JUMLAH
NO URAIAN DAN JENIS PEKERJAAN
HARGA
I. PEKERJAAN STRUKTUR 460,931,534.34
II. PEKERJAAN ARSITEKTUR 540,117,827.98
III. PEKERJAAN MEP 101,624,995.00
IV. PENGADAAN BARANG 1,255,200,000.00
A REAL COST 2,357,874,357.33
C TOTAL Rp 2,357,850,000.00
Terbilang : DUA MILIAR TIGA RATUS LIMA PULUH TUJUH JUTA DELAPAN RATUS LIMAH PULUH RIBU RUPIAH
RENCANA ANGGARAN BIAYA (RAB)
JUMLAH
NO URAIAN DAN JENIS PEKERJAAN
HARGA
I. PEKERJAAN STRUKTUR 334,805,959.13
II. PEKERJAAN ARSITEKTUR 277,733,455.93
III. PEKERJAAN MEP 74,962,366.90
A REAL COST 687,501,781.96
B TOTAL Rp 687,500,000.00
Terbilang : TIGA RATUS ENAM PULUH DELAPAN JUTA SEMBILAN RATUS LIMA PULUH RIBU RUPIAH
BACKUP DATA
= 225.00 M3
= 3.00 M3
= 6.00 M3 = 75.00 M3
= 164.14 X 0.30
= 49.24 M3
= 164.14 X 0.05
= 8.21 M3
= 3.60 M3 = 45.00 M3
= 10.08 M3 = 126.00 M3
PEKERJAAN BETON PEKERJAAN BETON
1 Pek. Membuat 1 m3 Lantai Kerja (Rabat Beton)
rabat beton dalam bangunan :
LUAS = 164.14
TINGGI = 0.10
= 164.14 X 0.10
= 16.41 M3
= 3.15 M2 = 39.38 M2
- Pek. Pembesian
Pembesian Tulangan DIA 12 :
Panjang = 225.00
Jumlah Tulangan = 8
Massa Jenis = 0.888
VOL. = PANJANG X JUMLAH X MASSA JENIS VOL. = PANJANG X JUMLAH X MASSA JENIS
= 127.87 KG = 1598.40 KG 12
= 10.656
Pembesian Begel DIA 10 :
Jumlah Begel = 1500.00 = 266400
Panjang Begel = 0.94 = 60419520
Massa Jenis = 0.617
VOL. = JUMLAH X PANJANG X MASSA JENIS VOL. = JUMLAH X PANJANG X MASSA JENIS
= 52.20 KG = 869.97 KG
= 12
TOTAL = 180.07 KG TOTAL = 2468.37 KG = 7.404
= 185100
- Pek. Beton Mutu f'c = 19.3 MPa (K.175) = 35671523.06962
Panjang = 225.00 96091043.06962
Lebar = 0.2
Tinggi = 0.2
BETON = 0.13 M3
BEKISTING = 1.14 M2
BESI PEDESTAL
TULANGAN UTAMA = 8.00 X 0.9 X 0.617
= 4.44 KG
= 43.50 M2
- Pek. Pembesian
Pembesian Tulangan DIA 12 :
TINGGI = 4.5
Jumlah Tulangan = 6
Massa Jenis = 0.888
jumlah = 29
= 4.50 X 6 X 0.888 X 29
= 695.30 KG
TOTAL = 880.88 KG
TOTAL = 3.92 M3
4 Pek. Kolom Teras
- Pek. Bekisting
TINGGI = 3.8
LEBAR = 0.8
JUMLAH SISI = 2.00
= 4.05 M2
- Pek. Pembesian
Pembesian Tulangan DIA 10 :
TINGGI = 3.8
Jumlah Tulangan = 10
Massa Jenis = 0.888
jumlah = 2
= 3.80 X 10 X 0.888 X 2
= 67.49 KG
= 29.62 KG
TOTAL = 97.11 KG
TOTAL = 1.14 M3
= 8.80 M2
- Pek. Pembesian
Pembesian Tulangan DIA 10 :
TINGGI = 3.3
Jumlah Tulangan = 10
Massa Jenis = 0.888
jumlah = 10
= 3.30 X 10 X 0.888 X 10
= 293.04 KG
= 49.24 KG
TOTAL = 342.28 KG
TOTAL = 1.32 M3
bekisting = 6.32
beton = 0.82
pembesian =
tulangan utama = 4.00 x 48.60 x 0.617
= 119.94 kg
bekisting = 3.10
beton = 0.47
pembesian =
tulangan utama = 4.00 x 20.68 x 0.395
= 32.67 kg
- Pek. Pembesian
Pembesian Plat Lantai Vertikal = 7.26 0.15
= 48.40 1.75
= 84.70 2
= 169.40
= 271.23 X 0.40
= 27.14 KG
= 20.87 X 0.15
= 3.13 m3
panjang jarak
- Pek. Pembesian = 55.55 / 0.25
= 222.20 x 0.45
= 199.98
berat besi
= 199.98 x 0.22
= 44.40 kg
panjang jarak
- Pek. Pembesian = 55.55 / 0.25
= 222.20 x 0.65
= 288.86
berat besi
= 288.86 x 0.22
= 64.13 kg
panjang jarak
- Pek. Pembesian = 11.50 / 0.25
= 46.00 x 0.95
= 87.40
berat besi
= 87.40 x 0.22
= 19.40 kg
VOL. = VOL. =
= =
= 81.00 M2 = 799.60 M2
5 Pek. Acian
= 799.60 M2
PEKERJAAN KUSEN PINTU/JENDELA, DAUN PINTU/JENDELA, KUNCI DAN KACA PEKERJAAN KUSEN PINTU/JENDELA, DAUN PINTU/JENDELA, KUNCI DAN KACA
1 PINTU 1 (P1)
- Pek. Pembuatan dan pemasangan 1 m3 kusen pintu Kayu Kelas I 4.95
= 0.06 M3
- HANDLE PINTU = 2 BH
- KUNCI PINTU = 1 BH
- ENGSEL = 6 BH
2 PINTU 2 (P2)
- Pek. Pembuatan dan pemasangan 1 m3 kusen pintu Kayu Kelas I
= 0.18 M3
- HANDLE PINTU = 5 BH
- KUNCI PINTU = 5 BH
- ENGSEL = 15 BH
4 PINTUJ1 (PJ1)
- Pek. Pembuatan dan pemasangan 1 m kusen aluminium
= 13.00 M1
- HANDLE PINTU = 5 BH
- KUNCI PINTU = 5 BH
- ENGSEL = 30 BH
- KACA = 5.14 M2
5 JENDELA 1 (J1)
- Pek. Pembuatan dan pemasangan 1 m3 kusen Jendela kayu kelas II
= 0.10 M3
- ENGSEL JENDELA = 8 BH
- KUNCI = 4 BH
- KAITANGIN = 8 BH
- KACA = 2.32 M2
6 JENDELA 2 (J2)
- Pek. Pembuatan dan pemasangan 1 m3 kusen Jendela kayu kelas II
= 0.25 M3
- ENGSEL JENDELA = 20 BH
- KUNCI = 10 BH
- KAITANGIN = 20 BH
- KACA = 5.2 M2
7 JENDELA 3 (J3)
- Pek. Pembuatan dan pemasangan 1 m3 kusen Jendela kayu kelas II
= 0.06 M3
- ENGSEL JENDELA = 4 BH
- KUNCI = 4 BH
- KAITANGIN = 4 BH
- KACA = 0.78 M2
8 JENDELA 4 (J4)
- Pek. Pembuatan dan pemasangan 1 m3 kusen Jendela kayu kelas II
= 0.05 M3
- ENGSEL JENDELA = 0 BH
- KUNCI = 2 BH
- KAITANGIN = 0 BH
- KACA = 0.92 M2
9 JENDELA 5 (J5)
- Pek. Pembuatan dan pemasangan 1 m3 kusen Jendela kayu kelas II
= 0.07 M3
- ENGSEL JENDELA = 6 BH
- KUNCI = 3 BH
- KAITANGIN = 6 BH
- KACA = 1.44 M2
10 VENTILASI WC (VWC)
- Pek. Pembuatan dan pemasangan 1 m3 kusen Jendela kayu kelas II
= 0.04 M3
- KACA = 0.48 M2
11 VENTILASI WC (VJI)
- Pek. Pembuatan dan pemasangan 1 m3 kusen Jendela kayu kelas II
= 0.04 M3
- KACA = 0.44 M2
12 VENTILASI (VP1)
- Pek. Pembuatan dan pemasangan 1 m3 kusen Jendela kayu kelas II
= 0.02 M3
- KACA = 0.3 M2
13 VENTILASI (VP2)
- Pek. Pembuatan dan pemasangan 1 m3 kusen Jendela kayu kelas II
= 0.03 M3
- KACA = 0.36 M2
14 VENTILASI (VJ5)
- Pek. Pembuatan dan pemasangan 1 m3 kusen Jendela kayu kelas II
= 0.03 M3
- KACA = 0.35 M2
15 KUSEN CARPORT
- Pek. Pembuatan dan pemasangan 1 m Kusen aluminium
= 66.00 M1
= 300.00 : 0.819
= 366.30 M2
= 5.00 X 0.15 X 2
= 1.50 M2
daun pintu
Luas = 0.06
= 0.06 X 2
= 0.12 M2
= 1.62 M2
2 Pek. Pengecatan 1 m2 tembok baru ( 1 lapis plamur, 1 lapis cat dasar, 2 lapis cat penutup )
luas = 0.00
sisi = 2.00
= 0.00 X 2.00
= 0.00 M2
I. PEKERJAAN TANAH
1 1.7.1.a. Penggalian 1 m3 Tanah Biasa Sedalam s.d 1 m Untuk Volume s.d 200 m3 Dalam Satu Lokasi
Harga Jumlah
No. Uraian Satuan Koefisien
Satuan Harga
A TENAGA KERJA
1 Pekerja Org/Hari 150,000.00 0.750 112,500.00
2 Mandor Org/Hari 160,000.00 0.025 4,000.00
Jumlah A 116,500.00
B BAHAN
Jumlah B -
C PERALATAN
Jumlah C -
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C) 116,500.00
Jumlah B
C PERALATAN
Jumlah C -
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C) 38,833.33
Jumlah C -
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C) 262,600.00
17
4 1.7.2.e Pengurugan dan Pemadatan 1 m3 Sirtu
Harga Jumlah
No. Uraian Satuan Koefisien
Satuan Harga
A TENAGA KERJA
1 Pekerja Org/Hari 150,000.00 0.2500 37,500.00
2 Mandor Org/Hari 160,000.00 0.0250 4,000.00
Jumlah A 41,500.00
B BAHAN
1 Sirtu M3 80,000.00 1.2000 96,000.00
Jumlah B 96,000.00
C PERALATAN
Jumlah C -
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C) 137,500.00
Jumlah C -
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C) 1,188,100.00
Jumlah C -
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C) 699,000.00
18
III. PEKERJAAN DINDING
1 4.4.1.8 Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal 1/2 batu campuran 1 PC : 3 PP
Harga Jumlah
No. Uraian Satuan Koefisien
Satuan Harga
A TENAGA KERJA
1 Pekerja Org/Hari 150,000.00 0.300 45,000.00
2 Tukang Batu Org/Hari 180,000.00 0.100 18,000.00
3 Kepala Tukang Org/Hari 200,000.00 0.010 2,000.00
4 Mandor Org/Hari 160,000.00 0.015 2,400.00
Jumlah A 67,400.00
B BAHAN
1 Batu bata Biji 700.00 70.000 49,000.00
2 Semen Kg 1,700.00 14.370 24,429.00
3 Pasir Pasang M3 200,000.00 0.040 8,000.00
Jumlah B 81,429.00
C PERALATAN
Jumlah C -
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C) 148,829.00
2 4.4.1.9 Pemasangan 1 m2 Dinding Bata Berah (5x11x22) cm Tebal 1/2 Batu Campuran 1 PC : 4 PP
Harga Jumlah
No. Uraian Satuan Koefisien
Satuan Harga
A TENAGA KERJA
1 Pekerja Org/Hari 150,000.00 0.3000 45,000.00
2 Tukang Batu Org/Hari 180,000.00 0.1000 18,000.00
3 Kepala Tukang Org/Hari 200,000.00 0.0100 2,000.00
4 Mandor Org/Hari 160,000.00 0.0150 2,400.00
Jumlah A 67,400.00
B BAHAN
1 Batu bata Biji 700.00 70.000 49,000.00
2 Semen Kg 1,700.00 11.500 19,550.00
3 Pasir Pasang M3 200,000.00 0.043 8,600.00
Jumlah B 77,150.00
C PERALATAN
Jumlah C -
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C) 144,550.00
19
3 4.4.1.9 Pemasangan 1 m2 dinding conblock HB15 campuran 1 PC : 4 PP
Harga Jumlah
No. Uraian Satuan Koefisien
Satuan Harga
A TENAGA KERJA
1 Pekerja Org/Hari 150,000.00 0.3200 48,000.00
2 Tukang Batu Org/Hari 180,000.00 0.1200 21,600.00
3 Kepala Tukang Org/Hari 200,000.00 0.0120 2,400.00
4 Mandor Org/Hari 160,000.00 0.0160 2,560.00
Jumlah A 74,560.00
B BAHAN
1 Batako HB-15 Bh 3,000.00 12.500 37,500.00
2 Semen Kg 1,700.00 18.200 30,940.00
3 Pasir Pasang M3 200,000.00 0.0582 11,640.00
4 Besi Angker dia. 8 Kg 13,500.00 0.280 3,780.00
Jumlah B 80,080.00
C PERALATAN
Jumlah C -
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C) 154,640.00
IV PEKERJAAN PLESTERAN
1 Anl. Pemasangan plesteran 1 m' tali air
Harga Jumlah
No. Uraian Satuan Koefisien
Satuan Harga
A TENAGA KERJA
1 Pekerja Org/Hari 150,000.00 0.0800 12,000.00
2 Tukang Batu Org/Hari 180,000.00 0.0040 720.00
3 Kepala Tukang Org/Hari 200,000.00 0.0080 1,600.00
4 Mandor Org/Hari 160,000.00 0.0040 640.00
Jumlah A 14,960.00
B BAHAN
1 Semen Kg 1,700.00 0.2500 425.00
2 Pasir Pasang M3 200,000.00 0.0080 1,600.00
Jumlah B 2,025.00
C PERALATAN
Jumlah C -
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C) 16,985.00
20
2 4.4.2.5 Pemasangan 1 m2 plesteran 1 PC : 5 PP tebal 15 mm
Harga Jumlah
No. Uraian Satuan Koefisien
Satuan Harga
A TENAGA KERJA
1 Pekerja Org/Hari 150,000.00 0.1500 22,500.00
2 Tukang Batu Org/Hari 180,000.00 0.0750 13,500.00
3 Kepala Tukang Org/Hari 200,000.00 0.0080 1,600.00
4 Mandor Org/Hari 160,000.00 0.0080 1,280.00
Jumlah A 38,880.00
B BAHAN
1 Semen Portlan (PC) Kg 1,700.00 5.184 8,812.80
2 Pasir Pasang (PP) M3 200,000.00 0.026 5,200.00
Jumlah B 14,012.80
C PERALATAN
Jumlah C -
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C) 52,892.80
Jumlah C -
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C) 57,125.00
V PEKERJAAN KAYU
1 4.6.1.21 Pemasangan 1 m' lisplank ukuran (3 x 20) cm, kayu kelas I atau kelas II
Harga Jumlah
No. Uraian Satuan Koefisien
Satuan Harga
A TENAGA KERJA
1 Pekerja Org/Hari 150,000.00 0.1000 15,000.00
2 Tukang Kayu Org/Hari 180,000.00 0.2000 36,000.00
3 Kepala Tukang Org/Hari 200,000.00 0.0200 4,000.00
4 Mandor Org/Hari 160,000.00 0.0050 800.00
Jumlah A 55,800.00
B BAHAN
1 Kayu Papan Klas II M3 4,200,000.00 0.0108 45,360.00
2 Paku 5 dan 7 cm Kg 20,000.00 0.100 2,000.00
Jumlah B 47,360.00
C PERALATAN
Jumlah C -
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C) 103,160.00
21
VI PEKERJAAN LANGIT-LANGIT (PLAFOND)
1 4.5.1.7 Pemasangan 1 m2 langit-langit gypsum board ukuran (120x240x9) mm, tebal 9 mm
Harga Jumlah
No. Uraian Satuan Koefisien
Satuan Harga
A TENAGA KERJA
1 Pekerja Org/Hari 150,000.00 0.1500 22,500.00
2 Tukang Kayu Org/Hari 180,000.00 0.0500 9,000.00
3 Kepala Tukang Org/Hari 200,000.00 0.5000 100,000.00
4 Mandor Org/Hari 160,000.00 0.0050 800.00
Jumlah A 132,300.00
B BAHAN
1 Gypsum Board Lembar 80,000.00 0.3640 29,120.00
2 Sekrup Gypsum Kg 35,000.00 0.1100 3,850.00
Jumlah B 32,970.00
C PERALATAN
Jumlah C -
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C) 165,270.00
Jumlah C -
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C) 24,661.25
22
VII PEKERJAAN BESI DAN ALUMINIUM
1 4.2.1.21 Pemasangan 1 m2 rangka besi hollow 1x40.40.2 mm, modul 60 x 60 cm, untuk plafon
Harga Jumlah
No. Uraian Satuan Koefisien
Satuan Harga
A TENAGA KERJA
1 Pekerja Org/Hari 150,000.00 0.3500 52,500.00
2 Tukang Besi Org/Hari 180,000.00 0.3500 63,000.00
3 Kepala Tukang Org/Hari 200,000.00 0.0350 7,000.00
4 Mandor Org/Hari 160,000.00 0.0180 2,880.00
Jumlah A 125,380.00
B BAHAN
1 Rangka Besi Hollow 40.40.2 cm M' 22,000.00 4.0000 88,000.00
2 Assesoris (perkuatan, las dll) Ls 30,800.00 1.0000 30,800.00
Jumlah B 118,800.00
C PERALATAN
Jumlah C -
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C) 244,180.00
2 4.2.1.22 Pemasangan 1 m2 Atap Pelana Rangka Atap Baja Ringan (Canai Dingin) profil C75
Harga Jumlah
No. Uraian Satuan Koefisien
Satuan Harga
A TENAGA KERJA
1 Pekerja Org/Hari 150,000.00 0.7340 110,100.00
2 Tukang Besi Org/Hari 180,000.00 0.7340 132,120.00
3 Kepala Tukang Org/Hari 200,000.00 0.0730 14,600.00
4 Mandor Org/Hari 160,000.00 0.0370 5,920.00
Jumlah A 262,740.00
B BAHAN
1 Baja Ringan Canai C75 Btg 120,000.00 3.0650 367,800.00
2 Sekrup Bh 500.00 9.0000 4,500.00
Jumlah B 372,300.00
C PERALATAN
Peralatan % 10.0000 37,230.00
Jumlah C 37,230.00
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C) 672,270.00
23
3 4.2.1.24 Pemasangan 1 m' Kusen Aluminium
Harga Jumlah
No. Uraian Satuan Koefisien
Satuan Harga
A TENAGA KERJA
1 Pekerja Org/Hari 150,000.00 0.0430 6,450.00
2 Tukang Besi Org/Hari 180,000.00 0.0430 7,740.00
3 Kepala Tukang Org/Hari 200,000.00 0.0043 860.00
4 Mandor Org/Hari 160,000.00 0.0021 336.00
Jumlah A 15,386.00
B BAHAN
1 Profil Aluminium 4" M 100,000.00 1.100 110,000.00
2 Skrup Fixer Bh 500.00 2.000 1,000.00
3 Sealant Tube 66,000.00 0.060 3,960.00
Jumlah B 111,000.00
C PERALATAN
Jumlah C -
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C) 126,386.00
Jumlah C -
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C) 1,039,422.00
24
5 4.2.1.26 Pemasangan 1 m2 Daun Kaca Aluminium
Harga Jumlah
No. Uraian Satuan Koefisien
Satuan Harga
A TENAGA KERJA
1 Pekerja Org/Hari 150,000.00 0.0850 12,750.00
2 Tukang Besi Org/Hari 180,000.00 0.0850 15,300.00
3 Kepala Tukang Org/Hari 200,000.00 0.0090 1,800.00
4 Mandor Org/Hari 160,000.00 0.0050 800.00
Jumlah A 30,650.00
B BAHAN
1 Pintu Aluminium M 180,000.00 4.400 792,000.00
2 Profil Kaca M 50,000.00 4.500 225,000.00
3 Sealant Tube 66,000.00 0.270 17,820.00
Jumlah B 1,017,000.00
C PERALATAN
Jumlah C -
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C) 1,047,650.00
Jumlah C -
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C) 3,266,600.00
25
2 2.2.2.1.g Membuat 1 m3 Beton Mutu f'c = 7,4 Mpa (K-100), Lantai Kerja
Harga Jumlah
No. Uraian Satuan Koefisien
Satuan Harga
A TENAGA KERJA
1 Pekerja Org/Hari 150,000.00 1.6500 247,500.00
2 Tukang Besi Org/Hari 180,000.00 0.2750 49,500.00
3 Kepala Tukang Org/Hari 200,000.00 0.0275 5,500.00
4 Mandor Org/Hari 160,000.00 0.1650 26,400.00
Jumlah A 328,900.00
B BAHAN
1 Semen Portland (PC) Kg 1,700.00 227 385,900.00
2 Pasir Beton (PB) M3 189.29 869 164,489.29
3 Kerikil (Kr) M3 263.17 1,000 263,171.85
4 Air Liter 90.00 215 19,350.00
Jumlah B 813,561.14
C PERALATAN
Jumlah C -
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C) 1,142,461.14
3 2.2.2.1.g Membuat 1 m3 Beton Mutu f'c = 14,5 Mpa (K-175), Lantai, Kolom, Balok
Harga Jumlah
No. Uraian Satuan Koefisien
Satuan Harga
A TENAGA KERJA
1 Pekerja Org/Hari 150,000.00 1.6500 247,500.00
2 Tukang Besi Org/Hari 180,000.00 0.2750 49,500.00
3 Kepala Tukang Org/Hari 200,000.00 0.0275 5,500.00
4 Mandor Org/Hari 160,000.00 0.1650 26,400.00
Jumlah A 328,900.00
B BAHAN
1 Semen Portland (PC) Kg 1,700.00 326 554,200.00
2 Pasir Beton (PB) Kg 189.29 760 143,857.14
3 Kerikil (Kr) M3 263.17 1,029 270,803.84
4 Air Liter 90.00 215 19,350.00
Jumlah B 968,860.98
C PERALATAN
Jumlah C -
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C) 1,297,760.98
26
4 4.1.1.19 Pemasangan 1 m2 Bekisting untuk Sloof Beton Bangunan Gedung (5x Pakai)
Harga Jumlah
No. Uraian Satuan Koefisien
Satuan Harga
A TENAGA KERJA
1 Pekerja Org/Hari 150,000.00 0.5200 78,000.00
2 Tukang Kayu Org/Hari 180,000.00 0.2600 46,800.00
3 Kepala Tukang Org/Hari 200,000.00 0.0260 5,200.00
4 Mandor Org/Hari 160,000.00 0.0260 4,160.00
Jumlah A 134,160.00
B BAHAN
1 Kayu Kelas III M3 2,205,000.00 0.0450 99,225.00
2 Paku 5 cm - 10 cm Kg 20,000.00 0.3000 6,000.00
3 Minyak Bekisting Liter 12,500.00 0.1000 1,250.00
Jumlah B 106,475.00
C PERALATAN
Jumlah C -
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C) 240,635.00
5 4.1.1.22 Pemasangan 1 m² Bekisting untuk Kolom Beton Bangunan Gedung (5x Pakai)
Harga Jumlah
No. Uraian Satuan Koefisien
Satuan Harga
A TENAGA KERJA
1 Pekerja Org/Hari 150,000.00 0.6600 99,000.00
2 Tukang Batu Org/Hari 180,000.00 0.3300 59,400.00
3 Kepala Tukang Org/Hari 200,000.00 0.0330 6,600.00
4 Mandor Org/Hari 160,000.00 0.0330 5,280.00
Jumlah A 170,280.00
B BAHAN
1 Kayu Papan kelas III m³ 2,205,000.00 0.0400 88,200.00
2 Paku 5 cm - 12 cm Kg 20,000.00 0.4000 8,000.00
3 Minyak bekisting Liter 12,500.00 0.2000 2,500.00
4 Balok Kayu kelas III m³ 2,205,000.00 0.0150 33,075.00
5 Multipleks tebal 9 mm Lbr 120,000.00 0.3500 42,000.00
6 Dolken kayu ø8-10 ) cm- panj 4 m Batang 10,000.00 2.0000 20,000.00
Jumlah B 193,775.00
C PERALATAN
Jumlah C -
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C) 364,055.00
27
6 4.1.1.22 Pemasangan 1 m² Bekisting untuk Plat Beton Bangunan Gedung
Harga Jumlah
No. Uraian Satuan Koefisien
Satuan Harga
A TENAGA KERJA
1 Pekerja Org/Hari 150,000.00 0.6600 99,000.00
2 Tukang Kayu Org/Hari 180,000.00 0.3300 59,400.00
3 Kepala Tukang Org/Hari 200,000.00 0.0330 6,600.00
4 Mandor Org/Hari 160,000.00 0.0330 5,280.00
Jumlah A 170,280.00
B BAHAN
1 Kayu Papan kelas IV (Bekisting) m³ 2,205,000.00 0.040 88,200.00
2 Paku 5 cm - 12 cm Kg 20,000.00 0.400 8,000.00
3 Minyak bekisting Liter 12,500.00 0.200 2,500.00
4 Balok Kayu kelas IV (Bekisting) m³ 2,205,000.00 0.015 33,075.00
5 Multipleks tebal 9 mm Lbr 120,000.00 0.350 42,000.00
6 Dolken kayu .. 8-10) cm- panj 4 m Batang 10,000.00 6.000 60,000.00
Jumlah B 233,775.00
C PERALATAN
Jumlah C -
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C) 404,055.00
28
2 4.4.3.6 Pemasangan 1 m2 lantai ubin warna ukuran 20 cm x 20 cm
Harga Jumlah
No. Uraian Satuan Koefisien
Satuan Harga
A TENAGA KERJA
1 Pekerja Org/Hari 150,000.00 0.1350 20,250.00
2 Tukang Batu Org/Hari 180,000.00 0.0140 2,520.00
3 Kepala Tukang Org/Hari 200,000.00 0.2700 54,000.00
4 Mandor Org/Hari 160,000.00 0.0140 2,240.00
Jumlah 79,010.00
B BAHAN
1 Tegel Anti slip 20 x 20 Cm Bh 3,200.00 26.5000 84,800.00
2 Semen warna Kg 28,000.00 1.0000 28,000.00
3 Semen portland Kg 1,700.00 10.4000 17,680.00
4 Pasir Pasang M3 200,000.00 0.0450 9,000.00
Jumlah 139,480.00
Harga Satuan A + B 218,490.00
Jumlah C -
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C) 63,138.00
29
4 4.4.3.54 Pemasangan 1 m2 dinding keramik 20 x 20 cm
No. Uraian Satuan Harga Jumlah
Koefisien
Satuan Harga
A TENAGA KERJA
1 Pekerja Org/Hari 150,000.00 0.600 90,000.00
2 Tukang Batu Org/Hari 180,000.00 0.450 81,000.00
3 Kapala Tukang Org/Hari 200,000.00 0.045 9,000.00
4 Mandor Org/Hari 160,000.00 0.030 4,800.00
Jumlah A 184,800.00
B BAHAN
1 Tegel Dinding Keramik 20 x20 Cm Bh 3,200.00 26.500 84,800.00
2 Semen portland Kg 1,700.00 9.300 15,810.00
3 Pasir Pasang M3 200,000.00 0.018 3,600.00
Jumlah B 104,210.00
C PERALATAN
Jumlah C -
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C) 289,010.00
Jumlah C -
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C) 272,158.00
30
X PEKERJAAN PENUTUP ATAP
4 Anl 1 m2 Pek. Kuda-Kuda Rangka Atap Baja Ringan
No. Uraian Satuan Harga Koefisien Jumlah
Satuan Harga
A TENAGA KERJA
1 Pekerja Org/Hari 150,000.00 0.3000 45,000.00
2 Tukang Org/Hari 180,000.00 0.1000 18,000.00
3 Kepala Tukang Org/Hari 200,000.00 0.0100 2,000.00
4 Mandor Org/Hari 160,000.00 0.0150 2,400.00
Jumlah A 67,400.00
B BAHAN
1 Main Trus C 75 - 75 m' 19,000.00 2.8000 53,200.00
2 Reef Botton / Reng R 33-0,45 m' 10,000.00 4.6000 46,000.00
3 Self drilling Screw dia 6 x 20 mm (Truss Screw) bh 500.00 17.0000 8,500.00
4 Self drilling Screw dia 4 x 16 mm (Roof Bottom bh 500.00 24.0000 12,000.00
5 Dynabolt 12 x 120 mm bh 5,500.00 1.0000 5,500.00
6 Alat bantu ls 35,500.00 0.0350 1,242.50
Jumlah B 126,442.50
C PERALATAN
Jumlah C -
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C) 193,842.50
Jumlah C -
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C) 83,800.00
Jumlah C -
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C) 127,360.00
31
4.5.2.37 Pemasangan 1 m' nok genteng metal
No. Uraian Satuan Harga Koefisien Jumlah
Satuan Harga
A TENAGA KERJA
1 Tukang Kayu Org/Hari 180,000.00 0.1500 27,000.00
2 Kepala Tukang Org/Hari 200,000.00 0.0150 3,000.00
3 Pekerja Org/Hari 150,000.00 0.2500 37,500.00
4 Mandor Org/Hari 160,000.00 0.0130 2,080.00
Jumlah A 69,580.00
B BAHAN
1 Nok Genteng Metal Lbr 35,000.00 1.1000 38,500.00
2 Paku Atap Kg 20,000.00 0.0500 1,000.00
Jumlah B 39,500.00
C PERALATAN
Jumlah C -
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C) 109,080.00
32
XI PEKERJAAN KUNCI DAN KACA
1 4.6.2.2 Pemasangan 1 buah kunci biasa
Harga Jumlah
No. Uraian Satuan Koefisien
Satuan Harga
A TENAGA KERJA
1 Pekerja Org/Hari 90,000.00 0.010 900.00
2 Tukang Kayu Org/Hari 120,000.00 0.500 60,000.00
3 Kapala Tukang Org/Hari 140,000.00 0.050 7,000.00
4 Mandor Org/Hari 120,000.00 0.005 600.00
Jumlah A 68,500.00
B BAHAN
1 Kunci Tanam Pintu Bh 200,000.00 1.0000 200,000.00
Jumlah B 200,000.00
C PERALATAN
Jumlah C -
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C) 268,500.00
Jumlah C -
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C) 66,546.00
33
3 4.6.2.6 Pemasangan 1 buah engsel jendela kupu-kupu
Harga Jumlah
No. Uraian Satuan Koefisien
Satuan Harga
A TENAGA KERJA
1 Pekerja Org/Hari 90,000.00 0.010 900.00
2 Tukang Kayu Org/Hari 120,000.00 0.100 12,000.00
3 Kapala Tukang Org/Hari 140,000.00 0.010 1,400.00
4 Mandor Org/Hari 120,000.00 0.0005 60.00
Jumlah A 14,360.00
B BAHAN
1 Engsel Kupu-Kupu Bh 40,000.00 1.0000 40,000.00
Jumlah B 40,000.00
C PERALATAN
Jumlah C -
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C) 54,360.00
34
4 4.6.2.8 Pemasangan 1 buah spring knip
Harga Jumlah
No. Uraian Satuan Koefisien
Satuan Harga
A TENAGA KERJA
1 Pekerja Org/Hari 90,000.00 0.015 1,350.00
2 Tukang Kayu Org/Hari 120,000.00 0.150 18,000.00
3 Kapala Tukang Org/Hari 140,000.00 0.015 2,100.00
4 Mandor Org/Hari 120,000.00 0.0008 96.00
Jumlah A 21,546.00
B BAHAN
1 Spring Knip Bh 26,000.00 1.0000 26,000.00
Jumlah B 26,000.00
C PERALATAN
Jumlah C -
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C) 47,546.00
Jumlah C -
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C) 36,546.00
Jumlah C -
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C) 131,378.00
35
XII PEKERJAAN PENGECATAN
1 4.7.1.10 Pengecetan 1 m2 tembok baru (1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup)
Harga Jumlah
No. Uraian Satuan Koefisien
Satuan Harga
A TENAGA KERJA
1 Pekerja Org/Hari 150,000.00 0.0200 3,000.00
2 Tukang Cat Org/Hari 180,000.00 0.0630 11,340.00
3 Kepala Tukang Org/Hari 200,000.00 0.0063 1,260.00
4 Mandor Org/Hari 160,000.00 0.0030 480.00
Jumlah A 16,080.00
B BAHAN
1 Plamir Kg 10,000.00 0.1000 1,000.00
2 Cat Dasar Kg 45,000.00 0.1000 4,500.00
3 Cat Penutup Kg 50,000.00 0.2600 13,000.00
Jumlah B 18,500.00
C PERALATAN
Jumlah C -
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C) 34,580.00
Jumlah C -
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C) 63,350.00
Jumlah C -
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C) 1,341,340.00
36
2 5.1.1.2 Memasang Closet Jongkok
Harga Jumlah
No. Uraian Satuan Koefisien
Satuan Harga
A TENAGA KERJA
1 Pekerja Org/Hari 150,000.00 0.070 10,500.00
2 Tukang Batu Org/Hari 180,000.00 0.100 18,000.00
3 Kapala Tukang Org/Hari 200,000.00 0.010 2,000.00
4 Mandor Org/Hari 160,000.00 0.004 640.00
Jumlah A 31,140.00
B BAHAN
1 Closed Jongkok Buah 500,000.00 1.0000 500,000.00
2 Semen Portland Kg 1,700.00 6.0000 10,200.00
3 Pasir Pasang M3 200,000.00 0.0100 2,000.00
Jumlah B 510,200.00
C PERALATAN
Jumlah C -
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C) 541,340.00
37
2 5.1.1.14 Pemasangan 1 buah floor drain
Harga Jumlah
No. Uraian Satuan Koefisien
Satuan Harga
A TENAGA KERJA
1 Pekerja Org/Hari 150,000.00 0.010 1,500.00
2 Tukang Batu Org/Hari 180,000.00 0.100 18,000.00
3 Kapala Tukang Org/Hari 200,000.00 0.010 2,000.00
4 Mandor Org/Hari 160,000.00 0.005 800.00
Jumlah A 22,300.00
B BAHAN
1 Floor Drain Bh 80,000.00 1.000 80,000.00
Jumlah B 80,000.00
C PERALATAN
Jumlah C -
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C) 102,300.00
Jumlah C -
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C) 138,550.00
38
4 5.1.1.25 Pemasangan 1 m' pipa PVC tipe AW diameter 1/2"
Harga Jumlah
No. Uraian Satuan Koefisien
Satuan Harga
A TENAGA KERJA
1 Pekerja Org/Hari 150,000.00 0.036 5,400.00
2 Tukang Batu Org/Hari 180,000.00 0.060 10,800.00
3 Kapala Tukang Org/Hari 200,000.00 0.006 1,200.00
4 Mandor Org/Hari 160,000.00 0.002 320.00
Jumlah A 17,720.00
B BAHAN
1 Pipa PVC 1/2" m' 5,300.00 1.2000 6,360.00
2 Perlengkapan 35 % dari harga pipa % 2,226.00 1.0000 2,226.00
Jumlah B 8,586.00
C PERALATAN
Jumlah C -
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C) 26,306.00
Jumlah C -
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C) 28,880.00
39
6 5.1.1.31 Memasang 1 M' Pipa PVC AW Diameter 3"
Harga Jumlah
No. Uraian Satuan Koefisien
Satuan Harga
A TENAGA KERJA
1 Pekerja Org/Hari 150,000.00 0.081 12,150.00
2 Tukang Batu Org/Hari 180,000.00 0.135 24,300.00
3 Kapala Tukang Org/Hari 200,000.00 0.0135 2,700.00
4 Mandor Org/Hari 160,000.00 0.004 640.00
Jumlah A 39,790.00
B BAHAN
1 Pipa PVC 3" m' 53,000.00 1.2000 63,600.00
2 Perlengkapan 35 % dari harga pipa ls 18,550.00 1.0000 18,550.00
Jumlah B 82,150.00
C PERALATAN
Jumlah C -
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C) 121,940.00
40
7 5.1.1.32 Memasang 1 M' Pipa PVC AW Diameter 4"
Harga Jumlah
No. Uraian Satuan Koefisien
Satuan Harga
A TENAGA KERJA
1 Pekerja Org/Hari 150,000.00 0.036 5,400.00
2 Tukang Batu Org/Hari 180,000.00 0.060 10,800.00
3 Kapala Tukang Org/Hari 200,000.00 0.006 1,200.00
4 Mandor Org/Hari 160,000.00 0.002 320.00
Jumlah A 17,720.00
B BAHAN
1 Pipa PVC 4" m' 85,000.00 1.2000 102,000.00
2 Perlengkapan 35 % dari harga pipa ls 29,750.00 1.0000 29,750.00
Jumlah B 131,750.00
C PERALATAN
Jumlah C -
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C) 149,470.00
41
XIV PEKERJAAN INSTALASI LISTRIK
1 8.4.6.1 Pemasangan 1 buah titik lampu
Harga Jumlah
No. Uraian Satuan Koefisien
Satuan Harga
A TENAGA KERJA
1 Pekerja Org/Hari 150,000.00 0.2000 30,000.00
2 Tukang Listrik Org/Hari 180,000.00 0.3000 54,000.00
3 Kepala Tukang Listrik Org/Hari 200,000.00 0.0500 10,000.00
4 Mandor Org/Hari 160,000.00 0.0500 8,000.00
Jumlah A 102,000.00
B BAHAN
1 Kabel NYM 2 x 2,5 mm m' 10,000.00 5.000 50,000.00
2 Pipa Conduit m' 6,250.00 5.000 31,250.00
3 Fitting (Elbow, T-Dus, Mongkok) bh 20,000.00 3.000 60,000.00
4 Klem bh 10,000.00 4.000 40,000.00
5 Fisher dan skrup bh 7,000.00 4.000 28,000.00
7 Fitting Lampu bh 20,000.00 1.000 20,000.00
Jumlah B 229,250.00
C PERALATAN
Jumlah C -
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C) 331,250.00
Jumlah C -
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C) 368,250.00
42
1 Unit Pasang Stop Kontak
No. Harga Jumlah
Uraian Satuan Koefisien
Satuan Harga
A TENAGA KERJA
1 Pekerja Org/Hari 150,000.00 0.1650 24,750.00
2 Tukang Listrik Org/Hari 180,000.00 0.0165 2,970.00
3 Kepala Tukang Listrik Org/Hari 200,000.00 0.0300 6,000.00
4 Mandor Org/Hari 160,000.00 0.0150 2,400.00
Jumlah A 36,120.00
B BAHAN
1 Stop Kontak BH 40,000.00 1.000 40,000.00
2 Perlengkapan % 40,000.00 0.350 14,000.00
Jumlah B 54,000.00
C PERALATAN
Jumlah C -
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C) 90,120.00
Jumlah C -
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C) 98,850.00
Jumlah C -
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C) 108,800.00
43
1 Unit Pasang Lampu SL 25 Watt + fitting downlight 5"
No. Harga Jumlah
Uraian Satuan Koefisien
Satuan Harga
A TENAGA KERJA
1 Pekerja Org/Hari 150,000.00 0.4000 60,000.00
2 Tukang Listrik Org/Hari 180,000.00 0.0850 15,300.00
3 Kepala Tukang Listrik Org/Hari 200,000.00 0.0500 10,000.00
4 Mandor Org/Hari 160,000.00 0.0050 800.00
Jumlah A 86,100.00
B BAHAN
1 Lampu SL25 Watt Setara Philips BH 120,000.00 1.000 120,000.00
2 Lampu Hias Led BH 2,300,000.00 1.000 2,300,000.00
3 Perlengkapan % 2,420,000.00 0.035 84,700.00
Jumlah B 2,504,700.00
C PERALATAN
Jumlah C -
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C) 2,590,800.00
Jumlah C -
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C) 148,200.00
Jumlah C -
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C) 199,950.00
44
1 Unit Pasang Lampu Led 5 Watt + fitting downlight 5"
No. Harga Jumlah
Uraian Satuan Koefisien
Satuan Harga
A TENAGA KERJA
1 Pekerja Org/Hari 150,000.00 0.4000 60,000.00
2 Tukang Listrik Org/Hari 180,000.00 0.0850 15,300.00
3 Kepala Tukang Listrik Org/Hari 200,000.00 0.0500 10,000.00
4 Mandor Org/Hari 160,000.00 0.0050 800.00
Jumlah A 86,100.00
B BAHAN
1 Lampu Led 5 Watt Philips BH 25,000.00 1.000 25,000.00
2 Downlight 5" BH 60,000.00 1.000 60,000.00
3 Perlengkapan % 85,000.00 0.035 2,975.00
Jumlah B 87,975.00
C PERALATAN
Jumlah C -
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C) 174,075.00
Jumlah C -
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C) 1,756,565.00
V PEKERJAAN KAYU
1 Anl 1 M3 PEK. KUSEN PINTU/JENDELA KAYU KLAS II
No. Uraian Satuan Harga Koefisien Jumlah
Satuan Harga
A TENAGA KERJA
1 Tukang Kayu Org/Hari 180,000.00 18.0000 3,240,000.00
2 Kepala Tukang Org/Hari 200,000.00 2.0000 400,000.00
3 Pekerja Org/Hari 150,000.00 6.0000 900,000.00
4 Mandor Org/Hari 160,000.00 0.3000 48,000.00
Jumlah A 4,588,000.00
B BAHAN
1 Kayu Klas II M3 4,200,000.00 1.2000 5,040,000.00
Jumlah B 5,040,000.00
C PERALATAN
Jumlah C -
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C) 9,628,000.00
45
2 Anl Pemasangan 1 m2 dinding pemisah Calsiboard rangkap, rangka kayu kelas II
No. Uraian Satuan Harga Koefisien Jumlah
Satuan Harga
A TENAGA KERJA
1 Tukang Kayu Org/Hari 180,000.00 0.6000 108,000.00
2 Kepala Tukang Org/Hari 200,000.00 0.0600 12,000.00
3 Pekerja Org/Hari 150,000.00 0.2000 30,000.00
4 Mandor Org/Hari 160,000.00 0.0100 1,600.00
Jumlah A 151,600.00
B BAHAN
1 Balok Kayu Klas II M3 4,200,000.00 0.0280 117,600.00
2 Paku 7 cm – 10 cm Kg 20,000.00 0.1500 3,000.00
3 Caslsiboard Lbr 70,000.00 0.8600 60,200.00
4 Lem Kayu Kg 20,000.00 0.5600 11,200.00
Jumlah B 192,000.00
C PERALATAN
Jumlah C -
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C) 343,600.00
Jumlah C -
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C) 1,188,000.00
46
3 Anl Memasang 1 m2 Panel Dinding Multipleks Finish HPL
No. Uraian Satuan Harga Koefisien Jumlah
Satuan Harga
A TENAGA KERJA
1 Tukang Kayu Org/Hari 180,000.00 0.6000 108,000.00
2 Kepala Tukang Org/Hari 200,000.00 0.0600 12,000.00
3 Pekerja Org/Hari 150,000.00 0.2000 30,000.00
4 Mandor Org/Hari 160,000.00 0.0100 1,600.00
Jumlah A 151,600.00
B BAHAN
1 Multipleks 12 mm Lbr 120,000.00 0.8600 103,200.00
2 HPL 1 mm Lbr 285,000.00 0.8600 245,100.00
4 Lem Fox Kg 20,000.00 0.5600 11,200.00
Jumlah B 359,500.00
C PERALATAN
Jumlah C -
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C) 511,100.00
4 Anl Memasang 1 m1 lisplank ukuran (3 x 20) cm, kayu kelas I atau kelas II
No. Uraian Satuan Harga Koefisien Jumlah
Satuan Harga
A TENAGA KERJA
1 Tukang Kayu Org/Hari 180,000.00 0.2000 36,000.00
2 Kepala Tukang Org/Hari 200,000.00 0.0250 5,000.00
3 Pekerja Org/Hari 150,000.00 0.1000 15,000.00
4 Mandor Org/Hari 160,000.00 0.0050 800.00
Jumlah A 56,800.00
B BAHAN
1 Kayu Papan Klas II M3 4,200,000.00 0.0108 45,360.00
2 Paku campur Kg 20,000.00 0.1000 2,000.00
Jumlah B 47,360.00
C PERALATAN
Jumlah C -
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C) 104,160.00
47
5 Anl Memasang 1 m’ list langit-langit kayu profil
No. Uraian Satuan Harga Koefisien Jumlah
Satuan Harga
A TENAGA KERJA
1 Tukang Kayu Org/Hari 180,000.00 0.0500 9,000.00
2 Kepala tukang Org/Hari 200,000.00 0.0050 1,000.00
3 Pekerja Org/Hari 150,000.00 0.0500 7,500.00
4 Mandor Org/Hari 160,000.00 0.0300 4,800.00
Jumlah 22,300.00
B BAHAN
1 Lis plafond kayu profil M1 5,000.00 1.0500 5,250.00
2 Paku Kg 20,000.00 0.0100 200.00
Jumlah B 5,450.00
C PERALATAN
Jumlah C -
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C) 27,750.00
Jumlah C -
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C) 54,030.00
Jumlah C -
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C) 62,520.00
48
8 Anl Pemasangan 1 M1 list langit-langit gypsum board
No. Uraian Satuan Harga Koefisien Jumlah
Satuan Harga
A TENAGA KERJA
1 Pekerja Org/Hari 180,000.00 0.0500 9,000.00
2 Tukang Org/Hari 200,000.00 0.0500 10,000.00
3 Kepala Tukang Org/Hari 150,000.00 0.0050 750.00
4 Mandor Org/Hari 160,000.00 0.0030 480.00
Jumlah 20,230.00
B BAHAN
1 List gypsum board M1 20,000.00 1.0000 20,000.00
2 Paku sekerup Kg 35,000.00 0.0100 350.00
Jumlah B 20,350.00
C PERALATAN
Jumlah C -
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C) 40,580.00
Jumlah C -
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C) 11,070,600.00
Jumlah C -
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C) 10,598,600.00
49
RENCANA ANGGARAN BIAYA BAHAN
Jumlah 21,091,695.00
Total Sub-Pekerjaan Arsitektur 277,733,455.93
HARGA JUMLAH HARGA
NO. URAIAN DAN JENIS PEKERJAAN SAT VOLUME
(Rp) (Rp)
1 2 4 5 6
HARGA JUMLAH
NO. URAIAN DAN JENIS PEKERJAAN SAT VOLUME
(Rp) (Rp)
1 2 3 4 5 6
I. PEKERJAAN STRUKTUR
A. Pekerjaan Tanah dan Pondasi
1 Pek. Galian Pondasi Menerus M3 225 116,500.00 26,212,500.00
2 Pek. Urugan Tanah Kembali M3 75 38,800.00 2,910,000.00
3 Pek. Batu Kosong (Aanstamping) M3 45.0
- Batu belah 15 cm/20 cm RIT 8.3 2,275,000.00 18,900,000.00
- Pasir Urug RIT 3.0 1,170,000.00 3,499,200.00
4 Pek. Pondasi Batu Belah M3 126.0
- Batu Gunung RIT 23.3 2,275,000.00 52,920,000.00
- Semen Portland ZAK 411 85,000.00 34,914,600.00
- Pasir Pasang RIT 10.1 1,300,000.00 13,104,000.00
5 Pek. Pasangan Sloof 15/20
A. Pek. Beton Mutu K-175 M3 9.0
- Semen Portland (PC) ZAK 59 85,000.00 4,987,800.00
- Pasir Beton (PB) RIT 0.8 1,722,500.00 1,294,714.29
- Kerikil (Kr) RIT 1.1 2,309,333.00 2,437,234.52
- Air LITER 1935 90.00 174,150.00
B. Pek. Pembesian KG 2468.4
- Besi Beton Polos Ǿ 10 BATANG 227 185,000.00 41,958,000.00
- Besi Beton Polos Ǿ 8 BATANG 193 118,500.00 22,836,712.50
- Kawat beton KG 69 20,000.00 1,382,287.20
C. Pek. Bekisting M2 39.4
- Kayu Kelas III M3 1.8 2,205,000.00 3,906,984.37
- Paku 5 cm - 10 cm KG 11.8 20,000.00 236,250.00
- Minyak Bekisting LTR 3.9 12,500.00 49,218.75
Jumlah 231,723,651.63
B. Pekerjaan Dinding dan Rangka Bangunan
1 Pek. Pasangan Kolom 15/15
A. Pek. Beton Mutu K-175 M3 3.9
- Semen Portland (PC) ZAK 26 85,000.00 2,169,693.00
- Pasir Beton (PB) RIT 0.3 1,722,500.00 563,200.71
- Kerikil (Kr) RIT 0.5 2,309,333.00 1,060,197.02
- Air LITER 842 90.00 75,755.25
B. Pek. Pembesian KG 880.9
- Besi Beton Polos Ǿ 10 BATANG 99 185,000.00 18,251,730.00
- Besi Beton Polos Ǿ 8 BATANG 41 118,500.00 4,871,238.75
- Kawat beton KG 24.7 20,000.00 493,290.00
C. Pek. Bekisting untuk 5x Pakai M2 43.5
- Kayu Papan kelas III M3 1.7 2,205,000.00 3,836,700.00
- Paku 5 cm - 12 cm KG 17 20,000.00 348,000.00
- Minyak bekisting LTR 8.7 12,500.00 108,750.00
- Balok Kayu kelas III M3 0.7 2,205,000.00 1,438,762.50
- Multipleks tebal 9 mm LBR 0.4 120,000.00 42,000.00
- Dolken kayu ø8-10 ) cm- panj 4 m BTG 87 10,000.00 870,000.00
HARGA JUMLAH
NO. URAIAN DAN JENIS PEKERJAAN SAT VOLUME
(Rp) (Rp)
1 2 3 4 5 6
2 Pek. Pasangan Kolom Teras 20/20
A. Pek. Beton Mutu K-175 M3 1.1
- Semen Portland (PC) ZAK 7 85,000.00 631,788.00
- Pasir Beton (PB) RIT 0.1 1,722,500.00 163,997.14
- Kerikil (Kr) RIT 0.1 2,309,333.00 308,716.37
- Air LITER 245 90.00 22,059.00
B. Pek. Pembesian KG 97.1
- Besi Beton Polos Ǿ 10 BATANG 10 185,000.00 1,771,560.00
- Besi Beton Polos Ǿ 8 BATANG 7 118,500.00 777,518.00
- Kawat beton KG 2.7 20,000.00 54,380.33
C. Pek. Bekisting untuk 5x Pakai M2 4.1
- Kayu Papan kelas III M3 0.2 2,205,000.00 357,504.00
- Paku 5 cm - 12 cm KG 1.6 20,000.00 32,426.67
- Minyak bekisting LTR 0.8 12,500.00 10,133.33
- Balok Kayu kelas III M3 0.1 2,205,000.00 134,064.00
- Multipleks tebal 9 mm LBR 1.4 120,000.00 170,240.00
- Dolken kayu ø8-10 ) cm- panj 4 m BTG 8 10,000.00 81,066.67
3 Pek. Pasangan Balok Latei 13/13
A. Pek. Beton Mutu K-175 M3 0.8
- Semen Portland (PC) ZAK 6.5 85,000.00 554,200.00
- Pasir Beton (PB) RIT 0.1 1,722,500.00 118,155.63
- Kerikil (Kr) RIT 0.1 2,309,333.00 222,422.02
- Air LTR 177 90.00 15,892.93
B. Pek. Pembesian KG 167.0
- Besi Beton Polos Ǿ 6 BATANG 47 66,500.00 3,148,551.00
- Besi Beton Polos Ǿ 6 BATANG 19 66,500.00 1,234,607.06
- Kawat beton KG 5 20,000.00 93,507.37
C. Pek. Bekisting untuk 5x Pakai M2 6.3
- Kayu Kelas III M3 0.3 2,205,000.00 626,903.55
- Paku 5 cm - 10 cm KG 2 20,000.00 37,908.00
- Minyak Bekisting LTR 0.6 12,500.00 7,897.50
4 Pek. Pasangan Balok Latei 15/15
A. Pek. Beton Mutu K-175 M3 0.5
- Semen Portland (PC) ZAK 3.0 85,000.00 257,869.26
- Pasir Beton (PB) RIT 0.04 1,722,500.00 66,936.73
- Kerikil (Kr) RIT 0.1 2,309,333.00 126,005.02
- Air LTR 100 90.00 9,003.55
B. Pek. Pembesian KG 44.8
- Besi Beton Polos Ǿ 8 BATANG 7 118,500.00 857,703.00
- Besi Beton Polos Ǿ 6 BATANG 5 66,500.00 319,358.65
- Kawat beton KG 1.3 20,000.00 25,110.65
C.Pek. Bekisting untuk 5x Pakai M2 3.1
- Kayu Kelas III M3 0.1 2,205,000.00 307,795.95
- Paku 5 cm - 10 cm KG 1 20,000.00 18,612.00
- Minyak Bekisting LTR 0.3 12,500.00 3,877.50
HARGA JUMLAH
NO. URAIAN DAN JENIS PEKERJAAN SAT VOLUME
(Rp) (Rp)
1 2 3 4 5 6
5 Pek. Pasangan Ringbalok 15/20
A. Pek. Beton Mutu K-175 M3 3.4
- Semen Portland (PC) ZAK 22 85,000.00 1,870,425.00
- Pasir Beton (PB) RIT 0.3 1,722,500.00 485,517.86
- Kerikil (Kr) RIT 0.4 2,309,333.00 913,962.95
- Air LTR 726 90.00 65,306.25
B. Pek. Pembesian KG 309.6
- Besi Beton Polos Ǿ 10 BATANG 39 185,000.00 7,288,312.50
- Besi Beton Polos Ǿ 8 BATANG 7 118,500.00 839,160.00
- Kawat beton KG 9 20,000.00 173,386.08
C.Pek. Bekisting untuk 5x Pakai M2 7.5
- Kayu Kelas III M3 0.3 2,205,000.00 744,187.50
- Paku 5 cm - 10 cm KG 2.3 20,000.00 45,000.00
- Minyak Bekisting LTR 0.8 12,500.00 9,375.00
6 Pek. Pasangan Kanopi keliling Tebal 12 cm
A. Pek. Beton Mutu K-175 M3 1.3
- Semen Portland (PC) ZAK 9 85,000.00 738,859.44
- Pasir Beton (PB) RIT 0.1 1,722,500.00 191,790.34
- Kerikil (Kr) RIT 0.2 2,309,333.00 361,035.67
- Air LTR 287 90.00 25,797.42
B. Pek. Pembesian KG 44.4
- Besi Beton Polos Ǿ 6 BATANG 18 66,500.00 1,165,383.45
- Kawat beton KG 1.2 20,000.00 24,861.51
C.Pek. Bekisting untuk 5x Pakai M2 4.4
- Kayu Kelas III M3 0.2 2,205,000.00 440,955.90
- Paku 5 cm - 10 cm KG 1.3 20,000.00 26,664.00
- Minyak Bekisting LTR 0.4 12,500.00 5,555.00
7 Pek. Pasangan Kanopi keliling Tebal 22 cm
A. Pek. Beton Mutu K-175 M3 2.4
- Semen Portland (PC) ZAK 16 85,000.00 1,354,575.64
- Pasir Beton (PB) RIT 0.2 1,722,500.00 351,615.63
- Kerikil (Kr) RIT 0.3 2,309,333.00 661,898.73
- Air LTR 526 90.00 47,295.27
B. Pek. Pembesian KG 64.1
- Besi Beton Polos Ǿ 6 BATANG 25.3 66,500.00 1,683,331.65
- Kawat beton KG 1.8 20,000.00 35,911.08
C.Pek. Bekisting untuk 5x Pakai M2 7.4
- Kayu Kelas III M3 0.3 2,205,000.00 734,926.50
- Paku 5 cm - 10 cm KG 2.2 20,000.00 44,440.00
- Minyak Bekisting LTR 0.7 12,500.00 9,258.33
8 Pek. Pasangan Kanopi Teras
A. Pek. Beton Mutu K-175 M3 0.9
- Semen Portland (PC) ZAK 6.0 85,000.00 509,864.00
- Pasir Beton (PB) RIT 0.1 1,722,500.00 132,348.57
- Kerikil (Kr) RIT 0.1 2,309,333.00 249,139.53
- Air LTR 198 90.00 17,802.00
B. Pek. Pembesian KG 19.4
- Besi Beton Polos Ǿ 6 BATANG 7.7 66,500.00 509,323.50
- Kawat beton KG 0.5 20,000.00 10,865.57
C.Pek. Bekisting untuk 5x Pakai M2 4.6
- Kayu Kelas III M3 0.2 2,205,000.00 456,435.00
- Paku 5 cm - 10 cm KG 1.4 20,000.00 27,600.00
- Minyak Bekisting LTR 0.5 12,500.00 5,750.00
10 Pek. Pasangan Bata Merah Camp. 1 : 4 M2 442.3
- Batu bata BIJI 30964 700.00 21,675,150.00
- Semen ZAK 102 85,000.00 8,647,942.50
- Pasir Pasang RIT 2.9 1,300,000.00 3,804,210.00
Jumlah 103,082,307.50
HARGA JUMLAH
NO. URAIAN DAN JENIS PEKERJAAN SAT VOLUME
(Rp) (Rp)
1 2 3 4 5 6
II. PEKERJAAN ARSITEKTUR
A. Pekerjaan Lantai
1 Pek. Rabat Beton Lantai tebal 5 cm M3 8.4
- Semen Portland (PC) ZAK 38 85,000.00 3,241,560.00
- Pasir Beton (PB) RIT 0.8 1,722,500.00 1,381,710.00
- Kerikil (Kr) RIT 1.0 2,309,333.00 2,210,643.56
- Air LTR 1806 90.00 162,540.00
2 Pek. Urugan Pasir Bawah Lantai M3 8.4
- Pasir Urug RIT 1.6 1,170,000.00 1,814,400.00
3 Pek. Urugan Tanah Bawah Lantai M3 33.6
- Sirtu RIT 6.2 520,000.00 3,225,600.00
4 Pek. Lantai Keramik 80 x 80 M2 145.0
- Tegel Keramik 80 x 80 cm DUS 225 300,000.00 67,425,000.00
- Semen warna KG 139 28,000.00 3,897,600.00
- Semen portland ZAK 4.4 85,000.00 369,750.00
- Pasir Pasang RIT 1.0 1,300,000.00 1,305,000.00
5 Pek. Lantai Keramik 40 x 40 M2 26.4
- Tegel Warna 40 x 40 Cm DUS 140 85,000.00 11,875,180.00
- Semen warna KG 26 28,000.00 738,080.00
- Semen portland ZAK 5.5 85,000.00 466,044.80
- Pasir Pasang RIT 0.2 1,300,000.00 237,240.00
6 Pek. Plint Lantai Keramik 10 x 60 M1 98.8
- Tegel Plint Keramik 10 x 60 Cm DUS 28 90,000.00 2,518,125.00
- Semen portland ZAK 2.3 85,000.00 191,377.50
- Pasir Pasang RIT 0.05 1,300,000.00 59,250.00
- Semen warna KG 10 28,000.00 276,500.00
7 Pek. Keramik 20x20 untuk KM M2 5.9
- Tegel Anti slip 20 x 20 Cm DUS 6.3 80,000.00 502,864.00
- Semen warna KG 6 28,000.00 166,040.00
- Semen portland ZAK 1.2 85,000.00 104,842.40
- Pasir Pasang RIT 0.04 1,300,000.00 53,370.00
8 Pek. Keramik 20x20 untuk dinding KM M2 27.3
- Tegel Dinding Keramik 20 x20 Cm DUS 29 80,000.00 2,312,496.00
- Semen portland ZAK 5 85,000.00 431,138.70
- Pasir Pasang RIT 0.1 1,300,000.00 98,172.00
Jumlah 105,064,523.96
B. Pekerjaan Plesteran
1 Pek. Plesteran Dinding Camp. 1 : 5 tebal 1,5 cm M2 799.6
- Semen Portlan (PC) ZAK 83 85,000.00 7,046,714.88
- Pasir Pasang (PP) RIT 3.2 1,300,000.00 4,157,920.00
2 Pekerjaan Acian Dinding M2 799.6
- Semen ZAK 52 85,000.00 4,417,790.00
Jumlah 15,622,424.88
C. Pekerjaan Plafond dan Atap
1 Pek. Rangka Baja ringan M2 366.3
- Main Trus C 75 - 75 BATANG 171 114,000.00 19,487,179.49
- Reef Botton / Reng R 33-0,45 BATANG 281 60,000.00 16,849,816.85
- Self drilling Screw dia 6 x 20 mm (Truss Screw) DUS 12 250,000.00 3,113,553.11
- Self drilling Screw dia 4 x 16 mm (Roof Bottom Screw) DUS 18 250,000.00 4,395,604.40
- Dynabolt 12 x 120 mm DUS 7 302,500.00 2,014,652.01
- Alat bantu LS 12.8 35,500.00 455,128.21
HARGA JUMLAH
NO. URAIAN DAN JENIS PEKERJAAN SAT VOLUME
(Rp) (Rp)
1 2 3 4 5 6
2 Pek. Atap Spandek M2 366.3
- Genteng Metal LEMBAR 476 49,000.00 23,333,333.33
- Baut Spandek 4,5cm DUS 44 50,000.00 2,197,802.20
3 Pek. Nok dan Jurai Atap Metal M1 80.4
- Nok Genteng Metal LMBR 88 35,000.00 3,093,860.00
- Paku Atap KG 4 20,000.00 80,360.00
4 Pek. Listplank 1x20 cm M1 300.0
Kayu Papan Klas II M3 3.2 4,200,000.00 13,608,000.00
Paku 5 dan 7 cm KG 30.0 20,000.00 600,000.00
5 Pek. Rangka Plafond Besi Hollow Modul 60 x 60 cm M2 154.5
- Rangka Besi Hollow 40.40.2 cm BATANG 154 88,000.00 13,591,600.00
- Assesoris (perkuatan, las dll) LS 154 30,800.00 4,757,060.00
6 Pek. Plafond Gypsum t= 9 mm M2 154.5
- Gypsum Board LMBR 56 80,000.00 4,497,584.00
- Sekrup Gypsum DUS 17 35,000.00 594,632.50
7 Pas. List Plafond Gipsum BATANG 66 40,000.00 2,656,000.00
Jumlah 115,326,166.10
D. Pekerjaan Kusen dan Aksesoris
1 Pembuatan dan Pemasangan Kusen Kayu Kelas II (Pintu,Jendela & Ventilasi) 0.9
- Kayu Klas II M3 1.1 4,200,000.00 4,611,600.00
2 Pembuatan dan Pemasangan Daun Pintu & Jendela Kayu Kelas II M3 1.7
- Papan Kayu Klas II M3 0.2 4,200,000.00 723,240.00
- Lem Kayu KG 1 20,000.00 17,220.00
3 Pek. Pemasangan Pintu WC BH 2 920,000.00 1,840,000.00
4 Pek. Pengadaan dan Pemasangan Pintu Jendela Aluminium
A. Pembuatan dan Pemasangan Kusen Aluminium M1 13.0
- Profil Aluminium 4" M1 14 100,000.00 1,430,000.00
- Skrup Fixer BH 26 500.00 13,000.00
- Sealant BOTOL 1 66,000.00 51,480.00
B. Pembuatan dan Pemasangan Daun Pintu Aluminium M2 3.3
- Profil Aluminium M1 15 80,000.00 1,177,088.00
- Aluminium Strip M1 49 45,000.00 2,197,008.00
C. Pek. Pemasangan Handle Pintu dan Kunci Tanam BH 2 268,500.00 537,000.00
D. Pek. Rel sliding door SET 2 300,000.00 600,000.00
E. Pek. Pemasangan Kaca pintu 3mm M2 5 131,300.00 674,882.00
5 Pek. Pemasangan Handle Pintu dan Kunci Tanam BH 7 200,000.00 1,400,000.00
6 Pek. Pemasangan Engsel Pintu BH 21 45,000.00 945,000.00
7 Pek. Pemasangan Engsel Jendela BH 38 40,000.00 1,520,000.00
8 Pek. Pemasangan Rel sliding door SET 2 300,000.00 600,000.00
9 Pek. Pemasangan Kaca 3mm M2 13 90,000.00 1,157,400.00
10 Pek. Pasangan Grendel Daun Jendela BH 23 26,000.00 598,000.00
11 Pek. Pasangan Kait Daun Jendela Standar BH 38 15,000.00 570,000.00
12 Pek. Pemasangan Lubang Udara Roster Block BH 18 35,000.00 630,000.00
Jumlah 21,292,918.00
E. Pekerjaan Pengecetan
1 Pek. Pengecetan Tembok Baru (Cat Dasar, Cat Penutup) M2 799.6
- Plamir KG 80 10,000.00 799,600.00
- Cat Dasar KG 80 45,000.00 3,598,200.00
- Cat Penutup KG 208 50,000.00 10,394,800.00
2 Pek. Pengecetan Plafond Gypsum (Plamir, Cat Penutup) M2 182.9
- Plamir KG 18 10,000.00 182,870.00
- Cat Dasar KG 18 45,000.00 822,915.00
- Cat Penutup KG 48 50,000.00 2,377,310.00
3 Pek. PengecetanPengecatan Kalsiplank 3 x sapu Cat Minyak M2 90.0
- Cat meni KG 18 25,000.00 450,000.00
- Plamir KG 14 15,000.00 202,500.00
- Cat dasar KG 15.3 45,000.00 688,500.00
- cat penutup/kilap 3 x KG 31 50,000.00 1,575,000.00
Jumlah 21,091,695.00
HARGA JUMLAH
NO. URAIAN DAN JENIS PEKERJAAN SAT VOLUME
(Rp) (Rp)
1 2 3 4 5 6
III. PEKERJAAN MEKANIKAL ELEKTRIKAL PLUMBING
A. Pekerjaan Instalasi Listrik
1 Pek. Pasangan Instalasi Penerangan TITIK 100.0
- Kabel NYM 2 x 2,5 mm M1 500 10,000.00 5,000,000.00
- Pipa Conduit M1 500 6,250.00 3,125,000.00
- Fitting (Elbow, T-Dus, Mongkok) BH 300 20,000.00 6,000,000.00
- Klem BH 400 10,000.00 4,000,000.00
- Fisher dan skrup BH 400 7,000.00 2,800,000.00
- Fitting Lampu BH 100 20,000.00 2,000,000.00
2 Pek. Pas. Lampu HIAS LED BH 8 2,300,000.00 18,400,000.00
3 Pek. Pas. Lampu LED 11 Watt Setara Philips BH 60.0
- Lampu Led 11 Watt Philips BH 60 50,000.00 3,000,000.00
- Downlight 5" BH 60 60,000.00 3,600,000.00
- Perlengkapan LS 2 110,000.00 231,000.00
4 Pek. Pas. Lampu LED 5 Watt BH 20.0
- Lampu Led 5 Watt Philips BH 20 25,000.00 500,000.00
- Downlight 5" BH 20 60,000.00 1,200,000.00
- Perlengkapan LS 0.7 85,000.00 59,500.00
5 Pek. Pasangan Stop Kontak Tanam BH 30.0
- Stop Kontak BH 30 40,000.00 1,200,000.00
- Perlengkapan LS 11 40,000.00 420,000.00
6 Pek. Pasang Saklar Ganda Tanam BH 20.0
- Saklar Ganda BH 20.0 40,000.00 800,000.00
- Perlengkapan LS 7.0 40,000.00 280,000.00
7 Pek. Pasang Saklar Tunggal Tanam BH 20.0
- Saklar Tunggal BH 20 35,000.00 700,000.00
- Perlengkapan LS 7 35,000.00 245,000.00
Jumlah 53,560,500.00
B. Pekerjaan Jaringan Air
1 Pek. Pemasangan Floor Drain BH 6.0 80,000.00 480,000.00
2 Pek. Pemasangan Closet Duduk BH 3.0
- Closed Duduk BH 3.0 1,300,000.00 3,900,000.00
- Semen Portland KG 18.0 1,700.00 30,600.00
- Pasir Pasang M3 0.030 200,000.00 6,000.00
3 Pek. Pemasangan Closet Jongkok BH 1.0
- Closed Jongkok BH 1.0 500,000.00 500,000.00
- Semen Portland KG 6.0 1,700.00 10,200.00
- Pasir Pasang M3 0.010 200,000.00 2,000.00
4 Pek. Pemasangan Kran Air 1/2" BH 10.0
- Kran air BH 10 55,000.00 550,000.00
- Seal tape BH 2.5 5,000.00 12,500.00
5 Pek. Pemasangan Pipa PVC dia. 1/2" M1 101.7
- Pipa PVC 1/2" M1 122 5,300.00 646,494.00
- Perlengkapan 35 % dari harga pipa LS 102 2,226.00 226,272.90
6 Pek. Pemasangan Pipa PVC dia. 3" M1 42.0
- Pipa PVC 3" M1 50 53,000.00 2,671,200.00
- Perlengkapan 35 % dari harga pipa LS 42 18,550.00 779,100.00
7 Pek. Pemasangan Pipa PVC dia. 4" M1 50.0
- Pipa PVC 4" M1 60 85,000.00 5,100,000.00
- Perlengkapan 35 % dari harga pipa LS 50 29,750.00 1,487,500.00
8 Pek. Pembuatan Septic Tank + Resapan LS 2 2,500,000.00 5,000,000.00
Jumlah 21,401,866.90
KEBUTUHAN BAHAN BANGUNAN
PEKERJAAN : CARPORT
LOKASI : KOTA KENDARI
OWNER : MRS. S
.
HARGA
NO. URAIAN JENIS TENAGA / BAHAN SATUAN
('Rp.)
1 2 3 4
I UPAH TENAGA KERJA :
1 Pekerja Hari 150,000.00
2 Mandor Hari 160,000.00
3 Tukang Batu Hari 180,000.00
4 Tukang Kayu Hari 180,000.00
5 Tukang Besi, Aluminium Hari 180,000.00
6 Tukang Cat Hari 180,000.00
7 Kepala Tukang Batu, Kayu, Besi, Cat Hari 200,000.00
II HARGA BAHAN
1 Tanah Timbunan (didatangkan) M3 80,000.00
2 Pasir Urug M3 180,000.00
3 Pasir Pasangan M3 200,000.00
4 Pasir Beton M3 265,000.00
Pasir Beton Kg 189.29
5 Kerikil M3 355,282.00
Krikil (Maks 30 mm) Kg 263.17
6 Batu Pecah/Suplit 1-2 cm M3 449,263.00
Batu Pecah/Suplit Kg 309.84
7 Batu Gunung M3 350,000.00
8 Air Ltr 90.00
9 Batu bata Bh 700.00
10 Paving Blok M2 120,000.00
11 Portland Cemen ( PC ) Kg 1,700.00
12 Portland Cemen ( PC ) Zak 85,000.00
13 Semen Warna Kg 28,000.00
14 Semen Nat Kg 28,000.00
15 Papan Kayu Jati M3 6,279,000.00
16 Balok Kayu Klas I M3 6,279,000.00
17 Balok Kayu Klas II M3 4,200,000.00
18 Balok Kayu Klas III M3 3,360,000.00
18 Papan Kayu Kelas I M3 6,279,000.00
19 Papan Kayu Kelas II M3 4,200,000.00
20 Kaso 5/7 Kls II M3 4,200,000.00
21 Reng 3/4 M3 4,200,000.00
20 Papan Kayu Kelas IV ( Bekesting ) M3 2,205,000.00
21 Kayu dolken diameter 8 cm btg 10,000.00
22 Lem Kayu Merk Fox Kg 20,000.00
23 List plafond kayu profil M1 5,000.00
24 List Gypsum M1 20,000.00
25 Lis kaca 1x 1 cm M1 3,500.00
26 Pintu/Jendela Aluminum M1 180,000.00
27 Profil Kaca M1 50,000.00
28 Kusen Aluminium Profil 4" M1 100,000.00
29 Profil Alumunium M1 80,000.00
30 Aluminium Strip M1 45,000.00
31 Bajar Ringan C 75 Btg 120,000.00
32 Besi Hollow t= 4.0 x 4.0 cm M1 22,000.00
33 Besi Hollow t= 4.0 x 2.0 cm M1 15,000.00
34 Besi Hollow t= 4.0 x 6.0 cm M1 36,666.67
35 Main Truss C 75 - 75 M1 19,000.00
36 Reef Botton / Reng R 33-0,45 M1 10,000.00
37 Besi Plat Baja Kg 28,000.00
38 Besi Polos Kg 25,000.00
39 Besi Ulir Kg 28,000.00
40 Baut (Srew driver) Bh 700.00
41 Selft drilling screw dia 6 x 20 mm(truss screw) Bh 500.00
65
HARGA
NO. URAIAN JENIS TENAGA / BAHAN SATUAN
('Rp.)
1 2 3 4
42 Selft drilling screw dia 4 x 16 mm (roof botton screw) Bh 500.00
43 Dynabolt 12 x 120 mm Bh 5,500.00
44 Insulasi ISOFLEX M2 50,000.00
44 Sekrup Bh 500.00
45 Sekrup Gypsum Kg 35,000.00
46 Sealant Tube 66,000.00
46 Tegel Geranit 80 x 80 Cm (motif) Bh 150,000.00
47 Tegel Geranit 60 x 60 Cm (motif) Bh 90,000.00
48 Tegel Keramik 60 x 60 Cm Anti Sliip Bh 50,000.00
49 Tegel Plint Geranit 10 x 60 Cm (motif) Bh 15,000.00
50 Tegel Keramik 50 x 50 Cm (motif) Bh 25,000.00
51 Tegel Keramik 50 x 50 Cm Anti Sliip Bh 25,000.00
52 Tegel Plint Keramik 10 x 50 Cm (motif) Bh 5,000.00
53 Tegel Keramik 40 x 40 Cm Bh 17,000.00
54 Tegel Plint Keramik 10 x 40 Cm Bh 4,250.00
55 Tegel Keramik 30 x 30 Cm Polos Bh 6,363.64
56 Tegel Plint Keramik 10 x 30 Cm (motif) Bh 6,363.64
57 Tegel Keramik 30 x 30 Cm (polos) Bh 6,363.64
58 Tegel Plint Keramik 10 x 30 Cm (polos) Bh 3,181.82
59 Tegel Keramik anti slip KM 20 x 20 Cm Bh 3,200.00
Tegel Keramik 20 x 20 Cm (Polos) Bh 2,500.00
60 Tegel Keramik Dinding 20 x 25 Cm Bh 3,200.00
61 Keramik Batu Alam M2 200,000.00
62 Nok Seng 40 CM M' 30,000.00
63 Atap Genteng Metal Soka Jempol Lbr 75,000.00
64 Atap Metal Spandek aspal Lbr 49,000.00
65 Nok Genteng Metal Soka Jempol Lbr 35,000.00
66 Baut Spandek 4,5cm Bh 1,000.00
67 Calsiboard 3 mm Lbr 70,000.00
68 Gypsum board Lbr 80,000.00
69 Wood Plank Lbr 60,000.00
70 Plywood 9 mm Lbr 80,000.00
71 Multipleks 9 mm Lbr 120,000.00
72 HPL 1 mm Lbr 285,000.00
73 Besi Beton Kg 21,000.00
74 Kawat Bindrat Kg 20,000.00
75 Kawat Las Kg 20,000.00
76 Paku Campur Kg 20,000.00
77 Paku Tripleks Kg 25,000.00
78 Paku seng Kg 25,000.00
79 Paku Genteng Metal Kg 20,000.00
80 Saklar Ganda Kg 40,000.00
81 Saklar Tunggal Bh 35,000.00
82 Stop Kontak Bh 40,000.00
83 Fitting Standar Bh 20,000.00
84 Lampu Led 11 Watt Philips Bh 50,000.00
85 Lampu Led 5 Watt Philips Bh 25,000.00
86 Lampu SL15 Watt Setara Philips Bh 40,000.00
87 Lampu SL25 Watt Setara Philips Bh 120,000.00
88 Lampu Hias Led Bh 2,300,000.00
89 Downlight 5" Bh 60,000.00
90 Kabel NYM 2 x 2,5 mm m' 10,000.00
91 Pipa Conduit m' 6,250.00
92 Fitting (elbow, male, bust) bh 20,000.00
93 Sadle/klem bh 10,000.00
94 Fisher dan skrup bh 7,000.00
95 Flexible Conduit PVC 20 mm m' 500.00
96 Tee dos bh 2,500.00
97 Mini Circuit Breaker ( MCB ) Bh 200,000.00
98 Kunci Tanam Anchor 693 LD 2 x putar pintu tunggal Bh 170,000.00
99 Kunci Tanam Anchor 693 LD 2 x putar pintu doble Bh 200,000.00
100 Kunci Pintu Kaca Bh 250,000.00
101 Rel sliding door Bh 300,000.00
66
HARGA
NO. URAIAN JENIS TENAGA / BAHAN SATUAN
('Rp.)
1 2 3 4
102 Patch Fitting Bh 500,000.00
103 Patch Lock Bh 1,000,000.00
104 Floor Hinge Bh 700,000.00
105 Engsel Pintu Type H Psg 45,000.00
106 Engsel Pintu Kaca Psg 50,000.00
107 Engsel Pintu Type Kupu Kupu Psg 45,000.00
108 Engsel Jendela Type Kupu Kupu Psg 40,000.00
109 Grendel Pintu Panjang Bh 25,000.00
110 Grendel Jendela Bh 10,000.00
111 Pegangan Pintu Steenlis Bh 600,000.00
112 Kait-kait Angin Bh 15,000.00
113 Kaca Ryben 5 mm M2 150,000.00
114 Kaca Tempered 12 mm M2 2,500,000.00
115 Fiber glass bening 3 mm M2 480,000.00
116 Spring Knip Bh 26,000.00
117 Cat Duco Kg 50,000.00
118 Cat Meny Seng/Besi Kg 25,000.00
119 Meny kayu Kg 25,000.00
120 Meny Besi Kg 25,000.00
121 Minyak cat Ltr 9,000.00
122 Minyak bekisting Ltr 12,500.00
123 Kuas Bh 20,000.00
124 Cat Dasar Kg 45,000.00
125 Cat Aviteks Kg 50,000.00
126 Cat Tembok Setara Metroligh Kg 40,000.00
127 Cat Atap / setara AGA Kg 45,000.00
128 Cat Kilap Kayu / setara glotex Kg 50,000.00
129 Cat Vernis Kayu Kg 50,000.00
130 Plamir Kayu Kg 15,000.00
131 Plamir Tembok Jadi Kg 10,000.00
132 Amplas Kayu Lbr 10,000.00
133 Dempul Kayu Kg 25,000.00
134 Lem Kayu Merk Fox Kg 18,000.00
135 Besi Beugel/baut/Angker Kuda-kuda Kg 27,000.00
136 Baut dia 12 Bh 27,000.00
115 Pipa Pvc 1/2" Wavin/Maspion M' 5,300.00
116 Pipa Pvc 3/4" Wavin/Maspion M' 7,200.00
117 Pipa Pvc 2" Wavin/Maspion M' 27,000.00
118 Pipa Pvc 3" Wavin/Maspion M' 53,000.00
119 Pipa Pvc 4" Wavin/Maspion M' 85,000.00
120 Klosed Jongkok Bh 500,000.00
121 Klosed Duduk Siram Bh 1,300,000.00
122 Bak Air Fiber Glas Bh 450,000.00
123 Wastafel Bh 1,000,000.00
124 Kran Air Bh 55,000.00
125 Floor Drain Bh 80,000.00
126 Seal Tape Bh 5,000.00
127 Pintu PVC Km/Wc Bh 920,000.00
128 Pengelasan Pipa cm 2,000.00
129 Rumput Gajah Mini M2 85,000.00
119 Kawat Duri M1 2,000.00
120 Beton Roster Bh 35,000.00
121 Jendela Boven Bh 215,000.00
122 Kaca tebal 5 mm M2 160,000.00
122 Kaca tebal 3mm M2 90,000.00
67
1,722,500.00
265,000.00
2,309,333.00
355,282.00
2,275,000.00
980,000.00
88,000.00
60,000.00
114,000.00
60,000.00
250,000.00
68
300,000.00
90,000.00
85,000.00
80,000.00
50,000.00
69
REKAPITULASI ANGGARAN BIAYA
PEKERJAAN : CARPORT
LOKASI : KOTA KENDARI
OWNER : MRS. S
JUMLAH
NO URAIAN DAN JENIS PEKERJAAN
HARGA
I. PEKERJAAN STRUKTUR 71,265,709.62
II. PEKERJAAN ARSITEKTUR 34,806,780.00
III. PEKERJAAN MEP 4,579,850.00
A REAL COST 110,652,339.62
C TOTAL Rp 110,650,000.00
JUMLAH
NO URAIAN DAN JENIS PEKERJAAN
HARGA
I. PEKERJAAN STRUKTUR 53,948,455.52
II. PEKERJAAN ARSITEKTUR 34,806,780.00
III. PEKERJAAN MEP 3,041,975.00
A REAL COST 91,797,210.52
C TOTAL Rp 91,750,000.00
Terbilang : ENAM PULUH LIMA JUTA DUA RATUS LIMA PULUH RIBU RUPIAH
RENCANA ANGGARAN BIAYA (RAB)
PEKERJAAN : CARPORT
LOKASI : KOTA KENDARI
OWNER : MRS. S
A.4.1.1.9 1m3 Pembuatan Beton Mutu fc 14,5 Mpa (K175), slump (12±2) cm, w/c= 0,66
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 1.650 100,000.00 165,000.00
Tukang Batu L.02 OH 0.275 130,000.00 35,750.00
Kepala Tukang L.03 OH 0.028 150,000.00 4,200.00
Mandor L.04 OH 0.083 110,000.00 9,130.00
JUMLAH TENAGA KERJA 214,080.00
B BAHAN
Semen Portland Kg 326.000 1,460.00 475,960.00
Pasir Beton Kg 760.000 160.71 122,142.86
Batu Pecah/Suplit Kg 1,029.000 210.54 216,644.95
Air Liter 215.000 70.00 15,050.00
JUMLAH HARGA BAHAN 829,797.81
C PERALATAN
- - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 1,043,877.81
E Overhead + Profit 15 % x D 0.15 156,581.67
F Harga Satuan Pekerjaan (D + E) 1,200,459.48
74
A.4.1.1.9 Pemasangan 1 BH Buis Beton Dia. Luar 80 cm, Tbl. 6 cm, Tinggi 60 cm
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.250 100,000.00 25,000.00
Tukang Batu L.02 OH 0.150 130,000.00 19,500.00
Kepala Tukang L.03 OH 0.010 150,000.00 1,500.00
Mandor L.04 OH 0.005 110,000.00 550.00
JUMLAH TENAGA KERJA 46,550.00
B BAHAN
Beton Mutu 1 K175 M3 0.080 1,043,877.81 83,510.22
JUMLAH HARGA BAHAN 83,510.22
C PERALATAN
Sewa Mal. Pracetak Ls 1.0000 20,000.00 20,000.00
JUMLAH HARGA ALAT 20,000.00
D Jumlah (A+B+C) 150,060.22
E Overhead + Profit 15 % x D 0.15 22,509.03
F Harga Satuan Pekerjaan (D + E) 172,569.26
75
A.4.1.1.21 Pemasangan 1 m2 bekisting untuk Balok (2x Pakai)
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.330 100,000.00 33,000.00
Tukang Kayu L.02 OH 0.165 130,000.00 21,450.00
Kepala Tukang L.03 OH 0.017 150,000.00 2,475.00
Mandor L.04 OH 0.017 110,000.00 1,815.00
JUMLAH TENAGA KERJA 58,740.00
B BAHAN
Kayu Papan kelas III (Bekisting) m³ 0.020 1,600,000.00 32,000.00
Paku 5 cm - 12 cm Kg 0.200 18,000.00 3,600.00
Minyak bekisting Liter 0.100 9,000.00 900.00
Balok Kayu kelas III (Bekisting) m³ 0.009 1,600,000.00 14,400.00
Multipleks tebal 9 mm Lbr 0.175 120,000.00 21,000.00
Dolken kayu .. 8-10) cm- panj 4 m Batang 1.000 9,000.00 9,000.00
JUMLAH HARGA BAHAN 80,900.00
C PERALATAN
- - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 139,640.00
E Overhead + Profit 15 % x D 0.15 20,946.00
F Harga Satuan Pekerjaan (D + E) 160,586.00
76
A.4.4.2.3 Pemasangan 1 m2 plesteran 1SP:3PP tebal 15mm
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.300 100,000.00 30,000.00
Tukang Batu L.02 OH 0.150 130,000.00 19,500.00
Kepala Tukang L.03 OH 0.015 150,000.00 2,250.00
Mandor L.04 OH 0.015 110,000.00 1,650.00
JUMLAH TENAGA KERJA 53,400.00
B BAHAN
Semen Portland Kg 7.776 1,460.00 11,352.96
Pasir pasang M3 0.023 225,000.00 5,175.00
JUMLAH HARGA BAHAN 16,527.96
C PERALATAN
- - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 69,927.96
E Overhead + Profit 15 % x D 0.15 10,489.19
F Harga Satuan Pekerjaan (D + E) 80,417.15
77
A.4.6.1. HARGA SATUAN PEKERJAAN KAYU
A.4.6.1.13 Pemasangan 1 m3 konstruksi kuda-kuda expose, kayu kelas II
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 6.7000 100,000.00 670,000.00
Tukang kayu L.02 OH 20.1000 130,000.00 2,613,000.00
Kepala Tukang L.03 OH 2.0100 150,000.00 301,500.00
Mandor L.04 OH 0.3350 110,000.00 36,850.00
JUMLAH TENAGA KERJA 3,621,350.00
B BAHAN
Kayu Kls.II M3 1.2000 2,600,000.00 3,120,000.00
Besi Strip tebal 5mm Kg 15.0000 20,000.00 300,000.00
Paku 12 cm Kg 5.6000 18,000.00 100,800.00
JUMLAH HARGA BAHAN 3,520,800.00
C PERALATAN
- - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 7,142,150.00
E Overhead + Profit 15 % x D 0.15 1,071,322.50
F Harga Satuan Pekerjaan (D + E) 8,213,472.50
78
A.4.6.1.22 Pemasangan 1 m’ lisplank ukuran (1 x 20) cm, Wood plank
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.1000 100,000.00 10,000.00
Tukang kayu L.02 OH 0.2000 130,000.00 26,000.00
Kepala Tukang L.03 OH 0.0200 150,000.00 3,000.00
Mandor L.04 OH 0.0050 110,000.00 550.00
JUMLAH TENAGA KERJA 39,550.00
B BAHAN
Wood Plank Lbr 0.2500 60,000.00 15,000.00
Skrup Bh 26.0000 500.00 13,000.00
JUMLAH HARGA BAHAN 28,000.00
C PERALATAN
- - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 67,550.00
E Overhead + Profit 15 % x D 0.15 10,132.50
F Harga Satuan Pekerjaan (D + E) 77,682.50
79
A.4.6.1.13B Pemasangan 1 m3 Balok Expose kayu kelas II
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 2.5000 100,000.00 250,000.00
Tukang kayu L.02 OH 8.0000 130,000.00 1,040,000.00
Kepala Tukang L.03 OH 1.0000 150,000.00 150,000.00
Mandor L.04 OH 0.2000 110,000.00 22,000.00
JUMLAH TENAGA KERJA 1,462,000.00
B BAHAN
Balok kayu Klas II M3 1.1000 2,600,000.00 2,860,000.00
Paku 5 dan 10 cm Kg 2.8000 18,000.00 50,400.00
JUMLAH HARGA BAHAN 2,910,400.00
C PERALATAN
- - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 4,372,400.00
E Overhead + Profit 15 % x D 0.15 655,860.00
F Harga Satuan Pekerjaan (D + E) 5,028,260.00
80
A.4.6.1.13B 1 M3 PEK. KUSEN PINTU/JENDELA KAYU KLAS II
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 6.0000 100,000.00 600,000.00
Tukang kayu L.02 OH 18.0000 130,000.00 2,340,000.00
Kepala Tukang L.03 OH 2.0000 150,000.00 300,000.00
Mandor L.04 OH 0.3000 110,000.00 33,000.00
JUMLAH TENAGA KERJA 3,273,000.00
B BAHAN
Balok kayu Klas II M3 1.2000 2,600,000.00 3,120,000.00
JUMLAH HARGA BAHAN 3,120,000.00
C PERALATAN
- - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 6,393,000.00
E Overhead + Profit 15 % x D 0.15 958,950.00
F Harga Satuan Pekerjaan (D + E) 7,351,950.00
81
A.4.6.1.13B 1 M2 PEK. PAS. KACA Bening 5 mm
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.0150 100,000.00 1,500.00
Tukang kayu L.02 OH 0.1500 130,000.00 19,500.00
Kepala Tukang L.03 OH 0.0150 150,000.00 2,250.00
Mandor L.04 OH 0.0008 110,000.00 82.50
JUMLAH TENAGA KERJA 23,332.50
B BAHAN
Kaca Bening M3 1.1000 150,000.00 165,000.00
JUMLAH HARGA BAHAN 165,000.00
C PERALATAN
- - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 188,332.50
E Overhead + Profit 15 % x D 0.15 28,249.88
F Harga Satuan Pekerjaan (D + E) 216,582.38
82
A.4.7.1. HARGA SATUAN PEKERJAAN PENGECETAN
A.4.7.1.4 Pengecetan 1 m2 Pengecetan Bidang Kayu Baru
( 1 Lapis Plamur, 1 lapis cat dasar, 2 lapis cat penutup)
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.020 100,000.00 2,000.00
Tukang cat L.02 OH 0.063 130,000.00 8,190.00
Kepala Tukang L.03 OH 0.006 150,000.00 945.00
Mandor L.04 OH 0.003 110,000.00 330.00
JUMLAH TENAGA KERJA 11,465.00
B BAHAN
Cat meni kayu Kg 0.200 25,000.00 5,000.00
Plamur Kayu Kg 0.150 19,200.00 2,880.00
Cat Dasar Kg 0.170 30,000.00 5,100.00
Cat Penutup Kg 0.260 30,000.00 7,800.00
Kuas 3'' Bh 0.010 15,000.00 150.00
Pengencer Kg 0.030 25,000.00 750.00
Amplas Lbr 0.200 10,000.00 2,000.00
JUMLAH HARGA BAHAN 23,680.00
C PERALATAN
- - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 35,145.00
E Overhead + Profit 15 % x D 0.15 5,271.75
F Harga Satuan Pekerjaan (D + E) 40,416.75
A.4.7.1.10 Pengecetan 1 m2 tembok baru ( 1 lapis plamur, 1 lapis cat dasar, 2 lapis cat penutup)
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.020 100,000.00 2,000.00
Tukang cat L.02 OH 0.063 130,000.00 8,190.00
Kepala Tukang L.03 OH 0.006 150,000.00 945.00
Mandor L.04 OH 0.003 110,000.00 330.00
JUMLAH TENAGA KERJA 11,465.00
B BAHAN
Plamur Tembok Kg 0.100 15,000.00 1,500.00
Cat tembok dasar Kg 0.100 15,000.00 1,500.00
Cat tembok penutup Kg 0.260 15,000.00 3,900.00
JUMLAH HARGA BAHAN 6,900.00
C PERALATAN
Kuas Rol Bh 0.010 15,000.0000 150.00
JUMLAH HARGA ALAT 150.00
D Jumlah (A+B+C) 18,515.00
E Overhead + Profit 15 % x D 0.15 2,777.25
F Harga Satuan Pekerjaan (D + E) 21,292.25
83
A.5.1.1. HARGA SATUAN PEKERJAAN SANITASI DALAM GEDUNG
A.8.4.1.11 Pemasangan 1 m1 pipa PVC tipe AW diameter 6"
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.081 100,000.00 8,100.00
Tukang pipa L.02 OH 0.130 130,000.00 16,900.00
Kepala Tukang L.03 OH 0.014 150,000.00 2,025.00
Mandor L.04 OH 0.004 110,000.00 440.00
JUMLAH TENAGA KERJA 27,465.00
B BAHAN
Pipa PVC diameter 6" M1 1.000 137,500.00 137,500.00
Perlengkapan % - 0.00 -
JUMLAH HARGA BAHAN 137,500.00
C PERALATAN
- - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 164,965.00
E Overhead + Profit 15 % x D 0.15 24,744.75
F Harga Satuan Pekerjaan (D + E) 189,709.75
84
A.8.4.1.11 Pemasangan 1 m1 pipa PVC tipe AW diameter 4"
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.081 100,000.00 8,100.00
Tukang pipa L.02 OH 0.130 130,000.00 16,900.00
Kepala Tukang L.03 OH 0.014 150,000.00 2,025.00
Mandor L.04 OH 0.004 110,000.00 440.00
JUMLAH TENAGA KERJA 27,465.00
B BAHAN
Pipa PVC diameter 4" M1 1.000 62,500.00 62,500.00
Perlengkapan % - 0.00 -
JUMLAH HARGA BAHAN 62,500.00
C PERALATAN
- - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 89,965.00
E Overhead + Profit 15 % x D 0.15 13,494.75
F Harga Satuan Pekerjaan (D + E) 103,459.75
85
D Jumlah (A+B+C) 123,375.00
E Overhead + Profit 15 % x D 0.15 18,506.25
F Harga Satuan Pekerjaan (D + E) 141,881.25
86
ANALISIS HARGA SATUAN PEKERJAAN BERDASARKAN
(PERMEN PUPR NOMOR 1 TAHUN 2022)
I. PEKERJAAN TANAH
1 1.7.1.a. Penggalian 1 m3 Tanah Biasa Sedalam s.d 1 m Untuk Volume s.d 200 m3 Dalam Satu Lokasi
Harga Jumlah
No. Uraian Satuan Koefisien
Satuan Harga
A TENAGA KERJA
1 Pekerja Org/Hari 150,000.00 0.750 112,500.00
2 Mandor Org/Hari 160,000.00 0.025 4,000.00
Jumlah A 116,500.00
B BAHAN
Jumlah B -
C PERALATAN
Jumlah C -
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C) 116,500.00
E Overhead 10% 11,650.00
F Harga Satuan D + E 128,100.00
Jumlah B
C PERALATAN
Jumlah C -
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C) 38,833.33
E Overhead 10% 3,883.33
F Harga Satuan D + E 42,700.00
87
3 1.7.2.d Pengurugan 1 m3 dengan Pasir Urug
Harga Jumlah
No. Uraian Satuan Koefisien
Satuan Harga
A TENAGA KERJA
1 Pekerja Org/Hari 150,000.00 0.3000 45,000.00
2 Mandor Org/Hari 160,000.00 0.0100 1,600.00
Jumlah A 46,600.00
B BAHAN
1 Pasir Urug M3 180,000.00 1.2000 216,000.00
Jumlah B 216,000.00
C PERALATAN
Jumlah C -
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C) 262,600.00
E Overhead 10% 26,260.00
F Harga Satuan D + E 288,800.00
Jumlah C -
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C) 137,500.00
E Overhead 10% 13,750.00
F Harga Satuan D + E 151,200.00
Jumlah C -
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C) 1,091,250.00
E Overhead 10% 109,125.00
F Harga Satuan D + E 1,200,300.00
88
2 1.5.1.1.b.(a) Pemasangan 1 m3 batu kosong (anstamping)
Harga Jumlah
No. Uraian Satuan Koefisien
Satuan Harga
A TENAGA KERJA
1 Pekerja Org/Hari 150,000.00 0.780 117,000.00
2 Tukang Batu Org/Hari 180,000.00 0.390 70,200.00
3 Kepala Tukang Org/Hari 200,000.00 0.039 7,800.00
4 Mandor Org/Hari 160,000.00 0.039 6,240.00
Jumlah A 201,240.00
B BAHAN
1 Batu belah 15 cm/20 cm M3 350,000.00 1.20 420,000.00
2 Pasir Urug M3 180,000.00 0.432 77,760.00
Jumlah B 497,760.00
C PERALATAN
Jumlah C -
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C) 699,000.00
E Overhead 10% 69,900.00
F Harga Satuan D + E 768,900.00
Jumlah C -
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C) 104,673.50
E Overhead 10% 10,467.35
F Harga Satuan D + E 115,100.00
89
2 4.4.1.10 Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal 1/2 batu campuran 1 PC : 5 PP
Harga Jumlah
No. Uraian Satuan Koefisien
Satuan Harga
A TENAGA KERJA
1 Tukang Batu Org/Hari 120,000.00 0.1000 12,000.00
2 Kepala Tukang Org/Hari 140,000.00 0.0100 1,400.00
3 Pekerja Org/Hari 90,000.00 0.3000 27,000.00
4 Mandor Org/Hari 120,000.00 0.0150 1,800.00
Jumlah A 42,200.00
B BAHAN
1 Batu bata Biji 500.00 70.000 35,000.00
2 Semen Kg 1,550.00 9.680 15,004.00
3 Pasir Pasang M3 130,000.00 0.045 5,850.00
Jumlah B 55,854.00
C PERALATAN
Jumlah C -
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C) 98,054.00
E Overhead 10% 9,805.40
F Harga Satuan D + E 107,800.00
Jumlah C -
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C) 120,076.00
E Overhead 10% 12,007.60
F Harga Satuan D + E 132,000.00
90
IV PEKERJAAN PLESTERAN
1 Anl. Pemasangan plesteran 1 m' tali air
Harga Jumlah
No. Uraian Satuan Koefisien
Satuan Harga
A TENAGA KERJA
1 Tukang Batu Org/Hari 120,000.00 0.0800 9,600.00
2 Kepala Tukang Org/Hari 140,000.00 0.0040 560.00
3 Pekerja Org/Hari 90,000.00 0.0080 720.00
4 Mandor Org/Hari 120,000.00 0.0040 480.00
Jumlah A 11,360.00
B BAHAN
1 Semen Kg 1,550.00 0.2500 387.50
2 Pasir Pasang M3 130,000.00 0.0080 1,040.00
Jumlah B 1,427.50
C PERALATAN
Jumlah C -
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C) 12,787.50
E Overhead 10% 1,278.75
F Harga Satuan D + E 14,000.00
Jumlah C -
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C) 60,315.20
E Overhead 10% 6,031.52
F Harga Satuan D + E 66,300.00
91
3 4.4.2.27 Pemasangan 1 m2 acian
Harga Jumlah
No. Uraian Satuan Koefisien
Satuan Harga
A TENAGA KERJA
1 Tukang Batu Org/Hari 120,000.00 0.2000 24,000.00
2 Kepala Tukang Org/Hari 140,000.00 0.1000 14,000.00
3 Pekerja Org/Hari 90,000.00 0.0100 900.00
4 Mandor Org/Hari 120,000.00 0.0100 1,200.00
Jumlah A 40,100.00
B BAHAN
1 Semen Kg 1,550.00 3.250 5,037.50
Jumlah B 5,037.50
C PERALATAN
Jumlah C -
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C) 45,137.50
E Overhead 10% 4,513.75
F Harga Satuan D + E 49,600.00
V PEKERJAAN KAYU
1 4.6.1.2 Pembuatan dan pemasangan 1 m3 kusen pintu dan kusen jendela, kayu kelas II atau III
Harga Jumlah
No. Uraian Satuan Koefisien
Satuan Harga
A TENAGA KERJA
1 Tukang Kayu Org/Hari 120,000.00 18.00 2,160,000.00
2 Kepala Tukang Org/Hari 140,000.00 1.80 252,000.00
3 Pekerja Org/Hari 90,000.00 6.00 540,000.00
4 Mandor Org/Hari 120,000.00 0.30 36,000.00
Jumlah A 2,988,000.00
B BAHAN
1 Kayu Klas II M3 4,200,000.00 1.2000 5,040,000.00
2 Paku 10 cm Kg 15,500.00 1.2500 19,375.00
3 Lem kayu Kg 91,400.00 1.0000 91,400.00
Jumlah B 5,150,775.00
C PERALATAN
Jumlah C -
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C) 8,138,775.00
E Overhead 10% 813,877.50
F Harga Satuan D + E 8,952,652.50
92
2 4.6.1.5 Pembuatan dan pemasangan 1 m2 daun pintu panel, kayu kelas I atau II
Harga Jumlah
No. Uraian Satuan Koefisien
Satuan Harga
A TENAGA KERJA
1 Tukang Kayu Org/Hari 120,000.00 3.0000 360,000.00
2 Kepala Tukang Org/Hari 140,000.00 0.3000 42,000.00
3 Pekerja Org/Hari 90,000.00 1.0000 90,000.00
4 Mandor Org/Hari 120,000.00 0.0500 6,000.00
Jumlah A 498,000.00
B BAHAN
1 Kayu Papan Kelas II M3 4,200,000.00 0.0400 168,000.00
2 Lem Kayu Kg 91,400.00 0.5000 45,700.00
Jumlah B 213,700.00
C PERALATAN
Jumlah C -
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C) 711,700.00
E Overhead 10% 71,170.00
F Harga Satuan D + E 782,870.00
3 4.6.1.6 Pembuatan dan pemasangan 1 m2 pintu dan jendela kaca, kayu kelas I atau II
Harga Jumlah
No. Uraian Satuan Koefisien
Satuan Harga
A TENAGA KERJA
1 Tukang Kayu Org/Hari 120,000.00 2.4000 288,000.00
2 Kepala Tukang Org/Hari 140,000.00 0.2400 33,600.00
3 Pekerja Org/Hari 90,000.00 0.8000 72,000.00
4 Mandor Org/Hari 120,000.00 0.0400 4,800.00
Jumlah A 398,400.00
B BAHAN
1 Kayu Papan Kelas II M3 4,200,000.00 0.0240 100,800.00
2 Lem Kayu Kg 91,400.00 0.3000 27,420.00
Jumlah B 128,220.00
C PERALATAN
Jumlah C -
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C) 526,620.00
E Overhead 10% 52,662.00
F Harga Satuan D + E 579,282.00
4 4.6.1.21 Pemasangan 1 m' lisplank ukuran (3 x 20) cm, kayu kelas I atau kelas II
Harga Jumlah
No. Uraian Satuan Koefisien
Satuan Harga
A TENAGA KERJA
1 Tukang Kayu Org/Hari 120,000.00 0.2000 24,000.00
2 Kepala Tukang Org/Hari 140,000.00 0.0250 3,500.00
3 Pekerja Org/Hari 90,000.00 0.1000 9,000.00
4 Mandor Org/Hari 120,000.00 0.0050 600.00
Jumlah A 37,100.00
B BAHAN
1 Kayu Papan Klas II M3 4,200,000.00 0.0108 45,360.00
2 Paku campur Kg 15,500.00 0.100 1,550.00
Jumlah B 46,910.00
C PERALATAN
93
Jumlah C -
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C) 84,010.00
E Overhead 10% 8,401.00
F Harga Satuan D + E 92,411.00
94
VI PEKERJAAN LANGIT-LANGIT (PLAFOND)
1 4.5.1.7 Pemasangan 1 m2 langit-langit gypsum board ukuran (120x240x9) mm, tebal 9 mm
Harga Jumlah
No. Uraian Satuan Koefisien
Satuan Harga
A TENAGA KERJA
1 Pekerja Org/Hari 90,000.00 0.1000 9,000.00
2 Tukang Kayu Org/Hari 120,000.00 0.0500 6,000.00
3 Kepala Tukang Org/Hari 140,000.00 0.0050 700.00
4 Mandor Org/Hari 120,000.00 0.0050 600.00
Jumlah A 16,300.00
B BAHAN
1 Gypsum Board Lembar 99,250.00 0.3640 36,127.00
2 Sekrup Gypsum Kg 35,000.00 0.1100 3,850.00
Jumlah B 39,977.00
C PERALATAN
Jumlah C -
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C) 56,277.00
E Overhead 10% 5,627.70
F Harga Satuan D + E 61,900.00
Jumlah C -
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C) 18,241.25
E Overhead 10% 1,824.13
F Harga Satuan D + E 20,000.00
95
VII PEKERJAAN BESI DAN ALUMINIUM
1 4.2.1.21 Pemasangan 1 m2 rangka besi hollow 1x40.40.2 mm, modul 60 x 60 cm, untuk plafon
Harga Jumlah
No. Uraian Satuan Koefisien
Satuan Harga
A TENAGA KERJA
1 Pekerja Org/Hari 90,000.00 0.3500 31,500.00
2 Tukang Besi Org/Hari 120,000.00 0.3500 42,000.00
3 Kepala Tukang Org/Hari 140,000.00 0.0350 4,900.00
4 Mandor Org/Hari 120,000.00 0.0180 2,160.00
Jumlah A 80,560.00
B BAHAN
1 Rangka Besi Hollow 40.40.2 cm M' 6,750.00 4.0000 27,000.00
2 Assesoris (perkuatan, las dll) Ls 9,450.00 1.0000 9,450.00
Jumlah B 36,450.00
C PERALATAN
Jumlah C -
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C) 117,010.00
E Overhead 10% 11,701.00
F Harga Satuan D + E 128,700.00
2 4.2.1.22 Pemasangan 1 m2 atap pelana rangka atap baja canai dingin profil C75
Harga Jumlah
No. Uraian Satuan Koefisien
Satuan Harga
A TENAGA KERJA
1 Pekerja Org/Hari 90,000.00 0.7340 66,060.00
2 Tukang Besi Org/Hari 120,000.00 0.7340 88,080.00
3 Kepala Tukang Org/Hari 140,000.00 0.0730 10,220.00
4 Mandor Org/Hari 120,000.00 0.0370 4,440.00
Jumlah A 168,800.00
B BAHAN
1 Baja Ringan Canai C75 Kg 17,500.00 3.0650 53,637.50
2 Sekrup Bh 400.00 9.0000 3,600.00
Jumlah B 57,237.50
C PERALATAN
Peralatan % 10.0000 5,723.75
Jumlah C 5,723.75
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C) 231,761.25
E Overhead 10% 23,176.13
F Harga Satuan D + E 254,900.00
96
VIII. PEKERJAAN BETON
1 2.2.6.1.d.(a) Pembesian kolom, balok, ring balk, dan sloof untuk besi beton < 12 mm (per - 1 Kg)
Harga Jumlah
No. Uraian Satuan Koefisien
Satuan Harga
A TENAGA KERJA
1 Pekerja Org/Hari 150,000.00 1.6000 240,000.00
2 Tukang Besi Org/Hari 180,000.00 1.6000 288,000.00
3 Kepala Tukang Org/Hari 200,000.00 0.1600 32,000.00
4 Mandor Org/Hari 160,000.00 0.1600 25,600.00
Jumlah A 585,600.00
B BAHAN
1 Besi Beton Polos Kg 25,000.00 105.0000 2,625,000.00
2 Kawat beton Kg 20,000.00 2.8000 56,000.00
Jumlah B 2,681,000.00
C PERALATAN
Jumlah C -
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C) 3,266,600.00
E Overhead 10% 326,660.00
F Harga Satuan D + E 35,932.00
2 2.2.2.1.g Membuat 1 m3 Beton Mutu f'c = 7,4 Mpa (K-100), Lantai Kerja
Harga Jumlah
No. Uraian Satuan Koefisien
Satuan Harga
A TENAGA KERJA
1 Pekerja Org/Hari 150,000.00 1.6500 247,500.00
2 Tukang Besi Org/Hari 180,000.00 0.2750 49,500.00
3 Kepala Tukang Org/Hari 200,000.00 0.0275 5,500.00
4 Mandor Org/Hari 160,000.00 0.1650 26,400.00
Jumlah A 328,900.00
B BAHAN
1 Semen Portland (PC) Kg 1,700.00 227 385,900.00
2 Pasir Beton (PB) M3 189.29 869 164,489.29
3 Kerikil (Kr) M3 263.17 1,000 263,171.85
4 Air Liter 90.00 215 19,350.00
Jumlah B 813,561.14
C PERALATAN
Jumlah C -
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C) 1,142,461.14
E Overhead 10% 114,246.11
F Harga Satuan D + E 1,256,700.00
97
3 2.2.2.1.g Membuat 1 m3 Beton Mutu f'c = 14,5 Mpa (K-175), Lantai, Kolom, Balok
Harga Jumlah
No. Uraian Satuan Koefisien
Satuan Harga
A TENAGA KERJA
1 Pekerja Org/Hari 150,000.00 1.6500 247,500.00
2 Tukang Besi Org/Hari 180,000.00 0.2750 49,500.00
3 Kepala Tukang Org/Hari 200,000.00 0.0275 5,500.00
4 Mandor Org/Hari 160,000.00 0.1650 26,400.00
Jumlah A 328,900.00
B BAHAN
1 Semen Portland (PC) Kg 1,700.00 326 554,200.00
2 Pasir Beton (PB) Kg 189.29 760 143,857.14
3 Kerikil (Kr) Kg 263.17 1,029 270,803.84
4 Air Liter 90.00 215 19,350.00
Jumlah B 968,860.98
C PERALATAN
Jumlah C -
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C) 1,297,760.98
E Overhead 10% 129,776.10
F Harga Satuan D + E 1,427,500.00
Jumlah C -
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C) 240,635.00
E Overhead 10% 24,063.50
F Harga Satuan D + E 264,600.00
98
5 4.1.1.22 Pemasangan 1 m² bekisting untuk kolom
Harga Jumlah
No. Uraian Satuan Koefisien
Satuan Harga
A TENAGA KERJA
1 Pekerja Org/Hari 90,000.00 0.6600 59,400.00
2 Tukang Batu Org/Hari 120,000.00 0.3300 39,600.00
3 Kepala Tukang Org/Hari 140,000.00 0.0330 4,620.00
4 Mandor Org/Hari 120,000.00 0.0330 3,960.00
Jumlah A 107,580.00
B BAHAN
1 Kayu Papan kelas IV (Bekisting) m³ 2,205,000.00 0.0400 88,200.00
2 Paku 5 cm - 12 cm Kg 20,000.00 0.4000 8,000.00
3 Minyak bekisting Liter 12,500.00 0.2000 2,500.00
4 Balok Kayu kelas IV (Bekisting) m³ 2,205,000.00 0.0150 33,075.00
5 Multipleks tebal 9 mm Lbr 167,000.00 0.3500 58,450.00
6 Dolken kayu .. 8-10 ) cm- panj 4 m Batang 13,600.00 2.0000 27,200.00
Jumlah B 217,425.00
C PERALATAN
Jumlah C -
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C) 325,005.00
E Overhead 10% 32,500.50
F Harga Satuan D + E 357,500.00
Jumlah C -
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C) 331,620.00
E Overhead 10% 33,162.00
F Harga Satuan D + E 364,700.00
99
IX PEKERJAAN PENUTUP LANTAI
1 4.4.3.9 Pemasangan 1 m2 lantai ubin granit ukuran 40 cm x 40 cm
Harga Jumlah
No. Uraian Satuan Koefisien
Satuan Harga
A TENAGA KERJA
1 Tukang Batu Org/Hari 90,000.00 0.4500 40,500.00
2 Kepala Tukang Org/Hari 120,000.00 0.0450 5,400.00
3 Pekerja Org/Hari 140,000.00 0.6000 84,000.00
4 Mandor Org/Hari 120,000.00 0.0300 3,600.00
Jumlah 133,500.00
B BAHAN
1 Tegel Keramik 40 x 40 Cm Bh 15,000.00 6.6300 99,450.00
2 Semen warna Kg 5,350.00 1.3000 6,955.00
3 Semen portland Kg 1,550.00 9.8000 15,190.00
4 Pasir Pasang M3 130,000.00 0.0450 5,850.00
Jumlah 127,445.00
Harga Satuan A + B 260,945.00
E Overhead 10% 26,094.50
F Harga Satuan D + E 287,000.00
100
3 4.4.3.24 Pemasangan 1 m' plint tegel granit ukuran 10 x 40 cm
Harga Jumlah
No. Uraian Satuan Koefisien
Satuan Harga
A TENAGA KERJA
1 Tukang Batu Org/Hari 90,000.00 0.0900 8,100.00
2 Kepala Tukang Org/Hari 120,000.00 0.0090 1,080.00
3 Pekerja Org/Hari 140,000.00 0.0900 12,600.00
4 Mandor Org/Hari 120,000.00 0.0050 600.00
Jumlah A 22,380.00
B BAHAN
1 Tegel Plint Keramik 10 x 40 Cm Bh 3,750.00 2.6500 9,937.50
2 Semen portland Kg 1,550.00 1.1400 1,767.00
3 Pasir Pasang M3 130,000.00 0.0030 390.00
4 Semen warna Kg 5,350.00 0.1000 535.00
Jumlah B 12,629.50
C PERALATAN
Jumlah C -
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C) 35,009.50
E Overhead 10% 3,500.95
F Harga Satuan D + E 38,500.00
Jumlah C -
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C) 215,215.00
E Overhead 10% 21,521.50
F Harga Satuan D + E 236,700.00
101
X PEKERJAAN PENUTUP ATAP
1 4.5.2.41 Pemasangan 1 m2 genteng metal ukuran 80 x 100 atap pelana
No. Uraian Satuan Harga Koefisien Jumlah
Satuan Harga
A TENAGA KERJA
1 Pekerja Org/Hari 90,000.00 0.200 18,000.00
2 Tukang kayu Org/Hari 120,000.00 0.100 12,000.00
3 Kepala Tukang Org/Hari 140,000.00 0.010 1,400.00
4 Mandor Org/Hari 120,000.00 0.001 120.00
Jumlah A 31,520.00
B BAHAN
1 Genteng Metal Lbr 25,116.67 1.300 32,651.67
2 Baut Spandek 4,5cm Bh 10,000.00 6.000 60,000.00
Jumlah B 92,651.67
C PERALATAN
Jumlah C -
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C) 124,171.67
E Overhead 10% 12,417.17
F Harga Satuan D + E 136,500.00
Jumlah C -
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C) 101,035.00
E Overhead 10% 10,103.50
F Harga Satuan D + E 111,100.00
102
XI PEKERJAAN KUNCI DAN KACA
1 4.6.2.2 Pemasangan 1 buah kunci biasa
Harga Jumlah
No. Uraian Satuan Koefisien
Satuan Harga
A TENAGA KERJA
1 Pekerja Org/Hari 90,000.00 0.010 900.00
2 Tukang Kayu Org/Hari 120,000.00 0.500 60,000.00
3 Kapala Tukang Org/Hari 140,000.00 0.050 7,000.00
4 Mandor Org/Hari 120,000.00 0.005 600.00
Jumlah A 68,500.00
B BAHAN
1 Kunci Tanam Pintu Bh 220,000.00 1.0000 220,000.00
Jumlah B 220,000.00
C PERALATAN
Jumlah C -
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C) 288,500.00
E Overhead 10% 28,850.00
F Harga Satuan D + E 317,300.00
Jumlah C -
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C) 53,946.00
E Overhead 10% 5,394.60
F Harga Satuan D + E 59,300.00
Jumlah C -
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C) 44,560.00
103
E Overhead 10% 4,456.00
F Harga Satuan D + E 49,000.00
104
4 4.6.2.8 Pemasangan 1 buah spring knip
Harga Jumlah
No. Uraian Satuan Koefisien
Satuan Harga
A TENAGA KERJA
1 Pekerja Org/Hari 90,000.00 0.015 1,350.00
2 Tukang Kayu Org/Hari 120,000.00 0.150 18,000.00
3 Kapala Tukang Org/Hari 140,000.00 0.015 2,100.00
4 Mandor Org/Hari 120,000.00 0.0008 96.00
Jumlah A 21,546.00
B BAHAN
1 Spring Knip Bh 26,000.00 1.0000 26,000.00
Jumlah B 26,000.00
C PERALATAN
Jumlah C -
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C) 47,546.00
E Overhead 10% 4,754.60
F Harga Satuan D + E 52,300.00
Jumlah C -
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C) 44,046.00
E Overhead 10% 4,404.60
F Harga Satuan D + E 48,400.00
Jumlah C -
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C) 211,296.00
E Overhead 10% 21,129.60
105
F Harga Satuan D + E 232,400.00
106
XII PEKERJAAN PENGECATAN
1 4.7.1.10 Pengecetan 1 m2 tembok baru (1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup)
Harga Jumlah
No. Uraian Satuan Koefisien
Satuan Harga
A TENAGA KERJA
1 Pekerja Org/Hari 90,000.00 0.0200 1,800.00
2 Tukang Cat Org/Hari 120,000.00 0.0630 7,560.00
3 Kepala Tukang Org/Hari 140,000.00 0.0063 882.00
4 Mandor Org/Hari 120,000.00 0.0030 360.00
Jumlah A 10,602.00
B BAHAN
1 Plamuur Kg 22,168.75 0.1000 2,216.88
2 Cat Dasar Kg 28,000.00 0.1000 2,800.00
3 Cat Penutup Kg 30,000.00 0.2600 7,800.00
Jumlah B 12,816.88
C PERALATAN
Jumlah C -
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C) 23,418.88
E Overhead 10% 2,341.89
F Harga Satuan D + E 25,700.00
Jumlah C -
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C) 269,480.00
E Overhead 10% 26,948.00
F Harga Satuan D + E 296,400.00
107
Jumlah B 75,000.00
C PERALATAN
Jumlah C -
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C) 89,900.00
E Overhead 10% 8,990.00
F Harga Satuan D + E 98,800.00
108
3 5.1.1.19 Pemasangan 1 buah kran diameter 1/2"
Harga Jumlah
No. Uraian Satuan Koefisien
Satuan Harga
A TENAGA KERJA
1 Pekerja Org/Hari 90,000.00 0.010 900.00
2 Tukang Batu Org/Hari 120,000.00 0.400 48,000.00
3 Kapala Tukang Org/Hari 140,000.00 0.040 5,600.00
4 Mandor Org/Hari 120,000.00 0.005 600.00
Jumlah A 55,100.00
B BAHAN
1 Kran air Bh 19,800.00 1.000 19,800.00
2 Seal tape Bh 10,000.00 0.250 2,500.00
Jumlah B 22,300.00
C PERALATAN
Jumlah C -
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C) 77,400.00
E Overhead 10% 7,740.00
F Harga Satuan D + E 85,100.00
Jumlah C -
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C) 25,290.00
E Overhead 10% 2,529.00
F Harga Satuan D + E 27,800.00
109
5 5.1.1.26 Pemasangan 1 m' pipa PVC tipe AW diameter 3/4"
Harga Jumlah
No. Uraian Satuan Koefisien
Satuan Harga
A TENAGA KERJA
1 Pekerja Org/Hari 90,000.00 0.036 3,240.00
2 Tukang Batu Org/Hari 120,000.00 0.060 7,200.00
3 Kapala Tukang Org/Hari 140,000.00 0.006 840.00
4 Mandor Org/Hari 120,000.00 0.002 240.00
Jumlah A 11,520.00
B BAHAN
1 Pipa PVC 3/4" m' 9,775.00 1.2000 11,730.00
2 Perlengkapan 35 % dari harga pipa ls 3,421.25 1.0000 3,421.25
Jumlah B 15,151.25
C PERALATAN
Jumlah C -
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C) 26,671.25
E Overhead 10% 2,667.13
F Harga Satuan D + E 29,300.00
Jumlah C -
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C) 126,610.00
E Overhead 10% 12,661.00
F Harga Satuan D + E 139,200.00
110
Jumlah C -
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C) 185,895.00
E Overhead 10% 18,589.50
F Harga Satuan D + E 204,400.00
111
XIV PEKERJAAN INSTALASI LISTRIK
1 8.4.6.1 Pemasangan 1 buah titik lampu
Harga Jumlah
No. Uraian Satuan Koefisien
Satuan Harga
A TENAGA KERJA
1 Pekerja Org/Hari 90,000.00 0.2000 18,000.00
2 Tukang Listrik Org/Hari 120,000.00 0.3000 36,000.00
3 Kepala Tukang Listrik Org/Hari 140,000.00 0.0500 7,000.00
4 Mandor Org/Hari 120,000.00 0.0500 6,000.00
Jumlah A 67,000.00
B BAHAN
1 Kabel NYM 2 x 2,5 mm m' 9,775.00 5.000 48,875.00
2 Pipa Conduit m' 8,500.00 5.000 42,500.00
3 Fitting (Elbow, T-Dus, Mongkok) bh 12,000.00 3.000 36,000.00
4 Klem bh 3,000.00 4.000 12,000.00
5 Fisher dan skrup bh 500.00 4.000 2,000.00
7 Fitting Lampu bh 20,000.00 1.000 20,000.00
Jumlah B 161,375.00
C PERALATAN
Jumlah C -
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C) 228,375.00
E Overhead 10% 22,837.50
F Harga Satuan D + E 251,200.00
Jumlah C -
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C) 258,875.00
E Overhead 10% 25,887.50
F Harga Satuan D + E 284,700.00
112
TABEL BESI ILMUSIPIL.COM
UKURAN BERAT
(mm) (Kg) Beton Rasio
6 0.222 0 -
8 0.395 4.74 1 Kg/m3
9 0.500 2 Kg/m3
10 0.617 7.404 3 Kg/m3
12 0.888 10.656 4 Kg/m3
13 1.040 5 Kg/m3
16 1.578 18.936 6 Kg/m3
16 1.578 7 Kg/m3
19 2.223 8 Kg/m3
22 2.985 9 Kg/m3
25 3.853 10 Kg/m3
28 4.830 11 Kg/m3
29 5.185 -
32 6.313
36 7.990
6p 0.22 10.656 23.40
8p 0.4
9p 0.5
10p 0.62
12p 0.89 Besi 12 1 Btg
13p 1.04
16p 1.57
16p 1.58
19p 2.23
22p 2.98 Besi 16 1 Btg
25p 3.85
28p 4.83
29p 5.19
32p 6.31
36p 7.99
25,000.00 9,875.00
4000 15,800
91,487,869.57
2.19594595 Btg
77,800.00
7,301.05
127,872.00 1.64
145,000.00
50,072.00
7,657.37
227,232.00
82,232.00
DATA PERHITUNGAN (BACK UP DATA)
No
SKET GAMBAR TAKE OF SHEET
I PEKERJAAN PERSIAPAN
1. Pembersihan Lapangan dan Perataan = 1.00 Ls
Pondasi Menerus 2
V= T x L x P
0.3 x 0.25 x 6.50 = 0.49 M3
V. Total = = 44.05 M3
2. Urugan Tanah
V= 1/3 Volume Galian = 14.68 M3
V= T x L x P
0.3 x 0.25 x 6.50 = 0.49 M3
V. Total = = 4.45 M3
V. Total = = 11.88 M3
Pas. Batu 2
V= T x L x P
0.3 x 0.30 x 6.50 = 0.59 M3
V. Total = = 36.22 M3
6. Sloof Beton 15/20 cm
Camp. Beton
V= T x L x P
0.2 x 0.15 x 138.50 = 4.16 M3
V. Total = = 4.16 M3
Pembesian
Tulangan pokok
V= P x Jml
138.50 x 4 = 554.00 M'
Berat besi x P
0.62 x 554.00 = 341.82 kg
Beugel
P / Jrk x L
138.50 / 0.15 x 0.54 = 498.60 M'
Berat besi x P
0.395 x 498.60 = 196.95 kg
Berat A + Berat B
341.82 + 196.95 = 538.77 kg
V. Total = = 538.77 kg
Bekisting
V= P x T x Banyak
138.50 x 0.2 x 2.00 = 55.40 M2
V. Total = = 13.85 M2
V. Total = = 4.27 M3
Pembesian
Tulangan pokok
V= T. P x Jml
157.50 x 4 = 630.00 M'
Berat besi x P
0.62 x 630.00 = 388.71 kg
Beugel
P / Jrk x L
157.50 / 0.15 x 0.44 = 462.00 M'
Berat besi x P
0.395 x 462.00 = 182.49 kg
Berat A + Berat B
388.71 + 182.49 = 571.20 kg
V. Total = = 571.20 M3
Bekisting
V= P x L x Banyak
157.50 x 0.15 x 4.00 = 94.50 M2
V. Total = = 23.63 M3
V. Total = = 516.54 M3
V. Total = = 0.99 M3
Pembesian
V= P x Jml
82.18 x 4 = 328.72 M'
Berat besi x P
0.40 x 328.72 = 129.84 kg
P / Jrk x L
82.18 / 0.2 x 0.36 = 147.92 M'
Berat besi x P
0.22 x 147.92 = 32.84 kg
Berat A + Berat B
129.84 + 32.84 = 162.68 kg
V. Total = = 162.68 kg
Bekisting
V= P x T x Banyak
82.18 x 0.11 x 2.00 = 18.08 M2
V. Total = = 4.52 M3
V. Total = = 4.25 M3
Pembesian
V= P x Jml
141.75 x 4 = 567.00 M'
Berat besi x P
0.62 x 567.00 = 349.84 kg
P / Jrk x L
141.75 / 0.15 x 0.52 = 491.40 M'
Berat besi x P
0.40 x 491.40 = 194.10 kg
Berat A + Berat B
349.84 + 194.10 = 543.94 kg
V. Total = = 543.94 Kg
Bekisting
V= P x T x Banyak
141.75 x 0.2 x 2.00 = 56.70 M2
V. Total = = 14.18 M2
5. Plat Kanopi
Plat Talang air keliling
V= T x L x P
V= 0.1 x 2.00 x 65.00 = 13.00 M3
pembesian
V= P / Jrk x L
65.00 / 0.20 x 2.00 = 650.00 M'
Berat besi x P
0.395 x 650.00 = 256.75 Kg
pembesian
V= P / Jrk x L
2.13 / 0.20 x 2.28 = 24.17 M'
Berat besi x P
0.40 x 24.17 = 9.55 Kg
V. Total = = 75.85 M3
2. Timbunan Pasir Bawah Lantai
V= Luas Lantai x T
189.62 x 0.05 = 9.48 M3
V. Total = = 9.48 M3
V. Total = = 9.48 M3
V. Total = = 177.95 M2
V. Total = = 11.68 M2
V. Total = = 25.43 M2
B. Pekerjaan Plesteran
1. Plasteran
V= V. Pas. Bata x J. Sisi
466.54 x 2 = 933.08 M2
V. Total = = 933.08 M2
2. Acian
V= V. Plasteran - D. Keramik
V= 933.08 - 25.43 = 907.65 M2
V. Total = = 907.65 M2
C. Pekerjaan Plafond dan Atap
1. Luasan Bidang Atap 1
= 6.93 M2
= 6.29 M2
= 35.45 M2
= 59.09 M2
= 56.20 M2
= 6.15 M2
= 6.15 M2
Luasan Bidang Atap 8
= 32.02 M2
= 2.86 M2
= 1.43 M2
V. Total = = 182.81 M2
3. Kuda-kuda kayu
Gording
V= P x Penampang
V= 208.50 x 0.01 = 1.50 M3
Balok Nok/bubungan
V= P x Penampang
V= 47.70 x 0.01 = 0.34 M3
Kuda-kuda
V= P x Penampang x Jumlah
V= 130.60 x 0.01 x = 0.94 M3
4. Lisplank
V= P x Qty
V= 62.00 x 1.00 = 62.00 M'
5. Rangka Plafond
V= Luas Plafond = 124.50 M2
V. Total = = 124.50 M2
6. Penutup Plafond Gypsum
V= Luas Plafond = 124.50 M2
V. Total = = 124.50 M2
8. Err:509
V. Total = = 56.00
Kusen
V= P x Penampang
6.5 x 0.01 = 0.05 M3
Daun Pintu
V= P x L x TEBAL
2.25 x 0.8 x 0.03 = 0.05 M3
Relling Pintu
V= Banyak Pintu = 5.00 Bh
Handle Pintu
V= Banyak Pintu = 5.00 Bh
Kusen
V= P x Penampang
6.5 x 0.01 = 0.03 M3
Daun Pintu
V= P x L x TEBAL
2.2 x 0.7 x 0.03 = 0.05 M3
Engsel Pintu
V= Banyak Pintu = 4.00 Bh
Handle Pintu
V= Banyak Pintu = 4.00 Bh
Kusen
V= P x Penampang
7.16 x 0.01 = 0.05 M3
V. Total = 0.05 x 1.00 = 0.05 M3
Bingkai Pintu
V= P x L x TEBAL
4.74 x 0.08 x 0.03 = 0.14 M3
Sliding rell
V= Banyak Pintu = 4.00 Bh
4. Jendela W01
V= Banyak Jendela = 3.00 Bh
Kusen
V= P x Penampang
9.40 x 0.01 = 0.07 M3
Daun Jendela
V= P x L x Penampang
3.30 x 2.70 X 0.00 = 0.03 M3
Kaca Jendela 5 mm
V= P x L
1.25 x 1.53 = 1.91 M2
Engsel Jendela
V= Banyak Jendela = 3.00 Bh
Pengunci Jendela
V= Banyak Pintu = 2.00 Bh
V. Total = = 2.00 Bh
5. Jendela W02
V= Banyak Jendela = 2.00 Bh
Kusen
V= P x Penampang
6.8 x 0.01 = 0.05 M3
Daun Jendela
V= P x L x Penampang
3.30 x 2.70 X 0.00 = 0.03 M3
Kaca Jendela 5 mm
V= P x L
2.29 x 0.7 = 1.60 M2
Engsel Jendela
V= Banyak Jendela = 2.00 Bh
V. Total = = 4.00 Bh
Pengunci Jendela
V= Banyak Jendela = 2.00 Bh
V. Total = = 2.00 Bh
6. Jendela W03
V= Banyak Jendela = 2.00 Bh
Kusen
V= P x Penampang
4.80 x 0.01 = 0.04 M3
Daun Jendela
V= P x L x Penampang
3.20 x 1.20 X 0.00 = 0.01 M3
Kaca Jendela 5 mm
V= P x L
1.58 x 0.6 = 0.95 M2
Engsel Jendela
V= Banyak Jendela = 2.00 Bh
V. Total = = 4.00 Bh
Pengunci Jendela
V= Banyak Jendela = 2.00 Bh
V. Total = = 2.00 Bh
7. Jendela W04
V= Banyak Pintu = 1.00 Bh
Kusen
V= P x Penampang
2.40 x 0.01 = 0.02 M3
Daun Jendela
V= P x L x Penampang
1.00 x 1.00 X 0.01 = 0.01 M3
Kaca Jendela 5 mm
V= P x L
0.52 x 0.52 = 0.27 M2
Engsel Jendela
V= Banyak Jendela = 1.00 Bh
V. Total = = 2.00 Bh
Pengunci Jendela
V= Banyak Jendela = 1.00 Bh
V. Total = = 1.00 Bh
8. Jendela W05
Kaca Jendela 5 mm
V= P x L
2.90 x 0.25 = 0.73 M2
9. Jendela W06
Kaca Jendela 5 mm
V= P x L
1.75 x 2.35 = 4.11 M2
Kusen
V= P x Penampang
6.6 x 0.01 = 0.05 M3
Daun Jendela
V= P x L x Penampang
4.80 x 1.42 X 0.00 = 0.02 M3
Kaca Jendela 5 mm
V= P x L
2.27 x 0.582 = 1.32 M2
Engsel Jendela
V= Banyak Jendela = 1.00 Bh
V. Total = = 2.00 Bh
Pengunci Jendela
V= Banyak Jendela = 1.00 Bh
V. Total = = 1.00 Bh
11. PJ 01
V= JUMLAH = 1.00 Bh
Kusen
V= P x Penampang
13.2 x 0.01 = 0.10 M3
PILAR KAYU
V= P x Penampang
6.6 x 0.04 = 0.26 M3
Daun Jendela
V= P x L x Penampang
4.82 x 1.42 X 0.00 = 0.04 M3
Daun Pintu
V= P x L x Penampang
5.00 x 2.00 X 0.00 = 0.06 M3
V. Total = = 0.10 M3
Kaca Jendela 5 mm
V= P x L
2.34 x 0.582 = 2.72 M2
Kaca Pintu 5 mm
V= P x L
2.34 x 0.8 = 3.74 M2
V. Total = = 6.47 M2
Engsel Jendela
V= Banyak Jendela = 2.00 Bh
V. Total = = 4.00 Bh
Relling Pintu
V= Banyak Pintu = 2.00 Bh
Handle Pintu
V= Banyak Pintu = 2.00 Bh
Pengunci Jendela
V= Banyak Jendela = 2.00 Bh
V. Total = = 2.00 Bh
12. PJ 02
Kusen
V= P x Penampang
10.8 x 0.01 = 0.08 M3
Daun Pintu
V= P x L x TEBAL
5.7 x 0.1 x 0.04 = 0.02 M3
Engsel Pintu
V= Banyak Pintu = 1.00 Bh
Handle Pintu
V= Banyak Pintu = 1.00 Bh
Kaca Jendela 5 mm
V= P x L
2.42 x 1.352 = 6.54 M2
Kaca Pintu 5 mm
V= P x L
1.96 x 0.72 = 2.82 M2
13. PJ 03
V= Banyak Pintu = 1.00 Bh
Kusen
V= P x 0
7.16 x 0.01 = 0.05 M3
Bingkai Pintu
V= P x L x TEBAL
4.74 x 0.08 x 0.03 = 0.01 M3
Kaca Buram 5 mm
V= P x L
2.16 x 0.56 = 1.21 M2
Sliding rell
V= Banyak Pintu = 4.00 Bh
14. PJ 04
V= Banyak Pintu = 1.00 Bh
Kusen
V= P x 0.08
6.85 x 0.01 = 0.05 M3
Bingkai Pintu
V= P x L x TEBAL
4.74 x 0.08 x 0.03 = 0.01 M3
Kaca Buram 5 mm
V= P x L
2.16 x 0.56 = 1.21 M2
Sliding rell
V= Banyak Pintu = 3.00 Bh
E. Pekerjaan Pengecatan
1. Pengecatan Dinding
V= V. Acian
V= 907.65 = 907.65 M2
Pengecatan Plafond
V = V. Penutup Plafond
V= 124.50 = 124.50 M2
= 0.00 Buah
= 16.00 Buah
= 1.00 Buah
= 1.00 Buah
= 4.00 Buah
= 12.00 Buah
7. Lampu LED 11 watt (Downlight) = 23.00 Buah
= 23.00 Buah
= 7.00 Buah
Buah
B. Pekerjaan Sanitasi Air Bersih dan Kotor
1. Floordrain = 3.00
= 3.00 Buah
= 3.00 Buah
= 4.00 Buah
= 3.00 Buah
= 3.00 Buah
= 35.80 M'
= 29.00 M'
= 35.90 M'
= 1.00 Buah