Anda di halaman 1dari 162

DAFTAR HARGA SATUAN BAHAN KAB.

SUMBAWA

INSTANSI : DINAS PERUMAHAN RAKYAT DAN KAWASAN PERMUKIMAN KAB. SUMBAW


KEGIATAN : PENYEDIAAN SARANA AIR BERSIH DAN SANITASI DASAR TERUTAMA BAG

PEKERJAAN : PEMBUATAN DED JARINGAN DISTRIBUSI DAN BANGUNAN PELENGKAP S


AI NGELAR DESA KEREKEH KEC. UNTER IWES

LOKASI : KEC. SUMBAWA, KEC. LABUHAN BADAS, KEC. UNTER IWES


TAHUN ANGGARAN : 2017

No JENIS BAHAN SATUAN

I. BAHAN PASANGAN
1 Batu Kali Alam M3
2 Kerikil Alam 2/3 Cm M3
3 Kerikil Alam 1/2 Cm M3
4 Kerikil Pecah 2/3 Cm M3
5 Kerikil Pecah 1/2 Cm M3
6 Agregat Kasar M3
7 Pasir Beton M3
8 Pasir Pasang M3
9 Pasir Urug M3
10 Tanah Urug Biasa M3
11 Tanah Urug Pilihan M3
12 Urugan Pilihan (EI-322) M3
13 Aggrgat A M26 M3
14 Aggregat B M27 M3
15 Agregat Kelas C1 (M28) M3
16 Aspal (M10) Kg
17 Kerosene (M11) liter
18 Agr 5-10 & 10-15 (M79) M3
19 Agr 0-5 (M78) M3
20 Pasir Halus (M01c) M3
21 Filler (M05) Kg
22 Aspal (M10) Kg
23 Semen Tiga Roda Kg
12 Bata Merah Kelas 1 Buah
13 Bata Merah Kelas 2 Buah
14 Semen (PC) Kg
15 Semen Warna butiran halus Kg
16 Sirtu M3
17 Modifier Liter
18 Minyak Aspal Liter
19 Minyak Tanah Liter
20 Gebalan Rumput M2
21 Air Liter
22 Minyak Bekisting Liter

II. BAHAN ATAP


1 Genteng Lokal Buah
2 Genteng Bubungan Lokal Buah
3 Genteng Beton/Pres Buah
4 Genteng Bubungan Beton Buah
5 Genteng Silang/Kodok Buah
6 Genteng Bubungan Silang Buah
7 Genteng Pres Lokal/Nujang Super Buah
8 Genteng Bubungan Pres Lokal/Nujang Super Buah
9 Genteng Kaca Buah
10 Genteng Keramik Buah
11 Genteng Bubungan Keramik Buah
12 Ijuk Kg
13 Asbes Gelombang Kecil Lembar
14 Asbes Gelombang Besar Lembar
15 Asbes Bubungan Glmb. Kecil Pasang
16 Asbes Bubungan Glmb. Besar Lembar
Nok Asbes Buah
17 Seng Gelombang Besar BJLS 20 Lembar
18 Seng Gelombang Besar BJLS 25 Lembar
19 Seng Gelombang Besar BJLS 30 Lembar
20 Seng Gelombang Kecil BJLS 20 Lembar
21 Seng Plat BJLS 20 Meter
22 Seng Plat BJLS 25 Meter
23 Seng Plat BJLS 30 Meter
24 Seng Spandek 3 mm lebar 70 cm Meter
25 Seng Spandek 3,5 mm lebar 70 cm Meter
26 Seng Spandek 4 mm lebar 70 cm Meter

III. BAHAN KAYU


1 Kayu Papan Klas I M3
2 Kayu Papan Klas II M3
3 Kayu Papan Klas III M3
4 Kayu Balok Klas I M3
5 Kayu Balok Klas II M3
6 Kayu Balok Klas III M3
7 Papan kayu bekisting M3
8 Balok kayu bekisting M3
9 Kayu Dolken Ø 7 cm L = 4 m' Batang
10 Plywood Tebal 9 mm Lembar
11 Kusen Kayu M³
12 Daun pintu Teakwood Buah
13 Daun jendela kaca polos 5 mm Buah
14 Kusen pintu rangka baja + pintu baja + gembok Buah
15 Ventilasi genset rangka dari baja Canal 100.50.5 (1x1 m) Buah
16 Kusen pintu kayu Buah
17 Kuzen pintu utama Tipe I termasuk Daun Pintu Buah
18 Kuzen pintu utama Tipe II termasuk Daun Pintu Buah
19 Kuzen bouven light Tipe IV Buah

IV. BAHAN CETAK


1 Lubang Angin 10 x 20 Cm Buah
2 Lubang Angin 20 x 20 Cm Buah
3 Lubang Angin 30 x 20 Cm Buah
4 Buis Beton dia. 10 Cm Buah
5 Buis Beton dia. 20 Cm Buah
6 Buis Beton dia. 30 Cm Buah
7 Buis Beton dia. 40 Cm Buah
8 Buis Beton dia. 60 Cm Buah
9 Buis Beton dia. 80 Cm Buah
10 Bataco 10 x 20 x 40 Cm Buah
11 Paving Block Press type bata t=6 M2
12 Paving Block biasa type bata t=8 M2
13 Paving Block press type berlian t=8 cm M2
14 Beton Precast U-Ditch 60x60 Buah

V. BAHAN LANTAI
1 Tegel Abu-abu 20 x 20 Cm M2
2 Tegel Bergaris Abu-abu 20 x 20 Cm M2
3 Tegel Warna 20 x 20 Cm. Buah
4 Tegel Bergaris Warna 20 x 20 Cm. M2
5 Tegel Traso Klas I 30 x 30 Cm M2
6 Tegel Traso Klas II 30 x 30 Cm M2
7 Keramik Dinding M2
8 Porselin Kualitas I (polos) M2
9 Keramik Kualitas I (Motif) M2
10 Keramik Kualitas II (Motif) M2
11 Keramik Kualitas I (polos) M2
12 Keramik Kualitas II (polos) M2
13 Marmer Kualitas I M2

VI. BAHAN BESI


1 Besi Beton Ulir Kg
2 Besi Beton Polos Kg
3 Besi Profil Canal ( EX KS ) Kg
4 Besi Profil Kg
5 Besi Hollow (4x4x,035) 4m Batang
6 Besi Plat 3mm Kg
Besi Siku
7 Kawat Beton Kg
8 Kawat Nyamuk Besi M2
9 Kawat Nyamuk Plastik M2
10 Kawat Saringan Pasir M2
11 Kawat Duri ( 1 rol = 30 m' ) Rol
12 Kawat Bronjong 3mm Kg
13 Kawat Bronjong 4mm Kg
14 Kawat Bronjong Pabrikasi Lubang 8x10 Heavy Galv Buah
( 2 x 1 x 0,5 m) Dia. 2,70 mm
15 Kawat Bronjong Pabrikasi Lubang 8x10 Heavy Galv Buah
( 2 x 1 x0,5 m) Dia. 3,00mm
16 Kawat Las Kg
17 Pembuatan Pintu Plat Baja Unit
18 Pemb. double ventilasi udara (pipa baja) Ø 50 mm Unit
19 Pembuatan tutup manhole plat baja 1 x 1 x 3 Unit
20 Pembuatan tangga R. Reservoir dari besi Ø 16 mm Unit
21 Pemb. Kusen pintu (pipa baja) Ø 50 mm Unit
22 Perakitan/Erection Kg
23 Besi plat t = 3 mm Kg
24 Besi plat t = 5 mm Kg
25 Anchor Bolt/Besi Angkur Buah
26 Dyna bolt dia. 10 mm Buah
27 Plat Baja M2
28 Engsel kupu-kupu Buah
29 Kawat las harmonika Buah
30 Kunci gembok lengkap Unit
31 Pegangan besi ø 12 mm Buah
32 Pengecatan besi Buah
33 Besi Beugel + Mur Baut Buah
34 Kawat Matahari Buah
35 Angkur Buah
36 Moer + Baut Ø 7/8 mm Buah
37 Moer + Baut Ø 5/8 mm Buah
38 U Bolt f 16 mm Pasang
39 Clamp Pipa Pasang
40 Penyangga Pipa Kg
41 Klem # 3 x 50 Kg
42 Pagar BRC 150x240 cm Buah
43 Pagar BRC 190x240 cm Buah
44 Pintu BRC (Dua Pintu) BRC 190x200 cm Buah
45 Tiang BRC 2"x190 cm Buah
46 Tiang BRC 1,5"x120 cm Buah
47 Tutup tiang pintu Buah
48 Roda pintu sesuai gambar Buah
49 Lidah kunci dan gembok pintu Buah
50 Knop Tiang BRC 1,5" Buah
51 Kusen Alumunium tebal 1,2 mm M'
52 Profil Kaca Alumunium M'
53 Pintu Alumunium M'
54 Alumunium Strip M'

VII. BAHAN LANGIT-LANGIT


1 Eternit 100 x 100 Cm Lembar
2 Triplek 120 x 240 x 2 mm Lembar
3 Triplek 120 x 240 x 3 mm Lembar
4 Triplek 120 x 240 x 6 mm Lembar
5 Triplek 120 x 240 x 9 mm Lembar
6 Triplek 120 x 240 x 12 mm Lembar
7 Triplek 120 x 240 x 18 mm Lembar
8 Triplek lapis Alumunium Lembar
9 Calsiboard 120 x 240 x 3,5 mm Lembar
10 Calsiboard 120 x 240 x 6 mm Lembar
11 Gypsum 12 mmuk.1200x2400 Lembar
12 Gypsum 9 mmuk. 1200x2400 Lembar
13 Gypsum M'
14 List gypsum profil M'
15 Tepung Gypsum Kg
16 List Kayu profil M'
17 Teakwood 120 x 240 x 3 mm Lembar
18 Formika Putih 120 x 240 Cm Lembar
19 Formika Warna 120 x 240 Cm Lembar
20 Lem Kayu Kg
21 GRC (4 mm) Lembar
22 GRC (6 mm) Lembar
23 Rangka atap M2
24 Atap asbes M2
25 Nok asbes M2

VIII. BAHAN KACA


1 Kaca Polos 3 mm M2
2 Kaca Polos 5 mm M2
3 Kaca Riben 3 mm M2
4 Kaca Riben 5 mm M2
5 Kerangka Nako 5 mm M2

IX. BAHAN FINISHING


1 Amplas Kayu Lembar
2 Plamir Kayu Kg
3 Spirtus Liter
4 Minyak Cat Liter
5 Residu Liter
6 Teak Oil Liter
7 Meni Besi Kg
8 Meni Kayu Kg
9 Cat Kayu Mutu Menengah Kg
10 Cat Kayu Mutu Tinggi Kg
11 Cat Tembok Mutu Menengah Kg
12 Cat Tembok Mutu Tinggi Kg
13 Cat Besi Kg
14 Plamir Tembok Kg
15 Teer Kg
16 Politur Liter
17 Cat Marka Jalan Scalato Kg
19 Cat Marka Jalan Biasa Kg
20 Roll cat Buah
21 Kuas besar Buah
22 Kuas kecil Buah
23 Cat Waterproof Kg

X. BAHAN PENGUNCI
1 Union Kecil Buah
2 Union Besar Buah
3 Yale Kecil Buah
4 Yale Besar Buah
5 Kuda Terbang Kecil Buah
6 Kuda Terbang Besar Buah
7 Royal Buah
8 Haag Angin Besar Buah
9 Haag Angin Kecil Buah
10 Grendel Besar Buah
11 Grendel Kecil Buah
12 Engsel Pintu Pasang
12 Engsel Jendela Pasang
13 Engsel Biasa Pasang
14 Expagnolet Buah
15 Kunci pintu mutu menengah Buah
16 Kunci pintu mutu Tinggi Buah
17 Kunci cylinder 2 kali slag Buah
18 Hak angin Buah

XI. BAHAN SANITAIRE


1 Closet Duduk ( Kualitas I ) Buah
2 Closet Jongkok Teraso Buah
3 Closet Jongkok Porselin Buah
4 Westafel Buah
5 Urinoir Porselin Buah
6 Saringan Air Besi Buah
7 Saringan Air Plastik Buah
8 Bak Cuci Piring Plastik Buah
9 Bak Cuci Piring Logam Buah
10 Reservoir Fyberglass Kapasitas 1 M3 Buah
11 Septictank Kapasitas 1 M3 Buah
12 Septictank Kapasitas 2 M3 Buah
13 Bak Fyberglass Kapasitas 0,5 M3 Buah
14 Bak Mandi Plastik Kapasitas 0,5 M3 Buah
15 Bak Mandi Teraso 50 x 50 m. Buah

XII. BAHAN PAKU


1 Paku Panjang 1 - 3 Cm Kg
2 Paku Panjang 4 - 6 Cm Kg
3 Paku Panjang 7 - 12 Cm Kg
4 Paku Kg
5 Paku Seng Kg
6 Paku Asbes Kg
7 Skrup/Piles 1,5 Cm Dos Kecil
8 Skrup/Piles 2,0 Cm Dos Kecil
9 Paku Sumbat Buah
10 Besi Beugel/Baut (Untuk Kuda-kuda) Buah

XIII. BAHAN INSTALASI LISTRIK


1 Titik Lampu Buah
2 Stop Kontak Tanam Buah
3 Stop Kontak Luar Buah
4 Saklar Ganda Buah
5 Saklar Tunggal Buah
6 Zekering Boxes 1 Group Buah
7 Zekering Boxes 2 Group Buah
8 Zekering Boxes 3 Group Buah
9 Lampu mercury lengkap dengan tiang dan armatour (tinggi 7 m, 250 watt) Unit
Buah

XIV. BAHAN PIPA


A. PIPA GI MEDIUM CLASS
1 Pipa GI ø 1/2" ø Meter
2 Pipa GI ø 3/4" ø Meter
3 Pipa GI ø 1" ø Meter
4 Pipa GI ø 1 1/4" ø Meter
5 Pipa GI ø 1 1/2" ø Meter
6 Pipa GI ø 2" ø Meter
7 Pipa GI ø 2 1/2" ø Meter
8 Pipa GI ø 3" ø Meter
9 Pipa GI ø 4" ø Meter
10 Pipa GI ø 5" ø Meter
11 Pipa GI ø 6" ø Meter
12 Pipa GI ø 8" ø Meter
13 Pipa GI ø 10" ø Meter
14 Pipa GI ø 12" ø Meter
15 Pipa GI ø 14" ø Meter
16 Pipa GI ø 16" ø Meter

B. PIPA PVC RRJ


1 Pipa PVC SCJ ø 1/2" ø Meter
2 Pipa PVC SCJ ø 3/4" ø Meter
3 Pipa PVC SCJ ø 1" ø Meter
4 Pipa PVC SCJ ø 1 1/4" ø Meter
5 Pipa PVC SCJ ø 1 1/2" ø Meter
6 Pipa PVC SCJ ø 2" ø Meter
7 Pipa PVC SCJ ø 2 1/2" ø Meter
8 Pipa PVC SCJ ø 3" ø Meter
9 Pipa PVC SCJ ø 4" ø Meter
10 Pipa PVC SCJ ø 6" ø Meter
11 Pipa PVC SCJ ø 8" ø Meter
12 Pipa PVC SCJ ø 10" ø Meter
13 Pipa PVC SCJ ø 12" ø Meter
14 Pipa PVC SCJ ø 14" ø Meter
15 Pipa PVC SCJ ø 16" ø Meter

C. PIPA HDPE PE 100 PN 10 SDR 17


1 Pipa HDPE ø ø 20 mm (1/2") Meter
2 Pipa HDPE ø ø 25 mm (3/4") Meter
3 Pipa HDPE ø ø 32 mm (1") Meter
4 Pipa HDPE ø ø 40 mm (1 1/4") Meter
5 Pipa HDPE ø ø 50 mm (1 1/2") Meter
6 Pipa HDPE ø ø 63 mm (2") Meter
7 Pipa HDPE ø ø 75 mm (2 1/2") Meter
8 Pipa HDPE ø ø 90 mm (3") Meter
9 Pipa HDPE ø ø 110 mm (4") Meter
10 Pipa HDPE ø ø 125 mm (5") Meter
11 Pipa HDPE ø ø 160 mm (6") Meter
12 Pipa HDPE ø ø 200 mm (8") Meter
13 Pipa HDPE ø ø 250 mm (10") Meter
14 Pipa HDPE ø ø 315 mm (12") Meter
15 Pipa HDPE ø ø 355 mm (14") Meter
16 Pipa HDPE ø ø 400 mm (16") Meter
17 Pipa HDPE ø ø 450 mm (18") Meter
18 Pipa HDPE ø ø 500 mm (20") Meter

D. ACCESSORIES
1 Bend PE 22,5º ø 63 mm (2") Buah
2 Bend PE 22,5º ø 75 mm (2 1/2") Buah
3 Bend PE 22,5º ø 90 mm (3") Buah
4 Bend PE 22,5º ø 110 mm (4") Buah
5 Bend PE 22,5º ø 160 mm (6") Buah
6 Bend PE 22,5º ø 200 mm (8") Buah
7 Bend PE 22,5º ø 250 mm (10") Buah
8 Bend PE 22,5º ø 315 mm (12") Buah
9 Bend PE 22,5º ø 355 mm (14") Buah
10 Bend PE 22,5º ø 400 mm (16") Buah
11 Bend PE 22,5º ø 450 mm (18") Buah
12 Bend PE 22,5º ø 500 mm (20") Buah
13 Bend PE 45º ø 63 mm (2") Buah
14 Bend PE 45º ø 75 mm (2 1/2") Buah
15 Bend PE 45º ø 90 mm (3") Buah
16 Bend PE 45º ø 110 mm (4") Buah
17 Bend PE 45º ø 160 mm (6") Buah
18 Bend PE 45º ø 200 mm (8") Buah
19 Bend PE 45º ø 250 mm (10") Buah
20 Bend PE 45º ø 315 mm (12") Buah
21 Bend PE 45º ø 355 mm (14") Buah
22 Bend PE 45º ø 400 mm (16") Buah
23 Bend PE 45º ø 450 mm (18") Buah
24 Bend PE 45º ø 500 mm (20") Buah
25 Bend PE 90º ø 63 mm (2") Buah
26 Bend PE 90º ø 75 mm (2 1/2") Buah
27 Bend PE 90º ø 90 mm (3") Buah
28 Bend PE 90º ø 110 mm (4") Buah
29 Bend PE 90º ø 160 mm (6") Buah
30 Bend PE 90º ø 200 mm (8") Buah
31 Bend PE 90º ø 250 mm (10") Buah
32 Bend PE 90º ø 315 mm (12") Buah
33 Bend PE 90º ø 355 mm (14") Buah
34 Bend PE 90º ø 400 mm (16") Buah
35 Bend PE 90º ø 450 mm (18") Buah
36 Bend PE 90º ø 500 mm (20") Buah
37 Bend PVC 90º ø 150 mm (6") Buah
38 Reducer PE ø 90 x 63 mm (3" x 2") Buah
39 Reducer PE ø 110 x 63 mm (4" x 2") Buah
40 Reducer PE ø 110 x 90 mm (4" x 3") Buah
41 Reducer PE ø 160 x 63 mm (6" x 2") Buah
42 Reducer PE ø 160 x 90 mm (6" x 3") Buah
43 Reducer PE ø 160 x 110 mm (6" x 4") Buah
44 Reducer PE ø 200 x 90 mm (8" x 3") Buah
45 Reducer PE ø 200 x 110 mm (8" x 4") Buah
46 Reducer PE ø 200 x 160 mm (8" x 6") Buah
47 Reducer PE ø 250 x 110 mm (10" x 4") Buah
48 Reducer PE ø 250 x 160 mm (10" x 6") Buah
49 Reducer PE ø 250 x 200 mm (10" x 8") Buah
50 Reducer PE ø 315 x 160 mm (12" x 6") Buah
51 Reducer PE ø 315 x 200 mm (12" x 8") Buah
52 Reducer PE ø 315 x 250 mm (12" x 10") Buah
53 Reducer PE ø 355 x 200 mm (14" x 8") Buah
54 Reducer PE ø 355 x 250 mm (14" x 10") Buah
55 Reducer PE ø 355 x 315 mm (14" x 12") Buah
56 Reducer PE ø 400 x 200 mm (16" x 8") Buah
57 Reducer PE ø 400 x 250 mm (16" x 10") Buah
58 Reducer PE ø 400 x 315 mm (16" x 12") Buah
59 Reducer PE ø 400 x 355 mm (16" x 14") Buah
60 Reducer PE ø 450 x 200 mm (18" x 8") Buah
61 Reducer PE ø 450 x 250 mm (18" x 10") Buah
62 Reducer PE ø 450 x 315 mm (18" x 12") Buah
63 Reducer PE ø 450 x 355 mm (18" x 14") Buah
64 Reducer PE ø 450 x 400 mm (18" x 14") Buah
65 Reducer PE ø 500 x 315 mm (20" x 12") Buah
66 Reducer PE ø 500 x 400 mm (20" x 16") Buah
67 Reducer PE ø 500 x 450 mm (20" x 18") Buah
68 Equal Tee PE ø 63 mm (2") Buah
69 Equal Tee PE ø 75 mm (2 1/2") Buah
70 Equal Tee PE ø 90 mm (3") Buah
71 Equal Tee PE ø 110 mm (4") Buah
72 Equal Tee PE ø 160 mm (6") Buah
73 Equal Tee PE ø 200 mm (8") Buah
74 Equal Tee PE ø 250 mm (10") Buah
75 Equal Tee PE ø 315 mm (12") Buah
76 Equal Tee PE ø 355 mm (14") Buah
77 Equal Tee PE ø 400 mm (16") Buah
78 Equal Tee PE ø 450 mm (18") Buah
79 Equal Tee PE ø 500 mm (20") Buah
80 Tee PE ø 90 x 63 mm (3" x 2") Buah
81 Tee PE ø 110 x 63 mm (4" x 2") Buah
82 Tee PE ø 110 x 90 mm (4" x 3") Buah
83 Tee PE ø 160 x 90 mm (6" x 3") Buah
84 Tee PE ø 160 x 110 mm (6" x 4") Buah
85 Tee PE ø 200 x 110 mm (8" x 4") Buah
86 Tee PE ø 200 x 160 mm (8" x 6") Buah
87 Tee PE ø 250 x 160 mm (10" x 6") Buah
88 Tee PE ø 250 x 200 mm (10" x 8") Buah
89 Tee PE ø 315 x 200 mm (12" x 8") Buah
90 Tee PE ø 315 x 250 mm (12" x 10") Buah
91 Tee PE ø 355 x 200 mm (14" x 8") Buah
92 Tee PE ø 355 x 250 mm (14" x 10") Buah
93 Tee PE ø 355 x 315 mm (14" x 12") Buah
94 Tee PE ø 400 x 315 mm (16" x 12") Buah
95 Tee PE ø 400 x 355 mm (16" x 14") Buah
96 Tee PE ø 450 x 355 mm (18" x 14") Buah
97 Tee PE ø 450 x 400 mm (18" x 14") Buah
98 Tee PE ø 500 x 400 mm (20" x 16") Buah
99 Tee PE ø 500 x 450 mm (20" x 18") Buah
100 Stub Flange ø 63 mm (2") Buah
101 Stub Flange ø 75 mm (2 1/2") Buah
102 Stub Flange ø 90 mm (3") Buah
103 Stub Flange ø 110 mm (4") Buah
104 Stub Flange ø 160 mm (6") Buah
105 Stub Flange ø 200 mm (8") Buah
106 Stub Flange ø 250 mm (10") Buah
107 Stub Flange ø 315 mm (12") Buah
108 Stub Flange ø 355 mm (14") Buah
109 Stub Flange ø 400 mm (16") Buah
110 Stub Flange ø 450 mm (18") Buah
111 Stub Flange ø 500 mm (20") Buah
112 End Cap ø 63 mm (2") Buah
113 End Cap ø 75 mm (2 1/2") Buah
114 End Cap ø 90 mm (3") Buah
115 End Cap ø 110 mm (4") Buah
116 End Cap ø 160 mm (6") Buah
117 End Cap ø 200 mm (8") Buah
118 End Cap ø 250 mm (10") Buah
119 End Cap ø 315 mm (12") Buah
120 End Cap ø 355 mm (14") Buah
121 End Cap ø 400 mm (16") Buah
122 End Cap ø 450 mm (18") Buah
123 End Cap ø 500 mm (20") Buah
124 Konektor PE ø 2" Buah
125 Konektor PE ø 3" Buah
126 Gate Valve All Flange ø 2" Buah
127 Gate Valve All Flange ø 3" Buah
128 Gate Valve All Flange ø 4" Buah
129 Gate Valve All Flange ø 6" Buah
130 Gate Valve All Flange ø 8" Buah
131 Gate Valve All Flange ø 10" Buah
132 Gate Valve All Flange ø 12" Buah
133 Gate Valve All Flange ø 14" Buah
134 Gate Valve All Flange ø 16" Buah
135 Gate Valve All Flange ø 18" Buah
136 Check Valve All Flange ø 2" Buah
137 Check Valve All Flange ø 3" Buah
138 Check Valve All Flange ø 4" Buah
139 Check Valve All Flange ø 6" Buah
140 Check Valve All Flange ø 8" Buah
141 Check Valve All Flange ø 10" Buah
142 Check Valve All Flange ø 12" Buah
136 Air Valve Single ø 13 mm Buah
137 Air Valve Single ø 20 mm Buah
138 Air Valve Single ø 25 mm Buah
139 Air Valve Single ø 50 mm Buah
140 Air Valve Single ø 75 mm Buah
141 Air Valve Single ø 100 mm Buah
142 Air Valve Double ø 25 mm Buah
143 Air Valve Double ø 50 mm Buah
144 Pipa Riser GI ø 2" - 0.80 m' Buah
145 Pipa Riser GI ø 3" - 0.80 m' Buah
146 Pipa Riser GI ø 3" - 1.00 m' Buah
147 Pipa Riser GI ø 4" - 0.80 m' Buah
148 Pipa Riser GI ø 6" - 2.50 m' Buah
149 Pipa Riser GI ø 6" - 1.50 m' Buah
150 Pipa Riser GI ø 8" - 0.80 m' Buah
151 Pipa Riser GI ø 10" - 0.80 m' Buah
152 Wall Pipe All Flange ø 3" - 0.80 m' Buah
153 Wall Pipe All Flange ø 4" - 0.80 m' Buah
154 Wall Pipe All Flange ø 4" - 2.50 m' Buah
155 Wall Pipe All Flange ø 6" - 1 m' Buah
156 Wall Pipe All Flange ø 6" - 2.5 m' Buah
157 Wall Pipe All Flange ø 8" - 1,5 m' Buah
158 Wall Pipe All Flange ø 10" - 1,5 m' Buah
159 Bend GI All Flange ø 2" x 90º Buah
160 Bend GI All Flange ø 2" x 45º Buah
161 Bend GI All Flange ø 2" x 22 1/2º Buah
162 Bend GI All Flange ø 3" x 90º Buah
163 Bend GI All Flange ø 3" x 45º Buah
164 Bend GI All Flange ø 3" x 22 1/2º Buah
165 Bend GI All Flange ø 4" x 90O Buah
166 Bend GI All Flange ø 4" x 45O Buah
167 Bend GI All Flange ø 4" x 22 1/2O Buah
168 Bend GI All Flange ø 6" x 90o Buah
169 Bend GI All Flange ø 6" x 45o Buah
170 Bend GI All Flange ø 6" x 22 1/2o Buah
171 Bend GI All Flange ø 8" x 90o Buah
172 Bend GI All Flange ø 8" x 45o Buah
173 Bend GI All Flange ø 8" x 22 1/2o Buah
174 Bend GI All Flange ø 10" x 90o Buah
175 Bend GI All Flange ø 10" x 45o Buah
176 Bend GI All Flange ø 10" x 22 1/2o Buah
177 Bend GI All Flange ø 12" x 90O Buah
178 Bend GI All Flange ø 12" x 45O Buah
179 Bend GI All Flange ø 12" x 22 1/2O Buah
180 Bend GI All Flange ø 14" x 90O Buah
181 Bend GI All Flange ø 14" x 45O Buah
182 Bend GI All Flange ø 14" x 22 1/2O Buah
183 Bend GI All Flange ø 16" x 90O Buah
184 Bend GI All Flange ø 16" x 45O Buah
185 Bend GI All Flange ø 16" x 22 1/2O Buah
186 Bend GI All Flange ø 20" x 45O Buah
187 Clamp Saddle ø 16" x 50 mm Buah
188 Clamp Saddle ø 14" x 50 mm Buah
189 Clamp Saddle ø 12" x 50 mm Buah
190 Clamp Saddle ø 10" x 50 mm Buah
191 Clamp Saddle ø 10" x 75 mm Buah
192 Clamp Saddle ø 10" x 100 mm Buah
193 Clamp Saddle ø 8" x 13 mm Buah
194 Clamp Saddle ø 8" x 20 mm Buah
195 Clamp Saddle ø 8" x 50 mm Buah
196 Clamp Saddle ø 8" x 75 mm Buah
197 Clamp Saddle ø 8" x 100 mm Buah
198 Clamp Saddle ø 6" x 50 mm Buah
199 Clamp Saddle ø 6" 25 mm Buah
200 Clamp Saddle ø 6" x 20 mm Buah
201 Clamp Saddle ø 6" x 13 mm Buah
202 Clamp Saddle ø 4" x 20 mm Buah
203 Clamp Saddle ø 4" x 25 mm Buah
204 Clamp Saddle ø 4" x 13 mm Buah
205 Clamp Saddle ø 3" x 25 mm Buah
206 Clamp Saddle ø 3" x 20 mm Buah
207 Clamp Saddle ø 3" x 13 mm Buah
208 Clamp Saddle ø 2" x 13 mm Buah
209 Flange Las ø 2" Buah
210 Flange Las ø 3" Buah
211 Flange Las ø 4" Buah
212 Flange Las ø 6" Buah
213 Flange Las ø 8" Buah
214 Flange Las ø 10" Buah
215 Flange Las ø 12" Buah
216 Flange Las ø 14" Buah
217 Flange Las ø 16" Buah
218 Flange Socket ø 2" Buah
219 Flange Socket ø 3" Buah
220 Flange Socket ø 4" Buah
221 Flange Socket ø 6" Buah
222 Flange Socket ø 8" Buah
223 Flange Socket ø 10" Buah
224 Flange Socket ø 12" Buah
225 Flange Socket ø 14" Buah
226 Flange Spigot ø 2" Buah
227 Flange Spigot ø 3" Buah
228 Flange Spigot ø 4" Buah
229 Flange Spigot ø 6" Buah
230 Flange Spigot ø 8" Buah
231 Flange Spigot ø 10" Buah
232 Flange Spigot ø 12" Buah
233 Flange Spigot ø 14" Buah
234 Screen Flange GI ø 8" Buah
235 Screen Flange GI ø 10" Buah
236 Giboult Joint ø 2" Buah
237 Giboult Joint ø 3" Buah
238 Giboult Joint ø 4" Buah
239 Giboult Joint ø 6" Buah
240 Giboult Joint ø 8" Buah
241 Giboult Joint ø 10" Buah
242 Giboult Joint ø 12" Buah
243 Giboult Joint ø 14" Buah
244 Giboult Joint ø 16" Buah
245 Rubber Packing ø 1" Buah
246 Rubber Packing ø 2" Buah
247 Rubber Packing ø 3" Buah
248 Rubber Packing ø 4" Buah
249 Rubber Packing ø 6" Buah
250 Rubber Packing ø 8" Buah
251 Rubber Packing ø 10" Buah
252 Rubber Packing ø 12" Buah
253 Rubber Packing ø 14" Buah
254 Rubber Packing ø 16" Buah
255 Reducer GI ø 10" x 8" Buah
256 Reducer GI ø 10" x 6" Buah
257 Reducer GI ø 8" x 6" Buah
258 Reducer GI ø 4" x 3" Buah
259 Tee GI All Flange ø 3" x 2" Buah
260 Tee GI All Flange ø 3" x 3" Buah
261 Tee GI All Flange ø 4" x 1" Buah
262 Tee GI All Flange ø 4" x 2" Buah
263 Tee GI All Flange ø 4" x 3" Buah
264 Tee GI All Flange ø 4" x 4" Buah
265 Tee GI All Flange ø 6" x 1" Buah
266 Tee GI All Flange ø 6" x 2" Buah
267 Tee GI All Flange ø 6" x 3" Buah
268 Tee GI All Flange ø 6" x 4" Buah
269 Tee GI All Flange ø 6" x 6" Buah
270 Tee GI All Flange ø 8" x 1" Buah
271 Tee GI All Flange ø 8" x 2" Buah
272 Tee GI All Flange ø 8" x 3" Buah
273 Tee GI All Flange ø 8" x 4" Buah
274 Tee GI All Flange ø 8" x 6" Buah
275 Tee GI All Flange ø 8" x 8" Buah
276 Tee GI All Flange ø 10" x 2" Buah
277 Tee GI All Flange ø 10" x 4" Buah
278 Tee GI All Flange ø 10" x 6" Buah
279 Tee GI All Flange ø 10" x 8" Buah
280 Tee GI All Flange ø 10" x 10" Buah
281 Tee GI All Flange ø 12" x 2" Buah
282 Tee GI All Flange ø 12" x 4" Buah
283 Tee GI All Flange ø 12" x 6" Buah
284 Tee GI All Flange ø 12" x 8" Buah
285 Tee GI All Flange ø 12" x 10" Buah
286 Tee GI All Flange ø 12" x 12" Buah
287 Tee GI All Flange ø 14" x 2" Buah
288 Tee GI All Flange ø 14" x 4" Buah
289 Tee GI All Flange ø 14" x 6" Buah
290 Tee GI All Flange ø 14" x 8" Buah
291 Tee GI All Flange ø 14" x 10" Buah
292 Tee GI All Flange ø 16" x 4" Buah
293 Tee GI All Flange ø 16" x 6" Buah
294 Tee GI All Flange ø 16" x 8" Buah
295 Tee GI All Flange ø 16" x 10" Buah
296 Penguras Pipa 0 0 Buah
297 Water Meter ø 12" Buah
298 Water Meter ø 10" Buah
299 Water Meter ø 8" Buah
300 Water Meter ø 6" Buah
301 Water Meter ø 4" Buah
302 Water Meter ø 3" Buah
303 Water Meter ø 2" Buah
304 Water Meter ø 1 1/2" Buah
305 Water Meter ø 1" Buah
306 Water Meter ø 3/4" Buah
307 Water Meter ø 1/2" Buah
308 Valve Threaded ø 2" Buah
309 Valve Socket ø 3" Buah
310 Valve Socket ø 2" Buah
311 Valve Socket ø 3/4" Buah
312 Valve Socket ø 1/2" Buah
313 Water Moer ø 2" Buah
314 Double Nepple ø 2" Buah
315 Mur + Baut Buah
316 Hidran Umum Fiber Glass 2 M3 Buah
317 Faucet Socket ø 20 mm (3/4") Buah
318 Stop Kran ø 20 mm (3/4") Buah
319 Stop Kran ø 13 mm (1/2") Buah
320 Kran Engsel ø 13 mm (1/2") Buah
321 Socket GI ø 13 mm (1/2") Buah
322 Socket GI ø 20 mm (3/4") Buah
323 Double Nepple ø 13 mm (1/2") Buah
324 Elbow FF ø 20 mm (3/4") Buah
325 Elbow MF ø 20 mm (3/4") Buah
326 Knee FF ø 13 mm (1/2") Buah
327 Verlop Ring ø 20 x 13 mm Buah
328 Clamp Sadle ø 75 x 20 mm Buah
329 Pelampung ø 20 mm (3/4") Buah
330 Reducer GI ø 20 x 13 mm Buah
331 Clamp pipa lengkap dg Baut Veø 6" Buah
332 Seltip 00 Rol
333 Dop GI ø 20 mm (3/4") Buah
334 Screen GI - 3 M' ø 100 mm (4") Buah
335 Screen GI - 3 M' ø 150 mm (6") Buah
336 Screen GI - 3 M' ø 250 mm (10") Buah
337 Knee PVC ø 20 mm (3/4") Buah
338 - Bend GI All Flange Buah
337 - Gate Valve All Flange Dia. 4" Buah
338 - Gate Valve All Flange Dia. 6" Buah
339 - Gate Valve All Flange Dia. 8" Buah
340 - Tee GI All Flange Buah
341 - Pipa GI Medium A Buah
342 - Flange Las Buah
343 - Rubber packing Buah
344 - Wall Pipe All Flange L : 0.80 Buah
345 - Mur baut Buah
346 - Pekerjaan Pemasangan Pipa & Accessoriesnya Buah
347 PIPA OUTLET, WASHOUT DAN OVERFLOW Buah
348 - Gate Valve All Flange Buah
349 - Wall Pipe All Flange L : 0.80 Buah
350 - Tee GI All Flange Buah
351 - Bend GI All Flange Buah
352 - Flange Spigot Buah
353 Water stop 3/250 mm Buah
354 Pipa dengan Flange ganda dia ¢ 200 mm panjang 300 cm Buah
355 Pipa Dinding dengan Flange ganda dia ¢ 200 mm panjang 80 cm Buah
356 Pipa dengan Flange ganda dia ¢ 200 mm panjang 50 cm Buah
357 Tee All flange ¢ 200 x ¢ 200 x ¢ 200 mm Buah
358 Gate valve ¢ 200 mm K. 150 Buah
359 Bend 90 º All Flange ¢ 200 mm Buah
360 Bend 90 º dengan Flange tunggal ¢ 200 mm Buah
361 Pipa dengan Flange ganda dia ¢ 250 mm panjang 200 cm Buah
362 Pipa Dinding dengan Flange ganda dia ¢ 250 mm panjang 80 cm Buah
363 Bend 90 º dengan flange ganda ¢ 250 mm Buah
364 Bend 90 º dengan flange tunggal ¢ 250 mm Buah
365 Pipa Dinding dengan Flange tunggal ¢ 150 mm panjang 100 cm Buah
366 Pipa dengan Flange ganda ¢ 150 mm panjang 600 cm Buah
367 Bend 90 º dengan flange tunggal ¢ 150 mm Buah
368 Gate valve ¢ 150 mm K. 150 Buah
369 Pekerjaan tangga monyet dari stenlis steel ( R. Kontrol ) Buah
370 Pekerjaan tangga Spiral Tinggi 5,2 m diameter 1500 mm Buah

XV BAHAN/PERLENGKAPAN IPA (INSTALASI PENGOLAHAN AIR)


1 Paket IPA dengan sistem backwash lengkap dengan acc /Unit
2 Pompa dosing lengkap dengan acc /Unit
3 untuk Alum Sulfat, Soda Ash, Kaporit
4 Tangki bahan kimia /Unit
5 Mixer di tangki bahan kimia /Unit
6 Panel dosing dan mixer /Unit
7 Install Paket IPA (2 x 50 Lt/Det) /Unit
8 Genset Kaps. 80 KVA Lengkap dgn Panel & Accesories /Unit
9 Perpipaan Air Bersih /Unit
10 Water Meter Induk Dia. 8" /Unit
11 Panel Induk + Panel Pompa Distribusi /Unit
12 Kabel - kabel /Unit
13 Lampu Penerangan (TL 2x40 Watt) /Unit

XVI. BAHAN TAMBAHAN


1 Aspal /Kg
2 Kayu Bakar /M3
3 Oli SAE 30 /Liter
4 Oli SAE 40 /Liter
5 Oli SAE 90 /Liter
6 Oli SAE 100 /Liter
7 Aspal Emulsi /Kg
8 Flux Oil /Set
9 Sambungan Rumah 1/2" /Set
10 Sambungan Rumah 3/4" /Set
11 Sambungan Rumah 1" /Set
12 Air /Liter
13 Kaporit 60 % /Gram
14 Pelicin/Lubrican /Kg
15 Lem PVC /Kg
16 Solar /Liter
17 Premium/Bensin /Liter
18 Gemuk /Kg
19 Lis Kaca /Meter
20 Papan nama proyek & Rambu-rambu /Set
21 Pengecatan Reservoir Unit
22 Kunci daun pintu plat besi lengkap Unit
23 Kunci engsel plat besi Unit
24 Saluran pembuang pas. Batu 1 : 4 M3
25 Pemb. Box Valve + Tutup Plat Baja + Kunci Unit
26 Water meter Unit
27 Perbaikan Akibat Pekerjaan Ls
28 Pasir kuarsa dia. 0,9 - 1,2 mm M3
29 Pasir kuarsa dia. 1,2 - 1,5 mm M3
30 Kerikil kuarsa dia. 0,8 - 1,5 cm M3
31 Kerikil kuarsa dia. 3,0 - 5,0 cm M3
32 Pekerjaan tangga monyet dari stenlis steel ( R. Kontrol ) Unit
33 Pekerjaan tangga Spiral Tinggi 5,2 m diameter 1500 mm Unit
34 Pagar pengaman dari stenlis steel Unit
35 Pintu Air (pintu angkat) (b = 0.5 h = 1) dengan penstock Unit
36 Tangki fiber glass, 500 lt Unit

XVII. BAHAN SPESIFIK RUMAH KIMIA & Genset


1 Lapisan Fiber Glass (2 x Lapis) M²
2 Plafond Gypsum Rangka Hollow M²
3 Pekerjaan list Plafond M²
4 Instalasi Plumbing Air Bersih M'
5 Instalasi Plumbing Air Kotor M'
6 Pasang Closet Duduk bh
7 Pasang Washtafel set
8 Pasang Floor Drain set
9 Pasang Kran air set
10 Pekerjaan Septick Tank dan peresapan unit
11 Pompa Air Bersih unit
12 Atap Baja Ringan M²
13 Pasangan Atap Genteng M²
14 Pas Bubungan M'
15 Pas. Listplank M'
16 Pas. Tatab M'
17 Pek. Cat Listplank M²
18 Kusen Pintu dan Jendela Aluminium M'
19 Daun Pintu Aluminium M²
20 Daun Jendela Aluminium Panil Kaca M²
21 Kusen Kayu M³
22 Daun Jendela Jalusi M²
23 Kusen Pintu Besi Profil C NP M'
24 Daun Pintu Besi rangka L 50.50.5 M²
25 Pasang Engsel Pintu pasang
26 Pasang Engsel Jendela pasang
27 Pasang Handle dan Kunci Pintu pasang
28 Pasang Grendel Jendela pasang
29 Pasang Kait Angin pasang
30 Pasang Engsel Pintu baja As 1" pasang
31 Pasang Kunci Pintu Baja pasang
32 Pasang Grendel Tanam untuk Pintu baja Set
33 Electric Motor Hoist crane, Kapasitas 1 ton, lengkap dengan span, flat bar Set
34 Electric Motor Hoist crane, Kapasitas 2 ton, lengkap dengan span, flat bar, Set
35 Pompa dozing alum Q = 250 l/jam; P=6,9 bar, Motor = 1,1kW, 380V, 3 pha Set
36 IWF Baja 150 x 300 mm Kg
37 Pompa dozing alum Q = 250 l/jam; P=6,9 bar, Motor = 1,1kW, 380V, 3 pha unit
38 Box Panel Pompa Air Bersih unit
39 Bus Bar 3P+N/125A +PE dan acessories set
40 MCCB 3P(100-125)A 36KA + electronic trip set
41 MCCB 3P(252-630)A 50KA + Micrologic 2,0 manually operated set
42 MCB 2P/25 A, 10 KA unit
43 MCB 2P/16 A, 10 KA unit
44 MCB 4P/20 A, 10 KA unit
45 Relay arus bocor (Modul Vigi) 4P, 40A, Sensitivitas = 300 mA unit
46 MCB 3P/20 A, 10 KA unit
47 MCB 3P/25 A, 10 KA unit
48 Isolating switch, 380 V, 3P, 40A unit
49 Voltmeter (0-500)V, Uk 72 x72 unit
50 VS (Voltage Selector switch, 7 posisi) unit
51 DOL Starting Motor 0.55kW, 3 komponen, type high performance set
52 DOL Starting Motor 1.1 kW, 3 komponen, type high performance set
53 DOL Starting Motor 4 kW, 3 komponen, type high performance set
54 Fuse carrier (STI), 2P (1P + N), lengkap dengan tabung sekring (fuse cat set
55 Buzzer, 70 dBA unit
56 RCP (Relay Control Phase) untuk unbalanced/missing phase 2 kontak outpu unit
57 Plug in relay 220V, 14 pin, 4 kontak C/O, 5 amp, built in pilot light, kompli unit
58 Water Level Control (WLC), Time delay (0.1-10)detik, sensitifitas (5-100) unit
59 Pilot lamp, Ø 22 mm plastic 220-240 VAC unit
60 Push button Ø 22 mm flush, plastic (reset) unit
61 Plug dan Socket 2P + E 16A, 220 VAC, Panel mounted, komplit set
62 Plug dan Socket 3P + N + E 16A, 380 VAC, Panel mounted, komplit set
63 Box Plate metal, 2100x800x600 mm, Floor Standing Unit
64 MCCB 3 POLE, 250 A Unit
65 MCCB 3 POLE, 80 A Unit
66 MCB 3 POLE, 6 A Unit
67 MCB 3 POLE, 10 A Unit
68 MCB 2 POLE, 6 A Unit
69 MCB 1P/6A 6 KA Unit
70 Indicator Lamp R, S, T Unit
71 Fuse carrier (STI), 2P (1P + N), lengkap dengan tabung sekring (fuse cat Unit
72 Current Transformator 250/5 A Unit
73 Contacor LC1D09 Unit
74 Thermal Overload LRD06 Unit
75 VSD 380/3P Unit
76 Power Supply DC 220VAC / 24VDC 10A Unit
77 Illuminated Push Button Red, 220VAC Unit
78 Illuminated Push Button Green, 220VAC Unit
79 Indicator Lamp Yellow, 220VAC Unit
80 Push Button Unit
81 Buzzer, 70 dBA Unit
82 Emergency Stop Unit
83 Plug in relay 220V, 14 pin, 4 kontak C/O, 5 amp, built in pilot light, kompli Unit
84 Exhaust Fan 6" Unit
85 Dust Filter Unit
86 Perakitan dan Pemasangan lengkap termasuk aksesoris Unit
87 Power Meter 5350 Unit
88 Box Plastic mini pragma pintu tranparant, inbow, 24 modul unit
89 MCB 3P/16A 10 KA unit
90 RCCB/ELCB, 4P, 25A, Sensitifitas : 30 mA unit
91 MCB 1P/6A 6 KA unit
92 MCB 1P/10A 6 KA unit
93 Box Plate metal, 600x500x200 mm, Wall Mounting unit
94 MCB 3P/6A, 6 KA unit
95 RCCB/ELCB, 4P, 10A, Sensitifitas : 30 mA unit
96 MCB 1P/4A 6 KA unit
97 MCB 1P/6A 6 KA unit
98 MCB 3P/4A 6 KA unit
99 Time Switch 24 Jam unit
100 Magnetic Contactor 10A unit
101 Indicator Lamp R, S, T unit
102 Mini Fuse 2A unit
103 Selector Switch 3 Posisi unit
104 Perakitan dan Pemasangan lengkap termasuk aksesoris LS
105 Lampu philips 2 x 18W/220V, WP (Water proof) unit
106 Single switch 10 A/ 220V plano unit
107 Outlet 10A/2P+E, 220V, WP (water proof) unit
108 Kabel NYM 3 x 2,5 mm2 m
109 uPVC Conduit 20 mm m
110 uPVC Conduit 25 mm m
111 Instalasi titik lampu Titik
112 Instalasi stop kontak Titik
113 - NYY 4 x 2,5 mm2 meter
114 - BC 4 mm2 meter
115 Exhaust Fan 16 Inch, 80 watt ( 2 unit di R. panel LVMDP) unit
116 Box Plastic mini pragma pintu tranparant, inbow, 24 modul unit
117 MCB 3P/16A 10 KA unit
118 RCCB/ELCB, 4P, 25A, Sensitifitas : 30 mA unit
119 MCB 1P/6A 6 KA unit
120 MCB 1P/10A 6 KA unit
121 Box Plate metal, 600x500x200 mm, Wall Mounting unit
122 MCB 3P/6A, 6 KA unit
123 RCCB/ELCB, 4P, 10A, Sensitifitas : 30 mA unit
124 MCB 1P/4A 6 KA unit
125 MCB 1P/6A 6 KA unit
126 MCB 3P/4A 6 KA unit
127 Time Switch 24 Jam unit
128 Magnetic Contactor 10A unit
129 Indicator Lamp R, S, T unit
130 Mini Fuse 2A unit
131 Selector Switch 3 Posisi unit
132 Perakitan dan Pemasangan lengkap termasuk aksesoris LS
133 Single switch 10 A/ 220V plano unit
134 Double Switch 10 A/ 220V plano unit
135 Outlet 10A/2P+E, 220V, WP (water proof) unit
136 Kabel NYM 3 x 2,5 mm2 m
137 uPVC Conduit 20 mm m
138 uPVC Conduit 25 mm m
139 Lampu TL WP 2 x 18 watt Unit
140 Lampu TL WP 2 x 36 watt Unit
141 Lampu DL 1 X 20watt Unit
142 Instalasi titik lampu Titik
143 Instalasi stop kontak Titik
144 - NYY 4 x 2,5 mm2 meter
145 - BC 4 mm2 meter
146 Exhaust Fan 16 Inch, 80 watt ( 2 unit di R. panel LVMDP) unit
147 Penangkal Petir type Elctrode dengan Rmin = 60m LS
148 BC 50 mm2 m
149 Clamp BC, 50 mm2 unit
150 Air terminal Ø 1, termasuk dudukan, komplit set
151 GIP Ø 2 termasuk socket set
152 Grounding rod 3/4 set
153 Grounding rod 3/4 set
154 Pipa PVC Ø 1, termasuk clamp set
155 Box control 30x30x70 cm LS
156 NYA 50 mm2 meter
157 GIP Ø 3 termasuk socket meter
158 Onsite Chlorine Disinfectant Generator kap. 4 kg.Cl/jam, termasuk sel elek Unit
159 Inline water filter kap. 4 m3/jam, tekanan kerja 3-6 bar Unit
160 Water softener dg hardness monitoring system Unit
161 Water chiller system, termasuk power control Unit
162 Submersible pump kap. 2500 L/jam, tekanan 5 bar, termasuk power control Unit
163 HDPE Brine tank kap. 4 m3, termasuk drain, corong inlet garam, soft water i Unit
164 HDPE brine tnak kap. 0,5 m3, termasuk inlet, outlet, drain, dan overflow Unit
165 Brine dosing pump, kap. Min. 100 L/jam, tekanan 5 bar, termasuk control pane Unit
166 HDPE Production tank 30 m3, dilengkapi dengan water level sensor Unit
167 Power stabiliser kap. 30 kVA Unit
168 Perakitan dan Pemasangan lengkap termasuk aksesoris set
169 Perakitan dan Pemasangan lengkap termasuk aksesoris set
170 Perakitan dan Pemasangan lengkap termasuk aksesoris set
171 Lampu TL WP 2 x 18 watt Unit
172 Lampu TL WP 2 x 36 watt Unit
173 Lampu DL 1 X 20watt Unit
174 Outlet 10A/2P+E, 220V, WP (water proof) unit
175 Exhaust fan, Industrial type, wall mounted, 16", komplit base frame set
176 Titik Lampu titik
177 Lampu philips 2 x 18W/220V, WP (Water proof) unit
178 Outlet 10A/2P+E, 220V, WP (water proof) unit
179 Exhaust fan, Industrial type, wall mounted, 16", komplit base frame set
180 Titik Lampu titik
181 Perakitan dan Pemasangan lengkap termasuk aksesoris LS
182 Pemasangan perpipaan sistem elektroklorinasi LS
183 Pemasangan pengkabelan sistem elektroklorinasi LS
184 Pemasangan sistem pembubuhan larutan klorin LS
185 Pemrograman sistem kendali setempat dan kendali jarak jauh, berikut piran LS
186 Pengujian komisioning dan pelatihan minimal 5 hari, termasuk dokumentas LS
187 Daun Jendela Jalus M²
188 Kusen Pintu Besi Profil C NP 140 x 60 x 7 mm M
189 Pintu Plat baja 2 sisi dalamnya Glass wool M²
190 Talang Air Hujan M
191 Baut Angkur M22 Penjangkaran 1000 mm bh
192 Panel LVM-DP + Capasitor bank 87,5 KVAR Lengkap dengan Accesories set
193 Box Plastic mini pragma pintu tranparant, inbow, 24 modul unit
194 MCB 3P/16A 10 KA unit
195 RCCB/ELCB, 4P, 25A, Sensitifitas : 30 mA unit
196 MCB 1P/6A 6 KA unit
197 MCB 1P/10A 6 KA unit
198 Box Plate metal, 600x500x200 mm, Wall Mounting unit
199 MCB 3P/6A, 6 KA unit
200 RCCB/ELCB, 4P, 10A, Sensitifitas : 30 mA unit
201 MCB 1P/4A 6 KA unit
202 Time Switch 24 Jam unit
203 Magnetic Contactor 10A unit
204 Indikator Lamp, Pilot Lamp Ø22mm, 220V unit
205 Mini Fuse 2A unit
206 Selector Switch 3 Posisi unit
207 Perakitan dan Pemasangan lengkap termasuk aksesoris LS
208 Lampu philips 2 x 18W/220V, WP (Water proof) unit
209 Lampu philips 36W/220V, Industrial Type unit
210 Lampu philips 2 x 36W/220V, Water proof unit
211 Single switch 10 A/ 220V plano unit
212 Double Switch 10 A/ 220V plano unit
213 Outlet 10A / 220 V unit
214 Outlet 10A / 2P+E,220 V,WP (Water proof) unit
215 Kabel NYM 3 x 2,5 mm2 m
216 uPVC Conduit 20 m m
217 uPVC Conduit 25 m m
218 Lampu PJU, 56 watt + timer unit
219 Exhaust Fan 16 Inch, 80 watt ( 2 unit di R. panel LVMDP) unit
221 - NYFGBY 2 x 4 mm2 meter
223 - NYFGBY 2 x 2,5 mm2 meter
225 - NYFGBY 4 x 1.5 mm meter
226 BC 4 mm2 meter
227 MCB 4 Amp untuk tiap2 tiang lampu unit
228 Instalasi titik lampu titik
229 Intalasi titik lampu PJU titik
230 Instalasi Stop kontak titik
231 Instalasi exhaust fan titik
234 Change Over Switch untuk kapasitas daya 1500 KvA, plus interlock system set
235 Box Panel, ukuran T:1800 X L:800 X D:600, free standing type set
237 Perakitan dan Pemasangan lengkap termasuk aksesoris set
239 Perakitan dan Pemasangan lengkap termasuk aksesoris set
241 Lampu philips 2 x 18W/220V, WP (Water proof) unit
242 Lampu philips 36W/220V, Industrial Type unit
243 Lampu philips 2 x 36W/220V, Water proof unit
244 Outlet 10A / 220 V unit
245 Outlet 10A / 2P+E,220 V,WP (Water proof) unit
246 Exhaust fan, Industrial type, wall mounted, 16", komplit base frame set
247 Titik lampu titik
248 Travo step down kap. 20 KV - 400 V, Daya 400 KVA set
249 Cabical in comiy/out going 20 KV set
250 Panel AMF set
251 Tiang Lampu PJU set
252 Tiang Lampu Penerangan set
A

WASAN PERMUKIMAN KAB. SUMBAWA


N SANITASI DASAR TERUTAMA BAGI MASYARAKAT MISKIN

USI DAN BANGUNAN PELENGKAP SISTEM SARANA AIR BERSIH

S, KEC. UNTER IWES

HARGA
SATUAN (Rp)

200,000
373,900
293,200
264,200
361,000
252,100
252,100
200,000
190,000
127,000
167,500
167,500
288,794
282,142
266,077
20,000
11,072
264,500
232,000
232,000
5,000
22,000
16,400
800
1,000
16,400
16,800
100,000
4,900
4,900
16,000
26,900
180
16,000

2,800
4,500
7,200
7,700
1,100
7,000
1,000
7,000
19,200
21,300
24,300
26,800
45,000
48,000
42,500
73,250
44,000
62,900
79,800
104,500
72,000
55,000
75,000
85,100
49,000
59,000
70,000

21,436,400
16,077,300
5,359,100
3,675,000
3,150,000
2,870,000
3,630,000
3,025,000
25,000
90,000
6,545,531
425,000
457,087
3,250,000
375,000
725,000
5,000,000
3,000,000
500,000

45,000
52,500
57,000
60,300
85,000
110,000
150,000
250,000
340,000
3,500
70,000
90,000
140,000
750,000

55,000
72,100
55,000
68,400
70,100
63,400
82,000
69,900
105,400
85,000
71,900
61,000
500,000

15,000
15,000
13,600
15,400
28,500
24,400

28,800
28,800
25,000
30,000
65,000
31,500
31,500
350,000

450,000

35,100
3,500,000 Ventilasi Upah 0.25 25625
160,000 Knee 2 28500
850,000 Tee 1 35700
700,000 Pipa 0.6 68520
650,000 158345
5,000 Tangga Besi 16 1 160000 160000
24,400 Mesin Las 394100
24,400 Upah 102500
7,200 656600
2,000
145,500
7,280
8,160
53,240
7,500
35,000
20,000
142,000
7,200 2.2225
12,500 1.5875
12,500
17,000
17,000
22,000
24,400
500,000
585,100
2,880,000
265,000
168,200
55,000
150,000
150,000

22,500
67,400
74,800
112,200
179,500
231,900
324,100
147,500
82,400
175,000
110,000
127,000
17,750
34,450
16,000
7,500
135,450
147,700
153,800
28,600
112,000
161,950
6,090,860
225,791
207,509

150,000
176,000
160,000
187,000
141,000

5,000
20,900
16,700
33,000
12,200
17,900
44,900
44,000
38,000
58,000
65,000
90,000
75,000
42,000
18,000
42,000
57,700
44,900
13,800
7,000
4,500
55,000

71,500
127,500
90,000
150,000
77,600
93,700
84,700
25,000
20,000
20,000
15,000
50,000
30,000
15,000
75,000
123,000
346,500
165,000
20,000

4,000,000
71,500
200,000
3,500,000
3,911,800
5,478,400
891,900
165,000
365,000
1,500,000
4,987,400
6,601,100
750,000
466,700
410,800

25,400
24,300
23,400
23,000
40,000
31,400
8,200
10,040
2,500
26,400

235,400
188,320
178,920
23,600
18,840
254,240
329,560
404,920
4,500,000
404,922

29,000
37,200
55,600
73,900
84,300
114,200
145,300
187,600
270,100
370,900
440,600
623,900
803,900
982,700
1,125,700
1,870,200

4,075
5,000
12,696
17,058
23,690
45,000
55,000
61,462
66,550
248,900
432,500
680,900
866,256
1,579,078
2,043,864

7,700 5,400.00 6,210.00


9,900 6,900.00 7,935.00
16,170 11,800.00 13,570.00
24,970 16,400.00 18,860.00
26,235 21,400.00 24,610.00
41,800 34,200.00 39,330.00
59,015 48,200.00 55,430.00
84,810 69,300.00 79,695.00
126,170 103,200.00 118,680.00
160,985 131,600.00 151,340.00
263,780 215,700.00 248,055.00
411,675 336,600.00 387,090.00
639,925 523,200.00 601,680.00
1,018,105 832,400.00 957,260.00
1,295,800 1,059,300.00 1,218,195.00
1,637,460 1,338,800.00 1,539,620.00
2,074,600 1,696,300.00 1,950,745.00
2,556,400 2,089,500.00 2,402,925.00

87,100
119,800
163,800
234,100
521,000
796,600
1,322,700
2,109,500
2,669,300
3,865,500
5,188,000
6,367,300
98,100
130,300
180,000
271,100
549,200
826,200
1,429,300
2,609,800
3,362,500
4,629,100
6,073,400
7,739,100
133,000
183,000
247,900
352,200
748,100
1,145,900
1,974,900
3,732,100
4,796,900
6,542,000
8,820,700
11,169,300
322,000
137,000
182,300
189,400
451,500
456,300
463,400
682,000
686,800
696,300
1,024,300
1,089,100
1,083,500
1,459,600
1,516,800
1,540,700
1,772,800
1,820,500
1,868,100
2,380,500
2,302,000
2,349,700
2,492,700
3,583,800
3,583,800
3,342,500
2,489,300
3,437,800
4,112,400
4,231,500
4,422,200
150,000
197,400
259,500
357,500
773,900
1,173,300
1,997,000
3,648,900
5,173,500
7,797,300
9,930,800
11,899,000
210,000
301,100
331,500
641,000
666,200
1,092,900
1,181,500
3,017,000
2,581,000
4,449,200
4,556,500
5,053,500
5,480,700
5,991,050
6,501,400
6,694,500
7,607,600
7,865,000
9,698,300
10,010,000
172,200
212,800
252,100
351,400
768,700
1,152,700
1,736,600
2,808,600
3,523,400
5,005,100
6,673,500
9,089,800
122,300
143,400
174,600
232,500
528,700
838,000
1,309,500
1,816,000
3,696,700
4,224,000
5,346,000
6,600,000
305,000
347,700
1,328,300
1,898,900 0
2,708,200 0
4,395,000
7,057,100 18,580,700 2.632908702
11,449,900
16,143,100
36,100,000
49,400,000
57,800,000
1,287,000
2,200,000
3,410,000
7,920,000
12,870,000
20,900,000
30,800,000
267,600
409,200
446,200 153 Flange Buta 4" Buah 127.430
788,800 154 Flange Buta 6" Buah 204.790
1,504,400 155 Flange Buta 8" Buah 280.230
1,655,700 156 Flange Buta 10" Buah 332.230
1,920,000 157 Flange Buta 12" Buah 897.400
2,341,100 158 Flange Buta 14" Buah 1.019.380
151,500 159 Flange Buta 16" Buah 1.529.130
157,600 160 Flange Las 2" Buah 67.410
169,700 161 Flange Las 2 1/2" Buah 70.510
194,000 162 Flange Las 3" Buah 85.600
224,300 163 Flange Las 4" Buah 105.600
261,800 164 Flange Las 6" Buah 194.410
607,300 165 Flange Las 8" Buah 259.790
759,100 166 Flange Las 10" Buah 387.760
676,200 Wall Pipe All Flan 4" - 0.80 m' 167 Flange Las 12" Buah 410.980
788,200 Wall Pipe All Flan 4" - 2.50 m' 168 Flange Las 14" Buah 679.770
1,030,800 Wall Pipe All Flan 6" - 1 m' 169 Flange Las 16" Buah 801.750
1,455,300 Wall Pipe All Flan 6" - 2.5 m' 500000 254860
1,697,800 Wall Pipe All Flan 8" - 1,5 m' 505832 754860
2,122,300 Wall Pipe All Flan 10" - 1,5 m'
2,607,400
182,400
200,100
204,300
212,800
226,100
231,200
346,100
376,500
394,100
460,100
503,200
527,500
861,000
1,030,800
1,194,500
1,819,800
2,365,500
2,607,400
2,662,200
2,971,800
3,464,100
3,935,300
4,548,000
5,033,100
5,120,000
5,480,000
5,930,000 10 0.01 0.010 0.005 7.85398163E-05
7,650,000 4 1.6 0.016 0.008 0.00020106193
1,100,000 6 2 0.020 0.01 0.000314159265
750,500 8 2 0.020 0.01 0.000314159265
670,000
582,600
641,000 4 10.16 0.102 0.0508 0.008107319666
705,000 6 15.24 0.152 0.0762 0.018241469248
476,000 8 20.32 0.203 0.1016 0.032429278662
503,000
525,000
554,200 4 220 0.220 0.11 0.038013271108
599,300 6 285 0.285 0.1425 0.063793965822
141,200 8 340 0.340 0.17 0.090792027689
133,300
121,200
117,000
119,400
120,000 Flange Las Buta 8" 504,900
98,900 Flange Las Buta 6" 383,900
79,000 Flange Las 6" 354,200 7.874
77,000 Flange Las 4" 163,900 0.007874
73,000 7874
54,000
188,100 153 Flange Buta 4" Buah 127.430 160 Flange Las 2" Buah 67.410
237,200 154 Flange Buta 6" Buah 204.790 161 Flange Las 2 1/2" Buah 70.510
334,300 155 Flange Buta 8" Buah 280.230 162 Flange Las 3" Buah 85.600
472,900 156 Flange Buta 10" Buah 332.230 163 Flange Las 4" Buah 105.600
575,900 157 Flange Buta 12" Buah 897.400 164 Flange Las 6" Buah 194.410
163,900 703,300 158 Flange Buta 14" Buah 1.019.380 165 Flange Las 8" Buah 259.790
354,200 1,031,500 159 Flange Buta 16" Buah 1.529.130 166 Flange Las 10" Buah 387.760
504,900 1,515,900 167 Flange Las 12" Buah 410.980
2,243,500 2,243,500 168 Flange Las 14" Buah 679.770
157,600 169 Flange Las 16" Buah 801.750
290,400
359,800 - Wall Pipe All Flange L : 0.80 Buah
480,400
659,800 Pipa dengan Flange ganda dia ¢ 200 mm panjang 300 cm
728,900 Wall Pipe Flange L : 80 dia ¢ 200 mm
1,152,100 Pipa dengan Flange ganda dia ¢ 200 mm panjang 50 cm
1,334,000 Tee All flange ¢ 200 x ¢ 200 x ¢ 200 mm
141,800 Gate valve ¢ 200 mm K. 150
250,000 Bend 90 º All Flange ¢ 200 mm
353,700 Bend 90 º dengan Flange tunggal ¢ 200 mm
442,300 Wall Pipe Flange L : 200 dia ¢ 250 mm
554,700 Pipa Dinding dengan Flange ganda dia ¢ 250 mm panjang 80 cm
663,500 Bend 90 º dengan flange ganda ¢ 250 mm
1,055,000 Bend 90 º dengan flange tunggal ¢ 250 mm
1,209,900 Pipa Dinding dengan Flange tunggal ¢ 150 mm panjang 100 cm
1,515,900 Pipa dengan Flange ganda ¢ 150 mm panjang 600 cm
2,728,600
154,000 1m2 Rubber Packing 124200
217,400 6 7.6 0.0182414692 3450
272,400 8 10.2 0.0324292787 6000
428,100 10 12.7 0.0506707479 9450
700,600 12 15.2 0.072965877 13650
1,012,100 14 17.8 0.0993146659 18450
1,245,600 20 25.4 0.2026829916 37800
1,479,200
2,179,900
8,500
13,900
20,900
29,900
35,900
44,200
50,100
59,000
113,700
135,000
1,182,700
1,043,500
904,400
290,000
173,900
191,200
281,300
306,600
334,200
364,300
333,400
397,700
486,100
574,400
618,800
588,100
701,300
752,000
825,100
924,100
1,039,800
1,053,800
1,072,100
1,092,800
1,146,500
1,209,600
1,243,700
1,260,500
1,423,300
1,565,700
1,723,600
1,895,900
1,395,200
1,467,400
1,651,000
1,865,600
3,622,300
2,900,000
3,050,000
3,400,000
4,600,000
7,882,800
28,947,500
25,724,200
21,859,700
18,580,700
13,935,500
10,451,500
7,838,600
4,305,200
1,722,100
516,600
154,800
54,500
63,000
42,300
11,500
9,400
78,700
27,200
8,600
4,584,100
10,800
101,100
65,800
26,600
7,800
10,200
9,000
10,900
11,500
7,000
13,200
30,900
42,400
18,100
72,000
3,000
10,200
545,700
579,700
592,900
6,700
1,850,000
6,800,000
8,800,000
9,550,000
1,350,000
1,100,000
550,000
110,000
2,150,000
12,000
2,961,668

8,800,000
2,150,000
1,350,000
1,850,000
310,000
125,000
2,521,200
1,583,120 - 354,200 354,200.0
927,200
647,000
3,452,800
627,800
627,800
2,221,200
1,357,680
651,200
651,200
929,900
2,138,900
305,900
2,328,900

2,500,000,000
19,000,000

2,500,000
8,750,000
15,500,000
135,000,000
242,000,000
21,000,000
9,550,000
38,500,000
18,500,000
850,000

18,500
153,000
13,000
14,000
19,000
20,000
19,000
3,500
918,000
1,275,000
1,785,000
200
300
57,500
123,000
6,450
5,650
15,100
2,800
500,000
1,800,000
150,000
50,000
576,581
2,000,000
350,000
1,500,000
5,100,000
5,100,000
5,100,000
5,100,000
2,445,000
8,000,000
326,000
5,000,000
1,000,000

507,789
179,174
35,307
42,900
231,171
2,395,481
5,032,755
44,974
74,938
11,963,344
3,850,000
190,000
147,454
105,391
71,968
29,360
44,690
97,204
714,444
714,444
6,545,531
676,325
391,122
1,630,392
28,046
26,108
96,000
19,838
30,854
220,768
180,000
129,382
38,985,000
42,472,500
22,655,000
29,766
1,812,390
3,599,750
1,510,325
3,410,314
9,841,278
109,926
109,926
237,028
251,983
177,771
177,771
407,788
209,814
118,278
466,836
466,836
610,620
285,451
19,027
469,711
43,711
308,550
8,228
40,112
222,018
222,018
11,860,456
10,169,294
2,060,497
1,230,251
1,230,251
918,224
37,787
59,036
285,451
779,130
300,939
911,889
12,239,150
5,622,090
444,929
444,929
59,036
59,036
19,027
370,486
43,711
2,697,797
593,671
755,163
7,000,000
278,518
177,771
531,596
37,787
37,787
4,319,700
1,230,251
869,700
151,190
37,787
1,447,100
1,233,706
1,301,382
59,036
131,607
319,802
755,163
493,680
17,485
237,121
13,371
8,074
16,456
550,762
367,175
48,957
29,374
452,951
278,518
177,771
531,596
37,787
37,787
4,319,700
1,230,251
869,700
151,190
37,787
1,447,100
1,233,706
1,301,382
59,036
131,607
319,802
755,163
17,485
21,599
237,121
13,371
8,074
16,456
159,829
21,599
17,485
48,957
29,374
48,957
29,374
452,951
10,119,178
50,911
37,758
641,888
619,233
264,307
264,307
271,859
792,621
140,390
719,950
1,928,836,800
39,494,400
16,456,000
98,736,000
32,912,000
32,912,000
8,228,000
49,368,000
453,024,000
16,044,600
755,163
755,163
755,163
37,746
37,746
37,746
22,627
226,476
67,965
37,746
22,627
226,476
67,965
755,163
10,490,700
20,570,000
98,736,000
46,076,800
23,038,400
541,571
391,122
2,136,723
32,768
260,400
255,000,000
278,518
177,771
531,596
37,787
37,787
4,319,700
1,230,251
869,700
151,190
1,233,706
1,301,382
71,995
131,607
319,802
755,163
370,260
265,817
493,680
17,485
21,599
86,089
237,121
13,371
8,074
16,456
71,995
1,596,849
40,461
37,725
146,006
29,374
248,815
550,762
611,958
367,175
367,175
45,309,753
7,551,625
755,163
755,163
37,746
37,746
37,746
22,627
22,627
226,476
67,965
120,000,000
158,812,500
75,000,000
4,000,000
4,000,000
6.00%

23.08%
1.8 0.018

0.0004712389 3.6049776 57,680


3.6191147E-06 0.2214898 4,607
6.9115038E-06 0.422984 8,798
6.9115038E-06 0.422984 8,798

0.0001459318 1.1455643 23,828


0.0004013123 3.1503017 65,526
0.0007134441 5.6005364 116,491

0.0006842389 5.3712752 120,854


0.0014034672 11.017218 247,887
0.0019974246 15.679783 352,795

4.0042211
7.4439321
9.6562627

g/c3
kg/cm3

ange Las 2" Buah 67.410


ange Las 2 1/2" Buah 70.510
ange Las 3" Buah 85.600
ange Las 4" Buah 105.600
ange Las 6" Buah 194.410
ange Las 8" Buah 259.790
ange Las 10" Buah 387.760
ange Las 12" Buah 410.980
ange Las 14" Buah 679.770
ange Las 16" Buah 801.750

2150000

2521200
1583120
927200
647000
3452800
627800
627800
2221200
1357680
651200
651200
929900
2138900
RENCANA ANGGARAN BIAYA

KEGIATAN : PENYEDIAAN SARANA AIR BERSIH DAN SANITASI DASAR TERUTAMA BAG
MISKIN
PEKERJAAN : PEMBUATAN DED JARINGAN DISTRIBUSI DAN BANGUNAN PELENGKAP SI
BERSIH AI NGELAR DESA KEREKEH KEC. UNTER
SUB PEKERJAAN : PEMBANGUNAN RESERVOIR KAPASITAS 200 m3 dan TANGKI BBM
LOKASI : KEC. UNTER IWES, KEC. SUMBAWA, KEC. LABUHAN BADAS
TAHUN ANGGARAN : 2020

KODE
NO. URAIAN PEKERJAAN SATUAN VOLUME
ANALISA
1 3 4 5
I. PEKERJAAN PERSIAPAN
1 Pengukuran, Penyiapan Lokasi dan Pemasangan Bowplank Ls 1.00

II PEMBANGUNAN RESERVOAR
A Pekerjaan Tanah
1 Galian Tanah Keras M³ 276.51 A.2.3.1.4.
2 Urugan Tanah
3 Urugan Pasir dibawah Lantai Kerja M³ 19.43 A.2.3.1.11
4 Membuang Tanah Sisa Galian M³ 166.00 A.2.3.1.8.

B Pekerjaan Beton
1 Beton tumbuk untuk lantai kerja, 1 : 3 : 5 tebal 5 Cm M³ 6.42 A.4.1.1.1
2 Plat lantai dasar tebal 30 cm
- Beton K.225 M³ 32.09 A.4.1.1.7
- Tulangan beton U.24, ø 16 Kg 3,377.25 A.4.2.1.1
- Bekisting 2 x Pakai M² 23.15 A.4.1.1.21
3 Dinding memanjang dan melintang tebal 25 cm
- Beton K.225 M³ 24.15 A.4.1.1.7
- Tulangan beton U.24, ø 16 & 12 mm Kg 2,547.39 A.4.2.1.1
- Bekisting 2 x Pakai M² 193.16 A.4.1.1.25
- Water Stop M 87.80
4 Dinding Penyekat tebal 20 cm
- Beton K.225 M³ 11.59 A.4.1.1.7
- Tulangan beton U.24, ø 16 & 12 mm M2 836.33 A.4.2.1.1
- Bekisting 2 x Pakai M2 58.80 A.4.1.1.25
5 Plat atas tebal 15 cm
- Beton K.175 M³ 15.33 A.4.1.1.5
- Tulangan beton U.24, ø 10-15 Kg 1,133.18 A.4.2.1.1
- Bekisting 2 x Pakai M² 135.29 A.4.1.1.24
6 Kolom beton, uk.25/25 cm = 25 Bh
- Beton K.175 M³ 2.06 A.4.1.1.5
- Tulangan beton U.24, ø 16 & 12 mm Kg 1,186.64 A.4.2.1.1
- Bekisting 2 x Pakai M² 33.00 A.4.1.1.22
7 Beton Sloof 25/40
- Beton K.175 M³ 7.45 A.4.1.1.5
- Tulangan beton U.24, ø 12 mm Kg 741.99 A.4.2.1.1
- Bekisting 2 x Pakai M² 65.85 A.4.1.1.21
8 Balok Atas 15/25
- Beton K.175 M³ 1.50 A.4.1.1.5
- Tulangan beton U.24, ø 12 mm Kg 602.46 A.4.2.1.1
- Bekisting 2 x Pakai M² 96.79 A.4.1.1.21

D Pekerjaan Besi dan Baja


1 Pemb. double ventilasi udara (pipa baja) Ø 50 mm Unit 4.00
2 Pembuatan tutup manhole plat baja 0,9 x 0,9 Unit 3.00
3 Pemb. Box Valve + Tutup Plat Baja + Kunci Unit 6.00
4 Pembuatan tangga R. Reservoir dari besi Ø 16 mm Unit 4.00

E P/P Pipa, Acces Inlet dan Outlet


A. PIPA INLET
1 - Wall Pipe All Flange L : 0.60 Ø150 mm (6") Bh 2.00
2 - Wall Pipe All Flange L : 0.70 Ø150 mm (6") Bh 2.00
3 - Wall Pipe All Flange L : 1.00 Ø150 mm (6") Bh 2.00
4 - Pipa GI Medium Ø 150 (6") M 4.00
5 - Pipa Inlet PVC Ø 200 (8") M 24.00
6 - Gate Valve All Flange Ø 200 mm (8") Bh 2.00 A.8.4.3.5
7 - Flange Las Ø 200 mm (8") Bh 6.00
8 - Flange Las Ø 150 mm(6") Bh 4.00
9 - Tee GI All Flange Ø 200 x 150 mm (8"x 6") Bh 2.00
10 - Bend GI All Flange Ø150 mm (6") x 90º Bh 4.00
11 - Flange Spigot Ø 200 mm (8") Bh 1.00
12 - Ruber Packing Ø 150 mm (6") Bh 14.00
13 - Ruber Packing Ø 200 mm (8") Bh 4.00
14 - Mur Baud Bh 72.00
15 - Pekerjaan Pemasangan Pipa & Accessoriesnya Ls 1.00

B. PIPA OUTLET, WASHOUT DAN OVERFLOW


1 - Wall Pipe All Flange L : 0.60 Ø150 mm (6") Bh 6.00
2 - Wall Pipe All Flange L : 0.70 Ø150 mm (6") Bh 2.00
3 - Wall Pipe All Flange L : 1.00 Ø150 mm (6") Bh 4.00
4 - Pipa GI Medium Ø 150 (6") M 24.00
5 - Pipa GI Medium Ø 200 (8") M 12.00
6 - Gate Valve All Flange Ø150 mm (6") Bh 2.00 A.8.4.3.6
7 - Gate Valve All Flange Ø100 mm (4") Bh 2.00
8 - Flange Las Ø 200 mm (8") Bh 4.00
9 - Flange Las Ø 150 mm(6") Bh 4.00
10 - Tee GI All Flange Ø 200 x 150 mm (8"x 6") Bh 2.00
11 - Tee GI All Flange Ø 150 x 150 mm (8"x 6) Bh 2.00
12 - Bend GI All Flange Ø150 mm (6") x 90º Bh 4.00
13 - Flange Spigot Ø150 mm (6") Bh 1.00
14 - Ruber Packing Ø 150 (6") Bh 38.00
15 - Ruber Packing Ø 200 (8") Bh 5.00
16 - Mur Baud Bh 172.00
17 - Pekerjaan Pemasangan Pipa & Accessoriesnya Ls 1.00

VI. PEKERJAAN TANGKI BBM


A Pekerjaan Tanah
1 Galian Tanah Biasa M³ 3.11 A.2.3.1.1.
2 Urugan Pasir M³ 0.89 A.2.3.1.11
3 Buangan Tanah M³ 3.11 A.2.3.1.8.
B Pekerjaan P/P Tangki BBM Kapasitas 5000 L
1 Beton Rabat untuk Lantai Kerja M³ 0.44 A.4.1.1.4
2 Beton K175 M³ 2.74 A.4.1.1.5
3 Tulangan Besi Lantai dan Dinding (Sesuai Gambar) kg 76.71 A.4.2.1.1
4 Bekisting M³ 8.21 A.4.1.1.20
5 Acian 1 : 2 M² 8.21 A.4.4.2.27
6 Tangki BBM Kap. 5000 L (Pabrikasi) Unit 1.00

Jumlah RP.

Total RP.

CHECK VALVE Ø CI 1 buah


GATE VALVE Ø GIP 1 buah
PUDDLE FLANGE Ø CI - buah
TEE FLANGE Ø GIP 2 buah
REDUCER Ø CI 3 buah
PIPA INLET Ø CI 6 buah
METER AIR Ø CI 1 buah
BEND 90° FLANGE Ø CI 1 buah
DISMANTLING JOINT Ø CI 2 buah
PIPA OUTLET Ø GIP -

VII. PEKERJAAN LAIN-LAIN


1 Pekerjaan Jalan dan Area Parkir m3 29.60 -
2 Pagar BRC m'
Pintu Pagar
3 Pengecatan Reservoir Unit 1.00
4 Penanaman Gebalan Rumput M² 128.00 A.4.4.3.65
5 Perbaikan Akibat Pekerjaan Ls 1.00
YA

TASI DASAR TERUTAMA BAGI MASYARAKAT

N BANGUNAN PELENGKAP SISTEM SARANA AIR


NTER
0 m3 dan TANGKI BBM
BUHAN BADAS

HARGA SATUAN JUMLAH HARGA


( Rp. ) SATUAN ( Rp. )
6 7
2,000,000.00 2,000,000.00
2,000,000.00 2,000,000.00

33,488,883.02 33,488,883.02
84,915.60 23,480,012.56

276,325.50 5,369,004.47
27,951.00 4,639,866.00

463,208,128.54 463,208,128.54
1,186,897.47 7,619,881.76

1,368,109.27 43,902,626.47
20,102.50 67,891,168.13
106,696.70 2,470,028.61

1,368,109.27 33,039,838.87
20,102.50 51,208,907.48
202,841.10 39,180,786.88
98,670.00 8,663,226.00

1,368,109.27 15,856,386.44
20,102.50 16,812,323.83
202,841.10 11,927,056.68

1,304,429.28 19,996,900.86
20,102.50 22,779,750.95
244,091.10 33,023,084.92

1,304,429.28 2,687,124.32
20,102.50 23,854,430.60
189,091.10 6,240,006.30

1,304,429.28 9,717,998.14
20,102.50 14,915,853.98
106,696.70 7,025,977.70

1,304,429.28 1,956,643.92
20,102.50 12,110,952.15
106,696.70 10,327,173.59

17,990,000.00 17,990,000.00
160,000.00 640,000.00 1,516,000 Plat Bordes/lembar 1,22 x 2,44
850,000.00 2,550,000.00 155,000 Besi Siku 50.50.5 Berat 18,36 panjang 6 m
2,000,000.00 12,000,000.00 25,833 103,333 758,000.00
700,000.00 2,800,000.00 Pemb. Box Valve + Tutup Plat Baja + Kunci

91,964,874.11 91,964,874.11

1,210,160.00 2,420,320.00
1,254,220.00 2,508,440.00 Pipa Flange Las
1,386,400.00 2,772,800.00 WPAF 6" L=0 264360 945,800
440,600.00 1,762,400.00 WPAF 6" L=0 308420 945,800
623,900.00 14,973,600.00 WPAF 6" L=1 440600 945,800
536,456.31 1,072,912.62
575,900.00 3,455,400.00
472,900.00 1,891,600.00
924,100.00 1,848,200.00
460,100.00 1,840,400.00
554,700.00 554,700.00
35,900.00 502,600.00
44,200.00 176,800.00
12,000.00 864,000.00
426,576.82 426,576.82

1,210,160.00 7,260,960.00
1,254,220.00 2,508,440.00
1,386,400.00 5,545,600.00
440,600.00 10,574,400.00
623,900.00 7,486,800.00
536,467.64 1,072,935.29
3,249,840.00 6,499,680.00
575,900.00 2,303,600.00
472,900.00 1,891,600.00
924,100.00 1,848,200.00
618,800.00 1,237,600.00
460,100.00 1,840,400.00
554,700.00 554,700.00
35,900.00 1,364,200.00
44,200.00 221,000.00
12,000.00 2,064,000.00
620,009.38 620,009.38

530,581.89 530,581.89
63,813.75 198,333.14
276,325.50 245,377.04
27,951.00 86,871.71
29,285,815.65 29,285,815.65
1,171,770.27 520,266.00
1304429.28 3,574,136.23
20,102.50 1,542,062.78
213,393.40 1,751,959.81
36,223.00 297,390.83
21,600,000.00 21,600,000.00

Jumlah RP. 608,651,885.67 608,651,885.67


PPN 10% RP. 60,865,188.57
Total RP. 669,517,074.24

35,206,827.17 35,206,827.17 0
- - 0

74,937.50 74,937.50 0
273,315.90 34,984,435.20 0
147,454.47 147,454.47 0
ar 1,22 x 2,44
5 Berat 18,36 panjang 6 m
861,333.33
+ Tutup Plat Baja + Kunci

1,210,160.00
1,254,220.00
1,386,400.00
#REF!

148.00 - -
- 0 -

29.60 0 -
0.00 0 -
148.00 0 -
PEKERJAAN TANAH

SALURAN PEMBUANG
Galian Tanah Saluran Pembuang 132.00 1.00
Urugan pasir 132.00 1.00
Pasangan Batu Kosong 132.00 1.00
Dimensi Saluran 132.00 0.50
Pasangan Batu Kali 132.00 1.00
Buangan Galian Tanah

RESERVOAR
Galian Tanah Keras Reservoar 13.95 9.20
1.50 1.50
Galian Tanah Keras Box Gate Valve 1.00 1.00
Galian Tanah untuk Pipa Penguras Dia. 150 53.80 0.60
Galian Tanah untuk Pipa Peluap Dia. 200 11.00 0.60
Urugan pasir 13.95 9.20
Lantai Kerja (Beton Tumbuk K225) 13.95 9.20
Urugan Tanah Reservoar 46.30 0.3
Urugan Tanah bekas galian Pipa
Galian Tanah
Membuang Tanah Sisa Galian

Pekerjaan Beton
Sloof 0,25 x 0,4 Panjang Lebar
Beton K.175 3 13.35
4 8.6

Tulangan Utama ø 16 3.00 13.45


Tulangan Utama ø 16 3.00 8.7
Banyak Sr/
Kolom
Sengkang ø 8 - 20 3 13.45 45
Sengkang ø 8 - 20 4 8.7 68

Bekisting 80.1 51.6

Jumlah Banyak
Kolom 0,25 x 0,25 Tinggi
Kolom As/Kolom
Beton K.225 15 2.20
Tulangan beton U.24, ø 12 15 8 3.30
Banyak Sr/
Tinggi
Kolom
Sengkang ø 8 - 20 15 2.20 11

Bekisting Kolom 15 2.20

Plat Bawah
Beton K.225 13.95 9.2
Tulangan beton U.24, ø 16
- Panjang ø 16 - 25 13.95 14.10
- Lebar ø 16 - 25 9.2 9.35

Bekisting 13.95 9.200

Balok Atas 0,15 x 0,25


Beton K175 3 13.35
Beton K175 4 8.6
Jumlah Banyak
Panjang
Balok As/Balok
Tulangan beton U.24, ø 12 3 13.45 5
Tulangan beton U.24, ø 12 4 8.7 5
Jumlah Sr/Blk
Sengkang ø 8 - 20 3 13.45 68
Sengkang ø 8 - 20 4 8.7 45

Bekisting 80.1 68.8

Plat Atas
Beton K175 13.55 8.8
Manhole 4 0.8
Tulangan beton U.24, ø 10 mm ø 10 - 25 13.05 13.20
Tulangan beton U.24, ø 10 mm ø 10 - 25 8.3 8.45

Bekisting 13.950
Bekisting 27.900

Dinding memanjang dan melintang tebal 25 cm


Beton K.225
Dinding Memanjang 2 13.35
Melintang 2 8.6

Tulangan beton U.24, ø 16 & 12 mm


Memanjang
Panjang ø 12 - 25 4 12.93 13.08
Tinggi ø 16 - 25 4 2.1 3.18
Melintang
Panjang ø 12 - 25 4 8.525 8.68
Tinggi ø 16 - 25 4 2.1 3.18
Penyiku 2.40

Bekisting
Memanjang 13.35
Melintang 8.6

Water Stop L=20cm

Dinding Penyekat tebal 25 cm


Beton K.225
Memanjang 12.925
Melintang 10.4
3
Tulangan beton U.24, ø 16 & 12 mm
Panjang ø 12 - 25 4 5.2 5.35
Tinggi ø 16 - 25 4 2.1 3.15
Panjang ø 12 - 25 2 3 3.15
Tinggi ø 16 - 25 2 2.1 3.15

Bekisting 2 2 5.2
1 2 3
6

Plat t=4mm 0,8*0,8


Engsel 2
Pengunci
Angkur
Pas. Batu bata =1*0,8*2+0,8*2
Besi L 50.50.4 = 0,8*4
Beton tumbuk 0,1x1x1

Dinding R. Valve pas. 1/2 bata


- Pas. 1/2 bata 1 : 4 6 2.60
- Plesteran dinding bata 1 : 3 6 2.56
- Acian 6 2.56
- Pengecatan 6 3.56

Kolom Balok R. Valve 12/12 = 4 Bh


- Beton Kolom K.175 6 4 0.0144
- Beton Balok K.175 6 4 0.0144
- Tulangan beton U.24, ø 8 mm
Kolom ø 8 mm 6 4 4
Sengkang ø 6 mm -15 6 4 28
Balok ø 8 mm 6 8 4
Sengkang ø 6 mm -15 6 8 55

- Bekisting 6 1.44 8.64

R. Meter Induk
- Beton Tumbuk untuk Lantai Kerja t=5cm 1 0.25
- Pas. 1/2 bata 1 : 4 1 9.8
- Plesteran dinding bata 1 : 3 1 9.5
- Acian 1 9.5
- Pengecatan 1 10.5

Kolom Balok R. Valve 12/12 = 4 Bh


- Beton Kolom K.175 1 6 0.0144
- Beton Balok K.175 1 10 0.0144
- Tulangan beton U.24, ø 8 mm
Kolom ø 8 mm 6 4 1
Sengkang ø 6 mm -15 9.9 67
Balok ø 8 mm 1 4 10
Sengkang ø 6 mm -15 8 8
- Bekisting 1 3.852 3.852

Tutup Manhle 0,8 x 0,8 berikut Engsel dan Gembok

Pipa dia, 50 0.6 73900


Tee 1 35,700
L 1 30,600
140200
210300

PAGAR
Panjang 119
Jumlah Tiang
0.95 125.400 125.400 125.40
0.05 6.600 6.600 6.60
0.15 19.800 19.800 19.80
0.60 39.600 39.600 39.60
0.15 19.800 19.800 59.40
39.60

0.90 115.506 116.406 116.41


0.40 0.900
0.60 6.000 3.600 3.60
0.80 25.824 25.824 25.82
0.80 5.280 5.280 5.28
0.10 12.834 12.834 19.43
0.05 6.417 6.417 6.42
0.75 10.418 10.418 10.42
30.495 30.49
276.51
166.00

0.4 0.250 4.005 4.01 4.01


0.4 0.250 3.440 3.44 2.58
7.45 6.59
Banyak Jumlah
Panjang x BJ
As/Kolom Panjang
5 201.750 318.765 318.77 255.01
5 130.500 206.190 206.19 1.9
Panjang Sr
1.350 182.250 71.989 71.99 1.6
1.350 367.200 145.044 145.04 108.78
741.99 367.29
131.7 0.500 65.850 65.85 32.04
32.925
Panjang Sr Jumlah Panjang
0.0625 2.063 2.06 2.06
396.000 351.648 351.65 298.37

1.1 181.5 71.693 71.69 63.99


423.34 362.36
1 33.000 33.00 42.9

0.25 32.085 32.085 32.09 19.250


Jmlh Jlr Jmlh Panjang
38.000 1071.600 1,693.128 1693.13 1693.13
57.000 1065.900 1,684.122 1684.12 1684.12
3377.25 3377.25
92.600 0.25 23.150 23.15 23.15

0.25 0.150 1.502 1.50 2.27


0.25 0.150 1.290 1.29 2.27
Jmlh Panjang
201.75 179.154 179.15 143.32
174.00 154.512 154.51 92.71
Panjang/Sr
0.70 142.800 56.406 142.80 41.8
0.70 126.000 49.770 126.00 64.6
602.46 342.43
148.9 0.650 96.785 96.79 32.93

0.15 17.886 15.326 15.33 15.33


0.8 2.56
35.000 924.000 570.108 570.11 570.11
54.000 912.600 563.074 563.07 563.07
1133.18 1133.18
9.200 128.340 128.34 128.34
18.400 0.15 6.945 6.95 6.95
135.29 135.29

2.2 0.25 14.685 14.69 14.69


2.2 0.25 9.460 9.46 9.46
24.15 24.15

8.000 418.400 371.539 371.54 371.54


51.000 647.700 1,023.366 1023.37 1023.37

8.000 277.600 246.509 246.51 246.51


34.000 431.800 682.244 682.24 682.24
59.000 141.600 223.728 223.73 223.73
2547.39 2547.39

2.2 4 117.480 117.48 117.48


2.2 4 75.680 75.68 75.68
193.16 193.16
87.8 87.8

2.2 0.20 5.687 5.69 5.690


2.2 0.20 4.576 4.58 4.58
2.2 0.20 1.320 1.32 1.32
11.59 11.59

8.000 171.200 152.026 152.03 152.03


20.000 252.000 398.160 398.16 398.16
8.000 50.400 79.632 79.63 79.630
11.000 69.300 206.514 206.51 206.510
836.33 836.33
2.1 43.68 43.680 43.68 43.68
2.1 12.6 12.600 12.60 12.6
2.1 0.2 2.520 2.52 2.52
58.80 58.8

0.115 0.691 0.27 0.27 34,000.00 0.00 0.39


0.104 0.622 0.25 0.25
0.52
96 96 37.92 37.92
0.37 62.16 13.80 13.80
192 192 75.84 75.84
0.37 122.1 27.11 27.11
154.67

Beton Tumbuk 2,5*1,5+1,2*1


Pasangan Batu bata bata 2,5*2+1*2+1*2+0,8
Plesteran 2,15*2+1*2+0,8*4 Pembesian
Acian Beton Lantai 1,44*1,04*0,12
Tutup Box 1,3*2,4 & 0,9*0,9 Trust Block 0,165*0,165*0,2*4
Meter Air Beton Dinding (1,2*2+0,8*2)*0,12
Pasir Urug 1,44*1,04*0,1+0,84*,084
0.173 0.173 0.07 0.07 Lantai Kerja 1,44*1,04*,1+0,84*0,84
0.276 0.276 0.11 0.11 Lantai TU 10-15 SR 8,15 1,44*1,04
0.18 Dinding Dia. 10 1,32*((1,44+1,04)*2/0,15)
24.00 24 9.48 9.48 Dia. 8 1,32/0,15 *((1,44+1,04)*2)
0.37 24.79 5.50 5.50 Plesteran 1,2*(0,8+1,2)*2+0,15*4
40.00 40 15.80 15.80 Acian
0.37 23.68 5.26 5.26
36.04
3.85 3.85
0
13,415.86

1,04)*2/0,15)

-
-
-

-
RENCANA ANGGARAN BIAYA

KEGIATAN :
PENYEDIAAN SARANA AIR BERSIH DAN SANITASI DASAR TERUTAMA BAGI MASYARAKAT

PEKERJAAN : PEMBUATAN DED JARINGAN DISTRIBUSI DAN BANGUNAN PELENGKAP SISTEM SARANA
DESA KEREKEH KEC. UNTER
SUB PEKERJAAN PEMBANGUNAN RUMAH GENSET
LOKASI : KEC. UNTER IWES, KEC. SUMBAWA, KEC. LABUHAN BADAS
TAHUN ANGGARAN : 2017

NO. URAIAN PEKERJAAN SATUAN VOLUME

1 2 3 4
I. PEKERJAAN PERSIAPAN
1 Pembersihan Lokasi, Penimbunan & Perataan Tanah Ls 1.00
2 Pengukuran dan pematokan Ls 1.00

II. PEKERJAAN TANAH


1 Galian Tanah Biasa M³ 150.83
2 Urugan Kembali Galian Tanah M³ 64.17
3 Urugan Pasir Padat M³ 17.62

III. PEKERJAAN BETON


1 Beton Lantai Kerja (1 PC : 3 PS : 5KR) M³ 9.44
2 Pondasi Beton Plat Kaki
- Beton K 300 M' 5.76
- Pembesian M² 603.71
- Bekisting 2 x Pakai M² 16.00
3 Balok Dasar Sloof
- Beton K 300 M³ 5.53
- Pembesian kg 1,126.08
- Begisting 2 x Pakai M² 36.84
4 Beton Kolom
- Beton K 300 M³ 6.70
- Pembesian kg 2,121.56
- Begisting 2 x Pakai M² 89.28
5 Beton Balok Atap
- Beton K 300 M³ 12.89
- Pembesian kg 1,964.15
- Begisting 2 x Pakai M² 82.72
6 Beton Dudukan Genset, Kolom Praktis dan Lantai
- Beton K 300 M³ 8.66
- Pembesian kg 33.29
- Begisting 2 x Pakai M² 3.12
6 Beton Kolom Praktis dan Lantai
- Beton K 100 M³ 16.88
- Pembesian kg 143.16
- Begisting 2 x Pakai M² 13.10
7 Plat Atap
- Beton K 300 M³ 20.20
- Pembesian kg 2,057.95
- Begisting 2x Pakai M² 162.64
8 Lisplank
- Beton K 300 M³ 1.92
- Pembesian kg 148.19
- Begisting 2 x Pakai M² 41.44

IV PEKERJAAN PASANGAN & PLESTERAN


1 Pekerjaan Pasangan Batu Kosong M² 10.35
2 Pekerjaan Pasangan Batu Kali 1:4 M² 44.06
3 Pekerjaan Pasangan Bata Dinding Bata dan Perakit Kabel 1:2 M² 197.50
4 Pekerjaan Plesteran Dinding 1:2, t-15mm M² 363.65
5 Pekerjaan Acian Dinding dan Lisplank M² 539.78
6 Pekerjaan Pasangan Keramik Lantai 40 x 40 cm M² 232.96
7 Pekerjaan Pasangan Keramik Lantai 30 x 30 cm M² 21.43
8 Pekerjaan Water Proofing ( Atap ) M² 161.84

V PEKERJAAN KUSEN, PINTU, DAN JENDELA


1 Kusen Pintu dan Jendela Aluminium M 21.16
2 Daun Jendela Jalus M² 10.37
3 Kusen Pintu Besi Profil C NP 140 x 60 x 7 mm M 29.63
4 Pintu Plat baja 2 sisi dalamnya Glass wool M² 13.68
5 Pasang Engsel Pintu baja As 1" pasang 18.00
6 Pasang Kunci Pintu Baja pasang 4.00
7 Pasang Grendel Tanam untuk Pintu baja Set 4.00
8 Talang Air Hujan M 20.80
9 Baut Angkur M22 Penjangkaran 1000 mm bh 10.00

VI PEKERJAAN MEKANIKAL & ELEKTRIKAL


a Pengadaan Elektrikal dan Accessories
1 Panel Induk Utama, LVM-DP
- Panel LVM-DP + Capasitor bank 87,5 KVAR Lengkap dengan Acc Set 1.00
2 Panel Penerangan Ruang Listrik Utama (PP-RL)
- Box Plastic mini pragma pintu tranparant, inbow, 24 modul unit 1.00
- MCB 3P/16A 10 KA unit 1.00
- RCCB/ELCB, 4P, 25A, Sensitifitas : 30 mA unit 1.00
- MCB 1P/6A 6 KA unit 3.00
- MCB 1P/10A 6 KA unit 4.00
- Box Plate metal, 600x500x200 mm, Wall Mounting unit 1.00
- MCB 3P/6A, 6 KA unit 1.00
- RCCB/ELCB, 4P, 10A, Sensitifitas : 30 mA unit 1.00
- MCB 1P/4A 6 KA unit 15.00
- Time Switch 24 Jam unit 1.00
- Magnetic Contactor 10A unit 1.00
- Indikator Lamp, Pilot Lamp Ø22mm, 220V unit 3.00
- Mini Fuse 2A unit 3.00
- Selector Switch 3 Posisi unit 1.00
- Perakitan dan Pemasangan lengkap termasuk aksesoris LS 1.00
3 Penerangan Ruang listrik utama
- Lampu philips 2 x 18W/220V, WP (Water proof) unit 8.00
- Lampu philips 36W/220V, Industrial Type unit 1.00
- Lampu philips 2 x 36W/220V, Water proof unit 4.00
- Single switch 10 A/ 220V plano unit 4.00
- Double Switch 10 A/ 220V plano unit 2.00
- Outlet 10A / 2P+E,220 V,WP (Water proof) unit 6.00
- Kabel NYM 3 x 2,5 mm2 m 160.00
- uPVC Conduit 20 m m 140.00
- uPVC Conduit 25 m m 2.00
- Lampu PJU, 56 watt + timer unit 30.00
- Exhaust Fan 16 Inch, 80 watt ( 2 unit di R. panel LVMDP) unit 7.00
- Kabel penerangan ke PJU
- NYFGBY 2 x 4 mm2 meter 612.00
- Kabel penerangan ke PJU - -
- NYFGBY 2 x 2,5 mm2 meter 163.00
- Kabel dari LVMDP ke P. Penerangan R. Genset
- NYFGBY 4 x 1.5 mm meter 10.00
- BC 4 mm2 meter 10.00
- MCB 4 Amp untuk tiap2 tiang lampu unit 10.00
- Instalasi titik lampu titik 13.00
- Intalasi titik lampu PJU titik 30.00
- Instalasi Stop kontak titik 12.00
- Instalasi exhaust fan titik 6.00
d Pengadaan Elektrikal dan Accessories
1 Panel Automatic Main Failure (AMF) dan Change Over Switch (COS)
Change Over Switch untuk kapasitas daya 1500 KvA, plus interlock
- set 1.00
system
- Box Panel, ukuran T:1800 X L:800 X D:600, free standing type set 1.00
2 Panel Induk Utama, LVM-DP
- Perakitan dan Pemasangan lengkap termasuk aksesoris set 1.00
3 Panel Penerangan Ruang Listrik Utama (PP-RL)
- Perakitan dan Pemasangan lengkap termasuk aksesoris set 1.00
4 Penerangan Ruang listrik utama
- Lampu philips 2 x 18W/220V, WP (Water proof) unit 8.00
- Lampu philips 36W/220V, Industrial Type unit 1.00
- Lampu philips 2 x 36W/220V, Water proof unit 4.00
- Outlet 10A / 220 V unit 2.00
- Outlet 10A / 2P+E,220 V,WP (Water proof) unit 2.00
- Exhaust fan, Industrial type, wall mounted, 16", komplit base frame set 2.00
- Titik lampu titik 13.00
- Travo step down kap. 20 KV - 400 V, Daya 400 KVA set 1.00
- Cabical in comiy/out going 20 KV set 1.00
- Panel AMF set 1.00
- Tiang Lampu PJU set 30.00
- Tiang Lampu Penerangan set 15.00

Ju
BIAYA

R TERUTAMA BAGI MASYARAKAT MISKIN

AN PELENGKAP SISTEM SARANA AIR BERSIH AI NGELAR

KODE HARGA SATUAN JUMLAH HARGA


ANALISA ( Rp. ) SATUAN ( Rp. )

5 6 7
2,000,000.00 2,000,000.00
1,000,000.00 1,000,000.00
1,000,000.00 1,000,000.00

17,495,730.12 17,495,730.12
A.2.3.1.1. 63,813.75 9,625,027.91
A.2.3.1.9. 46,777.50 3,001,846.89
A.2.3.1.11 276,325.50 4,868,855.31

372,488,543.65 372,488,543.65
A.4.1.1.4 1,171,770.27 11,062,097.23

A.4.1.1.10 1,429,758.88 8,235,411.15


A.4.1.1.11 20,102.50 12,136,080.28
A.4.1.1.12 106,696.70 1,707,147.20

A.4.1.1.10 1,429,758.88 7,906,566.61


A.4.1.1.11 20,102.50 22,637,023.20
A.4.1.1.12 106,696.70 3,930,706.43

A.4.1.1.10 1,429,758.88 9,579,384.50


A.4.2.1.1 20,102.50 42,648,659.90
A.4.1.1.20 189,091.10 16,882,053.41

A.4.1.1.10 1,429,758.88 18,429,591.96


A.4.2.1.1 20,102.50 39,484,325.38
A.4.1.1.20 176,757.35 14,621,367.99

A.4.1.1.10 1,429,758.88 12,381,711.90


A.4.2.1.1 20,102.50 669,212.23
A.4.1.1.20 106,696.70 332,893.70

A.4.1.1.10 1,171,770.27 19,779,482.16


A.4.2.1.1 20,102.50 2,877,873.90
A.4.1.1.20 106,696.70 1,397,726.77

A.4.1.1.10 1,429,758.88 28,881,129.38


A.4.2.1.1 20,102.50 41,369,939.88
A.4.1.1.20 244,091.10 39,698,976.50
A.4.1.1.10 1,429,758.88 2,745,137.05
A.4.2.1.1 20,102.50 2,978,909.77
A.4.1.1.20 244,091.10 10,115,135.18

208,929,492.68 208,929,492.68
A.3.2.1.9 470,933.10 4,874,157.59
A.3.2.1.2 830,303.10 36,583,154.59
A.4.4.1.1 254,270.50 50,218,423.75
A.4.4.2.3 66,500.59 24,182,926.25
A.4.4.2.27 36,223.00 19,552,476.11
A.4.4.3.35 253,401.50 59,032,413.44
A.4.4.3.35 253,401.50 5,430,394.15
A.4.7.1.5 55,953.70 9,055,546.81

58,388,129.38 58,388,129.38
@ 97,204.22 2,056,841.30
@ 676,325.00 7,015,045.80
@ 391,122.31 11,588,954.05
@ 2,136,722.82 29,230,368.18
@ 220,767.65 3,973,817.70
@ 180,000.00 720,000.00
@ 129,381.99 517,527.96
@ 32,768.00 681,574.40
@ 260,400.00 2,604,000.00

949,016,435.86 949,016,435.86

@ 255,000,000.00 255,000,000.00

@ 278,517.80 278,517.80
@ 177,771.08 177,771.08
@ 531,595.65 531,595.65
@ 37,787.09 113,361.27
@ 37,787.09 151,148.36
@ 4,319,700.00 4,319,700.00
@ 1,230,250.56 1,230,250.56
@ 869,699.60 869,699.60
@ 151,189.50 2,267,842.50
@ 1,233,706.32 1,233,706.32
@ 1,301,381.62 1,301,381.62
@ 71,995.00 215,985.00
@ 131,606.86 394,820.58
@ 319,801.79 319,801.79
@ 755,162.55 755,162.55

@ 370,260.00 2,962,080.00
@ 265,817.21 265,817.21
@ 493,680.00 1,974,720.00
@ 17,484.50 69,938.00
@ 21,598.50 43,197.00
@ 86,088.54 516,531.24
@ 13,370.50 2,139,280.00
@ 8,073.73 1,130,322.20
@ 16,456.00 32,912.00
@ 71,995.00 2,159,850.00
@ 1,596,849.10 11,177,943.70

@ 40,461.19 24,762,248.28

@ 37,725.38 6,149,236.94

@ 146,005.86 1,460,058.60
@ 29,373.96 293,739.60
@ 248,814.72 2,488,147.20
@ 550,761.75 7,159,902.75
@ 611,957.50 18,358,725.00
@ 367,174.50 4,406,094.00
@ 367,174.50 2,203,047.00

@ 45,309,752.93 45,309,752.93

@ 7,551,625.49 7,551,625.49

@ 755,162.55 755,162.55

@ 755,162.55 755,162.55

@ 37,745.95 301,967.60
@ 37,745.95 37,745.95
@ 37,745.95 150,983.80
@ 22,627.00 45,254.00
@ 22,627.00 45,254.00
@ 226,475.70 452,951.40
@ 67,964.63 883,540.19
@ 120,000,000.00 120,000,000.00
@ 158,812,500.00 158,812,500.00
@ 75,000,000.00 75,000,000.00
@ 4,000,000.00 120,000,000.00
@ 4,000,000.00 60,000,000.00

Jumlah 1,608,318,331.68 1,608,318,331.68


PPN 10% 160,831,833.17
Total 1,769,150,164.85
SNI 19-6782-2002

Diamater Pipa Lebar galian Kedalaman Pipa Lebar Pipa


(m)
2 50.80 0.50 0.50 0.20 0.71
3 76.20 0.50 0.70 0.30 0.71
4 101.60 0.50 0.70 0.41 0.71
6 152.40 0.60 0.80 0.61 0.76
8 203.20 0.60 0.80 0.81 0.81
10 254.00 0.70 1.00 1.02 0.86
12 304.80 0.70 1.20 1.22 0.91
14 355.60 0.80 1.40 1.42 0.97
16 406.40 0.80 1.60 1.02
18 457.20 0.90 1.80 1.07
20 508.00 0.90 2.00 1.12
24 609.60 1.00 2.40 1.22
30 762.00 1.20 3.00 1.37
36 914.40 1.30 3.70 1.52
42 1066.80 1.50 4.30 1.68
48 1219.20 1.60 4.90 1.83

Berta Besi Volume Berat/m Berat/Btg Berat/m


2 1.00 0.0000 0.025 0.30
3 1.00 0.0000 0.055 0.66
4 1.00 0.0000 0.099 1.19
6 1.00 0.0000 0.222 2.66 2.66 0.222
8 1.00 0.0001 0.395 4.74 4.74 0.395
10 1.00 0.0001 0.617 7.40 7.40 0.617
12 1.00 0.0001 0.888 10.66 10.66 0.888
14 1.00 0.0002 1.208 14.50 14.50 1.208
16 1.00 0.0002 1.578 18.94 18.96 1.58
19 1.00 0.0003 2.226 26.71 26.76 2.23
22 1.00 0.0004 2.984 35.81 35.76 2.98
25 1.00 0.0005 0.0059 0.07 46.20 3.85
RENCANA ANGGARAN BIAYA

KEGIATAN : PENYEDIAAN SARANA AIR BERSIH DAN SANITASI DASAR TERUTAMA BAG
MISKIN
PEKERJAAN : PEMBUATAN DED JARINGAN DISTRIBUSI DAN BANGUNAN PELENGKAP SI
AIR BERSIH AI NGELAR DESA KEREKEH KEC. UNTER
SUB PEKERJAAN : PEMBANGUNAN RUMAH POMPA DAN METER INDUK
LOKASI : KEC. UNTER IWES, KEC. SUMBAWA, KEC. LABUHAN BADAS
TAHUN ANGGARAN : 2020

KODE
NO. URAIAN PEKERJAAN SATUAN VOLUME
ANALISA
1 3 4 5
I. PEKERJAAN PERSIAPAN
1 Pengukuran, Penyiapan Lokasi dan Pemasangan Bowplank Ls 1.00

II. PEKERJAAN TANAH


1 Galian Tanah Keras M³ 34.29 A.2.3.1.4.
2 Urugan Pasir dibawah Lantai Kerja M³ 5.46 A.2.3.1.11
3 Urugan Tanah M³ 182.91 A.2.3.1.17.

A Pekerjaan Beton
1 Beton tumbuk untuk lantai kerja, 1 : 3 : 5 tebal 5 Cm M³ 2.88 A.4.1.1.1
2 Beton Sloof 25/40
- Beton K.175 M³ 1.65 A.4.1.1.5
- Tulangan beton U.24, ø 12 mm Kg 193.69 A.4.2.1.1
- Bekisting 2 x pakai M² 8.25 A.4.1.1.21
3 Kolom beton, uk.25/15 cm dan 15/15 cm = 8 Bh
- Beton K.175 M³ 0.75 A.4.1.1.5
- Tulangan beton U.24, ø 16 & 12 mm Kg 113.99 A.4.2.1.1
- Bekisting 2 x pakai M² 17.64 A.4.1.1.22
4 Balok Atas 40/20 dan 30/20
- Beton K.175 M³ 1.74 A.4.1.1.5
- Tulangan beton U.24, ø 12 mm Kg 375.06 A.4.2.1.1
- Bekisting 2 x pakai M² 8.72 A.4.1.1.22
5 Plat Lantai Atas 12 cm
- Beton K.175 M³ 7.04 A.4.1.1.5
- Tulangan beton U.24, ø 10-15 Kg 1,356.36 A.4.2.1.1
- Bekisting 2 x pakai M² 62.16 A.4.1.1.22

B Pekerjaan Pasangan dan Plesteran


1 Pas. Lantai beton rabat (beton cor 1:3:5) M² 2.94 A.4.1.1.2
2 Pasangan batu bata 1 : 4 M³ 22.71 A.4.4.1.3
3 Pasangan batu belah 1: 3 u/ pondasi M³ 9.36 A.3.2.1.1
4 Plesteran 1 PC : 4 PS ( 2,50 cm ) M² 41.90 A.4.4.2.4
5 Acian M² 48.00 A.4.4.2.27
6 Pasangan Keramik 30 x 30 M² 42.00 A.4.4.3.35

C Pekerjaan Kusen, Pintu dan Jendela


1 Kusen Jendela Kayu M³ 0.36 @
2 Daun Jalusi Bahan Kayu M³ 0.06 @
3 Daun Jendela Aluminium Panil Kaca M² 0.55 @
4 Daun Jendela Jalusi Plt Baja t=2,3 mm M² 1.38 @
5 Kusen Pintu Besi Profil C NP C.100.50.5 M' 5.90 @
6 Daun Pintu Besi rangka L 50.50.5 M² 2.60 @
7 Pasang Engsel Pintu pasang 3.00 @
8 Pasang Handle dan Kunci Pintu pasang 2.00 @
9 Pasang Engsel Pintu baja As 1" pasang 3.00 @
10 Pasang Kunci Pintu Baja pasang 2.00 @
11 Kaca t=5m M² 0.75 @

D Pekerjaan Pengecetan
1 Pengecetan Tembok M² 41.90 A.4.7.1.10
2 Pengecetan Kayu M² 3.20 A.4.7.1.4
3 Pengecetan Besi M² 5.10 A.4.7.1.5

III PEKERJAAN METER INDUK


A Pekerjaan Tanah
1 Galian Tanah Biasa (Box Meter Induk dan Galian Pipa) M³ 6.51 A.4.1.38
2 Urugan Pasir M³ 0.69 A.8.4.1.26
3 Urugan Tanah Bekas Galian Pipa M³ 3.02 A.4.1.50
4 Buangan Tanah M³ 3.49 A.4.1.51

B Pekerjaan Pasangan dan Beton


1 Beton Rabat untuk Lantai Kerja dan Trust Block M³ 0.13 A.4.1.1.4
2 Beton Lantai dan Dinding K175 M³ 0.66 A.4.1.1.5
3 Tulangan Besi Lantai dan Dinding kg 117.25 A.4.2.1.1
4 Bekisting 2 x Pakai M² 10.98 A.4.1.1.20
5 Plesteran 1 PC : 4 PS (1,50 cm) M³ 9.72 A.4.4.1.9
6 Acian M² 9.72 A.4.4.2.27

C Pekerjaan Pipa dan Box Valve dan Penerangan


1 Meter Air Ø 150 mm (6") Bh 1.00 @
2 Check Valve Ø 150 mm (6") Bh 1.00 @
3 Gate Valve All Flange Ø 150 mm (6") Bh 3.00 @
4 Biaya Pemasangan Valve Ø 150 mm (6") Bh 5.00 A.8.4.3.1
5 Tee GI All Flange Ø 150 x 150 mm (6"x 6") Bh 2.00 @
6 Puddle Flange L : 1,7 Ø 150 mm (6") Bh 2.00 @
7 Puddle Flange L : 0,45 Ø 150 mm (6") Bh 2.00 @
8 Puddle Flange L : 0,4 Ø 150 mm (6") Bh 2.00 @
9 Bend GI All Flange Ø 150 mm (6") x 90º Bh 3.00 @
10 Pipa Inlet dari Rumah Pompa, GI Medium Ø 150 (6") M 3.00 @
11 Pipa Outle, GI Medium Ø 150 (6") M 6.00 @
12 Flange Las Ø 150 mm (8") Bh 3.00 @
13 Mur Baut Bh 240.00 @
14 Pembuatan Penutup Box Bh 2.00 @
15 Pengecetan Kg 1.00 @
16 Ttitik Lampu Titik 2.00 @

Jumlah

Total
A

TASI DASAR TERUTAMA BAGI MASYARAKAT

N BANGUNAN PELENGKAP SISTEM SARANA


. UNTER

BUHAN BADAS

HARGA JUMLAH HARGA


SATUAN ( Rp. ) SATUAN ( Rp. )
6 7
2,000,000.00 2,000,000.00
2,000,000.00 2,000,000.00

44,796,503.83 44,796,503.83
84,915.60 2,911,755.92
276,325.50 1,508,737.23
220,742.50 40,376,010.68

79,922,633.46 79,922,633.46
1,186,897.47 3,418,264.71

1,304,429.28 2,152,308.31
20,102.50 3,893,653.23
106,696.70 880,247.78

1,304,429.28 978,321.96
20,102.50 2,291,483.98
189,091.10 3,335,567.00

1,304,429.28 2,269,706.95
20,102.50 7,539,643.65
176,757.35 1,541,324.09

1,304,429.28 9,183,182.13
20,102.50 27,266,226.90
244,091.10 15,172,702.78

28,256,189.72 28,256,189.72
1,230,345.82 3,617,216.71
243,446.50 5,528,670.02
831,675.90 7,784,486.42
61,125.90 2,561,466.29
36,223.00 1,738,704.00
253,401.50 10,642,863.00

12,609,305.63 12,609,305.63
6,545,530.90 2,356,391.12
6,545,530.90 392,731.85
714,444.06 392,944.23
676,325.00 933,666.66
391,122.31 2,307,621.63
1,630,392.09 4,239,019.43
220,767.65 662,302.95
96,000.00 192,000.00
220,767.65 662,302.95
165,000.00 330,000.00
187,000.00 140,324.80

2,248,893.15 2,248,893.15
42,628.91 1,786,354.11
55,285.73 177,091.23
55,953.70 285,447.80

1,492,569.66 1,492,569.66
63,813.75 415,369.31
276,325.50 190,200.37
220,105.68 663,681.74
63,918.42 223,318.24

6,180,318.72 6,180,318.72
1,171,770.27 154,603.37
1304429.28 860,547.65
20,102.50 2,357,112.20
106,696.70 1,171,785.84
132,117.50 1,284,182.10
36,223.00 352,087.56

63,068,617.79 63,068,617.79
18,580,700.00 18,580,700.00 Pipa
7,920,000.00 7,920,000.00 PF 6" L=0,4 176240
4,395,000.00 13,185,000.00 PF 6" L=0,4 198270
222,766.54 1,113,832.71
1,690,166.54 3,380,333.08 PF 6" L=1,7 749020
1,466,304.00 2,932,608.00
805,404.00 1,610,808.00
778,968.00 1,557,936.00
346,100.00 1,038,300.00
623,900.00 1,871,700.00
575,900.00 3,455,400.00
861,000.00 2,583,000.00
8,600.00 2,064,000.00
850,000.00 1,700,000.00 850,000 1,1x0,9 dan 0,7x0,7
75,000.00 75,000.00
235,400.00 470,800.00

Jumlah 240,575,031.97
PPN 10% 24,057,503.20
Total 264,632,535.16
Flange Las
472,900 778,968.00
472,900 805,404.00

472,900 1,466,304.00

1,1x0,9 dan 0,7x0,7


RUMAH POMPA

Galian Tanah
6.96 9.26 1.86 16.22
Urugan Tanah 12.8928 1.54 1.94 4.48 2.24

Urugan Pasir
Urugan Pasir Pondasi 7.00 0.70 0.10 0.49
Urugan Pasir Pondasi 5.00 0.70 0.10 0.35
Urugan Pasir Pondasi 6.00 0.70 0.10 0.42
Urugan Pasir Lantai 7.00 6.00 0.10 4.20
Lantai Kerja 0.07 41.10 2.877
Pondasi 8.40 0.96

Urugan Tanah

Pembesian
Panjang/ Jumlah
Sloof 20 x 25 Panjang Panjang
sengkang sengkang
Tulangan Utama 4 ø 12 14.15 97.20 97.20
Tulangan Utama 4 ø 12 33.20 33.20
Sengkang ø 8 - 15 0.8 24.00 161 128.80
Sengkang ø 8 - 15 0.8 9.00 61 48.80
Angkur ø 8 - 500 0.4 24.00 49 19.60

Beton Sloof 25 x 15 24.00


Beton Sloof 25 x 15 9.00

Bekisting 20 x 25 24.00
Bekisting 20 x 25 9.00

Kolom 25 x 15
Tulangan Utama 4 ø 12 4 4 64
Sengkang ø 8 - 15 0.7 4 3.15 88 61.60

Kolom 15 x 15
Tulangan Utama 4 ø 8 4 4 64
Sengkang ø 6 - 20 0.5 4 3.15 68 34.00

Pembesian

Beton 25 x 15 12.6
Beton 15 x 15 12.6

Bekisting 25 x 15 4
Bekisting 15 x 15 4
Panjang/ Jumlah
Ring Balok 20 x 40 Panjang Panjang
sengkang sengkang
Tulangan Utama 4 ø 12 100.00 100.00
Sengkang ø 8 - 15 1.1 24.00 160 176.00

Ring Balok 20 x 30
Tulangan Utama 4 ø 12 148.00 148.00
Sengkang ø 8 - 15 0.9 36.00 240 216.00

Beton 6.00
Beton 21.00

Bekisting 20 x 40 11.6
Bekisting 20 x 30 13.6

Jumlah
Plat Atap Panjang
Jalur
Panjang Bagian Atas ø 12 - 15 8.3 57 473.1
Panjang Bagian Bawah ø 12 - 15 8.48 58 491.84
Lebar Bagian Atas 6.3 43 270.9
Lebar Bagian Bawah 6.48 45 291.6

Beton Plat
Beton Plapon

Bekisting

Pekerjaan Pasangan
Pasangan Bata 11.4 3.15 35.91 22.71 m2
Boupenlig 3 2.6 0.6 4.68
Boupenlig 4 1.75 0.6 4.20
Pintu 1 2.7 1.6 4.32
13.20

Plesteran 48.00 m2
Trasram 1:3 24 6.10 m2
Plestera n 1 :4 41.90 m2
Acian 48.00 m2
Rabat Beton t=7cm 2.94 m2
Pas. Keramik 30x30 42.00 m2

Pekerjaan Kusen dan Jendela


Kusen Pintu
Baja C.100.50.5 5.4 9.2 m 5.9
3.2
0.6

Daun Pintu Plat Baja t=2,3 2.1 0.75 2 3.15


Jendela Jalusi 0.55 0.5 2 0.55
Jalusi Plat Baja t=2,3
Kaca t=3mm 0.55 0.5 2 0.55

Besi Siku L 40.40.4 4.20 18.02 m


6.40
4.00
2.16
1.26

Plat Baja t=2,3 4.26 m2


0.04
0.05
Jalusi t=2,3 x 5 1.38
0.55
Daun Pintu 2.24

Kaca t=5mm 0.75 m2

Pegangan Pintu Dia. 12 0.3 5.027E-05

Pekerjaan Kayu 3.15


Kusen 1.75 x 0,6 4 1.75 0.6 4.20
Kayu 5/15 14.00 m 3.50 4.00
7.20 m 1.80 2.00
Papan Jalusi 2/11 8.00 m 2.00 2.00
4 5.00 0.8 0.11 1.76
Kusen 2,6 x 0,6 3 2.60 0.6 4.68
Kayu 5/15 15.60 m 3.90 4.00
7.20 m 1.80 2.00
Papan Jalusi 2/11 12.00 m 3.00 3.00
3 5.00 0.8 0.11 1.32
Kusen 8.88 m2
Jalusi 3.08 m2
Kunci
Engsel Baja L=10

Angkur ø 8 - 25 2.20 10 20 5.027E-05


34.29 34.29
176.4 199.50 199.50

5.46

2.88
9.36
17.70
-182.91 182.91

Volume Berat Berat


0.0001131 0.0109931 86.296 86.31
0.0001131 0.0037548 29.475 29.48
5.027E-05 0.0064742 50.822 50.88
5.027E-05 0.002453 19.256 19.28
5.027E-05 0.0009852 7.734 7.74
193.583 193.69

0.05 1.2 1.20


0.05 0.45 0.45
1.65
0.25 6 6.00
0.25 2.25 2.25
8.25

0.0001131 0.0072382 56.820 56.82 56.83


5.027E-05 0.0030964 24.306 24.31 24.332
81.13 81.162

5.027E-05 0.003217 25.253 25.25 25.28


2.827E-05 0.0009613 7.546 7.55 7.548
32.80 32.828
113.99

0.0375 0.4725 0.47


0.0225 0.2835 0.28
0.75
3.15 0.80 10.08 10.08
3.15 0.60 7.56 7.56
17.64
Volume Berat
0.0001131 0.0113097 88.781 88.78 88.80
5.027E-05 0.0088467 69.447 69.45 69.52
158.32

0.0001131 0.0167384 131.396 131.40 131.42


5.027E-05 0.0108573 85.230 85.23 85.32
216.63 216.74
375.06
0.08 0.48 0.48 0.48
0.06 1.26 1.26 1.26
1.74
0.4 4.64 4.64 4.64
0.3 4.08 4.08 4.08
8.72

0.0001131 0.0535063 420.025 420.02 420.11


0.0001131 0.0556258 436.662 436.66 436.75
0.0001131 0.0306381 240.509 240.51 240.56
0.0001131 0.0329792 258.887 258.89 258.94
1356.08 1356.36

0.12 49.2 5.904 5.90 5.90


28.4 0.04 1.136 1.14 1.14
7.04 7.04
7.4 8.4 62.16 62.16 62.16

2.88

2.6 m2
m2
1.508E-05 0.115 kg

3.51 1.232 3.2032

btg 0.12 m3
btg 0.06 m3 0.088 3.08
btg 0.02 m3
3.2

btg 0.12 m3
btg 0.06 m3
btg 0.04 m3
2.4
0.36
0.06 5.6 0.01232
1 buah
6 psg

0.0010053 7.691 kg
REKAPITULASI
ANALISA HARGA SATUAN PEKERJAAN

INSTANSI : DINAS PERUMAHAN RAKYAT DAN KAWASAN PERMUKIMAN KAB. SUMBAWA


KEGIATAN : PENYEDIAAN SARANA AIR BERSIH DAN SANITASI DASAR TERUTAMA BAGI MASYARAKAT MISKIN

PEKERJAAN : PEMBUATAN DED JARINGAN DISTRIBUSI DAN BANGUNAN PELENGKAP SISTEM SARANA AIR BE

LOKASI : KEC. SUMBAWA, KEC. LABUHAN BADAS, KEC. UNTER IWES


TAHUN ANGGARAN : 2017

NO KODE JENIS PEKERJAAN

I PEKERJAAN PERSIAPAN
1 A.2.2.1.4 1 m' Pengukuran dan Pemasangan Bouwplank A
1 A.2.2.1.9 1 m2 Pembersihan dan Perataan A
II PEKERJAAN TANAH PEKERJAAN TA
1 A.2.3.1.1. 1 m3 Galian Tanah Biasa A
2 A.2.3.1.4. 1 m3 Galian Tanah Keras A
3 A.2.3.1.7. 1 m3 Galian Tanah Berbatu A
4 A.2.3.1.6. 1 m3 Galian Tanah Lumpur A
5 A.2.3.1.5. 1 m3 Galian Tanah Cadas A
6 A.2.3.1.8. 1 m3 membuang tanah sisa galian A
6 A.2.3.1.8a 1 m3 membuang tanah sisa galian jarak s/d 3 km A
6 A.2.3.1.9. 1 m3 Urugan kembali galian tanah A
8 A.2.3.1.16. 1 m3 Urugan Tanah Lempung A
9 A.2.3.1.11 1 m3 Urugan Pasir Urug A
10 A.2.3.1.17. 1 m3 Pemadatan tanah,perataan dan perapihan A
11 A.2.3.1.13. Pemasangan 1 m2 Lapisan Ijuk Tebal 10 cm A
12 A.2.3.1.14. Pengurugan 1 m3 Sirtu Padat A
III PEKERJAAN PONDASI
1 A.21 1 m2 Penanaman Gebalan Rumput A
2 A.3.2.1.1 Pemasangan 1 m3 Pondasi batu Belah Campuran 1PC : 3PS A
3 A.3.2.1.2 Pemasangan 1 m3 Pondasi batu Belah Campuran 1PC : 4PS A
4 A.3.2.1.3 Pemasangan 1 m3 Pondasi batu Belah Campuran 1PC : 5PS A
5 A.3.2.1.9 1 m3 Pasangan Batu Kosong A
6 G.5.b 1 m3 Pas. Batu Bronjong Kwt. galvanis 3 mm G
7 G.32 1 m3 Bongkaran Pasangan Batu Kali/Beton G
IV PEKERJAAN DINDING P
1 A.4.4.1.5 1 m2 Pas. Bata 1 PC : 6 PS - 1 Bata A
2 A.4.4.1.4 1 m2 Pas. Bata 1 PP : 5 PS - 1 Bata A
3 A.4.4.1.3 1 m2 Pas. Bata 1 PC : 4 PS - 1 Bata A
4 A.4.4.1.2 1 m2 Pas. Bata 1 PC : 3 PS - 1 Bata A
5 A.4.4.1.1 1 m2 Pas. Bata 1 PC : 2 PS - 1 Bata A
6 A.4.4.1.9 1 m2 Pas. Bata 1 PC : 4 PS - 1/2 Bata A
7 A.4.4.1.10 1 m2 Pas. Bata 1 PC : 3 PS - 1/2 Bata A
8 A.4.4.1.7 1 m2 Pas. Bata 1 PC : 2 PS - 1/2 Bata A
9 A.4.4.1.24 Memasang Paving Block A
10 A.4.4.1.24a Memasang Paving Block (akibat bongkaran galian pipa 40% bahan diganti) A
V PEKERJAAN PLESTERAN PEKERJAAN PL
1 A.4.4.2.2 1 m2 Plesteran 1 PC : 2 PS ( 1,50 cm ) A
2 A.4.4.2.3 1 m2 Plesteran 1 PC : 3 PS ( 1,50 cm ) A
3 A.4.4.2.4 1 m2 Plesteran 1 PC : 4 PS ( 1,50 cm ) A
4 A.4.4.2.5 1 m2 Plesteran 1 PC : 5 PS ( 1,50 cm ) A
5 G.51.c 1 m2 Siaran 1 PC : 2 PS G
6 A.4.4.2.27 1 M2 Acian
VI PEKERJAAN LANTAI PEKERJAAN LA
1 A.4.4.3.65 1 m2 Pasang Lantai Keramik 10x20 cm A
2 A.4.4.3.64 1 m2 Pasang Lantai Keramik 20x20 cm A
3 A.4.4.3.63 1 m2 Pasangan Keramik Dinding 20 x 25 cm A
4 A.4.4.3.35 1 m2 Pasangan Lantai Keramik 30 x 30 cm A
VII PEKERJAAN BESI PEKERJAAN BE
1 A.4.2.1.1 Pemasangan 1 Kg besi tulangan A
2 A.4.2.1.2 Pemasangan 1 Kg besi profil baja IWF A
3 A.4.2.1.3 Perakitan 1 Kg besi profil A
4 A.4.2.1.4 Pemasangan 1m Pagar BRC 190 cm A
5 Err:509 Err:509 ###
6 M.07.6.3 1 Kg Perakitan dan Eriction M
VIII PEKERJAAN BETON
1 A.4.1.1.1 1 m3 Beton Mutu f'c = 7,4 Mpa (K100), Slump (12 ± 2) cm, w/c + 0,87 A
2 A.4.1.1.2 1 m3 Beton Mutu f'c = 9,8 Mpa (K125), Slump (12 ± 2) cm,w/c + 0,78 A
3 A.4.1.1.3a 1 m3 Beton lantai Ready Mix K-225 + Besi Beton + Bekisting Expose + Stoot A

1 m3 Beton dinding Ready Mix K-225 + Besi Beton + Bekisting Expose +


4 A.4.1.1.3b A
Stoot
1 m3 Beton balok dan atap Ready Mix K-225 + Besi Beton + Bekisting
5 A.4.1.1.3c A
Expose + Stoot
Membuat 1 m3 Lantai Kerja Beton Mutu f'c = 7,4 Mpa (K100), Slump (3 -6)
6 A.4.1.1.4 A
cm,w/c + 0,87
7 A.4.1.1.5 1 m3 Beton Mutu f'c = 14,5 Mpa (K175), Slump (12 ± 2) cm,w/c + 0,66 A
8 A.4.1.1.7 1 m3 Beton Mutu f'c = 19,3 Mpa (K225), Slump (12 ± 2) cm,w/c + 0,58 A
9 A.4.1.1.8 1 m3 Beton Mutu f'c = 21,7 Mpa (K250), Slump (12 ± 2) cm,w/c + 0,56 A
10 A.4.1.1.9 1 m3 Beton Mutu f'c = 24,0 Mpa (K275), Slump (12 ± 2) cm,w/c + 0,53 A
11 A.4.1.1.10 1 m3 Beton Mutu f'c = 26,4 Mpa (K300), Slump (12 ± 2) cm,w/c + 0,52 A
12 A.4.1.1.11 1 m3 Beton Bertulang K175 200 kg besi + bekisting A
13 A.4.1.1.12 1 m3 Beton Bertulang K225 200 kg besi + bekisting A
14 A.4.1.1.13 1 m3 Saluran Terbuka U-Ditch 60x60 A
15 A.4.1.1.14 Pemasangan 1 m’ PVC Waterstop lebar 200 mm A
16 A.4.1.1.17 Pembesian 1 Kg Besi Polos atau besi Ulir A
17 A.4.1.1.20 Pemasangan 1 m2 Bikisting untuk Pondasi A
18 A.4.1.1.21 Pemasangan 1 m2 Bikisting untuk Sloof A
19 A.4.1.1.22 Pemasangan 1 m2 Bikisting untuk Kolom A
20 A.4.1.1.23 Pemasangan 1 m2 Bikisting untuk Balok A
21 A.4.1.1.24 Pemasangan 1 m2 Bikisting untuk Lantai A
22 A.4.1.1.25 Pemasangan 1 m2 Bikisting untuk Dinding A
23 A.4.1.1.26 Pemasangan 1 m2 Bikisting untuk Tangga A
24 A.4.1.1.35 1 m' Pek. Beton kolom praktis ( 11x11cm ) A
25 A.4.1.1.36 1 m' Pek. Ring balok (10x15cm) A
IX PEKERJAAN ATAP DAN KAYU PEKERJAAN AT
1 A.4.5.2.14 1 m2 Memasang Atap Asbes A
2 A.4.5.1.4.a 1 m' Memasang Bubungan Atap Asbes A
3 A.4.5.1.5 1 m2 Mengerjakan Plafon Triplek A
Pembuatan dan Pemasangan 1 m3 Kusen Pintu dan Kusen Jendela, Kayu
4 A.4.6.1.2. A
Kls. I, II atau III
Pembuatan dan Pemasangan 1 m3 Kusen Pintu dan Kusen Jendela, Kayu
5 A.4.6.1.3. A
Kls. I, II atau III
Pembuatan dan Pemasangan 1 m3 Kusen Pintu dan Kusen Jendela, Kayu
6 A.4.6.1.4. A
Kls. I, II atau III
7 A.4.6.1.5. Pembuatan dan pemasangan 1 m2 daun pintu panel, kayu kelas I atau II A

8 A.4.6.1.8. Pembuatan 1 m2 daun pintu plywood rangkap, rangka kayu kelas II tertutup A

9 A.4.6.1.9. Pembuatan dan pemasangan 1 m2 daun pintu panel, kayu kelas I atau II A
10 A.4.6.1.10. Pemasangan 1 m2 jalusi kusen, kayu kelas I atau II A
Pemasangan 1 m3 konstruksi kuda-kuda konvensional, kayu kelas I, II dan
11 A.4.6.1.13. A
III bentang 6 meter
12 A.4.6.1.15. Pemasangan 1 m3 konstruksi gordeng, kayu kelas II A
Pemasangan 1 m2 Plafon termasuk rangka (60 x 60) cm, kayu kelas II
13 A.4.6.1.20. A
atau III

14 A.4.6.1.21. Pemasangan 1 m’ Lisplank ukuran (3 x 20) cm, kayu kelas I atau kelas II A
X PEKERJAAN PENGECATAN PEKERJAAN PE
1 A.4.7.1.10 1 m2 Pek. Cat Tembok (1 lapis plamuur, 1 lapis cat dasar 2 lapis cat penutup) A
2 A.4.7.1.4 1 m2 Pek. Cat Kayu (1 lapis plamir, 1 lapis cat dasar 2 lapis cat penutup) A
3 A.4.7.1.5 1 m2 Pek. Cat Waterproof A
4 A.4.7.1.16 1 m2 Pengecatan permukaan baja dg. Meni besi A
5 A.4.7.1.20 1 m2 Pengecatan permukaan baja galvanis secara manual sistem 3 lapis A
6 PEKERJAAN PIPA #N/A P
XI PEKERJAAN PENGECATAN
1 m2 Pek. Cat Tembok (1 lapis plamuur, 1 lapis cat dasar 2 lapis cat
1 A.4.7.1.10 A
penutup)

2 A.4.7.1.4 1 m2 Pek. Cat Kayu (1 lapis plamir, 1 lapis cat dasar 2 lapis cat penutup) A
2 A.4.7.1.5 1 m2 Pek. Cat Waterproof A
3 A.4.7.1.16 1 m2 Pengecatan permukaan baja dg. Meni besi A
4 A.4.7.1.20 1 m2 Pengecatan permukaan baja galvanis secara manual sistem 3 lapis A
XII PEKERJAAN PIPA
1 Sp.1 1 M' Uitzet Pipa/Pematokan S
2 A.4.1.5 1 cm Pengelasan dengan las listrik A
3 A.4.1.48 1 M' Pemasangan Water stop 3/250 mm A
4 A.4.1.49a 1 M' Pemasangan Pipa GI Ø 16" A
5 A.4.1.49 1 M' Pemasangan Pipa GI Ø 14" A
6 A.4.1.39 1 M' Pemasangan Pipa GI Ø 12" A
7 A.4.1.38 1 M' Pemasangan Pipa GI Ø 10" A
8 A.4.1.37 1 M' Pemasangan Pipa GI Ø 8" A
9 A.4.1.36 1 M' Pemasangan Pipa GI Ø 6" A
10 A.4.1.34 1 M' Pemasangan Pipa GI Ø 4" A
11 A.4.1.50 1 M' Pemasangan Pipa GI Ø 3" A
12 A.4.1.51 1 M' Pemasangan Pipa GI Ø 2" A
13 A.4.1.52 1 M' Pemasangan Pipa GI Ø 3/4" A
14 A.4.1.53 1 M' Pemasangan Pipa GI Ø 1/2" A
15 A.8.4.1.26 1 M' Pemasangan Pipa HDPE Ø 20" A
16 A.8.4.1.25 1 M' Pemasangan Pipa HDPE Ø 18" A
17 A.8.4.1.24 1 M' Pemasangan Pipa HDPE Ø 16" A
18 A.8.4.1.23.1 1 M' Pemasangan Pipa HDPE Ø 14" A
19 A.8.4.1.23 1 M' Pemasangan Pipa HDPE Ø 12" A
20 A.8.4.1.22 1 M' Pemasangan Pipa HDPE Ø 10" A
21 A.8.4.1.21 1 M' Pemasangan Pipa HDPE Ø 8" A
22 A.8.4.1.20 1 M' Pemasangan Pipa HDPE Ø 6" A
23 A.8.4.1.18 1 M' Pemasangan Pipa HDPE Ø 4" A
24 A.8.4.1.17 1 M' Pemasangan Pipa HDPE Ø 3" A
25 A.8.4.1.16 1 M' Pemasangan Pipa HDPE Ø 2" A
26 A.8.4.1.15 1 M' Pemasangan Pipa HDPE Ø 1 1/2" A
27 A.8.4.1.14 1 M' Pemasangan Pipa HDPE Ø 1" A
28 A.8.4.1.14.a 1 m' Pemasangan pipa PVC Dia ( 1" )" A
29 A.8.4.1.14.b 1 m' Pemasangan pipa PVC Dia ( 1.5" )" A
30 A.8.4.1.14.c 1 m' Pemasangan pipa PVC Dia ( 2" )" A
31 A.8.4.1.14.d 1 m' Pemasangan pipa PVC Dia ( 3" )" A
32 A.8.4.1.14.e 1 m' Pemasangan pipa PVC Dia ( 4" )" A
33 A.8.4.1.14.f 1 m' Pemasangan pipa PVC Dia ( 6" )" A
34 A.8.4.1.14.g 1 m' Pemasangan pipa PVC Dia ( 8" )" A
35 A.8.4.1.14.h 1 m' Pengetesan pipa PVC Dia ( 6" )" A
36 A.8.4.1.14.i 1 m' Pengetesan pipa PVC Dia ( 4" )" A
37 A.8.4.1.14.j 1 m' Pengetesan pipa PVC Dia ( 3" )" A
38 A.8.4.1.14.k 1 m' Pengetesan pipa PVC Dia ( 2" )" A
39 A.8.4.1.14.l 1m' Pengetesan pipa PVC Dia ( 1" )" A
40 A.8.4.3.1 Pemasangan 1 Buah Valve Ø 6" A
41 A.8.4.3.2 Pemasangan 1 Buah Valve Ø 8" A
42 A.8.4.3.3 Pemasangan 1 Buah Valve Ø 10" A
43 A.8.4.3.4 Pemasangan 1 Buah Valve Ø 12" A
44 A.8.4.3.5 Pemasangan 1 Buah Valve Ø 14" A
45 A.8.4.3.6 Pemasangan 1 Buah Valve Ø 16" A
46 A.8.4.5.8 1 M' Pengetesan pipa Ø 16" A
47 A.8.4.5.7 1 M' Pengetesan pipa Ø 12" A
48 A.8.4.5.6 1 M' Pengetesan pipa Ø 10" A
49 A.8.4.5.5 1 M' Pengetesan pipa Ø 8" A
50 A.8.4.5.4 1 M' Pengetesan pipa Ø 6" A
51 A.8.4.5.3 1 M' Pengetesan pipa Ø 4" A
52 A.8.4.5.2 1 M' Pengetesan pipa Ø 3" A
53 A.8.4.5.1 1 M' Pengetesan pipa Ø 2" A
54 M.07.6.3 1 Kg Perakitan dan Eriction M
XIII PEKERJAAN BINA MARGA
1 3.1 (1) 1 M3 Galian Biasa 3
2 3.1 (2) 1 M3 Galian Batu 3
3 3.1 (3) 1 M3 Galian Struktur dengan Kedalaman 0 - 2 M 3
4 3.1 (4) 1 M3 Galian Struktur dengan Kedalaman 2 - 4 M 3
5 3.1.(7) 1 M3 Galian Perkerasan Beraspal dengan Cold Milling Machine 3
6 3.1.(8) 1 M3 Galian Perkerasan Beraspal tanpa Cold Milling Machine 3
7 3.1 (9) 1 M3/Km Angkut bahan galian buangan dengan jarak melebihi 5 Km. 3
8 3.2 (1) 1 M3 Timbunan Biasa dari selain Sumber Galian 3
9 3.2 (2) 1 M3 Timbunan Pilihan 3
10 3.3 1 M2 Penyiapan Badan Jalan 3
11 5.1 (1) 1 M3 Lps. Pond. Agg. Kls. A 5
11 5.1 (2) 1 M3 Lps Pond Agg Kls B 5
12 5.1 (2)a 1 M3 Lapis Pond. Agg. Kls. B dari Bahan Yang Disimpan 5
13 5.2 (1) 1 M3 Lapis Pondasi Agregat Kelas C 5
14 6.1 (1) 1 Liter Lapis Resap Pengikat 6
15 6.1 (2) 1 Liter Lapis Perekat 6
16 6.3 (3) 1 M2 Lataston Lapis Aus (HRS-WC) 6
17 6.3 (3a) 1 Ton Lataston Lapis Aus Perata (HRS-WCL) 6
18 6.3 (4) 1 M3 Lataston Lapis Pondasi (HRS-Base) 6
19 6.3 (4a) 1 Ton Lataston Lapis Pondasi Perata (HRS-Base L) 6
20 6.3 (5a) 1 M2 Laston Lapis Aus (AC-WC) 6
XIV PEKERJAAN LAIN-LAIN PEKERJAAN LA
1 PGR-1 Pemasangan 1 m2 Pagar BRC P
1 CR.06 1 M' Crossing Jalan (Boring) C
2 Ls Administrasi Proyek L
3 Ls Asbuilt Drawing L
4 Ls Dokumentasi L
5 Sp.9 1 Unit Manhole lengkap ukuran 0,60 x 0,60 S
BAGI MASYARAKAT MISKIN

AP SISTEM SARANA AIR BERSIH

HARGA
SATUAN
(Rp)

90,378.75
14,437.50
PEKERJAAN TANAH
63,813.75
84,915.60
123,180.75
102,737.25
128,898.00
27,951.00
63,918.42
46,777.50
193,165.50
276,325.50
220,742.50
190,913.25
157,525.50
-
41,904.50
831,675.90
830,303.10
834,377.50
470,933.10
1,075,800.00
135,019.50
-
235,658.50
237,770.50
243,446.50
254,270.50
254,270.50
132,117.50
149,720.45
157,781.25
131,081.50
104,902.60
PEKERJAAN PLESTERAN
67,250.70
66,500.59
61,125.90
59,707.34
24,389.75
36,223.00
PEKERJAAN LANTAI
273,315.90
255,663.10
246,229.50
253,401.50
PEKERJAAN BESI
20,102.50
32,194.25
734.10
356,080.78
Err:509
5,031.15

1,186,897.47
1,230,345.82
4,983,426.55

6,408,439.15

6,068,357.10

1,171,770.27
400000 250,000.00 650,000.00
1,304,429.28
1,368,109.27
1,386,709.83
1,419,723.91
1,429,758.88
7,284,288.55
7,476,180.47
1,578,559.68
112,612.50
32,695.85
213,393.40
213,393.40
378,182.20
353,514.70
488,182.20
405,682.20
488,182.20
97,920.79
116,283.64
PEKERJAAN ATAP DAN KAYU
62,595.50
131,492.90
97,847.75
6,988,630.00

870,169.85

398,569.05
712,787.00

585,744.00

635,407.00
351,798.00
6,687,560.00
3,933,587.00
63,531.00

66,755.00
PEKERJAAN PENGECATAN
42,628.91
55,285.73
55,953.70
31,761.13
164,562.20
-
-
42,628.91

55,285.73
55,953.70
31,761.13
164,562.20

1,020.88
3,469.84
320,894.75
1,417,731.35
1,417,731.35
1,240,518.18
1,039,380.01
834,574.98
568,602.81
286,056.94
220,105.68
152,281.95
87,888.46
77,213.82
2,999,481.21
2,435,715.15
1,920,598.02
1,512,707.19
1,177,156.75
1,160,391.87
474,628.44
308,709.94
154,065.89
107,763.87
60,452.87
43,331.37
32,259.87
8,019.92
10,771.48
16,110.99
20,198.28
22,012.62
24,781.68
31,456.09
811.66
809.33
606.64
404.87
239.41
222,767
270,267
270,267
312,857
536,456
536,468
1,776.95
1,619.40
1,541.71
1,464.81
1,388.90
1,313.59
1,276.13
1,239.07
5,031.15

57,247.55
339,577.02
115,824.35
241,744.02
152,003.47
160,433.01
11,203.21
36,402.53
281,717.04
1,535.73
449,652.29
440,442.79
49,825.60
443,305.83
20,143.84
21,904.62
155,056.96
2,230,181.51
4,341,790.30
1,917,946.30
164,859.64
PEKERJAAN LAIN-LAIN
366,603.00
194,078.50
3,500,000.00
2,000,000.00
1,000,000.00
856,445.32
RENCANA ANGGARAN BIAYA

KEGIATAN : PENYEDIAAN SARANA AIR BERSIH DAN SANITASI DASAR TERUTAMA BAG
MISKIN
PEKERJAAN : PEMBUATAN DED JARINGAN DISTRIBUSI DAN BANGUNAN PELENGKAP SI
BERSIH AI NGELAR DESA KEREKEH KEC. UNTER
SUB PEKERJAAN : PEMBANGUNAN RUMAH JAGA
LOKASI : KEC. UNTER IWES, KEC. SUMBAWA, KEC. LABUHAN BADAS
TAHUN ANGGARAN : 2020

KODE
NO. URAIAN PEKERJAAN SATUAN VOLUME
ANALISA
1 3 4 5
I. PEKERJAAN PERSIAPAN
1 Pengukuran, Penyiapan Lokasi dan Pemasangan Bowplank Ls 1.00

II. PEKERJAAN TANAH


1 Galian Tanah Keras M³ 24.23 A.2.3.1.4.
2 Urugan Pasir dibawah Lantai Kerja M³ 1.14 A.2.3.1.11
3 Urugan Tanah M³ 9.57 A.2.3.1.17.
3 Buangan Tanah M³ 14.66 A.2.3.1.8.

III. PEKERJAAN BETON


1 Pas. Lantai kerja podasi (beton cor 1:3:5) M² 1.14 A.4.1.1.1
2 Beton Sloof 15/20
- Beton K.175 M³ 4.47 A.4.1.1.5
- Tulangan beton U.24, ø 8 dan ø 6 Kg 102.76 A.4.2.1.1
- Bekisting 2 x Pakai M² 26.72 A.4.1.1.21
3 Kolom beton, uk.15/15 cm = 15 Bh
- Beton K.175 M³ 1.01 A.4.1.1.5
- Tulangan beton U.24, ø 8 dan ø 6 Kg 105.99 A.4.2.1.1
- Bekisting 2 x Pakai M² 27.00 A.4.1.1.22

4 Balok Atas 15/20


- Beton K.175 M³ 4.47 A.4.1.1.5
- Tulangan beton U.24, ø 8 dan ø 6 Kg 102.76 A.4.2.1.1
- Bekisting 2 x Pakai M² 26.72 A.4.1.1.23

IV. PEK. PASANGAN, PLESTERAN & PENGECETAN


Pasangan Batu Kosong M³ 4.58 A.3.2.1.9
3 Pasangan batu belah 1: 3 u/ pondasi M³ 7.85 A.3.2.1.1
2 Pasangan batu bata 1 : 4 M³ 101.00 A.4.4.1.3
4 Plesteran 1 PC : 4 PS ( 2,50 cm ) M² 202.00 A.4.4.2.4
5 Acian M² 202.00 A.4.4.2.27
6 Pasangan Keramik Lantai 30 x 30 M² 33.50 A.4.4.3.35
7 Pasangan Keramik Kamar Mandi 20 x 20 M² 2.50 A.4.4.3.64
8 Pengecetan Dinding M² 202.00 A.4.7.1.10
9 Pengecetan Kusen Pintu, Jendela dan Misplang M² 14.62 A.4.7.1.4

VI PEKERJAAN KAYU
1 Kusen Pintu dan Jendela M³ 0.14 A.4.6.1.2.
2 Daun Pintu Plywood Rangkap M² 7.60 A.4.6.1.3.
3 Rangka Plafon Kaso 5/7 M² 49.47 A.4.6.1.4.
4 Plafon Triplek 120 x 240 x 3 mm M² 49.47 A.4.6.1.5.
5 Lisplang 20mm x 2mm M² 1.60 A.4.6.1.8.
6 Kuda-kuda M³ 0.46 A.4.6.1.9.
7 Gordeng M³ 0.44 A.4.6.1.10.
8 Atap Asbes M² 67.21 A.4.6.1.13.
9 Nok/Bubungan Bh 8.00 A.4.6.1.15.
VI PEKERJAAN KAYU
10 Engsel Pintu pasang 5.00 @
11 Engsel Jendela pasang 1.00 @
12 Kunci Pintu pasang 2.00 @
13 Pemasangan Kaca 3mm M² 1.52 @

VII. Pekerjaan Lain-Lain


1 Titik Lampu Titik 8.00 @
2 Perpipaan Air Bersih Ls 1.00 @
3 Closet Jongkok Porselen Buah 1.00 @
4 Bak Fiber Kamar Mandi Buah 1.00 @
5 Septictank Kapasitas 2 M3 Unit 1.00 @

Jumlah

Total
A

SI DASAR TERUTAMA BAGI MASYARAKAT

ANGUNAN PELENGKAP SISTEM SARANA AIR


R

HAN BADAS

HARGA SATUAN JUMLAH HARGA


( Rp. ) SATUAN ( Rp. )
6 7
2,000,000.00 2,000,000.00
2,000,000.00 2,000,000.00

4,894,783.44 4,894,783.44
84,915.60 2,057,504.99
276,325.50 315,011.07
220,742.50 2,112,505.73
27,951.00 409,761.66

31,920,633.44 31,920,633.44
1,186,897.47 1,353,063.12

1,304,429.28 5,830,798.88
20,102.50 2,065,773.11
106,696.70 2,850,935.82

1,304,429.28 1,317,473.57
20,102.50 2,130,663.98
189,091.10 5,105,459.70

1,304,429.28 5,830,798.88
20,102.50 2,065,773.11
176,757.35 4,722,956.39

71,485,555.47 71,485,555.47
470,933.10 2,156,873.60
831,675.90 6,528,655.82
243,446.50 24,588,096.50
61,125.90 12,347,431.80
36,223.00 7,317,046.00
253,401.50 8,488,950.25
255,663.10 639,157.75
42,628.91 8,611,038.81
55,285.73 808,304.94

25,296,987.19 25,296,987.19
6,988,630.00 1,006,362.72
585,744.00 4,451,654.40
112,630.00 5,571,806.10
52,802.00 2,612,114.94
235,177.00 376,283.20
6,200,810.00 2,857,333.25
7,380,425.00 3,247,387.00
57,998.00 3,898,045.58
44,000.00 352,000.00

60,000.00 300,000.00
36,000.00 36,000.00
180,000.00 360,000.00
150,000.00 228,000.00

4,089,900.00 4,089,900.00
235,400.00 1,883,200.00
1,500,000.00 1,500,000.00
200,000.00 200,000.00
466,700.00 466,700.00
6,601,100.00 40,000.00

Jumlah 139,687,859.53
PPN 10% 13,968,785.95
Total 153,656,645.49
RENCANA ANGGARAN BIAYA

KEGIATAN : PENYEDIAAN SARANA AIR BERSIH DAN SANITASI DASAR TERUTAMA BAG
MISKIN
PEKERJAAN : PEMBUATAN DED JARINGAN DISTRIBUSI DAN BANGUNAN PELENGKAP SI
BERSIH AI NGELAR DESA KEREKEH KEC. UNTER
SUB PEKERJAAN PEMBANGUNAN GASEBO/MUSHOLA
LOKASI : KEC. UNTER IWES, KEC. SUMBAWA, KEC. LABUHAN BADAS
TAHUN ANGGARAN : 2020

KODE
NO. URAIAN PEKERJAAN SATUAN VOLUME
ANALISA
1 3 4 5
I. PEKERJAAN PERSIAPAN
1 Pengukuran, Penyiapan Lokasi dan Pemasangan Bowplank Ls 1.00

II. PEKERJAAN TANAH


1 Galian Tanah Keras M³ 1.80 A.2.3.1.4.
2 Urugan Pasir dibawah Lantai Kerja M³ 1.28 A.2.3.1.11
3 Buangan Tanah M³ 0.52 A.2.3.1.8.

III. PEKERJAAN BETON


2 Beton Sloof 15/20
- Beton K.175 M³ 0.48 A.4.1.1.5
- Tulangan beton U.24, ø 8 dan ø 6 Kg 40.17 A.4.2.1.1
- Bekisting M² 6.40 A.4.1.1.21
3 Kolom beton, uk.15/15 cm = 15 Bh
- Beton K.175 M³ 0.27 A.4.1.1.5
- Tulangan beton U.24, ø 8 dan ø 6 Kg 101.71 A.4.2.1.1
- Bekisting M² 16.00 A.4.1.1.22
4 Balok Lantai 15/20
- Beton K.175 M³ 0.72 A.4.1.1.5
- Tulangan beton U.24, ø 8 dan ø 6 Kg 81.56 A.4.2.1.1
- Bekisting M² 9.60 A.4.1.1.23
4 Ring Balok Atas 15/20
- Beton K.175 M³ 0.48 A.4.1.1.5
- Tulangan beton U.24, ø 8 dan ø 6 Kg 54.38 A.4.2.1.1
- Bekisting M² 6.40 A.4.1.1.23
5 Plat Lanta t=12cm
- Beton K.175 M³ 1.92 A.4.1.1.5
- Tulangan beton U.24, ø 8 dan ø 6 Kg 33.15 A.4.2.1.1
- Bekisting M² 17.92 A.4.1.1.24

IV. PEK. PASANGAN, PLESTERAN & PENGECETAN


1 Pasangan batu bata 1 : 4 M³ 13.40 A.4.4.1.3
2 Beton rabat 1:3:5 M² 0.36 A.4.1.1.1
4 Plesteran 1 PC : 4 PS ( 2,50 cm ) M² 3.00 A.4.4.2.4
5 Acian M² 24.40 A.4.4.2.27
6 Pasangan Keramik 30 x 30 M² 11.52 A.4.4.3.35
7 Pengecetan M² 24.40 A.4.7.1.10
VI PEKERJAAN KAYU
1 Pekerjaan Konstruksi Kuda-kuda Konvensional M³ 0.46 A.4.6.1.13.
2 Pekerjaan Konstruksi Gordeng M³ 0.44 A.4.6.1.15.
3 Rangka Plafon Kaso 5/7 M² 16.00 A.4.6.1.20.
4 Plafon Triplek 120 x 240 x 3 mm M² 16.00 A.4.5.1.5
5 Lisplang 20mm x 2mm M² 3.20 A.4.6.1.21.
6 Atap Asbes M² 84.00 A.4.5.2.14
7 Nok/Bubungan M 7.00 A.4.5.1.4.a
8 Pagar Relling

VI PEKERJAAN LAINNYA
- Pagar Railing Balkon Stainless Minimalis SRSM110 M' 13.80 @
- Titik Lampu Titik 1.00 @

JUMLAH

TOTAL
A

TASI DASAR TERUTAMA BAGI MASYARAKAT

N BANGUNAN PELENGKAP SISTEM SARANA AIR


NTER

BUHAN BADAS

HARGA SATUAN JUMLAH HARGA


( Rp. ) SATUAN ( Rp. )
6 7
2,000,000.00 2,000,000.00
2,000,000.00 2,000,000.00

521,079.24 521,079.24
84,915.60 152,848.08
276,325.50 353,696.64
27,951.00 14,534.52

33,120,508.92 33,120,508.92

1,304,429.28 626,126.05
20,102.50 807,517.43
213,393.40 1,365,717.76

1,304,429.28 352,195.91 15 3
20,102.50 2,044,625.28 15 3
378,182.20 6,050,915.20

1,304,429.28 939,189.08
20,102.50 1,639,559.90
353,514.70 3,393,741.12

1,304,429.28 626,126.05
20,102.50 1,093,173.95
353,514.70 2,262,494.08

1,304,429.28 2,504,504.22
20,102.50 666,397.88
488,182.20 8,748,225.02

8,716,015.65 8,716,015.65
243,446.50 3,262,183.10
1,186,897.47 427,283.09
61,125.90 183,377.70
36,223.00 883,841.20
253,401.50 2,919,185.28
42,628.91 1,040,145.28
13,786,554.23 13,786,554.23
6,687,560.00 3,081,627.65
3,933,587.00 1,730,778.28
63,531.00 1,016,496.00
97,847.75 1,565,564.00
Jenis
Pagar
66,755.00 213,616.00
Pagar Satuan
Pagar
Stainles
Balkon / Per M2
62,595.50 5,258,022.00
131,492.90 920,450.30 Steel Per M2
sRailing
Balkon
456.5 3.75
14,725,400.00 14,725,400.00 2.1
1,050,000.00 14,490,000.00 5.85
235,400.00 235,400.00

JUMLAH 72,869,558.04 72869558.0418


PPN 10% 7,286,955.80
TOTAL 80,156,513.85
0.0225 1.0125
0.6 27
Harga
Rp. 1 jt –
2.250.000
Rp. 380 – 480 rb
RENCANA ANGGARAN BIAYA

KEGIATAN : PENYEDIAAN SARANA AIR BERSIH DAN SANITASI DASAR TERUTAMA BAGI MA
PEKERJAAN : PEMBUATAN DED JARINGAN DISTRIBUSI DAN BANGUNAN PELENGKAP SISTEM
AI NGELAR DESA KEREKEH KEC. UNTER
SUB PEKERJAAN : CUT AND FILL SITE PLAN IPA, AKSES JALAN DAN JEMBATAN, PEMAGARAN
LOKASI : KEC. UNTER IWES, KEC. SUMBAWA, KEC. LABUHAN BADAS

TAHUN ANGGARAN : 2017

KODE
NO. URAIAN PEKERJAAN SAT. VOLUME
ANALISA
1 2 3 4 5

I. PEKERJAAN PERSIAPAN
### Pengukuran, Penyiapan Lokasi dan Pemasangan Bowplank Ls 1.00

II. PEKERJAAN SALURAN PEMBUANG


A Pekerjaa Galian Tanah
1 Galian Tanah M³ 151.05 A.2.3.1.4.
2 Urugan Pasir M³ 7.16 A.2.3.1.11
Buangan Tanah M³ 143.90 A.2.3.1.8.

B Pekerjaan Pasangan
1 Pasangan Batu Kosong M³ 13,189.90 3.1 (2)
2 Pasangan Batu Kali M³ 3,813.28 3.1 (2)
3 Plsteran Bagian Atas Pasangan Batukali 1:3 (t=1,5cm) M2 31.80 A.4.4.2.3
4 Acian 1:2 M2 73.14 A.4.4.2.27
5 Siaran 1:2 M2 254.40 G.51.c

II. PEKERJAAN PAGAR


A Pekerjaa Galian Tanah
1 Galian Tanah Biasa M³ 2.74 A.21
2 Buangan Tanah M³ 0.60 A.4.4.1.5

B Pekerjaan P/P Pagar dan Pintu BRC (Type-2)


1 Pagar BRC M' 150.00 PGR-1
2 Pintu Pagar BRC unit 1.00

III. PEKERJAAN JALAN MASUK 180 x 3 m


1 Penyiapan Badan Jalan M2 1,418.50 3.3
2 Lapis Pondasi Bawah Agregat Kls C M3 225.00 5.2 (1)
3 Lapis Pondasi Atas Agregat Kls B M3 81.00 5.1 (2)
4 Lapis Resap Pengikat Liter 540.00 6.1 (1)
5 Lapis Perekat Liter 189.00 6.1 (2)
6 Lataston Lapis Pondasi (HRS-Base) t=5cm M3 27.00 6.3 (4)

IV. PEKERJAAN JEMBATAN KELAS B BENTANG 4 M


A PEKERJAAN TANAH
1 Galian Tanah Keras M³ 54.00 a.2.3.1.4
2 Urugan Tanah Kembali M³ 13.50 a.2.3.1.9

B PEKERJAAN PASANGAN DAN BETON


1 Pas. Batu Kali 1pc : 4psr M³ 132.75 a.3.2.1.2
2 Plesteran 1pc : 3psr M2 20.59 a.4.4.2.3
3 Siaran M2 66.00 g.51.c
4 Beton Tiang Sandaran Mutu K175 M³ 0.23 a.4.1.1.5
5 Beton Pelat Lantai Mutu K225 M³ 11.34 a.4.1.1.7
6 Beton Balok Induk Mutu K225 M³ 11.03 a.4.1.1.7
7 Beton Diagfragma Mutu K225 M³ 10.08 a.4.1.1.7
8 Beton Kepala Abutment/Bantalan Mutu K225 M³ 8.66 a.4.1.1.7
9 Beton Telapak Pondasi Mutu K225 M³ 16.76 a.4.1.1.7
10 Beton Trotoar Mutu K175 M³ 3.28 a.4.1.1.5
11 Pembesian Tiang Sandaran Kg 583.12 a.4.1.1.17
12 Pembesian Pelat Lantai Kg 1,719.29 a.4.1.1.17
13 Pembesian Balok Induk Kg 2,492.06 a.4.1.1.17
14 Pembesian Diafragma Kg 174.80 a.4.1.1.17
15 Pembesian Kepala Abutment Kg 843.01 a.4.1.1.17
16 Pembesian Telapak Abutment Kg 1,763.63 a.4.1.1.17
17 Bikisting Balok M2 40.29 A.4.1.1.23
18 Bikisting Plat Lantai M3 18.52 A.4.1.1.24
19 Bikisting Tiang Sandaran M4 7.88 A.4.1.1.22
20 Hand Ralling f 75 M 54.00 A.4.1.50
21 Besi Siku 70.70.7 / trotoar M 35.00 @
22 Besi Siku 50.50.5 . Tepi aspal M 26.00 @
23 Besi Siku 90.90.9 / expantion joint M 52.00 @
24 Pipa Drain PVC f 75 mm M 9.60 @

V. PEKERJAAN TALUD DAN JALAN LINGKUNGAN


1 Pas. Batu Kali 1pc : 4psr (talud, tinggi variabel) M³ 92.00 a.3.2.1.2
2 Plesteran 1pc : 3psr M2 68.80 a.4.4.2.3
3 Siaran M2 108.00 g.51.c
4 Pasangan Bata 1pc : 4psr M2 32.00 A.4.4.1.3
5 Pasangan Paving block M2 175.00 A.4.4.1.24
6 Pagar BRC M' 217.00 A.4.2.1.4

VI. PEKERJAAN PENYELESAIAN


1 Administrasi Proyek Ls 1.00 -
2 Dokumentasi Proyek Ls 1.00 -
3 Asbuilt Drawing Ls 1.00 -

JUMLAH
PPN 10 %
TOTAL
AR TERUTAMA BAGI MASYARAKAT MISKIN
NAN PELENGKAP SISTEM SARANA AIR BERSIH

MBATAN, PEMAGARAN

HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
6 7

500,000.00 500,000.00
500,000.00 500,000.00

14,803,610.33 14,803,610.33

84,915.60 12,826,501.38
276,325.50 1,977,108.95
27,951.00 4,022,009.15

831,675.90 10,969,717,869.19
831,675.90 3,171,416,183.65
66,500.59 2,114,718.76
36,223.00 2,649,350.22
24,389.75 6,204,752.40

191,365.02 191,365.02

63,813.75 174,594.42
27,951.00 16,770.60

366,603.00 54,990,450.00
2,880,000.00 2,880,000.00

269,844,092.03 269,844,092.03
1,535.73 2,178,429.32 900.00
443,305.83 99,743,811.94
440,442.79 35,675,866.34
20,143.84 10,877,674.10
21,904.62 4,139,972.30
4,341,790.30 117,228,338.03
5,216,938.65 5,216,938.65
84,915.60 4,585,442.40
46,777.50 631,496.25

484,484,061.66 484,484,061.66
830,303.10 110,225,850.16 1.88 5.25
66,500.59 1,369,352.85
24,389.75 1,609,723.50 (954,943,999.46)
1,304,429.28 300,018.73
1,368,109.27 15,514,359.12
1,368,109.27 15,083,404.70
1,368,109.27 13,790,541.44
1,368,109.27 11,851,930.61
1,368,109.27 22,929,511.37
1,304,429.28 4,278,528.04
32,695.85 19,065,604.05
32,695.85 56,213,647.95 BESI
32,695.85 81,480,019.95
32,695.85 5,715,234.58
32,695.85 27,562,928.51
32,695.85 57,663,381.94
353,514.70 14,243,107.26 BETON
488,182.20 9,041,134.34
378,182.20 2,980,075.74
220,105.68 11,885,706.82 65,000,000.00
48,000.00 1,680,000.00 132,000,000.00
18,000.00 468,000.00 -
52,000.00 2,704,000.00
62,000.00 595,200.00

191,596,298.55 191,596,298.55
830,303.10 76,387,885.20
66,500.59 4,575,240.59
24,389.75 2,634,093.00
243,446.50 7,790,288.00
131,081.50 22,939,262.50
356,080.78 77,269,529.26

6,500,000.00 6,500,000.00
3,500,000.00 3,500,000.00
1,000,000.00 1,000,000.00
2,000,000.00 2,000,000.00

Rp. 973,136,366.25
Rp. 97,313,636.62
Rp. 1,070,450,002.87 2,025,394,002.33
(954,943,999.46)
4.50

PAVING
TALUD
BRC
GALIAN

LEBAR TINGGI PANJANG VOLUME


6'' 0.5 0.8 #REF! #REF!

GALIAN

LEBAR TINGGI PANJANG VOLUME


6'' 0.5 0.8 #REF! #REF!

3'' 0.3 0.6 #REF! #REF!


PASIR VOLUME PIPAVOLUME

VOULUME TIMBUNAN
#REF! #REF!

PASIR VOLUME PIPAVOLUME

VOULUME TIMBUNAN
#REF! #REF!

#REF! #REF!
RENCANA ANGGARAN BIAYA

KEGIATAN : PENYEDIAAN SARANA AIR BERSIH DAN SANITASI DASAR TERUTAMA BAG
MISKIN
PEKERJAAN : PEMBUATAN DED JARINGAN DISTRIBUSI DAN BANGUNAN PELENGKAP SI
BERSIH AI NGELAR DESA KEREKEH KEC. UNTER
SUB PEKERJAAN : SEPTI TANK DAN PERESAPAN
LOKASI : KEC. UNTER IWES, KEC. SUMBAWA, KEC. LABUHAN BADAS
TAHUN ANGGARAN : 2020

KODE
NO. URAIAN PEKERJAAN SATUAN VOLUME
ANALISA

1 3 4 5
I. PEKERJAAN PERSIAPAN
1 Pengukuran, Penyiapan Lokasi dan Pemasangan Bowplank Ls 1.00

II. PEKERJAAN SEPTI TANK DAN RESAPAN


A Pekerjaan Tanah
1 Galian Tanah Keras M³ 8.83 A.2.3.1.4.
2 Urugan Pasir dibawah Lantai Kerja M³ 0.18 A.2.3.1.11
2 Urugan Tanah M³ 0.58 A.2.3.1.9.
3 Buangan Tanah M³ 8.25 A.2.3.1.8a

B Pekerjaan Beton
1 Pas. Lantai kerja podasi (beton cor 1:3:5) M³ 0.54 A.4.1.1.4
2 Beton K-175 M³ 0.39 A.4.1.1.5
3 Pembesian Kg 184.90 A.4.2.1.1
4 Bekisting 2 x Pakai M² 21.83 A.4.1.1.20

IV. PEK. PASANGAN, PLESTERAN & PENGECETAN


1 Pasangan Batu Kosong M³ 0.29 A.3.2.1.9
2 Pasangan batu bata 1 : 23 M³ 14.80 A.4.4.1.3
3 Plesteran 1 PC : 3 PS ( 1,50 cm ) M² 13.97 A.4.4.2.4
4 Acian M² 13.97 A.4.4.2.27
5 Pasangan Ijuk M² 0.08 A.4.4.3.35
6 Pasangan Kerikil M² 0.29 A.4.4.3.64
7 Pengecetan Tutup Manhole M² 13.97 A.4.7.1.10

VII. Pekerjaan Lain-Lain


1 Manhole 60 cm x 60 cm Set 1.00 @
2 Pipa Udara Dia. 2" Buah 1.00 @
3 Pipa PVC Dia. 4" M 2.00 @
4 Bend PVC Dia. 4" Buah 2.00 @

Jumlah

Total
A

SI DASAR TERUTAMA BAGI MASYARAKAT

ANGUNAN PELENGKAP SISTEM SARANA AIR


R

HAN BADAS

HARGA SATUAN JUMLAH HARGA


( Rp. ) SATUAN ( Rp. )

6 7
500,000.00 500,000.00
500,000.00 500,000.00

1,354,086.54 1,354,086.54
84,915.60 749,804.75
276,325.50 49,738.59
46,777.50 26,898.10
63,918.42 527,645.10

6,552,438.25 6,552,438.25
1,171,770.27 632,755.95
1,304,429.28 506,542.50
20,102.50 3,716,973.53
106,696.70 2,328,922.22

5,789,483.15 5,789,483.15
470,933.10 136,570.60
243,446.50 3,603,008.20
61,125.90 853,928.82
36,223.00 506,035.31
253,401.50 20,272.12
255,663.10 74,142.30
42,628.91 595,525.80

1,351,700.00 1,351,700.00
566,700.00 566,700.00
435,000.00 435,000.00
45,000.00 90,000.00 45,000.00 260,000.00 130000
130,000.00 260,000.00

Jumlah 15,547,707.94
PPN 10% 1,554,770.79
Total 17,102,478.73
435,000.00
RENCANA ANGGARAN BIAYA

KEGIATAN : PENYEDIAAN SARANA AIR BERSIH DAN SANITASI DASAR TERUTAMA BA


MISKIN
PEKERJAAN : PEMBUATAN DED JARINGAN DISTRIBUSI DAN BANGUNAN PELENGKAP S
BERSIH AI NGELAR DESA KEREKEH KEC. UNTER
SUB PEKERJAAN : PEMBANGUNAN TANGKI BBM
LOKASI : KEC. UNTER IWES, KEC. SUMBAWA, KEC. LABUHAN BADAS
TAHUN ANGGARAN : 2020

NO. SATUAN VOLUME KODE ANALISA

1 3 4 5
I. PEKERJAAN PERSIAPAN
1 Pengukuran, Penyiapan Lokasi dan Pemasangan Bowplank Ls 1.00

II. PEKERJAAN TANAH


1 Galian Tanah Keras M³ 3.11 A.2.3.1.4.
2 Urugan Pasir dibawah Lantai Kerja M³ 0.89 A.2.3.1.11
3 Membuang Tanah Sisa Galian M³ 3.11 A.2.3.1.8.

III. PEKERJAAN BETON


1 Beton tumbuk untuk lantai kerja, 1 : 3 : 5 tebal 5 Cm M³ 0.44 A.4.1.1.1
2 Plat lantai dasar tebal 30 cm
- Beton K.225 M³ 2.74 A.4.1.1.7
- Tulangan beton U.24, ø 8 Kg 76.71 A.4.2.1.1
- Bekisting M² 8.21 A.4.1.1.21

IV. PEKERJAAN PLESTERAN & PENGECATAN


1 Plesteran 1 PC : 4 PS ( 2,0 cm ) M² 8.21 A.4.4.2.4
2 Acian M² 8.21 A.4.4.2.27
3 Pengecetan M² 8.21 A.4.7.1.16

V PENGADAAN DAN PEMASANGAN TANKI BBM dan ACCESSORIES


1 Pengadaan dan Pemasangan Tanki Air BBM Unit 1.00
2 Angkur Bold M.20x150mm Bh 6.00
3 Pembuatan tangga dari besi Ø 16 mm Unit 1.00
5 Plate t = 8 mm (0,30 cm x 0,40 cm) Bh 6.00

Jumlah

Total

RENCANA ANGGARAN BIAYA

KEGIATAN : PENYEDIAAN SARANA AIR BERSIH DAN SANITASI DASAR TERUTAMA BA


MISKIN
PEKERJAAN : PEMBUATAN DED JARINGAN DISTRIBUSI DAN BANGUNAN PELENGKAP S
BERSIH AI NGELAR DESA KEREKEH KEC. UNTER
SUB PEKERJAAN : PEMBANGUNAN SEPTI TANK DAN PERESAPAN
LOKASI : KEC. UNTER IWES, KEC. SUMBAWA, KEC. LABUHAN BADAS
TAHUN ANGGARAN : 2020

KODE
NO. SATUAN VOLUME
ANALISA
1 3 4 5
I. PEKERJAAN PERSIAPAN
1 Pengukuran, Penyiapan Lokasi dan Pemasangan Bowplank Ls 1.00

II. PEKERJAAN TANAH


1 Galian Tanah Keras M³ 8.83 A.2.3.1.4.
2 Urugan Pasir dibawah Lantai Kerja M³ 0.18 A.2.3.1.11
3 Urugan Tanah M³ 0.58 A.2.3.1.9.
4 Membuang Tanah Sisa Galian M³ 8.25 A.2.3.1.8a

III. PEKERJAAN BETON


1 Beton tumbuk untuk lantai kerja, 1 : 3 : 5 tebal 5 Cm M³ 0.18 A.4.1.1.1
2 Plat lantai dasar tebal 10 cm
- Beton K.225 M³ 0.36 A.4.1.1.7
- Tulangan beton U.24, ø 8 Kg 70.29 A.4.2.1.1
- Bekisting M² 0.76 A.4.1.1.21
3 Kolom Praktis 15 x 15
- Beton K.225 M³ 37.02 A.4.1.1.7
- Tulangan beton U.24, ø 8 dan ø 6 Kg 37.02 A.4.2.1.1
- Bekisting M² 9.42 A.4.1.1.22
4 Balok 15 x 20
- Beton K.225 M³ 37.02 A.4.1.1.7
- Tulangan beton U.24, ø 8 dan ø 6 Kg 48.22 A.4.2.1.1
- Bekisting M² 5.09 A.4.1.1.23
5 Beton Plat Atas
- Beton K.225 M³ 0.39 A.4.1.1.7
- Tulangan beton U.24, ø 8 Kg 28.78 A.4.2.1.1
- Bekisting M² 6.56 A.4.1.1.24

IV. PEKERJAAN PASANGAN & PENGECATAN


Pasangan Batu Bata M² 14.800 A.4.4.1.3
1 Pasangan Batu Kosong M² 0.290 A.3.2.1.9
2 Plesteran 1:3 M² 13.970 A.4.4.2.3
3 Acian M² 13.970 A.4.4.2.27
4 Pasangan Ijuk M² 0.723 A.2.3.1.13.
5 Pasangan Kerikil M² 0.290
6 Pengecetan Tutup Man Hole M² 0.56 A.4.7.1.16

V. PEKERJAAN PIPA DAN BESI BAJA


1 Pipa udara GI ø 2" Unit 1.00
2 Pipa PVC ø 4" M' 6.00
3 Pipa Inlet dan Outlet PVC Dia. 4" M' 8.00
4 Bend 90 PVC Dia.4" Bh 3.00
5 Pembuatan tutup manhole plat baja 0,6 x 0,6 Unit 1.00
6 Pembuatan tangga R. Reservoir dari besi Ø 16 mm Bh 1.00

Jumlah
Total

RENCANA ANGGARAN BIAYA

KEGIATAN : PENYEDIAAN SARANA AIR BERSIH DAN SANITASI DASAR TERUTAMA BA


MISKIN
PEKERJAAN : PEMBUATAN DED JARINGAN DISTRIBUSI DAN BANGUNAN PELENGKAP S
BERSIH AI NGELAR DESA KEREKEH KEC. UNTER
SUB PEKERJAAN : PEMBANGUNAN SALURAN PEMBUANG DAN PEMASANGAN PAGAR
LOKASI : KEC. UNTER IWES, KEC. SUMBAWA, KEC. LABUHAN BADAS
TAHUN ANGGARAN : 2020

KODE
NO. SATUAN VOLUME
ANALISA

1 3 4 5
I. PEKERJAAN PERSIAPAN
1 Pengukuran, Penyiapan Lokasi dan Pemasangan Bowplank Ls 1.00

II. PEKERJAAN TANAH


1 Galian Tanah Keras M³ 151.05 A.4.1.1.3b
2 Urugan Pasir M³ 7.16 A.4.1.1.11
3 Membuang Tanah Sisa Galian M³ 151.05 A.4.1.1.8

IV. PEKERJAAN PASANGAN


1 Pasangan Batu Kosong M² 21.465 A.3.2.1.9
2 Pasangan Batu Belah 1 : 4 M² 74.730 A.3.2.1.1
3 Siaran 1:2 M² 82.680 G.51.c
4 Plesteran diatas Pondasi Pasangan Batu Belah 1 : 3 M² 119.400 A.4.4.2.3
5 Acian M² 119.400 A.4.4.2.27

Jumlah

Total

RENCANA ANGGARAN BIAYA

KEGIATAN : PENYEDIAAN SARANA AIR BERSIH DAN SANITASI DASAR TERUTAMA BA


MISKIN
PEKERJAAN : PEMBUATAN DED JARINGAN DISTRIBUSI DAN BANGUNAN PELENGKAP S
BERSIH AI NGELAR DESA KEREKEH KEC. UNTER
SUB PEKERJAAN : PEMBANGUNAN JALAN, JEMBATAN, AREA PARKIR DAN PAVING BLOK
LOKASI : KEC. UNTER IWES, KEC. SUMBAWA, KEC. LABUHAN BADAS
TAHUN ANGGARAN : 0

KODE
ANALISA
KODE
NO. SAT. VOLUME
ANALISA

1 3 4 5

I. PEKERJAAN PERSIAPAN
1 Pengukuran & Pematokan Lahan M' 400.00 Sp.1
2 Papan Nama Proyek Bh 1.00 -
3 Perizinan Ls 1.00 -

III. PEKERJAAN JALAN MASUK DAN AREA PARKIR


1 Penyiapan Badan Jalan dan Area Parkir M2 338.50 3.3
2 Lapis Pondasi Bawah Agregat Kls B M 3
225.00 5.2 (1)
3 Lapis Pondasi Atas Agregat Kls A M3 81.00 5.1 (2)
4 Lapis Resap Pengikat Liter 540.00 6.1 (1)
5 Lapis Perekat Liter 189.00 6.1 (2)
6 Lataston Lapis Pondasi (HRS-Base) t=5cm M3 27.00 6.3 (4)

IV. PEKERJAAN JEMBATAN KELAS B BENTANG 4 M


A PEKERJAAN TANAH
1 Galian Tanah Keras M³ 54.00 a.2.3.1.4
2 Urugan Tanah Kembali M³ 13.50 a.2.3.1.9

B PEKERJAAN PASANGAN DAN BETON


1 Pas. Batu Kali 1pc : 4psr M³ 44.16 a.3.2.1.2
2 Plesteran 1pc : 3psr M2 20.59 a.4.4.2.3
3 Siaran M2 66.00 g.51.c
4 Beton Tiang Sandaran Mutu K175 M³ 0.23 a.4.1.1.5
5 Beton Pelat Lantai Mutu K225 M³ 11.34 a.4.1.1.7
6 Beton Balok Induk Mutu K225 M³ 11.03 a.4.1.1.7
7 Beton Diagfragma Mutu K225 M³ 10.08 a.4.1.1.7
8 Beton Kepala Abutment/Bantalan Mutu K225 M³ 8.66 a.4.1.1.7
9 Beton Telapak Pondasi Mutu K225 M³ 16.76 a.4.1.1.7
10 Beton Trotoar Mutu K175 M³ 3.28 a.4.1.1.5
11 Pembesian Tiang Sandaran Kg 583.12 a.4.1.1.17
12 Pembesian Pelat Lantai Kg 1,719.29 a.4.1.1.17
13 Pembesian Balok Induk Kg 2,492.06 a.4.1.1.17
14 Pembesian Diafragma Kg 174.80 a.4.1.1.17
15 Pembesian Kepala Abutment Kg 843.01 a.4.1.1.17
16 Pembesian Telapak Abutment Kg 1,763.63 a.4.1.1.17
17 Bikisting Balok M2 40.29 A.4.1.1.23
18 Bikisting Plat Lantai M3 18.52 A.4.1.1.24
19 Bikisting Tiang Sandaran M4 7.88 A.4.1.1.22
20 Hand Ralling f 75 M 54.00 A.4.1.50
21 Besi Siku 70.70.7 / trotoar M 35.00 @
22 Besi Siku 50.50.5 . Tepi aspal M 26.00 @
23 Besi Siku 90.90.9 / expantion joint M 52.00 @
24 Pipa Drain PVC f 75 mm M 9.60 @

V. PEKERJAAN TALUD DAN JALAN LINGKUNGAN


1 Pas. Batu Kali 1pc : 4psr (talud, tinggi variabel) M³ 92.00 a.3.2.1.2
2 Plesteran 1pc : 3psr M2 68.80 a.4.4.2.3
3 Siaran M2 108.00 g.51.c
4 Pasangan Bata 1pc : 4psr M2 32.00 6.3 (3)
5 Pasangan Paving block M2 175.00 CR.06
6 Pagar BRC M' 217.00 A.4.2.1.4

VI. PEKERJAAN PENYELESAIAN


1 Administrasi Proyek Ls 1.00 -
2 Dokumentasi Proyek Ls 1.00 -
3 Asbuilt Drawing Ls 1.00 -

JUMLAH
PPN 10 %
TOTAL
ASI DASAR TERUTAMA BAGI MASYARAKAT

BANGUNAN PELENGKAP SISTEM SARANA AIR


ER

UHAN BADAS

HARGA SATUAN JUMLAH HARGA


( Rp. ) SATUAN ( Rp. )
6 7
2,000,000.00 2,000,000.00
2,000,000.00 2,000,000.00

596,166.44 596,166.44
84,915.60 263,917.68
276,325.50 245,377.04
27,951.00 86,871.71

7,576,454.05 7,576,454.05
1,186,897.47 526,982.48

1,368,109.27 3,755,448.98
20,102.50 1,542,062.78
213,393.40 1,751,959.81

1,059,993.31 1,059,993.31
61,125.90 501,843.64
36,223.00 297,390.83
31,761.13 260,758.84

23,441,200.00 23,441,200.00
21,600,000.00 21,600,000.00
7,200.00 43,200.00
700,000.00 700,000.00
183,000.00 1,098,000.00 0.00096 7.536 7.50

Jumlah RP. 34,673,813.79


PPN 10% RP. 3,467,381.38
Total RP. 38,141,195.17

ASI DASAR TERUTAMA BAGI MASYARAKAT

BANGUNAN PELENGKAP SISTEM SARANA AIR


ER
UHAN BADAS

HARGA SATUAN JUMLAH HARGA


( Rp. ) SATUAN ( Rp. )
6 7
2,000,000.00 2,000,000.00
2,000,000.00 2,000,000.00

1,354,086.54 1,354,086.54
84,915.60 749,804.75
276,325.50 49,738.59
46,777.50 26,898.10
63,918.42 527,645.10

114,965,887.88 114,965,887.88
1,186,897.47 213,641.54

1,368,109.27 492,519.34
20,102.50 1,413,004.73
213,393.40 162,178.98

1,368,109.27 50,648,853.17
20,102.50 744,215.83
378,182.20 3,562,476.32

1,368,109.27 50,648,853.17
20,102.50 969,342.55
353,514.70 1,798,506.04

1,368,109.27 531,271.03
20,102.50 578,549.95
488,182.20 3,202,475.23

1,812,368.20 1,812,368.20
243,446.50 3,603,008.20
470,933.10 136,570.60
66,500.59 929,013.24
36,223.00 506,035.31 Volume
190,913.25 137,934.82 0.4 0.2 0.8 0.064
293,200.00 85,028.00 3.39
31,761.13 17,786.23 0.30

3,462,865.00 3,462,865.00
210,000.00 210,000.00
66,550.00 399,300.00
199,680.00 1,597,440.00
26,000.00 78,000.00
478,125.00 478,125.00
700,000.00 700,000.00

Jumlah RP. 123,595,207.62


PPN 10% RP. 12,359,520.76
Total RP. 135,954,728.38

ASI DASAR TERUTAMA BAGI MASYARAKAT

BANGUNAN PELENGKAP SISTEM SARANA AIR


ER
EMASANGAN PAGAR
UHAN BADAS

HARGA SATUAN JUMLAH HARGA


( Rp. ) SATUAN ( Rp. )

6 7
2,000,000.00 2,000,000.00
2,000,000.00 2,000,000.00

19,025,608.88 19,025,608.88
84,915.60 12,826,501.38
276,325.50 1,977,108.95
27,951.00 4,221,998.55

76,432,881.18 76,432,881.18
470,933.10 10,108,578.99
831,675.90 62,151,140.01
24,389.75 2,016,544.53
66,500.59 7,940,170.45
36,223.00 4,325,026.20

Jumlah RP. 97,458,490.07


PPN 10% RP. 9,745,849.01
Total RP. 107,204,339.07

ASI DASAR TERUTAMA BAGI MASYARAKAT

BANGUNAN PELENGKAP SISTEM SARANA AIR


ER
RKIR DAN PAVING BLOK
UHAN BADAS

HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
6 7

10,908,353.00
###
1,020.88 408,353.00
500,000.00 500,000.00
10,000,000.00 10,000,000.00

135,939,522.01
###
1,535.73 519,843.73
443,305.83 99,743,811.94 75.25
440,442.79 35,675,866.34 75.25
- 0.00 55.9
- 0.00
- 0.00

5,216,938.65
###
84,915.60 4,585,442.40
46,777.50 631,496.25

372,774,372.23
###
830,303.10 36,666,184.90
66,500.59 1,369,352.85
24,389.75 1,609,723.50
1,304,429.28 300,018.73
1,368,109.27 15,514,359.12
1,368,109.27 15,083,404.70
1,368,109.27 13,790,541.44
1,368,109.27 11,851,930.61
1,368,109.27 22,929,511.37
1,304,429.28 4,278,528.04
32,695.85 19,065,604.05
32,695.85 56,213,647.95
32,695.85 81,480,019.95
32,695.85 5,715,234.58
32,695.85 27,562,928.51
32,695.85 57,663,381.94
- 0.00
- 0.00
- 0.00
- 0.00
48,000.00 1,680,000.00
18,000.00 468,000.00
52,000.00 2,704,000.00
62,000.00 595,200.00

191,596,298.55
###
830,303.10 76,387,885.20
66,500.59 4,575,240.59
24,389.75 2,634,093.00
243,446.50 7,790,288.00
131,081.50 22,939,262.50
356,080.78 77,269,529.26

6,500,000.00
###
3,500,000.00 3,500,000.00
1,000,000.00 1,000,000.00
2,000,000.00 2,000,000.00

Rp. 722,935,484.44
Rp. 72,293,548.44
Rp. 795,229,032.88
46,909.65
46,909.65

Berat
0.3 15.625 4.6875 894,905.86
TANGKI BBM
Pekerjaan Tanah
Galian Tanah 3.7 2.4 0.35 3.108
Buangan Tanah 3.7 2.4 0.35 3.108
Urugan Pasir 3.7 2.4 0.1 0.888
Beton Tumbuk 3.7 2.4 0.05 0.444

Pembesian 60.593
Lantai Dis. 8 - 250 72 153.40 13.00 156.00 5.0265E-05
81.4
3.7 11.00 81.4 5.0265E-05
2.4 16.00 76.8 5.0265E-05
Dinding 24.48 66.60 6.00 72.00 0.0001131
18.84
15.84
7.44
24.24 35.88 3.00 36.00 5.0265E-05
7.2
4.44

Beton 1:2:3
Lantai 3.7 2.4 0.2 1.776
Dinding 3 2 0.8 0.3 0.969
3 0.52 0.3 0.471008
Bekisting 2 0.8 6 9.6
0.8 0.3 6 1.44

Besi Plat t=5mm 18.095574 0.0904778684 692.1557 24000


Besi Plat t=8mm 30x31cm 6 buah
Besi Plat t=5mm 10x10cm 4 buah
Angkur Bolt M20 x 150mm 6 buah
Dina Bolt M12 4 buah
Plat Bordes t=10mm 0,85 x 0,4 0.34 m2
Pipa GIP Dia. 40mm 4m
Pipa GIP Dia. 25mm 4m
Pipa GIP Dia. 50 mm 1m
Gate Valve Dia. 50 mm 2 buah
Gate Valve Dia. 50 mm 1 buah
Stop Kran Dia. 50 mm 1 buah
Plate t = 8 mm Dia. 0,6 m 1 buah
Besi Plat t=5mm 0.23 m2

SEPTI TANK
Pekerjaan Tanah
Galian Tanah 1.65 2.15 1.75 6.208 6.210
Buangan Tanah 6.210
Urugan Pasir 1.65 2.15 0.05 0.177 0.180
Beton Lantai Kerja 1.65 2.15 0.05 0.177 0.180

Plat Lantai
Beton 1.65 2.15 0.1 0.355 0.36
Tulangan 8 - 15 1.65 28 46.2 76.23 30.11085
2.15 22 47.3 101.695 40.169525
Bekisting 7.6 0.1

Kolom Praktis 15 x 15
Jumlah Panjang/
Pembesian Panjang
Kolom/Balok sengkang
Kolom 12 x 12
Tulangan Utama 4 ø 8 4.00 1.60 4.00
Tulangan Utama 4 ø 8 2.00 1.50 4.00
Sengkang ø 6 - 15 4.00 1.60 0.40 48.00
Sengkang ø 6 - 15 2.00 1.50 0.40 22.00

Beton K 175 4 1.60 0.0225 0.144


Beton K 176 2 1.50 0.0225 0.0675

Bekisting 6 1.55 0.6 5.58

Balok 20 x 15
Tulangan Utama 4 ø 8 4 1.65 4 26.400
Tulangan Utama 4 ø 8 2 2.15 4 17.200
Sengkang ø 6 - 15 4 1.65 14 56.00 92.400
Sengkang ø 6 - 15 2 2.15 11 22.00 47.300

Beton K 175 2.15 1.65 0.03 0.106425


Beton K 176 2 2.15 0.03 0.129

Bekisting 1.65 3 0.55 2.72


2.15 2 0.55 2.37
5.09

Jumlah Total
Beton Plat Atas Jalur Panjang Panjang
Pembesian Dia. 8 2.15 12.00 25.80 25.80 5.0265E-05
1.65 16.00 26.40 26.40 5.0265E-05
Beton K225 2.15 1.65 0.07 0.248325 0.250
Bekisting 2.15 1.65 0.1 4.3075 4.310

Pipa GIP Dia. 2" 1m


Pipa Inlet dan Outlet PVC Dia. 4" 8m
Bend 90 PVC Dia.4" 3 buah
Bend 90 GIP Dia.2" 2 buah
Tee GIP Dia.2" 1 buah

Pasangan Batu Bata


1.32 1.38 1 1.8216
1.41 1.38 1 1.9458
1.76 1.37 2 4.8224
0.8 1.38 1 1.104
9.6938
Plesteran 1.55 1.38 1 2.139
1.6 1.85 1 2.96
1.55 1.85 2 5.735
1.15 1.36 2 3.128
13.962
Acian

PERESAPAN
Pekerjaan Tanah
Galian Tanah 1.15 1.15 1.5 1.984 1.99
Galian Tanah Pipa Buangan 4" 7 0.3 0.3 0.630 0.63
Galian Tanah 2.62
Urugan Tanah Galian Pipa 0.58
Buangan Tanah 2.04
Pekerjaan Pasangan
Ijuk 0.85 0.85 0.1 0.072 0.08
Batu Kosong 0.85 0.85 0.4 0.289 0.29
Kerikil 0.85 0.85 0.4 0.289 0.29
Pasangan Batu Bata 0.85 1.5 4 5.100 5.10

Pembesian dan Beton


Kolom
Tulangan Utama 4 ø 8 4.00 1.60 4.00 25.60 25.600
Sengkang ø 6 - 15 4.00 1.50 0.40 44.00 26.400

Beton K 225 4.00 1.50 0.0225 0.135 0.14


Bekisting 4.00 1.60 0.6 3.84 3.84

Beton Penutup Atas K225


Pembesian ø 8 - 15 1.15 9.00 10.35 10.35 5.0265E-05
1.15 9.00 10.35 10.35 5.0265E-05

Beton K225 1.15 1.15 0.1 0.13225 0.14


Bekisting 1.15 1.15 0.2 2.2425 2.25

Septi Tank dan Peresapan


Beton Tumbuk 0.18 Galian Tanah 8.83
Beton Lantai 0.36 Urugan Pasir 0.18
0.54 Urugan Tanah 0.58
Besi Sloof Buangan Tanah 8.25
Besi Lantai 70 Pasangan Batu Bata 14.800
Besi Kolom 37.02 Pasangan Batu Kosong 0.29
Besi Balok 48.22 Plesteran 13.970
Besi Beton Kolom 0.35 Acian 13.970
Besi Beton Balok 0.240 Pasangan Ijuk 0.08
Besi Penutup 28.780 Pasangan Kerikil 0.29
184.90
Bekisting Lantai 0.760
Bekisting Kolom 9.420
Bekisting Balok 5.088
Bekisting Penutup 6.560
21.828
Beton Penutup 0.388

SALURAN PEMBUANG TYPE-2


Saluran Air 159 0.3 47.7 m3
Galian Tanah 159 0.95 151.05 m3
Urugan Pasir 159 0.045 7.155 m3
Pasangan Batu Kosong 159 0.135 21.465 m3
Pasangan Batu Kali 74.73 m3
Buangan Tanah 151.05 m3
Plesteran 159 0.2 31.8 m2
Acian 159 0.23 73.14
Siaran 159 1.6 254.4
DECKER 1m

JALAN DAN AREA PARKIR 150 71.2 117.3 338.5 338.50


PAPING BLOK 3.2 4.2485 6.6 14.0485 14.05

PAGAR BRC
Jumlah Tiang 152 64 L P T
Galian Tanah 62 0.3 0.3 0.4
2 0.6 0.6 0.7
Cor Beton K175 62 0.3 0.3 0.4
2 0.6 0.6 0.7
Pipa Tertanam 64 0.04 0.001257 0.5
Buangan Tanah
Dia Besi
Besi untuk angker Dia. 12 12 0.888 64 0.3 17.0496
12 0.888 2 0.7 1.2432
PAGAR BRC 150
Pintu Pagar 2

METER INDUK
Galian Tanah Pipa 9.36 0.4 0.950 3.557 3.557
Volume Pipa 9.36 0.007854 0.074
Urugan Pasir 9.36 0.05 0.468 0.468
Urugan Tanah 3.015
Buangan Tanah 3.015 0.542
Galian Tanah 0.84 0.84 1.340 0.946 2.952
1.44 1.04 1.340 2.007

Urugan Pasir 0.84 0.84 0.100 0.071 0.220


1.44 1.04 0.100 0.150
Beton Tumbuk 0.84 0.84 0.050 0.035
Buangan Tanah 2.952

Galian Tanah 6.509


Urugan Pasir 0.688
Urugan Tanah 3.015
Buangan Tanah 3.494
Beton Tumbuk 0.150

Pembesian Volume
Lantai Kerja 0.11 m3
Trust Block 4 buah 0.02 m3
Beton Lantai 0.18 m3
Beton Dinding (1,2*2+0,8*2)*0,12 0.48
Pembesian
- Lantai ø 10-15 (Box1) 1.44 8.000 11.52 7.108 kg
- Lantai ø 8-15 Box 1) 1.04 8.000 8.32 5.133 kg
- Lantai ø 10-15 Box 2 0.84 7.000 5.88 3.628 kg
- Lantai ø 8-15 Box 2 0.84 7.000 5.88 3.628 kg
- Dinding Tinggi ø10-15 1.32 4.96 34.00 27.691 kg
- Dinding Melintang ø 8-15 1.32 10.00 4.96 30.603 kg
- Dinding Tinggi ø10-15 (Bo x 2) 1.32 3.36 23.00 18.732 kg
- Dinding Melintang ø 8-15 (Box 2) 1.32 10.00 3.36 20.731 kg
117.255
Dinding Box 1 1.32 4.96 6.55 10.982
Bekisting Box 2 1.32 3.36 4.44
Plesteran 5.40 4.32 9.72 m2
Acian 9.72 m2
Pengecetan Tutup Manhole
m3
m3
m3
m3

76.710 76.71
0.0078414 61.555

0.0040916 32.119 32.15


0.0038604 30.304 30.34
0.0081430 63.923 62.49

0.0018096 14.205 14.22

2.745 2.74 Dia. Tangki 1.6 0.8


Luas Tembereng
Lusa Segitiga
Luas Busur
8.214 8.21

16,611,737
m3
m3
m3
m3

30.12 70.290
40.17
0.76 0.760

Jumlah
Panjang Volume
sengkang

25.600 5.0265E-05 0.0012868 10.10


12.000 5.0265E-05 0.00060319 4.74
19.200 2.8274E-05 0.00054287 4.26
8.800 2.8274E-05 0.00024881 1.95
21.05

0.14
0.07
0.21
5.58

5.026548E-05 0.00132701 10.417 10.42


5.026548E-05 0.00086457 6.787 6.79
2.827433E-05 0.00261255 20.509 20.51
2.827433E-05 0.00133738 10.498 10.50
48.22
0.11
0.13
0.24

0.001 10.180 10.18


0.001 10.417 10.42
20.60
9.700

13.970
13.970

5.026548E-05 0.0012868 10.10 10.11


2.827433E-05 0.00074644 5.86 5.86
15.97

0.001 4.084 4.09


0.001 4.084 4.09
8.18

-
-
-
-
-

2.232 2.74 M3
0.504
2.232 2.70 M3
0.504
0.040
2.70 M3

17.05 18.29 Kg
1.24

-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-

-
-
-
-

-
Luas
2.0106193
1.2566371
0.23064
0.5233422
PAGAR BRC

Galian Tanah 64 0.036 2.304


2 0.252 0.504

Cor Beton K175 64 0.054 3.456


2 0.252 0.504
Panjang Lebar
Tiang 64
Pagar t=2m 80 68 148
Pintu 4 2

Tangki 18,000,000
Besi Plat t=5mm 18.09557 0.090478 692.155693 24000 16,611,737
692.155693 10,106,640 6,995,368
5 mm x 1,22 x 2,44 0.014884 113.8626 1,265,000 11,497,908
0.014884 113.8626 1,821,802
5 mm x 6' x 20'

5 mm x 4' x 8'

Maka berat besi = (2 x 2 x 0.002)

4
8
0.005
1 feet 0.308

1,249,000 Luas Silinder Linkaran Tabung


113.8626 2.010619 2.010619
10,969 1.6 2.8 21.61416 4.021239 14.07434
1.6 0.8 5.601585
0.6 438 kg
4590
1.6 0.8 2.010619
0.16 1.256637
117 0.2544
berat besi = (2 x 2 x 0.002) m3  x  7850 kg/m3 = 62.8 kg 1.511037
0.16 0.499582
1224
1.232
2.464 1 dolar 14037
116.1135 10,106,640
77,315,796
14.07434 18.09557
18.09557
18.09557 m2
Satuan Pekerjaan : Pemasangan 1 m2 Bikisting untuk Kolom Kode Analisa
BIAYA
NO. URAIAN SATUAN KUANTITAS SATUAN
Rp.

A. TENAGA KERJA
Pekerja OH 0.6600 73,500
Tukang Kayu OH 0.3300 102,500
Kep. Tukang Kayu OH 0.0330 108,500
Mandor OH 0.0330 115,500

B. BAHAN
Papan Kayu Bekisting m3 0.0400 2,870,000
Paku Kg 0.4000 23,000
Minyak Bekisting Liter 0.2000 16,000
Balok Kayu Bekisting m3 0.0150 3,025,000
Plywood tebal 9 mm Lbe 0.3500 90,000
Kayu Dolken Ø 7 cm L = 4 m' Batang 2.0000 25,000

TOTAL UNTUK BURUH, MATERIAL DAN PERALATAN


OVER HEAD DAN KEUNTUNGAN10%
HARGA SATUAN DILUAR PPN

Sekaleng cat (ukuran 2,5 liter) bisa digunakan untuk mengecat 27 m2. Maka, jika ruangan Anda seluas 60,34
Namun, karena biasanya pengecatan selalu dilakukan dua kali (dua lapis), setidaknya Anda perlu membeli sekitar 5
enis Ukuran
Kayu Spesifikasi (PxLxT) Harga (Rp)
Meranti Reng 4x6x4 32,500
Meranti Reng 5x7x4 39,000
Borneo Reng 4x6x4 28,000
Borneo Reng 5x7x4 43,000
Kamper Reng 4x6x4 50,000
Kamper Reng 5x7x4 70,000
Meranti Reng 2x3x4 15,000
Meranti Reng 3x4x4 17,500
Borneo Reng 2x3x4 17,000
Borneo Reng 3x4x4 20,500
Kamper Reng 2x3x4 20,500
Kamper Reng 3x4x4 22,000
Meranti Galar 5 x 10 x 60,000
Borneo Galar 5
4 x 10 x 60,000
Kamper Galar 5
4 x 10 x 95,000
Meranti Balok 6 x 12 x
4 80,000
Meranti Balok 8 x 12 x
4 125,000
Borneo Balok 6
4 x 12 x 80,000
Borneo Balok 8
4 x 12 x 100,000
4
Kamper Balok 6 x 12 x 185,000
Kamper Balok 8
4 x 12 x 210,000
Meranti Kaso 4x6x4 32,500
Meranti Kaso 5x7x4 39,000
Borneo Kaso 4x6x4 28,000
Borneo Kaso 5x7x4 43,000
Kamper Kaso 4x6x4 50,000
Kamper Kaso 5x7x4 70,000

o. 1
Descriptio Knee 90º Knee 45º Tee V. Tee
1/8”-3/8” 5,100 - 6,375 8,670
1/2" 4,335 4,590 5,355 8,670
3/4” 6,120 6,885 7,905 10,455
1” 8,925 10,200 12,495 16,065
1 1/4” 14,280 16,575 18,870 24,225
1 1/2” 17,850 20,400 23,970 30,600
2” 28,050 30,600 35,700 43,350
2 1/2” 53,550 63,750 81,600 89,250
3” 81,600 96,900 107,100 127,500
4” 147,900 165,750 193,800 242,250
5” 408,000 484,500 510,000 637,500
6” 586,500 561,000 688,500 867,000
A.4.1.1.22 Pemasanga 0.00
JUMLAH
HARGA
Rp.

48,510.00
33,825.00
3,580.50
3,811.50

114,800.00
9,200.00
3,200.00
-
-
-

216,927.00
21,692.70
238,619.70

ika ruangan Anda seluas 60,34 m2, membutuhkan 2 kaleng cat, karena 60,34 dibagi 27 hasilnya 2,2
idaknya Anda perlu membeli sekitar 5 kaleng cat untuk mengecat ruangan seluas 60,34 m2.
28,000 35,700 91700
114200
205900
dibagi 27 hasilnya 2,23.
60,34 m2.
1 AKSESORIS Ø ( mm ) JML
REDUCING TEE 400 X 250 1
STUBE END 250 4
FLANGE SOCKET 250 2
FLANGE GATE VALVE 250 2
WELDING 90° ELBOW 250 4
WELDING 45° ELBOW 250 4
CONCENTRIC REDUCER 400 x 250 1
RUBBER RING 250 4
GIP CROSSING 250 2 (7m)

2 CONCENTRIC REDUCER 250 x 150 1


WELDING 45° ELBOW 150 1

3 EQUAL TEE 150 X 150 1


STUBE END 150 2
FLANGE SOCKET 150 1
100 2
FLANGE GATE VALVE 150 1
100 1
WELDING 45° ELBOW 150 1
CONCENTRIC REDUCER 150 x 100 1
RUBBER RING 150 2
GIP CROSSING 150 1 (12m)

4 EQUAL TEE 150 X 150 1


STUBE END 150 6
FLANGE SOCKET 150 2
FLANGE GATE VALVE 150 2
WELDING 90° ELBOW 150 3
RUBBER RING 150 4
GIP CROSSING 150 2 (7m)
WELDING 45° ELBOW 150 3

5 WELDING 90° ELBOW 150 1

6 EQUAL TEE 150 X 150 2


STUBE END 150 2
FLANGE GATE VALVE 150 4
FLANGE SOCKET 150 1
WELDING 45° ELBOW 150 2

7 EQUAL TEE 200 X 200 1


150 x 150 1
STUBE END 200 1
150 1
75 1
FLANGE SOCKET 200 1
150 1
75 1
FLANGE GATE VALVE 200 1
150 1
75 1
CONCENTRIC REDUCER 200 x 150 1
150 x 75 1
RUBBER RING 150 1
GIP CROSSING 150 1 (7m)

8 CONCENTRIC REDUCER 75 x 50 1
MALE THREAD ADAPTOR 50 2
FEMALE GATE VALVE 50 1
CAP 50 1

9 CONCENTRIC REDUCER 150 x 100 1

10 CONCENTRIC REDUCER 200 x 150 1

11 CONCENTRIC REDUCER 150 x 100 1


100 x 75 1

12 CONCENTRIC REDUCER 200 x 150


75 x 50 1
MALE THREAD ADAPTOR 50 4
FEMALE GATE VALVE 50 2
CAP 50 2

13 CONCENTRIC REDUCER 250 x 200 1


WELDING 90° ELBOW 200 1

14 REDUCING TEE 100 x 100 1


TEE ALL SOCKET 100 x100 1
STUBE END 100 1
FLANGE SOCKET 100 1
CONCENTRIC REDUCER 200 x 100 1
150 x 100 1
RUBBER RING 100 1
GIBOULT JOINT 100 1
GIP CROSSING 100 1 (7m)
15 WALL PIPE ( 80 cm ) 300 1
FLANGE SOCKET 300 1
FLANGE GATE VALVE 300 1
WELDING 90° ELBOW 300 1

16 CONCENTRIC REDUCER 300 x 200 1


WELDING 90° ELBOW 200 1

17 CONCENTRIC REDUCER 200 x 150 1


WELDING 90° ELBOW 100 1
TEE ALL SOCKET 150 x150 1
STUBE END 150 1
FLANGE SOCKET 150 2
GIBOULT JOINT 150 1
RUBBER RING 150 2
GIP CROSSING 150 1 (7m)

18 TEE ALL SOCKET 100 x 75 1


STUBE END 75 2
FLANGE SOCKET 75 2
GIBOULT JOINT 100 1

19 CONCENTRIC REDUCER 75 x 50 1
MALE THREAD ADAPTOR 50 2
FEMALE GATE VALVE 50 1
CAP 50 1

20 WALL PIPE ( 80 cm ) 150 1


FLANGE SOCKET 150 1
FLANGE GATE VALVE 150 1
WELDING 90° ELBOW 150 1

21 TEE ALL SOCKET 250 x 150 1


FLANGE GATE VALVE 250 1
FLANGE SOCKET 300 2
250 2
STUBE END 300 2
GIBOULT JOINT 250 1
WELDING 45° ELBOW 300 1
WELDING 90° ELBOW 150 1
RUBBER RING 300 2
GIP CROSSING 300 1 (7m)

22 TEE ALL SOCKET 350 x 150 1


FLANGE GATE VALVE 200 1
150 1
100 1
FLANGE SOCKET 200 2
150 2
100 2
STUBE END 150 2
100 2
GIBOULT JOINT 350 1
WELDING 90° ELBOW 150 2
100 1
RUBBER RING 150 2
100 2
GIP CROSSING 150 1 (7m)
100 1 (7m)

23 CONCENTRIC REDUCER 150 x 100 1


STUBE END 150 2
RUBBER RING 100 2
GIP CROSSING 100 1 (7m)

24 CONCENTRIC REDUCER 100 x 50 1


MALE THREAD ADAPTOR 50 2
FEMALE GATE VALVE 50 1
CAP 50 1

25 CONCENTRIC REDUCER 75 x 50 1
MALE THREAD ADAPTOR 50 2
FEMALE GATE VALVE 50 1
CAP 50 1

26 CONCENTRIC REDUCER 100 x 50 1


MALE THREAD ADAPTOR 50 2
FEMALE GATE VALVE 50 1
CAP 50 1

27 CONCENTRIC REDUCER 150 x 75 1


EQUAL TEE 75 X 75
STUBE END 75 4
FLANGE SOCKET 75 1
FLANGE GATE VALVE 150 2
RUBBER RING 75 2
GIP CROSSING 75 1 (7m)

28 CONCENTRIC REDUCER 75 x 50 1
MALE THREAD ADAPTOR 50 2
FEMALE GATE VALVE 50 1
CAP 50 1

29 CONCENTRIC REDUCER 75 x 50 1
MALE THREAD ADAPTOR 50 2
FEMALE GATE VALVE 50 1
CAP 50 1
Aksesories JML
Reducing Tee ø 400 x 250 mm (16" x 10") 1
Stube Bend ø 250 mm (10") 4
Flange Socket ø 250 mm (10") 2
Flange Gate Valve ø 250 mm (10") 2
Welding 90° Elbow ø 250 mm (10") 4
Welding 45° Elbow ø 250 mm (10") 4
Concentric Reducer ø 400 x 250 mm (16" x 10") 1
Rubber Ring ø 250 mm (10") 4
GIP Crossing ø 250 mm (10") 2 (7m)

Concentric Reducer ø 250 x 150 mm (10" x 6") 1


Welding 45° Elbow ø 150 mm (6") 1

Equal Tee ø 150 x 150 mm (6" x 6") 1


Stube Bend ø 150 mm (6") 2
Flange Socket ø 150 mm (6") 1
Flange Socket ø 100 mm (4") 2
Flange Gate Valve ø 150 mm (6") 1
Flange Gate Valve ø 100 mm (4") 1
Welding 45° Elbow ø 150 mm (6") 1
Concentric Reducer ø 250 x 150 mm (10" x 6") 1
Rubber Ring ø 150 mm (6") 2
GIP Crossing ø 150 mm (6") 1 (12m)

Equal Tee ø 150 x 150 mm (6" x 6") 1


Stube Bend ø 150 mm (6") 6
Flange Socket ø 150 mm (6") 2
Flange Gate Valve ø 150 mm (6") 2
Welding 90° Elbow ø 150 mm (6") 3
Rubber Ring ø 150 mm (6") 4
GIP Crossing ø 150 mm (6") 2 (7m)
Welding 45° Elbow ø 150 mm (6") 3

Welding 90° Elbow ø 150 mm (6") 1

Equal Tee ø 150 x 150 mm (6" x 6") 2


Stube Bend ø 150 mm (6") 2
Flange Gate Valve ø 150 mm (6") 4
Flange Socket ø 150 mm (6") 1
Welding 45° Elbow ø 150 (6") 2

Equal Tee ø 200 x 200mm (8" x 8") 1


Equal Tee ø 150 x 150 mm (6" x 6") 1
Stube Bend ø 200 mm (8") 1
Stube Bend ø 150 mm (6") 1
Stube Bend ø 75 mm (3") 1
Flange Socket ø 150 mm (6") 1
Flange Socket ø 150 mm (6") 1
Flange Socket ø 75 mm (3") 1
Flange Gate Valve ø 200 mm (8") 1
Flange Gate Valve ø 150 mm (6") 1
Flange Gate Valve ø 75 mm (3") 1
Concentric Reducer ø 200 x 150 mm (8" x 6") 1
Concentric Reducer ø 150 x 75 mm (6" x 3") 1
Rubber Ring ø 150 mm (6") 1
GIP Crossing ø 150 mm (6") 1 (7m)

Concentric Reducer ø 75 x 50 mm (3" x 2") 1


Male Thread Adaptor 50 mm (2") 2
Flange Gate Valve ø 50 mm (2") 1
Cap ø 50 mm (2") 1

Concentric Reducer ø 150 x 100 mm (6" x 4") 1

Concentric Reducer ø 200 x 150 mm (8" x 6") 1

Concentric Reducer ø 150 x 100 mm (6" x 4") 1


Concentric Reducer ø 100 x 75 mm (4" x 3") 1

Concentric Reducer ø 200 x 150 mm (8" x 6")


1
Male Thread Adaptor 50 mm (2") 4
Female Gate Valve 50 mm (2") 2
Cap ø 50 mm (2") 2

Concentric Reducer ø 200 x 200 mm (8" x 8") 1


Welding 90° Elbow ø 200 mm (8") 1

Reducing Tee ø 100 x 100 mm (4" x 4") 1


Tee All Socket ø 100 x 100 mm (4" x 4") 1
Stube Bend ø 100 mm (4") 1
Flange Socket ø 100 mm (4") 1
Concentric Reducer ø 200 x 100 mm (8" x 4") 1
Concentric Reducer ø 150 x 100 mm (6" x 4") 1
Rubber Ring ø 100 mm (4") 1
Giboult Joint ø 100 mm (4") 1
GIP Crossingø 100 mm (4") 1 (7m)
Wall Pipe (80 cm) ø 300 mm (12") 1
Flange Socket ø 300 mm (12") 1
Flange Gate Valve ø 300 mm (12") 1
Welding 90° Elbow ø 300 mm (12") 1

Concentric Reducer ø 300 x 200 mm (12" x 8") 1


Welding 90° Elbow ø 200 mm (8") 1

Concentric Reducer ø 200 x 150 mm (8" x 6") 1


Welding 90° Elbow ø 100 mm (4") 1
Tee All Socket ø 150 x 150 mm (6x6") 1
Stube Bend ø 150 mm (4") 1
Flange Socket ø 150 mm (6") 2
Giboult Joint ø 150 mm (6") 1
Rubber Ring ø 150 mm (6") 2
GIP Crossing ø 150 mm (6") 1 (7m)

Tee All Socket ø 100 x 75 mm (4x3") 1


Stube Bend ø 75 mm (3") 2
Flange Socket ø 75 mm (3") 2
Giboult Joint ø 100 mm (4") 1

Concentric Reducer ø 75 x 50 mm (3" x 2") 1


Male Thread Adaptor ø 50 mm (2") 2
Female Gate Valve ø 50 mm (2") 1
Cap ø 50 mm (2") 1

Wall Pipe (80 cm) ø 150 mm (6") 1


Flange Socket ø 150 mm (6") 1
Flange Gate Valve ø 150 mm (6") 1
Welding 90° Elbow ø 150 mm (6") 1

Tee All Socket ø 250 x 100 mm (10 "x 6") 1


Flange Gate Valve ø 250 mm (10") 1
Flange Socket ø 300 mm (12") 2
Flange Socket ø 250 mm (10") 2
Stube Bend ø 300 mm (12") 2
Stube Bend ø 250 mm (10") 1
Welding 45° Elbow ø 300 mm (12") 1
Welding 90° Elbow ø 150 mm (6") 1
Rubber Ring ø 300 mm (12") 2
GIP Crossing ø 300 mm (12") 1 (7m)

Tee All Socket ø 350 x 150 mm (14x6") 1


Flange Gate Valve ø 200 mm (8") 1
Flange Gate Valve ø 150 mm (6") 1
Flange Gate Valve ø 100 mm (4") 1
Flange Socket ø 200 mm (8") 2
Flange Socket ø 150 mm (6") 2
Flange Socket ø 100 mm (4") 2
Stube Bend ø 150 mm (6") 2
Stube Bend ø 100 mm (6") 2
Giboult Joint ø 350 mm (14") 1
Welding 90° Elbow ø 150 mm (6") 2
Welding 90° Elbow ø 100 mm (4") 1
Rubber Ring ø 150 mm (6") 2
Rubber Ring ø 100 mm (4") 2
GIP Crossing ø 150 mm (6") 1 (7m)
GIP Crossing ø 100 mm (4") 1 (7m)

Concentric Reducer ø 150 x 100 mm (6x4") 1


Stube Bend ø 150 mm (6") 2
Rubber Ring ø 100 mm (4") 2
GIP Crossing ø 100 mm (4") 1 (7m)

Concentric Reducer ø 100 x 50 mm (4x2") 1


Male Thread Adaptor ø 50 mm (2") 2
Female Gate Valve ø 50 mm (2") 1
Cape ø 50 mm (2") 1

Concentric Reducer ø 75 x 50 mm (3x2") 1


Male Thread Adaptor ø 50 mm (2") 2
Female Gate Valve ø 50 mm (2") 1
Cape ø 50 mm (2") 1

Concentric Reducer ø 100 x 50 mm (4x2") 1


Male Thread Adaptor ø 50 mm (2") 2
Female Gate Valve ø 50 mm (2") 1
Cape ø 50 mm (2") 1

Concentric Reducer ø 150 x 75 mm (6x3") 1


Equal Tee ø 75 x 75 mm (6x6")
Stube Bend ø 75 mm (3") 4
Flange Socket ø 75 mm (3") 1
Flange Gate Valve ø 150 mm (6") 2
Rubber Ring ø 75 mm (3") 2
GIP Crossing ø 75 mm (3") 1 (7m)

Concentric Reducer ø 75 x 50 mm (3x2") 1


Male Thread Adaptor ø 50 mm (2") 2
Female Gate Valve ø 50 mm (2") 1
1

Concentric Reducer ø 75 x 50 mm (3x2") 1


Male Thread Adaptor ø 50 mm (2") 2
Female Gate Valve ø 50 mm (2") 1
Cape ø 50 mm (2") 1
Reducing Tee 63×32 2” x 1” 53,400
63×40 2” x 1¼” 56,400
63×50 2” x 1½” 61,080
90×40 3” x 1¼” 124,680
90×50 3” x 1½” 111,720
90×63 3” x 2” 135,000
90×75 3” x 2½” 155,040
110×63 4” x 2” 195,840
110×75 4” x 2½” 207,240
110×90 4” x 3” 223,680
125×63 5” x 2” 246,480
125×90 5” x 3” 258,240
125×110 5” x 4” 292,080
160×63 6” x 2” 376,560
160×90 6” x 3” 388,200
160×110 6” x 4” 407,160
160×125 6” x 5” 436,440
180×160 – 653,280
200×63 8” x 2” 599,040
200×90 8” x 3” 662,400
200×110 8” x 4” 696,600
200×125 8” x  5” 712,200
200×160 8” x 6” 789,600

Stub End 63 2″ 97,600


75 2-1/2″ 121,100
90 3″ 159,100
110 4″ 197,900
160 6″ 358,600
200 8″ 634,400
250 10″ 859,300
315 12″ 1,652,000
355 14″ 6,087,200
400 16″ 9,991,500
500 20″ ###

Anda mungkin juga menyukai