UPAT
GUN
EN
SITU
AN
BON
DAN
DO
TAR HARGA
UPA SATUAN DASAR
TAHU
HN
2011
JENIS
NO BAHAN SATUAN
KOTA PEGUNUNGAN
I BAHAN PASIR
1 Pasir Pasang m3 102,000 161,000
2 Pasir Urug/Sirtu m3 91,000 152,000
3 Pasir Cor m3 - -
4 Batu Koral m3 120,000 180,000
5 Tanah Urug m3 59,000 71,000
IV BAHAN ASPAL
1 Aspal Curah kg 10,000 10,000
2 Aspal Kemas kg 11,000 11,000
V BAHAN SEMEN
2 Semen 40 Kg zak 60,000 65,000
3 Semen Putih 40 Kg zak 90,000 95,000
VI BAHAN KAPUR
Halaman 1
JENIS
NO BAHAN SATUAN
KOTA PEGUNUNGAN
1 Kapur Pasang m3 300,000 325,000
2 Kapur Pasang (10 Kg) zak 6,000 6,500
Halaman 2
JENIS
NO BAHAN SATUAN
KOTA PEGUNUNGAN
IX BAHAN BESI
1 Besi Beton Polos kg 13,700 14,200
2 Besi Beton Ulir kg 14,300 14,800
3 Kawat Beton kg 18,700 19,200
4 Kawat Bronjong/Jaring Kawat Baja kg 15,600 16,100
5 Kawat Duri Rool 84,500 85,000
6 Kawel / Baut ( bahan plat ) kg 17,000 17,500
7 Kawel / Baut ( bahan besi ) kg 17,000 17,500
7 Kawat bronjong Pabrikasi
7 Uk 0.5 x 1.0 x 2.0 m d = 2.7 mm kg 325,000 325,000
Halaman 3
JENIS
NO BAHAN SATUAN
KOTA PEGUNUNGAN
29 Profil Kanal UNP 100 x 50 x 6 x 8,5 x 4,5 Ljr 914,200 914,200
30 Profil Kanal UNP 120 x 55 x 7 x 9 x 4,5 Ljr 1,155,700 1,155,700
31 Profil Kanal UNP 150 x 75 x 6,5 Ljr 1,610,000 1,610,000
32 Profil kanal CNP 125 x 50 x 20 x 3 Ljr 486,500 486,500
33 Profil kanal CNP 125 x 50 x 20 x 2,0 Ljr 326,200 326,200
34 Profil kanal CNP 100 x 50 x 20 x 3 Ljr 424,000 424,000
35 Profil kanal CNP 100 x 50 x 20 x 2,2 Ljr 311,800 311,800
Halaman 4
JENIS
NO BAHAN SATUAN
KOTA PEGUNUNGAN
XIII SENG TALANG
1 Seng Talang BJLS 30 uk. 45 M' 21,800 22,300
2 Seng Talang BJLS 30 uk. 55 M' 28,100 28,600
3 Seng Talang BJLS 30 uk. 60 M' 31,200 31,700
4 Seng Talang BJLS 30 uk. 90 M' 43,700 44,200
XV BAHAN PAKU
1 Paku Reng Kg 16,200 16,200
2 Paku Usuk Kg 15,000 15,000
3 Paku Triplek/Eternit Kg 18,700 18,700
4 Paku Seng Kg 28,100 28,100
5 Paku Sekrup 7,5 cm Bj 900 900
6 Paku Sekrup 10 cm Bj 1,200 1,200
7 Paku Sekrup 12 cm Bj 1,900 1,900
Halaman 5
JENIS
NO BAHAN SATUAN
KOTA PEGUNUNGAN
9 Pipa Gl Medium I Ø 4" Lj 1,856,200 1,861,800
10 Pipa Gl Medium I Ø 5" Lj 2,497,000 2,503,800
11 Pipa Gl Medium I Ø 6" Lj 2,972,700 2,980,700
12 Pipa Gl Medium I Ø 8" Lj 4,268,100 4,278,100
B Pipa Gl Medium II
1 Pipa Gl Medium II Ø 1/2" Lj 157,600 158,200
2 Pipa Gl Medium II Ø 3/4" Lj 195,000 196,000
3 Pipa Gl Medium II Ø 1" Lj 298,700 300,100
4 Pipa Gl Medium II Ø 1 1/4" Lj 385,600 387,400
5 Pipa Gl Medium II Ø 1 1/2" Lj 457,500 458,100
6 Pipa Gl Medium II Ø 2" Lj 671,200 672,200
7 Pipa Gl Medium II Ø 2 1/2" Lj 864,600 866,000
8 Pipa Gl Medium II Ø 3" Lj 1,059,100 1,060,900
9 Pipa Gl Medium II Ø 4" Lj 1,549,500 1,550,100
C Pipa Gl BSA
1 Pipa Gl BSA Ø 1/2" Lj 157,500 158,100
2 Pipa Gl BSA Ø 3/4" Lj 198,200 199,200
3 Pipa Gl BSA Ø 1" Lj 257,800 259,200
4 Pipa Gl BSA Ø 1 1/4" Lj 329,500 331,300
5 Pipa Gl BSA Ø 1 1/2" Lj 408,700 409,300
6 Pipa Gl BSA Ø 2" Lj 548,800 549,800
7 Pipa Gl BSA Ø 2 1/2" Lj 755,600 757,000
8 Pipa Gl BSA Ø 3" Lj 888,200 890,000
9 Pipa Gl BSA Ø 4" Lj 1,260,600 1,261,200
10 Pipa Gl BSA Ø 6" Lj 2,148,800 2,149,400
11 Pipa Gl BSA Ø 8" Lj 3,602,800 3,603,800
D Pipa Gl BSA (B)
1 Pipa Gl BSA (B) Ø 1/2" Lj 84,300 85,300
2 Pipa Gl BSA (B) Ø 3/4" Lj 106,200 107,200
3 Pipa Gl BSA (B) Ø 1" Lj 153,100 154,100
4 Pipa Gl BSA (B) Ø 1 1/4" Lj 193,700 194,700
5 Pipa Gl BSA (B) Ø 1 1/2" Lj 262,500 263,500
6 Pipa Gl BSA (B) Ø 2" Lj 362,500 363,500
7 Pipa Gl BSA (B) Ø 2 1/2" Lj 531,200 532,200
8 Pipa Gl BSA (B) Ø 3" Lj 625,000 626,000
9 Pipa Gl BSA (B) Ø 4" Lj 825,000 826,000
E Pipa Gl B.SIZE
1 Pipa Gl B.SIZE Ø 1/2" Lj 200,500 200,500
2 Pipa Gl B.SIZE Ø 3/4" Lj 266,500 267,500
3 Pipa Gl B.SIZE Ø 1" Lj 394,500 395,100
Halaman 6
JENIS
NO BAHAN SATUAN
KOTA PEGUNUNGAN
4 Pipa Gl B.SIZE Ø 1 1/4" Lj 538,200 538,800
5 Pipa Gl B.SIZE Ø 1 1/2" Lj 639,800 640,800
6 Pipa Gl B.SIZE Ø 2" Lj 854,500 855,100
7 Pipa Gl B.SIZE Ø 2 1/2" Lj 1,358,500 1,359,100
8 Pipa Gl B.SIZE Ø 3" Lj 1,786,700 1,787,700
9 Pipa Gl B.SIZE Ø 4" Lj 2,540,000 2,540,600
Halaman 7
JENIS
NO BAHAN SATUAN
KOTA PEGUNUNGAN
33 KNIE 2" Bh 27,500 28,500
34 KNIE 2 1/2" Bh 60,500 61,500
35 KNIE 3" Bh 92,200 93,200
36 KNIE 4" Bh 167,100 168,100
37 KNIE 6" Bh 664,800 665,800
38 DOUBLE NEPEL 1/2" Bh 4,300 5,300
39 DOUBLE NEPEL 3/4" Bh 5,600 6,600
40 DOUBLE NEPEL 1" Bh 7,500 8,500
41 DOUBLE NEPEL 1 1/4" Bh 10,600 11,600
42 DOUBLE NEPEL 1 1/2" Bh 14,300 15,300
43 DOUBLE NEPEL 2" Bh 22,400 23,400
44 DOUBLE NEPEL 2 1/2" Bh 37,400 38,400
45 DOUBLE NEPEL 3" Bh 63,300 64,300
46 DOUBLE NEPEL 4" Bh 100,800 101,800
47 TEE 1/2" Bh 5,600 6,600
48 TEE 3/4" Bh 8,100 9,100
49 TEE 1" Bh 12,500 13,500
50 TEE 1 1/4" Bh 18,700 19,700
51 TEE 1 1/2" Bh 23,700 24,700
52 TEE 2" Bh 40,300 41,300
53 TEE 2 1/2" Bh 92,200 93,200
54 TEE 3" Buah 121,000 122,000
55 TEE 3" x 2" Bh 144,500 145,500
56 TEE 4" Buah 218,900 219,900
57 TEE 4" x 2" Bh 274,600 275,600
58 TEE 6" x 4" Bh 982,800 983,800
59 REDUCER 3/4" x 1/2 " Buah 6,200 7,200
60 REDUCER 1" x 1/2 " Buah 8,100 9,100
61 REDUCER 2" x 1 " Buah 9,200 10,200
62 REDUCER 3" x 2 " Buah 24,400 25,400
63 REDUCER 4" x 2" Buah 72,200 73,200
64 REDUCER 4" x 3" Buah 132,900 133,900
65 REDUCER 6" x 2" Buah 132,900 133,900
66 REDUCER 6" x 3" Buah 346,800 347,800
67 REDUCER 6" x 4" Buah 346,800 347,800
68 KLEM 1/2" Buah 600 1,600
69 KLEM 3/4" Buah 700 1,700
70 KLEM 1" Buah 900 1,900
71 KLEM 1 1/4" Buah 1,800 2,800
72 KLEM 1 1/2" Buah 2,100 3,100
Halaman 8
JENIS
NO BAHAN SATUAN
KOTA PEGUNUNGAN
73 KLEM 2" Buah 2,500 3,500
74 KLEM 2 1/2" Buah 2,800 3,800
75 KLEM 3" Buah 3,100 4,100
76 KLEM 4" Buah 3,400 4,400
Halaman 9
JENIS
NO BAHAN SATUAN
KOTA PEGUNUNGAN
10 PIPA PVC 12" Ljr 2,873,800 3,017,400
A.3 PIPA + MOF UKURAN 6 METER
1 PIPA PVC 1" Ljr 50,400 52,900
2 PIPA PVC 1 1/2" Ljr 77,700 81,500
3 PIPA PVC 2" Ljr 111,700 117,200
4 PIPA PVC 2 1/2" Ljr 160,100 168,100
5 PIPA PVC 3" Ljr 231,700 243,200
6 PIPA PVC 4" Ljr 341,900 358,900
7 PIPA PVC 6" Ljr 728,500 764,900
8 PIPA PVC 8" Ljr 1,177,000 1,235,800
9 PIPA PVC 10" Ljr 1,837,500 1,929,300
10 PIPA PVC 12" Ljr 2,910,900 3,056,400
A.4 PIPA + MOF UKURAN 6 METER - EFF
1 PIPA PVC 1" Ljr 50,700 53,200
2 PIPA PVC 1 1/2" Ljr 78,000 81,900
3 PIPA PVC 2" Ljr 112,400 118,000
4 PIPA PVC 2 1/2" Ljr 161,300 169,300
5 PIPA PVC 3" Ljr 233,600 245,200
6 PIPA PVC 4" Ljr 345,300 362,500
7 PIPA PVC 6" Ljr 738,800 775,700
8 PIPA PVC 8" Ljr 1,197,600 1,257,400
9 PIPA PVC 10" Ljr 1,877,000 1,970,800
10 PIPA PVC 12" Ljr 2,989,400 3,138,800
A.5 PIPA + RR UKURAN 6 METER 0 - -
1 PIPA PVC 2" Ljr 123,000 129,100
2 PIPA PVC 2 1/2" Ljr 174,300 183,000
3 PIPA PVC 3" Ljr 244,900 257,100
4 PIPA PVC 4" Ljr 358,800 376,700
5 PIPA PVC 6" Ljr 750,900 788,400
6 PIPA PVC 8" Ljr 1,212,000 1,272,600
7 PIPA PVC 10" Ljr 1,883,900 1,978,000
8 PIPA PVC 12" Ljr 2,971,800 3,120,300
A.6 PIPA + RR UKURAN 6 METER - EFF 0 - -
1 PIPA PVC 2" Ljr 124,900 131,100
2 PIPA PVC 2 1/2" Ljr 177,000 185,800
3 PIPA PVC 3" Ljr 248,900 261,300
4 PIPA PVC 4" Ljr 365,200 383,400
5 PIPA PVC 6" Ljr 766,900 805,200
6 PIPA PVC 8" Ljr 1,240,600 1,302,600
7 PIPA PVC 10" Ljr 1,934,600 2,031,300
Halaman 10
JENIS
NO BAHAN SATUAN
KOTA PEGUNUNGAN
8 PIPA PVC 12" Ljr 3,063,300 3,216,400
B PIPA PVC S - 10
B.1 PIPA UKURAN 4 METER
1 PIPA PVC 1" Ljr 25,400 26,600
2 PIPA PVC 1 1/4" Ljr 37,600 39,400
3 PIPA PVC 1 1/2" Ljr 59,300 62,200
4 PIPA PVC 2" Ljr 90,900 95,400
5 PIPA PVC 2 1/2" Ljr 129,000 135,400
6 PIPA PVC 3" Ljr 185,900 195,100
7 PIPA PVC 4" Ljr 279,200 293,100
8 PIPA PVC 5" Ljr 454,000 476,700
9 PIPA PVC 6" Ljr 587,800 617,100
10 PIPA PVC 8" Ljr 958,000 1,005,900
11 PIPA PVC 10" Ljr 1,484,100 1,558,300
12 PIPA PVC 12" Ljr 2,356,800 2,474,600
B.2 PIPA UKURAN 6 METER
1 PIPA PVC 1" Ljr 35,900 37,900
2 PIPA PVC 1 1/4" Ljr 56,500 59,300
3 PIPA PVC 1 1/2" Ljr 88,900 93,300
4 PIPA PVC 2" Ljr 136,400 143,200
5 PIPA PVC 2 1/2" Ljr 193,600 203,200
6 PIPA PVC 3" Ljr 279,200 293,100
7 PIPA PVC 4" Ljr 418,800 439,700
8 PIPA PVC 5" Ljr 681,000 715,000
9 PIPA PVC 6" Ljr 881,700 925,700
10 PIPA PVC 8" Ljr 1,437,100 1,508,900
11 PIPA PVC 10" Ljr 2,226,100 2,337,400
12 PIPA PVC 12" Ljr 3,535,300 3,712,000
B.3 PIPA + MOF UKURAN 6 METER
1 PIPA PVC 1" Ljr 38,400 40,300
2 PIPA PVC 1 1/4" Ljr 56,700 59,500
3 PIPA PVC 1 1/2" Ljr 89,800 94,200
4 PIPA PVC 2" Ljr 138,200 145,100
5 PIPA PVC 2 1/2" Ljr 195,800 205,500
6 PIPA PVC 3" Ljr 282,200 296,300
7 PIPA PVC 4" Ljr 424,000 445,200
8 PIPA PVC 5" Ljr 688,400 722,800
9 PIPA PVC 6" Ljr 893,500 938,100
10 PIPA PVC 8" Ljr 1,453,300 1,525,900
Halaman 11
JENIS
NO BAHAN SATUAN
KOTA PEGUNUNGAN
11 PIPA PVC 10" Ljr 2,254,000 2,366,700
12 PIPA PVC 12" Ljr 3,572,300 3,750,900
B.4 PIPA + MOF UKURAN 6 METER - EFF
1 PIPA PVC 1" Ljr 38,600 40,500
2 PIPA PVC 1 1/4" Ljr 57,000 59,800
3 PIPA PVC 1 1/2" Ljr 90,200 94,700
4 PIPA PVC 2" Ljr 139,100 146,000
5 PIPA PVC 2 1/2" Ljr 197,200 207,000
6 PIPA PVC 3" Ljr 284,500 298,700
7 PIPA PVC 4" Ljr 428,300 449,700
8 PIPA PVC 5" Ljr 697,000 731,800
9 PIPA PVC 6" Ljr 906,100 951,400
10 PIPA PVC 8" Ljr 1,478,700 1,552,600
11 PIPA PVC 10" Ljr 2,302,600 2,417,700
12 PIPA PVC 12" Ljr 3,669,000 3,852,400
B.5 PIPA + RR UKURAN 6 METER
1 PIPA PVC 2" Ljr 149,500 156,900
2 PIPA PVC 2 1/2" Ljr 210,000 220,500
3 PIPA PVC 3" Ljr 295,300 310,000
4 PIPA PVC 4" Ljr 440,900 462,900
5 PIPA PVC 5" Ljr 706,300 741,600
6 PIPA PVC 6" Ljr 915,900 961,600
7 PIPA PVC 8" Ljr 1,488,300 1,562,700
8 PIPA PVC 10" Ljr 2,300,500 2,415,500
9 PIPA PVC 12" Ljr 3,633,300 3,814,900
B.6 PIPA + RR UKURAN 6 METER - EFF
1 PIPA PVC 2" Ljr 151,700 159,200
2 PIPA PVC 2 1/2" Ljr 213,300 223,900
3 PIPA PVC 3" Ljr 300,300 315,300
4 PIPA PVC 4" Ljr 448,800 471,200
5 PIPA PVC 5" Ljr 720,700 756,700
6 PIPA PVC 6" Ljr 935,600 982,300
7 PIPA PVC 8" Ljr 1,523,700 1,599,800
8 PIPA PVC 10" Ljr 2,362,800 2,480,900
9 PIPA PVC 12" Ljr 3,745,800 3,933,000
Halaman 12
JENIS
NO BAHAN SATUAN
KOTA PEGUNUNGAN
XX ASESORIS PIPA
1 Air Valve 1" Buah 323,000 334,500
2 Air Valve 2" Buah 547,000 566,500
3 Air Valve 3" Buah 665,000 688,700
4 Baut Mur 5/8" x 2" Buah 4,400 4,500
5 Baut Mur 5/8" x 2,5" Buah 5,100 5,300
6 Baut Mur 5/8" x 3" Buah 5,800 6,000
7 Baut Mur 5/8" x 4" Buah 7,200 7,400
8 Baut Mur 3/4" x 2,5" Buah 8,500 8,800
9 Baut Mur 3/4" x 3" Buah 9,200 9,600
10 Clamp Sadle 2" x 3/4" Buah 65,000 67,200
11 Clamp Sadle 3 x 3/4" Buah 85,000 88,000
12 Clamp Sadle 4" x 3/4" Buah 114,000 118,000
13 Clamp Sadle 6" Buah 247,000 255,700
14 Flange Las 2" Buah 58,000 60,000
15 Flange Las 2 1/2" Buah 65,000 67,200
16 Flange Las 3" Buah 71,000 73,500
17 Flange Las 4" Buah 93,000 96,200
18 Giboult Joint 2" Buah 156,000 161,500
19 Giboult Joint 3" Buah 225,000 233,000
20 Giboult Joint 4" Buah 385,000 398,700
21 Giboult Joint 6" Buah 1,329,000 1,376,500
22 HU (Hidrant Umum) Type Conical 1m3 (Pabrikasi) Buah 1,320,000 1,355,000
23 HU (Hidrant Umum) Type Conical 2m3 (Pabrikasi) Buah 2,310,000 2,345,000
24 HU (Hidrant Umum) Type Conical 3m3 (Pabrikasi) Buah 2,750,000 2,785,000
25 Reducer PVC Moof 1 1/2" x 1" Buah 3,800 3,900
26 Reducer PVC Moof 2" x 1 1/2" Buah 7,500 7,800
27 Reducer PVC Moof 2" x 1" Buah 6,300 6,500
28 Reducer PVC Moof 3" x 2" Buah 19,000 19,700
29 Reducer PVC Moof 4" x 2" Buah 31,500 32,700
30 Reducer PVC Moof 4" x 3" Buah 34,500 35,700
31 Reducer PVC Moof 6" x 3" Buah 28,500 29,700
32 Reducer PVC Moof 6" x 4" Buah 31,500 32,700
33 Sock Drat PVC 1/2" Buah 1,300 1,300
34 Sock Drat PVC 3/4" Buah 1,900 1,900
35 Sock Drat PVC 1" Buah 2,500 2,600
36 Sock Drat PVC 1 1/4" Buah 3,300 3,400
37 Sock Drat PVC 1 1/2" Buah 4,400 4,600
38 Sock Drat PVC 2" Buah 6,600 6,800
39 Sock Drat PVC 2 1/2" Buah 7,700 8,000
Halaman 13
JENIS
NO BAHAN SATUAN
KOTA PEGUNUNGAN
40 Sock Drat PVC 3" Buah 11,300 11,800
41 Sock Drat PVC 4" Buah 22,000 22,800
42 Stop Kran 1" Buah 100,000 103,500
43 Stop Kran 1 1/4" Buah 150,000 155,500
44 Stop Kran 1 1/2" Buah 194,000 201,000
45 Stop Kran 2" (Gate Valve) Buah 275,000 276,000
46 Stop Kran 3" (Gate Valve) Buah 762,500 787,500
47 Stop Kran 4" (Gate Valve) Buah 1,469,000 1,519,000
48 Stop Kran 6" (Gate Valve) Buah 2,028,000 2,180,500
49 Straatpot 4" Buah 141,000 146,000
50 Straatpot 6" Buah 184,000 190,500
51 Tee All Flange 3" x 3" Buah 406,000 420,500
52 Tee All Flange 4" x 2" Buah 512,000 530,200
53 Tee All Flange 4" x 3" Buah 526,000 544,700
54 Tee All Flange 4" x 4" Buah 539,000 558,200
55 Manhole 60 x 60 (Plat Baja) + Pengunci Buah 560,000 580,000
56 Formika (90 x 120 cm) Lembar 176,000 182,200
57 Kabel Sling (Wire Rop) Baja F 20 mm M' 37,500 38,500
58 Kabel Sling (Wire Rop) Baja F 10 mm M' 18,700 19,700
59 Bak Mandi Fibre 60 x 60 Buah 219,000 227,000
60 Ass (Rol) Buah 176,000 182,200
61 Klem Pengapit Buah 36,000 37,200
62 Track Skhor Buah 20,000 22,000
63 Kunci Pipa Besar Set 62,500 64,500
64 Kunci Pipa Kecil Set 44,000 46,000
65 Ijuk Aren Kg 55,000 57,000
66 Katup Apung 3/4" Buah 137,500 139,500
67 Wall Pipe Buah 110,000 112,000
Halaman 14
JENIS
NO BAHAN SATUAN
KOTA PEGUNUNGAN
11 Kayu Meranti Papan 2/20 ; 3/30 ; 4/20 M3 6,300,000 6,350,000
12 Kayu Meranti Reng 2/3 ; 3/5 M3 4,375,000 4,425,000
13 Kayu Kruing 5/7 ; 6/12 ; 8/12 ; 8/15 M3 6,875,000 6,925,000
14 Kayu Bengkirai 8/12 ; 6/12 M3 11,400,000 11,450,000
15 Kayu Bengkirai Usuk 5/7 ; 4/6 ; 3/5 M3 10,200,000 10,250,000
16 Kayu Bengkirai Papan 2/20 ; 3/30 ; 4/20 M3 13,200,000 13,250,000
17 Kayu Bengkirai 8/20 M3 14,800,000 14,850,000
18 Kayu ( Bekisting ) M3 2,187,500 2,237,500
19 Bambu Lj 31,000 31,000
20 Kayu List 1/5 Meranti Lj 4,400 4,500
21 Sesek Bambu Lbr 31,000 32,000
Halaman 15
JENIS
NO BAHAN SATUAN
KOTA PEGUNUNGAN
5 Kerangka Kaca Nako Ukr. 10 x 100 Daun 12,000 14,500
6 Glass Block Bj 20,400 22,900
Halaman 16
JENIS
NO BAHAN SATUAN
KOTA PEGUNUNGAN
13 Pav. Stone Segi 8 t = 6 cm (abu-abu) M2 56,000 58,400
14 Pav. Stone Segi 8 t = 5 cm (abu-abu) M2 51,200 53,600
15 Pav. Stone 3 Berlian/Segi 6 t = 8 cm (warna) M2 70,300 77,300
16 Pav. Stone 3 Berlian/Segi 6 t = 7 cm (warna) M2 64,200 71,300
17 Pav. Stone 3 Berlian/Segi 6 t = 6 cm (warna) M2 58,400 63,800
18 Pav. Stone 3 Berlian/Segi 6 t = 5 cm (warna) M2 53,600 59,000
19 Pav. Stone 3 Berlian/Segi 6 t = 8 cm (abu-abu) M2 64,300 71,300
20 Pav. Stone 3 Berlian/Segi 6 t = 7 cm (abu-abu) M2 58,200 65,300
21 Pav. Stone 3 Berlian/Segi 6 t = 6 cm (abu-abu) M2 52,400 57,800
22 Pav. Stone 3 Berlian/Segi 6 t = 5 cm (abu-abu) M2 47,600 53,000
23 Kanstein uk. 10 x 30 x 50 Bj 16,800 18,000
24 Kanstein uk. 15 x 30 x 50 Bj 23,400 24,600
25 Batako Uk.10 x 20 x 40 Bj 3,600 4,800
Halaman 17
JENIS
NO BAHAN SATUAN
KOTA PEGUNUNGAN
26 Lampu Dop Pijar (merk setara Philip) 15 Watt Bh 5,000 5,000
27 Lampu Dop Pijar (merk setara Philip) 25 Watt Bh 5,600 5,600
28 Lampu Dop Pijar (merk setara Philip) 40 Watt Bh 6,400 6,400
29 Lampu Dop Pijar (merk setara Philip) 60 Watt Bh 7,500 7,500
30 Lampu Dop Pijar (merk setara Philip) 75 Watt Bh 7,800 7,800
31 Lampu Dop Pijar (merk setara Philip) 100 Watt Bh 8,100 8,100
32 Lampu PLC (merk setara Philip) 65 Watt Bh 218,700 218,700
33 Lampu PLC (merk setara Philip) 8 Watt Bh 33,100 33,100
34 Lampu PLC (merk setara Philip) 14 Watt Bh 37,500 37,500
35 Lampu PLC (merk setara Philip) 18 Watt Bh 41,200 41,200
36 Lampu PLC (merk setara Philip) 23 Watt Bh 45,600 45,600
37 Lampu PLC Trafo (merk setara Philip) 7 Watt Bh 20,600 20,600
38 Lampu PLC Trafo (merk setara Philip) 9 Watt Bh 20,600 20,600
39 Lampu PLC Trafo (merk setara Philip) 11 Watt Bh 34,300 34,300
40 Dop Halogen 400 Watt ( HPIT ) (merk setara iwasaki) Bh 218,700 218,700
41 Sakelar Tunggal (merk setara Brocco) Bh 15,000 15,000
42 Sakelar Ganda (merk setara Brocco) Bh 18,700 18,700
43 Stop Kontak (merk setara Brocco) Bh 15,600 15,600
44 Zekering Bh 9,800 9,800
45 Kap T.O 2 Bh 181,200 181,200
46 Kap Mercury Cobra Kecil Bh 312,500 312,500
47 Kap Mercury Cobra Besar Bh 437,500 437,500
48 Kap Terbuka E. 27 (hijau) Bh 40,300 40,300
49 Time Switch Bh 437,500 437,500
50 Magnetic Contractor 220 V Bh 468,700 468,700
51 Suspension Clamp Bh 40,300 40,300
52 Sekering Kodok 1 Group Bh - -
53 Terminal 16 mm Bh 31,200 31,200
54 Lidah Buaya Set 43,700 43,700
55 Perching Connector 1 B Bh 6,800 6,800
56 Kabel NYAF 16 mm M" 43,700 43,700
57 Elemen + Kop + Sekring 63 A Bh 46,800 46,800
58 Elemen + Kop + Sekring 10 A Bh 31,200 31,200
59 Skoen 25 Bh 3,100 3,100
60 Isolasi Kertas Besar Bh 16,800 16,800
61 Stank Ampera Bh 1,062,500 1,062,500
62 Lampu Selang Warna M 15,000 15,000
63 Silkon / Foto Sensor 6 A Bh 112,500 112,500
64 Silkon / Foto Sensor 3 A Bh 90,600 90,600
65 Isolasi Plastik Bh 6,800 6,800
Halaman 18
JENIS
NO BAHAN SATUAN
KOTA PEGUNUNGAN
66 Kabel NYY 3 x 2,5 mm m 21,800 21,800
67 Kabel TC 2 x 16 mm Bh 8,100 8,100
68 Kap Lampu tertutup untuk HPI-T 250 watt Set 287,500 287,500
69 Kontaktor 40 Ampere Bh 525,000 525,000
70 MCB 10 Ampere Bh 50,000 50,000
71 MCB 50 Ampere Bh 16,800 16,800
72 MCB 6 Ampere Bh 52,500 52,500
73 Panel kontrol 40 x 60 cm Bh 375,000 375,000
74 Stoping bucle (yokes) Bh 1,000 1,000
75 Stainless steel strip m 8,100 8,100
76 Service Wadge Clamp Bh 3,700 3,700
77 Tiang Oktagonal 7 m double Bh 4,062,500 4,062,500
78 Tiang Oktagonal 9 m Bh 4,843,700 4,843,700
79 Tiang Oktagonal 8 m Bh 4,062,500 4,062,500
80 Tiang Oktagonal 8 m double Bh 4,687,500 4,687,500
81 Tiang bulat Hod dip 6 m Bh 2,500,000 2,500,000
82 Tiang bulat Hod dip 7 m Bh 2,968,700 2,968,700
83 Tiang bulat Hod dip 8 m Bh 3,593,700 3,593,700
84 Tiang bulat Hod dip 9 m\ Bh 4,062,500 4,062,500
85 Kap Lampu Sorot untuk HPI-T 400 Watt Bh 287,500 287,500
86 Dop Lampu HPI-T 250 Watt Bh 212,500 212,500
87 Dop Lampu HPI-T 400 Watt Bh 225,000 225,000
88 MCB 2 Ampere Bh 56,200 56,200
89 MCB 4 Ampere Bh 56,200 56,200
90 MCB 16 Ampere Bh 53,100 53,100
91 MCB 20 Ampere Bh 53,100 53,100
92 MCCB 100 Ampere Bh 812,500 812,500
93 MCCB 150 Ampere Bh 1,562,500 1,562,500
94 MCCB 200 Ampere Bh 1,687,500 1,687,500
95 Panel kontrol 30 x 40 x 15 cm Bh 212,500 212,500
96 Panel kontrol 30 x 40 x 20cm Bh 268,700 268,700
97 Panel kontrol 60 x 80 cm Bh 700,000 700,000
98 Fitting Porselen Pendek Bh 3,700 3,700
99 Fitting Porselen Panjang Bh 6,200 6,200
100 Kap E-40 (Hijau) Bh 25,000 25,000
101 Kabel NYZ 2 x 23 x 0,3 mm (Serabut) Bh 2,800 2,800
102 Skoen 10 Bh 1,500 1,500
103 Skoen 6 Bh 1,200 1,200
104 Lampu Selang Warna LED m 28,100 28,100
105 Elemen + Kop + Sekring 10 A Bh 25,000 25,000
Halaman 19
JENIS
NO BAHAN SATUAN
KOTA PEGUNUNGAN
106 Ornamen Pipa BSA uk. 1m (2") + 1m (1,5") / 2m Bh 215,700 215,700
107 Ornamen Pipa BSA uk. 2m (2") + 1m (1,5") / 3m Bh 307,200 307,200
108 Ornamen Pipa BSA uk. 3m (2") + 1m (1,5") / 4m Bh 398,700 398,700
109 Ornamen Pipa BSA uk. 4m (2") + 1m (1,5") / 5m Bh 490,200 490,200
110 Ornamen Pipa BSA uk. 5m (2") + 1m (1,5") / 6m Bh 581,700 581,700
111 Ornamen Pipa BSA uk. 6m (2") + 2m (1,5") / 7m Bh 673,200 673,200
112 Ornamen Pipa BSA uk. 7m (2") + 2m (1,5") / 8m Bh 764,700 764,700
113 Ornamen Pipa BSA uk. 8m (2") + 3m (1,5") / 9m Bh 856,200 856,200
114 Ornamen Pipa BSA uk. 1m (1,5") + 1m (1,25") / 2m Bh 179,200 179,200
115 Ornamen Pipa BSA uk. 2m (1,5") + 1m (1,25") / 3m Bh 247,200 247,200
116 Ornamen Pipa BSA uk. 3m (1,5") + 1m (1,25") / 4m Bh 315,200 315,200
117 Ornamen Pipa BSA uk. 4m (1,5") + 1m (1,25") / 5m Bh 383,200 383,200
118 Ornamen Pipa BSA uk. 5m (1,5") + 1m (1,25") / 6m Bh 451,200 451,200
119 Ornamen Pipa BSA uk. 6m (1,5") + 2m (1,25") / 7m Bh 519,200 519,200
120 Ornamen Pipa BSA uk. 7m (1,5") + 2m (1,25") / 8m Bh 587,200 587,200
121 Ornamen Pipa BSA uk. 8m (1,5") + 3m (1,25") / 9m Bh 655,200 655,200
122 Ornamen Pipa BSA (B) uk. 1m (2") + 1m (1,5") / 2m Bh 160,000 160,000
123 Ornamen Pipa BSA (B) uk. 2m (2") + 1m (1,5") / 3m Bh 220,000 220,000
124 Ornamen Pipa BSA (B) uk. 3m (2") + 1m (1,5") / 4m Bh 280,000 280,000
125 Ornamen Pipa BSA (B) uk. 4m (2") + 1m (1,5") / 5m Bh 340,000 340,000
126 Ornamen Pipa BSA (B) uk. 5m (2") + 1m (1,5") / 6m Bh 400,000 400,000
127 Ornamen Pipa BSA (B) uk. 6m (2") + 2m (1,5") / 7m Bh 460,000 460,000
128 Ornamen Pipa BSA (B) uk. 7m (2") + 2m (1,5") / 8m Bh 520,000 520,000
129 Ornamen Pipa BSA (B) uk. 8m (2") + 3m (1,5") / 9m Bh 580,000 580,000
130 Ornamen Pipa BSA (B) uk. 1m (1,5") + 1m (1,25") / 2m Bh 148,200 148,200
131 Ornamen Pipa BSA (B) uk. 2m (1,5") + 1m (1,25") / 3m Bh 175,700 175,700
132 Ornamen Pipa BSA (B) uk. 3m (1,5") + 1m (1,25") / 4m Bh 219,500 219,500
133 Ornamen Pipa BSA (B) uk. 4m (1,5") + 1m (1,25") / 5m Bh 290,200 290,200
134 Ornamen Pipa BSA (B) uk. 5m (1,5") + 1m (1,25") / 6m Bh 307,000 307,000
135 Ornamen Pipa BSA (B) uk. 6m (1,5") + 2m (1,25") / 7m Bh 350,700 350,700
136 Ornamen Pipa BSA (B) uk. 7m (1,5") + 2m (1,25") / 8m Bh 394,500 394,500
137 Ornamen Pipa BSA (B) uk. 8m (1,5") + 3m (1,25") / 9m Bh 438,200 438,200
138 Klem Begel Æ 45 cm 0,005 x 0,05 (4 PS)/set Bh 87,700 87,700
139 Klem Begel Æ 30 cm 0,005 x 0,05 (4 PS)/set Bh 78,300 78,300
140 Klem Begel Æ 24 cm 0,005 x 0,05 (4 PS)/set Bh 75,100 75,100
141 Klem Begel Æ 12 cm 0,005 x 0,05 (4 PS)/set Bh 70,100 70,100
142 Dop Sodium 250 Watt (merk setara Philip) Bh 312,500 312,500
143 Dop Merqury m 125 Watt (merk setara Philip) Bh 50,000 50,000
144 Dop Merqury m 250 Watt (merk setara Philip) Bh 81,200 81,200
145 Trafo m 125 Watt (220 v merk setara Philip) Set 168,700 168,700
Halaman 20
JENIS
NO BAHAN SATUAN
KOTA PEGUNUNGAN
146 Trafo m 250 Watt (220 v merk setara Philip) Set 275,000 275,000
147 Trafo m 400 Watt (220 v merk setara Philip) Set 312,500 312,500
148 Kap Lampu Taman Tutup Atas Bh 250,000 250,000
149 Kap Lampu Taman Bulat Bh 175,000 175,000
150 MCB 40 A Bh 75,000 75,000
151 Service Clamp Bh 5,600 5,600
152 Neon 40 Watt (merk setara Philip) Bh 18,700 18,700
153 Trafo 40 Watt (merk setara Philip) Bh 40,000 40,000
154 Kap WD Bh 75,000 75,000
155 Starter Bh 3,100 3,100
156 Tiang PJU Pipa BSA 4" = 6 m + BSA 3" = 2 m Bh 1,556,600 1,556,600
157 Tiang PJU Pipa BSB 4" = 6 m + BSB 3" = 2 m Bh 1,359,200 1,359,200
Halaman 21
JENIS
NO BAHAN SATUAN
KOTA PEGUNUNGAN
20 Oker Kg 30,000 32,500
21 Lem Kayu Kg 12,000 13,000
22 Dempul Kayu (untuk plitur) Bj 1,200 1,500
23 Tandon Fiber Glass 550 ltr Bh 780,000 830,000
24 Tandon Fiber Glass 1100 ltr Bh 1,260,000 1,340,000
25 Tandon Steinless Stel 550 ltr Bh 1,980,000 2,060,000
26 Tandon Steinless Stel 1000 ltr Bh 3,000,000 3,150,000
27 Batu Alam (Piring) Biji 1,200 1,300
28 Batu Palimanan Halus (10 x 20) M2 84,600 89,600
29 Batu Palimanan Kasar (10 x 20) M2 84,600 89,600
30 Batu Susun Sirih M2 60,600 65,600
31 Batu Hijau Sukabumi M2 102,600 107,600
32 Batu Andesit Bakar M2 144,600 149,600
33 Batu Precast M2 - 5,000
34 Batu Pacitarasa M2 - 5,000
35 Batu Bali Green (polos) M2 108,600 113,600
36 Batu Bali Green (alur) M2 - 5,000
37 Roster Karang Pilang Besar Bj 8,100 9,100
38 Roster Beton uk.30 Bj 9,100 10,100
39 Roster Karang Pilang Kecil Bj 4,300 5,300
40 Aqua Proof Kg 51,000 53,000
41 Elektroda 3,2 mm (2%) Kg 126,000 126,000
42 Chladianplast 180 x 80 Lbr 78,000 84,000
43 Chladianplast 210 x 80 Lbr 91,200 97,200
44 Chladianplast 240 x 80 Lbr 104,400 112,400
45 Chladianplast 300 x 80 Lbr 130,200 140,200
46 Pipa Besi Kotak 1,4 mm uk. 4 x 4 Lj 114,000 124,000
47 Pipa Besi Kotak 1,4 mm uk. 2 x 4 Lj 90,000 100,000
48 Pipa Besi Kotak 1,4 mm uk. 2 x 2 Lj 42,000 52,000
49 Pipa Besi Kotak 1,6 mm uk. 5 x 5 Lj 198,000 208,000
50 Kereta Dorong Bh 432,000 447,000
51 Timba Bh 6,000 6,500
52 Cangkul Bh 42,000 44,000
53 Gancu Bh 57,000 59,500
54 Sekrop Bh 42,000 44,500
55 Kuas 3 " Bh 7,200 7,700
56 Kuas 4 " Bh 15,000 15,500
57 Kuas 5 " Bh 20,000 20,000
58 Bodem / Palu Bh 29,000 29,000
59 Cetok Bh 16,500 16,500
Halaman 22
JENIS
NO BAHAN SATUAN
KOTA PEGUNUNGAN
60 Gergaji Bh 41,500 41,500
61 Keranjang Bh 15,000 15,000
62 Linggis Bh 52,000 52,000
63 Meteran (50 m) Bh 57,500 57,500
64 Poly Carbonat (P= 11,80 m, L = 2,10, Tebal 6 mm) Lbr 2,160,000 2,160,000
65 Kalsiplank uk. 8 mm x 20 cm x 4 m Lbr 60,000 63,000
66 Kalsiplank uk. 8 mm x 30 cm x 4 m Lbr 102,000 106,000
67 Kalsibot/Silikabot Lbr 51,000 54,000
68 Air Ltr 25 25
Halaman 23
JENIS
NO BAHAN SATUAN
KOTA PEGUNUNGAN
XXXII TANAMAN PENGHIJAUAN DAN TAMAN
1 Palem Putri Batang 125,000 125,000
2 Palem Tupai Batang 125,000 125,000
3 Palem Sepuluh Batang 31,200 31,200
4 Palem Poenix Batang 93,700 93,700
5 Palem Merah Rumpun 187,500 187,500
6 Palem Kuning Batang 31,200 31,200
7 Palem Botol Batang 187,500 187,500
8 Cemara Pecut Batang 43,700 43,700
9 Cemara Pua - Pua Batang 62,500 62,500
10 Cemara Frentris Batang 62,500 62,500
11 Cemara Udang Batang 62,500 62,500
12 Glodogan Tiang Batang 43,700 43,700
13 Glodogan Biasa Batang 43,700 43,700
14 Bougenvile Batang 12,500 12,500
15 Parigata Batang 12,500 12,500
16 Tetean Batang 3,000 3,000
17 Pangkas Hijau Batang 3,700 3,700
18 Pangkas Mas Batang 3,700 3,700
19 Terang Bulan Pot 3,700 3,700
20 Jaburan Batang 3,700 3,700
21 Asoka Batang 6,200 6,200
22 Krisdorn Batang 9,000 9,000
23 Bulu Ayam Batang 3,700 3,700
24 Krokot Batang 3,700 3,700
25 Lantana Batang 3,700 3,700
26 Bonsai Parigata Batang 93,700 93,700
27 Bonsai Bougenvile Batang 93,700 93,700
28 Bonsai Cemara Udang Batang 125,000 125,000
29 Asoka Daun Besar Batang 18,700 18,700
30 Puring Jetz Batang 18,700 18,700
31 Nusa Indah Batang 24,000 24,000
Halaman 24
JENIS
NO BAHAN SATUAN
KOTA PEGUNUNGAN
32 Alamanda Batang 24,000 24,000
33 Kaca Piring Batang 12,500 12,500
34 Pohon Tanjung Batang 62,500 62,500
35 Bunga Mawar Batang 6,200 6,200
36 Agawe Batang 31,200 31,200
37 Tri Colour Batang 12,500 12,500
38 Corombusa Batang 9,300 9,300
39 Pandan Nusa Batang 6,200 6,200
40 Tabe Buya Batang 102,600 102,600
41 Dadap Merah Batang 75,000 75,000
42 Bintaro Batang 75,000 75,000
43 Song Of India Batang 12,500 12,500
44 Wali Songo Batang 12,500 12,500
45 Sikat Botol Batang 43,700 43,700
46 Rumput Gajah M2 31,200 31,200
47 Pucuk Merah Batang 74,400 74,400
48 Pohon Pelindung Phn 31,500 31,500
XXXIII TENAGA
1 Mandor Org/Hr 57,000 62,000
2 Kepala Tukang Org/Hr 55,000 60,000
3 Tukang Kayu Org/Hr 53,000 58,000
4 Tukang Batu Org/Hr 50,000 55,000
5 Tukang Besi Org/Hr 50,000 55,000
6 Tukang Pipa Org/Hr 50,000 55,000
7 Tukang Cat Org/Hr 45,000 50,000
8 Tukang Plitur Org/Hr 45,000 50,000
9 Pekerja Org/Hr 37,000 42,000
10 Juru Ukur Org/Hr 85,000 90,000
11 Mekanik Org/Hr 53,000 58,000
12 Pembantu Mekanik Org/Hr 44,000 49,000
13 Operator Terampil Org/Hr 55,000 60,000
14 Pembantu Operator Org/Hr 45,000 50,000
15 Sopir Terampil Org/Hr 55,000 60,000
16 Pembantu Sopir Org/Hr 44,000 49,000
17 Penjaga Org/Hr 40,000 45,000
18 Buruh Terampil Org/Hr 50,000 55,000
19 Penganyam Org/Hr 50,000 55,000
20 Pekerja Pengisi Org/Hr 37,000 42,000
21 Pekerja Penganyam Org/Hr 37,000 42,000
Halaman 25
JENIS
NO BAHAN SATUAN
KOTA PEGUNUNGAN
BUPATI S
TIM SURVEY HARGA SATUAN DASAR BAHAN BANGUNAN DAN UPAH
KABUPATEN SITUBONDO - TAHUN 2011
KOORDINATOR 1 MARSUTO, SH
H. DADANG
Halaman 26
KOTA PEGUNUNGAN KOTA PEGUNUNGAN
- - - -
262,000 272,000 190,000 257,000
204,000 264,000 183,000 250,000
192,000 247,000 171,000 234,000
187,000 240,000 164,000 227,000
149,000 207,000 173,000 246,000
132,000 188,000 156,000 227,000
137,000 209,000 130,000 194,000
510 630 600 720
Halaman 27
KOTA PEGUNUNGAN KOTA PEGUNUNGAN
300,000 325,000 300,000 325,000
6,000 6,500 6,000 6,500
Halaman 28
KOTA PEGUNUNGAN KOTA PEGUNUNGAN
Halaman 29
KOTA PEGUNUNGAN KOTA PEGUNUNGAN
914,200 914,200 914,200 914,200
1,155,700 1,155,700 1,155,700 1,155,700
1,610,000 1,610,000 1,610,000 1,610,000
486,500 486,500 486,500 486,500
326,200 326,200 326,200 326,200
424,000 424,000 424,000 424,000
311,800 311,800 311,800 311,800
Halaman 30
KOTA PEGUNUNGAN KOTA PEGUNUNGAN
Halaman 31
KOTA PEGUNUNGAN KOTA PEGUNUNGAN
1,856,200 1,861,800 1,856,200 1,861,800
2,497,000 2,503,800 2,497,000 2,503,800
2,972,700 2,980,700 2,972,700 2,980,700
4,268,100 4,278,100 4,268,100 4,278,100
Halaman 32
KOTA PEGUNUNGAN KOTA PEGUNUNGAN
538,200 538,800 538,200 538,800
639,800 640,800 639,800 640,800
854,500 855,100 854,500 855,100
1,358,500 1,359,100 1,358,500 1,359,100
1,786,700 1,787,700 1,786,700 1,787,700
2,540,000 2,540,600 2,540,000 2,540,600
Halaman 33
KOTA PEGUNUNGAN KOTA PEGUNUNGAN
31,600 32,600 31,200 32,200
60,500 61,500 62,500 63,500
92,200 93,200 93,700 94,700
167,100 168,100 168,700 169,700
664,800 665,800 687,500 688,500
4,300 5,300 5,600 6,600
5,700 6,700 6,800 7,800
8,000 9,000 9,300 10,300
11,800 12,800 12,500 13,500
16,400 17,400 16,800 17,800
22,400 23,400 23,700 24,700
37,400 38,400 37,500 38,500
63,300 64,300 65,600 66,600
100,800 101,800 112,500 113,500
6,000 7,000 8,100 9,100
8,900 9,900 10,000 11,000
14,100 15,100 15,600 16,600
21,300 22,300 22,500 23,500
27,000 28,000 28,100 29,100
40,300 41,300 40,600 41,600
92,200 93,200 93,700 94,700
121,000 122,000 125,000 126,000
144,500 145,500 144,500 145,500
218,900 219,900 225,000 226,000
274,600 275,600 312,500 313,500
982,800 983,800 1,062,500 1,063,500
6,200 7,200 6,200 7,200
6,900 7,900 6,900 7,900
9,200 10,200 9,200 10,200
24,400 25,400 24,400 25,400
72,200 73,200 72,200 73,200
132,900 133,900 132,900 133,900
132,900 133,900 132,900 133,900
346,800 347,800 346,800 347,800
346,800 347,800 346,800 347,800
600 1,600 600 1,600
700 1,700 700 1,700
900 1,900 900 1,900
1,800 2,800 1,800 2,800
2,100 3,100 2,100 3,100
Halaman 34
KOTA PEGUNUNGAN KOTA PEGUNUNGAN
2,500 3,500 2,500 3,500
2,800 3,800 2,800 3,800
3,100 4,100 3,100 4,100
3,400 4,400 3,400 4,400
Halaman 35
KOTA PEGUNUNGAN KOTA PEGUNUNGAN
2,873,800 3,017,400 2,873,800 3,017,400
Halaman 36
KOTA PEGUNUNGAN KOTA PEGUNUNGAN
3,063,300 3,216,400 3,063,300 3,216,400
Halaman 37
KOTA PEGUNUNGAN KOTA PEGUNUNGAN
2,254,000 2,366,700 2,254,000 2,366,700
3,572,300 3,750,900 3,572,300 3,750,900
Halaman 38
KOTA PEGUNUNGAN KOTA PEGUNUNGAN
Halaman 39
KOTA PEGUNUNGAN KOTA PEGUNUNGAN
11,300 11,800 11,300 11,800
22,000 22,800 22,000 22,800
100,000 103,500 100,000 103,500
150,000 155,500 150,000 155,500
194,000 201,000 194,000 201,000
275,000 276,000 275,000 276,000
762,500 787,500 762,500 787,500
1,469,000 1,519,000 1,469,000 1,519,000
2,028,000 2,180,500 2,100,500 2,180,500
141,000 146,000 141,000 146,000
184,000 190,500 184,000 190,500
406,000 420,500 406,000 420,500
512,000 530,200 512,000 530,200
526,000 544,700 526,000 544,700
539,000 558,200 539,000 558,200
560,000 580,000 560,000 580,000
176,000 182,200 176,000 182,200
37,500 38,500 37,500 38,500
18,700 19,700 18,700 19,700
219,000 227,000 250,000 258,000
176,000 182,200 176,000 182,200
36,000 37,200 36,000 37,200
20,000 22,000 20,000 22,000
62,500 64,500 62,500 64,500
44,000 46,000 44,000 46,000
65,000 67,000 55,000 57,000
137,500 139,500 137,500 139,500
110,000 112,000 110,000 112,000
Halaman 40
KOTA PEGUNUNGAN KOTA PEGUNUNGAN
6,300,000 6,350,000 6,300,000 6,350,000
4,375,000 4,425,000 4,375,000 4,425,000
6,875,000 6,925,000 6,875,000 6,925,000
11,400,000 11,450,000 11,400,000 11,450,000
10,200,000 10,250,000 10,200,000 10,250,000
13,200,000 13,250,000 13,200,000 13,250,000
14,800,000 14,850,000 14,800,000 14,850,000
2,187,500 2,237,500 2,187,500 2,237,500
31,000 31,000 31,000 31,000
4,400 4,500 4,400 4,500
31,000 32,000 31,000 32,000
Halaman 41
KOTA PEGUNUNGAN KOTA PEGUNUNGAN
12,000 14,500 12,000 14,500
20,400 22,900 20,400 22,900
Halaman 42
KOTA PEGUNUNGAN KOTA PEGUNUNGAN
54,000 56,000 56,000 58,400
49,200 51,200 51,200 53,600
67,800 70,300 70,300 77,300
61,200 64,200 64,200 71,300
56,400 58,400 58,400 63,800
51,600 53,600 53,600 59,000
61,800 64,300 64,300 71,300
55,200 58,200 58,200 65,300
50,400 52,400 52,400 57,800
45,600 47,600 47,600 53,000
15,600 16,800 16,800 18,000
21,600 23,400 23,400 24,600
3,240 3,600 3,600 4,800
,
Halaman 43
KOTA PEGUNUNGAN KOTA PEGUNUNGAN
5,000 5,000 5,000 5,000
5,600 5,600 5,600 5,600
6,400 6,400 6,400 6,400
7,500 7,500 7,500 7,500
7,800 7,800 7,800 7,800
8,100 8,100 8,100 8,100
218,700 218,700 218,700 218,700
33,100 33,100 33,100 33,100
37,500 37,500 37,500 37,500
41,200 41,200 41,200 41,200
45,600 45,600 45,600 45,600
20,600 20,600 20,600 20,600
20,600 20,600 20,600 20,600
34,300 34,300 34,300 34,300
218,700 218,700 218,700 218,700
15,000 15,000 15,000 15,000
18,700 18,700 18,700 18,700
15,600 15,600 15,600 15,600
9,800 9,800 9,800 9,800
181,200 181,200 181,200 181,200
312,500 312,500 312,500 312,500
437,500 437,500 437,500 437,500
40,300 40,300 40,300 40,300
437,500 437,500 437,500 437,500
468,700 468,700 468,700 468,700
40,300 40,300 40,300 40,300
79,000 79,000 79,000 79,000
31,200 31,200 31,200 31,200
43,700 43,700 43,700 43,700
6,800 6,800 6,800 6,800
43,700 43,700 43,700 43,700
46,800 46,800 46,800 46,800
31,200 31,200 31,200 31,200
3,100 3,100 3,100 3,100
16,800 16,800 16,800 16,800
1,062,500 1,062,500 1,062,500 1,062,500
15,000 15,000 15,000 15,000
112,500 112,500 112,500 112,500
90,600 90,600 90,600 90,600
6,800 6,800 6,800 6,800
Halaman 44
KOTA PEGUNUNGAN KOTA PEGUNUNGAN
21,800 21,800 21,800 21,800
8,100 8,100 8,100 8,100
287,500 287,500 287,500 287,500
525,000 525,000 525,000 525,000
50,000 50,000 50,000 50,000
16,800 16,800 16,800 16,800
52,500 52,500 52,500 52,500
375,000 375,000 375,000 375,000
1,000 1,000 1,000 1,000
8,100 8,100 8,100 8,100
3,700 3,700 3,700 3,700
4,062,500 4,062,500 4,062,500 4,062,500
4,843,700 4,843,700 4,843,700 4,843,700
4,062,500 4,062,500 4,062,500 4,062,500
4,687,500 4,687,500 4,687,500 4,687,500
2,500,000 2,500,000 2,500,000 2,500,000
2,968,700 2,968,700 2,968,700 2,968,700
3,593,700 3,593,700 3,593,700 3,593,700
4,062,500 4,062,500 4,062,500 4,062,500
287,500 287,500 287,500 287,500
212,500 212,500 212,500 212,500
225,000 225,000 225,000 225,000
56,200 56,200 56,200 56,200
56,200 56,200 56,200 56,200
53,100 53,100 53,100 53,100
53,100 53,100 53,100 53,100
812,500 812,500 812,500 812,500
1,562,500 1,562,500 1,562,500 1,562,500
1,687,500 1,687,500 1,687,500 1,687,500
212,500 212,500 212,500 212,500
268,700 268,700 268,700 268,700
700,000 700,000 700,000 700,000
3,700 3,700 3,700 3,700
6,200 6,200 6,200 6,200
25,000 25,000 25,000 25,000
2,800 2,800 2,800 2,800
1,500 1,500 1,500 1,500
1,200 1,200 1,200 1,200
28,100 28,100 28,100 28,100
25,000 25,000 25,000 25,000
Halaman 45
KOTA PEGUNUNGAN KOTA PEGUNUNGAN
215,700 215,700 215,700 215,700
307,200 307,200 307,200 307,200
398,700 398,700 398,700 398,700
490,200 490,200 490,200 490,200
581,700 581,700 581,700 581,700
673,200 673,200 673,200 673,200
764,700 764,700 764,700 764,700
856,200 856,200 856,200 856,200
179,200 179,200 179,200 179,200
247,200 247,200 247,200 247,200
315,200 315,200 315,200 315,200
383,200 383,200 383,200 383,200
451,200 451,200 451,200 451,200
519,200 519,200 519,200 519,200
587,200 587,200 587,200 587,200
655,200 655,200 655,200 655,200
160,000 160,000 160,000 160,000
220,000 220,000 220,000 220,000
280,000 280,000 280,000 280,000
340,000 340,000 340,000 340,000
400,000 400,000 400,000 400,000
460,000 460,000 460,000 460,000
520,000 520,000 520,000 520,000
580,000 580,000 580,000 580,000
148,200 148,200 148,200 148,200
175,700 175,700 175,700 175,700
219,500 219,500 219,500 219,500
290,200 290,200 290,200 290,200
307,000 307,000 307,000 307,000
350,700 350,700 350,700 350,700
394,500 394,500 394,500 394,500
438,200 438,200 438,200 438,200
87,700 87,700 87,700 87,700
78,300 78,300 78,300 78,300
75,100 75,100 75,100 75,100
70,100 70,100 70,100 70,100
312,500 312,500 312,500 312,500
50,000 50,000 50,000 50,000
81,200 81,200 81,200 81,200
168,700 168,700 168,700 168,700
Halaman 46
KOTA PEGUNUNGAN KOTA PEGUNUNGAN
275,000 275,000 275,000 275,000
312,500 312,500 312,500 312,500
250,000 250,000 250,000 250,000
175,000 175,000 175,000 175,000
75,000 75,000 75,000 75,000
5,600 5,600 5,600 5,600
18,700 18,700 18,700 18,700
40,000 40,000 40,000 40,000
75,000 75,000 75,000 75,000
3,100 3,100 3,100 3,100
1,556,600 1,556,600 1,556,600 1,556,600
1,359,200 1,359,200 1,359,200 1,359,200
Halaman 47
KOTA PEGUNUNGAN KOTA PEGUNUNGAN
30,000 32,500 30,000 32,500
12,000 13,000 12,000 13,000
1,200 1,500 1,200 1,500
780,000 830,000 780,000 830,000
1,260,000 1,340,000 1,260,000 1,340,000
1,980,000 2,060,000 1,980,000 2,060,000
3,000,000 3,150,000 3,000,000 3,150,000
1,200 1,300 1,200 1,300
84,600 89,600 84,600 89,600
84,600 89,600 84,600 89,600
60,600 65,600 60,600 65,600
102,600 107,600 102,600 107,600
144,600 149,600 144,600 149,600
- 5,000 - 5,000
- 5,000 - 5,000
108,600 113,600 108,600 113,600
- 5,000 - 5,000
8,100 9,100 8,100 9,100
9,100 10,100 9,100 10,100
4,300 5,300 4,300 5,300
51,000 53,000 51,000 53,000
126,000 126,000 126,000 126,000
78,000 84,000 78,000 84,000
91,200 97,200 91,200 97,200
104,400 112,400 104,400 112,400
130,200 140,200 130,200 140,200
114,000 124,000 114,000 124,000
90,000 100,000 90,000 100,000
42,000 52,000 42,000 52,000
198,000 208,000 198,000 208,000
432,000 447,000 432,000 447,000
6,000 6,500 6,000 6,500
42,000 44,000 42,000 44,000
57,000 59,500 57,000 59,500
42,000 44,500 42,000 44,500
7,200 7,700 7,200 7,700
15,000 15,500 15,000 15,500
20,000 20,000 20,000 20,000
29,000 29,000 29,000 29,000
16,500 16,500 16,500 16,500
Halaman 48
KOTA PEGUNUNGAN KOTA PEGUNUNGAN
41,500 41,500 41,500 41,500
15,000 15,000 15,000 15,000
52,000 52,000 52,000 52,000
57,500 57,500 57,500 57,500
2,160,000 2,160,000 2,160,000 2,160,000
60,000 63,000 60,000 63,000
102,000 106,000 102,000 106,000
51,000 54,000 51,000 54,000
25 25 25 25
Halaman 49
KOTA PEGUNUNGAN KOTA PEGUNUNGAN
Halaman 50
KOTA PEGUNUNGAN KOTA PEGUNUNGAN
24,000 24,000 24,000 24,000
12,500 12,500 12,500 12,500
62,500 62,500 62,500 62,500
6,200 6,200 6,200 6,200
31,200 31,200 31,200 31,200
12,500 12,500 12,500 12,500
9,300 9,300 9,300 9,300
6,200 6,200 6,200 6,200
102,600 102,600 102,600 102,600
75,000 75,000 75,000 75,000
75,000 75,000 75,000 75,000
12,500 12,500 12,500 12,500
12,500 12,500 12,500 12,500
43,700 43,700 43,700 43,700
31,200 31,200 31,200 31,200
74,400 74,400 74,400 74,400
31,500 31,500 31,500 31,500
Halaman 51
KOTA PEGUNUNGAN KOTA PEGUNUNGAN
BUPATI SITUBONDO
H. DADANG WIGIARTO,SH
Halaman 52
DAFTAR HARGA SATUAN DASAR
BAHAN BANGUNAN DAN UPAH
KABUPATEN SITUBONDO TAHUN 2009
Halaman 53
ASEMBAGUS SITUBONDO BESUKI
NO SATUAN
KOTA PEGUNUNGAN KOTA PEGUNUNGAN KOTA PEGUNUNGAN
26 Tegel Keramik 30 x 30 (warna gelap) m2 45,000 46,500 45,000 46,500 45,000 46,500
27 Tegel Keramik 40 x 40 (polos) m2 54,000 55,500 54,000 55,500 54,000 55,500
28 Tegel Keramik 40 x 40 (warna gelap) m2 57,000 58,500 57,000 58,500 57,000 58,500
29 Tegel Keramik 20 x 25 (polos) m2 48,000 49,500 48,000 49,500 48,000 49,500
30 Tegel Keramik 20 x 20 (polos) m2 45,000 46,500 45,000 46,500 45,000 46,500
31 Tegel Abu-Abu 20 x 20 m2 27,200 28,700 24,800 26,300 24,800 26,300
32 Tegel Wavel Warna 20 x 20 m2 33,200 34,700 30,800 32,300 30,800 32,300
33 Tegel Galar Abu-abu 30 x 30 m2 32,300 33,800 29,900 31,400 29,900 31,400
34 Wastafel (setara INA) komplit buah 420,000 421,500 420,000 421,500 420,000 421,500
35 Tempat Sabun buah 30,000 31,500 30,000 31,500 30,000 31,500
36 Kloset Jongkok (setara INA) warna muda komplit buah 114,000 115,500 114,000 115,500 114,000 115,500
37 Kloset Jongkok (setara INA) warna tua komplit buah 150,000 151,500 150,000 151,500 150,000 151,500
38 Kloset Duduk (setara INA) warna muda komplit buah 360,000 361,500 360,000 361,500 360,000 361,500
39 Kloset Duduk (setara INA) warna tua komplit buah 420,000 421,500 420,000 421,500 420,000 421,500
40 Tempat Cuci Piring (komplit) buah 288,000 289,500 288,000 289,500 288,000 289,500
41 Avour (KM/WC dan Bak Cuci) buah 48,000 49,500 48,000 49,500 48,000 49,500
42 Genteng Karang Pilang ex Ambulu (SNI) biji 2,400 2,500 2,400 2,500 2,500 2,600
43 Genteng Bubungan Karang Pilang ex Ambulu biji 7,000 7,100 6,800 6,900 7,000 7,100
44 Genteng Karang Pilang ex Kalibagor biji 1,400 1,500 1,400 1,500 1,500 1,600
45 Genteng Bubungan Karang Pilang ex Kalibagor biji 2,600 2,700 2,400 2,500 2,600 2,700
46 Genteng Palm Press Kalibagor biji 900 1,000 800 1,000 900 1,000
47 Genteng Bubungan Palm Press Kalibagor biji 2,500 2,600 2,400 2,500 2,500 2,600
48 Genteng Mirando ex Kalibagor biji 2,000 2,100 1,900 2,000 2,000 2,100
49 Genteng Bubungan Mirando ex Kalibagor biji 2,500 2,600 2,400 2,500 2,500 2,600
50 Genteng Beton biji 3,800 3,900 3,700 3,800 3,800 3,900
51 Genteng Bubungan Beton biji 4,300 4,400 4,200 4,300 4,300 4,400
52 Roster Karang Pilang Besar biji 8,100 9,100 8,100 9,100 8,100 9,100
53 Roster Beton biji 9,100 10,100 9,100 10,100 9,100 10,100
54 Besi Beton Polos kg 13,700 14,200 13,700 14,200 13,700 14,200
Halaman 54
ASEMBAGUS SITUBONDO BESUKI
NO SATUAN
KOTA PEGUNUNGAN KOTA PEGUNUNGAN KOTA PEGUNUNGAN
55 Besi Beton Ulir kg 14,300 14,800 14,300 14,800 14,300 14,800
56 Kawat Beton kg 18,700 19,200 18,700 19,200 18,700 19,200
57 Kawat Bronjong/Jaring Kawat Baja kg 15,600 16,100 15,600 16,100 15,600 16,100
58 Kawat Duri rool 84,500 85,000 84,500 85,000 84,500 85,000
59 Kawel / Baut ( bahan plat ) kg 17,000 17,500 17,000 17,500 17,000 17,500
60 Kawel / Baut ( bahan besi ) kg 17,000 17,500 17,000 17,500 17,000 17,500
61 WF 150 mm s/d 280 panjang 12 m Kg 14,300 14,300 14,300 14,300 14,300 14,300
62 WF 300 mm s/d 500 panjang 12 m Kg 14,300 14,300 14,300 14,300 14,300 14,300
63 WF 600 mm s/d 900 panjang 12 m Kg 14,300 14,300 14,300 14,300 14,300 14,300
64 Plat Simpul Kg 11,800 11,800 11,800 11,800 11,800 11,800
65 Baut Baja Dia. 3/4" panjang 4" Bj 6,800 6,800 6,800 6,800 6,800 6,800
66 Baut Baja Dia. 1/2" panjang 4" Bj 3,100 3,100 3,100 3,100 3,100 3,100
67 Baut Baja Dia. 5/8" panjang 1,5" Bj 2,500 2,500 2,500 2,500 2,500 2,500
68 Baut Baja Dia. 1" panjang 4" Bj 31,200 31,200 31,200 31,200 31,200 31,200
69 Baut Baja Dia. 1 1/4" panjang 4" Bj 56,200 56,200 56,200 56,200 56,200 56,200
70 Baut Baja Dia. 1 1/4" panjang 6" Bj 62,500 62,500 62,500 62,500 62,500 62,500
71 Besi Mur Baut Angker f 1/2 panjang 30 cm Bj 12,500 12,500 12,500 12,500 12,500 12,500
72 Besi Mur Baut Pagar Sandaran f 3/8 panjang 4 cm Bj 2,500 2,500 2,500 2,500 2,500 2,500
73 Besi Mur Baut Pagar Sandaran f 3/8 panjang 15 cm Bj 7,500 7,500 7,500 7,500 7,500 7,500
74 Besi Mur Baut Kuku Macan f 3/8 panjang 15 cm Bj 18,700 18,700 18,700 18,700 18,700 18,700
75 Profil Siku 30 x 30 x 3 kg 14,354 14,354 14,354 14,354 14,354 14,354
76 Profil Siku 40 x 40 x 4 kg 14,350 14,350 14,350 14,350 14,350 14,350
77 Profil Siku 50 x 50 x 5 kg 14,255 14,255 14,255 14,255 14,255 14,255
78 Profil Siku 60 x 60 x 6 kg 14,308 14,308 14,308 14,308 14,308 14,308
79 Profil Siku 70 x 70 x 7 kg 14,319 14,319 14,319 14,319 14,319 14,319
80 Profil Siku 80 x 80 x 8 kg 14,333 14,333 14,333 14,333 14,333 14,333
81 Profil Siku 90 x 90 x 9 kg 14,319 14,319 14,319 14,319 14,319 14,319
82 Profil Siku 100 x 100 x 10 kg 14,355 14,355 14,355 14,355 14,355 14,355
83 Profil Siku 120 x 120 x 11 kg 14,344 14,344 14,344 14,344 14,344 14,344
Halaman 55
ASEMBAGUS SITUBONDO BESUKI
NO SATUAN
KOTA PEGUNUNGAN KOTA PEGUNUNGAN KOTA PEGUNUNGAN
84 Profil Siku 130 x 130 x 12 kg 14,423 14,423 14,423 14,423 14,423 14,423
85 Profil Siku 150 x 150 x 15 kg 15,317 15,317 15,317 15,317 15,317 15,317
86 Profil Kanal UNP 100 x 50 x 6 x 8,5 x 4,5 kg 16,325 16,325 16,325 16,325 16,325 16,325
87 Profil Kanal UNP 120 x 55 x 7 x 9 x 4,5 kg 18,946 18,946 18,946 18,946 18,946 18,946
88 Profil kanal CNP 125 x 50 x 20 x 2,0 kg 13,752 13,752 13,752 13,752 13,752 13,752
89 Profil kanal CNP 100 x 50 x 20 x 3 kg 13,620 13,620 13,620 13,620 13,620 13,620
90 Profil kanal CNP 100 x 50 x 20 x 2,2 kg 12,800 12,800 12,800 12,800 12,800 12,800
91 Plat 8 mm uk. 120 x 240 = 187 Kg Kg 12,500 13,000 12,500 13,000 12,500 13,000
92 Plat 10 mm uk. 120 x 240 = 233 Kg Kg 12,500 13,000 12,500 13,000 12,500 13,000
93 Plat 15 mm uk. 120 x 240 = 350 Kg Kg 12,500 13,000 12,500 13,000 12,500 13,000
94 Plat 1,2 mm uk. 120 x 240 Lbr 337,500 339,500 337,500 339,500 337,500 339,500
95 Plat 1,8 mm uk.120 x 240 Lbr 512,500 514,500 512,500 514,500 512,500 514,500
96 Plat 2,8 mm uk. 120 x 240 Lbr 781,200 783,200 781,200 783,200 781,200 783,200
97 Plat 3,8 mm uk.120 x 240 Lbr 1,187,500 1,189,500 1,187,500 1,189,500 1,187,500 1,189,500
98 Plat strip lebar 2 cm tebal 6 mm kg 14,245 14,815 14,245 14,815 14,245 14,815
99 Plat strip lebar 3 cm tebal 6 mm kg 16,311 16,785 16,311 16,785 16,311 16,785
100 Plat strip lebar 5 cm tebal 6 mm kg 12,464 12,749 12,464 12,749 12,464 12,749
101 Seng Gelombang BJLS 30 uk. 80 x 300 Lbr 125,000 130,000 125,000 130,000 125,000 130,000
102 Seng Gelombang BJLS 30 uk. 80 x 180 Lbr 75,000 80,000 75,000 80,000 75,000 80,000
103 Seng Talang BJLS 30 uk. 45 M' 21,800 22,300 21,800 22,300 21,800 22,300
104 Seng Talang BJLS 30 uk. 55 M' 28,100 28,600 28,100 28,600 28,100 28,600
105 Seng Talang BJLS 30 uk. 60 M' 31,200 31,700 31,200 31,700 31,200 31,700
106 Seng Talang BJLS 30 uk. 90 M' 43,700 44,200 43,700 44,200 43,700 44,200
107 Asbes Gelombang Kecil 300 x 105 x 4 mm lembar 78,000 79,500 78,000 79,500 78,000 79,500
108 Asbes Gelombang Kecil 240 x 105 x 4 mm lembar 62,400 63,900 62,400 63,900 62,400 63,900
109 Asbes Gelombang Kecil 210 x 105 x 4 mm lembar 54,600 56,100 54,600 56,100 54,600 56,100
110 Asbes Gelombang Kecil 180 x 105 x 4 mm lembar 46,800 48,300 46,800 48,300 46,800 48,300
111 Asbes Gelombang Besar 300 x 102 x 5 mm lembar 102,000 103,500 102,000 103,500 102,000 103,500
112 Asbes Gelombang Besar 250 x 102 x 5 mm lembar 84,000 85,500 84,000 85,500 84,000 85,500
Halaman 56
ASEMBAGUS SITUBONDO BESUKI
NO SATUAN
KOTA PEGUNUNGAN KOTA PEGUNUNGAN KOTA PEGUNUNGAN
113 Asbes Gelombang Besar 225 x 102 x 5 mm lembar 75,000 76,500 75,000 76,500 75,000 76,500
114 Asbes Gelombang Besar 200 x 102 x 5 mm lembar 69,000 70,500 69,000 70,500 69,000 70,500
115 Asbes Gelombang Besar 180 x 102 x 5 mm lembar 63,000 64,500 63,000 64,500 63,000 64,500
116 Nock Stel Kecil 105 cm lembar 30,000 31,000 30,000 31,000 30,000 31,000
117 Nock Stel Besar 102 cm lembar 54,000 55,000 54,000 55,000 54,000 55,000
118 Enternit Polos m2 11,400 11,900 11,400 11,900 11,400 11,900
119 Gypsum 9 mm m2 66,000 67,500 66,000 67,500 66,000 67,500
120 Paku Reng Kg 16,200 16,200 16,200 16,200 16,200 16,200
121 Paku Usuk Kg 15,000 15,000 15,000 15,000 15,000 15,000
122 Paku Triplek/Eternit Kg 18,700 18,700 18,700 18,700 18,700 18,700
123 Paku Seng Kg 28,100 28,100 28,100 28,100 28,100 28,100
124 Paku Sekrup 7,5 cm Bj 900 900 900 900 900 900
125 Paku Sekrup 10 cm Bj 1,200 1,200 1,200 1,200 1,200 1,200
126 Paku Sekrup 12 cm Bj 1,900 1,900 1,900 1,900 1,900 1,900
127 Pipa Gl Medium I Ø 1/2" Lj 191,000 191,600 191,000 191,600 191,000 191,600
128 Pipa Gl Medium I Ø 3/4" Lj 245,800 246,800 245,800 246,800 245,800 246,800
129 Pipa Gl Medium I Ø 1" Lj 376,600 378,000 376,600 378,000 376,600 378,000
130 Pipa Gl Medium I Ø 1 1/4" Lj 497,100 498,900 497,100 498,900 497,100 498,900
131 Pipa Gl Medium I Ø 1 1/2" Lj 571,100 573,300 571,100 573,300 571,100 573,300
132 Pipa Gl Medium I Ø 2" Lj 776,600 779,400 776,600 779,400 776,600 779,400
133 Pipa Gl Medium I Ø 2 1/2" Lj 993,100 996,600 993,100 996,600 993,100 996,600
134 Pipa Gl Medium I Ø 3" Lj 1,282,800 1,287,000 1,282,800 1,287,000 1,282,800 1,287,000
135 Pipa Gl Medium I Ø 4" Lj 1,856,200 1,861,800 1,856,200 1,861,800 1,856,200 1,861,800
136 Pipa Gl Medium I Ø 5" Lj 2,497,000 2,503,800 2,497,000 2,503,800 2,497,000 2,503,800
137 Pipa Gl Medium I Ø 6" Lj 2,972,700 2,980,700 2,972,700 2,980,700 2,972,700 2,980,700
138 Pipa Gl Medium I Ø 8" Lj 4,268,100 4,278,100 4,268,100 4,278,100 4,268,100 4,278,100
139 Pipa Gl Medium II Ø 1/2" Lj 157,600 158,200 157,600 158,200 157,600 158,200
140 Pipa Gl Medium II Ø 3/4" Lj 195,000 196,000 195,000 196,000 195,000 196,000
141 Pipa Gl Medium II Ø 1" Lj 298,700 300,100 298,700 300,100 298,700 300,100
Halaman 57
ASEMBAGUS SITUBONDO BESUKI
NO SATUAN
KOTA PEGUNUNGAN KOTA PEGUNUNGAN KOTA PEGUNUNGAN
142 Pipa Gl Medium II Ø 1 1/4" Lj 385,600 387,400 385,600 387,400 385,600 387,400
143 Pipa Gl Medium II Ø 1 1/2" Lj 457,500 458,100 457,500 458,100 457,500 458,100
144 Pipa Gl Medium II Ø 2" Lj 671,200 672,200 671,200 672,200 671,200 672,200
145 Pipa Gl Medium II Ø 2 1/2" Lj 864,600 866,000 864,600 866,000 864,600 866,000
146 Pipa Gl Medium II Ø 3" Lj 1,059,100 1,060,900 1,059,100 1,060,900 1,059,100 1,060,900
147 Pipa Gl Medium II Ø 4" Lj 1,549,500 1,550,100 1,549,500 1,550,100 1,549,500 1,550,100
148 Pipa Gl BSA Ø 1/2" Lj 157,500 158,100 157,500 158,100 157,500 158,100
149 Pipa Gl BSA Ø 3/4" Lj 198,200 199,200 198,200 199,200 198,200 199,200
150 Pipa Gl BSA Ø 1" Lj 257,800 259,200 257,800 259,200 257,800 259,200
151 Pipa Gl BSA Ø 1 1/4" Lj 329,500 331,300 329,500 331,300 329,500 331,300
152 Pipa Gl BSA Ø 1 1/2" Lj 408,700 409,300 408,700 409,300 408,700 409,300
153 Pipa Gl BSA Ø 2" Lj 548,800 549,800 548,800 549,800 548,800 549,800
154 Pipa Gl BSA Ø 2 1/2" Lj 755,600 757,000 755,600 757,000 755,600 757,000
155 Pipa Gl BSA Ø 3" Lj 888,200 890,000 888,200 890,000 888,200 890,000
156 Pipa Gl BSA Ø 4" Lj 1,260,600 1,261,200 1,260,600 1,261,200 1,260,600 1,261,200
157 Pipa Gl BSA Ø 6" Lj 2,148,800 2,149,400 2,148,800 2,149,400 2,148,800 2,149,400
158 DOP 1/2" Bh 4,300 5,300 4,000 5,000 5,000 6,000
159 DOP 3/4" Bh 5,000 6,000 4,900 5,900 6,200 7,200
160 DOP 1" Bh 6,200 7,200 6,900 7,900 9,300 10,300
161 DOP 1 1/4" Bh 8,700 9,700 10,000 11,000 11,200 12,200
162 DOP 1 1/2" Bh 11,800 12,800 13,200 14,200 15,600 16,600
163 DOP 2" Bh 18,400 19,400 18,400 19,400 20,000 21,000
164 DOP 2 1/2" Bh 37,400 38,400 37,400 38,400 37,500 38,500
165 DOP 3" Bh 51,800 52,800 51,800 52,800 52,500 53,500
166 DOP 4" Bh 86,400 87,400 86,400 87,400 87,500 88,500
167 DOP 6" Bh 289,000 290,000 289,000 290,000 312,500 313,500
168 PLUG 1/2" Bh 3,100 4,100 3,400 4,400 5,000 6,000
169 PLUG 3/4" Bh 3,700 4,700 4,300 5,300 6,200 7,200
170 PLUG 1" Bh 5,600 6,600 5,700 6,700 9,300 10,300
Halaman 58
ASEMBAGUS SITUBONDO BESUKI
NO SATUAN
KOTA PEGUNUNGAN KOTA PEGUNUNGAN KOTA PEGUNUNGAN
171 PLUG 1 1/2" Bh 8,700 9,700 10,000 11,000 15,600 16,600
172 PLUG 2" Bh 14,400 15,400 14,400 15,400 15,600 16,600
173 PLUG 2 1/2" Bh 28,800 29,800 28,800 29,800 28,100 29,100
174 PLUG 3" Bh 40,300 41,300 40,300 41,300 43,700 44,700
175 SOCK 1/2" Bh 3,700 4,700 4,000 5,000 5,000 6,000
176 SOCK 3/4" Bh 5,000 6,000 5,100 6,100 6,200 7,200
177 SOCK 1" Bh 7,500 8,500 8,600 9,600 10,000 11,000
178 SOCK 1 1/4" Bh 10,600 11,600 12,100 13,100 12,500 13,500
179 SOCK 1 1/2" Bh 13,700 14,700 14,900 15,900 16,200 17,200
180 SOCK 2" Bh 20,000 21,000 23,000 24,000 25,000 26,000
181 SOCK 2 1/2" Bh 43,200 44,200 43,200 44,200 43,700 44,700
182 SOCK 3" Bh 63,300 64,300 63,300 64,300 68,700 69,700
183 SOCK 4" Bh 103,700 104,700 103,700 104,700 106,200 107,200
184 SOCK 6" Bh 317,900 318,900 317,900 318,900 325,000 326,000
185 KNIE 1/2" Bh 4,300 5,300 4,800 5,800 6,200 7,200
186 KNIE 3/4" Bh 6,200 7,200 6,900 7,900 8,100 9,100
187 KNIE 1" Bh 8,700 9,700 10,000 11,000 11,200 12,200
188 KNIE 1 1/4" Bh 13,700 14,700 16,100 17,100 16,800 17,800
189 KNIE 1 1/2" Bh 17,500 18,500 20,100 21,100 21,200 22,200
190 KNIE 2" Bh 27,500 28,500 31,600 32,600 31,200 32,200
191 KNIE 2 1/2" Bh 60,500 61,500 60,500 61,500 62,500 63,500
192 KNIE 3" Bh 92,200 93,200 92,200 93,200 93,700 94,700
193 KNIE 4" Bh 167,100 168,100 167,100 168,100 168,700 169,700
194 KNIE 6" Bh 664,800 665,800 664,800 665,800 687,500 688,500
195 DOUBLE NEPEL 1/2" Bh 4,300 5,300 4,300 5,300 5,600 6,600
196 DOUBLE NEPEL 3/4" Bh 5,600 6,600 5,700 6,700 6,800 7,800
197 DOUBLE NEPEL 1" Bh 7,500 8,500 8,000 9,000 9,300 10,300
198 DOUBLE NEPEL 1 1/4" Bh 10,600 11,600 11,800 12,800 12,500 13,500
199 DOUBLE NEPEL 1 1/2" Bh 14,300 15,300 16,400 17,400 16,800 17,800
Halaman 59
ASEMBAGUS SITUBONDO BESUKI
NO SATUAN
KOTA PEGUNUNGAN KOTA PEGUNUNGAN KOTA PEGUNUNGAN
200 DOUBLE NEPEL 2" Bh 22,400 23,400 22,400 23,400 23,700 24,700
201 DOUBLE NEPEL 2 1/2" Bh 37,400 38,400 37,400 38,400 37,500 38,500
202 DOUBLE NEPEL 3" Bh 63,300 64,300 63,300 64,300 65,600 66,600
203 DOUBLE NEPEL 4" Bh 100,800 101,800 100,800 101,800 112,500 113,500
204 TEE 1/2" Bh 5,600 6,600 6,000 7,000 8,100 9,100
205 TEE 3/4" Bh 8,100 9,100 8,900 9,900 10,000 11,000
206 TEE 1" Bh 12,500 13,500 14,100 15,100 15,600 16,600
207 TEE 1 1/4" Bh 18,700 19,700 21,300 22,300 22,500 23,500
208 TEE 1 1/2" Bh 23,700 24,700 27,000 28,000 28,100 29,100
209 TEE 2" Bh 40,300 41,300 40,300 41,300 40,600 41,600
210 TEE 2 1/2" Bh 92,200 93,200 92,200 93,200 93,700 94,700
211 TEE 3" x 2" Bh 144,500 145,500 144,500 145,500 144,500 145,500
212 TEE 4" x 2" Bh 274,600 275,600 274,600 275,600 312,500 313,500
213 TEE 6" x 4" Bh 982,800 983,800 982,800 983,800 1,062,500 1,063,500
214 Kran Biasa 1/2" Bh 31,200 32,200 31,200 32,200 31,200 32,200
215 Kran Biasa 3/4" Bh 12,500 13,500 12,500 13,500 12,500 13,500
216 Stop Kran 1/2" Bh 40,600 41,600 40,600 41,600 40,600 41,600
217 Stop Kran 3/4" Bh 62,500 63,500 62,500 63,500 62,500 63,500
218 Ball Valve 3/4" Bh 71,800 72,800 71,800 72,800 71,800 72,800
219 Ball Valve 1" Bh 112,500 113,500 112,500 113,500 112,500 113,500
220 Ball Valve 1 1/4" Bh 187,500 188,500 187,500 188,500 187,500 188,500
221 Ball Valve 1 1/2" Bh 250,000 251,000 250,000 251,000 250,000 251,000
222 Ball Valve 2" Bh 406,200 407,200 406,200 407,200 406,200 407,200
223 Ball Valve 3" Bh 1,343,700 1,344,700 1,343,700 1,344,700 1,343,700 1,344,700
224 PIPA PVC 1" m' 8,900 9,300 8,900 9,300 8,900 9,300
225 PIPA PVC 1 1/2" m' 12,800 13,425 12,800 13,425 12,800 13,425
226 PIPA PVC 2" m' 18,325 19,225 18,325 19,225 18,325 19,225
227 PIPA PVC 2 1/2" m' 26,300 27,600 26,300 27,600 26,300 27,600
228 PIPA PVC 3" m' 38,075 39,975 38,075 39,975 38,075 39,975
Halaman 60
ASEMBAGUS SITUBONDO BESUKI
NO SATUAN
KOTA PEGUNUNGAN KOTA PEGUNUNGAN KOTA PEGUNUNGAN
229 PIPA PVC 4" m' 56,100 58,900 56,100 58,900 56,100 58,900
230 PIPA PVC 6" m' 119,450 125,400 119,450 125,400 119,450 125,400
231 PIPA PVC 8" m' 193,475 203,125 193,475 203,125 193,475 203,125
232 PIPA PVC 10" m' 301,600 316,675 301,600 316,675 301,600 316,675
233 PIPA PVC 12" m' 478,975 502,900 478,975 502,900 478,975 502,900
234 PIPA PVC 8" m' 196,167 205,967 196,167 205,967 196,167 205,967
235 PIPA PVC 10" m' 306,250 321,550 306,250 321,550 306,250 321,550
236 PIPA PVC 12" m' 485,150 509,400 485,150 509,400 485,150 509,400
237 PIPA PVC 1" m' 8,450 8,867 8,450 8,867 8,450 8,867
238 PIPA PVC 1 1/2" m' 13,000 13,650 13,000 13,650 13,000 13,650
239 PIPA PVC 2" m' 18,733 19,667 18,733 19,667 18,733 19,667
240 PIPA PVC 2 1/2" m' 26,883 28,217 26,883 28,217 26,883 28,217
241 PIPA PVC 12" m' 495,300 520,050 495,300 520,050 495,300 520,050
242 PIPA PVC 2" m' 20,817 21,850 20,817 21,850 20,817 21,850
243 PIPA PVC 2 1/2" m' 29,500 30,967 29,500 30,967 29,500 30,967
244 PIPA PVC 3" m' 41,483 43,550 41,483 43,550 41,483 43,550
245 PIPA PVC 4" m' 60,867 63,900 60,867 63,900 60,867 63,900
246 PIPA PVC 6" m' 127,817 134,200 127,817 134,200 127,817 134,200
247 PIPA PVC 8" m' 206,767 217,100 206,767 217,100 206,767 217,100
248 PIPA PVC 10" m' 322,433 338,550 322,433 338,550 322,433 338,550
249 PIPA PVC 1" m' 6,350 6,650 6,350 6,650 6,350 6,650
250 PIPA PVC 1 1/4" m' 9,400 9,850 9,400 9,850 9,400 9,850
251 PIPA PVC 1 1/2" m' 14,825 15,550 14,825 15,550 14,825 15,550
252 PIPA PVC 2" m' 22,725 23,850 22,725 23,850 22,725 23,850
253 PIPA PVC 2 1/2" m' 32,250 33,850 32,250 33,850 32,250 33,850
254 PIPA PVC 3" m' 46,475 48,775 46,475 48,775 46,475 48,775
255 PIPA PVC 4" m' 69,800 73,275 69,800 73,275 69,800 73,275
256 PIPA PVC 5" m' 113,500 119,175 113,500 119,175 113,500 119,175
257 PIPA PVC 6" m' 146,950 154,275 146,950 154,275 146,950 154,275
Halaman 61
ASEMBAGUS SITUBONDO BESUKI
NO SATUAN
KOTA PEGUNUNGAN KOTA PEGUNUNGAN KOTA PEGUNUNGAN
258 PIPA PVC 8" m' 239,500 251,475 239,500 251,475 239,500 251,475
259 PIPA PVC 10" m' 371,025 389,575 371,025 389,575 371,025 389,575
260 PIPA PVC 12" m' 589,200 618,650 589,200 618,650 589,200 618,650
261 PIPA PVC 1" m' 5,983 6,317 5,983 6,317 5,983 6,317
262 PIPA PVC 1 1/4" m' 9,417 9,883 9,417 9,883 9,417 9,883
263 PIPA PVC 1 1/2" m' 14,817 15,550 14,817 15,550 14,817 15,550
264 PIPA PVC 2" m' 22,733 23,867 22,733 23,867 22,733 23,867
265 PIPA PVC 5" m' 113,500 119,167 113,500 119,167 113,500 119,167
266 PIPA PVC 6" m' 146,950 154,283 146,950 154,283 146,950 154,283
267 PIPA PVC 8" m' 239,517 251,483 239,517 251,483 239,517 251,483
268 PIPA PVC 10" m' 371,017 389,567 371,017 389,567 371,017 389,567
269 PIPA PVC 12" m' 589,217 618,667 589,217 618,667 589,217 618,667
270 Air Valve 1" Buah 323,000 334,500 323,000 334,500 323,000 334,500
271 Air Valve 2" Buah 547,000 566,500 547,000 566,500 547,000 566,500
272 Air Valve 3" Buah 665,000 688,700 665,000 688,700 665,000 688,700
273 Baut Mur 5/8" x 2" Buah 4,400 4,500 4,400 4,500 4,400 4,500
274 Baut Mur 5/8" x 2,5" Buah 5,100 5,300 5,100 5,300 5,100 5,300
275 Baut Mur 5/8" x 3" Buah 5,800 6,000 5,800 6,000 5,800 6,000
276 Baut Mur 5/8" x 4" Buah 7,200 7,400 7,200 7,400 7,200 7,400
277 Baut Mur 3/4" x 2,5" Buah 8,500 8,800 8,500 8,800 8,500 8,800
278 Baut Mur 3/4" x 3" Buah 9,200 9,600 9,200 9,600 9,200 9,600
279 Clamp Sadle 2" x 3/4" Buah 65,000 67,200 65,000 67,200 65,000 67,200
280 Clamp Sadle 3 x 3/4" Buah 85,000 88,000 85,000 88,000 85,000 88,000
281 Clamp Sadle 4" x 3/4" Buah 114,000 118,000 114,000 118,000 114,000 118,000
282 Clamp Sadle 6" Buah 247,000 255,700 247,000 255,700 247,000 255,700
283 Flange Las 2" Buah 58,000 60,000 58,000 60,000 58,000 60,000
284 Flange Las 2 1/2" Buah 65,000 67,200 65,000 67,200 65,000 67,200
285 Flange Las 3" Buah 71,000 73,500 71,000 73,500 71,000 73,500
286 Flange Las 4" Buah 93,000 96,200 93,000 96,200 93,000 96,200
Halaman 62
ASEMBAGUS SITUBONDO BESUKI
NO SATUAN
KOTA PEGUNUNGAN KOTA PEGUNUNGAN KOTA PEGUNUNGAN
287 Giboult Joint 2" Buah 156,000 161,500 156,000 161,500 156,000 161,500
288 Giboult Joint 3" Buah 225,000 233,000 225,000 233,000 225,000 233,000
289 Giboult Joint 4" Buah 385,000 398,700 385,000 398,700 385,000 398,700
290 Giboult Joint 6" Buah 1,329,000 1,376,500 1,329,000 1,376,500 1,329,000 1,376,500
291 HU (Hidrant Umum) Type Conical 1m3 (Pabrikasi) Buah 1,320,000 1,355,000 1,320,000 1,355,000 1,320,000 1,355,000
292 HU (Hidrant Umum) Type Conical 2m3 (Pabrikasi) Buah 2,310,000 2,345,000 2,310,000 2,345,000 2,310,000 2,345,000
293 HU (Hidrant Umum) Type Conical 3m3 (Pabrikasi) Buah 2,750,000 2,785,000 2,750,000 2,785,000 2,750,000 2,785,000
294 Reducer PVC Moof 1 1/2" x 1" Buah 3,800 3,900 3,800 3,900 3,800 3,900
295 Reducer PVC Moof 2" x 1 1/2" Buah 7,500 7,800 7,500 7,800 7,500 7,800
296 Reducer PVC Moof 2" x 1" Buah 6,300 6,500 6,300 6,500 6,300 6,500
297 Reducer PVC Moof 3" x 2" Buah 19,000 19,700 19,000 19,700 19,000 19,700
298 Reducer PVC Moof 4" x 2" Buah 31,500 32,700 31,500 32,700 31,500 32,700
299 Reducer PVC Moof 4" x 3" Buah 34,500 35,700 34,500 35,700 34,500 35,700
300 Reducer PVC Moof 6" x 3" Buah 28,500 29,700 28,500 29,700 28,500 29,700
301 Reducer PVC Moof 6" x 4" Buah 31,500 32,700 31,500 32,700 31,500 32,700
302 Sock Drat PVC 1/2" Buah 1,300 1,300 1,300 1,300 1,300 1,300
303 Sock Drat PVC 3/4" Buah 1,900 1,900 1,900 1,900 1,900 1,900
304 Sock Drat PVC 1" Buah 2,500 2,600 2,500 2,600 2,500 2,600
305 Sock Drat PVC 1 1/4" Buah 3,300 3,400 3,300 3,400 3,300 3,400
306 Sock Drat PVC 1 1/2" Buah 4,400 4,600 4,400 4,600 4,400 4,600
307 Sock Drat PVC 2" Buah 6,600 6,800 6,600 6,800 6,600 6,800
308 Sock Drat PVC 2 1/2" Buah 7,700 8,000 7,700 8,000 7,700 8,000
309 Sock Drat PVC 3" Buah 11,300 11,800 11,300 11,800 11,300 11,800
310 Sock Drat PVC 4" Buah 22,000 22,800 22,000 22,800 22,000 22,800
311 Stop Kran 1" Buah 100,000 103,500 100,000 103,500 100,000 103,500
312 Stop Kran 1 1/4" Buah 150,000 155,500 150,000 155,500 150,000 155,500
313 Stop Kran 1 1/2" Buah 194,000 201,000 194,000 201,000 194,000 201,000
314 Stop Kran 2" (Gate Valve) Buah 275,000 276,000 275,000 276,000 275,000 276,000
315 Stop Kran 3" (Gate Valve) Buah 762,500 787,500 762,500 787,500 762,500 787,500
Halaman 63
ASEMBAGUS SITUBONDO BESUKI
NO SATUAN
KOTA PEGUNUNGAN KOTA PEGUNUNGAN KOTA PEGUNUNGAN
316 Stop Kran 4" (Gate Valve) Buah 1,469,000 1,519,000 1,469,000 1,519,000 1,469,000 1,519,000
317 Stop Kran 6" (Gate Valve) Buah 2,028,000 2,180,500 2,028,000 2,180,500 2,100,500 2,180,500
318 Straatpot 4" Buah 141,000 146,000 141,000 146,000 141,000 146,000
319 Straatpot 6" Buah 184,000 190,500 184,000 190,500 184,000 190,500
320 Tee All Flange 3" x 3" Buah 406,000 420,500 406,000 420,500 406,000 420,500
321 Tee All Flange 4" x 2" Buah 512,000 530,200 512,000 530,200 512,000 530,200
322 Tee All Flange 4" x 3" Buah 526,000 544,700 526,000 544,700 526,000 544,700
323 Tee All Flange 4" x 4" Buah 539,000 558,200 539,000 558,200 539,000 558,200
324 Manhole 60 x 60 (Plat Baja) + Pengunci Buah 560,000 580,000 560,000 580,000 560,000 580,000
325 Formika (90 x 120 cm) Lembar 176,000 182,200 176,000 182,200 176,000 182,200
326 Kabel Sling (Wire Rop) Baja F 20 mm M' 37,500 38,500 37,500 38,500 37,500 38,500
327 Kabel Sling (Wire Rop) Baja F 10 mm M' 18,700 19,700 18,700 19,700 18,700 19,700
328 Bak Mandi Fibre 60 x 60 Buah 219,000 227,000 219,000 227,000 250,000 258,000
329 Ass (Rol) Buah 176,000 182,200 176,000 182,200 176,000 182,200
330 Klem Pengapit Buah 36,000 37,200 36,000 37,200 36,000 37,200
331 Track Skhor Buah 20,000 22,000 20,000 22,000 20,000 22,000
332 Kunci Pipa Besar Set 62,500 64,500 62,500 64,500 62,500 64,500
333 Kunci Pipa Kecil Set 44,000 46,000 44,000 46,000 44,000 46,000
334 Ijuk Aren Kg 55,000 57,000 65,000 67,000 55,000 57,000
335 Katup Apung 3/4" Buah 137,500 139,500 137,500 139,500 137,500 139,500
336 Kayu Jati 8/12 ; 6/12 (Klass B) M3 13,050,000 13,100,000 13,050,000 13,100,000 13,050,000 13,100,000
337 Kayu Jati Usuk 5/7 ; 4/6 (Klass B) M3 11,800,000 11,850,000 11,800,000 11,850,000 11,800,000 11,850,000
338 Kayu Jati Papan 2/20 ; 3/30 ; 4/20 (Klass B) M3 15,625,000 15,675,000 15,625,000 15,675,000 15,625,000 15,675,000
339 Kayu Jati Reng 2/3 ; 3/5 (Klass C) M3 9,250,000 9,300,000 9,250,000 9,300,000 9,250,000 9,300,000
340 Kayu Kamper 8/12 ; 6/12 M3 10,312,500 10,362,500 10,312,500 10,362,500 10,312,500 10,362,500
341 Kayu Kamper Usuk 5/7 ; 4/6 M3 8,125,000 8,175,000 8,125,000 8,175,000 8,125,000 8,175,000
342 Kayu Kamper Papan 2/20 ; 3/30 ; 4/20 M3 10,937,500 10,987,500 10,937,500 10,987,500 10,937,500 10,987,500
343 Kayu Kamper Reng 2/3 ; 3/5 M3 8,125,000 8,175,000 8,125,000 8,175,000 8,125,000 8,175,000
344 Kayu Meranti 8/12 ; 6/12 M3 5,750,000 5,800,000 5,750,000 5,800,000 5,750,000 5,800,000
Halaman 64
ASEMBAGUS SITUBONDO BESUKI
NO SATUAN
KOTA PEGUNUNGAN KOTA PEGUNUNGAN KOTA PEGUNUNGAN
345 Kayu Meranti Usuk 5/7 ; 4/6 M3 4,375,000 4,425,000 4,375,000 4,425,000 4,375,000 4,425,000
346 Kayu Meranti Papan 2/20 ; 3/30 ; 4/20 M3 6,300,000 6,350,000 6,300,000 6,350,000 6,300,000 6,350,000
347 Kayu Meranti Reng 2/3 ; 3/5 M3 4,375,000 4,425,000 4,375,000 4,425,000 4,375,000 4,425,000
348 Kayu Kruing 5/7 ; 6/12 ; 8/12 ; 8/15 M3 6,875,000 6,925,000 6,875,000 6,925,000 6,875,000 6,925,000
349 Kayu Bengkirai 8/12 ; 6/12 M3 11,400,000 11,450,000 11,400,000 11,450,000 11,400,000 11,450,000
350 Kayu Bengkirai Usuk 5/7 ; 4/6 ; 3/5 M3 10,200,000 10,250,000 10,200,000 10,250,000 10,200,000 10,250,000
351 Kayu Bengkirai Papan 2/20 ; 3/30 ; 4/20 M3 13,200,000 13,250,000 13,200,000 13,250,000 13,200,000 13,250,000
352 Kayu Bengkirai 8/20 M3 14,800,000 14,850,000 14,800,000 14,850,000 14,800,000 14,850,000
353 Kayu ( Bekisting ) M3 2,187,500 2,237,500 2,187,500 2,237,500 2,187,500 2,237,500
354 Bambu Lj 31,000 31,000 31,000 31,000 31,000 31,000
355 Kayu List 1/5 Meranti Lj 4,400 4,500 4,400 4,500 4,400 4,500
356 Sesek Bambu Lbr 31,000 32,000 31,000 32,000 31,000 32,000
357 Triplek 122 x 244 x 2 mm Lbr 42,000 43,500 42,000 43,500 42,000 43,500
358 Triplek 122 x 244 x 3 mm Lbr 54,000 55,500 54,000 55,500 54,000 55,500
359 Triplek 92 x 210 x 4 mm Lbr 69,000 70,500 69,000 70,500 69,000 70,500
360 Multiplek 122 x 244 x 9 mm Lbr 126,000 127,500 126,000 127,500 126,000 127,500
361 TeakWood 122 x 244 x 3 mm Lbr 105,000 106,500 105,000 106,500 105,000 106,500
362 TeakWood 92 x 210 x 3 mm Lbr 78,000 79,500 78,000 79,500 78,000 79,500
363 Triplek 92 x 210 x 3 mm lapis aluminium Lbr 105,000 106,500 105,000 106,500 105,000 106,500
364 Triplek 92 x 210 x 3 mm lapis aluminium garis Lbr 111,000 112,500 111,000 112,500 111,000 112,500
365 Teak bloks (lapis jati) Lbr 252,000 253,500 252,000 253,500 252,000 253,500
366 Plamir Tembok Kg 16,200 16,700 16,200 16,700 16,200 16,700
367 Plamir Kayu Kg 22,200 22,700 22,200 22,700 22,200 22,700
368 Cat Genteng Kg 33,000 33,500 33,000 33,500 33,000 33,500
369 Cat Tembok (Setara Cathilac) Kg 24,000 24,500 24,000 24,500 24,000 24,500
370 Minyak Cat Ltr 21,000 21,500 21,000 21,500 21,000 21,500
371 Meni Kayu Kg 22,800 23,300 22,800 23,300 22,800 23,300
372 Cat Kayu (Setara Emco) Kg 64,800 65,300 64,800 65,300 64,800 65,300
373 Cat Brown Kg 42,000 42,500 42,000 42,500 42,000 42,500
Halaman 65
ASEMBAGUS SITUBONDO BESUKI
NO SATUAN
KOTA PEGUNUNGAN KOTA PEGUNUNGAN KOTA PEGUNUNGAN
374 Ter 1 Blek = 3.5L Blek 78,000 78,500 78,000 78,500 78,000 78,500
375 Kaca polos 3 mm M2 57,000 59,500 57,000 59,500 57,000 59,500
376 Kaca polos 5 mm M2 75,000 77,500 75,000 77,500 75,000 77,500
377 Kaca Ryban 3 mm M2 63,000 65,500 63,000 65,500 63,000 65,500
378 Kaca Ryban 5 mm M2 93,000 95,500 93,000 95,500 93,000 95,500
379 Kerangka Kaca Nako Ukr. 10 x 100 Daun 12,000 14,500 12,000 14,500 12,000 14,500
380 Glass Block Bj 20,400 22,900 20,400 22,900 20,400 22,900
381 Kunci 2 x putar Bh 69,000 69,000 69,000 70,000 69,000 70,000
382 Engsel jendela nylon arch asli Bh 23,000 23,000 23,000 24,000 23,000 24,000
383 Engsel pintu nylon arch asli Bh 34,500 34,500 34,500 35,500 34,500 35,500
384 Engsel singapur Bh 57,000 57,000 57,000 58,000 57,000 58,000
385 Grendel Jendela Bh 40,000 40,000 40,000 41,000 40,000 41,000
386 Grendel Tanam Bh 57,000 57,000 57,000 58,000 57,000 58,000
387 Hak angin biasa Bh 46,000 46,000 46,000 47,000 46,000 47,000
388 Buis Beton bulat diameter 1,00 x 0,5 Bj 138,000 168,500 124,200 138,000 138,000 168,500
389 Buis Beton bulat diameter 0,80 x 0,50 Bj 111,500 121,700 97,800 111,500 111,500 121,700
390 Buis Beton bulat diameter 0,70 x 0,50 Bj 95,000 101,300 85,800 95,000 95,000 101,300
391 Buis Beton bulat diameter 0,60 x 0,50 Bj 80,500 98,700 72,000 80,500 80,500 98,700
392 Buis Beton bulat diameter 0,50 x 0,50 Bj 62,500 74,700 58,800 62,500 62,500 74,700
393 Buis Beton bulat diameter 0,40 x 1 Bj 86,500 98,700 82,800 86,500 86,500 98,700
394 Buis Beton bulat diameter 0,30 x 1 Bj 56,500 68,700 52,800 56,500 56,500 68,700
395 Buis Beton bulat diameter 0,20 x 1 Bj 38,500 44,100 37,800 38,500 38,500 44,100
396 Buis Beton Sigaran diameter 0,20 x 1 Bj 19,000 22,100 18,900 19,000 19,000 22,100
397 Buis Beton Sigaran diameter 0,30 x 1 Bj 28,250 34,350 26,400 28,250 28,250 34,350
398 Paving Stone Kotak tebal 8 cm (warna) M2 64,800 70,900 61,800 64,800 64,800 70,900
399 Paving Stone Kotak tebal 7 cm (warna) M2 58,700 65,900 55,200 58,700 58,700 65,900
400 Paving Stone Kotak tebal 6 cm (warna) M2 52,900 58,400 50,400 52,900 52,900 58,400
401 Paving Stone Kotak tebal 8 cm (abu-abu) M2 58,900 64,900 56,400 58,900 58,900 64,900
402 Paving Stone Kotak tebal 7 cm (abu-abu) M2 52,900 59,900 50,400 52,900 52,900 59,900
Halaman 66
ASEMBAGUS SITUBONDO BESUKI
NO SATUAN
KOTA PEGUNUNGAN KOTA PEGUNUNGAN KOTA PEGUNUNGAN
403 Paving Stone Kotak tebal 6 cm (abu-abu) M2 47,000 52,400 45,000 47,000 47,000 52,400
404 Pav. Stone Segi 8 t = 8 cm (warna) M2 73,900 80,900 71,400 73,900 73,900 80,900
405 Pav. Stone Segi 8 t = 7 cm (warna) M2 67,800 74,900 64,800 67,800 67,800 74,900
406 Pav. Stone Segi 8 t = 6 cm (warna) M2 62,000 67,400 60,000 62,000 62,000 67,400
407 Pav. Stone Segi 8 t = 5 cm (warna) M2 57,200 62,600 55,200 57,200 57,200 62,600
408 Pav. Stone Segi 8 t = 8 cm (abu-abu) M2 67,900 71,900 65,400 67,900 67,900 71,900
409 Pav. Stone Segi 8 t = 7 cm (abu-abu) M2 61,800 65,900 58,800 61,800 61,800 65,900
410 Pav. Stone Segi 8 t = 6 cm (abu-abu) M2 56,000 58,400 54,000 56,000 56,000 58,400
411 Pav. Stone Segi 8 t = 5 cm (abu-abu) M2 51,200 53,600 49,200 51,200 51,200 53,600
412 Pav. Stone 3 Berlian/Segi 6 t = 8 cm (warna) M2 70,300 77,300 67,800 70,300 70,300 77,300
413 Pav. Stone 3 Berlian/Segi 6 t = 7 cm (warna) M2 64,200 71,300 61,200 64,200 64,200 71,300
414 Pav. Stone 3 Berlian/Segi 6 t = 6 cm (warna) M2 58,400 63,800 56,400 58,400 58,400 63,800
415 Pav. Stone 3 Berlian/Segi 6 t = 5 cm (warna) M2 53,600 59,000 51,600 53,600 53,600 59,000
416 Pav. Stone 3 Berlian/Segi 6 t = 8 cm (abu-abu) M2 64,300 71,300 61,800 64,300 64,300 71,300
417 Pav. Stone 3 Berlian/Segi 6 t = 7 cm (abu-abu) M2 58,200 65,300 55,200 58,200 58,200 65,300
418 Pav. Stone 3 Berlian/Segi 6 t = 6 cm (abu-abu) M2 52,400 57,800 50,400 52,400 52,400 57,800
419 Pav. Stone 3 Berlian/Segi 6 t = 5 cm (abu-abu) M2 47,600 53,000 45,600 47,600 47,600 53,000
420 Kanstein uk. 10 x 30 x 50 Bj 16,800 18,000 15,600 16,800 16,800 18,000
421 Kanstein uk. 15 x 30 x 50 Bj 23,400 24,600 21,600 23,400 23,400 24,600
422 Batako Uk.10 x 20 x 40 Bj 3,600 4,800 3,240 3,600 3,600 4,800
423 NYA 1,5 mm M' 3,700 3,700 3,700 3,700 3,700 3,700
424 NYA 2,5 mm M' 5,600 5,600 5,600 5,600 5,600 5,600
425 NYA 4 mm M' 9,800 9,800 9,800 9,800 9,800 9,800
426 NYA 6 mm M' 12,700 12,700 12,700 12,700 12,700 12,700
427 Twistel kabel 2 x 10 mm M' 8,100 8,100 8,100 8,100 8,100 8,100
428 Twistel kabel 2 x 16 mm M' 6,900 6,900 6,900 6,900 6,900 6,900
429 Kabel Turin NYA 3 x 4 mm ( NYM 3 x 4 ) M' 29,400 29,400 29,400 29,400 29,400 29,400
430 Kabel NYY. LMK uk. 2 x 1 1/2" M' 12,500 12,500 12,500 12,500 12,500 12,500
431 Kabel NYY. LMK uk.4 x 16 mm M' 106,200 106,200 106,200 106,200 106,200 106,200
Halaman 67
ASEMBAGUS SITUBONDO BESUKI
NO SATUAN
KOTA PEGUNUNGAN KOTA PEGUNUNGAN KOTA PEGUNUNGAN
432 Kabel NYY. LMK uk.2 x 2,5" mm M' 16,800 16,800 16,800 16,800 16,800 16,800
433 Kabel NYAF uk. 6 mm M' 16,200 16,200 16,200 16,200 16,200 16,200
434 Kabel Tanah uk.3 x 6 mm M' 46,200 46,200 46,200 46,200 46,200 46,200
435 Kabel NYY.LMK 2 x 4 mm M' 23,100 23,100 23,100 23,100 23,100 23,100
436 Kabel NYY.LMK 2 x 6 mm M' 34,500 34,500 34,500 34,500 34,500 34,500
437 Kabel NYMHY.LMK 2 x 4 mm M' 25,000 25,000 25,000 25,000 25,000 25,000
438 Kabel NYA.LMK uk. 10 mm M' 21,800 21,800 21,800 21,800 21,800 21,800
439 Kabel NYAF.LMK. Uk. 10 mm M' 30,500 30,500 30,500 30,500 30,500 30,500
440 Kabel NYAF.LMK. Uk. 6 mm M' 17,300 17,300 17,300 17,300 17,300 17,300
441 Kabel NYM 2 x 1,5/m M' 9,300 9,300 9,300 9,300 9,300 9,300
442 Kabel NYM 2 x 2,5/m M' 15,000 15,000 15,000 15,000 15,000 15,000
443 Kabel NYM 3 x 2,5/m M' 17,500 17,500 17,500 17,500 17,500 17,500
444 Kabel T.C 3 x 35 + 1 x 25 M' 28,800 28,800 28,800 28,800 28,800 28,800
445 Lampu TL 20 Watt (merk setara Philip) komplit Bh 75,000 75,000 75,000 75,000 75,000 75,000
446 Lampu TL 2 x 20 Watt (merk setara Philip) komplit Bh 187,500 187,500 187,500 187,500 187,500 187,500
447 Lampu Dop Pijar (merk setara Philip) 5 Watt Bh 4,300 4,300 4,300 4,300 4,300 4,300
448 Lampu Dop Pijar (merk setara Philip) 15 Watt Bh 5,000 5,000 5,000 5,000 5,000 5,000
449 Lampu Dop Pijar (merk setara Philip) 25 Watt Bh 5,600 5,600 5,600 5,600 5,600 5,600
450 Lampu Dop Pijar (merk setara Philip) 40 Watt Bh 6,400 6,400 6,400 6,400 6,400 6,400
451 Lampu Dop Pijar (merk setara Philip) 60 Watt Bh 7,500 7,500 7,500 7,500 7,500 7,500
452 Lampu Dop Pijar (merk setara Philip) 75 Watt Bh 7,800 7,800 7,800 7,800 7,800 7,800
453 Lampu Dop Pijar (merk setara Philip) 100 Watt Bh 8,100 8,100 8,100 8,100 8,100 8,100
454 Lampu PLC (merk setara Philip) 8 Watt Bh 33,100 33,100 33,100 33,100 33,100 33,100
455 Lampu PLC (merk setara Philip) 14 Watt Bh 37,500 37,500 37,500 37,500 37,500 37,500
456 Lampu PLC (merk setara Philip) 18 Watt Bh 41,200 41,200 41,200 41,200 41,200 41,200
457 Lampu PLC (merk setara Philip) 23 Watt Bh 45,600 45,600 45,600 45,600 45,600 45,600
458 Lampu PLC Trafo (merk setara Philip) 7 Watt Bh 20,600 20,600 20,600 20,600 20,600 20,600
459 Lampu PLC Trafo (merk setara Philip) 9 Watt Bh 20,600 20,600 20,600 20,600 20,600 20,600
460 Lampu PLC Trafo (merk setara Philip) 11 Watt Bh 34,300 34,300 34,300 34,300 34,300 34,300
Halaman 68
ASEMBAGUS SITUBONDO BESUKI
NO SATUAN
KOTA PEGUNUNGAN KOTA PEGUNUNGAN KOTA PEGUNUNGAN
461 Dop Halogen 400 Watt ( HPIT ) (merk setara iwasaki) Bh 218,700 218,700 218,700 218,700 218,700 218,700
462 Sakelar Tunggal (merk setara Brocco) Bh 15,000 15,000 15,000 15,000 15,000 15,000
463 Sakelar Ganda (merk setara Brocco) Bh 18,700 18,700 18,700 18,700 18,700 18,700
464 Stop Kontak (merk setara Brocco) Bh 15,600 15,600 15,600 15,600 15,600 15,600
465 Zekering Bh 9,800 9,800 9,800 9,800 9,800 9,800
466 Kap T.O 2 Bh 181,200 181,200 181,200 181,200 181,200 181,200
467 Magnetic Contractor 220 V Bh 468,700 468,700 468,700 468,700 468,700 468,700
468 Suspension Clamp Bh 40,300 40,300 40,300 40,300 40,300 40,300
469 Lidah Buaya Set 43,700 43,700 43,700 43,700 43,700 43,700
470 Kabel NYAF 16 mm M" 43,700 43,700 43,700 43,700 43,700 43,700
471 Elemen + Kop + Sekring 63 A Bh 46,800 46,800 46,800 46,800 46,800 46,800
472 Elemen + Kop + Sekring 10 A Bh 31,200 31,200 31,200 31,200 31,200 31,200
473 Skoen 25 Bh 3,100 3,100 3,100 3,100 3,100 3,100
474 Isolasi Kertas Besar Bh 16,800 16,800 16,800 16,800 16,800 16,800
475 Lampu Selang Warna M 15,000 15,000 15,000 15,000 15,000 15,000
476 Silkon / Foto Sensor 6 A Bh 112,500 112,500 112,500 112,500 112,500 112,500
477 Silkon / Foto Sensor 3 A Bh 90,600 90,600 90,600 90,600 90,600 90,600
478 Isolasi Plastik Bh 6,800 6,800 6,800 6,800 6,800 6,800
479 Kabel NYY 3 x 2,5 mm m 21,800 21,800 21,800 21,800 21,800 21,800
480 Kabel TC 2 x 16 mm Bh 8,100 8,100 8,100 8,100 8,100 8,100
481 Kap Lampu tertutup untuk HPI-T 250 watt Set 287,500 287,500 287,500 287,500 287,500 287,500
482 MCB 10 Ampere Bh 50,000 50,000 50,000 50,000 50,000 50,000
483 MCB 50 Ampere Bh 16,800 16,800 16,800 16,800 16,800 16,800
484 MCB 6 Ampere Bh 52,500 52,500 52,500 52,500 52,500 52,500
485 Panel kontrol 40 x 60 cm Bh 375,000 375,000 375,000 375,000 375,000 375,000
486 Stoping bucle (yokes) Bh 1,000 1,000 1,000 1,000 1,000 1,000
487 Stainless steel strip set 8,100 8,100 8,100 8,100 8,100 8,100
488 Service Wadge Clamp Bh 3,700 3,700 3,700 3,700 3,700 3,700
489 Tiang Oktagonal 7 m double Bh 4,062,500 4,062,500 4,062,500 4,062,500 4,062,500 4,062,500
Halaman 69
ASEMBAGUS SITUBONDO BESUKI
NO SATUAN
KOTA PEGUNUNGAN KOTA PEGUNUNGAN KOTA PEGUNUNGAN
490 Tiang Oktagonal 9 m Bh 4,843,700 4,843,700 4,843,700 4,843,700 4,843,700 4,843,700
491 Tiang Oktagonal 8 m Bh 4,062,500 4,062,500 4,062,500 4,062,500 4,062,500 4,062,500
492 Tiang Oktagonal 8 m double Bh 4,687,500 4,687,500 4,687,500 4,687,500 4,687,500 4,687,500
493 Tiang bulat Hod dip 6 m Bh 2,500,000 2,500,000 2,500,000 2,500,000 2,500,000 2,500,000
494 Tiang bulat Hod dip 7 m Bh 2,968,700 2,968,700 2,968,700 2,968,700 2,968,700 2,968,700
495 Tiang bulat Hod dip 9 m\ Bh 4,062,500 4,062,500 4,062,500 4,062,500 4,062,500 4,062,500
496 Kap Lampu Sorot untuk HPI-T 400 Watt Bh 287,500 287,500 287,500 287,500 287,500 287,500
497 Dop Lampu HPI-T 250 Watt Bh 212,500 212,500 212,500 212,500 212,500 212,500
498 Dop Lampu HPI-T 400 Watt Bh 225,000 225,000 225,000 225,000 225,000 225,000
499 MCB 2 Ampere Bh 56,200 56,200 56,200 56,200 56,200 56,200
500 MCB 4 Ampere Bh 56,200 56,200 56,200 56,200 56,200 56,200
501 MCB 16 Ampere Bh 53,100 53,100 53,100 53,100 53,100 53,100
502 MCB 20 Ampere Bh 53,100 53,100 53,100 53,100 53,100 53,100
503 MCCB 100 Ampere Bh 812,500 812,500 812,500 812,500 812,500 812,500
504 MCCB 150 Ampere Bh 1,562,500 1,562,500 1,562,500 1,562,500 1,562,500 1,562,500
505 MCCB 200 Ampere Bh 1,687,500 1,687,500 1,687,500 1,687,500 1,687,500 1,687,500
506 Panel kontrol 30 x 40 x 15 cm Bh 212,500 212,500 212,500 212,500 212,500 212,500
507 Panel kontrol 30 x 40 x 20cm Bh 268,700 268,700 268,700 268,700 268,700 268,700
508 Panel kontrol 60 x 80 cm Bh 700,000 700,000 700,000 700,000 700,000 700,000
509 Fitting Porselen Pendek Bh 3,700 3,700 3,700 3,700 3,700 3,700
510 Fitting Porselen Panjang Bh 6,200 6,200 6,200 6,200 6,200 6,200
511 Kap E-40 (Hijau) Bh 25,000 25,000 25,000 25,000 25,000 25,000
512 Kabel NYZ 2 x 23 x 0,3 mm (Serabut) Bh 2,800 2,800 2,800 2,800 2,800 2,800
513 Skoen 10 Bh 1,500 1,500 1,500 1,500 1,500 1,500
514 Skoen 6 Bh 1,200 1,200 1,200 1,200 1,200 1,200
515 Lampu Selang Warna LED m 28,100 28,100 28,100 28,100 28,100 28,100
516 Elemen + Kop + Sekring 10 A Bh 25,000 25,000 25,000 25,000 25,000 25,000
517 Ornamen Pipa BSA uk. 1m (2") + 1m (1,5") / 2m Bh 215,700 215,700 215,700 215,700 215,700 215,700
518 Ornamen Pipa BSA (B) uk. 2m (1,5") + 1m (1,25") / 3m Bh 175,700 175,700 175,700 175,700 175,700 175,700
Halaman 70
ASEMBAGUS SITUBONDO BESUKI
NO SATUAN
KOTA PEGUNUNGAN KOTA PEGUNUNGAN KOTA PEGUNUNGAN
519 Ornamen Pipa BSA (B) uk. 3m (1,5") + 1m (1,25") / 4m Bh 219,500 219,500 219,500 219,500 219,500 219,500
520 Ornamen Pipa BSA (B) uk. 4m (1,5") + 1m (1,25") / 5m Bh 290,200 290,200 290,200 290,200 290,200 290,200
521 Ornamen Pipa BSA (B) uk. 5m (1,5") + 1m (1,25") / 6m Bh 307,000 307,000 307,000 307,000 307,000 307,000
522 Ornamen Pipa BSA (B) uk. 6m (1,5") + 2m (1,25") / 7m Bh 350,700 350,700 350,700 350,700 350,700 350,700
523 Ornamen Pipa BSA (B) uk. 7m (1,5") + 2m (1,25") / 8m Bh 394,500 394,500 394,500 394,500 394,500 394,500
524 Ornamen Pipa BSA (B) uk. 8m (1,5") + 3m (1,25") / 9m Bh 438,200 438,200 438,200 438,200 438,200 438,200
525 Klem Begel Æ 45 cm 0,005 x 0,05 (4 PS)/set Bh 87,700 87,700 87,700 87,700 87,700 87,700
526 Klem Begel Æ 30 cm 0,005 x 0,05 (4 PS)/set Bh 78,300 78,300 78,300 78,300 78,300 78,300
527 Klem Begel Æ 24 cm 0,005 x 0,05 (4 PS)/set Bh 75,100 75,100 75,100 75,100 75,100 75,100
528 Klem Begel Æ 12 cm 0,005 x 0,05 (4 PS)/set Bh 70,100 70,100 70,100 70,100 70,100 70,100
529 Dop Sodium 250 Watt (merk setara Philip) Bh 312,500 312,500 312,500 312,500 312,500 312,500
530 Dop Merqury m 125 Watt (merk setara Philip) Bh 50,000 50,000 50,000 50,000 50,000 50,000
531 Dop Merqury m 250 Watt (merk setara Philip) Bh 81,200 81,200 81,200 81,200 81,200 81,200
532 Trafo m 125 Watt (220 v merk setara Philip) Set 168,700 168,700 168,700 168,700 168,700 168,700
533 Trafo m 250 Watt (220 v merk setara Philip) Set 275,000 275,000 275,000 275,000 275,000 275,000
534 Trafo m 400 Watt (220 v merk setara Philip) Set 312,500 312,500 312,500 312,500 312,500 312,500
535 Kap Lampu Taman Tutup Atas Bh 250,000 250,000 250,000 250,000 250,000 250,000
536 Kap Lampu Taman Bulat Bh 175,000 175,000 175,000 175,000 175,000 175,000
537 MCB 40 A Bh 75,000 75,000 75,000 75,000 75,000 75,000
538 Service Clamp Bh 5,600 5,600 5,600 5,600 5,600 5,600
539 Neon 40 Watt (merk setara Philip) Bh 18,700 18,700 18,700 18,700 18,700 18,700
540 Spirtus Ltr 15,000 17,000 15,000 17,000 15,000 17,000
541 Sirlak India Kg 187,500 189,500 187,500 189,500 187,500 189,500
542 Pewarna Plitur Bh 300 300 300 300 300 300
543 Amplas Lbr 3,000 3,500 3,000 3,500 3,000 3,500
544 Minyak Tanah Ltr 10,000 10,000 10,000 10,000 10,000 10,000
545 Solar Ltr 4,500 4,500 4,500 4,500 4,500 4,500
546 Bensin Ltr 4,500 4,500 4,500 4,500 4,500 4,500
547 Kayu Bakar M3 125,000 125,000 125,000 125,000 125,000 125,000
Halaman 71
ASEMBAGUS SITUBONDO BESUKI
NO SATUAN
KOTA PEGUNUNGAN KOTA PEGUNUNGAN KOTA PEGUNUNGAN
548 Pelumas Ltr 30,000 30,000 30,000 30,000 30,000 30,000
549 Gemuk/Stempet Kg 81,500 81,500 81,500 81,500 81,500 81,500
550 Kusen Aluminium warna putih 4 " M' 84,000 84,000 84,000 84,000 84,000 84,000
551 Kusen Aluminium warna coklat 4 " M' 90,000 90,000 90,000 90,000 90,000 90,000
552 Rangka Jendela Aluminium warna putih M2 90,000 90,000 90,000 90,000 90,000 90,000
553 Rangka Jendela Aluminium warna coklat M2 90,000 90,000 90,000 90,000 90,000 90,000
554 Rangka Pintu Aluminium warna putih M2 125,000 125,000 125,000 125,000 125,000 125,000
555 Rangka Pintu Aluminium warna coklat M2 156,250 156,250 156,250 156,250 156,250 156,250
556 Rolling Door Aluminium warna Putih M2 420,000 420,000 420,000 420,000 420,000 420,000
557 Rolling Door Aluminium Warna Coklat M2 480,000 480,000 480,000 480,000 480,000 480,000
558 Pintu Harmonika M2 1,380,000 1,380,000 1,380,000 1,380,000 1,380,000 1,380,000
559 Oker Kg 30,000 32,500 30,000 32,500 30,000 32,500
560 Lem Kayu Kg 12,000 13,000 12,000 13,000 12,000 13,000
561 Dempul Kayu (untuk plitur) Bj 1,200 1,500 1,200 1,500 1,200 1,500
562 Tandon Fiber Glass 550 ltr Bh 780,000 830,000 780,000 830,000 780,000 830,000
563 Tandon Fiber Glass 1100 ltr Bh 1,260,000 1,340,000 1,260,000 1,340,000 1,260,000 1,340,000
564 Tandon Steinless Stel 550 ltr Bh 1,980,000 2,060,000 1,980,000 2,060,000 1,980,000 2,060,000
565 Tandon Steinless Stel 1000 ltr Bh 3,000,000 3,150,000 3,000,000 3,150,000 3,000,000 3,150,000
566 Batu Alam (Piring) Biji 1,200 1,300 1,200 1,300 1,200 1,300
567 Batu Palimanan Halus (10 x 20) M2 84,600 89,600 84,600 89,600 84,600 89,600
568 Batu Palimanan Kasar (10 x 20) M2 84,600 89,600 84,600 89,600 84,600 89,600
569 Batu Susun Sirih M2 60,600 65,600 60,600 65,600 60,600 65,600
570 Batu Hijau Sukabumi M2 102,600 107,600 102,600 107,600 102,600 107,600
571 Batu Andesit Bakar M2 144,600 149,600 144,600 149,600 144,600 149,600
572 Batu Precast M2 - 5,000 - 5,000 - 5,000
573 Batu Bali Green (alur) M2 - 5,000 - 5,000 - 5,000
574 Aqua Proof Kg 51,000 53,000 51,000 53,000 51,000 53,000
575 Elektroda 3,2 mm (2%) Kg 126,000 126,000 126,000 126,000 126,000 126,000
576 Chladianplast 180 x 80 Lbr 78,000 84,000 78,000 84,000 78,000 84,000
Halaman 72
ASEMBAGUS SITUBONDO BESUKI
NO SATUAN
KOTA PEGUNUNGAN KOTA PEGUNUNGAN KOTA PEGUNUNGAN
577 Chladianplast 210 x 80 Lbr 91,200 97,200 91,200 97,200 91,200 97,200
578 Chladianplast 300 x 80 Lbr 130,200 140,200 130,200 140,200 130,200 140,200
579 Pipa Besi Kotak 1,4 mm uk. 4 x 4 M' 19,000 20,667 19,000 20,667 19,000 20,667
580 Pipa Besi Kotak 1,4 mm uk. 2 x 4 M' 15,000 16,667 15,000 16,667 15,000 16,667
581 Pipa Besi Kotak 1,4 mm uk. 2 x 2 M' 7,000 8,667 7,000 8,667 7,000 8,667
582 Pipa Besi Kotak 1,6 mm uk. 5 x 5 M' 33,000 34,667 33,000 34,667 33,000 34,667
583 Kereta Dorong Bh 432,000 447,000 432,000 447,000 432,000 447,000
584 Timba Bh 6,000 6,500 6,000 6,500 6,000 6,500
585 Cangkul m' 7,000 7,333 7,000 7,333 7,000 7,333
586 Gancu Bh 57,000 59,500 57,000 59,500 57,000 59,500
587 Sekrop Bh 42,000 44,500 42,000 44,500 42,000 44,500
588 Kuas 3 " Bh 7,200 7,700 7,200 7,700 7,200 7,700
589 Kuas 4 " Bh 15,000 15,500 15,000 15,500 15,000 15,500
590 Kuas 5 " Bh 20,000 20,000 20,000 20,000 20,000 20,000
591 Bodem / Palu Bh 29,000 29,000 29,000 29,000 29,000 29,000
592 Cetok Bh 16,500 16,500 16,500 16,500 16,500 16,500
593 Gergaji Bh 41,500 41,500 41,500 41,500 41,500 41,500
594 Keranjang Bh 15,000 15,000 15,000 15,000 15,000 1,688
595 Meteran (50 m) m2 6,469 6,469 6,469 6,469 6,469 57,500
596 Poly Carbonat (P= 11,80 m, L = 2,10, Tebal 6 mm) M2 243,000 243,000 243,000 243,000 243,000 243,000
597 Kalsiplank uk. 8 mm x 20 cm x 4 m Lbr 60,000 63,000 60,000 63,000 60,000 63,000
598 Kalsiplank uk. 8 mm x 30 cm x 4 m Lbr 102,000 106,000 102,000 106,000 102,000 106,000
599 Kalsibot/Silikabot Lbr 51,000 54,000 51,000 54,000 51,000 54,000
600 Air Ltr 25 25 25 25 25 25
601 Bronjong 2.0 x 1.0 x 0.5 ( Ø 2.7 mm ) Unit 559,200 559,200 559,200 559,200 559,200 559,200
602 Bronjong 3.0 x 1.0 x 0.5 ( Ø 2.7 mm ) Unit 814,200 814,200 814,200 814,200 814,200 814,200
603 Bronjong 3.0 x 1.5 x 0.5 ( Ø 2.7 mm ) Unit 1,108,800 1,108,800 1,108,800 1,108,800 1,108,800 1,108,800
604 Bronjong 4.0 x 1.0 x 0.5 ( Ø 2.7 mm ) Unit 1,045,500 1,045,500 1,045,500 1,045,500 1,045,500 1,045,500
605 Bronjong 1.5 x 1.0 x 1.0 ( Ø 2.7 mm ) Unit 613,100 613,100 613,100 613,100 613,100 613,100
Halaman 73
ASEMBAGUS SITUBONDO BESUKI
NO SATUAN
KOTA PEGUNUNGAN KOTA PEGUNUNGAN KOTA PEGUNUNGAN
606 Bronjong 2.0 x 1.0 x 1.0 ( Ø 2.7 mm ) Unit 849,200 849,200 849,200 849,200 849,200 849,200
607 Bronjong 3.0 x 1.0 x 1.0 ( Ø 2.7 mm ) Unit 1,180,100 1,180,100 1,180,100 1,180,100 1,180,100 1,180,100
608 Bronjong 4.0 x 1.0 x 1.0 ( Ø 2.7 mm ) Unit 1,528,600 1,528,600 1,528,600 1,528,600 1,528,600 1,528,600
609 Bronjong 2.0 x 1.0 x 0.5 ( Ø 3.0 mm ) Unit 617,800 617,800 617,800 617,800 617,800 617,800
610 Bronjong 3.0 x 1.0 x 0.5 ( Ø 3.0 mm ) Unit 898,200 898,200 898,200 898,200 898,200 898,200
611 Bronjong 3.0 x 1.5 x 0.5 ( Ø 3.0 mm ) Unit 1,238,800 1,238,800 1,238,800 1,238,800 1,238,800 1,238,800
612 Bronjong 4.0 x 1.0 x 0.5 ( Ø 3.0 mm ) Unit 1,164,300 1,164,300 1,164,300 1,164,300 1,164,300 1,164,300
613 Bronjong 1.5 x 1.0 x 1.0 ( Ø 3.0 mm ) Unit 679,600 679,600 679,600 679,600 679,600 679,600
614 Bronjong 2.0 x 1.0 x 1.0 ( Ø 3.0 mm ) Unit 941,000 941,000 941,000 941,000 941,000 941,000
615 Bronjong 3.0 x 1.0 x 1.0 ( Ø 3.0 mm ) Unit 1,314,800 1,314,800 1,314,800 1,314,800 1,314,800 1,314,800
616 Bronjong 4.0 x 1.0 x 1.0 ( Ø 3.0 mm ) Unit 1,726,600 1,726,600 1,726,600 1,726,600 1,726,600 1,726,600
617 Palem Putri Batang 125,000 125,000 125,000 125,000 125,000 125,000
618 Palem Tupai Batang 125,000 125,000 125,000 125,000 125,000 125,000
619 Palem Sepuluh Batang 31,200 31,200 31,200 31,200 31,200 31,200
620 Palem Poenix Batang 93,700 93,700 93,700 93,700 93,700 93,700
621 Palem Merah Rumpun 187,500 187,500 187,500 187,500 187,500 187,500
622 Palem Kuning Batang 31,200 31,200 31,200 31,200 31,200 31,200
623 Palem Botol Batang 187,500 187,500 187,500 187,500 187,500 187,500
624 Cemara Pecut Batang 43,700 43,700 43,700 43,700 43,700 43,700
625 Cemara Pua - Pua Batang 62,500 62,500 62,500 62,500 62,500 62,500
626 Cemara Frentris Batang 62,500 62,500 62,500 62,500 62,500 62,500
627 Cemara Udang Batang 62,500 62,500 62,500 62,500 62,500 62,500
628 Glodogan Tiang Batang 43,700 43,700 43,700 43,700 43,700 43,700
629 Glodogan Biasa Batang 43,700 43,700 43,700 43,700 43,700 43,700
630 Bougenvile Batang 12,500 12,500 12,500 12,500 12,500 12,500
631 Parigata Batang 12,500 12,500 12,500 12,500 12,500 12,500
632 Tetean Batang 3,000 3,000 3,000 3,000 3,000 3,000
633 Pangkas Hijau Batang 3,700 3,700 3,700 3,700 3,700 3,700
634 Pangkas Mas Batang 3,700 3,700 3,700 3,700 3,700 3,700
Halaman 74
ASEMBAGUS SITUBONDO BESUKI
NO SATUAN
KOTA PEGUNUNGAN KOTA PEGUNUNGAN KOTA PEGUNUNGAN
635 Terang Bulan Pot 3,700 3,700 3,700 3,700 3,700 3,700
636 Jaburan Batang 3,700 3,700 3,700 3,700 3,700 3,700
637 Asoka Batang 6,200 6,200 6,200 6,200 6,200 6,200
638 Krisdorn Batang 9,000 9,000 9,000 9,000 9,000 9,000
639 Bulu Ayam Batang 3,700 3,700 3,700 3,700 3,700 3,700
640 Krokot Batang 3,700 3,700 3,700 3,700 3,700 3,700
641 Lantana Batang 3,700 3,700 3,700 3,700 3,700 3,700
642 Bonsai Parigata Batang 93,700 93,700 93,700 93,700 93,700 93,700
643 Bonsai Bougenvile Batang 93,700 93,700 93,700 93,700 93,700 93,700
644 Bonsai Cemara Udang Batang 125,000 125,000 125,000 125,000 125,000 125,000
645 Asoka Daun Besar Batang 18,700 18,700 18,700 18,700 18,700 18,700
646 Puring Jetz Batang 18,700 18,700 18,700 18,700 18,700 18,700
Halaman 75
ASEMBAGUS SITUBONDO BESUKI
NO SATUAN
KOTA PEGUNUNGAN KOTA PEGUNUNGAN KOTA PEGUNUNGAN
647 Nusa Indah Batang 24,000 24,000 24,000 24,000 24,000 24,000
648 Alamanda Batang 24,000 24,000 24,000 24,000 24,000 24,000
649 Kaca Piring Batang 12,500 12,500 12,500 12,500 12,500 12,500
650 Pohon Tanjung Batang 62,500 62,500 62,500 62,500 62,500 62,500
651 Bunga Mawar Batang 6,200 6,200 6,200 6,200 6,200 6,200
652 Agawe Batang 31,200 31,200 31,200 31,200 31,200 31,200
653 Tri Colour Batang 12,500 12,500 12,500 12,500 12,500 12,500
654 Corombusa Batang 9,300 9,300 9,300 9,300 9,300 9,300
655 Pandan Nusa Batang 6,200 6,200 6,200 6,200 6,200 6,200
656 Tabe Buya Batang 102,600 102,600 102,600 102,600 102,600 102,600
657 Dadap Merah Batang 75,000 75,000 75,000 75,000 75,000 75,000
658 Bintaro Batang 75,000 75,000 75,000 75,000 75,000 75,000
659 Song Of India Batang 12,500 12,500 12,500 12,500 12,500 12,500
660 Wali Songo Batang 12,500 12,500 12,500 12,500 12,500 12,500
661 Sikat Botol Batang 43,700 43,700 43,700 43,700 43,700 43,700
662 Rumput Gajah M2 31,200 31,200 31,200 31,200 31,200 31,200
663 Pucuk Merah Batang 74,400 74,400 74,400 74,400 74,400 74,400
664 Pohon Pelindung Phn 31,500 31,500 31,500 31,500 31,500 31,500
TENAGA
665 Mandor Org/Hr 57,000 62,000 57,000 62,000 57,000 62,000
666 Kepala Tukang Org/Hr 55,000 60,000 55,000 60,000 55,000 60,000
667 Tukang Kayu Org/Hr 53,000 58,000 53,000 58,000 53,000 58,000
668 Tukang Batu Org/Hr 50,000 55,000 50,000 55,000 50,000 55,000
669 Tukang Besi Org/Hr 50,000 55,000 50,000 55,000 50,000 55,000
670 Tukang Pipa Org/Hr 50,000 55,000 50,000 55,000 50,000 55,000
671 Tukang Cat Org/Hr 45,000 50,000 45,000 50,000 45,000 50,000
672 Tukang Plitur Org/Hr 45,000 50,000 45,000 50,000 45,000 50,000
673 Pekerja Org/Hr 37,000 42,000 37,000 42,000 37,000 42,000
Halaman 76
ASEMBAGUS SITUBONDO BESUKI
NO SATUAN
KOTA PEGUNUNGAN KOTA PEGUNUNGAN KOTA PEGUNUNGAN
674 Juru Ukur Org/Hr 85,000 90,000 85,000 90,000 85,000 90,000
675 Mekanik Org/Hr 53,000 58,000 53,000 58,000 53,000 58,000
676 Pembantu Mekanik Org/Hr 44,000 49,000 44,000 49,000 44,000 49,000
677 Operator Terampil Org/Hr 55,000 60,000 55,000 60,000 55,000 60,000
678 Pembantu Operator Org/Hr 45,000 50,000 45,000 50,000 45,000 50,000
679 Sopir Terampil Org/Hr 55,000 60,000 55,000 60,000 55,000 60,000
680 Pembantu Sopir Org/Hr 44,000 49,000 44,000 49,000 44,000 49,000
681 Penjaga Org/Hr 40,000 45,000 40,000 45,000 40,000 45,000
682 Buruh Terampil Org/Hr 50,000 55,000 50,000 55,000 50,000 55,000
683 Penganyam Org/Hr 50,000 55,000 50,000 55,000 50,000 55,000
684 Pekerja Pengisi Org/Hr 37,000 42,000 37,000 42,000 37,000 42,000
Halaman 77
DAFTAR HARGA SATUAN BAHAN DAN UPAH KERJA
(WILAYAH SITUBONDO KOTA)
NO. JENIS BAHAN DAN UPAH SAT HARGA SATUAN
BAHAN
1 Pasir Pasang m3 Rp 77,000.00
2 Pasir Urug/Sirtu m3 Rp 73,000.00
3 Batu Koral m3 Rp 144,000.00
4 Tanah Urug m3 Rp 54,000.00
5 Batu 1-2 (Grosok Ayak/Ampyangan/manual) m3 Rp 262,000.00
6 Batu Pecah 2-3 (manual) m3 Rp 204,000.00
7 Batu Pecah 3-5 (manual) m3 Rp 192,000.00
8 Batu Pecah 5-7 (manual) m3 Rp 187,000.00
9 Batu Pecah 10-15 (manual) m3 Rp 149,000.00
10 Batu Gunung/Batu Kali m3 Rp 132,000.00
11 Batu Grosok (ABC) m3 Rp 137,000.00
12 Batu Merah biji Rp 510.00
13 Batu Pecah 0,5-1 (mesin) m3 Rp 365,000.00
14 Batu Pecah 1-1 (mesin) m3 Rp 355,000.00
15 Batu Pecah 1-2 (mesin) m3 Rp 346,000.00
16 Batu Pecah 2-3 (mesin) m3 Rp 312,000.00
17 Pasir Abu Batu (mesin) m3 Rp 326,000.00
18 Pasir Ayak Untuk Hot Mix m3 Rp 288,000.00
19 Aspal Curah kg Rp 10,000.00
20 Aspal Kemas kg Rp 11,000.00
21 Semen 40 Kg kg Rp 1,500.00
22 Semen Putih 40 Kg kg Rp 2,250.00
23 Kapur Pasang m3 Rp 300,000.00
54 Besi Beton Polos kg Rp 13,700.00
55 Besi Beton Ulir kg Rp 14,300.00
56 Kawat Beton kg Rp 18,700.00
57 Paku Usuk Kg Rp 15,000.00
58 Paku Triplek/Eternit Kg Rp 18,700.00
59 Paku Seng Kg Rp 28,100.00
60 Kayu ( Bekisting ) M3 Rp 2,187,500.00
61 Bambu Lj Rp 31,000.00
62 Buis Beton bulat diameter 0,50 x 0,50 Bj Rp 58,800.00
64 Buis Beton bulat diameter 0,30 x 1 Bj Rp 52,800.00
65 Buis Beton bulat diameter 0,20 x 1 Bj Rp 37,800.00
66 Buis Beton Sigaran diameter 0,20 x 1 Bj Rp 18,900.00
67 Buis Beton Sigaran diameter 0,30 x 1 Bj Rp 26,400.00
68 Paving Stone Kotak tebal 8 cm (warna) M2 Rp 61,800.00
NO. JENIS BAHAN DAN UPAH SAT HARGA SATUAN
UPAH KERJA
1 Mandor Org/Hr Rp 57,000.00
2 Kepala Tukang Org/Hr Rp 55,000.00
3 Tukang Kayu Org/Hr Rp 53,000.00
4 Tukang Batu Org/Hr Rp 50,000.00
5 Tukang Besi Org/Hr Rp 50,000.00
6 Pekerja Org/Hr Rp 37,000.00
7 Juru Ukur Org/Hr Rp 85,000.00
8 Mekanik Org/Hr Rp 53,000.00
9 Pembantu Mekanik Org/Hr Rp 44,000.00
10 Operator Terampil Org/Hr Rp 55,000.00
11 Pembantu Operator Org/Hr Rp 45,000.00
12 Sopir Terampil Org/Hr Rp 55,000.00
13 Pembantu Sopir Org/Hr Rp 44,000.00
14 Penjaga Org/Hr Rp 40,000.00
15 Buruh Terampil Org/Hr Rp 50,000.00
PERHITUNGAN PEMBESIAN BETON BERTULANG
3.51
7.4088
0.7
3.51
5.1375
ANALISA HARGA SATUAN BAHAN DAN UPA
Urugan Pasir M3
Bahan Pasir Urug/Sirtu m3 1.20000
Upah Pekerja Org/Hr 0.30000
JENIS PEKERJAAN SAT INDEKS
Mandor Org/Hr 0.01000
Urugan Tanah M3
Bahan Tanah Urug m3 1.20000
Upah Pekerja Org/Hr 0.30000
Mandor Org/Hr 0.01000
Meratakan kembali M3
Upah Pekerja Org/Hr 0.25000
Mandor Org/Hr 0.00833
Pembersihan lokasi M2
Upah Pekerja Org/Hr 0.10000
Mandor Org/Hr 0.05000
Pengukuran / Bouwplank M2
Bahan Kayu ( Bekisting ) M3 0.01200
Paku Usuk Kg 0.02000
Kayu ( Bekisting ) M3 0.00700
Upah Pekerja Org/Hr 0.10000
Tukang Kayu Org/Hr 0.10000
Kepala Tukang Org/Hr 0.01000
Mandor Org/Hr 0.00500
Pembongkaran keramik M2
Upah Pekerja Org/Hr 0.26250
Mandor Org/Hr 0.01350
Roster camp. 1 : 4 M2
Bahan Roster Karang Pilang Besar biji 30.00000
Semen 40 Kg kg 11.00000
Pasir Pasang m3 0.03500
Upah Pekerja Org/Hr 0.30000
Tukang Batu Org/Hr 0.10000
Kepala Tukang Org/Hr 0.01000
Mandor Org/Hr 0.01500
Pekerjaan Plesteran
JENIS PEKERJAAN SAT INDEKS
Plesteran camp. 1 : 3 tbl 15 mm M2
Bahan Semen 40 Kg kg 7.77600
Pasir Pasang m3 0.02300
Upah Pekerja Org/Hr 0.30000
Tukang Batu Org/Hr 0.15000
Kepala Tukang Org/Hr 0.01500
Mandor Org/Hr 0.01500
Acian Kg
Bahan Semen 40 Kg kg 3.25000
Upah Pekerja Org/Hr 0.20000
Tukang Batu Org/Hr 0.10000
Kepala Tukang Org/Hr 0.01000
Mandor Org/Hr 0.01000
Perakitan Pembesian
Pembesian 10 Kg dengan besi polos atau ulir Kg
Bahan Besi Beton Polos kg 10.50000
Kawat Beton kg 0.15000
Upah Pekerja Org/Hr 0.07000
Tukang Besi Org/Hr 0.07000
Kepala Tukang Org/Hr 0.00700
Mandor Org/Hr 0.00400
Pembuatan Bekisting
Bekisting untuk pondasi M2
Bahan Kayu ( Bekisting ) M3 0.04000
Paku Usuk Kg 0.30000
Pelumas Ltr 0.10000
Upah Pekerja Org/Hr 0.52000
JENIS PEKERJAAN SAT INDEKS
Tukang Kayu Org/Hr 0.26000
Kepala Tukang Org/Hr 0.02600
Mandor Org/Hr 0.02600
Beton sloof 12 / 12 M3
JENIS PEKERJAAN SAT INDEKS
Mengecor beton 1 : 2 : 3 M3 1.00000
Bekisting untuk sloof M2 16.66667
Besi beton polos ( Σ 4 / Ф 12 ) Kg 312.36000
( € 20 / Ф 8 )
Beton sloof 20 / 25 M3
Mengecor beton 1 : 2 : 3 M3 1.00000
Bekisting untuk sloof M2 10.00000
Besi beton polos ( Σ 6 / Ф 12 ) Kg 126.50580
( € 20 / Ф 6 )
Beton kolom 16 / 16 M3
Mengecor beton 1 : 2 : 3 M3 1.00000
Bekisting untuk kolom M2 12.50000
Besi beton polos ( Σ 4 / Ф 12 ) Kg 188.03250
( € 20 / Ф 8 )
Beton kolom 20 / 20 M3
Mengecor beton 1 : 2 : 3 M3 1.00000
Bekisting untuk kolom M2 10.00000
Besi beton polos ( Σ 8 / Ф 12 ) Kg 207.14400
( € 15 / Ф 6 )
Beton kolom 30 / 30 M3
Mengecor beton 1 : 2 : 3 M3 1.00000
Bekisting untuk kolom M2 13.33333
Besi beton polos ( Σ 8 / Ф 16 ) Kg 166.59200
( € 20 / Ф 8 )
Beton balok 20 / 35 M3
Mengecor beton 1 : 2 : 3 M3 1.00000
Bekisting untuk balok M2 12.85714
Besi beton polos ( Σ 8 / Ф 12 ) Kg 124.70914
( € 15 / Ф 6 )
Rangka Baja WF 1 Kg Kg
Bahan WF 150 mm s/d 280 panjang 12 m Kg 1.15000
Upah Pekerja Org/Hr 0.06000
Tukang Besi Org/Hr 0.06000
Kepala Tukang Org/Hr 0.00600
Mandor Org/Hr 0.00300
Pekerjaan Kayu
Kusen pintu dan jendela kayu klas II M3
JENIS PEKERJAAN SAT INDEKS
Bahan Kayu Kamper 8/12 ; 6/12 M3 1.20000
Paku Usuk Kg 1.25000
Lem Kayu Kg 1.00000
Upah Pekerja Org/Hr 6.00000
Tukang Kayu Org/Hr 18.00000
Kepala Tukang Org/Hr 1.80000
Mandor Org/Hr 0.30000
Genteng beton M2
Bahan Genteng Beton biji 11.00000
JENIS PEKERJAAN SAT INDEKS
Paku Usuk Kg 0.03000
Upah Pekerja Org/Hr 0.20000
Tukang Batu Org/Hr 0.10000
Kepala Tukang Org/Hr 0.01000
Mandor Org/Hr 0.01000
Lantai keramik 40 x 40 M2
Bahan Tegel Keramik 40 x 40 (polos) m2 1.00000
Semen 40 Kg kg 10.00000
Pasir Pasang m3 0.04500
Semen Putih 40 Kg kg 1.50000
Upah Pekerja Org/Hr 0.70000
Tukang Batu Org/Hr 0.35000
JENIS PEKERJAAN SAT INDEKS
Kepala Tukang Org/Hr 0.03500
Mandor Org/Hr 0.03500
Lantai keramik 30 x 30 M2
Bahan Tegel Keramik 30 x 30 (polos) m2 1.00000
Semen 40 Kg kg 10.00000
Pasir Pasang m3 0.04500
Semen Putih 40 Kg kg 1.50000
Upah Pekerja Org/Hr 0.90000
Tukang Batu Org/Hr 0.45000
Kepala Tukang Org/Hr 0.04500
Mandor Org/Hr 0.04500
Dinding keramik 20 x 25 M2
Bahan Tegel Keramik 20 x 25 (polos) m2 1.00000
Semen 40 Kg kg 10.00000
Pasir Pasang m3 0.04500
Semen Putih 40 Kg kg 1.50000
Upah Pekerja Org/Hr 0.70000
Tukang Batu Org/Hr 0.35000
Kepala Tukang Org/Hr 0.03500
Mandor Org/Hr 0.03500
Lantai keramik 20 x 20 M2
Bahan Tegel Keramik 20 x 20 (polos) m2 1.00000
Semen 40 Kg kg 9.30000
Pasir Pasang m3 0.01800
Semen Putih 40 Kg kg 1.94000
Upah Pekerja Org/Hr 0.90000
Tukang Batu Org/Hr 0.45000
Kepala Tukang Org/Hr 0.04500
Mandor Org/Hr 0.04500
Batu palimanan M2
Bahan Batu Palimanan Halus (10 x 20) M2 1.10000
Semen 40 Kg kg 11.75000
Pasir Pasang m3 0.03500
Upah Pekerja Org/Hr 0.70000
Tukang Batu Org/Hr 0.35000
Kepala Tukang Org/Hr 0.03500
Mandor Org/Hr 0.03500
Paving stone M2
Bahan Paving Stone Kotak tebal 7 cm (abu-abu) M2 1.20000
Pasir Urug/Sirtu m3 0.10000
Upah Pekerja Org/Hr 0.50000
Tukang Batu Org/Hr 0.25000
Kepala Tukang Org/Hr 0.02500
Mandor Org/Hr 0.02500
Pasangan Paving M2
Bahan Paving Stone Kotak tebal 6 cm (abu-abu) M2 1.20000
Pasir Urug/Sirtu m3 0.10000
Upah Pekerja Org/Hr 0.50000
Tukang Batu Org/Hr 0.25000
Kepala Tukang Org/Hr 0.02500
Mandor Org/Hr 0.02500
Engsel pintu Bh
JENIS PEKERJAAN SAT INDEKS
Bahan Engsel pintu nylon arch asli Bh 1.00000
Upah Pekerja Org/Hr 0.01500
Tukang Kayu Org/Hr 0.15000
Kepala Tukang Org/Hr 0.01500
Mandor Org/Hr 0.00075
Engsel jendela Bh
Bahan Engsel jendela nylon arch asli Bh 1.00000
Upah Pekerja Org/Hr 0.01000
Tukang Kayu Org/Hr 0.10000
Kepala Tukang Org/Hr 0.01000
Mandor Org/Hr 0.00050
Grendel jendela Bh
Bahan Grendel Jendela Bh 1.00000
Upah Pekerja Org/Hr 0.01000
Tukang Kayu Org/Hr 0.10000
Kepala Tukang Org/Hr 0.01000
Mandor Org/Hr 0.00050
Hak angin Bh
Bahan Hak angin biasa Bh 1.00000
Upah Pekerja Org/Hr 0.01500
Tukang Kayu Org/Hr 0.15000
Kepala Tukang Org/Hr 0.01500
Mandor Org/Hr 0.00075
Kaca bening Bh
Bahan Kaca polos 5 mm M2 1.10000
Upah Pekerja Org/Hr 0.01500
Tukang Kayu Org/Hr 0.15000
Kepala Tukang Org/Hr 0.01500
Mandor Org/Hr 0.00075
Pekerjaan Pengecatan
Pengecatan tembok baru M2
Bahan Plamir Tembok Kg 0.10000
Cat Tembok (Setara Cathilac) Kg 0.36000
Upah Pekerja Org/Hr 0.02000
Tukang Cat Org/Hr 0.06300
Kepala Tukang Org/Hr 0.00630
Mandor Org/Hr 0.00250
Pengecatan Kereb M2
Bahan Cat Genteng Kg 0.46000
Upah Pekerja Org/Hr 0.02000
Tukang Cat Org/Hr 0.06300
Kepala Tukang Org/Hr 0.00630
Mandor Org/Hr 0.00250
Pengecatan besi M2
Bahan Cat Brown Kg 0.10000
Kuas 4 " Bh 0.01000
Upah Pekerja Org/Hr 0.02000
Tukang Cat Org/Hr 0.20000
Kepala Tukang Org/Hr 0.02000
Mandor Org/Hr 0.01000
Pekerjaan Listrik
Titik lampu 1 Ttk
Bahan NYA 2,5 mm M' 15.00000
Upah Tukang Kayu Org/Hr 0.75000
JENIS PEKERJAAN SAT INDEKS
Lampu TL 20 watt
Bahan Lampu TL 20 Watt (merk setara Philip) komplit Bh 1.00000
Lampu Pijar
Bahan Lampu Dop Pijar (merk setara Philip) 15 Watt Bh 1.00000
Lampu PLC
Bahan Lampu PLC (merk setara Philip) 8 Watt Bh 1.00000
Saklar Tunggal
Bahan Sakelar Tunggal (merk setara Brocco) Bh 1.00000
Saklar Ganda
Bahan Sakelar Ganda (merk setara Brocco) Bh 1.00000
Stop Kontak
Bahan Stop Kontak (merk setara Brocco) Bh 1.00000
Zekring Kast
Bahan Zekering Bh 1.00000
Pekerjaan Bongkaran
Bongkaran Beton Bertulang M3
Upah Pekerja Org/Hr 6.66700
Mandor Org/Hr 0.33300
Buis Beton M2
Bahan Plat strip lebar 2 cm tebal 6 mm kg 1.10000
Batu Pecah 3-5 (manual) m3 20.00000
Batu Pecah 5-7 (manual) m3 3.92000
Pasir Pasang m3 0.05600
Pasir Urug/Sirtu m3 0.02400
Upah Pekerja Org/Hr 0.14000
Tukang Batu Org/Hr 0.07000
Kepala Tukang Org/Hr 0.00700
Mandor Org/Hr 0.00700
Pekerjaan Sanitasi
Pasangan Pipa Galvanis
Pasang Pipa GI dia. ¾" M'
Bahan Pipa Gl BSA Ø 3/4" Lj 0.20000
Perlengkapan Set 1.00000
Upah Pekerja Org/Hr 0.05400
Tukang Batu Org/Hr 0.09000
Kepala Tukang Org/Hr 0.00900
Mandor Org/Hr 0.02700
JENIS PEKERJAAN SAT INDEKS
Pasangan Kran
Pasang Kran Air dia. 1/2" Bh
Bahan Kran Biasa 1/2" Bh 1.00000
Upah Pekerja Org/Hr 0.01000
Tukang Batu Org/Hr 0.10000
Kepala Tukang Org/Hr 0.01000
Mandor Org/Hr 0.00500
Resapan Bh
Galian Tanah M3 2.18466
Urugan Pasir M3 0.22019
Buis Beton Ø 0,80 m Bh 2.00000
Bata merah Bh 556.00000
Beton Plat, tebal 8 cm M3 0.07599
Pipa Hawa (Pipa GI Ø 1") Ljr 0.75000
Angkur Pipa Bh
Beton Ringan M3 0.04225
Plesteran M3 0.54000
ARGA SATUAN BAHAN DAN UPAH
Rp 37,000.00 Rp 27,750.00
Rp 57,000.00 Rp 1,425.00
Jumlah Rp 29,175.00
Rp 37,000.00 Rp 33,300.00
Rp 57,000.00 Rp 2,565.00
Jumlah Rp 35,865.00
Rp 37,000.00 Rp 38,850.00
Rp 57,000.00 Rp 3,819.00
Jumlah Rp 42,669.00
Rp 37,000.00 Rp 37,000.00
Rp 57,000.00 Rp 1,824.00
Jumlah Rp 38,824.00
Rp 37,000.00 Rp 55,500.00
Rp 57,000.00 Rp 3,420.00
Jumlah Rp 58,920.00
Rp 37,000.00 Rp 44,400.00
Rp 57,000.00 Rp 2,565.00
Jumlah Rp 46,965.00
Rp 37,000.00 Rp 12,210.00
Rp 57,000.00 Rp 570.00
Jumlah Rp 12,780.00
Rp 73,000.00 Rp 87,600.00
Rp 37,000.00 Rp 9,250.00
Rp 57,000.00 Rp 1,425.00
Jumlah Rp 98,275.00
Rp 37,000.00 Rp 18,500.00
Rp 57,000.00 Rp 2,850.00
Jumlah Rp 21,350.00
Rp 73,000.00 Rp 87,600.00
Rp 37,000.00 Rp 11,100.00
HARGA SATUAN JUMLAH HARGA
Rp 57,000.00 Rp 570.00
Jumlah Rp 99,270.00
Rp 54,000.00 Rp 64,800.00
Rp 37,000.00 Rp 11,100.00
Rp 57,000.00 Rp 570.00
Jumlah Rp 76,470.00
Rp 37,000.00 Rp 9,250.00
Rp 57,000.00 Rp 475.00
Jumlah Rp 9,725.00
Rp 37,000.00 Rp 3,700.00
Rp 57,000.00 Rp 2,850.00
Jumlah Rp 6,550.00
Rp 2,187,500.00 Rp 26,250.00
Rp 15,000.00 Rp 300.00
Rp 2,187,500.00 Rp 15,312.50
Rp 37,000.00 Rp 3,700.00
Rp 53,000.00 Rp 5,300.00
Rp 55,000.00 Rp 550.00
Rp 57,000.00 Rp 285.00
Jumlah Rp 51,697.50
Jumlah per-M' Rp 5,169.75
Rp 65,000.00 Rp 390.00
Rp 37,000.00 Rp 5,550.00
Rp 57,000.00 Rp 855.00
Jumlah Rp 6,795.00
Rp 37,000.00 Rp 9,712.50
Rp 57,000.00 Rp 769.50
Jumlah Rp 10,482.00
Rp 37,000.00 Rp 148,000.00
Rp 57,000.00 Rp 22,800.00
Jumlah Rp 170,800.00
Rp 132,000.00 Rp 158,400.00
Rp 1,500.00 Rp 303,000.00
Rp 77,000.00 Rp 37,345.00
Rp 37,000.00 Rp 55,500.00
HARGA SATUAN JUMLAH HARGA
Rp 50,000.00 Rp 37,500.00
Rp 55,000.00 Rp 4,125.00
Rp 57,000.00 Rp 4,275.00
Jumlah Rp 600,145.00
Rp 132,000.00 Rp 158,400.00
Rp 1,500.00 Rp 244,500.00
Rp 77,000.00 Rp 40,040.00
Rp 37,000.00 Rp 55,500.00
Rp 50,000.00 Rp 37,500.00
Rp 55,000.00 Rp 4,125.00
Rp 57,000.00 Rp 4,275.00
Jumlah Rp 544,340.00
Rp 132,000.00 Rp 158,400.00
Rp 1,500.00 Rp 204,000.00
Rp 77,000.00 Rp 41,888.00
Rp 37,000.00 Rp 55,500.00
Rp 50,000.00 Rp 37,500.00
Rp 55,000.00 Rp 4,125.00
Rp 57,000.00 Rp 4,275.00
Jumlah Rp 505,688.00
Rp 132,000.00 Rp 158,400.00
Rp 1,500.00 Rp 175,500.00
Rp 77,000.00 Rp 43,197.00
Rp 37,000.00 Rp 55,500.00
Rp 50,000.00 Rp 37,500.00
Rp 55,000.00 Rp 4,125.00
Rp 57,000.00 Rp 4,275.00
Jumlah Rp 478,497.00
Rp 132,000.00 Rp 158,400.00
Rp 1,500.00 Rp 136,500.00
Rp 77,000.00 Rp 44,968.00
Rp 37,000.00 Rp 55,500.00
Rp 50,000.00 Rp 37,500.00
Rp 55,000.00 Rp 4,125.00
Rp 57,000.00 Rp 4,275.00
Jumlah Rp 441,268.00
Rp 132,000.00 Rp 158,400.00
Rp 1,500.00 Rp 91,500.00
Rp 300,000.00 Rp 44,100.00
Rp 77,000.00 Rp 37,884.00
HARGA SATUAN JUMLAH HARGA
Rp 37,000.00 Rp 55,500.00
Rp 50,000.00 Rp 37,500.00
Rp 55,000.00 Rp 4,125.00
Rp 57,000.00 Rp 4,275.00
Jumlah Rp 433,284.00
Rp 132,000.00 Rp 158,400.00
Rp 77,000.00 Rp 33,264.00
Rp 37,000.00 Rp 28,860.00
Rp 50,000.00 Rp 19,500.00
Rp 55,000.00 Rp 2,145.00
Rp 57,000.00 Rp 2,223.00
Jumlah Rp 244,392.00
HARGA SATUAN JUMLAH HARGA
Rp 132,000.00 Rp 63,360.00
Rp 1,500.00 Rp 291,000.00
Rp 77,000.00 Rp 24,024.00
Rp 144,000.00 Rp 67,392.00
Rp 13,700.00 Rp 1,726,200.00
Rp 18,700.00 Rp 33,660.00
Rp 37,000.00 Rp 125,800.00
Rp 50,000.00 Rp 42,500.00
Rp 55,000.00 Rp 4,675.00
Rp 57,000.00 Rp 9,690.00
Jumlah Rp 2,388,301.00
Rp 132,000.00 Rp 59,400.00
Rp 1,500.00 Rp 291,000.00
Rp 77,000.00 Rp 24,024.00
Rp 144,000.00 Rp 67,392.00
Rp 37,000.00 Rp 88,800.00
Rp 50,000.00 Rp 40,000.00
Rp 55,000.00 Rp 4,400.00
Rp 57,000.00 Rp 6,783.00
Jumlah Rp 581,799.00
Rp 510.00 Rp 71,400.00
Rp 1,500.00 Rp 49,425.00
Rp 77,000.00 Rp 7,007.00
Rp 37,000.00 Rp 22,200.00
Rp 50,000.00 Rp 10,000.00
Rp 55,000.00 Rp 1,100.00
Rp 57,000.00 Rp 1,710.00
Jumlah Rp 162,842.00
Rp 510.00 Rp 71,400.00
Rp 1,500.00 Rp 39,825.00
Rp 77,000.00 Rp 7,161.00
Rp 37,000.00 Rp 22,200.00
Rp 50,000.00 Rp 10,000.00
Rp 55,000.00 Rp 1,100.00
Rp 57,000.00 Rp 1,710.00
Jumlah Rp 153,396.00
Rp 510.00 Rp 71,400.00
Rp 1,500.00 Rp 33,300.00
Rp 77,000.00 Rp 7,854.00
HARGA SATUAN JUMLAH HARGA
Rp 37,000.00 Rp 22,200.00
Rp 50,000.00 Rp 10,000.00
Rp 55,000.00 Rp 1,100.00
Rp 57,000.00 Rp 1,710.00
Jumlah Rp 147,564.00
Rp 510.00 Rp 71,400.00
Rp 1,500.00 Rp 27,750.00
Rp 77,000.00 Rp 9,394.00
Rp 37,000.00 Rp 22,200.00
Rp 50,000.00 Rp 10,000.00
Rp 55,000.00 Rp 1,100.00
Rp 57,000.00 Rp 1,710.00
Jumlah Rp 143,554.00
Rp 510.00 Rp 71,400.00
Rp 1,500.00 Rp 15,120.00
Rp 77,000.00 Rp 7,122.50
Rp 300,000.00 Rp 8,250.00
Rp 37,000.00 Rp 22,200.00
Rp 50,000.00 Rp 10,000.00
Rp 55,000.00 Rp 1,100.00
Rp 57,000.00 Rp 1,710.00
Jumlah Rp 136,902.50
Rp 510.00 Rp 35,700.00
Rp 1,500.00 Rp 21,555.00
Rp 77,000.00 Rp 3,080.00
Rp 37,000.00 Rp 11,100.00
Rp 50,000.00 Rp 5,000.00
Rp 55,000.00 Rp 550.00
Rp 57,000.00 Rp 855.00
Jumlah Rp 77,840.00
Rp 510.00 Rp 35,700.00
Rp 1,500.00 Rp 17,250.00
Rp 77,000.00 Rp 3,311.00
Rp 37,000.00 Rp 11,100.00
Rp 50,000.00 Rp 5,000.00
Rp 55,000.00 Rp 550.00
Rp 57,000.00 Rp 855.00
Jumlah Rp 73,766.00
Rp 510.00 Rp 35,700.00
Rp 1,500.00 Rp 14,520.00
HARGA SATUAN JUMLAH HARGA
Rp 77,000.00 Rp 3,465.00
Rp 37,000.00 Rp 11,100.00
Rp 50,000.00 Rp 5,000.00
Rp 55,000.00 Rp 550.00
Rp 57,000.00 Rp 855.00
Jumlah Rp 71,190.00
Rp 510.00 Rp 35,700.00
Rp 1,500.00 Rp 12,480.00
Rp 77,000.00 Rp 3,773.00
Rp 37,000.00 Rp 11,100.00
Rp 50,000.00 Rp 5,000.00
Rp 55,000.00 Rp 550.00
Rp 57,000.00 Rp 855.00
Jumlah Rp 69,458.00
Rp 510.00 Rp 35,700.00
Rp 1,500.00 Rp 6,750.00
Rp 77,000.00 Rp 3,850.00
Rp 300,000.00 Rp 450.00
Rp 37,000.00 Rp 11,100.00
Rp 50,000.00 Rp 5,000.00
Rp 55,000.00 Rp 550.00
Rp 57,000.00 Rp 855.00
Jumlah Rp 64,255.00
Rp 3,240.00 Rp 40,500.00
Rp 1,500.00 Rp 27,300.00
Rp 77,000.00 Rp 44,814.00
Rp 13,700.00 Rp 3,836.00
Rp 37,000.00 Rp 13,320.00
Rp 50,000.00 Rp 6,000.00
Rp 55,000.00 Rp 660.00
Rp 57,000.00 Rp 1,026.00
Jumlah Rp 137,456.00
Rp 8,100.00 Rp 243,000.00
Rp 1,500.00 Rp 16,500.00
Rp 77,000.00 Rp 2,695.00
Rp 37,000.00 Rp 11,100.00
Rp 50,000.00 Rp 5,000.00
Rp 55,000.00 Rp 550.00
Rp 57,000.00 Rp 855.00
Jumlah Rp 279,700.00
HARGA SATUAN JUMLAH HARGA
Rp 1,500.00 Rp 11,664.00
Rp 77,000.00 Rp 1,771.00
Rp 37,000.00 Rp 11,100.00
Rp 50,000.00 Rp 7,500.00
Rp 55,000.00 Rp 825.00
Rp 57,000.00 Rp 855.00
Jumlah Rp 33,715.00
Rp 1,500.00 Rp 9,360.00
Rp 77,000.00 Rp 1,848.00
Rp 37,000.00 Rp 11,100.00
Rp 50,000.00 Rp 7,500.00
Rp 55,000.00 Rp 825.00
Rp 57,000.00 Rp 855.00
Jumlah Rp 31,488.00
Rp 1,500.00 Rp 7,776.00
Rp 77,000.00 Rp 2,002.00
Rp 37,000.00 Rp 11,100.00
Rp 50,000.00 Rp 7,500.00
Rp 55,000.00 Rp 825.00
Rp 57,000.00 Rp 855.00
Jumlah Rp 30,058.00
Rp 1,500.00 Rp 6,624.00
Rp 77,000.00 Rp 2,079.00
Rp 37,000.00 Rp 11,100.00
Rp 50,000.00 Rp 7,500.00
Rp 55,000.00 Rp 825.00
Rp 57,000.00 Rp 855.00
Jumlah Rp 28,983.00
Rp 1,500.00 Rp 5,184.00
Rp 77,000.00 Rp 2,233.00
Rp 37,000.00 Rp 11,100.00
Rp 50,000.00 Rp 7,500.00
Rp 55,000.00 Rp 825.00
Rp 57,000.00 Rp 855.00
Jumlah Rp 27,697.00
Rp 1,500.00 Rp 4,500.00
Rp 77,000.00 Rp 1,540.00
Rp 300,000.00 Rp 1,500.00
Rp 37,000.00 Rp 13,320.00
HARGA SATUAN JUMLAH HARGA
Rp 50,000.00 Rp 6,000.00
Rp 55,000.00 Rp 660.00
Rp 57,000.00 Rp 1,026.00
Jumlah Rp 28,546.00
Rp 1,500.00 Rp 7,776.00
Rp 77,000.00 Rp 2,002.00
Rp 37,000.00 Rp 5,550.00
Rp 50,000.00 Rp 3,750.00
Rp 55,000.00 Rp 440.00
Rp 57,000.00 Rp 456.00
Jumlah Rp 19,974.00
Rp 1,500.00 Rp 750.00
Rp 77,000.00 Rp 1,001.00
Rp 37,000.00 Rp 2,960.00
Rp 50,000.00 Rp 2,000.00
Rp 55,000.00 Rp 2,200.00
Rp 57,000.00 Rp 228.00
Jumlah Rp 9,139.00
Rp 1,500.00 Rp 4,662.00
Rp 37,000.00 Rp 5,550.00
Rp 50,000.00 Rp 3,750.00
Rp 55,000.00 Rp 440.00
Rp 57,000.00 Rp 456.00
Jumlah Rp 14,858.00
Rp 1,500.00 Rp 9,510.00
Rp 77,000.00 Rp 9,240.00
Rp 37,000.00 Rp 11,100.00
Rp 50,000.00 Rp 7,500.00
Rp 55,000.00 Rp 825.00
Rp 57,000.00 Rp 855.00
Jumlah Rp 39,030.00
Rp 1,500.00 Rp 4,875.00
Rp 37,000.00 Rp 7,400.00
Rp 50,000.00 Rp 5,000.00
Rp 55,000.00 Rp 550.00
Rp 57,000.00 Rp 570.00
Jumlah Rp 18,395.00
HARGA SATUAN JUMLAH HARGA
Rp 1,500.00 Rp 345,000.00
Rp 77,000.00 Rp 49,115.00
Rp 144,000.00 Rp 105,634.29
Rp 25.00 Rp 5,000.00
Rp 37,000.00 Rp 44,400.00
Rp 50,000.00 Rp 10,000.00
Rp 55,000.00 Rp 1,100.00
Rp 57,000.00 Rp 3,420.00
Jumlah Rp 563,669.29
Rp 1,500.00 Rp 489,000.00
Rp 77,000.00 Rp 41,800.00
Rp 144,000.00 Rp 105,840.00
Rp 25.00 Rp 5,375.00
Rp 37,000.00 Rp 61,050.00
Rp 50,000.00 Rp 13,750.00
Rp 55,000.00 Rp 1,540.00
Rp 57,000.00 Rp 4,731.00
Jumlah Rp 723,086.00
HARGA SATUAN JUMLAH HARGA
Rp 1,500.00 Rp 528,000.00
Rp 77,000.00 Rp 38,390.00
Rp 144,000.00 Rp 107,691.43
Rp 25.00 Rp 5,375.00
Rp 37,000.00 Rp 61,050.00
Rp 50,000.00 Rp 13,750.00
Rp 55,000.00 Rp 1,540.00
Rp 57,000.00 Rp 4,731.00
Jumlah Rp 760,527.43
Rp 1,500.00 Rp 609,000.00
Rp 77,000.00 Rp 37,620.00
Rp 144,000.00 Rp 105,531.43
Rp 25.00 Rp 5,375.00
Rp 37,000.00 Rp 61,050.00
Rp 50,000.00 Rp 13,750.00
Rp 55,000.00 Rp 1,540.00
Rp 57,000.00 Rp 4,731.00
Jumlah Rp 838,597.43
Rp 13,700.00 Rp 143,850.00
Rp 18,700.00 Rp 2,805.00
Rp 37,000.00 Rp 2,590.00
Rp 50,000.00 Rp 3,500.00
Rp 55,000.00 Rp 385.00
Rp 57,000.00 Rp 228.00
Jumlah Rp 153,358.00
Jumlah Per Kg Rp 15,335.80
Rp 15,600.00 Rp 159,120.00
Rp 18,700.00 Rp 935.00
Rp 37,000.00 Rp 925.00
Rp 50,000.00 Rp 1,250.00
Rp 55,000.00 Rp 1,375.00
Rp 57,000.00 Rp 57.00
Jumlah Rp 163,662.00
Jumlah Per Kg Rp 16,366.20
Rp 2,187,500.00 Rp 87,500.00
Rp 15,000.00 Rp 4,500.00
Rp 30,000.00 Rp 3,000.00
Rp 37,000.00 Rp 19,240.00
HARGA SATUAN JUMLAH HARGA
Rp 53,000.00 Rp 13,780.00
Rp 55,000.00 Rp 1,430.00
Rp 57,000.00 Rp 1,482.00
Jumlah Rp 130,932.00
Rp 2,187,500.00 Rp 32,812.50
Rp 15,000.00 Rp 4,500.00
Rp 30,000.00 Rp 3,000.00
Rp 37,000.00 Rp 19,240.00
Rp 53,000.00 Rp 13,780.00
Rp 55,000.00 Rp 1,430.00
Rp 57,000.00 Rp 1,482.00
Jumlah Rp 76,244.50
Rp 2,187,500.00 Rp 61,906.25
Rp 15,000.00 Rp 6,000.00
Rp 30,000.00 Rp 6,000.00
Rp 31,000.00 Rp 15,500.00
Rp 37,000.00 Rp 24,420.00
Rp 53,000.00 Rp 17,490.00
Rp 55,000.00 Rp 1,815.00
Rp 57,000.00 Rp 1,881.00
Jumlah Rp 135,012.25
Rp 2,187,500.00 Rp 192,500.00
Rp 15,000.00 Rp 6,000.00
Rp 30,000.00 Rp 6,000.00
Rp 31,000.00 Rp 62,000.00
Rp 37,000.00 Rp 24,420.00
Rp 53,000.00 Rp 17,490.00
Rp 55,000.00 Rp 1,815.00
Rp 57,000.00 Rp 1,881.00
Jumlah Rp 312,106.00
Rp 2,187,500.00 Rp 185,937.50
Rp 15,000.00 Rp 6,000.00
Rp 30,000.00 Rp 6,000.00
Rp 31,000.00 Rp 186,000.00
Rp 37,000.00 Rp 24,420.00
Rp 53,000.00 Rp 17,490.00
Rp 55,000.00 Rp 1,815.00
Rp 57,000.00 Rp 1,881.00
Jumlah Rp 429,543.50
Rp 2,187,500.00 Rp 175,000.00
HARGA SATUAN JUMLAH HARGA
Rp 15,000.00 Rp 6,000.00
Rp 30,000.00 Rp 6,000.00
Rp 31,000.00 Rp 217,000.00
Rp 37,000.00 Rp 24,420.00
Rp 53,000.00 Rp 17,490.00
Rp 55,000.00 Rp 1,815.00
Rp 57,000.00 Rp 1,881.00
Jumlah Rp 449,606.00
Rp 2,187,500.00 Rp 164,062.50
Rp 15,000.00 Rp 6,000.00
Rp 30,000.00 Rp 4,500.00
Rp 31,000.00 Rp 62,000.00
Rp 37,000.00 Rp 24,420.00
Rp 53,000.00 Rp 17,490.00
Rp 55,000.00 Rp 1,815.00
Rp 57,000.00 Rp 1,881.00
Jumlah Rp 282,168.50
Rp 2,187,500.00 Rp 57,750.00
Rp 15,000.00 Rp 9,000.00
Rp 31,000.00 Rp 15,500.00
Rp 37,000.00 Rp 5,550.00
Rp 53,000.00 Rp 2,650.00
Rp 55,000.00 Rp 275.00
Rp 57,000.00 Rp 456.00
Jumlah Rp 91,181.00
Rp 760,527.43 Rp 760,527.43
Rp 15,335.80 Rp 2,152,388.82
Jumlah Rp 2,912,916.25
Rp 760,527.43 Rp 760,527.43
Rp 15,335.80 Rp 2,511,361.24
Jumlah Rp 3,271,888.67
Rp 760,527.43 Rp 760,527.43
Rp 76,244.50 Rp 1,270,741.67
Rp 15,335.80 Rp 4,790,290.49
Jumlah Rp 6,821,559.58
HARGA SATUAN JUMLAH HARGA
Rp 760,527.43 Rp 760,527.43
Rp 76,244.50 Rp 1,270,741.67
Rp 15,335.80 Rp 4,790,290.49
Jumlah Rp 6,821,559.58
Rp 760,527.43 Rp 760,527.43
Rp 76,244.50 Rp 762,445.00
Rp 15,335.80 Rp 1,940,067.65
Jumlah Rp 3,463,040.08
Rp 760,527.43 Rp 760,527.43
Rp 135,012.25 Rp 1,687,653.13
Rp 15,335.80 Rp 2,883,628.81
Jumlah Rp 5,331,809.37
Rp 760,527.43 Rp 760,527.43
Rp 135,012.25 Rp 1,350,122.50
Rp 15,335.80 Rp 3,176,718.96
Jumlah Rp 5,287,368.88
Rp 760,527.43 Rp 760,527.43
Rp 135,012.25 Rp 1,800,163.33
Rp 15,335.80 Rp 2,554,821.59
Jumlah Rp 5,115,512.36
Rp 760,527.43 Rp 760,527.43
Rp 312,106.00 Rp 5,721,943.33
Rp 15,335.80 Rp 3,664,152.02
Jumlah Rp 10,146,622.78
Rp 760,527.43 Rp 760,527.43
Rp 312,106.00 Rp 4,012,791.43
Rp 15,335.80 Rp 1,912,514.47
Jumlah Rp 6,685,833.33
Rp 760,527.43 Rp 760,527.43
Rp 429,543.50 Rp 3,579,529.17
Rp 15,335.80 Rp 1,662,886.31
HARGA SATUAN JUMLAH HARGA
Jumlah Rp 6,002,942.91
Rp 760,527.43 Rp 760,527.43
Rp 429,543.50 Rp 4,295,435.00
Rp 15,335.80 Rp 674,674.60
Jumlah Rp 5,730,637.03
Rp 760,527.43 Rp 760,527.43
Rp 429,543.50 Rp 5,369,293.75
Rp 15,335.80 Rp 855,949.27
Jumlah Rp 6,985,770.45
Rp 760,527.43 Rp 760,527.43
Rp 429,543.50 Rp 6,136,335.71
Rp 15,335.80 Rp 943,593.58
Jumlah Rp 7,840,456.72
Rp 760,527.43 Rp 760,527.43
Rp 429,543.50 Rp 8,590,870.00
Rp 15,335.80 Rp 1,326,784.40
Jumlah Rp 10,678,181.83
Rp 760,527.43 Rp 760,527.43
Rp 243,543.50 Rp 649,449.33
Rp 15,335.80 Rp 2,128,401.70
Jumlah Rp 3,538,378.46
Rp 760,527.43 Rp 760,527.43
Rp 243,543.50 Rp 974,174.00
Rp 15,335.80 Rp 2,930,901.42
Jumlah Rp 4,665,602.85
Rp 760,527.43 Rp 760,527.43
Rp 243,543.50 Rp 1,217,717.50
Rp 15,335.80 Rp 1,283,923.91
HARGA SATUAN JUMLAH HARGA
Jumlah Rp 3,262,168.84
HARGA SATUAN JUMLAH HARGA
Rp 14,318.56 Rp 16,466.34
Rp 37,000.00 Rp 2,220.00
Rp 50,000.00 Rp 3,000.00
Rp 55,000.00 Rp 330.00
Rp 57,000.00 Rp 171.00
Jumlah Rp 22,187.34
Rp 14,300.00 Rp 16,445.00
Rp 37,000.00 Rp 2,220.00
Rp 50,000.00 Rp 3,000.00
Rp 55,000.00 Rp 330.00
Rp 57,000.00 Rp 171.00
Jumlah Rp 22,166.00
Rp 13,752.11 Rp 15,814.92
Rp 37,000.00 Rp 2,220.00
Rp 50,000.00 Rp 3,000.00
Rp 55,000.00 Rp 330.00
Rp 57,000.00 Rp 171.00
Jumlah Rp 21,535.92
Rp 4,500.00 Rp 4,500.00
Rp 30,000.00 Rp 3,000.00
Rp 37,000.00 Rp 3,700.00
Rp 50,000.00 Rp 5,000.00
Rp 55,000.00 Rp 55.00
Rp 57,000.00 Rp 285.00
Rp 250,000.00 Rp 200,000.00
Jumlah Rp 216,540.00
Jumlah Per Kg Rp 2,165.40
Rp 14,254.85 Rp 213,822.75
Rp 12,500.00 Rp 410,000.00
Rp 18,700.00 Rp 935.00
Rp 37,000.00 Rp 38,850.00
Rp 50,000.00 Rp 52,500.00
Rp 55,000.00 Rp 5,775.00
Rp 57,000.00 Rp 2,964.00
Jumlah Rp 724,846.75
Rp 18,700.00 Rp 7,480.00
HARGA SATUAN JUMLAH HARGA
Rp 4,500.00 Rp 1,350.00
Rp 30,000.00 Rp 1,200.00
Rp 37,000.00 Rp 1,480.00
Rp 50,000.00 Rp 1,000.00
Rp 55,000.00 Rp 110.00
Rp 57,000.00 Rp 114.00
Rp 376,600.00 Rp 64,022.00
Jumlah Rp 76,756.00
Jumlah Per cm Rp 7,675.60
Rp 33,000.00 Rp 132,235.71
Rp 19,000.00 Rp 29,857.13
Rp 243,000.00 Rp 267,300.00
Rp 18,700.00 Rp 935.00
Rp 37,000.00 Rp 38,850.00
Rp 50,000.00 Rp 52,500.00
Rp 55,000.00 Rp 5,775.00
Rp 57,000.00 Rp 2,964.00
Jumlah Rp 530,416.84
Rp 84,000.00 Rp 92,400.00
Rp 37,000.00 Rp 1,591.00
Rp 50,000.00 Rp 2,150.00
Rp 55,000.00 Rp 236.50
Rp 57,000.00 Rp 119.70
Jumlah Rp 96,497.20
Rp 20,454.55 Rp 90,000.00
Rp 20,666.67 Rp 93,000.00
Rp 37,000.00 Rp 3,145.00
Rp 50,000.00 Rp 4,250.00
Rp 55,000.00 Rp 495.00
Rp 57,000.00 Rp 285.00
Jumlah Rp 191,175.00
Rp 28,409.09 Rp 125,000.00
Rp 20,666.67 Rp 93,000.00
Rp 37,000.00 Rp 3,145.00
Rp 50,000.00 Rp 4,250.00
Rp 55,000.00 Rp 495.00
Rp 57,000.00 Rp 285.00
Jumlah Rp 226,175.00
HARGA SATUAN JUMLAH HARGA
Rp 10,312,500.00 Rp 12,375,000.00
Rp 15,000.00 Rp 18,750.00
Rp 12,000.00 Rp 12,000.00
Rp 37,000.00 Rp 222,000.00
Rp 53,000.00 Rp 954,000.00
Rp 55,000.00 Rp 99,000.00
Rp 57,000.00 Rp 17,100.00
Jumlah Rp 13,697,850.00
Rp 10,937,500.00 Rp 437,500.00
Rp 12,000.00 Rp 6,000.00
Rp 37,000.00 Rp 37,000.00
Rp 53,000.00 Rp 159,000.00
Rp 55,000.00 Rp 16,500.00
Rp 57,000.00 Rp 2,850.00
Jumlah Rp 658,850.00
Rp 10,937,500.00 Rp 262,500.00
Rp 12,000.00 Rp 3,600.00
Rp 37,000.00 Rp 29,600.00
Rp 53,000.00 Rp 127,200.00
Rp 55,000.00 Rp 13,200.00
Rp 57,000.00 Rp 2,280.00
Jumlah Rp 438,380.00
Rp 10,937,500.00 Rp 700,000.00
Rp 12,000.00 Rp 6,000.00
Rp 37,000.00 Rp 37,000.00
Rp 53,000.00 Rp 159,000.00
Rp 55,000.00 Rp 16,500.00
Rp 57,000.00 Rp 2,850.00
Jumlah Rp 921,350.00
Rp 10,312,500.00 Rp 264,000.00
Rp 15,000.00 Rp 450.00
Rp 12,000.00 Rp 6,000.00
Rp 14,254.85 Rp 14,254.85
Rp 37,000.00 Rp 29,600.00
Rp 53,000.00 Rp 127,200.00
Rp 55,000.00 Rp 13,200.00
Rp 57,000.00 Rp 2,280.00
Jumlah Rp 456,984.85
Rp 10,312,500.00 Rp 264,000.00
Rp 15,000.00 Rp 450.00
HARGA SATUAN JUMLAH HARGA
Rp 12,000.00 Rp 3,600.00
Rp 14,308.37 Rp 14,308.37
Rp 37,000.00 Rp 29,600.00
Rp 53,000.00 Rp 127,200.00
Rp 55,000.00 Rp 13,200.00
Rp 57,000.00 Rp 2,280.00
Jumlah Rp 454,638.37
Rp 6,875,000.00 Rp 7,562,500.00
Rp 17,000.00 Rp 255,000.00
Rp 15,000.00 Rp 84,000.00
Rp 37,000.00 Rp 148,000.00
Rp 53,000.00 Rp 636,000.00
Rp 55,000.00 Rp 66,000.00
Rp 57,000.00 Rp 11,400.00
Jumlah Rp 8,762,900.00
Rp 6,875,000.00 Rp 7,562,500.00
Rp 17,000.00 Rp 255,000.00
Rp 15,000.00 Rp 45,000.00
Rp 37,000.00 Rp 88,800.00
Rp 53,000.00 Rp 381,600.00
Rp 55,000.00 Rp 39,600.00
Rp 57,000.00 Rp 6,840.00
Jumlah Rp 8,379,340.00
Rp 8,125,000.00 Rp 113,750.00
Rp 8,125,000.00 Rp 29,250.00
Rp 15,000.00 Rp 3,750.00
Rp 37,000.00 Rp 3,700.00
Rp 53,000.00 Rp 5,300.00
Rp 55,000.00 Rp 550.00
Rp 57,000.00 Rp 285.00
Jumlah Rp 156,585.00
Rp 4,375,000.00 Rp 61,250.00
Rp 4,375,000.00 Rp 39,375.00
Rp 15,000.00 Rp 3,750.00
Rp 37,000.00 Rp 3,700.00
Rp 53,000.00 Rp 5,300.00
Rp 55,000.00 Rp 550.00
Rp 57,000.00 Rp 285.00
Jumlah Rp 114,210.00
Rp 8,125,000.00 Rp 48,750.00
HARGA SATUAN JUMLAH HARGA
Rp 15,000.00 Rp 3,750.00
Rp 37,000.00 Rp 3,700.00
Rp 53,000.00 Rp 5,300.00
Rp 55,000.00 Rp 550.00
Rp 57,000.00 Rp 285.00
Jumlah Rp 62,335.00
Rp 4,375,000.00 Rp 68,906.25
Rp 15,000.00 Rp 3,000.00
Rp 37,000.00 Rp 5,550.00
Rp 53,000.00 Rp 15,900.00
Rp 55,000.00 Rp 1,650.00
Rp 57,000.00 Rp 4,275.00
Jumlah Rp 99,281.25
Rp 10,937,500.00 Rp 120,312.50
Rp 15,000.00 Rp 750.00
Rp 37,000.00 Rp 3,700.00
Rp 53,000.00 Rp 10,600.00
Rp 55,000.00 Rp 1,100.00
Rp 57,000.00 Rp 285.00
Jumlah Rp 136,747.50
Rp 6,300,000.00 Rp 47,250.00
Rp 15,000.00 Rp 750.00
Rp 37,000.00 Rp 3,700.00
Rp 53,000.00 Rp 10,600.00
Rp 55,000.00 Rp 1,100.00
Rp 57,000.00 Rp 285.00
Jumlah Rp 63,685.00
Rp 2,187,500.00 Rp 10,500.00
Rp 15,000.00 Rp 750.00
Rp 37,000.00 Rp 3,700.00
Rp 53,000.00 Rp 10,600.00
Rp 55,000.00 Rp 1,100.00
Rp 57,000.00 Rp 285.00
Jumlah Rp 26,935.00
Rp 28,100.00 Rp 29,505.00
Rp 15,000.00 Rp 225.00
Rp 2,187,500.00 Rp 41,562.50
Rp 37,000.00 Rp 7,400.00
Rp 53,000.00 Rp 21,200.00
Rp 55,000.00 Rp 1,375.00
HARGA SATUAN JUMLAH HARGA
Rp 57,000.00 Rp 570.00
Jumlah Rp 101,837.50
Rp 8,125,000.00 Rp 227,500.00
Rp 15,000.00 Rp 2,250.00
Rp 78,000.00 Rp 67,080.00
Rp 12,000.00 Rp 6,720.00
Rp 37,000.00 Rp 5,550.00
Rp 53,000.00 Rp 23,850.00
Rp 55,000.00 Rp 2,475.00
Rp 57,000.00 Rp 456.00
Jumlah Rp 335,881.00
Rp 37,000.00 Rp 5,550.00
Rp 50,000.00 Rp 3,750.00
Rp 55,000.00 Rp 440.00
Rp 57,000.00 Rp 456.00
Jumlah Rp 10,196.00
Rp 1,500.00 Rp 12,000.00
Rp 77,000.00 Rp 2,464.00
Rp 37,000.00 Rp 14,800.00
Rp 50,000.00 Rp 10,000.00
Rp 55,000.00 Rp 1,100.00
Rp 57,000.00 Rp 114.00
Jumlah Rp 40,478.00
Rp 2,400.00 Rp 60,000.00
Rp 37,000.00 Rp 5,550.00
Rp 50,000.00 Rp 3,750.00
Rp 55,000.00 Rp 440.00
Rp 57,000.00 Rp 456.00
Jumlah Rp 70,196.00
Rp 6,800.00 Rp 34,000.00
Rp 1,500.00 Rp 12,000.00
Rp 77,000.00 Rp 2,464.00
Rp 37,000.00 Rp 14,800.00
Rp 50,000.00 Rp 10,000.00
Rp 55,000.00 Rp 1,100.00
Rp 57,000.00 Rp 114.00
Jumlah Rp 74,478.00
Rp 3,700.00 Rp 40,700.00
HARGA SATUAN JUMLAH HARGA
Rp 15,000.00 Rp 450.00
Rp 37,000.00 Rp 7,400.00
Rp 50,000.00 Rp 5,000.00
Rp 55,000.00 Rp 550.00
Rp 57,000.00 Rp 570.00
Jumlah Rp 54,670.00
Rp 4,200.00 Rp 14,700.00
Rp 15,000.00 Rp 750.00
Rp 1,500.00 Rp 16,200.00
Rp 77,000.00 Rp 2,464.00
Rp 2,250.00 Rp 2,250.00
Rp 37,000.00 Rp 14,800.00
Rp 50,000.00 Rp 10,000.00
Rp 55,000.00 Rp 1,100.00
Rp 57,000.00 Rp 1,140.00
Jumlah Rp 63,404.00
Rp 243,000.00 Rp 145,800.00
Rp 15,000.00 Rp 750.00
Rp 37,000.00 Rp 5,180.00
Rp 50,000.00 Rp 3,350.00
Rp 55,000.00 Rp 385.00
Rp 57,000.00 Rp 399.00
Jumlah Rp 155,864.00
Rp 78,000.00 Rp 58,500.00
Rp 15,000.00 Rp 1,800.00
Rp 37,000.00 Rp 5,180.00
Rp 50,000.00 Rp 3,500.00
Rp 55,000.00 Rp 385.00
Rp 57,000.00 Rp 399.00
Jumlah Rp 69,764.00
Rp 30,000.00 Rp 72,000.00
Rp 1,200.00 Rp 7,200.00
Rp 37,000.00 Rp 3,108.00
Rp 50,000.00 Rp 6,250.00
Rp 55,000.00 Rp 715.00
Rp 57,000.00 Rp 228.00
Jumlah Rp 89,501.00
Rp 125,000.00 Rp 87,500.00
Rp 15,000.00 Rp 300.00
Rp 37,000.00 Rp 4,440.00
HARGA SATUAN JUMLAH HARGA
Rp 50,000.00 Rp 3,000.00
Rp 55,000.00 Rp 330.00
Rp 57,000.00 Rp 342.00
Jumlah Rp 95,912.00
Rp 30,000.00 Rp 72,000.00
Rp 1,200.00 Rp 7,200.00
Rp 37,000.00 Rp 3,108.00
Rp 50,000.00 Rp 6,250.00
Rp 55,000.00 Rp 715.00
Rp 57,000.00 Rp 228.00
Jumlah Rp 89,501.00
Rp 6,000.00 Rp 6,120.00
Rp 8,100.00 Rp 1,620.00
Rp 37,000.00 Rp 7,400.00
Rp 50,000.00 Rp 5,000.00
Rp 55,000.00 Rp 550.00
Rp 57,000.00 Rp 57.00
Jumlah Rp 20,747.00
Rp 37,800.00 Rp 41,580.00
Rp 8,100.00 Rp 405.00
Rp 37,000.00 Rp 9,250.00
Rp 50,000.00 Rp 7,500.00
Rp 55,000.00 Rp 825.00
Rp 57,000.00 Rp 741.00
Jumlah Rp 60,301.00
Rp 24,800.00 Rp 24,800.00
Rp 1,500.00 Rp 15,600.00
Rp 77,000.00 Rp 3,465.00
Rp 37,000.00 Rp 9,990.00
Rp 50,000.00 Rp 6,750.00
Rp 55,000.00 Rp 770.00
Rp 57,000.00 Rp 798.00
Jumlah Rp 62,173.00
Rp 54,000.00 Rp 54,000.00
Rp 1,500.00 Rp 15,000.00
Rp 77,000.00 Rp 3,465.00
Rp 2,250.00 Rp 3,375.00
Rp 37,000.00 Rp 25,900.00
Rp 50,000.00 Rp 17,500.00
HARGA SATUAN JUMLAH HARGA
Rp 55,000.00 Rp 1,925.00
Rp 57,000.00 Rp 1,995.00
Jumlah Rp 123,160.00
Rp 37,800.00 Rp 37,800.00
Rp 1,500.00 Rp 15,000.00
Rp 77,000.00 Rp 3,465.00
Rp 2,250.00 Rp 3,375.00
Rp 37,000.00 Rp 33,300.00
Rp 50,000.00 Rp 22,500.00
Rp 55,000.00 Rp 2,475.00
Rp 57,000.00 Rp 2,565.00
Jumlah Rp 120,480.00
Rp 48,000.00 Rp 48,000.00
Rp 1,500.00 Rp 15,000.00
Rp 77,000.00 Rp 3,465.00
Rp 2,250.00 Rp 3,375.00
Rp 37,000.00 Rp 25,900.00
Rp 50,000.00 Rp 17,500.00
Rp 55,000.00 Rp 1,925.00
Rp 57,000.00 Rp 1,995.00
Jumlah Rp 117,160.00
Rp 45,000.00 Rp 45,000.00
Rp 1,500.00 Rp 13,950.00
Rp 77,000.00 Rp 1,386.00
Rp 2,250.00 Rp 4,365.00
Rp 37,000.00 Rp 33,300.00
Rp 50,000.00 Rp 22,500.00
Rp 55,000.00 Rp 2,475.00
Rp 57,000.00 Rp 2,565.00
Jumlah Rp 125,541.00
Rp 84,600.00 Rp 93,060.00
Rp 1,500.00 Rp 17,625.00
Rp 77,000.00 Rp 2,695.00
Rp 37,000.00 Rp 25,900.00
Rp 50,000.00 Rp 17,500.00
Rp 55,000.00 Rp 1,925.00
Rp 57,000.00 Rp 1,995.00
Jumlah Rp 160,700.00
Rp 60,600.00 Rp 66,660.00
Rp 1,500.00 Rp 17,625.00
HARGA SATUAN JUMLAH HARGA
Rp 77,000.00 Rp 2,695.00
Rp 37,000.00 Rp 25,900.00
Rp 50,000.00 Rp 17,500.00
Rp 55,000.00 Rp 1,925.00
Rp 57,000.00 Rp 1,995.00
Jumlah Rp 134,300.00
Rp 1,200.00 Rp 66,000.00
Rp 1,500.00 Rp 17,625.00
Rp 77,000.00 Rp 2,695.00
Rp 37,000.00 Rp 25,900.00
Rp 50,000.00 Rp 17,500.00
Rp 55,000.00 Rp 1,925.00
Rp 57,000.00 Rp 1,995.00
Jumlah Rp 133,640.00
Rp 50,400.00 Rp 60,480.00
Rp 73,000.00 Rp 7,300.00
Rp 37,000.00 Rp 18,500.00
Rp 50,000.00 Rp 12,500.00
Rp 55,000.00 Rp 1,375.00
Rp 57,000.00 Rp 1,425.00
Jumlah Rp 101,580.00
Rp 45,000.00 Rp 54,000.00
Rp 73,000.00 Rp 7,300.00
Rp 37,000.00 Rp 18,500.00
Rp 50,000.00 Rp 12,500.00
Rp 55,000.00 Rp 1,375.00
Rp 57,000.00 Rp 1,425.00
Jumlah Rp 95,100.00
Rp 21,600.00 Rp 43,200.00
Rp 73,000.00 Rp 547.50
Rp 37,000.00 Rp 12,950.00
Rp 50,000.00 Rp 8,750.00
Rp 55,000.00 Rp 962.50
Rp 57,000.00 Rp 997.50
Jumlah Rp 67,407.50
Rp 15,600.00 Rp 31,200.00
Rp 73,000.00 Rp 547.50
Rp 37,000.00 Rp 12,950.00
Rp 50,000.00 Rp 8,750.00
Rp 55,000.00 Rp 962.50
HARGA SATUAN JUMLAH HARGA
Rp 57,000.00 Rp 997.50
Jumlah Rp 55,407.50
Rp 11,400.00 Rp 12,540.00
Rp 18,700.00 Rp 187.00
Rp 37,000.00 Rp 1,110.00
Rp 53,000.00 Rp 3,710.00
Rp 55,000.00 Rp 385.00
Rp 57,000.00 Rp 228.00
Jumlah Rp 18,160.00
Rp 66,000.00 Rp 66,000.00
Rp 15,000.00 Rp 1,650.00
Rp 37,000.00 Rp 1,110.00
Rp 53,000.00 Rp 3,710.00
Rp 55,000.00 Rp 385.00
Rp 57,000.00 Rp 228.00
Jumlah Rp 73,083.00
Rp 4,200.00 Rp 4,410.00
Rp 8,100.00 Rp 81.00
Rp 37,000.00 Rp 1,850.00
Rp 53,000.00 Rp 2,650.00
Rp 55,000.00 Rp 275.00
Rp 57,000.00 Rp 171.00
Jumlah Rp 9,437.00
Rp 14,350.47 Rp 15,068.00
Rp 8,100.00 Rp 81.00
Rp 37,000.00 Rp 1,850.00
Rp 53,000.00 Rp 2,650.00
Rp 55,000.00 Rp 275.00
Rp 57,000.00 Rp 171.00
Jumlah Rp 20,095.00
Rp 69,000.00 Rp 69,000.00
Rp 37,000.00 Rp 370.00
Rp 53,000.00 Rp 26,500.00
Rp 55,000.00 Rp 550.00
Rp 57,000.00 Rp 285.00
Jumlah Rp 96,705.00
HARGA SATUAN JUMLAH HARGA
Rp 34,500.00 Rp 34,500.00
Rp 37,000.00 Rp 555.00
Rp 53,000.00 Rp 7,950.00
Rp 55,000.00 Rp 825.00
Rp 57,000.00 Rp 42.75
Jumlah Rp 43,872.75
Rp 23,000.00 Rp 23,000.00
Rp 37,000.00 Rp 370.00
Rp 53,000.00 Rp 5,300.00
Rp 55,000.00 Rp 550.00
Rp 57,000.00 Rp 28.50
Jumlah Rp 29,248.50
Rp 40,000.00 Rp 40,000.00
Rp 37,000.00 Rp 370.00
Rp 53,000.00 Rp 5,300.00
Rp 55,000.00 Rp 550.00
Rp 57,000.00 Rp 28.50
Jumlah Rp 46,248.50
Rp 46,000.00 Rp 46,000.00
Rp 37,000.00 Rp 555.00
Rp 53,000.00 Rp 7,950.00
Rp 55,000.00 Rp 825.00
Rp 57,000.00 Rp 42.75
Jumlah Rp 55,372.75
Rp 75,000.00 Rp 82,500.00
Rp 37,000.00 Rp 555.00
Rp 53,000.00 Rp 7,950.00
Rp 55,000.00 Rp 825.00
Rp 57,000.00 Rp 42.75
Jumlah Rp 91,872.75
Rp 16,200.00 Rp 1,620.00
Rp 24,000.00 Rp 8,640.00
Rp 37,000.00 Rp 740.00
Rp 45,000.00 Rp 2,835.00
Rp 55,000.00 Rp 346.50
Rp 57,000.00 Rp 142.50
Jumlah Rp 14,324.00
Rp 24,000.00 Rp 7,200.00
HARGA SATUAN JUMLAH HARGA
Rp 37,000.00 Rp 1,036.00
Rp 45,000.00 Rp 1,890.00
Rp 55,000.00 Rp 231.00
Rp 57,000.00 Rp 142.50
Jumlah Rp 10,499.50
Rp 64,800.00 Rp 27,864.00
Rp 22,800.00 Rp 4,560.00
Rp 22,200.00 Rp 3,330.00
Rp 37,000.00 Rp 2,590.00
Rp 45,000.00 Rp 405.00
Rp 55,000.00 Rp 330.00
Rp 57,000.00 Rp 142.50
Jumlah Rp 39,221.50
Rp 33,000.00 Rp 15,180.00
Rp 37,000.00 Rp 740.00
Rp 45,000.00 Rp 2,835.00
Rp 55,000.00 Rp 346.50
Rp 57,000.00 Rp 142.50
Jumlah Rp 19,244.00
Rp 64,800.00 Rp 22,032.00
Rp 22,200.00 Rp 3,330.00
Rp 37,000.00 Rp 2,590.00
Rp 45,000.00 Rp 3,375.00
Rp 55,000.00 Rp 412.50
Rp 57,000.00 Rp 142.50
Jumlah Rp 31,882.00
Rp 42,000.00 Rp 4,200.00
Rp 15,000.00 Rp 150.00
Rp 37,000.00 Rp 740.00
Rp 45,000.00 Rp 9,000.00
Rp 55,000.00 Rp 1,100.00
Rp 57,000.00 Rp 570.00
Jumlah Rp 15,760.00
Rp 5,600.00 Rp 84,000.00
Rp 53,000.00 Rp 39,750.00
HARGA SATUAN JUMLAH HARGA
Jumlah Rp 123,750.00
Rp 75,000.00 Rp 75,000.00
Jumlah Rp 75,000.00
Rp 5,000.00 Rp 5,000.00
Jumlah Rp 5,000.00
Rp 33,100.00 Rp 33,100.00
Jumlah Rp 33,100.00
Rp 15,000.00 Rp 15,000.00
Jumlah Rp 15,000.00
Rp 18,700.00 Rp 18,700.00
Jumlah Rp 18,700.00
Rp 15,600.00 Rp 15,600.00
Jumlah Rp 15,600.00
Rp 9,800.00 Rp 9,800.00
Jumlah Rp 9,800.00
Rp 37,000.00 Rp 246,679.00
Rp 57,000.00 Rp 18,981.00
Jumlah Rp 265,660.00
Rp 37,000.00 Rp 246,679.00
Rp 57,000.00 Rp 1,881.00
Jumlah Rp 248,560.00
Rp 37,000.00 Rp 18,500.00
Rp 57,000.00 Rp 2,850.00
Jumlah Rp 21,350.00
Rp 37,000.00 Rp 3,700.00
Rp 57,000.00 Rp 570.00
Jumlah Rp 4,270.00
Rp 37,000.00 Rp 7,400.00
Rp 53,000.00 Rp 5,300.00
Rp 55,000.00 Rp 550.00
Rp 57,000.00 Rp 1,140.00
Jumlah Rp 14,390.00
HARGA SATUAN JUMLAH HARGA
Rp 37,000.00 Rp 5,550.00
Rp 53,000.00 Rp 3,975.00
Rp 55,000.00 Rp 412.50
Rp 57,000.00 Rp 855.00
Jumlah Rp 10,792.50
HARGA SATUAN JUMLAH HARGA
Rp 37,000.00 Rp 148,000.00
Rp 53,000.00 Rp 318,000.00
Rp 55,000.00 Rp 33,000.00
Rp 57,000.00 Rp 22,800.00
Jumlah Rp 521,800.00
Rp 37,000.00 Rp 148,000.00
Rp 53,000.00 Rp 159,000.00
Rp 57,000.00 Rp 11,400.00
Jumlah Rp 318,400.00
Rp 37,000.00 Rp 3,700.00
Rp 53,000.00 Rp 15,900.00
Rp 55,000.00 Rp 1,650.00
Rp 57,000.00 Rp 570.00
Jumlah Rp 21,820.00
Rp 37,000.00 Rp 5,550.00
Rp 57,000.00 Rp 855.00
Jumlah Rp 6,405.00
Rp 14,245.01 Rp 15,669.52
Rp 192,000.00 Rp 3,840,000.00
Rp 187,000.00 Rp 733,040.00
Rp 77,000.00 Rp 4,312.00
Rp 73,000.00 Rp 1,752.00
Rp 37,000.00 Rp 5,180.00
Rp 50,000.00 Rp 3,500.00
Rp 55,000.00 Rp 385.00
Rp 57,000.00 Rp 399.00
Jumlah Rp 4,604,237.52
Rp 198,200.00 Rp 39,640.00
Rp 13,874.00 Rp 13,874.00
Rp 37,000.00 Rp 1,998.00
Rp 50,000.00 Rp 4,500.00
Rp 55,000.00 Rp 495.00
Rp 57,000.00 Rp 1,539.00
HARGA SATUAN JUMLAH HARGA
Jumlah Rp 62,046.00
Rp 257,800.00 Rp 51,560.00
Rp 18,046.00 Rp 18,046.00
Rp 37,000.00 Rp 1,998.00
Rp 50,000.00 Rp 4,500.00
Rp 55,000.00 Rp 495.00
Rp 57,000.00 Rp 1,539.00
Jumlah Rp 78,138.00
Rp 408,700.00 Rp 81,740.00
Rp 28,609.00 Rp 28,609.00
Rp 37,000.00 Rp 3,996.00
Rp 50,000.00 Rp 9,000.00
Rp 55,000.00 Rp 990.00
Rp 57,000.00 Rp 307.80
Jumlah Rp 124,642.80
Rp 548,800.00 Rp 109,760.00
Rp 38,416.00 Rp 38,416.00
Rp 37,000.00 Rp 3,996.00
Rp 50,000.00 Rp 9,000.00
Rp 55,000.00 Rp 990.00
Rp 57,000.00 Rp 307.80
Jumlah Rp 162,469.80
HARGA SATUAN JUMLAH HARGA
Rp 888,200.00 Rp 177,640.00
Rp 62,174.00 Rp 62,174.00
Rp 37,000.00 Rp 3,996.00
Rp 50,000.00 Rp 9,000.00
Rp 55,000.00 Rp 990.00
Rp 57,000.00 Rp 307.80
Jumlah Rp 254,107.80
Rp 12,800.00 Rp 3,840.00
Rp 1,344.00 Rp 1,344.00
Rp 37,000.00 Rp 1,332.00
Rp 50,000.00 Rp 3,000.00
Rp 55,000.00 Rp 330.00
Rp 57,000.00 Rp 102.60
Jumlah Rp 9,948.60
Rp 18,325.00 Rp 5,497.50
Rp 1,924.13 Rp 1,924.13
Rp 37,000.00 Rp 1,998.00
Rp 50,000.00 Rp 4,500.00
Rp 55,000.00 Rp 495.00
Rp 57,000.00 Rp 1,539.00
Jumlah Rp 15,953.63
Rp 38,075.00 Rp 11,422.50
Rp 3,997.88 Rp 3,997.88
Rp 37,000.00 Rp 2,997.00
Rp 50,000.00 Rp 6,750.00
Rp 55,000.00 Rp 742.50
Rp 57,000.00 Rp 233.70
Jumlah Rp 26,143.58
Rp 31,200.00 Rp 31,200.00
Rp 37,000.00 Rp 370.00
Rp 50,000.00 Rp 5,000.00
Rp 55,000.00 Rp 550.00
Rp 57,000.00 Rp 285.00
Jumlah Rp 37,405.00
Rp 12,500.00 Rp 12,500.00
Rp 37,000.00 Rp 370.00
Rp 50,000.00 Rp 5,000.00
HARGA SATUAN JUMLAH HARGA
Rp 55,000.00 Rp 550.00
Rp 57,000.00 Rp 285.00
Jumlah Rp 18,705.00
Rp 29,175.00 Rp 63,737.31
Rp 99,270.00 Rp 21,858.51
Rp 97,800.00 Rp 195,600.00
Rp 510.00 Rp 283,560.00
Rp 3,262,168.84 Rp 247,885.69
Rp 257,800.00 Rp 193,350.00
Jumlah Rp 1,005,991.50
Rp 760,527.43 Rp 32,132.28
Rp 31,488.00 Rp 17,003.52
Jumlah Rp 49,135.80
PERHITUNGAN VOLUME
KEGIATAN PERKERASAN ALUN-ALUN SITUBONDO
PEKERJAAN PERKERASAN ALUN-ALUN SITUBONDO
LOKASI KECAMATAN SITUBONDO
KABUPATEN SITUBONDO
TAHUN ANGGARAN 2011
No URAIAN PEKERJAAN
I PEKERJAAN PERKERASAN
A PEKERJAAN PERSIAPAN
1 Pembuatan Papan Nama
2 Pengukuran / Uitzet
3 Pembersihan Lahan
B PEKERJAAN TANAH
1 Galian Tanah Biasa Kanstein
Pas. Antar Pot lama = 7.000 x 0.100 x 0.150
Pas. u/ Pot baru = 4.000 x 0.100 x 0.150 x 4.000
11.000
= 9.600 x 3.000
= 1.800 x 3.000
WASTAFEL
1 Galian Tanah = 0.300 x 0.300 x 0.500 x 3.000
Keramik 20x20
= 1.200 x 0.700 x 2.000 x 10.000
No URAIAN PEKERJAAN
= 0.600 x 0.700 x 2.000 x 10.000
Atas = 0.600 x 0.680 x 1.000 x 10.000
Lis = 1.640 x 0.150 x 1.000 x 10.000
= 0.380 x 0.300 x 1.000 x 10.000
= 1.360 x 0.200 x 1.000 x 10.000
Pembuatan Resapan
Angkur Pipa
Beton Ringan = 0.040 + 0.090 x 0.650
2
2 Plesteran
4 Benangan
a Bata Merah
No URAIAN PEKERJAAN
VI PEKERJAAN PENGECATAN
8.700
V PEKERJAAN SANITASI
Plesteran Luar =
Dalam = 1.200 x 0.300 x 2.000
Lantai = 0.300 x 0.300 x 2.000
1.000 Ls
1.000 Ls
50.000 M1
1.000 Ls
0.105
0.240
0.000
13.000
21.401
34.746 M3
34.746
34.746 M3
JUMLAH SAT
44.828 M3
10.082 M3
584.683
128.900
133.755
M2
829.928 M2
7.000 M'
16.000 M'
23.000 M'
2.760 M2
JUMLAH SAT
17.094 M3
1.553 M3
0.907 M3
1.800 M3
13.050 M2
2.760
2.760
5.520 M2
57.600
0.000
28.800
5.400
91.800 M'
7.680
2.160
9.840 M2
0.135 M3
0.027 M3
0.990 M2
JUMLAH SAT
2.520
2.520 M2
1.575 M3
0.630 M3
1.815 M3
6.480 M3
24.000
12.000
1.800
37.800 M2
0.000
0.000
0.000
0.000
0.000
0.000
0.000 M2
0.000
0.000
0.000
0.000 M'
16.800
JUMLAH SAT
8.400
4.080
2.460
1.140
2.720
35.600 M2
2.185
0.047
0.173
0.220
556.094
556.094
556.000
0.076
0.076
0.210
0.360
0.090
0.120
0.495
0.042 M3
0.540 M2
JUMLAH SAT
0.480 M3
0.480 M3
0.000 M3
0.000 M3
0.000 M3
0.000 M3
JUMLAH SAT
M3
###
14.175
6.075
###
0.000 ###
16.200 M2
M1
JUMLAH SAT
0.000 M1
0.000
0.000 M2
0.102
JUMLAH SAT
0.051
0.510
0.510
0.049
0.049
2.380
2.380
1.700
0.680
0.510
2.890
3.915 M3
3.895
2.727 M3
28.710 M3
28.710
17.400 M3
19.000 M3
36.400
0.574 M3
6.552 M2
1.800 M3
0.122
0.020
0.540
0.540
JUMLAH SAT
0.180
1.260
0.360
0.090
0.450
0.008
RENCANA ANGGARAN BIAYA
I PEKERJAAN PERKERASAN
A PEKERJAAN PERSIAPAN
1 Pembuatan papan nama 1.000 Ls Rp 400,000.00
2 Pengukuran / Uitzet 1.000 Ls Rp 250,000.00
3 Pembersihan Lahan 1.000 Ls Rp 350,000.00
JUMLAH
B PEKERJAAN TANAH
1 Galian Tanah biasa 34.746 M3 Rp 29,175.00
2 Urugan Tanah Kembali 34.746 M3 Rp 9,725.00
3 Urugan Tanah Pilihan 10.082 M3 Rp 76,470.00
JUMLAH
C PEKERJAAN PAVING STONE
1 Pek. Pas. Paving Stone, tbl 6 cm 829.928 M2 Rp 95,100.00
2 Pas. Kanstein 10.30.50 23.000 M1 Rp 55,407.50
3 Plesteran campuran 1Pc : 4Psr 2.760 M2 Rp 31,488.00
4 Tebaran pasir pengunci 17.094 M3 Rp 99,270.00
JUMLAH
ANGGARAN BIAYA
JUMLAH HARGA
Rp 400,000.00
Rp 250,000.00
Rp 350,000.00
Rp 1,000,000.00
Rp 1,013,708.72
Rp 337,902.91
Rp 770,955.80
Rp 2,122,567.42
Rp 78,926,105.25
Rp 1,274,372.50
Rp 86,906.88
Rp 1,696,930.70
Rp 81,984,315.33
REKAPITULASI RENCANA ANGGARAN BIAYA
I PEKERJAAN PERKERASAN
JUMLAH Rp 85,106,882.75
PPn 10 % Rp 8,510,688.27
JUMLAH TOTAL Rp 93,617,571.02
DIBULATKAN Rp 93,617,000.00
TERBILANG
Situbondo, ……………………….2011
Mengetahui, Mengetahui,
KEPALA DINAS CIPTA KARYA KABID KEBERSIHAN DAN PERTAMANAN
KABUPTEN SITUBONDO SELAKU PPTK
KEGIATAN
PEKERJAAN
PERENCANAAN TEKNIK
LOKASI
ALUN-ALUN SITUBONDO
KABUPATEN SITUBONDO
PERENCANA
RENCANA ANGGARAN BIAYA
JUMLAH
I.1.2 PEKERJAAN POT BUNGA, 3 BH
1 Galian Tanah 1.553 M3 Rp 29,175.00
2 Urugan Pasir bawah Pondasi 0.907 M3 Rp 99,270.00
3 Urugan Tanah kembali 1.800 M3 Rp 9,725.00
4 Pasangan Bata Merah 1/2 bt. Camp. 1Pc : 4Psr 13.050 M2 Rp 73,766.00
5 Plesteran, camp. 1Pc : 4Psr 5.520 M2 Rp 31,488.00
6 Benangan/ Col-colan 91.800 M' Rp 9,139.00
7 Pengecatan 9.840 M2 Rp 14,324.00
JUMLAH
I.1.3 PEKERJAAN WASTAFEL, 3 BH
1 Galian Tanah 0.135 M3 Rp 29,175.00
2 Urugan Pasir bawah Pondasi 0.027 M3 Rp 99,270.00
3 Pasangan Bata Merah 1 bt. Camp. 1Pc : 4Psr 0.990 M2 Rp 153,396.00
4 Pasang Wastafel batu alam 3.000 Bh Rp 420,000.00
5 Pasang Batu alam 2.520 M2 Rp 133,640.00
JUMLAH
I.1.4 PEKERJAAN BAK CUCI
1 Galian Tanah 1.575 M3 Rp 29,175.00
2 Urugan Pasir bawah pondasi 0.630 M3 Rp 99,270.00
3 Urugan Tanah kembali 1.815 M3 Rp 9,725.00
4 Urugan Tanah dalam bak 4.665 M3 Rp 76,470.00
5 Pasangan Bata Merah 1/2 bt. Camp. 1Pc : 4Psr 37.800 M2 Rp 73,766.00
6 Pasang Keramik 20x20 35.600 M2 Rp 125,541.00
JUMLAH
I.1.5 PEKERJAAN SANITAIR
1 Pasang Pipa GI dia. 3/4" 169.880 M' Rp 62,046.00
2 Pasang Pipa GI dia. 1 1/2" 7.000 M' Rp 124,642.80
3 Pasang Pipa GI dia. 2" 76.000 M' Rp 162,469.80
4 Pasang DOP dia. 1 1/2" 2.000 Bh Rp 13,200.00
5 Pasang Kran air 3/4" 13.000 Bh Rp 18,705.00
6 Pasang PVC PVC dia. 3" untuk pembuangan 59.900 M' Rp 26,143.58
7 Resapan 4.000 Bh Rp 1,005,991.50
8 Angkur Pipa dia. 1 1/2" (beton ringan) 2.000 Bh Rp 49,135.80
JUMLAH
II PEKERJAAN INSTALASI SANITAIR
II.1 PEKERJAAN INSTALASI SANITAIR DI TAMAN HASANUDDIN
II.1.1 PEKERJAAN PERSIAPAN
1 Pengukuran / Uitzet 1.000 Ls Rp 250,000.00
2 Pembersihan Lahan 1.000 Ls Rp 650,000.00
3 Pembongkaran Paving dipasang kembali jalan aspal 1.000 Ls Rp 850,000.00
JUMLAH
II.1.2 PEKERJAAN SANITAIR
1 Pasang Pipa GI dia. 1 1/2" 1.000 M' Rp 124,642.80
2 Pasang Pipa GI dia. 2" 113.660 M' Rp 162,469.80
3 Pasang DOP dia. 1 1/2" 1.000 Bh Rp 13,200.00
4 Angkur Pipa dia. 1 1/2" (beton ringan) 1.000 Bh Rp 49,135.80
JUMLAH
ANGGARAN BIAYA
JUMLAH HARGA
Rp 400,000.00
Rp 250,000.00
Rp 650,000.00
Rp 450,000.00
Rp 1,750,000.00
Rp 45,294.19
Rp 90,004.14
Rp 17,505.00
Rp 962,646.30
Rp 173,813.76
Rp 838,960.20
Rp 140,948.16
Rp 2,269,171.75
Rp 3,938.63
Rp 2,680.29
Rp 151,862.04
Rp 1,260,000.00
Rp 336,772.80
Rp 1,755,253.76
Rp 45,950.63
Rp 62,540.10
Rp 17,650.88
Rp 356,732.55
Rp 2,788,354.80
Rp 4,469,259.60
Rp 7,740,488.55
Rp 10,540,374.48
Rp 872,499.60
Rp 12,347,704.80
Rp 26,400.00
Rp 243,165.00
Rp 1,566,000.14
Rp 4,023,966.02
Rp 98,271.61
Rp 29,718,381.65
Rp 250,000.00
Rp 650,000.00
Rp 850,000.00
Rp 1,750,000.00
Rp 124,642.80
Rp 18,466,317.47
Rp 13,200.00
Rp 49,135.80
Rp 18,653,296.07
REKAPITULASI RENCANA ANGGARAN BIAYA
NO JENIS KEGIATAN
JUMLAH
PPn 10 %
JUMLAH TOTAL
DIBULATKAN
TERBILANG
TUJUH PULUH JUTA RUPIAH
Situbondo, ……………………….2011
JUMLAH
Rp 1,750,000.00
Rp 2,269,171.75
Rp 1,755,253.76
Rp 7,740,488.55
Rp 29,718,381.65
Rp 1,750,000.00
Rp 18,653,296.07
Rp 63,636,591.77
Rp 6,363,659.18
Rp 70,000,250.95
Rp 70,000,000.00
TERBILANG
TUJUH PULUH JUTA RUPIAH
Situbondo, ……………………….2011
Dibuat oleh,
KONSULTAN PERENCANA
……………………………….
………………………………
Direktur
Mengetahui,
KABID KEBERSIHAN DAN PERTAMANAN
SELAKU PPTK
R AT M A J I , S H
NIP. 19571028 198003 1 013
PEMERINTAH DAERAH KABUPATEN SITUBONDO
DINAS CIPTA KARYA
KABUPATEN SITUBONDO
Jln. Madura no. 17 Telp. (0338) 675570 - Fax. (0338) 670631 Situbondo
KEGIATAN
PEKERJAAN
PERENCANAAN TEKNIK
LOKASI
ALUN-ALUN SITUBONDO
KABUPATEN SITUBONDO
PERENCANA