200
x 0,30
Berat Max : 3,3 Kg

4 Fiber Semen SWP/Dinding Lapis Uk. Standar : 270 x 100 Lembar 387,500
x 3,5
Berat Max : 62 Kg
Uk. Standar : 240 x 100 337,100
x 3,5
Berat Max : 5,5 Kg
Uk. Standar : 100 x 100 298,000
x 3,5
Berat Max : 3,5 Kg
5 Talang Fiber Semen Talang Setengah
Lingkaran
- Talang Dia Lembar 145,000
Uk. Standar : 250 x
15
Berat Max : 16,5 Kg
- Corong Dia Lembar 75,000
Uk. Standar : 15 x 50
Berat Max : 7 Kg
- Penutu Pipa Lembar 75,000

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)
NO. BAHAN DASAR SPESIFIKASI SATUAN HARGA

1 2 3 4 5
Uk. Standar : 15 x 10
Berat Max : 2 Kg
- Talang Persegi Lembar 75,000
Uk. Standar : 25 x 25
x 200
Berat Max : 16 Kg
- Corong Dia Lembar 75,000
Uk. Standar : 25 x15
x 50
Berat Max : 5,6 Kg

DAFTAR HARGA DASAR UPAH KERJA


1 Operator Greader Org/Hr 180,000
2 Operator Loader Org/Hr 180,000
3 Operator Walls Org/Hr 180,000
4 Pembantu Operator Org/Hr 135,000
5 Sopir Terampil Org/Hr 155,000
6 Mandor Org/Hr 140,000
7 Kepala Tukang Org/Hr 125,000
8 Tukang Org/Hr 125,000
9 Buruh Terampil Org/Hr 100,000
10 Buruh Semi Terampil Org/Hr 90,000
11 Mekanik Org/Hr 180,000
12 Pembantu Mekanik Org/Hr 150,000

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
STANDAR HARGA SATUAN BAHAN BANGUNAN DAN UPAH KERJA
PEMERINTAH PROVINSI SULAWESI SELATAN
KABUPATEN TAKALAR
TAHUN 2020
Dalam Rupiah (Rp)
NO. BAHAN DASAR SPESIFIKASI SATUAN HARGA

1 2 3 4 5
BAHAN DASAR
1 Batu Gunung M3 216,000
2 Batu Kali Utuh M3 203,000
Belah/Kerak M3 254,000
Gravel M3 191,000
3 Batu Pecah 10 - 15 cm M3 387,000
7 - 10 cm M3 316,200
5 - 7 cm M3 376,600
3 - 5 cm M3 412,800
2 - 3 cm M3 424,200
1 - 2 cm M3 438,200
0,5 - 1 cm M3 475,000
4 Batu Kapur / Batu Karang Buah 139,700
5 Batu Bata Kelas I Buah 1,000
Kelas II M3 650
6 Batu Brojol (untuk brojong) M3 245,000
7 Batu Koral Beton Kali M3 228,000
8 Batu Tempel Hitam M3 128,900
9 Batu Koral Ukuran Besar (Batu Telor) Kg 103,500
10 Filer Kg 2,600
11 Kapur Pasang M3 390,500
12 Kerikil Chipping M3 323,900
13 Kerikil Koral M3 312,000
14 Kerikil Sungai M3 293,000
15 Kerikil Sungai Ayak Tanpa Pasir M3 381,000
16 Kerikil / Agregat Kasar M3 356,000
Kerikil / Agregat Halus M3 298,000
17 Bahan Agregat Base Kelas A M3 368,000
Kelas B M3 349,000
Kelas C M3 351,000
Kelas S M3 337,000
18 Pasir Urung Timbunan M3 130,800
19 Tanah Timbunan M3 85,100
20 Pasir Beton M3 215,900
21 Pasir Ayak M3 184,200
22 Pasir Batu (Sirtu) M3 152,400
23 Pasir Campuran/Pasangan M3 203,200
24 Sirtu (Tak Ayak) M3 254,000
25 Bahan Timbunan Pilihan M3 165,100
26 Semen : - Tonasa 50 Kg Zak 74,900
40 Kg Zak 66,000
- Bosowa 50 Kg Zak 67,300
40 Kg Zak 57,200
- Tiga Roda 50 Kg Zak 71,100
40 Kg Zak 59,700
- Putih Tiga Roda 40 Kg Zak 101,600
- Holcim 50 kg Zak 76,200
40 kg Zak 62,200
- Conch 40 kg Zak 53,300
Semen Warna Kg 19,000

Harga Satuan Bahan Bangunan dan Upah Kerja Semester I Tahun 2020
Dalam Rupiah (Rp)
NO. BAHAN DASAR SPESIFIKASI SATUAN HARGA

1 2 3 4 5
27 Readymix Beton Tanpa Pompa (Selang) K500 M3 1,486,000
K400 M3 1,232,000
K350 M3 1,130,000
K300 M3 1,105,000
K225 M3 1,003,000
K175 M3 902,000
28 Cornice Adhesive Aplus (20 Kg) Zak 88,900
29 Gypsum Compound Aplus 200 (20 Kg) Zak 82,600
Gipro (20 Kg) Zak 101,600

BAHAN KAYU
1 Kayu Kelas I (Bayam)
- Balok M3 11,430,000
- Papan M3 20,320,000
2 Kayu Kelas II (Samarinda & sejenisnya)
- Balok M3 3,810,000
- Papan M3 3,810,000
3 Kayu Kelas III (Kemiri & sejenisnya)
- Balok M3 2,159,000
- Papan M3 2,159,000
4 Kayu Kelas IV (Kapok & sejenisnya)
- Balok M3 1,270,000
- Papan M3 1,270,000
5 Kayu Lapis 4 mm 8" x 4" Lembar 81,300
6 Kayu Lapis 12 mm 8" x 4" Lembar 198,100

BAHAN ATAP :
1 Atap Asbes
- Gelombang Besar 80 x 180 x 5 mm Lembar 55,200
2 Genteng Metal (sakura) 77 x 80 Lembar 44,500
3 Genteng Metal (prisma) Multi Roof 77 x 100 Lembar 120,700
- Kasar 78 x 100 Lembar 146,100
4 Baja Ringan
- Profil C < 80 mm Batang 282,600
- Profil U Tinggi < 80 mm Batang 282,600
Tinggi > = 80 mm Batang 360,000
- Profil L Tinggi > = 80 mm (2.5 x 2.5) cn Batang 52,100
Tinggi > = 80 mm (3 x 3) cn Batang 88,900
Tinggi > = 80 mm (5 x 5) cn Batang 146,100
5 Genteng Harflex
- Polos 115 x 85 x 0,5 cm Lembar 49,500
- Warna 115 x 85 x 0,5 cm Lembar 54,000
6 Genteng Lisplank Polos 3 x 0,25 m Lembar 101,600
Genteng Bubungan Beton Buah 44,500
7 Seng Gelombang
- BWG 33" BJLS 0,20 mm Sermani Kaki 9,300
- BWG 32" BJLS 0,30 mm Sermani Lembar 88,300
- BWG 28" BJLS 0,35 mm Sermani Lembar 103,700
- BWG 33" BJLS 0,20 mm Gajah Kaki 8,700
- BWG 32" BJLS 0,30 mm Gajah Lembar 86,000

8 Seng Gelombang Kecil Sermani Kaki 9,500


Gajah Kaki 8,900
9 Seng Plastik Kaki 8,600
11 Seng Plat : - BWG 33" BJLS 0,20 mm Lembar 62,200
- BWG 32" BJLS 0,30 mm Lembar 85,100
- BWG 28" BJLS 0,35 mm Lembar 101,600

Harga Satuan Bahan Bangunan dan Upah Kerja Semester I Tahun 2020
Dalam Rupiah (Rp)
NO. BAHAN DASAR SPESIFIKASI SATUAN HARGA

1 2 3 4 5
L. 30 cm Lembar 19,100
L. 40 cm Lembar 25,400
L. 50 cm Lembar 31,800
L. 90 cm Lembar 47,000

BAHAN BAMBU
1 Bambu - Besar Pattung Batang 47,200
- Sedang Parring Batang 34,000
- Kecil Batang 24,800
- Bilik Bambu Kulit M2 25,000
- Bilik Bambu Tanpa Kulit M2 22,200
- Bilik Bambu Hitam Variasi M3 27,300

BAHAN BESI
1 Besi Beton 6 mm SNI Batang 38,100
8 mm Batang 50,800
10 mm Batang 82,600
12 mm Batang 120,700
14 mm Batang 174,000
16 mm Batang 228,600
19 mm Batang 336,600
22 mm Batang 438,200
25 mm Batang 571,500
2 Besi Beton Ukir 13 mm Batang 146,100
3 Besi Plat 2 mm 120 x 240 mm Lembar 825,500
3 mm 120 x 240 mm Lembar 1,225,600
4 Besi Siku L.30.30.3.3240 mm Batang 114,300
L.40.40.4 Batang 190,500
L.50.50.5 Batang 222,300
L.60.60.6 Batang 296,900
L.70.70.7 Batang 736,600
5 Besi Strep 1.5 cm Batang 25,400
2 cm Batang 36,200
6 Kawat : - Ikat Beton Kg 25,400
- Beton Kg 31,800
- Kasa Nyamuk Plastik M2 34,300
- Saringan Plastik Rol 196,900
- Duri 10 Kg/Glng 231,800
- Beronjong 2.7 mm Rol 304,800
3 mm Rol 381,000
5 mm Rol 453,400
- Rang 3.0 cm M2 30,500
5.0 cm M2 31,800
7 Besi Begel/Bantalan (U/ Kuda-kuda) Buah 30,500
8 Besi Profil C a Pipa Besi Batang 369,600
9 Pagar BRC jadi (lengkap tiang) M2 204,500

BAHAN FINISHING KAYU


1 Amplas Halus Untuk Besi Meter 13,300
2 Amplas Kasar Untuk Kayu Meter 13,300
3 Cat Dasar Zyncrumate 1 Kg/Klg 69,900
4 Dempul Cap Kucing Asli Kg 82,600
5 Lem Aibon Tube 29,200
6 Meni Kayu Yoko 3,5 kg 114,300
Nippon 82,600

Harga Satuan Bahan Bangunan dan Upah Kerja Semester I Tahun 2020
Dalam Rupiah (Rp)
NO. BAHAN DASAR SPESIFIKASI SATUAN HARGA

1 2 3 4 5
7 Minyak Cat / Afdunner 1 Liter 35,600
8 Thinner A / Super 0,7 Liter 44,500
4 Liter 123,200
9 Politur Boyo 0,5 Liter 43,200
10 Teak Oil 1 Liter 26,700
11 Vernis Vernis Klg/0,5 Ltr 95,300

BAHAN KACA
1 Kaca Bening 3 mm Meter 139,700
5 mm Meter 165,100
2 Kaca Riben 3 mm Meter 152,400
5 mm Meter 190,500

BAHAN LANGIT-LANGIT

1 Asbes Plat Harlex :


- Selica Board 122 x 244 x 0,4 cm Lembar 73,700
- Gypsum 120 x 250 t=9 mm ex Lembar 82,600
DN
120 x 250 t=9 mm ex Lembar 76,200
Luar
2 Eternit 100 x 100 cm Lembar 25,400
4 mm M2 -
3 Plafond Asbes Semen 3,5 mm M2 66,700
4 Gypsum 9 mm Lembar 82,600
5 Hard Board 120 x 240 cm Lembar 101,600
6 Kalsiboard 122 x 244 cm Lembar 73,700
7 Cornice Adhesive Aplus 20 Kg 82,600
8 Tripleks 122 x 244 x 3 mm Lembar 62,200
122 x 244 x 4 mm Lembar 73,700
122 x 244 x 6 mm Lembar 82,600
122 x 244 x 9 mm Lembar 120,700
122 x 244 x 10 mm Lembar 152,400
122 x 244 x 12 mm Lembar 184,200
Untuk Daun Pintu Lembar 141,000
9 Teak Wood - 122 x 244 x 3 mm Asli Lembar 107,000
Jati Lembar 121,000
10 Multiplex 120 x 240 x 18 mm Lembar 286,000
120 x 240 x 12 mm Lembar 184,000
120 x 240 x 9 mm Lembar 121,000

BAHAN LANTAI
1 Tegel :
- Tegel Mozaik Uk : 30 x 30 cm Motif Buah 235,000
Kaca Motif Lembar 266,700
- Teralux : 30 x 30 cm Polos Dos 59,700
2 Keramik 25 x 25 cm Dos 76,200
- Putih 30 x 30 cm Dos 50,800
30 x 60 cm Dos 82,600
40 x 40 cm Dos 61,000
50 x 50 cm Dos 88,900
- Warna 25 x 25 cm Dos 82,600
30 x 30 cm Dos 88,900
30 x 60 cm Dos 146,100
40 x 40 cm Dos 95,300
50 x 50 cm Dos 158,800
3 Granit

Harga Satuan Bahan Bangunan dan Upah Kerja Semester I Tahun 2020
Dalam Rupiah (Rp)
NO. BAHAN DASAR SPESIFIKASI SATUAN HARGA

1 2 3 4 5
- Standar / Biasa 60 x 60 cm Dos 203,200
- Hugo Motif 60 x 60 cm Dos 317,500
- Hugo Hitam 60 x 60 cm Dos 349,300
- Hugo 100 x 100 cm Dos 825,500
- Ezenza Ivory 60 x 60 cm Dos 333,500
- Ezenza Unica Grey 60 x 60 cm Dos 350,200
- Granito Tile Ezenza :
- Polis 60 x 60 cm M² 294,600
- Unpolis 60 x 60 cm M² 275,600
4 Ubin Porselin Merk KIA ( Dekorasi ) 11 x 11 cm Dos 55,900

BAHAN PAKU / SEKRUP


1 Paku : - Biasa 1 s/d 4 cm Kg 27,900
- Biasa 5 s/d 10 cm Kg 25,400
- Paku Seng Kg 44,500
RRT Kg 34,900
- Paku Sirap Ikat 26,500
- Paku Payung Berulir 75 mm kg 48,900

2 Paku : - Beton Hitam 3 cm Dos 44,000


5 cm Dos 44,000
7 cm Dos 57,000
- Beton Putih 2,5 - 5 cm Dos 19,000
3 Sekrup : 3 1/2 cm kg 21,600
4 cm kg 21,600

BAHAN SANITER
1 Kloset Duduk TOTO Polos Unit/Set 4,445,000
American Standard Unit/Set 1,905,000
Icepol Unit/Set 1,530,000
KIA Unit/Set 1,905,000
2 Kloset Duduk Keramik TOTO Buah 3,181,000
3 Kloset Jongkok KIA Buah 381,000
TOHO Buah 285,800
TOTO Putih Buah 476,300
TOTO Warna Buah 539,800
American Standard Buah 381,000
4 Kloset Jongkok Keramik Standard Buah 285,800
5 Kloset Jongkok
- Global Polos Buah 159,000
Warna Buah 179,100
6 Kran Air
- Kuningan Ø 1/2" Buah 82,600
- Putih Ø 1/2" Buah 25,400
Ø 3/4" Buah 31,800
7 Kran Wastafel (Washer) Ø 1/2" Buah 318,000
8 Kran Taman TAB 5/8" Buah 97,000
9 Septik Tank Fiber Semen : Type a.85 x 98 x 1,2 cm 297,000
Type b. 106 x 115 x 1,2 cm 472,000
10 Urinoar Keramik Standar Buah 1,524,000
Warna Buah 1,041,000
Toto U57M Buah 3,181,000
- American Standard Kecil Buah 870,000
Sedang Buah 1,207,000
11 Wastafel Polos Buah 603,000
Warna Buah 527,000
12 Wastafel Gantung :
- TOTO Keramik Buah 775,000

Harga Satuan Bahan Bangunan dan Upah Kerja Semester I Tahun 2020
Dalam Rupiah (Rp)
NO. BAHAN DASAR SPESIFIKASI SATUAN HARGA

1 2 3 4 5
- American Standard Keramik Buah 445,000
Keramik Set 1,537,000
ICEPOL Set 1,911,000
13 Bak Mandi Fiber Glas 70 x 70 x 66 ( Biasa ) Buah 406,000
70 x 70 x 66 Buah 1,905,000
14 Bak Mandi Reservoir Fibre Glass Kop 1000 Ltr Batang 1,524,000

BETON CETAK
1 Batako Besar 8 x 20 x 30 Buah 3,500
Kecil 8 x 10 x 20 Buah 2,900
2 Beton Segaran ( Belah ) 0-1/2 Ø 10 x 100 cm Batang 28,100
3 Besi Beton Kg 23,000
4 Roster Beton Polos 15 x 25 Buah 10,200
15 x 30 Buah 15,300
15 x 40 Buah 19,800
20 x 20 Buah 14,700
30 x 30 Buah 20,400
5 Roster Bentuk Ketupat 20 x 30 Buah 18,600
6 Roster Motif Kembang 40 x 40 Buah 39,200
7 Sumur Beton (Tidak Pakai Besi) Ø 50 x 50 cm Buah 83,500
Ø 60 x 50 cm Buah 101,500
Ø 80 x 50 cm Buah 116,900
Ø 90 x 50 cm Buah 134,900
Ø 100 x 50 cm Buah 141,400
8 Buis Beton Ø 20 cm Buah 90,200
9 Batu Pinggir Beton 10 x 20 x 35 Buah 14,800
15 x 35 x 50 Buah 75,200
10 Paving Blok K 300 6 cm M2 70,700
8 cm (10 x 20) M2 83,500
11 Paving Blok Warna 6 cm M2 75,200
8 cm M2 88,000
12 Gorong-gorong Beton Ø 20 cm M2 134,900
Ø 30 cm M2 193,500
Ø 50 cm M2 193,500
13 Castin Paving Blok 20 x 25 x 50 M 48,200

CAT BESI / KAYU


1 Cat Meni Kayu :
- Yoko 1 kg Kg 44,500
- Nippon 1 kg Kg 57,200
2 Avian 1 kg Kg 82,600

CAT SENG / GENTENG


1 Yoku Kg 44,500
2 Nippon 2,5 Liter 279,400

CAT TEMBOK
1 Nippon Paint
- Vinilex 5 Kg 173,500
25 Kg 867,000
- Avitex 5 Kg 147,800
25 Kg 681,000
2 Mowilex (Interior)
- Standar 2,5 Liter 210,000
- Pastel 2,5 Liter 190,000
- VIP 2,5 Liter 195,000
3 Mowilex (Exterior) 2,5 Liter 308,600

Harga Satuan Bahan Bangunan dan Upah Kerja Semester I Tahun 2020
Dalam Rupiah (Rp)
NO. BAHAN DASAR SPESIFIKASI SATUAN HARGA

1 2 3 4 5
4 Dulux Weathershield 2,5 Liter 363,700
Dulux Putih 5 Liter 154,200
Dulux Penta 2,5 Liter 213,300
5 Metrolite 3 Liter 139,700
16 Liter 698,500
6 No Drop 1 Kg 77,100
4 Kg 279,400
20 Kg 1,270,000
7 AGA 4 Kg 209,600
8 Super Paragon 4 Kg 179,900
9 Jotun 4 Kg 205,600
25 Kg 674,600
10 Envi 5 Kg 173,500
1 Kg 57,800
11 Aries 1 Kg 57,800
5 Kg 90,000
20 Kg 179,900

LAIN-LAIN
1 Aspal Bitumen AC 60 / 70 Kg 17,100
Aspal Emulsi Kg 12,000
Aspal Curah Kg 17,100
2 Baja Konstruksi 12 Kg 19,900
3 Casting M 32,800
4 Clamp : Ø 1/2" Buah 1,500
Ø 3/4" Buah 1,500
5 Ijuk Ikat 35,400
6 Instalasi Listrik Titik 192,800
7 Kawat Las Dos 173,500
8 Kunci Tanam : - Union 1x Slang Pasang 118,200
2x Slang Pasang 172,200
- Yale 1x Slang Pasang 160,600
2x Slang Pasang 192,800
- Kuda terbang Pasang 106,700
9 Lem Fox 300 Gr Kaleng 33,400
600 Gr Kaleng 70,700
2,5 Kg Kaleng 122,100
Lem Pipa Tube 12,700
Lem Seng 15,400
10 Penggantung : - Hak Angin Besar Pasang 25,700
- Hak Angin Kecil Pasang 22,200
- Grendel Kecil Pasang 12,700
- Grendel Besar Pasang 25,400
- Grendel Pintu Pasang 22,200
- Engsel Pintu Pasang 69,900
- Engsel Jendela Pasang 44,500

DAFTAR HARGA UNTUK PIPA DAN ALAT BANTU BESI


1 Pipa Galvanis Ø 3" A Batang 1,270,000
2 Pipa gip Ø 1" A Batang 241,300
Ø 1 1/2" A Batang 317,500
Ø 2 1/2" A Batang 571,500
3 Pipa Besi GIP PHT Dia 1/2 Inch - 6 M Batang 161,900
( Medium ) Dia 3/4 Inch - 6 M Batang 200,500
Dia 1 Inch - 6 M Batang 386,800
Dia 1 1/2 Inch - 6 M Batang 662,700
Dia 2 Inch - 6 M Batang 1,040,600

Harga Satuan Bahan Bangunan dan Upah Kerja Semester I Tahun 2020
Dalam Rupiah (Rp)
NO. BAHAN DASAR SPESIFIKASI SATUAN HARGA

1 2 3 4 5
Dia 2 1/2 Inch - 6 M Batang 1,336,700
Dia 3 Inch - 6 M Batang 1,714,600
4 Pipa PVC
- Maspion AW Ø 12 " Batang 24,100
Ø 3/4 " Batang 31,800
Ø2" Batang 88,900
Ø3" Batang 184,200
Ø4" Batang 349,300
- Power Max Ø 1/2 " Batang 31,800
Ø 3/4 " Batang 35,600
Ø1" Batang 50,800
Ø 1 1/4 " Batang 69,900
Ø 1 1/2 " Batang 95,300
Ø2" Batang 99,700
Ø 2 1/2 " Batang 145,500
Ø3" Batang 196,200
Ø4" Batang 325,100
Ø5" Batang 538,700
Ø6" Batang 755,700
5 Pipa Paralon PVC Ø 1/2 " - 4 M Batang 36,000
(SII ) Ø 3/4 " - 4 M Batang 42,000
Ø1"-4M Batang 61,000
Ø 1 1/4 " - 6 M Batang 78,000
Ø 1 1/2 " - 4 M Batang 104,000
Ø 2"-4M Batang 148,500
Ø 2 1/2 " - 4 M Batang 188,700
Ø3"-4M Batang 270,000
Ø4"-4M Batang 409,000
Ø5"-4M Batang 564,100
Ø6"-4M Batang 821,000
Ø8"-4M Batang 1,273,100
Ø 10 " - 4 M Batang 1,871,000
6 Pipa jenis " C " untuk Saluran Pembuangan air Ø1"-4M Batang 35,800
Ø 1 1/2 " - 4 M Batang 44,800
Ø21"-4M Batang 70,400
Ø 2 1/2 " - 4 M Batang 83,200
Ø3"-4M Batang 89,600
Ø4"-4M Batang 185,600
Ø5"-4M Batang 208,600
Ø6"-4M Batang 289,300
Ø8"-4M Batang 499,200
Ø 10 " - 4 M Batang 794,900
7 Pipa jenis " C " untuk dinding lapis Ø 5/8 " - 4 M Batang 10,200
Ø 3/4 " - 4 M Batang 26,900
Ø1"-4M Batang 33,900
Ø 1 1/2 " - 4 M Batang 38,400
8 Pipa Blue ( Cold ) PN 12.5 16 mm Meter 13,000
20 mm Meter 17,700
25 mm Meter 24,600
32 mm Meter 37,500
40 mm Meter 60,800
9 Pipa Red ( Hot ) PN 12.5 16 mm Meter 23,200
20 mm Meter 32,100
25 mm Meter 43,000
32 mm Meter 51,900
40 mm Meter 86,000
10 Pipa Blue & Red PN 20 16 mm Meter 25,900
20 mm Meter 37,500

Harga Satuan Bahan Bangunan dan Upah Kerja Semester I Tahun 2020
Dalam Rupiah (Rp)
NO. BAHAN DASAR SPESIFIKASI SATUAN HARGA

1 2 3 4 5
25 mm Meter 49,100
11 Pompa Tangan Buah 184,300
12 Tee, Elbow, Sambungan Buah 5,100
-Tee Copper ( air panas ) T 16 Buah 72,800
T 20 Buah 91,500
- Tee Nylon ( air dingin ) T 20 Buah 20,900
T 25 Buah 28,300
T 32 Buah 51,200
- Tee Expander Copper ( air panas ) T 16 Buah 27,300
T 20 Buah 39,500
T 25 Buah 81,200
- Tee Expander Copper ( air panas ) T 16 Buah 8,000
T 20 Buah 8,700
T 25 Buah 13,900
- Elbow Copper ( air panas ) L 16 Buah 49,100
L 20 Buah 64,500
L 25 Buah 92,700
- Elbow Nylon ( air dingin ) L 16 Buah 12,600
L 25 Buah 22,200
L 32 Buah 38,200
- Elbow Expander Copper ( air panas ) T 16 Buah 19,600
T 20 Buah 28,600
T 25 Buah 61,300
- Elbow Expander Plastik ( air dingin ) T 16 Buah 8,100
T 20 Buah 8,700
T 25 Buah 13,700
13 Klem 16 mm Buah 600
20 mm Buah 700
25 mm Buah 800
14 Seal Tape Buah 4,400
15 Ring Expander 16 mm Buah 15,800
20 mm Buah 22,000
25 mm Buah 31,700
16 Cotton Plaster Buah 32,500

ALAT TUKANG
1 Kuas
- Eterna 1" Buah 5,700
1 1/2" Buah 6,400
2" Buah 12,700
2 1/2" Buah 15,200
3" Buah 17,800
4" Buah 25,400
- Jason 1" Buah 7,600
2" Buah 10,800
3" Buah 17,100
4" Buah 23,500
5" Buah 26,000
2 Kape Cat
- Metal / Besi 12 cm Tora Buah 16,500
S/S 8x11 cm Buah 15,900
GG Karet 2" Buah 19,700
GG Karet 3" Buah 23,500
- PVC / Plastik Besar Buah 10,200
Sedang Buah 7,600
Kecil Buah 5,100
3 Amplas Lembar 12,700

Harga Satuan Bahan Bangunan dan Upah Kerja Semester I Tahun 2020
Dalam Rupiah (Rp)
NO. BAHAN DASAR SPESIFIKASI SATUAN HARGA

1 2 3 4 5
DAFTAR KELENGKAPAN FIBER SEMEN
1 Eternit Gelombang Mini Uk. Standar : 180 x 80 x 0,35 Lembar 74,600
Berat Max : 9 Kg
Uk. Standar : 150 x 80
x 0,35 68,300
Berat Max : 7 Kg
Uk. Standar : 210 x 80
x 0,35 87,400
Berat Max : 10 Kg
Uk. Standar : 240 x 80
x 0,35 107,100
Berat Max : 11 Kg
Uk. Standar : 180 x 80
x 0,45 76,700
Berat Max : 9 Kg
2 FIBER SEMEN ARDEX GELOMBANG MINI Uk. Standar : 300 x 150 Lembar
x 0,4 87,700
Berat Max : 23 Kg
Uk. Standar : 270 x 150
x 0,4 107,100
Berat Max : 21 Kg
Uk. Standar : 240 x 150
x 0,4 126,500
Berat Max : 18 Kg
Uk. Standar : 240 x 150
x 0,4 116.600
Berat Max : 16 Kg
Uk. Standar : 180 x 150
x 0,4 68,800
Berat Max : 13 Kg
Uk. Standar : 180 x 150
x 0,4 88,200
Berat Max : 11 Kg

3 Fiber Semen Lembaran Rata Uk. Standar : 100 x 100 Lembar


x 0,27 29,900
Berat Max : 4,5 Kg
Uk. Standar : 200 x 100 49,400
x 0,30
Berat Max : 9 Kg
Uk. Standar : 200 x 100 39,400
x 0,30
Berat Max : 6 Kg
TY 90 (INJ) Uk. Standar : 200 x 100 39,100
x 0,30
Berat Max : 6 Kg
Uk. Standar : 200 x 50 54,100
x 0,35
Berat Max : 5 Kg
Uk. Standar : 200 x 40 55,100
x 0,30
Berat Max : 4 Kg
Uk. Standar : 200 x 40 39,400
x 0,30
Berat Max : 3,3 Kg

Harga Satuan Bahan Bangunan dan Upah Kerja Semester I Tahun 2020
Dalam Rupiah (Rp)
NO. BAHAN DASAR SPESIFIKASI SATUAN HARGA

1 2 3 4 5

4 Fiber Semen SWP/Dinding Lapis Uk. Standar : 270 x 100 Lembar 388,500
x 3,5
Berat Max : 62 Kg
Uk. Standar : 240 x 100 337,600
x 3,5
Berat Max : 5,5 Kg
Uk. Standar : 100 x 100 299,300
x 3,5
Berat Max : 3,5 Kg
5 Talang Fiber Semen Talang Setengah
Lingkaran
Talang Dia Lembar 145,000
Uk. Standar : 250 x
15
Berat Max : 16,5 Kg
- Corong Dia Lembar 77,000
Uk. Standar : 15 x 50
Berat Max : 7 Kg
- Penutu Pipa Lembar 77,000
Uk. Standar : 15 x 10
Berat Max : 2 Kg
- Talang Persegi Lembar 77,000
Uk. Standar : 25 x 25
x 200
Berat Max : 16 Kg
- Corong Dia Lembar 77,000
Uk. Standar : 25 x15
x 50
Berat Max : 5,6 Kg

DAFTAR HARGA DASAR UPAH KERJA


1 Operator Greader Org/Hr 185,000
2 Operator Loader Org/Hr 185,000
3 Operator Walls Org/Hr 185,000
4 Pembantu Operator Org/Hr 140,000
5 Sopir Terampil Org/Hr 160,000
6 Mandor Org/Hr 145,000
7 Kepala Tukang Org/Hr 130,000
8 Tukang Org/Hr 120,000
9 Buruh Terampil Org/Hr 95,000
10 Buruh Semi Terampil Org/Hr 85,000
11 Mekanik Org/Hr 185,000
12 Pembantu Mekanik Org/Hr 155,000

Harga Satuan Bahan Bangunan dan Upah Kerja Semester I Tahun 2020
STANDAR HARGA SATUAN BAHAN BANGUNAN DAN UPAH KERJA
PEMERINTAH SULAWESI SELATAN
KABUPATEN JENEPONTO
TAHUN 2020
Dalam Rupiah (Rp)
NO BAHAN DASAR SPESIFIKASI SATUAN HARGA

1 2 3 4 5
A UPAH TENAGA KERJA
1 Mandor Oh 145,000
2 Buruh lapangan tidak Terlatih Oh 75,000
3 Buruh Lapangan Semi Terlatih Oh 78,000
4 Buruh Lapangan Terlatih Oh 84,000
5 pekerja Oh 100,000
6 Tukang batu Oh 134,000
7 Tukang Kayu Oh 134,000
8 Tukang Besi Oh 134,000
9 Tukang Cat Oh 134,000
10 Kepala Tukang Oh 168,000
11 Petugas Satpam Oh 134,000
12 Mekanik Oh 134,000
13 Mekanik Pembantu Oh 95,200
14 Operator Terlatih Oh 134,000
15 Operator Kurang terlatih Oh 97,000
16 Pembantu operator Oh 84,000
17 Sopir Terampil Oh 134,000
18 Pembantu sopir Oh 84,000

AGREGAT HALUS
Pasir Urug / Pasir Timbunan
1 Zona I
Binamu, Turatea, Tamalatea< Arungkeke M3 151,200
Kelara Rumbia 1 , Batang Tarowang
2 Zona II
Rumbia II ( daerah Pegunungan ) M3 226,800
3 Zona III
Bangkalan Barat , Bangkalan Bontoramba M3 151,200
Pasir Pasang / Kali
1 Zona I
Binamu, Turatea, Tamalatea< Arungkeke M3 241,900
Kelara Rumbia 1 , Batang Tarowang
2 Zona II
Rumbia II ( daerah Pegunungan ) M3 400,700
3 Zona III
Bangkalan Barat , Bangkalan Bontoramba M3 241,900
Pasir Beton
1 Zona I
Binamu, Turatea, Tamalatea< Arungkeke M3 241,900
Kelara Rumbia 1 , Batang Tarowang
2 Zona II M3 400,700
Rumbia II ( daerah Pegunungan )
3 Zona III
Bangkalan Barat , Bangkalan Bontoramba M3 241,900
Pasir Batu (Sirtu)
1 Zona I
Binamu, Turatea, Tamalatea< Arungkeke M3 264,600
Kelara Rumbia 1 , Batang Tarowang
2 Zona II M3 264,600
Rumbia II ( daerah Pegunungan )
3 Zona III
Bangkalan Barat , Bangkalan Bontoramba M3 264,000
Kerikil Koral
1 Zona I
Binamu, Turatea, Tamalatea< Arungkeke M3 355,600

Harga Satuan Bahan Bangunan dan Upah Kerja Semester I Tahun 2020
Dalam Rupiah (Rp)
NO BAHAN DASAR SPESIFIKASI SATUAN HARGA

1 2 3 4 5
Kelara Rumbia 1 , Batang Tarowang
2 Zona II
Rumbia II ( daerah Pegunungan ) M3 378,000
3 Zona III
Bangkalan Barat , Bangkalan Bontoramba M3 355,600
Kerikil Sungai
1 Zona I
Binamu, Turatea, Tamalatea< Arungkeke M3 355,600
Kelara Rumbia 1 , Batang Tarowang
2 Zona II M3 378,000
Rumbia II ( daerah Pegunungan )
3 Zona III
Bangkalan Barat , Bangkalan Bontoramba M3 453,000
Kerikil Tersaring
1 Zona I M3
Binamu, Turatea, Tamalatea< Arungkeke 453,000
Kelara Rumbia 1 , Batang Tarowang M3
2 Zona II
Rumbia II ( daerah Pegunungan ) M3 453,000
3 Zona III
Bangkalan Barat , Bangkalan Bontoramba 453,000
1 Kerikil Sungai Royalti M3 378,000
2 Kerikil Sungai Pecah Tersaring M3 423,400
3 Kerikil Sungai Tidak Tersaring M3 338,700
4 Tanah timbunan Pilihan M3 151,200
5 Tanah Timbunan Biasa M3 114,800
6 Tanah Liat M3 151,200

AGREGAT KASAR
Batu kali M3 241,900
Kerikil Tersaring
1 Zona I M3 241,900
Binamu, Turatea, Tamalatea< Arungkeke
Kelara Rumbia 1 , Batang Tarowang M3
2 Zona II
Rumbia II ( daerah Pegunungan ) M3 347,800
3 Zona III
Bangkalan Barat , Bangkalan Bontoramba M3 241,900
1 Batu karang Hitam M3 204,100
2 Batu Karang Putih / Batu Gunung M3 203,100
3 Batu Pecah 10-15 Cm M3 345,200
4 Batu Pecah 7-10 cm M3 330,100
5 Batu Pecah 5-7 cm M3 415,800
6 Batu pecah 3-5 cm M3 468,700
7 Batu pecah 2-3 cm M3 476,300
8 Batu pecah 1-2 cm M3 491,400
9 Batu pecah 0.5-1 Cm M3 506,500
10 Batu belah M3 241,900
11 Kerikil Tersaring M3 241,900
1 Zona I M3
Binamu, Turatea, Tamalatea< Arungkeke M3 241,900
Kelara Rumbia 1 , Batang Tarowang M3
2 Zona II
Rumbia II ( daerah Pegunungan ) M3 347,800
3 Zona III
Bangkalan Barat , Bangkalan Bontoramba 241,000
1 Batu bata standar ( besar ) Klas 1 Buah 900
2 Batu Bata Standar Buah 800
3 Kapur Zak 16,600
4 Aspal Kg 12,880
SEMEN
1 Semen Porland kg 1,700

Harga Satuan Bahan Bangunan dan Upah Kerja Semester I Tahun 2020
Dalam Rupiah (Rp)
NO BAHAN DASAR SPESIFIKASI SATUAN HARGA

1 2 3 4 5
2 Semen Putih kg 3,100
3 Semen Warna Grout kg 32,200

KAYU
1 Kayu Balok Khas I (Bayam) M3 14,936,000
2 Kayu Papan Khas I (Bayam) M3 16,322,000
3 Kayu Balok Khas II M3 9,854,000
4 Kayu Papan Khas II M3 9,854,000
5 Kayu Balok Klas III M3 6,389,000
6 Kayu Papan Klas III M3 6,389,000
KAYU LAPIS
1 Tripleks 3mm (Uk. 120 X 240) Lembar 73,400
2 Tripleks 4mm (Uk. 120 X 240) Lembar 98,400
3 Tripleks 6mm (Uk. 120 X 240) Lembar 120,200
4 Tripleks 9mm (Uk. 120 X 240) Lembar 184,800
5 Tripleks 12mm (Uk. 120 X 240) Lembar 217,200
6 Tripleks 15mm (Uk. 120 X 240) Lembar 285,500
7 Tripleks 18mm (Uk. 120 X 240) Lembar 354,200
8 Teakwood Lembar 122,000
9 Kalsiboard Tebal 4 mm Lembar 97,000

GYPSUN
1 Gypsun (120 x 240 mm) Jaya Board Lembar 90,100
LIST PROFIL
1 List Profil K1 A M1 27,700
2 List Profil T 1 1 M1 25,600
3 List Profil Kayu 7 cm M1 23,300
4 Lambersering 9 cm M1 13,900

PAKU
1 Paku kayu / Tripleks Uk. 1-4 cm kg 31,000
2 Paku Kayu / Tripleks Uk. 5-12 cm kg 29,600
3 Paku Beton Biasa (Semua Ukuran) Dos 45,100
4 Paku Beton Bagus ( Semua Ukuran) Dos 69,900
5 Paku Perahu Uk. 1-4 cm Kg 36,100
6 Paku Perahu Uk. 5-12 cm Kg 38,800
7 Paku Asbes Kg 45,100
8 Kawat Beton Kg 27,700

SENG
1 Seng Gelombang Bjls 0.25 Serami Lembar 82,900
2 Seng Gelombang Bjls 0.30 Gajah Lembar 98,100
3 Seng Licin Bjls 0.20 - 6 Kaki Gajah Lembar 86,600
4 Seng Licin Bjls 0.30 - 6 Kaki Serami Lembar 82,200
5 Asbes Gelombang Besar (300x102 x5 mm) Jabesemen Lembar 155,800
6 Asbes Gelombang Besar (200x102 x5 mm) Jabesemen Lembar 120,000
7 Asbes Gelombang Besar (180x102 x5 mm) Jabesemen Lembar 102,200
8 Asbes Gelombang Besar (300x102 x5 mm) Jabesemen Lembar 104,900
9 Asbes Gelombang Besar (270x102 x5 mm) Jabesemen Lembar 91,500
10 Asbes Gelombang Besar (210x102 x5 mm) Jabesemen Lembar 74,400
11 Asbes Gelombang Besar (180x102 x5 mm) Jabesemen Lembar 65,200
12 Asbes Gelombang Besar (150x102 x5 mm) Jabesemen Lembar 63,700
13 Asbes Gelombang Besar (240x102 x5 mm) Jabesemen Lembar 98,900
14 Asbes Nok Gelombang Besar Jabesemen Lembar 67,500
15 Asbes Nok Gelombang Kecil Jabesemen Lembar 44,400
16 Seng Plat 0,35 - 6 Kaki Lembar 55,300

BESI
1 Besi Profil IWF Kg 18,400
2 Besi siku L 30 x 30 x 3 mm Batang 107,400
3 Besi siku L 40 x 40 x 4 mm Batang 176,400
4 Besi siku L 50 x 50 x 5 mm Batang 318,800

Harga Satuan Bahan Bangunan dan Upah Kerja Semester I Tahun 2020
Dalam Rupiah (Rp)
NO BAHAN DASAR SPESIFIKASI SATUAN HARGA

1 2 3 4 5
5 Besi Strip Kg 25,500
6 Besi Beton 6 mm (12 m) Batang 32,200
7 Besi Beton 8 mm (12m) Batang 58,700
8 Besi Beton 10 mm (12m) Batang 83,700
9 Besi Beton 12 mm (12m) Batang 115,900
10 Besi Beton 16 mm (12m) Batang 193,200
11 Besi Beton 19 mm (12m) Batang 276,000
12 Besi Beton Ulir 10 mm Batang 93,600
13 Besi Beton Ulir 13 mm Batang 132,700
14 Besi Beton Ulir 16 mm Batang 223,200
12 Besi Beton Ulir 19 mm Batang
13 Angkur kg 25,800
14 Besi Beugel/Baut kg 31,200

KERAMIK/TEGEL
1 Keramik Uk.20 x 20 cm (W. Putih ) Mulia M2 85,400
2 Keramik Uk.30 x 30 cm (W. Putih ) Mulia M2 69,300
3 Keramik Dinding Uk.20 x 25 cm ( W . Tua) asia Tile M2 76,200
4 Keramik Dinding Uk.20 x 25 cm ( W . Muda) asia Tile M2 80,400
5 Keramik Lantai Uk.20 x 20 cm (W.Putih) asia Tile M2 76,200
6 Keramik Lantai Uk.30 x 30 cm (W.Putih) asia Tile M2 76,200
7 Keramik Lantai Uk.40 x 40 cm (W.Putih) asia Tile M2 106,300
8 Keramik Lantai Uk.20 x 20 cm (Motif) Roman M2 109,900
9 Keramik Teras/Garasi 30x30 Materina M2 74,500
10 Keramik Plint 7,5 x 20 cm Buah 18,600
11 Keramik Plint 8 x 25 cm Buah 31,000
12 Kuku macam Buah 3,500
13 Granit 40 x40 cm Granito M2 194,000
14 Granit 60 x60 cm ( W. Muda ) M2 245,600
15 Granit 60 x60 cm ( w. Tua ) M2 346,500
16 Ubin Abu abu 20 x 20 M2 55,400
17 Ubin Super Hitam 20 x 20 M2 76,200
18 Ubin Badak 30 x 30 M2 79,000

E PIPA
1 Pipa PVC Type AW 1/2" Batang 34,700
2 Pipa PVC Type AW 3/4" Batang 41,600
3 Pipa PVC Type AW 1" Batang 55,400
4 Pipa PVC Type AW 1 1/4 " Batang 62,400
5 Pipa PVC Type AW 1 1/2" Batang 76,200
6 Pipa PVC Type AW 2" Batang 11,400
7 Pipa PVC Type AW 2 1/2" Batang 162,500
8 Pipa PVC Type AW 3" Batang 229,000
9 Pipa PVC Type AW 4" Batang 379,000
10 Pipa PVC Type AW 5" Batang 601,200
11 Pipa PVC Type AW 6" Batang 843,300
12 Pipa PVC Type AW 8" Batang 1,016,500
13 Pipa PVC Type C 1/2" Batang 27,700
14 Pipa PVC Type C 3/4" Batang 34,700
15 Pipa PVC Type C 1" Batang 48,500
16 Pipa PVC Type C 2" Uk.5-10 cm Batang 59,800
17 Pipa PVC Type C 2 1/2" Uk.11 -15 cm Batang 70,100
18 Pipa PVC Type C 3" 16 - 20 cm Batang 82,200
19 Pipa PVC Type C 4" Uk.10-20 cm Batang 105,300
20 Pipa PVC Type D 1 1/4" Uk.21-30 cm Batang 37,600
21 Pipa PVC Type D 1 1/2" Uk.21-30 cm Batang 45,800
22 Pipa PVC Type D 2" Type 81 New Star Batang 60,900
23 Pipa PVC Type D 3" Batang 122,600
24 Pipa PVC Type D 4" Batang 157,100
25 Pipa PVC Type D 5" Batang 237,000
26 Pipa PVC Type D 6" Batang 361,200
27 Pipa PVC Type D 8" Batang 605,900

Harga Satuan Bahan Bangunan dan Upah Kerja Semester I Tahun 2020
Dalam Rupiah (Rp)
NO BAHAN DASAR SPESIFIKASI SATUAN HARGA

1 2 3 4 5
28 Pipa Galvanis Medium (GIP) 1/2" Batang 219,300
29 Pipa Galvanis Medium (GIP) 3/4" Batang 285,600
30 Pipa Galvanis Medium (GIP) 1" Batang 392,400
31 Pipa Galvanis Medium (GIP) 1 1/4" Batang 513,600
32 Pipa Galvanis Medium (GIP) 1 1/2" Batang 588,600
33 Pipa Galvanis Medium (GIP) 2" Batang 779,000
34 Pipa Galvanis Medium (GIP) 2 1/2" Batang 991,000
35 Pipa Galvanis Medium (GIP) 3" Batang 1,774,300

F SAMBUNGAN PIPA
1 Knie 90o - 1/2" Buah 4,200
2 Knie 90o - 3/4" Buah 4,200
3 Knie 90o - 1" Buah 4,900
4 Knie 90o - 1 1/4" Buah 8,300
5 Knie 90o - 1 1/2" Buah 10,400
6 Knie 90o - 2" Buah 11,100
7 Knie 90o - 2 1/2" Buah 11,800
8 Knie 90o - 3" Buah 13,900

G KACA
1 Kaca Bening Tebal 3 mm M2 131,900
2 Kaca Bening Tebal 5 mm M2 147,500
3 Kaca Bening Tebal 8 mm M2 201,800
4 Kaca Bening Tebal 10 mm M2 287,200
5 Kaca Rayban Tebal 3 mm M2 100,900
6 Kaca Rayban Tebal 5 mm M2 103,200
7 Kaca Rayban Tebal 6 mm M2 194,000
8 Kaca Rayban Tebal 8 mm M2 317,400
9 Neko Bh 27,700

H GENTENG
1 Genteng Beton Biasa Bh 6,200
2 Genteng Kanmuri Glassure Bh 10,900
3 Genteng Kanmuri Biasa Bh 9,300
4 Karet Talang Bh 155,000
5 Karet Talang Bh 195,500
6 Karet Lapisan Genteng Bh 28,900
7 Genteng Keramik KIA Natural Bh 8,500
8 Genteng Keramik KIA Maroon Bh 14,000
9 Nok Keramik Kia Bh 16,300
10 Nok Beton Presss Bh 9,300
11 Ujung Nok Bh 69,900
12 Genteng Metal Zincalume Kasar (100 x 77 cm) Bh 186,300
13 Genteng Metal Zincalume Polos (100 x 77 cm) Bh 150,600
14 Genteng Metal Zincalume Kasar (80 x 77 cm) Bh 111,800
15 Genteng Metal Zincalume Polos (80 x 77 ) Bh 104,000
16 Gentweng Asbes Bh 54,300

I SANRANGAN/BUIS BETON
1 Dia 80 x 50 Buah 93,100
2 Dia 70 x 50 Buah 77,600
3 Dia 60 x 50 Buah 62,100

J GORONG - GORONHG
1 Dia 1 x 60 Buah 93,100
2 Dia 1 x 50 Buah 77,600
3 Dia 1 x 40 Buah 69,900
4 Dia 1 x 30 Buah 46,600
5 Dia 1 x 20 Buah 31,000
6 Dia 1 x 100 Buah 155,200

J PAVING BLOK

Harga Satuan Bahan Bangunan dan Upah Kerja Semester I Tahun 2020
Dalam Rupiah (Rp)
NO BAHAN DASAR SPESIFIKASI SATUAN HARGA

1 2 3 4 5
1 Uk. 6 cm (60 bh/m2) M2 86,600
2 Uk. 8 cm (60 bh/M2) M2 103,900
3 Losster Semen (Uk. 15 x 30 cm) Buah 69,900
4 Losster Semen (Uk. 20 x 30) Buah 34,700
5 Batako 40 x 20 x 10 Buah 4,900
6 Rumput Peking M2 64,400
7 Grandel Uk. 5 - 10 cm Buah 18,000
8 Grandel Uk. 11 - 15 cm Buah 23,600
9 Grandel Uk. 16 - 20 cm Buah 34,700
10 Kait Angin Kuningan Uk. 10 - 20 cm Buah 23,600
11 Kait Angin Kuningan Uk. 21 - 30 cm Buah 41,600
12 Espagnolet tanam Uk. 21 - 30 cm Buah 34,700
13 Door Close Type 81 New Star Buah 204,900
14 Door Stopp Lokal Buah 15,500
15 Engsel Pintu 77 Buah 20,800
16 Engsel Jendela 77 Buah 20,800
17 Hak Angin 8" Buah 23,600
18 Lem Pipa Kaleng 52,000
19 Meter Rol 30 m Buah 100,000
20 Meter Rol 50 m Buah 125,000
21 Pintu PVC Buah 504,500
22 Pintu Aluminium Buah 519,800
23 Rolling Door Bahan besi Buah 554,400
24 Rolling Door Bahan Aluminium M2 465,700
25 Sunscreen Aluminium M2 558,800
26 Pintu Gulung Besi M2 512,300
27 Pintu Besi Baja M2 1,474,700
28 Jendela Besi M2 1,552,300

K PINTU AIR
1 Pintu Tersier Unit 6,860,700
2 Pintu Romijing b=0,5 m: h = 1 m Unit 17,295,200
3 Pintu Romijing b=0,6 m: h = 1 m Unit 17,447,700
4 Pintu Romijing b=0,7 m: h = 1 m Unit 18,438,700
5 Pintu Romijing b=0,8 m: h = 1 m Unit 20,543,000
6 Pintu Sorong b=1 m; h = 1 m Unit 28,336,000
7 Pintu Sorong b=1 m; h = 1,2 m Unit 32,016,600
8 Pintu Sorong b=1 m; h = 1,25 m Unit 32,200,000
9 Pintu Sorong b=1 m; h = 1,5 m Unit 38,640,000

L SANITASI
1 Bak Air Mandi Fiberglass 0,3 m3 Buah 554,400
2 Kloset Jongkok Standar Ex Toto Buah 831,600
4 Kloset Duduk Standar Lengkap Ex Toto Buah 3,155,600
5 Urinoir Buah 1,940,400
6 Wastafel Standar Kecil Buah 838,300
7 Wastafel Standar Besar Buah 1,024,500
8 Kitchen Zinc Standar Buah 341,500
9 Kran Air wastafel Buah 32,600
10 Kran Air Bak Cuci Dapur Buah 65,200
11 Tempat Sabun Porselin Buah 55,900
12 Knie 90o - 4" Buah 23,300
13 Knie 90o - 5" Buah 58,400
14 Knie 90o - 6" Buah 76,600
15 Tee - 1/2" Buah 4,200
16 Tee - 3/4" Buah 4,900
17 Tee - 1" Buah 7,000
18 Tee 1 1/4" Buah 5,500
19 Tee 1 1/2" Buah 7,000
20 Tee - 2" Buah 8,800
21 Tee - 2 1/2" Buah 14,900
22 Tee - 3" Buah 7,500

Harga Satuan Bahan Bangunan dan Upah Kerja Semester I Tahun 2020
Dalam Rupiah (Rp)
NO BAHAN DASAR SPESIFIKASI SATUAN HARGA

1 2 3 4 5
23 Tee - 4" Buah 21,900
24 Tee - 5" Buah 65,200
25 Tee - 6" Buah 95,200
26 Socket - 1/2" Buah 4,200
27 Socket - 3/4" Buah 4,200
28 Socket - 1" Buah 4,200
29 Socket 1 1/4" Buah 6,900
30 Socket 1 1/2" Buah 4,200
31 Socket 2" Buah 4,900
32 Socket - 2 1/2" Buah 6,500
33 Socket - 3" Buah 7,900
34 Socket 4" Buah 11,200
35 Socket 5" Buah 32,600
36 Socket 6" Buah 46,600
37 Knie 45o - 2" Buah 95,200
38 Knie 45o - 2 1/2" Buah 14,000
39 Knie 45o 3" Buah 20,500
40 Knie 45o 4" Buah 37,300

M KUNCI
1 Kunci Tanam double slag / selot pintu Buah 83,300
2 Kunci Tanam Antik Buah 465,700
3 Kunci Lemari Buah 27,700
4 Door Holder Buah 34,700
5 Kunci Laci 101 Buah 172,500
6 Kunci laci 808 Kecil Buah 18,400
7 Kunci Laci 808 Besar Buah 23,000
8 Kunci Tanam Selinder Buah 139,700
9 Kunci Kamar Mnadi Buah 48,500
10 Engsel Pintu Kuningan 3" Buah 23,300
11 Engsel Pintu Kuningan 4" Buah 21,700
12 Engsel Pintu Nilon 3" Buah 13,900
13 Engsel Pintu Nilon 4" Buah 15,500
14 Engsel Stainles Stell 3" Buah 34,900
15 Engsel Stainles Stell 4" Buah 44,200
16 Kabel NYAF 1,5 MM Roll 388,100
17 Kabel NYAM 2 x 1,5 M' 9,000
18 Kabel NYAM 2 x 2,5 Eterna Roll 483,000
19 Kabel NYAM 3 x 2,5 Eterna Roll 541,000
20 Kabel NYAM 3 x 4 Eterna Roll 721,300
21 Kabel NYY 4 x 16 M' 54,300
22 Kabel NYY 4 x 2,5 M' 11,600
23 Kabel NYY 4 x 4 M' 15,500
24 Kabel NYA 10 M M' 13,900
25 BC 50 mm Kg 57,400
26 Spit Tembaga Asli Buah 10,900
27 Tiang Spit Buah 38,800
28 Arde 4 mtr Asli Batang 543,300
29 Down Light Kuning Buah 54,300
30 Donw Light Besar Buah 77,600
31 Down light Sedang Buah 69,900
32 Lampu Merkuri Philips 250 Watt Asli Buah 465,700
33 Fitting Merkuri 250 Watt Buah 77,600
34 Lampu Merkuri Philips 250 watt (Untuk Jalan) Set 1,154,000
35 Lampu TL 20 watt Philips Set 77,600
36 Lampu softone 40 watt philips Buah 69,000
37 Fitting Batu Buah 18,000
38 Kayu Roset Buah 6,900
39 MCB 16 Group MG asli Buah 69,900
40 MCB 10 Group Mg Asli Buah 62,100
41 Rang Pasir Meter 20,000
42 Sisir MCB Legrad Buah 31,000
43 Boks MCB 4 Grup IB Buah 38,800
44 Boks MCB Plastik Grup MCB asli Set 1,009,000

Harga Satuan Bahan Bangunan dan Upah Kerja Semester I Tahun 2020
Dalam Rupiah (Rp)
NO BAHAN DASAR SPESIFIKASI SATUAN HARGA

1 2 3 4 5
45 MCB 63 Amp Mg Buah 341,500
46 Panel OB + MCB 12 Amp Set 776,200
47 MCB 30 Amp 3 phase Buah 649,200
48 Saklar 63 Amp Buah 219,300
49 Boks MCB Unit 54,300
50 Panel Kas 30 x 40 cm Set 100,900
51 Panel Kas untuk Lampu Merkuri ASLI Lembar 1,226,200
52 Pane Kas Lengkap Asli MG Buah 3,029,400
53 KWH 3 Phase Japan Buah 1,241,900
54 MCB + KWH Meter + Ok Buah 331,800
55 OHM Saklar Buah 649,200
56 NFB Buah 219,300
57 Engkel IB Buah 18,600
58 Stop Arde IB Mekel Buah 13,900
59 Saklar Seri Makel /Stop Arde Makel Buah 15,200
60 OHN Saklar 60 Grub Set 360,600
61 Stop Arde + Tedos OB Buah 3,100
62 Steker Arde Buah 15,200
63 Engkel IB Makel Buah 15,500
64 Tangki Air Fiberglass bulat 500 ltr Buah 1,319,500
65 Tangki Air Fiberglass bulat 1000 ltr Buah 1,940,400
66 Swaltape Kecil Buah 6,900
67 Pipa Fleksibel Buah 85,400

N CAT DAN MINYAK


1 Cat Besi/Kayu Warna Standar Emco Kg 70,800
2 Cat Besi/Kayu Warna Khusus Emco Kg 83,700
3 Cat Besi/Kayu Avian Kg 69,900
4 Cat Tembok Metrolite Kg 32,200
5 Cat Tembok Interior Warna Standar Mowillex Liter 75,300
6 Cat Tembok Exterior Warna Standar Mowillex Liter 70,700
7 Cat Tembok interior Warna Standar Dulux Liter 87,000
8 Cat Tembok Exterior Warna Standar Dulux Liter 93,900
9 Cat Meni Besi Kg 38,600
10 Cat Meni Kayu Kg 34,800
11 Cat No Drop 5 kg 225,000
12 Dempul Kayu Kg 54,300
13 Ember Cor Kecil Buah 10,000
14 Ember Cor Besar Buah 15,000
15 Isolasi Pipa Buah 6,000
16 Plamur kg 46,700
17 Politur Kaleng 58,000
18 Teak Oil Liter 42,700
19 Pernis Liter 64,400
20 Minyak Cat Liter 20,800
21 ThInner A 1 Liter 59,000
22 Thinner A 1/2 Biasa Liter 25,000
23 Spirtus Liter 15,000
24 Wood Filler kg 40,400
25 Amplas lbr 12,900
26 Kuas Roll Biasa 32,200
27 Kuas Roll Ace Buah 23,300
28 Kuas 1" Buah 10,000
29 Kuas 2 1/2 Buah 20,800
30 Kuas 4 Buah 23,600
31 Lem kayu Fox Kg 27,700
32 Lem Fox Bungkus 22,400
33 Lem Fox Bungkus 16,300
34 Lem Epoxy Pasang 37,000
35 Residu Liter 20,200
36 Minyak Bekesting Liter 13,900

Harga Satuan Bahan Bangunan dan Upah Kerja Semester I Tahun 2020
Chart Title
14,000

12,000

10,000

8,000

6,000

4,000

2,000

-
1 2 3
STANDAR HARGA SATUAN BAHAN BANGUNAN DAN UPAH KERJA
PEMERINTAH PROVINSI SULAWESI SELATAN
KABUPATEN BARRU
TAHUN 2020
HARGA
NO BAHAN DASAR SATUAN
Zona A Zona B Zona C
1 2 3 5 6 7
A MATERIAL DASAR BANGUNAN
BAHAN DASAR
PERBATUAN
Batu Gunung / Kali m3 177,160 177,160 177,160
Batu Belah / Chipping m3 375,000 375,000 375,000
Batu Kali Utuh/Bulat M3 155,081 155,081 155,081
Batu Prcah 7-10 cm m3 177,160 177,160 177,160
Batu Pecah 5-7 cm M3 217,330 217,330 217,330
Batu Pecah 3-5 cm M3 250,290 250,290 250,290
Batu Pecah 2-3 cm M3 280,675 280,675 280,675
Batu Pecah 1-2 cm M3 280,675 280,675 280,675
Chipping 2-3 cm M3 363,000 363,000 363,000
Batu Gerinda Kinik 4" dos 250,000 250,000 250,000
Batu Gerinda Potong WD 4" dos 60,000 60,000 60,000
Batu Gerinda Kinik WD 4" dos 50,000 50,000 50,000
GORONG-GORONG
Gorong2 Beton dia. 80 cm m' 200,000 200,000 200,000
Gorong2 Beton dia. 100 cm m' 240,000 250,000 255,000
PAVING BLOK
Paving Blok 6 cm m2 70,000 70,000 72,000
Paving Blok 8 cm m2 80,000 80,000 82,000
Paving Blok Tebal 6 cm Biji 2,300 2,300 2,500
Paving Blok Kotak K-300 T. 8 cm,Warna(44b m2 113,815 113,815 113,815
PASIR
Pasir M3 400,000 400,000 405,000
Pasir Cor truk 550,000 550,000 550,000
Pasir Pasangan M3 162,225 162,225 162,225
Pasir Beton M3 169,950 169,950 169,950
Pasir Timbunan/Urug M3 86,520 86,520 86,520
TIMBUNAN
Timbunan Pilihan M3 140,000 140,000 140,000
Tanah Urug M3 90,125 90,125 90,125
BAMBU
Bambu btg 40,000 40,000 40,000
PORTLAND CEMENT
- Merak Tonasa kg 1,200 1,200 1,200
- Merek Bosowa kg 1,125 1,125 1,125
Semen Putih (@ 20 kg/Zak) kg 3,400 3,400 3,400
Semen PC (50 kg) Tonasa Zak 59,000 59,000 59,000
Semen Warna (Prima Gront) kg 27,000 27,000 27,000
Semen Untuk Lantai Zak 62,000 62,000 62,000
Semen Portland PC, @40 kg kg 1,213 1,213 1,213
Semen Nat/Warna kg 15,450 15,450 15,450
Semen Warna kg 1,500 1,500 1,500
PEREKAT BATA RINGAN
Mortar Perekat Bata Ringan (40 kg) Zak 135,000 140,000 143,000
Mortar Perekat Bata Ringan (50 Kg) Zak 175,000 180,000 182,000
BATA RINGAN
Batu Bata Buah 650 650 700
Bata Ringan Uk.60x20x7,5 cm (112 bh/m3) M3 8,750 9,000 11,000

Harga Satuan Bahan Bangunan dan Upah KerjaTahun 2020


HARGA
NO BAHAN DASAR SATUAN
Zona A Zona B Zona C
1 2 3 5 6 7
Bata Ringan Uk.60x20x10 cm (84 bh/m3) M3 850,000 900,000 950,000
Bata Ringan Uk.60x20x12,5 cm (67 bh/m3) M3 14,650 14,750 15,000
Bata Ringan Uk.60x20x15 cm (56 bh/m3) M3 17,500 17,500 19,000
Bata Ringan Uk.60x20x20 cm (42 bh/m3) M3 23,350 23,750 25,000
Batu Bata Terakota uk. 5 x 20 x 2 cm bh 3,785 3,785 3,785
BAHAN BESI
BESI
Besi Beton kg 13,500 13,500 15,000
Besi Beton 5 btg 26,000 29,000 32,000
Besi Beton 6 btg 32,000 32,000 35,000
Besi Beton 8 btg 58,000 58,000 60,000
Besi Beton 10 btg 80,500 80,500 83,000
Besi Beton 12 btg 115,000 115,000 117,000
Besi Beton 14 btg 161,000 172,500 175,000
Besi Beton 16 btg 180,000 185,000 187,000
Besi Beton 18 btg 166,100 166,500 168,000
Besi Beton 20 btg 188,400 190,000 195,000
Besi Beton 22 btg 211,700 215,700 220,000
Besi Siku btg 150,000 160,500 163,000
Besi Strip kg 11,550 11,550 11,550
Besi Ulir (D) kg 12,500 12,500 12,500
Besi Polor U. 24 kg 11,000 11,000 11,000
Besi Strip 5 x 50 mm kg 12,000 12,000 12,000
Besi Plat Baja Tebel 3 mm lbr 750,000 750,000 750,000
Besi Plat 10 mm x 1200 mm x 2400 mm lbr 2,000,000 2,000,000 2,000,000
Besi Plat 6 mm x 1200 mm x 2400 mm lbr 1,600,000 1,600,000 1,600,000
Kanal (Baja Ringan) btg 100,000 100,000 100,000
Ring (Baja Ringan) btg 45,000 45,000 45,000
GERGAJI
Gergaji Besi buah 15,000 15,500 16,000
Pemotong Besi WD dos 75,000 77,500 78,000
KAWAT
Kawat Las LB kg 140,000 145,000 150,000
Kawat Las kg 23,000 23,000 23,000
Kawat Las (Elektroda) kg 23,000 23,000 23,000
Kawat Duri roll 185,000 185,500 200,000
Kawat Ram m3 25,300 25,350 27,000
Kawat Beton kg 25,000 27,000 28,000
Kawat Segel roll 200,000 200,000 200,000
MUR/BAUT
Mur/Baut diameter 20 mm bh 15,000 15,500 18,000
Mur/Baut diameter 25 mm bh 7,500 7,500 10,000
Mur/Baut diameter 18 mm bh 4,500 5,900 9,000
Mur/Baut diameter 10 mm bh 4,200 4,400 7,000
Baut Dinabol buah 5,000 5,500 6,000
Baugel U. 40 40 mm bh 23,300 27,500 30,000
Baugel Strip 40.40 mm bh 19,400 22,750 25,000
Baut Dinabolt dos 175,000 175,250 177,000
Dinabolt kg 20,000 20,000 20,000
ACP PVDF 1220x2440 mm Coating 0.3 lbr 779,000 779,000 779,000
ACP 1220x2440 mm Coating 0.21 lbr 539,900 539,900 539,900
PAKU
Paku Gording Panjang 5 cm kg 27,900 28,000 30,000
Paku Biasa 6-10 cm kg 23,000 29,000 31,000
Paku Biasa 2-5 cm kg 25,000 26,500 28,000
Paku Campur 5-7 cm kg 20,000 20,000 20,000

Harga Satuan Bahan Bangunan dan Upah KerjaTahun 2020


HARGA
NO BAHAN DASAR SATUAN
Zona A Zona B Zona C
1 2 3 5 6 7
Paku Seng Biasa kg 50,000 50,000 59,000
Paku Beton Dos 28,900 28,900 35,000
Paku Asbes kg 50,000 50,500 55,000
Paku Les kg 25,000 30,500 32,000
Paku Tripleks kg 40,000 40,550 49,000
NACO
Trail Naco (Besi Batangan) btg 33,000 40,250 42,000
Rangka Naco/Batang Daun 27,000 27,500 30,000
BAHAN LANTAI DAN DINDING
TEGEL
Tegel Kramik Warna 40x40 cm Dos 75,100 76,000 80,000
Keramik 30x30 cm Warna Tua bj 13,950 13,950 13,950
Keramik 40 x 40 cm bh 11,550 11,550 11,550
Tegel Pengarah30x30cm,Warna Kuning/Difa bh 31,157 31,157 31,157
Tegel Keramik Warna 60x60cm dos 160,000 160,000 167,000
Tegel Keramik 30x30cm ( Polos ) dos 63,300 63,300 65,000
Tegel Keramik 20x20cm (Alur) dos 65,550 65,550 67,000
Tegel Keramik 20x20cm (Polos) dos 66,700 70,000 73,000
Tegel ubin Warna 20x20 cm dos 70,000 70,800 75,000
Tegel Plit 10x31 bh 15,000 15,550 22,000
Dinding Keramik 25x40 cm dos 75,000 75,500 80,000
Border Keramik 20x 40 cm dos 85,000 85,250 87,000
Teakwood 120x240 cm Tebal 3 mm lbr 60,000 60,000 63,000
LOSTER
Loster Keramik bh 45,000 60,500 65,000
Loster Beton Besar bh 50,000 53,000 60,000
Loster Beton Kecil bh 25,000 25,000 30,000
Bahan Penutup Lantai
Granit 60x60
Granit ex .China bh 13,733 13,733 13,733
Polished,atena,Natura Series bh 106,894 106,894 106,894
Pas. Granit Artistik dia. 400 cm m2 3,812,250 3,812,250 3,812,250
UnPolished,Topaz,Unicolor Series bh 100,116 100,116 100,116
Matt, Silverlake,Stream Series bh 106,048 106,048 106,048
Matt,Havana,Stream Series bh 106,048 106,048 106,048
Granit 30x60
Polished,Bougenlive,Natura Series bh 68,880 68,880 68,880
UnPolished, White Pine , Pinwood Series bh 63,420 63,420 63,420

Granit Slab Tebal 15 - 20 mm


Granit Slab Tebal 15 - 20 mm m2 1,323,000 1,323,000 1,323,000
Upah Membuat Step Nose bh 26,250 26,250 26,250
PALU
Palu buah 50,000 50,000 60,000
BAHAN KAYU
KAYU KELAS I JENIS ULIN
- Balok m3 13,000,000 13,200,000 13,300,000
- Papan m3 13,500,000 13,700,000 13,800,000
KAYU KELAS I JENIS BAYAM
- Balok m3 12,000,000 12,500,000 12,600,000
- Papan m3 12,500,000 12,800,000 12,850,000
KAYU KELAS II JENIS KAPUR
- Balok m3 7,500,000 7,700,000 7,750,000
- Papan m3 7,500,000 7,650,000 7,700,000

KAYU KELAS III

Harga Satuan Bahan Bangunan dan Upah KerjaTahun 2020


HARGA
NO BAHAN DASAR SATUAN
Zona A Zona B Zona C
1 2 3 5 6 7
- Balok m3 2,147,550 2,500,000 2,550,000
- Papan m3 2,500,000 3,000,000 3,020,000
Les Kayu Plafond 1 x 4 cm kls II m' 25,000 26,500 27,000
Plywood 4 mm lmbr 70,000 70,000 70,000
Multipleks / Plywood 6 mm lbr 70,000 70,550 90,000
Multipleks / Plywood 9 mm lbr 105,000 110,000 135,000
MultiPleks T. 12 mm lbr 165,000 165,000 165,000
MultiPleks T. 9 mm lbr 130,000 130,000 130,000
MultiPleks T. 6 mm lbr 98,000 98,000 98,000
MultiPleks T. 3 mm lbr 70,000 70,000 70,000
MultiPleks T. 18 mm lbr 285,000 285,000 285,000
MultiPleks T. 15 mm lbr 230,000 230,000 230,000
Kayu Kelas I Jenis Kumia m3 7,000,000 7,100,000 7,150,000
Kayu Kelas I Jenis Kapur m3 7,500,000 7,750,000 7,850,000
Kayu Kelas I Jenis Meranti m3 4,000,000 4,450,000 4,500,000
Kayu kls I Papan m3 13,493,000 13,493,000 13,493,000
Kayu Kelas I Balok m3 9,550,000 9,550,000 9,550,000
Kayu Kls II Papan m3 3,574,000 3,574,000 3,574,000
Kayu Kelas II Balok m3 3,550,000 3,550,000 3,550,000
Kayu Kelas III m3 2,000,000 2,570,000 2,457,400
Kayu Kelas III Balok Bekisting m3 2,147,550 2,147,550 2,147,550
Kayu Kelas III Papan Bekisting m3 2,147,550 2,147,550 2,147,550
Dolken Kayu Dia. 8-10 cm 4 m btg 280,000 280,500 285,000
Kayu dolken dia 8-10 / 400 cm btg 32,000 32,000 32,000
Dolken Bambu btg 32,000 32,000 32,000
Kayu Kelas I Jenis Ulin m3 11,000,000 11,200,000 11,350,000
Kayu Kelas II Jenis Kumea m3 6,000,000 6,250,000 6,500,000
Kayu Kelas III Merati / Kapur m3 4,000,000 4,200,000 4,500,000
Kayu Campuran Mall/COR m3 1,900,000 2,100,000 2,800,000
BAHAN ATAP
SENG
Seng Gelombang BWG 32" BJLS 0.25 mm lbr 83,000 85,000 87,000
Seng Gelombang (6 Kaki) lbr 65,600 65,600 65,600
Seng BWG 33" BJLS 0.20 mm kaki 35,000 35,500 38,000
Bumbungan Seng 90 x 180 cm lbr 50,000 50,250 55,000
Seng Plat BWG 28" lbr 113,200 113,500 125,000
Seng Spandek 0.3 mtr 41,000 41,250 45,000
Seng Spandek 0.3 Warna mtr 45,000 45,500 48,000
Seng Spandek 0.35 mtr 50,000 50,250 55,300
Seng Spandek 0.35 Warna m 50,000 50,250 55,300
Seng Spandek 0.4 mtr 53,000 53,500 57,000
Seng Spandek 0.4 Warna mtr 58,000 58,550 60,000
Seng Gelombang BWG 33" kaki 9,800 9,850 12,000
Karet Talang m 10,000 10,000 10,000
Multi Roof lbr 33,000 35,200 37,000
Nok Multi Roof lbr 37,000 37,300 39,000
Surya Roof lbr 35,000 37,300 43,000
Nok Surya Roof lbr 22,000 22,500 25,000
Main Trus C 85 btg 78,000 78,000 79,000
Reng U Type 41 btg 45,000 45,000 48,500
Screw Spandek dos 225,000 225,850 230,500
Screw 12 - 14x20 dos 235,000 235,000 240,200
Screw 10 - 16 x 16 dos 215,000 215,500 225,500
Bahan Rangka Dan Penutup Atap
Main Trus m' 25,647 25,647 25,647

Harga Satuan Bahan Bangunan dan Upah KerjaTahun 2020


HARGA
NO BAHAN DASAR SATUAN
Zona A Zona B Zona C
1 2 3 5 6 7

-C-75-0,75(BMT);0,80(TCT),Az-100 G550Mpa
- Mill Certificate
Roof Bottom/Reng m' 9,888 9,888 9,888
- TS-40.0,45 (BMT);0,5 (TCT)
Mill Certificate
Self Drilling Screw 12-14x20 mm (Truss Scre bj 752 752 752
Self Drilling Screw 10-16x16 mm (Roof Bott bj 567 567 567
Dynabolt 12x120 mm ex, HILTI, RAMSET bj 4,635 4,635 4,635
Sekrup Galvanis 12 - 14x 500HGS bj 1,023 1,023 1,023
Sekrup Galvanis 12 - 14x 20HWF bj 749 749 749
Genteng Atap Bithumen Bergelombang Mon lbr 155,000 155,000 155,000
Paku Sekrup Atap Bithumen bh 1,100 1,100 1,100
Alat Bantu Pekerjaan Atap Is 5,000 5,000 5,000
BAHAN KACA
KACA
Kaca Bening Tebal 3 mm m2 130,000 130,000 130,000
Kaca Bening Tebal 5 mm m2 225,000 225,000 225,000
Kaca Bening 8 mm m2 206,000 206,000 206,000
Kaca Tebal 5 mm ( Tempered Glass) m2 500,000 500,000 500,000
Kaca Tebal 5 mm Ryben Dark Blue m3 275,000 275,000 275,000
Silikon Kaca buah 35,000 35,000 35,000
Pilloks Penta btl 30,000 30,000 30,000
BAHAN KACA DAN ALLUMUNIUM
Kaca Tempered Bening 10 mm m2 936,849 936,849 936,849
Kaca Tempered Bening 12 mm m2 936,849 936,849 936,849
Cermin 5 mm + Bevel + Lubang Sekrup m2 486,675 486,675 486,675
Kusen Allumunium 4 " Fin. Coating Powder m' 158,980 158,980 158,980
Rangka Pintu Allumunium Slimar Fin. Coati m' 146,002 146,002 146,002
Profil Allumunium Kaca m' 54,075 54,075 54,075
Daun Jendela Allumunium Casemen Fin. Coa m' 113,557 113,557 113,557
Sealent Non Acid tube 22,711 22,711 22,711
Paku Tembak Payung bj 178 178 178
Karet Kaca bj 1,784 1,784 1,784
Jendela Nako Unit 367,500 367,500 367,500
BAHAN PINTU,KUNCI DAN PENGGANTUNG
Pintu Baja Paprikasi 1 Daun (Steel/Dppr)+Vie m2 1,954,134 1,954,134 1,954,134
Kusen Baja Tebal 1,5 mm
1 Daun Pintu Plat Baja Steel 4 buah/Daun
Architrave
Engsel Pintu Stainless Steel 4 Buah/Daun
Kunci Pintu Tanam Stainless Steel SUS 32D
Viewer Glass/Vision Glass
Pintu Baja Paprikasi 1 Daun (Steel Door),Incl m2 1,838,931 1,838,931 1,838,931
Kusen Baja Tebal 1,5 mm
1 Daun Pintu Plat Baja Tebal 0.8 mm
Architrave
Engsel Pintu Stainless Steel 4 buah/Daun
Kunci Pintu Tanam Stainless Steel SUS 32D
Pintu Baja Paprikasi 2 Daun (Steel Door)+Visi m2
Kusen Baja Tebal 1,5 mm
2 Daun Pintu Plat Baja Tebal 0.8 mm (Mother dan Son Door)
Architrave
Engsel Pintu Stainless Steel 4 Buah/Daun
Kunci Pintu Tanam Stainless Steel SUS 32D
Vision Glass

Harga Satuan Bahan Bangunan dan Upah KerjaTahun 2020


HARGA
NO BAHAN DASAR SATUAN
Zona A Zona B Zona C
1 2 3 5 6 7
Pintu Emergency Exit 1 Daun (Steel Door),In m2
Rangka/Kusen,T.2.0 mm
Daun Pintu Tebal 1.5 mm
Vision Glass (Double Glazed 6 mm (600x200 mm )
Panic Bar Galvanized Steel
Handle Stainless Steel 304
Heavy Duty Door Closer
Door Stopper
Kunci Tanam Biasa set 82,400 82,400 82,400
Rangka Dan Daun Pintu Sahft,Multipleks T.18 mm Fin.La 660,000 660,000 660,000
Engsel Jendela Casement 12", CMT FB27-US32D 77,868 77,868 77,868
Rambuncis Jendela Allumunium,RMB-FB090RH 58,401 58,401 58,401
Kunci Tanam Pintu Allumunium 227,115 227,115 227,115
Pull Handle PH DL801 32 x 350 PSS 405,562 405,562 405,562
Pintu Besi Uk.90 x 275 cm Lengkap Ass Dan Kunci 3,785,250 3,785,250 3,785,250
Kunci Pintu Untuk Panel Baja 180,000 180,000 180,000
ASSESORIS PINTU KACA
Floor Hinge FH 84FB S unit 1,226,421 1,226,421 1,226,421
Patch Lock US2210 US32 set 848,274 848,274 848,274
Double Cylinder DC.Fn1001-60 US 14 set 107,311 107,311 107,311
Bottom Patch Fitting PT 2210 US32 bh 470,128 470,128 470,128
Top Patch Fitting PT 2220 US32 bh 470,128 470,128 470,128
Overpanel Pivot Patch Fitting PT 2240 US32 bh 694,971 694,971 694,971
Pull Hnadle GHD4502 Uk.600 x 900 mm US3 psg 1,359,283 1,359,283 1,359,283
Jasa Lubang Kaca Handle Pintu Tempered psg 17,884 17,884 17,884
Jasa Coak Kaca psg 41,637 41,637 41,637
BAHAN CAT DAN LABURAN
Cat Dinding Dalam Interior kg 63,477,270 63,477,270 63,477,270
Cat Dinding Weatjershield Eksterior kg 99,272,730 99,272,730 99,272,730
Cat Dasar Dinding (UnderCoat) ex.Mowilex kg 56,700,000 56,700,000 56,700,000
Cat Plafond kg 32,340,000 32,340,000 32,340,000
Cat penutup Eksterior 2x lapis kg 99,273 99,273 99,273
Cat Penutup Interior 2x lapis kg 6,347 6,347 6,347
Cat Penutup Nippe 2000 kg 62,000 62,000 62,000
Thinner Sure / Pengencer kg 14,500 14,500 14,500
Skimcoat A+ Merah/Hijau kg 262,500 262,500 262,500
Water Proofing Membrant,Profex Torcheal.t m2 11,639,000 11,639,000 11,639,000
Water Proofing 2 komponen (liquid+Bubuk) kg 6,825,000 6,825,000 6,825,000
Meni Besi ltr 2,800,000 2,800,000 2,800,000
BAHAN KUNCI DAN PENGGANTUNG PENGAMAN
Kunci Tanam 2x Putar buah 175,000 175,000 175,000
Kunci Lemari Mutu Baik psg 18,000 18,000 18,000
Engsel Pintu (kuningan) buah 35,000 35,000 35,000
Engsel Pintu (Kuningan) buah 60,000 60,000 60,000
Engsel Pintu Baja bj 15,000,000 15,000,000 15,000,000
Engsel Jendela (Kuningan) buah 15,100 15,100 15,100
Engsel Pivot buah 15,000 15,000 15,000
Flooring Engsel set 900,000 900,000 900,000
Grendel Pintu dan Jendela buah 22,600 22,600 22,600
Grendel Tanam set 90,000 90,000 90,000
Hak Angin /Hak Angin Lipat/no.7" psg 15,000 15,000 15,000
Pegangan/Tarikan Jendela + Pintu buah 8,000 8,000 8,000
Kait Jendela Jungkit/Kait Angin buah 10,000 10,000 10,000
Gembok No.5 buah 15,000 15,000 15,000
Door Close set 150,000 150,000 150,000
Pintu WC buah 300,000 300,000 300,000

Harga Satuan Bahan Bangunan dan Upah KerjaTahun 2020


HARGA
NO BAHAN DASAR SATUAN
Zona A Zona B Zona C
1 2 3 5 6 7
Pintu Aluminium set 850,000 850,000 850,000
Sekrur Fischer buah 5,000 5,250 6,500
BAHAN CAT
CAT
Cat Meni Kayu/Besi kg 70,000 70,500 75,000
Minyak Bekisting ltr 25,000 25,500 28,500
Minyak Bekisting ltr 5,000 5,000 5,000
Cat Kayu kg 60,000 60,500 65,000
Cat Besi Merk "AVIAN" kg 64,000 64,500 70,000
Minyak Cat (Afdenur) ltr 7,500 7,850 8,500
Kertas Gosok (Amplas) m' 9,270 9,270 9,270
Cat Tembok 5 kg 70,500 70,500 77,000
Bahan Anti Rayap kg/ltr 33,000 33,250 40,000
Clear kg 55,000 63,500 66,500
Plamur kg 58,000 58,500 60,500
Plamir kg 2,468 2,468 2,468
Politur kg 65,000 65,750 67,300
Dempul kg 45,000 42,250 47,500
Cat Tembok "Aries" 4kg 70,000 70,400 73,000
Cat Tembok "Maritex" kg 70,000 70,400 73,000
Cat Tembok "Avitex" 5kg 120,000 120,500 130,000
Cat Anti Lumur/Pail kg 835,000 835,350 843,000
Cat Dasar Tembok 20 Kg kg 250,000 250,500 258,500
Cat dasar Tembok kg 56,700 56,700 56,700
Minyak Cat Nippon Paint-Thinner Melamic ltr 30,000 40,200 42,000
KUAS
Kuas buah 13,000 13,250 15,000
Rol buah 40,000 40,200 42,000
BAHAN SANITASI
KLOSET
Kloset jongkok buah 140,000 150,250 153,550
Kloset Jongkok TOTO buah 350,000 350,500 355,000
Kloset Duduk buah 750,000 750,000 765,000
Kloset Duduk ex.TOTO buah 1,750,500 1,750,500 1,870,000
Kloset Duduk 2 tombol,CW 421 J/SW 420 JP bh 2,845,475 2,845,375 2,845,375
Kloset Jongkok Type CE6 ex.Toto bh 336,192 336,192 336,192
Uinoir Kramik buah 500,000 500,200 650,000
Floor Drain buah 35,000 35,200 37,000
Dol Penguras buah 15,000 15,200 20,000
Tutup Bak Kontrol Besi Curah 40 cm tinggi 5 buah 1,350,000 1,350,000 1,350,000
Tutup Manhole Besi Curah 60 cm tinggi 5 c buah 1,500,000 1,500,000 1,500,000
ShowerBidet +Ass bh 178,447 178,447 178,447
Shower Hand bh 261,723 261,723 261,723
Urinoir Muslim,U 57M +Assesoris sry 2,862,885 2,862,885 2,862,885
Urinal Partition Uk.100 x 350 x 760 mm,AW bh 1,374,535 1,374,535 1,374,535
Floor Drain Stainless Steel bh 89,223 89,223 89,223
Rak Handuk 1 Susun Stainlessteel,TX4A set 768,689 768,689 768,689
WASHTAFEL
Washtafel set 450,000 450,250 525,000
waterdrain buah 15,000 15,250 18,000
washtafel meja LW 530 J + Sifon bh 667,131 667,131 667,131
Sifon Washtafel Meja Stainless Steel + Asses bh 226,033 226,033 226,033
Sealtape buah 5,000 5,250 7,000
PIPA
Pipa PVC Type D Diameter 4" btg 165,000 167,500 185,000
Pipa PVC Type D Diameter 4" btg 95,000 97,500 100,000

Harga Satuan Bahan Bangunan dan Upah KerjaTahun 2020


HARGA
NO BAHAN DASAR SATUAN
Zona A Zona B Zona C
1 2 3 5 6 7
Pipa PVC Type D Dia 2" btg 75,000 80,500 83,000
Pipa PVC Type D Dia 3/4" btg 30,000 30,250 33,500
Pipa PVC Type D Dia 1/2" btg 23,000 25,250 28,000
Pipa PVC Type AW Diameter 4" btg 295,000 295,500 305,000
Pipa PVC Type AW Diameter 3" btg 180,000 183,500 195,000
Pipa PVC Type AW Diameter 2" btg 90,000 95,000 115,000
Pipa PVC Type AW Diameter 2,5" btg 165,000 165,250 173,500
Pipa PVC Type AW Diameter 1,5" btg 68,000 68,250 83,500
Pipa PVC Type AW Diameter 1,25" btg 59,000 69,000 87,000
Pipa PVC Type AW Diameter 1" btg 45,000 59,300 63,000
Pipa PVC Type AW Diameter 3/4" btg 17,300 17,300 20,000
Pipa PVC Type AW Diameter 1/2" btg 40,000 40,300 45,000
Pipa PVC Type AW WAVIN Diameter 6" btg 942,500 945,800 1,000,000
Pipa PVC Type AW WAVIN Diameter 8" btg 1,439,500 1,460,000 1,320,000
Pipa PVC Type AW WAVIN Diameter 10" btg 2,330,000 2,430,500 2,450,000
Pipa PVC Type AW WAVIN Diameter 12" btg 3,550,000 3,650,000 3,700,000
Pipa PVC MASPION SNI (6M)S.10 Diameter 6 btg 925,000 925,300 1,050,000
Pipa PVC MASPION SNI (6M)S.10 Diameter 8 btg 1,485,000 1,485,500 1,550,000
Pipa PVC MASPION SNI (6M)S.10 Diameter 1 btg 2,310,000 2,310,500 2,400,000
Pipa PVC MASPION SNI (6M)S.12.5 Diameter btg 850,000 850,450 1,000,000
Pipa PVC MASPION SNI (6M)S.12.5 Diameter btg 1,250,000 1,255,000 1,300,000
Pipa PVC MASPION SNI (6M)S.12.5 Diameter btg 2,100,000 2,100,500 2,356,000
Pipa PVC S.12.5 Diameter 6 ex.Triliun SNI btg 878,700 878,700 1,100,000
Pipa PVC S.12.5 Diameter 8 ex.Triliun SNI btg 1,582,000 1,582,000 1,650,000
Pipa PVC S.12.5 Diameter 10 ex.Triliun SNI btg 2,511,500 2,511,500 2,600,000
Pipa PVC S.12.5 Diameter 12 ex.Triliun SNI btg 3,671,000 3,671,000 3,700,000
Pipa Service Gip 1/2 m' 12,500 12,500 12,500
Check Valve 3" buah 1,200,000 1,200,000 1,200,000
Check Valve 4" buah 1,850,000 1,850,000 1,850,000
Tee Type AW 1/2" buah 3,000 3,000 3,000
Tee Type AW 3/4 " buah 4,000 4,000 4,000
Tee Type AW 2" buah 8,000 8,000 8,000
Tee Type AW 3" buah 12,000 12,000 12,000
Tee Type AW 4" buah 20,000 20,000 20,000
Tee PVC 3" buah 12,000 12,000 12,000
Tee 1,5" buah 65,000 65,000 65,000
Tee GIP 1/2" buah 12,500 12,500 12,500
Tee Y 45 PVC (SNI 06-0162-1987) 4x4 buah 126,400 126,400 126,400
Tee Y 45 PVC (SNI 06-0162-1987) 6x4 buah 312,800 312,800 312,800
Tee Y 45 PVC 3x3 buah 30,000 30,000 30,000
Elbow Type AW 1/2" buah 2,500 2,500 2,500
Elbow Type AW 1" buah 3,000 3,000 3,000
Elbow Type AW 2" buah 7,000 7,000 7,000
Elbow Type AW 3" buah 9,000 9,000 9,000
Elbow PVC 3" buah 10,000 10,000 10,000
Elbow Type AW 4" buah 15,000 15,000 15,000
Bend 45 PVC (SNI 06-0162-1987) 4 buah 89,500 89,500 89,500
Bend 45 PVC 3 buah 30,000 30,000 30,000
Acces PVC (SNI 06-0162-1987) 4 buah 325,900 325,900 325,900
Acces PVC (SNI 06-0162-1987) 6 buah 552,700 552,700 552,700
Overshock PVC 4x3" buah 35,000 35,000 35,000
Overshock PVC 6x4" buah 55,000 55,000 55,000
Knee Gip 90 1/2 buah 12,500 12,500 12,500
Kne 90 1/5" buah 85,000 85,000 85,000
Kne 45 1,5" buah 85,000 85,000 85,000
Knee PVC 90 1/2" buah 8,000 8,000 8,000

Harga Satuan Bahan Bangunan dan Upah KerjaTahun 2020


HARGA
NO BAHAN DASAR SATUAN
Zona A Zona B Zona C
1 2 3 5 6 7
Knee Drat Dalam PVC 90 1/2" buah 8,000 8,000 8,000
Katup Searah buah 27,500 27,500 27,500
Clamb Sadel 1" buah 52,000 52,000 52,000
Double Nippe Gip 1/2" buah 25,000 25,000 25,000
Sock Drat Luar PVC 1/2" buah 8,500 8,500 8,500
Sock Drat Luar 1,5" buah 35,000 35,000 35,000
Sock Drat Dalam 1,5" buah 35,000 35,000 35,000
Dop Drat Luar PVC 1/2" buah 6,000 6,000 6,000
Penutup Meteran Air buah 175,000 25,000 25,000
Dop/Cap 1,5" buah 25,000 25,000 25,000
Gate Valve 1,5" buah 400,000 400,000 400,000
Gate Valve 1" buah 97,500 97,500 97,500
Watr mooor 2" buah 56,000 56,000 56,000
DESALINASI MESIN RO
0-200 PSI Transmitter P/N 182B0400 pcs 8,500,000 8,500,000 8,500,000
0-200 PSI Transmitter P/N 182B0401 pcs 8,500,000 8,500,000 8,500,000
Coupling P/N 182B5351 pcs 3,750,000 3,750,000 3,750,000
PCB/LCD Controller pcs 13,500,000 13,500,000 13,500,000
Starting Capacitor 60 UF pcs 750,000 750,000 750,000
Running Capacitor 315 UF pcs 1,300,000 1,300,000 1,300,000
Panel Controller set 6,000,000 6,000,000 6,000,000
Pompa Mesin Wasser pcs 7,320,000 7,320,000 7,320,000
Skrut bks 200,000 200,000 200,000
DESALINASI PLTS/Sollar Cell-N
Intverter IFS V 5 KW set 76,000,000 76,000,000 76,000,000
Aki/Baterai + Ongkos Kirim pcs 72,000,000 72,000,000 72,000,000
KAWAT
Kawat Bronjong Vol.2x1x0,5m diameter 2,7 unit 3,180,000 3,180,000 3,180,000
Elektroda L852u kg 64,000 64,000 64,000
Elektroda L852 kg 58,000 58,000 58,000
Elektroda Nikko Stell kg 30,000 30,000 30,000
PELENGKAPAN LAS
Apron Las Kulit Tebal buah 100,000 100,000 100,000
Sarung Tangan Las Kulit Tebal buah 50,000 50,000 50,000
Kaca Mata Gerinda buah 20,000 20,000 20,000
Sikat Baja buah 12,000 12,000 12,000
Kop Las buah 91,000 91,000 91,000
Mesin Las 40 Amp jam 125,000 125,000 125,000
KRAN AIR
Kran Air 1/2" buah 25,000 25,000 25,000
Krank Air 3/4" buah 35,000 35,000 35,000
Kran Air 1/2" buah 30,000 30,000 30,000
Kran Air Standar T23B13 bh 263,525 263,525 263,525
Kran Air Urinoir T6 OP + Assesoris set 963,050 963,050 963,050
Kran Air Dingin Double Stainles Steel set 297,412 297,412 297,412
Kran Air Dingin Wahtafel Meja Singel Faucet unit 1,418,310 1,418,310 1,418,310
Kran Air Single Lever BATH + Shower set TX unit 2,127,465 2,127,465 2,127,465
Stop Kran 1/2" Lengkap Baut(Kuningan) m 75,000 75,000 75,000
Plug Kran 1/2" (Kuningan) buah 27,500 27,500 27,500
Meter Air ONDA (SNI) buah 325,000 325,000 325,000
Water MOR 1/2 buah 10,000 10,000 10,000
Water MOR 3/4 buah 11,000 11,000 11,000
SAMBUNGAN PIPA
Sambungan T dan L PVC Dia 2" buah 9,200 9,200 9,200
Sambungan 4" buah 25,000 25,000 25,000
Sambungan 3" buah 15,000 15,000 15,000

Harga Satuan Bahan Bangunan dan Upah KerjaTahun 2020


HARGA
NO BAHAN DASAR SATUAN
Zona A Zona B Zona C
1 2 3 5 6 7
Pas.Sambungan Elbo 3/4" bh 3,000 3,000 3,000
Pas.Sambungan Elbo 1/2" bh 3,000 3,000 3,000
Pas.Sambungan T 1/2" bh 3,000 3,000 3,000
Pas.Sambungan T 3/4" bh 4,000 4,000 4,000
Sambungan T 4" bh 25,000 25,000 25,000
Sambungan T 3" bh 15,500 15,500 15,500
Pas.Socket 3/4" bh 3,000 3,000 3,000
Pas.Sambungan Lurus 1/2" bh 3,500 3,500 3,500
Sambungan Lurus GI 1,5" SNI bh 40,000 40,000 40,000
LEM
Lem Pipa @45 gram tube 15,600 15,600 15,600
Lem Deron/Besi buah 20,600 20,600 20,600
Lem Pipa 50,000 50,000 50,000

POMPA AIR
Pompa Air Penampung Air Excel buah 1,250,000 1,250,500 1,350,000
Pompa Air Shimizu unit 590,000 590,250 620,000
Pompa Submersible Otomatis 2 (Untuk air L unit 4,000,000 4,000,000 4,000,000
Pompa Submersible Otomatis 3 (Untuk Air L unit 5,000,000 5,000,000 5,000,000
Pompa Air Otomatis (Untuk Air Bersih) unit 850,000 850,000 850,000
Tando Air Fibelglass Vol.1,00m3 unit 1,450,000 1,450,000 1,450,000
IPAL Fiberglass Kapasitas 50 KK unit 162,000,000 162,000,000 162,000,000
Mesin Pompa Air buah 750,000 750,000 750,000
Pelampung Air ONDA unit 142,500 166,500 185,000
Radar Sintung Otomatis Air buah 80,000 80,500 95,000
PENAMPUNGAN
Tower Penampungan Air T=5,60k LA = 2 m2 unit 1,800,000 1,800,500 1,955,000
Tangki Penampungan Air Excel buah 2,800,000 2,800,500 2,930,000
Tangki Septik + Resapan Kapasitas 600 liter unit 2,900,000 2,900,000 2,900,000
Towe / Tambang Air paket 3,500,000 3,500,000 3,500,000
Gembor Air buah 125,000 125,000 125,000
Drum Plastik Besar buah 350,000 350,000 350,000
MATA BOR
Mata Bor Besi 12 buah 30,000 32,500 50,000
Mata Bor Besi Betong buah 30,000 32,500 35,000
BAHAN LANGIT LANGIT
TRIPLEX
Triplex (1,20 x 2,40) cm t = 3 mm lbr 55,000 67,750 75,000
Triplex (1,20 x 2,40) cm t = 4 mm lbr 70,000 70,500 85,300
Triplex (1,20 x 2,40) cm t = 6 mm lbr 80,000 80,500 93,000
Triplex (1,20 x 2,40) cm t = 9 mm lbr 120,000 120,500 135,000
Casibord lbr 70,000 70,000 90,000
Asbes Semen (Eternit) 1 x 1 meter 3 mm lbr 45,000 15,500 23,000
BAHAN JALAN
BAHAN BAHAN JALAN
Sirtu m3 115,000 115,500 195,000
Aspal Bitumen kg 13,700 13,800 15,000
Minyak Tanah Industri ltr 15,000 15,500 18,700
Karet Elastomerit bh 2,063,200 2,063,550 2,110,000
Plastik Alas Cor m2 4,700 4,750 6,500
Minyak Pelumas ltr 64,700 64,900 80,000
Beronjong Jadi 2,7 mm kg 318,000 318,000 318,000
BAHAN PARTISI DAN PLAFOND
BAHAN BAHAN PARTISI DAN PLAFOND
Gypsum Board 1200 mm x 9 mm lbr 65,000 65,500 70,000
Gypsum m2 75,000 75,500 85,000

Harga Satuan Bahan Bangunan dan Upah KerjaTahun 2020


HARGA
NO BAHAN DASAR SATUAN
Zona A Zona B Zona C
1 2 3 5 6 7
Gypsum Board T. 9 mm lbr 65,920 65,920 65,920
GRC Board (Uk.120 x 240 x 0,4 cm) lbr 68,000 68,500 70,000
Silicone botol 45,000 45,500 53,000
BAHAN PLAFOND
Kalsiboard T.4 mm Lbr 64,890 64,890 64,890
Plafond PVC, Uk 400 x 10 x 0,9 cm , Fany Bl lbr 85,470 85,470 85,470
List Plafond PVC Silver Metalic LS - 309-1 m' 36,300 36,300 36,300
List Plafond Allumunium U, 100x100 mm m' 3,000 3,000 3,000
Rangka Hollow Galvalum 2x4x0,35 mm m' 6,180 6,180 6,180
Rangka Hollow Galvalum 4x4x0,35 mm m' 6,695 6,695 6,695
Wall Angel m' 2,403 2,403 2,403
Kawat Penggantung kg 20,600 20,600 20,600
Sekrup Rangka Hollow 4 cm bj 120 120 120
Sekrup Gypsum 2,5 cm bj 120 120 120
Perban Gypsum roll 11,330 11,330 11,330
Cormice Gypsum Ex. A plus kg 3,341 3,341 3,341
Upah Dan Material Membuat Lubang Angin P bh 25,000 25,000 25,000
Alaet Bantu Pek.Plafond set 5,000 5,000 5,000
BAHAN AKUISTIKAL
RANGKA PLAFOND
Suspension Bracket PN 220 bj 1,835 1,835 1,835
Suspension Rod PN 409 m' 3,059 3,059 3,059
Suspension Clip PN 410 bj 6,118 6,118 6,118
Main Runner PN 400 m' 12,360 12,360 12,360
Cross Tee PN 402 (Panjang 120) m' 11,124 11,124 11,124
Wall Angel PN 408 m' 9,084 9,084 9,084
panel Plafon Akuistik Jaya Akustik Type Sop lbr 23,793 23,793 23,793
Panel Dinding Akuistik Jayabell ex.Jaya Boa lbr 319,042 319,042 319,042
Glasswool m2 11,802 11,802 11,802
Rockwoll,Uk 60 x 120 x 5 cm, Density 80% m2 125,173 125,173 125,173
Kawat Nyamuk Uk. 10x10 mm m2 15,450 15,450 15,450
BAHAN BANGUNAN LAINNYA
Paranat 50%x50% roll 1,400,000 1,400,000 1,400,000
Waring roll 500,000 500,000 500,000
Selang Air roll 500,000 500,000 500,000
Cangkul buah 100,000 100,000 100,000
Skop Besar buah 120,000 120,000 120,000
Skop Kecil buah 50,000 50,000 50,000
Linggis buah 150,000 150,000 150,000
PEKERJAAN FHINISHING ARSITEKTUR
Pas.Railing Pipa Stainles Steel 2" ex.Essyei M' 1,903,440 1,903,440 1,903,440
Allumunium Compossite Panel Jenis PVDF e M2 892,223 892,223 892,223
Pasangan Bata Terakota m2 312,500 312,500 312,500
pas Baty Alam Tempel Fin.Coating Netral Do m2 250,000 250,000 250,000
Tangga Maintenance Besi Hollow 40 x 40 m m' 380,000 380,000 380,000
Pintu Plat Besi (Penutup Tangga Maintenanc unit 750,000 750,000 750,000
BAHAN LANSKAP/Site Development
Tanah Humus m3 157,500 157,500 157,500
Grass Block Lubang 8 Uk. 45 x 30 cm.Tebal m2 203,500 203,500 203,500
Kansteen Beton K-300 Uk.15 x 40 x 50 cm bh 56,650 56,650 56,650
Batu Alam Andesit Polos Bakar Uk. 30 x 30 m2 116,040 116,040 116,040
Pohon Ekor Tupai btg 262,500 262,500 262,500
Rumput Gaja Mini m2 26,250 26,250 26,250
Pupuk Kandang m2 26,250 26,250 26,250
Pupuk Organik m2 36,750 36,750 36,750
Bak Kontrol Saluran Keliling Bangunan Fin.Ple bh 275,000 275,000 275,000

Harga Satuan Bahan Bangunan dan Upah KerjaTahun 2020


HARGA
NO BAHAN DASAR SATUAN
Zona A Zona B Zona C
1 2 3 5 6 7
Poster Semen Motif uk. 20 x 20 x 10 cm bh 33,000 33,000 33,000
BAHAN DASAR BETON
Support + Scafolding + Acc Utk Kolom m2 50,000 50,000 50,000
Support + Scafolding + Acc Utk Balok m2 50,000 50,000 50,000
Support + Scafolding + Acc Utk Plat Lantai m2 120,000 120,000 120,000
Support + Scafolding + Acc Utk Tangga m2 150,000 150,000 150,000
Support + Scafolding + Acc Utk Dinding m2 150,000 150,000 150,000
Pancang Beton 40 cm K.600 Kg/Cm2 (Botton m 360,000 360,000 360,000
Pancang Beton 40 cm K.600 Kg/Cm2 (Midle T m 407,000 407,000 407,000
Pancang Beton 30 cm K.600 Kg/Cm2 (Bottom m 270,000 270,000 270,000
Pancang Beton 30 cm K.600 Kg/Cm2 (Midle T m 305,250 305,250 305,250
BAHAN DASAR BESI DAN BAJA
Wiremesh M8 (210x 540) m2 62,000 62,000 62,000
Floor Deck BMT 0,75- Mutu Baja G550 m2 120,000 120,000 120,000
Sekrup Fixer kg 500 500 500
Baja Profil Siku 50 x 50 bj 11,000 11,000 11,000
Rolling Door Alluminium bh 270,000 270,000 270,000

BAHAN DASAR PANCANG


Karbit kg 35,149 35,149 35,149
Oli ltr 6,129 6,129 6,129
Solar ltr 7,725 7,725 7,725
Diesel Hammer hr 850,000 850,000 850,000
Generator Set jam 208,333 208,333 208,333
Mobilisasi dan Demobilisasi Peralatan Panc ls 15,000,000 15,000,000 15,000,000

Harga Satuan Bahan Bangunan dan Upah KerjaTahun 2020


STANDAR HARGA SATUAN BAHAN BANGUNAN DAN UPAH KERJA
PEMERINTAH PRVINSI SULAWESI SELATAN
KOTA PARE-PARE
TAHUN 2018
Dalam Rupiah (Rp)

NO. JENIS BARANG MERK / UKURAN SATUAN HARGA

1 2 3 4 5
1 SUB BIDANG BAHAN DAN PERALATAN BANGUNAN
a. Bahan Dasar
1 Aspal Bitumen (drum) Kg 13,500
2 Abu Batu M³ 125,000
3 Batu Kali
* Utuh M³ 125,000
* Spilit 7-10 cm 7-10 cm M³ 148,500
* spilit 5-7 cm 5-7 cm M³ 192,500
* Spilit 3-5 cm 3-5 cm M³ 225,000
* Spilit 2-3 cm 2-3 cm M³ 225,000
* Spilit 1-2 cm 1-2 cm M³ 250,000
* Spilit 0.5-1 0.5-1 M³ 275,000
4 Batu Gunung 15 cm M³ 150,000
Batu Border > 15 M³ 248,600
5 Timbunan
* Tanah M³ 43,750
* Pilihan M³ 55,000
* Tanah (Quarry) M³ 33,000
* Pilihan (Quarry) M³ 41,250
6 Batu Merah
* Ukuran Kecil Buah 600
* Ukuran Besar Buah 600
7 Batako 20x40x10 cm Buah 6,000
8 Gorong-gorong
* Diameter 20 cm 6x10x20 M¹ 80,000
* Diameter 30 cm 8x10x20 M¹ 135,000
* Diameter 40 cm Tebal 6 M¹ 175,000
* Diameter 50 cm Tebal 6 M¹ 260,000
* Diameter 60 cm Tebal 6 M¹ 260,000
* Diameter 80 cm Tebal 6 M¹ 422,000
* Diameter 100 cm Tebal 6 M¹ 563,000
9 Kapur Pasangan M³ 94,700
10 Kerikil Galian Royalti M³ 192,500
11 Kerikil Sirtu Royaliti M³ 187,500
12 Pasir
* Urug M³ 100,000
* Pasangan M³ 125,000
* Beton M³ 126,500
13 Paving Blok
* Segi empat 6x10x20 Buah 1,400
* Segi empat 8x10x20 Buah 1,550
* Segi enam Tebal 6 Buah 1,800
* Kacang Tebal 6 Buah 2,200
14 Roster Krawang Buah 22,000
15 Sirtu M³ 81,250
16 Sirtu royalti M³ 105,000

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)

NO. JENIS BARANG MERK / UKURAN SATUAN HARGA

1 2 3 4 5
17 Ijuk ikat 15,000
B. BAHAN KAYU
1 Kayu Kelas I
* Balok Ulin M³ 12,000,000
* Papan Ulin M³ 12,000,000
* Balok Bayam M³ 8,250,000
* Papan Bayam M³ 12,250,000
2 Kayu Kelas II
* Balok M³ 5,750,000
* Papan M³ 6,150,000
* Balok Kumia M³ 6,000,000
* Papan Kumia M³ 6,500,000
* Balok Kalapi M³ 6,500,000
3 Kayu Kelas III ( Bekisting )
* Balok M³ 1,800,000
* Papan M³ 1,800,000
4 Kayu Lapis
* 4 mm 8" x 4" Lembar 65,000
* 12 mm 8" x 4" Lembar 175,000
5 Kayu Les M' 15,000
6 Bambu Btg 28,000
7 Tripleks
* 0.2 cm 122 x 244 cm Lembar 42,500
* 0.3 cm 122 x 244 cm Lembar 50,000
* 0.4 cm 122 x 244 cm Lembar 65,000
* 0.6 cm 122 x 244 cm Lembar 75,000
* 0.9 cm 122 x 244 cm Lembar 105,000
8 Multipleks
* 6 mm Lembar 80,000
* 10 mm Lembar 150,000
9 List Profil Kayu Btg 15,000
10 Teakwood 4 mm ( 90 x 220 ) Lembar 130,000
C. BAHAN BESI
1 Besi Beton
* d = 4 mm SII-SNI Polos Btg 12,000
* d = 6 mm SII-SNI Polos Btg 27,250
* d = 8 mm SII-SNI Polos Btg 41,250
* d = 10 mm SII-SNI Polos Btg 61,000
* d = 12 mm SII-SNI Polos Btg 88,500
* d = 14 mm SII-SNI Polos Btg 127,500
* d = 16 mm SII-SNI Polos Btg 170,000
* d = 19 mm SII-SNI Polos Btg 195,000
* d = 22 mm SII-SNI Polos Btg 250,000
2 Besi Beton Polos kg 12,500
3 Besi Beton
* d = 10 mm SII-SNI Ulir Btg 57,000
* d = 12 mm SII-SNI Ulir Btg 75,000
* d = 14 mm SII-SNI Ulir Btg 135,000
* d = 16 mm SII-SNI Ulir Btg 180,000
* d = 19 mm SII-SNI Ulir Btg 200,000
* d = 22 mm SII-SNI Ulir Btg 275,000
4 Besi Beton Ulir kg 16,000

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)

NO. JENIS BARANG MERK / UKURAN SATUAN HARGA

1 2 3 4 5
5 Besi Plat
* 2 mm 120x240 mm Lembar 550,000
* 3 mm 120x240 mm Lembar 900,000
6 Besi Strip
* 30.2 mm Btg 20,000
* 30.3 mm Btg 30,000
* 35.4 mm Btg
* 40.4 mm Btg 50,000
* 40.6 mm Btg 75,000
* 50.6 mm Btg
7 Besi Siku
* 30.30.3 Btg 67,500
* 40.40.3 Btg 100,000
* 40.40.4 Btg 125,000
* 50.50.5 Btg 187,000
* 60.60.6 Btg 450,000
* 70.70.7 Btg 550,000
8 Besi Hollow
* Besi Hollow 20.20 Btg 67,500
* Besi Hollow 20.40 Btg 100,000
* Besi Hollow 40.40 Btg 132,500
* Besi Hollow 50.50 Btg 192,500
9 Besi Kotak d = 12 mm kg 15,985
10 Kawat
* Kawat Galvanis 0 3 mm Kg 12,500
* Kawat Galvanis 0 4 mm Kg 12,500
* Kawat Galvanis 0 5 mm Kg 12,500
* Licin 4 mm Kg 25,000
* Beton kg 20,000
* Bronjong d = 6 mm kg 25,000
* Bronjong Pabrikasi Uk. 2x10.5 m¹ Buah 350,000
* Nyamuk Meter 35,000
* Ayakan Kecil Meter 17,500
* Duri 100 m/roll Roll 200,000
12 Kuku Macan d = 1.5" Buah 28,000
d = 1.0" Buah 25,000
d = 0.5" Buah 20,000
13 Tali Seling d = 36 mm M¹ 213,900
d = 32 mm M¹ 157,000
d = 28 mm M¹ 80,500
d = 24 mm M¹ 72,500
d =19 mm M¹ 50,700
14 Paku
* Biasa Kg 17,600
* Asbes kg 51,600
* Seng (Payung) RRT kg 51,600
* Skrup 3½ inci kg 45,000
* Skrup 4 inci kg 60,000
* Payung Berulir 75 mm kg 50,000
* Sirap kg 25,000
* Beton kg 20,000
* Ramset bh 225,000

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)

NO. JENIS BARANG MERK / UKURAN SATUAN HARGA

1 2 3 4 5
15 Baja Ringan (Main Truas) M²
16 Trus Canal / TS C75.75 Taso 6m 85,000
17 Reng U 45. 0.45 6m 55,000
18 Screw 12-16x16 bh 200
19 Screw 12-14x20 bh 250
20 Dyna Bolt 10.80 bh 7,000
21 Aluminium 4 inci (warna) M 119,500
22 Aluminium Composit Panel M² 255,300
23 Besi angkur dia =8 mm kg 10,500
24 Kawat las kg 25,000
25 Saringan Pasir M' 10,000
D. BAHAN LANTAI
1 Tegel PC
* PC Abu-abu 20x20 cm buah 2,308
* PC Abu-abu 30x30 cm buah 5,000
* PC Warna 20x20 cm buah 2,308
* PC Badak 20x20 cm buah 2,308
* PC Badak 30x30 cm buah 5,909
* PC Wafel 20x20 cm buah 2,415
* PC Wafel 30x30 cm buah 6,555
* Plint PC 15x20 cm buah 3,100
* Plint PC 15x20 cm buah 3,100
2 Tegel Mozaik
* Mozaik 30 30x30 cm buah 10,000
* Mozaik 20 20x20 cm buah 42,000
3 Tegel Keramik
* Putih 10x10 cm buah 1,380
* Warna 10x20 cm buah 1,300
* Putih 20x20 cm buah 2,500
* Warna 20x20 cm buah 3,000
* Putih 20x25 cm buah 3,250
* Warna 20x25 cm buah 3,750
* Putih 30x30 cm buah 5,000
* Warna 30x30 cm buah 7,100
* Putih 40x40 cm buah 12,500
* Warna 40x40 cm buah 16,700
* Putih 60x60 cm buah 105,500
* Warna ext Esenza / 60x60 cm buah 117,000
* Plint 11 11x11 cm buah 1,150
* Plint 20 20x25 cm buah 3,180
4 Glass Blok 6/dos dos 137,500
5 Kuku Tegel 180 bj/dos dos 92,500
6 Terasso 30x30 cm buah 70,000
40 x 40 cm buah 85,000
7 Parquet m2 265,000
8 Lem FOX putih kg 18,000
FOX kuning ( karet ) kg 50,000
9 keramik artistik 5 x 20 cm m2 57,500
10 x 20 cm m2 69,000
20 x 20 cm m 2
79,000
10 Granito 60x60 cm m2 210,000

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)

NO. JENIS BARANG MERK / UKURAN SATUAN HARGA

1 2 3 4 5
11 Marmer 100 x 100 cm m2 504,000
40 x 40 cm m 2
430,000
60 x 60 m 2
479,000
12 Batu Tempel / Alam Batu Andesid m2 150,000
Batu Alam m 2
150,000
Batu Paras m 2
235,000
13 Wallpaper lbr 50 cm bh 350,000
14 Floor Hardener kg 10,695
E. BAHAN PIPA
1 Pipa PVC tipe AW
* Pipa PVC Tipe AW Ǿ 1/2" panjang 4 m Btg 20,000
* Pipa PVC Tipe AW Ǿ 3/4" panjang 4 m Btg 25,000
* Pipa PVC Tipe AW Ǿ 1" panjang 4 m Btg 35,000
* Pipa PVC Tipe AW Ǿ 1 1/2" panjang 4 m Btg 64,625
* Pipa PVC Tipe AW Ǿ 1 1/4" panjang 4 m Btg 55,000
* Pipa PVC Tipe AW Ǿ 2" panjang 4 m Btg 82,500
* Pipa PVC Tipe AW Ǿ 2 1/2" panjang 4 m Btg 108,000
* Pipa PVC Tipe AW Ǿ 3" panjang 4 m Btg 142,500
* Pipa PVC Tipe AW Ǿ 4" panjang 4 m Btg 222,500
* Pipa PVC Tipe AW Ǿ 5" panjang 4 m Btg 407,500
* Pipa PVC Tipe AW Ǿ 6" panjang 4 m Btg 525,000
* Pipa PVC Tipe AW Ǿ 8" panjang 4 m Btg 835,000
2 Pipa PVC tipe D
* Pipa PVC Tipe D Ǿ 1 1/4" panjang 4 m Btg 36,125
* Pipa PVC Tipe D Ǿ 1 1/2" panjang 4 m Btg 42,250
* Pipa PVC Tipe D Ǿ 2" panjang 4 m Btg 51,875
* Pipa PVC Tipe D Ǿ 2 1/2" panjang 4 m Btg 62,500
* Pipa PVC Tipe D Ǿ 3" panjang 4 m Btg 70,000
* Pipa PVC Tipe D Ǿ 4" panjang 4 m Btg 102,500
* Pipa PVC Tipe D Ǿ 5" panjang 4 m Btg 180,000
* Pipa PVC Tipe D Ǿ 6" panjang 4 m Btg 250,000
* Pipa PVC Tipe D Ǿ 8" panjang 4 m Btg 450,000
* Pipa PVC Tipe D Ǿ 10" panjang 4 m Btg 765,000
* Pipa PVC Tipe D Ǿ 12" panjang 4 m Btg 1,200,000

3 Pipa jenis Btg C untuk Instalasi Listrik


Φ 5/8 inci - 4 m btg 8,500
Φ 3/4 inci - 4 m btg 22,000
Φ 1 inci - 4m btg 35,000
Φ 1 1/2 inci - 4 m btg 35,000
Φ 2 inci - 4 m btg 45,000
4 Sambungan Pipa
a Knie
* Knie 1/2" Buah 3,000
* Knie 3/4" Buah 4,500
* Knie 1" Buah 6,000
* Knie 1 1/4" Buah 8,000
* Knie 1 1/2" Buah 10,000
* Knie 2" Buah 12,000
* Knie 3" Buah 15,000

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)

NO. JENIS BARANG MERK / UKURAN SATUAN HARGA

1 2 3 4 5
* Knie 4" Buah 25,000
b Lurus
* Lurus 1/2" Buah 3,000
* Lurus 3/4" Buah 4,500
* Lurus 1" Buah 6,000
* Lurus 1 1/4" Buah 8,000
* Lurus 1 1/2" Buah 10,000
* Lurus 2" Buah 12,000
* Lurus 3" Buah 15,000
* Lurus 4" Buah 25,000
c Tee
* Tee 1/2" Buah 3,500
* Tee 3/4" Buah 4,600
* Tee 1" Buah 5,600
* Tee 1 1/4" Buah 8,000
* Tee 1 1/2" Buah 10,000
* Tee 2" Buah 12,500
* Tee 3" Buah 20,000
* Tee 4" Buah 25,000
7 Isolasi Pipa Buah 5,000
F. BAHAN FINISHING CAT
1 Cat Tembok
* Avitex 5 Kg 105,000
* Metrolite 2.5 Kg 95,000
* Mowilex (Luar) 2.5 Kg 240,000
* Mowilex (Dalam) 2.5 Kg 150,000
2 Cat Besi Kg
3 Cat Kayu
* Glotex Kg 49,000
* Avian Kg 57,000
* Politur Kg 55,000
* Meni Kayu Kg 25,000
* Mowilex Liter 75,000
4 Minyak Cat kg 22,000
5 Minyak Bekisting Kg 20,000
6 Cat Atap
* Yoko 4 Kg 99,000
* AGA 4 Kg 180,000
7 Cat Anti Karat Kg 65,000
8 Cat Coating Liter
9 Dempul Kg 30,000
10 Dempul Jadi Kg 25,000
11 Ampelas Lembar 5,000
12 Kuas 4" Buah 20,000
13 Kuas 3" Buah 16,500
14 Kuas 2" Buah 12,500
15 Kuas 1" Buah 6,300
16 Plamir Kayu Kg 32,500
17 Plamir Tembok Kg 37,500
18 Politur Liter 50,000
19 Politur Jadi Liter
20 Vernis Liter 57,500

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)

NO. JENIS BARANG MERK / UKURAN SATUAN HARGA

1 2 3 4 5
21 Pengencer Cat Kayu/Besi Kg 22,000
22 Cat genteng Kg
23 Kuas Roll Buah 40,000
24 Kapur Ayak Bks 46,000
25 Lem Kayu Kg 15,000

G. BAHAN KACA
1 Kaca
* Polos/Bening 2 mm M² 70,000
* Polos/Bening 3 mm M² 95,000
* Polos/Bening 5 mm M² 120,000
* Polos/Bening 8 mm M² 500,000
* Buram 3 mm M² 187,500
* Buram 5 mm 225,000
* Rayben 3 mm M² 105,000
* Rayben 5 mm M² 130,000
* Biru M² 275,000
* Cermin M² 450,000
* Gravire M² 1,000,000
* Lukis Alur M² 900,000
2 Rangka Nako Lengkap Terali 10 mm Set 180,000
3 Seal Besar Buah 60,000
4 Seal Kecil Buah 40,000
5 Sealant Tube 29,450
6 Sealant Kaca Kg 35,000
H. BAHAN LANGIT-LANGIT
1 Eternit 100x100 cm lembar 20,000
2 Tripleks
* 0.2 cm 122x244 cm lembar 40,000
* 0.3 cm 122x244 cm lembar 50,000
* 0.6 cm 122x244 cm lembar 75,000
* 0.9 cm 122x244 cm lembar 105,000
3 Tripleks Melamin 122x244x1.2 cm lembar 67,500
4 Akustik 40x60 cm lembar 52,000
5 Teakwood
* 0.4 cm 122x244 cm lembar 125,000
* 0.3 cm 122x244 cm lembar 130,000
* 0.3 cm 80x244 cm lembar 90,000
6 Hard Board 122x244 cm lembar 220,000
7 Asbes Plat Harfek 0.3 cm 200x100 cm lembar 45,300
8 Papan Gypsum
* 9 mm 120x240 cm lembar 62,500
* 12 mm 120x240 cm lembar 100,000
9 Papan Fiber Semen
* 6 mm 120x240 cm lembar 125,000
* 4 mm 120x240 cm lembar 57,500
10 List Profil Kayu
* 2x3 cm lembar 13,000
* 3x3 cm lembar 15,000
* 4x4 cm lembar 17,000
* 5x5 cm lembar 20,000
11 List Profil Gypsum

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)

NO. JENIS BARANG MERK / UKURAN SATUAN HARGA

1 2 3 4 5
* 17 x 210 cm lembar 27,000
* 12 x 210 cm lembar 25,000
12 Multipleks
* 6 mm lembar 75,000
* 10 mm lembar 110,000
I. BAHAN ATAP
1 Genteng
* Beton Buah 35,000
* Keramik lembar 15,000
* Asbes lembar 45,000
* Harflex (115x0.5) kaki 65,000
2 Asbes Gelombang 5 mm 7 kaki 6,000
3 Seng Kelombang
* BWG 34" BJLS 0.20 mm kaki 6,125
* BWG 33" BJLS 0.22 mm kaki 9,167
* BWG 32" BJLS 0.22 mm kaki 11,667
* BWG 28" BJLS 0.35 mm kaki 14,167
4 Seng Plat
* BJLS 0.30 mm Lembar 65,000
* BJLS 0.28 mm Lembar 80,000
5 Genteng Metal
* Kualitas 1 Lembar 85,000
* Kealitas 2 Lembar 47,000
6 Seng aluminium Gelombang
* SWG 32" 0.27 mm Lembar 20,500
* SWG 32" 0.31 mm Lembar 22,100
* SWG 32" 0.38 mm Lembar 30,613
7 Spandeck / Essar Deck
* 75 cm x 0.40 cm M² 50,000
* 76 cm x 0.40 cm M²
8 Seng Plastik (Fiber) Kaki 15,000
9 Fiber Semen (Harflex)
* Super 240x108x0.6 cm Lembar 72,500
* Super 180x108x0.6 cm Lembar 65,000
* Ekonomi 240x29x0.5 cm Lembar 65,000
* Ekonomi 180x29x0.5 cm Lembar 60,000
* Mini 240x105x0.4 cm Lembar 60,000
* Mini 180x105x0.4 cm Lembar 55,000
* Super 240x105x0.4 cm Lembar 62,500
* Super 180x105x0.4 cm Lembar 57,000
10 Nok / Bubungan
* Genteng Metal Buah 30,000
* Genteng Asbes Buah 25,000
* Genteng Keramik Buah 24,200
* Alm. SWG 28" - 180 cm Lembar 59,000
* Alm. SWG 28" - 105 cm Lembar 40,000
11 Nok Steel Gelombang
* Super 180 cm Buah 50,000
* Mini 105 cm Buah 40,000
* ekonomi 95 cm Buah 20,000
12 Nok Steel Rata
* Super 180 cm Lembar 45,000

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)

NO. JENIS BARANG MERK / UKURAN SATUAN HARGA

1 2 3 4 5
* Mini 105 cm Lembar 25,000
* ekonomi 95 cm Lembar 20,900
13 Nok 1/2 Lingkungan Lembar 37,000
14 Nok Spandek 40 cm
* 40 cm x 0.40 cm 120x240 mm Lembar 57,000
* 30 cm x 0.25 cm 212x240 mm Lembar 38,000
15 Karet Pelapis Genteng
* Lebar 55 cm M¹
* Lebar 90 cm M¹
* Lebar 120 cm M¹
16 Talang Jurai Aluzinc (Baja Ringan)
* Jurai Aluzinc (Baja Ringan) M
* Setengah Lingkaran Btg 45,000
* Segi Empat Btg 25,000
17 Corong Talang
* Setengah Lingkaran Buah 60,000
* Segi Empat Buah 50,000
18 Sambungan Talang Buah 15,000
19 List Plank Papan Semen (superplank)
* 10 x 244 x 0.9 cm Lembar 32,500
* 20 x 244 x 0.9 cm Polos Lembar 65,000
* 30 x 244 x 0.9 cm Polos Lembar 85,000
* 20 x 244 x 0.9 cm Urat Lembar 75,000
* 30 x 244 x 0.9 cm Urat Lembar 110,000
20 Rangka Baja
* Untuk Atap Spandek M² 192,800
* Untuk Atap Genteng Metal M² 201,000
21 Suryaroof Lembar 52,500
22 Multiroof Lembar 83,500
J. BAHAN PENGGANTUNG
1 Door Closer Buah 250,000
2 Door Holder Buah 30,000
3 Floor Drain
* Floor Drain PVC Buah 25,000
* Floor Drain Stainless Buah 25,000
4 Engsel
* Engsel Angin Buah 15,000
* Engsel Jendela Buah 20,000
* Engsel Pintu ( kw 2 ) Buah 17,500
* Engsel Pintu ( kw 1 ) Buah 30,000
* Engsel Kupu-kupu Buah 15,000
* Engsel Lengan Jendela Buah 20,000
5 Kait Angin Buah 22,500
6 Kunci Lemari Buah 25,000
7 Kunci Selot Buah 40,000
8 Kunci Silinder Buah 60,000
9 Kunci Tanam
* Union 2x Slag (Biasa) Buah 35,000
* Benotti 2x Slag (semacamnya) Buah 175,000
* Ses 2x Slag (semacamnya) Buah 250,000
* Ses 1x Slag (semacamnya) Buah 203,500

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)

NO. JENIS BARANG MERK / UKURAN SATUAN HARGA

1 2 3 4 5
10 Spring Knip Buah
11 Gerendel Tanam /Psg 175,000
12 Grendel Biasa Buah 15,000
13 Handle pintu Buah 150,000
14 Rel Pintu Sorong Buah 450,000
15 1 Set Kunci Pintu ( kw 1 ) Buah 200,000
16 1 Set Kunci Pintu ( kw 2 ) Buah 150,000
17 Expanyolet Buah 125,000
Buah

K. BAHAN SANITAIR
1 Kloset duduk KIA (Lengkap) Buah 1,500,000
Toto 1 Tombol 1,850,000
2 Kloset Jongkok KIA Buah 250,000
Toto Warna 370,000
3 Wasthafel Gantung Keramik Buah 750,000
4 Wasthafel Cuci Piring 1 Mata Buah 175,000
5 Wasthafel Cuci Piring 2 Mata Buah 750,000
6 Pompa Tangan Terpasang Buah 139,250
7 Pompa Air Sanyo Buah 1,500,000
8 Urinoir Buah 1,750,000
9 Bak Mandi Fiber Buah 1,000,000
10 Reservoir Fiber = 1 M³ Buah 1,300,000
11 Reservoir Fiber = 2 M³ Buah 2,750,000
12 Stop Kran Buah 10,000
13 Tempat Sabun Keramik Buah 50,000
14 Kran Air
* Biasa Buah 20,500
* Angsa Buah 100,000
* Kristal Buah 150000
* Pembuangan Kolam Buah 20,000
15 Pintu KM/WC (180x70) cm (fiber) Buah 235,000
16 Pintu KM/WC (180x70) cm (alumunium) Buah 250,000
17 Door Closer Buah 187,500
18 Floor drain Buah 25,000
L. BAHAN INSTALASI LISTRIK
1 Pipa Union Untuk Kabel
Φ 5/8 inci - 4 m Btg 8,250
Φ 1 inci - 4 m Btg 37,500
Φ 1 1/2 inci - 4 m Btg 64,500
Φ 2 inci - 4 m Btg 82,000
2 Lampu Neon
* 1x20 W Philips Buah 15,000
* 2x20 W (Pakai Kap) Philips Buah 154,000
* 1 x 36 W Buah 18,000
* 1x40 W Buah 20,000
* 2x36 W (Pakai Kap) Buah 65,000
* 2x40 W (Pakai Kap) Buah 65,000

3 Lampu Pijar
* 24 Watt 9,000
* 25 Watt Buah

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)

NO. JENIS BARANG MERK / UKURAN SATUAN HARGA

1 2 3 4 5
* 40 Watt Buah 10,000
* 42 Watt Buah 10,000
* 52 Watt Buah 10,000
* 60 Watt Buah 10,000
* 100 Watt Buah 25,000
4 Lampu Tanam Mercury (Lam. Jln SON) Buah 225,000
5 Shakelar Phase
* Coklat Buah 55,000
* Putih Tunggal Buah 17,000
* Putih Ganda Buah 26,000
6 Fitting Buah 10,000
7 Exhaust Besar
* Panasonic (dinding) Buah 425,000
* Panasonic (plafond) Buah 450,000
8 Exhaust sedang 26,000
* Panasonic (dinding) Buah 375,000
* Panasonic (plafond) Buah 400,000
9 Down Light
Φ 4 Inci Buah 50,000
Φ 3.5 inci Buah 44,000
10 Travo
* TL 10 Watt Buah 35,000
* TL 20 Watt Buah 40,000
* TL 30 Watt Buah 40,000
11 Lampu SL 32 Watt Buah 60,000
12 Lampu SL 42 Watt Buah 70,000
13 Lampu TL 2 X 18 Watt Buah 28,000
14 Lampu TL 2 X 36 Watt Buah 32,000
15 Lampu SON-T 150 Watt ( komplit set) Set 280,000
16 Lampu HPI.T 250 W /220 V Komplit Set Set 750,000
17 Lampu HPI.T 400 W /220 V Komplit Set Set 750,000
18 Lampu Hias Selang M' 1,400,000
19 Traffo SON.T 150 W /220 V Buah 210,000
20 MCB 6 A Masko/3p Buah 100,000
21 MCB 10 A Scheineider/1p Buah 50,000
22 MCB 25 A Scheineider/1p Buah 56,667
23 MCB 30 A Buah 85,000
24 Kabel NYM 2 x 1,5 mm2 Eterna m' 7,500
25 Kabel NYM 2 x 2,5 mm2 Eterna m' 10,000
26 Kabel NYM 2 x 4 mm2 m' 25,000
27 Kabel NYM 3 x 1,5 mm2
28 Kabel NYM 3 x 2,5 mm2
29 Kabel NYM 3 x 4 mm2
30 Kabel NYM 3 x 1,5 mm2
31 Kabel NYM 3 x 2,5 mm2
32 Kabel NYM 3 x 4 mm2
33 Kabel NYM 4 x 4 mm2
34 Kabel NYM 4 x 6 mm2
35 Kabel NYM 1,5 mm2
36 Kabel NYM 2,5 mm2
37 Kap Hijau E 27
38 Kap Hijau E 40

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)

NO. JENIS BARANG MERK / UKURAN SATUAN HARGA

1 2 3 4 5
39 Ballast TL 36
40 Fitting Lampu Pijar
41 Isolasi Biasa 3 M
42 Kabel Twisted 2 x10 mm
43 Kabel Twisted 2 x16 mm
44 Kapasitor HPI-T
45 Lampu Sorot LED 10 watt
46 Lampu Sorot LED 100 watt
47 Lampu Natal
48 Lampu Selang LED
49 Lampu Sumpit 45 W
50 Lampu Spiral 52 W
51 Lampu LED 3 Watt
52 Lampu LED 3,5 Watt
53 Lampu LED 4 Watt
54 Lampu LED 5 Watt
55 Lampu LED 9 Watt
56 Lampu LED 13 Watt
57 Lampu LED 18 Watt
58 Lampu LED 23 Watt
59 Lampu TL 36 W
60 Lampu TL 20 W
61 MCB 2 A
62 MCB 4 A
63 MCB 6 A
64 MCB 50 A
65 MCB 63 A
66 Stop Kontak 3 mata
67 Terminal 4 mm
68 Timer
69 Paku Sadel
70 Sambungan Fitting( over fitting )
71 Mata gurinda kecil
72 Mata gurinda potong 14'
73 Gurinda Besi
74 Kacamata Las
75 Fotocell 3 A
76 Lampu strip
77 Testpen
78 Obeng Min
79 Obeng Kembang
80 Silicon

M. BAHAN BAKAR MINYAK


1 Pertamax Ltr 8,600
2 Pertalite Ltr 7,700
3 Solar Ltr 5,150
4 Bensin Ltr 6,450
5 Thinner A Ltr 35,000
6 Minyak Cat Kg 20,000

N BAHAN PEREKAT

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)

NO. JENIS BARANG MERK / UKURAN SATUAN HARGA

1 2 3 4 5
1 Semen PC ( 40 kg )
* Tonasa
* Bosowa
* Putih Tiga Roda
2 Semen PC ( 50 kg )
* Tonasa
* Bosowa
* Putih Tiga Roda
3 Semen Warna
4 Perekat untuk walpaper
5 Semen nat

O BAHAN DRAINASE
1 U - Ditch 600 x 600 mm, panjang 1,2 m unit 805,200
2 U - Ditch 800 x 800 mm, panjang 1,2 m unit 1,168,200

P BAHAN BETON PRECAST


1 Tiang pancang pratekan pracetak Ǿ 400 mm Kelas A2(Bottom) M' 411,400
spun piles
2 Tiang pancang pratekan pracetak Ǿ 400 mm Kelas A2(Middle) M' 446,600
spun piles
3 Tiang pancang pratekan pracetak Ǿ 500 mm Kelas A2(Bottom) M' 618,200
spun piles
4 Tiang pancang pratekan pracetak Ǿ 500 mm Kelas A2(Middle) M' 672,100
spun piles
5 Sheetpile type CCSP W.325.1000 kls A M' 930,000
6 Sheetpile type CCSP W.350.1000 kls A M' 1,072,500

Q UPAH KERJA
1 Mandor Lapangan Orang/Hari 165,000
2 Kepala Tukang Kayu Orang/Hari 141,000
3 Kepala Tukang Batu Orang/Hari 141,000
4 Kepala Tukang Listrik Orang/Hari 141,000
5 Kepala Tukang Cat Orang/Hari 141,000
6 Kepala Tukang Pipa Orang/Hari 141,000
7 Kepala Tukang Besi Orang/Hari 141,000
8 Tukang Kayu Orang/Hari 124,000
9 Tukang Batu Orang/Hari 124,000
10 Tukang Listrik Orang/Hari 124,000
11 Tukang Cat Orang/Hari 124,000
12 Tukang Pipa Orang/Hari 124,000
13 Tukang Besi Orang/Hari 124,000
14 Tukang Listrik Orang/Hari 124,000
15 Tukang Pipa Orang/Hari 124,000
16 Pekerja Orang/Hari 124,000
17 Mekanik Orang/Hari 141,000
18 Sopir Orang/Hari 130,000
19 Pembantu Sopir Orang/Hari 106,000
20 Operator Orang/Hari 141,000
21 Pembantu Operator Orang/Hari 106,000
22 Penjaga Malam Orang/Hari 106,000

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
STANDAR HARGA SATUAN BAHAN BANGUNAN DAN UPAH KERJA
PEMERINTAH PRVINSI SULAWESI SELATAN
KOTA PARE-PARE
TAHUN 2019
Dalam Rupiah (Rp)

HARGA SATUAN
NO. NAMA BARANG MERK/UKURAN SATUAN
(RP)

1 2 3 4 5
1 SUB BIDANG BAHAN DAN PERALATAN BANGUNAN
a. Bahan Dasar
1 Aspal Bitumen (drum) Kg 13,500
2 Abu Batu M³ 125,000
3 Batu Kali
* Utuh M³ 125,000
* Spilit 7-10 cm 7-10 cm M³ 148,500
* spilit 5-7 cm 5-7 cm M³ 192,500
* Spilit 3-5 cm 3-5 cm M³ 225,000
* Spilit 2-3 cm 2-3 cm M³ 225,000
* Spilit 1-2 cm 1-2 cm M³ 250,000
* Spilit 0.5-1 0.5-1 M³ 275,000
4 Batu Gunung 15 cm M³ 150,000
Batu Border > 15 M³ 248,600
5 Timbunan
* Tanah M³ 43,750
* Pilihan M³ 55,000
* Tanah (Quarry) M³ 33,000
* Pilihan (Quarry) M³ 41,250
6 Batu Merah
* Ukuran Kecil Buah 600
* Ukuran Besar Buah 600
7 Batako 20x40x10 cm Buah 6,000
8 Gorong-gorong
* Diameter 20 cm 6x10x20 M¹ 80,000
* Diameter 30 cm 8x10x20 M¹ 135,000
* Diameter 40 cm Tebal 6 M¹ 175,000
* Diameter 50 cm Tebal 6 M¹ 260,000
* Diameter 60 cm Tebal 6 M¹ 260,000
* Diameter 80 cm Tebal 6 M¹ 422,000
* Diameter 100 cm Tebal 6 M¹ 563,000
9 Kapur Pasangan M³ 94,700
10 Kerikil Galian Royalti M³ 192,500
11 Kerikil Sirtu Royaliti M³ 187,500
12 Pasir
* Urug M³ 100,000
* Pasangan M³ 125,000
* Beton M³ 126,500
13 Paving Blok
* Segi empat 6x10x20 Buah 1,400
* Segi empat 8x10x20 Buah 1,550

Harga Satuan Bahan Bangunan dan Upah Kerja Semester I Tahun 2019
Dalam Rupiah (Rp)

HARGA SATUAN
NO. NAMA BARANG MERK/UKURAN SATUAN
(RP)

1 2 3 4 5
* Segi enam Tebal 6 Buah 1,800
* Kacang Tebal 6 Buah 2,200
* Tiga berlian Tebal 6 Buah 1,650
* Bundar Tebal 6 Buah 1,775
14 Roster Krawang Buah 24,200
15 Sirtu M³ 91,250
16 Sirtu royalti M³ 115,500
17 Semen PC (40 kg)
* Tonasa zak 47,300
* Bosowa zak 43,600
18 Semen PC (50 kg)
* Tonasa Zak 60,000
* Bosowa Zak 55,000
* Putih Tiga Roda Zak 143,000
19 Semen Warna Kg 17,500
20 Perekat Wallpaper Kg 85,000
21 Semen nat Kg 16,600
22 Ijuk Kg 16,500

b. Bahan Kayu
1 Kayu Kelas I
* Balok Ulin M³ 10,000,000
* Papan Ulin M³ 12,000,000
* Balok Bayam M³ 9,400,000
* Papan Bayam M³ 10,625,000
2 Kayu Kelas II
* Balok meranti M³ 2,880,000
* Papan meranti M³ 2,880,000
* Balok Kumia M³ 6,625,000
* Papan Kumia M³ 7,000,000
* Balok Kalapi M³ 6,650,000
3 Kayu Kelas III
* Balok M³ 2,000,000
* Papan M³ 2,000,000
4 Kayu Kelas IV (Kayu Bagetting) M³ 1,800,000
5 Kayu Lapis
* 4 mm 8" x 4" Lembar 71,500
* 12 mm 8" x 4" Lembar 192,500
6 Kayu Les M¹ 20,000
7 Bambu Btg 30,000
8 Tripleks
* 0.2 cm 122 x 244 cm Lembar 45,000
* 0.3 cm 122 x 244 cm Lembar 50,000
* 0.4 cm 122 x 244 cm Lembar 68,750
* 0.6 cm 122 x 244 cm Lembar 77,500
* 0.9 cm 122 x 244 cm Lembar 111,250
9 Multipleks

Harga Satuan Bahan Bangunan dan Upah Kerja Semester I Tahun 2019
Dalam Rupiah (Rp)

HARGA SATUAN
NO. NAMA BARANG MERK/UKURAN SATUAN
(RP)

1 2 3 4 5
* 6 mm Lembar 80,000
* 10 mm Lembar 115,000
10 List Kayu profil m1 20,000
11 Teakwood 4 mm (90x220) Lembar 150,000

c Bahan Besi
1 Besi Beton
* d = 4 mm SII-SNI Polos Btg 25,000
* d = 6 mm SII-SNI Polos Btg 32,000
* d = 8 mm SII-SNI Polos Btg 46,500
* d = 10 mm SII-SNI Polos Btg 71,500
* d = 12 mm SII-SNI Polos Btg 106,250
* d = 14 mm SII-SNI Polos Btg 136,250
* d = 16 mm SII-SNI Polos Btg 187,500
* d = 19 mm SII-SNI Polos Btg 275,000
* d = 22 mm SII-SNI Polos Btg 325,000
2 Besi Beton Polos kg 13,750
3 Besi Beton
* d = 10 mm SII-SNI Ulir Btg 80,000
* d = 12 mm SII-SNI Ulir Btg 120,000
* d = 14 mm SII-SNI Ulir Btg 145,000
* d = 16 mm SII-SNI Ulir Btg 198,000
* d = 19 mm SII-SNI Ulir Btg 285,000
* d = 22 mm SII-SNI Ulir Btg 385,000
4 Besi Beton Ulir kg 17,600
5 Besi Plat
* 2 mm 120x240 mm Lembar 625,000
* 3 mm 120x240 mm Lembar 1,050,000
6 Besi Strip
* 30.2 mm Btg 35,000
* 30.3 mm Btg 50,000
* 35.4 mm Btg
* 40.4 mm Btg 70,000
* 40.6 mm Btg 100,000
* 50.6 mm Btg 280,000
7 Besi Siku
* 30.30.3 Btg 66,600
* 40.40.4 Btg 143,000
* 50.50.5 Btg 255,000
* 60.60.6 Btg 425,000
* 70.70.7 Btg 637,500
* 40.40.3 Btg
8 Besi Hollow
* Besi Hollow 20.20 Btg 75,000
* Besi Hollow 20.40 Btg 100,000
* Besi Hollow 40.40 Btg 125,000
* Besi Hollow 50.50 Btg 185,000

Harga Satuan Bahan Bangunan dan Upah Kerja Semester I Tahun 2019
Dalam Rupiah (Rp)

HARGA SATUAN
NO. NAMA BARANG MERK/UKURAN SATUAN
(RP)

1 2 3 4 5
9 Besi Kotak d = 12 mm kg 17,600
10 Jarum pegas 2 " Buah 2,160,000
1.5 " Buah 1,574,000
1" Buah 750,000
11 Kawat
* Kawat galvanis 03 mm Kg 25,000
* Kawat galvanis 04 mm Kg 25,000
* Kawat galvanis 05 mm Kg 30,000
* Licin 4 mm Kg 30,000
* Beton kg 20,000
* Bronjong d = 6 mm kg 27,500
* Bronjong Pabrikasi Uk. 2x10.5 m¹ Buah 385,000
* Nyamuk Meter 25,000
* Ayakan Kecil Meter 15,000
* duri 100 m/roll Roll 197,500
12 Kuku Macan d = 1.5" Buah 30,800
d = 1.0" Buah 27,500
d = 0.5" Buah 15,000
13 Tali Seling d = 36 mm M¹ 350,000
d = 32 mm M¹ 280,000
d = 28 mm M¹ 88,550
d = 24 mm M¹ 180,000
d =19 mm M¹ 130,000
14 Paku
* Biasa Kg 20,000
* Asbes kg 50,000
* Seng (Payung) RRT kg 51,600
* Skrup 3½ inci kg 45,000
* Skrup 4 inci kg 66,000
* Payung Berulir 75 mm kg 50,000
* Sirap kg 30,000
* Beton kg 25,000
* Ramset dos 237,500
15 Baja Ringan (Main Truas) M²
16 Trus Canal / TS C75.75 Taso 6m 95,000
17 Reng U 45. 0.45 6m 54,000
18 Screw 12-16x16 bh 400
19 Screw 12-14x20 bh 500
20 Dyna Bolt 10.80 bh 5,000
21 Aluminium 4 inci (warna) M 131,450
22 Aluminium Composit Panel M² 280,000
23 Aluminium Colour Pintu & Jendela M¹
24 Besi angkur dia =8 mm kg 11,550
25 Kawat las kg 30,000

d Bahan Lantai
1 Tegel PC

Harga Satuan Bahan Bangunan dan Upah Kerja Semester I Tahun 2019
Dalam Rupiah (Rp)

HARGA SATUAN
NO. NAMA BARANG MERK/UKURAN SATUAN
(RP)

1 2 3 4 5
* PC Abu-abu 20x20 cm buah 2,500
* PC Abu-abu 30x30 cm buah 5,500
* PC Warna 20x20 cm buah 2,500
* PC Badak 20x20 cm buah 2,500
* PC Badak 30x30 cm buah 6,500
* PC Wafel 20x20 cm buah 2,650
* PC Wafel 30x30 cm buah 7,200
* Plint PC 15x20 cm buah 3,400
* Plint PC 15x20 cm buah 3,400
2 Tegel Mozaik
* Mozaik 30 30x30 cm buah 11,000
* Mozaik 20 20x20 cm buah 46,200
3 Tegel Keramik
* Putih 10x10 cm buah 1,500
* Warna 10x20 cm buah 1,400
* Putih 20x20 cm buah 2,400
* Warna 20x20 cm buah 2,450
* Putih 20x25 cm buah 3,125
* Warna 20x25 cm buah 3,300
* Putih 30x30 cm buah 5,000
* Warna 30x30 cm buah 7,000
* Putih 40x40 cm buah 10,300
* Warna 40x40 cm buah 12,300
* Putih 60x60 cm buah 33,750
* Warna ext Esenza / 60x60 buah 50,000
* Plint 11 11x11 cm buah 1,250
* Plint 20 20x25 cm buah 3,500
4 Glass Blok 6/dos dos 144,000
5 Kuku Tegel 180 bj/dos dos 88,300
6 Terasso 30x30 cm buah 77,000
40 x 40 cm buah 93,500
7 Parquet m2 291,500
8 Lem FOX putih kg 15,000
FOX kuning ( karet ) kg 65,000
9 keramik artistik 5 x 20 cm m2 63,250
10 x 20 cm m2 75,900
20 x 20 cm m2 86,900
10 Granito 60x60 cm m2 231,000
11 Marmer 100 x 100 cm m2 554,000
40 x 40 cm m 2
473,000
60 x 60 m 2
526,900
12 Batu Tempel / Alam Batu Andesid m2 165,000
Batu Alam m2 120,000
Batu Paras m 2
258,500
13 Wallpaper lbr 50 cm bh 200,000
14 Floor hardener kg 11,750

Harga Satuan Bahan Bangunan dan Upah Kerja Semester I Tahun 2019
Dalam Rupiah (Rp)

HARGA SATUAN
NO. NAMA BARANG MERK/UKURAN SATUAN
(RP)

1 2 3 4 5

e Bahan Pipa
1 Pipa Besi GIP medium B Φ 1/2 inci - 6 m btg 85,000
Φ 3/4 inci - 6 m btg 100,000
Φ 1 inci - 6 m btg 125,000
Φ 1 1/2 inci - 6 m btg 162,500
Φ 2 inci - 6 m btg 220,000
Φ 2 1/2 inci - 6 m btg 252,000
Φ 3 inci - 6 m btg 425,000
2 Pipa Paralon PVC
Φ 1/2 inci 4 m Btg 30,000
Φ 3/4 inci - 4 m Maspion Btg 40,000
Φ 1 inci - 4m Maspion Btg 55,000
Φ 1 1/2 inci - 4 m AW Btg 95,000
Φ 2 inci - 4 m Btg 135,000
Φ 2 1/2 inci - 4 m Btg 175,000
Φ 3 inci - 4 m Btg 240,000
Φ 4 inci - 4 m Btg 350,000
Φ 5 inci - 4 m Btg 575,000
Φ 6 inci - 4 m Btg 700,000
Φ 8 inci - 4 m Btg 1,100,000
Φ 10 inci - 4 m Btg 1,650,000
3 Pipa jenis Btg (AW) Untuk Saluran
Φ 1/2 inci 4 m btg 18,300
Φ 3/4 inci - 4 m btg 23,600
Φ 1 inci - 4m btg 31,600
Φ 1 1/2 inci - 4 m btg 57,300
Φ 2 inci - 4 m btg 71,600
Φ 2 1/2 inci - 4 m btg 106,600
Φ 3 inci - 4 m btg 145,000
Φ 4 inci - 4 m btg 215,000
Φ 5 inci - 4 m btg 375,000
Φ 6 inci - 4 m btg 475,000
Φ 8 inci - 4 m btg 777,500
4 Pipa Jenis Btg (D) Untuk Saluran
Φ 1 1/4 inci - 4 m btg 31,600
Φ 1 1/2 inci - 4 m btg 38,300
Φ 2 inci - 4 m btg 45,800
Φ 2 1/2 inci - 4 m btg 57,300
Φ 3 inci - 4 m btg 70,000
Φ 4 inci - 4 m btg 111,600
Φ 5 inci - 4 m btg 186,600
Φ 6 inci - 4 m btg 258,300
Φ 8 inci - 4 m btg 420,000
Φ 10 inci - 4 m btg 730,000
5 Pipa jenis Btg C untuk Instalasi Listrik
Φ 5/8 inci - 4 m btg 12,500

Harga Satuan Bahan Bangunan dan Upah Kerja Semester I Tahun 2019
Dalam Rupiah (Rp)

HARGA SATUAN
NO. NAMA BARANG MERK/UKURAN SATUAN
(RP)

1 2 3 4 5
Φ 3/4 inci - 4 m btg 40,000
Φ 1 inci - 4m btg 35,000
Φ 1 1/2 inci - 4 m btg 65,000
Φ 2 inci - 4 m btg 100,000
6 Sambungan Pipa
a Knie
* Knie 1/2" Buah 2,000
* Knie 3/4" Buah 2,800
* Knie 1" Buah 3,650
* Knie 1 1/4" Buah 5,000
* Knie 1 1/2" Buah 6,300
* Knie 2" Buah 9,000
* Knie 3" Buah 9,000
* Knie 4" Buah 14,500
b Lurus
* Lurus 1/2" Buah 2,125
* Lurus 3/4" Buah 2,750
* Lurus 1" Buah 3,300
* Lurus 1 1/4" Buah 4,500
* Lurus 1 1/2" Buah 6,000
* Lurus 2" Buah 7,000
* Lurus 3" Buah 8,650
* Lurus 4" Buah 11,800
c Tee
* Tee 1/2" Buah 2,800
* Tee 3/4" Buah 3,300
* Tee 1" Buah 4,500
* Tee 1 1/4" Buah 5,650
* Tee 1 1/2" Buah 8,300
* Tee 2" Buah 11,600
* Tee 3" Buah 15,000
* Tee 4" Buah 20,000
7 Isolasi Pipa Buah 5,000

f Bahan Finising Cat


1 Cat Tembok
* Avitex 5 Kg 110,000
* Metrolite 2.5 Kg 100,000
* Mowilex Dalam 2.5 Kg 160,000
* Mowilex Luar 2.5 Kg 180,000
2 Cat Besi Kg 67,500
3 Cat Kayu
* Glotex Kg 62,000
* Avian Kg 61,000
* Politur Kg 58,300
* Meni Kayu Kg 28,300
* Mowilex Kg 90,000

Harga Satuan Bahan Bangunan dan Upah Kerja Semester I Tahun 2019
Dalam Rupiah (Rp)

HARGA SATUAN
NO. NAMA BARANG MERK/UKURAN SATUAN
(RP)

1 2 3 4 5
4 Minyak Cat liter 25,000
5 Minyak Begesting Kg 22,000
6 Cat Atap
* Yoko 4 Kg 106,600
* AGA 4 Kg 185,000
7 cat anti karat kg 197,500
8 Plamur Yoko Kg 210,000
Skimcoat luar zak 70,000
Skimcoat dalam zak 58,000
9 Dempul Kayu Altex Buah 37,500
10 Residu Kg 16,500
11 Cat Melamin Kg 39,000
12 Amplas / Kertas Gosok Lbr 4,000
13 Kuas 4" Buah 20,000
14 Kuas 3" Buah 13,000
15 Kuas 2" Buah 10,000
16 Kuas Roll Buah 35,000
17 Kapur Ayak Bks 50,600
18 Lem kayu kg 15,000

g Bahan Kaca
1 Kaca
* Bening 3 mm M² 95,000
* Bening 5 mm M² 122,500
* Bening 8 mm M² 500,000
* Buram 3 mm M² 250,000
* Buram 5 mm M² 325,000
* Rayben 3 mm M² 91,600
* Rayben 5 mm M² 115,000
* Biru M² 250,000
2 Rangka Nako Lengkap Terali 10 daun Set 300,000
3 Seal Besar Buah 25,000
4 Seal Kecil Buah 25,000
Sealant Tube 50,000

h Bahan Langit-langit
1 Eternit 100x100 cm lembar 21,000
2 Tripleks
* 0.2 cm 122x244 cm lembar 47,500
* 0.3 cm 122x244 cm lembar 55,000
* 0.6 cm 122x244 cm lembar 77,500
* 0.9 cm 122x244 cm lembar 112,500
3 Tripleks Melamin 122x244x1.2 cm lembar 96,500
4 Acausic 40x60 cm lembar 57,200
5 Teakwood
* 0.4 cm 122x244 cm lembar 137,500
* 0.3 cm 122x244 cm lembar 135,000

Harga Satuan Bahan Bangunan dan Upah Kerja Semester I Tahun 2019
Dalam Rupiah (Rp)

HARGA SATUAN
NO. NAMA BARANG MERK/UKURAN SATUAN
(RP)

1 2 3 4 5
* 0.3 cm 80x244 cm lembar 99,000
6 Hard Board 122x244 cm lembar 60,000
7 Asbes Plat Harfek 0.3 cm 200x100 cm lembar 49,500
8 Papan Gypsum
* 9 mm 120x240 cm lembar 60,000
* 12 mm 120x240 cm lembar 110,000
9 Papan Fiber Semen
* 6 mm 120x240 cm lembar 135,000
* 4 mm 120x240 cm lembar 60,000
10 List Profil Kayu
* 2x3 cm lembar 14,300
* 3x3 cm lembar 14,750
* 4x4 cm lembar 18,750
* 5x5 cm lembar 18,750
11 List Profil Gypsum
* 17 x 210 cm lembar 29,700
* 12 x 210 cm lembar 27,500
12 Multipleks
* 6 mm lembar 82,500
* 10 mm lembar 121,000
13 plapon PVC
* papan PVC sunda lembar 19,000
* papan PVC indah plafon / vinitex lembar 85,000
14 Kalsi Board
* kalsi 3 mm (1,22 X 2,44 m) lembar 62,600
* kalsi 6 mm (1,22 X 2,44 m) lembar 137,500
* kalsi 8 mm (1,22 X 2,44 m) lembar 200,000

i Bahan Atap
1 Genteng
* Beton Buah 38,500
* Keramik lembar 16,500
* Asbes lembar 49,500
* Harflex (115x0.5) kaki 71,500
2 Asbes Gelombang 5 mm kaki 5,800
3 Seng Kelombang
* BWG 34" BJLS 0.20 mm kaki 6,700
* BWG 33" BJLS 0.22 mm kaki 7,300
* BWG 32" BJLS 0.22 mm kaki 12,800
* BWG 28" BJLS 0.35 mm kaki 15,550
4 Seng Plat
* BJLS 0.30 mm Lembar 71,500
* BJLS 0.28 mm Lembar 88,000
5 Genteng Metal
* Kualitas 1 Lembar 93,500
* Kealitas 2 Lembar 51,700
6 Seng aluminium Gelombang

Harga Satuan Bahan Bangunan dan Upah Kerja Semester I Tahun 2019
Dalam Rupiah (Rp)

HARGA SATUAN
NO. NAMA BARANG MERK/UKURAN SATUAN
(RP)

1 2 3 4 5
* SWG 32" 0.27 mm Lembar 22,550
* SWG 32" 0.31 mm Lembar 24,300
* SWG 32" 0.38 mm Lembar 33,675
7 Spandeck / Essar Deck
* 75 cm x 0.40 cm M² 50,000
* 76 cm x 0.40 cm M²
8 Seng Plastik (Fiber) Kaki 17,500
9 Fiber Semen (Harflex)
* Super 240x108x0.6 cm Lembar 70,750
* Super 180x108x0.6 cm Lembar 71,500
* ekonomi 240x29x0.5 cm Lembar 71,500
* ekonomi 180x29x0.5 cm Lembar 66,000
* Mini 240x105x0.4 cm Lembar 66,000
* Mini 180x105x0.4 cm Lembar 60,500
* Super 240x105x0.4 cm Lembar 68,750
* Super 180x105x0.4 cm Lembar 62,700
10 Nok / Bubungan
* Genteng Metal Buah 30,000
* Genteng Asbes Buah 27,500
* Genteng Keramik Buah 26,600
* Alm. SWG 28" - 180 cm Lembar 64,900
* Alm. SWG 28" - 105 cm Lembar 44,000
11 Nok Stell Gelombang
* Super 180 cm Buah 55,000
* Mini 105 cm Buah 44,000
* ekonomi 95 cm Buah 22,000
12 Nok Stell Rata
* Super 180 cm Lembar 49,500
* Mini 105 cm Lembar 27,500
* ekonomi 95 cm Lembar 23,000
13 Nok 1/2 Lingkungan Lembar 40,700
14 Nok Spandeck 40 cm
* 40 cm x 0.40 cm 120x240 mm Lembar 62,700
* 30 cm x 0.25 cm 212x240 mm Lembar 41,800
15 Karet Pelapis Genteng
* Lebar 55 cm M¹ 6,000
* Lebar 90 cm M¹ 10,000
* Lebar 120 cm M¹ 12,500
16 Talang Jurai Alunzinc (Baja Ringan)
* Jurai Aluzic (Baja Ringan) M
* Setengah Lingkaran Btg 49,500
* Segi Empat Btg 27,500
17 Corong Talang
* Setengah Lingkaran Buah 105,000
* Segi Empat Buah 115,000
18 Sambungan Talang Buah 15,000
19 List Plank Papan Semen (superplank)

Harga Satuan Bahan Bangunan dan Upah Kerja Semester I Tahun 2019
Dalam Rupiah (Rp)

HARGA SATUAN
NO. NAMA BARANG MERK/UKURAN SATUAN
(RP)

1 2 3 4 5
* 10x244x0.9 cm Lembar 35,750
* 20x244x0.9 cm polos Lembar 60,000
* 30x244x0.9 cm polos Lembar 82,500
20 Rangka Baja
* Untuk Atap Spandek M² 85,000
* Untuk Atap Genteng Metal M² 221,100
21 Suryaroof Lembar 58,000
22 Multiroof Lembar 90,000

j Bahan Penggantung
1 Kunci Tanam
* Union 2x Slag (Biasa) Buah 38,500
* Benotti 2x Slag (semacamnya) Buah 192,500
* Ses 2x Slag (semacamnya) Buah 275,000
* Ses 1x Slag (semacamnya) Buah 223,850
Kunci Sloot Buah 30,000
Rel pintu sorong Set 350,000
Kunci lemari Buah 20,000
Penggantung
* Hak Angin Kecil (Pasangan) Buah 8,000
* Hak Angin Besar (Pasangan) Buah 15,000
* Grendel Tanam Buah 192,000
* Grendel Biasa Buah 12,000
* Engsel Pintu kw 1 Buah 45,000
* Engsel Jendela Buah 40,000
* Expaynolet Buah 137,500
* Handel Pintu Aluminium Pasang 300,000
* Handel Pintu Set 160,000
* Tarikan Jendela Buah 15,000
3 Door Closser Buah 175,000
Door Holder Buah 26,000
Floor drain PVC Buah 25,000
Stainles Stell Buah 65,000
k. Bahan Saniter
1 Kloset duduk toto Buah 1,500,000
2 Kloset Jongkok toto warna Buah 381,000
3 Wasthafel Gantung Keramik Buah 483,000
4 Wasthafel Cuci Piring 1 Mata Buah 175,000
5 Wasthafel Cuci Piring 2 Mata Buah 600,000
6 Pompa tangan Terpasang Buah 153,175
7 Pompa Air 125 watt Buah 540,000
8 Urinoir Buah 1,500,000
9 Bak Mandi Fiber Buah 350,000
10 Rezervoir Fiber = 1 M³ Buah 1,430,000
11 Rezervoir Fiber = 2 M³ Buah 3,025,000
12 Stop Kran Buah 50,000
13 Tempat Sabun Keramik Buah 50,000

Harga Satuan Bahan Bangunan dan Upah Kerja Semester I Tahun 2019
Dalam Rupiah (Rp)

HARGA SATUAN
NO. NAMA BARANG MERK/UKURAN SATUAN
(RP)

1 2 3 4 5
14 Kran Air
* Biasa Buah 21,600
* Angsa Buah 106,000
* Kristal Buah 165,000
* Pembuangan Kolam Buah 20,000
15 Pintu KM/WC (180x70) cm (fiber) Buah 285,000
16 pintu KM/WC(180x70) cm (allumunium) Buah 425,000
Door Closser Buah 200,000
Floor drain Buah 25,000

l Bahan Instalasi Listrik


1 Pipa Union Untuk Kabel
Φ 5/8 inci - 4 m Btg 11,100
Φ 1 inci - 4 m Btg 46,000
Φ 1 1/2 inci - 4 m Btg 79,000
Φ 2 inci - 4 m Btg 105,000
2 Kabel Listrik
Type NYA
* 1 1/2 mm ETERNA m 3,000
* 2 1/2 mm m 4,300
* 1x20 W M 15,000
* 2x20 W (pakai Kap) M 20,000
* 2x4 mm (Putih) M 15,000
Type NYM
* 2 x 1,5mm m 7,000
* 2 x 2,5 mm m 11,000
3 Lampu Neon
* 1x20 W Buah 15,000
* 2x20 W (pakai Kap) Buah 315,000
* 1x36 W Buah 18,500
* 1x40 W Buah 18,500
* 2x36 W (pakai kap) Buah 500,000
* 2x40 W (Pakai Kap) Buah 500,000
4 Lampu Pijar
* 24 Watt Philips Buah 9,900
* 25 Watt Buah 9,000
* 40 Watt Buah 10,000
* 42 Watt Philips Buah 10,000
* 52 Watt Philips Buah 10,000
* 60 Watt Buah 15,000
* 100 Watt Buah 25,000
5 Lampu Tanam Mercury (Lam. Jln SON) Buah 120,000
6 Shakelar Phase
* Coklat Buah 60,500
* Putih Tunggal Buah 13,750
* Putih Ganda Buah 15,750
7 Zekering Kast Lokal Biasa

Harga Satuan Bahan Bangunan dan Upah Kerja Semester I Tahun 2019
Dalam Rupiah (Rp)

HARGA SATUAN
NO. NAMA BARANG MERK/UKURAN SATUAN
(RP)

1 2 3 4 5
* MCB 2 Grup Buah 15,000
* MCB 3 Grup Buah 25,000
* Lokal 2 Grup Autmat Buah 20,000
* Lokal 2 Grup Biasa Buah 6,000
8 Fitting brco Buah 12,500
9 Stop Kontak
* Cokelat Buah 18,000
* Putih Buah 25,000
10 Exchause Besar Dinding Buah 475,000
11 Exchause Besar Plafond Buah 365,000
12 Down Light
Φ 4 Inci Buah 39,250
Φ 3.5 inci Buah 31,750
13 Travo
* TL 10 Watt Buah 38,000
* TL 20 Watt Buah 38,000
* TL 30 Watt Buah 38,000

n. Upah Kerja
1 Mandor Lapangan Orang/Hari 178,000
2 Kepala Tukang Kayu Orang/Hari 152,000
3 Kepala Tukang Batu Orang/Hari 178,000
4 Kepala Tukang Listrik Orang/Hari 178,000
5 Kepala Tukang Cat Orang/Hari 178,000
6 Kepala Tukang Pipa Orang/Hari 178,000
7 Kepala Tukang Besi Orang/Hari 178,000
8 Tukang Kayu Orang/Hari 133,800
9 Tukang Batu Orang/Hari 178,000
10 Tukang Listrik Orang/Hari 178,000
11 Tukang Cat Orang/Hari 178,000
12 Tukang Pipa Orang/Hari 178,000
13 Tukang Besi Orang/Hari 178,000
14 Tukang Listrik Orang/Hari 178,000
15 Tukang Pipa Orang/Hari 178,000
16 Pekerja Orang/Hari 114,400
17 Mekanik Orang/Hari 178,000
18 Sopir Orang/Hari 178,000
19 Pembantu Sopir Orang/Hari 178,000
20 Operator Orang/Hari 178,000
21 Pembantu Operator Orang/Hari 178,000
22 Penjaga Malam Orang/Hari 178,000

Catatan.
Daftar harga satuan bahan/upah tersebut di atas belum termasuk :
1 PPN
2 Keuntungan dan Overhead maksimal 15

Harga Satuan Bahan Bangunan dan Upah Kerja Semester I Tahun 2019
STANDAR HARGA SATUAN BAHAN BANGUNAN DAN UPAH KERJA
PEMERINTAH PROVINSI SULAWESI SELATAN
KABUPATEN BONE
TAHUN 2018

Dalam Rupiah (Rp)


No BAHAN DASAR SPESIFIKASI SATUAN HARGA

1 2 3 4 5
1 Batu Kali Utuh M3 223,750
-Batu Pecah split 10-15 M3 295,000
-Batu Pecah Split 7 - 10 cm M 3
340,500
-Batu Pecah Split 5 - 7 cm M 3
410,000
-Batu Pecah Split 3 - 5 cm M3 440,000
-Batu Pecah Split 2 - 3 cm M 3
520,000
-Batu Pecah Split 1 - 2 cm M 3
550,000
-Batu Pecah Split 0,5 - 1 cm M3 550,000
Abu Batu M 3
752,000
2 Batu Gunung M 3
234,000
3 Tanah Timbunan M3 110,000
4 Pasir Timbunan/Urug M 3
155,000
Pasangan M 3
165,000
Beton M3 183,525
5 Kerikil M3 209,000
6 Sirtu M 3
131,750
7 Kapur Pasangan Zak 70,950
8 Semen (PC) Tonasa 50 Kg Zak 59,500
Tonasa 40 Kg Zak 57,357
Putih Tiga Roda 50 kg Zak 140,250
Bosowa 50 Kg Zak 57,300
Bosowa 40 Kg Zak 56,833
9 Batu Merah Buah 750
10 Batako Press Buah 11,770
11 Paving Blok k225 Persegi Panjang M² 83,825
Segi Enam M² 88,780
Kacang M² 99,000
Paving Blok K250 Persegi Panjang M² 124,500
Segi Enam M² 99,550
Kacang M² 99,550
Paving Blok K300 Persegi Panjang M² 88,350
Segi Enam M² 93,000
Kacang M² 102,300
Diamond (Manual) M² 93,500
Paving Blok K 350 Persegi Panjang M² 104,500
12 Consteen Beton 15 x 25 x 40 ( Press Mesin ) Buah 121,000

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)
No BAHAN DASAR SPESIFIKASI SATUAN HARGA

1 2 3 4 5
15 x 25 x 50 ( Press Mesin ) Buah 125,840
15 x 30 x 40 ( Press Mesin ) Buah 123,200
13 Topi Uskup K300 Buah 5,115
Gress Blok 3 x 45 cm Buah 25,080
Panel Beton 240 x 40 x 5 cm Buah 302,500
Tiang Panel Beton 5 Susun Buah 317,350
b. BAHAN KAYU
1 Kayu Kls I Balok Gergaji Sawmil M3 10,000,000
Papan Gergaji Sawmil M3 11,550,000
Balok Gergaji Sensaw M 3
9,075,000
Papan Gergaji Sensaw M 3
9,900,000
2 Kayu Kls II Balok M3 3,837,500
Papan M 3
4,262,500
3 Kayu Kls III Balok M 3
2,500,000
Papan M3 2,750,000
Bambu Batang 24,625

c. BAHAN LANTAI
1 Tegel PC PC Abu-abu 20 x 20 cm Dos 122,250
PC Abu-abu 30 x 30 cm Dos 62,000
PC Warna 20 x 20 cm Dos 68,500
PC Badak 20 x 20 cm Dos 120,000
Pc Badak 30 x 30 cm Dos 66,000
PC Wafel 20 x 20 cm Dos 69,250
PC Wafel 30 x 30 cm Dos 44,000
Plint PC 20 x 20 cm Buah 66,000
Plint PC 30 x 30 cm Buah 71,500
Tegel Mozaik 30 x 30 cm Buah 67,833
2 Tegel Kramik Putih 10 x 20 cm Dos 71,638
Warna 10 x 20 cm Dos 72,417
Putih 20 x 20 cm Dos 69,679
Warna 20 x 20 cm Dos 55,217
Putih 20 x 25 cm Dos 73,938
Warna 20 x 25 cm Dos 59,764
Putih 30 x 30 cm Dos 71,944
Warna 30 x 30 cm Dos 164,450
Putih 40 x 40 cm Dos 148,500
warna 40 x 40 cm Dos 154,000
d. BAHAN KACA
1 Kaca Bening 3 mm M² 118,625
2 Kaca Bening 5 mm M² 133,250
3 Kaca Bening 2 mm M² 96,250
4 Kaca Buram 3 mm M² 177,750
5 Kaca Buram 5 mm M 248,750

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)
No BAHAN DASAR SPESIFIKASI SATUAN HARGA

1 2 3 4 5
6 Kaca Ryben 3 mm M 130,500
7 Kaca Ryben 5 mm M 145,125
8 Kaca / Cermin 122 x 51 cm M 79,625
9 Rangka Nako Tanpa Terali Mata Daun 17,488
8 Rangka Nako Lengkap Terali Daun 83,600
e. BAHAN FINISHING KAYU

Amplas halus untuk besi Amplas Lembar 4,333


Amplas kasar untuk kayu Lembar 3,891
Cat dasar Cap Ayam Kg 31,350
Dempul Kaleng Kecil 34,179
Lem aibon Kg 22,875
Mani kayu Kg 27,806
Minyak cat Liter 19,628
Oker Kg 40,250
Politur cap kayu / Jati Boyo Kg 56,994
Vernis spesial netral warna Kaleng 58,790
f. BAHAN BESI
1 Besi Beton ( SII ) diameter = 4 mm Batang 15,180
Panjang 12 Meter diameter = 6 mm Batang 33,000
diameter = 8 mm Batang 48,217
diameter = 10 mm Batang 70,522
diameter = 12 mm Batang 103,278
diameter = 14 mm Batang 146,163
diameter = 16 mm Batang 192,500
diameter = 19 mm Batang 268,767
diameter = 22 mm Batang 323,150
diameter = 25 mm Batang 435,600
2 Paku Paku biasa 4 - 10 cm Kg 18,040
Paku Asbes Ulir Kg 54,588
Paku Seng (payung) RRT Kg 51,810
Paku Skrup 3 1/2 inci Kg 77,000
Paku Skrup 4 inci Kg 77,000
Paku Payung Berulir 75 mm Kg 57,750
Paku Sirap 1 cm Kg 26,950
Paku Beton 5 - 10 cm putih Dos 38,438
2 - 4 cm hitam Dos 24,200
3 Kawat Beton Kg 24,444
Nyamuk M 24,600
Ayakan Kecil M 22,367
Duri Rol 268,500
4 Besi Plat 2 mm = 120 x 140 mm Lembar 660,000
3 mm = 120 x 140 mm Lembar 780,000
5 Besi Strep 30,3 mm 1 x 3 Batang 22,700
35,4 mm 1 1/2 x 4 Batang 30,700
46,4 mm 2 x 4 Batang 35,000

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)
No BAHAN DASAR SPESIFIKASI SATUAN HARGA

1 2 3 4 5
40,6 mm 2 x 6 Batang 56,700
50,6 mm 2 1/2 x 6 Batang 247,500
6 Besi Siku 30.30.3 Batang 66,500
40.40.4 Batang 70,100
50.50.5 Batang 190,587
60.60.6 Batang 316,250
70.70.7 Batang 388,500
40.40.3 Batang 57,500
50.50.4 Batang 114,750
7 Besi Kanal C 75/75 Batang 99,367
75/65 Batang 79,142
Reng 30/45 Batang 38,000
Besi Plafond 18/38 Batang 48,000
Besi Hallow 15/35 Batang 26,500
35/35 Batang 35,700
3m Batang 9,629
g. BAHAN PIPA
1 Pipa GIP Medium Class SNI / ISO Dia 1/2 inci - 6 m Batang 177,445
Dia 3/4 Inci - 6 m Batang 227,585
Dia 1 Inci - 6 m Batang 295,240
Dia 1/2 Inci - 6 m Batang 439,040
Dia 2 Inci - 6 m Batang 537,386
Dia 2 1/2 Inci - 6 m Batang 679,582
Dia 3 Inci - 6 m Batang 1,165,083
2 Pipa PVC SNI S10 (SCJ) Dia 1/2 Inci - 6 m Batang 29,261
Dia 3/4 Inci - 6 m Batang 43,413
Dia 1 Inci - 6 m Batang 71,645
Dia 1 1/2 Inci - 6 m Batang 167,325
Pipa PVC SNI S10 (RRJ)
Dia 2 Inci - 6 m Batang 275,415
Dia 2 1/2 Inci - 6 m Batang 396,453
Dia 3 Inci - 6 m Batang 556,370
Dia 4 Inci - 6 m Batang 830,720
Dia 6 Inci - 6 m Batang 1,729,500
Dia 8 Inci - 6 m Batang 2,806,513
Dia 10 Inci - 6 m Batang 4,365,214
Dia 12 Inci - 6 m Batang 6,931,335
Dia 14 Inci - 6 m Batang 8,914,570
Pipa PVC SNI S12.5 (RRJ)
Dia 2 Inci - 6 m Batang 231,150
Dia 2 1/2 Inci - 6 m Batang 329,935
Dia 3 Inci - 6 m Batang 466,458
Dia 4 Inci - 6 m Batang 673,458
Dia 6 Inci - 6 m Batang 1,415,995
Dia 8 Inci - 6 m Batang 2,293,575
Dia 10 Inci - 6 m Batang 3,589,265

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)
No BAHAN DASAR SPESIFIKASI SATUAN HARGA

1 2 3 4 5
Dia 12 Inci - 6 m Batang 5,700,435
Pipa PVC Orange SNI ( untuk LimbahDia 4 Inci Buah 485,750
3 PVC Jenis D untuk Saluran Pembuan Dia 1/2 Inci - 4 m Batang 42,550
Dia 3/4 Inci - 4 m Batang 52,900
Dia 1 Inci - 4 m Batang 55,200
Dia 1 1/2 Inci - 4 m Batang 57,500
Dia 2 Inci - 4 m Batang 69,000
Dia 2 1/2 Inci - 4 m Batang 86,250
Dia 3 Inci - 4 m Batang 100,050
Dia 4 Inci - 4 m Batang 155,250
Dia 5 Inci - 4 m Batang 241,500
Dia 6 Inci - 4 m Batang 310,500
Dia 8 Inci - 4 m Batang 529,000
Dia 10 Inci - 4 m Batang 545,250
4 PVC Jenis C Untuk Instalasi Listrik Clipsal 20 mm² (3m) Batang 13,100
Dia 5/8 Inci - 4 m Batang 18,000
Dia 3/4 Inci - 4 m Batang 28,000
Dia 1 Inci - 4 m Batang 37,250
Dia 1 1/2 Inci - 4 m Batang 99,000
5 Sock Pvc Dia 1/2 Inch Buah 3,500
Dia 3/4 Inch Buah 4,000
Dia 1 Inch Buah 7,000
Dia 1 1/4 Inch Buah 7,000
Dia 1 1/2 Inch Buah 8,000
Dia 2 Inch Buah 9,000
Dia 2 1/2 Inch Buah 9,500
Dia 3 Inch Buah 12,000
Dia 4 Inch Buah 17,000
6 Stop Kran PVC 12,000
Dia 1/2 Inch Buah 12,000
Dia 3/4 Inch Buah 17,000
Dia 1 Inch Buah 40,000
Dia 1 1/4 Inch Buah 47,000
Dia 1 1/2 Inch Buah 67,000
7 Stop Kran Gate Valve (SNI) Merk : Onda
Dia 1/2 Inch Buah 49,725
Dia 3/4 Inch Buah 73,875
Dia 1 Inch Buah 122,750
Dia 1 1/4 Inch Buah 191,750
Dia 1 1/2 Inch Buah 260,750
Dia 2 Inch Buah 364,250
Dia 2 1/2 Inch Buah 605,750
Dia 3 Inch Buah 789,750
Dia 4 Inch Buah 1,554,500
8 Tee Pvc (BIASA)
Dia 1/2 Inch Batang 5,000

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)
No BAHAN DASAR SPESIFIKASI SATUAN HARGA

1 2 3 4 5
Dia 3/4 Inch Batang 7,000
Dia 1 Inch Batang 7,000
Dia 1 1/4 Inch Batang 8,000
Dia 1 1/2 Inch Batang 9,000
Dia 2 Inch Batang 12,000
Tes SNI Dia 4 Inch Buah 127,000
9 Bend 90° Dia 4 Inch Buah 147,000
10 IPAL Fiber Glass ISO 5 m³ Buah 147,000
10 m³ Buah 87,752,550
15 m³ Buah 132,760,250
20 m³ Buah 177,013,000
h. BAHAN LANGIT-LANGIT
1 Enternit 100 x 100 Lokal Harpur Lembar 22,000
2 Tripleks 122 x 244 x 0.2 cm Lembar 52,000
122 x 244 x 0.3 cm Lembar 52,000
122 x 244 x 0.6 cm Lembar 77,000
122 x 244 x 0.9 cm Lembar 105,000
3 Tripleks Melamin 122 x 244 x 0,3 cm Lembar 117,000
4 Teakwood 122 x 244 x 0,3 cm Lembar 87,000
80 x 244 x 0.03 cm Lembar 77,000
5 Akustik 40 x 60 cm Lembar 133,000
6 Hard Board 122 x 244 cm Lembar 257,000
7 Asbes Plat Harflek Lembar 73,500
8 List Profil 2 x 3 cm Batang 14,000
3 x 3 cm Batang 18,000
4 x 4 cm Batang 25,000
4 x 5 cm Batang 26,000
5 x 5 cm Batang 27,000
2 x 3 cm Batang 12,000
3 x 3 cm Batang 14,500
4 x 4 cm Batang 17,000
5 x 5 cm Batang 24,000
6 x 6 cm Batang 25,000
9 Lamber sering klas II 1 x 9 x 400 cm Batang 26,000
10 Plafond GRC T = 4 cm M2 72,000
11 Gypsum board T = 0,8 cm Lembar 70,000
Profil gypsum board Tipe CA (besar) 15 cm Lembar 112,000
Profil gypsum board Tipe CE (besar) 12 cm Lembar 90,000
Profil gypsum board Tipe SL (kecil) 9 cm Lembar 68,000
i. BAHAN ATAP
1 Genteng Beton Lembar 18,500
Keramik (Glasur ) Lembar 189,750
Asbes 0,3 cm Lembar 55,770
Harfles (115 x 85 x 0,5 cm) Lembar 57,640
Spandek G550 AZ T = 0,4 mm M2 57,200
2 Asbes Gelombang (rusa) Kaki 51,700

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)
No BAHAN DASAR SPESIFIKASI SATUAN HARGA

1 2 3 4 5
3 Asbes Gelombang 7,040
BMG 34" -BJLS 0,18 mm Kaki 16,500
BMG 33" -BJLS 0,22 mm Kaki 17,500
BMG 32" -BJLS 0,30 mm Kaki 55,000
BMG 28" -BJLS 0,35 mm Kaki 88,000
4 Sirap Ikat/m2 115,500
5 Seng Gelombang BWG 34" BJLS 0.18 mm 0,20 Ru Kaki 8,250
BWG 33" BJLS 0.22 mm Kaki 8,250
BWG 32" BJLS 0.30 mm Kaki 82,500
BWG 28" BJLS 0.35 mm Kaki/Lbr 93,500
6 Seng Plat BMG 33" - BJLS 0,18 mm Kaki/Lbr 57,750
BMG 32" - BJLS 0,22 mm Kaki/Lbr 85,250
BMG 28" - BJLS 0,35 mm Kaki/Lbr 96,250
7 Seng Super Deck ( Spandek ) 0,3 mm ( Silver ) M1 43,950
0,3 mm (Merah) M1 48,517
180 x 77 cm - 8 kaki Lembar 46,200
180 x 77 cm - 7 kaki Lembar 185,900
180 x 77 cm - 6 kaki Lembar 148,720
8 Seng Aluminium Gelombang SWG 32" 0.27 mm Lembar 146,850
SWG 30" 0.31 mm Lembar 148,500
SWG 28" 0.38 mm Lembar 167,200
9 Seng Plastik (Fiber) 10000 KK Kaki 14,925
10 Fiber Semen (Harlex) Super 240 x 108 x 0.6 cm Lembar 37,400
Super 180 x 108 x 0.6 cm Lembar 19,800
Ekonomi 240 x 92 x 0.5 cm Lembar 130,130
Ekonomi 180 x 92 x 0.5 cm Lembar 130,130
Mini 240 x 105 x 0.4 cm Lembar 111,540
Mini 180 x105 x 0.4 cm Lembar 111,540
Super 240 x 105 x 0.4 cm Lembar 185,900
Super 180 x 105 x 0.4 cm Lembar 120,835
11 Nok/Bubungan Genteng Beton Buah 27,500
Genteng Asbes Lembar 13,200
Genteng Keramik Lembar 13,200
Alm. SWG 28" - 168 cm Lembar 129,800
Alm. SWG 28" - 64 cm Lembar 92,950
Nok Steel Gelombang Super - 180 cm Buah 167,200
Mini - 105 cm Buah 148,720
Ekonomi - 95 cm Buah 102,300
Nok Steel Rada Super - 108 cm Buah 102,300
Mini - 105 cm Buah 111,650
Ekonomi - 95 cm Buah 89,100
Nok 1/2 Lingkaran Buah 68,750
12 Karet Pelapis Genteng 55 cm x 50 m Roll 5,500
Karet Pelapis Genteng 178,750
Atap Spandeq 57,200
Atap Spandeq 51,700

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)
No BAHAN DASAR SPESIFIKASI SATUAN HARGA

1 2 3 4 5
Nok Spandeq 57,200
Nok Spandeq 39,600
Sekrup Atal metal 55,550
Besi Canal C 75 92,017
Reng Baja Ringan 51,150
Besi Hollow 1 77,000
Besi Hollow 3 77,000
Rangka Atap Baja Ringan 193,050

j. Bahan Penggantung
1 Kunci Tanam Union 1 x Slag Buah 111650
Union 2 x Slag Buah 192500
Yale 1 x Slag Buah 114000
Yale 2 x Slag Buah 154000
Kuda Terbang Buah 139370
2 Penggantung Hak Angin Kecil Buah 20.825
Hak Angin Besar Buah 26.325
Grendel Kecil Buah 13800
Grendel Besar Buah 23500
Engsel Pintu Pasang 38500
Engsel Jendela Pasang 28,600
Expanyolet Buah 139,700
k. BAHAN SANITER
1 Kloset Duduk KIA (lengkap) Buah 2,126,667
2 Kloset Duduk Toto Buah 2,487,083
3 Kloset Jongkok Toto Buah 396,700
4 Wasthafel Warna Buah 504,200
5 Wasthafel cuci piring logam Royal Buah 210,375
6 Pompa tangan terpasang Buah 330,000
7 Urinor lengkap Buah 1,296,250
8 Bak Mandi fiber Buah 192,500
9 Reservoir Fiber = 1 m Merk Grand : 1 m3 Fiber Buah 1,265,000
Merk Grand : 1 m3 Stainless Buah 4,180,000
10 Reservoir Fiber = 2 m Buah
11 Stop Kran 1/2 " Buah 30,500
12 Kran Air kuningan Buah 145,750
13 Kran Air putih FIA Buah 33,250
14 Kloset duduk Polas ito Buah 451,000
Warna Buah 306,250
15 Kloset jongkok Polas ito Buah 232,400
Warna Buah 149,250
l BAHAN FINISHING / CAT
1 Cat Tembok Aviatex 5 Kg 106,500
Dulux Luar (Ext) 2,5 Kg 302,500
Dulux Dalam ( Int ) 2,5 Kg 181,500
Metrolite 5 Kg 107,200

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)
No BAHAN DASAR SPESIFIKASI SATUAN HARGA

1 2 3 4 5
Kimex 5 Kg 86,250
Vinikex Nippon Paint 5 Kg 99,000
Mowilex 5 Kg 187,500
Vinotex( standar ) 5 Kg 60,500
Vinotex( special ) 5 Kg 88,000
2 Cat Kayu Glotex Kg 49,200
Avian Kg 61,000
Palatone Kg 57,750
ICI Kg 85,250
Politur Kg 59,800
Meni Kg 26,150
Altex 30,500
Minyak Cat (AVIAN) Liter 29,950
3 Cat Atap/Seng AGA Kg 104,500
Nippon Kg 220,000
Lem Seng Buah 9,700
Yoko 5 Kg 104,900
Amplas/Kertas Gosok Lembar 4,500
Dempul Kg 35,200
Residu Kg/10 27,500
4 Politur kg 67,900
5 Dempul kg 38,500
6 Pamur Tembok Kg 63,100
7 Kertas Gosok lembar 13,700
8 Lem Kayu gram 16,500
9 Minyak Cat liter 22,400
10 Minyak Bekistin liter 11,000
m. BAHAN INSTALASI LISTRIK
1 Pipa Union Untuk Kabel 5/8 inci - 4 m Batang 11,000
1 inci - 4 m Batang 12,950
1 1/2 inci - 4 m Batang 13,000
2 inci - 4 m Batang 28,050
2 Kabel Listrik Tipe NYA
1,5 mm 50 m 121,000
1,5 mm Roll 239,500
2,5 mm 50 m 220,000
2,5 mm Roll 349,700
Tipe NYY
2x1 1/2 mm Roll 770,000
2x2 1/2 mm Roll 1,100,000
2x4 mm Roll 739,200
3 Lampu TL 1x20 W Buah 99,000
2x20 W Buah 247,500
1x40 W Buah 132,000
2x40 W Buah 66,000
4 Lampu Pijar 25 W Buah 21,950

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)
No BAHAN DASAR SPESIFIKASI SATUAN HARGA

1 2 3 4 5
40 W Buah 33,950
60 W Buah 59,085
100 W Buah 100,913
5 Lampu Taman Mercury Buah 550,000
6 Saklar Broco Tunggal Putih Buah 17,400
Tunggal Hitam Buah 22,000
Double Putih Buah 21,350
Double Hitam Buah 17,600
7 Stop Kontak Hitam Buah 17,900
Putih Buah 18,500
8 Zekering Kast Lokal Biasa
Lokal Buah 5,500
Lokal Automatis Buah 49,500
Lokal 2 Group Automat Buah 139,700
Lokal 3 Group Biasa Buah 232,100
9 Fitting Buah 14,000
MCB 6 A Ex Supran Buah 30,750
MCB 32 A Ex Supran Buah 60,500
Panil Box + Accecories + Lengkap Set 111,100
Penangkal Petir Lengkap Set 92,700
n. UPAH KERJA
1 Pekerja Org/hr 97,500
2 Pekerja semi trampil Org/hr 97,500
3 Pekerja trampil Org/hr 127,500
4 Mekanik trampil Org/hr 137,500
5 Mekanik semi trampil Org/hr 120,000
6 Operator trampil Org/hr 146,000
7 Operator semi trampil Org/hr 137,500
8 Pembantu Operator Org/hr 127,500
9 Sopir trampil Org/hr 127,500
10 Sopir semi trampil Org/hr 120,000
11 Pembantu sopir Org/hr 97,500
12 Tukang Tukang Kayu Org/hr 120,000
Tukang Batu Org/hr 120,000
Tukang Cat Org/hr 120,000
Tukang Listrik Org/hr 120,000
Tukang Pipa Org/hr 120,000
Tukang Besi Org/hr 120,000
13 Kepala Tukang Kepala Tukang Kayu Org/hr 146,000
Kepala Tukang Batu Org/hr 146,000
Kepala Tukang Listrik Org/hr 137,500
Kepala Tukang Cat Org/hr 127,500
Kepala Tukang Pipa Org/hr 137,500
Kepala Tukang Besi Org/hr 137,500

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
STANDAR HARGA SATUAN BAHAN BANGUNAN DAN UPAH KERJA
PEMERINTAH PROVINSI SULAWESI SELATAN
KABUPATEN SOPPENG
TAHUN 2020
Dalam Rupiah (Rp)
NO JENIS BARANG SPECIFIKASI SATUAN HARGA

1 2 3 4 5
DAFTAR UPAH KERJA
1 Pekerja Orang/Hari 126,000
2 Mandor Orang/Hari 189,000
3 Tukang batu / besi / kayu Orang/Hari 150,000
4 Kepala Tukang batu / besi / kayu Orang/Hari 169,000
5 Pengayam Orang/Hari 150,000
6 Mekanik Orang/Hari 173,000
7 Pembantu Mekanik Orang/Hari 150,000
8 Operator Terampil Orang/Hari 189,000
9 Operator Kurang Terampil Orang/Hari 126,000
10 Pembantu Operator Orang/Hari 150,000
11 Supir Terampil Orang/Hari 189,000
12 Supir Kurang Terampil Orang/Hari 150,000
13 Pembantu Supir Orang/Hari 126,000
14 Buruh Lapangan Tak Terampil Orang/Hari 115,000
15 Buruh Lapangan Semi Terampil Orang/Hari 120,000
16 Buruh Lapangan Terampil Orang/Hari 126,000

BAHAN BANGUNAN
1 Abu Batu M3 585,000
2 Alat - alat Bantu (Set @ 3 Alat ) SET 292,500
3 Arde BUAH 53,500
4 Aspalt
- Aspalt Bituman KG 17,615
- Aspalt curah KG 21,965
- Aspalt Emulasi KG 16,440
5 Atap
- Aspalt asbes gelombang Lembar 105,300
- Aspalt genteng keramik Buah 22,100
- Aspalt genteng metal Multi Roof Lembar 126,900
Sakura roof Lembar 69,700
Surya Roof Lembar 69,700
- Aspalt Seng datar BJLS 0,3 Lembar 104,900
- Aspalt fiber Lembar 97,500
- Aspalt Karet (Talang/Pelapis Atap) Lebar 55cm M1 9,300
- Aspalt Karet (Talang/Pelapis Atap) Lebar 90cm M1 17,550
- Aspalt Karet merah(Talang/PelapisAtap) Lebar 110cm M1 26,000
- Atap Seng Gelombang Kecil Lembar 65,000
BJLS 0,02 Lembar 63,375
BJLS 0,3 Lembar 147,875
- Atap Licin Lembar 66,300
- Atap Seng Plat ( Nok/Talang) Lembar 30 cm M' 16,150
Lembar 40 cm M' 19,200

Harga Satuan Bahan Bangunan dan Upah Kerja Tahun 2020


Dalam Rupiah (Rp)
NO JENIS BARANG SPECIFIKASI SATUAN HARGA

1 2 3 4 5
Lembar 50 cm M' 22,100
Lembar 60 cm M' 26,000
Lembar 90 cm M' 43,000

- Atap Seng SPANDEK


- Silver ( AZ 100 ) Tebal 0,30 mm M2 16,150
Tebal 0,35 mm M2 91,000
Tebal 0,40 mm M2 104,000
- Silver ( AZ 150 ) Tebal 0,30 mm M2 104,000
Tebal 0,35 mm M2 117,000
Tebal 0,40 mm M2 130,000
- Warna Tebal 0,30 mm M2 75,000
Tebal 0,35 mm M2 88,400
Tebal 0,40 mm M2 101,000
- Atap Zincalume M2 71,500
- Atap Nok Bubungan Asbes Gelombang M' 41,600
- Atap Nok Genteng Metal Buah 42,250
- Atap Nok Bubungan Genteng Keramik Buah 104,000
- Atap Nok Bubungan Nok zincalum M' 26,000
- Atap WoodPlank M2 123,500
6 Baja
- Baja konstruksi Kg 65,000
- Baja Tulangan Beton Kg 32,500
7 Bak Mandi
- Besi Beton Polos DIA 6 mm 70x70x66 Buah 325,000
Kap 1000 Ltr Buah 1,950,000
- Reservoir stainless stell 500 M3 Buah 3,315,000
8 Bambu Batang 39,000
9 Batu
- Batu alam M2 234,000
- Batu Belah M3 275,000
- Batu Kali M3 312,000
- Batu Merah/Batu Bata Biji 910
- Batu Pecah 0,5 - 1,0 cm M3 585,000
- Batu Pecah 1 - 2cm M3 520,000
- Batu Pecah 2 - 3 cm M3 507,000
- Batu Pecah 3 - 5 cm M3 494,000
- Batu Pecah 5 - 7cm M3 468,000
- Batu Pecah 7 - 10 cm M3 468,000
- Batu Pecah 10 - 15 cm M3 325,000
10 B e s i
- Besi Beton Polos DIA 6 mm Dia 6 mm Batang 41,600
Dia 8 mm Batang 80,600
Dia 10 mm Batang 114,400
Dia 12 mm Batang 162,500
Dia 14 mm Batang 182,000
- Besi Beton Polos DIA 13 mm Dia 13 mm Batang 260,000
- Besi Galvanis Batang 45,500
- Besi Strep 30,3mm Batang 81,250

Harga Satuan Bahan Bangunan dan Upah Kerja Tahun 2020


Dalam Rupiah (Rp)
NO JENIS BARANG SPECIFIKASI SATUAN HARGA

1 2 3 4 5
- Besi siku 30,30,3mm Batang 74,100
40,40,4mm Batang 123,500
50,50,5mm Batang 194,350
- Besi Hollow 1.5x3.6 Batang 104,000
2x4 Batang 123,500
- Besi Baja Ringan c=0.75 Batang 117,000
reng=0.45 Batang 55,900
- Besi L Braket M' 28,080
- Besi Dynabolt Buah 6,500
- Besi Self Drilling Screw Buah 1,950
- Besi Aluminium 3 " x 1 1/2" M' 123,500
4 " x 1 1/2" M' 203,500
11 Beton Roster / Kerawang Biji 84,500
12 Beugel Jembatan Bh 76,050
13 Bronjong Pabrikasi Unit 487,500
14 Bronjong Lokal Unit 585,000
15 Buis Beton Buah 65,000
16 Cat
- Cat atap minyak 1 kg 115,050
- Cat besi 1 kg 74,425
- Cat genteng / seng 4 kg Yoko kg 162,500
- Cat jembatan Avian kg 74,100
- Cat kayu Avian kg 84,500
- Cat menie/kayu kg 83,200
- Cat tembok anti lumut Altex kg 54,450
Nodrop kg 71,500
- Cat tembok Putih kg 26,500
Nippon paint kg 31,850
Altex kg 32,500
Metrolite 3L 143,000
17 Calsibor 4 MM Lembar 101,900
6.0 MM Lembar 193,000
18 Dempul Kayu Yoko 0,8 kg 58,500
19 Door Closer Buah 32,500
20 Engsel Jendela Pasang 32,500
21 Engsel Pintu Pasang 45,500
22 Eternit Lembar 22,750
23 Filler Kg 54,000
24 Flordain Plastik Buah 19,500
Stainless Buah 71,500
25 Gagang Nako Dikki Daun 45,500
26 Glass Block Buah 35,750
27 Gorong - gorong Beton Dia. 80 cm M1 520,000
Dia. 60 cm M1 494,000
Dia. 40 cm M1 253,500
Dia. 30 cm M1 221,000
28 Grendel biasa/pendek (Jendela) Buah 39,000
29 Grendel Panjang/Pintu) Buah 65,000
30 Gypsum Board Lembar 110,500

Harga Satuan Bahan Bangunan dan Upah Kerja Tahun 2020


Dalam Rupiah (Rp)
NO JENIS BARANG SPECIFIKASI SATUAN HARGA

1 2 3 4 5
31 Haag Angin Biasa Pasang 20,800
Motif Pasang 37,700
32 K a c a
- Kaca Nako Hitam Lengkap Set/7 Daun 296,725
- Kaca Nako putih lengkap Set/7 Daun 289,250
- Kaca Nako Hitam Lembar 25,500
- Kaca Nako Putih Lembar 23,800
- Kaca tebal 3 mm hitam M2 195,000
- Kaca tebal 3 mm Putih M2 175,500
- Kaca tebal 5 mm hitam M2 214,500
- Kaca tebal 5 mm Putih M2 198,250
33 K a p u r Kg 9,650
34 Karet Pelapis Atap Lembar 110 cm 130,000
35 K a w a t
- Kawat bronjong kg 26,000
- Duri 70 Meter Roll 260,000
- Beton Kg 32,500
36 K a y u
- Kayu Bakar M3 455,000
- Kayu Kelas I Balok M3 11,505,000
Papan M3 15,600,000
- Kayu Kelas II ( Balok ) Balok m³ 3,555,000
Papan m³ 3,900,000
Papan Jati m³ 3,575,000
- Kayu Kelas III Papan M3 2,145,000
- Kayu Kelas IV Papan M3 1,943,500
- Kayu Lapis 2 cm Lembar 286,000
- Kayu Lapis 1,20 cm Lembar 187,000
- Kayu Lapis 0,9 cm Uk.122x240 cm Lembar 144,300
- Kayu Less Profil 3 cm M' 13,000
5 cm M' 19,500
- Kayu Less M' 17,550
- Kayu Untuk Jembatan M3 6,630,000
- Kayu Kelas lll Untuk Perancah M3 1,950,000
- Kayu Kumia Balok M3 8,352,500
Papan M3 7,020,000
- Kayu Kalafi Balok M3 7,345,000
Papan M3 7,800,000
37 Kertas Gosok Lembar 5,850
38 Kloset
- Kloset Duduk Biasa Tanpa Tabung Buah 812,500
- Kloset Duduk Keramik Tanpa Tabung Buah 1,105,000
Pakai Tabung Buah 3,770,000
- Kloset Jongkok Standar Buah 325,000
- Kloset Jongkok Toto Buah 624,000
- Kloset Jongkok Keramik Toto Buah 585,000
39 Kran Air Biasa Bh 23,400
Besi Bh 32,500
Stainless Bh 104,000

Harga Satuan Bahan Bangunan dan Upah Kerja Tahun 2020


Dalam Rupiah (Rp)
NO JENIS BARANG SPECIFIKASI SATUAN HARGA

1 2 3 4 5
40 K u a s Biasa Buah 18,200
Roll Buah 39,000
41 Kunci Pintu
- Kunci Pintu Besar Micol Buah 260,000
- Kunci Pintu Sedang Micol Buah 195,000
- Kunci Pintu Kecil Micol Buah 130,000
42 Kusen Pintu (KM/WC)
- Fiber Set 347,500
- Aluminium Wingking Door Set 524,300
- Alma Motif 70 x 200 Set 1,950,000
43 Les Plafon Gypsum M1 78,325
44 Minyak
- Minyak Cat Liter 26,975
- Minyak Cat Thinner Liter 39,000
- Minyak Pelumas Liter 48,700
45 Mur Baut 25 cm Buah 9,000
Buah 10,400
46 Paku
- Paku Biasa 1 kg 26,000
- Paku Jembatan 5 cm Dos 65,000
- Paku Seng 1 kg 58,500
- Paku Triplex (Sirap) 1 kg 29,900
- Paku Uk.5 - 7 cm Kg 26,000
- Paku Ulir Kg 37,700
- Paku Gypsum Kg 39,000
47 Pasir
- Pasir Beton M3 227,500
- Pasir Pasangan M3 273,000
- Pasir Urug (Timbunan) M3 227,500
48 Paving Block
- Tebal 8 cm K 400 M2 104,000
K 300 M2 101,400
K 225 M2 98,800
K 175 M2 97,500
- Tebal 6 cm K 300 M2 100,100
K 225 M2 97,500
K 175 M2 84,500
- Berlian K 175 M2 84,500
49 Pipa Dan Assecoris Pipa
- Dop 4" bh 42,250
- Dop 3" bh 35,750
- Dop 2" bh 29,250
- Dop 1" bh 16,250
- Dop 1/2" bh 13,650
- Dop drag dalam 3/4" bh 9,750
- Dop drag luar 3/4" bh 97,500
- Faucet Elbow 1/2" bh 7,000
- Knee / Elbow PVC 4" bh 42,250
- Knee / Elbow PVC 3" bh 35,750

Harga Satuan Bahan Bangunan dan Upah Kerja Tahun 2020


Dalam Rupiah (Rp)
NO JENIS BARANG SPECIFIKASI SATUAN HARGA

1 2 3 4 5
- Knee / Elbow PVC 2" bh 29,250
- Knee / Elbow PVC 1" bh 16,250
- Knee / Elbow PVC 1/2" bh 9,750
- Socket 4" bh 35,750
- Socket 3" bh 29,250
- Socket 2" bh 22,750
- Socket 1" bh 16,250
- Socket 1/2" bh 9,750
- Socket 2 x 1/2" bh 22,750
- Socket 2 x 2 1/2 " bh 35,750
- Socket Drag Luar 1/2 x 3/4" bh 16,250
- Socket Valve 1/2" bh 22,750
- Socket Valve 3 x 2 1/2" bh 35,750
- Tee PVC 4" bh 35,750
- Tee PVC 3" bh 22,750
- Tee PVC 2" bh 16,250
- Tee PVC 1" bh 8,450
- Tee PVC 1/2" bh 9,750
- Tee PVC 4" bh 35,750
- Tee PVC dia. 3/4" x 1/2" bh 16,250
- Gate Valve 1/2" bh 9,750
- Gate Valve 3/4" bh 29,250
- Gate Valve 1" bh 20,150
- Gate Valve 1/2" Kuningan bh 87,750
- Gate Valve 2" Kuningan bh 125,450
- Double Nipple GI 1/2" bh 16,250
- Double Nipple PVC 1.2" bh 7,150
- Seal Tape bh 9,750
50 Pipa PVC SC ( Type AW ) Uk . 4 M
- Pipa PVC Dia 1/2" AW Batang 32,500
- Pipa PVC Dia 3/4" AW Batang 39,000
- Pipa PVC Dia 1" AW Batang 46,700
- Pipa PVC Dia 1 1/4" AW Batang 67,500
- Pipa PVC Dia 1 1/2" ` Batang 80,400
- Pipa PVC Dia 2" AW Batang 106,250
- Pipa PVC Dia 2 1/2" AW Batang 133,700
- Pipa PVC Dia 3" AW Batang 214,500
- Pipa PVC Dia 4" AW Batang 304,500
- Pipa PVC Dia 6" AW Batang 656,500
- Pipa PVC Dia 8" AW Batang 877,500
51 PIipa PVC SC ( Type D ) Uk. 4 M
- Pipa PVC Dia 1 1/4" D Batang 45,500
- Pipa PVC Dia 1 1/2" D Batang 40,500
- Pipa PVC Dia 2" D Batang 63,600
- Pipa PVC Dia 2 1/2" D Batang 91,000
- Pipa PVC Dia 3" D Batang 110,500
- Pipa PVC Dia 4" D Batang 170,650
52 Pamur
Plamur BOYO 25 KG 216,600

Harga Satuan Bahan Bangunan dan Upah Kerja Tahun 2020


Dalam Rupiah (Rp)
NO JENIS BARANG SPECIFIKASI SATUAN HARGA

1 2 3 4 5
Skin Coat ( A Plus ) INTERIOR 20 KG 84,500
EXTERIOR 20 KG 97,500
53 Pompa Air Mesin
- Shimizu Otomatis 260 Bit Set 1,534,000
- Shimizu Otomatis 130 Bit Set 721,000
- Shimizu (Tanpa Tabung) 128 Bit Set 585,000
54 Residu Liter 108,200
55 R a n g
- Harmonika M 41,300
- Loket 1 M 33,000
- Pasir 10 X 10 M 39,000
56 Rangka Atap Baja Ringan
- Tebal 0,75 mm M2 292,500
- Tebal 1,00 mm M2 325,000
57 Rangka Plafond Baja Ringan (Terpasang) M2 260,000
58 S e m e n
- Semen Bosowa 40 Kg Zak 69,000
- Semen Bosowa 50 Kg Zak 79,000
- Semen Putih Zak 78,000
- Semen Tonasa 40 Kg Zak 75,400
- Semen Tonasa 50 Kg Zak 84,500
- Semen warna 1 kg 32,500
59 Shower Buah 178,750
60 S i r t u M3 195,000
61 Tempat sabun (Soap Holder)
- Biasa buah 45,500
-Keramik Buah 97,500
62 T e g e l
- Tegel Keramik 20 x 20 cm Motif Dos 84,700
Putih Dos 78,500
Polos Dos 81,300
- Tegel Keramik 20 x 25 cm Modif Dos 97,500
Putih Dos 71,500
- Tegel Keramik 25 x 40 cm Modif Dos 91,000
- Tegel Keramik 30 x 30 cm Modif Dos 195,000
Putih Dos 195,000
Kasar Dos 170,625
- Tegel Keramik 40 x 40 cm Modif Dos 101,400
Putih Dos 84,500
Kasar Dos 98,200
- Tegel Keramik 50 x 50 cm Kasar Dos 214,500
Modif Dos 130,000
- Tegel Step Nosing 10 x 40 cm Dos 25,150
63 Timbunan Biasa M3 130,000
Pilihan M3 195,000
64 Tripleks 3 mm Lembar 91,000
4 mm Lembar 104,000
6 mm Lembar 130,000
65 Urinior Keramik Standar Buah 444,000

Harga Satuan Bahan Bangunan dan Upah Kerja Tahun 2020


Dalam Rupiah (Rp)
NO JENIS BARANG SPECIFIKASI SATUAN HARGA

1 2 3 4 5
66 Wastafel Aluminium buah 585,000
Keramik + Sifon buah 2,330,900
Kaca Buah 3,250,000

PERALATAN PERTUKANGAN
1 Bor Mesin Modern set 390,000
2 Catok Kayu buah 260,000
3 Ember Cor Kecil Buah 19,500
4 Ember Cor Besar buah 39,000
5 - Gergaji Tangan ( Besi ) buah 97,500
6 - Gergaji Tangan ( Kayu) buah 78,000
7 Gergaji Mesin Modern set 661,700
8 Mesin Profil Modern set 812,500
9 Mesin Ketam Modern buah 574,600
10 Meter Roll 5m Buah 36,800
100 m Buah 134,500
11 Pahat Kayu Buah 35,000
12 Palu - palu Buah 88,000
13 Siku buah 39,000

Harga Satuan Bahan Bangunan dan Upah Kerja Tahun 2020


STANDAR HARGA SATUAN BAHAN BANGUNAN DAN UPAH KERJA
PROVINSI SULAWESI SELATAN
KABUPATEN WAJO
TAHUN 2020
(Dalam Rupiah (Rp)

NO JENIS BARANG SPECIFIKASI SATUAN HARGA ( Rp )

1 2 3 4 5
A BAHAN DASAR
1 Semen PC 50 Kg Zak 70,970
2 Semen Warna Kg 25,310
3 Batu Bara Merah Bh 910

B BAHAN BESI
1 Kawat Ikat Beton Kg 25,090
2 Paku Biasa 5-10 cm Kg 19,470
3 Paku Biasa 2,5-4 cm Kg 29,340
4 Paku Seng Kg 45,340
5 Paku beton Persegi 5 - 10 Cm Doz 23,580
6 Besi tulangan Polos Kg 17,600
7 Besi tulangan Ulir Kg 19,600
8 Besi UNP 10 P = 6 M' Btg 450,000
9 Besi UNP 8 P = 6 M' Btg 350,000
10 Besi UNP 6 P = 6 M' Btg 325,000
11 Besi Siku P = 6 M, T= 3 mm Btg 90,000
12 Besi Siku P = 6 M, T= 5 mm Btg 200,000

C BAHAN LANTAI DAN DINDING


1 Tegel Keramik 30 x 30 Polos M2 54,880
2 Tegel Keramik 40 x 40 Polos M2 65,604
3 Tegel Keramik 25 x 25 Polos M2 68,410
4 Tegel Keramik 20 x 20 Polos Doz 67,300
5 Tegel Granit Warna 60 x 60 Cm M2 186,730

D BAHAN ATAP
1 Atap Spandek Zincalium 0,35 mm silver Lbr 50,810
2 Non Spandek 45 cm 0,30 M' 35,360
3 Genteng Metal (sakura roof) 0,70 x 0,80 Lbr 41,360
4 Non Genteng Metal Lbr 36,300
5 Seng Gelombang BWG 33" Bjls 0,3 KK 9,910
6 Seng Plat Bjls 0,30 M' 81,020
7 Kanal Metal CV 75/75 Setara " TASO " Btg 96,140
8 Reng 0,45 Panjang 6 M Setara " TASO " Btg 59,190
9 Dynabolt 10 x 5 mm Bh 2,870
10 Karet Pelapis L 55 mm M' 74,430
11 Talang Air Listrik Bh 99,210

E BAHAN KACA
1 Kaca Bening 3 mm m² 139,100
2 Kaca Bening 5 mm m² 161,150
3 Kaca Ryben 3 mm m² 162,500
4 Kaca Ryben 5 mm m² 163,000
5 Cermin m² 138,630
6 Silicone Sealant Ultraglaze ex GE Tube 15,350

F BAHAN KUNCI DAN PENGGANTUNG


1 Kunci Tanam " SES " setara bh 268,250
2 Kunci tanam Biasa 2 Slag bh 180,940
3 Kunci Lemari Mutu Baik bh 18,250
4 Handle Pintu bh 200,380
5 Engsel Pintu Biasa bh 20,920
6 Engsel Jendela Bh 13,630
7 Grendel Pintu Bh 45,920
8 Grendel Jendela Bh 25,380
9 Hak Angin/ Kait-Kait Bh 12,160

G BAHAN CAT
1 Meni 1 Kg "PERAHU" Klg 48,610

Harga Bahan Bangunan dan Upah Kerja Semester I Tahun 2020


(Dalam Rupiah (Rp)

NO JENIS BARANG SPECIFIKASI SATUAN HARGA ( Rp )

1 2 3 4 5
2 Cat Kayu "AVIAN" (1 Kg) Klg 60,290
3 Minyak Cat "AVIAN" Klg 47,140
4 Plamur tembok Alcaplast 20 Kg Klg 199,430
5 Plamur Kayu Kucing Klg 42,240
6 Cat Tembok Setara " METROLITE " ( 3 Ltr ) Klg 107,790
7 Cat Tembok Setara " MOWILEX " (2,5 Ltr ) Luar Klg 270,570
8 Cat Tembok Setara " METROLITE " ( 2,5 Ltr ) Dalam Klg 250,730
9 Cat Seng/ Genteng 4 Kg Klg 160,040
10 Bahan Anti Rayap 10 Kg Klg 190,730
11 Lem Kayu 800 gram Klg 49,070
12 Cat Water Profing Merk " Dulux Watershield " 2,5 Ltr Klg 275,570
13 Ter Residu 1 Kg Klg 59,540
14 Kertas Gosok ( Amplas ) Klg 12,650
15 Kuas 1 " Klg 5,590
16 Kuas 2,5 " Klg 10,970
17 Kuas 3 " Klg 13,840

H BAHAN SANITASI
1 Floor Drain " Plastik " Bh 12,650
2 Kloset Duduk "TOTO" Bh 3,000,000
3 Kloset Jongkok "TOTO" Bh 427,150
4 Wastafel Bh 531,430
5 Wastafel Lengkap Set 2,098,000
6 Urinoir 1 Set Lengkap Set 3,047,150
7 Stop Kran 1/2 " Biasa Bh 13,620
8 Stop Kran 3/4 " Biasa Bh 19,190
9 Kran Air Double + Shower Bh 220,850
10 Krai Air Shower Bh 118,350
11 Kram Air 1/2 " ONDA Bh 34,190
12 Kram Air 3/4 " ONDA Bh 36,500
13 Jet Washer " TOTO " Bh 277,050
14 Seal Tape Bh 5,200
15 Bak Penampungan Air Kap. 1 M3 Bh 1,347,290
16 Bak Penampungan Air Kap. 2 M3 Bh 2,761,540

I BAHAN LISTRIK
1 Skring Box 1 Lubang Bh 50,130
2 Panel MCB Bh 30,130
3 MCB 6A-10A Bh 62,650
4 Stop Kontak "PANASONIC" Bh 18,900
5 Saklar Ganda "PANASONIC" Bh 26,360
6 Saklar Tunggal " PANASONIC " Bh 18,650
7 Lampu CPL Kapsul 8 Watt " PHILIPS Bh 30,340
8 Lampu CPL Kapsul 15 Watt " PHILIPS Bh 40,340
9 Lampu CPL Kapsul 18 Watt " PHILIPS Bh 47,840
10 Lampu CPL Kapsul 23 Watt " PHILIPS Bh 41,500
11 Kap Industri HDK + Lampu HPLN 80 Watt Bh 85,470
12 Kap Industri HDK + Lampu HPLN 150 Watt Bh 50,470
13 Lampu Down Light Plafond Bh 62,840
14 Fitting Lampu Bh 12,650
15 Stand Lampu Tanam Bh 130,370
16 Lampu TL 20 Watt Bh 71,680
17 PIPA PVC diameter 5/8" - 4 M M' 10,360
18 Kabel NYY 2 x 2,5 mm Roll 148,820
19 Kabel NYY 2 x 1,5 mm Roll 96,570
20 Panel Box Bh 500,130
21 Inbuw Duz Bh 5,150
22 Sekring 16 A Bh 60,110

J BAHAN LANGIT - LANGIT


1 Gypsum Board Lbr 85,110
2 Calsiboard 35 mm Lbr 80,110
3 List Profil Kayu Bh 48,000
4 Sekrup Gibsum Bh 82,700
5 Plaster Gypsum Roll 15,200
6 Besi Hollow 40x 40 mm Btg 39,300

Harga Bahan Bangunan dan Upah Kerja Semester I Tahun 2020


(Dalam Rupiah (Rp)

NO JENIS BARANG SPECIFIKASI SATUAN HARGA ( Rp )

1 2 3 4 5
7 Besi Hollow 20x 40 mm Btg 28,800
8 Lem Gypsum 20 Kg ( comice Aplus ) Bh 85,230
9 Paku Gypsum Doz 27,700
10 Tripleks 122 x 244 x 0,3 mm Lbr 59,760
11 Tripleks 122 x 244 x 0,4 mm Lbr 74,920
12 Tripleks 122 x 244 x 0,6 mm Lbr 84,230
13 Multipleks 122 x 244 x 0,8 mm Lbr 116,780
14 Teakwood 122 x 244 x 0,3 mm Lbr 153,730

K PAVING BLOK
1 Paving Blok ( Kotak) K.300 T=8 Cm ( 44 Buah /M2 ) m² 101,400
2 Paving Blok ( Kotak) K.300 T=6 Cm ( 44 Buah /M2 ) m² 100,100
3 Paving Blok ( Kotak) K.400 T=8 Cm ( 44 Buah /M2 ) m² 98,800
4 Paving Blok ( Kotak) K.400 T=6 Cm ( 44 Buah /M2 ) m² 97,500

L PIPA
1 Pipa GIP ( 6 meter )
(Sekelas Med.A)
- Dia 50 mm (1 1/2") tebal 2 mm Btg 474,800
- Dia 63 mm (2") tebal 2 mm Btg 658,500
- Dia 75 mm (2 1/2") tebal 2 mm Btg 818,200
- Dia 90 mm (3") tebal 2,9 mm Btg 1,321,100
- Dia 110 mm (4") tebal 2,9 mm Btg 1,594,000
- Dia 125 mm (5") tebal 2,9 mm Btg 2,297,100
- Dia 160 mm (6") tebal 2,9 mm Btg 2,806,300

2 Pipa GIP ( 6 meter )


(Sekelas Med.B)
- Dia 50 mm (1 1/2") tebal 1,5 mm Btg 460,800
- Dia 63 mm (2") tebal 1,5 mm Btg 494,500
- Dia 75 mm (2 1/2") tebal 2,0 mm Btg 600,000
- Dia 90 mm (3") tebal 2,0 mm Btg 1,093,100
- Dia 110 mm (4") tebal 2,0 mm Btg 1,594,000

3 Pipa HDPE ( 6 meter )


(Sekelas Med.B)
Dia 2" Btg 193,500
Dia 2 1/2" Btg 269,200
Dia 3" Btg 387,600
Dia 4" Btg 582,000
Dia 6" Btg 776,300
Dia 8" Btg 1,281,700

4 PIPA PVC
Dia 1/2" - 4,00 M Btg 37,000
- Dia 3/4" - 4,00 M Btg 44,000
- Dia 1" - 4,00 M - AW Btg 193,500
- Dia 1 1/2" - 4,00 M - AW Btg 269,200
- Dia 2" - 4,00 M - AW Btg 387,600
- Dia 3" - 4,00 M - AW Btg 582,000
- Dia 4" - 4,00 M - AW Btg 776,300
- Dia 6" - 4,00 M - AW Btg 1,281,700

5 PIPA PVC SNI T.12,5 bar - S.10 ( Pemyambungan Lem)


- Dia 63 mm (2") - 6 M Btg 175,000
- Dia 90 mm (3") - 6 M Btg 334,100
- Dia 110 mm (4") - 6 M Btg 509,000
- Dia 160 mm (6") - 6 M Btg 1,076,300
- Dia 160 mm (8") - 6 M Btg 1,736,700

6 PIPA PVC SNI T.12,5 bar - S.10 ( Penyambungan Ring karet)


- Dia 63 mm (2") - 6 M Btg 180,000
- Dia 90 mm (3") - 6 M Btg 345,000
- Dia 110 mm (4") - 6 M Btg 523,000
- Dia 160 mm (6") - 6 M Btg 1,101,300
- Dia 200 mm (8") - 6 M Btg 1,774,200

Harga Bahan Bangunan dan Upah Kerja Semester I Tahun 2020


(Dalam Rupiah (Rp)

NO JENIS BARANG SPECIFIKASI SATUAN HARGA ( Rp )

1 2 3 4 5

7. PIPA PVC SNI T.10 bar - S.12,5 (t Pemyambungan Lem)


- Dia 50 mm (1 1/2") - 6 M Btg 103,100
- Dia 63 mm (2") - 6 M Btg 146,800
- Dia 90 mm (3") - 6 M Btg 284,100
- Dia 110 mm (4") - 6 M Btg 419,000
- Dia 160 mm (6") - 6 M Btg 896,300
- Dia 200 mm (8") - 6 M Btg 1,306,400

8 PIPA PVC SNI T.10 bar - S.12,5 ( Pemyambungan Ring karet)


- Dia 50 mm (1 1/2") - 6 M Btg 160,000
- Dia 63 mm (2") - 6 M Btg 290,000
- Dia 90 mm (3") - 6 M Btg 400,000
- Dia 110 mm (4") - 6 M Btg 815,000
- Dia 160 mm (6") - 6 M Btg 1,340,000
- Dia 200 mm (8") - 6 M Btg 1,471,700

9 FLANGE GIP/STEEL (sist. Las)


- Flange Gip/Steel f 2" Bh 77,000
- Flange Gip/Steel f 3" Bh 99,000
- Flange Gip/Steel f 4" Bh 121,000
- Flange Gip/Steel f 6" Bh 203,500
- Flange Gip/Steel f 8" Bh 302,500

10 TEE GIP/STEEL (sist. Las)


- Tee Gip/Steel f 2" Bh 96,250
- Tee Gip/Steel f 3" Bh 214,500
- Tee Gip/Steel f 4" Bh 302,500
- Tee Gip/Steel f 6" Bh 657,800
- Tee Gip/Steel f 8" Bh 1,375,000

11 BEND GIP/STEEL (sist. Las)


- Bend Gip/Steel 90o f 2" Bh 44,000
- Bend Gip/Steel 90o f 3" Bh 115,500
- Bend Gip/Steel 90o f 4" Bh 170,500
- Bend Gip/Steel 90o f 6" Bh 439,670
- Bend Gip/Steel 90o f 8" Bh 856,350

12 BEND GIP/STEEL (sist. Las)


- Bend Gip/Steel 45o f 2" Bh 38,500
- Bend Gip/Steel 45o f 3" Bh 71,500
- Bend Gip/Steel 45o f 4" Bh 104,500
- Bend Gip/Steel 45o f 6" Bh 272,525
- Bend Gip/Steel 45o f 8" Bh 490,545

13 FLANGE TEE GIP


- Flange Tee GIP f 4" x 4" Bh 666,050
- Flange Tee GIP f 6" x 6" Bh 1,006,500
- Flange Tee GIP f 8" x 8" Bh 1,825,615
- Flange Tee GIP f 10" x 10" Bh 2,920,500

14 Flange Bend GIP


- Flange Bend Gip/Steel 90o f 2" Bh 324,500
- Flange Bend Gip/Steel 90o f 3" Bh 379,500
- Flange Bend Gip/Steel 90o f 4" Bh 533,500
- Flange Bend Gip/Steel 90o f 6" Bh 797,500
- Flange Bend Gip/Steel 90o f 8" Bh 1,085,150

15 Flange Bend GIP


- Flange Bend Gip/Steel 45o f 2" Bh 302,500
- Flange Bend Gip/Steel 45o f 3" Bh 368,500
- Flange Bend Gip/Steel 45o f 4" Bh 522,500
- Flange Bend Gip/Steel 45o f 6" Bh 679,250
- Flange Bend Gip/Steel 45o f 8" Bh 1,064,250

16 Stub End / Stub Flange PE 100

Harga Bahan Bangunan dan Upah Kerja Semester I Tahun 2020


(Dalam Rupiah (Rp)

NO JENIS BARANG SPECIFIKASI SATUAN HARGA ( Rp )

1 2 3 4 5
- Stub End / Stub Flange PE 100 f 63 mm (2") Bh 115,500
- Stub End / Stub Flange PE 100 f 90 mm (3") Bh 231,000
- Stub End / Stub Flange PE 100 f 110 mm (4") Bh 280,500
- Stub End / Stub Flange PE 100 f 160 mm (6") Bh 445,500
- Stub End / Stub Flange PE 100 f 200 mm (8") Bh 836,000

17 Flange Spigot
- Flange Spigot Ǿ 2" Bh 207,350
- Flange Spigot Ǿ 3" Bh 278,850
- Flange Spigot Ǿ 4" Bh 350,350
- Flange Spigot Ǿ 6" Bh 693,550
- Flange Spigot Ǿ 8" Bh 1,215,500

18 Flange Socket
- Flange Socket Ǿ 2" (63 mm SC) Bh 115,500
- Flange Socket Ǿ 3" (90 mm SC) Bh 247,500
- Flange Socket Ǿ 4" (110 mm SC) Bh 302,500
- Flange Socket Ǿ 6" (160 mm SC) Bh 467,500
- Flange Socket Ǿ 2" (63 mm RR) Bh 126,500
- Flange Socket Ǿ 3" (90 mm RR) Bh 258,500
- Flange Socket Ǿ 4" (110 mm RR) Bh 313,500
- Flange Socket Ǿ 6" (160 mm RR) Bh 522,500
- Flange Socket Ǿ 8" (200 mm RR) Bh 1,265,000

19 TEE PVC SNI - 3 x Socket Rubber Ring


- Tee PVC Ø 2" x 2" Bh 109,450
- Tee PVC Ø 3" x 3" Bh 371,800
- Tee PVC Ø 3" x 2" Bh 328,900
- Tee PVC Ø 4" x 4" Bh 614,900
- Tee PVC Ø 4" x 3" Bh 529,100
- Tee PVC Ø 4" x 2 " Bh 500,500
- Tee PVC Ø 6" x 6" Bh 929,500
- Tee PVC Ø 6" x 4" Bh 993,850

20 TEE PVC SNI - Socket


- Tee PVC Socket Ø 8" x 8" Bh 1,287,000
- Tee PVC Socket Ø 8" x 6" Bh 1,573,000
- Tee PVC Socket Ø 8" x 4" Bh 786,500
- Tee PVC Socket Ø 8" x 3" Bh 786,500
21 Bend HDPE PE 100 45 o Ø 2" Bh 121,000
Bend HDPE PE 100 90 o Ø 2" Bh 134,200

22 LONG BEND DOUBLE SOCKET (solvent cament}


- Ø 2" (63 mm) x 45º Bh 51,480
- Ø 3" (90 mm) x 45º Bh 112,750
- Ø 2" (63 mm) x 90º Bh 67,650
- Ø 3" (90 mm) x 90º Bh 140,800

23 LONG BEND DOUBLE SOCKET (rubber ring}


- Ø 2" (63 mm) x 45º Bh 102,850
- Ø 2" (63 mm) x 90º Bh 126,500

24 LONG BEND SOCKET / SPIGOT (rubber ring}


- Ø 2" (63 mm) x 45º Bh 185,900
- Ø 3" (90 mm) x 45º Bh 286,000
- Ø 4" (110 mm) x 45º Bh 398,750
- Ø 6" (160 mm) x 45º Bh 806,850
- Ø 8" (200 mm) x 45º Bh 1,401,400

25 LONG BEND SOCKET / SPIGOT (rubber ring}


- Ø 2" (63 mm) x 45º Bh 185,900
- Ø 3" (90 mm) x 45º Bh 286,000
- Ø 4" (110 mm) x 45º Bh 398,750
- Ø 6" (160 mm) x 45º Bh 806,850
- Ø 8" (200 mm) x 45º Bh 1,401,400

Harga Bahan Bangunan dan Upah Kerja Semester I Tahun 2020


(Dalam Rupiah (Rp)

NO JENIS BARANG SPECIFIKASI SATUAN HARGA ( Rp )

1 2 3 4 5
26 LONG BEND SOCKET / SPIGOT (rubber ring}
- Ø 2" (63 mm) x 90º Bh 185,900
- Ø 3" (90 mm) x 90º Bh 286,000
- Ø 4" (110 mm) x 90º Bh 398,750
- Ø 6" (160 mm) x 90º Bh 806,850
- Ø 8" (200 mm) x 90º Bh 1,685,750

27 REDUCER PE 100
- Reducer PE 100 Ø 3" x 2" Bh 148,500
- Reducer PE 100 Ø 4" x 2" Bh 192,500
- Reducer PE 100 Ø 4" x 3" Bh 209,000
- Reducer PE 100 Ø 6" x 3" Bh 374,000
- Reducer PE 100 Ø 6" x 4" Bh 401,500

28 REDUCER PVC SNI - Socket Solvent Cement


- Reducer PVC Ø 3" x 1 1/2" Bh 71,500
- Reducer PVC Ø 3" x 2" Bh 77,000
- Reducer PVC Ø 4" x 2" Bh 92,950
- Reducer PVC Ø 4" x 3" Bh 107,250

29 REDUCER PVC SNI - Rubber Ring


- Reducer PVC Ø 4" x 3" Bh 171,600
- Reducer PVC Ø 6" x 4" Bh 291,500
- Reducer PVC Ø 8" x 6" Bh 500,500
- Reducer PVC Ø 10" x 6" Bh 803,000
- Reducer PVC Ø 10" x 8" Bh 918,500

30 DOP PE 100
- Dop PE Ø 2" Bh 52,250
- Dop PE Ø 3" Bh 82,500
- Dop PE Ø 4" Bh 115,500
- Dop PE Ø 6" Bh 181,500
- Dop PE Ø 8" Bh 797,500

31 DOP/CAP PVC SNI (Slovent Cement)


- Dop PVC Ø 1/2" 28,600
- Dop PVC Ø 2" Bh 35,750
- Dop PVC Ø 3" Bh 42,900
- Dop PVC Ø 4" Bh 100,100
- Dop PVC Ø 6" Bh 137,500

32 DOP/CAP PVC SNI (Rubber Ring)


- Dop PVC Ø 2" Bh 27,500
- Dop PVC Ø 3" Bh 38,500
- Dop PVC Ø 4" Bh 60,500
- Dop PVC Ø 6" Bh 137,500

33 CLAMP SADDLE GIP/STELL


- Clamp Saddle Ø 2" x 3/4" Bh 38,500
- Clamp Saddle Ø 2" x 1 1/2" Bh 46,750
- Clamp Saddle Ø 4" x 3/4" Bh 71,500
- Clamp Saddle Ø 6" x 3/4" Bh 107,250
- Clamp Saddle Ø 6" x 1 1/2" Bh 104,500
- Clamp Saddle Ø 6" x 2" Bh 104,500

34 STOP KRAN KUNINGAN


- Stop Kran Ǿ 1 1/2" Bh 302,500
- Stop Kran Ǿ 2" Bh 412,500
- Stop Kran Ǿ 3" Bh 1,155,000

35 Air Valve
- Air Valve Ǿ 2" Bh 654,500
- Air Valve Ǿ 3" Bh 984,500
- Air Valve Ǿ 4" Bh 1,284,250
- Air Valve Ǿ 6" Bh 2,442,000

Harga Bahan Bangunan dan Upah Kerja Semester I Tahun 2020


(Dalam Rupiah (Rp)

NO JENIS BARANG SPECIFIKASI SATUAN HARGA ( Rp )

1 2 3 4 5
36 Gate Valve
- > Gate Valve Ǿ 2" Bh 999,900
- > Gate Valve Ǿ 3" Bh 1,384,350
- > Gate Valve Ǿ 4" Bh 2,663,650
- > Gate Valve Ǿ 6" Bh 3,245,000

37 Check Valve
- > Check Valve Ǿ 1 1/2" Bh 398,200
- > Check Valve Ǿ 2" Bh 3,712,500
- > Check Valve Ǿ 3" Bh 1,802,900
- > Check Valve Ǿ 4" Bh 3,608,000
- > Check Valve Ǿ 6" Bh 3,575,000

38 Gibeoul Joint
- Gibeoul Joint Cast Iron PN 10 Ǿ 3" Bh 250,250
- Gibeoul Joint Cast Iron PN 10 Ǿ 4" Bh 350,350
- Gibeoul Joint Cast Iron PN 10 Ǿ 6" Bh 672,100
- Gibeoul Joint Cast Iron PN 10 Ǿ 8" Bh 1,215,500

39 Karet Packing
- Karet Packing Ǿ 2" Bh 15,950
- Karet Packing Ǿ 3" Bh 18,150
- Karet Packing Ǿ 4' Bh 22,000
- Karet Packing Ǿ 6" Bh 33,000
- Karet Packing Ǿ 8" Bh 34,650
40 - Bout/Moer 5/8 x 3" Bh 11,000
- Bout/Moer 3/8 x 3" Bh 16,500
41 - Lem Pipa Bh 82,500

M Batu
Batu Gunung m³ 574,300
Batu kali m³ 389,700
Batu Belah 10 -15 cm m³ 578,900
Batu Belah 7 -10 cm m³ 667,000
Batu Belah 5 -7 cm m³ 755,100
Batu Pecah 3 - 5 cm ( Crusher ) m³ 604,400
Batu Pecah 2 - 3 cm ( Crusher ) m³ 704,300
Batu Pecah 1 - 2 cm ( Crusher ) m³ 733,400
Batu Pecah 0,5 - 1 cm ( Crusher ) m³ 733,400
Abu Batu ( Filler ) Kg 1,000
Kerikil ayak beton m³ 365,300
Sirtu / Kerikil Sungai m³ 323,100

N PASIR
Pasir Urug m³ 179,200
Pasir Pasangan m³ 283,500
Pasir Beton m³ 339,100
Tanah Timbungan m³ 125,500
Material Timbunan Pilihan m³ 296,400

O GORONG - GORONG
Gorong - Gorong beton Dia 60 cm ( Bertulang ) M' 360,000
Gorong - Gorong beton Dia 80 cm ( Bertulang ) M' 530,000
Gorong - Gorong beton Dia 100 cm ( Bertulang ) M' 740,000
Gorong - Gorong beton Dia 60 cm M' 170,000
Gorong - Gorong beton Dia 80 cm M' 250,000
Gorong - Gorong beton Dia 100 cm M' 330,000

P KAYU m³
Kayu Kelas I ( Bayam ) m³ 12,654,100
Kayu Kelas I ( Kumia, Kalapi ) m³ 7,654,100
Kayu Kelas II ( Baramming, Batau, Nato ) m³ 4,154,100
Kayu Kelas III ( Lapi- Lapi ) m³ 3,644,500

Q PEMASANGAN SAMBUNGAN RUMAH


- Kran Ǿ 1/2" Bh 22,000

Harga Bahan Bangunan dan Upah Kerja Semester I Tahun 2020


(Dalam Rupiah (Rp)

NO JENIS BARANG SPECIFIKASI SATUAN HARGA ( Rp )

1 2 3 4 5
- Stop Kran Ǿ 1/2" Bh 77,000
- Knee GIP Ǿ 1/2" Bh 11,000
- Katup Searah ( Check Valve ) Ǿ 1/2" Bh 89,650
- Water Meter Ǿ 15 MM 1/2 ( Setara Bestini, AMNB,ONDA) Bh 286,000
- Plung Kran Ǿ 1/2" ( Setara YUTA ) Bh 144,100
- Tee GIP Ǿ 1/2" Bh 9,900
- Pipa GIP Ǿ 1/2" 2 mm Bh 221,100
- Clamp Saddle Ǿ 3" x 1/2" Bh 57,200
- Clamp Saddle Ǿ 2" x 1/2" Bh 38,500
- Clamp Saddle Ǿ 1 1/2" x 1/2" Bh 27,500
- Seal Tape Bh 3,300
- Box meter (biru) Bh 71,500
- Plug PVC Ǿ 1/2" Bh 3,300

1 Aspal Bitumen ( Drum ) Kg 16,000


Aspal Bitumen ( Curah ) Kg 15,000
2 Kayu Bakar m³ 188,200
3 Kayu untuk perancah ( Kapok, Kemiri, Piawing ) m³ 2,154,100
4 Kawat Bronjong ( Pabrikasi Uk.2x1x0,5 M" ) bh 483,800
5 Baut
Baut + Mour ( Dia 14 mm , P = 15 cm ) bh 4,300
Baut + Mour ( Dia 17 mm , P = 15 cm ) bh 5,400
Baut + Mour ( Dia 19 mm , P = 30 cm ) bh 10,800
6 Alat-alat Bantu 3 Set Set 275,000
7 Minyak Diesel/ Solar Liter 9,800
Solar/ Industri Liter 10,700
Bensin/Premium Liter 7,000
Minyak Pelumas Liter 57,100
Minyak Flux Liter 3,800
Minyak Tanah ( Industri ) Liter 15,100
8 Kuku Macan Dia. 1,5" Bh 46,300
Kuku Macan Dia. 1,0" Bh 22,100
Kuku Macan Dia. 0,5" Bh 15,100
9 Kabel/ Tali Sling Baja Dia 36 mm M' 181,700
Kabel/ Tali Sling Baja Dia 28 mm M' 85,000
Kabel /Tali Sling Baja Dia 24 mm M' 67,200
Kabel Pengaku Dia 16 mm M' 48,600
11 Jarum Keras 1,5" Bh 1,494,300
Jarum Keras 1,0" Bh 662,200
12 Beugel Plat Baja M' 88,200
13 Sadle Kabel Bh 881,500
14 Plastik Alas M2 3,500

DAFTAR HARGA SATUAN UPAH


1 Pekerja Org/Hari 114,100
2 Tukang Org/Hari 147,200
3 Mandor Org/Hari 161,920
4 Operator Terampil Org/Hari 152,800
5 Pembantu Operator Org/Hari 132,800
6 Sopir Terampil Org/Hari 147,200
7 Pembantu Sopir Org/Hari 130,400
8 Mekanik Terampil Org/Hari 152,800
9 Pembantu Mekanik Org/Hari 132,800
10 Kepala Tukang Org/Hari 152,800
11 Buruh Tak Terampil Org/Hari 130,400
12 Buruh Semi Terampil Org/Hari 132,000
13 Buruh Terampil Org/Hari 132,800
14 Tukang Batu Org/Hari 147,200
15 Tukang Cat Org/Hari 147,200
16 Tukang Kayu Org/Hari 147,200
17 Tukang Besi Org/Hari 147,200
18 Operator Semi Terampil Org/Hari 147,200
19 Sopir Pribadi Org/Hari 147,200

Harga Bahan Bangunan dan Upah Kerja Semester I Tahun 2020


STANDAR HARGA SATUAN BAHAN BANGUNAN DAN UPAH KERJA
PEMERINTAH PROVINSI SULAWESI SELATAN
KABUPATEN SIDENRENG RAPPANG
TAHUN 2018

Dalam Rupiah (Rp)

No JENIS BARANG SPESIFIKASI SATUAN HARGA

1 2 4 5
9.1.161 Sayur - Mayur - Tomat Kg 10,000
9.1.162 Sayur - Mayur - Toge Ons 6,000
9.1.163 Sayur - Mayur - Vetsin 250 Gr Bungkus 14,000
9.1.164 Sayur - Mayur - Wortel Kg 14,000
9.1.165 Sirup - ABC Botol 19,000
9.1.166 Sirup -DHT Botol 27,000
9.1.167 Sirup - Marjan Botol 26,000
9.1.168 Sohun / Laksa - Besar Bungkus 16,000
9.1.169 Sohun / Laksa - Kecil Bungkus 6,000
9.1.170 Sohun / Laksa cap Mangkok - Besar Bungkus 20,000
9.1.171 Sohun / Laksa Cap Mangkok - Kecil Bungkus 7,000
9.1.172 Susu - Bubuk Bendera 800 Gr Kotak 138,000
9.1.173 Susu - Bubuk Dancow Gantung Bungkus 6,000
9.1.174 Susu - Kental Manis Bendera Coklat Kaleng 16,000
9.1.175 Susu - Kental Manis Enak Kaleng 12,000
9.1.176 Susu - Kental Manis Indomilk Kaleng 16,000
9.1.177 Susu - Kental Manis Omela Kaleng 15,000
9.1.178 Susu - Kental Manis bendera Kaleng 17,000
9.1.179 teh - Cap Cangkir Besar Bungkus 8,000
9.1.180 teh - Cap Cangkir Kecil Bungkus 5,000
9.1.181 teh - Cap Gunung Mas 250 Gr Bungkus 20,000
9.1.182 teh - Celup Sariwangi Isi 25 Dos 10,000
9.1.183 teh - Celup Teh botol Besar Bungkus 9,000
9.1.184 teh - Celup Teh botol Kecil Bungkus 6,000
9.1.185 teh - Teh Celup Warna Hijau ABC Bungkus 9,000
9.1.186 Telur - Ayam Kampung Butir 3,000
9.1.187 Telur - Itik Butir 4,000
9.1.188 Tepung - Bumbu Sajiku Besar Bungkus 16,000
9.1.189 Tepung - Bumbu Sajiku Kecil Bungkus 6,000
9.1.190 Tepung - Bumbu Sasa Besar Bungkus 24,000
9.1.191 Tepung - Bumbu Sasa Kecil Bungkus 5,000
9.1.192 Tepung - Hunkwe 200 Gr Bungkus 5,000
9.1.193 Tepung - Kanji 500 Gr Bungkus 12,000
9.1.194 Tepung - Maizena Jagung 300 Gr Bungkus 11,000
9.1.195 Tepung - Rose Brand Biasa 500 Gr Bungkus 11,000

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2020
Dalam Rupiah (Rp)

No JENIS BARANG SPESIFIKASI SATUAN HARGA

1 2 4 5
9.1.196 Tepung - Rose Brand Ketan 500 Gr Bungkus 12,000
9.1.197 Tepung - Sagu Mutiara 100 Gr Bungkus 4,000
9.1.198 Tepung - Terigu Cap Gatot Kaca kg 14,000
9.1.199 Tepung - Terigu Cap. Kompas Kg 14,000
9.1.200 Temak Potong - Kambing Ekor 3,735,000
9.1.201 Temak Potong - Kerbau Ekor 23,655,000
9.1.202 Temak Potong - Sapi Ekor 24,900,000
10 BIDANG BAHAN BANGUNAN
10.1 BAHAN DASAR BANGUNAN
10.1.1 Abu Batu M3 513,000
10.1.2 Aspal Bitumen (Curah) kg 32,000
10.1.3 Aspal Bitumen (Drum) Kg 32,000
10.1.4 Bata Blok - 21 x 10,5 x 6 cm -60 bh/m2 M2 46,000
10.1.5 Bata Ringan M2 2,000
10.1.6 Batako - 40 x 20 x 10 cm~13 bh/m2 M2 72,000
10.1.7 Batu Gunung M3 237,000
10.1.8 Batu Kali Quary M3 76,000
10.1.9 Batu Kali Utuh M3 282,000
10.1.10 Batu Merah Uk.Besar Buah 1,000
10.1.11 Batu Merah Uk.Kecil Buah 1,000
10.1.12 Cincin Beton - Diameter 60 cm Buah 260,000
10.1.13 Cincin Beton - Diameter 80 cm Buah 351,000
10.1.14 Ciping - Split 0,5 - 1 cm M3 398,000
10.1.15 Ciping - Split 1 - 2 cm M3 398,000
10.1.16 Ciping - Split 2 - 3 cm M3 372,000
10.1.17 Ciping - Split 3 - 5 cm M3 301,000
10.1.18 Ciping - Split 5 - 7 cm M3 276,000
10.1.19 Ciping - Split 7 - 10 cm M3 282,000
10.1.20 Glas Blok Buah 52,000
10.1.21 Gorong - Gorong - Diameter 20 cm - 6x10x20 Buah 91,000
10.1.22 Gorong - Gorong - Diameter 30 cm - 8x10x20 Buah 137,000
10.1.23 Gorong - Gorong - Diameter 40 cm - Tebal 6 Buah 181,000
10.1.24 Gorong - Gorong - Diameter 50 cm - Tebal 6 Buah 225,000
10.1.25 Gorong - Gorong - Diameter 60 cm - Tebal 6 Buah 268,000
10.1.26 Grass Block - 40x25x10 cm Buah 136,000
10.1.27 Ijuk Ikat 28,000
10.1.28 Kansteen Beton - 15 x 20 x 40 Buah 44,000
10.1.29 Kansteen Beton - 15 x 25 x 40 Buah 53,000
10.1.30 Kansteen Beton - 15 x 30 x 40 Buah 51,000
10.1.31 Kansteen Beton - 15 x 30 x 50 Buah 97,000
10.1.32 Krikil M³ 256,000
10.1.33 Loster Beton Buah 35,000
10.1.34 Loster Beton - 15 x 20 Buah 67,000
10.1.35 Loster Beton - 15 x 30 Buah 90,000

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2020
Dalam Rupiah (Rp)

No JENIS BARANG SPESIFIKASI SATUAN HARGA

1 2 4 5
10.1.36 Loster Keramik M³ 107,000
10.1.37 Pasir Beton M³ 173,000
10.1.38 Pasir Pasangan M³ 233,000
10.1.39 Pasir Quary M³ 129,000
10.1.40 Pasir Saringan M³ 183,000
10.1.41 Pasir Timbunan / Urungan M³ 81,000
10.1.42 Paving Block - Kacang Tbl. 6 cm K. 250 - Warna M² 107,000
10.1.43 Paving Block - Kacang Tbl. 8 cm K. 225-Standar M² 93,000
10.1.44 Paving Block - Kacang Tbl. 8 cm K.250 - Warna M² 95,500
10.1.45 Paving Block - Kacang Tbl. 8 cm K 250 - Standar M² 100,000
10.1.46 Paving Block - Kacang Tbl. 6 cm K. 225 M² 85,000
10.1.47 Paving Block - Kacang Tbl. 6 cm K. 300 - Warna M² 114,000
10.1.48 Paving Block - Kacang Tbl. 6 cm K. 300 - Standar M² 151,000
10.1.49 Paving Block - Kacang Tbl. 8 cm K. 300 - Standar M² 103,000
10.1.50 Paving Block - Kacang Tbl. 10 cm K. 250 - Standar M² 101,000
10.1.51 Paving Block - Segi Empat Tbl. 6 cm K. 225 M² 90,000
10.1.52 Paving Block - Segi Empat Tbl. 6 cm K. 250 - Standar M² 90,000
10.1.53 Paving Block - Segi Empat Tbl. 6 cm K.250 - Warna M² 118,000
10.1.54 Paving Block - Segi Empat Tbl. 8 cm K. 225 - Standar M² 94,000
10.1.55 Paving Block - Segi Empat Tbl. 8 cm K. 250 - Standar M² 92,000
10.1.56 Paving Block - Segi Empat Tbl. 8 cm K.250 - Standar M² 95,000
10.1.57 Paving Block - Segi Empat Tbl. 10 cm K. 300 - Standar M² 101,000
10.1.58 Paving Block - Segi Empat Tbl. 6 cm K. 300 - Standar M² 115,000
10.1.59 Paving Block - Segi Empat Tbl. 6 cm K. 300 - Warna M² 115,000
10.1.60 Paving Block - Segi Empat Tbl. 8 cm K. 300 - Standar M² 91,000
10.1.61 Paving Block - Segi Empat Tbl. 8 cm K. 300 - Standar M² 92,000
10.1.62 Paving Block - Segi Enam Tbl. 6 cm K. 250 - Standar M² 94,000
10.1.63 Paving Block - Segi Enam Tbl. 8 cm K. 250 - Standar M² 99,000
10.1.64 Paving Block - Segi Enam Tbl. 6 cm K. 250 - Standar M² 90,000
10.1.65 Paving Block - Segi Enam Tbl. 6 cm K. 300 - Standar M² 94,000
10.1.66 Paving Block - Segi Enam Tbl. 6 cm K. 300 - Standar M² 91,000
10.1.67 Portland Cement (Bosowa) - 40 Kg kg 66,000
10.1.68 Portland Cement (Tonasa) - 40 Kg kg 70,000
10.1.69
10.1.70 3 mm Lembar 55,440
10.1.71 4 mm Lembar 75,075
10.1.72 6 mm Lembar 80,850
10.1.73 9 mm Lembar 132,825
10.1.74 12 mm Lembar 205,950
10.1.75 Teakwod Lembar 98,175
10.1.76 Lembrasering Standar 4m Btg 23,100
10.1.77 Kayu Lapis Btg 6,825
10.1.78 4 mm 63,000
10.1.79 12 mm 201,600

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2020
Dalam Rupiah (Rp)

No JENIS BARANG SPESIFIKASI SATUAN HARGA

1 2 4 5
10.1.80 Bambu 33,075
10.1.81 Rotan Pengikat 29,453
10.1.82 Kayu Dolken dia 8-10/4 meter 36,750
10.1.83
10.1.84 BAHAN LANTAI/DINDING
10.1.85 Bahan Lantai
10.1.86 Ezenza
10.1.87 Granit/ Marmer
10.1.88 Tegel Granito ex.Granito 60 x 60 cm Dos 265,250
10.1.89 Tegel Granito Warna Terang (Cina) 60 x 60 cm Dos 155,925
10.1.90 Tegel Granito Warna Gelap ( Cina 60 x 60 cm Dos 205,590
10.1.91 Tegel Granit Ex.Granito 30 x 60 cm Dos 330,330
10.1.92 Granite Star White Inpor M² 1,282,050
10.1.93 Granit Ex.Ezenza 60 x 60 cm Dos 300,300
10.1.94 Tegel Keramik
10.1.95 Tegel Keramik Polos 40 x 40 cm Dos 75,075
10.1.96 Tegel Keramik Warna 40 x 40 cm Dos 75,075
10.1.97 Tegel Keramik Polos 30 x 30 cm Dos 63,525
10.1.98 Tegel Keramik Warna 30 x 30 cm Dos 75,075
10.1.99 Tegel Keramik Polos 20 x 20 cm Dos 63,525
10.2 Tegel Keramik Warna 20 x 20 cm Dos 63,525
10.2.1 Tegel Keramik Polos 25 x 20 cm Dos 63,525
10.2.2 Tegel Keramik Warna 25 x 20 cm Dos 63,525
10.2.3 Tegel Plint
10.2.4 Plint Granit Impor 10 x 60 Buah 28,350
10.2.5 Plint Granit Impor 10 x 40 Buah 28,350
10.2.6 Kuku Tegel Buah 13,860
10.2.7 Batu Koral Bks 315,000
10.2.8 Bahan Dinding
10.2.9
10.2.10 Tegel Keramik Polos 20 x 20 cm Dos 63,525
10.2.11 Tegel Kleramik Warna 20 x 20 cm Dos 63,525
10.2.12 Tegel Keramik Polos 25 x 20 cm Dos 63,525
10.2.13 Tegel Kleramik Warna 25 x 20 cm Dos 63,525
10.2.14 Tegel Keramik Polos 25 x 40 cm Dos 86,625
10.2.15 Tegel Keramik 30 x 60 cm Dos 138,600
10.2.16 Tegel Keramik 18 x 27 Dos 94,500
10.2.17 Batu Alam/Tempel Batu Alam M² 207,900
10.2.18 Batu Andesit M² 254,100
10.2.19 Batu Paras M² 254,100
10.3
10.3.1 Bahan Atap
Bahan Atap
Seng

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2020
Dalam Rupiah (Rp)

No JENIS BARANG SPESIFIKASI SATUAN HARGA

1 2 4 5
Seng BJLS 0.30 mm Lembar 66,990
Seng BJLS 0.28 mm Lembar 75,075
Seng Gelombang BJLS 34" BJLS
Lembar 51,975
0,18 MM 6,7 kk
Seng Gelombang BJLS 33" BJLS
Lembar 48,510
0,22 MM 6,7 kk
Seng Gelombang BJLS 32" BJLS
Lembar 86,625
0,35 MM 10 kk
Seng Gelombang BJLS 28" BJLS
Lembar 98,175
0,30 MM 10 kk
Seng Zingagalume / Spandek Tebal 2,5 mm m' 32,340
Tebal 3 mm m' 42,735
Tebal 3,5 mm m' 48,510
Tebal 4 mm m' 48,510
Genteng Metal
Maxi Group Lembar 28,350
Genteng Metal Permukaan Halus Lembar 78,750
Genteng Metal Permukaan Kasar Lembar
Genteng Keramik/Beton
Genteng Beton Buah 18,900
Genteng Keramik Buah 36,750

Nok
Nok Atap Zinggalume 44,730
Nok Atap Metal Sheet
Nok Genteng Beton 47,250
Nok Genteng Keramik 78,750
Nok Aluminium SWG 28"-180 cm 44,730
Nok Aluminium SWG 28"-180 cm
List Plank Semen ( super Plank )
10 x 244x 0,9 cm lembar 34,125
10 x 244x 0,9 cm lembar 57,750
10 x 244x 0,9 cm lembar 68,250
Wood Plank 10 x 244x 0,9 cm lembar 120,750
Rangka Atap
Baja Ringan ( Kuda- Kuda ) 0.60 Btg 60,375
0.70 Btg 67,620
0.75 Btg 72,450
1.00 Btg 120,750
Rangka Atap
Baja Ringan ( Rink ) 25.00 Btg 30,188
3.00 Btg 33,810
Bahan Talang
Talang Jural Alunzinc (Baja Ringan ) M' 55,755

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2020
Dalam Rupiah (Rp)

No JENIS BARANG SPESIFIKASI SATUAN HARGA

1 2 4 5
Setengah Lingkaran M' 55,755
Segiempat M' 47,250

Talang PVC
Setengah Lingkaran Dia 6 Buah 55,755
Dia 8 Buah 47,250
Segi Empat
Karet Pelapis Genteng
Lebar 55 cm M' 10,500
Lebar 90 cm M' 19,425
Lebar 120 cm M' 26,250

Corong Talang PVC


Setengah Lingkaran 85,680
Segi Empat 40,215

Bahan Plafond Kg
Penutup Plafond Lembar
Eternit 100 x 100 Lembar 28,350
Asbes 100 x 100 M1 30,450
Gypsum Board Tbl 9 mm Lembar 78,750
Gypsum Board Tbl 12 mm 110 x 220 97,650
Calsiboard 120 x 240 92,400
Tripleks Melamin
Lest Profil Kayu 2 x 3 cm m1 6,064
3 x 3 cm m1 9,096
4 x 4 cm m1 13,571
5 x 5 cm m1 18,191
Rangka Plafon
Hollow Kelas 1 ( Galvanis )
2x4 Btg 34,178
4x4 Btg 60,638
4x6 Btg 66,150
6x6 Btg 73,868

Hollow Kelas 2
2x4 Btg 25,200
4x4 Btg 57,750
HPL 220,500
Lem HPL (Fox Kining ) Kaleng Besar 137,550
UB 888/400 Compoud Zak
Cornis Zak
Isolasi Gypsum ( Paper Tape ) Roll 15,750
Screws /Sekrup dos

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2020
Dalam Rupiah (Rp)

No JENIS BARANG SPESIFIKASI SATUAN HARGA

1 2 4 5
Kertas Amplas Lembar 5,250

BAHAN BESI/BAJA
Besi Beton SNI
* d=5 mm Btg 20,475
* d=6 mm 0,22 kg/m1 Btg 27,720
* d=8 mm 0,39 kg/m1 Btg 43,575
* d=10 mm 0,62 kg/m1 Btg 68,775
* d=12 mm 0,89 kg/m1 Btg 100,164
* d=14 mm 1,21 kg/m1 Btg 151,719
* d=16 mm 1,39 kg/m1 Btg 185,400
* d=19 mm 2,23 kg/m1 Btg 231,584
* d=22 mm 2, 46 kg/m1 Btg 409,020
Besi Beton Polos Kg 13,650
Besi Beton Ulir Kg 14,490
Besi Siku
Besi Siku 30.30.3 Btg 69,300
Besi Siku 40.40.4 Btg 103,950
Besi Siku 40.40.3 Btg 10,710
Besi Siku 50.50.4 Btg 150,675
Besi Siku 50.50.5 Btg 181,125
Besi Siku 60.60.6 Btg 265,650
Besi Siku 70.70.7 Btg 404,250
Besi Siku 100.100.10 Btg 1,016,400
Besi Hollow Medium A
1,5 x 1,5 Btg 55,750
20 x 20 Btg 69,300
20 x 40 Btg 80,850
40 x 40 Btg 115,500
40 x 60 Btg 161,700
50 x 50 Btg 161,700
60 x 60 Btg 236,775
Besi Strip Btg
30,2 mm 1x4 Btg 26,250
30,3 mm 1x5 Btg 38,118
35,4 mm 1x6 Btg 49,035
40,4 mm 2x6 Btg 60,165
40,6 mm 2x8 Btg 69,930
50,6 mm 1,5 x 6 Btg 87,780
Besi Hollow Medium B
20 x 20 Btg 35,700
20 x 40 Btg 53,550
40 x 40 Btg 68,250
40 x 60 Btg 78,750

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2020
Dalam Rupiah (Rp)

No JENIS BARANG SPESIFIKASI SATUAN HARGA

1 2 4 5
50 x 50 Btg 89,250
60 x 60 Btg
Besi Hollow Galvanis
20 x 20 Btg
20 x 40 Btg
40 x 40 Btg
40 x 60 Btg
50 x 50 Btg
60 x 60 Btg
Besi Hollow Stailiss 20 x 20 Btg 144,900
20 x 40 Btg 213,675
40 x 40 Btg 288,750
20 x 60 Btg 314,213
Besi Plat Stailiss
Baja Pofil Kg 18,900

Besi Plat
* 1,5 mm Lembar 367,200
* 2 mm Lembar 472,500
* 2,5 mm Lembar 546,000
* 3 mm Lembar 640,500
* 3, 5 mm Lembar 766,500
* 4 mm Lembar 882,000
* 4,5 mm Lembar 966,000
* 5 mm Lembar 1,345,575
* 6 mm Lembar 1,599,675
* 8 mm Lembar 2,100,000
* 9 mm Lembar 2,336,250
Tali Sleng
d = 36 mm M' 225,750
d = 32 mm M' 147,000
d = 28 mm M' 89,775
d = 24 mm M' 81,900
d = 19 mm M' 58,485
d = 38 mm M' 204,750
Kawat Las Dos 94,500
Jarum Pengeras 2" Buah 2,268,000
1,5 " Buah 1,652,700
1" Buah 787,500
Kuku Macan d= 1, 5 Buah 73,500
d=1,0 Buah 38,115
d=0,5 Buah 28,613
Kawat
Licin 4 mm kg 21,000

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2020
Dalam Rupiah (Rp)

No JENIS BARANG SPESIFIKASI SATUAN HARGA

1 2 4 5
Beton kg 176,850
Bronjong d= 6mm kg 37,800
Bronjong Pabrikasi Uk 2x10,5 mm Buah
Nyamuk Plastik Meter 19,950
Ayakan Kecil Meter 19,950
Duri 100 m/roll Roll 147,000
Paku
Biasa Kg 17,850
Asbes Kg 17,850
Seng (Payung)RRT Kg 31,500
Skrup besi hollow Dos/Bks 68,250
Skrup Biji 26,250
Payung Berulir Kg 31,500
Sirap Kg 26,250
Beton Kg 33,075
Ramset biji 525
Baut Baja 30,608
BAHAN ALUMINIUM
Almunium 4 Inci ( warna ) 154,665
Almunium Composit Panel 315,000
Almunium Color Pintu & Jendela 12,600
Kusen Aluminium 4'x1 3/4"(YKK) M'
Kusen Aluminium 3'x1 1/2"(YKK) M'
Kusen Aluminium 2"x1 " M'

KACA
Bening 3 mm M² 105,000
Bening 5 mm M² 115,500
Buram 3 mm M² 107,730
Buram 5 mm M² 315,000
Rayben 3 mm M² 115,500
Rayben 5 mm M² 141,750
Biru 5 mm M² 155,925
Rangka Nako Lengkap Terali Mata 21,000
Seal Besar Untuk Kaca Tube 36,750
Seal Kacil Untuk Kaca Tube 31,500
Sealant Kls 1 Tube 68,250
PENGGANTUNG/JENDELA/PINTU
Kunci Tanam
Union 2x Slag ( Biasa ) Buah 68,250
Benotti 2 Slag ( Semacamnya ) Buah 168,000
Ses 2x Slag ( Semacamnya ) Buah 219,450
Ses 1x Slag ( Semacamnya )
Kunci Sloot Buah 15,750

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2020
Dalam Rupiah (Rp)

No JENIS BARANG SPESIFIKASI SATUAN HARGA

1 2 4 5
Kunci Lemari Buah 11,650
Penggantung
Hak Angin Kecil ( Pasangan ) Buah 14,238
Hak Angin Besar ( Pasangan ) Buah 21,000
Grendel
Grendel Kecil Buah 12,810
Grendel Kecil Buah 24,150
Grendel Besar Buah 34,650
Grendel Tanam Buah 49,088
Grendel Kodok Buah 35,700
Engsel Pintu
Engsel Pintu Biasa Pasang 10,868
Engsel Pintu Ex.SES Pasang 27,300
Engsel Jendela Buah 17,325
Engsel Jendela ex.SES Pasang 21,000
Expaynolet
Handel Pintu Aluminium Buah 157,500
Hak Angin Buah 10,500
Handel Pintu Bossini Buah 68,250
Arcel Stainless Buah 273,000
Stainless Buah 307,650
Tarikan Jendela Buah 10,500

BAHAN SANITASI

1 Pipa Besi GIP 1/2 inci - 6 m btg 71,663


3/4 inci - 6 m btg 86,625
1 inci - 6 m btg 102,638
1 1/2 inci - 6 m btg 165,375
2 inci - 6 m btg 270,113
2 1/2 inci - 6 m btg 392,490
3 inci - 6 m btg 407,925

2 Pipa Superalon PVC AW Panjang 4 Mtr


1/2 inci 4 m btg 24,255
3/4 inci 4 m btg 30,870
1 inci - 4 m btg 49,613
1 1/2 inci - 4 m btg 60,638
2 inci - 4 m btg 82,688
2 1/2 inci - 4 m btg 93,713
3 inci - 4 m btg 187,425
4 inci - 4 m btg 253,575

3. Pipa PVC Panjang 4 mtr AW

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2020
Dalam Rupiah (Rp)

No JENIS BARANG SPESIFIKASI SATUAN HARGA

1 2 4 5
1/2 inci btg 18,900
3/4 inci btg 18,900
1 inci btg 47,250
1 1/2 inci btg 52,500
2 inci btg 68,250
2 1/2 inci btg 84,000
3 inci btg 115,500
4 inci btg 189,000
5 Inci btg 367,500
6 Inci btg 505,000

4 Pipa PVC Panjang 4 Mtr D untuk Saluran


2 inci 47,250
2 1/2 inci 68,250
3 inci 78,750
4 inci 126,000
5 Inci
6 Inci 257,775

5 Pipa jenis Btg C Untuk Instalasi Listrik


5/8 inci - 4 m btg 9,135
3/4 inci - 4 m btg 14,280
1 inci - 4 m btg 19,425
1 1/2 inci - 4 m btg 20,580
2 inci - 4 m btg 27,510
6 Sambungan Pipa
Lurus 1/2 Inci Buah 1,575
Knie 1/2 Inci Buah 2,100
Tee 1/2 Inci Buah 2,100
Lurus 3/4 Inci Buah 2,100
Knie 3/4 Inci Buah 2,625
Tee 3/4 Inci Buah 3,150
Lurus 2 Inci Buah 3,150
Knie 2 Inci Buah 4,200
Tee 2 Inci Buah 5,250
Lurus 3 Inci 5,250
Knie 3 Inci 8,400
Tee 3 Inci 9,450
Lurus 4 Inci 13,650
Knie 4 Inci 10,500
Tee 4 Inci 15,750

Kloset Duduk Lengkap Ex.KIA(Warna ) Buah 2,727,900


Kloset Duduk Lengkap Ex.TOTO(Warna ) Buah 3,037,650

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2020
Dalam Rupiah (Rp)

No JENIS BARANG SPESIFIKASI SATUAN HARGA

1 2 4 5
Kloset Jongkok Buah 326,025
Wastahafel Gantung Keramik(Warna) Buah 630,000
Wastahafel Cuci Piring 1 Mata Biasa Buah 210,000
Wastahafel Cuci Piring 2 Mata Biasa Buah 630,000
Wastahafel Cuci Piring 1 Mata Buah 630,000
Wastahafel Cuci Piring 2 Mata Buah 1,260,000
Pompa Air PS 130 Bit Ex. Simisu/SANYO Buah 2,100,000
Pompas Air Ex.Simizu Sumur Dangkal Buah 573,300
Urinior Buah 840,000
Backtup
Biasa Fiber Buah 2,415,000
Ex.Toto Keramik Buah 4,567,000
Hand Shower Mini Buah 220,500
Shower Gantung Untuk Mandi Gantung Buah 688,500
Shower Tempel Untuk Mandi Stainless Buah 1,365,000
Bak Mandi Fiber Buah 400,050
Rezervoir Fiber= 0,5 M3 Buah 866,250
Rezervoir Fiber= 1 M3 Buah 1,455,300
Rezervoir Fiber= 2 M3 Buah 2,625,000
Stop Kran Besi Buah
1/2 Inci Pvc Buah 20,066
Kuningan Buah 49,350
3/4 Inci Pvc Buah 26,250
Kuningan Buah 58,800
1 Inci Pvc Buah 58,800
Kuningan Buah 136,500
2 Inci Pvc 126,000
Kuningan 273,000
Tempat Sabun Keramik Buah 36,750
Kran Air Buah
Biasa Buah 15,750
Angsa Biasa Buah 126,000
Kls I Buah 892,500
Wastafel Biasa Buah 126,000
Kls I Buah 892,500
Kristal Buah 108,780
Pembuangan Kolam Buah 4,000
Pintu KM/WC (180 x170 )cm Aluminum Buah 892,500
Pintu KM/WC (180 x170 )cm Lengkap Buah 288,750
Pintu KM/WC (180 x170 )cm Zinggalume Buah 252,000
Kelas 1 Buah 577,500
Kelas 2 Buah 252,000
Floor Drain Stainless Kelas I Buah 183,750
Kelas II Buah 47,250

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2020
Dalam Rupiah (Rp)

No JENIS BARANG SPESIFIKASI SATUAN HARGA

1 2 4 5
Floor Drain PVC Biasa Buah 18,900
Kelas I Buah 89,250

Bahan Finishing Cat


Cat Dasar Ex.Andurcoat Liter 89,513
Cat Tembok
Interior
Ex. Dulux Kg 37,800
Ex.Mowilex Kg 37,800
Ex.Jotun Kg 50,400
Avitex Kg 16,800
Metrolite Kg 32,243
Ex.Aries Gold Kg 9,387
Exterior Ex. Dulux Kg 75,600
Ex.Mowilex Kg 73,500
Ex.Jotun Kg 76,650
Cat Besi/Kayu
Auto Lux Liter 68,250
Suzuka Liter 63,000
mowilex Liter 57,110
Dulux Liter 49,560
Meni Besi Kg 18,209
Sending Sungkay Liter 59,850
Inpra Liter 59,850
Cat Clear Ex.Impra Kg 63,000
Cat Clear Dop Liter 68,250
Wood Filler Ex.Impra Kg 63,000
Glotex Kg 45,675
Avian Kg 57,750
Politur Kg 57,750
Meni Kayu Kg 18,218
Cat Atap/Genteng
Yoko Kg 20,948
AGA Kg 27,038
Avitex 33,994
Acicryl 54,915
Mowilex Liter 67,694
Dulux Liter 111,794
Plamur Merah Zak 63,000
Yoko Kg 4,200
Scancoat Kg 3,780
Dempul Besi/Kayu
Dempul Mobil Besar Klg 115,500

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2020
Dalam Rupiah (Rp)

No JENIS BARANG SPESIFIKASI SATUAN HARGA

1 2 4 5
Dempul Mobil Sedang Klg 57,750
Dempul Mobil Kecil Klg 36,750
Dempul Impra Klg 36,750
Dempul Isamu Klg 57,750
Dempul Kayu Klg 34,808

Minyak Cat
Afdunner Liter 8,400
Thinner Bias Liter 20,790
Thinner A 9 Ex.Avian ) 5 Kg Liter 126,000
Thinner Super Liter 29,400

BAHAN LISTRIK
Lampu Jalan Buah 4,989,600
Tiang PJU Octagonal Galvanis Single 9 Mtr Buah 6,142,500
Tiang PJU Octagonal Galvanis Duble 9 Mtr Buah 5,526,675
Tiang PJU Octagonal Galvanis Decoratif Tinggi 9 Mtr Double Buah 7,856,415
Tiang PJU Octagonal Galvanis Decoratif Tinggi 9 Mtr Single Buah 15,642,900
Lampu LED 150 Watt/220 V AC Buah 13,800,150
Lampu LED 120 Watt/220 V AC Buah 63,000
Kapasitor HPIT 250 W H Buah 71,190
Kapasitor HPIT 400 W PH Buah 71,190
Kapasitor SON T 400 W PH Buah 71,190
Kapasitor SON T 400 W Buah 71,190

Bahan Listrik Bangunan


Kuku Macan Buah 34,650
Pipa Union Untuk Kabel
5/8 Inci - 4 m Btg 8,925
1 Inci - 4 m Btg 18,270
1 1/2 Inci - 4 m Btg 22,785
2 Inci- 4 m Btg 28,350
Kabel Listrik
Kabel NYY
1 x 1 1/2 mm2 roll 309,750
1 x 2 1/2 mm2 m1 40,950
2 x 1 1/2 mm2 m1 14,128
2 x 2 1/2 mm2 m1 14,700
3 x 1 1/2 mm2 m1 14,333
3 x 2 1/2 mm2 m1 17,640
Lampu
Neon Buah
1 x 20 W Kap Biasa Buah 126,000
2 x 20 W (Pakai Kap ) Buah 171,780

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2020
Dalam Rupiah (Rp)

No JENIS BARANG SPESIFIKASI SATUAN HARGA

1 2 4 5
1 x 40 W Kap Biasa Buah 138,750
2 x 40 W (Pakai Kap ) Buah 286,335
lampu Pijar Buah
25 Watt Buah 10,500
40 Watt Buah 26,250
kapsul Ex.Philips 5 Watt Buah 39,900
18 Watt Buah 48,300
25 Watt Buah 58,800
MCB
MCB 6 A Buah 71,715
MCB 10 A Buah 99,750
MCB 30 A Buah 378,000
Shakelar Phase
Biasa Tunggal Buah 7,875
Biasa Ganda Buah 14,175
Broco Tunggal Buah 17,325
Broco Ganda Buah 24,255
Klipsal/ Panasonic Tunggal Buah 28,350
Klipsal/ Panasonic Ganda Buah 36,750
STOP KONTAK
Biasa ( Tempel ) Buah 4,725
Broco ( Tempel ) Buah 24,255
Klipsal /Panasonic ( Tanam ) Tunggal Buah 28,350
Klipsal /Panasonic ( Tanam ) Ganda Buah 36,750
Fitting
Keramik Buah 21,053
Biasa Buah 3,675
Kembang Buah 23,100
Cup Down Light 4 inc Buah 54,600
3 inc Buah 44,100
5 inc Buah 66,150

BAHAN BAKAR MINYAK


Premium Industri Ltr 8,925
Pelumas Ltr 16,695
Solar Ltr 5,150
Solar Industri Ltr 7,900
Pertamax Ltr 8,450
Minyak Tanah Ltr
Minyak Tanah Industri Ltr
Pertalite Ltr 7,700

UPAH KERJA
Pekerja Orang/Hari 86,500

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2020
Dalam Rupiah (Rp)

No JENIS BARANG SPESIFIKASI SATUAN HARGA

1 2 4 5
Tukang :
Tukang Kayu Orang/Hari 103,000
Tukang Batu Orang/Hari 103,000
Tukang Cat Orang/Hari 103,000
Tukang Listrik Orang/Hari 103,000
Tukang Pipa Orang/Hari 98,700
Tukang Besi Orang/Hari 103,000
Operator/Driver
Sopir Orang/Hari 111,500
Pembantu Sopir Orang/Hari 97,500
pembantu Masinis Orang/Hari 97,500
Operator Terlatih Orang/Hari 113,500
Operator Kurang Terlatih Orang/Hari 97,500
Mekanik Orang/Hari 120,000
Kepala Tukang
Kepala Tukang Kayu Orang/Hari 130,000
Kepala Tukang Batu Orang/Hari 130,000
Kepala Tukang Cat Orang/Hari 130,000
Kepala Tukang Listrik Orang/Hari 130,000
Kepala Tukang Pipa Orang/Hari 130,000
Kepala Tukang Besi Orang/Hari 130,000
Mandor Orang/Hari 130,000

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2020
STANDAR HARGA SATUAN BAHAN BANGUNAN DAN UPAH KERJA
PEMERINTAH PROVINSI SULAWESI SELATAN
KABUPATEN BULUKUMBA
TAHUN 2020
Dalam Rupiah (Rp)
NO JENIS BARANG SPESIFIKASI SATUAN HARGA

1 2 3 4 5
A. BAHAN DASAR
1 Batu Kali :
Utuh m³ 244,500
Batu Pecah 7 - 10 cm m³ 400,000
Batu Pecah 5 - 7 cm m³ 400,000
Batu Pecah 3 - 5 cm m³ 400,000
Batu Pecah 2 - 3 cm m³ 400,000
Batu Pecah 1 - 2 cm m³ 400,000
Batu Pecah 0,51 - 1 cm m³ 400,000
2 Batu Merah Buah 800
3 Batako Buah 1,900
4 Batu Gunung m2 215,000
5 Batu Alam
Andesit Biasa m² 226,000
Andesit Susun Sirih m² 205,000
Andesit Halus m² 196,000
Andesit Gelombang m² 211,000
Batu Candi pemukaan Rata m² 190,000
Batu palimanag Kuning m² 196,000
Batu Hijau Sukabumi m² 186,000
Batu Bali Green m² 181,000
Batu Napoli m² 196,000
Paras jokja Besar m² 196,000
Batu Ciribon beraturan m² 160,000
Batu ciribon tidak beraturan m² 91,000
6 Tanah timbunan biasa m3 102,100
Tanah timbunan gunung / kapur putih m³ 107,500
7 Pasir
Timbunan / urung m³ 147,000
Pasangan m³ 292,400
Beton m³ 349,000
8 Kerikil m3 260,100
9 Sirtu m3 175,200
10 Kapur campur BKS 4,300
11 Semen Pc
Ordinary portland cement (OPC 50 kg) Kg 1,400
porland pozzoland cement (OPC 40 kg) Kg 1,500
Porland compisite cement (OPC 40 kg) Kg 1,400
Putih tiga roda @ 40 kg Kg 3,400
Portland cement Holsim 50 kg kg 1,600
Portland cement holsim 40 kg kg 1,730
Semen nat putih kg 27,000
12 Semen nat warna kg 27,000
13 Paving Blok Lokal
Tebal 6 cm Biji 1,400
Tenal 8 cm Biji 1,600
Model Berlian Biji 1,600

Harga Satuan Bahan Bangunan dan Upah Kerja Tahun 2020


Dalam Rupiah (Rp)
NO JENIS BARANG SPESIFIKASI SATUAN HARGA

1 2 3 4 5
14 Paving Blok Lokal ( K225 )
Tebal 6 cm Biji 1,600
Tebal 8 cm Biji 1,700
15 Paving Blok Mutu ( K300 )
Tebal 6 cm Biji 1,800
Tebal 8 cm Biji 1,900
16 Paving Blok Mutu ( K400 ) Biji 2,100
17 Tiopioskup ( K225 ) Biji 6,000
18 Kanstin 20x25x50 Biji 43,000
Buis beton
d=20 Biji 267,000
d=30 Biji 311,000
d=40 Biji 378,400
d=50 Biji 438,000
d=50 Biji 495,000
19 Gorong gorong
d=30cm;pjg 1m Biji 111,000
d=40cm;pjg 1m Biji 130,000
d=60cm;pjg 0,5 m Biji 111,000
d=70cm;pjg 0,5 m Biji 121,000
d=80cm;pjg 0,5 Biji 132,000
B HARGA ASPAL/HOTMIX
1 Aspal 60/70 (155kg/drum) kg 7,419
2 Aspal 60/70 (183kg/drum) kg 6,557
3 Aspal Shell 60/70 (155kg/drum) kg 8,065
4 Aspal Pertamina 60/70 (155kg/drum) kg 7,419
5 Aspal Caltex 60/70 (155kg/drum) kg 7,419
6 aspal araco 60/70 (200kg/drum) kg 6,250
7 Hotmix ATB Ton 1,085,000
8 Hotmix AC-BC Ton 1,111,000
9 Hotmix AC-WC Ton 1,150,000
10 Hotmix III-laston Ton 1,202,000
11 Hotmix III-laston spec Ton 1,306,000
12 Hotmix HRS Ton 1,293,000
13 Hotmix Sand Sheet Ton 1,423,000
14 Hotmix Sand Sheet Spec Ton 1,527,000
15 Tack Coat / Emulsi Dos 12,000
16 Prime Coat Dos 16,000
C BAHAN KAYU
1 Kayu Kelas II
Balok Gergaji Sawmil M3 10,000,000
Papan gergaji Swamil M3 10,750,000
2 Kayu Kelas II
Balok M3 6,450,000
Papan M3 6,450,000
3 Kayu kelas III
Balok M3 4,680,000
Papan M3 4,680,000
4 Kayu Kelas IV
Balok M3 3,430,000
Papan M3 3,430,000
D D.BAHAN LANTAI
Tegel Keramik

Harga Satuan Bahan Bangunan dan Upah Kerja Tahun 2020


Dalam Rupiah (Rp)
NO JENIS BARANG SPESIFIKASI SATUAN HARGA

1 2 3 4 5
1 Putih 10x20 cm Dos 73,000
2 warna 10x20 cm Dos 73,000
3 Putih 20x20cm Dos 73,000
4 Warna 20x20cm Dos 62,000
5 Putih 20x25cm Dos 62,000
6 Warna 20x25cm Dos 62,000
7 Putih 30x30cm Dos 49,000
8 Warna 30x30cm Dos 75,000
9 putih 40x40 cm Dos 54,000
10 Warna 40x40 cm Dos 75,000
11 Warna 50x50cm Dos 97,000
12 Warn 60x60 cm Dos 269,000
13 Motif 60x60 cm Dos 270,000
14 Granit 60x60cm Dos 274,000
15 Tegel Plint 10x30cm Lbr 13,000
16 Tegel Plint 10x40cm Lbr 16,000
E BAHAN KACA
1 Kaca Bening 3 mm uk.152x122cm Meter 72,000
2 Kaca Bening 5 mm uk.152x122cm Meter 103,000
3 Kaca Ryben 3 mm uk.152x122cm Meter 77,000
4 Kaca Ryben 5 mm uk.152x122cm Meter 103,000
5 Rangka Nako Lengkap Terali 7 Mata Set/Daun 132,000
F BAHAN BESI
1 Besi Beton
Polos Kg 31,000
Ulir Kg 31,000
2 Paku
Paku biasa kg 19,000
Paku Asbes kg 59,000
Paku seng (Payung )RRT Dos 54,000
Paku Skrub 31/1 inci Dos 65,000
Paku skrup 4 inci Biji 800
Paku Payung Berulir 75mm kg 30,000
paku Sirap 3 cm kg 27,000
Paku Beton Hitam 7 cm Dos 38,000
Paku Beton Hitam 10 cm Dos 59,000
Paku Baton Putih Dos 27,000
3 Kawat
Beton Kg 27,000
Nyamuk Meter 27,000
Ayakan Kecil Meter 32,000
Duri@ 7kg Roll 153,000
Duri@ 10 kg Roll 185,000
4 Besi Plat
2 mm= 120x240 mm Lembar 645,000
3 mm= 120x240 mm Lembar 968,000
5 Besi Strep
1x4 cm ; L =3 m Batang 21,000
1x5 cm ; L= 3 m Batang 14,000
1 1/4x5 cm; L = 3m Batang 86,000
1 1/2x5 cm ; L =3m Batang 96,000
2x6 cm ; L 3m Batang 129,000
6 Besi Siku

Harga Satuan Bahan Bangunan dan Upah Kerja Tahun 2020


Dalam Rupiah (Rp)
NO JENIS BARANG SPESIFIKASI SATUAN HARGA

1 2 3 4 5
30.30.3 Batang 53,000
40.40.4 Batang 107,000
40.40.3 Batang 96,000
50.50.4 Batang 88,000
50.50.5 Batang 215,000
60.60.6 Batang 276,000
70.70.7 Batang 365,000
7 Besi Type C (Rangka Baja Ringan) 6m
canal 8 cm x 0,75 ,p = 5,8 meter Batang 97,000
canal 8 cm x 0,65,p = 5,8 meter Batang 81,000
Besi CNP 100x50x20; t=1.15 mm; p=6 mtr Batang 169,000
Besi CNP 100x50x20; t=1.35 mm; p=6 mtr Batang 195,000
Besi CNP 100x50x20; t=1.55 mm; p=6 mtr Batang 223,000
Besi CNP 100x50x20; t=2.00 mm; p=6 mtr Batang 285,000
Besi CNP 125x50x20; t=1.15 mm; p=6 mtr Batang 192,000
Besi CNP 125x50x20; t=1.35 mm; p=6 mtr Batang 224,000
Besi CNP 125x50x20; t=1.55 mm; p=6 mtr Batang 255,000
Besi CNP 125x50x20; t=2.00 mm; p=6 mtr Batang 325,000
Besi CNP 150x50x20; t=1.55 mm; p=6 mtr Batang 283,000
Besi CNP 150x50x20; t=2.00 mm; p=6 mtr Batang 362,000
8 Besi Hollow (baja Ringan)
20 x 40 x 0.25 ;p = 5.8 meter Batang 27,000
20 x 40 x 0.30 ;p = 5.8 meter Batang 32,000
20 x 40 x 0.35 ;p = 5.8 meter Batang 27,000
9 Besi Hollow (Galvanis)
Besi Hollow (Galvanis)
Hollow Tipis Uk 20 x 40 , L = 6m Batang 64,000
Hollow B Uk 20 x 40 ,L = 6m Batang 75,000
Hollow A Uk 20 x 40 ,L = 6m Batang 86,000

Hollow Tipis Uk 15 x 30 , L = 6m Batang 49,000


Hollow B Uk 15 x 30 ,L = 6m Batang 51,000
Hollow A Uk 15 x 30 ,L = 6m Batang 62,000

Hollow Tipis Uk 20 x 40 , L = 6m Batang 47,000


Hollow B Uk 20 x 40 ,L = 6m Batang 56,000
Hollow A Uk 20 x 40 ,L = 6m Batang 84,000
Hollow Tipis Uk 30 , L = 6m Batang 55,000
Hollow B Uk 30 ,L = 6m Batang 66,000
Hollow A Uk 30 ,L = 6m Batang 96,000

Hollow Tipis Uk 40 , L = 6m Batang 81,000


Hollow B Uk 40 ,L = 6m Batang 102,000
Hollow A Uk 40 ,L = 6m Batang 134,000

UNP : 5 L = 6m Batang 270,000


UNP : 6.5 = 6m Batang 344,000
UNP : 8 = 6m Batang 408,000
UNP : 10 = 6m Batang 526,000
UNP : 12 = 6m Batang 752,000
Besi UNP Kanal U 50,50x38x5 mm; p= 6mtr Batang 134,000
Besi UNP Kanal U 65,65x42x5 mm; p= 6mtr Batang 206,000
Besi UNP Kanal U 80,80x42x6 mm; p= 6mtr Batang 241,000

Harga Satuan Bahan Bangunan dan Upah Kerja Tahun 2020


Dalam Rupiah (Rp)
NO JENIS BARANG SPESIFIKASI SATUAN HARGA

1 2 3 4 5
Besi UNP Kanal U 100,100x50x5 mm; p= 6mtr Batang 329,000
Besi UNP Kanal U 120,120x55x6 mm; p= 6mtr Batang 477,000
Besi UNP Kanal U 150,150x72x6.5mm; p=6mtr Batang 860,000
Besi UNP Kanal U 200,200x80x7.5mm; p= 6mtr Batang 1,478,000
G BAHAN PIPA
1 Pipa Besi GIP
Ø 1/2 Inci - 6 m Batang 37,000
Ø 3/4 Inci - 6 m Batang 45,000
Ø 1 Inci - 6 m Batang 53,000
Pipa Besi GIP Medium B
Ø 2 1/2 Inci - 6 m Batang 427,000
Ø 3 Inci - 6 m Batang 510,000
Ø 1/2 Inci - 6 m Medium A Batang 127,000
Ø 3/4 Inci - 6 m Medium A Batang 129,000
Ø 1 Inci - 6 m Medium A Batang 232,000
Ø 1,5 Inci - 6 m Medium A Batang 376,000
Ø 2 Inci - 6 m Medium A Batang 514,000
Ø 2 1/2 Inci - 6 m Medium A Batang 845,000
Ø 3 Inci - 6 m Medium A Batang 1,129,000
1 Pipa PVC Air Bersih
Pipa Paralon PVC
Ø 1/2" - 4 m Batang 34,000
Ø 3/4" - 4 m Aw Batang 41,000
Ø 1" - 4 m Aw Batang 51,000
Ø 1,5" - 4 m Aw Batang 95,000
Ø 2" - 4 m Aw Batang 142,000
Ø 2,5" - 4 m Aw Batang 183,000
Ø 3" - 4 m Aw Batang 261,000
Ø 4" - 4 m Aw Batang 381,000
2 Pipa Untuk Saluram Pembuangan Air
Ø 1/2 inci - 4 m Batang 33,000
Ø 3/4 inci - 4 m Batang 41,000
Ø 1 inci - 4 m Batang 51,000
Ø 1 1/2 inci - 4 m Batang 73,000
Ø 2 inci - 4 m Batang 95,000
Ø 2 1/2 inci - 4 m Batang 183,000
Ø 3 inci - 4 m Batang 262,000
Ø 4 inci - 4 m Batang 381,000
Pipa Untuk Instalasi Listrik
Ø 5/8 inci - 4 m Batang 11,000
H BAHAN LANGIT - LANGIT
1 Eternit 100 x 100 Set 21,000
Tripleks
122 x 244 x 0.2 cm Lembar 46,000
122 x 244 x 0.3 cm Lembar 64,000
122 x 244 x 0.4 cm Lembar 75,000
122 x 244 x 0.6 cm Lembar 86,000
122 x 244 x 0.9 cm Lembar 129,000
2 Tripleks Melamin
122 x 244 x 0.3 cm Lembar 72,000
3 Teakwood
80 x 244 x 0.3 xm Lembar 126,000
122 x 244 x 0.3 cm Lembar 134,000

Harga Satuan Bahan Bangunan dan Upah Kerja Tahun 2020


Dalam Rupiah (Rp)
NO JENIS BARANG SPESIFIKASI SATUAN HARGA

1 2 3 4 5
Karsiboard Lembar 70,000
Gipsum Lembar 74,000

4 Hard Board 122 X 244 cm Lembar 70,000


5 Asbes Plat Harfeks
200 x 100 x 0.0 cm Lembar 67,000
6 Boundeck
Tebal 1 mm M' 204,000
Tebal 0.75 mm M' 161,000
Tebal 0.70 mm M' 156,000
Tebal 0.65 mm M' 150,000
7 List Profil
2 x 3 cm / 4 M Batang 8,000
3 x 3 cm / 4 M Batang 11,000
4 x 5 cm / 4 M Batang 16,000
I BAHAN ATAP
1 Genteng
Asbes Gelombang 7 Kaki Lembar 68,000
2 Seng Gelombang Kecil
BJLS 0.20 mm Kaki 7,000
BJLS 0.30 mm Lbr 70,000
BJLS 0.30 mm color 6 Kaki Lbr 65,000
3 Seng Plat
BJLS 0.30 mm 90 x 180 Lembar 48,000
BJLS 0.30 mm 40 x 180 Lembar 54,000
4 Spandek
Spandek Silver
Spandek t = 0,30 Meter 48,000
Spandek t = 0,35 Meter 53,000
5 Spandek Warna
Spandek t = 0,30 Meter 54,000
Spandek t = 0,35 Meter 59,000
Baut Drillimg Biji 650
6 Atap Metal Lembar 43,000
Sakura Roof Lembar 43,000
Seng Plastik (Fiber) Kaki 16,000
7 Atap Metal Sakura Roof Buah 32,000
8 Casiplank/ Woodplank
Polos Meter 108,000
Motif Meter 114,000

J BAHAN PENGGANTUNG
1 Kunci Tanam
1 slag Buah 323,000
2 Penggangtung
Hak Angin Kecil Buah 22,000
Hak Angin Besar Buah 32,000
Grendel Kecil Buah 9,000
Grendel Besar Buah 38,000
Engsel Pintu Buah 38,000
Engsel Jendela Buah 27,000
Door Close Buah 161,000
K BAHAN SANITER

Harga Satuan Bahan Bangunan dan Upah Kerja Tahun 2020


Dalam Rupiah (Rp)
NO JENIS BARANG SPESIFIKASI SATUAN HARGA

1 2 3 4 5
1 Kloset jongkok Buah 215,000
2 Kloset Duduk DATA Buah 1,075,000
3 Wastafel Warna Buah 323,000
4 Wastafel Cuci Piring Logam Buah 194,000
5 Urinoir Lenngkap Buah 833,000
6 Bak Mandi Fiber Buah 376,000
7 Reservoir Fiber = 1 m3 Buah 1,400,000
8 Reservoir Fiber = 2 m3 Buah 3,000,000
9 Reservoir Stainless Stell = 1 m3 Buah 4,250,000
10 Stop Kran 3/4 Buah 86,000
11 Krank air 3/4 Buah 54,000
L POMPA AIR
Mesin Pompa
1 Pompa Mesin Kecil
Manual Buah 484,000
Outomatic Buah 741,000
2 Pompa Mesin Besar
Manual Buah 914,000
Outomatic Buah 3,762,000
M BAHAN FINISHING / CAT
1 Cat Tembok
Cat Dasar Kg 64,000
Cat Kilap Kg 107,000
Cat Nippon Esterior (Weatherbond) Kg 92,000
2 Cat Kayu
Cat Dasar Kg 134,000
Cat Kilap Ltr 134,000
Politur
SP 3 Kg 59,000
Warna Kg 62,000
Meni Kg 80,000
Minyak Cat Liter 29,000
Minyak Cat Botol 7,500
3 Cat Atap
Cat Dasar Kg 220,000
Cat Kilap Kg 220,000
Lem Seng Meter 16,000
Amplas / Kertas Gosok Lembar 11,000
Dempul Kg 43,000
Residu Liter 70,000
Kuas Besar Buah 24,000
Kuas Kecil Buah 19,000
Plamur / skimcoat @ 20 Kg Kg 3,500
Gerobak Dorong Buah 645,000
N BAHAN ISNTALASI LISTRIK
1 Kabel Listrik
Type NYA
1 1/2 mm Roll 215,000
2 1/2 mm Roll 269,000
2 Type NYY
2 x 1 1/2 mm Roll 430,000
2 x 2 2 1/2 mm Roll 591,000
3 Lampu TL

Harga Satuan Bahan Bangunan dan Upah Kerja Tahun 2020


Dalam Rupiah (Rp)
NO JENIS BARANG SPESIFIKASI SATUAN HARGA

1 2 3 4 5
1 x 18 W Buah 16,000
2 x 18 W Buah 32,000
1 x 40 W Buah 19,000
2 x 40 W Buah 38,000
4 Lampu Pijar
100 W Buah 8,000
Lampu Taman Mercury Buah 400,000
5 Lampu Pijar
Lampu Sorot 20 Watt + sett Buah 134,000
6 Lampu Jalan Tenaga Surya
20 Watt Set 16,968,750
30 Watt Set 17,906,250
40 Watt Set 18,750,000
50 Watt Set 20,656,250
60 Watt Set 22,468,750
70 Watt Set 24,300,000
80 Watt Set 26,612,500
90 Watt Set 29,812,500
100 Watt Set 30,562,500
Tiang Lampu Galvanis Anti Karat Meter 2,812,500
7 Saklar Phase
Tunggal Putih Buah 16,000
Double Putih Buah 25,000
8 Stop Kontak
Putih Buah 16,000
9 Zekering Kast Lokal Biasa
Lokal 2 Group Automat Buah 16,000
Fitting Buah 11,000
10 Pekerja
Pekerja Tak Terlatih Org/Hari 70,000
Pekerja Kurang Terlatih Org/Hari 75,000
Pekerja Terampil Org/Hari 85,000
11 Tukang
Tukang Kayu Org/Hari 100,000
Tukang batu Org/Hari 100,000
Tukang Cat Org/Hari 100,000
Tukang listrik Org/Hari 100,000
Tukang pipa Org/Hari 100,000
Tukang Besi Org/Hari 100,000
12 Kepala Tukang
Kepala Tukang Kayu Org/Hari 150,000
Kepala Tukang Batu Org/Hari 150,000
Kepala Tukang Listrik Org/Hari 150,000
Kepala Tukang Cat Org/Hari 150,000
Kepala Tukang Pipa Org/Hari 150,000
Kepala Tukang Besi Org/Hari 150,000
Mandor Org/Hari 150,000

Harga Satuan Bahan Bangunan dan Upah Kerja Tahun 2020


STANDAR HARGA SATUAN BAHAN BANGUNAN DAN UPAH KERJA
PEMERINTAH PROVINSI SULAWESI SELATAN
KABUPATEN SINJAI
TAHUN 2018

Dalam Rupiah (Rp)

NO JENIS BARANG SPESIFIKASI SATUAN HARGA

1 2 3 4 5
A. BAHAN DASAR
1. Batu kali
Utuh m² 237,500
- Split 7-10 cm m² 381,250
- Split 5 - 7 cm m² 400,000
- Split 3 - 5 cm m² 437,500
- Split 2 - 3 cm m² 475,000
- Split 1-2 cm m² 500,000
- Split 0,5 - 1 cm m² 531,250
2. Batu gunung m² 212,500
3. Batu Alam
Andesit Biasa m² 224,838
Andesit Susun Sirih m² 230,945
Andesit Halus m² 219,842
Andesit Gelombang m² 238,162
Batu Candi Permukaan Rata m² 189,308
Batu Palimanan Kuning m² 199,856
Batu Hijau Suka Bumi m² 170,988
Batu Bali Green m² 201,522
Batu Bali Napoli m² 207,628
Paras Jogja Besar m² 213,735
Batu Cirebon Beraturan m² 177,095
Batu Cirebon Tidak Beraturan m² 92,156
4. Batu Quarry (Ukuran Cruisher) M-010 m³ 279,799
Batu Belah 10-15 cm m³ 331,983
Batu Pecah 5-7 cm m³ 388,609
Batu Pecah 3-5 cm m³ 451,342
Batu Pecah 2-3 cm m³ 595,683
Batu Pecah 1-2 cm m³ 586,800
Batu Pecah 0.5-1 cm m³ 629,547
Royalty-Batu Quarry MR-10 m³ 189,863
Royalty-Kerikil Galian MR-11 m³ 180,426
Kerikil Sungai-Royalti MR-12 m³ 252,596
Sirtu-Royalty MR-42 m³ 180,426
Gorong-gorong Beton pipa 60 cm M' Lari 1,082,555
Gorong-gorong Beton pipa 80 cm M' Lari 1,262,980
5. Tanah Timbunan

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)

NO JENIS BARANG SPESIFIKASI SATUAN HARGA

1 2 3 4 5

Bahan Timbunan/ Pengikat pilihan M-040


m³ 76,612
6. Pasir
Pasir ayak Untuk Beton M-041 m³ 265,809
- Timbunan / Urug m³ 158,220
- Pasangan m³ 165,076
- Beton m³ 184,589
7. Kerikil m³ 171,404
8. Sirtu m³ 158,220
9. Kapur Pasangan Zak 105,480
Kapur Hidrasi M-081 m³ 73,836
10 Semen (PC)
- Tonasa 50 Kg Zak 72,500
- Tonasa 40 Kg Zak 60,000
- Putih Tiga Roda 50Kg Zak 156,250
- Bosowa 50 Kg Zak 71,250
- Bosowa 40 Kg Zak 64,800
12 Semen Putih (50 Kg) Zak 58,750
13 Batu merah Buah 116,875
14 Paving Blok 750
Urugan Pilihan M-050 m³ 144,341
Bitumen ( Asphalt ) M-061 Kg 16,888
Bitumen ( Asbuton ) M-062 Ton 16,888
Kerosine M-065 Ltr 15,011
15 Paving Blok Mutu (K 175)
Tebal 6 cm M2 54,900
Tebal 8 cm M2 61,067
Berlian M2 61,067
16 Paving Blok Mutu (K 225)
Tebal 6 cm M2 58,625
Tebal 8 cm M2 63,510
17 Paving Blok Mutu (K 300)
Tebal 6 cm M2 67,174
Tebal 8 cm M2 73,281
18 Paving Blok Mutu (K400) M2 79,387
19 Topiuskup (K 225) Biji 4,275
20 Kanstin 20X25X50 Biji 44,579
21 Buis Beton
d=20 cm Biji 243,558
d=30 cm Biji 295,871
d=40 cm Biji 377,670
d=50 cm Biji 446,705
d=60 cm Biji 510,522
22 Aspal AC 60/70 Kg 13,100
B. BAHAN KAYU

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)

NO JENIS BARANG SPESIFIKASI SATUAN HARGA

1 2 3 4 5
1 Kayu Kls I (Bayam)
- Balok Gergaji Sawmil m³ 11,281,250
- Papan Gergaji Sawmil m³ 11,875,000
- Balok Gergaji Sawmil m³ 11,281,250
- Balok Gergaji Sawmil m³ 11,875,000
2 Kayu Kls II (Kalapi)
- Balok m³ 8,312,500
- Papan m³ 8,906,250
3 Kayu Kls III
- Balok m³ 3,562,500
- Papan m³ 4,156,250
4 Kayu Bakar M-070 m³ 360,852
5 Acuan dari Kayu M-180 m³ 1,804,256
C. BAHAN LANTAI
1. Tegel PC
Tegel PC Abu-Abu 20 x 20 cm Dos 57,000
Tegel PC Abu-Abu 30 x 30 cm Dos 77,188
Tegel PC Warna 20 x 20 cm Dos 65,313
Tegel PC Badak 20 x 20 cm Buah 3,331
Tegel PC Badak 30 x 30 cm Buah 3,331
Tegel PC Wafel 20 x 20 cm Buah 3,442
Tegel PC Wafel 30 x 30 cm Buah 3,441
Tegel Plint PC 15 x 20 cm Buah 3,497
Tegel Plint PC 15 x 30 cm Buah 7,772
Tegel Mozaik 30 x 30 cm Buah 15,882
2. Tegel Keramik
Tegel Keramik Putih 10 x 20 cm Dos 83,125
Tegel Keramik Warna 10 x 20 cm Dos 89,063
Tegel Keramik Putih 20 x 20 cm Dos 77,188
Tegel Keramik Warna 20 x 20 cm Dos 73,281
Tegel Keramik Putih 20 x 25 cm Dos 73,281
3. Tegel Keramik Warna 20 x 25 cm Dos 77,188
Tegel Keramik Putih 30 x 30 cm Dos 73,281
Tegel Keramik Warna 30 x 30 cm Dos 86,604
Tegel Keramik Putih 40 x 40 cm Dos 65,313
Tegel Keramik Warna 40 x 40 cm Dos 71,250
Tegel Keramik Warna 50 x 50 cm Dos 106,875
Tegel Keramik Warna 60 x 60 cm Dos 285,000
D. BAHAN KACA
Kaca Bening 3 mm M' 190,000
Kaca Bening 5 mm M' 213,750
Kaca Bening 2 mm M' 51,630
Kaca Buram 3 mm M' 118,248
Kaca Buram 5 mm M' 130,462
Kaca Buram 3 mm M' 122,134

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)

NO JENIS BARANG SPESIFIKASI SATUAN HARGA

1 2 3 4 5
Kaca Bening DG 5 mm M' 118,248
Kaca Bening 3 mm M' 119,914
Kaca Bening 5 mm M' 128,241
Kaca Bening 2 mm M' 51,630
Rangka Nako Lengkap Terali Set 13,879
Kaca Ryben 3 mm M' 201,875
Kaca Ryben 5 mm M' 225,625
Rangka Nako Lengkap Terali 7 Mata Set/Daun
427,470
E. BAHAN BESI
1 Besi Beton
Besi Beton d = 4 mm Batang 22,818
Besi Beton d = 6 mm Batang 34,975
Besi Beton d = 8 mm Batang 49,500
Besi Beton d = 10 mm Batang 67,313
Besi Beton d = 12 mm Batang 134,903
Besi Beton d = 14 mm Batang 166,250
Besi Beton d = 16 mm Batang 213,750
Besi Beton d = 19 mm Batang 332,500
Besi Beton d = 22 mm Batang 475,000
2 Besi Ulir
Besi Beton d = 12 mm Batang 100,150
Besi Beton d = 16 mm Batang 192,972
Besi Beton d = 19 mm Batang 335,870
3 Paku
Paku Biasa Kg 20,818
Baja Paku-Paku Jembatan M-166 Kg 36,085
Paku Asbes Dos 36,085
Paku Seng (payung) RRT Dos 47,500
Paku Skrup 3 1/2 Inci Biji 27,758
Paku Skrup 4 inci Biji 34,697
Paku Payung Berulir 75 mm Kg 39,971
Paku Sirap Kg 36,085
Paku Beton Dos 48,854
Paku Beton Hitam Dos 18,320
Paku Beton Putih Dos 51,630
4 Kawat
Kawat Beton Kg 29,978
Baja Anyaman Bronjong M-062 Kg 36,085
Kawat Nyamuk M'/Roll 20,541
Kawat Ayakan kecil M'/Roll 16,100
Kawat Duri Roll 148,438
5 Besi Plat
Besi Plat 2 mm = 120 x 240 mm Lembar 1,054,797
Besi Plat 2 mm = 120 x 240 mm Lembar 1,276,859

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)

NO JENIS BARANG SPESIFIKASI SATUAN HARGA

1 2 3 4 5
Besi H 15 cm Panjang 12 cm Batang 5,662,594
6 Besi Strep
Besi Strep 30,3 mm Batang 46,078
Besi Strep 35,4 mm Batang 52,185
Besi Strep 46,4 mm Batang 54,960
Besi Strep 40,6 mm Batang 99,928
Besi Strep 50,6 mm Batang 136,013
7 Besi Siku
Besi Siku 30,30.3 Batang 113,252
Besi Siku 40.40.4 Batang 138,789
Besi Siku 50.50.5 Batang 173,486
Besi Siku 60.60.6 Batang 243,158
Besi Siku 70.70.7 Batang 343,087
Besi Siku 40.40.3 Batang 920,490
Besi Siku 40.40.4 Batang 146,000
Besi Siku 50.50.4 Batang 146,000
8 Tulangan Besi M-167 Kg 19,986
9 Besi Tipe C (Rangka Baja Ringan) 6
Lebar 10, Tebal 1,8-2,00 mm Batang 141,565
Lebar 12,5, Tebal 1,8-2,00 mm Batang 171,543
Lebar 15, Tebal 1,8-2,00 mm Batang 243,158
F BAHAN PIPA
1 Pipa GIP Medium A
Pipa Besi GIP *1/2 Inci 6m Batang 218,511
Pipa Besi GIP *3/4 Inci 6m Batang 295,678
Pipa Besi GIP *1 Inci 6m Batang 359,521
Pipa Besi GIP *2 Inci 6m Batang 810,308
Pipa Besi GIP *3 Inci 6m Batang 1,492,260
Pipa Besi GIP *4 Inci 6m Batang 1,989,680
2 Pipa Paralon PVC
Pipa Paralon PVC *1/2 Inci 4m Batang 26,982
Pipa Paralon PVC *3/4 Inci 6m Batang 36,975
Pipa Paralon PVC *1 Inci 6m Batang 43,637
Pipa Paralon PVC *1 1/2 Inci 6m Batang 64,733
Pipa Paralon PVC *2 Inci 6m Batang 85,273
Pipa Paralon PVC *2 1/2 Inci 6m Batang 134,127
Pipa Paralon PVC *3 Inci 6m Batang 175,486
Pipa Paralon PVC *4 Inci 6m Batang 224,063
Pipa Paralon PVC *5 Inci 6m Batang 348,979
Pipa Paralon PVC *6 Inci 6m Batang 376,730
Pipa Paralon PVC *8 Inci 6m Batang 487,462
Pipa Paralon PVC *10 Inci 6m Batang 695,493
3 Pipa Untuk Saluran Pembuangan Air

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)

NO JENIS BARANG SPESIFIKASI SATUAN HARGA

1 2 3 4 5
Jenis Btg D Untuk Saluran
Pembuangan Air *1/2 Inci 4m Batang
22,818
Jenis Btg D Untuk Saluran
Pembuangan Air *3/4 Inci 4m Batang
29,758
Jenis Btg D Untuk Saluran
Pembuangan Air *1 Inci 4m Batang
46,413
Jenis Btg D Untuk Saluran
Pembuangan Air *1 1/2 Inci 4m Batang
119,243
Jenis Btg D Untuk Saluran
Pembuangan Air *2 Inci 4m Batang
187,034
Jenis Btg D Untuk Saluran
Pembuangan Air *2 1/2 Inci 4m Batang
269,474
Jenis Btg D Untuk Saluran
Pembuangan Air *3 Inci 4m Batang
385,502
Jenis Btg D Untuk Saluran
Pembuangan Air *4 Inci 4m Batang
578,474
Jenis Btg D Untuk Saluran
Pembuangan Air *5 Inci 4m Batang
933,275
Jenis Btg D Untuk Saluran
Pembuangan Air *6 Inci 4m Batang
1,238,672
Jenis Btg D Untuk Saluran
Pembuangan Air *10 Inci 4m Batang
3,000,620
4 Pipa Untuk Instalasi Listrik
Pipa Jenis Btg Untuk Instalasi Listrik
*5/8 Inci 4m Batang
15,789
Pipa Jenis Btg Untuk Instalasi Listrik
*3/4 Inci 4m Batang
32,534
Pipa Jenis Btg Untuk Instalasi Listrik *1
Inci 4m Batang
51,409
Pipa Jenis Btg Untuk Instalasi Listrik *1
1/2 Inci 4m Batang
119,249
G. BAHAN LANGIT-LANGIT -
1 Eternit 100 x 100 cm Set 27,758
2 Triplex -
Triplex 122 x 244 x 0,2 cm Lembar 55,516
Triplex 122 x 244 x 0,3 cm Lembar 62,733
Triplex 122 x 244 x 0,6 cm Lembar 97,152
Triplex 122 x 244 x 0,9 cm Lembar 152,668
3 Triplex Melamin 122 x 244 x 0,3 cm Lembar 97,152
4 Accustic 40 x 60 cm Lembar 77,722
5 Teakwood
Teakwood 122 x 244 x 0,3 cm Lembar 124,910
Teakwood 80 x 244 x 0,3 cm Lembar 97,569
Karsiboard Lembar 83,273
Gypsum Lembar 98,563

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)

NO JENIS BARANG SPESIFIKASI SATUAN HARGA

1 2 3 4 5
Les qipsum Lembar 33,648
6 Hard Board 122 x 244 cm Lembar 102,843
7 Asbes Plat Harfex 200 x 100 x 0,3 cm Lembar 55,904
8 List Profill
List Profill 2 x 3 cm 4M 16,100
List Profill 3 x 3 cm 4M 16,665
List Profill 4 x 4 cm 4M 22,206
List Profill 4 x 5 cm 4M 27,758
H. BAHAN ATAP
1 Genteng
Genteng Beton Buah 12,213
Genteng Keramik Buah 37,751
Genteng Asbes Lembar 207,073
Genteng Harflex (115 x 85 x 0,5 cm) Lembar 48,229
Asbes Gelombang 7 kaki Lembar 72,225
2 Seng Gelombang BWG
Seng Gelombang BWG 34" BJLS 0,18 mm Kaki 7,772
Seng Gelombang BWG 33" BJLS 0,22 mm Kaki 8,660
Seng Gelombang BWG 32" BJLS 0,30 mm Kaki 9,438
Seng Gelombang BWG 28" BJLS 0,35 mm Kaki 10,548
Bitumen Gelombang 200 x 95 x 0,3 cm Lembar 183,535
Bitumen Genteng 106 x 40 x 0,3 cm Lembar 84,939
Nok Bitumen 50 x 90 x 0,3 cm Lembar 116,028
3 Atap Metal Lembar 65,925
4 Asbes Genteng Lembar 37,445
5 Seng Plastik (Fiber) Kaki/Lbr 17,813
6 Sirap Ikat/M2 348,083
7 Seng Plat
Seng Plat BJLS 0,30 mm Kaki/Lbr 81,110
Seng Plat BJLS 0,28 mm Kaki/Lbr 74,170
Seng Plat BJLS 0,35 mm Kaki/Lbr 88,604
8 Seng Super Deck
Seng Super Deck 180 x 70 cm 10 kaki Lembar 221,925
Seng Super Deck 180 x 70 cm 8 kaki Lembar 142,815
Seng Super Deck 180 x 70 cm 7 kaki Lembar 125,411
Seng Super Deck 180 x 70 cm 6 kaki Lembar 91,130
9 Seng Aluminium Gelombang SWG

Seng Aluminium Gelombang SWG 32" 0,27 mm Lembar


96,404
Seng Aluminium Gelombang SWG 30" 0,31 mm Lembar
94,295
Seng Aluminium Gelombang SWG 28" 0,38 mm Lembar
102,206
10 Fiber Semen (Harflex)

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)

NO JENIS BARANG SPESIFIKASI SATUAN HARGA

1 2 3 4 5
Fiber Semen (Harflex) Super 240 x 108 x 0,6 mm Lembar 135,238
Fiber Semen (Harflex) Super 180 x 108 x 0,6 mm Lembar 88,049
Fiber Semen (Harflex) Ekonomi 240 x 92 x 0,5 mm Lembar 92,490
Fiber Semen (Harflex) Ekonomi 180 x 92 x 0,4 mm Lembar 83,608
Fiber Semen (Harflex) Mini 240x 105 x 0,4 mm Lembar 83,608
Fiber Semen (Harflex) Mini 180 x 92 x 0,5 mm Lembar 74,170
Fiber Semen (Harflex) Super 140 x 105 x 0,4 mm Lembar 91,935
Fiber Semen (Harflex) Super 180 x 105 x 0,4 mm Lembar 88,049
11 Nok/Bubungan Genteng
Nok/Bubungan Genteng Beton Buah 44,747
Nok/Bubungan Genteng Asbes Buah 69,174
Nok/Bubungan Genteng Keramik Buah 53,074
12 Aluminium SWG
Aluminium SWG 28" 180 cm Lembar 86,939
Aluminium SWG 28" 105 cm Lembar 70,839
13 Nok Steel Gelombang/Rata
Nok Steel Gelombang Super 180 cm Buah 114,808
Nok Steel Gelombang Mini 105 cm Buah 104,149
Nok Steel Gelombang Ekonomi 95 cm Buah 70,284
Nok Steel Rata Super 108 cm Buah 66,953
Nok Steel Rata Mini 105 cm Buah 54,185
Nok Steel Rata Ekonomi 95 cm Buah 61,402
Nok 1/2 Lingkaran Buah 36,975
14 Karet Pelapis Genteng Roll 451,897
Karet Pelapis 55 M Meter 11,103
Karet Pelapis 90 M Meter 11,103
I. BAHAN PENGGANTUNG
1 Kunci Tanam
Kunci Tanam Union 1 x Slag Buah 199,301
Kunci Tanam Union 2 x Slag Buah 305,336
Kunci Tanam Yale 1 x Slag Buah 87,715
Kunci Tanam Yale 2 x Slag Buah 128,796
2 Kunci Tanam Kuda Terbang Buah 84,700
3 Penggantung
Penggantung Hak Angin Kecil Buah 13,324
Penggantung Hak Angin Besar Buah 17,765
Grendel Kecil Buah 14,434
Grendel Besar Buah 16,655
4 Engsel
Engsel Pintu Buah 35,308
Engsel Jendela Buah 26,648
Engsel Staenless Grandino EK G3 Buah 210,959
Engsel Staenless Grandino EK G2 Buah 190,974
Engsel Staenless Grandino EK G1 Buah 125,465
Engsel Biasa EB 070 Paloma Buah 165,076

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)

NO JENIS BARANG SPESIFIKASI SATUAN HARGA

1 2 3 4 5
Engsel Biasa Solid EK 09 (4BB) SN Buah 98,818
Engsel Biasa Solid EK 02 (2BB) CHR Buah 52,740
Engsel Biasa Solid EK 01 (2 BB) CHR Buah 92,267
Engsel Biasa EB 035 Paloma Buah 105,480
Expanyonet Buah 257,370
J. BAHAN SANITER
1 Kloset Duduk KIA (Lengkap) Buah 2,109,594
2 Kloset Jongkok Buah 299,562
3 Wasthafel Warna Buah 593,323
4 Wasthafel Cuci Piring Logam Buah 514,213
5 Pompa Tangan Terpasang Buah 355,994
5 Pompa Mesin Buah 1,898,634
6 Urinor Lengkap Buah 1,004,114
7 Bak Mandi Fiber Buah 444,125
8 Reservoir Fiber 1m Buah 1,221,344
9 Reservoir Fiber 3m Buah 3,997,125
10 Stop Kran Buah 44,413
11 Kran Air Buah 38,861
K. BAHAN FINISHING / CAT
1 Cat Tembok
1 Cat Tembok Aviatex 5 kg 106,369
Metrolite 5 kg 126,910
Kimex 5 kg 92,490
Vinikex Nippon Paint 5 kg 81,387
Dulux 5 kg 164,661
2 Cat Tembok Interior Dulux Pearl Glo 2.5 Ltr 265,699
Dulux Pentalite Standar 2.5 Ltr 203,244
Catylac 5 Kg 201,856
Catylac 25 Kg 974,634
Metrolite 16 Ltr / Pail 528,288
3 Cat Tembok Eksterior Dulux 2.5 Ltr 348,418
Dulux 20 Ltr 2,160,448
Mowilex 2.5 Ltr 244,881
Mowilex 20 Ltr 1,963,047
4 Cat Kayu Glotex Kg 64,938
Avian Kg 67,313
Dulux 1 Kg 57,516
Mowilex 1 Kg 92,490
Catylac 1 Kg 57,516
Palatone Kg 53,630
ICI Kg 78,612
Politur Kg 67,313
Meni Kg 34,656
Minyak Cat Liter 31,423
5 Cat Atap AGA 92,490

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)

NO JENIS BARANG SPESIFIKASI SATUAN HARGA

1 2 3 4 5
Lem Seng 134,127
Plamur 38,085
Amplas / Kertas Gosok 4,886
Dempul 46,531
Residu 64,733
6 Cat Untuk Pekerjaan Baja Jembatan M-090 Kg 21,430
I. BAHAN INSTALASI LISTRIK
1 Pipa Ion Untuk Kabel 5/8 inci - 4 m Batang 7,217
1 inci - 4 m Batang 23,872
1 1/2 inci - 4 m Batang 35,530
2 inci - 4 m Batang 34,420
2 Kabel Listrik
Type NYK 1 1/2 mm Roll 333,094
2 1/2 mm Roll 760,564
Type NYY 2 x 1 1/2 mm Roll 677,291
2 x 2 1/2 mm Roll 843,838
2 x 4 mm 388,609
3 Lampu TL 1 x 20 W Buah 99,928
2 x 20 W Buah 133,238
1 x 40 W Buah 127,686
2 x 40 W Buah 165,437
4 Lampu Pijar 25 W Buah 33,309
40 W Buah 61,067
60 W Buah 116,583
100 W Buah 207,628
Taman Mercury Buah 388,609
6 Saklar Phase Tunggal Putih Buah 24,982
Tunggal Hitam Buah 19,430
Double Putih Buah 27,758
Double Hitam Buah 22,206
7 Stop Kontak Hitam Buah 27,758
Putih Buah 29,978
8 Zekering Kast Lokal Biasa Buah 23,317
Lokal 2 Group Automat Buah 91,601
Lokal 3 Group Biasa Buah 105,480
Fitting Buah 11,103

A UPAH KERJA -
1 Pekerja Pekerja Org/hr 92,000
Buruh Org/hr 92,000
Pembantu Masinis Org/hr 97,500
Penjaga Gudang Org/hr 97,500
2 Tukang : Tukang Kayu Org/hr 113,500
Tukang Batu Org/hr 113,500

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)

NO JENIS BARANG SPESIFIKASI SATUAN HARGA

1 2 3 4 5
Tukang Cat Org/hr 113,500
Tukang Listrik Org/hr 113,500
Tukang Pipa Org/hr 103,000
Tukang Besi Org/hr 105,000
3 Kepala Tukang : Kepala Tukang Kayu Org/hr 140,500
Kepala Tukang Batu Org/hr 140,500
Kepala Tukang Listrik Org/hr 140,500
Kepala Tukang Cat Org/hr 140,500
Kepala Tukang Pipa Org/hr 140,500
Kepala Tukang Besi Org/hr 140,500
Mandor Org/hr 140,500
4 Penjaga Malam Org/hr 108,000

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
STANDAR HARGA SATUAN BAHAN BANGUNAN DAN UPAH KERJA
PEMERINTAH PROVINSI SULAWESI SELATAN
KABUPATEN BANTAENG
TAHUN 2018

(Dalam Rupiah (Rp)

HARGA
NO. URAIAN SPESIFIKASI SATUAN
SATUAN

1 2 3 4 5

A BAHAN DASAR
1 Batu kali
- Utuh m³ 195,000
- Batu pecah 7 - 10 cm m³ 308,100
- Batu pecah 5 - 7 cm m³ 332,800
- Batu pecah 3 - 5 cm (Manual) m³ 340,600
- Batu pecah 3 - 5 cm (Cruser) m³ 390,000
- Batu pecah 2 - 3 cm (Manual) m³ 422,500
- Batu pecah 2 - 3 cm (Cruser) m³ 455,000
- Batu pecah 1 - 2 cm (Cruser) m³ 520,000
2 Batu gunung m³ 234,000
3 Tanah timbunan pilihan m³ 130,000
4 Tanah timbunan biasa m³ 97,500
5 Tanah timbunan humus m³ 195,000
6 Pasir urug/timbunan m³ 130,000
7 Pasir Pasangan m³ 260,000
8 Kerikil sungai m³ 195,000
9 Sirtu m³ 260,000
10 Kapur pasangan Zak 78,000
11 Semen tonasa @ 50 kg Zak 78,000
12 Bosowa @ 40 Kg Zak 58,500
13 Batu merah Bh 780
14 Batu beton ringan Bh 11,050
15 Paveing blok t. 6 cm M2 97,500
16 Paveing blok t. 8 cm M2 117,000
17 Plastik bening alas beton M2 7,800
18 Gorong-gorong dia. 60 cm Bh 130,000
19 Gorong-gorong dia. 80 cm Bh 162,500
20 Gorong-gorong dia. 100 cm Bh 260,000
21 Gorong-gorong dia. 60 , tul Ø 12 mm Bh 455,000
22 Gorong-gorong dia. 80 cm tul Ø 12 mm Bh 585,000
23 Gorong-gorong dia. 100 cm tul Ø 12 mm Bh 715,000

B BAHAN KAYU
1 Kayu kls I
- Balok gergaji swalmil m³ 13,000,000
- Papan gergaji swalmil m³ 14,300,000

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
(Dalam Rupiah (Rp)

HARGA
NO. URAIAN SPESIFIKASI SATUAN
SATUAN

1 2 3 4 5
- Balok gergaji chansow m³ 13,000,000
- Papan gergaji chansow m³ 14,300,000
2 Kayu kls II
- Balok m³ 4,550,000
- Papan m³ 4,550,000
3 Kayu kls III
- Balok m³ 3,250,000
- Papan m³ 3,250,000
4 Bambu Btg 32,500
5 Kayu Kelas IV m³ 2,600,000

C BAHAN LANTAI
1 Tegel PC
- Abu-abu 20 x 20 cm Dos 79,500
- Abu-abu 30 x 30 cm Dos 83,000
- Warna 20 x 20 cm Dos 81,500
- Badak 20 x 20 cm Dos 83,500
- Badak 30 x 30 cm Dos 85,500
- Wafel 20 x 20 cm Dos 68,000
- Wafel 30 x 30 cm Dos 73,500
- Plint PC 15 x 20 cm Dos 72,500
- Plint PC 15 x 30 cm Dos 84,000
2 Tegel mozaik 30 x 30 cm Dos 104,000
3 Tegel keramik
- Putih 10 x 20 cm Dos 91,000
- Warna 10 x 20 cm Dos 97,500
- Putih 20 x 20 cm Dos 62,400
- Warna 20 x 20 cm Dos 78,000
- Putih 20 x 25 cm Dos 62,400
- Warna 20 x 25 cm Dos 78,000
- Putih 30 x 30 cm Dos 62,400
- Warna 30 x 30 cm Dos 71,500
- Putih 40 x 40 cm Dos 65,000
- Warna 40 x 40 cm Dos 78,000
- Warna 60 x 60 Dos 208,000
4 Granit ezensa 30 x 30 Dos 416,000
5 Granit ezensa 40 x 40 Dos 455,000
6 Granit ezensa 60 x 60 Dos 520,000
7 Batu alam paliman Bh 15,600

D BAHAN KACA
1 Kaca bening 3 mm m² 143,000
2 Kaca bening 5 mm m² 162,500
3 Kaca buram 2 mm m² 130,000
4 Kaca buram 3 mm m² 130,000

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
(Dalam Rupiah (Rp)

HARGA
NO. URAIAN SPESIFIKASI SATUAN
SATUAN

1 2 3 4 5
5 Kaca buram 5 mm m² 325,000
6 Kaca ryben 3 mm m² 195,000
7 Kaca ryben 5 mm m² 227,500
8 Kaca Tempered 15 mm m² 3,510,000
9 Glass block Bh 32,500
10 Kaca nako (rangka nako + terali besi) daun 19,500
11 Loster Angin 15/25 Bh 22,100
12 Loster Angin 15/30 Bh 22,100
13 Loster Karawang Bh 22,100

E BAHAN BESI DAN BAJA


1 Besi beton Kg 13,000
2 Besi Beton Ulir 0 15,600
3 Paku biasa Kg 19,500
4 Paku asbes Kg 39,000
5 Paku seng (payung) RRT Kg 32,500
6 Paku sekrup 3 1/2 inc Kg 130,000
7 Paku sekrup 4 inc Kg 19,500
8 Paku 3-7 Kg 39,000
9 Paku payung berulir Kg 39,000
10 Paku sirap Kg 39,000
11 Paku Beton Dos 58,500
12 Kawat beton Kg 19,500
13 Rang Nyamuk m² 71,500
14 Rang Ayakan kecil m² 19,500
15 Kawat Duri @ 10Kg Roll 208,000
16 Kawat harmonika, #3 cm m² 45,500
17 Besi plat 2mm = 4 x 8 m Lbr 650,000
18 Besi plat 3mm = 4 x 8 m Lbr 1,007,500
19 Besi strep 3 x 30 mm - 6 m Kg 110,500
20 Besi strep 4 x 40 mm - 6 m Kg 143,000
21 Besi strep 5 x 30 mm - 6 m Kg 162,500
22 Besi strep 5 x 50 mm - 6 m Kg 227,500
23 Besi strep 6 x 50 mm - 6 m Kg 292,500
24 Besi siku 30,30,3 - 6 m Btg 84,500
25 Besi siku 40,40,4 - 6 m Btg 110,500
26 Besi siku 50,50,5 - 6 m Btg 227,500
27 Besi siku 60,60,6 - 6 m Btg 377,000
28 Besi siku 70,70,7 - 6 m Btg 422,500
29 Besi siku 40,40,3 - 6 m Btg 65,000
30 Besi siku 50,50,4 - 6 m Btg 110,500
31 Besi Baja H Beam 125 x 125 x 6,5 x 9 cm Kg 17,550
32 Besi Baja H Beam 150 x 150 x 7 x 10 cm Kg 17,550
33 Besi Baja Kanal UNP "U" 6,5 x 42 x 5 x 6 m' btg 279,500
Besi Baja Kanal UNP "U" 70 x 40 x 5 x 6 m' btg 305,500

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
(Dalam Rupiah (Rp)

HARGA
NO. URAIAN SPESIFIKASI SATUAN
SATUAN

1 2 3 4 5
34 Besi Hollow 40 x 60, t = 1 mm 6m 188,500
35 Besi Hollow 40 x 40 t = 1 mm 6m 123,500
36 Besi Hollow 20 x 40 t = 1 mm 6m 97,500
37 Besi Hollow 20 x 20 t = 1 mm 6m 58,500
38 Baja Tralis m² 500,500
39 Kawat Bronjong (Pabrikan) m³ 487,500
40 Baut Baja Kg 22,750
41 Besi Galvanisir Kg 22,750
42 Paku Jembatan Kg 32,500
43 Besi Tempa m² 325,000
44 Rangka Atap Baja Ringan m² -
45 Baja Ringan (CNP) 75 x 0.75 M 19,500

F BAHAN PIPA
I Pipa PVC AW ###
Diameter 2 " Meter 11,960
Diameter 3 " Meter 24,960
Diameter 4 " Meter 41,210
Diameter 6 " Meter 97,500
Diameter 8 " Meter 162,500
Diameter 10 " Meter 249,210
Diameter 12 " Meter 357,500
II Pipa PVC S-10
1 Diameter 1/2 " 6,890
2 Diameter 3/4 " Meter 9,100
3 Diameter 1" Meter 14,625
4 Diameter 1 1/4 " Meter 19,955
5 Diameter 1 1/2 " Meter 31,525
6 Diameter 2 " Meter 52,455
7 Diameter 3 " Meter 104,780
8 Diameter 4 " Meter 156,520
9 Diameter 6 " Meter 325,780
10 Diameter 8 " Meter 528,710

III Pipa PVC S-12,5


1 Diameter 1/2 " Meter 4,810
2 Diameter 3/4 " Meter 7,150
3 Diameter 1" Meter 10,400
4 Diameter 1 1/4 " Meter 18,980
5 Diameter 1 1/2 " Meter 26,780
6 Diameter 2 " Meter 43,030
7 Diameter 3 " Meter 87,750
8 Diameter 4 " Meter 128,310
9 Diameter 6 " Meter 274,105
10 Diameter 8 " Meter 532,610

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
(Dalam Rupiah (Rp)

HARGA
NO. URAIAN SPESIFIKASI SATUAN
SATUAN

1 2 3 4 5

IV Pipa GIP SNI Medium A


1 Diameter 1/2 " Meter 26,000
2 Diameter 3/4 " Meter 36,920
3 Diameter 1" Meter 56,420
4 Diameter 1 1/4 " Meter 72,670
5 Diameter 1 1/2 " Meter 83,460
6 Diameter 2 " Meter 112,710
7 Diameter 2 1/2 " Meter 151,710
8 Diameter 3 " Meter 219,505
9 Diameter 4 " Meter 283,660
10 Diameter 6 " Meter 407,940

V Pipa GIP Medium B


1 Diameter 1/2 " Meter 16,250
2 Diameter 3/4 " Meter 20,540
3 Diameter 1" Meter 26,000
4 Diameter 1 1/4 " Meter 32,500
5 Diameter 1 1/2 " Meter 37,960
6 Diameter 2 " Meter 48,750
7 Diameter 2 1/2 " Meter 67,210
8 Diameter 3 " Meter 86,710

VI Pipa HDPE (PE 100 / PN 10)


1 Diameter 1" Meter 16,335
2 Diameter 2" Meter 46,862
3 Diameter 3" Meter 93,730
4 Diameter 4" Meter 148,623
5 Diameter 6" Meter 328,640
6 Diameter 8" Meter 522,578
7 Diameter 10" Meter 806,802
8 Diameter 12" Meter 1,213,404
9 Diameter 16" Meter 1,890,054

VII Pipa Air Limbah SDR 41


1 Diameter 3" Meter 37,050
2 Diameter 4" Meter 73,190
3 Diameter 6" Meter 141,700
4 Diameter 8" Meter 216,905
5 Diameter 10" Meter 344,695
6 Diameter 12" Meter 536,640
7 Diameter 16" Meter 869,180
8 Diameter 20" Meter 1,352,130

VIII Pipa Jenis Batang C untuk instalasi

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
(Dalam Rupiah (Rp)

HARGA
NO. URAIAN SPESIFIKASI SATUAN
SATUAN

1 2 3 4 5
listrik
1 Pipa dia. 5/8" 4 M btg/4m 9,750
2 Pipa dia. 3/4" 4 M btg/4m 15,600
3 Pipa dia. 1 1/2" 4 M btg/4m 15,600

IX Asessories Pipa
TEE
1 PVC Ø ¾" Buah 6,500
2 PVC Ø 1½" Buah 39,000
3 PVC Ø 2" Buah 78,000
4 PVC Ø 3" Buah 198,900
5 GIP Ø ½" Buah 6,500
6 GIP Ø ¾" Buah 10,400
7 GIP Ø 1¼" Buah 23,400
8 GIP Ø 1½" Buah 30,550
9 GIP Ø 2" Buah 46,475
KNEE 90°
1 PVC Ø 1½" Buah 22,750
2 PVC Ø 2" Buah 32,500
3 PVC Ø 3" Buah 45,500
4 GIP Ø ½" Buah 5,688
5 GIP Ø ¾" Buah 7,605
6 GIP Ø 1¼" Buah 18,200
7 GIP Ø 1½" Buah 23,725
8 GIP Ø 2" Buah 37,700
9 GIP Ø 3" Buah 107,250
KNEE 45°
1 PVC Ø 1½" Buah 26,000
2 PVC Ø 2" Buah 35,750
3 PVC Ø 3" Buah 54,600
4 GIP Ø 1½" Buah 28,600
5 GIP Ø 2" Buah 40,950
6 GIP Ø 3" Buah 131,300
REDUCER
1 PVC Ø 1½" x 1" Buah 19,500
2 PVC Ø 2" x 1" Buah 35,750
3 PVC Ø 2" x 1½" Buah 35,750
4 PVC Ø 3" x 1½" Buah 84,500
5 PVC Ø 3" x 2" Buah 78,000
6 PVC Ø 4" x 1½" Buah 107,250
7 PVC Ø 4" x 2" Buah 100,750
8 PVC Ø 4" x 3" Buah 100,750
9 GIP Ø 1½" x 1" Buah 22,750
10 GIP Ø 2" x 1" Buah 29,250
11 GIP Ø 2" x 1½" Buah 29,250

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
(Dalam Rupiah (Rp)

HARGA
NO. URAIAN SPESIFIKASI SATUAN
SATUAN

1 2 3 4 5
12 GIP Ø 3" x 1½" Buah 84,500
13 GIP Ø 3" x 2" Buah 84,500
14 GIP Ø 4" x 1½" Buah 149,500
15 GIP Ø 4" x 2" Buah 149,500
16 GIP Ø 4" x 3" Buah 149,500
DOP (CAP)
1 PVC Ø ½" Buah 4,550
2 PVC Ø ¾" Buah 7,150
3 PVC Ø 1" Buah 12,350
4 PVC Ø 2" Buah 17,160
5 PVC Ø 3" Buah 22,360
CLAMP SADLE
1 Clam sadle 3" x 1/2" Buah 47,125
2 Clam sadle 2" x 1/2" Buah 29,250
3 Clam sadle 1 1/2" x 1/2" Buah 24,375
VALVE SOCKET (Sock Drat Luar)
1 GIP Ø 1" Buah 9,750
2 GIP Ø 1½" Buah 19,500
3 GIP Ø 2" Buah 27,950
4 GIP Ø 2½" Buah 42,900
5 GIP Ø 3" Buah 71,500
6 GIP Ø 4" Buah 116,350
FLANGE
1 GIP Ø 1" Buah 52,000
2 GIP Ø 1½" Buah 58,500
3 GIP Ø 2" Buah 67,600
4 GIP Ø 2½" Buah 78,000
5 GIP Ø 3" Buah 87,750
6 GIP Ø 4" Buah 104,000
FAUCET SOCKET (Sock Drat Dalam)
1 GIP Ø 1" Buah 10,400
2 GIP Ø 1½" Buah 19,500
3 GIP Ø 2" Buah 29,250
4 GIP Ø 2½" Buah 50,050
5 GIP Ø 3" Buah 71,500
6 GIP Ø 4" Buah 116,350
SOCKET
1 PVC Ø 2" 22,750
2 PVC Ø 3" Buah 45,500
3 GIP Ø ½" Buah 4,875
4 GIP Ø ¾" Buah 5,850
5 GIP Ø 1¼" Buah 14,300
6 GIP Ø 1½" Buah 17,225
7 GIP Ø 2" Buah 25,025
8 GIP Ø 2½" Buah 43,875

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
(Dalam Rupiah (Rp)

HARGA
NO. URAIAN SPESIFIKASI SATUAN
SATUAN

1 2 3 4 5
9 GIP Ø 3" Buah 65,000
OVER SOCKET Buah
1 GIP Ø 2" x 1½" 29,250
DOUBLE NEPLE Buah -
1 GIP Ø 1½" 20,800
2 GIP Ø 2" Buah 26,975
3 GIP Ø 3" Buah 74,913
WATER MOER Buah
1 GIP Ø 1½" 53,625
2 GIP Ø 2" Buah 74,750
3 GIP Ø 3" Buah 143,000
KRAN AIR Buah -
1 GIP Ø ½" 17,875
2 GIP Ø ¾" Buah 23,400
WATER METER Buah -
1 Water meter Ø1/2" (Standar PDAM) 292,500
GATE VALVE (Stop Kran)
1 GIP Ø 1/2" Kuningan Buah 49,400
2 GIP Ø 3/4" Kuningan Buah 71,500
3 GIP Ø 1¼" Kuningan Buah 162,500
4 GIP Ø 1½" Kuningan Buah 234,000
5 GIP Ø 2" Kuningan Buah 341,250
6 GIP Ø 3" Kuningan Buah 867,750
7 GIP Ø 4" Kuningan Buah 1,430,000
CHECK VALVE (Klep Tidur)
1 GIP Ø ½" Kuningan Buah 51,350
2 GIP Ø 1¼" Kuningan Buah 182,000
3 GIP Ø 1½" Kuningan Buah 263,250
4 GIP Ø 2" Kuningan Buah 393,250
ASCCESORIES LAIN-LAIN -
1 Foot Valve Ø 1½" Kuningan Buah 195,000
2 Foot Valve Ø 2" Kuningan Buah 292,500
3 Air Valve 1½" Buah 292,500
4 Air Valve Ø 2" Buah 292,500
5 Lem Pipa 1/2 kg Buah 48,750
6 Seal Tape Buah 26,000
VALVE ALL FLANGE -
1 Valve All Flange Ø 8" Buah 12,272,000
2 Valve All Flange Ø 6" Buah 6,817,200
3 Valve All Flange Ø 4" Buah 3,389,100
4 Valve All Flange Ø 3" Buah 2,355,600
5 Valve All Flange Ø 2" Buah 1,562,600
CHECK VALVE ALL FLANGE -
1 Check Valve All Flange Ø 8" Buah 8,543,600
2 Check Valve All Flange Ø 6" Buah 5,401,500

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
(Dalam Rupiah (Rp)

HARGA
NO. URAIAN SPESIFIKASI SATUAN
SATUAN

1 2 3 4 5
3 Check Valve All Flange Ø 4" Buah 2,909,400
4 Check Valve All Flange Ø 3" Buah 2,025,400
5 Check Valve All Flange Ø 2" Buah 1,298,700
BUTTERFLY VALVE
1 Butterfly Valve Ø 8" Buah 4,695,600
2 Butterfly Valve Ø 6" Buah 3,091,400
3 Butterfly Valve Ø 4" Buah 2,167,100
4 Butterfly Valve Ø 3" Buah 1,748,500
5 Butterfly Valve Ø 2" Buah 1,387,100
GILBOULT JOINT CI
1 Gilboult Joint CI Ø 350 mm Buah 2,017,600
2 Gilboult Joint CI Ø 300 mm Buah 971,100
3 Gilboult Joint CI Ø 250 mm Buah 933,400
4 Gilboult Joint CI Ø 200 mm Buah 660,400
5 Gilboult Joint CI Ø 150 mm Buah 367,900
6 Gilboult Joint CI Ø 100 mm Buah 208,000
7 Gilboult Joint CI Ø 75 mm Buah 145,600
8 Gilboult Joint CI Ø 50 mm Buah 137,800
FLANGE STEEL
1 Flange steel Ø 400 mm 1,193,140
2 Flange steel Ø 350 mm Buah 850,850
3 Flange steel Ø 300 mm Buah 705,640
4 Flange steel Ø 250 mm Buah 612,690
5 Flange steel Ø 200 mm Buah 391,040
6 Flange steel Ø 150 mm Buah 328,770
7 Flange steel Ø 100 mm Buah 163,150
8 Flange steel Ø 75 mm Buah 135,460
9 Flange steel Ø 50 mm Buah 97,370
BEND 90 STEEL ALL FLANGE
1 Bend 90 Steel all flange Ø 400 mm Buah 3,878,680
2 Bend 90 Steel all flange Ø 350 mm Buah 2,681,770
3 Bend 90 Steel all flange Ø 300 mm Buah 1,749,670
4 Bend 90 Steel all flange Ø 250 mm Buah 1,201,200
5 Bend 90 Steel all flange Ø 200 mm Buah 693,940
6 Bend 90 Steel all flange Ø 150 mm Buah 314,080
7 Bend 90 Steel all flange Ø 100 mm Buah 147,160
8 Bend 90 Steel all flange Ø 75 mm Buah 69,680
9 Bend 90 Steel all flange Ø 50 mm Buah 42,900
BEND 45 STEEL ALL FLANGE
1 Bend 45 Steel all flange Ø 400 mm Buah 2,346,240
2 Bend 45 Steel all flange Ø 350 mm Buah 2,210,260
3 Bend 45 Steel all flange Ø 300 mm Buah 1,110,720
4 Bend 45 Steel all flange Ø 250 mm Buah 872,430
5 Bend 45 Steel all flange Ø 200 mm Buah 426,140
6 Bend 45 Steel all flange Ø 150 mm Buah 213,720

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
(Dalam Rupiah (Rp)

HARGA
NO. URAIAN SPESIFIKASI SATUAN
SATUAN

1 2 3 4 5
7 Bend 45 Steel all flange Ø 100 mm Buah 90,610
8 Bend 45 Steel all flange Ø 75 mm Buah 59,800
9 Bend 45 Steel all flange Ø 50 mm Buah 23,400
BEND 90 SOCKET DRAFT
1 Bend 90 Socket Drat Ø 6" Buah 903,344
2 Bend 90 Socket Drat Ø 4" Buah 216,015
3 Bend 90 Socket Drat Ø 3" Buah 119,184
4 Bend 90 Socket Drat Ø 2" Buah 40,950
BEND 45 SOCKET DRAFT
1 Bend 45 Socket Drat Ø 6" 864,071
2 Bend 45 Socket Drat Ø 4" Buah 248,300
3 Bend 45 Socket Drat Ø 3" Buah 144,300
4 Bend 45 Socket Drat Ø 2" Buah 50,700
SOCKET DRAFT Buah
1 Socket Drat Ø 150 mm 426,400
2 Socket Drat Ø 100 mm Buah 133,900
3 Socket Drat Ø 75 mm Buah 81,900
4 Socket Drat Ø 50 mm Buah 29,770
5 Socket Drat Ø 25 mm Buah 7,150
6 Socket Drat Ø 20 mm Buah 5,200
BELL CAP
1 Bell Cap PVC Ø 8" Buah 790,075
2 Bell Cap PVC Ø 6" Buah 604,175
3 Bell Cap PVC Ø 4" Buah 306,735
4 Bell Cap PVC Ø 2 1/2" Buah 172,900
5 Bell Cap PVC Ø 2" Buah 120,835
CAP HDPE
1 Cap HDPE Ø 4" Buah 102,310
2 Cap HDPE Ø 3" Buah 76,310
3 Cap HDPE Ø 2" Buah 46,540
BELL TEE BELL
1 Bell Tee Bell Ø 6" 1,394,250
2 Bell Tee Bell Ø 6" x 4" Buah 1,115,400
3 Bell Tee Bell Ø 6" x 3" Buah 1,115,400
4 Bell Tee Bell Ø 4" Buah 557,700
5 Bell Tee Bell Ø 4" x 3" Buah 557,700
6 Bell Tee Bell Ø 4" x 2" Buah 557,700
7 Bell Tee Bell Ø 2 1/2" Buah 278,850
8 Bell Tee Bell Ø 3" x 2" Buah 348,985
9 Bell Tee Bell Ø 2" Buah 139,425
TEE SEGMENTED
1 Equal Tee Segmented HDPE Ø 315 x 315 mm Buah 5,205,200
2 Unequal Tee Segmented HDPE Ø 315 x 280 mm Buah 5,205,200
3 Unequal Tee Segmented HDPE Ø 315 x 225 mm Buah 4,926,350
4 Equal Tee Segmented HDPE Ø 280 x 280 mm Buah 2,602,600

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
(Dalam Rupiah (Rp)

HARGA
NO. URAIAN SPESIFIKASI SATUAN
SATUAN

1 2 3 4 5
5 Unequal Tee Segmented HDPE Ø 280 x 210 mm Buah 3,048,500
6 Equal Tee Segmented HDPE Ø 200 x 200 mm Buah 1,301,300
7 Unequal Tee Segmented Ø HDPE 200 x 150 mm Buah 1,207,700
8 Equal Tee Segmented HDPE Ø 160 x 160 mm Buah 780,780
9 Unequal Tee Segmented HDPE Ø 160 x 110 mm Buah 604,240
10 Equal Tee Segmented HDPE Ø 110 x 110 mm Buah 269,620
11 Unequal Tee Segmented HDPE Ø 110 x 75 mm Buah 260,260
12 Equal Tee Segmented HDPE Ø 90 x 90 mm Buah 195,000
13 Unequal Tee Segmented HDPE Ø 90 x 65 mm Buah 176,670
14 Equal Tee Segmented HDPE Ø 65 x 65 mm Buah 87,490
FLANGE BELL END PVC
1 Flange Bell End PVC Ø 12" Buah 5,762,900
2 Flange Bell End PVC Ø 10" Buah 3,718,000
3 Flange Bell End PVC Ø 8" Buah 2,602,600
4 Flange Bell End PVC Ø 6" Buah 1,673,100
5 Flange Bell End PVC Ø 4" Buah 929,500
6 Flange Bell End PVC Ø 2 1/2" Buah 557,700
7 Flange Bell End PVC Ø 2" Buah 464,750
FLANGE SPIGOT PVC
1 Flange Spigot PVC Ø 12" Buah 5,577,000
2 Flange Spigot PVC Ø 10" Buah 3,346,200
3 Flange Spigot PVC Ø 8" Buah 2,416,700
4 Flange Spigot PVC Ø 6" Buah 1,487,200
5 Flange Spigot PVC Ø 4" Buah 836,550
6 Flange Spigot PVC Ø 2 1/2" Buah 464,750
7 Flange Spigot PVC Ø 1/2" Buah 371,800
BELL 90 BEND PVC
1 Bell Bend 90 PVC Ø 12" Buah 4,368,000
2 Bell Bend 90 PVC Ø 10" Buah 2,416,700
3 Bell Bend 90 PVC Ø 8" Buah 1,301,300
4 Bell Bend 90 PVC Ø 6" Buah 743,600
5 Bell Bend 90 PVC Ø 4" Buah 325,325
6 Bell Bend 90 PVC Ø 2 1/2" Buah 93,080
7 Bell Bend 90 PVC Ø 2" Buah 55,770
BEND 90 SEGMENTED HDPE
1 Bend 90 Segmented HDPE Ø 12" Buah 5,297,500
2 Bend 90 Segmented HDPE Ø 10" Buah 1,913,600
3 Bend 90 Segmented HDPE Ø 8" Buah 957,450
4 Bend 90 Segmented HDPE Ø 6" Buah 576,290
5 Bend 90 Segmented HDPE Ø 4" Buah 278,850
6 Bend 90 Segmented HDPE Ø 3" Buah 185,900
7 Bend 90 Segmented HDPE Ø 2" Buah 94,900
BELL 45 BEND PVC
1 Bell Bend 45º PVC Ø 12" Buah 3,532,100
2 Bell Bend 45º PVC Ø 10" Buah 1,859,000

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
(Dalam Rupiah (Rp)

HARGA
NO. URAIAN SPESIFIKASI SATUAN
SATUAN

1 2 3 4 5
3 Bell Bend 45º PVC Ø 8" Buah 1,301,300
4 Bell Bend 45º PVC Ø 6" Buah 743,600
5 Bell Bend 45º PVC Ø 4" Buah 325,325
6 Bell Bend 45º PVC Ø 3" Buah 92,950
7 Bell Bend 45º PVC Ø 2" Buah 55,770
BEND 45 SEGMENTED HDPE
1 Bend 45º Segmented PE Ø 315 mm Buah 4,089,800
2 Bend 45º Segmented PE Ø 250 mm Buah 1,561,560
3 Bend 45º Segmented PE Ø 200 mm Buah 780,780
4 Bend 45º Segmented PE Ø 150 mm Buah 474,110
5 Bend 45º Segmented HDPE Ø 110 mm Buah 241,670
6 Bend 45º Segmented HDPE Ø 90 mm Buah 158,080
7 Bend 45º Segmented HDPE Ø 63 mm Buah 87,490
BELL BEND 22,50 PVC
1 Bell Bend 22,5º PVC Ø 12" Buah 2,788,500
2 Bell Bend 22,5º PVC Ø 10" Buah 1,673,100
3 Bell Bend 22,5º PVC Ø 8" Buah 929,500
4 Bell Bend 22,5º PVC Ø 6" Buah 418,275
5 Bell Bend 22,5º PVC Ø 4" Buah 148,720
6 Bell Bend 22,5º PVC Ø 2 1/2" Buah 74,360
7 Bell Bend 22,5º PVC Ø 2" Buah 41,860
BELL REDUCER PVC
1 Bell Reducer PVC SNI Ø 12" x 10" Buah 1,598,740
2 Bell Reducer PVC SNI Ø 10" x 8" Buah 743,600
3 Bell Reducer PVC SNI Ø 8" x 6" Buah 464,750
4 Bell Reducer PVC SNI Ø 8" x 4" Buah 534,495
5 Bell Reducer PVC SNI Ø 4" x 3" Buah 120,770
6 Bell Reducer PVC SNI Ø 2 1/2" x 2" Buah 65,000
REDUCER SEGMENTED HDPE
1 Reducer Segmented PE Ø 315 x 250 mm Buah 2,163,850
2 Reducer Segmented PE Ø 315 x 200 mm Buah 2,044,900
3 Reducer Segmented PE Ø 250 x 200 mm Buah 1,394,250
4 Reducer Segmented PE Ø 250 x 150 mm Buah 1,162,200
5 Reducer Segmented PE Ø 200 x 150 mm Buah 743,600
6 Reducer Segmented PE Ø 200 x 100 mm Buah 705,900
7 Reducer Segmented HDPE Ø 110 x 90 mm Buah 185,900
8 Reducer Segmented HDPE Ø 90 x 63 mm Buah 111,540
REDUCER STEEL
1 Reducer Steel Ø 400 x 300 mm Buah 2,043,600
2 Reducer Steel Ø 250 x 200 mm Buah 454,350
3 Reducer Steel Ø 250 x 150 mm Buah 521,560
4 Reducer Steel Ø 250 x 100 mm Buah 807,170
5 Reducer Steel Ø 200 x 150 mm Buah 314,080
6 Reducer Steel Ø 200 x 100 mm Buah 382,330
7 Reducer Steel Ø 150 x 100 mm Buah 192,530

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
(Dalam Rupiah (Rp)

HARGA
NO. URAIAN SPESIFIKASI SATUAN
SATUAN

1 2 3 4 5
8 Reducer Steel Ø 100 x 75 mm Buah 80,600
FLANGE STEEL
1 Flange steel buta Ø 400 mm Buah 776,100
2 Flange steel buta Ø 350 mm Buah 564,200
3 Flange steel buta Ø 300 mm Buah 462,800
4 Flange steel buta Ø 250 mm Buah 458,120
5 Flange steel buta Ø 200 mm Buah 305,370
6 Flange steel buta Ø 150 mm Buah 197,080
7 Flange steel buta Ø 100 mm Buah 121,940
8 Flange steel buta Ø 75 mm Buah 93,080
9 Flange steel buta Ø 50 mm Buah 73,970
CLAMP SADLE
1 Clamp Sadle Ø 150 x 25 mm Buah 61,620
2 Clamp Sadle Ø 100 x 25 mm Buah 42,744
3 Clamp Sadle Ø 75 x 25 mm Buah 32,370

G BAHAN PLAFON DAN PARTISI


1 Eternit 100 x 100 x 0,2 26,000
2 Tripleks lbr -
- 122 x 244 x 0,2 cm 50,700
- 122 x 244 x 0,3 cm lbr 62,400
- 122 x 244 x 0,6 cm lbr 93,600
- 122 x 244 x 0,9 cm lbr 143,000
- 122 x 244 x 1,8 cm lbr 357,500
3 Tripleks melamin lbr -
- 122 x 244 x 0,2 cm 97,500
4 Acustic 40 x 60 lbr 58,500
5 Teakwood lbr -
- 122 x 244 x 0,3 cm 149,500
- 80 x 244 x 0,3 cm lbr 78,000
6 Hard board 122 x 244 cm 18 mm lbr 325,000
7 Asbes plat harflex 200 x 100 cm lbr 110,500
8 Gipsum board lbr
- 240 x 120 x 0,3 cm 88,400
- 240 x 120 x 0,4 cm lbr 91,000
- 240 x 120 x 0,9 cm lbr 97,500
9 List Profil Kayu lbr -
- 2 x 3 cm 11,700
- 3 x 3 cm btg/4 m' 13,000
- 4 x 4 cm btg/4 m' 19,500
- 4 x 5 cm btg/4 m' 32,500
List Profil Gypsum btg/4 m' -
- 7/7 20,800
- 7/10 m' 22,100
- 7/16 m' 24,700

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
(Dalam Rupiah (Rp)

HARGA
NO. URAIAN SPESIFIKASI SATUAN
SATUAN

1 2 3 4 5
- 13/15 m' 26,000
List PVC m' -
- 58 x 32 mm 31,200
- 32 x 32 mm btg/2 m' 24,700
- 26 x 30 mm btg/2 m' 20,800
10 Lambrisering btg/2 m' 338,000
11 Plafon dan Partisi PVC m² -
- Tebal 1 cm 260,000
- Tebal 0,8 cm lbr 221,000
- List Samping lbr 117,000
- List Sambungan 4m 117,000
12 GRC t = 0,6 mm (1,20 x 2,40) 4m 175,500
13 Kalsiboard (0,35 mm x 1,2 x 2,4) lbr 91,000
Kalsiboard (0,8 mm x 0,3 x 3) lbr 97,500
Kalsiplank Jati (0,8 mm x 0,3 x 3) lbr 100,750
Baja Ringan 4 meter
- 2 x 4 x 0.25 btg 20,800
- 4 x 4 x 0.30 btg 26,000
- 2 x 4 x 0.25 btg 32,500
- 4 x 4 x 0.30 btg 39,000

H BAHAN ATAP
1 Genteng
- Tanah Liat 3,900
- Beton Bh 13,000
- Keramik Bh 15,600
- Asbes Bh 65,000
- Harflex (115 x 85 x 0,5) lbr 58,500
2 Asbes gelombang lbr 13,000
3 Sirap Kaki 143,000
4 Seng gelombang Ikat/M2 -
- BWG 34" BJLS 0,20 mm 7,800
- BWG 32" BJLS 0,30 mm Kaki 13,000
- BWG 28" BJLS 0,35 mm Kaki 14,300
5 Seng plat BJLS Galvanis Kaki -
- BJLS 0,4 mm 1,219 x 1 m 182,000
- BJLS 0,5 mm 1,219 x 1 m m' 221,000
- BJLS 0,6 mm 1,219 x 1 m m' 247,000
- BJLS 0,7 mm 1,219 x 1 m m' 260,000
6 Polycarbonate m' 130,000
7 Atap Fiber m² 45,500
8 Atap Zincalum, t=0.3 mm m² 58,500
9 Nok Bubungan m² -
- Genteng beton 32,500
- Genteng asbes Bh 39,000

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
(Dalam Rupiah (Rp)

HARGA
NO. URAIAN SPESIFIKASI SATUAN
SATUAN

1 2 3 4 5
- Genteng keramik Bh 54,600
- Nok Zincalum Bh 58,500
10 Karet pelapis genteng 55 cm x 30 m Bh 487,500
11 List Plank sejenis Woodplank Roll -
- Polos 4m 65,000
- Motif 4m 97,500

I BAHAN PENGGANTUNG
1 Kunci tanam
- Union 1 x slag 91,000
- Union 2 x slag Bh 130,000
- Yale 1 x slag Bh 120,900
- Yale 2 x slag Bh 123,500
- Kuda terbang Bh 97,500
2 Penggantung -
- Hak angin kecil Bh 19,500
- Hak angin besar Bh 32,500
- Grendel kecil Bh 26,000
- Grendel besar Bh 39,000
- Engsel pintu Bh 39,000
- Engsel jendela Psg 26,000
- Expanyolet Psg 88,400
3 Door closer Bh 195,000
4 Door Stopper Bh 26,000

J BAHAN SANITER
1 Samb. PDAM 2,600,000
2 Closet duduk KIA (Lengkap) unit 2,730,000
3 Closet duduk TT (Lengkap) Set 2,990,000
4 Closet jongkok Set 403,000
5 Wasthafel Bh 325,000
6 Wasthafel cuci piring logam 1 mata Bh 552,500
7 Pompa tangan terpasang Bh 604,500
8 Urinoir sejenis TT Bh 3,354,000
9 Bak mandi fiber Bh 426,400
10 Reservoir fiber 1 m3 Bh 1,755,000
11 Reservoir fiber 2 m3 Bh 3,510,000
12 Reservoir fiber 3 m3 Bh 4,550,000
13 Kran wasthafel stanless Bh 110,500
14 Kran urinoir Bh 162,500
15 Floordrain Besi Bh 156,000
Floordrain Plastik Bh 65,000
16 Soap holder Bh 65,000
17 Kitchen set Bh 1,495,000
18 Kran Air 3/4 m' 32,500

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
(Dalam Rupiah (Rp)

HARGA
NO. URAIAN SPESIFIKASI SATUAN
SATUAN

1 2 3 4 5
19 Kusen Pintu Fiber + Daun pintu Bh 286,000

K BAHAN FINISHING
1 Cat tembok sejenis Dulux Interior Kg 130,000
Cat tembok sejenis Dulux Eksterior Kg 156,000
2 Cat kayu sejenis glotex Kg 78,000
3 Cat atap sejenis No Drop Kg 65,000
4 Cat Besi Sejenis Avian Kg 71,500
5 Wallpaper M2 91,000
6 Lem Perekat Kg 71,500
7 HPL Motif lbr 247,000
8 Parket M2 613,600
9 Plint Parket m 293,800
10 Plamur tembok Zak 72,800
11 Cat dasar (meni kayu) Kg 39,000
12 Cat Jembatan Kg 13,000
13 Minyak cat ltr 49,400
14 Minyak Flux Ltr 13,000
15 Pelumas Ltr 39,000
16 Solar Ltr 7,085
17 Bensin Ltr 8,385
18 Politur Kg 71,500
19 Dempul Kg 32,500
20 Kertas gosok (amplas) lbr 13,000
21 Residu Ltr/Kg 45,500
22 Okar Kg 32,500
23 Spiritus ltr 26,000
24 Aspal Cair Kg 17,420
25 Aspal Buton Ton 17,550,000

L BAHAN INSTALASI LISTRIK


1 Peng. Samb. Listrik KWH 1300 Unit 3,250,000
2 Box Panel PVC isi 4 MCB Bh 65,000
3 MCB 6A Bh 78,000
4 MCB 4A Bh 78,000
5 Kabel NYM 2 x 2,5 mm2 m 15,600
6 Kabel NYM 3 x 2,5 mm2 m 15,600
7 Kabel Telephone 4 x o,5 mm m 5,200
8 Isolasi Bh 6,500
9 Saklar tunggal Bh 19,500
10 Saklar ganda Bh 35,750
11 Stop Kontak Bh 48,750
12 Outlet TV Bh 35,750
13 Outlet Telephone Bh 48,750
14 Downlight / PLC 13 watt Bh 52,000

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
(Dalam Rupiah (Rp)

HARGA
NO. URAIAN SPESIFIKASI SATUAN
SATUAN

1 2 3 4 5
15 Fitting Plafound + Lampu Bh 10,400
16 Lampu TL 2 x 18 watt grille Set 299,000
17 Lampu TL 2 x 36 watt grille Set 487,500

M UPAH KERJA
1 Pekerja hari 92,000
2 Tukang hari -
- Tukang kayu hari 130,000
- Tukang Batu hari 130,000
- Tukang Cat hari 130,000
- Tukang Listrik hari 167,500
- Tukang Pipa hari 130,000
- Tukang Besi hari 130,000
- Tukang Las hari 130,000
- Tukang Landscaping hari 130,000
- Tukang Profil hari 130,000
3 Kepala Tukang
- Kepala Tukang kayu hari 162,000
- KepalaTukang Batu hari 162,000
- KepalaTukang Cat hari 162,000
- KepalaTukang Listrik hari 216,000
- KepalaTukang Pipa hari 189,000
- KepalaTukang Besi hari 173,000
- KepalaTukang Las hari 173,000
- KepalaTukang Landscaping hari 189,000
- KepalaTukang Profil hari 189,000
4 Mandor hari 170,000
5 Masinis hari 130,000
6 Pembantu Masinis hari 90,500
7 Penjaga Gudang hari 115,000
8 Penjaga malam hari 115,000

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
STANDAR HARGA SATUAN BAHAN BANGUNAN DAN UPAH KERJA
PEMERINTAH PROVINSI SULAWESI SELATAN
KABUPATEN SELAYAR
TAHUN 2018
(Dalam Rupiah (Rp)

NO JENIS BAHAN SPESIFIKASI SATUAN HARGA

1 2 3 4
A. BAHAN DASAR
1 Batu Gunung
Batu Gunung (Quarry) M³ 83,600
Batu Gunung M³ 284,300
2 Batu Kali M³
Batu Kali (quarry ) M³ 83,600
Utuh M³ 284,300
Split 7-10 cm M³ 284,300
Split 5-7 cm M³ 250,000
Split 3-5 cm M³ 200,000
Split 2-3 cm M³ 442,300
Split 1-2 cm M³ 442,300
Split 0,5-1 cm M² 450,000
Split 10-15 cm M³ 250,000
3 Batu Pecah Produksi Luar Kabupaten
Agregat Kasar M³ 650,000
Agregat Halus M³ 700,000
4 Batu Belah M³ 250,000
5 Batu Gunung Quarry M³ 83,600
6 Tanah
* Timbunan / Urug / Tanah pilihan / M³ 111,400
Berbatu ( quarry)
* Timbunan / Urug / Tanah pilihan / M³ 287,500
Berbatu
* Timbunan / Urug / Tanah biasa /( quarry) M³ 111,400
* Timbunan / Urug / Tanah biasa (perkota kecamatan) M³ 201,300
* Sirtu (quarry ) M³ 139,200
* Sirtu ( perkota kecamatan ) M³ 230,000
7 Pasir
Pasir (Quarry) M³ 178,160
Pasir ( perkota kecamatan ) M³ 176,890
Pasir Pasangan /Pasir Beton ( quarry ) M³ 178,200
Pasir pasangan / Pasir Beton ( per kota kecamatan ) M³ 236,300
8 Kerikil
* Sirtu/ kerikil Berpasir Alami (tidak di ayak ) M³ 230,000
* Kerikil Sungai ( tidak disaring ) M³ 230,000
* Kerikil sungai / batu kali kecil ( disaring ) 300,000
* Kerikil Sungai pecah ( disaring ) M³ 402,500
* Gorong - Gorong Dia.80 cm ( bertulang ) M³ 537,900
9 Kapur
Kapur Bakar /Hidrasi Karung 14,500
Batu Kapur ( bongkahan ) M³ 178,200
10 Semen kg 1,700
11 Semen Waterproof kg 25,000
12 Batu Bata ( quarry ) buah 1,000
13 Batako ( quarry ) buah 4,100
14 Paving Blok Segi Empat buah 2,000
15 Paving Blok Segi Enam buah 3,200

B BAHAN KAYU
1 Kayu Kelas I
Balok M³ 11,038,000
Papan M³ 14,773,900
Kayu Ulin Besi untk kontruksi M³ 6,538,700
2 Kayu Kelas II
Balok M³ 5,084,000
Papan M³ 5,580,000
3 Kayu Kelas III
Balok M³ 3,728,000
Papan M³ 4,142,300
Kayu Perancah /Acuan ( Papan Mal ) M³ 2,096,000
C BAHAN LANTAI
Tegel Mozaik 30 x 30 Dos 63,000
Tegel Granit 60 x 60 Dos 178,000

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
(Dalam Rupiah (Rp)

NO JENIS BAHAN SPESIFIKASI SATUAN HARGA

1 2 3 4
Tegel Kramik
Putih 10 x 20 Dos 63,000
Warna 10 x 20 Dos 63,000
Putih 20 x 20 Dos 63,000
Warna 20 x 20 Dos 55,000
Putih 20 x 25 Dos 66,000
Warna 20 x 25 Dos 70,000
Putih 30 x 30 Dos 63,000
Warna 30 x 30 Dos 66,000
Putih 40 x 40 Dos 73,000
Warna 40 x 40 Dos 74,000
Paving Blok
Segi empat ( bata ) buah 2,000
Segi Enam buah 3,200
D BAHAN KACA
* 2 mm 66 x 132 Lbr 55,700
* 3 mm 66 x 132 Lbr 83,600
* 5 mm 66 x 132 Lbr 114,900
Kaca Bening 3 mm M² 138,000
Kaca Bening 5 mm M² 188,000
Kaca Bening 2 mm M² 55,700
Kaca Buram 5 mm M² 311,800
Kaca Buram 3 mm M² 278,400
Kaca Ryben 3 mm M² 104,700
Kaca Ryben 5 mm M² 157,000
Kaca / Cermin 3 mm M² 135,000
Kaca / Cermin 5 mm M² 190,000
BAHAN BESI
1 Besi Beton Polos
Ø 6 mm ( full ) Btg 32,000
Ø 8 mm ( full ) Btg 51,000
Ø 10 mm ( full ) Btg 77,000
Ø 12 mm ( full ) Btg 114,300
Ø 14 mm ( full ) Btg 159,000
Ø 16 mm ( full ) Btg 190,000
2 Besi tulangan beton dan kawat baja
* Besi Beton Polos ( Baja tulangan U24 polos ) kg 10,900
* Besi Beton Ulir ( Baja tulangan U24 polos ) kg 11,000
* Baja Tralis/ Gulung kg 18,700
* Baja Konstruksi kg 18,600
* Baja Galvanis kg 15,200
* Baut Baja 15 cm Btg 3,100
* Baut Baja 20 cm Btg 3,800
* Baut Baja 25 cm Btg 3,900
* Baut Baja 30 cm Btg 5,300
* Pengikat Begel ( kawat ) Kg 23,000
3 PAKU
Paku Tripleks Kg 21,000
Paku Seng 3 cm Kg 28,000
Paku Seng 5 cm Kg 28,000
Paku Seng 7 cm Kg 30,500
Paku Biasa Kg 19,500
Paku biasa 5 cm 1 Kg 14,400
Paku Asbes Kg 32,100
Paku Seng RRT Kg 26,500
Paku Jembatan Kg 26,500
Paku skrup 3 ½ inci Kg 29,400
Paku Payung Berulir 75 mm Kg 24,300
Paku Skrup 4 Inci Kg 30,400
Paku Sirap Kg 18,200
Paku Beton Kg 37,000
4 Kawat
Beronjong Gulung 783,400
Beton Kg 21,500
Las ( Asetilen ) roll 11,700
Nyamuk M 14,800
Duri roll 169,000
Ayakan Kecil M 16,500
Las Listrik Kg 49,500
5 Besi Plat

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
(Dalam Rupiah (Rp)

NO JENIS BAHAN SPESIFIKASI SATUAN HARGA

1 2 3 4
2 x 1200 x 2400 mm Lbr 674,000
3 x 1200 x 2400 mm Lbr 991,000
4 x 1200 x 2400 mm Lbr 1,334,000
6 Besi Strep
( 40 x 1 x 6000 ) mm Btg 34,000
( 50 x 1 x 6000 ) mm Btg 46,000
( 50 x 2 x 6000 ) mm Lbr 153,000
( 70 x 2 x 6000 ) mm Btg 185,000
7 Besi Siku
30 x 30 x 3000 mm Btg 70,000
60 x 60 x 6000 mm Btg 331,000
40 x 40 x 3000 mm Btg 115,000
50 x 50 x 4000 mm Btg 204,000
8 Tiang Besi
7m Btg 950,000
11 m Btg 3,750,000
9 Besi Hollow (40 x 40 ), tebal 2,5 mm ( pagar ) Btg 140,000
Lebar 15,Tebal 1,8 – 2,00 mm
10 Kalsiboard M²
BAHAN PIPA
1 Pipa Besi GIP ( MEDIUM A )
Tebal Btg
3/4" - 6 m Btg 211,700
1" - 6 m Btg 297,000
1 1/2 - 6 m Btg 448,600
1" - 6 mm Btg 296,923
2" - 6 mm Btg 562,300
2 1/2" - 6 m Btg 818,200
3" - 6 m Btg 979,300
4" - 6 m Btg 1,358,300
6" - 6 m Btg 2,211,200
8" - 6 m Btg 5,433,100
Tipis
1 1/2" - 6 m Btg 369,600
3/4" - 6 m Btg 186,400
1" - 6 m Btg 259,100
2" - 6 m Btg 461,200
2 Pipa Besi GIP ( MEDIUM B )
1" - 6 m Btg 183,300
1 1/2" - 6 m Btg 268,500
2" - 6 m Btg 341,200
2 1/2" - 6 m Btg 436,000
3" - 6 m Btg 518,100
4" - 6 m Btg 663,400
6" - 6 m Btg 1,547,800
8" - 6 m Btg 2,988,200
3 Pipa PVC ( AW )
1/4" - 4 m Btg
1/2" - 4 m Btg 18,200
3/4" - 4 m Btg 25,300
1" - 4 m Btg 33,400
1 1/2" - 4 m Btg 39,000
2" - 4 m Btg 88,500
2 1/2" - 4 m Btg 125,000
3" - 4 m Btg 172,000
4" - 4 m Btg 284,000
5" - 4 m Btg
6" - 4 m Btg 633,000
8" - 4 m Btg 1,073,000
4 PIPA PVC ( SNI )
1/2" - 6 m Btg 24,300
3/4" - 6 m Btg 42,500
1" - 6 m Btg 78,900
1 1/2" - 6 m Btg 127,400
2" - 6 m Btg 200,200
2 1/2" - 6 m Btg 345,700
3" - 6 m Btg 412,500
4" - 6 m Btg 618,700
5" - 6 m Btg
6" - 6 m Btg 1,297,900

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
(Dalam Rupiah (Rp)

NO JENIS BAHAN SPESIFIKASI SATUAN HARGA

1 2 3 4
8" - 6 m Btg 2,019,600
10" - 6 m Btg
3 inchi - 6 m Btg 73,330
4 inchi - 6 m Btg 87,996
6 inchi - 6 m Btg 102,662
5 PIPA PARALON PVC
Diameter 1" ( SNI ) Btg 20,800
Diameter 1 1/2" ( SNI ) Btg 21,700
Diameter 2" ( SNI ) Btg 28,500
Diameter 3" ( SNI ) Btg 51,200
Diameter 4" ( SNI ) Btg 85,300
3/4 - 4 m Btg 15,800
1" - 4 mm Btg 31,600
1 1/2" - 4 mm Btg 25,300
2" - 4 mm Btg 35,400
3" - 4 mm Btg 55,600
6 Pipa Paralon PVC . PVC PARALON Std s-10 scj @:
Diameter 1/2" Btg 18,900
Diameter 3/4" Btg 27,900
Diameter 1" Btg 45,000
Diameter 1 1/4" Btg 62,800
Diameter 1 1/2" Btg 100,200
7 Pipa PVC Paralon Std.S 12.5 SCJ@ 5 mtr /btg :
Diameter 2" Btg 154,800
Diameter 2 1/2" Btg 222,400
Diameter 3" Btg 326,800
Diameter 4" Btg 478,200
Diameter 5" Btg 781,700
Diameter 6" Btg 1,031,100
Diameter 8" Btg 1,603,300
8 Pipa PVC Paralon Std.S 12.5 SCJ@ 6 mtr /btg :
Diameter 2" Btg 160,200
Diameter 2 1/2" Btg 228,800
Diameter 3" Btg 334,500
Diameter 4" Btg 488,500
Diameter 5" Btg 794,500
Diameter 6" Btg 1,049,100
Diameter 8" Btg 1,630,300
9 TANGKI FIBER
Tangki fiberglass Kap. 1 m3 Buah 1,500,000
Tangki fiberglass Kap. 2 m3 Buah 3,032,400
Tangki fiberglass Kap. 3 m3 Buah 4,043,200
10 Jenis Batang D untuk saluran pembuangan air :
1/2 inci - 4 m Btg 16,200
3/4 inci - 4 m Btg 23,300
1 inci - 4 m Btg 32,400
1 1/2 inci - 4 m Btg 35,400
2 inci - 4 m Btg 45,500
2 1/2 inci - 4 m Btg 60,800
3 inci - 4 m Btg 73,800
4 inci - 4 m Btg 91,900
5 inci - 4 m Btg 128,900
6 inci - 4 m Btg 214,300
8 inci - 4 m Btg 318,200
10 inci - 4 m Btg 428,800
11 Pipa Jenis Batang C untuk Intalasi Listrik :
5/ inci - 4 m Btg 21,200
3/4 inci - 4 m Btg 26,300
1 inci - 4 m Btg 30,200
1 1/2 inci - 4 m Btg 41,600
12 Klep Dia 3/4 buah 25,000
13 Tangki Air 2000 Ltr buah 2,500,000
Tangki Air 1000 Ltr buah s
Tangki Air 500 Ltr buah 712,500
Pelampung otomatis buah 40,000

G BAHAN LAINNYA
1 Aspal / Bitumen ( ex Pertamina ) Kg 15,200
Aspal Buton Ton 707,600
Minyak Flux / Flux Oil Ltr 7,500

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
(Dalam Rupiah (Rp)

NO JENIS BAHAN SPESIFIKASI SATUAN HARGA

1 2 3 4
Kerosin /Minyak Tanah Ltr 14,200
Kayu Bakar M3 126,400
Oil/ Minyak Pelumas Liter 25,800
Grease( Gemuk ) Liter 29,200
Solar/ Minyak Diesel Liter 9,100
Bensin/ Premium Liter 8,100
Royalty - Batu Quarry M³ 19,200
Royalty - Kerikil Galian M³ 19,200
Royalty - Kerikil Sungai M³ 19,200
Royalty - Sirtu M³ 19,200
Alat-Alat Bantu /Kerja set 93,000
Expantion Joint M 377,800
Geotextile Non Woven M² 37,800
Geotextile Moven M² 43,600
Fender Karet Ban Mobil ( lokal ) UNIT 1,162,500
Bollard Kapasitas 10 Ton ( Lokal ) UNIT 930,000
Geotextite Density 200 gr /M2 Lbr 56,800
Geogrid Density 300 gr / M2 M² 35,300
Tiang pancang Beton Praktekan dia 40 cm M 727,700
Tiang pancang Beton Praktekan dia 45 cm M 778,900
Peralatan Utama Kincir Angin Lengkap Acc;Kap 10 KW
Set 180,680,800
Peralatan Utama PLTS Angin Lengkap Acc;Kap 10 KW Set 367,334,100
Kabel Tray NYY 4 x 50 mm 2 M 123,300
Instalasi Penangkal Petir Set 19,350,900
Peralatan Utama IPA 40 it/det dng sistem Backwash Set 2.265.725,20
Peralatan Utama IPA 20 it /det dng sistem Backwash Set 1.434.803,80
Peralatan Utama IPA10 L/det dng sistem Backwash Set 918.277.600
Water Meter Induk DIA 12" unit 56,103,100
Panel Induk unit 47,705,800
Panel Intake unit 36,140,900
Peralatan lab ( PH test. Sisa Chlour ) unit 15,642,700
Peralatan Utama Pompa Air Tanpa Mesin ( PTAM ) unit 79,091,100
Gate Valve dia 150 MM Buah 2,021,300
Karbon Calgon untuk Salinitas @ 20 kg /zak kg 125,000
Meganese green sand zak 2,500,000
Ultra Violet Sterilver set 4,375,000
Membran Produkasi set 10,000,000
Sambungan Pipa Stainless 1/2 set 1,250,000
AVR Dinamo Denyo unit 8,125,000
Mengana Zeolit zak

H BAHAN PLAFOND
1 Eternit 100 X 100 Lembar 20,200
2 Tripleks
122 X 244 x 0.2 cm Lbr 41,000
122 X 244 x 0.3 cm Lbr 58,000
122 X 244 x 0.6 cm Lbr 91,000
122 X 244 x 0.9 cm Lbr 129,000
3 Tripleks Melamin
122 X 244 x 0.3 cm Lbr 70,800
Accoustic 40 X 60 Lbr 80,900
4 Teakwood
80 X 244 x 0.3 cm Lbr 111,200
122 X 244 x 0.3 cm Lbr 73,600
5 Hard Board 122 X 244 cm Lbr 97,700
6 Asbes Plat Harfeks
200 X 100 X 0.3 cm Lbr 45,100
7 List Profil
2 x 3 cm / 4 m M 5,300
3 x 3 cm / 4 m M 5,700
4 x 4 cm / 4 m M 6,200
8 Besi Hollow ( Rangka Plafond )
(40x40x6000) mm, tebal = 0,35 mm Btg 37,000
(40x20x6000) mm, tebal = 0,20 mm Btg 28,000
Gypsumboard t.9 mm Lembar 65,000
List profil 5 cm Gypsum M 13,000
Rangka Plafond Metal Furing M² 25,000

I BAHAN ATAP

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
(Dalam Rupiah (Rp)

NO JENIS BAHAN SPESIFIKASI SATUAN HARGA

1 2 3 4
1 Genteng
Beton Buah 10,300
Caisboard Lembar 68,000
Keramik Buah 11,100
Asbes Lbr 30,800
Harfles (115X85x0.5 cm) Lbr 35,800
Genteng Metal Multy Roof Lbr 83,200
Genteng Metal Surya Roof Lbr 49,700
Genteng Metal Sakura Roof Lbr 41,600
2 Asbes Gelombang Kaki 6,000
3 Sirap Ikat 20,600
4 Seng licin Lbr 46,700
5 Seng gelombang
Sermani Kaki 7,300
Cap Gajah Duduk Kaki 6,600
BWG 34" BJLS 0.20 mm Kaki 5,600
BWG 32"BJLS 0.30 mm Kaki 9,300
BWG 28"BJLS 0.35 mm Kaki 11,600
6 Seng Plat
BJLS 0.30 mm Lbr 40,500
BJLS 0.28 mm Lbr 64,000
7 Seng Super Deck
180 X 70 cm – 10 kaki Lbr 137,400
180 X 70 cm – 8 kaki Lbr 121,700
180 X 70 cm – 7 kaki Lbr 91,600
180 X 70 cm – 6 kaki Lbr 90,200
8 Seng Aluminium Gelombang
SWG 32” 0.27 mm Lbr 33,500
SWG 30” 0.31 mm Lbr 43,000
SWG 28” 0.38 mm Lbr 50,100
9 Seng Plastik (Fiber) Lbr 45,800
10 Fiber Semen (Harflex)
Super 240 X 108 X 0.6 cm Lbr 44,100
Super 180 X 1082 X 0,5 cm Lbr 28,700
Ekonomi 240 X 92 X 0.5 cm Lbr 44,100
Ekonomi 180 X 92 X 0.5 cm Lbr 28,700
Mini 240 X 105 X 0.4 cm Lbr 36,500
Mini 180 X 92 X 0.5 cm Lbr 28,300
11 Nok/Bubungan
Genteng Beton Bh 10,300
Genteng Asbes Bh 30,800
Genteng Keramik Bh 45,700
Metal Multi Roof Lbr 33,400
Metal Sakura Roof Lbr 33,400
Alm. SWG 28” -180 cm Lbr 30,500
Alm. SWG 28” –105 cm Lbr 33,400
Nok Steel Gelombang Bh 30,500
Super – 180 cm Lbr 29,000
Mini – 105 cm Lbr 53,100
Ekonomi – 95 cm Lbr 40,200
Nok Steel Rata Lbr 34,400
Super – 108 cm Bh 54,800
Mini – 105 cm Bh 80,500
12 Nok ½ Lingkaran Bh 37,600
13 Karet Pelapis Genteng M 29,700
14 Atap Metal Spandex( warna ) tebal ;0,3 mm M 7,800
M 45,000
J BAHAN PENGGANTUNG
1 Kunci Tanam
Union 1 x Slag Pasang 35,800
Union 1 x Slag Pasang 40,100
Yale 1 x Slag Pasang 65,800
Yale 1 x Slag Pasang 90,200
Kuda Terbang Pasang 44,800
2 Penggantung
Hak Angin Kecil Pasang 2,600
Hak Angin Besar Pasang 7,900
Grendel Pasang 45,800
Engsel Pintu Pasang 25,000
Expanyolet Pasang 45,800

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
(Dalam Rupiah (Rp)

NO JENIS BAHAN SPESIFIKASI SATUAN HARGA

1 2 3 4

K BAHAN SANITER
1 Closet Duduk
Biasa ( Tanpa Tabung ) Bh 510,000
Standar ( dengan Tabung ) Bh 1,145,000
American Standar Bh 1,655,000
Toto Bh 3,050,000
2 Closet Jongkok Unit 101,000
3 Wasthafel Bh 361,400
4 Wasthafel cuci piring logam Bh 361,400
5 Pompa Tangan Terpasang Bh
6 Urinoir Bh 626,700
7 Bak Mandi fiber Bh 319,700
8 Reservoir fiber = 1 m3 Bh 1,144,800
9 Reservoir Stainless stell = 1 m3 Bh 2,906,100
10 Stop Kran Bh 20,000
11 Kran Air Bh 18,000
12 Shower Set Bh 45,000
13 Shower Spray Bh 45,000
14 Floodrain Bh 55,000
15 Tempat Sabun Bh 30,000
16 Kran Zink Bh 45,000
17 Kran Cabang Shower Bh 150,000
18 Pompa Air Unit 5,000,000

L BAHAN INSTALASI LISTRIK


1 Pipa Union Untuk Kabel
5/8 inchi - 4 Meter Batang 6,100
1 Inchi - 4 Meter Batang 29,500
1,5 Inchi- 4 meter
2 inchi - 4 meter Batang 27,300
2 Kabel Listrik Type NYK (Full)
1,5 mm Roll 202,200
2,5 mm Roll 283,100
2 x 1,5 mm Roll 510,600
2 x 2,5 mm Roll 606,337
3 Type NYY
2 X 1 ½ mm Roll 859,200
2 X 2 ½ mm Roll 1,400,000
2 X 4 mm Roll
4 Lampu TL
1 X 20 W Bh 29,500
2 X 20 W Bh 123,500
1 X 40 W Bh 44,200
2 X 40 W Bh 321,000
5 Lampu Pijar
40 W Bh 11,000
6 TL Sumpit / Lampu Visicom
Lampu sumpit 5 Watt Bh 32,400
Lampu sumpit 3 Watt Bh 36,960
Lampu sumpit 11 Watt Bh 39,600
Lampu sumpit 14 Watt Bh 42,000
Lampu sumpit 18 Watt Bh 45,600
Lampu sumpit 23 Watt Bh 52,800
Lampu sumpit 28 Watt Bh 69,600
Lampu sumpit 60 Watt Bh 202,200
Lampu sumpit 58 Watt Bh 196,000
Lampu sumpit 60 Watt Bh 202,200
Lampu sumpit 68 Watt Bh 201,600
Lampu sumpit 100 Watt Bh
7 Lampu Ulir
Lampu Ulir 5 Watt Bh 35,840
Lampu Ulir 8 Watt Bh 36,960
Lampu Ulir 12 Watt Bh 41,440
Lampu Ulir 15 Watt Bh 44,800
Lampu Ulir 20 Watt Bh 47,040
Lampu Ulir 24 Watt Bh 55,193
Lampu Ulir 25 Watt Bh 58,956
Lampu Ulir 32 Watt Bh 66,000
Lampu Ulir 36 Watt Bh 224,000

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
(Dalam Rupiah (Rp)

NO JENIS BAHAN SPESIFIKASI SATUAN HARGA

1 2 3 4
Lampu Ulir 65 Watt Bh 244,560
8 Lampu Taman Mercury Bh 329,200
9 Saklar Phase
Tunggal Putih Bh 18,000
Tunggal Hitam Bh 7,000
Double Putih Bh 27,000
Double Hitam Bh 15,000
10 Stop Kontak
Hitam Bh 16,000
Putih Bh 25,000
11 Zekering Kast Lokal Biasa
Lokal 2 Group Automat Bh 123,500
Lokal 3 Group Biasa Bh 126,800
12 Fitting Biasa Bh 19,000
13 Fitting Downlight
Diameter 3" Bh 40,000
Diameter 4" Bh 50,000

M BAHAN FINISHING /CAT


1 Cat Tembok
Avitex 5 Kg 97,000
Metrolaite 25 Kg 490,000
Corolex 1 Kg 43,500
Aries 5 Kg 71,250
Kimex 1 Kg 17,600
Vinilex Nippon Paint 1 Kg 26,900
Dulux 1 Kg 25,700
2 Cat Kayu
Glotex Kg 63,000
3 Flat Beck Truck 3-4 M3 Jam 411,000
4 Track Loader 75-100 HP Jam 336,000
5 Three Wheel Roller 6-8 Ton Jam 341,000
6 Pedestrian Roller Jam 77,000
7 Jack Hammer Jam 42,000
8 Fulvi Mixer Jam 840,000
9 Concerette Pump Jam 284,000
10 Trailer 20 Ton Jam 350,000
11 Pile Drive + Hammer Jam 189,000
12 Bore Pile Machine 2.000 M Jam 1,007,000
13 Asphalt Liquid Mixer 5 HP, 1000 L Jam 59,000
14 Tronton Jam 436,000
15 Cold Milling Jam 598,000
16 Rock Drill Breaker Jam 74,000
17 Slip From Paver Jam 243,000
18 Concrete Pan Mixer 600 L Jam 347,000
19 Concrette Breaker 20 M3/Jam Jam 564,000
20 Asphalt Tanker 4.000 L Jam 403,500
21 Cement Tanker 4.000 L Jam 367,000
22 Vibrating Rammer Jam 71,000
23 Truck Mixer ( agitator ) Jam 701,000
24 Asphalt Liquid Mixer 40 HP,2.000 L Jam 119,000
25 Batching Plant 8.000 L Jam 557,000
26 Pedestrian Roller Jam 62,560
27 Asphalt Liquid Mixer Jam 46,989
28 Trailler 15 Ton Jam 275,772
29 Batching Plant Jam 570,556
30 Dump Truck 3,5 Ton Jam 264,500
31 Dump Truck 3,5 Ton Jam 43,100

Q BAHAN ALUMINIUM
1 Kusen dan pintu OVC toilet Unit 195,000
2 Engsel Buah 11,750
3 Handle Pintu Buah 10,500
4 Selinder Buah 17,500
5 Slop Tanam Buah 50,000
6 Kait Angin Buah 4,000
7 Grendel Buah 6,000

R UPAH KERJA
Pekerja RP/Hari 89,100

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
(Dalam Rupiah (Rp)

NO JENIS BAHAN SPESIFIKASI SATUAN HARGA

1 2 3 4
Tukang Kayu RP/Hari 144,800
Tukang Batu RP/Hari 144,800
Tukang Cat RP/Hari 144,755
Tukang Listrik RP/Hari 144,800
Tukang Besi RP/Hari 144,800
Tukang Pipa RP/Hari 144,800
Kepala Tukang Kayu RP/Hari 167,100
Kepala Tukang Batu RP/Hari 146,500
Kepala Tukang Cat RP/Hari 167,100
Kepala Tukang Listrik RP/Hari 167,100
Kepala Tukang Besi RP/Hari 167,100
Kepala Tukang Pipa RP/Hari 167,100
Mandor RP/Hari 183,800
Pembantu Mekanik RP/Hari 89,100
Penjaga Gudang RP/Hari 144,800
Penjaga Malam RP/Hari 144,800
Mekanik terampil RP/Hari 167,100
Mekanik Semi Termapil RP/Hari 144,800
Operator Terampil RP/Hari 167,100
Operator Semi Terampil RP/Hari 144,800
Pembantu Operator RP/Hari 83,600
Sopir Terampil RP/Hari 167,100
Sopir Pribadi RP/Hari 144,800
Buruh Tak Terampil RP/Hari 89,100
Buruh Semi Terampil RP/Hari 100,300
Buruh Terampil RP/Hari 122,500

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
STANDAR HARGA SATUAN BAHAN BANGUNAN DAN UPAH KERJA
PEMERINTAH PROVINSI SULAWESI SELATAN
KABUPATEN PINRANG
TAHUN 2018

Dalam Rupiah (Rp)


No JENIS BAHAN SPESIFIKASI SATUAN HARGA

1 2 3 4 5
BAHAN DASAR
1 Batu Kali / Gunung
Utuh m³ 150,000
split 3-5 cm m³ 210,000
split 2-3 cm m³ 240,000
split 1-2 cm m³ 281,000
2 Tanah Timbunan m³
3 Pasir m³
Timbunan Urug m³ 81,500
Pasangan m³ 97,200
Beton ( Abu Batu ) m³ 100,000
4 Kerikil Sungai m³ 162,000
5 Sirtu 130,000
6 Semen Potland
Semen PC 50 Kg/ Tonasa Kg 1,188
Semen PC 40 Kg/ Bosowa Kg 1,075
Scream Coat 20 Kg Zak 70,000
7 Kapur
Kapur Pasangan m³
8 Air Ltr 500

BAHAN CETAKAN
1 Batu Merah Uk.5x10x20 cm Buah 650
2 Paving Blok
Paving Blok Standar m² 52,500
Paving Blok K 200 m² 80,000
Paving Blok K 300 m² 86,000
Paving Blok K 400 m² 105,000
3 Gorong- Gorong
Gorong - Gorong 20" Buah 150,000
Gorong - Gorong 30" Buah 200,000
Gorong - Gorong 40" Buah 250,000
Gorong - Gorong 50" Buah 300,000
Gorong - Gorong 60" Buah 350,000
4 Rooster
Model ( Ukuran kecil ) Buah Rp 15,000
Model ( Ukuran sedang ) Buah 25,000

BAHAN BAKAR MINYAK


1 Premium/Bensin Ltr 6,450
2 Solar Ltr 5,150
3 Solar Industri Ltr
4 Minyak Bekisting Ltr
5 Minyak Pelumas Ltr 32,000

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)
No JENIS BAHAN SPESIFIKASI SATUAN HARGA

1 2 3 4 5
BAHAN PENUTUP LANTAI DAN DINDING
1 Keramik Lantai
Ukuran 20 x 20 cm Polos Buah 2,200
Ukuran 20 x 20 cm Motif/Tekstur Buah 2,600
Ukuran 30 x 30 cm Putih Buah 3,909
Ukuran 30 x 30 cm Warna Buah 5,909
Ukuran 30 x 30 cm Motif/Tekstur Buah 5,909
Ukuran 40 x 40 cm Putih Buah 7,500
Ukuran 40 x 40 cm Warna Buah 9,167
Ukuran 40 x 40 cm Motif/Tekstur Buah 10,833
Ukuran 50 x 50 cm Putih Buah 19,688
Ukuran 50 x 50 cm Warna Buah 21,250
Ukuran 50 x 50 cm Motif/Tekstur Buah 24,938
Ukuran 60 x 60 cm SNI Polos Buah 43,333
Ukuran 60 x 60 cm SNI Motif/ Tekstur Buah 46,667
Ukuran 60 x 60 cm Ext.Esenza ( Polos ) Buah 61,250
Ukuran 60 x 60 cm Ext.Esenza (Motif ) Buah 70,000
2 Keramik Dinding
Ukuran 20 x 25 cm Polos Buah 2,888
Ukuran 20 x 25 cm Motif Buah 5,455
Ukuran 25 x 40 cm Polos Buah 7,875
Ukuran 25 x 40 cm Motif Buah 13,333
Ukuran 30 x 60 cm Ext.Platinum Buah 19,250
3 Lantai Granite
Ukuran 60 x 60 cm Polos Buah 150,000
Ukuran 60 x 60 cm Motif Buah 160,000
4 Batu Alam
Batu Alam Paras Yogya 15 x 15 m² 220,000
Batu Alam Andesit Polos Bakar 15 x 30 m² 220,000
Batu Alam Andesit Bintik Bakar 15 x 30 m² 220,000
Batu Alam Candi Merah 10 x 20 m² 189,000
Batu alam palimanan 10 x 20 m² 200,000
Wali Cladding Kombinasi 20 x 50 m² 280,000

BAHAN PLUMBING DAN SANITARY


1 Pipa PVC - Type AW
ø 1/2 " Inci - 4 m Btg 18,000
ø 3/4 " Inci - 4 m Btg 22,000
ø 1 " Inci - 4 m Btg 25,000
ø 1 1/2 " Inci - 4 m Btg 45,000
ø 2 " Inci - 4 m Btg 60,000
ø 2 1/2 " Inci - 4 m Btg 80,000
ø 3 " Inci - 4 m Btg 115,000
ø 4 " Inci - 4 m Btg 185,000
ø 6 " Inci - 4 m Btg 425,000
ø 8 " Inci - 4 m Btg 750,000
Pipa PVC /Pipa Limbah 4 Inci -6 m Btg 450,000
Pipa PVC /Pipa Limbah 3 Inci -6 m Btg 350,000
ø 2 " Inci -Panjang 6 m S10 Bar 12,5 Btg 165,000
ø 2 " Inci -Panjang 6 m S12,5 Bar 10 Btg 115,000
ø 3 " Inci -Panjang 6 m S12 Bar 10 Btg 240,000
2 Pipa PVC -Type D

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)
No JENIS BAHAN SPESIFIKASI SATUAN HARGA

1 2 3 4 5
ø 1 1/4 " Inci - 4 m Btg 25,000
ø 1 1/2 " Inci - 4 m Btg 35,000
ø 2 " Inci - 4 m Btg 40,000
ø 2 1/2 " Inci - 4 m Btg 50,000
ø 3 " Inci - 4 m Btg 60,000
ø 4 " Inci - 4 m Btg 90,000
ø 5 " Inci - 4 m Btg 150,000
ø 6 " Inci - 4 m Btg 200,000
ø 8 " Inci - 4 m Btg 375,000
ø 10 " Inci - 4 m Btg 700,000
ø 12 " Inci - 4 m Btg 980,000
3 Pipa PVC- Type Wavin ( s 10 Tekanan Nominal 10 Bar ( 1,0 mpa ) 4 m )
ø 1/2 " Inci Btg 14,280
ø 3/4" Inci Btg 21,000
ø 1 " Inci Btg 25,000
ø 1 1/4" Inci Btg 35,000
ø 2 " Inci Btg 198,030
ø 3 " Inci Btg 384,615
ø 4 " Inci Btg 578,340
ø 6 " Inci Btg 1,227,870
ø 8 " Inci Btg 1,937,250

BAHAN CAT DAN FINISHING


1 Cat Tembok
Cat Tembok ( Kualitas Standar ) ext.Aries Kg 12,600
Cat Tembok ( Kualitas menengah ) ext.Metrolite Kg 25,000
Cat Tembok Interior ext Mowilex (2,5 liter) Ltr 60,000
Cat Tembok Eksterior ext Mowilex (2,5 liter) Ltr 100,000
Cat Precoat Varnish Batu Alam ( Solven 2,5 liter Ltr 120,750
Cat Precoat Varnish Batu Alam ( Solven 1 Liter Ltr 75,000
Plamur Tembok Zak Zak 55,000
2 Cat Kayu dan Besi
Cat Dasar Kayu 0,7 kg Kg 20,000
Cat Dasar Besi 0,7 kg Kg 20,000
Cat Kayu dan Besi ( Alvian ) Kg 57,000
Cat Kayu dan Besi ( Al-tex ) Kg 45,000
Cat Melamin ( Impra ) 5 kg Ltr 250,000
Cat Melamin Biasa Ltr 45,000
Cat Anti Karat Kg 65,000
Politur Ltr 65,000
Dempul Kg 35,000
Thinner Avian Ltr 35,000
Pengencer Cat/ Thinner Literan Ltr 15,000
Meni Kayu 0,7 kg Kg 20,000
Meni Besi 0,7 kg Kg 20,000
Vernis Ltr 65,000
Lem Kayu Kg 15,000
3 Cat Atap dan Waterproofing
Roof Paint Mowilex 4 Kg Ltr 180,000
Cat atap yoko 4 Kg Kg 95,000
Cat Atap dan Waterproofing No-Drop 4 Kg Ltr 180,000
Waterproofing Biasa Ltr

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)
No JENIS BAHAN SPESIFIKASI SATUAN HARGA

1 2 3 4 5
4 Kuas
Kuas 1" Buah 4,000
Kuas 2" Buah 7,000
Kuas 3" Buah 10,500
Kuas 4" Buah 15,750
5 Ampelas Lbr 8,500

BAHAN BESI
1 Besi Beton Polos ( SNI ) Kg 8,500
d = 6 mm btg 25,000
d = 8 mm btg 37,500
d = 10 mm btg 59,000
d = 12 mm btg 87,500
d = 14 mm btg 120,000
d = 16 mm btg 160,000
d = 19 mm btg 225,000
d = 22 mm btg 263,500
2 Besi Beton Ulir ( SNI ) Kg 9,000
d = 8 mm btg 47,250
d = 10 mm btg 65,000
d = 12 mm btg 127,500
d = 14 mm btg 130,000
d = 16 mm btg 165,000
d = 19 mm btg 225,000
d = 22 mm btg 320,000
3 Besi Kotak ( Metal Hollow )
ukuran 20 x 20 x0,3 mm panjang 6 m btg 45,000
ukuran 20 x 40 x0,3 mm panjang 6 m btg 80,000
ukuran 40 x 40 x0,3 mm panjang 6 m btg 105,000
ukuran 40 x 60 x0,3 mm panjang 6 m btg
ukuran 60 x 60 x 1,10 mm btg
4 Besi Baja Ringan
Galvalum
Truss Profil c-75, tebal 0,80 mm btg
Truss Profil c-75, tebal 0,75 mm btg 70,000
Truss Profil c-75, tebal 0,60 mm btg 65,000
Truss taso profil C-75 btg 85,000
Hollow 20 x20 (plafond ) btg 27,500
Hollow 20 x40 (plafond ) btg 21,000
Hollow 40 x40 (plafond ) btg
Galvanis
Truss Profil c-75, tebal 0,80 mm btg 92,400
Truss Apro Profil C=6 m btg 101,640
Aksesories baja ringan
Screw baja ringan buah 500
Dynabolt buah 2,000
Skrup Fixer Dos 50,000
5 Besi Plat
2 mm = 120 x 240 mm Lbr 450,000
3 mm = 120 x 240 mm Lbr 600,000
5 mm = 120 x 240 mm Lbr
6 Besi Siku

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)
No JENIS BAHAN SPESIFIKASI SATUAN HARGA

1 2 3 4 5
30 x 30 x 3 mm kg 60,000
40 x 40 x 3 mm kg 97,000
40 x 40 x 4 mm kg 90,000
50 x 50 x 5 mm kg 165,000
60 x 60 x 6 mm kg
70 x 70 x 7 mm kg 275,000
7 Paku
Paku Kayu kg 20,000
Paku Beton kg 31,500
Paku Seng ( Payung ) kg 50,000
Paku Skrup kg 75,000
Paku Asbes kg 70,000
Paku
KawatSirap kg 30,188
8
Beton Kg 25,000
Duri m 16,800
Kawat Las kg 115,000
Ayakan Kecil m² 28,875
Bronjong Kg 19,425
9 Profil Aluminium
Profil Aluminium Natural 4" 6m Btg 50,000
Profil Aluminium Natural 8" Btg 250,000
Profil daun jendela aluminium Btg 145,000
Aluminium Strip 03 mm Btg 110,000
Kusen Aluminium Btg 200,000
Rooling Door Aluminium m² 500,000
Rooling Door Besi m³ 400,000
Sealant tube 50,000
10 Rangka Nako Lengkap m

BAHAN PIPA
1 Pipa Besi
1.1 GIP(galvanize iron pipe )
Medium A ( Panjang 6 M )
Medium A ø 1/2 inchi btg 127,339
Medium A ø 3/4 inchi btg 175,628
Medium A ø 1 inchi btg 242,964
Medium A ø 1 1/2 inchi btg 339,606
Medium A ø 2 inchi btg 410,461
Medium A ø 3 inchi btg 721,586
Medium A ø 4 inchi btg 1,000,519
Medium A ø 5 inchi btg 1,648,238
Medium A ø 6 inchi 2,206,313
Medium A ø 8 inchi 4,410,000

Medium B ( Panjang 6 M )
Medium B ø 1/2 inchi btg 63,000
Medium B ø 3/4 inchi btg 95,000
Medium B ø 1 inchi btg 159,863
Medium B ø 1 1/2 inchi btg 210,000
Medium B ø 2 inchi btg 225,000
Medium B ø 3 inchi btg 400,000

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)
No JENIS BAHAN SPESIFIKASI SATUAN HARGA

1 2 3 4 5
Medium B ø 4 inchi btg 500,000
1.2 BSP ( Black Steel Pipe )
1/2 inci - 6 m tebal 2 mm
3/4 inci - 6 m tebal 2 mm
1 inci - 6 m tebal 2 mm
2 inci - 6 m tebal 2 mm
3 inci - 6 m tebal 2 mm
4 inci - 6 m tebal 2 mm
6 inci - 6 m tebal 2 mm

2 Tipe C ( Instalasi Listrik )


5/8 inci - 4 m Maspion Btg 9,900
3/4 inci - 4 m Btg
1 inci - 4 m Btg 18,585
1 1/2 inci - 4 m Btg 22,785
2 inci - 4 m Btg 29,190
3 Isolasi Pipa Buah 10,000
4 Lem Pipa Buah 12,500

BAHAN UNTUK LANGIT -LANGIT


1 Eternit 100 x 100 cm Lbr 20,000
2 Papan Gypsum
Gypsum 120 x 240 x 12 mm Lbr 170,000
3 Papan Fiber Semen ( GRC )
GRC 120 X 240 X 6 mm Lbr 72,765
4 Cotton Plaster Lbr 10,000
5 BJLS
Seng Gelombang BWG 34" BJLS 0,20 Kaki
mm 7,560
Seng Gelombang BWG 33" BJLS 0,22 Kaki
mm 8,925
Seng Gelombang BWG 32" BJLS 0,22 Kaki
mm 49,875
Seng Gelombang BWG 28" BJLS 0,35 Kaki
mm 78,750
Seng Aluminium Gelombang SWG Kaki
32"0,27 mm 29,085
Seng Aluminium Gelombang SWG Kaki
32"0,31 mm 34,230
Seng Aluminium Gelombang SWG Kaki
32"0,38 mm 43,785
Seng Plastik ( Serat Fiber ) Lbr 73,500
6 Seng Plat
Seng Plat BJLS 0,30 mm m' 50,000
Seng Plat BJLS 0,28 mm m' 75,000
7 Genteng Metal
ex.Multi Roof Lbr 87,150
ex.Perkasa Roof Lbr
ex.surya Roof Lbr 50,820
ex.intiroof Lbr
8 Metal Deck/Spandeck
Spandek Polos 0,40 mm

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)
No JENIS BAHAN SPESIFIKASI SATUAN HARGA

1 2 3 4 5
Spandek Polos 0,35 mm
Spandek Polos 0,30 mm
Spandek Polos 0,25 mm
Spandek Warna 0,40 mm
Spandek Warna 0,35 mm
Spandek Warna 0,30 mm
Spandek Warna 0,25 mm
9 Seng Plastik ( Fiber )
Fiber Glass ( Jabes ) 180 x 92 cm Lbr 63,000
Fiber Glass ( Jabes ) 200 x 92 cm Lbr 91,875
10 Nok /Bubungan
Nok Metal ext Multi Roof Lbr 42,000
Nok Metal ext Perkasa Roof Lbr 29,400
Nok Metal ext Surya Roof Lbr 23,625
Genteng Metal Buah 28,000
11 Nok Spandeck 40 cm
40 cm x 0,40 cm m 20,000
30 cm x 0,25 cm m
12 Karet Pelapis Genteng lebar 110 cm roll
13 List Plank Papan Semen ( Superplank )
Listplank Tekstur Kayu Lbr 99,750
Listplank Calsiboard Lebar 20 cm Lbr 68,250

BAHAN KACA, KUNCI DAN


PENGGANTUNG
1 Kaca
Kaca Bening 3 mm m² 100,000
Kaca Bening 5 mm m² 130,000
Kaca Rayben 3 mm m² 120,000
Kaca Rayben 5 mm m² 130,000

2 Kunci
Kunci Silinder KM/WC ( Kualitas Buah 50,000
biasa )
Kunci Silinder KM/WC ( Kualitas Buah 100,000
biasa )
Kunci Tanam Biasa ( antik ) Buah 120,000
Kunci Tanam 2x Slag Buah 180,000
Kunci Tanam 3x Slag Buah
3 Handle Pintu
Handle Pintu Biasa (Handel Buah 80,000
Pintu+Kunci)
Kualitas standar Buah 100,000
Kualitas Sedang Buah 150,000
Kualitas Baik(Handel Pintu Stainless + Buah 300,000
Kunci
Kualitas Baik (Handel Pintu Stainless + 150,000
Kunci
Handel Pintu Stainless (Kualitas Baik) Buah 300,000
4 Hak Angin
Hak Angin -Kecil ( Pasangan ) Buah 10,500
Hak Angin -Besar ( Pasangan ) Buah 15,750

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)
No JENIS BAHAN SPESIFIKASI SATUAN HARGA

1 2 3 4 5
5 Grendel
Grendel Kecil - 3 " Buah 10,000
Grendel Sedang - 6 " Buah 15,000
Grendel Besar - 12" Buah
Kualitas Standar Buah 20,000
Kualitas Sedang Buah 35,000
Kualitas Baik Buah 50,000
Grendel Tanam ( Kotak ) Buah 35,000
6 Engsel Pintu Buah 15,000
7 Engsel Jendela Buah 10,000
8 Engsel Kupu-Kupu Buah 15,000
9 Expaynolet Buah 135,000
10 Door Closer Buah 225,000
11 Door Stop Buah 20,000
12 Sekrup Fixer Buah 3,000
13 Kusen Aluminium 4" ( Putih ) Buah 275,000
14 Kusen Aluminium 4" (Coklat ) Buah 350,000
15 Kait Angin Buah 15,000
16 Pintu Aluminium Putih Buah 275,000
17 Pintu Aluminium Coklat Buah 550,000
18 Pintu Aluminium + Kusen Buah 900,000
19 Rolling Door Aluminium Buah
20 Rolling Door Besi ( pakai besi plat ) m 750,000
21 Rolling Door Besi ( Biasa ) m 500,000
22 Pintu Lipat Aluminium ( folding door ) m 750,000
23 Pintu Lipat Besi ( Folding Door ) m 750,000

BAHAN LAIN-LAIN
1 Minyak Tanah Ltr
2 Pelumas Ltr 29,000
3 Solar Industri Ltr 8,900
4 Solar Ltr 6,950
5 Premium Ltr 6,950
6 Paving Blok
Paving Blok Standar m² 52,500
Paving Blok K-250 m² 75,600
Paving Blok K-300 m² 84,000
Paving Blok 8 cm warna K-400 m² 105,000
BAHAN SANITER
1 Kloset Duduk
ex. TOTO ( 1 Tombol ) Set 1,800,000
ex. TOTO ( 2 Tombol ) Set 2,600,000
2 Kloset Jongkok
ex.TOTO Set 360,000
Standar Set 150,000
3 Washtafel
ex.Data Set 385,875
Tanam Persegi Empat( standar ) Set 200,000
Tanam Bulat ( standar ) Set 200,000
4 Bak Cuci Piring 1 Lubang ( sink )
Kualitas set 950,000
Kualitas Standar set 650,000

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)
No JENIS BAHAN SPESIFIKASI SATUAN HARGA

1 2 3 4 5
5 Bak Cuci Piring 2 Lubang ( sink )
Kualitas tebal set 975,000
Kualitis Tipis
6 Urinoir Buah 300,000
7 Bak Air Fiber 1000 Ltr Buah 1,200,000
8 Tangki Air Fiber - 1/2 m³ Buah 1,155,000
9 Tangki Air Fiber - 2 m³ Buah 2,940,000
10 Tangki Air Fiber 600 Ltr Buah 700,000
11 Tangki Air Stainless steel -1/2 m³ Maspion Buah 2,900,000
12 Tangki Air Stainless steel -1 m³ Maspion Buah 3,750,000
13 Tangki Air Stainless steel -1,5 m³ Maspion Buah 5,000,000
14 Kran Air
Stainless steel kualitas baik Buah 100,000
Stainless steel kualitas biasa Buah 50,000
Biasa Buah 25,000
15 Floor Drain stainless steel
Floor Drain kualitas standar Buah 55,000
Floor Drain kualitas sedang Buah 65,000
Floor Drain kualitas baik Buah 120,000
16 Waterdrain Buah 50,000
17 Pintu KM/WC PVC ( Standar ) Buah 300,000
18 Mesin Pompa Air
ex.Shimizu Set 550,000

BAHAN INSTALASI LISTRIK


1 Kabel Listrik
Kabel Tiostik 2x10 mm m' 12,000
Kabel Tiostik 2x16 mm m' 17,000
TYPE NYA
1,5 mm roll 190,000
2,5 mm roll 295,000
2 x 1,5 mm m' 11,500
2 x 2,5 mm m' 14,700
3 x 1,5 mm m' 13,650
3 x 2, 5 mm m' 16,800
TYPE NYM
2 x 1,5 mm m' 7,500
2 x 2,5 mm m' 12,000
2 x 4 mm m' 22,000
3 x 1,5 mm m' 10,000
3 x 2, 5 mm m' 13,000
3 x 4 mm m' 28,000
3 x 6 mm m' 35,000
TYPE NYY
2 x 2,5 mm m' 15,000
3 x 1,5 mm m' 17,000
3 x 2, 5 mm m' 22,000
3 x 4 mm m' 34,000
4 x 4 mm m' 30,000
4 x 6 mm m' 42,000
4 x 10 mm m' 88,000
LAMPU

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)
No JENIS BAHAN SPESIFIKASI SATUAN HARGA

1 2 3 4 5
Lampu LED 40 Watt Hwalite Buah 2,750,000
Lampu LED 90 Watt Hwalite Buah 4.850.000
Lampu LED 120 Watt Hwalite Buah 6.735.000
Lampu LED 100 Watt Sky Buah 1.450.000
Balon LHE 42 Watt Visicom Buah 115,000
Balon LHE 45 Watt Hamochs Buah 125,000
Balon TL Buah 25,000
2 Photo Sel Buah 75,000
3 Konektor Buah 15,000
4 Kap Lampu Buah 50,000
5 Trafo 40 Watt TL Buah 55,000
6 Pitting Lampu Buah 50,000
7 Pitting TL Buah 45,000
8 Stater TL Buah 10,000
9 Sok Pitting over Buah 25,000
10 Kontraktor 60 Ampere Buah 750,000
11 Tiang Arm Buah 175,000
12 MCB 35 Ampere Buah 145,000
13 Isolasi Unibel Buah 10,000
14 Servis Dial Clamp Buah 12,000
15 Safety Belt Buah 1,550,000
16 Clamp meter Buah 2,500,000
17 Behel Tiang Besi Buah 65,000
18 Behel Tiang Beton Buah 85,000
19 LAMPU NEON
Lampu Neon 1x40 watt ( kap biasa) ext.Philips Set 120,000
Lampu Neon 1x20 watt ( kap biasa) ext.Philips Set 85,000
Lampu Neon 2x40 watt ( kap tanam) ext.Philips Set 240,000
Lampu Neon 2x20 watt ( kap tanam) ext.Philips Set 99,750
20 LAMPU HEMAT ENERGI ( Kualitas Baik )
Lampu hemat energi 28 Watt ext.Philips Buah 60,000
Lampu hemat energi 23 Watt ext.Philips Buah 50,000
Lampu hemat energi 18 Watt ext.Philips Buah 45,000
Lampu hemat energi 14 Watt ext.Philips Buah 40,000
Lampu hemat energi 11 Watt ext.Philips Buah 35,000
21 KAP DOWN LIGHT
Diameter 5 Inchi Buah
Diameter 4 Inchi Buah 55,000
Diameter 3 Inchi ( Kualitas Baik ) Buah 45,000
Diameter 5 Inchi ( Kualitas Sedang ) Buah 40,000
22 SAKLAR PHASE
Saklar Phase Tunggal ext.Broco Buah 17,850
Saklar Phase Double ext.Broco Buah 28,350
Saklar Phase Tunggal panasonic Buah 16,000
Saklar Phase Double panasonic Buah 25,000
Stop Kontak Tunggal ext.Broco Buah 18,000
Stop Kontak Double ext.Broco Buah 17,850
23 Stop Kontak
Kualitas Baik panasonic Buah 16,000
Kualitas Sedang ext.Broco Buah 15,000
24 Sekering
Box MCB Buah 35,000

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)
No JENIS BAHAN SPESIFIKASI SATUAN HARGA

1 2 3 4 5
MCB Tunggal Buah 25,000
MCB 10 A Buah 47,000
MCB 25 A Buah 60,000
MCB 60 A Buah 682,500
MCB 30 A Buah 367,500
MCB 2 Group 2 A Buah 138,350
MCB 2 Group 10 A Buah 68,825
Lokal 2 Group Biasa Buah 68,825
Lokal 2 Group Outomatic Buah 95,025

BAHAN KAYU
1 Kayu Kelas I
Balok( Bayam ) m³ 12,500,000
Papan ( Bayam ) m³ 15,000,000
Balok ( Kumia ) m³ 6,500,000
Papan ( Kumia ) m³ 6,500,000
2 Kayu Kelas II ( Jenis Kayu Merah )
Balok m³ 3.500.000
Papan m³ 3.500.000
3 Kayu Kelas III ( Jenis Kayu Putih )
Balok m² 2.500.000
Papan m³ 2.500.000
4 Tripleks
122 x 244 x 0,4 cm lbr 55,000
122 x 244 x 0,6 cm lbr 79,800
122 x 244 x 0,9 cm lbr 110,250
5 Tripleks Melamin lbr 178,500
6 Teakwood lbr 98,175
7 Bambu Btg 40,000
8 List Profil Kayu
2 x 3 cm lbr 15,000
3 x 3 cm lbr 20,000
4 x 4 cm lbr 20,000
5 x 5 cm lbr 25,000
9 Lem Kayu kg 30,000

UPAH KERJA
Pekerja Org / hari 106,000
Tukang
Tukang kayu Org / hari 120,500
Tukang batu Org / hari 120,500
Tukang cat Org / hari 120,500
Tukang listrik Org / hari 120,500
Tukang pipa Org / hari 120,500
Tukang besi Org / hari 120,500
Kepala tukang
Kepala tukang kayu Org / hari 140,500
Kepala tukang batu Org / hari 140,500
Kepala tukang cat Org / hari 140,500
Kepala tukang listrik Org / hari 140,500
Kepala tukang pipa Org / hari 140,500
Kepala tukang besi Org / hari 140,500

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)
No JENIS BAHAN SPESIFIKASI SATUAN HARGA

1 2 3 4 5
Mandor Org / hari 122,700
Mekanik Org / hari 122,700
Sopir Org / hari 116,700
Pembantu sopir Org / hari 111,500
Operator terlatih Org / hari 120,500
Operator kurang terlatih Org / hari 106,000
Pembantu operator Org / hari 106,000
Pembantu masinis Org / hari 106,000
Penjaga Gudang Org / hari 106,000
Penjaga Malam Org / hari 106,000

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
STANDAR HARGA SATUAN BAHAN BANGUNAN DAN UPAH KERJA
PEMERINTAH PROVINSI SULAWESI SELATAN
KABUPATEN PINRANG
TAHUN 2020

Dalam Rupiah (Rp)


No JENIS BAHAN SPESIFIKASI SATUAN HARGA

1 2 3 4 5
BAHAN DASAR
1 Batu Kali / Gunung
Utuh m³ 150,000
split 7-10 cm m³ 160,000
split 5 -7 cm m³ 190,000
split 3-5 cm m³ 210,000
split 2-3 cm m³ 240,000
split 1-2 cm m³ 281,000
split 0,5-1 cm m³ 300,000
2 Tanah Timbunan m³ 56,250
3 Pasir m³
Timbunan Urug m³ 81,500
Pasangan m³ 97,200
Beton ( Abu Batu ) m³ 115,000
4 Kerikil Sungai m³ 175,000
5 Sirtu gunung 85,000
6 Semen Potland
Semen PC 50 Kg/ Tonasa Kg 1,220
Semen PC 50 Kg/ Bosowa Kg 1,100
Semen PC 40 Kg/ Tonasa Kg 1,175
Semen PC 40 Kg/ Bosowa Kg 1,075
Scream Coat 20 Kg Zak 65,000
BAHAN CETAKAN
1 Batu Merah Uk.5x10x20 cm Buah 650
2 Paving Blok
Paving Blok Standar 35 pc, t = 6 cm m² 63,000
Paving Blok K 225 m² 73,500
Paving Blok K 300 m² 76,650
Paving Blok K 400 m² 89,250
3 Gorong- Gorong
Gorong - Gorong 20" Buah 80,000
Gorong - Gorong 30" Buah 100,000
Gorong - Gorong 40" Buah 120,000
Gorong - Gorong 50" Buah 150,000
Gorong - Gorong 60" Buah 200,000
4 Rooster
Model Polos ( Ukuran kecil ) 15 x 25 Buah Rp 5,000
Model Polos ( Ukuran sedang ) 15 x 30 Buah 7,000
Model Kembang ( Ukuran kecil ) 15 x 40 Buah Rp 8,000
Model Kembang ( Ukuran sedang ) 15 x 40 Buah 10,000
5 Buis Beton
φ 50 cm x 1 m Buah 275,000
φ 40 cm x 1 m Buah 185,000
φ 30 cm x 1 m Buah 140,000
6 Batako 20 x 10 x 40 Buah 63,000

Harga Satuan Bahan Bangunan dan Upah Kerja Semester I Tahun 2020
Dalam Rupiah (Rp)
No JENIS BAHAN SPESIFIKASI SATUAN HARGA

1 2 3 4 5
7 Kanstin 12 x 25 x 40 Buah 22,000
8 Topi Uskup Paving Buah 3,500
BAHAN BAKAR MINYAK
1 Premium/Bensin Ltr 6,450
2 Pertalite Ltr 7,850
3 Pertamax Ltr 10,400
4 Solar Ltr 5,150
5 Minyak Pelumas
Mesran Super utk Mesin Bensin Ltr 37,000
Mesran B utk Mesin Solar Ltr 35,000
BAHAN PENUTUP LANTAI DAN DINDING
1 Keramik Lantai
Ukuran 20 x 20 cm Polos Buah 2,200
Ukuran 20 x 20 cm Motif/Tekstur Buah 2,300
Ukuran 30 x 30 cm Putih Buah 4,545
Ukuran 30 x 30 cm Warna Buah 6,091
Ukuran 30 x 30 cm Motif/Tekstur Buah 5,909
Ukuran 40 x 40 cm Putih Buah 8,333
Ukuran 40 x 40 cm Warna Buah 9,333
Ukuran 40 x 40 cm Motif/Tekstur Buah 12,500
Ukuran 50 x 50 cm Putih Buah 18,750
Ukuran 50 x 50 cm Warna Buah 21,250
Ukuran 50 x 50 cm Motif/Tekstur Buah 21,625
Ukuran 60 x 60 cm SNI Polos Buah 35,000
Ukuran 60 x 60 cm SNI Motif/ Tekstur Buah 36,250
2 Keramik Dinding
Ukuran 20 x 25 cm Polos Buah 3,000
Ukuran 20 x 25 cm Motif Buah 3,000
Ukuran 25 x 40 cm Polos Buah 12,083
Ukuran 25 x 40 cm Motif Buah 7,000
Ukuran 30 x 60 cm Ext.Platinum Buah 20,000
3 Lantai Granite
Ukuran 60 x 60 cm Ext. Esenza Polos Buah 61,250
Ukuran 60 x 60 cm Ext. Esenza Motif Buah 70,000
4 Batu Alam
Batu Alam Paras Yogya 80 x 70 x 7 lmbr 1,365,000
Batu Alam Andesit lmbr 141,750
Batu Alam Andesit Polos lmbr 89,250
Batu Alam Centro lmbr 68,250
BAHAN PLUMBING DAN SANITARY
1 Pipa PVC - Type AW
φ 1/2 " Inci - 4 m Btg 15,000
φ 3/4 " Inci - 4 m Btg 20,000
φ 1 " Inci - 4 m Btg 30,000
φ 1 1/2 " Inci - 4 m Btg 45,000
φ 2 " Inci - 4 m Btg 65,000
φ 2 1/2 " Inci - 4 m Btg 120,000
φ 3 " Inci - 4 m Btg 200,000
φ 4 " Inci - 4 m Btg 175,000
φ 6 " Inci - 4 m Btg 350,000
2 Pipa PVC -Type D
φ 1 1/4 " Inci - 4 m Btg 25,000

Harga Satuan Bahan Bangunan dan Upah Kerja Semester I Tahun 2020
Dalam Rupiah (Rp)
No JENIS BAHAN SPESIFIKASI SATUAN HARGA

1 2 3 4 5
φ 1 1/2 " Inci - 4 m Btg 35,000
φ 2 " Inci - 4 m Btg 40,000
φ 2 1/2 " Inci - 4 m Btg 50,000
φ 3 " Inci - 4 m Btg 65,000
φ 4 " Inci - 4 m Btg 100,000
φ 5 " Inci - 4 m Btg 165,000
φ 6 " Inci - 4 m Btg 210,000
φ 8 " Inci - 4 m Btg 375,000
φ 10 " Inci - 4 m Btg 650,000
φ12 " Inci - 4 m Btg 980,000
3 Pipa PVC- Type Wavin ( s 10 Tekanan Nominal 10 Bar ( 1,0 mpa ) 4 m )
φ 1/2 " Inci Btg 13,125
φ 3/4" Inci Btg 18,900
φ 1 " Inci Btg 54,600
φ 1 1/4" Inci Type SC Btg 78,750
φ 1 1/4" Inci Type RR Btg 46,725
φ 2 " Inci Type SC Btg 136,500
φ 2 " Inci Type RR Btg 141,750
φ 3 " Inci Type SC Btg 285,600
φ 3 " Inci Type RR Btg 288,750
φ 4 " Inci Type SC Btg 414,750
φ 4 " Inci Type RR Btg 427,350
φ 6 " Inci Btg 1,227,870
φ 8 " Inci Btg 1,937,250
4 Accessories PVC SNI
Knee PVC 90 φ 3 " Buah 68,250
Knee PVC 90 φ 2 " Buah 36,750
Knee PVC 90 φ 1 1/2 " Buah 26,250
Knee PVC 90 φ 1 1/4 " Buah 15,750
Knee PVC 90 φ 1 " Buah 10,500
Knee PVC 90 φ 3/4 " Buah 5,250
Knee PVC 90 φ 1/2 " Buah 4,725
Knee PVC 45 φ 3 " Buah 78,750
Knee PVC 45 φ 2 " Buah 47,250
Knee PVC 45 φ 1 1/2 " Buah 28,875
Tee PVC φ 4"x 3 "x 4 " Buah 162,750
Tee PVC φ 3"x 3 "x 3 " Buah 141,750
Tee PVC φ 3"x 2 "x 3 " Buah 141,750
Tee PVC φ 2"x 2 "x 2 " Buah 68,250
Tee PVC φ 2"x 1 1/2 "x 2 " Buah 68,250
Tee PVC φ 1 1/2"x 1 1/2 "x 1 1/2 " Buah 28,875
Tee PVC φ 1 1/4"x 1 "x 1 1/4 " Buah 18,375
Tee PVC φ 1 1/4"x 1 1/4 "x 1 1/4 " Buah 18,375
Tee PVC φ 3/4"x 3/4 "x 3/4 " Buah 7,875
Tee PVC φ 1/2"x 1/2 "x 1/2" Buah 5,250
Reducer PVC ф 4"x 2" Buah 78,750
Reducer PVC ф 3"x 2" Buah 68,250
Reducer PVC ф 2"x 1 1/2" Buah 47,250
Reducer PVC ф 2"x 1 1/4" Buah 47,250
Reducer PVC ф 1 1/2"x 1 1/4" Buah 18,375
Reducer PVC ф 1 1/2"x 1" Buah 18,375
Reducer PVC ф 2"x 1" Buah 47,250

Harga Satuan Bahan Bangunan dan Upah Kerja Semester I Tahun 2020
Dalam Rupiah (Rp)
No JENIS BAHAN SPESIFIKASI SATUAN HARGA

1 2 3 4 5
Reducer PVC ф 1 1/4"x 3/4" Buah 10,500
Reducer PVC ф 3/4"x 1/2" Buah 7,875
5 Pipa PVC Air Buangan Type B/SDR 41
1 1/2" SC ( 4 m ) Vinilon Coklat Batang 111,563
1 1/2" SC ( 4 m ) Batang 142,013
2" SC ( 6 m ) Batang 272,423
2" RR ( 6 m ) Batang 274,838
2 1/2" SC ( 6 m ) Batang 327,495
2 1/2" RR ( 6 m ) Batang 330,383
3" SC ( 6 m ) Batang 397,530
3" RR ( 6 m ) Batang 399,945
4" SC ( 6 m ) Batang 490,245
4" RR ( 6 m ) Batang 493,133
5" SC ( 6 m ) 560,280
5" RR ( 6 m ) 562,223
6" SC ( 6 m ) 894,023
6" RR ( 6 m ) 896,910
8" RR ( 6 m ) 1,373,190
10" RR ( 6 m ) 2,169,615
12" RR ( 6 m ) 3,408,510
16" RR ( 6 m ) 5,546,783
20" RR ( 6 m ) 8,753,903
24" RR ( 6 m ) 13,943,265
BAHAN CAT DAN FINISHING
1 Cat Tembok
Cat Tembok (Kualitas Standar) 20 kg (Aries) 160,000
Cat Tembok (Kualitas Menengah) 5 kg 130,000
Cat Tembok Interior (EX. Metrolite) 5 kg 100,000
Cat Tembok Eksterior (Ex. Metrolite) 20 kg 415,000
Cat Tembok Eksterior (Ex. Mowilex) 2,5 ltr 200,000
Skim Coat 20 kg 60,000
2 Cat Kayu dan Besi
Cat dasar kayu Liter 35,000
Cat Dasar Besi Liter 35,000
Cat Kayu dan Besi (Nippe 2000) Liter 75,000
Cat Kayu dan Besi (Glotex) Liter 60,000
Cat Kayu dan Besi (Alvian) Liter 60,000
Cat Kayu dan Besi (Al-tex) Liter 65,000
Cat Melamin (Impra) Liter 65,000
Cat Melamin Biasa Liter 65,000
Cat Politur Liter 60,000
Cat Anti Karat Liter 65,000
Plamir Kayu Liter 35,000
Politur Liter 60,000
Dempul Liter 35,000
Thinner Avian Liter 35,000
Pengencer Cat/Thinner Literan Liter 15,000
Meni Kayu Liter 35,000
Meni Besi Liter 35,000
Vernis Liter 60,000
Lem Kayu 800 gr Kg 15,000
3 Cat Atap dan Waterproofing

Harga Satuan Bahan Bangunan dan Upah Kerja Semester I Tahun 2020
Dalam Rupiah (Rp)
No JENIS BAHAN SPESIFIKASI SATUAN HARGA

1 2 3 4 5
Cat atap yoko 4 Kg Kg 105,000
Cat Atap dan Waterproofing No-Drop 4 Kg Ltr 190,000
Waterproofing Biasa 0,9 Ltr 85,000
4 Kuas
Kuas 1" Buah 5,000
Kuas 2" Buah 10,000
Kuas 3" Buah 15,000
Kuas 4" Buah 20,000
5 Ampelas Lbr 3,000

BAHAN BESI
1 Besi Beton Polos ( SNI )
d = 6 mm 12 m SNI Batang 27,000
d = 8 mm 12 m SNI Batang 45,000
d = 10 mm Batang 70,000
d = 12 mm Batang 100,000
d = 14 mm Batang 145,000
d = 16 mm Batang 190,000
d = 19 mm Batang 285,000
2 Besi Beton Ulir ( SNI )
d = 8 mm Batang 45,000
d = 10 mm Batang 70,000
d = 12 mm Batang 100,000
d = 14 mm Batang 145,000
d = 16 mm Batang 190,000
d = 19 mm Batang 285,000
3 Besi Kotak ( Metal Hollow ) Type A
ukuran 20 x 20 x 0,3 mm panjang 6 m Batang 47,500
ukuran 20 x 40 x 0,3 mm panjang 6 m Batang 80,000
ukuran 40 x 40 x 0,3 mm panjang 6 m Batang 105,000
ukuran 40 x 60 x 0,3 mm panjang 6 m Batang 150,000
4 Besi Baja Ringan
Galvalum
Truss Profil C-75, tebal 0,75 mm Batang 80,000
Truss Profil C-75, tebal 0,60 mm Batang 75,000
Truss Taso Profil C - 75 Batang 92,000
Hollow 20 x 40 (plafond) 4m Batang 18,000
Hollow 40 x 40 (plafond) Batang 25,000
Galvanis
Truss Profil c-75, tebal 0,80 mm Batang 92,400
Truss Apro Profil C=6 m Batang 101,640
Aksesories baja ringan
Screw baja ringan buah 500
Dynabolt buah 2,000
Skrup Fixer Dos 50,000
5 Besi Plat
2 mm = 120 x 240 mm Lbr 450,000
3 mm = 120 x 240 mm Lbr 610,000
5 mm = 120 x 240 mm Lbr 1,300,000
6 Besi Siku
30 x 30 x 3 mm Batang 60,000
40 x 40 x 3 mm Batang 95,000

Harga Satuan Bahan Bangunan dan Upah Kerja Semester I Tahun 2020
Dalam Rupiah (Rp)
No JENIS BAHAN SPESIFIKASI SATUAN HARGA

1 2 3 4 5
50 x 50 x 5 mm kg 175,000
70 x 70 x 7 mm kg 275,000
7 Paku
Paku Kayu Dos 18,000
Paku Beton Dos 40,000
Paku Seng ( Payung ) Dos 40,000
Paku Skrup kg 75,000
Paku Asbes kg 70,000
Paku
KawatSirap kg 30,188
8
Beton 8 kg Rool 130,000
Duri m 180,000
Kawat Las 5 kg kg 120,000
Ayakan Kecil m² 28,875
Bronjong Rool 800,000
9 Profil Aluminium
Profil M 4" 6m Batang 230,000
Profil Z 4" Batang 190,000
Profil Cekokan Kusen (tutup Z) 4" Batang 130,000
Profil Cekokan Kusen 4" Batang 85,000
Profil C 4" Batang 150,000
Profil M 3" Batang 147,000
Profil Z 3" Batang 136,000
Profil Cekokan Kusen (tutup Z) 3" Batang 72,000
Profil Cekokan Kusen 3" Batang 54,000
Profil C 3" 123,000
Rooling Door Aluminium m2 550,000
Rooling Door Besi m3 450,000
Sealant tube 50,000
BAHAN PIPA
1 Pipa Besi
GIP(galvanize iron pipe )
Medium A ( Panjang 6 M )
Medium A Ø 1/2 inchi Batang
Medium A Ø 3/4 inchi Batang 85,000
Medium A Ø 1 inchi Batang 135,000
Medium A Ø 1 1/2 inchi Batang 165,000
Medium A Ø 2 inchi Batang 250,000
Medium A Ø 3 inchi Batang 350,000
Medium A Ø 4 inchi Batang 390,000
2 Tipe C ( Instalasi Listrik )
5/8 inci - 4 m Maspion Batang 8,500
3/4 inci - 4 m Batang 24,000
3 Isolasi Pipa Buah 3,000
4 Lem Pipa Buah 10,000

BAHAN UNTUK LANGIT -LANGIT


1 Eternit 100 x 100 cm Lbr 18,000
2 Papan Gypsum
Gypsum 120 x 240 x 12 mm Lbr 60,000
3 Papan Fiber Semen ( GRC )
GRC 120 X 240 X 6 mm Lbr 65,000

Harga Satuan Bahan Bangunan dan Upah Kerja Semester I Tahun 2020
Dalam Rupiah (Rp)
No JENIS BAHAN SPESIFIKASI SATUAN HARGA

1 2 3 4 5
4 Cotton Plaster Lbr 10,000
5 BJLS
Seng Gelombang BWG 34" BJLS 0,20 Kaki 7,200
mm
Seng Gelombang BJLS 0,20 mm 1,8 m x 80 cm Lbr 47,000
Seng Gelombang BJLS 0,25 mm 180 cm x 80 cm Lbr 60,000
Seng Gelombang BJLS 0,25 mm 210 cm x 80 cm Lbr 69,000
Seng Gelombang BJLS 0,25 mm 240 cm x 80 cm Lbr 80,000
Seng Gelombang BJLS 0,25 mm 300 cm x 80 cm Lbr 100,000
Seng Gelombang BJLS 0,30 mm 180 cm x 80 cm Lbr 68,000
Seng Gelombang BJLS 0,30 mm 2100 cm x 80 cm Lbr 80,000
Seng Gelombang BJLS 0,30 mm 240 cm x 80 cm Lbr 90,000
Seng Gelombang BJLS 0,30 mm 300 cm x 80 cm Lbr 113,000
6 Seng Plat
Seng Plat BJLS 0,30 mm 90 x 180 x 0,2 m' 50,000
7 Genteng Metal
ex.Multi Roof 80 x 80 Lbr 88,000
ex.Perkasa Roof Lbr 67,500
ex.surya Roof Lbr 52,000
ex.intiroof Lbr Rp 27,500
8 Metal Deck/Spandeck
Spandek polos 0.30 mm 0,30 silver m 38,000
Spandek polos 0.35 mm m 42,000
Spandek warna 0.50 mm m 107,900
Spandek warna 0.45 mm m 97,900
Spandek warna 0.40 mm m 82,900
Spandek warna 0.35 mm m 72,900
Spandek warna 0.30 mm m 62,900
Spandek warna 0.25 mm m 52,900
9 Seng Plastik ( Fiber )
Fiber Glass ( Jabes ) 180 x 92 cm Lbr 63,000
Fiber Glass ( Jabes ) 200 x 92 cm Lbr 91,875
10 Nok /Bubungan
Nok Metal ext Multi Roof Lbr 45,000
Nok Metal ext Perkasa Roof Lbr 20,000
Nok Metal ext Surya Roof Lbr 20,000
Genteng Metal Buah 28,000
11 Nok Spandeck 40 cm
40 cm x 0,40 cm 2m m 65,000
12 Karet Pelapis Genteng lebar 110 cm roll 360,000
13 List Plank Papan Semen (Superplank)
Listplank Tekstur Kayu 4m Lbr 60,000
Listplank Calsiboard Lebar 20 cm 4m Lbr 53,000

BAHAN KACA, KUNCI DAN


PENGGANTUNG
1 Kaca
Kaca Bening 3 mm m² 100,000
Kaca Bening 5 mm m² 125,000
Kaca Rayben 3 mm m² 120,000
Kaca Rayben 5 mm m² 125,000
Kaca Buram 5 mm m² 250,000

Harga Satuan Bahan Bangunan dan Upah Kerja Semester I Tahun 2020
Dalam Rupiah (Rp)
No JENIS BAHAN SPESIFIKASI SATUAN HARGA

1 2 3 4 5
Sealent Kaca Kecil Buah 10,000
Sealent Kaca Besar Buah 15,000
2 Kunci
Kunci Silinder KM/WC ( Kualitas Buah 100,000
biasa )
Kunci Silinder KM/WC ( Kualitas Buah 100,000
sedang )
Kunci Tanam Biasa ( antik ) Buah 125,000
3 Handle Pintu
Handle Pintu Biasa (Handel Buah 125,000
Pintu+Kunci)
Kualitas standar Buah 112,500
Kualitas Sedang Buah 162,500
Kualitas Baik(Handel Pintu Stainless + Buah 235,000
Kunci
Kualitas Baik (Handel Pintu Stainless +
Kunci 475,000
4 Hak Angin
Hak Angin -Kecil ( Pasangan ) Buah 10,000
Hak Angin -Besar ( Pasangan ) Buah 25,000
5 Grendel
Grendel Kecil - 3 " Buah 10,000
Grendel Sedang - 6 " Buah 15,000
Grendel Besar - 12" Buah 25,000
6 Engsel Pintu Buah 17,500
7 Engsel Jendela Buah 13,750
8 Engsel Kupu-Kupu Buah 7,000
9 Expaynolet Buah 135,000
10 Door Closer Buah 110,000
11 Door Stop Buah 20,000
12 Sekrup Fixer Buah 3,000
13 Kusen Aluminium 4" ( Putih ) Buah 250,000
14 Kusen Aluminium 4" (Coklat ) Buah 400,000
15 Kait Angin Buah 10,000
16 Pintu Aluminium Putih Buah 250,000
17 Pintu Aluminium Coklat Buah 650,000
18 Pintu Aluminium + Kusen Buah 900,000
19 Pintu Lipat Aluminium ( folding door ) m 725,000
20 Pintu Lipat Besi ( Folding Door ) m 1,000,000

BAHAN LAIN-LAIN
1 Minyak Tanah Ltr
2 Pelumas Ltr 29,000
3 Solar Industri Ltr 8,900
4 Solar Ltr 6,950
5 Premium Ltr 6,950
6 Paving Blok
Paving Blok Standar m² 52,500
Paving Blok K-250 m² 75,600
Paving Blok K-300 m² 84,000
Paving Blok 8 cm warna K-400 m² 105,000
BAHAN SANITER
1 Kloset Duduk

Harga Satuan Bahan Bangunan dan Upah Kerja Semester I Tahun 2020
Dalam Rupiah (Rp)
No JENIS BAHAN SPESIFIKASI SATUAN HARGA

1 2 3 4 5
ex. TOTO ( 1 Tombol ) Set 2,250,000
ex. TOTO ( 2 Tombol ) Set 2,450,000
2 Kloset Jongkok
ex.TOTO Set 350,000
Standar Set 150,000
3 Washtafel
Wastafel putih (standar) set 250,000
Wastafel Toto Bulat set 462,000
Wastafel Toto persegi empat set 408,800
Wastafel Toto set komplit dan kaca set 939,800
Wastafel Toto full set lengkap set 2,623,000
4 Bak Cuci Piring 1 Lubang ( sink )
Kualitas biasa set 150,000
5 Bak Cuci Piring 2 Lubang ( sink )
Kualitas tebal set 450,000
6 Urinoir Buah 300,000
7 Bak Air Fiber 1000 Ltr Buah 1,100,000
8 Tangki Air Fiber - 1/2 m³ Buah 700,000
9 Tangki Air Fiber - 2 m³ Buah 2,300,000
11 Tangki Air Stainless steel 470 ltr Profil tank Buah 1,706,250
12 Tangki Air Stainless steel 500 ltr Sakura water tank Buah 1,627,500
13 Tangki Air Stainless steel 1000 ltr Profil tank Buah 3,066,000
14 Tangki Air Stainless steel 1500 ltr Penguin Buah 7,759,500
15 Kran Air
Stainless steel kualitas baik Buah 100,000
Stainless steel kualitas biasa Buah 70,000
Biasa Buah 25,000
16 Floor Drain stainless steel
Floor drain plastik Buah 6,300
Floor drain pembuangan Buah 23,205
Floor drain model kotak Buah 36,750
Floor Drain otomatis Buah 50,400
Floor drain model toto mjs Buah 88,200
Floor drain model toto sus 304 Buah 189,000
floor drain American Standard 294,000
17 Waterdrain Buah 50,000
18 Pintu KM/WC PVC ( Standar ) Buah 350,000
19 Mesin Pompa Air
ex.Shimizu Set 550,000

BAHAN INSTALASI LISTRIK


1 Kabel Listrik
TYPE NYA
Twistik 2 x 10 mm Jembo m' 6,000
Twistik 2 x 16 mm Jembo m' 9,000
TYPE NYA
1 x 1,5 mm supreme roll/100 m 310,000
1 x 1,5 mm visicom / eterna roll/100 m 210,000
1 x 2,5 mm supreme roll/100 m 510,000
1 x 2,5 mm visicom / eterna roll/100 m 320,000
1 x 4 mm supreme roll/100 m 300,000
1 x 4 mm visicom / eterna roll/100 m 500,000

Harga Satuan Bahan Bangunan dan Upah Kerja Semester I Tahun 2020
Dalam Rupiah (Rp)
No JENIS BAHAN SPESIFIKASI SATUAN HARGA

1 2 3 4 5
1 x 6 mm supreme roll/100 m 1,180,000
1 x 10 mm supreme roll/100 m 1,960,000
TYPE NYM (Putih)
2 x 1, 5 mm supreme roll/100 m 980,000
2 x 1,5 mm visicom / eterna roll/100 m 550,000
2 x 1,5 mm Buana / Cosmic roll/100 m 550,000
2 x 2,5 mm supreme roll/100 m 1,400,000
2 x 2,5 mm visicom / eterna roll/100 m 900,000
2 x 2,5 mm Buana / Cosmic roll/100 m 800,000
2 x 4 mm supreme roll/100 m 2,100,000
2 x 6 mm supreme roll/100 m 2,800,000
2 x 10 mm supreme roll/100 m 4,250,000
3 x15 mm supreme roll/100 m 1,260,000
3 x 1,5 mm visicom / eterna roll/100 m 800,000
3 x 1,5 mm Buana / Cosmic roll/100 m 700,000
3 x 2,5 mm supreme roll/100 m 1,820,000
3 x 2,5 mm visicom / eterna roll/100 m 1,150,000
3 x 2,5 mm Buana / Cosmic roll/100 m 1,050,000
3 x 4 mm supreme roll/100 m 2,800,000
3 x 6 mm supreme roll/100 m 4,060,000
3 x 10 mm supreme roll/100 m 6,720,000
4 x 1,5 mm supreme roll/100 m 1,540,000
4 x 1,5 mm visicom / eterna roll/100 m 1,050,000
4 x 2,5 mm supreme roll/100 m 2,880,000
4 x 2,5 mm visicom / eterna roll/100 m 1,550,000
4 x 4 mm supreme roll/100 m 3,780,000
4 x 6 mm supreme roll/100 m 5,320,000
4 x 10 mm supreme roll/100 m 8,820,000
TYPE NYY (Hitam)
2 x 1,5 mm supreme roll/100 m 1,120,000
2 x 2,5 mm supreme roll/100 m 1,540,000
2 x 4 mm supreme roll/100 m 2,380,000
2 x 6 mm supreme roll/100 m 3,220,000
2 x 10 mm supreme roll/100 m 5,040,000
3 x 1,5 mm supreme roll/100 m 1,400,000
3 x 2,5 mm supreme roll/100 m 2,100,000
3 x 4 mm supreme roll/100 m 3,220,000
3 x 6 mm supreme roll/100 m 4,480,000
3 x 10 mm supreme roll/100 m 7,280,000
4 x 1,5 mm supreme roll/100 m 1,320,000
4 x 2,5 mm supreme roll/100 m 2,300,000
4 x 4 mm supreme roll/100 m 4,200,000
4 x 6 mm supreme roll/100 m 5,380,000
4 x 10 mm supreme roll/100 m 9,380,000
TYPE NYM - HY (Putih Serabut))
2 x 0,75 mm supreme roll/100 m 530,000
2 x 1,5 mm supreme roll/100 m 980,000
2 x 2,5 mm supreme roll/100 m 1,540,000
2 x 4 mm supreme roll/100 m 2,240,000
2 x 6 mm supreme roll/100 m 3,220,000
2 x 10 mm supreme roll/100 m 5,320,000
3 x 0,75 mm supreme roll/100 m 910,000

Harga Satuan Bahan Bangunan dan Upah Kerja Semester I Tahun 2020
Dalam Rupiah (Rp)
No JENIS BAHAN SPESIFIKASI SATUAN HARGA

1 2 3 4 5
3 x 1,5 mm supreme roll/100 m 1,470,000
3 x 2,5 mm supreme roll/100 m 2,100,000
3 x 4 mm supreme roll/100 m 3,360,000
3 x 6 mm supreme roll/100 m 4,760,000
3 x 10 mm supreme roll/100 m 7,980,000
4 x 0,75 mm supreme roll/100 m 1,540,000
4 x 1,5 mm supreme roll/100 m 1,890,000
4 x 2,5 mm supreme roll/100 m 2,940,000
4 x 4 mm supreme roll/100 m 4,200,000
4 x 6 mm supreme roll/100 m 6,160,000
4 x 10 mm supreme roll/100 m 10,220,000

2 Lampu
Type LED
Led Bulb 3/3,5 watt Philips Buah 21,000
Led Bulb 4/5 watt Philips Buah 29,000
Led Bulb 6/7 watt Philips Buah 33,000
Led Bulb 8 watt Philips Buah 38,000
Led Bulb 10 watt Philips Buah 42,000
Led Bulb 12 watt Philips Buah 52,000
Led Bulb 14,5 watt Philips Buah 56,000
Led Bulb 19 watt Philips Buah 80,000
Led Bulb 27 watt Philips Buah 95,000
Led Bulb 33 watt Philips Buah 165,000
Led Bulb 40 watt Philips Buah 210,000
Led Bulb 3/3,5 watt Visicom Buah 19,000
Led Bulb 5 watt Visicom Buah 26,000
Led Bulb 7 watt Visicom Buah 31,000
Led Bulb 9 watt Visicom Buah 35,000
Led Bulb 12 watt Visicom Buah 45,000
Led Bulb 15 watt Visicom Buah 53,000
Led Bulb 20 watt Visicom Buah 73,000
Led Bulb 30 watt Visicom Buah 120,000
Led Bulb 40 watt Visicom Buah 195,000
Led TL 8 watt Philips Set 70,000
Led TL 16 watt Philips Set 80,000
Type Neon
Neon 1 x 18 watt (Kap OB) Philips Set 105,000
Neon 2 X 36 watt (Kap OB) Philips Set 125,000
Type Lampu Hemat Energi (LHE)
Sumpit 11 Watt Philips Buah 33,000
Sumpit 14 Watt Philips Buah 35,000
Sumpit 18 Watt Philips Buah 37,000
Sumpit 23 Watt Philips Buah 43,000
Spiral 15 Watt Philips Buah 43,000
Spiral 20 Watt Philips Buah 46,000
Spiral 24 Watt Philips Buah 50,000
Spiral 27 Watt Philips Buah 53,000
Spiral 32 Watt Philips Buah 57,000
Spiral 42 Watt Philips Buah 69,000
Spiral 52 Watt Philips Buah 95,000
Sumpit 11 Watt Visicom Buah 29,000

Harga Satuan Bahan Bangunan dan Upah Kerja Semester I Tahun 2020
Dalam Rupiah (Rp)
No JENIS BAHAN SPESIFIKASI SATUAN HARGA

1 2 3 4 5
Sumpit 14 Watt Visicom Buah 31,000
Sumpit 18 Watt Visicom Buah 33,000
Sumpit 23 Watt Visicom Buah 39,000
Sumpit 28 Watt Visicom Buah 45,000

Harga Satuan Bahan Bangunan dan Upah Kerja Semester I Tahun 2020
STANDAR HARGA SATUAN BAHAN BANGUNAN DAN UPAH KERJA
PEMERINTAH PROVINSI SULAWESI SELATAN
KABUPATEN ENREKANG
TAHUN 2018
Dalam Rupiah (Rp)
NO JENIS BARANG SPESIFIKASI SATUAN HARGA

1 2 3 4 5
1 Amplas Lbr 5,500
2 Aspal Cair Kg 14,000
3 Abses Gelombang Besar Lbr 83,800
4 Abses Gelombang Kecil Lbr 80,200
5 Abses 3 mm uk. 100 x 100 Lbr 22,570
6 Aspal Bitumen Lt 13,000
7 Aspal Emulsi Lt 12,000
8 Baja Struktural Kg 28,713
9 Baja Tulangan Beton Kg 11,241
10 Batako uk. 20 x 40 x 10 Biji 2,095
11 Baut Baja Kg 18,800
12 Besi Galvanisasi Kg 18,793
13 Besi Profil Ca Pipa Besi Dai 2" m' 15,380
14 Beton Roster / Karawang Biji 40,315
15 Bubungan Abses Gib. Besar Lbr 30,395
16 Besi Beton d = 4 mm Btg 33,125
d = 6 mm Btg 33,125
d = 8 mm Btg 62,155
d = 10 mm Btg 96,280
d = 12 mm Btg 138,595
d = 14 mm Btg 202,750
d = 16 mm Btg 432,070
d = 19 mm Btg 576,760
d = 22 mm Btg 650,470
18 Paku Paku Biasa Kg 21,888
Paku Asbes Kg 38,950
Paku Seng (Payung) RRT Kg 27,075
Paku Skrup 3 1/2 inch Kg 28,030
Paku Skrup 4 inch Kg 26,665
Paku Payung Berulir 75 mm Kg 38,950
Paku Sirap Kg 25,983
Paku Beton Hitam Dos 38,950
Paku Beton Putih Dos 20,523
19 Kawat Beton Kg 32,125
Nyamuk Mtr 19,840
Ayakan Kecil Mtr 25,300
Duri Kg 19,840
20 Besi Plat 2mm = 120 x 240 mm Lbr 671,628
3mm = 120 x 240 mm Lbr 951,453
Besi H 15 cm 12 m panjang Btg 6,222,400
21 Besi Strep 30,3 mm Btg 33,078
35,4 mm Btg 47,410
46,4 mm Btg 52,553
40,6 mm Btg 49,140
50,6 mm Btg 67,658
22 Besi Siku 30.30.3 Btg 88,725
40.40.4 Btg 95,550
40.40.3 Btg 103,105
50.50.4 Btg 114,025
50.50.5 Btg 120,850
60.60.6 Btg 142,690
70.70.7 Btg 230,733

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)
NO JENIS BARANG SPESIFIKASI SATUAN HARGA

1 2 3 4 5
23 Besi Tipe C (Rangka Baja Ringan) Lebar 10, tebal 1,8 - 2,00 mm Btg 262,128
6 meter Lebar 12,5 tebal 1,8 - 2,00 mm Btg 286,000
Lebar 15 tebal 1,8 - 2,00 Btg 361,090
24 Besi Type C Ninoruss untuk Atap -
- Genteng atau Multiroof C.85.68, Reng 41 Bentang 5 s/d 7 M2 296,253
- Genteng atau Multiroof C.85.68, Reng 41 Bentang 9 s/d 11 M2 328,330
- Seng atau Spandeck C.85.68, Reng 41 Bentang 5 s/d 8 M2 288,063
- Seng atau Spandeck C.85.68, Reng 41 Bentang 9 s/d 11 M2 320,072
25 Genteng Metal Sakura Roof Lbr 59,100
26 Genteng Metal Surya Roof Lbr 74,700
27 Genteng Metal Multi Roof Lbr 92,900
28 Bubungan Genteng Metal M 56,500
29 Atap Spendek -
Tebal 0.3 Lbr 74,700
Tebal 0.35 Lbr 81,200
104,600
30 Gypsum Lbr 104,600
31 Sekrup Gypsum Isi 1000 perkotak Ktk 138,400
32 Aplus Cornice Compound Adhesive zak 20 kg Kg 80,940
33 Calsibox Lbr 95,500
34 Bubungan Abses Gib. Kecil Lbr 44,800
35 Bubungan Genteng Beton Bh 8,920
36 Bubungan Genteng Keramik Bh 49,118
37 Bubungan Seng Multi Roof Lbr 63,520
38 Buis Beton 1/2 Dia. 20 cm M 63,520
39 Bak Air Penampungan Veber isi 1 m3 Bh 1,330,000
40 Bak Air Penampungan Veber isi 0,6 m3 Bh 1,050,000
41 Bak Air kolam veber Bh 366,550
42 Cat Atap Seng (AGA) Isi 5 Kg Klg 188,000
43 Cat Meni Kayu Kg 32,125
44 Cat Minyak Kg 45,775
45 Cat Seng Minyak Isi 5 Kg Klg 79,900
46 Cat Tembok
- Cat Tembok Maritex Sejenisnya Kg 20,523
- Cat Tembok Mitroleit Kg 28,713
47 Cat Besi Kg 59,425
48 Cat Untuk Pekerjaan Jembatan Kg
49 Corong Talang Setengah Lingkaran Bh 93,550
50 Corong Talang Segi Empat Bh 93,550
51 Dempul Kayu Klg 38,950
52 Engsel Jendela Kuningan Psg 25,300
53 Engsel Pintu Kuningan Psg 38,950
54 Embo Doz Bh 2,048
55 Eternit 1 X 1 T . 33 mm Lbr 22,570
56 Engkel Stop kontak Bh 33,490
57 Genteng Beton Bh 6,873
58 Genteng Keramik Bh 10,285
59 Gorong-gorong beton 100 cm M¹ 407,500
60 Gorong-gorong beton 60 cm M¹ 305,125
61 Gorong-gorong beton 80 cm M¹ 355,630
62 Gorong-gorong beton 30 cm M¹ 202,750
63 Gorong-gorong beton 40 cm M¹ 253,255
64 Grendel Jendela 3,000
65 Grendel Kupu-kupu Jendela Bh 5,000
66 Grendel Kodok Jendela Bh 12,337
67 Hak Angin Psg 5,187
68 Instalasi Listrik Titik 305,125
69 Jarum Pengeras 1 1/2" Inc 509,875

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)
NO JENIS BARANG SPESIFIKASI SATUAN HARGA

1 2 3 4 5
70 Jarum Pengeras 1" Inc 305,125
71 Jarum Pengeras 1/2" Inc 202,750
72 Jarum Pengeras 3 1/6" Inc 202,750
73 Jarum Pengeras 3/4" Inc 28,713
74 Jarum Pengeras 5/16" Inc 8,238
75 Kaca Bening 3 mm M2 79,900
76 Kabel Tunggal 1,5 Isi 100 mtr rool 261,445
77 Kaca Bening 5 mm M2 130,405
78 Kaca Warna Biru M2 223,225
79 Kaca Ryben 3 mm M2 120,850
Kaca Ryben 5 mm M2 141,325
Kaca Ryben 7 mm M2 1,124,125
80 Kap TL 20 Watt Bh 131,088
81 Kap TL 10 Watt Bh 181,593
82 Kni M3 2,048
83 Kapur Ayak M3 85,360
84 Karet Roll M¹ 10,285
Karet Roll Lebar 55 cm M¹ 10,285
Karet Roll lebar 90 cm M¹ 16,428
Karet Roll 120 cm M¹ 17,110
85 Kawat Baja (bindraat) Kg 32,125
86 Kawat Berduri Kg 32,808
Kawat Berduri 100 M Roll 240,970
87 Kawat digelvano Kg 22,570
88 Kayu bakar M3 754,210
88 Kayu Kelas I / Balok (Bayam) m3 14,600,000
89 Kayu Kelas I / Papan (Bayam) m3 15,800,000
90 Kayu Kelas II / Balok m3 5,600,000
Kayu Kelas II / (Lokal) m3 9,018,000
91 Kayu Kelas III (Lokal) m3
Kayu Kelas III (Lokal) Balok m3 4,580,000
Kayu Kelas III (Lokal) Papan m3 5,100,370
92 Kayu Kelas IV untuk bagesting m3 3,570,205
93 Kayu Perancah m3 2,362,863
94 Kayu Lapis 4 mm uk. 8" x 4" Lbr 92,185
95 Kayu Lapis 12 mm uk.8" x 4" Lbr 18,475
96 Kayu Lapis 4 mm uk. 120" x 240" Lbr 66,250
97 Kayu Struktural (Ulin) m3 18,545,000
98 knee Bh 1,502
99 Klin 1 1/2" inc 104,470
1" inc 57,378
1/2" inc 57,378
3/4" inc 14,380
100 Kloset Biasa Bh 141,325
Kloset Duduk CW 600 J/SW 660 J KOMPLIT & ACC Unit 3,158,678
Kloset Jongkok type CE 6 ex.Toto Unit 254,545
Duduk Keramik Set 1,881,700
Jongkok Kramik Set 390,438
101 Kran Air Biasa Bh 26,665
Angsa Bh 66,250
Kristal Bh 63,520
Pembuangan Kolam Bh 18,475
102 Kuas Besar 4 inc Bh 14,380
Kecil 2 inc Bh 8,190
Sedang 3 inc Bh 10,285
Roll Bh 18,475
103 Kuku Tegel isi 80 biji Dos 100,375
104 Kunci Pintu 2 X Putar Bh 141,325

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)
NO JENIS BARANG SPESIFIKASI SATUAN HARGA

1 2 3 4 5
105 Lampu Pijar Chiyoda 5 watt Bh 4,773
10 watt Bh 5,460
25 watt Bh 6,143
40 watt Bh 6,825
60 watt Bh 5,508
75 watt Bh 6,463
100 watt Bh 8,238
200 watt Bh 16,428
106 Lampu Pijar Philips 5 watt Bh 6,825
10 watt Bh 6,873
25 watt Bh 8,238
40 watt Bh 9,193
60 watt Bh 10,285
75 watt Bh 11,650
100 watt Bh 21,888
200 watt Bh 18,475
107 Lampu Neon Chiyoda TL 10 Watt Bh 25,300
TL 20 Watt Bh 22,570
TL 40 watt Bh 30,760
108 Lampu Neon Philips TL 10 Watt Bh 11,650
TL 20 Watt Bh 18,475
TL 40 watt Bh 28,440
109 Lampu sumpit biasa 5 watt Bh 11,650
8 watt Bh 18,475
11 watt Bh 28,713
14 watt Bh 33,490
18 watt Bh 15,745
20 watt Bh 41,680
23 watt Bh 43,728
110 Lampu Sumpit Philips 5 watt 45,775
8 watt Bh 48,505
11 watt Bh 52,600
14 watt Bh 53,965
18 watt Bh 56,013
20 watt Bh 58,743
23 watt Bh 58,980
35 watt Bh 139,278
45 watt Bh 194,560
111 Lampu TS 23 watt Bh 76,488
28 watt Bh 100,375
36 watt Bh 139,515
58 watt Bh 217,765
40 watt Bh 17,793
20 watt Bh 15,745
112 Lampu Mercury 250 watt Bh 85,678
500 watt Bh 131,770
hpln 250 watt Bh 84,678
hpln 400 watt Bh 131,770
son h 220 watt Bh 301,030
son h 250 watt Bh 359,043
Son T 250 watt Bh 336,520
Son T 400 watt Bh 390,438
113 Lampu Sorot 500 watt set 154,975
150 watt set 92,185
Balon Visicom 36 watt Bh 141,325
114 Lampu Siang 21,888
115 Kabel EYM 2 x 1,5 mm m1 6,873
2 x 2,5 mm m1 10,285

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)
NO JENIS BARANG SPESIFIKASI SATUAN HARGA

1 2 3 4 5
2 x 4 mm m1 17,110
116 Kabel NYY 3x 4 mm m1 23,253
4 x 4 mm m1 32,808
2 x 6 mm m1 29,395
4 x 6 mm m1 42,363
2 x 10 mm m1 45,093
4 x 10 mm m1 75,805
2 x 1,5 mm m1 7,508
2 x 2,5 mm m1 10,285
117 Kabel Serabut rol 202,750
Tunggal rol 252,255
118 Kabel Twistik 2 x 10 mm m1 7,555
2 x 16 mm m1 12,968
119 Travo Mercury 250 watt Bh 202,750
400 watt Bh 296,253
120 Travo TL 40,315
121 Fitting Pijar Biasa Gantung Bh 5,460
Batu Gantung Bh 17,110
122 Fitting TL Bh 10,285
123 Fitting Mercury Biasa Gantung Bh 32,808
Batu Gantung Bh 32,808
124 Kap Lampu Pijar Bh 32,808
TL Bh 85,360
Mercury Gantung Bh 37,585
125 Fhoto Sell 3.A Bh 86,725
6.A Bh 116,755
126 Saklar Biasa Bh 18,475
MCB 2 A Bh 55,330
MCB 4 A Bh 55,330
MCB 6 A Bh 55,330
MCB 10 A Bh 55,330
MCB 16 A Bh 55,330
MCB 20 A Bh 55,330
MCB 3 phasa 25 A Bh 277,825
Kontraktor 3 phasa 25 A Bh 343,345
Kontraktor 3 phasa 16 A Bh 238,240
Timer 16 A Bh 600,695
127 Konektor 10 mm Bh 8,920
16 mm Bh 13,698
24 mm Bh 21,888
128 Stand Lampu TL Bh 76,488
Mercury Bh 123,580
129 Terminal Kabel 12 mm Bh 7,555
16 mm Bh 13,698
25 mm Bh 35,538
130 Panel Uk. 40 x 60 x 15 Bh 547,413
Uk. 30 x 40 x 15 Bh 311,950
131 Tangga Bambu Uk. 7 m Bh 154,975
Uk. 9 m Bh 233,463
132 Stater Bh 3,413
133 Isolasi Kabel Bh 8,238
134 Tang Kombinasi Bh 76,488
135 Obeng Test Bh 21,888
136 Avometer Bh 782,875
137 Settibell Bh 625,900
138 Betel Bh 18,475
139 Les Kayu (profil) M¹ 8,873
140 Lem Seng M¹ 100,375

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)
NO JENIS BARANG SPESIFIKASI SATUAN HARGA

1 2 3 4 5
141 Loster Kaca Bh 65,250
Keramik 30 x 30 Bh 96,233
142 Multiplex 5 mm Lbr 202,750
10 mm Lbr 134,500
143 Multiroof Lbr 202,068
144 Pagar BRC Tipe EP (T.0.9M) M¹ 305,125
BRC Tipe HD (T.0.9M) M¹ 202,750
145 Tiang Pagar BRC Btg

146 Paving Blok (T.8 cm K225 Model Batu Bata Biji 2,730
Model Kacang Biji 2,730
Model Tiga Berlian Biji 2,730
Model Segi Enam Biji 3,413
147 Penutup Talang Bh 8,238
148 Peralatan Gambar Teknik Mesin gambar (Bova A2) 5,484,125
Kaki meja gambar A2 2,451,185
Meja Gambar A2 1,626,725
Drawing Pen Rotring isi 4 885,250
Segi Tiga Set 145,468
Pensil 3,413
Tinta Warna 28,030
Penghapus 100,375
Jangka Huruf(Aluminium) 96,280
Mal lingkaran 587,680
Mal Simbol 587,680
Mal Huruf 587,680
Busur Derajat Plastik(Besar) 86,725
149 Peralatan bengkel Batu Sendok Spesi Besar 23,935
Sendok Spesi Sedang 23,935
Sendok Spesi Kecil 23,935
Pensil 3,413
Unting-Unting 47,823
Water Pas Aluminium 47,823
Selang Air 10 Meter 8,238
Siku Baja kecil 33,490
Ember 17,793
Palu Besi 57,378
Betel 15,745
Catut 37,585
Jangka Sorong 292,840
Mikrometer 489,400
Dial indikator 878,425
Mistar Baja (1 Meter) 96,280
Mistar Siku 47,823
Mistar Baja (30 cm) 43,728
Echol Chair No.2(Wood) 250,525
Echol Chair No.3(Wood) 387,025
Echol Chair No.4(Wood) 407,500
Echol Chair No.5(Wood) 407,500
Echol Chair No.6(Wood) 407,500
Echol Chair No.6(Wood) 407,500
Echol Chair No.2(Wood) 576,760
Echol Chair No.3(Wood) 576,760
Echol Chair No.4(Wood) 605,425
Echol Chair No.5(Wood) 605,425
Echol Chair No.6(Wood) 605,425
150 Vernis Kayu Kg 55,330
151 Pion Beton Bh 26,665

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)
NO JENIS BARANG SPESIFIKASI SATUAN HARGA

1 2 3 4 5
152 Pipa Plastik PVC 25 mm Btg 102,375
PVC 50 mm Btg 172,673
PVC 75 mm Btg 264,128
153 Pipa Gip DIA 1" M¹ 326,918
DIA 1 1/2" M¹ 388,343
DIA 2" M¹ 510,510
154 Pipa PVC AW DIA 1/2" M¹ 6,715
DIA 3/4" M¹ 7,789
DIA 1" M¹ 8,864
DIA 2" M¹ 20,145
DIA 3" M¹ 216,942
DIA 4" M¹ 325,758
DIA 5" M¹ 142,191
DIA 6" M¹ 188,846
DIA 8" M¹ 335,095
DIA 10" M¹ 511,235
DIA 12" M¹ 732,927
155 Pipa Instalasi Listrik Btg 12,333
156 Plamur Tembok Kg 81,265
157 Pompa Tangan Bh 55,330
158 Kawat Ram Galvanis Uk. 1 x 1 m M¹ 28,713
Uk. 1,5 x 1 m M¹ 49,188
159 Sambungan Talang Bh 8,238
Sambungan Pipa Keni 2' Bh 4,143
Sambungan Pipa Keni 3' Bh 10,286
Sambungan Pipa Keni 4' Bh 14,380
Sambungan Pipa Lurus 2' Bh 4,143
Sambungan Pipa Lurus 3' Bh 8,238
Sambungan Pipa Lurus 4' Bh 16,428
Sambungan Pipa Tee 2' Bh 9,603
Sambungan Pipa Tee 3' Bh 11,650
Sambungan Pipa Tee 4" Bh 18,475
160 Saklar tunggal Broco Bh 40,000
Saklar ganda Broco Bh 55,000
161 Semen semen putih kg 2,500
162 Seng Gelombang BJLS 0,20 Kaki 7,825
Gelombang BJLS 0,30 Kaki 9,739
Licin BJLS 0,20 Lbr 69,526
Licin BJLS 0,30 Lbr 111,730
Plat BJLS 0,20 Lbr 59,663
Plat BJLS 0,30 Lbr 110,930
163 starter 20 watt Bh 4,825
40 watt Bh 6,825
164 Stop Kontek Bh 22,570
165 Tear Kg 18,475
166 Tali Sling 1 1/2" inc 324,235
1" inc 181,593
1/2" inc 83,722
3 1/6" inc 22,570
3/4" inc 90,455
5/16" inc 32,490
167 Tarikan Jendela Bh 4,095
168 Teak Oil Kg 18,840
169 Teak Wood 3 mm Lbr 181,593
170 Tegel Plint 15 x 30 Bh 76,624
Keramik 30 x 30 Bh 59,289
Keramik 40 x 40 Bh 83,722
Mosaik 20 x 20 Bh 76,624

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)
NO JENIS BARANG SPESIFIKASI SATUAN HARGA

1 2 3 4 5
Mosaik 30 x 30 Bh 76,624
PC 20 x 20 Bh 76,624
Plint Keramik 20 x 20 Dos 76,624
Plint Keramik 15 x 20 Dos 76,624
Plint Keramik 11 x 11 Dos 76,624
Porselin 15 x 15 Dos 74,167
Keramik 30 x 30 Polos Dos 58,060
Keramik 30 x 30 Kembang Dos 60,790
Keramik 40 x 40 Polos Dos 60,790
Keramik 40 x 40 Kembang Dos 41,680
Keramik 20 x 20 Polos Dos 62,155
Keramik 20 x 20 Kembang Dos 61,473
Keramik 10 x 20 Polos Dos 55,330
Terasso 30 x 30 Bh 85,360
171 Tempat Sabun Porselin Bh 59,425
172 Tinner Super Ltr 45,775
173 Topi Uskup (T.8 cm K225) Biji 6,625
174 Travo TL 10 watt Bh 29,030
20 watt Bh 39,950
40 watt Bh 41,680
175 Tripleks 3 mm Lbr 70,072
176 Washtafel Cuci Piring 1 mata Bh 292,840
2 mata Bh 500,600
177 Washtafel Gantung Keramik Bh 430,705
178 Talang Setengah Lingkaran Btg 89,455
179 Talang Segi Empat Btg 73,075
180 Unior Keramik Standar Bh 1,244,525
181 Batu Kali (Besar) m³ 327,237
182 Batu Gunung/ Batu Belah Ukuran Crusher m³ 296,000
183 10-15 cm m³ 334,600
184 5-7 cm m³ 356,200
185 3-5 cm m³ 377,800
186 2-3 cm m³ 400,400
187 1-2 cm m³ 431,800
188 0.5-1 cm m³ 475,000
189 kerikil Sirtu m³ 332,566
190 Sirtu Gunung m³ 198,000
191 Sirtu Kali m³ 332,566
192 Timbunan Pilihan m³ 144,000
193 Tanah Timbunan m³ 100,000
194 Pasir Ayak Beton m³ 249,096
195 Pasir Pasang m³ 240,598
196 Sirtu Royalti m³ 153,000
197 Krikil Sungai Royalti m³ 175,000
198 Timbunan Pengikat Pilihan/ pasir timbunan m³ 152,450
199 Semen Tonasa 40kg 75,744
200 Semen Semen Indonesia 50kg 65,513
201 Semen Bosowa 40kg 72,757
202 Semen Warna Semen Indonesia KG 2
203 Semen Putih kg 2,296
204 Besi Beton Polos u-24 KS kg 11,836
205 Besi Beton Polos u-39 KS Kg 13,295
206 Kawat Bendrat Kg 31,920
207 Batu Merah bh 929
208 Kayu Cetakan m³ 3,000,000
209 Kayu Kelas I m³
210 sekelas Ulin m³ 17,700,000
211 sekelas Bayam m³ 13,792,000

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)
NO JENIS BARANG SPESIFIKASI SATUAN HARGA

1 2 3 4 5
212 Sekelas Jati m³ 8,004,167
213 Sekelas Kumea m³ 8,528,400
214 Kayu Kelas II kamper m³ 5,216,374
215 Papan Kelas I m³ 18,789,200
216 Papan Kelas II m³ 9,800,000
217 Kayu Kelas III meranti m³ 3,623,828
218 Aspal Bitumen kg 12,708
219 Kawat Bronjong 1x1x2m bh 386,135
220 1 x 0.5 x 2 m bh 371,112
221 Galvanis 1 x 1 x 2 bh 593,896
222 Galvanis 1 x 0.5 x 2 bh 571,550
223 Paku Beton kg 35,802
224 Paku Campuran Kg 23,025
225 Paku Payung/ Seng Kg 27,442
226 Atap Seng BJLS 0.18 mm (BWG 34) /6 kk 54,843
227 0.22 mm (BWG 33) /6 kk 95,195
228 0.30 mm (BWG 32) /6 kk 67,960
229 0.35 mm (BWG 28) /6 kk 94,195
230 Seng Bubungan Lbr 67,960
231 Minyak Tanah Industri Liter 11,700
232 Minyak Bakar Industri Liter 11,700
233 Solar In dustri Liter 11,700
234 Bensin Industri Liter 11,700
235 Minyak Pelumas Liter 391,500
236 Alat-alat Bantu Set 163,200

UPAH PEKERJA
238 Pekerja Org/ Hr 67,000
239 Mandor Org/ Hr 97,500
240 Kepala Tukang Org/ Hr 125,000
241 Tukang Org/ Hr 117,500
242 Mandor lapangan Org/ Hr 97,500
243 Mekanik Org/ Hr 101,000
244 Mekanik Pembantu Org/ Hr 90,000
245 Operator Terampil Org/ Hr 117,500
246 Operator Semi Terampil Org/ Hr 113,000
247 Pembantu Operator Org/ Hr 103,500
248 Sopir Maretial/Truk Org/ Hr 113,000
249 Pembantu Sopir/ Kernek Org/ Hr 101,500
250 Buruh Lp. Tak Terlatih Org/ Hr 67,850
251 Buruh Lap. Semi terlatih Org/ Hr 78,200
252 Buruh Lap. terlatih Org/ Hr 83,000
256 Operator Terampil Org/ Hr 120,000
257 Operator Semi Terampil Org/ Hr 115,100
258 Pembantu Operator Org/ Hr 105,500
259 Sopir Maretial/Truk Org/ Hr 115,500
260 Pembantu Sopir/ Kernek Org/ Hr 103,250
261 Buruh Lp. Tak Terlatih Org/ Hr 69,000
262 Buruh Lap. Semi terlatih Org/ Hr 80,500
263 Buruh Lap. terlatih Org/ Hr 85,000

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
STANDAR HARGA SATUAN BAHAN BANGUNAN DAN UPAH KERJA
PEMERINTAH PROVINSI SULAWESI SELATAN
KABUPATEN TANA TORAJA
TAHUN 2018
Dalam Rupiah (Rp)
No JENIS BARANG SPESIFIKASI SATUAN HARGA

1 2 3 4 5
1 Pasir pasangan / Beton m³ 278,000
2 Batu Gunung m³ 150,000
3 Batu Kali (Batu belah) m³ 278,000
4 Batu Kerikil m³ 305,000
5 Batu Pecah (Stone Cruisser) : Ukuran 0,5 - 1 cm m³ 389,000
Ukuran 1 - 2 cm m³ 389,000
Ukuran 2 - 3 cm m³ 389,000
Ukuran 3 - 5 cm m³ 389,000
Ukuran 5 - 7 cm m³ 389,000
Ukuran 7 - 10 cm m³ 389,000
Ukuran 10 - 15 cm m³ 389,000
6 Sirtu (Pasir dan Batu) m³ 200,000
7 Pasir Timbunan / urungan m³ 223,000
8 Timbunan Tanah Biasa m³ 110,000
9 Timbunan Pilihan m³ 150,000
10 Aggregate Penutup m³ 100,000
11 Aggregate Halus m³ 120,000
12 Aggregate Kelas A m³ 145,000
13 Batu Kali Bulat m³ 150,000
14 Batu Bata (Rappang) Biji 1,000
15 Batu Bata (Palopo) Biji 1,000
16 Batu Vaving Block ( T =6cm ) Biji 1,700
17 Batu Vaving Block ( T=8cm ) Biji 1,800
18 Batako 20 x 40 cm Biji 3,500
19 Semen Bosowa PC 40 kg zak 46,000
PC 50 kg zak 65,000
20 Semen Tiga Roda PC 50 kg zak 59,000
21 Semen Tonasa PC 50 kg zak 60,000
22 Semen Putih Tiga Roda zak 64,000
23 Kapur zak / 5 kg 70,000
24 Amplas / Kertas Gosok Halus Lembar 2,500
Kasar Lembar 2,500
25 Asbes Gelombang Kaki 5,600
26 Nok Asbes Lbr 15,000
27 Bak Mandi Fiber Glass Bh 210,000
28 Bak Reservoir 1000 liter Bh 1,300,000
29 Baut 10 cm Bj 4,000
12 - 15 cm Bj 4,500
20 cm Bj 5,000

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)
No JENIS BARANG SPESIFIKASI SATUAN HARGA

1 2 3 4 5
25 cm Bj 5,000
30 cm Bj 6,000
30 Baugel I Bj 12,000
U Bj 15,000
31 Gorong - gorong (buis beton) Diameter 100 cm m³ 600,000
pakai tulang : Diameter 80 cm m^1 500,000
Diameter 60 cm m^1 400,000
Diameter 40 cm m^1 300,000
Diameter 30 cm m^1 250,000
Diameter 20 cm m^1 200,000
32 Gorong - gorong - Diameter 100 cm m^1 550,000
tidak pakai tulang : - Diameter 80 cm m^1 470,000
- Diameter 60 cm m^1 370,000
- Diameter 40 cm 280,000
33 Kayu Kelas I
- Balok Jati m³ 11,500,000
- Papan ( Sawmil ) m³ 16,000,000
34 Kayu Kelas II
- Papan kamper m³ 7,350,000
35 Kayu Kelas II
- Balok m³ 4,000,000
- Papan ( Sawmil ) m³ 4,000,000
36 Kayu Kelas III
- Balok Meranti m³ 3,000,000
- Papan m³ 3,000,000
37 Kayu Kelas IV
- Balok Terentang m³ 2,100,000
- Papan Pinus m³ 1,900,000
38 Tripleks - Tebal 2 mm lbr 39,000
- Tebal 3 mm lbr 52,000
- Tebal 4 mm lbr 62,000
- Tebal 6 mm lbr 73,000
39 Plywood 4 mm lbr 64,000
40 Teakwood lbr 75,000
41 Bahan Besi dan Kawat
- Kawat Berduri Roll 180,000
- Kawat Pengikat Kg 22,000
- Kawat Licin Diameter 3 mm Kg 22,000
Diameter 4 mm Kg 22,000
Diameter 5 mm Kg 22,000
- Kawat Bronjong 50 kg Roll 650,000
- Kawat Nyamuk mtr 12,000
- Kawat Ayak mtr 17,000
- Besi Beton Polos Kg 14,000
- Besi Beton Ulir Kg 15,000
- Besi Beton 6 mm - biasa 1 Btg = 9 mtr btg 24,000

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)
No JENIS BARANG SPESIFIKASI SATUAN HARGA

1 2 3 4 5
- SNI 1 Btg = 12 mtr btg 27,000
- Besi Beton 8 mm - biasa 1 Btg = 9 mtr btg -
- SNI 1 Btg = 12 mtr btg 43,000
- Besi Beton 10 mm - biasa 1 Btg = 9 mtr btg 56,000
- SNI 1 Btg = 12 mtr btg 60,000
- Besi Beton 12 mm - biasa 1 Btg = 9 mtr btg -
- SNI 1 Btg = 12 mtr btg 85,000
- Besi Beton 14 mm SNI btg 138,000
- Besi Beton 16 mm SNI btg 165,000
- Besi Beton 19 mm SNI btg 255,000
- Besi Beton 20 mm SNI btg 275,000
- Besi Beton 22 mm SNI btg 310,000
- Besi Beton 24 mm SNI btg 400,000
- Besi Beton 30' btg 625,000
- Besi Beton 32' btg 785,000
- Besi Kanal UNP 80x45x5xPj 6 m btg 285,000
- Besi Kanal UNP 100x50x5xPj 6 m btg 427,000
- Besi Kanal UNP 120x55x7xPj 6 m btg 495,000
42 Besi Siku Panjang 6 m : - L 25/25 Tebal 2,5 mm btg 47,000
- L 30 / 30 tebal 3 mm btg 65,000
- L 40 / 40 tebal 4 mm btg 65,000
- L 50 / 50 tebal 5 mm btg 95,000
- L 60 / 60 tebal 6 mm btg 220,000
43 Besi Beton Ulir Diameter 13 mm Kg 17,000
44 Besi Provin C Diameter 2" mtr 118,000
45 Besi Strip / plat gepeng btg 600,000
46 Besi Plat : 2 mm x 120mm x 240mm Lbr 750,000
3mm x 120mm x 240mm Kg 32,000
47 Paku Biasa 2 cm Kg 22,000
3 cm Kg 20,000
4 cm Kg 20,000
5 cm Kg 18,000
6 cm Kg 18,000
7 cm Kg 18,000
10 cm Kg 18,000
48 Paku Beton Hitam Hitam Kg 37,000
49 Paku Beton Putih 2 cm Dos 17,000
3 cm Dos 17,000
4 cm Dos 17,000
5 cm Dos 17,000
7 cm Dos 17,000
50 Paku Seng Kg 22,000
51 Paku Sekrup Dos 11,000
52 Plat Aluminium 2 x 1 m tebal 0,7 mm Lbr 250,000
2 x 1 m tebal 0,9 mm Lbr 300,000
2 x 1 m tebal 1,0 mm Lbr 400,000

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)
No JENIS BARANG SPESIFIKASI SATUAN HARGA

1 2 3 4 5
53 Seng Gelombang
- Gelombang Besar Merk Gajah Kaki 6,800
- Gelombang Kecil Merk Gajah Kaki 6,755
54 Seng Polos Merk Gajah Lbr 50,000
55 Atap Plastik :
- Warna Putih Arcylic 6 Kaki Lbr 45,000
- Fiber Glass/6 VK Lbr 48,000
56 Atap Seng Warna 6 Kaki Lbr 60,000
57 Atap Seng Biasa
Kode 28 RUSA / SERMANI Kaki 77,000
Kode 31 RUSA / SERMANI Kaki 57,000
Kode 33 GAJAH Kaki 6,300
RUSA / SERMANI Kaki 6,700
58 Atap Multiroof Berglazur Lbr 82,000
Polos Lbr 82,000
59 Atap Suryaroof Berglazur Lbr 33,000
Polos Lbr
60 Atap Sakuraroof Berglazur Lbr 33,000
Polos Lbr 48,000
61 Paku Atap Seng Genteng Metal Kg 27,000
62 Eternik Ukuran 3 mm Lbr 8,000
63 Tegel Keramik - Uk. (10 x 20) cm Dos 55,000
- Uk. (20 x 20) cm Dos 60,000
- Uk. (20 x 25 ) cm Dos 57,000
- Uk. (30 x 30) cm Dos 59,000
- Uk. (40 x 40) cm Dos 62,000
64 Kuku Tegel 1 cm m 6,000
10 cm Bh 500
65 Melamin 2 mm Lbr 56,000
3 mm Lbr 79,000
66 Bahan Terase
- PC Uk. (30 x 30) cm Bh 57,000
- Pintu Angin Uk. (20 x 20) cm Lookster Keramik Bh 35,000
- Pintu Angin Uk. (30 x 30) cm Lookster Keramik Bh 55,000
66 Bahan Kaca :
a. Kaca Polos - Tebal 2 mm m2 85,000
- Tebal 3 mm m2 90,000
- Tebal 5 mm m2 115,000
b. Kaca Reiben : - Tebal 3 mm m2 110,000
- Tebal 5 mm m2 131,000
c. Kaca Naco Polos : - Ukuran 60 x 100 Set 203,000
- Ukuran 50 x 100 Set 190,000
d. Kaca Nako Reben Set 185,000
e. Nako (7 mata) lengkap Set 175,000
67 Vermika Lbr 55,000
68 Kait Angin 10" Btg 10,000

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)
No JENIS BARANG SPESIFIKASI SATUAN HARGA

1 2 3 4 5
8" Btg 10,000
Kacetra Psg 12,000
69 Kunci Pintu / Taman : Napoli Set 40,000
Kodai Set 75,000
Jangkar 9702 RRC/692 Set 75,000
Golden Set 65,000
Freeder (Kunci Kembar) Set 125,000
Cavel (besar) Set 150,000
70 Grendel Antik 2 Psg 45,000
71 Grendel Biasa Besar Bh 15,000
Kecil Bh 12,000
72 Tarikan Antik Jendela Set 7,500
73 Engsel Biasa (H) sedang Psg 10,000
74 Engsel SES Psg 20,000
75 Engsel Jendela Psg 25,000
76 Engsel Pintu Kupu-Kupu Psg 40,000
77 Eternit 3 mm Lbr 20,000
78 Cat Tembok Aries Kg 9,400
Avitex Kg 21,000
Metrolite Kg 28,000
Vinotex Kg 17,000
Tiger 5 Kg 40,000
79 Cat Genteng Ayam (4 kg) Kg 15,000
Yoko (4 kg) 4 Kg 86,000
Nippon (5 kg) Kg 185,000
80 Cat Kayu Avian Liter 55,000
Glotex Kg 57,000
81 Cat Besi Padma Kg 8,500
82 Cat Maritex Kg 54,000
83 Cat Kominax Kg 33,000
84 Cat Meni Kayu/Besi Kg 34,000
85 Dempul Kayu Kg 21,000
86 Dempul Tembok Kg 47,500
87 Minyak Berkisting Ltr 1,900
88 Minyak Cat Biasa Ltr 17,000
Thinner Super Ltr 35,000
89 Plamur Boyo Kg 9,000
Kucing Kg 30,000
Perahu Kg 14,000
90 Kuas Biasa 1" Bh 9,000
2 1/2" Bh 11,000
3" Bh 12,000
4" Bh 16,000
Kecil Bh 6,000
Besar Bh 27,000
91 Kuas Roll Bh 25,000

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)
No JENIS BARANG SPESIFIKASI SATUAN HARGA

1 2 3 4 5
92 Bahan Sanitasi
a. Closet Jongkok : type CE 6 ex.Toto unit 390,000
- Merk KIA Type Ex Bh 215,000
- Merk Top DX Global Bh 80,000
- Merk INA Bh 165,000
- Merk Toto Bh 280,000
- Merk Imperial Bh 90,000
b. Closet Duduk CW 600 J /SW 660 J Komplit & acc unit 2,310,000
- Merk Toto Type CE 7 Bh 1,500,000
- Merk D - Euro Set 750,000
c. Wastafel Kenplok - Merk KIA Type Ex Set 450,000
- Urinoar Keramik Standard Bh 175,000
Aluminium 2 Lubang Bh 320,000
d. Tempat Cuci Piring - Merk Viega 1 Lubang Bh 180,000
- Merk viega 2 Lubang Bh 380,000
93 Bak Mandi Fiber glass 70 x 70 x 6 Cap Kuda Bh 225,000
94 Kran Air Kuningan 1/2" Bh 20,000
3/4" Bh 25,000
95 Lampu Philips Sumpit 5 Watt Bh 27,000
8 Watt Bh 29,000
14 Watt Bh 33,000
18 Watt Bh 35,000
96 Colokan Lampu Besar Bh 10,000
Kacil Bh 5,000
97 Saklar Bundar Bh 8,000
Segi Empat Bh 10,000
98 Stop Kontak Putih Bh 10,000
99 Vitting Lampu Biasa Bh 5,000
Plafond Bh 20,000
100 Lem Fox 150 gr Tube 7,500
101 Lem Pipa Bh 9,000
102 Gaji/Upah - Mandor Lapangan Org/hari 108,000
- Mekanik Org/hari 86,500
- Mekanik Pemnbantu Org/hari 70,500
- Kepala Tukang Org/hari 130,000
- Tukang Org/hari 108,000
- Operator Terlatih Org/hari 86,500
- Pembantu Operator Org/hari 70,500
- Sopir Truk Org/hari 81,000
- Sopir Porsenil Org/hari 70,500
- Pembantu Sopir Org/hari 65,000
- Buruh Terampil Org/hari 86,500
- Buruh Semi Terampil Org/hari 76,000
- Buruh Tak Terampil Org/hari 70,500

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)
No JENIS BARANG SPESIFIKASI SATUAN HARGA

1 2 3 4 5

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
STANDAR HARGA SATUAN BAHAN BANGUNAN DAN UPAH KERJA
PEMERINTAH PROVINSI SULAWESI SELATAN
KABUPATEN TORAJA UTARA
TAHUN 2020
Dalam Rupiah (Rp)

NO BAHAN-BAHAN BANGUNAN SPESIFIKASI SATUAN HARGA

1 2 4 5 6
A HARGA BAHAN DASAR
1 Aggregate Kasar (1-2) M3 416,667
Kasar (2-3) M3 420,000
2 Batu Bata biji 750
Batu Ringan biji 12,048
3 Beton roster/kerawang 35,000
4 Batu Kali / gunung M3 351,325
Batu kali pecah 2/3 Split M3 420,000
Batu kali pecah 1/2 Koral M3 420,000
5 Koral beton M3 361,111
Koral beton M3 175,000
6 Kerikil saring M3 201,250
Kerikil saring Kg 14,907
Kerikil beton M3 361,111
7 Glass blok Buah 30,000
8 Pasir Timbunan/urungan M3 201,250
Pasir Timbunan/urungan M3 170,000
Pasir pasang M3 318,550
Pasir pasang Kg 22,754
Pasir pasangan M3 305,000
Pasir beton M3 305,000
9 Tanah timbunan Tanah biasa M3 100,000
10 Sirtu timbunan M3 305,000
Sirtu kali M3 305,000
Sirtu gunung M3 305,000
11 Semen PC Kg 38,333
Semen PC 50 kg Zak 69,000
Semen Warna/Sika Kg 22,000
Semen Bosowa 50 Kg 65,000
Semen Tonasa 50 Kg 67,000
Semen Tiga Roda 50 Kg 64,000
Semen putih Zak 110,000
12 Kapur ayak Kg 10,000
13 Bambu Btg 50,000

B HARGA PENUTUP ATAP


1 Atap Plastik : - Warna Putih 6 Kaki lbr 90,000
2 Atap Seng Seng gelombang UJLS lbr 65,000
5 Kaki (Gajah) lbr 37,500
6 Kaki (Gajah) lbr 45,000
7 Kaki (Gajah) lbr 52,500
8 Kaki (Gajah) lbr 60,000
9 Kaki (Gajah) lbr 67,500
10 Kaki (Gajah) lbr 75,000
5 Kaki (Rusa) lbr 40,500
6 Kaki (Rusa) lbr 48,600
7 Kaki (Rusa) lbr 56,700
8 Kaki (Rusa) lbr 64,000
9 Kaki (Rusa) lbr 72,900
10 Kaki (Rusa) lbr 81,000
3 Atap Roof lbr 48,500
Multiroof lbr 90,000
Aluminium Gelombang lbr 65,000

Harga Satuan Bahan Bangunan dan Upah Kerja Tahun 2020


Dalam Rupiah (Rp)

NO BAHAN-BAHAN BANGUNAN SPESIFIKASI SATUAN HARGA

1 2 4 5 6
Multiroof lbr 90,000
Multiroof lbr 110,000
Suria Roof lbr 60,000
Sakura Roof lbr 65,000
4 Seng Plat (BJLS 0,20) Gajah lbr 57,500
Seng Plat (BJLS 0,20) Rusa lbr 60,000
Seng Plat (BJLS 0,25) lbr 60,000
Seng Plat (BJLS 0,20) lbr 90,000
5 Genteng Keramik 32 cm x 31 cm M3 13,500
Genteng Keramik 13 PCS M3 175,500
Genteng Keramik 25 PCS (Tanah liat) M3 1,800
Genteng Keramik M3 45,000
6 Annker 22 mm Panjang 50 cm Buah 32,000
7 Aluminium seet Lebar 10 cm Btg 82,000
8 Baja tulangan Kg 10,350
Baja profil C 125/100 Kg 14,500
9 Baut 16 mm Buah 10,000
Baut/mur Ø 55 mm panjang Buah 7,500
10 Besi plat Uk 4x8 Kg 13,500
11 Dynabolt Buah 4,500
12 Karet pelapis atap M' 15,000
Karet talang M' 15,000
Karet talang Uk. 50 cm 10,000
Karet talang Uk. 110 cm 15,000
13 Kawat las Kg 35,000
14 Minyak pelumas Ltr 40,000
15 Solar Ltr 5,800
16 Not roof M' 25,000
Not metal M' 45,000
Not aluminium 0.3 M' 30,000
17 Paku biasa 5 - 10 cm Kg 25,300
Paku hak panjang utk atap Kg 60,000
18 Reng RT.75.15 mm SNI TASO M 8,500
19 Sewa alat Unit 75,000
20 Truss C75 SNI TASO M 15,750
21 Talang jurai M 40,000
22 Turn buckle Buah 52,000

C HARGA BAHAN KERAMIK


1 Tegel keramik 20 x 20 Buah 2,800
2 Tegel keramik 20 x 25 Buah 3,750
3 Tegel keramik tangga (Keyra Grey) 50 x 50 Buah 30,000
4 Tegel keramik lantai 80 x 80 Buah 185,000
5 Tegel keramik lantai (Asia Tile) 40 x 40 M2 65,000
- Uk. (20 x 20) cm Putih polos M2 75,000
- Uk. (30 x 30) cm Putih polos M2 75,000
- Uk. (10 x 20) cm Putih polos M2 70,000
6 Keramik untuk dinding Asia Tile (20 x 20) cm 70,000
7 Keramik untuk dinding Asia Tile (20 x 25) cm 70,000
8 Tegel keramik sekelas Portino (60 x 60) cm M2 110,000
9 Batu alam M2 280,000
10 Batu palimanan (20 x 40) cm M2 250,000
11 Paving block Buah 2500

D HARGA KAYU DAN TRIPLEKS


1 Kayu Kelas I Bayam M3 27,500,000
Kayu Papan Kelas I Bayam M3 27,500,000
Kayu Balok Kelas I Lokal Kalapi M3 8,000,000
Kayu Papan Kelas I Lokal Kalapi M3 8,000,000

Harga Satuan Bahan Bangunan dan Upah Kerja Tahun 2020


Dalam Rupiah (Rp)

NO BAHAN-BAHAN BANGUNAN SPESIFIKASI SATUAN HARGA

1 2 4 5 6
2 Kayu Balok Kelas II Bitti M3 5,000,000
Kayu Papan Kelas II Lokal Bitti M3 5,000,000
Kayu Papan Kelas II Lokal M3 5,750,000
3 Kayu Kelas II Lokal M3 4,140,000
Kayu Kelas III Betau M3 3,700,000
Kayu Papan Kelas III Betau M3 3,750,000
4 Kayu Kelas IV untuk Bekisting M3 2,415,000
Kayu Kelas IV Pinus M3 2,100,000
Kayu Papan Kelas IV Pinus M3 2,100,000
5 Dolken kayu Ø 8-10/400 cm Btg 25,000
6 Sungkai Lbr 95,000
7 Papan Lambrisiring 9 mm M3 12,500,000
8 Tripleks t = 3 mm Lbr 55,000
Tripleks t = 4 mm Lbr 70,000
Tripleks t = 6 mm Lbr 80,000
Tripleks t = 9 mm Lbr 115,000
9 Plywood 6 mm Lbr 90,000
10 List Plafon Profil M' 7,500

E HARGA BAHAN LOGAM


Besi Hollow Galvanis 40x40 mm M' 20,000
Besi Hollow Galvanis 40x20 mm M' 15,000
Besi Strip/Skrup 1/2" Kg 16,500
Besi Strip/plat gepeng
(1 1/4x4 1/3) Plat Panjang 4 m btg 30,000
(1 1/2x4 1/3) Plat Panjang 4 m btg 40,000
Besi beton U. 24 SNI btg 13,500
Besi beton U. 32 SNI btg 14,000
Besi kanal UNP Kanal btg 275,000
Besi wiremesh M 10 btg 85,000
Bondek 0.75 mm M2 140,000
Bingkai aluminium M2 18,000
Kalsiboard 12x140x9 lbr 250,000
Kawat aluminium 4 mm Kg 25,000
Kawat berduri Kg 25,000
Kawat pengikat Kg 25,000
Kawat pengikat beton Kg 17,250
Kawat bronjong 50 Kg Kg 300,000
Kawat bronjong 1 M3 325,000
Kawat bronjong m 25,000
Kawat nyamuk m 30,000
Kawat Ayak m 35,000
List gypsum profil 15 cm M' 12,500
Listplank simple plank profil Lebar 30 cm M' 34,000
Listplank simple plank polos Lebar 30 cm M' 26,000
Paku seng Payung Kg 50,000
Paku seng Gelombang kecil Kg 50,000
Paku seng Gelombang besar Kg 55,000
Paku atap seng genteng metal 50,000
Paku atap spendek Buah 700
Paku tripleks Kg 30,000
Paku biasa Kg 22,000
Paku beton 3 cm Dos 25,000
Paku beton 4 cm Dos 25,000
Paku beton 5 cm Dos 35,000
Paku beton 7 cm Dos 45,000
Paku beton 10 cm 65,000
Paku eternit Kg 30,000
Paku sekrup Kg 75,000

Harga Satuan Bahan Bangunan dan Upah Kerja Tahun 2020


Dalam Rupiah (Rp)

NO BAHAN-BAHAN BANGUNAN SPESIFIKASI SATUAN HARGA

1 2 4 5 6
Paku aluminium M' 32,000
Paku aluminium (untuk kaca) M' 3,600
Sekrup fixer Buah 1,600
Sling Ø 3/4 M' 92,000
Sling Ø 1/4 M' 27,600
Sealand Tube 15,000

F HARGA BAHAN LISTRIK


1 Balon jari Unit 61,000
2 Fitting plafond Buah 32,000
3 Grounding/arde Buah 150,000
4 Kabel distribusi 2 x 10 mm M 5,500
5 Kabel induk 2 x 16 mm M 6,750
Kabel induk 4 x 16 mm M 17,500
6 Lampu gantung Unit 1,500,000
7 Lampu LED setara Philips 20 watt Buah 80,000
Lampu LED setara Philips 10 watt Buah 60,000
8 Lampu neon tanam 3 x 40 watt Unit 152,000
9 MCB box Unit 70,000
10 Pasangan meteran listrik 2.200 watt Unit 4,500,000
11 Pipa listrik M' 3,200
12 Pasangan kabel induk tunggal 2 x 25 mm M' 25,000
Pasangan kabel NYM 2 x 1.5 mm M' 7,500
13 Saklar tunggal setara Nasional Buah 30,000
Saklar ganda setara Nasional Buah 35,000
14 Stop kontak setara Nasional Buah 30,000

G HARGA BAHAN CAT


Amplas Lbr 4,000
Cat meni Kg 45,000
Cat besi/kayu Ltr 69,000
Cat besi/kayu Kg 161,000
Cat besi setara Padma Padma Kg 60,000
Cat tembok setara Altex Altex Kg 30,000
5 Kg 135,000
Cat tembok Tiger 5 Kg 60,000
Metrolite 5 Kg 110,000
Cat tembok Kg 161,000
Cat kayu setara Glotex Glotex Kg 60,000
Cat dasar Kg 50,000
Cat dasar TL Yoko 1 Kg 48,000
Cat minyak Avian/Glotex Kg 60,000
Coating Ltr 70,000
Compoun Kg 45,000
Dempul Kg 40,000
Dempul tembok Boyo 5 Kg 65,000
Kuas besar Buah 27,000
Kuas M' 16,000
Lem dempul epoxy Kg 9,000
Lem kayu Kg 30,000
Minyak cat/Tinner super Kg 40,000
Minyak cat Ltr 23,575
Minyak bekisting Kg 5,750
Platon/cat besi/cat perak/blok Kg 60,000
Pelumas Oli mesran Ltr 40,000
Pylex a (pilox) Btl 35,000
Pelitur Ltr 65,000
Pelitur jadi Ltr 85,000
Plamir tembok Kg 9,000

Harga Satuan Bahan Bangunan dan Upah Kerja Tahun 2020


Dalam Rupiah (Rp)

NO BAHAN-BAHAN BANGUNAN SPESIFIKASI SATUAN HARGA

1 2 4 5 6
Plamir kayu Kg 40,000
Seal tape Buah 5,000
7 Bahan Cat
- Cat Tembok Tiger 5 Kg 67,000
- Metro Lite 5 Kg 152,000
- Cat Tembok Nagaitex Kg 72,000
- Dempul Tembok Boyo 5 Kg 77,000
- Platon Cat Besi/Cat Perak/Blok Kg 132,000
- Pelumas Oli Mesran Ltr 42,000
- Cat Minyak Avian/Glotes Kg 63,000
- Cat Dasar TL 1 Kg YOKO Kg 42,000
- Pylex a (pilox) Botol 32,000
- Cat Glotex Kg 70,000

12 Bahan Sanitasi
a. Closet Jongkok ITO Global Buah 160,000
KIA Type Ex Buah 300,000
TOP DX Global Buah 150,000
INA Buah 300,000
TOTO Buah 420,000
IMPERIAL Buah 130,000
b. Closet Duduk Standart Set 180,000
Complet Set 2,400,000
Complet Set 1,300,000
c. Westafel Kenplok Complet Buah 700,000
Standart Buah 700,000

d. Tempat cuci Piring 1 lobang Buah 450,000


2 Lobang Buah 750,000
e. Bak Mandi Fibre glass 70x70x66 Buah 350,000
f. Bak reservoar fibre glass kap 1000 ltr Buah 1,300,000

17 Bahan Kaca:
a.Kaca Polos
Tebal 2 mm Uk. 1x1m m2 80,000
Tebal 3 mm m2 110,000
Tebal 5 mm m2 110,000
b.Kaca Reiben
Tebal 3 mm m2 120,000
Tebal 5 mm m2 140,000
c.Kaca Naco Polos:
Ukuran 60 x 100 Lbr 232,000
Ukuran 50 X 100 Lbr 210,000
18 Bahan Terasa
Pc 30 x 30 cm Buah 55,000
Pintu Angin 20 x 20 cm Buah 50,000
Pintu Angin 30 x 30 cm Buah 65,000
19 Besi Beton Ulir diameter 13 mm batang 135,000
20 Beton Roster/karawang 45,000
21 Gorong-gorong (buis beton)pakai Tulang
Diameter 100 cm 1/2 m Pakai besi M¹ 1,500,000
Diameter 80 cm 1,000,000

Harga Satuan Bahan Bangunan dan Upah Kerja Tahun 2020


Dalam Rupiah (Rp)

NO BAHAN-BAHAN BANGUNAN SPESIFIKASI SATUAN HARGA

1 2 4 5 6
Diameter 60 cm 1 m pakai besi M¹ 625,000
Diameter 40 cm M¹ 350,000
Diameter 30 cm M¹ 300,000
Diameter 20 cm M¹ 250,000
22 Gorong-gorong (buis beton)
tidak pakai tulang :
Diameter 100 cm 1/2 m Pakai besi M¹ 650,000
Diameter 60 cm 1 m pakai besi M¹ 450,000
Diameter 30 cm 1m M¹ 225,000
23 Generator 10 KVA + Landasan Unit 6,000,000
24 Generator 15 KVA + Landasan Unit 9,000,000
25 Generator 20 KVA + Landasan Unit 6,250,000
26 Generator 30 KVA + Landasan Unit 8,000,000
27 Generator 40 KVA + Landasan Unit 9,000,000
28 Kabel Distribusi 2 x 10 mm mtr 5,000
29 Kabel Induk 2 x 16 mm mtr 55,000
2 x 25 mm mtr 40,000
4 x 16 mm mtr 13,000
4 x 35 mm mtr 20,000
4 x 70 mm mtr 35,000
30 Kapur 5 Kg Zak 25,000
31
32
33
34 Semen 50 Kg zak 63,000
50 Kg Zak 63,000
50 Kg Zak 65,000
35 Semen putih Zak 100,000
36 Sirtu (pasir dan batu) Zak 300,000
37 Timbunan Pilihan M3 200,000
Tanah Biasa M3 150,000
42 Paku Biasa
2cm kg 30,000
3cm kg 23,000
4cm kg 20,000
5cm kg 18,000
7cm kg 18,000
43 Paku Beton
3 cm dos 28,000
4 cm dos 30,000
5 cm dos 35,000
6 cm dos 40,000
7 cm dos 45,000
10 cm dos 60,000
44 Paku Seng Gelombang Kecil kg 55,000
45 Paku Seng Gelombang Besar kg 40,000
46 Paku Atap Seng Genteng Metal kg 50,000
47 Eternit Ukuran 1x1 m M2 25,000
48 Pipa
- Pipa GIP diameter 1" T.S. Batang 300,000
- Pipa GIP diameter 1 1/2" T.S. Batang 420,000
- Pipa GIP diameter 2" T.S. Batang 500,000
- Pipa PVC diameter 1/2". Batang 30,000
- Pipa PVC diameter 3/4" AW. Batang 40,000
- Pipa PVC diameter 2" AW. Batang 90,000
- Pipa PVC diameter 3" AW. Batang 180,000
- Pipa PVC diameter 4" AW. Batang 280,000
49 Panel Kontrol Unit 3,500,000
50 Penggantung/Pengunci

Harga Satuan Bahan Bangunan dan Upah Kerja Tahun 2020


Dalam Rupiah (Rp)

NO BAHAN-BAHAN BANGUNAN SPESIFIKASI SATUAN HARGA

1 2 4 5 6
Kunci Pintu/Taman
Kunci Pintu/Taman Set 100,000
Kunci Pintu/Taman Set 95,000
Kunci Pintu/Taman Set 75,000
Kunci Pintu/Taman Set 80,000
Kunci Pintu/Taman Set 140,000
Kunci Pintu/Taman Set 140,000
Kunci Pintu/Taman Set 120,000
Kunci Pintu/Taman Set 140,000
Kunci Pintu/Taman Set 140,000
- Kunci Yale Set 175,000
- Kunci Antik A/C itali Merk Top Set 150,000
- Kunci Set 85,000
- Grendel Antik 2 Psg 10,000
- Tarikan antik Jandela Set 10,000
- Engsel Psg 20,000
- Engsel Psg 30,000
51 Seng Gelombang
- Seng BJLS 0,20 6k lbr 41,000
- Seng BJLS 0,20 6k lbr 38,000
- Seng BJLS 0,25 6k lbr 65,000
- seng BJLS 0,35 6k lbr 88,000
52 Seng Plat
- Seng BJLS 0,20 lbr 60,000
- Seng BJLS 0,20 lbr 58,000
- Seng BJLS 0,25 lbr 70,000
- Seng BJLS 0,35 lbr 90,000
53 Tripleks
- Tebal 2 mm lbr 45,000
- Tebal 3 mm lbr 57,000
- Tebal 4 mm lbr 67,000
- Tebal 6 mm lbr 105,000
54 Keramik Asia Tile
1. Untuk Lantai
- Uk. ( 10x20 ) cm Putih Polos DOS 60,000
- Uk. ( 20x20 ) cm Putih Polos M2 65,000
- Uk. ( 30x30 ) cm Putih Polos M2 65,000
- Uk. ( 40x40 ) cm Putih Polos M2 65,000
2. Untuk Dinding M2
- Uk. ( 10x10 ) cm M2 65,000
- Uk. ( 20x20 ) cm M2 65,000
- Uk. ( 20x25 ) cm M2 65,000
PIPA DAN ACCESSORIES
I PIPA DAN ACCESSORIES PVC
1 PIPA GALVANIS
- 1/2" GIP/SNI btg 180,000
- 3/4" GIP/SNI btg 215,000
- 1" GIP/SNI btg 330,000
- 1 1/4" GIP/SNI btg 380,000
- 1 1/2" GIP/SNI btg 480,000
- 2" GIP/SNI btg 600,000
- 3" GIP/SNI btg 950,000
- 4" GIP/SNI btg 1,250,000
- 6" GIP/SNI btg 1,950,000
- 8" GIP/SNI btg 2,450,000
- 10" GIP/SNI btg
2 PIPA PVC WAVIN AW
4m/ Btg
- 1/2" SNI btg 25,000

Harga Satuan Bahan Bangunan dan Upah Kerja Tahun 2020


Dalam Rupiah (Rp)

NO BAHAN-BAHAN BANGUNAN SPESIFIKASI SATUAN HARGA

1 2 4 5 6
- 3/4" SNI btg 30,000
- 1" SNI btg 45,000
- 1 1/2" SNI btg 75,000
- 2" SNI btg 95,000
- 3" SNI btg 180,000
- 4" SNI btg 280,000
- 6" SNI btg 525,000
- 8" SNI btg 1,025,000
- 10" SNI btg 1,500,000
3 FAUCET SOCKET PVC
- 1/2" Jls / SII Buah 3,000
- 3/4" Jls / SII Buah 4,000
-1 Jls / SII Buah 5,000
4 FAUCET ELBOW PVC
- 1/2" Jls / SII Buah 4,500
- 3/4" Jls / SII Buah 5,500
-1 Jls / SII Buah 6,500
5 FAUCET TEE PVC
- 1/2" X 1/2" Jls / SII Buah 5,000
- 3/4" X 3/4" Jls / SII Buah 7,500
- 1 X 1" Jls / SII Buah 10,000
6 LEM SOLVEN CEMEN PVC
- Lem Botol ( 45 gr ) Botol 13,000
- Lem Tube ( 45 gr ) Tube 8,000
7 TS TEE PVC
- 1/2 X 1/2" Jls / Sll Buah 6,000
- 3/4 X 1/2" Jls / Sll Buah 8,000
8 TS CAP / DOP PVC
- 1/2 " Jls / SII Buah 5,000
- 3/4" Jls / SII Buah 6,000
- 1" Jls / SII Buah 7,000
- 1 1/4" Jls / SII Buah 7,000
- 1 1/2" Jls / SII Buah 9,000
- 2" Jls / SII Buah 15,000
- 2 1/2" Jls / SII Buah 14,000
- 3" Jls / SII Buah 30,000
- 4" Jls / SII Buah 55,000
- 6" Jls / SII Buah 75,000
- 8" Jls / SII Buah 150,000
9 TS REDUCING SOCKET PVC
- 3/4 X 1/2" Jls / SII Buah 7,500
- 1 X 1/2" Jls / SII Buah 10,000
- 1 X 3/4" Jls / SII Buah 15,000
10 TS ELBOW PVC
- 1/2" Jls / SII Buah 5,000
- 3/4" Jls / SII Buah 5,000
- 1" Jls / SII Buah 7,500
- 1 1/4" Jls / SII Buah 10,000
- 1 1/2" Jls / SII Buah 15,000
- 2" Jls / SII Buah 20,000
- 2 1/2" Jls / SII Buah 30,000
- 3" Jls / SII Buah 40,000
- 4" Jls / SII Buah 45,000
11 VALVE SOCKET PVC
- 1/2" Jls / SII Buah 4,000
- 3/4" Jls / SII Buah 4,000
- 1" Jls / SII Buah 6,000
- 1 1/4" Jls / SII Buah 10,000
- 1 1/2" Jls / SII Buah 15,000

Harga Satuan Bahan Bangunan dan Upah Kerja Tahun 2020


Dalam Rupiah (Rp)

NO BAHAN-BAHAN BANGUNAN SPESIFIKASI SATUAN HARGA

1 2 4 5 6
- 2" Jls / SII Buah 22,500
- 2 1/2" Jls / SII Buah 30,000
- 3" Jls / SII Buah 45,000
- 4" Jls / SII Buah 55,000
ii ACESSORIS PIPA GALPANIS/BESI
1 BEND 90' / BOCH GIP Buah 10,000
- 1/2" GIP/SNI Buah 15,000
- 3/4" GIP/SNI Buah 20,000
- 1" GPI Buah 30,000
- 1 1/4"
2 BALL VALVE / STOP KRAN
- 1/2" Kuningan/SNI Buah 60,000
- 3/4" Kuningan/SNI Buah 75,000
- 1" Kuningan/SNI Buah 125,000
- 1 1/4" Kuningan/SNI Buah 200,000
- 1 1/2" Kuningan/SNI Buah 330,000
- 2" Kuningan/SNI Buah 380,000
- 2 1/2" Kuningan/SNI Buah 480,000
- 3" Kuningan/SNI Buah 750,000
- 4" Kuningan/SNI Buah 1,300,000
3 DOP / CAP
- 1/2" GIP Buah 6,000
- 3/4" GIP Buah 10,000
- 1" GIP Buah 15,000
4 ISOLASI / SEAL TAPE SNI Roll 5,000
5 CLAMP SADDLE
- 2 X 1/2" GIP Buah 42,500
- 2 X 3/4" GIP Buah 42,500
- 2 X 1" GIP Buah 42,500
- 2 1/2 X 1/2" GIP Buah 45,000
- 2 1/2 X 3/4" GIP Buah 45,000
- 2 1/2 X 1" GIP Buah 45,000
- 3 X 1/2" GIP Buah 50,000
-3 X 3/4" GIP Buah 50,000
- 3 X 1" GIP Buah 50,000
- 3 X 1 1/2" GIP Buah 50,000
- 3 X 2" GIP Buah 75,000
- 4 X 1/2" GIP Buah 55,000
- 4 X 3/4" GIP Buah 55,000
- 4 X 1" GIP Buah 60,000
- 4 X 1 1/2" GIP Buah 70,000
- 4 X 2" GIP Buah 80,000
- 6 X 1/2" GIP Buah 175,000
- 6 X 3/4' GIP Buah 175,000
- 6 X 1" GIP Buah 175,000
- 6 X 1 1/2" GIP Buah 175,000
- 6 X 2" GIP Buah 250,000
- 6 X 3" GIP Buah 250,000
- 8 X 1/2" GIP Buah 270,000
- 8 X 3/4" GIP Buah 270,000
- 8 X 1" GIP Buah 300,000
- 8 X 2" GIP Buah 300,000
- 8 X 3" GIP Buah 300,000
- 8 X 4" GIP Buah 420,000
6 DOUBLE NIPPLE
- 1/2" GIP Buah 10,000
- 3/4" GIP Buah 12,500
- 1" GIP Buah 17,500
- 1 1/4" GIP Buah 20,000

Harga Satuan Bahan Bangunan dan Upah Kerja Tahun 2020


Dalam Rupiah (Rp)

NO BAHAN-BAHAN BANGUNAN SPESIFIKASI SATUAN HARGA

1 2 4 5 6
- 1 1/2" GIP Buah 27,500
- 2" GIP Buah 45,000
- 2 1/2" GIP Buah 55,000
- 3" GIP Buah 75,000
- 4" GIP Buah 125,000
7 PLUG CLOSE END
- 1/2" GIP Buah 10,000
- 3/4" GIP Buah 15,000
- 1" GIP Buah 20,000

8 KNIE / ELBOW 45"


- 1/2" GIP/SNI Buah 10,000
- 3/4" GIP/SNI Buah 12,500
- 1" GIP/SNI Buah 15,000
- 1 1/4" GIP Buah 20,000
- 1 1/2" GIP Buah 27,500
- 2" GIP Buah 45,000
- 2 1/2" GIP Buah 55,000
- 3" GIP Buah 95,000
- 4" GIP Buah 125,000
9 SOCKET
- 1/2" GIP Buah 10,000
- 3/4" GIP Buah 15,000
- 1" GIP Buah 20,000
- 1 1/4" GIP Buah 25,000
- 1 1/2" GIP Buah 30,000
- 2" GIP Buah 40,000
- 2 1/2" GIP Buah 60,000
- 3" GIP Buah 100,000
- 4" GIP Buah 150,000
10 KUNCI PIPA 1/2 S/D 1 1/4 SNI Buah 125,000
11 SNEY PYPA 1/2 S/D 1 1/4 SNI Buah 400,000
12 BOX METER FIBER ALINCO/SNI Buah 75,000
13 BOX METER BESI PLAT Standart/SNI Buah 375,000
14 WATER METER BR
- 1/2" MB/SNI Buah 175,000
- 3/4" MB/SNI Buah 225,000
- 1" MB/SNI Buah 500,000
15 WATER METER LINFLOW 1/2" Kuningan/SNI Buah 400,000
16 WATER METER BESTINI 1/2" Kuningan/SNI Buah 300,000
17 WATER METER ONDA 1/2" Kuningan/SNI Buah 350,000
18 TAWAS AL2 03 ≥ 17% Kg 5,000
19 KAPURIT SODA CLORINE 60% Kg 31,000
20 KARET PAKKING Standard/ 5 mm Meter 200,000
UPAH KERJA
Gaji/Upah
Mandor lapangan org/hari 140,500
Mekanik org/hari 162,000
Mekanik pembantu org/hari 81,000
Kepala Tukang org/hari 162,000
Tukang org/hari 140,500
Operator Terlatih alat Berat org/hari 162,000
Pembantu Operator alat berat org/hari 108,000
Sopir Truk org/hari 162,000
Sopir Personil org/hari 108,000
Pembantu Sopir org/hari 108,000
Buruh Terampil org/hari 81,000
Semi Buruh Terampil org/hari 70,500
Buruh Tak Terampil org/hari 65,000

Harga Satuan Bahan Bangunan dan Upah Kerja Tahun 2020


STANDAR HARGA SATUAN BAHAN BANGUNAN DAN UPAH KERJA
PEMERINTAH PROVINSI SULAWESI SELATAN
KABUPATEN LUWU
TAHUN 2018

(Dalam Rupiah (Rp)


NO JENIS BAHAN SPESIFIKASI SATUAN HARGA
1 2 3 4 5
BAHAN DASAR
1 Aspal Aspal Bitumen Kg 24,500
Aspal Curah ( Low Emultion ) Ton 23,348,000
Aspal Buton ( Tambah Agregat ) Ton 18,258,000
Aspal Hotmix ( HRS ) M³ 3,091,000
2 Batu Kali
Utuh M³ 193,700
Batu pecah 3 - 5 cm M³ 525,000
Batu pecah 2 - 3 cm M³ 537,500
3 Batu Gunung M³ 433,333
4 Batu Merah Buah 845
5 Tanah Timbunan M³ 59,800
6 Pasir
Timbunan / Urug M³ 162,500
Pasangan M³ 137,800
Beton M³ 172,900
Pasir ( Sirtu ) M³ 71,500
7 Kerikil Anyak tanpa pasir M³ 208,000
8 Aplux 20 Kg ( Luar ) Zak 97,500
20 Kg ( Dalam ) Zak 81,900
9 Semen PC 50 Kg ( Semen Tonasa ) Zak 84,500
PC 50 Kg ( Semen Bosowa ) Zak 84,500
PC 40 Kg ( Semen Tonasa ) Zak 67,600
PC 40 Kg ( Semen Bosowa ) Zak 65,000
Putih 50 kg Zak 195,000
Warna Zak 32,500
10 Paving Blok Mutu Balok M² 165,000
Segi 6 M² 175,000
Tiga Berlian M² 177,000
11 Topiokus ( K 225 ) Buah 22,400
12 Kanstin 20 x 25 x 50 Buah 78,400
13 Buis Beton d=20 cm Biji 243,100
d=30 cm Biji 269,100
d=40 cm Biji 321,100
d=50 cm Biji 366,600
d=60 cm Biji 399,100
14 Batu Alam
Andesit Biasa M² 237,900
Andesit Susun Sirih M² 351,000
Andesit Halus M² 234,000
Andesit Gelombang M² 247,000
Batu Candi Permukaan Rata M² 221,000
Batu Palimanan Kuning M² 227,500
Batu Hijau Sukabumi M² 214,500

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
(Dalam Rupiah (Rp)
NO JENIS BAHAN SPESIFIKASI SATUAN HARGA
1 2 3 4 5
Batu Bali Green M² 201,500
Batu Bali Napoli M² 214,500
Paras Jokja Besar M² 217,000
Batu Cirebon Beraturan M² 182,000
Batu Cirebon Tidak Beraturan M² 156,000

BAHAN KAYU
1 Kayu Kelas I
Balok Gergaji Sansaw M³ 5,525,000
Papan Gergaji Sansaw M³ 5,570,500
2 Kayu Kelas II
Balok M³ 3,850,000
Papan M³ 3,948,000
3 Kayu Kelas III
Balok M³ 3,080,000
Papan M³ 3,178,000
4 Kayu Jembatan Balok Gelagar 25 cm x 29x4m M³ 5,913,875
Papan Jembatan 23 cm x 3 cm x 4 m M³ 5,913,875
Papan Jembatan gentung 23cmx22c M³ 5,913,875
Balok Jembatan Gantung 5cmx10cmx M³ 5,913,875
Balok Jembatan Gantung 5cmx7cmx2 M³ 5,913,875
BAHAN LANTAI
1 Tegel PC Abu-abu 20 x 20 cm ( motif ) Dos 91,000
30 x 30 cm ( polos ) Dos 97,500
2 Tegel Badak 20 x 20 cm Dos 107,900
30 x 30 cm Dos 113,100
3 Tegel Plint PC 15 X 20 cm Dos 87,100
15 x 30 cm Dos 87,100
4 Tegel Mozaik 30 x 30 cm Dos 331,500
5 Tegel Wafel 20 x 20 cm Dos 84,500
30 x 30 cm Dos 97,500
1 Tegel Keramik
Putih 10 X 20 cm Dos 97,500
Warna 10 X 20 cm Dos 101,400
Putih 20 X 20 cm Dos 92,300
Warna 20 X 20 cm Dos 84,500
Putih 20 X 25 cm Dos 84,500
Warna 20 X 25 cm Dos 88,400
Putih 30 X 30 cm Dos 84,500
Warna 30 X 30 cm Dos 91,000
Putih 40 X 40 cm Dos 84,500
Warna 40 X 40 cm Dos 97,500
Warna 50 x 50 Dos 110,500
Warna 60 x 60 Dos 234,000

BAHAN KACA
1 Kaca Buram Tebal 3 mm lbr 175,500
Tebal 5 mm lbr 195,000

2 Kaca Bening Tebal 3 mm lbr 175,600


Kaca Buram 5 mm Tebal 5 mm lbr 223,600

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
(Dalam Rupiah (Rp)
NO JENIS BAHAN SPESIFIKASI SATUAN HARGA
1 2 3 4 5

3 Kaca Rayben Tebal 3 mm lbr 230,200


Tebal 5 mm lbr 258,000
4 Kaca Nako Lengkap terali 7 mata set/daun 232,700

BAHAN BESI
1 Besi Beton
Ø 4 mm Btg 23,400
Ø 6 mm Btg 39,000
Ø 8 mm Btg 62,400
Ø 10 mm Btg 88,400
Ø 12 mm Btg 127,400
Ø 14 mm Btg 182,000
Ø 16 mm Btg 208,000
Ø 19 mm Btg 299,650
Ø 20 mm Btg 416,650
2 Paku
Paku Biasa Kg 23,400
Paku Asbes Kg 32,500
Paku Seng (payung) RRT Kg 58,500
Paku skrup 3 ½ inci Dos 45,500
Paku Skrup 4 Inci Dos 45,500
Paku Payung Berulir 7 cm Dos 58,500
Paku Sirap Kg 78,000
Paku Beton Hitam Dos 58,500
Paku Beton Putih Dos 26,000
Paku tripleks Kg 26,000
3 Kawat
Beton Kg 32,500
Bronjong Kg 42,250
Rang Besar 90 cm Mtr 32,500
Ayak Kecil 90 cm Mtr 32,500
Duri 10 Kg roll 240,500
Nyamuk Mtr 32,000
4 Besi Siku
30.30.3 Btg 68,900
40.40.4 Btg 76,700
40.40.3 Btg 97,500
50.50.4 Btg 101,400
50.50.5 Btg 128,700
60.60.6 Btg 247,000
70.70.7 Btg 367,900
5 Baut Baut Kayu 12 mm , pjg 15 cm Buah 5,850
Baut Kayu 12 mm , pjg 20 cm Buah 7,150
Baut Kayu 12 mm , pjg 25 cm Buah 10,400
Baut Kayu 12 mm , pjg 30 cm Buah 11,700
6 Besi Plat
polos Lbr 1,245,000
kembang Lbr 1,293,500
7 Besi Ulir
diameter 13 mm Btg 132,600

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
(Dalam Rupiah (Rp)
NO JENIS BAHAN SPESIFIKASI SATUAN HARGA
1 2 3 4 5
diameter 16 mm Btg 197,600
diameter 19 mm Btg 279,500
8 Besi Strep
30.3 mm Btg 59,800
35.4 mm Btg 92,950
46.4 mm Btg 165,750
40.6 mm Btg 120,900
50.6 mm Btg 199,550

9 Besi Tipe C (Rangka Baja Ringan) 6 m


Lebar 10, tebal, 1,8 -2,00 mm Btg 267,800
Lebar 12,5, tebal 1,8 -2,00 mm Btg 283,400
Lebar 15,Tebal 1,8 – 2,00 mm Btg 360,750
Taso, 75 x 75 mm Btg 126,750

BAHAN PIPA
1 Pipa Besi GIP
ؽ Inci – 6 m Btg 74,100
Ø ¾ Inci – 6 m Btg 92,300
Ø 1Inci – 6 m Btg 120,900
Ø 2 Inci – 6 m Btg 178,100
Ø 2 ½ Inci – 6 m Btg 422,500
Ø 3 Inci – 6 m Btg 604,500
2 Pipa PVC Air Bersih
Ø ½ Inci – 4 m Btg 26,000
Ø ¾ Inci – 4 m Btg 39,000
Ø 1 Inci – 4 m Btg 45,500
Ø 1½ Inci – 4 m Btg 58,500
Ø 2 Inci – 4 m Btg 71,500
Ø 2 ½ Inci – 4 m Btg 97,500
Ø 3 Inci – 4 m Btg 136,500
Ø 4 Inci – 4 m Btg 188,500
Ø 5 Inci – 4 m Btg 286,000
Ø 6 Inci – 4 m Btg 383,500
Ø 8 Inci – 4 m Btg 630,000
Ø 10 Inci – 4 m Btg 1,072,500
3 Pipa untuk Saluran Pembuangan Air
Ø ½ Inci – 4 m Btg 39,600
Ø ¾ Inci – 4 m Btg 46,100
Ø 1 Inci – 4 m Btg 56,500
Ø 1 ½ Inci – 4 m Btg 58,500
Ø 2 Inci – 4 m Btg 84,500
Ø 2 ½ Inci – 4 m Btg 110,500
Ø 3 Inci – 4 m Btg 156,000
Ø 4 Inci – 4 m Btg 227,000
Ø 5 Inci – 4 m Btg 260,000
Ø 6 Inci – 4 m Btg 299,000
Ø 8 Inci – 4 m Btg 500,500
Ø 10 Inci – 4 m Btg 1,950,000
Pipa Jenis Btg C Untuk Instalasi Listrik
4

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
(Dalam Rupiah (Rp)
NO JENIS BAHAN SPESIFIKASI SATUAN HARGA
1 2 3 4 5
Ø 5/8 Inci – 4 m Btg 19,500
Ø ¾ Inci – 4 m Btg 39,000
BAHAN LANGIT-LANGIT
1 Eternit 100 X 100 cm Lbr 45,500
2 Tripleks
122 X 244 x 0.3 cm Lbr 82,500
122 X 244 x 0.6 cm Lbr 115,000
122 X 244 x 0.9 cm Lbr 167,000
122 X 244 x 0.3 cm Lbr 115,000
3 Tripleks Melamin 82,500
122 X 244 x 0.3 cm Lbr 115,000
4 Multipleks
Ukuran 4 mm Lbr 115,000
Ukuran 6 mm Lbr 130,900
Ukuran 9 mm Lbr 140,500
5 Teakwond Ukuran 122x244x0,3 cm Lbr 182,000
Ukuran 80 x 200 x 0,6 cm Lbr 110,500
6 Asbes Plat Harfeks
200 X 100 X 0.3 cm Lbr 84,500
7 List Profil
2 x 3 cm / 4 m Btg 27,600
3 x 3 cm / 4 m Btg 33,100
4 x 4 cm / 4 m Btg 42,100
5 x 5 cm / 4 m Btg 46,600
8 Lambrasering Ukuran 3x 4 cm, 4 m M³ 3,055,000
Ukuran 3x 4 cm, 4 m M³ 3,224,000
Ukuran 3x 4 cm, 4 m M³ 3,523,000
9 Hard Board 122 x 244 cm Lbr 126,100
10 Gamacca 50 x 120 cm Lbr 88,400
11 Accoestic 40 x 60 cm Lbr 96,200
12 Calsiboard Lbr 91,000
13 Gypsum Lbr 104,000
14 Lee Gypsum Lbr 70,200
BAHAN ATAP
1 Genteng
Beton , flat Buah 20,150
Keramik , nok Buah 65,000
Kaca, flat Lbr 94,250
Tanah Buah 5,850
2 Sirap Ikat 57,200
3 Seng gelombang
BJLS 0.18 mm Kaki 8,840
BJLS 0.22 mm Kaki 9,490
BJLS 0.30 mm Kaki 28,600
BJLS 0.35 mm Kaki 35,100
4 Seng Plat
BJLS 0,32 mm Lbr 117,000
BJLS 0,22 mm Lbr 71,500
5 Seng Plastik Laserlite 8 kk Lbr 110,500
6 Seng Super Deck
180 X 70 cm – 10 kaki Kaki 65,000

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
(Dalam Rupiah (Rp)
NO JENIS BAHAN SPESIFIKASI SATUAN HARGA
1 2 3 4 5
180 X 70 cm – 8 kaki Kaki 28,600
180 X 70 cm – 7 kaki Kaki 63,700
180 X 70 cm – 10 kaki Kaki 104,000
7 Seng Spandek
0,25 mm Meter 46,800
0,30 mm Meter 53,300
0,35 mm Meter 59,800
0,40 mm Meter 66,300
8 Genteng Metal
Sakura roof Meter 45,500
Surya Roof Meter 66,300
Multi Roof Meter 149,500
Tiara Rood Meter 123,500
9 Fiber Semen (Harflex)
Super 240 X 108 X 0.6 cm Kaki 153,400
Super 180 X 108 X 0.6 cm Kaki 107,900
Ekonomi 240 X 92 X 0.5 cm Kaki 120,900
Ekonomi 180 X 92 X 0.4 cm Kaki 110,500
Mini 240 X 105 X 0.4 cm Kaki 108,550
Mini 180 X 92 X 0.5 cm Kaki 121,550
Super 240 X 105 X 0.4 cm Kaki 117,000
Super 180 X 105 X 0.4 cm Kaki 111,800
10 Nok Steel Gelombang
Super – 180 cm Bh 91,000
Mini – 105 cm Bh 74,100
Ekonomi – 95 cm Bh 37,700
14 Nok Steel Rata
Super – 108 cm Bh 89,700
Mini – 105 cm Bh 72,150
Ekonomi – 95 cm Bh 36,400
15 Nok ½ Lingkaran Bh 71,500
16 Karet Pelapis Genteng
Ukuran 55 mtr 14,500
Ukuran 90 Mtr 16,600

BAHAN PENGGANTUNG
1 Kunci Tanam ( Biasa )
1 x Putar Unit 97,500
1 x Putar Unit 136,500
2 Kunci Tanam
1 Slag Buah 227,500
Double Slag Buah 305,500
3 Penggantung ( Biasa )
Hak Angin Kecil Bh 13,000
Hak Angin Besar Bh 22,100
Grendel Kecil Bh 13,000
Grendel Besar Bh 35,100
Engsel Pintu Bh 49,400
Engsel Jendela Bh 37,700
Expanyolet Bh 172,900

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
(Dalam Rupiah (Rp)
NO JENIS BAHAN SPESIFIKASI SATUAN HARGA
1 2 3 4 5
BAHAN SANITER
Kloset Duduk Toto set 2,925,000
Kloset Jongkok Toto Bh 507,000
Wasthafel warna Toto/keramik unit 487,500
Wasthafel cuci piring logam 1 lubang Bh 585,000
Wasthafel cuci piring logam 2 lubang Bh 624,000
Pompa Mesin Bh 728,000
Pompa tangan terpasang Bh 3,061,500
Urinoir lengkap Bh 1,560,000
Bak Mandi fiber oval uk. 55 x 55x60 ( 120 liter ) Bh 689,000
Bak Mandi fiber oval uk.66x66x70 ( 220 liter ) Bh 858,000
Reservoir fiber = 1 m3 Bh 1,644,500
Reservoir Stainless stell = 1 m3 Bh 5,785,000
Stop Kran Bh 19,500
Kran Air Bh 32,500
Floor Drain Bh 32,500

BAHAN FINISHING/CAT
1 Cat Tembok
Cat Dasar 20 kg ( No Drop ) Kaleng 851,500
Cat Kilap Cat kilap 2,5 liter Kaleng 286,000
2 Cat Kayu
Cat Dasar 3 liter Kaleng 117,000
Cat Kilap 1 kg Kaleng 74,100
Palatone Ltr 86,400
ICI Kg 109,473
Politur Kg 78,000
Meni 3,5 kg Kg 107,900
Minyak Cat Ltr 39,000
3 Cat Besi 1 kg Kaleng 78,000
Supermetal Kaleng 111,800
4 Cat Atap
Cat Dasar Kg 390,000
Lem Seng Kg 15,600
Plamur Kg 15,600
Amplas/Kertas Gosok Lbr 42,900
Dempul Kg 9,750
Residu Ltr 123,500
Cat Kilap Kg
BAHAN INSTALASI LISTRIK
Kabel Listrik
1 Type NYA (Full)
1 ½ mm Roll 305,000
2 ½ mm Roll 417,000
2 Type NYY
2 X 1 ½ mm Roll 663,000
2 X 2 ½ mm Roll 822,500
2 X 4 mm Roll 687,500
3 Lampu TL
1 X 20 W Bh 98,000
2 X 20 W Bh 127,000

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
(Dalam Rupiah (Rp)
NO JENIS BAHAN SPESIFIKASI SATUAN HARGA
1 2 3 4 5
1 X 40 W Bh 121,000
2 X 40 W Bh 154,000
4 Lampu Pijar
25 W Bh 36,000
40 W Bh 60,000
60 W Bh 110,000
100 W Bh 192,000
Lampu Taman Mercury Bh 389,500
5 Saklar Phase
Tunggal Putih Bh 27,000
Tunggal Hitam Bh 22,000
Double Putih Bh 30,000
Double Hitam Bh 25,000
6 Stop Kontak
Hitam Bh 30,000
Putih Bh 32,000
7 Zekering Kast Lokal Biasa
Lokal 2 Group Automat Bh 87,000
Lokal 3 Group Biasa Bh 99,500
Fitting Bh 19,500

BAHAN JEMBATAN GANTUNG


1 Beugul U-10 mm Bh 18,375
2 Baut Baja U-15 mm Bh 40,425
U-20 mm Bh 52,325
U-35 mm Bh 81,879

3 Besi Plat 1 mm Lbr 661,500


5 mm Lbr 559,335
6 mm Lbr 867,300
7 mm Lbr 157,500
8 mm Lbr 1,427,370
23 mm Kembang Lbr 1,359,750
4 Jarum Keras Besar, Warfel Unit 28,000
Kecil, Warfel Unit 15,600
5 Tarif Baja ( Slink ) 1/2" Meter 89,700
3/4" Meter 149,800
1" Meter 194,040
1,5" Meter 269,885

TARIF /SEWA PERALATAN

Unit/ Hari 300.000-600.000


1 Dump/ Truck
PC 100 Unit/ Jam 250.000-400.000
2 Escavator
PC 200 Unit/ Jam 350.000-550.000

D3 Unit/ Jam 250.000-500.000


3 Buldozer

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
(Dalam Rupiah (Rp)
NO JENIS BAHAN SPESIFIKASI SATUAN HARGA
1 2 3 4 5
D6 Unit/M² 325.000-600.000

4 Mesin Gilas 8 -16 ton Kerikil Unit/M² 1.250-4.500


Aspal Unit/M² 1.500-5.000
5 Mesin Gilas 6-8 ton Kerikil Unit/M² 800-4.000
Aspal Unit/M² 1.000-4.000
6 Tandem Roller 6/8 Kerikil Unit/M² 1.000-4.000
Aspal Unit/M² 1.200-4.500
7 Vibro Roller Unit/ Jam 418,950
300.000-500.000
8 Motor Grader Unit/ Jam
2.000.000-
9 Aspal Mixing Plan Unit/ Hari 4.000.000
150.000-500.000
10 Genset 30 V Unit/ Hari
200.000-400.000
11 Water Tanker Unit/ Hari
200.000-400.000
12 Wheel Loader Unit/ Jam
200.000-400.000
13 Komposser Unit/ Hari
100.000-350.000
14 Jack Hammer Unit/ Jam
350.000-700.000
15 Aspal Sprayyer Unit/M²
250.000-500.000
16 Molen Unit/ Hari
150.000-450.000
17 Hand Steamer Unit/ Hari
300.000-550.000
18 Stone Cruisher Unit/ Hari
100.000-350.000
19 Cutting Drill Unit/ Hari
150.000-350.000
20 Chain Saw Unit/ Hari
170.000-400.000
21 Amro Truck Unit/ Hari
200.000-400.000
22 Lavatory Truck Unit/ Hari
200.000-400.000
23 Sky Walker Unit/ Hari

BIAYA ANGKUT/TRONTON
650.000-
1 Jarak 0 -15 km Unit/ Jarak 1.100.000
1.200.000-
2 Jarak 16- 25 km Unit/ Jarak 2.700.000
2.700.000-
3 Jarak 26 -40 km Unit/ Jarak 4.700.000
5.640.000-(+
4 Jarak > 40 km Unit/ Jarak 100.00/ km )

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
(Dalam Rupiah (Rp)
NO JENIS BAHAN SPESIFIKASI SATUAN HARGA
1 2 3 4 5

UPAH KERJA
1 Pekerja Org/hr 115,000
2 Tukang :
Tukang Listrik Org/hr 138,000
Tukang Batu Org/hr 138,000
Tukang Kayu Org/hr 138,000
Tukang Besi Org/hr 138,000
Tukang Pipa Org/hr 138,000
Tukang Cat Org/hr 138,000
Tukang Kaca Org/hr 138,000
Tukan Aluminium Org/hr 138,000
3 Kepala Tukang
Kepala Tukang Listrik Org/hr 172,500
Kepala Tukang Batu Org/hr 172,500
Kepala Tukang Kayu Org/hr 172,500
Kepala Tukang Besi Org/hr 172,500
Kepala Tukang Pipa Org/hr 172,500
Kepala Tukang Cat Org/hr 172,500
Kepala Tukang Besi Org/hr 172,500
4 Mandor Org/hr 207,000
5 Mekanik Org/hr 287,500
6 Pembantu Mekanik Org/hr 207,000
7 Penjaga Gudang Org/hr 138,000
8 Penjaga Malam Org/hr 138,000
9 Operator Alat Berat Terlatih Org/hr 425,000

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
s
STANDAR HARGA SATUAN BAHAN BANGUNAN DAN UPAH KERJA
PEMERINTAH PROVINSI SULAWEI SELATAN
KABUPATEN LUWU UTARA
TAHUN 2018

Dalam Rupiah (Rp)


No Jenis Bahan Satuan Harga ZONA I Harga ZONA II

1 2 3 4 5

A. HARGA BAHAN LOKAL


MATERIAL BETON CETAK
1 Batu Bata Ukuran Tebal Buah 750 800
2 Batako Buah 3.75 3.75
4 Gorong-gorong 40 cm Buah 166,500 167,000
5 Gorong-gorong 60 cm Buah 258,500 260,000
6 Gorong-gorong 80 cm Buah 300,000 300,000
7 Gorong-gorong 100 cm Buah 350,000 350,000
8 Kapur Bakar Zak 77,500 77,500
9 Paving Blok Bentuk Persegi, t = 8.cm M2 100,000 102,500
10 Paving Blok Bentuk Persegi, t = 8.cm M2 95,000 97,500
11 Paving Pengunci ( topi uskup ) t = 8 M2
Kansten Pres
50 x 25 x 15 cm Zak 40,000 42,500
40 x 20 x 15 cm Buah 28,000 30,000
40 x 30 x 15 cm Buah 37,000 40,000
12 Rooster Beton Uk.20 x 30 Buah 25,000 25,000
13 Rooster Beton Uk.20 x 40 Buah 30,000
14 Rooster Beton Uk.20 x 35 Buah 20,000 17,000
15 Rooster Beton Uk.25 x 40 Buah 30,000 30,000
16 Rooster Beton Uk.18 x 18 Buah 12,000 12,000
17 Rooster Beton Uk.25 x 25 15,000 15,000

MATERIAL KAYU /BAMBU


1 Bambu Btg 18,000 20,000
2 Kayu Klas - 1 ( Jati, Merbau ) M3 11,000,000 4,000,000
3 Kayu Klas - II ( Lokal ) M3 3,500,000 3,500,000
4 Kayu Klas - III ( Lokal ) M3 3,000,000 3,000,000
5 Kayu Klas - IV ( Lokal ) M3 2,500,000 2,500,000

1 Aspal Bitumen Kg 13,500


Material Pipa dan Accessories ( PVC-4 m )
2 Accessories Pipa PVC 1 " (Shock)
/2
Buah 4,000 4,000

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)
No Jenis Bahan Satuan Harga ZONA I Harga ZONA II

1 2 3 4 5
Accessories Pipa PVC " (Shock)
3/4
Buah 4,500 4,500
Accessories Pipa PVC 1" (Shock) Buah 6,000 7,500
Accessories Pipa PVC 2" (Shock) Buah 8,500 10,000
Accessories Pipa PVC 3" (Shock) Buah 14,000 15,000
Accessories Pipa PVC 4" (Shock) Buah 23,000 20,000
3 Accessories ( tee )
Accessories Pipa PVC 1/2" (Tee) Buah 4,000 5,000
Accessories Pipa PVC 3/4" (Tee) Buah 4,500 5,000
Accessories Pipa PVC 1" (Tee) Buah 6,000 8,000
Accessories Pipa PVC 2" (Tee) Buah 10,000 12,000
Accessories Pipa PVC 3" (Tee) Buah 16,000 20,000
Accessories Pipa PVC 4" (Tee) Buah 29,000 25,000

4 Accessories ( Elbow )
Accessories Pipa PVC 1/2" (Elbow) Buah 4,000 4,000
Accessories Pipa PVC 3/4" (Elbow) Buah 4,500 5,000
Accessories Pipa PVC 1" (Elbow) Buah 6,000 7,000
Accessories Pipa PVC 2" (Elbow) Buah 9,000 8,000
Accessories Pipa PVC 3" (Elbow) Buah 14,500 15,000
Accessories Pipa PVC 4" (Elbow) Buah 24,500 22,000
5 Pipa PVC
Pipa PVC 5/8". 4 m btg 14,000 15,000
Pipa PVC 1/2" AW Merk Wavin, 4 m btg 26,500 25,000
Pipa PVC 3/4" AW Merk Wavin, 4 m btg 40,500 35,000
Pipa PVC 1" AW Merk Wavin, 4 m btg 54,500 50,000
Pipa PVC 1 1/2" AW Merk Wavin, 4 btg 76,500 65,000
Pipa PVC 1 1/2" D Merk Wavin, 4 m btg 60,000 60,000
Pipa PVC 2" AW Merk Wavin, 4 m btg 96,000 95,000
Pipa PVC 2" D Merk Wavin, 4 m btg 65,000 75,000
Pipa PVC 3" AW Merk Wavin, 4 m btg 198,000 195,000
Pipa PVC 3" D Merk Wavin, 4 m btg 138,000 115,000
Pipa PVC 4" AW Merk Wavin, 4 m btg 325,000 315,000
Pipa PVC 4" D Merk Wavin, 4 m btg 167,000 185,000
6 Pipa GIP
Pipa GIP Medium B 1/2"-4m btg 96,000 96,000
Pipa GIP Medium B 3/4" - 4m btg 148,000 148,000
Pipa GIP Medium B 1"-4m btg 188,000 188,000
Pipa GIP Medium B 1.1/2" - 4m btg 240,000 240,000
Pipa GIP Medium B 2" - 4m btg 293,000 293,000
Pipa GIP Medium B 2.1/2" - 4m btg 356,000 356,000
Pipa GIP Medium B 3" - 4m btg 450,000 450,000
Pipa GIP Medium B 4" - 4m btg 550,000 550,000

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)
No Jenis Bahan Satuan Harga ZONA I Harga ZONA II

1 2 3 4 5
Pipa GIP Medium B 6" - 4m btg 750,000 750,000
Pipa GIP Medium A 3/4" - 4m btg 200,000 200,000
Pipa GIP Medium A 1" - 4m btg 250,000 250,000
Pipa GIP Medium A 1.1/2" - 4m btg 350,000 350,000
Pipa GIP Medium A 2" - 4m btg 450,000 450,000
Pipa GIP Medium A 3" - 4m btg 750,000 750,000
Pipa GIP Medium A 4" - 4m btg 850,000 850,000
Pipa GIP Medium A 6" - 4m btg 12,505,000 1,250,000

MATERIAL LOGAM
7 Baja Ringan
c -0,75 x 0,75 mm/6 m' btg 100,000 100,000
c -0,75 x 0,80 mm/6 m' btg 110,000 115,000
Reng Baja Ringan ( keci) 0,35 x 0,45
mm/6 m' btg 60,000
65,000
Reng Baja Ringan ( keci) 0,35 x 0,45 btg 65,000
mm/6 m' 65,000
Rangka Plafond Metal Furing 35,000
8 Baja Tulangan kg 11,500
9 Kawat Duri Roll 200,000 210,000
10 Kawat Pengikat Beton kg 25,000 30,000
11 Kawat Licin / galvano kg 25,000 30,000
12 Kawat Ram Harmonika 2 mm M 45,000 35,000
13 Baut
Baut 10 cm Buah 4,500 5,000
Baut 12 -15 cm Buah 6,000 8,000
Baut 20 cm Buah 7,500 10,000
Baut 25 cm Buah 8,100 12,000
Baut 30 cm Buah 9,500 13,000
14 Sekrup Baja Ringan
Sekrup 12-14 x 20 Buah 700 800
Sekrup 10 - 16 x 16 Buah 750 900
15 Besi Plat
1,2 mm x 120 cm x 240 cm Buah 387,500
1,5 mm x 120 cm x 240 cm Buah 487,500
2 mm x 120 cm x 240 cm Buah 696,500
3 mm x 120 cm x 240 cm Buah 950,000
4 mm x 120 cm x 240 cm Buah 1,300,000
16 Besi Siku
Besi Siku 30 x 30 x 3 Btg 80,000 85,000
Besi Siku 40 x 40 x 3 Btg 101,500 130,000
17 Besi Hollow ( Panjang 6 M )

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)
No Jenis Bahan Satuan Harga ZONA I Harga ZONA II

1 2 3 4 5
1,5 X 3,6 Btg 120,000
2 X 4 -0,25 mm Btg 110,000 175,000
3x3 Btg 131,000
4 x 4 -0,25 mm Btg 181,000 192,000
4,5 x 7,5 Btg
2x 4 -0,30 Btg 110,000 180,000
5 x 10 Btg
4 x 4 -0,30 Btg 150,000 204,000
50 x 50 x 4 Btg
50 x 50 x 5 Btg
18 Besi Beton
Besi Beton Ф 6 Btg 36,000 35,000
Besi Beton Ф 8 Btg 55,000 48,000
Besi Beton Ф 10 Btg 80,000 72,000
Besi Beton Ф 12 Btg 120,000 110,000
Besi Beton Ф 14 Btg 160,000 170,000
Besi Beton Ф 16 Btg 201,000 240,000
Besi Beton Ф 19 Btg 301,000 300,000
19 Jarum Pengunci Slink
Ф 1/4" ( jarum keras ) Buah 25,000
Ф 1/2" ( jarum keras ) Buah 30,000
Ф 3/4" ( jarum keras ) Buah 60,500
Ф 1" ( jarum keras ) Buah 88,500
Ф 1 1/4" ( jarum keras ) Buah 85,000
Ф 1 1/2" ( jarum keras ) Buah 90,000
Ф 2" ( jarum keras ) Buah 120,000
20 Klem Slink
Ф 1/4"( Kuku Macan ) Buah 7,000 7,000
Ф 1/2"( Kuku Macan ) Buah 15,000 15,000
Ф 3/4"( Kuku Macan ) Buah 20,000 20,000
Ф 1"( Kuku Macan ) Buah 25,000 25,000
Ф 1 1/4"( Kuku Macan ) Buah 30,000 30,000
Ф 1 1/2"( Kuku Macan ) Buah 35,000 35,000
Ф 2"( Kuku Macan ) Buah 45,000 45,000
21 Tali Slink
Tali Slank Ф 1/4" M 20,000
Tali Slank Ф 1/2" M 45,000
Tali Slank Ф 3/4" M 75,000
Tali Slank Ф 1" M 110,000
Tali Slank Ф 1 1/4" M 130,000
Tali Slank Ф 1 1/2" M 175,000
22 Paku/ Sekrup
Paku Beton Hitam 5 cm Dos 55,000

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)
No Jenis Bahan Satuan Harga ZONA I Harga ZONA II

1 2 3 4 5
Paku Beton Putih 1- 3 cm Dos 33,000
Paku Beton Putih 5- 10 cm Dos 54,500
Paku Biasa 1- 3 cm kg 28,500 25,000
Paku Biasa 5- 7 cm kg 23,000 20,000
Paku Biasa 8- 12 cm kg 20,500 25,000
Paku Sekrup 1- 3 cm Dos 25,000 125,000
Paku Sekrup 5 -10 cm Dos 69,000 125,000
Paku Seng kg 53,000 65,000
Paku Seng Ulir kg 55,000 65,000

MATERIAL CAT DAN FINISHING


23 Cat Tembok Metrolite kg 53,000 60,000
24 Cat Tembok Aries kg 18,000 18,000
25 Cat Tembok Avitex kg 53,000 60,000
26 Cat Atap kg 84,000 75,000
27 Cat Anti Bocor No Drop kg 59,000 55,000
28 Cat Minyak Avian ltr 65,000 65,000
29 Cat Meni Kayu ltr 34,000 45,000
30 Cat Meni Besi ltr 45,000 50,000
31 Dempul Kayu kg 43,000 45,000
32 Kuas Eterna 1" Buah 7,500 10,000
33 Kuas Eterna 2 1/2 " Buah 12,000 15,000
34 Kuas Eterna 3" Buah 16,500 25,000
35 Kuas Eterna 4" Buah 22,500 30,000
36 Kuas Roll lbr 33,000 35,000
37 Amplas Halus /Kertas Gosok lbr 5,500 5,000
38 Amplas kasar /Kertas Gosok lbr 5,500 5,000
39 Plamor ( Boyo ) kg 12,500 17,000
40 Plamor ( Ablus ) Zak 67,500 70,000
41 Lem Fox Putih 150 Gram Tube 15,000 10,000
42 Lem Fox Putih 500 Gram Tube 21,500 20,000
43 Lem Pipa Isarplas ( 45 gram ) Buah 30,000 15,000
44 Minyak Pelumas ( Oil ) Ltr 38,000
45 Minyak Tanah Ltr 12,500
46 Minyak cat Kg 32,000
47 Minyak Cat ( Thinner Super ) Kg 45,000 35,000
48 Pelitur Kg 65,000 75,000

MATERIAL ELETRIKAL
49 Cok Lampu Besar Buah 12,500 20,000
50 Cok Lampu Kecil Buah 6,500 15,000
51 Kabel Listrik NYM 1 x 2,5 mm Roll 355,000 325,000
52 Kabel Listrik NYM 2 x 1,5 mm Roll 655,000 225,000

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)
No Jenis Bahan Satuan Harga ZONA I Harga ZONA II

1 2 3 4 5
53 Kabel Listrik NYM 2 x 2,5 mm Roll 885,000 325,000
54 Kabel Listrik NYM 3 x 2,5 mm Roll 995,000 950,000
55 Kabel Listrik Eterna 3x 2.5 mm Roll 1,285,000 1,150,000
56 Box Panel isi 2 MCB 24,000 35,000
57 Box Panel isi 4 MCB 45,000 45,000
58 MCB 4 A 65,000 75,000
59 MCB 6 A 65,000 85,000
60 Isolator 12,000 25,000
61 Saklar Tunggal 30,000 25,000
62 Saklar Ganda 36,500 55,000
63 Stop Kontak Besar 35,000 30,000
64 Stop Kontak Kecil 35,000 25,000
65 Down Light 61,500 55,000
66 Fitting Plafon 16,500 25,000
67 Lampu Philips Sumpit 5 watt Buah 55,000 30,000
68 Lampu Philips Sumpit 8 watt Buah 60,000 35,000
69 Lampu Philips Sumpit 14 watt Buah 75,000 45,000
70 Lampu Philips Sumpit 18 watt Buah 50,000 50,000

ATAP DAN RANGKA ATAP


71 Genteng Multi Roof lbr 90,000 85,000
72 Genteng Multi Roof Glasur lbr 110,000 155,000
73 Genteng Sakura Roof lbr 70,000 55,000
74 Genteng Surya Roof lbr 60,500 55,000
75 Nok Genteng Multi Roof lbr 38,500 45,000
76 Nok Genteng Sakura Roof lbr 30,500 35,000
77 Nok Genteng Surya Roof lbr 31,500 35,000
78 Seng Gelombang Kecil Sermani Kaki 8,500 8,000
79 Seng Gelombang Besar Sermani Kaki 9,000 8,000
80 Seng Gelombang Besar Gajah Berlian Kaki 8,000 7,600
81 Seng Gelombang kecil Gajah Berlian Kaki 8,500 7,600
82 Seng Gelombang polos Gajah Berlia Lbr 65,000 95,000
83 Seng Polos Sermani Lbr 75,000 120,000
Seng Kumira Kaki 8,500
84 Spandec
Spandec 0,25 mm M' 38,500 42,000
Spandec 0,30 mm M' 43,000 45,000
Spandec 0,35 mm M' 48,500 50,000
Spandec 0,40 mm M' 58,000 55,000
Spandec 0,25 mm ( Warna ) M' 42,000 45,000
Spandec 0,30 mm ( Warna ) M' 47,000 48,000
Spandec 0,35 mm ( Warna ) M' 53,000 55,000
Spandec 0,40 mm ( Warna ) M' 59,000 58,000

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)
No Jenis Bahan Satuan Harga ZONA I Harga ZONA II

1 2 3 4 5

MATERIAL PELAPIS,PARTISI DINDING /PLAFOND


85 Eternit 3 mm Lbr 62,000
86 Lipslank calsiboard Lbr 80,000 95,000
87 Calsiboard Lbr 78,500 75,000
88 Gypsum
* ex Jayaboard 9 mm Lbr 81,500 95,000
* ex Elephant 9 mm 1,20 x 2,40 Lbr 96,500 70,000
* ex Knauf 9 mm 1,20 x 2,40 Lbr 89,000 75,000
89 Tripleks
* Tripleks 2 mm Lbr 46,000 55,000
* Tripleks 3 mm Lbr 60,000 60,000
* Tripleks 4 mm Lbr 65,000 75,000
* Tripleks 5 mm Lbr 85,000 85,000
* Tripleks 6 mm Lbr 91,500 95,000
* Tripleks 9 mm Lbr 130,000 120,000
* List Profil 5 cm M' 25,000 25,000
90 Material Kaca
* Kaca Bening Tebal 2 mm M2 81,000
* Kaca Bening Tebal 3 mm M2 91,500
* Kaca Bening Tebal 5 mm M2 191,000
* Kaca Bening Tebal 8 mm M2 250,000
91 Pintu /Jendela
* Engsel Jendela Psng 25,000 20,000
* Engsel Pintu Kupu-Kupu Psng 31,000 15,000
* Grandel Besar ( Biasa ) 12" Buah 36,000 15,000
* Grandel Besar ( Biasa ) 4" Buah 16,000 20,000
* Kait Angin Besar Btg 25,000
* Kait Angin Kecil Btg 15,000
* Kunci Tanam Merk 2 x Slag Kodal Buah 112,500
* Kunci Tanam Merk 2 x Slag Napoli Buah 122,500
* Kunci Tanam Merk 2 x Slag Union Buah 203,500

MATERIAL PENUTUP LANTAI


92 Keramik Biasa Uk.20 cm x 20 cm M' 68,000 70,000
93 Keramik Biasa Uk.20 cm x 25 cm M' 74,500 75,000
94 Keramik Biasa Uk.30 cm x 30 cm M' 71,000 85,000
95 Keramik Biasa Uk.40 cm x 40 cm ( put M' 77,000 60,000
96 Keramik Biasa Uk.40 cm x 40 cm ( wa M' 80,000 75,000
97 Kuku Tegel Buah 1,000 1,000
98 Melamin Lbr 140,000 130,000
99 Plint Keramik 10 cm x 30 cm Buah 13,600 12,000
100 Plint Keramik 10 cm x 40 cm Buah 22,500 15,000

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)
No Jenis Bahan Satuan Harga ZONA I Harga ZONA II

1 2 3 4 5

MATERIAL SANITAIR
101 Bak Mandi Fiber Glass Buah 550,000 275,000
102 Bak Reservoir Kapasitas 1000 Ltr Buah 1,450,000 1,250,000
103 Bak Reservoir Kapasitas 500 Ltr Buah 920,000 920,000
104 Bath Tub Keramik Buah
105 Floor Drain Buah 21,000
Kloset Duduk ( menggunakan
106
tabung ) 2,550,000 1,800,000
107 Kloset Duduk Buah 773,000 1,000,000
108 Kloset Jongkok Buah 220,000 150,000
109 Kloset Jongkok Toto Buah 400,000 450,000
110 Kran Air Kuningan 1/2 " Buah 35,000 50,000
111 Kran Air Kuningan 3/4 " Buah 95,000 55,000
112 Kran Dinding 1/2" Buah 95,000 75,000
113 Kran Dinding 3/4" Buah 84,500 35,000
114 Kran zink /wasthafel 1/2" Buah 183,000 180,000
115 Kran zink /wasthafel 3/4" Buah 127,000 180,000
116 Mesin Jet Pump Unit 734,000 1,800,000
117 Mesin Pompa Unit 640,000 650,000
118 Pintu Vinil Set 610,000
119 Pintu Aluminium Set 550,000 1,100,000
120 Shower Set Set 550,000
121 Shower Spray Buah 131,000 850,000
122 Stop Kran 1" Buah 65,000 35,000
123 Urinoir Buah 2,705,000
124 Whastafel Keramik Gantung Buah 750,000 650,000

MATERIAL PELEKAT
125 Semen Bosowa PC (40 ) Kg Zak 56,000 56,000
126 Semen Bosowa PC (50 ) Kg Zak 68,000 68,000
127 Semen Tonasa PC (40 ) Kg Zak 58,000 58,000
128 Semen Tonasa PC (50 ) Kg Zak 70,000 70,000
129 Semen Tiga Roda PC ( 40 ) Kg Zak 56,000 56,000

HARGA BAHAN LOKAL JENIS


C. MINERAL BUKAN LOGAM DAN
BATUAN
1 Pasir Pasang M3 120,000 150,000
Batu Kali M3 270,000 295,000
Kerikil Saring M3 270,000 295,000
Sirtu M3 120,000 145,000
Tanah Urug / Timbunan M3 120,000 130,000

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)
No Jenis Bahan Satuan Harga ZONA I Harga ZONA II

1 2 3 4 5
Batu Pecah 0,5 - 1 cm M3 380,000 380,000
Batu Pecah 2 - 3 cm M3 350,000 350,000

D. UPAH KERJA
1 Buruh Terlatih org 130,000
2 Tukang org 150,000
3 Kepala Tukang org 155,000
4 Mandor Lapangan org 160,000
5 Mekanik Terlatih org 230,000
6 Mekanik Pembantu org 145,000
7 Operator Terlatih org 230,000
8 Operator Pembantu org 145,000
9 Sopir org 180,000

HARGA BAHAN NON LOKAL


E ( BAJA,DLL )
Meterial Baja WF
1 WF 100 x 50 x 5 x 7 Kg 14,000 14,500
2 WF 148 x 75 x 5 x 7 Kg 14,000 14,500
3 WF 200 x 100 x 3.2 x 4.5 Kg 14,000 14,500
4 WF 250 x 125 x 6 x 9 Kg 15,000 15,500
5 WF 300 x 150 x 6.5 x 9 Kg 14,500 15,000
6 WF 350 x 175 x 7 x 11 Kg 15,000 15,000
7 WF 400 x 200 x 8 x 13 Kg 15,000 15,000
8 WF 500 x 200 x 10 x 16 Kg 16,000 16,000
9 WF 600 x 200 x 11 x 17 Kg 16,000 16,000
Wiremash
10 M6 Lembar 382,000 384,000
11 M8 Lembar 685,000 687,000
12 M10 Lembar 1,090,000 1,092,000
Bondek
13 t = 0.65 mm Lembar 137,000 139,000
14 t = 0.7 mm Lembar 145,000 147,000
15 t = 0.75 mm Lembar 155,000 157,000
16 shear connector Lembar

HARGA BAHAN NON LOKAL (PIPA


F.
DAN ACCESSORIES )
Pipa PVC S 12,5 - 1,1/2" (Solven
1 Btg
Cement / SC ),6m 110,000 111,000
Pipa PVC S 12,5 - 2" (Solven Cement
2 Btg
/ SC ),6m 155,000 156,000

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)
No Jenis Bahan Satuan Harga ZONA I Harga ZONA II

1 2 3 4 5
Pipa PVC S 12,5 - 3" (Solven Cement
3 Btg
/ SC ),6m 298,000 2,990,000
Pipa PVC S 12,5 - 4" (Solven Cement
4 / SC ),6m Btg 469,000
468,000
Pipa PVC S 12,5 - 6" (Solven Cement
5 Btg 932,333
/ SC ),6m 931,333
Pipa PVC S 12,5 - 2" (Rubber
6 Btg 156,000
Ring/RR),6m 155,000
Pipa PVC S 12,5 - 3" (Rubber
7 Btg 301,000
Ring/RR),6m 300,000
Pipa PVC S 12,5 - 4" (Rubber
8 Btg 100,000
Ring/RR),6m 443,000
Pipa PVC S 12,5 - 6" (Rubber
9 Btg 930,000
Ring/RR),6m 929,000
10 Pipa PVC S 12,5 - 8" (Rubber Btg
Ring/RR),6m

11 Sambungan (Knee)Pipa PVC S 12,5 - Bh 9,700


1/2" 8,700
Sambungan (Knee)Pipa PVC S 12,5 -
12 3/4" Bh 10,850
9,850
Sambungan (Knee)Pipa PVC S 12,5 -
13 Bh 28,500
1.1/2" 27,500
14 Sambungan (Knee)Pipa PVC S 12,5 - Bh 53,500
2" 52,500
Sambungan (Knee)Pipa PVC S 12,5 -
15 Bh 87,200
3" 86,200
Sambungan (Knee)Pipa PVC S 12,5 -
16 4" Bh 175,400
174,400
17 Sambungan (Knee)Pipa PVC S 12,5 - Bh 366,350
6" 365,350
18 Sambungan (Tee) Pipa PVC 12,5 - 3/4 Bh 12,000 13,000
19 Sambungan (Tee) Pipa PVC 12,5 - 1,1 Bh 26,950 27,950
20 Sambungan (Tee) Pipa PVC 12,5 - 1.1 Bh 32,950 33,950
21 Sambungan (Tee) Pipa PVC 12,5 - 2" Bh 62,500 63,500
22 Sambungan (Tee) Pipa PVC 12,5 - 2.1 Bh 67,250 68,250
23 Sambungan (Tee) Pipa PVC 12,5 - 3" Bh 125,000 126,000
24 Sambungan (Tee) Pipa PVC 12,5 - 4" Bh 205,200 206,200

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
STANDAR HARGA SATUAN BAHAN BANGUNAN DAN UPAH KERJA
PEMERINTAH PROVINSI SULAWESI SELATAN
KOTA PALOPO
TAHUN 2018

Dalam Rupiah (Rp)

No. JENIS BARANG SPESIFIKASI SATUAN HARGA

1 2 3 4 5
1. BAHAN BANGUNAN
A.1BAHAN
UPAHDASAR
KERJA
A PEKERJA
1 Pekerja Org/Hari 110.000
B TUKANG
2 Tukang Batu Org/Hari 130.000
3 Tukang Besi Org/Hari 130.000
4 Tukang Cat Org/Hari 130.000
5 Tukang Kayu Org/Hari 130.000
6 Tukang Listrik Org/Hari 130.000
7 Tukang Pipa Org/Hari 130.000
C KEPALA TUKANG
8 Kepala tukang Batu Org/Hari 150.000
9 Kepala tukang besi Org/Hari 150.000
10 Kepala Tukang Cat Org/Hari 150.000
11 Kepala Tukang Kayu Org/Hari 150.000
12 Kepala Tukang Listrik Org/Hari 150.000
13 Kepala Tukang Pipa Org/Hari 150.000
D MANDOR LAPANGAN
14 Mandor lapangan Org/Hari 150.000
E OPERATOR
15 Operator kurang terlatih Org/Hari 110.000
16 Operator Terlatih Org/Hari 150.000
17 Pembantu Operator Org/Hari 120.000
F SOPIR
18 Sopir Pembantu Org/Hari 120.000
19 Sopir Terlatih Org/Hari 150.000
G MEKANIK
20 Mekanik Org/Hari 150.000
21 Mekanik pembantu Org/Hari 120.000
2 BAHAN BANGUNAN
A BAHAN DASAR
22 Abu Batu M3 330.800
23 Bahan tanah Timbunan M08 M3 60.043
24 Bahan Belah / KerakalM06 M3 400.600
25 Batu kali M3 432.950
26 Batu kali M3 449.400
27 Batu kali (Leveransir) M3 184.950
28 Batu kali (Quarry) M3 185.000
29 Batu Looster ukuran 20 x 20 Buah 21.000
30 Batu Looster ukuran 20 x 20 Buah 29.000
31 Batu Looster ukuran 20 x 30 Buah 24.700
32 Batu Looster ukuran 20 x 35 Buah 32.600
33 Batu Looster ukuran 20 x 50 Buah 36.800
34 Batu Looster ukuran 24 x 24 Buah 24.700
35 Batu Looster ukuran 25 x 25 Buah 27.500

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)

No. JENIS BARANG SPESIFIKASI SATUAN HARGA

36 Batu Looster ukuran 25 x 40 Buah 30.000


37 Batu Looster ukuran 40 x 40 Buah 30.000
38 Batu merah Buah 675.000
39 batu pecah M3 400.000
41 batu pecah M3 378.400
42 batu pecah M3 400.000
43 batu pecah M3 400.000
44 batu pecah M3 400.000
45 batu pecah M3 400.000
46 Gorong-gorong Buah 396.700
47 Gorong-gorong Buah 140.500
49 Gorong-gorong Buah 157.500
50 Gorong-gorong Buah 78.800
51 Gorong-gorong Buah 210.000
52 Gorong-gorong Buah 101.100
53 Gorong-gorong Buah 262.500
54 Gorong-gorong Buah 288.800
55 Gorong-gorong Buah 168.500
56 Gorong-gorong Buah 367.500
57 Gorong-gorong Buah 168.500
58 Gorong-gorong Buah 401.460
59 Gorong-gorong Buah 224.700
60 Gorong-gorong Buah 357.000
61 Gorong-gorong Buah 89.900
62 Gorong-gorong Buah 105.000
63 Gorong-gorong Buah 144.300
64 kapur batu ah 5.950
65 kapur pasang 5 kg 6.600
66 kerikil saring M3 189.000
67 looster kaca Buah 26.000
68 pasir(levaransi) M3 139.375
69 pasir(quary) m³ 144.400

70 Pasir(untuk HRS) Molc M3 118.450


71 Pasir Beton (Kasar) Mola M3 264.300
72 Pasir Pasang (Sedang) Molb M3 236.900
73 Pasir Tailing M3 259.000
74 Pasir Urug(ada unsur lempung) M3 112.100
75 Paving Blok (K.225) Buah 3.570
76 Paving Blok (K.225) Buah 2.280
77 Paving Blok (K.225) Buah 3.030

78 Paving Blok (K.250) Buah 2.550


79 Paving Blok (K.300) Buah 3.900
80 Paving Blok (K.300) Buah 2.400
81 Paving Blok (K.300) Buah 2.800
82 Paving Blok (K.300) model cacing Buah 2.100
83 Paving Blok (K.300) model gress blok Buah 13.100
84 Paving Blok (K.300) model segi 4 Buah 1.900
85 Paving Blok (K.300) model segi 6 Buah 3.200
86 Paving Blok (K.300) model topi uskup Buah 8.000
87 Paving Blok (K.350) Buah 4.220
88 Paving Blok (K.350) Buah 2.810

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)

No. JENIS BARANG SPESIFIKASI SATUAN HARGA

89 Paving Blok (K.350) - Buah 3.460


90 Paving Blok (K.400) Buah 4.32
91 Paving Blok (K.400) Buah 2.92
92 Paving Blok (K.400) Buah 3.64
93 Paving Blok (K.450) Buah 4.8
94 Paving Blok (K.450) Buah 3.200
95 Paving Blok (K.450) Buah 3.9
96 Paving Blok (K.500) Buah 5.000
97 Paving Blok (K.500) Buah 3.200
98 Paving Blok (K.500) Buah 4.100
99 Paving Blok model berlian M2 121.7
100 Paving Blok model kaca M2 121.7
101 Sirtu (leverensi) m³ 71.05
102 sirtu (quarry) m³ 69.967
103 Tanah timbunan (leverensi) m³ 46.75
104 Tanah Timbunan (quarry) m³ 60.043
B SEMEN
105 semen Zak 50.000
106 semen Zak 65.000
107 semen kg 17.000
108 semen kg 20.000
109 semen Zak 50.000
110 semen Zak 66.500
111 semen Zak 50.250
112 semen Zak 66.000
C HOLLOW BLOCK
113 Besi Hollow Ukuran 15 x 30 x 0.60 buah 17.500
114 Besi Hollow Ukuran 20 x 40 x 0.60 Buah 20.000
115 Besi Hollow Ukuran 40 x 40 x 0.80 Buah 24.500
116 HOLLOW BLOCK 15 x 30 x 0.6 batang 16.800
117 HOLLOW BLOCK 20 x 20 x 1.2 batang 43.500
118 HOLLOW BLOCK 20 x 20 x 1.5 batang 61.000
119 HOLLOW BLOCK 20 x 40 x 0.6 batang 21.000

120 HOLLOW BLOCK batang 87.500


121 HOLLOW BLOCK batang 108.000
122 HOLLOW BLOCK batang 122.000
123 HOLLOW BLOCK batang 36.200
D BAHAN KAYU
124 Babu Panjang Batang 33.100
125 Bitao M3 3.438.100
126 Bitti (Vitex covasus) M3 3.465
127 Cempedak(Anthocarpus Champede) M3 2.625.000
128 Damar ( Agathis alba) M3 3.967.100
129 Dolken Kayu batang 19.800
130 Durian M3 2.835.000
131 Durian M3 3.018.800
132 Durian (Durio Zibethinus) M3 2.843.100
133 Jabon (Anthocrphalus Cadamba) M3 2.314.200
134 Jati lokal (tectona grandis) M3 2.512.400
135 Jati putih (gmelina Abrorea) M3 2.512.400
136 Kacapi/ketapi(Sandoricum Koecepa) M3 2.730.000
137 kayu kelas I M3 12.231.900
138 kayu kelas I M3 16.529.500

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)

No. JENIS BARANG SPESIFIKASI SATUAN HARGA

139 kayu kelas II M3 4.231.500


140 kayu kelas II M3 7.934.100
141 kayu kelas II M3 4.231.500
142 kayu kelas II M3 8.595.300
143 kayu kelas III M3 3.517.500
144 Kayu kelas III M3 3.780.000
145 kayu mai/bakesting M3 2.572.500
146 kayu mai/bakesting M3 2.572.500
147 mangga (magifera indica) M3 2.677.500
148 matoa (pometia pinnata) M3 3.305.900
149 meranti ( shorea ,sp) M3 2.975.400

150 nyatoh/nato (palaqium,sp) M3 3.438.100


151 sawo/kumea (manilkara,spp) M3 5.055.800
152 sengon (paraserianthes falcataria) M3 2.520.000
153 sinangkala M3 4.042.500
154 ulin (eusinderoxylon zwegeri) M3 5.289.500
155 uru M3 4.095.000
156 uru (elmerillia ovalis) M3 3.834.800
E BAHAN LANTAI
157 garit niro 40x 40 Dos 279.650
158 garit niro 60x 60 Dos 175.000
159 kuku tegel polos 10 cm Dos 750.000
160 kuku tegel ulir 10 cm Dos 650.000
161 tegel cream 60x60 Dos 156.667
162 tegel keramik 60x60 Dos 230.000

163 tegel keramik abu abu 20x20 25 Dos 68.600


164 tegel keramik biji
accent color 25x25 Dos 68.300
165 tegel keramik clasy color 25x25 Dos 72.250
166 tegel keramik fany color 25x25 Dos 69.300
167 tegel keramik gelap 40x40 Dos 74.750
168 tegel keramik hercules gelap Dos 64.600
169 tegel keramik 40x40
media gelap 40x40 Dos 68.300
170 tegel keramik median color 40x40 Dos 78.800
171 tegel keramik PC badak 20x20 Dos 83.700
172 tegel keramik PC badak 30x30 Dos 86.600
173 tegel keramik PC warna 20x20 Dos 83.700
174 tegel keramik pure color 25x25 Dos 68.300
175 tegel keramik pure color 50x50 Dos 86.000
176 tegel keramik putih 10x20 Dos 50.600
177 tegel keramik putih 20x20 Dos 71.400
178 tegel keramik putih 20x25 Dos 61.500
179 tegel keramik putih 30x30 Dos 45.000
180 tegel keramik putih 40x40 Dos 52.000
181 tegel keramik warna 10x20 Dos 63.000
182 tegel keramik warna 20x20 Dos 66.200
183 tegel keramik warna 20x25 Dos 64.100
184 tegel keramik warna 30x30 Dos 67.200
185 tegel keramik warna 40x40 Dos 85.000
186 tegel keramik warna marble 30x30 Dos 65.000
187 tegel keramik warna muda 20x20 Dos 65.000
188 tegel keramik warna tua 20x20 Dos 65.000
189 tegel keramik - Dos 39.700

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)

No. JENIS BARANG SPESIFIKASI SATUAN HARGA

F BAHAN JALAN
190 aspal amusi CSS 1H kg 13.100
191 aspal emusi prime coat CSS 1 (200 kg) drum 1.800.000
192 aspal emusi tack coat CSS 1 (200 kg) drum 1.530.000
193 wetboad anti stripping drum 190 kg kg 67.000
G BAHAN BESI
194 ayakan kecil meter 35.000
195 ayakan pasir (tebal) meter 32.500
196 ayakan pasir (tipis) meter 21.167
197 Besi plat 2mm=120x240mm Lembar 535.500
198 Besi plat 2,3mm=120x240mm Lembar 598.500
199 Besi plat 3mm=120x240 Lembar 598.500
200 besi plat 1mm (polos) Lembar 346.400
201 Besi plat 1,2mm (polos) Lembar 277.500
202 Besi plat 1,5mm(polos) Lembar 370.000
203 Besi plat 1,6mm (polos) Lembar 470.000
204 Besi plat 2mm (polos) Lembar 544.500
205 Besi plat 2,3mm (polos) Lembar 761.000
206 Besi plat 2,3mm (polos) Lembar 809.000
207 Besi plat 2,6mm (polos) Lembar 639.500
208 Besi polos kg 13.400
209 Besi Siku 30.30.3m Batang 59.900
210 Besi Siku 30.30.3m(tebal 4,2) Batang 34.700
211 Besi Siku 40.40.3-6m Batang 66.200
212 Besi Siku 40.40.3 Batang 72.500
213 Besi siku 40.40.4m (tebal 2,3) Batang 38.900
214 Besi siku 40.40.6m Batang 85.600
215 Besi siku 50.50.4 Batang 101.500
216 Besi siku 50.50.5m Batang 198.000
217 Besi siku 50.50.5m(tebal 2,5) Batang 62.000
218 Besi siku 50.50.6m Batang 177.500
219 Besi siku 60.60.6m Batang 194.300
220 Besi siku 60.60.6m Batang 194.300
221 Besi siku 70.70.7 Batang 373.000
222 Besi strep 4 cm Batang 16.500
223 Besi strep 5 cm 2'x5x6 Batang 58.800
224 Besi strep tebal 1,5 mm Batang 99.200
225 Besi strep tebal 2mm kg 22.350
226 Besi strep tebal 3mm kg 15.800
227 Besi strep tebal 3mm batang 31.500
228 Besi ulir kg 14.300
229 Duri meter 27.100
230 Duri kg/roll 285.100
231 Duri 10 kg/5kg roll 176.000
232 kawat ayak meter 36.800
233 kawat baja (bindstaal) kg 27.633
234 kawat beton kg 22.000
235 kawat bronjong roll 407.400
236 kawat bronjong manual kg 16.800
237 kawat bronjong pabrikan kg 16.900
238 kawat nyamuk meter 23.000
239 kawat rang besar meter 25.000
240 kawat rang kecil meter 30.000
241 mur/baut 10 cm buah 3.200

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)

No. JENIS BARANG SPESIFIKASI SATUAN HARGA

242 mur/baut 15cm buah 4.200


243 mur/baut 6 cm buah 3.200
244 mur/baut 8 cm buah 3.200
245 paku paku asbes kg 30.000
246 paku paku biasa 5,6 Kg 18.000
247 paku 7dan10
paku panyung 75cm Kg 31.250
248 paku paku sirap Kg 23.767
249 paku paku skrup 3 1/2inc Dos 68.300
250 paku paku skrup 4 inc Dos 6.300
251 paku beton 10 cm Dos 54.667
252 paku beton 4 cm Dos 15.833
253 paku beton 7 cm Dos 35.333
254 paku beton 3 cm Dos 11.000
255 paku beton 5 cm 2'x5x6 Dos 195.000
256 paku biasa 10 cm kg 18.500
257 paku biasa 5 cm kg 18.500

258 paku biasa 6 cm kg 18.500


259 paku biasa 7 cm kg 18.500
260 paku biasa uk.2,5-3,5 kg 22.500
261 paku biasa uk .4'-6' kg 18.000
262 Paku Jembatan kg 25.000
263 paku sekrup 2 cm Dos 17.900
264 pakiu sekrup 4 cm Dos 33.600
265 paku seng kg 25.200
266 paku seng (payung ) RRT kg 35.200
267 paku tindis Dos 2.000
268 paku tripleks kg 25.000
H BAHAN PIPA
269 Benang roll 5.000
270 fauchet elbow PVC 0=1' buah 4.000
271 fauchet elbow PVC 0=1/2 buah 3.000
272 fauchet elbow PVC 0=3/4 buah 3.250
273 fauchet socket PVC 0=1 buah 4.500
274 fauchet socket PVC 0=1/2 buah 2.500
275 fauchet socket PVC 0=3/4 buah 3.000
276 fauchet tee PVC 0=1 buah 7.000
277 fauchet tee PVC 0=1/2 buah 4.500
278 fauchet tee PVC 0=3/4 buah 5.000
279 fitting PVC fauchet socket (AW) 1 1/2 Batang 9.500
280 fitting PVC fauchet socket (AW) 1 1/4 Batang 7.400
281 fitting PVC fauchet socket (AW) 1 Batang 4.200
282 fitting PVC fauchet socket (AW) 1'X 1/2' Batang 3.700
283 fitting PVC fauchet socket (AW) 1 X 3/4 Batang 3.700
284 fitting PVC fauchet socket (AW) 1/2' Batang 2.600
285 fitting PVC fauchet socket (AW) 1/2' X 3/4 Batang 3.200
286 fitting PVC fauchet socket (AW) 2 Batang 11.600
287 fitting PVC fauchet socket (AW) 3/4' Batang 3.200
288 Fitting PVC-TEE (AW) 1 1/2 Batang 17.900
289 Fitting PVC-TEE (AW) 1 1/2 X 1 1/4 Batang 17.900
290 Fitting PVC-TEE (AW) 1 1/2 X 1 Batang 15.800
291 Fitting PVC-TEE (AW) 1 1/2 X 1/2 Batang 14.700
292 Fitting PVC-TEE (AW) 1 1/2 X 3/4 Batang 14.700
293 Fitting PVC-TEE (AW) 1 1/4 X 1 Batang 12.600

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)

No. JENIS BARANG SPESIFIKASI SATUAN HARGA

294 Fitting PVC-TEE (AW) 1 1/4 Batang 11.000


295 Fitting PVC-TEE (AW) Batang 11.600
296 Fitting PVC-TEE (AW) Batang 11.600
297 Fitting PVC-TEE (AW) Batang 6.300
298 Fitting PVC-TEE (AW) Batang 6.300
299 Fitting PVC-TEE (AW) Batang 6.300
300 Fitting PVC-TEE (AW) Batang 3.200
301 Fitting PVC-TEE (AW) Batang 16.300
302 Fitting PVC-TEE (AW) Batang 18.400
303 Fitting PVC-TEE (AW) Batang 24.200
304 Fitting PVC-TEE (AW) Batang 18.900
305 Fitting PVC-TEE (AW) Batang 23.600
306 Fitting PVC-TEE (AW) Batang 5.700
307 Fitting PVC-TEE (AW) Batang 17.900
308 Fitting PVC-TEE (AW) Batang 24.700
309 Fitting PVC-TEE (AW) Batang 22.100
310 Fitting PVC-TEE (AW) Batang 4.200
311 Fitting PVC-TEE (AW) Batang 4.200
312 Fitting PVC-TEE (AW) Batang 38.900
313 Fitting PVC-TEE (AW) Batang 119.700
314 Fitting PVC-TEE (AW) Batang 248.900
315 Pipa Fitting PVC-CAP (D) Batang 4.250
316 Pipa Fitting PVC-CAP (D) Batang 4.700
317 Pipa Fitting PVC-CAP (D) Batang 4.700
318 Pipa Fitting PVC-CAP (D) Batang 42.000
319 Pipa Fitting PVC-CAP (D) Batang 2.100
320 Pipa Fitting PVC-CAP (D) Batang 313.400
321 Pipa Fitting PVC-CAP (D) Batang 8.400
322 Pipa Fitting PVC-CAP (D) Batang 4.367
323 Pipa Fitting PVC-CAP (D) Batang 10.700
324 Pipa Fitting PVC-CAP (D) Batang 2.850
325 Pipa Fitting PVC-CAP (D) Batang 19.600
326 Pipa Fitting PVC-CAP (D) Batang 65.700
327 Pipa Fitting PVC-CAP (D) Batang 80.900
328 Pipa Fitting PVC-CAP (D) Batang 165.700
329 Pipa Fitting PVC-Elbow (D-DL)/ Keni Batang 8.900
330 Pipa Fitting PVC-Elbow (D-DL)/ Keni Batang 7.400
331 Pipa Fitting PVC-Elbow (D-DL)/ Keni Batang 293.000
332 Pipa Fitting PVC-Elbow (D-DL)/ Keni Batang 443.100
333 Pipa Fitting PVC-Elbow (D-DL)/ Keni Batang 17.300
334 Pipa Fitting PVC-Elbow (D-DL)/ Keni Batang 12.350
335 Pipa Fitting PVC-Increaser (Pralon SNI Batang 40.000
336 Class AW) PVC-Increaser (Pralon SNI
Pipa Fitting Batang 55.000
337 Class AW) PVC-Increaser (Pralon SNI
Pipa Fitting Batang 60.000
338 ClassFitting
Pipa AW) PVC-Increaser (Pralon SNI Batang 55.000
339 Class AW) PVC-Increaser (Pralon SNI
Pipa Fitting Batang 35.000
340 Class AW) PVC-Increaser (Pralon SNI
Pipa Fitting Batang 65.000
341 Class AW) PVC-Increaser (Pralon SNI
Pipa Fitting Batang 95.000
342 Class AW) PVC-Increaser (Pralon SNI
Pipa Fitting Batang 130.000
343 Class AW) PVC-Increaser (Pralon SNI
Pipa Fitting Batang 285.000
344 Class AW)Pralon Class D ( 4m/batang)
Pipa PVC Batang 18.250
345 Pipa PVC Pralon Class D ( 4m/batang) Batang 26.500
346 Pipa PVC Pralon Class D ( 4m/batang) Batang 38.750
347 Pipa PVC Pralon Class D ( 4m/batang) Batang 40.750

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)

No. JENIS BARANG SPESIFIKASI SATUAN HARGA

348 Pipa PVC Pralon Class D ( 4m/batang) Batang 45.500


349 Pipa PVC Pralon Class D ( 4m/batang) Batang 62.000
350 Pipa PVC Pralon Class D ( 4m/batang) Batang 77.000
351 Pipa PVC Pralon Class D ( 4m/batang) Batang 116.000
352 Pipa PVC Pralon Class D ( 4m/batang) Batang 203.000
353 Pipa PVC Pralon Class D ( 4m/batang) Batang 256.000
354 Sambungan L Ø 2 1/2" Buah 7.000
355 Sambungan L Ø 2 Buah 7.000
356 Sambungan L Ø 3" Buah 8.000
357 Sambungan L Ø 4" Buah 18.000
358 Sambungan Pipa Buah 4.000
359 Sambungan pipa Buah 4.000
360 Sambungan pipa Buah 2.000
361 Slang Air Pakai Benang 50/Roll 240.000
362 Slang Air Pakai Benang 50/Roll 339.450
363 Slang Air SH Transparan 50/Roll 111.000
364 Slang Air SH Transparan 50/Roll 186.000
365 Talang Batang 90.500
366 Talang Batang 48.500
367 Talang Batang 119.000
368 Talang Batang 103.500
I BAHAN ATAP
369 Rangka Baja Ringan Batang 85.250
370 Rangka Baja Ringan Batang 95.250
371 Rangka Baja Ringan Batang 108.500
372 Seng Plastik Laser Lite Kaki 18.000
373 Spandek Warna Biru Meter 37.500
374 Spandek Warna Biru Meter 42.500
375 Spandek Warna Biru Meter 47.500
J BAHAN LANGIT - LANGIT
376 Dinabolt Batang 3.000
377 Dinabolt Batang 4.000
378 Gipsum Board Lembar 72.500
379 Reng 32.45 HD Taso Batang 49.000
380 Reng 40.45 HD Taso Batang 61.000
381 Teakwood Lembar 95.000
382 Tripleks Lembar 196.000
383 Tripleks Lembar 235.000
384 Tripleks Lembar 50.000
385 Tripleks Lembar 64.500
386 Tripleks Lembar 87.000
387 Tripleks Lembar 112.250
K BAHAN SANITASI
388 Closed Duduk Standar (Warna) Buah 7000.000
389 Kloset Duduk Monoblok (lengkap) Buah 250000.000
390 Kloset Jongkok Buah 135.000
391 Krank Air AMICO 1/2 Buah 27.750
392 Kran Wasthafel Buah 95.000
393 Pelampung Otomatis Buah 155.000
L BAHAN FINISHING / CAT
394 Amplas / Kertas gosok Lembar 5.000
395 Cat Anti Bocor 4 Kg 199.500
396 Cat Atap 5 ltr 423.850
397 Cat Atap 4 KG 109.250

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)

No. JENIS BARANG SPESIFIKASI SATUAN HARGA

398 Cat Kayu Kg 61.000


399 Cat Kayu Btl 21.000
400 Cat Kayu Ltr 39.000
401 Cat Kayu ltr 65.000
402 Cat Kayu KG 43.000
403 Cat Kayu dan besi Kg 61.500
404 Cat Tembok 5 Kg 57.500
405 Dempul Kayu 5 Kg 113.000
406 Kuas Kg 39.000
407 Kuas Buah 5.000
408 Kuas Buah 7.250
409 Kuas Buah 23.500
410 Kuas Buah 19.000
411 Kuas Buah 165.000
412 Kuas Buah 255.700
413 Kuas Buah 23.500
414 Kuas Rol Imundex Buah 19.000
415 Mowilex (2,5 Itr) ltr 165.000
416 Mowilex (2,5 Itr) ltr 255.700
417 Plamur Kg 5.000
418 Politur Vernis Netral 1 ltr 53.500
419 Politur Vernis Warna 1 ltr 62.500
M KUNCI
420 Door Clozer Buah 175.000
422 Engsel Jendela Buah 35.000
423 Engsel Jendela Buah 45.000
424 Grendel Buah 25.000
425 Grendel Buah 10.000
426 Hak Angin ATC Buah 49.400
427 Kunci Lemari Buah 23.600
428 Kunci silinder Buah 66.700
429 Kunci Tanam Set 92.900
N BAHAN INSTALASI LISTRIK
430 Eterna NYA 1 x 1.5 Meter 225.000
431 Eterna NYA 1 x 2.5 Meter 332.000
432 Eterna NYA 2 x 1.5 Meter 327.000
433 Eterna NYA 2 x 2.5 Meter 468.000
434 Lampu Neon Type Neon Essetial Buah 35.000
435 Lampu Neon Type Neon Essetial Buah 36.500
436 Lampu Neon Type Neon Essetial Buah 44.000
437 Lampu Neon Type Neon Essetial Buah 31.500
438 Lampu Neon Type Neon Essetial Buah 27.000
439 Lampu Neon Type Tornado Buah 29.500
440 Lampu Neon Type Tornado Buah 41.000
441 Lampu Neon Type Tornado Buah 44.000
442 Lampu Neon Type Tornado Buah 46.500
O BAHAN PINTU
443 Bahan Pintu set 262.500
444 BAHAN PINTU set 441.000
445 Bahan Pintu set 241.500
446 Bahan Pintu set 288.800
P BAHAN JEMBATAN
447 Additive M67a Liter 38.500
448 Aditif Anti Pengelupasan Kg 30.000

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)

No. JENIS BARANG SPESIFIKASI SATUAN HARGA

449 Agg. Halu LP A M3 82.215


450 Agr . Base Kelas A M26 M3 302.224
451 Agr . Base Kelas B M27 M3 221.954
452 Agr . Base Kelas C M28 M3 156.030
453 Agregat lolos # 1" M3 116.614
454 Agregat Pecah Kasar M3 335.954
455 Anchorange M65 Buah 480.000
456 Angker Bout Besar Unit 766.500
457 Angker Bout Kecil Unit 665.500
458 Asbuton Halus M55 Ton 325.000
459 Asbuton Yang Di proses Kg 30.000
460 Bahan Modifikasi Kg 75.000
461 Bahan Modifikasi M67 Kg 1.000
462 Bahan Pengisi (Filter) Tambahan Kg 1.300
463 Bahan Pengisi (Quary) M09 M3 60.043
464 Baja Prategang M56 Kg 8.000
465 Baja Strucktur M48 Kg 11.000
466 Baja Tulangan ( Polos) U24 M39a Kg 13.400
467 Baja Tulangan ( Polos) U32 M57a Kg 13.400
468 Baja Tulangan ( Polos) U32 M39b Kg 14.300
469 Baja Tulangan ( Polos) U39 M39c Kg 14.300
470 Baja Tulangan ( Polos) U48 M39d Kg 17.160
471 Batu Bara Kg 5.000
472 Besi Beton Kg 13.400
473 Beton K-125 M47 M3 1.125.466
474 Beton K-175 M60 M3 1.280.727
475 Beton K-250 M37 M3 1.606.142
476 Beton K-300 M59 M3 2.016.502
477 Beton K-350 M72 M3 2.574.664
478 Beton K-400 M69 M3 2.631.158
479 Beton K-500 M68 M3 2.747.127
480 Bunker Oil M54 Liter 3.000
481 Casing M100 M2 9.000
482 Cat Marka (Themoplastic) Kg 20.000
483 Cerucuk M61 M 15.000
484 Chipping M41 M3 82.400
485 Chipping M41Kg Kg 4.250
486 CuringCoumpound M98 Liter ,210
487 Elastomer Alam Kg 38.500
488 Elastomer Hidup Buah 30.000
489 Elastomer Jenis 1 M74a Buah 750.000
490 Elastomer Jenis 2 M74b Buah 614.800
491 Elastomer Jenis 3 M74c Buah 614.800
492 Elastomer M62 Buah 614.800
493 Elastomer Mati Buah 400.000
494 Elastomer Sintesis Kg 30.000
495 Epoxy Bahan Penutup (Sealant) kg 34.100
496 Expansios Cap M96 M2 6.050
497 Expansion Joint Tipe Torma M80 M1 1.961.100
498 Filler M05 kG 1.100
499 Glass Beda M34 Kg 17.000
500 Gravel M07 M3 339.800
501 Jarum Keras (Besar) - Warfel (16 mm) Batang 58.800
502 Jarum Keras (Kecil) - Warfel (6 mm) Batang 4.400

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)

No. JENIS BARANG SPESIFIKASI SATUAN HARGA

503 Joint Sealent M94 Kg 34.100


504 Kaos Kawat 0 1" Buah 50.800
505 Kawat Las M51 Dos 16.000
506 Kayu acuan M99 M3 2.572.500
507 Kayu Perancah M19 M3 2.572.500
508 Kerb Jenis 1 Buah 45.000
509 Kerb Jenis 2 Buah 50.000
510 Kerb Jenis 3 Buah 55.000
511 Kuku Macan 1 " Buah 7.400
512 Kuku Macan Fe 1" Buah 20.500
513 Lolos Screen1 Ukuran (0 - 5) M3 83.215

514 Lolos Screen 2 Ukuran (0 - 5) M3 140.771


515 Lolos Screen 2 Ukuran (5 - 9,5) M3 116.614
516 Lolos Screen 2 Ukuran (9,5 - 19,0) M3 97.288
517 Minyak Fluks M53 M3 6.237
518 Multipleks 12 mm M73 Lembar 19.700
519 Paku Jembatan Kg 25.200
520 Pipa Baja M52 Kg 15.000
521 Pipa Galvanis M24 Batang 198.500
522 Pipa Galvanis M24b M 33.083
523 Pipa Galvanished 3" M24a m 110.516
524 Pipa Porus/E 2" m 65.300
525 Pipa Sandaran Diameter 3,00 in Batang 504.900
526 Medium
Polimer B Kg 45.000
527 Polytene 125 mikron M97 Kg 19.250
528 Roller Besar Buah 56.900
529 Roller Keci Buah 46.700
530 Roller Sedang buah 63.400
531 Slang 0 1" Meter 105.200
532 Tali Baja (Sling) - 16 mm m 53.200
533 Tali Baja (Sling) - 22 mm m 68.800
534 Tali Baja (Sling) - 25 mm m 143.200
535 Tali Baja (Sling) - 6 mm m 15.300
536 Tiang Pancang Baja M49 Kg 45.400
537 Tiang Pancang Beton Pratekan M50 Kg 423.957
Q BAHAN KACA
538 Kaca Lembar 133.900

539 Kaca Lembar 175.900


540 Kaca Lembar 36.800
541 Kaca Lembar 33.100
542 Kaca Lembar 126.800
543 Kaca Lembar 159.900
544 Kaca Lembar 350.400
545 Kaca Lembar 529.000
546 Kaca Lembar 246.010
547 Kaca Lembar 519.270
548 Kaca Lembar 73.100
549 Kaca Lembar 147.000
550 Kaca Lembar 181.100
551 Kaca Lembar 213.500
R BAHAN LAIN
552 Lem Kayu (0,7) Kg 47.000

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)

No. JENIS BARANG SPESIFIKASI SATUAN HARGA

553 Lem Kayu (1/2) kg 30.000


554 Lem Seng Meter 10.000
555 Les Aluminium 1,5 Batang 25.000
556 Tali Nilon Roll 5.000

26 95.600
27 Stop Kran PVC Ø 2,5" Buah 262.000
28 Stop Kran PVC Ø 3" - Buah 341.300
29 Tempat Sabun Kramik - Buah 48.300
30 Urinoir TOTO Buah 1.575.000
31 Wasthafel Buah 1.731.500

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)

No. JENIS BARANG SPESIFIKASI SATUAN HARGA

32 Wasthafel + Cermin + Siphon Set 449.400


33 Wasthafel cuci piring logam (1 Buah 246.800
lubang)
L. BAHAN FINISHING / CAT
1 Amplas / Kertas gosok - Lembar 4.450
2 Cat Anti Bocor 4 Kg 194.633
3 Cat Atap Nippon Paint 5 Ltr 423.850
4 Cat Atap YOKO 4 Kg 102.400
5 Cat Besi - Kg 58.800
6 Cat Dasar - Kg 32.600
7 Cat Kayu Avian Kg 59.467
8 Cat Kayu Glotex Kg 66.200
9 Cat Kayu I.C.I Kg 33.400
10 Cat Kayu Meni Btl 19.400
11 Cat Kayu Minyak Cat Ltr 32.167
12 Cat Kayu Politur Ltr 63.750
13 Cat Kayu Yoko Kg 44.600
14 Cat Kayu dan besi - Mowilex Kg 105.000
15 Cat Kayu dan besi Avian Kg 59.467
16 Cat Kayu dan besi Brillo Kg 78.800
17 Cat Penutup - Kg 57.800
18 Cat Tembok Aries 5 Kg 51.833
19 Cat Tembok Avitex 5 Kg 110.467
20 Cat Tembok Catilylac 5 Kg 110.300
21 Cat Tembok Catilylac 25 Kg 630.000
22 Cat Tembok Dulux Pentalite 2,5 Ltr 190.100
23 Cat Tembok Standard Colour
Dulux Weather 2,5 Ltr 267.800
24 Cat Tembok Shield
Metrolite 5 Kg 97.700
25 Cat Tembok Mowilex (2,5 Itr) Ltr 152.300
26 Cat Tembok Dalam
Mowilex (2,5 Itr) Ltr 245.200
27 Cat Tembok Luar
Vinilex Nippon paint 5 Kg 126.000
28 Cat Tembok Exterior - Mowilex 2,5 Ltr 275.100
29 Cat Tembok Exterior - Mowilex 20 Ltr 2.028.600
30 Cat Tembok Exterior Catilylac 5 Kg 178.500
31 Cat Tembok Exterior Catilylac 25 Kg 945.000
32 Cat Tembok Exterior Dulux 20 Ltr 1.995.000
33 Cat Tembok Exterior Dulux 2,5 Ltr 267.800
34 Cat Tembok Exterior Metrolite 3 Ltr 97.700
35 Cat Tembok Exterior Metrolite 16 Ltr 472.500
36 Cat Tembok Interior - Mowilex 2,5 Ltr 152.300
37 Cat Tembok Interior - Mowilex 20 Ltr 1.207.500
38 Cat Tembok Interior - Mowilex 1 Ltr 104.000
39 Cat Tembok Interior Metrolite 3 Ltr 97.700
40 Cat Tembok Interior Metrolite 16 Ltr 472.500
41 Dempul Kayu - Kg 35.700
42 Dempul Kayu Cap Kucing Kg 33.100
43 Kuas - 1" Buah 4.867
44 Kuas - 1,5" Buah 7.133
45 Kuas - 2" Buah 8.567
46 Kuas - 2,5" Buah 11.000
47 Kuas - 3" Buah 12.600
48 Kuas 4" Buah 17.467
49 Kuas 5" Buah 23.350
50 Kuas Rol - Buah 24.867
51 Kuas Rol Imundex - Buah 28.900

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)

No. JENIS BARANG SPESIFIKASI SATUAN HARGA

52 Minyak Cat (Tinner Biasa) - Ltr 20.250


53 Minyak Cat (Tinner Super) - Ltr 36.450
54 Mowilex (2,5 Itr) - Mowilex 2,5 Itr Ltr 141.800
55 Mowilex (2,5 Itr) dalam
- Mowilex 2,5 Itr luar Ltr 216.300
56 Nodrop Roof Sealir 4 Kg 195.300
57 Plamur - 5 Kg 46.200
58 Plamuur - Kg 2.950
59 Politur Vernis Netral - 1 Ltr 54.600
60 Politur Vernis Warna - 1 Ltr 63.750
M. KUNCI
1 Door Clozer - Buah 226.800
2 Engsel Jendela - Buah 22.100
3 Engsel Jendela Uk. 80 x 5 mm Buah 23.100
4 Engsel Kupu-Kupu 4 x 3 - Pasang 32.600
5 Engsel Nilon Ring Pintu Uk. 3 x 2,5 mm Pasang 32.600
6 Engsel Pintu - Buah 31.500
7 Expanyclet - Set 264.500
8 Grendel Besar Buah 36.800
9 Grendel Kecil Buah 10.500
10 Grendel Sedang Buah 15.800
11 Hak Angin ATC Besar Buah 21.000
12 Hak Angin ATC Kecil Buah 15.800
13 Kunci Lemari - Buah 21.000
14 Kunci silinder - Buah 36.800
15 Kunci tanam Royal 1 Slaag Set 23.600
16 Kunci tanam Royal 2 Slaag Set 89.300
17 Kunci tanam Union 1 x slag Buah 78.600
18 Kunci tanam Belucci
Union 12xxslag
slag Buah 204.800
19 Kunci tanam Bertolli 2 x slag
Union 1 x slag Buah 56.200
20 Kunci tanam 808 (Sejenis) Niccole
- 2 x slag Buah 12.600
21 Tarikan Lemari Besar - Buah 15.800
22 Tarikan Lemari Kecil - Buah 3.200
23 Tarikan Lemari Sedang - Buah 3.200
N. BAHAN INSTALASI LISTRIK
1 Boks Sekring - Buah 42.250
2 Boks Sekring Kas Kosong DN 1 G Buah 3.700
3 Boks Sekring Kas Kosong DN 2 G Buah 5.300
4 Boks Sekring Kas Kosong DN 3 G Buah 15.800
5 Broco – 1 Way – Engkel - Buah 15.800
6 Broco – 2 Way – Seri - Buah 20.000
7 Broco-1 Way-Engkel - Buah 13.150
8 Broco-2 Way-Seri - Buah 16.900
9 Down light / PLC 13 W - Buah 66.200
10 Eterna NYA 1x1.5 100 m Meter 156.500
11 Eterna NYA 1x10 100 m Meter 16.900
12 Eterna NYA 1x2.5 100 m Meter 327.600
13 Eterna NYA 1x4 100 m Meter 6.400
14 Eterna NYA 1x6 100 m Meter 13.400
15 Eterna NYM 2x1.5 50 m Meter 167.750
16 Eterna NYM 2x2.5 50 m Meter 468.300
17 Eterna NYM 3x1.5 50 m Meter 10.500
18 Eterna NYM 3x2.5 50 m Meter 12.600
19 Eterna NYM 3x4 50 m Meter 472.500
20 Eterna NYM 4x2.5 50 m Meter 17.363

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)

No. JENIS BARANG SPESIFIKASI SATUAN HARGA

21 Eterna NYM 4x4 50 m Meter 22.995


22 Eterna NYY 2x1.5 50 m Meter 10.015
23 Eterna NYY 2x2.5 50 m Meter 14.363
24 Eterna NYY 3x1.5 50 m Meter 12.753
25 Eterna NYY 3x4 50 m Meter 26.070
26 Eterna NYY 3x6 50 m Meter 29.610
27 Eterna NYY 4x2.5 50 m Meter 17.600
28 Eterna NYY 4x4 50 m Meter 27.150
29 Eterna NYY 4x6 50 m Meter 37.235
30 Fitting Ganda - Buah 16.900
31 Fitting Hias Broco - Buah 14.033
32 Isolator - Buah 32.000
33 Kabel Listrik Type NYY - 2 x 1 1/2 mm Rol/100m 805.400
34 Kabel Listrik Type NYY Eterna
- 2 x 2 1/2 mm Rol/100m 1.053.867
35 Kabel Listrik Type NYY Eterna
- 2 x 4 mm Rol/100m 1.809.200
36 Kabel Listrik Type NYY - 3 x 2 1/2 mm Rol 1.455.800
37 Kabel Telepon 4 x 0,5 mm - Meter 2.200
38 Kabel Tunggal Ny 1,5 (Eternal) - Rol/100m 218.400
39 Kabel Tunggal Ny 1,5 (Mastelindo) - Rol 277.700
40 Lampu Osram TL-D 18 W Buah 16.900
41 Lampu Osram TL-D 36 W Buah 28.100
42 Lampu Pijar - 10 Watt Buah 6.800
43 Lampu Pijar - 100 Watt Buah 8.900
44 Lampu Pijar - 15 Watt Buah 6.300
45 Lampu Pijar - 25 Watt Buah 6.800
46 Lampu Pijar - 40 Watt Buah 6.800
47 Lampu Pijar - 60 Watt Buah 6.800
48 Lampu Pijar (Philips) - 20 Watt Buah 6.800
49 Lampu Pijar (Philips) - 5 Watt Buah 6.300
50 Lampu PL ( Philips ) Type Essential - 14 Watt Buah 36.200
51 Lampu PL ( Philips ) Type Essential - 18 W Buah 38.300
52 Lampu PL ( Philips ) Type Essential - 23 W Buah 38.900
53 Lampu PL ( Philips ) Type Essential -5W Buah 26.300
54 Lampu PL ( Philips ) Type Essential -8W Buah 30.500
55 Lampu Spiral Type Tornado Philips 12 W Buah 43.600
56 Lampu Spiral Type Tornado Philips 15 W Buah 48.300
57 Lampu Spiral Type Tornado Philips 20 W Buah 45.950
58 Lampu Spiral Type Tornado Philips 24 W Buah 54.600
59 Lampu Spiral Type Tornado Philips 5 W Buah 36.800
60 Lampu Spiral Type Tornado Philips 8 W Buah 38.550
61 Lampu Sumpit ( Philips ) Essential - 14 Watt Buah 44.100
62 Lampu Sumpit ( Philips ) Essential - 23 Watt Buah 38.900
63 Lampu Sumpit ( Philips ) Essential - 5 Watt (JNE) Buah 20.000
64 Lampu Sumpit ( Philips ) Essential - 8 Watt Buah 24.200
65 Lampu Sumpit ( Philips ) Tornado - 15 Watt (Cristal) Buah 52.500
66 Lampu Sumpit ( Philips ) Tornado - 20 Watt (Cristal) Buah 43.100
67 Lampu Taman Mercuri - 1 Set 673.400
68 Lampu TL ( Biasa ) 20 Watt Buah 17.900
69 Lampu TL ( Biasa ) 40 Watt Buah 16.800
70 Lampu TL ( Philips ) - 23 Watt Buah 47.100
71 Lampu TL ( Philips ) - 5 Watt (JNE) Buah 29.200
72 Lampu TL ( Philips ) - 8 Watt Buah 31.500
73 Lampu TL ( Philips ) - Ix 20 W Buah 57.600
74 Lampu TL ( Philips ) 1 x 18 W Set 198.500

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)

No. JENIS BARANG SPESIFIKASI SATUAN HARGA

75 Lampu TL ( Philips ) 1 x 36 W Set 264.500


76 Lampu TL ( Philips ) 2 x 20 W - 18 W Set 264.500
77 Lampu TL ( Philips ) 2 x 40 W Set 330.600
78 Lampu Type Softtone Philips 25 W Buah 12.567
79 Lampu Type Softtone Philips 40 W Buah 16.633
80 Lampu Type Softtone Philips 60 W Buah 12.900
81 Lampu Type Superlux Philips 25 W Buah 9.600
82 Lampu Type Superlux Philips 40 W Buah 10.700
83 Lampu Type Superlux Philips 60 W Buah 11.200
84 MCB - Buah 45.700
85 NCB - Buah 46.600
86 Outlet Telepon - Buah 66.200
87 Outlet TV - Buah 42.100
88 Paralon 5/8 - Buah 8.900
89 Philips LED 3W Putih 3 Watt Buah 34.700
90 Philips LED 7W Putih-Cool Buah 57.800
91 Philips Daylight
Vision LED7 Watt
4 Watt Buah 34.700
92 Pipa Conduit 1/2" - Batang 28.400
93 Pipa Union Untuk Kabel - 5/8 Inc - 4 m Batang 9.000
94 Saklar Phase Double Hitam OB Buah 19.200
95 Saklar Phase Broco
Double Putih CH Buah 19.200
96 Saklar Phase Tunggal Hitam OB Buah 8.000
97 Saklar Phase Broco
Tunggal Putih IB Buah 12.650
98 Saklar Triple Broco
- Buah 68.300
99 Stop Kontak Hitam Buah 14.100
100 Stop Kontak Putih IB Broco Buah 17.900
101 Stop Kontak Steker Broco Buah 15.800
102 Stop Kontak Dinding CP Panasonic WBJ1214- Buah 70.800
103 Stop Kontak Dinding CP 3K
Panasonic WEJP- Buah 68.300
O. BAHAN PINTU 11217
1 BAHAN PINTU Pintu Aluminium Set 262.500
2 BAHAN PINTU Biasa
Pintu Aluminium Set 262.500
3 BAHAN PINTU Standar
Pintu PVC Warna Set 241.500
4 BAHAN PINTU Muda
Pintu PVC Warna Set 288.800
P. BAHAN JEMBATAN Tua (Urat Kayu)
1 Angker Bout Besar - Unit 730.000
2 Angker Bout Kecil - Unit 634.800
3 Jarum Keras (Besar) - Warfel (16mm) - Batang 23.100
4 Jarum Keras (Kecil) - Warfel (6mm) - Batang
5 Kaos Kawat 0 1" - Buah 48.400
6 Kuku Macan 1 " - Buah 7.400
7 Kuku Macan fe 1" - Buah 19.500
8 Paku Jembatan - Kg 25.200
9 Pipa Galvanished 3" - m 30.500
10 Pipa Porus/E 2" - m 62.200
11 Pipa Sandaran Diameter 3,00 in - Batang 480.900
12 Medium B
Roller Besar - Buah 54.200
13 Roller Kecil - Buah 44.500
14 Roller Sedang - Buah 60.400
15 Slang 0 1" - Meter 100.200
16 Tali Baja (sling) - 16 mm - m 53.200
17 Tali Baja (sling) - 22 mm - m 68.800
18 Tali Baja (sling) - 25 mm - m 143.200
19 Tali Baja (sling) - 6 mm - m 15.300

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)

No. JENIS BARANG SPESIFIKASI SATUAN HARGA

20 Tiang Pancang Baja - Kg 43.200


Q. BAHAN JALAN
1 Aspal - Kg 13.200
2 Bensin (Industri) - Ltr 11.000
3 Minyak Pelumas - Ltr 36.000
4 Minyak Solar (Industri) - Ltr 11.800
5 Minyak Tanah (Industri) - Ltr 11.900
R. BAHAN LAIN
1 Elastomer (Bearing Pad) 250 x 250 x - Buah 585.500
2 30
Elastomer (Bearing Pad) 300 x 250 x - Buah 988.600
3 30
Expantion Join Type Torma - m 1.824.900
4 Lem Kayu (0,7) - Klg 47.300
5 Lem Kayu (1/2) - Klg 31.500
6 Lem Seng - Meter 8.400
7 Les Aluminium 1,5 - Batang 21.000
8 Tali Nilon - Rol 4.200
UPAH KERJA
A. PEKERJA
1 Pekerja - Org/Hari 90.000
B. TUKANG
2 Tukang Batu - Org/Hari 110.000
3 Tukang Besi - Org/Hari 110.000
4 Tukang Cat - Org/Hari 110.000
5 Tukang Kayu - Org/Hari 110.000
6 Tukang Listrik - Org/Hari 110.000
7 Tukang Pipa - Org/Hari 110.000
C. KEPALA TUKANG
8 Kepala Tukang Batu - Org/Hari 120.000
9 Kepala Tukang Besi - Org/Hari 120.000
10 Kepala Tukang Cat - Org/Hari 120.000
11 Kepala Tukang Kayu - Org/Hari 120.000
12 Kepala Tukang Listrik - Org/Hari 120.000
13 Kepala Tukang Pipa - Org/Hari 120.000
D. MANDOR LAPANGAN
14 Mandor Lapangan - Org/Hari 110.000
E. OPERATOR
15 Operator Kurang terlatih - Org/Hari 90.000
16 Operator Terlatih - Org/Hari 120.000
17 Pembantu Operator - Org/Hari 110.000
F. SOPIR
18 Sopir Pembantu - Org/Hari 110.000
19 Sopir Telatih - Org/Hari 120.000
G. MEKANIK
20 Mekanik - Org/Hari 120.000
21 Mekanik Pembantu - Org/Hari 110.000

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
STANDAR HARGA SATUAN BAHAN BANGUNAN DAN UPAH KERJA
PEMERINTAH PROVINSI SULAWESI SELATAN
KABUPATEN LUWU TIMUR
TAHUN 2018

(Dalam Rupiah (Rp)

NO JENIS BAHAN SPESIFIKASI SATUAN HARGA

1 2 3 4 5
I BATA, BATU DAN PASIR
1 Batu Merah uk.5 x 11 x 22 cm Bh 700
2 Bata Beton Ringan ex Celcom Uk.9 x 19 x 39 cm Bh Rp 10,000
3 Batu Kali M³ 250,000
4 Batu Split Pecah Mesin 1/2 M³ 375,000
5 Batu Split Pecah Mesin 3/5 M³ 335,000
6 Batu Kerikil M³ 375,000
7 Pasir Beton M³ 190,000
8 Pasir Pasang M³ 150,000
9 Pasir urug M³ 140,000
10 Tanah Urug M³ 140,000

II BAHAN PEREKAT
1 Semen ( 50 Kg ) Semen Indonesia Zak 70,000
2 Semen Warna Semen Indonesia Kg 9,000

III BAHAN BAJA


1 Besi Beton U-24 KS Kg 13,000
2 Besi Beton U-39 KS Kg 14,000
3 Besi Plat Rata Rata KS Kg 13,000
4 Besi Tempa m² 275,000
5 Rangka Atap Baja Ringan Smart truss;Prima truss Zak 285,000
6 Kawat Beton Kawat Beton Zak 25,000

IV. BAHAN KAYU


1 Kayu Klas 1 Jati M³ 9,250,000
2 Kayu Klas II Kamper M³ 4,750,000
3 Kayu Klas III Meranti M³ 3,150,000
4 Kayu Klas IV Terentang M³ 2,100,000
5 Dolken DIA 8 s/d 10 cm p.4 m M³ 17,500

V. Bahan Aluminium
1 Kusen Aluminium m' 85,000
2 Rangka Jendela Aluminium m' 115,000
3 Rangka Pintu Aluminium m' 196,000
4 Kusen & Pintu PVC Toilet Unit 275,000
5 Engsel Bh 35,000
6 Handle Pintu Bh 375,000
7 Selinder Bh 160,000
8 Door Stoper Bh 45,000
9 Door Closer Bh 199,000
10 Slot Tanam Bh 70,000
11 Kait Angin Bh 16,500
12 Grendel Bh 659,375
13 Bahan Jalan Bh 30,000

VI BAHAN PELAPIS

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
(Dalam Rupiah (Rp)

NO JENIS BAHAN SPESIFIKASI SATUAN HARGA

1 2 3 4 5
Triplek t.3 mm Uk.120 x 40 cm 65,000
Triplek t.4 mm Uk.120 x 40 cm m 75,000
Triplek t.9 mm Uk.120 x 40 cm m 195,000

VII BAHAN LANTAI DAN DINDING KERAMIK


1 Keramik 30/30 ex Masterina m² 82,700
2 Granite Tile 40/40 ex Granito tile m² 308,700
3 Plint Keramik ex Roman bh 7,600
4 Plint Granitetetile 10/40 cm ex Granito bh 22,800

VIII BAHAN PENUTUP ATAP


1 Genteng Keramik 25 bh/m² ex Jatiwangi bh 6,100
2 Genteng Keramik Glazur 15 bh/m² KANMURI bh 12,100
3 Nok Genteng Keramik 4 bh/m ex Jatiwangi bh 14,600
4 Nok Genteng Keramik Glasur 4 bh/m ex KANMURI bh 19,100
5 Seng Plat BJLS 30 L.90 cm m' 56,900

IX BAHAN KACA
1 Kaca Polos 3 mm m² 132,300
2 Kaca Polos 5 mm m² 185,400
3 Kaca Polos 8 mm m² 228,500

X BAHAN PAKU DAN MUR BAUT


1 Paku 1 s/d 3 cm kg 25,000
2 Paku 5 s/d 10 cm kg 25,000
3 Paku 8 sd 12 cm kg 25,000
4 Paku Skrup buah 1,050

XI BAHAN FINISHING
1 Cat Kayu/Besi ex.SEIV Kg 57,600
2 Plamir Kayu Kg 34,200
3 Meni Kayu ex.Nippon Kg 44,600.0
4 Wood Filler Impra Kg 48,000
5 Thinner ND IMPALA Ltr 32,100
6 Amplas Kayu Lbr 7,100
7 Kuas Cat Bh 17,600

8 Cat Tembok kw1 ex.Dulux ; Warna Standard Kg 60,700

ex.Vinilex ; Warna
9 Cat Tembok kw2 Kg 36,400
Standard
10 Plamir Tembok Kg 34,200
11 Lem Kayu Kg 35,000
12 Seal Tape Bh 13,500
13 Minyak Bekisting Ltr 14,100

XXI BAHAN SANITARI


1 Washtafel LW 240 CJ ex Toto,Komplit Kran & ACC 696,200
2 Kloset Duduk CW600J/SW660 J Komplit ACC 2,311,400
3 Kloset Jongkok Type CE6 ex.Toto Unit 385,900
4 Urinoir Type U 57 M ex.Toto Unit 1,771,800
5 Bak Air fibreglass uk.55 x 55 x 60 cm M³ 575,700
6 Shower Pray type THX 20 NBPIV ex.Toto M³ 256,000
7 Shower Set type TX 423 SZ ex.Toto M³ 680,700
8 Floor Drain TX 1B ex.Toto M³ 46,400

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
(Dalam Rupiah (Rp)

NO JENIS BAHAN SPESIFIKASI SATUAN HARGA

1 2 3 4 5
9 Tempat Sabun S 11 N EX.Toto 42,300
10 Kran zink T 30 AR13NV7N ex.Toto M³ 55,000
11 Kitchenzink Hwaco 1L M³ 355,000
12 Kran Dinding type T23 B13V7N ex. Toto 35,000

XIII BAHAN PARTISI DINDING


1 Gypsumboard t.9 mm ex.Jayaboard;uk120x240 cm lbr 90,000
2 List Profil 5 cm Gypsum m 22,100
3 Rangka Metal Furing termasuk paku ripet& acc m² 55,000

XIV BAHAN SALURAN AIR


1 PIPA PVC dia 1/2" ex.Wavin; P.4m m' 18,000
2 PIPA PVC dia 3/4" ex.Wavin; P.4m m' 23,000
3 PIPA PVC dia 1" ex.Wavin; P.4m m' 30,000
4 PIPA PVC dia 2" ex.Wavin; P.4m m' 55,000
5 PIPA PVC dia 3" ex.Wavin; P.4m m' 99,500
6 PIPA PVC dia 4" ex.Wavin; P.4m m' 170,000
7 Stop Kran dia 1" ex.Onda bh 39,900
8 Klep Diameter3/4" ex.Onda bh 29,500
9 Tangki Air 1000 Liter EXEL bh 1,465,000
10 Tangki Air 100 Liter EXEL bh 950,000
11 Pelampung Otomats bh 55,000
12 Roof Drain Metal bh 38,000
13 Mesin Jet Pump Kap.250 Watt Groundfos Unit 1,075,000
14 Mesin Pompa Tekan Kap.150 watt Groundfos Unit 575,000

XV PERALATAN ELEKTRIKAL
1 Box Panel PVC isi 4 MCB Legran Buah
2 MCB 6 A Legran Buah
3 MCB 4 A Legran Buah
4 Kabel NYM 2 X 2,5 mm2 m'
5 Kabel NYM 3 X 2,5 mm2 m'
6 Kabel telephone 4 x 0,5 mm m'
7 Isolasi Buah
8 Saklar Tunggal Broco Buah
9 Saklar Ganda Broco Buah
10 Stop Kontak Broco Buah
11 Outlet TV Broco Buah
12 Outlet Telephone Broco Buah
13 Down Light/ PLC 13 W Buah
14 Fitting Plafond + Lampu SL Panasonic Buah
15 Lampu TL 2 x 18 watt grile Panasonic Buah
16 Lampu TL 2 x 36 watt grile Panasonic Buah

XVI UPAH PEKERJA


1 Tukang Besi Konstruksi Org/Hari 120,000
2 Tukang Besi Tulangan Org/Hari 120,000
3 Kepala Tukang Besi Org/Hari 130,000
(Plafond,Kuda/
4 Tukang Kayu Kasar Org/Hari 120,000
Gording,R.Atap)
5 Tukang Kayu Halus Kusen Org/Hari 120,000
6 Kepala Tukang Kayu Org/Hari 130,000
7 Tukang Batu Kasar Tukang Batu Kasar Org/Hari 120,000

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
(Dalam Rupiah (Rp)

NO JENIS BAHAN SPESIFIKASI SATUAN HARGA

1 2 3 4 5
Tukang Batu
8 Tukang Batu Halus Halus( Bata,Plester,Acian Org/Hari 120,000
list2)
9 Kepala Tukang Batu Org/Hari 130,000
10 Tukang Cat Biasa Org/Hari 120,000
11 Kepala Tukang Cat Org/Hari 130,000
12 Tukang Listrik Org/Hari 120,000
13 Kepala Tukang Listrik Org/Hari 130,000
14 Pekerja Org/Hari 107,323
15 Mandor Org/Hari 130,000

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
STANDAR HARGA SATUAN BAHAN BANGUNAN DAN UPAH KERJA
PEMERINTAH PROVINSI SULAWESI SELATAN
KABUPATEN LUWU TIMUR
TRIWULAN I TAHUN 2019

(Dalam Rupiah (Rp)

NO JENIS BAHAN SPESIFIKASI SATUAN HARGA

1 2 3 4 5
I BATA, BATU DAN PASIR
1 Batu Merah uk.5 x 11 x 22 cm Bh 700
2 Bata Beton Ringan ex Celcom Uk.9 x 19 x 39 cm Bh 12,000
3 Batu Kali M³ 295,000
4 Batu Split Pecah Mesin 1/2 M³ 405,000
5 Batu Split Pecah Mesin 3/5 M³ 405,000
6 Batu Kerikil M³ 345,000
7 Pasir Beton M³ 225,000
8 Pasir Pasang M³ 215,000
9 Pasir urug M³ 175,000
10 Tanah Urug M³ 125,000

II BAHAN PEREKAT
1 Semen ( 50 Kg ) Semen Indonesia Zak 75,000
2 Semen Warna Semen Indonesia Kg 11,000

III BAHAN BAJA


1 Besi Beton U-24 KS Kg 13,000
2 Besi Beton U-39 KS Kg 14,000
3 Besi Plat Rata Rata KS Kg 13,000
4 Besi Tempa m² 275,000
5 Rangka Atap Baja Ringan Smart truss;Prima truss Zak 285,000
6 Kawat Beton Kawat Beton Zak 25,000

IV. BAHAN KAYU


1 Kayu Klas 1 Jati M³ 9,250,000
2 Kayu Klas II Kamper M³ 4,750,000
3 Kayu Klas III Meranti M³ 3,150,000
4 Kayu Klas IV Terentang M³ 2,100,000
5 Dolken DIA 8 s/d 10 cm p.4 m M³ 17,500

V. Bahan Aluminium
1 Kusen Aluminium M' 250,000
2 Rangka Jendela Aluminium M' 250,000
3 Rangka Pintu Aluminium M' 250,000
4 Kusen & Pintu PVC Toilet Unit 295,000
5 Engsel Bh 45,000
6 Handle Pintu Bh 375,000
7 Selinder Bh 160,000
8 Door Stoper Bh 85,000
9 Door Closer Bh 285,000
10 Slot Tanam Bh 70,000
11 Kait Angin Bh 25,000
12 Grendel Bh 30,000
13 Bahan Jalan Bh 30,000

VI BAHAN PELAPIS

Harga Satuan Bahan Bangunan dan Upah Kerja Semester I 2020


(Dalam Rupiah (Rp)

NO JENIS BAHAN SPESIFIKASI SATUAN HARGA

1 2 3 4 5
1 Triplek t.3 mm Uk.120 x 40 cm M 65,000
2 Triplek t.4 mm Uk.120 x 40 cm M 75,000
3 Triplek t.9 mm Uk.120 x 40 cm M 195,000

VII BAHAN LANTAI DAN DINDING KERAMIK


1 Keramik 30/30 ex Masterina M² 82,700
2 Granite Tile 40/40 ex Granito tile M² 308,700
3 Plint Keramik ex Roman bh 7,600
4 Plint Granitetetile 10/40 cm ex Granito bh 22,800

VIII BAHAN PENUTUP ATAP


1 Genteng Keramik 25 bh/m² ex Jatiwangi bh 6,100
2 Genteng Keramik Glazur 15 bh/m² KANMURI bh 12,100
3 Nok Genteng Keramik 4 bh/m ex Jatiwangi bh 14,600
4 Nok Genteng Keramik Glasur 4 bh/m ex KANMURI bh 19,100
5 Seng Plat BJLS 30 L.90 cm m' 56,900

IX BAHAN KACA
1 Kaca Polos 3 mm M² 132,300
2 Kaca Polos 5 mm M² 185,400
3 Kaca Polos 8 mm M² 228,500

X BAHAN PAKU DAN MUR BAUT


1 Paku 1 s/d 3 cm kg 25,000
2 Paku 5 s/d 10 cm kg 25,000
3 Paku 8 sd 12 cm kg 25,000
4 Paku Skrup buah 1,050

XI BAHAN FINISHING
1 Cat Kayu/Besi ex.SEIV Kg 68,000
2 Plamir Kayu Kg 38,000
3 Meni Kayu ex.Nippon Kg 44,600
4 Wood Filler Impra Kg 48,000
5 Thinner ND IMPALA Ltr 45,000
6 Amplas Kayu Lbr 7,100
7 Kuas Cat Bh 25,000

8 Cat Tembok kw1 ex.Dulux ; Warna Standard Kg 60,700

ex.Vinilex ; Warna
9 Cat Tembok kw2 Kg 36,400
Standard
10 Plamir Tembok Kg 38,000
11 Lem Kayu Kg 35,000
12 Seal Tape Bh 20,000
13 Minyak Bekisting Ltr 14,100

XXI BAHAN SANITARI


1 Washtafel LW 240 CJ ex Toto,Komplit Kran & ACC 696,200
2 Kloset Duduk CW600J/SW660 J Komplit ACC 2,800,000
3 Kloset Jongkok Type CE6 ex.Toto Unit 550,000
4 Urinoir Type U 57 M ex.Toto Unit 1,771,800
5 Bak Air fibreglass uk.55 x 55 x 60 cm M³ 700,000
6 Shower Pray type THX 20 NBPIV ex.Toto M³ 256,000
7 Shower Set type TX 423 SZ ex.Toto M³ 680,700
8 Floor Drain TX 1B ex.Toto M³ 46,400

Harga Satuan Bahan Bangunan dan Upah Kerja Semester I 2020


(Dalam Rupiah (Rp)

NO JENIS BAHAN SPESIFIKASI SATUAN HARGA

1 2 3 4 5
9 Tempat Sabun S 11 N EX.Toto 45,000
10 Kran zink T 30 AR13NV7N ex.Toto M³ 180,000
11 Kitchenzink Hwaco 1L M³ 355,000
12 Kran Dinding type T23 B13V7N ex. Toto 35,000

XIII BAHAN PARTISI DINDING


1 Gypsumboard t.9 mm ex.Jayaboard;uk120x240 cm lbr 90,000
2 List Profil 5 cm Gypsum m 25,000
3 Rangka Metal Furing termasuk paku ripet& acc m² 55,000

XIV BAHAN SALURAN AIR


1 PIPA PVC dia 1/2" ex.Wavin; P.4m m' 18,000
2 PIPA PVC dia 3/4" ex.Wavin; P.4m m' 23,000
3 PIPA PVC dia 1" ex.Wavin; P.4m m' 30,000
4 PIPA PVC dia 2" ex.Wavin; P.4m m' 55,000
5 PIPA PVC dia 3" ex.Wavin; P.4m m' 99,500
6 PIPA PVC dia 4" ex.Wavin; P.4m m' 170,000
7 Stop Kran dia 1" ex.Onda bh 40,000
8 Klep Diameter3/4" ex.Onda bh 40,000
9 Tangki Air 1000 Liter EXEL bh 1,580,000
10 Tangki Air 100 Liter EXEL bh 950,000
11 Pelampung Otomats bh 120,000
12 Roof Drain Metal bh 38,000
13 Mesin Jet Pump Kap.250 Watt Groundfos Unit 1,075,000
14 Mesin Pompa Tekan Kap.150 watt Groundfos Unit 580,000

XV PERALATAN ELEKTRIKAL
1 Box Panel PVC isi 4 MCB Legran Buah 387,900
2 MCB 6 A Legran Buah 75,000
3 MCB 4 A Legran Buah 75,000
4 Kabel NYM 2 X 2,5 mm2 m' 18,000
5 Kabel NYM 3 X 2,5 mm2 m' 23,000
6 Kabel telephone 4 x 0,5 mm m' 15,000
7 Isolasi Buah 15,000
8 Saklar Tunggal Broco Buah 45,000
9 Saklar Ganda Broco Buah 60,000
10 Stop Kontak Broco Buah 45,000
11 Outlet TV Broco Buah 70,000
12 Outlet Telephone Broco Buah 55,000
13 Down Light/ PLC 13 W Buah 180,000
14 Fitting Plafond + Lampu SL Panasonic Buah 71,700
15 Lampu TL 2 x 18 watt grile Panasonic Buah 123,000
16 Lampu TL 2 x 36 watt grile Panasonic Buah 373,800

XVI UPAH PEKERJA


1 Tukang Besi Konstruksi Org/Hari 130,000
2 Tukang Besi Tulangan Org/Hari 130,000
3 Kepala Tukang Besi Org/Hari 135,000
(Plafond,Kuda/
4 Tukang Kayu Kasar Org/Hari 130,000
Gording,R.Atap)
5 Tukang Kayu Halus Kusen Org/Hari 130,000
6 Kepala Tukang Kayu Org/Hari 135,000
7 Tukang Batu Kasar Tukang Batu Kasar Org/Hari 130,000

Harga Satuan Bahan Bangunan dan Upah Kerja Semester I 2020


(Dalam Rupiah (Rp)

NO JENIS BAHAN SPESIFIKASI SATUAN HARGA

1 2 3 4 5
Tukang Batu
8 Tukang Batu Halus Halus( Bata,Plester,Acian Org/Hari 130,000
list2)
9 Kepala Tukang Batu Org/Hari 135,000
10 Tukang Cat Biasa Org/Hari 130,000
11 Kepala Tukang Cat Org/Hari 135,000
12 Tukang Listrik Org/Hari 130,000
13 Kepala Tukang Listrik Org/Hari 135,000
14 Pekerja Org/Hari 115,000
15 Mandor Org/Hari 140,000

Harga Satuan Bahan Bangunan dan Upah Kerja Semester I 2020


STANDAR HARGA SATUAN BAHAN BANGUNAN DAN UPAH KERJA
PEMERINTAH PROVINSI SULAWESI SELATAN
KABUPATN BARRU
TAHUN 2016
Dalam Rupiah (Rp)
NO BAHAN DASAR SPESIFIKASI SATUAN HARGA
1 2 3 4 5
BAHAN DASAR
1 Batu Gunung / Kali
2 Kerikil Tersaring 2 - 3 cm
3 Batu Belah 10 - 15 cm
4 Batu Belah 7 - 10 cm
5 Batu Belah 5 - 7 cm
6 Batu Belah 3 - 5 cm
7 Batu Belah 2 - 3 cm
8 Batu Belah 1 - 2 cm
9 Batu Belah 0.5 - 1 cm
10 Gorong2 Beton dia. 40 cm
11 Gorong2 Beton dia. 60 cm
12 Gorong2 Beton dia. 80 cm
13 Gorong2 Beton dia. 100 cm
14 Gorong-gorong dia. 30 cm
15 Paving Block
16 Pasir Urug
17 Pasir
18 Timbunan Pilihan
19 Batu Bata
20 Kapur Pasangan
21 Bambu
22 Ijuk
BAHAN SEMEN
1 Portland Cement PC (@ 50kg/zak)
- Merek Tonasa
- Merek Bososwa
2 Portland Cement PC (@ 40kg/zak)
- Merek Tonasa
- Merek Bososwa
3 Semen Putih (@ 50kg/zak)
BAHAN BESI
1 Besi Beton Ø 4
Besi Beton Ø 6
Besi Beton Ø 8
Besi Beton Ø 10
Besi Beton Ø 12
Besi Beton Ø 14
Besi Beton Ø 16
Besi Beton Ø 18
Besi Beton Ø 20
Besi Beton Ø 22
2 Kawat Beton
3 Kawat Ram
4 Kawat Duri
5 Mur/Baut diameter 20 mm
6 Mur/Baut diameter 25 mm
7 Mur/Baut diameter 18 mm
8 Mur/Baut diameter 10 mm
9 Beugel U. 40.40 mm
10 Beugel Strip 40.40 mm
11 Paku Gording panjang . 5 cm
12 Paku Biasa 6-10 Cm
13 Paku Biasa 2-5 Cm
14 Paku Seng Biasa
15 Paku Beton
16 Paku Asbes
17 Paku Les
18 Trali Naco (Besi Batangan)
19 Rangka Naco/Batang
BAHAN LANTAI DAN DINDING
1 Tegel Kramik warna 40x40 cm
2 Tegel Kramik 30x30 cm(Polos)
3 Tegel Kramik 20x20 cm(Alur)
4 Tegel Kramik 20x20 cm(Polos)
5 Tegel ubin warna 20x20 cm
6 Tegel plit 10x30
7 Paving Blok tebal 6 cm
8 Teakwood 120x 240 cm Tebal 3 mm
9 Loster Kramik
BAHAN KAYU
1 Kayu kelas I Jenis Ulin
- Balok
- Papan
2 Kayu kelas I Jenis Bayam
- Balok
- Papan
3 Kayu kelas II Jenis Kapur
- Balok
- Papan
4 Kayu kelas III
- Balok
- Papan
5 Kayu Untuk Perancah
7 Les Kayu Plafond 1 x 4 cm kls II
BAHAN ATAP
1 Seng Gelombang BWG 32" BJLS 0.25 mm
2 Seng BWG 33" BJLS 0.20 mm
3 Bumbungan Seng 90 x 180 cm
4 Seng plat BWG 28"
5 Seng Gelombang BWG 33"
6 Karet Talang
7 Multi Roof
8 Nok Multi Roof
9 Surya Roof
10 Nok Surya Roof
11 Main Trus C 85
12 Reng U Type 41
13 Screw 12-14x20
14 Screw 10 - 16 x 16
15 Baaut Dinabolt
BAHAN KACA
1 Kaca Bening Tebal 3 mm
2 Kaca Bening Tebal 5 mm
3 Kaca Naco Panjang 60 cm
BAHAN KUNCI DAN PENGGANTUNG
1 Kunci Tanam 2x Putar
2 Kunci Merk "Yale" 2X Slag
3 Kunci lemari mutu baik
4 Engsel Pintu ( Kuningan)
5 Engsel Jendela ( Kuningan)
6 Grendel Pintu dan Jendela
7 Hak Angin / Hak Angin Lipat / No.7"
8 Pegangan / Tarikan Jendela + Pintu
9 Kait Jendela Jungkit / Kait Angin
BAHAN CAT
1 Cat Meni Kayu/ Besi "Altex"
2 Minyak Bekisting
3 Cat Kayu Merk "AVIAN"
4 Cat Kilap Merk "Altex"
5 Plamur
6 Politur
7 Dempul
8 Minyak Cat ( Afduner)
9 Kertas Gosok ( Amplas)
10 Cat Tembok "Aries"
11 Cat Tembok "Maritex"
12 Cat Tembok "Avitex"
13 Cat Atap Seng Merk "AGA"
14 Bahan Anti Rayap
BAHAN SANITASI
1 Floor Drain
2 Dol Penguras
3 Closed Jongkok Merek TOTO
4 Closed Duduk Merek TOTO
5 Closed Duduk Merek OHO
6 Urinoir Kramik
7 Waestapel
8 Pipa PVC Type D Diameter 4" merk Wavin btg
9 Pipa PVC Type D Diameter 3" merk Wavin btg
10 Pipa PVC Type D Dia 2" Merek Wavin
11 Pipa PVC Type D Dia. 3/4" Merek Wavin btg
12 Pipa PVC Type D Dia. 1/2" Merek Wavin btg
13 Pipa PVC Type AW Diameter 4"
14 Pipa PVC Type AW Diameter 3"
15 Pipa PVC Type AW Diameter 2"
16 Pipa PVC Type AW Diameter ¾"
17 Pipa PVC Type AW Diameter ½"
18 Kran Air 1/2" Merek Amico
19 Kran Air 3/4" Merek Amico
20 Sambungan T dan L PVC Dia. 2"
21 Sambungan L 4"
22 Sambungan L 3"
23 Pas. Sambungan Elbo 3/4"
24 Pas. Sambungan Elbo 1/2"
25 Pas. Sambungan T 1/2"
26 Pas. Sambungan T 3/4"
27 Sambungan T 4"
28 Sambungan T 3"
29 Pas. Socket 3/4"
30 Pas. Sambungan Lurus 1/2"
31 Pipa GIP Dia 2"
32 Lem Pipa @45 gram
BAHAN LISTRIK
1 Sekring Kas 2 Grup
2 Saklar Tunggal
3 Saklar Ganda
4 Saklar Tiga
5 Stop Kontak
6 Lampu SL 20 Watt
7 Lampu SL 15 Watt
8 Pintting Lampu Pijar
9 Lampu Pijar 18 Watt "Philips"
10 Lampu Pijar 15 Watt "Philips"
11 Lampu Pijar 40 Watt "Philips"
12 Pipa Pengaman Kabel
13 Kabel NYA 2.5 mm
14 Kabel NYA 1.5 mm
BAHAN LANGIT - LANGIT
1 Asbes Semen (Eternit) 1 x 1 Meter 3 mm lbr
2 Triplex (1,20 x 2,40 ) cm t = 3 mm
3 Triplex (1,20 x 2,40 ) cm t = 4 mm
4 Triplex (1,20 x 2,40 ) cm t = 6 mm
5 Triplex (1,20 x 2,40 ) cm t = 9 mm
6 Calsibord
7 Gibsun
BAHAN JALAN
1 Sirtu Royalti
2 Aspal Bitumen
3 As - Buton
4 Minyak Flux
5 Minyak Aspal
6 Minyak Tanah Industri
7 Kayu Bakar
8 Karet Elastomerit
9 Plastik Alas Cor
10 Expansion Joint
11 Berat Girder
12 Guide post
13 Pipa besi untuk Sandaran dia. 2.5".
14 Pipa besi untuk Saluran dia. 2"
15 Minyak Pelumas
16 Kawat Beronjong
17 Baja Tralis
18 Baut Baja
19 Besi Galvanis
20 Baja Profil
BAHAN PIPA
S-10
1 PIPA PVC 1/2"
2 PIPA PVC 3/4"
3 PIPA PVC 1"
4 PIPA PVC 1 1/4"
5 PIPA PVC 1 1/2"
6 PIPA PVC 2"
7 PIPA PVC 2 1/2"
8 PIPA PVC 3"
9 PIPA PVC 4"
10 PIPA PVC 5"
11 PIPA PVC 6"
12 PIPA PVC 8" (OD = 200 mm)
13 PIPA PVC 8" (OD = 225 mm)
14 PIPA PVC 10"
15 PIPA PVC 12"
16 PIPA PVC 14"
17 PIPA PVC 16"
18 PIPA PVC 18"
19 PIPA PVC 20"
20 PIPA PVC 24"
S-12,5
1 PIPA PVC 2"
2 PIPA PVC 2 1/2"
3 PIPA PVC 3"
4 PIPA PVC 4"
5 PIPA PVC 5"
6 PIPA PVC 6"
7 PIPA PVC 8" (OD = 200 mm)
8 PIPA PVC 8" (OD = 225 mm)
9 PIPA PVC 10"
10 PIPA PVC 12"
11 PIPA PVC 14"
12 PIPA PVC 16"
13 PIPA PVC 18"
14 PIPA PVC 20"
15 PIPA PVC 24"
ACCESORIES PVC
1. Valve Socket PVC
1 Valve Socket PVC 1/2"
2 Valve Socket PVC 3/4"
3 Valve Socket PVC 1"
4 Valve Socket PVC 1 1/4"
5 Valve Socket PVC 1 1/2"
6 Valve Socket PVC 2"
7 Valve Socket PVC 2 1/2"
8 Valve Socket PVC 3"
9 Valve Socket PVC 4"
2.TS. Cap/Dop PVC
1 TS. Cap/Dop PVC 1/2"
2 TS. Cap/Dop PVC 3/4"
3 TS. Cap/Dop PVC 1"
4 TS. Cap/Dop PVC 1 1/4"
5 TS. Cap/Dop PVC 1 1/2"
6 TS. Cap/Dop PVC 2"
7 TS. Cap/Dop PVC 2 1/2"
8 TS. Cap/Dop PVC 3"
9 TS. Cap/Dop PVC 4"
10 TS. Cap/Dop PVC 5"
11 TS. Cap/Dop PVC 6"
12 TS. Cap/Dop PVC 8"
13 TS. Cap/Dop PVC 10"
14 TS. Cap/Dop PVC 12"
3. Bell Cap/Dop PVC
1 Bell Cap/Dop PVC 2"
2 Bell Cap/Dop PVC 3"
3 Bell Cap/Dop PVC 4"
4 Bell Cap/Dop PVC 6"
5 Bell Cap/Dop PVC 8"
6 Bell Cap/Dop PVC 10"
7 Bell Cap/Dop PVC 12"
8 Bell Cap/Dop PVC 14"
4. Dressert Join PVC
1 Dressert Join PVC 2"
2 Dressert Join PVC 3"
3 Dressert Join PVC 4"
4 Dressert Join PVC 6"
5 Dressert Join PVC 8"
6 Dressert Join PVC 10"
7 Dressert Join PVC 12"
8 Dressert Join PVC 14"
9 Dressert Join PVC 16"
5. TS. Socket PVC
1 TS. Socket PVC 1/2"
2 TS. Socket PVC 3/4"
3 TS. Socket PVC 1"
4 TS. Socket PVC 1 1/4"
5 TS. Socket PVC 1 1/2"
6 TS. Socket PVC 2"
7 TS. Socket PVC 2 1/2"
8 TS. Socket PVC 3"
9 TS. Socket PVC 4"
10 TS. Socket PVC 5"
11 TS. Socket PVC 6"
12 TS. Socket PVC 8"
13 TS. Socket PVC 10"
14 TS. Socket PVC 12"
6. Bell Socket PVC
1 Bell Socket PVC 2"
2 Bell Socket PVC 3"
3 Bell Socket PVC 4"
4 Bell Socket PVC 6"
5 Bell Socket PVC 8"
6 Bell Socket PVC 10"
7 Bell Socket PVC 12"
8 Bell Socket PVC 14"
9 Bell Socket PVC 16"
10 Bell Socket PVC 20"
11 Bell Socket PVC 24"
7. Bell Reducer PVC
1 Bell Reducer PVC 2 x 1 1/2"
2 Bell Reducer PVC 3 x 2"
3 Bell Reducer PVC 4 x 3"
4 Bell Reducer PVC 5 x 4"
5 Bell Reducer PVC 6 x 4"
6 Bell Reducer PVC 8 x 6"
7 Bell Reducer PVC 10 x 8"
8 Bell Reducer PVC 12 x 4"
9 Bell Reducer PVC 12 x 10"
10 Bell Reducer PVC 14 x 12"
11 Bell Reducer PVC 16 x 14"
8. TS. Reducing Socket PVC
1 TS. Reducing Socket PVC 3/4 x 1/2"
2 TS. Reducing Socket PVC 1 x 1/2"
3 TS. Reducing Socket PVC 1 x 3/4"
4 TS. Reducing Socket PVC 1 1/4 x 1"
5 TS. Reducing Socket PVC 1 1/2 x 1"
6 TS. Reducing Socket PVC 1 1/2 x 1 1/4"
7 TS. Reducing Socket PVC 2 x 1"
8 TS. Reducing Socket PVC 2 x 1 1/4"
9 TS. Reducing Socket PVC 2 x 1 1/2"
10 TS. Reducing Socket PVC 2 1/2 x 2"
11 TS. Reducing Socket PVC 3 x 2"
12 TS. Reducing Socket PVC 3 x 2 1/2"
13 TS. Reducing Socket PVC 4 x 3"
14 TS. Reducing Socket PVC 5 x 4"
15 TS. Reducing Socket PVC 6 x 4"
16 TS. Reducing Socket PVC 6 x 5"
17 TS. Reducing Socket PVC 8 x 6"
18 TS. Reducing Socket PVC 10 x 8"
19 TS. Reducing Socket PVC 12 x 10"
9. TS. Tee PVC
1 TS. Tee PVC 1/2"
2 TS. Tee PVC 3/4 x 1/2"
3 TS. Tee PVC 3/4"
4 TS. Tee PVC 1 x 1/2"
5 TS. Tee PVC 1 x 3/4"
6 TS. Tee PVC 1 x 1"
7 TS. Tee PVC 1 1/4 x 3/4"
8 TS. Tee PVC 1 1/4 x 1"
9 TS. Tee PVC 1 1/4"
10 TS. Tee PVC 1 1/2 x 1"
11 TS. Tee PVC 1 1/2 x 1 1/4"
12 TS. Tee PVC 1 1/2"
13 TS. Tee PVC 2 x 1/2"
14 TS. Tee PVC 2 x 3/4"
15 TS. Tee PVC 2 x 1"
16 TS. Tee PVC 2 x 1 1/2"
17 TS. Tee PVC 2 x 2"
18 TS. Tee PVC 2 1/2 x 1 1/2"
19 TS. Tee PVC 2 1/2 x 2"
20 TS. Tee PVC 2 1/2"
21 TS. Tee PVC 3 x 1"
22 TS. Tee PVC 3 x 1 1/2"
23 TS. Tee PVC 3 x 2"
24 TS. Tee PVC 3 x 2 1/2"
25 TS. Tee PVC 3 x 3"
26 TS. Tee PVC 4 x 2"
27 TS. Tee PVC 4 x 3"
28 TS. Tee PVC 4 x 4"
29 TS. Tee PVC 5 x 5"
30 TS. Tee PVC 6 x 3"
31 TS. Tee PVC 6 x 4"
32 TS. Tee PVC 6 x 6"
10. Bell Tee Bell Branch PVC
1 Bell Tee Bell Branch PVC 2 x 2"
2 Bell Tee Bell Branch PVC 3 x 2"
3 Bell Tee Bell Branch PVC 3 x 3"
4 Bell Tee Bell Branch PVC 4 x 2"
5 Bell Tee Bell Branch PVC 4 x 3"
6 Bell Tee Bell Branch PVC 4 x 4"
7 Bell Tee Bell Branch PVC 5 x 3"
8 Bell Tee Bell Branch PVC 5 x 4"
9 Bell Tee Bell Branch PVC 5 x 5"
10 Bell Tee Bell Branch PVC 6 x 2"
11 Bell Tee Bell Branch PVC 6 x 3"
12 Bell Tee Bell Branch PVC 6 x 4"
13 Bell Tee Bell Branch PVC 6 x 6"
11. Flange Spigot PVC / Flange Socket PVC
1 Flange Spigot PVC / Flange Socket PVC 1 1/2"
2 Flange Spigot PVC / Flange Socket PVC 2"
3 Flange Spigot PVC / Flange Socket PVC 2 1/2"
4 Flange Spigot PVC / Flange Socket PVC 3"
5 Flange Spigot PVC / Flange Socket PVC 4"
6 Flange Spigot PVC / Flange Socket PVC 5"
7 Flange Spigot PVC / Flange Socket PVC 6"
8 Flange Spigot PVC / Flange Socket PVC 8"
9 Flange Spigot PVC / Flange Socket PVC 10"
10 Flange Spigot PVC / Flange Socket PVC 12
11 Flange Spigot PVC / Flange Socket PVC 14"
12 Flange Spigot PVC / Flange Socket PVC 16'
13 Flange Spigot PVC / Flange Socket PVC 20"
12. Flange Bell End PVC
1 Flange Bell End PVC 2"
2 Flange Bell End PVC 2 1/2"
3 Flange Bell End PVC 3"
4 Flange Bell End PVC 4"
5 Flange Bell End PVC 5"
6 Flange Bell End PVC 6"
7 Flange Bell End PVC 8"
8 Flange Bell End PVC 10"
9 Flange Bell End PVC 12"
10 Flange Bell End PVC 14"
11 Flange Bell End PVC 16"
12 Flange Bell End PVC 20"
13. TS. Bend 90' PVC
1 TS. Bend 90' PVC 1/2"
2 TS. Bend 90' PVC 3/4"
3 TS. Bend 90' PVC 1"
4 TS. Bend 90' PVC 1 1/4"
5 TS. Bend 90' PVC 1 1/2"
6 TS. Bend 90' PVC 2"
7 TS. Bend 90' PVC 2 1/2"
8 TS. Bend 90' PVC 3"
9 TS. Bend 90' PVC 4"
10 TS. Bend 90' PVC 5"
11 TS. Bend 90' PVC 6"
12 TS. Bend 90' PVC 8"
13 TS. Bend 90' PVC 10"
14 TS. Bend 90' PVC 12"
14. TS. Bend 45' PVC
1 TS. Bend 45' PVC 1/2"
2 TS. Bend 45' PVC 3/4"
3 TS. Bend 45' PVC 1"
4 TS. Bend 45' PVC 1 1/4"
5 TS. Bend 45' PVC 1 1/2"
6 TS. Bend 45' PVC 2"
7 TS. Bend 45' PVC 2 1/2"
8 TS. Bend 45' PVC 3"
9 TS. Bend 45' PVC 4"
10 TS. Bend 45' PVC 5"
11 TS. Bend 45' PVC 6"
12 TS. Bend 45' PVC 8"
13 TS. Bend 45' PVC 10"
14 TS. Bend 45' PVC 12"
15. TS. Bend 22 1/2' PVC
1 TS. Bend 22 1/2' PVC 1/2"
2 TS. Bend 22 1/2' PVC 3/4"
3 TS. Bend 22 1/2' PVC 1"
4 TS. Bend 22 1/2' PVC 1 1/4"
5 TS. Bend 22 1/2' PVC 1 1/2"
6 TS. Bend 22 1/2' PVC 2"
7 TS. Bend 22 1/2' PVC 2 1/2"
8 TS. Bend 22 1/2' PVC 3"
9 TS. Bend 22 1/2' PVC 4"
10 TS. Bend 22 1/2' PVC 5"
11 TS. Bend 22 1/2' PVC 6"
12 TS. Bend 22 1/2' PVC 8"
14 TS. Bend 22 1/2' PVC 12"
16. TS. Bend 11 1/4' PVC
1 TS. Bend 11 1/4' PVC 1/2"
2 TS. Bend 11 1/4' PVC 3/4"
3 TS. Bend 11 1/4' PVC 1"
4 TS. Bend 11 1/4' PVC 1 1/4"
5 TS. Bend 11 1/4' PVC 1 1/2"
6 TS. Bend 11 1/4' PVC 2"

Harga Satuan Bahan Bangunan dan Upah Kerja Semester I Tahun 2016321
Dalam Rupiah (Rp)
NO BAHAN DASAR SPESIFIKASI SATUAN HARGA
1 2 3 4 5
7 TS. Bend 11 1/4' PVC 2 1/2"
8 TS. Bend 11 1/4' PVC 3"
9 TS. Bend 11 1/4' PVC 4"
10 TS. Bend 11 1/4' PVC 5"
11 TS. Bend 11 1/4' PVC 6"
12 TS. Bend 11 1/4' PVC 8"
13 TS. Bend 11 1/4' PVC 10"
14 TS. Bend 11 1/4' PVC 12"
17. Bell Bend 90' PVC
1 Bell Bend 90' PVC 2"
2 Bell Bend 90' PVC 2 1/2"
3 Bell Bend 90' PVC 3"
4 Bell Bend 90' PVC 4"
5 Bell Bend 90' PVC 5"
6 Bell Bend 90' PVC 6"
7 Bell Bend 90' PVC 8"
8 Bell Bend 90' PVC 10"
9 Bell Bend 90' PVC 12"
10 Bell Bend 90' PVC 14"
11 Bell Bend 90' PVC 16"
12 Bell Bend 90' PVC 20"
13 Bell Bend 90' PVC 24"
18. Bell Bend 45' PVC
1 Bell Bend 45' PVC 2"
2 Bell Bend 45' PVC 2 1/2"
3 Bell Bend 45' PVC 2"
4 Bell Bend 45' PVC 2"
5 Bell Bend 45' PVC 2"
6 Bell Bend 45' PVC 2"
7 Bell Bend 45' PVC 2"
8 Bell Bend 45' PVC 2"
9 Bell Bend 45' PVC 2"
10 Bell Bend 45' PVC 2"
11 Bell Bend 45' PVC 2"
12 Bell Bend 45' PVC 2"
13 Bell Bend 45' PVC 2"
18. Bell Bend 45' PVC
1 Bell Bend 45' PVC 2"
2 Bell Bend 45' PVC 2 1/2"
3 Bell Bend 45' PVC 2"
4 Bell Bend 45' PVC 2"
5 Bell Bend 45' PVC 2"
6 Bell Bend 45' PVC 2"
7 Bell Bend 45' PVC 2"
8 Bell Bend 45' PVC 2"
9 Bell Bend 45' PVC 2"
10 Bell Bend 45' PVC 2"
11 Bell Bend 45' PVC 2"
12 Bell Bend 45' PVC 2"
13 Bell Bend 45' PVC 2"
19. Bell Bend 22 1/2' PVC
1 Bell Bend 22 1/2' PVC 2"
2 Bell Bend 22 1/2' PVC 2 1/2"
3 Bell Bend 22 1/2' PVC 3"
4 Bell Bend 22 1/2' PVC 4"
5 Bell Bend 22 1/2' PVC 5"
6 Bell Bend 22 1/2' PVC 6"
7 Bell Bend 22 1/2' PVC 8"
8 Bell Bend 22 1/2' PVC 10"
9 Bell Bend 22 1/2' PVC 12"
10 Bell Bend 22 1/2' PVC 14"
11 Bell Bend 22 1/2' PVC 16"
12 Bell Bend 22 1/2' PVC 20"
13 Bell Bend 22 1/2' PVC 24"
20. Bell Bend PVC 11 1/4' PVC
1 Bell Bend PVC 11 1/4' PVC 2"
2 Bell Bend PVC 11 1/4' PVC 2 1/2"
3 Bell Bend PVC 11 1/4' PVC 3"
4 Bell Bend PVC 11 1/4' PVC 4"
5 Bell Bend PVC 11 1/4' PVC 5"
6 Bell Bend PVC 11 1/4' PVC 6"
7 Bell Bend PVC 11 1/4' PVC 8"
8 Bell Bend PVC 11 1/4' PVC 10"
9 Bell Bend PVC 11 1/4' PVC 12"
10 Bell Bend PVC 11 1/4' PVC 14"
11 Bell Bend PVC 11 1/4' PVC 16"
12 Bell Bend PVC 11 1/4' PVC 20"
13 Bell Bend PVC 11 1/4' PVC 24"
21. Solvent Cement Pralon (500 gr/klg)
22. Lubricant (1 kg / klg)
PIPA BAJA
1 Pipa Baja 1/2"
2 Pipa Baja 3/4"
3 Pipa Baja 1"
4 Pipa Baja 1 1/4"
5 Pipa Baja 1 1/2"
6 Pipa Baja 2"
7 Pipa Baja 2 1/2"
Rp Pipa Baja 3"
9 Pipa Baja 4"
10 Pipa Baja 5"
11 Pipa Baja 6"
12 Pipa Baja 8"
13 Pipa Baja 10"
14 Pipa Baja 12"
15 Pipa Baja 14"
16 Pipa Baja 16"
ACCESORIES GIP
1. Knie / Elbow 90'
1 Dia. 1/2"
2 Dia. 3/4"
3 Dia. 1"
4 Dia. 1 1/4"
5 Dia. 1 1/2"
6 Dia. 2"
7 Dia. 2 1/2"
8 Dia. 3"
9 Dia. 4"
10 Dia. 5"
11 Dia. 6"
2. Knie / Elbow 45'
1 Dia. 1/2"
2 Dia. 3/4"
3 Dia. 1"
4 Dia. 1 1/4"
5 Dia. 1 1/2"
6 Dia. 2"
7 Dia. 2 1/2"
8 Dia. 3"
9 Dia. 4"
10 Dia. 5"
11 Dia. 6"
3. Tee
1 Dia. 1/2"
2 Dia. 3/4"
3 Dia. 1"
4 Dia. 1 1/4"
5 Dia. 1 1/2"
6 Dia. 2"
7 Dia. 2 1/2"
8 Dia. 3"
9 Dia. 4"
10 Dia. 6"
4. Bend 90' / Boch
1 Dia. 1/2"
2 Dia. 3/4"
3 Dia. 1"
4 Dia. 1 1/4"
5 Dia. 1 1/2"
6 Dia. 2"
7 Dia. 2 1/2"
8 Dia. 3"
9 Dia. 4"
5. Watermuur / Union
1 Dia. 1/2"
2 Dia. 3/4"
3 Dia. 1"
4 Dia. 1 1/4"
5 Dia. 1 1/2"
6 Dia. 2"
7 Dia. 2 1/2"
8 Dia. 3"
9 Dia. 4"
10 Dia. 6"
6. Double Nipple
1 Dia. 1/2"
2 Dia. 3/4"
3 Dia. 1"
4 Dia. 1 1/4"
5 Dia. 1 1/2"
6 Dia. 2"
7 Dia. 2 1/2"
8 Dia. 3"
9 Dia. 4"
10 Dia. 5"
11 Dia. 6"
7. Socket
1 Dia. 1/2"
2 Dia. 3/4"
3 Dia. 1"
4 Dia. 1 1/4"
5 Dia. 1 1/2"
6 Dia. 2"
7 Dia. 2 1/2"
8 Dia. 3"
9 Dia. 4"
10 Dia. 5"
11 Dia. 6"
8. Plug Close End
1 Dia. 1/2"
2 Dia. 3/4"
3 Dia. 1"
4 Dia. 1 1/4"
5 Dia. 1 1/2"
6 Dia. 2"
7 Dia. 2 1/2"
8 Dia. 3"
9 Dia. 4"
10 Dia. 6"
9. Cap / Dop
1 Dia. 1/2"
2 Dia. 3/4"
3 Dia. 1"
4 Dia. 1 1/4"
5 Dia. 1 1/2"
6 Dia. 2"
7 Dia. 2 1/2"
8 Dia. 3"
9 Dia. 4"
10 Dia. 6"
10. Verlop Tee / Reducer
1 Dia. 3/4"
2 Dia. 1"
3 Dia. 1 1/4"
4 Dia. 1 1/2"
5 Dia. 2"
6 Dia. 2 1/2"
7 Dia. 3"
8 Dia. 4"
9 Dia. 6"
11. Verlop Socket / Reducer
1 Dia. 3/4"
2 Dia. 1"
3 Dia. 1 1/4"
4 Dia. 1 1/2"
5 Dia. 2"
6 Dia. 2 1/2"
7 Dia. 3"
8 Dia. 4"
9 Dia. 6"
12. Verlop Ring / Flow Ring
1 Dia. 3/4"
2 Dia. 1"
3 Dia. 1 1/4"
4 Dia. 1 1/2"
5 Dia. 2"
6 Dia. 2 1/2"
7 Dia. 3"
8 Dia. 4"
9 Dia. 6"
13. Verlop Knie / Verlop Elbow
1 Dia. 3/4"
2 Dia. 1"
3 Dia. 1 1/4"
4 Dia. 1 1/2"
5 Dia. 2"
14. Verlop Nipple
1 Dia. 3/4"
2 Dia. 1"
3 Dia. 1 1/4"
4 Dia. 1 1/2"
5 Dia. 2"
15. Gilbout Joint For PVC
1 Dia. 2"
2 Dia. 3"
3 Dia. 4"
4 Dia. 6"
5 Dia. 8"
6 Dia. 10"
16. Gilbout Joint For ACP
1 Dia. 2"
2 Dia. 3"
3 Dia. 4"
4 Dia. 6"
5 Dia. 8"
6 Dia. 10"
7 Dia. 12"
8 Dia. 14"
17. Clamp Saddle
1 Dia. 2 x 1/2"
2 Dia. 2 x 3/4"
3 Dia. 2 x 1"
4 Dia. 3 x 1/2"
5 Dia. 3 x 3/4"
6 Dia. 3 x 1"
7 Dia. 3 x 1 1/2"
8 Dia. 3 x 2"
9 Dia. 4 x 1/2"
10 Dia. 4 x 3/4"
11 Dia. 4 x 1"
12 Dia. 4 x 1 1/2"
13 Dia. 4 x 2"
14 Dia. 6 x 1/2"
15 Dia. 6 x 3/4"
16 Dia. 6 x 1"
17 Dia. 6 x 1 1/2"
18 Dia. 6 x 2"
19 Dia. 6 x 3"
20 Dia. 8 x 1/2"
21 Dia. 8 x 3/4"
22 Dia. 8 x 1"
23 Dia. 8 x 2"
24 Dia. 8 x 3"
18. Street Box / Valve Cover
1 Dia. 2"
2 Dia. 3"
3 Dia. 4"
4 Dia. 6"
5 Dia. 8"
6 Dia. 10"
19. Flange Steel JIS 10K
1 Dia. 2"
2 Dia. 3"
3 Dia. 4"
4 Dia. 6"
5 Dia. 8"
6 Dia. 10"
7 Dia. 12"
20. Lem Pipa PVC
1 @ 600 gram / kaleng
2 @ 45 gram / tube
21. Gate Valve Merk Arrow JIS 10K
1 Dia. 2"
2 Dia. 3"
3 Dia. 4"
4 Dia. 6"
5 Dia. 8"
6 Dia. 10"
7 Dia. 12"
SUB BIDANG HARGA UPAH PEKERJAAN KONSTRUKSI
1 Man d o r
2 Mek an i k
3 Mekanik Pembantu
4 Tukang Kepala
5 Tu kan g
6 Op er at o r
7 Operator Tak Terlatih
8 Pembantu Operator
9 Sopir
10 Sopir Personil
11 Pembantu Sopir
12 Buruh Tak Terlatih
13 Buruh Agak Terlatih
14 Buruh Terlatih

Harga Satuan Bahan Bangunan dan Upah Kerja Semester I Tahun 2016322

Anda mungkin juga menyukai