Tahun 2001
Penawar
PT. DUTA KELUARGA IMFACO
Dibulatkan
IM2 PAS. BAHAN PLAFOND TRIPLEK 4 MM ( 1 X 1 ) PADA RANGKANYA
Bahan Plafond Triplek 4 mm m2 1.1000 #REF! #REF!
Paku 1 cm s/d 3 cm kg 0.0200 21,000.00 420.000
Alat Bantu ls 0.7500 475.00 356.250
Pekerja Setengah Terampil org 0.0473 19,500.00 922.350
Tk. Kayu Terampil org 0.1125 26,400.00 2,970.000
Kep. Tukang Kayu org 0.0098 27,500.00 269.500
Mandor org 0.0030 29,400.00 88.200
Total ................................................................................ Rp. #REF! 4,250.05
Total Harga ..................................................................... Rp. #REF! 4,250.05
Dibulatkan
1,674.00
1,674.00
1,670.00
10,985.00
10,985.00
10,990.00
225,555.00
225,555.00
225,560.00
248,055.00
248,055.00
248,060.00
9,126.00
9,126.00
9,130.00
11,985.80
11,985.80
11,990.00
4,260.60
4,260.60
4,260.00
12,570.00
12,570.00
12,570.00
81,069.00
81,069.00
81,070.00
297,255.25
297,255.25
297,260.00
406,689.00
406,689.00
406,690.00
431,195.00
431,195.00
431,200.00
5,593.00
5,593.00
5,590.00
6,123.90
6,123.90
6,120.00
34,692.50
34,692.50
34,690.00
37,377.13
37,377.13
37,380.00
54,004.80
54,004.80
54,000.00
164,455.22
164,455.22
164,460.00
345,717.60
345,717.60
345,720.00
211,345.61
211,345.61
211,350.00
61,511.37
61,511.37
61,510.00
53,510.72
53,510.72
53,510.00
49,470.72
49,470.72
49,470.00
43,915.72
43,915.72
43,920.00
53,763.32
53,763.32
53,760.00
46,243.07
46,243.07
46,240.00
417,045.00
417,045.00
417,050.00
18,284.90
18,284.90
18,280.00
16,802.90
16,802.90
16,800.00
8,287.45
8,287.45
8,300.00
11,076.85
11,076.85
11,080.00
12,564.85
12,564.85
12,560.00
#REF!
#REF!
#REF!
37,346.20
37,346.20
37,350.00
12,476.30
12,476.30
12,480.00
#REF!
#REF!
#REF!
2,985,900.00
2,985,900.00
2,985,900.00
203,764.40
203,764.40
203,760.00
123,712.20
123,712.20
123,710.00
86,478.00
86,478.00
86,480.00
100,831.60
100,831.60
100,800.00
16,805.12
16,805.12
16,810.00
29,577.60
29,577.60
29,580.00
19,577.60
19,577.60
19,580.00
31,642.00
31,642.00
31,640.00
35,642.00
35,642.00
35,640.00
82,725.12
82,725.12
82,730.00
29,577.60
29,577.60
29,580.00
45,740.40
45,740.40
45,740.00
24,810.20
24,810.20
24,810.00
24,110.20
24,110.20
24,110.00
26,189.60
26,189.60
26,190.00
59,535.00
59,535.00
59,540.00
77,135.00
77,135.00
77,140.00
91,950.00
91,950.00
91,950.00
22,860.00
22,860.00
22,860.00
18,390.00
18,390.00
18,390.00
10,455.00
10,455.00
10,460.00
20,955.00
20,955.00
20,960.00
44,625.00
44,625.00
44,630.00
45,050.00
45,050.00
37,120.00
32,638.67
32,638.67
32,640.00
60,200.70
60,200.70
55,940.00
23,683.50
23,683.50
23,680.00
272,875.00
272,875.00
272,900.00
112,729.00
112,729.00
112,700.00
1,357.60
1,357.60
1,400.00
26,570.00
26,570.00
26,600.00
269,823.78
269,823.78
269,800.00
1,781.340
1,781.340
1,800.00
7,156.48
7,156.48
7,160.00
7,156.48
7,156.48
7,160.00
238,091.00
238,091.00
238,090.00
3,340,300.00
3,340,300.00
3,340,300.00
2,200,300.00
2,200,300.00
2,200,300.00
2,980,300.00
2,980,300.00
2,980,300.00
27,735.80
27,735.80
27,700.00
66,275.50
66,275.50
66,280.00
72,389.50
72,389.50
72,400.00
3,933,397.48
3,933,397.48
3,933,400.00
16,775.20
16,775.20
16,780.00
181,023.00
181,023.00
181,020.00
2,655,900.00
2,655,900.00
2,655,900.00
100,764.40
100,764.40
100,760.00
51,458.00
51,458.00
51,460.00
16,805.12
16,805.12
16,810.00
8,977.60
8,977.60
8,980.00
29,577.60
29,577.60
29,580.00
49,265.40
49,265.40
49,270.00
35,515.40
35,515.40
35,520.00
2,980,300.00
2,980,300.00
2,980,300.00
1,609,160.00
1,609,160.00
1,609,160.00
2,314,660.00
2,314,660.00
2,314,660.00
206,569.61
206,569.61
206,570.00
185,993.07
185,993.07
185,990.00
498,065.00
498,065.00
498,070.00
199,984.00
199,984.00
199,980.00
361,970.00
361,970.00
361,970.00
165,079.00
165,079.00
165,080.00
429,304.00
429,304.00
429,300.00
40,562.72
40,562.72
40,560.00
509,832.00
509,832.00
509,830.00
386,007.00
386,007.00
386,000.00
255,877.00
255,877.00
255,880.00
REKAPITULASI
LAPORAN MINGGUAN KEMAJUAN FISIK
BOBOT PROGRES
NO URAIAN PEKERAAN PEK MINGGU LALU MINGGU INI S/D MINGGU INI
(%) VOL PRESTASI VOL PRESTASI VOL PRESTASI
(%) (%) (%)
BOBOT PROGRES
PEK MINGGU LALU MINGGU INI S/D MINGGU INI
NO KODE URAIAN PEKERJAAN VOL SAT
(%) PRESTASI PRESTASI PRESTASI
VOL VOL VOL
(%) (%) (%)
A. PERSIAPAN DAN STRUKTUR
I PEKERJAAN PERSIAPAN
1 A.01. Pengukuran dan pemasangan Bouwplank 1.00 ls 0.054 1.00 0.054 - - 1.00 0.054
2 A.03. Pembuatan papan kegiatan 1.00 m2 0.008 1.00 0.008 - - 1.00 0.008
3 A.04. Pembuatan pagar sementara dari seng gelombang tinggi 2 meter 25.00 m2 0.170 25.00 0.170 - - 25.00 0.170
4 A.05. Pembuatan kantor sementara lantai plesteran 15.00 m2 0.616 15.00 0.616 - - 15.00 0.616
5 A.06. Pembuatan gudang semen dan peralatan 6.00 m2 0.165 6.00 0.165 - - 6.00 0.165
6 Z.01. Rencana Keselamatan dan Kesehatan Kerja Konstruksi 1.00 paket 0.367 1.00 0.367 - - 1.00 0.367
7 Z.03. Biaya Mobilisasi dan demobilisasi alat 1.00 ls 0.248 0.30 0.074 - - 0.30 0.074
8 Z.05. Biaya Administrasi dan Dokumentasi 1.00 ls 0.033 0.30 0.010 - - 0.30 0.010
Jumlah 1.660 1.464 - 1.464
B PEKERJAAN STRUKTUR
I. PEKERJAAN PENGURUGAN LAHAN DAN TALUD KELILING
1 B.01.A Galian Tanah Biasa Dalam 1 m 26.00 m3 0.084 26.00 0.084 - - 26.00 0.084
2 C.3. Pondasi Batu Belah 1:5 82.00 m3 1.847 77.90 1.755 - - 77.90 1.755
3 B.05. Urugan Tanah Dari Luar termasuk perataan dan pemadatan 1,413.00 m3 6.014 876.06 3.729 - - 876.06 3.729
Jumlah I 7.946 5.568 - 5.568
II. PEKERJAAN PONDASI
1 B.01.B Galian Tanah Biasa Dalam 2 m pondasi foot plat 478.00 m3 1.892 478.00 1.892 - - 478.00 1.892
2 B.02. Urugan Kembali Galian Tanah pondasi foot plat 192.00 m3 0.446 192.00 0.446 - - 192.00 0.446
3 B.03. Urugan Pasir T. 5 cm (bawah pondasi foot plat) 10.00 m3 0.078 10.00 0.078 - - 10.00 0.078
4 D.01. Beton Lantai Kerja Mutu K-100 T. 5 cm (bawah pondasi foot plat) 10.00 m3 0.256 10.00 0.256 - - 10.00 0.256
5 Pek. Beton Pondasi P1
D.05. Beton Mutu K-300 (Ready Mix ) Min. 6 m3 + slang 37.20 m3 1.247 37.20 1.247 - - 37.20 1.247
D.06. Pembesian 1 Kg Besi Polos / Ulir 203.50 kg/bh 6,308.62 kg 2.381 6,308.62 2.381 - - 6,308.62 2.381
F.02. Bata Merah 1/2 Bata 1:5 75.00 m2 0.274 75.00 0.274 - - 75.00 0.274
6 Pek. Beton Pondasi P2
D.05. Beton Mutu K-300 (Ready Mix ) Min. 6 m3 + slang 1.00 m3 0.034 1.00 0.034 - - 1.00 0.034
D.06. Pembesian 1 Kg Besi Polos / Ulir 85.32 kg/bh 171.00 kg 0.065 171.00 0.065 - - 171.00 0.065
F.02. Bata Merah 1/2 Bata 1:5 3.00 m2 0.011 3.00 0.011 - - 3.00 0.011
7 Pek. Beton Pondasi P3
D.05. Beton Mutu K-300 (Ready Mix ) Min. 6 m3 + slang 8.40 m3 0.282 8.40 0.282 - - 8.40 0.282
D.06. Pembesian 1 Kg Besi Polos / Ulir 354.24 kg/bh 2,482.00 kg 0.937 2,482.00 0.937 - - 2,482.00 0.937
F.02. Bata Merah 1/2 Bata 1:5 17.00 m2 0.062 17.00 0.062 - - 17.00 0.062
8 Pek. Beton Pondasi P4
D.05. Beton Mutu K-300 (Ready Mix ) Min. 6 m3 + slang 2.16 m3 0.072 2.16 0.072 - - 2.16 0.072
D.06. Pembesian 1 Kg Besi Polos / Ulir 537.20 kg/bh 355.00 kg 0.134 355.00 0.134 - - 355.00 0.134
F.02. Bata Merah 1/2 Bata 1:5 4.00 m2 0.015 4.00 0.015 - - 4.00 0.015
9 Pek. Beton Pondasi P5
D.05. Beton Mutu K-300 (Ready Mix ) Min. 6 m3 + slang 3.36 m3 0.113 3.36 0.113 - - 3.36 0.113
D.06. Pembesian 1 Kg Besi Polos / Ulir 386.47 kg/bh 537.20 kg 0.203 537.20 0.203 - - 537.20 0.203
F.02. Bata Merah 1/2 Bata 1:5 4.91 m2 0.018 4.91 0.018 - - 4.91 0.018
10 Pek. Beton Pondasi P6
D.05. Beton Mutu K-300 (Ready Mix ) Min. 6 m3 + slang 4.80 m3 0.161 4.80 0.161 - - 4.80 0.161
D.06. Pembesian 1 Kg Besi Polos / Ulir 184.67 kg/m3 772.94 kg 0.292 772.94 0.292 - - 772.94 0.292
F.02. Bata Merah 1/2 Bata 1:5 7.20 m2 0.026 7.20 0.026 - - 7.20 0.026
11 Pek. Beton Kolom Pedestal K1
D.05. Beton Mutu K-300 (Ready Mix ) Min. 6 m3 + slang 14.72 m3 0.494 14.72 0.494 - - 14.72 0.494
D.06. Pembesian 1 Kg Besi Polos / Ulir 127.79 kg/m3 2,718.29 kg 1.026 2,718.29 1.026 - - 2,718.29 1.026
F.02. Bata Merah 1/2 Bata 1:5 147.20 m2 0.539 147.20 0.539 - - 147.20 0.539
12 Pek. Beton Kolom Pedestal K2
D.05. Beton Mutu K-300 (Ready Mix ) Min. 6 m3 + slang 0.50 m3 0.017 0.50 0.017 - - 0.50 0.017
D.06. Pembesian 1 Kg Besi Polos / Ulir 63.89 kg 0.024 63.89 0.024 - - 63.89 0.024
D.10. Pemasangan bekisting kolom 5.00 m2 0.016 5.00 0.016 - - 5.00 0.016
Jumlah II 11.113 11.113 - 11.113
III. PEKERJAAN BETON LANTAI 1
1 B.03. Urugan Pasir 10.72 m3 0.083 10.72 0.083 - - 10.72 0.083
2 D.01. Beton Lantai Kerja Mutu K-100 T. 7 cm 10.72 m3 0.274 10.72 0.274 - - 10.72 0.274
3 C.3. Pondasi Batu Belah 15 2.52 m3 0.057 2.52 0.057 - - 2.52 0.057
2 Pek. Beton Sloof S1
D.05. Beton Mutu K-300 (Ready Mix ) Min. 6 m3 + slang 14.78 m3 0.496 14.78 0.496 - - 14.78 0.496
D.06. Pembesian 1 Kg Besi Polos \/ Ulir 149.78 kg/m3 2,213.96 kg 0.836 2,213.96 0.836 - - 2,213.96 0.836
F.02. Bata Merah 1\/2 Bata 15 147.82 m2 0.541 147.82 0.541 - - 147.82 0.541
3 Pek. Beton Sloof S2
D.05. Beton Mutu K-300 (Ready Mix ) Min. 6 m3 + slang 2.57 m3 0.086 2.57 0.086 - - 2.57 0.086
D.06. Pembesian 1 Kg Besi Polos \/ Ulir 158.40 kg/m3 406.89 kg 0.154 406.89 0.154 - - 406.89 0.154
F.02. Bata Merah 1\/2 Bata 15 20.55 m2 0.075 20.55 0.075 - - 20.55 0.075
4 Pek. Beton Sloof S4
D.05. Beton Mutu K-300 (Ready Mix ) Min. 6 m3 + slang 1.49 m3 0.050 1.49 0.050 - - 1.49 0.050
D.06. Pembesian 1 Kg Besi Polos \/ Ulir 200.89 kg/m3 299.53 kg 0.113 299.53 0.113 - - 299.53 0.113
F.02. Bata Merah 1\/2 Bata 15 19.88 m2 0.073 19.88 0.073 - - 19.88 0.073
5 D.04. Plat lantai T. 7 cm Beton Mutu K-175 (Ready Mix ) Min. 6 m3 + slang 25.02 m3 0.798 25.02 0.798 - - 25.02 0.798
6 Pek. Beton Kolom K1
D.05. Beton Mutu K-300 (Ready Mix ) Min. 6 m3 + slang 29.44 m3 0.987 29.44 0.987 - - 29.44 0.987
D.06. Pembesian 1 Kg Besi Polos \/ Ulir 184.67 kg/m3 5,436.59 kg 2.052 5,436.59 2.052 - - 5,436.59 2.052
D.10. Pemasangan bekisting kolom 294.40 m2 0.956 294.40 0.956 - - 294.40 0.956
7 Pek. Beton Kolom K2
D.05. Beton Mutu K-300 (Ready Mix ) Min. 6 m3 + slang 0.75 m3 0.025 0.75 0.025 - - 0.75 0.025
D.06. Pembesian 1 Kg Besi Polos \/ Ulir 127.79 kg/m3 95.84 kg 0.036 95.84 0.036 - - 95.84 0.036
D.10. Pemasangan bekisting kolom 7.50 m1 0.024 7.50 0.024 - - 7.50 0.024
Sub Jumlah Untuk Dipindahkan 7.716 7.716 - 7.716
BOBOT PROGRES
PEK MINGGU LALU MINGGU INI S/D MINGGU INI
NO KODE URAIAN PEKERJAAN VOL SAT
(%) PRESTASI PRESTASI PRESTASI
VOL VOL VOL
(%) (%) (%)
Sub Jumlah Pindahan 7.716 7.716 - 7.716
8 Pek. Beton tangga
D.05. Beton Mutu K-300 (Ready Mix ) Min. 6 m3 + slang 3.23 m3 0.108 - - 3.23 0.108 3.23 0.108
D.06. Pembesian 1 Kg Besi Polos \/ Ulir 176.00 kg/m3 517.54 kg 0.195 517.54 0.195 - - 517.54 0.195
D.10. Pemasangan bekisting tangga 24.78 m1 0.075 24.78 0.075 - - 24.78 0.075
9 Pek. Beton Balok B2
D.05. Beton Mutu K-300 (Ready Mix ) Min. 6 m3 + slang 2.85 m3 0.096 2.85 0.096 - - 2.85 0.096
D.06. Pembesian 1 Kg Besi Polos \/ Ulir 517.54 kg/unit 564.30 kg 0.213 564.30 0.213 - - 564.30 0.213
D.13. Pemasangan bekisting balok 29.45 m2 0.098 29.45 0.098 - - 29.45 0.098
10 Pek. Beton Balok RB3 El. +2.95 m
D.05. Beton Mutu K-300 (Ready Mix ) Min. 6 m3 + slang 2.57 m3 0.086 2.57 0.086 - - 2.57 0.086
D.06. Pembesian 1 Kg Besi Polos \/ Ulir 198.00 kg/m3 579.05 kg 0.219 579.05 0.219 - - 579.05 0.219
D.11. Pemasangan bekisting balok 32.54 m2 0.108 32.54 0.108 - - 32.54 0.108
11 Pek. Beton Balok L1 El. +2.95 m
D.05. Beton Mutu K-300 (Ready Mix ) Min. 6 m3 + slang 3.36 m3 0.113 3.36 0.113 - - 3.36 0.113
D.06. Pembesian 1 Kg Besi Polos \/ Ulir 225.42 kg/m3 179.20 kg 0.068 179.20 0.068 - - 179.20 0.068
D.11. Pemasangan bekisting balok 67.76 m2 0.225 67.76 0.225 - - 67.76 0.225
12 Pek. Beton Plat dak El. +2.95 m
D.05. Beton Mutu K-300 (Ready Mix ) Min. 6 m3 + slang 10.30 m3 0.345 10.30 0.345 - - 10.30 0.345
D.06. Pembesian jaring kawat baja\/wiremesh M8 53.33 kg/m3 208.30 m2 0.079 208.30 0.079 - - 208.30 0.079
D.11. Pemasangan bekisting plat lantai 103.00 m2 0.373 103.00 0.373 - - 103.00 0.373
13 Pek. Beton Plat meja beton El. +2.95 m
D.05. Beton Mutu K-175 1.00 m3 0.034 - - - - - -
D.06.A Pembesian jaring kawat baja\/wiremesh M8 (1 lapis ) 12.52 m2 0.018 - - - - - -
D.12. Pemasangan bekisting plat lantai 12.52 m2 0.045 - - - - - -
Jumlah III 10.212 10.007 0.108 10.115
IV. PEKERJAAN BETON LANTAI 2
1 Pek. Beton Balok B1
D.05. Beton Mutu K-300 (Ready Mix ) Min. 6 m3 + slang 22.47 m3 0.753 22.47 0.753 - - 22.47 0.753
D.06. Pembesian 1 Kg Besi Polos / Ulir 198.00 kg/m3 4,449.46 kg 1.680 4,449.46 1.680 - - 4,449.46 1.680
D.11. Pemasangan bekisting balok 224.72 m2 0.746 224.72 0.746 - - 224.72 0.746
2 Pek. Beton Balok B2
D.05. Beton Mutu K-300 (Ready Mix ) Min. 6 m3 + slang 2.57 m3 0.086 2.57 0.086 - - 2.57 0.086
D.06. Pembesian 1 Kg Besi Polos / Ulir 200.32 kg/m3 514.57 kg 0.194 514.57 0.194 - - 514.57 0.194
D.11. Pemasangan bekisting balok 21.58 m2 0.072 21.58 0.072 - - 21.58 0.072
3 Pek. Beton Balok B3
D.05. Beton Mutu K-300 (Ready Mix ) Min. 6 m3 + slang 6.87 m3 0.230 6.87 0.230 - - 6.87 0.230
D.06. Pembesian 1 Kg Besi Polos / Ulir 202.44 kg/m3 1,390.79 kg 0.525 1,390.79 0.525 - - 1,390.79 0.525
D.11. Pemasangan bekisting balok 70.99 m2 0.236 70.99 0.236 - - 70.99 0.236
4 Pek. Beton Listplank L1
D.05. Beton Mutu K-300 (Ready Mix ) Min. 6 m3 + slang 1.43 m3 0.048 1.43 0.048 - - 1.43 0.048
D.06. Pembesian 1 Kg Besi Polos / Ulir 53.33 kg/m3 76.13 kg 0.029 76.13 0.029 - - 76.13 0.029
D.11. Pemasangan bekisting balok 28.55 m2 0.095 28.55 0.095 - - 28.55 0.095
5 Pek. Beton Plat lantai
D.05. Beton Mutu K-300 (Ready Mix ) Min. 6 m3 + slang 54.50 m3 1.827 54.50 1.827 - - 54.50 1.827
D.06.A Pembesian jaring kawat baja/wiremesh M8 (2 lapis ) 739.84 m2 1.048 739.84 1.048 - - 739.84 1.048
D.12. Pemasangan bekisting plat lantai 369.92 m2 1.339 369.92 1.339 - - 369.92 1.339
6 Pek. Beton Kolom K3
D.05. Beton Mutu K-300 (Ready Mix ) Min. 6 m3 + slang 14.76 m3 0.495 14.76 0.495 - - 14.76 0.495
D.06. Pembesian 1 Kg Besi Polos / Ulir 176.00 kg/m3 2,597.76 kg 0.981 2,597.76 0.981 - - 2,597.76 0.981
D.10. Pemasangan bekisting kolom 196.80 m2 0.639 196.80 0.639 - - 196.80 0.639
7 Pek. Meja beton
D.03. Beton Mutu K-175 0.09 m3 0.002 - - - - - -
D.06.B Pembesian jaring kawat baja/wiremesh M6 (1 lapis ) 1.08 m2 0.001 - - - - - -
D.12. Pemasangan bekisting plat lantai 1.08 m2 0.003 - - - - - -
Jumlah IV 11.028 11.022 - 11.022
V. PEKERJAAN BETON LANTAI ATAP
1 Pek. Beton Balok RB1
D.05. Beton Mutu K-300 (Ready Mix ) Min. 6 m3 + slang 15.68 m3 0.526 15.68 0.526 - - 15.68 0.526
D.06. Pembesian 1 Kg Besi Polos / Ulir 202.44 kg/m3 3,175.14 kg 1.199 3,175.14 1.199 - - 3,175.14 1.199
D.11. Pemasangan bekisting balok 209.12 m2 0.694 209.12 0.694 - - 209.12 0.694
2 Pek. Beton Balok RB3
D.05. Beton Mutu K-300 (Ready Mix ) Min. 6 m3 + slang 0.08 m3 0.003 0.08 0.003 - - 0.08 0.003
D.06. Pembesian 1 Kg Besi Polos / Ulir 225.42 kg/m3 16.91 kg 0.006 16.91 0.006 - - 16.91 0.006
D.11. Pemasangan bekisting balok 1.30 m2 0.004 1.30 0.004 - - 1.30 0.004
3 Pek. Beton Balok RB4
D.05. Beton Mutu K-300 (Ready Mix ) Min. 6 m3 + slang 0.31 m3 0.010 0.31 0.010 - - 0.31 0.010
D.06. Pembesian 1 Kg Besi Polos / Ulir 326.22 kg/m3 100.56 kg 0.038 100.56 0.038 - - 100.56 0.038
D.11. Pemasangan bekisting balok 8.22 m2 0.027 8.22 0.027 - - 8.22 0.027
4 Pek. Beton Listpank L1
D.05. Beton Mutu K-300 (Ready Mix ) Min. 6 m3 + slang 4.10 m3 0.137 4.10 0.137 - - 4.10 0.137
D.06. Pembesian 1 Kg Besi Polos / Ulir 53.33 kg/m3 218.93 kg 0.083 218.93 0.083 - - 218.93 0.083
D.11. Pemasangan bekisting balok 90.31 m2 0.300 90.31 0.300 - - 90.31 0.300
5 Pek. Beton Plat lantai Tebal 10 cm El. +7.90 m
D.05. Beton Mutu K-300 (Ready Mix ) Min. 6 m3 + slang 13.00 m3 0.436 13.00 0.436 - - 13.00 0.436
D.06.A Pembesian jaring kawat baja/wiremesh M8 (1 lapis ) 130.00 m2 0.184 130.00 0.184 - - 130.00 0.184
D.12. Pemasangan bekisting plat lantai 130.00 m2 0.470 130.00 0.470 - - 130.00 0.470
6 Pek. Beton Plat lantai Tebal 12 cm El. +7.90 m
D.05. Beton Mutu K-300 (Ready Mix ) Min. 6 m3 + slang 1.20 m3 0.040 1.20 0.040 - - 1.20 0.040
D.06.A Pembesian jaring kawat baja/wiremesh M8 (2 lapis ) 17.00 m2 0.024 17.00 0.024 - - 17.00 0.024
D.12. Pemasangan bekisting plat lantai 10.00 m2 0.036 10.00 0.036 - - 10.00 0.036
7 D.20. Pembuatan kolom praktis beton bertulang (11x11) 51.50 m1 0.042 51.50 0.042 - - 51.50 0.042
8 D.21. Pembuatan ring balok beton bertulang (10x15) 200.00 m1 0.227 200.00 0.227 - - 200.00 0.227
Jumlah V 4.487 4.487 - 4.487
BOBOT PROGRES
PEK MINGGU LALU MINGGU INI S/D MINGGU INI
NO KODE URAIAN PEKERJAAN VOL SAT
(%) PRESTASI PRESTASI PRESTASI
VOL VOL VOL
(%) (%) (%)
C. ARSITEKTUR
I. PEKERJAAN ARSITEKTUR LANTAI 1
A. PEKERJAAN LANTAI DAN DINDING
1 F.03. Pemasangan Bata Ringan tebal 10 cm 644.00 m2 2.086 644.00 2.086 - - 644.00 2.086
2 G.01. Plesteran 1:3 tebal 15mm 1,098.79 m2 2.740 1,098.79 2.740 - - 1,098.79 2.740
3 G.03. Acian 1,025.43 m2 1.498 1,025.43 1.498 - - 1,025.43 1.498
4 L.02. Pengecatan Dinding 3x setara Vinillex 991.04 m2 0.979 - - 198.21 0.196 198.21 0.196
5 H.03. Dinding Keramik 30x60 Corak setara Mulia 186.00 m2 0.723 - - - - - -
6 H.01.B Lantai Keramik 60x60 Polos setara Mulia 429.23 m2 1.631 - - 429.23 1.631 429.23 1.631
7 H.04. Plint Keramik 10x60 rumah sakit 219.96 m1 0.383 - - - - - -
8 H.01.A Lantai Keramik 30x30 Corak setara Mulia 7.00 m2 0.027 - - - - - -
9 H.01.B Pemasangan step dan tread tangga 20x30 20.00 m2 0.076 - - - - - -
10 H.03. Step nosing 10x30 4.00 m2 0.016 - - - - - -
11 S.04. Pemasangan pagar stainless steel 9.00 m1 0.037 - - - - - -
12 H.05. Conwood plank 0,8x12x305 115.00 m2 0.206 - - - - - -
13 L.05 Pengecatan Conwood 3x setara Propan 115.00 m2 0.131 - - - - - -
14 K.06. Plat timbal 2 mm + lapis Panel Multiplek 9mm + HPL 35.00 m2 0.334 - - - - - -
15 D.20. Pembuatan kolom praktis beton bertulang (11x11) 130.00 m1 0.315 130.00 0.315 - - 130.00 0.315
16 D.21. Pembuatan ring balok beton bertulang (10x15) lintel 57.00 m1 0.194 57.00 0.194 - - 57.00 0.194
Jumlah I 11.376 6.833 1.827 8.660
II. PEKERJAAN ARSITEKTUR LANTAI 2
A. PEKERJAAN LANTAI DAN DINDING
1 F.03. Pemasangan Bata Ringan tebal 10 cm 572.00 m2 1.853 572.00 1.853 - - 572.00 1.853
2 G.01. Plesteran 1:3 tebal 15mm 961.00 m2 2.396 816.85 2.037 144.15 0.359 961.00 2.396
3 G.03. Acian 942.00 m2 1.376 - - 942.00 1.376 942.00 1.376
4 L.02. Pengecatan Dinding 3x setara Vinillex 942.00 m2 0.930 - - - - - -
5 H.03. Dinding Keramik 30x60 Corak setara Mulia 60.00 m2 0.233 - - - - - -
6 E.06. Pemasangan Aluminium Composite Panel + rangka 283.00 m2 3.423 - - - - - -
7 B.03. Urugan Pasir T. 5 cm 20.00 m3 0.155 - - - - - -
8 H.01.B Lantai Keramik 60x60 Polos setara Mulia termasuk meja beton 387.00 m2 1.471 - - - - - -
9 H.04. Plint Keramik 10x60 rumah sakit 196.00 m1 0.341 - - - - - -
10 H.01.A Lantai Keramik 30x30 Corak setara Mulia 7.00 m2 0.027 - - - - - -
11 D.20. Pembuatan kolom praktis beton bertulang (11x11) 97.00 m1 0.235 94.09 0.228 2.91 0.007 97.00 0.235
12 D.21. Pembuatan ring balok beton bertulang (10x15) 43.00 m1 0.147 43.00 0.147 - - 43.00 0.147
13 L.07. Pengecatan Waterproofing 150.00 m2 0.129 - - - - - -
14 Pemasangan tangga dinding/monyet T.650 m L.45cm hollow galvanis 5.00 m1 0.030 - - - - - -
Jumlah A 12.747 4.264 1.743 6.007
B. PEKERJAAN KUSEN
1 P.06. Pemasangan curtain wall type CW1 1.00 unit 0.606 - - 1.00 0.606 1.00 0.606
2 P.07. Pemasangan curtain wall type CW2 1.00 unit 0.259 - - 1.00 0.259 1.00 0.259
3 P.07.B Pemasangan curtain wall type CW3 2.00 unit 0.091 - - 2.00 0.091 2.00 0.091
4 PG.03. Pemasangan Pintu PG3 1.00 unit 0.073 - - 1.00 0.073 1.00 0.073
5 P.10. Pemasangan Pintu P3 3.00 unit 0.084 - - 3.00 0.084 3.00 0.084
6 P.11. Pemasangan Pintu P4 1.00 unit 0.111 - - 1.00 0.111 1.00 0.111
7 P.12. Pemasangan Pintu P5 7.00 unit 0.704 - - 7.00 0.704 7.00 0.704
8 P.13. Pemasangan Pintu P6 1.00 unit 0.068 - - 1.00 0.068 1.00 0.068
9 P.15. Pemasangan Pintu P7 1.00 unit 0.054 - - 1.00 0.054 1.00 0.054
11 P.21. Pemasangan Jendela J5 14.00 unit 0.462 - - 14.00 0.462 14.00 0.462
12 P.22. Pemasangan Jendela J6 4.00 unit 0.245 - - 4.00 0.245 4.00 0.245
14 P.26. Pemasangan Bouvenlight type BV2 4.00 buah 0.045 - - 4.00 0.045 4.00 0.045
Jumlah B 2.801 - 2.801 2.801
C. PEKERJAAN PELAPIS PLAFOND
1 I.02. Plafond Gypsum tebal 9mm + rangka hollow 40x40 385.00 m2 1.454 - - 385.00 1.454 385.00 1.454
2 I.01. Plafond PVC tebal 9mm + List + rangka hollow 40x40 47.51 m2 0.303 - - 47.51 0.303 47.51 0.303
3 L.4. Pengecatan Plafond 3x setara Vinillex 384.79 m2 1.011 - - 384.79 1.011 384.79 1.011
Jumlah C 2.768 - 2.768 2.768
Jumlah A + B + C 18.316 4.264 7.312 11.576
III. PEKERJAAN ARSITEKTUR LANTAI DAK
A. PEKERJAAN LANTAI DAN DINDING
1 F.03. Pemasangan Bata Ringan tebal 10 cm 125.25 m2 0.406 125.25 0.406 - - 125.25 0.406
2 G.01. Plesteran 1:3 tebal 15mm 250.51 m2 0.625 - - 250.51 0.625 250.51 0.625
3 G.03. Acian 84.82 m2 0.124 - - 84.82 0.124 84.82 0.124
4 P.16.D Pemasangan Pintu shaft /janitor (80 x 180 cm) 1.00 unit 0.018 - - - - - -
5 E.06. Pemasangan Aluminium Composite Panel + rangka 20.00 m2 0.242 - - - - - -
6 H.05. Conwood plank 0,8x12x305 106.00 m2 0.190 - - - - - -
7 L.05 Pengecatan Conwood 3x setara Propan 106.00 m2 0.121 - - - - - -
8 L.07. Pengecatan Waterproofing 138.00 m2 0.119 - - - - - -
Jumlah A 1.843 0.406 0.749 1.154
B. PEKERJAAN ATAP
1 E.04. Memasang 1 m2 atap baja ringan 448.00 m2 2.664 448.00 2.664 - - 448.00 2.664
2 J.18. Atap U-PVC Alderon RS 1000 Trimdeck Single Layer Corrugated 448.00 m2 2.149 425.60 2.041 22.40 0.107 448.00 2.149
3 J.19. Nok U-PVC Alderon RS Trimdeck 53.00 m1 0.201 - - 53.00 0.201 53.00 0.201
4 I.22. Listplank PVC uk. 9 mm x 20 cm 78.00 m1 0.167 - - 23.40 0.050 23.40 0.050
5 E.07. Pemasangan Atap U-PVC Alderon RS 1000 Trimdeck + rangkaEL. +9.90 M 2.00 m2 0.024 - - - - - -
Jumlah B 5.205 4.705 0.358 5.063
Jumlah A + B 7.048 5.111 1.107 6.218
IV. PEKERJAAN AKSESORIS DAN LAINNYA
1 S.03. Pemasangan logo puskesmas T. 100 cm 1.00 bh 0.025 - - - - - -
2 S.10. Pemasangan hurup stainless steel T. 20 cm 22.00 bh 0.015 - - - - - -
3 S.11. Pemasangan hurup stainless steel T. 18 cm 32.00 bh 0.021 - - - - - -
4 S.12. Pemasangan hurup stainless steel T. 15 cm 182.00 bh 0.114 - - - - - -
Jumlah B 0.175 - - -
BOBOT PROGRES
PEK MINGGU LALU MINGGU INI S/D MINGGU INI
NO KODE URAIAN PEKERJAAN VOL SAT
(%) PRESTASI PRESTASI PRESTASI
VOL VOL VOL
(%) (%) (%)
D. PEKERJAAN MEKANIKAL ELEKTRIKAL PLUMBING AC
I. PEKERJAAN ELEKTRIKAL
A. LANTAI 1
1 Q.01 Memasang 1 titik Instalasi Penerangan NYM 3 x 2,5 84.00 ttk 0.685 42.00 0.343 - - 42.00 0.343
2 Q.02.A Memasang 1 buah Saklar Tunggal Philips, 10 A, 250 VAC 13.00 ttk 0.018 - - - - - -
3 Q.02.B Memasang 1 buah Saklar Ganda Philips, 10 A, 250 VAC 7.00 ttk 0.013 - - - - - -
4 Q.02.C Memasang 1 buah saklar 6 gang , 10 A, 250 VAC 1.00 ttk 0.003 - - - - - -
5 Q.02.D Memasang 1 buah Stop kontak Philips, 1 Phase, 10 A, 250 VAC 25.00 ttk 0.040 - - - - - -
6 Q.03.B Memasang 1 buah Downlight LED Philips DN027B G2 14 watt 33.00 ttk 0.115 - - - - - -
7 Q.03.C Memasang 1 buah Downlight LED Philips DN027C 24 watt 8.00 ttk 0.015 - - - - - -
8 Q.03.F Memasang 1 buah Lampu Slim Panel LED PHILIPS RC091V Putih 40 w 9.00 ttk 0.136 - - - - - -
9 Q.03.G Memasang 1 buah Lampu Slim Panel LED PHILIPS RC091V Putih 28 w 3.00 ttk 0.039 - - - - - -
10 R.02 Pemasangan exhaust fan dinding 1.00 unit 0.014 - - - - - -
11 R.03 Pemasangan exhaust fan plafond 5.00 unit 0.070 - - - - - -
Jumlah A 1.147 0.343 - 0.343
B. LANTAI 2
1 Q.01 Memasang 1 titik Instalasi Penerangan NYM 3 x 2,5 57.00 ttk 0.465 14.25 0.116 - - 14.25 0.116
2 Q.02.A Memasang 1 buah Saklar Tunggal Philips, 10 A, 250 VAC 11.00 ttk 0.015 - - - - - -
3 Q.02.B Memasang 1 buah Saklar Ganda Philips, 10 A, 250 VAC 5.00 ttk 0.009 - - - - - -
4 Q.02.D Memasang 1 buah Stop kontak Philips, 1 Phase, 10 A, 250 VAC 23.00 ttk 0.036 - - - - - -
5 Q.03.B Memasang 1 buah Downlight LED Philips DN027B G2 14 watt 5.00 ttk 0.017 - - - - - -
6 Q.03.C Memasang 1 buah Downlight LED Philips DN027C 24 watt 1.00 ttk 0.002 - - - - - -
7 Q.03.F Memasang 1 buah Lampu Slim Panel LED PHILIPS RC091V Putih 40 w 10.00 ttk 0.151 - - - - - -
8 Q.03.G Memasang 1 buah Lampu Slim Panel LED PHILIPS RC091V Putih 28 w 14.00 ttk 0.180 - - - - - -
9 R.03 Pemasangan exhaust fan plafond 4.00 unit 0.056 - - - - - -
Jumlah B 0.932 0.116 - 0.116
C. PANEL DAN KABEL FEEDER
1 Q.04.A Memasang 1 buah Panel Utama 1.00 buah 0.460 - - - - - -
2 Q.04.B Memasang 1 buah Panel A Lantai 1 1.00 buah 0.370 - - - - - -
3 Q.04.C Memasang 1 buah Panel B Lantai 2 1.00 buah 0.346 - - - - - -
4 Q.06 Memasang kabel NYA 4 x 35 mm + NYA 16 mmDari panel Utama ke PLN 40.00 m1 0.023 - - - - - -
5 Q.06 Memasang kabel NYA 4 x 35 mm + NYA 16 mmPanel Utama ke PP.Lt.1 3.00 m1 0.002 - - - - - -
6 Q.07 Memasang kabel NYA 4 x 25 mm + NYA 16 mmPanel Utama ke PP.Lt.2 6.00 m1 0.003 - - - - - -
7 Q.17. Sambungan listrik baru 40,000.00 watt 0.186 40,000.00 0.186 - - 40,000.00 0.186
8 Q.18. Sertifikat layak operasi 40,000.00 watt 0.186 - - - - - -
Jumlah C 1.577 0.186 - 0.186
D. PENANGKAL PETIR
1 Pengadaan dan Pemasangan Instalasi Penangkal Petir
2 - Penangkar petir elektrostatis radius 40 meter 1.00 Btg 0.004 - - - - - -
3 - Pipa Galvanized dia. 2" 2.00 m1 0.002 - - - - - -
4 - Bak Kontrol 1.00 unit 0.007 - - - - - -
5 - Grounding 1.00 bh 0.054 - - - - - -
6 - BC 50 mm2 dalam conduit pvc 35.00 m1 0.037 - - - - - -
7 - Kabel NYA 1x35 mm 35.00 m1 0.010 - - - - - -
8 Peralatan bantu 1.00 ls 0.001 - - - - - -
9 Tes tahanan Pentanahan 1.00 ls 0.015 - - - - - -
Jumlah D 0.129 - - -
Jumlah A + B + C + D 3.784 0.645 - 0.645
II. PEKERJAAN PLUMBING
A. LANTAI 1
SANITER
1 M.01. Pemasangan Closet Duduk 4.00 buah 0.289 - - - - - -
2 M.04. Pemasangan Wastafel 5.00 buah 0.261 - - - - - -
3 Pemasangan cermin 40x60 cm 5.00 buah 0.065 - - - - - -
4 M.05. Pemasangan Floor drain 4.00 buah 0.007 - - - - - -
5 M.06. Pemasangan Kran 1/2 " 1.00 buah 0.001 - - - - - -
6 M.07. Pemasangan Kran leher angsa 3.00 buah 0.008 - - - - - -
7 M.08. Pemasangan Jet Washer 4.00 buah 0.017 - - - - - -
8 M.22. Pemasangan Kitchen Sink 1 lubang 1.00 unit 0.015 - - - - - -
9 M.23. Pemasangan Kitchen sink 2 lubang 1.00 unit 0.022 - - - - - -
10 M.24. Pemasangan bak cuci radiologi 1.00 unit 0.045 - - - - - -
11 S.06. Pemasangan railing disabilitas stainless steel kamar mandi 1.00 paket 0.033 - - - - - -
AIR BERSIH
1 M.09. Pemasangan Pipa PVC 1/2” 78.00 m1 0.048 - - - - - -
2 M.10. Pemasangan Pipa PVC 3/4” 14.00 m1 0.010 - - - - - -
3 M.11. Pemasangan Pipa PVC 1” 13.00 m1 0.007 - - - - - -
4 M.12. Pemasangan pipa PVC 1 1/2” 47.00 m1 0.057 - - - - - -
5 M.31. Pemasangan gate valve 40 mm 1.00 bh 0.011 - - - - - -
AIR KOTOR DAN BEKAS
1 M.13. Pemasangan pipa PVC 2” 29.00 m1 0.040 2.90 0.004 - - 2.90 0.004
2 M.14. Pemasangan Pipa PVC 3” 9.00 m1 0.022 0.90 0.002 - - 0.90 0.002
3 M.15. Pemasangan Pipa PVC 4" 130.00 m1 0.438 13.00 0.044 - - 13.00 0.044
4 M.16. Pemasangan Pipa PVC 5" 24.00 m1 0.081 2.40 0.008 - - 2.40 0.008
AIR HUJAN
1 M.14. Pemasangan Pipa PVC 3” 80.00 m1 0.195 - - - - - -
2 M.15. Pemasangan Pipa PVC 4" 61.00 m1 0.206 - - - - - -
3 M.16. Pemasangan Pipa PVC 5" 14.00 m1 0.047 - - - - - -
Jumlah A 1.924 0.058 - 0.058
B. LANTAI 2
SANITER
1 M.01. Pemasangan Closet Duduk 3.00 buah 0.217 - - - - - -
2 M.04. Pemasangan Wastafel 6.00 buah 0.313 - - - - - -
3 Pemasangan cermin 40x60 cm 6.00 buah 0.078 - - - - - -
4 M.05. Pemasangan Floor drain 4.00 buah 0.007 - - - - - -
5 M.06. Pemasangan Kran 1/2 " 2.00 buah 0.003 - - - - - -
6 M.07. Pemasangan Kran leher angsa 3.00 buah 0.008 - - - - - -
7 M.08. Pemasangan Jet Washer 4.00 buah 0.017 - - - - - -
8 M.22. Pemasangan Kitchen Sink 1 lubang 1.00 unit 0.015 - - - - - -
AIR BERSIH
1 M.09. Pemasangan Pipa PVC 1/2” 73.00 m1 0.045 - - - - - -
2 M.10. Pemasangan Pipa PVC 3/4” 10.00 m1 0.007 - - - - - -
3 M.11. Pemasangan Pipa PVC 1” 31.50 m1 0.016 - - - - - -
4 M.13. Pemasangan pipa PVC 2” 4.00 m1 0.005 - - - - - -
5 M.30. Pemasangan gate valve 25 mm 1.00 bh 0.008 - - - - - -
AIR KOTOR DAN BEKAS
1 M.13. Pemasangan pipa PVC 2” 40.60 m1 0.056 - - - - - -
2 M.14. Pemasangan Pipa PVC 3” 14.00 m1 0.034 - - - - - -
3 M.15. Pemasangan Pipa PVC 4" 14.00 m1 0.047 - - - - - -
AIR HUJAN
1 M.14. Pemasangan Pipa PVC 3” 117.00 m1 0.285 - - - - - -
2 M.05. Pemasangan Floor drain 10.00 buah 0.019 - - - - - -
Jumlah B 1.180 - - -
BOBOT PROGRES
PEK MINGGU LALU MINGGU INI S/D MINGGU INI
NO KODE URAIAN PEKERJAAN VOL SAT
(%) PRESTASI PRESTASI PRESTASI
VOL VOL VOL
(%) (%) (%)
C. LANTAI DAK
AIR BERSIH
1 M.11. Pemasangan Pipa PVC 1” 15.00 m1 0.008 - - - - - -
2 M.13. Pemasangan pipa PVC 2” 5.00 m1 0.007 - - - - - -
3 M.25. Pemasangan watertorn 1000 liter 2.00 unit 0.165 - - - - - -
4 M.28. Pemasangan Jet Pump 1.00 unit 0.058 - - - - - -
5 M.29. Pemasangan booster pump 1.00 unit 0.025 - - - - - -
6 M.30. Pemasangan gate valve 25 mm 5.00 bh 0.041 - - - - - -
AIR HUJAN
1 M.05. Pemasangan Floor drain 15.00 buah 0.028 - - - - - -
Jumlah C 0.331 - - -
D. SITE DEVELOPMENT
AIR BERSIH
1 M.26. Sambungan PDAM 1.00 Paket 0.083 1.00 0.083 - - 1.00 0.083
2 M.11. Pemasangan Pipa PVC 1” 37.00 m1 0.019 - - - - - -
3 M.27. Pembuatan sumur bor + pompa + instalasi pemipaan 1.00 paket 0.124 - - - - - -
4 S.21. Pembuatan bak kontrol 1.00 unit 0.011 - - - - - -
AIR KOTOR DAN BEKAS
1 M.22 Pembuatan Biotech 5 m3 1.00 unit 0.326 - - - - - -
2 M.21 Sumur resapan Buis uk. 100x50 cm kedalaman 4 meter (3 m3) 1.00 unit 0.133 - - - - - -
Jumlah D 0.694 0.083 - 0.083
Jumlah A + B + C + D 4.130 0.141 - 0.141
III. PEKERJAAN TATA UDARA
A. LANTAI 1
1 R.01.A Pemasangan AC 1/2 PK 10.00 unit 0.755 - - - - - -
2 R.01.C Pemasangan AC 1 PK 3.00 unit 0.247 - - - - - -
3 R.01.E Pemasangan AC 2 PK 1.00 unit 0.122 - - - - - -
4 R.04 Pemasangan Pipa drain AC PVC 5/8” 105.00 m1 0.321 - - - - - -
5 R.05.A Pemasangan Pipa refrigerator AC 1/4-3/8” 40.00 m1 0.062 - - - - - -
6 R.05.C Pemasangan Pipa refrigerator AC 1/4 - 5/8” 10.00 m1 0.024 - - - - - -
7 Q.01 Memasang 1 titik Instalasi Penerangan NYM 3 x 2,5 16.00 ttk 0.131 - - - - - -
8 Q.02.D Memasang 1 buah Stop kontak Philips, 1 Phase, 10 A, 250 VAC 16.00 ttk 0.025 - - - - - -
Jumlah A 1.687 - - -
B. LANTAI 2
1 R.01.A Pemasangan AC 1/2 PK 6.00 unit 0.453 - - - - - -
2 R.01.C Pemasangan AC 1 PK 1.00 unit 0.082 - - - - - -
3 R.01.D Pemasangan AC 1,5 PK 1.00 unit 0.093 - - - - - -
4 R.01.E Pemasangan AC 2 PK 4.00 unit 0.489 - - - - - -
5 R.04 Pemasangan Pipa drain AC PVC 5/8” 64.00 m1 0.195 - - - - - -
6 R.05.A Pemasangan Pipa refrigerator AC 1/4-3/8” 24.00 m1 0.037 - - - - - -
7 R.05.C Pemasangan Pipa refrigerator AC 1/4 - 5/8” 38.00 m1 0.090 - - - - - -
8 Q.01 Memasang 1 titik Instalasi Penerangan NYM 3 x 2,5 12.00 ttk 0.098 - - - - - -
9 Q.02.D Memasang 1 buah Stop kontak Philips, 1 Phase, 10 A, 250 VAC 12.00 ttk 0.019 - - - - - -
Jumlah B 1.558 - - -
Jumlah A + B 3.245 - - -
BOBOT PROGRES
PEK MINGGU LALU MINGGU INI S/D MINGGU INI
NO KODE URAIAN PEKERJAAN VOL SAT
(%) PRESTASI PRESTASI PRESTASI
VOL VOL VOL
(%) (%) (%)
E PEKERJAAN SITE DEVELOPMENT
I. PEKERJAAN PAGAR DEPAN DAN GERBANG
1 B.01.A Galian Tanah Biasa Dalam 1 m 5.00 m3 0.016 - - - - - -
2 B.02. Urugan Kembali Galian Tanah 2.00 m3 0.005 - - - - - -
3 B.03. Urugan Pasir 1.00 m3 0.008 - - - - - -
4 C.3. Pondasi Batu Belah 1:5 3.00 m3 0.068 - - - - - -
5 D.21. Pembuatan sloof beton bertulang (10x15) 33.00 m1 0.112 - - - - - -
6 D.20. Pembuatan kolom praktis beton bertulang (11x11) 20.00 m1 0.049 - - - - - -
7 D.21. Pembuatan ring balok beton bertulang (10x15) 7.00 m1 0.024 - - - - - -
8 F.02. Bata Merah 1/2 Bata 1:5 22.00 m2 0.081 - - - - - -
9 G.02. Plesteran 1:5 tebal 15 mm 22.00 m2 0.051 - - - - - -
10 G.03. Acian 22.00 m2 0.032 - - - - - -
11 H.06. Dinding Batu Tempel Hitam 22.00 m2 0.157 - - - - - -
12 L.02. Pengecatan Dinding 3x setara Vinillex 22.00 m2 0.022 - - - - - -
13 S.22. Pemasangan kanstin 23.00 m1 0.067 - - - - - -
14 S.04. Pemasangan pagar stainless steel 11.00 m1 0.045 - - - - - -
15 S.05. Pemasangan gerbang stainless steel 12.00 m1 0.050 - - - - - -
16 S.01. Pemasangan logo kota bogor T. 27 cm 1.00 bh 0.017 - - - - - -
17 S.02. Pemasangan logo dinkes T. 27 cm 1.00 bh 0.017 - - - - - -
18 S.13. Pemasangan hurup stainless steel T. 10 cm 22.00 bh 0.013 - - - - - -
19 S.14. Pemasangan hurup stainless steel T. 8 cm 33.00 bh 0.016 - - - - - -
20 S.15. Pemasangan hurup stainless steel T. 5 cm 36.00 bh 0.015 - - - - - -
21 Bibit tanaman setinggi maks 35 cm 78.00 bh 0.045 - - - - - -
22 Penanaman rumput gajah termasuk tanah humus dan pupuk 25.00 m2 0.029 - - - - - -
Jumlah I 0.936 - - -
II. PEKERJAAN JALAN DAN RAMP
RAMP MASUK DAN KELUAR
1 B.03. Urugan Pasir T. 3 cm 2.00 m3 0.016 - - - - - -
2 D.01. Beton Lantai Kerja Mutu K-100 T. 3 cm 2.00 m3 0.051 - - - - - -
3 D.05. Beton Mutu K-300 (Ready Mix ) Min. 6 m3 + slang 6.00 m3 0.201 - - - - - -
4 D.06.A Pembesian jaring kawat baja/wiremesh M8 2 lapis 71.00 m2 0.101 - - - - - -
RAMP IGD
1 D.05. Beton Mutu K-300 (Ready Mix ) Min. 6 m3 + slang 10.00 m3 0.335 - - - - - -
2 D.06.A Pembesian jaring kawat baja/wiremesh M8 91.00 m2 0.129 - - - - - -
JALAN 1 lapis
1 S.23. Pek. Lapisan batu split 3/5 dipadatkan 11.00 m3 0.050 - - - - - -
2 H.07. Paving Block Natural 6cm 336.00 m2 1.782 - - - - - -
3 S.22. Pemasangan kanstin 33.00 m1 0.095 - - - - - -
Jumlah II 2.760 - - -
III. PEKERJAAN SALURAN
1 B.01.A Galian Tanah Biasa Dalam 1 m 27.00 m3 0.087 - - - - - -
2 B.02. Urugan Kembali Galian Tanah 5.31 m3 0.012 - - - - - -
3 M.18. Saluran Air Hujan Buis Beton 1/2 Ø 20 cm 25.00 m1 0.130 - - - - - -
4 M.18.B Saluran Air Hujan Buis Beton 1/2 Ø 30 cm 71.86 m2 0.382 - - - - - -
5 M.19. Saluran Air Hujan Buis Beton Ø 30 cm 11.00 m1 0.064 - - - - - -
6 S.19. Pemasangan grill 20 cm 11.00 m1 0.015 - - - - - -
7 S.20. Pemasangan Plat deker 14.00 m2 0.029 - - - - - -
8 Pembuatan bak kontrol beton 50x50x50 cm 5.00 unit 0.081 - - - - - -
Jumlah III 0.801 - - -
IV. PEKERJAAN PAGAR KELILING
PANJANG PAGAR 30 METER
1 D.15. Pembuatan 1 M3 sloof beton bertulang (200 kg besi + bekisting) 1.00 m3 0.146 - - - - - -
2 D.16. Pembuatan 1 M3 kolom beton bertulang (150 kg besi + bekisting) 0.54 m3 0.089 - - - - - -
3 D.17. Pembuatan 1 M3 balok beton bertulang (200 kg besi + bekisting) 0.90 m3 0.173 - - - - - -
4 F.03. Pemasangan Bata Ringan tebal 10 cm 51.00 m2 0.165 - - - - - -
5 G.02. Plesteran 1:5 tebal 15 mm 51.00 m2 0.118 - - - - - -
6 G.03. Acian 51.00 m2 0.075 - - - - - -
7 L.01. Pengecatan Dinding 2x setara Vinillex 60.00 m2 0.043 - - - - - -
Jumlah IV 0.809 - - -
BOBOT PROGRES
PEK MINGGU LALU MINGGU INI S/D MINGGU INI
NO KODE URAIAN PEKERJAAN VOL SAT
(%) PRESTASI PRESTASI PRESTASI
VOL VOL VOL
(%) (%) (%)
F PEKERJAAN INTERIOR
I. PEKERJAAN BACKDROP
1 S.16. Backdrop R. Pendaftaran 12.00 m2 0.089 - - - - - -
2 Penutup sementara dinding belakang ( triplex 6 mm + rangka kaso) 21.00 m2 0.076 - - - - - -
Jumlah I 0.165 - - -
II. PEKERJAAN MEJA DAN RAK
1 S.17. Meja pendaftaran 4.00 m1 0.003 - - - - - -
S.18. Pintu meja R. steril Persalinan, R. Cuci, dan Pantry 5.35 m1 0.006 - - - - - -
Jumlah II 0.009 - - -
REKAPITULASI
LAPORAN MINGGUAN KEMAJUAN FISIK
BOBOT PROGRES
PEK MINGGU LALU MINGGU INI S/D MINGGU INI
NO URAIAN PEKERJAAN
(%) PRESTASI PRESTASI PRESTASI
VOL VOL VOL
(%) (%) (%)
A PEKERJAAN PERSIAPAN 1.660 1.464 - 1.464
B PEKERJAAN STRUKTUR
I. PEKERJAAN PENGURUGAN LAHAN DAN TALUD KELILING 7.946 5.568 - 5.568
II. PEKERJAAN PONDASI 11.113 11.113 - 11.113
III. PEKERJAAN BETON LANTAI 1 10.212 10.007 0.108 10.115
IV. PEKERJAAN BETON LANTAI 2 11.028 11.022 - 11.022
V. PEKERJAAN BETON LANTAI ATAP 4.487 4.487 - 4.487
C PEKERJAAN ARSITEKTUR
I. PEKERJAAN ARSITEKTUR LANTAI 1 11.376 6.833 1.827 8.660
II. PEKERJAAN ARSITEKTUR LANTAI 2 18.316 4.264 7.312 11.576
III. PEKERJAAN ARSITEKTUR LANTAI DAK 7.048 5.111 1.107 6.218
IV. PEKERJAAN AKSESORIS DAN LAINNYA 0.175 - - -
D. PEKERJAAN MEKANIKAL ELEKTRIKAL PLUMBING
I. PEKERJAAN ELEKTRIKAL 3.784 0.645 - 0.645
II. PEKERJAAN PLUMBING 4.130 0.141 - 0.141
III. PEKERJAAN TATA UDARA 3.245 - - -
E PEKERJAAN SITE DEVELOPMENT
I. PEKERJAAN PAGAR DEPAN DAN GERBANG 0.936 - - -
II. PEKERJAAN JALAN DAN RAMP 2.760 - - -
III. PEKERJAAN SALURAN 0.801 - - -
V. PEKERJAAN PAGAR KELILING 0.809 - - -
F PEKERJAAN INTERIOR
I. PEKERJAAN BACKDROP 0.165 - - -
II. PEKERJAAN MEJA DAN RAK 0.009 - - -
TOTAL 100.000 60.655 10.354 71.010
Mengetahui,
Pejabat Pembuat Komitmen Pejabat Pelaksana Teknis Kegiatan
Dinas Kesehatan Kota Bogor Dinas Kesehatan Kota Bogor