SUMBAWA
I. BAHAN PASANGAN
1 Batu Kali Alam M3
2 Kerikil Alam 2/3 Cm M3
3 Kerikil Alam 1/2 Cm M3
4 Kerikil Pecah 2/3 Cm M3
5 Kerikil Pecah 1/2 Cm M3
6 Agregat Kasar M3
7 Pasir Beton M3
8 Pasir Pasang M3
9 Pasir Urug M3
10 Tanah Urug Biasa M3
11 Tanah Urug Pilihan M3
12 Urugan Pilihan (EI-322) M3
13 Aggrgat A M26 M3
14 Aggregat B M27 M3
15 Agregat Kelas C1 (M28) M3
16 Aspal (M10) Kg
17 Kerosene (M11) liter
18 Agr 5-10 & 10-15 (M79) M3
19 Agr 0-5 (M78) M3
20 Pasir Halus (M01c) M3
21 Filler (M05) Kg
22 Aspal (M10) Kg
23 Semen Tiga Roda Kg
12 Bata Merah Kelas 1 Buah
13 Bata Merah Kelas 2 Buah
14 Semen (PC) Kg
15 Semen Warna butiran halus Kg
16 Sirtu M3
17 Modifier Liter
18 Minyak Aspal Liter
19 Minyak Tanah Liter
20 Gebalan Rumput M2
21 Air Liter
22 Minyak Bekisting Liter
V. BAHAN LANTAI
1 Tegel Abu-abu 20 x 20 Cm M2
2 Tegel Bergaris Abu-abu 20 x 20 Cm M2
3 Tegel Warna 20 x 20 Cm. Buah
4 Tegel Bergaris Warna 20 x 20 Cm. M2
5 Tegel Traso Klas I 30 x 30 Cm M2
6 Tegel Traso Klas II 30 x 30 Cm M2
7 Keramik Dinding M2
8 Porselin Kualitas I (polos) M2
9 Keramik Kualitas I (Motif) M2
10 Keramik Kualitas II (Motif) M2
11 Keramik Kualitas I (polos) M2
12 Keramik Kualitas II (polos) M2
13 Marmer Kualitas I M2
X. BAHAN PENGUNCI
1 Union Kecil Buah
2 Union Besar Buah
3 Yale Kecil Buah
4 Yale Besar Buah
5 Kuda Terbang Kecil Buah
6 Kuda Terbang Besar Buah
7 Royal Buah
8 Haag Angin Besar Buah
9 Haag Angin Kecil Buah
10 Grendel Besar Buah
11 Grendel Kecil Buah
12 Engsel Pintu Pasang
12 Engsel Jendela Pasang
13 Engsel Biasa Pasang
14 Expagnolet Buah
15 Kunci pintu mutu menengah Buah
16 Kunci pintu mutu Tinggi Buah
17 Kunci cylinder 2 kali slag Buah
18 Hak angin Buah
D. ACCESSORIES
1 Bend PE 22,5º ø 63 mm (2") Buah
2 Bend PE 22,5º ø 75 mm (2 1/2") Buah
3 Bend PE 22,5º ø 90 mm (3") Buah
4 Bend PE 22,5º ø 110 mm (4") Buah
5 Bend PE 22,5º ø 160 mm (6") Buah
6 Bend PE 22,5º ø 200 mm (8") Buah
7 Bend PE 22,5º ø 250 mm (10") Buah
8 Bend PE 22,5º ø 315 mm (12") Buah
9 Bend PE 22,5º ø 355 mm (14") Buah
10 Bend PE 22,5º ø 400 mm (16") Buah
11 Bend PE 22,5º ø 450 mm (18") Buah
12 Bend PE 22,5º ø 500 mm (20") Buah
13 Bend PE 45º ø 63 mm (2") Buah
14 Bend PE 45º ø 75 mm (2 1/2") Buah
15 Bend PE 45º ø 90 mm (3") Buah
16 Bend PE 45º ø 110 mm (4") Buah
17 Bend PE 45º ø 160 mm (6") Buah
18 Bend PE 45º ø 200 mm (8") Buah
19 Bend PE 45º ø 250 mm (10") Buah
20 Bend PE 45º ø 315 mm (12") Buah
21 Bend PE 45º ø 355 mm (14") Buah
22 Bend PE 45º ø 400 mm (16") Buah
23 Bend PE 45º ø 450 mm (18") Buah
24 Bend PE 45º ø 500 mm (20") Buah
25 Bend PE 90º ø 63 mm (2") Buah
26 Bend PE 90º ø 75 mm (2 1/2") Buah
27 Bend PE 90º ø 90 mm (3") Buah
28 Bend PE 90º ø 110 mm (4") Buah
29 Bend PE 90º ø 160 mm (6") Buah
30 Bend PE 90º ø 200 mm (8") Buah
31 Bend PE 90º ø 250 mm (10") Buah
32 Bend PE 90º ø 315 mm (12") Buah
33 Bend PE 90º ø 355 mm (14") Buah
34 Bend PE 90º ø 400 mm (16") Buah
35 Bend PE 90º ø 450 mm (18") Buah
36 Bend PE 90º ø 500 mm (20") Buah
37 Bend PVC 90º ø 150 mm (6") Buah
38 Reducer PE ø 90 x 63 mm (3" x 2") Buah
39 Reducer PE ø 110 x 63 mm (4" x 2") Buah
40 Reducer PE ø 110 x 90 mm (4" x 3") Buah
41 Reducer PE ø 160 x 63 mm (6" x 2") Buah
42 Reducer PE ø 160 x 90 mm (6" x 3") Buah
43 Reducer PE ø 160 x 110 mm (6" x 4") Buah
44 Reducer PE ø 200 x 90 mm (8" x 3") Buah
45 Reducer PE ø 200 x 110 mm (8" x 4") Buah
46 Reducer PE ø 200 x 160 mm (8" x 6") Buah
47 Reducer PE ø 250 x 110 mm (10" x 4") Buah
48 Reducer PE ø 250 x 160 mm (10" x 6") Buah
49 Reducer PE ø 250 x 200 mm (10" x 8") Buah
50 Reducer PE ø 315 x 160 mm (12" x 6") Buah
51 Reducer PE ø 315 x 200 mm (12" x 8") Buah
52 Reducer PE ø 315 x 250 mm (12" x 10") Buah
53 Reducer PE ø 355 x 200 mm (14" x 8") Buah
54 Reducer PE ø 355 x 250 mm (14" x 10") Buah
55 Reducer PE ø 355 x 315 mm (14" x 12") Buah
56 Reducer PE ø 400 x 200 mm (16" x 8") Buah
57 Reducer PE ø 400 x 250 mm (16" x 10") Buah
58 Reducer PE ø 400 x 315 mm (16" x 12") Buah
59 Reducer PE ø 400 x 355 mm (16" x 14") Buah
60 Reducer PE ø 450 x 200 mm (18" x 8") Buah
61 Reducer PE ø 450 x 250 mm (18" x 10") Buah
62 Reducer PE ø 450 x 315 mm (18" x 12") Buah
63 Reducer PE ø 450 x 355 mm (18" x 14") Buah
64 Reducer PE ø 450 x 400 mm (18" x 14") Buah
65 Reducer PE ø 500 x 315 mm (20" x 12") Buah
66 Reducer PE ø 500 x 400 mm (20" x 16") Buah
67 Reducer PE ø 500 x 450 mm (20" x 18") Buah
68 Equal Tee PE ø 63 mm (2") Buah
69 Equal Tee PE ø 75 mm (2 1/2") Buah
70 Equal Tee PE ø 90 mm (3") Buah
71 Equal Tee PE ø 110 mm (4") Buah
72 Equal Tee PE ø 160 mm (6") Buah
73 Equal Tee PE ø 200 mm (8") Buah
74 Equal Tee PE ø 250 mm (10") Buah
75 Equal Tee PE ø 315 mm (12") Buah
76 Equal Tee PE ø 355 mm (14") Buah
77 Equal Tee PE ø 400 mm (16") Buah
78 Equal Tee PE ø 450 mm (18") Buah
79 Equal Tee PE ø 500 mm (20") Buah
80 Tee PE ø 90 x 63 mm (3" x 2") Buah
81 Tee PE ø 110 x 63 mm (4" x 2") Buah
82 Tee PE ø 110 x 90 mm (4" x 3") Buah
83 Tee PE ø 160 x 90 mm (6" x 3") Buah
84 Tee PE ø 160 x 110 mm (6" x 4") Buah
85 Tee PE ø 200 x 110 mm (8" x 4") Buah
86 Tee PE ø 200 x 160 mm (8" x 6") Buah
87 Tee PE ø 250 x 160 mm (10" x 6") Buah
88 Tee PE ø 250 x 200 mm (10" x 8") Buah
89 Tee PE ø 315 x 200 mm (12" x 8") Buah
90 Tee PE ø 315 x 250 mm (12" x 10") Buah
91 Tee PE ø 355 x 200 mm (14" x 8") Buah
92 Tee PE ø 355 x 250 mm (14" x 10") Buah
93 Tee PE ø 355 x 315 mm (14" x 12") Buah
94 Tee PE ø 400 x 315 mm (16" x 12") Buah
95 Tee PE ø 400 x 355 mm (16" x 14") Buah
96 Tee PE ø 450 x 355 mm (18" x 14") Buah
97 Tee PE ø 450 x 400 mm (18" x 14") Buah
98 Tee PE ø 500 x 400 mm (20" x 16") Buah
99 Tee PE ø 500 x 450 mm (20" x 18") Buah
100 Stub Flange ø 63 mm (2") Buah
101 Stub Flange ø 75 mm (2 1/2") Buah
102 Stub Flange ø 90 mm (3") Buah
103 Stub Flange ø 110 mm (4") Buah
104 Stub Flange ø 160 mm (6") Buah
105 Stub Flange ø 200 mm (8") Buah
106 Stub Flange ø 250 mm (10") Buah
107 Stub Flange ø 315 mm (12") Buah
108 Stub Flange ø 355 mm (14") Buah
109 Stub Flange ø 400 mm (16") Buah
110 Stub Flange ø 450 mm (18") Buah
111 Stub Flange ø 500 mm (20") Buah
112 End Cap ø 63 mm (2") Buah
113 End Cap ø 75 mm (2 1/2") Buah
114 End Cap ø 90 mm (3") Buah
115 End Cap ø 110 mm (4") Buah
116 End Cap ø 160 mm (6") Buah
117 End Cap ø 200 mm (8") Buah
118 End Cap ø 250 mm (10") Buah
119 End Cap ø 315 mm (12") Buah
120 End Cap ø 355 mm (14") Buah
121 End Cap ø 400 mm (16") Buah
122 End Cap ø 450 mm (18") Buah
123 End Cap ø 500 mm (20") Buah
124 Konektor PE ø 2" Buah
125 Konektor PE ø 3" Buah
126 Gate Valve All Flange ø 2" Buah
127 Gate Valve All Flange ø 3" Buah
128 Gate Valve All Flange ø 4" Buah
129 Gate Valve All Flange ø 6" Buah
130 Gate Valve All Flange ø 8" Buah
131 Gate Valve All Flange ø 10" Buah
132 Gate Valve All Flange ø 12" Buah
133 Gate Valve All Flange ø 14" Buah
134 Gate Valve All Flange ø 16" Buah
135 Gate Valve All Flange ø 18" Buah
136 Check Valve All Flange ø 2" Buah
137 Check Valve All Flange ø 3" Buah
138 Check Valve All Flange ø 4" Buah
139 Check Valve All Flange ø 6" Buah
140 Check Valve All Flange ø 8" Buah
141 Check Valve All Flange ø 10" Buah
142 Check Valve All Flange ø 12" Buah
136 Air Valve Single ø 13 mm Buah
137 Air Valve Single ø 20 mm Buah
138 Air Valve Single ø 25 mm Buah
139 Air Valve Single ø 50 mm Buah
140 Air Valve Single ø 75 mm Buah
141 Air Valve Single ø 100 mm Buah
142 Air Valve Double ø 25 mm Buah
143 Air Valve Double ø 50 mm Buah
144 Pipa Riser GI ø 2" - 0.80 m' Buah
145 Pipa Riser GI ø 3" - 0.80 m' Buah
146 Pipa Riser GI ø 3" - 1.00 m' Buah
147 Pipa Riser GI ø 4" - 0.80 m' Buah
148 Pipa Riser GI ø 6" - 2.50 m' Buah
149 Pipa Riser GI ø 6" - 1.50 m' Buah
150 Pipa Riser GI ø 8" - 0.80 m' Buah
151 Pipa Riser GI ø 10" - 0.80 m' Buah
152 Wall Pipe All Flange ø 3" - 0.80 m' Buah
153 Wall Pipe All Flange ø 4" - 0.80 m' Buah
154 Wall Pipe All Flange ø 4" - 2.50 m' Buah
155 Wall Pipe All Flange ø 6" - 1 m' Buah
156 Wall Pipe All Flange ø 6" - 2.5 m' Buah
157 Wall Pipe All Flange ø 8" - 1,5 m' Buah
158 Wall Pipe All Flange ø 10" - 1,5 m' Buah
159 Bend GI All Flange ø 2" x 90º Buah
160 Bend GI All Flange ø 2" x 45º Buah
161 Bend GI All Flange ø 2" x 22 1/2º Buah
162 Bend GI All Flange ø 3" x 90º Buah
163 Bend GI All Flange ø 3" x 45º Buah
164 Bend GI All Flange ø 3" x 22 1/2º Buah
165 Bend GI All Flange ø 4" x 90O Buah
166 Bend GI All Flange ø 4" x 45O Buah
167 Bend GI All Flange ø 4" x 22 1/2O Buah
168 Bend GI All Flange ø 6" x 90o Buah
169 Bend GI All Flange ø 6" x 45o Buah
170 Bend GI All Flange ø 6" x 22 1/2o Buah
171 Bend GI All Flange ø 8" x 90o Buah
172 Bend GI All Flange ø 8" x 45o Buah
173 Bend GI All Flange ø 8" x 22 1/2o Buah
174 Bend GI All Flange ø 10" x 90o Buah
175 Bend GI All Flange ø 10" x 45o Buah
176 Bend GI All Flange ø 10" x 22 1/2o Buah
177 Bend GI All Flange ø 12" x 90O Buah
178 Bend GI All Flange ø 12" x 45O Buah
179 Bend GI All Flange ø 12" x 22 1/2O Buah
180 Bend GI All Flange ø 14" x 90O Buah
181 Bend GI All Flange ø 14" x 45O Buah
182 Bend GI All Flange ø 14" x 22 1/2O Buah
183 Bend GI All Flange ø 16" x 90O Buah
184 Bend GI All Flange ø 16" x 45O Buah
185 Bend GI All Flange ø 16" x 22 1/2O Buah
186 Bend GI All Flange ø 20" x 45O Buah
187 Clamp Saddle ø 16" x 50 mm Buah
188 Clamp Saddle ø 14" x 50 mm Buah
189 Clamp Saddle ø 12" x 50 mm Buah
190 Clamp Saddle ø 10" x 50 mm Buah
191 Clamp Saddle ø 10" x 75 mm Buah
192 Clamp Saddle ø 10" x 100 mm Buah
193 Clamp Saddle ø 8" x 13 mm Buah
194 Clamp Saddle ø 8" x 20 mm Buah
195 Clamp Saddle ø 8" x 50 mm Buah
196 Clamp Saddle ø 8" x 75 mm Buah
197 Clamp Saddle ø 8" x 100 mm Buah
198 Clamp Saddle ø 6" x 50 mm Buah
199 Clamp Saddle ø 6" 25 mm Buah
200 Clamp Saddle ø 6" x 20 mm Buah
201 Clamp Saddle ø 6" x 13 mm Buah
202 Clamp Saddle ø 4" x 20 mm Buah
203 Clamp Saddle ø 4" x 25 mm Buah
204 Clamp Saddle ø 4" x 13 mm Buah
205 Clamp Saddle ø 3" x 25 mm Buah
206 Clamp Saddle ø 3" x 20 mm Buah
207 Clamp Saddle ø 3" x 13 mm Buah
208 Clamp Saddle ø 2" x 13 mm Buah
209 Flange Las ø 2" Buah
210 Flange Las ø 3" Buah
211 Flange Las ø 4" Buah
212 Flange Las ø 6" Buah
213 Flange Las ø 8" Buah
214 Flange Las ø 10" Buah
215 Flange Las ø 12" Buah
216 Flange Las ø 14" Buah
217 Flange Las ø 16" Buah
218 Flange Socket ø 2" Buah
219 Flange Socket ø 3" Buah
220 Flange Socket ø 4" Buah
221 Flange Socket ø 6" Buah
222 Flange Socket ø 8" Buah
223 Flange Socket ø 10" Buah
224 Flange Socket ø 12" Buah
225 Flange Socket ø 14" Buah
226 Flange Spigot ø 2" Buah
227 Flange Spigot ø 3" Buah
228 Flange Spigot ø 4" Buah
229 Flange Spigot ø 6" Buah
230 Flange Spigot ø 8" Buah
231 Flange Spigot ø 10" Buah
232 Flange Spigot ø 12" Buah
233 Flange Spigot ø 14" Buah
234 Screen Flange GI ø 8" Buah
235 Screen Flange GI ø 10" Buah
236 Giboult Joint ø 2" Buah
237 Giboult Joint ø 3" Buah
238 Giboult Joint ø 4" Buah
239 Giboult Joint ø 6" Buah
240 Giboult Joint ø 8" Buah
241 Giboult Joint ø 10" Buah
242 Giboult Joint ø 12" Buah
243 Giboult Joint ø 14" Buah
244 Giboult Joint ø 16" Buah
245 Rubber Packing ø 1" Buah
246 Rubber Packing ø 2" Buah
247 Rubber Packing ø 3" Buah
248 Rubber Packing ø 4" Buah
249 Rubber Packing ø 6" Buah
250 Rubber Packing ø 8" Buah
251 Rubber Packing ø 10" Buah
252 Rubber Packing ø 12" Buah
253 Rubber Packing ø 14" Buah
254 Rubber Packing ø 16" Buah
255 Reducer GI ø 10" x 8" Buah
256 Reducer GI ø 10" x 6" Buah
257 Reducer GI ø 8" x 6" Buah
258 Reducer GI ø 4" x 3" Buah
259 Tee GI All Flange ø 3" x 2" Buah
260 Tee GI All Flange ø 3" x 3" Buah
261 Tee GI All Flange ø 4" x 1" Buah
262 Tee GI All Flange ø 4" x 2" Buah
263 Tee GI All Flange ø 4" x 3" Buah
264 Tee GI All Flange ø 4" x 4" Buah
265 Tee GI All Flange ø 6" x 1" Buah
266 Tee GI All Flange ø 6" x 2" Buah
267 Tee GI All Flange ø 6" x 3" Buah
268 Tee GI All Flange ø 6" x 4" Buah
269 Tee GI All Flange ø 6" x 6" Buah
270 Tee GI All Flange ø 8" x 1" Buah
271 Tee GI All Flange ø 8" x 2" Buah
272 Tee GI All Flange ø 8" x 3" Buah
273 Tee GI All Flange ø 8" x 4" Buah
274 Tee GI All Flange ø 8" x 6" Buah
275 Tee GI All Flange ø 8" x 8" Buah
276 Tee GI All Flange ø 10" x 2" Buah
277 Tee GI All Flange ø 10" x 4" Buah
278 Tee GI All Flange ø 10" x 6" Buah
279 Tee GI All Flange ø 10" x 8" Buah
280 Tee GI All Flange ø 10" x 10" Buah
281 Tee GI All Flange ø 12" x 2" Buah
282 Tee GI All Flange ø 12" x 4" Buah
283 Tee GI All Flange ø 12" x 6" Buah
284 Tee GI All Flange ø 12" x 8" Buah
285 Tee GI All Flange ø 12" x 10" Buah
286 Tee GI All Flange ø 12" x 12" Buah
287 Tee GI All Flange ø 14" x 2" Buah
288 Tee GI All Flange ø 14" x 4" Buah
289 Tee GI All Flange ø 14" x 6" Buah
290 Tee GI All Flange ø 14" x 8" Buah
291 Tee GI All Flange ø 14" x 10" Buah
292 Tee GI All Flange ø 16" x 4" Buah
293 Tee GI All Flange ø 16" x 6" Buah
294 Tee GI All Flange ø 16" x 8" Buah
295 Tee GI All Flange ø 16" x 10" Buah
296 Penguras Pipa 0 0 Buah
297 Water Meter ø 12" Buah
298 Water Meter ø 10" Buah
299 Water Meter ø 8" Buah
300 Water Meter ø 6" Buah
301 Water Meter ø 4" Buah
302 Water Meter ø 3" Buah
303 Water Meter ø 2" Buah
304 Water Meter ø 1 1/2" Buah
305 Water Meter ø 1" Buah
306 Water Meter ø 3/4" Buah
307 Water Meter ø 1/2" Buah
308 Valve Threaded ø 2" Buah
309 Valve Socket ø 3" Buah
310 Valve Socket ø 2" Buah
311 Valve Socket ø 3/4" Buah
312 Valve Socket ø 1/2" Buah
313 Water Moer ø 2" Buah
314 Double Nepple ø 2" Buah
315 Mur + Baut Buah
316 Hidran Umum Fiber Glass 2 M3 Buah
317 Faucet Socket ø 20 mm (3/4") Buah
318 Stop Kran ø 20 mm (3/4") Buah
319 Stop Kran ø 13 mm (1/2") Buah
320 Kran Engsel ø 13 mm (1/2") Buah
321 Socket GI ø 13 mm (1/2") Buah
322 Socket GI ø 20 mm (3/4") Buah
323 Double Nepple ø 13 mm (1/2") Buah
324 Elbow FF ø 20 mm (3/4") Buah
325 Elbow MF ø 20 mm (3/4") Buah
326 Knee FF ø 13 mm (1/2") Buah
327 Verlop Ring ø 20 x 13 mm Buah
328 Clamp Sadle ø 75 x 20 mm Buah
329 Pelampung ø 20 mm (3/4") Buah
330 Reducer GI ø 20 x 13 mm Buah
331 Clamp pipa lengkap dg Baut Veø 6" Buah
332 Seltip 00 Rol
333 Dop GI ø 20 mm (3/4") Buah
334 Screen GI - 3 M' ø 100 mm (4") Buah
335 Screen GI - 3 M' ø 150 mm (6") Buah
336 Screen GI - 3 M' ø 250 mm (10") Buah
337 Knee PVC ø 20 mm (3/4") Buah
338 - Bend GI All Flange Buah
337 - Gate Valve All Flange Dia. 4" Buah
338 - Gate Valve All Flange Dia. 6" Buah
339 - Gate Valve All Flange Dia. 8" Buah
340 - Tee GI All Flange Buah
341 - Pipa GI Medium A Buah
342 - Flange Las Buah
343 - Rubber packing Buah
344 - Wall Pipe All Flange L : 0.80 Buah
345 - Mur baut Buah
346 - Pekerjaan Pemasangan Pipa & Accessoriesnya Buah
347 PIPA OUTLET, WASHOUT DAN OVERFLOW Buah
348 - Gate Valve All Flange Buah
349 - Wall Pipe All Flange L : 0.80 Buah
350 - Tee GI All Flange Buah
351 - Bend GI All Flange Buah
352 - Flange Spigot Buah
353 Water stop 3/250 mm Buah
354 Pipa dengan Flange ganda dia ¢ 200 mm panjang 300 cm Buah
355 Pipa Dinding dengan Flange ganda dia ¢ 200 mm panjang 80 cm Buah
356 Pipa dengan Flange ganda dia ¢ 200 mm panjang 50 cm Buah
357 Tee All flange ¢ 200 x ¢ 200 x ¢ 200 mm Buah
358 Gate valve ¢ 200 mm K. 150 Buah
359 Bend 90 º All Flange ¢ 200 mm Buah
360 Bend 90 º dengan Flange tunggal ¢ 200 mm Buah
361 Pipa dengan Flange ganda dia ¢ 250 mm panjang 200 cm Buah
362 Pipa Dinding dengan Flange ganda dia ¢ 250 mm panjang 80 cm Buah
363 Bend 90 º dengan flange ganda ¢ 250 mm Buah
364 Bend 90 º dengan flange tunggal ¢ 250 mm Buah
365 Pipa Dinding dengan Flange tunggal ¢ 150 mm panjang 100 cm Buah
366 Pipa dengan Flange ganda ¢ 150 mm panjang 600 cm Buah
367 Bend 90 º dengan flange tunggal ¢ 150 mm Buah
368 Gate valve ¢ 150 mm K. 150 Buah
369 Pekerjaan tangga monyet dari stenlis steel ( R. Kontrol ) Buah
370 Pekerjaan tangga Spiral Tinggi 5,2 m diameter 1500 mm Buah
HARGA
SATUAN (Rp)
200,000
373,900
293,200
264,200
361,000
252,100
252,100
200,000
190,000
127,000
167,500
167,500
288,794
282,142
266,077
20,000
11,072
264,500
232,000
232,000
5,000
22,000
16,400
800
1,000
16,400
16,800
100,000
4,900
4,900
16,000
26,900
180
16,000
2,800
4,500
7,200
7,700
1,100
7,000
1,000
7,000
19,200
21,300
24,300
26,800
45,000
48,000
42,500
73,250
44,000
62,900
79,800
104,500
72,000
55,000
75,000
85,100
49,000
59,000
70,000
21,436,400
16,077,300
5,359,100
3,675,000
3,150,000
2,870,000
3,630,000
3,025,000
25,000
90,000
6,545,531
425,000
457,087
3,250,000
375,000
725,000
5,000,000
3,000,000
500,000
45,000
52,500
57,000
60,300
85,000
110,000
150,000
250,000
340,000
3,500
70,000
90,000
140,000
750,000
55,000
72,100
55,000
68,400
70,100
63,400
82,000
69,900
105,400
85,000
71,900
61,000
500,000
15,000
15,000
13,600
15,400
28,500
24,400
28,800
28,800
25,000
30,000
65,000
31,500
31,500
350,000
450,000
35,100
3,500,000 Ventilasi Upah 0.25 25625
160,000 Knee 2 28500
850,000 Tee 1 35700
700,000 Pipa 0.6 68520
650,000 158345
5,000 Tangga Besi 16 1 160000 160000
24,400 Mesin Las 394100
24,400 Upah 102500
7,200 656600
2,000
145,500
7,280
8,160
53,240
7,500
35,000
20,000
142,000
7,200 2.2225
12,500 1.5875
12,500
17,000
17,000
22,000
24,400
500,000
585,100
2,880,000
265,000
168,200
55,000
150,000
150,000
22,500
67,400
74,800
112,200
179,500
231,900
324,100
147,500
82,400
175,000
110,000
127,000
17,750
34,450
16,000
7,500
135,450
147,700
153,800
28,600
112,000
161,950
6,090,860
225,791
207,509
150,000
176,000
160,000
187,000
141,000
5,000
20,900
16,700
33,000
12,200
17,900
44,900
44,000
38,000
58,000
65,000
90,000
75,000
42,000
18,000
42,000
57,700
44,900
13,800
7,000
4,500
55,000
71,500
127,500
90,000
150,000
77,600
93,700
84,700
25,000
20,000
20,000
15,000
50,000
30,000
15,000
75,000
123,000
346,500
165,000
20,000
4,000,000
71,500
200,000
3,500,000
3,911,800
5,478,400
891,900
165,000
365,000
1,500,000
4,987,400
6,601,100
750,000
466,700
410,800
25,400
24,300
23,400
23,000
40,000
31,400
8,200
10,040
2,500
26,400
235,400
188,320
178,920
23,600
18,840
254,240
329,560
404,920
4,500,000
404,922
29,000
37,200
55,600
73,900
84,300
114,200
145,300
187,600
270,100
370,900
440,600
623,900
803,900
982,700
1,125,700
1,870,200
4,075
5,000
12,696
17,058
23,690
45,000
55,000
61,462
66,550
248,900
432,500
680,900
866,256
1,579,078
2,043,864
87,100
119,800
163,800
234,100
521,000
796,600
1,322,700
2,109,500
2,669,300
3,865,500
5,188,000
6,367,300
98,100
130,300
180,000
271,100
549,200
826,200
1,429,300
2,609,800
3,362,500
4,629,100
6,073,400
7,739,100
133,000
183,000
247,900
352,200
748,100
1,145,900
1,974,900
3,732,100
4,796,900
6,542,000
8,820,700
11,169,300
322,000
137,000
182,300
189,400
451,500
456,300
463,400
682,000
686,800
696,300
1,024,300
1,089,100
1,083,500
1,459,600
1,516,800
1,540,700
1,772,800
1,820,500
1,868,100
2,380,500
2,302,000
2,349,700
2,492,700
3,583,800
3,583,800
3,342,500
2,489,300
3,437,800
4,112,400
4,231,500
4,422,200
150,000
197,400
259,500
357,500
773,900
1,173,300
1,997,000
3,648,900
5,173,500
7,797,300
9,930,800
11,899,000
210,000
301,100
331,500
641,000
666,200
1,092,900
1,181,500
3,017,000
2,581,000
4,449,200
4,556,500
5,053,500
5,480,700
5,991,050
6,501,400
6,694,500
7,607,600
7,865,000
9,698,300
10,010,000
172,200
212,800
252,100
351,400
768,700
1,152,700
1,736,600
2,808,600
3,523,400
5,005,100
6,673,500
9,089,800
122,300
143,400
174,600
232,500
528,700
838,000
1,309,500
1,816,000
3,696,700
4,224,000
5,346,000
6,600,000
305,000
347,700
1,328,300
1,898,900 0
2,708,200 0
4,395,000
7,057,100 18,580,700 2.632908702
11,449,900
16,143,100
36,100,000
49,400,000
57,800,000
1,287,000
2,200,000
3,410,000
7,920,000
12,870,000
20,900,000
30,800,000
267,600
409,200
446,200 153 Flange Buta 4" Buah 127.430
788,800 154 Flange Buta 6" Buah 204.790
1,504,400 155 Flange Buta 8" Buah 280.230
1,655,700 156 Flange Buta 10" Buah 332.230
1,920,000 157 Flange Buta 12" Buah 897.400
2,341,100 158 Flange Buta 14" Buah 1.019.380
151,500 159 Flange Buta 16" Buah 1.529.130
157,600 160 Flange Las 2" Buah 67.410
169,700 161 Flange Las 2 1/2" Buah 70.510
194,000 162 Flange Las 3" Buah 85.600
224,300 163 Flange Las 4" Buah 105.600
261,800 164 Flange Las 6" Buah 194.410
607,300 165 Flange Las 8" Buah 259.790
759,100 166 Flange Las 10" Buah 387.760
676,200 Wall Pipe All Flan 4" - 0.80 m' 167 Flange Las 12" Buah 410.980
788,200 Wall Pipe All Flan 4" - 2.50 m' 168 Flange Las 14" Buah 679.770
1,030,800 Wall Pipe All Flan 6" - 1 m' 169 Flange Las 16" Buah 801.750
1,455,300 Wall Pipe All Flan 6" - 2.5 m' 500000 254860
1,697,800 Wall Pipe All Flan 8" - 1,5 m' 505832 754860
2,122,300 Wall Pipe All Flan 10" - 1,5 m'
2,607,400
182,400
200,100
204,300
212,800
226,100
231,200
346,100
376,500
394,100
460,100
503,200
527,500
861,000
1,030,800
1,194,500
1,819,800
2,365,500
2,607,400
2,662,200
2,971,800
3,464,100
3,935,300
4,548,000
5,033,100
5,120,000
5,480,000
5,930,000 10 0.01 0.010 0.005 7.85398163E-05
7,650,000 4 1.6 0.016 0.008 0.00020106193
1,100,000 6 2 0.020 0.01 0.000314159265
750,500 8 2 0.020 0.01 0.000314159265
670,000
582,600
641,000 4 10.16 0.102 0.0508 0.008107319666
705,000 6 15.24 0.152 0.0762 0.018241469248
476,000 8 20.32 0.203 0.1016 0.032429278662
503,000
525,000
554,200 4 220 0.220 0.11 0.038013271108
599,300 6 285 0.285 0.1425 0.063793965822
141,200 8 340 0.340 0.17 0.090792027689
133,300
121,200
117,000
119,400
120,000 Flange Las Buta 8" 504,900
98,900 Flange Las Buta 6" 383,900
79,000 Flange Las 6" 354,200 7.874
77,000 Flange Las 4" 163,900 0.007874
73,000 7874
54,000
188,100 153 Flange Buta 4" Buah 127.430 160 Flange Las 2" Buah 67.410
237,200 154 Flange Buta 6" Buah 204.790 161 Flange Las 2 1/2" Buah 70.510
334,300 155 Flange Buta 8" Buah 280.230 162 Flange Las 3" Buah 85.600
472,900 156 Flange Buta 10" Buah 332.230 163 Flange Las 4" Buah 105.600
575,900 157 Flange Buta 12" Buah 897.400 164 Flange Las 6" Buah 194.410
163,900 703,300 158 Flange Buta 14" Buah 1.019.380 165 Flange Las 8" Buah 259.790
354,200 1,031,500 159 Flange Buta 16" Buah 1.529.130 166 Flange Las 10" Buah 387.760
504,900 1,515,900 167 Flange Las 12" Buah 410.980
2,243,500 2,243,500 168 Flange Las 14" Buah 679.770
157,600 169 Flange Las 16" Buah 801.750
290,400
359,800 - Wall Pipe All Flange L : 0.80 Buah
480,400
659,800 Pipa dengan Flange ganda dia ¢ 200 mm panjang 300 cm
728,900 Wall Pipe Flange L : 80 dia ¢ 200 mm
1,152,100 Pipa dengan Flange ganda dia ¢ 200 mm panjang 50 cm
1,334,000 Tee All flange ¢ 200 x ¢ 200 x ¢ 200 mm
141,800 Gate valve ¢ 200 mm K. 150
250,000 Bend 90 º All Flange ¢ 200 mm
353,700 Bend 90 º dengan Flange tunggal ¢ 200 mm
442,300 Wall Pipe Flange L : 200 dia ¢ 250 mm
554,700 Pipa Dinding dengan Flange ganda dia ¢ 250 mm panjang 80 cm
663,500 Bend 90 º dengan flange ganda ¢ 250 mm
1,055,000 Bend 90 º dengan flange tunggal ¢ 250 mm
1,209,900 Pipa Dinding dengan Flange tunggal ¢ 150 mm panjang 100 cm
1,515,900 Pipa dengan Flange ganda ¢ 150 mm panjang 600 cm
2,728,600
154,000 1m2 Rubber Packing 124200
217,400 6 7.6 0.0182414692 3450
272,400 8 10.2 0.0324292787 6000
428,100 10 12.7 0.0506707479 9450
700,600 12 15.2 0.072965877 13650
1,012,100 14 17.8 0.0993146659 18450
1,245,600 20 25.4 0.2026829916 37800
1,479,200
2,179,900
8,500
13,900
20,900
29,900
35,900
44,200
50,100
59,000
113,700
135,000
1,182,700
1,043,500
904,400
290,000
173,900
191,200
281,300
306,600
334,200
364,300
333,400
397,700
486,100
574,400
618,800
588,100
701,300
752,000
825,100
924,100
1,039,800
1,053,800
1,072,100
1,092,800
1,146,500
1,209,600
1,243,700
1,260,500
1,423,300
1,565,700
1,723,600
1,895,900
1,395,200
1,467,400
1,651,000
1,865,600
3,622,300
2,900,000
3,050,000
3,400,000
4,600,000
7,882,800
28,947,500
25,724,200
21,859,700
18,580,700
13,935,500
10,451,500
7,838,600
4,305,200
1,722,100
516,600
154,800
54,500
63,000
42,300
11,500
9,400
78,700
27,200
8,600
4,584,100
10,800
101,100
65,800
26,600
7,800
10,200
9,000
10,900
11,500
7,000
13,200
30,900
42,400
18,100
72,000
3,000
10,200
545,700
579,700
592,900
6,700
1,850,000
6,800,000
8,800,000
9,550,000
1,350,000
1,100,000
550,000
110,000
2,150,000
12,000
2,961,668
8,800,000
2,150,000
1,350,000
1,850,000
310,000
125,000
2,521,200
1,583,120 - 354,200 354,200.0
927,200
647,000
3,452,800
627,800
627,800
2,221,200
1,357,680
651,200
651,200
929,900
2,138,900
305,900
2,328,900
2,500,000,000
19,000,000
2,500,000
8,750,000
15,500,000
135,000,000
242,000,000
21,000,000
9,550,000
38,500,000
18,500,000
850,000
18,500
153,000
13,000
14,000
19,000
20,000
19,000
3,500
918,000
1,275,000
1,785,000
200
300
57,500
123,000
6,450
5,650
15,100
2,800
500,000
1,800,000
150,000
50,000
576,581
2,000,000
350,000
1,500,000
5,100,000
5,100,000
5,100,000
5,100,000
2,445,000
8,000,000
326,000
5,000,000
1,000,000
507,789
179,174
35,307
42,900
231,171
2,395,481
5,032,755
44,974
74,938
11,963,344
3,850,000
190,000
147,454
105,391
71,968
29,360
44,690
97,204
714,444
714,444
6,545,531
676,325
391,122
1,630,392
28,046
26,108
96,000
19,838
30,854
220,768
180,000
129,382
38,985,000
42,472,500
22,655,000
29,766
1,812,390
3,599,750
1,510,325
3,410,314
9,841,278
109,926
109,926
237,028
251,983
177,771
177,771
407,788
209,814
118,278
466,836
466,836
610,620
285,451
19,027
469,711
43,711
308,550
8,228
40,112
222,018
222,018
11,860,456
10,169,294
2,060,497
1,230,251
1,230,251
918,224
37,787
59,036
285,451
779,130
300,939
911,889
12,239,150
5,622,090
444,929
444,929
59,036
59,036
19,027
370,486
43,711
2,697,797
593,671
755,163
7,000,000
278,518
177,771
531,596
37,787
37,787
4,319,700
1,230,251
869,700
151,190
37,787
1,447,100
1,233,706
1,301,382
59,036
131,607
319,802
755,163
493,680
17,485
237,121
13,371
8,074
16,456
550,762
367,175
48,957
29,374
452,951
278,518
177,771
531,596
37,787
37,787
4,319,700
1,230,251
869,700
151,190
37,787
1,447,100
1,233,706
1,301,382
59,036
131,607
319,802
755,163
17,485
21,599
237,121
13,371
8,074
16,456
159,829
21,599
17,485
48,957
29,374
48,957
29,374
452,951
10,119,178
50,911
37,758
641,888
619,233
264,307
264,307
271,859
792,621
140,390
719,950
1,928,836,800
39,494,400
16,456,000
98,736,000
32,912,000
32,912,000
8,228,000
49,368,000
453,024,000
16,044,600
755,163
755,163
755,163
37,746
37,746
37,746
22,627
226,476
67,965
37,746
22,627
226,476
67,965
755,163
10,490,700
20,570,000
98,736,000
46,076,800
23,038,400
541,571
391,122
2,136,723
32,768
260,400
255,000,000
278,518
177,771
531,596
37,787
37,787
4,319,700
1,230,251
869,700
151,190
1,233,706
1,301,382
71,995
131,607
319,802
755,163
370,260
265,817
493,680
17,485
21,599
86,089
237,121
13,371
8,074
16,456
71,995
1,596,849
40,461
37,725
146,006
29,374
248,815
550,762
611,958
367,175
367,175
45,309,753
7,551,625
755,163
755,163
37,746
37,746
37,746
22,627
22,627
226,476
67,965
120,000,000
158,812,500
75,000,000
4,000,000
4,000,000
6.00%
23.08%
1.8 0.018
4.0042211
7.4439321
9.6562627
g/c3
kg/cm3
2150000
2521200
1583120
927200
647000
3452800
627800
627800
2221200
1357680
651200
651200
929900
2138900
RENCANA ANGGARAN BIAYA
KEGIATAN : PENYEDIAAN SARANA AIR BERSIH DAN SANITASI DASAR TERUTAMA BAG
MISKIN
PEKERJAAN : PEMBUATAN DED JARINGAN DISTRIBUSI DAN BANGUNAN PELENGKAP SI
BERSIH AI NGELAR DESA KEREKEH KEC. UNTER
SUB PEKERJAAN : PEMBANGUNAN RESERVOIR KAPASITAS 200 m3 dan TANGKI BBM
LOKASI : KEC. UNTER IWES, KEC. SUMBAWA, KEC. LABUHAN BADAS
TAHUN ANGGARAN : 2020
KODE
NO. URAIAN PEKERJAAN SATUAN VOLUME
ANALISA
1 3 4 5
I. PEKERJAAN PERSIAPAN
1 Pengukuran, Penyiapan Lokasi dan Pemasangan Bowplank Ls 1.00
II PEMBANGUNAN RESERVOAR
A Pekerjaan Tanah
1 Galian Tanah Keras M³ 276.51 A.2.3.1.4.
2 Urugan Tanah
3 Urugan Pasir dibawah Lantai Kerja M³ 19.43 A.2.3.1.11
4 Membuang Tanah Sisa Galian M³ 166.00 A.2.3.1.8.
B Pekerjaan Beton
1 Beton tumbuk untuk lantai kerja, 1 : 3 : 5 tebal 5 Cm M³ 6.42 A.4.1.1.1
2 Plat lantai dasar tebal 30 cm
- Beton K.225 M³ 32.09 A.4.1.1.7
- Tulangan beton U.24, ø 16 Kg 3,377.25 A.4.2.1.1
- Bekisting 2 x Pakai M² 23.15 A.4.1.1.21
3 Dinding memanjang dan melintang tebal 25 cm
- Beton K.225 M³ 24.15 A.4.1.1.7
- Tulangan beton U.24, ø 16 & 12 mm Kg 2,547.39 A.4.2.1.1
- Bekisting 2 x Pakai M² 193.16 A.4.1.1.25
- Water Stop M 87.80
4 Dinding Penyekat tebal 20 cm
- Beton K.225 M³ 11.59 A.4.1.1.7
- Tulangan beton U.24, ø 16 & 12 mm M2 836.33 A.4.2.1.1
- Bekisting 2 x Pakai M2 58.80 A.4.1.1.25
5 Plat atas tebal 15 cm
- Beton K.175 M³ 15.33 A.4.1.1.5
- Tulangan beton U.24, ø 10-15 Kg 1,133.18 A.4.2.1.1
- Bekisting 2 x Pakai M² 135.29 A.4.1.1.24
6 Kolom beton, uk.25/25 cm = 25 Bh
- Beton K.175 M³ 2.06 A.4.1.1.5
- Tulangan beton U.24, ø 16 & 12 mm Kg 1,186.64 A.4.2.1.1
- Bekisting 2 x Pakai M² 33.00 A.4.1.1.22
7 Beton Sloof 25/40
- Beton K.175 M³ 7.45 A.4.1.1.5
- Tulangan beton U.24, ø 12 mm Kg 741.99 A.4.2.1.1
- Bekisting 2 x Pakai M² 65.85 A.4.1.1.21
8 Balok Atas 15/25
- Beton K.175 M³ 1.50 A.4.1.1.5
- Tulangan beton U.24, ø 12 mm Kg 602.46 A.4.2.1.1
- Bekisting 2 x Pakai M² 96.79 A.4.1.1.21
Jumlah RP.
Total RP.
33,488,883.02 33,488,883.02
84,915.60 23,480,012.56
276,325.50 5,369,004.47
27,951.00 4,639,866.00
463,208,128.54 463,208,128.54
1,186,897.47 7,619,881.76
1,368,109.27 43,902,626.47
20,102.50 67,891,168.13
106,696.70 2,470,028.61
1,368,109.27 33,039,838.87
20,102.50 51,208,907.48
202,841.10 39,180,786.88
98,670.00 8,663,226.00
1,368,109.27 15,856,386.44
20,102.50 16,812,323.83
202,841.10 11,927,056.68
1,304,429.28 19,996,900.86
20,102.50 22,779,750.95
244,091.10 33,023,084.92
1,304,429.28 2,687,124.32
20,102.50 23,854,430.60
189,091.10 6,240,006.30
1,304,429.28 9,717,998.14
20,102.50 14,915,853.98
106,696.70 7,025,977.70
1,304,429.28 1,956,643.92
20,102.50 12,110,952.15
106,696.70 10,327,173.59
17,990,000.00 17,990,000.00
160,000.00 640,000.00 1,516,000 Plat Bordes/lembar 1,22 x 2,44
850,000.00 2,550,000.00 155,000 Besi Siku 50.50.5 Berat 18,36 panjang 6 m
2,000,000.00 12,000,000.00 25,833 103,333 758,000.00
700,000.00 2,800,000.00 Pemb. Box Valve + Tutup Plat Baja + Kunci
91,964,874.11 91,964,874.11
1,210,160.00 2,420,320.00
1,254,220.00 2,508,440.00 Pipa Flange Las
1,386,400.00 2,772,800.00 WPAF 6" L=0 264360 945,800
440,600.00 1,762,400.00 WPAF 6" L=0 308420 945,800
623,900.00 14,973,600.00 WPAF 6" L=1 440600 945,800
536,456.31 1,072,912.62
575,900.00 3,455,400.00
472,900.00 1,891,600.00
924,100.00 1,848,200.00
460,100.00 1,840,400.00
554,700.00 554,700.00
35,900.00 502,600.00
44,200.00 176,800.00
12,000.00 864,000.00
426,576.82 426,576.82
1,210,160.00 7,260,960.00
1,254,220.00 2,508,440.00
1,386,400.00 5,545,600.00
440,600.00 10,574,400.00
623,900.00 7,486,800.00
536,467.64 1,072,935.29
3,249,840.00 6,499,680.00
575,900.00 2,303,600.00
472,900.00 1,891,600.00
924,100.00 1,848,200.00
618,800.00 1,237,600.00
460,100.00 1,840,400.00
554,700.00 554,700.00
35,900.00 1,364,200.00
44,200.00 221,000.00
12,000.00 2,064,000.00
620,009.38 620,009.38
530,581.89 530,581.89
63,813.75 198,333.14
276,325.50 245,377.04
27,951.00 86,871.71
29,285,815.65 29,285,815.65
1,171,770.27 520,266.00
1304429.28 3,574,136.23
20,102.50 1,542,062.78
213,393.40 1,751,959.81
36,223.00 297,390.83
21,600,000.00 21,600,000.00
35,206,827.17 35,206,827.17 0
- - 0
74,937.50 74,937.50 0
273,315.90 34,984,435.20 0
147,454.47 147,454.47 0
ar 1,22 x 2,44
5 Berat 18,36 panjang 6 m
861,333.33
+ Tutup Plat Baja + Kunci
1,210,160.00
1,254,220.00
1,386,400.00
#REF!
148.00 - -
- 0 -
29.60 0 -
0.00 0 -
148.00 0 -
PEKERJAAN TANAH
SALURAN PEMBUANG
Galian Tanah Saluran Pembuang 132.00 1.00
Urugan pasir 132.00 1.00
Pasangan Batu Kosong 132.00 1.00
Dimensi Saluran 132.00 0.50
Pasangan Batu Kali 132.00 1.00
Buangan Galian Tanah
RESERVOAR
Galian Tanah Keras Reservoar 13.95 9.20
1.50 1.50
Galian Tanah Keras Box Gate Valve 1.00 1.00
Galian Tanah untuk Pipa Penguras Dia. 150 53.80 0.60
Galian Tanah untuk Pipa Peluap Dia. 200 11.00 0.60
Urugan pasir 13.95 9.20
Lantai Kerja (Beton Tumbuk K225) 13.95 9.20
Urugan Tanah Reservoar 46.30 0.3
Urugan Tanah bekas galian Pipa
Galian Tanah
Membuang Tanah Sisa Galian
Pekerjaan Beton
Sloof 0,25 x 0,4 Panjang Lebar
Beton K.175 3 13.35
4 8.6
Jumlah Banyak
Kolom 0,25 x 0,25 Tinggi
Kolom As/Kolom
Beton K.225 15 2.20
Tulangan beton U.24, ø 12 15 8 3.30
Banyak Sr/
Tinggi
Kolom
Sengkang ø 8 - 20 15 2.20 11
Plat Bawah
Beton K.225 13.95 9.2
Tulangan beton U.24, ø 16
- Panjang ø 16 - 25 13.95 14.10
- Lebar ø 16 - 25 9.2 9.35
Plat Atas
Beton K175 13.55 8.8
Manhole 4 0.8
Tulangan beton U.24, ø 10 mm ø 10 - 25 13.05 13.20
Tulangan beton U.24, ø 10 mm ø 10 - 25 8.3 8.45
Bekisting 13.950
Bekisting 27.900
Bekisting
Memanjang 13.35
Melintang 8.6
Bekisting 2 2 5.2
1 2 3
6
R. Meter Induk
- Beton Tumbuk untuk Lantai Kerja t=5cm 1 0.25
- Pas. 1/2 bata 1 : 4 1 9.8
- Plesteran dinding bata 1 : 3 1 9.5
- Acian 1 9.5
- Pengecatan 1 10.5
PAGAR
Panjang 119
Jumlah Tiang
0.95 125.400 125.400 125.40
0.05 6.600 6.600 6.60
0.15 19.800 19.800 19.80
0.60 39.600 39.600 39.60
0.15 19.800 19.800 59.40
39.60
1,04)*2/0,15)
-
-
-
-
RENCANA ANGGARAN BIAYA
KEGIATAN :
PENYEDIAAN SARANA AIR BERSIH DAN SANITASI DASAR TERUTAMA BAGI MASYARAKAT
PEKERJAAN : PEMBUATAN DED JARINGAN DISTRIBUSI DAN BANGUNAN PELENGKAP SISTEM SARANA
DESA KEREKEH KEC. UNTER
SUB PEKERJAAN PEMBANGUNAN RUMAH GENSET
LOKASI : KEC. UNTER IWES, KEC. SUMBAWA, KEC. LABUHAN BADAS
TAHUN ANGGARAN : 2017
1 2 3 4
I. PEKERJAAN PERSIAPAN
1 Pembersihan Lokasi, Penimbunan & Perataan Tanah Ls 1.00
2 Pengukuran dan pematokan Ls 1.00
Ju
BIAYA
5 6 7
2,000,000.00 2,000,000.00
1,000,000.00 1,000,000.00
1,000,000.00 1,000,000.00
17,495,730.12 17,495,730.12
A.2.3.1.1. 63,813.75 9,625,027.91
A.2.3.1.9. 46,777.50 3,001,846.89
A.2.3.1.11 276,325.50 4,868,855.31
372,488,543.65 372,488,543.65
A.4.1.1.4 1,171,770.27 11,062,097.23
208,929,492.68 208,929,492.68
A.3.2.1.9 470,933.10 4,874,157.59
A.3.2.1.2 830,303.10 36,583,154.59
A.4.4.1.1 254,270.50 50,218,423.75
A.4.4.2.3 66,500.59 24,182,926.25
A.4.4.2.27 36,223.00 19,552,476.11
A.4.4.3.35 253,401.50 59,032,413.44
A.4.4.3.35 253,401.50 5,430,394.15
A.4.7.1.5 55,953.70 9,055,546.81
58,388,129.38 58,388,129.38
@ 97,204.22 2,056,841.30
@ 676,325.00 7,015,045.80
@ 391,122.31 11,588,954.05
@ 2,136,722.82 29,230,368.18
@ 220,767.65 3,973,817.70
@ 180,000.00 720,000.00
@ 129,381.99 517,527.96
@ 32,768.00 681,574.40
@ 260,400.00 2,604,000.00
949,016,435.86 949,016,435.86
@ 255,000,000.00 255,000,000.00
@ 278,517.80 278,517.80
@ 177,771.08 177,771.08
@ 531,595.65 531,595.65
@ 37,787.09 113,361.27
@ 37,787.09 151,148.36
@ 4,319,700.00 4,319,700.00
@ 1,230,250.56 1,230,250.56
@ 869,699.60 869,699.60
@ 151,189.50 2,267,842.50
@ 1,233,706.32 1,233,706.32
@ 1,301,381.62 1,301,381.62
@ 71,995.00 215,985.00
@ 131,606.86 394,820.58
@ 319,801.79 319,801.79
@ 755,162.55 755,162.55
@ 370,260.00 2,962,080.00
@ 265,817.21 265,817.21
@ 493,680.00 1,974,720.00
@ 17,484.50 69,938.00
@ 21,598.50 43,197.00
@ 86,088.54 516,531.24
@ 13,370.50 2,139,280.00
@ 8,073.73 1,130,322.20
@ 16,456.00 32,912.00
@ 71,995.00 2,159,850.00
@ 1,596,849.10 11,177,943.70
@ 40,461.19 24,762,248.28
@ 37,725.38 6,149,236.94
@ 146,005.86 1,460,058.60
@ 29,373.96 293,739.60
@ 248,814.72 2,488,147.20
@ 550,761.75 7,159,902.75
@ 611,957.50 18,358,725.00
@ 367,174.50 4,406,094.00
@ 367,174.50 2,203,047.00
@ 45,309,752.93 45,309,752.93
@ 7,551,625.49 7,551,625.49
@ 755,162.55 755,162.55
@ 755,162.55 755,162.55
@ 37,745.95 301,967.60
@ 37,745.95 37,745.95
@ 37,745.95 150,983.80
@ 22,627.00 45,254.00
@ 22,627.00 45,254.00
@ 226,475.70 452,951.40
@ 67,964.63 883,540.19
@ 120,000,000.00 120,000,000.00
@ 158,812,500.00 158,812,500.00
@ 75,000,000.00 75,000,000.00
@ 4,000,000.00 120,000,000.00
@ 4,000,000.00 60,000,000.00
KEGIATAN : PENYEDIAAN SARANA AIR BERSIH DAN SANITASI DASAR TERUTAMA BAG
MISKIN
PEKERJAAN : PEMBUATAN DED JARINGAN DISTRIBUSI DAN BANGUNAN PELENGKAP SI
AIR BERSIH AI NGELAR DESA KEREKEH KEC. UNTER
SUB PEKERJAAN : PEMBANGUNAN RUMAH POMPA DAN METER INDUK
LOKASI : KEC. UNTER IWES, KEC. SUMBAWA, KEC. LABUHAN BADAS
TAHUN ANGGARAN : 2020
KODE
NO. URAIAN PEKERJAAN SATUAN VOLUME
ANALISA
1 3 4 5
I. PEKERJAAN PERSIAPAN
1 Pengukuran, Penyiapan Lokasi dan Pemasangan Bowplank Ls 1.00
A Pekerjaan Beton
1 Beton tumbuk untuk lantai kerja, 1 : 3 : 5 tebal 5 Cm M³ 2.88 A.4.1.1.1
2 Beton Sloof 25/40
- Beton K.175 M³ 1.65 A.4.1.1.5
- Tulangan beton U.24, ø 12 mm Kg 193.69 A.4.2.1.1
- Bekisting 2 x pakai M² 8.25 A.4.1.1.21
3 Kolom beton, uk.25/15 cm dan 15/15 cm = 8 Bh
- Beton K.175 M³ 0.75 A.4.1.1.5
- Tulangan beton U.24, ø 16 & 12 mm Kg 113.99 A.4.2.1.1
- Bekisting 2 x pakai M² 17.64 A.4.1.1.22
4 Balok Atas 40/20 dan 30/20
- Beton K.175 M³ 1.74 A.4.1.1.5
- Tulangan beton U.24, ø 12 mm Kg 375.06 A.4.2.1.1
- Bekisting 2 x pakai M² 8.72 A.4.1.1.22
5 Plat Lantai Atas 12 cm
- Beton K.175 M³ 7.04 A.4.1.1.5
- Tulangan beton U.24, ø 10-15 Kg 1,356.36 A.4.2.1.1
- Bekisting 2 x pakai M² 62.16 A.4.1.1.22
D Pekerjaan Pengecetan
1 Pengecetan Tembok M² 41.90 A.4.7.1.10
2 Pengecetan Kayu M² 3.20 A.4.7.1.4
3 Pengecetan Besi M² 5.10 A.4.7.1.5
Jumlah
Total
A
BUHAN BADAS
44,796,503.83 44,796,503.83
84,915.60 2,911,755.92
276,325.50 1,508,737.23
220,742.50 40,376,010.68
79,922,633.46 79,922,633.46
1,186,897.47 3,418,264.71
1,304,429.28 2,152,308.31
20,102.50 3,893,653.23
106,696.70 880,247.78
1,304,429.28 978,321.96
20,102.50 2,291,483.98
189,091.10 3,335,567.00
1,304,429.28 2,269,706.95
20,102.50 7,539,643.65
176,757.35 1,541,324.09
1,304,429.28 9,183,182.13
20,102.50 27,266,226.90
244,091.10 15,172,702.78
28,256,189.72 28,256,189.72
1,230,345.82 3,617,216.71
243,446.50 5,528,670.02
831,675.90 7,784,486.42
61,125.90 2,561,466.29
36,223.00 1,738,704.00
253,401.50 10,642,863.00
12,609,305.63 12,609,305.63
6,545,530.90 2,356,391.12
6,545,530.90 392,731.85
714,444.06 392,944.23
676,325.00 933,666.66
391,122.31 2,307,621.63
1,630,392.09 4,239,019.43
220,767.65 662,302.95
96,000.00 192,000.00
220,767.65 662,302.95
165,000.00 330,000.00
187,000.00 140,324.80
2,248,893.15 2,248,893.15
42,628.91 1,786,354.11
55,285.73 177,091.23
55,953.70 285,447.80
1,492,569.66 1,492,569.66
63,813.75 415,369.31
276,325.50 190,200.37
220,105.68 663,681.74
63,918.42 223,318.24
6,180,318.72 6,180,318.72
1,171,770.27 154,603.37
1304429.28 860,547.65
20,102.50 2,357,112.20
106,696.70 1,171,785.84
132,117.50 1,284,182.10
36,223.00 352,087.56
63,068,617.79 63,068,617.79
18,580,700.00 18,580,700.00 Pipa
7,920,000.00 7,920,000.00 PF 6" L=0,4 176240
4,395,000.00 13,185,000.00 PF 6" L=0,4 198270
222,766.54 1,113,832.71
1,690,166.54 3,380,333.08 PF 6" L=1,7 749020
1,466,304.00 2,932,608.00
805,404.00 1,610,808.00
778,968.00 1,557,936.00
346,100.00 1,038,300.00
623,900.00 1,871,700.00
575,900.00 3,455,400.00
861,000.00 2,583,000.00
8,600.00 2,064,000.00
850,000.00 1,700,000.00 850,000 1,1x0,9 dan 0,7x0,7
75,000.00 75,000.00
235,400.00 470,800.00
Jumlah 240,575,031.97
PPN 10% 24,057,503.20
Total 264,632,535.16
Flange Las
472,900 778,968.00
472,900 805,404.00
472,900 1,466,304.00
Galian Tanah
6.96 9.26 1.86 16.22
Urugan Tanah 12.8928 1.54 1.94 4.48 2.24
Urugan Pasir
Urugan Pasir Pondasi 7.00 0.70 0.10 0.49
Urugan Pasir Pondasi 5.00 0.70 0.10 0.35
Urugan Pasir Pondasi 6.00 0.70 0.10 0.42
Urugan Pasir Lantai 7.00 6.00 0.10 4.20
Lantai Kerja 0.07 41.10 2.877
Pondasi 8.40 0.96
Urugan Tanah
Pembesian
Panjang/ Jumlah
Sloof 20 x 25 Panjang Panjang
sengkang sengkang
Tulangan Utama 4 ø 12 14.15 97.20 97.20
Tulangan Utama 4 ø 12 33.20 33.20
Sengkang ø 8 - 15 0.8 24.00 161 128.80
Sengkang ø 8 - 15 0.8 9.00 61 48.80
Angkur ø 8 - 500 0.4 24.00 49 19.60
Bekisting 20 x 25 24.00
Bekisting 20 x 25 9.00
Kolom 25 x 15
Tulangan Utama 4 ø 12 4 4 64
Sengkang ø 8 - 15 0.7 4 3.15 88 61.60
Kolom 15 x 15
Tulangan Utama 4 ø 8 4 4 64
Sengkang ø 6 - 20 0.5 4 3.15 68 34.00
Pembesian
Beton 25 x 15 12.6
Beton 15 x 15 12.6
Bekisting 25 x 15 4
Bekisting 15 x 15 4
Panjang/ Jumlah
Ring Balok 20 x 40 Panjang Panjang
sengkang sengkang
Tulangan Utama 4 ø 12 100.00 100.00
Sengkang ø 8 - 15 1.1 24.00 160 176.00
Ring Balok 20 x 30
Tulangan Utama 4 ø 12 148.00 148.00
Sengkang ø 8 - 15 0.9 36.00 240 216.00
Beton 6.00
Beton 21.00
Bekisting 20 x 40 11.6
Bekisting 20 x 30 13.6
Jumlah
Plat Atap Panjang
Jalur
Panjang Bagian Atas ø 12 - 15 8.3 57 473.1
Panjang Bagian Bawah ø 12 - 15 8.48 58 491.84
Lebar Bagian Atas 6.3 43 270.9
Lebar Bagian Bawah 6.48 45 291.6
Beton Plat
Beton Plapon
Bekisting
Pekerjaan Pasangan
Pasangan Bata 11.4 3.15 35.91 22.71 m2
Boupenlig 3 2.6 0.6 4.68
Boupenlig 4 1.75 0.6 4.20
Pintu 1 2.7 1.6 4.32
13.20
Plesteran 48.00 m2
Trasram 1:3 24 6.10 m2
Plestera n 1 :4 41.90 m2
Acian 48.00 m2
Rabat Beton t=7cm 2.94 m2
Pas. Keramik 30x30 42.00 m2
5.46
2.88
9.36
17.70
-182.91 182.91
2.88
2.6 m2
m2
1.508E-05 0.115 kg
btg 0.12 m3
btg 0.06 m3 0.088 3.08
btg 0.02 m3
3.2
btg 0.12 m3
btg 0.06 m3
btg 0.04 m3
2.4
0.36
0.06 5.6 0.01232
1 buah
6 psg
0.0010053 7.691 kg
REKAPITULASI
ANALISA HARGA SATUAN PEKERJAAN
PEKERJAAN : PEMBUATAN DED JARINGAN DISTRIBUSI DAN BANGUNAN PELENGKAP SISTEM SARANA AIR BE
I PEKERJAAN PERSIAPAN
1 A.2.2.1.4 1 m' Pengukuran dan Pemasangan Bouwplank A
1 A.2.2.1.9 1 m2 Pembersihan dan Perataan A
II PEKERJAAN TANAH PEKERJAAN TA
1 A.2.3.1.1. 1 m3 Galian Tanah Biasa A
2 A.2.3.1.4. 1 m3 Galian Tanah Keras A
3 A.2.3.1.7. 1 m3 Galian Tanah Berbatu A
4 A.2.3.1.6. 1 m3 Galian Tanah Lumpur A
5 A.2.3.1.5. 1 m3 Galian Tanah Cadas A
6 A.2.3.1.8. 1 m3 membuang tanah sisa galian A
6 A.2.3.1.8a 1 m3 membuang tanah sisa galian jarak s/d 3 km A
6 A.2.3.1.9. 1 m3 Urugan kembali galian tanah A
8 A.2.3.1.16. 1 m3 Urugan Tanah Lempung A
9 A.2.3.1.11 1 m3 Urugan Pasir Urug A
10 A.2.3.1.17. 1 m3 Pemadatan tanah,perataan dan perapihan A
11 A.2.3.1.13. Pemasangan 1 m2 Lapisan Ijuk Tebal 10 cm A
12 A.2.3.1.14. Pengurugan 1 m3 Sirtu Padat A
III PEKERJAAN PONDASI
1 A.21 1 m2 Penanaman Gebalan Rumput A
2 A.3.2.1.1 Pemasangan 1 m3 Pondasi batu Belah Campuran 1PC : 3PS A
3 A.3.2.1.2 Pemasangan 1 m3 Pondasi batu Belah Campuran 1PC : 4PS A
4 A.3.2.1.3 Pemasangan 1 m3 Pondasi batu Belah Campuran 1PC : 5PS A
5 A.3.2.1.9 1 m3 Pasangan Batu Kosong A
6 G.5.b 1 m3 Pas. Batu Bronjong Kwt. galvanis 3 mm G
7 G.32 1 m3 Bongkaran Pasangan Batu Kali/Beton G
IV PEKERJAAN DINDING P
1 A.4.4.1.5 1 m2 Pas. Bata 1 PC : 6 PS - 1 Bata A
2 A.4.4.1.4 1 m2 Pas. Bata 1 PP : 5 PS - 1 Bata A
3 A.4.4.1.3 1 m2 Pas. Bata 1 PC : 4 PS - 1 Bata A
4 A.4.4.1.2 1 m2 Pas. Bata 1 PC : 3 PS - 1 Bata A
5 A.4.4.1.1 1 m2 Pas. Bata 1 PC : 2 PS - 1 Bata A
6 A.4.4.1.9 1 m2 Pas. Bata 1 PC : 4 PS - 1/2 Bata A
7 A.4.4.1.10 1 m2 Pas. Bata 1 PC : 3 PS - 1/2 Bata A
8 A.4.4.1.7 1 m2 Pas. Bata 1 PC : 2 PS - 1/2 Bata A
9 A.4.4.1.24 Memasang Paving Block A
10 A.4.4.1.24a Memasang Paving Block (akibat bongkaran galian pipa 40% bahan diganti) A
V PEKERJAAN PLESTERAN PEKERJAAN PL
1 A.4.4.2.2 1 m2 Plesteran 1 PC : 2 PS ( 1,50 cm ) A
2 A.4.4.2.3 1 m2 Plesteran 1 PC : 3 PS ( 1,50 cm ) A
3 A.4.4.2.4 1 m2 Plesteran 1 PC : 4 PS ( 1,50 cm ) A
4 A.4.4.2.5 1 m2 Plesteran 1 PC : 5 PS ( 1,50 cm ) A
5 G.51.c 1 m2 Siaran 1 PC : 2 PS G
6 A.4.4.2.27 1 M2 Acian
VI PEKERJAAN LANTAI PEKERJAAN LA
1 A.4.4.3.65 1 m2 Pasang Lantai Keramik 10x20 cm A
2 A.4.4.3.64 1 m2 Pasang Lantai Keramik 20x20 cm A
3 A.4.4.3.63 1 m2 Pasangan Keramik Dinding 20 x 25 cm A
4 A.4.4.3.35 1 m2 Pasangan Lantai Keramik 30 x 30 cm A
VII PEKERJAAN BESI PEKERJAAN BE
1 A.4.2.1.1 Pemasangan 1 Kg besi tulangan A
2 A.4.2.1.2 Pemasangan 1 Kg besi profil baja IWF A
3 A.4.2.1.3 Perakitan 1 Kg besi profil A
4 A.4.2.1.4 Pemasangan 1m Pagar BRC 190 cm A
5 Err:509 Err:509 ###
6 M.07.6.3 1 Kg Perakitan dan Eriction M
VIII PEKERJAAN BETON
1 A.4.1.1.1 1 m3 Beton Mutu f'c = 7,4 Mpa (K100), Slump (12 ± 2) cm, w/c + 0,87 A
2 A.4.1.1.2 1 m3 Beton Mutu f'c = 9,8 Mpa (K125), Slump (12 ± 2) cm,w/c + 0,78 A
3 A.4.1.1.3a 1 m3 Beton lantai Ready Mix K-225 + Besi Beton + Bekisting Expose + Stoot A
8 A.4.6.1.8. Pembuatan 1 m2 daun pintu plywood rangkap, rangka kayu kelas II tertutup A
9 A.4.6.1.9. Pembuatan dan pemasangan 1 m2 daun pintu panel, kayu kelas I atau II A
10 A.4.6.1.10. Pemasangan 1 m2 jalusi kusen, kayu kelas I atau II A
Pemasangan 1 m3 konstruksi kuda-kuda konvensional, kayu kelas I, II dan
11 A.4.6.1.13. A
III bentang 6 meter
12 A.4.6.1.15. Pemasangan 1 m3 konstruksi gordeng, kayu kelas II A
Pemasangan 1 m2 Plafon termasuk rangka (60 x 60) cm, kayu kelas II
13 A.4.6.1.20. A
atau III
14 A.4.6.1.21. Pemasangan 1 m’ Lisplank ukuran (3 x 20) cm, kayu kelas I atau kelas II A
X PEKERJAAN PENGECATAN PEKERJAAN PE
1 A.4.7.1.10 1 m2 Pek. Cat Tembok (1 lapis plamuur, 1 lapis cat dasar 2 lapis cat penutup) A
2 A.4.7.1.4 1 m2 Pek. Cat Kayu (1 lapis plamir, 1 lapis cat dasar 2 lapis cat penutup) A
3 A.4.7.1.5 1 m2 Pek. Cat Waterproof A
4 A.4.7.1.16 1 m2 Pengecatan permukaan baja dg. Meni besi A
5 A.4.7.1.20 1 m2 Pengecatan permukaan baja galvanis secara manual sistem 3 lapis A
6 PEKERJAAN PIPA #N/A P
XI PEKERJAAN PENGECATAN
1 m2 Pek. Cat Tembok (1 lapis plamuur, 1 lapis cat dasar 2 lapis cat
1 A.4.7.1.10 A
penutup)
2 A.4.7.1.4 1 m2 Pek. Cat Kayu (1 lapis plamir, 1 lapis cat dasar 2 lapis cat penutup) A
2 A.4.7.1.5 1 m2 Pek. Cat Waterproof A
3 A.4.7.1.16 1 m2 Pengecatan permukaan baja dg. Meni besi A
4 A.4.7.1.20 1 m2 Pengecatan permukaan baja galvanis secara manual sistem 3 lapis A
XII PEKERJAAN PIPA
1 Sp.1 1 M' Uitzet Pipa/Pematokan S
2 A.4.1.5 1 cm Pengelasan dengan las listrik A
3 A.4.1.48 1 M' Pemasangan Water stop 3/250 mm A
4 A.4.1.49a 1 M' Pemasangan Pipa GI Ø 16" A
5 A.4.1.49 1 M' Pemasangan Pipa GI Ø 14" A
6 A.4.1.39 1 M' Pemasangan Pipa GI Ø 12" A
7 A.4.1.38 1 M' Pemasangan Pipa GI Ø 10" A
8 A.4.1.37 1 M' Pemasangan Pipa GI Ø 8" A
9 A.4.1.36 1 M' Pemasangan Pipa GI Ø 6" A
10 A.4.1.34 1 M' Pemasangan Pipa GI Ø 4" A
11 A.4.1.50 1 M' Pemasangan Pipa GI Ø 3" A
12 A.4.1.51 1 M' Pemasangan Pipa GI Ø 2" A
13 A.4.1.52 1 M' Pemasangan Pipa GI Ø 3/4" A
14 A.4.1.53 1 M' Pemasangan Pipa GI Ø 1/2" A
15 A.8.4.1.26 1 M' Pemasangan Pipa HDPE Ø 20" A
16 A.8.4.1.25 1 M' Pemasangan Pipa HDPE Ø 18" A
17 A.8.4.1.24 1 M' Pemasangan Pipa HDPE Ø 16" A
18 A.8.4.1.23.1 1 M' Pemasangan Pipa HDPE Ø 14" A
19 A.8.4.1.23 1 M' Pemasangan Pipa HDPE Ø 12" A
20 A.8.4.1.22 1 M' Pemasangan Pipa HDPE Ø 10" A
21 A.8.4.1.21 1 M' Pemasangan Pipa HDPE Ø 8" A
22 A.8.4.1.20 1 M' Pemasangan Pipa HDPE Ø 6" A
23 A.8.4.1.18 1 M' Pemasangan Pipa HDPE Ø 4" A
24 A.8.4.1.17 1 M' Pemasangan Pipa HDPE Ø 3" A
25 A.8.4.1.16 1 M' Pemasangan Pipa HDPE Ø 2" A
26 A.8.4.1.15 1 M' Pemasangan Pipa HDPE Ø 1 1/2" A
27 A.8.4.1.14 1 M' Pemasangan Pipa HDPE Ø 1" A
28 A.8.4.1.14.a 1 m' Pemasangan pipa PVC Dia ( 1" )" A
29 A.8.4.1.14.b 1 m' Pemasangan pipa PVC Dia ( 1.5" )" A
30 A.8.4.1.14.c 1 m' Pemasangan pipa PVC Dia ( 2" )" A
31 A.8.4.1.14.d 1 m' Pemasangan pipa PVC Dia ( 3" )" A
32 A.8.4.1.14.e 1 m' Pemasangan pipa PVC Dia ( 4" )" A
33 A.8.4.1.14.f 1 m' Pemasangan pipa PVC Dia ( 6" )" A
34 A.8.4.1.14.g 1 m' Pemasangan pipa PVC Dia ( 8" )" A
35 A.8.4.1.14.h 1 m' Pengetesan pipa PVC Dia ( 6" )" A
36 A.8.4.1.14.i 1 m' Pengetesan pipa PVC Dia ( 4" )" A
37 A.8.4.1.14.j 1 m' Pengetesan pipa PVC Dia ( 3" )" A
38 A.8.4.1.14.k 1 m' Pengetesan pipa PVC Dia ( 2" )" A
39 A.8.4.1.14.l 1m' Pengetesan pipa PVC Dia ( 1" )" A
40 A.8.4.3.1 Pemasangan 1 Buah Valve Ø 6" A
41 A.8.4.3.2 Pemasangan 1 Buah Valve Ø 8" A
42 A.8.4.3.3 Pemasangan 1 Buah Valve Ø 10" A
43 A.8.4.3.4 Pemasangan 1 Buah Valve Ø 12" A
44 A.8.4.3.5 Pemasangan 1 Buah Valve Ø 14" A
45 A.8.4.3.6 Pemasangan 1 Buah Valve Ø 16" A
46 A.8.4.5.8 1 M' Pengetesan pipa Ø 16" A
47 A.8.4.5.7 1 M' Pengetesan pipa Ø 12" A
48 A.8.4.5.6 1 M' Pengetesan pipa Ø 10" A
49 A.8.4.5.5 1 M' Pengetesan pipa Ø 8" A
50 A.8.4.5.4 1 M' Pengetesan pipa Ø 6" A
51 A.8.4.5.3 1 M' Pengetesan pipa Ø 4" A
52 A.8.4.5.2 1 M' Pengetesan pipa Ø 3" A
53 A.8.4.5.1 1 M' Pengetesan pipa Ø 2" A
54 M.07.6.3 1 Kg Perakitan dan Eriction M
XIII PEKERJAAN BINA MARGA
1 3.1 (1) 1 M3 Galian Biasa 3
2 3.1 (2) 1 M3 Galian Batu 3
3 3.1 (3) 1 M3 Galian Struktur dengan Kedalaman 0 - 2 M 3
4 3.1 (4) 1 M3 Galian Struktur dengan Kedalaman 2 - 4 M 3
5 3.1.(7) 1 M3 Galian Perkerasan Beraspal dengan Cold Milling Machine 3
6 3.1.(8) 1 M3 Galian Perkerasan Beraspal tanpa Cold Milling Machine 3
7 3.1 (9) 1 M3/Km Angkut bahan galian buangan dengan jarak melebihi 5 Km. 3
8 3.2 (1) 1 M3 Timbunan Biasa dari selain Sumber Galian 3
9 3.2 (2) 1 M3 Timbunan Pilihan 3
10 3.3 1 M2 Penyiapan Badan Jalan 3
11 5.1 (1) 1 M3 Lps. Pond. Agg. Kls. A 5
11 5.1 (2) 1 M3 Lps Pond Agg Kls B 5
12 5.1 (2)a 1 M3 Lapis Pond. Agg. Kls. B dari Bahan Yang Disimpan 5
13 5.2 (1) 1 M3 Lapis Pondasi Agregat Kelas C 5
14 6.1 (1) 1 Liter Lapis Resap Pengikat 6
15 6.1 (2) 1 Liter Lapis Perekat 6
16 6.3 (3) 1 M2 Lataston Lapis Aus (HRS-WC) 6
17 6.3 (3a) 1 Ton Lataston Lapis Aus Perata (HRS-WCL) 6
18 6.3 (4) 1 M3 Lataston Lapis Pondasi (HRS-Base) 6
19 6.3 (4a) 1 Ton Lataston Lapis Pondasi Perata (HRS-Base L) 6
20 6.3 (5a) 1 M2 Laston Lapis Aus (AC-WC) 6
XIV PEKERJAAN LAIN-LAIN PEKERJAAN LA
1 PGR-1 Pemasangan 1 m2 Pagar BRC P
1 CR.06 1 M' Crossing Jalan (Boring) C
2 Ls Administrasi Proyek L
3 Ls Asbuilt Drawing L
4 Ls Dokumentasi L
5 Sp.9 1 Unit Manhole lengkap ukuran 0,60 x 0,60 S
BAGI MASYARAKAT MISKIN
HARGA
SATUAN
(Rp)
90,378.75
14,437.50
PEKERJAAN TANAH
63,813.75
84,915.60
123,180.75
102,737.25
128,898.00
27,951.00
63,918.42
46,777.50
193,165.50
276,325.50
220,742.50
190,913.25
157,525.50
-
41,904.50
831,675.90
830,303.10
834,377.50
470,933.10
1,075,800.00
135,019.50
-
235,658.50
237,770.50
243,446.50
254,270.50
254,270.50
132,117.50
149,720.45
157,781.25
131,081.50
104,902.60
PEKERJAAN PLESTERAN
67,250.70
66,500.59
61,125.90
59,707.34
24,389.75
36,223.00
PEKERJAAN LANTAI
273,315.90
255,663.10
246,229.50
253,401.50
PEKERJAAN BESI
20,102.50
32,194.25
734.10
356,080.78
Err:509
5,031.15
1,186,897.47
1,230,345.82
4,983,426.55
6,408,439.15
6,068,357.10
1,171,770.27
400000 250,000.00 650,000.00
1,304,429.28
1,368,109.27
1,386,709.83
1,419,723.91
1,429,758.88
7,284,288.55
7,476,180.47
1,578,559.68
112,612.50
32,695.85
213,393.40
213,393.40
378,182.20
353,514.70
488,182.20
405,682.20
488,182.20
97,920.79
116,283.64
PEKERJAAN ATAP DAN KAYU
62,595.50
131,492.90
97,847.75
6,988,630.00
870,169.85
398,569.05
712,787.00
585,744.00
635,407.00
351,798.00
6,687,560.00
3,933,587.00
63,531.00
66,755.00
PEKERJAAN PENGECATAN
42,628.91
55,285.73
55,953.70
31,761.13
164,562.20
-
-
42,628.91
55,285.73
55,953.70
31,761.13
164,562.20
1,020.88
3,469.84
320,894.75
1,417,731.35
1,417,731.35
1,240,518.18
1,039,380.01
834,574.98
568,602.81
286,056.94
220,105.68
152,281.95
87,888.46
77,213.82
2,999,481.21
2,435,715.15
1,920,598.02
1,512,707.19
1,177,156.75
1,160,391.87
474,628.44
308,709.94
154,065.89
107,763.87
60,452.87
43,331.37
32,259.87
8,019.92
10,771.48
16,110.99
20,198.28
22,012.62
24,781.68
31,456.09
811.66
809.33
606.64
404.87
239.41
222,767
270,267
270,267
312,857
536,456
536,468
1,776.95
1,619.40
1,541.71
1,464.81
1,388.90
1,313.59
1,276.13
1,239.07
5,031.15
57,247.55
339,577.02
115,824.35
241,744.02
152,003.47
160,433.01
11,203.21
36,402.53
281,717.04
1,535.73
449,652.29
440,442.79
49,825.60
443,305.83
20,143.84
21,904.62
155,056.96
2,230,181.51
4,341,790.30
1,917,946.30
164,859.64
PEKERJAAN LAIN-LAIN
366,603.00
194,078.50
3,500,000.00
2,000,000.00
1,000,000.00
856,445.32
RENCANA ANGGARAN BIAYA
KEGIATAN : PENYEDIAAN SARANA AIR BERSIH DAN SANITASI DASAR TERUTAMA BAG
MISKIN
PEKERJAAN : PEMBUATAN DED JARINGAN DISTRIBUSI DAN BANGUNAN PELENGKAP SI
BERSIH AI NGELAR DESA KEREKEH KEC. UNTER
SUB PEKERJAAN : PEMBANGUNAN RUMAH JAGA
LOKASI : KEC. UNTER IWES, KEC. SUMBAWA, KEC. LABUHAN BADAS
TAHUN ANGGARAN : 2020
KODE
NO. URAIAN PEKERJAAN SATUAN VOLUME
ANALISA
1 3 4 5
I. PEKERJAAN PERSIAPAN
1 Pengukuran, Penyiapan Lokasi dan Pemasangan Bowplank Ls 1.00
VI PEKERJAAN KAYU
1 Kusen Pintu dan Jendela M³ 0.14 A.4.6.1.2.
2 Daun Pintu Plywood Rangkap M² 7.60 A.4.6.1.3.
3 Rangka Plafon Kaso 5/7 M² 49.47 A.4.6.1.4.
4 Plafon Triplek 120 x 240 x 3 mm M² 49.47 A.4.6.1.5.
5 Lisplang 20mm x 2mm M² 1.60 A.4.6.1.8.
6 Kuda-kuda M³ 0.46 A.4.6.1.9.
7 Gordeng M³ 0.44 A.4.6.1.10.
8 Atap Asbes M² 67.21 A.4.6.1.13.
9 Nok/Bubungan Bh 8.00 A.4.6.1.15.
VI PEKERJAAN KAYU
10 Engsel Pintu pasang 5.00 @
11 Engsel Jendela pasang 1.00 @
12 Kunci Pintu pasang 2.00 @
13 Pemasangan Kaca 3mm M² 1.52 @
Jumlah
Total
A
HAN BADAS
4,894,783.44 4,894,783.44
84,915.60 2,057,504.99
276,325.50 315,011.07
220,742.50 2,112,505.73
27,951.00 409,761.66
31,920,633.44 31,920,633.44
1,186,897.47 1,353,063.12
1,304,429.28 5,830,798.88
20,102.50 2,065,773.11
106,696.70 2,850,935.82
1,304,429.28 1,317,473.57
20,102.50 2,130,663.98
189,091.10 5,105,459.70
1,304,429.28 5,830,798.88
20,102.50 2,065,773.11
176,757.35 4,722,956.39
71,485,555.47 71,485,555.47
470,933.10 2,156,873.60
831,675.90 6,528,655.82
243,446.50 24,588,096.50
61,125.90 12,347,431.80
36,223.00 7,317,046.00
253,401.50 8,488,950.25
255,663.10 639,157.75
42,628.91 8,611,038.81
55,285.73 808,304.94
25,296,987.19 25,296,987.19
6,988,630.00 1,006,362.72
585,744.00 4,451,654.40
112,630.00 5,571,806.10
52,802.00 2,612,114.94
235,177.00 376,283.20
6,200,810.00 2,857,333.25
7,380,425.00 3,247,387.00
57,998.00 3,898,045.58
44,000.00 352,000.00
60,000.00 300,000.00
36,000.00 36,000.00
180,000.00 360,000.00
150,000.00 228,000.00
4,089,900.00 4,089,900.00
235,400.00 1,883,200.00
1,500,000.00 1,500,000.00
200,000.00 200,000.00
466,700.00 466,700.00
6,601,100.00 40,000.00
Jumlah 139,687,859.53
PPN 10% 13,968,785.95
Total 153,656,645.49
RENCANA ANGGARAN BIAYA
KEGIATAN : PENYEDIAAN SARANA AIR BERSIH DAN SANITASI DASAR TERUTAMA BAG
MISKIN
PEKERJAAN : PEMBUATAN DED JARINGAN DISTRIBUSI DAN BANGUNAN PELENGKAP SI
BERSIH AI NGELAR DESA KEREKEH KEC. UNTER
SUB PEKERJAAN PEMBANGUNAN GASEBO/MUSHOLA
LOKASI : KEC. UNTER IWES, KEC. SUMBAWA, KEC. LABUHAN BADAS
TAHUN ANGGARAN : 2020
KODE
NO. URAIAN PEKERJAAN SATUAN VOLUME
ANALISA
1 3 4 5
I. PEKERJAAN PERSIAPAN
1 Pengukuran, Penyiapan Lokasi dan Pemasangan Bowplank Ls 1.00
VI PEKERJAAN LAINNYA
- Pagar Railing Balkon Stainless Minimalis SRSM110 M' 13.80 @
- Titik Lampu Titik 1.00 @
JUMLAH
TOTAL
A
BUHAN BADAS
521,079.24 521,079.24
84,915.60 152,848.08
276,325.50 353,696.64
27,951.00 14,534.52
33,120,508.92 33,120,508.92
1,304,429.28 626,126.05
20,102.50 807,517.43
213,393.40 1,365,717.76
1,304,429.28 352,195.91 15 3
20,102.50 2,044,625.28 15 3
378,182.20 6,050,915.20
1,304,429.28 939,189.08
20,102.50 1,639,559.90
353,514.70 3,393,741.12
1,304,429.28 626,126.05
20,102.50 1,093,173.95
353,514.70 2,262,494.08
1,304,429.28 2,504,504.22
20,102.50 666,397.88
488,182.20 8,748,225.02
8,716,015.65 8,716,015.65
243,446.50 3,262,183.10
1,186,897.47 427,283.09
61,125.90 183,377.70
36,223.00 883,841.20
253,401.50 2,919,185.28
42,628.91 1,040,145.28
13,786,554.23 13,786,554.23
6,687,560.00 3,081,627.65
3,933,587.00 1,730,778.28
63,531.00 1,016,496.00
97,847.75 1,565,564.00
Jenis
Pagar
66,755.00 213,616.00
Pagar Satuan
Pagar
Stainles
Balkon / Per M2
62,595.50 5,258,022.00
131,492.90 920,450.30 Steel Per M2
sRailing
Balkon
456.5 3.75
14,725,400.00 14,725,400.00 2.1
1,050,000.00 14,490,000.00 5.85
235,400.00 235,400.00
KEGIATAN : PENYEDIAAN SARANA AIR BERSIH DAN SANITASI DASAR TERUTAMA BAGI MA
PEKERJAAN : PEMBUATAN DED JARINGAN DISTRIBUSI DAN BANGUNAN PELENGKAP SISTEM
AI NGELAR DESA KEREKEH KEC. UNTER
SUB PEKERJAAN : CUT AND FILL SITE PLAN IPA, AKSES JALAN DAN JEMBATAN, PEMAGARAN
LOKASI : KEC. UNTER IWES, KEC. SUMBAWA, KEC. LABUHAN BADAS
KODE
NO. URAIAN PEKERJAAN SAT. VOLUME
ANALISA
1 2 3 4 5
I. PEKERJAAN PERSIAPAN
### Pengukuran, Penyiapan Lokasi dan Pemasangan Bowplank Ls 1.00
B Pekerjaan Pasangan
1 Pasangan Batu Kosong M³ 13,189.90 3.1 (2)
2 Pasangan Batu Kali M³ 3,813.28 3.1 (2)
3 Plsteran Bagian Atas Pasangan Batukali 1:3 (t=1,5cm) M2 31.80 A.4.4.2.3
4 Acian 1:2 M2 73.14 A.4.4.2.27
5 Siaran 1:2 M2 254.40 G.51.c
JUMLAH
PPN 10 %
TOTAL
AR TERUTAMA BAGI MASYARAKAT MISKIN
NAN PELENGKAP SISTEM SARANA AIR BERSIH
MBATAN, PEMAGARAN
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
6 7
500,000.00 500,000.00
500,000.00 500,000.00
14,803,610.33 14,803,610.33
84,915.60 12,826,501.38
276,325.50 1,977,108.95
27,951.00 4,022,009.15
831,675.90 10,969,717,869.19
831,675.90 3,171,416,183.65
66,500.59 2,114,718.76
36,223.00 2,649,350.22
24,389.75 6,204,752.40
191,365.02 191,365.02
63,813.75 174,594.42
27,951.00 16,770.60
366,603.00 54,990,450.00
2,880,000.00 2,880,000.00
269,844,092.03 269,844,092.03
1,535.73 2,178,429.32 900.00
443,305.83 99,743,811.94
440,442.79 35,675,866.34
20,143.84 10,877,674.10
21,904.62 4,139,972.30
4,341,790.30 117,228,338.03
5,216,938.65 5,216,938.65
84,915.60 4,585,442.40
46,777.50 631,496.25
484,484,061.66 484,484,061.66
830,303.10 110,225,850.16 1.88 5.25
66,500.59 1,369,352.85
24,389.75 1,609,723.50 (954,943,999.46)
1,304,429.28 300,018.73
1,368,109.27 15,514,359.12
1,368,109.27 15,083,404.70
1,368,109.27 13,790,541.44
1,368,109.27 11,851,930.61
1,368,109.27 22,929,511.37
1,304,429.28 4,278,528.04
32,695.85 19,065,604.05
32,695.85 56,213,647.95 BESI
32,695.85 81,480,019.95
32,695.85 5,715,234.58
32,695.85 27,562,928.51
32,695.85 57,663,381.94
353,514.70 14,243,107.26 BETON
488,182.20 9,041,134.34
378,182.20 2,980,075.74
220,105.68 11,885,706.82 65,000,000.00
48,000.00 1,680,000.00 132,000,000.00
18,000.00 468,000.00 -
52,000.00 2,704,000.00
62,000.00 595,200.00
191,596,298.55 191,596,298.55
830,303.10 76,387,885.20
66,500.59 4,575,240.59
24,389.75 2,634,093.00
243,446.50 7,790,288.00
131,081.50 22,939,262.50
356,080.78 77,269,529.26
6,500,000.00 6,500,000.00
3,500,000.00 3,500,000.00
1,000,000.00 1,000,000.00
2,000,000.00 2,000,000.00
Rp. 973,136,366.25
Rp. 97,313,636.62
Rp. 1,070,450,002.87 2,025,394,002.33
(954,943,999.46)
4.50
PAVING
TALUD
BRC
GALIAN
GALIAN
VOULUME TIMBUNAN
#REF! #REF!
VOULUME TIMBUNAN
#REF! #REF!
#REF! #REF!
RENCANA ANGGARAN BIAYA
KEGIATAN : PENYEDIAAN SARANA AIR BERSIH DAN SANITASI DASAR TERUTAMA BAG
MISKIN
PEKERJAAN : PEMBUATAN DED JARINGAN DISTRIBUSI DAN BANGUNAN PELENGKAP SI
BERSIH AI NGELAR DESA KEREKEH KEC. UNTER
SUB PEKERJAAN : SEPTI TANK DAN PERESAPAN
LOKASI : KEC. UNTER IWES, KEC. SUMBAWA, KEC. LABUHAN BADAS
TAHUN ANGGARAN : 2020
KODE
NO. URAIAN PEKERJAAN SATUAN VOLUME
ANALISA
1 3 4 5
I. PEKERJAAN PERSIAPAN
1 Pengukuran, Penyiapan Lokasi dan Pemasangan Bowplank Ls 1.00
B Pekerjaan Beton
1 Pas. Lantai kerja podasi (beton cor 1:3:5) M³ 0.54 A.4.1.1.4
2 Beton K-175 M³ 0.39 A.4.1.1.5
3 Pembesian Kg 184.90 A.4.2.1.1
4 Bekisting 2 x Pakai M² 21.83 A.4.1.1.20
Jumlah
Total
A
HAN BADAS
6 7
500,000.00 500,000.00
500,000.00 500,000.00
1,354,086.54 1,354,086.54
84,915.60 749,804.75
276,325.50 49,738.59
46,777.50 26,898.10
63,918.42 527,645.10
6,552,438.25 6,552,438.25
1,171,770.27 632,755.95
1,304,429.28 506,542.50
20,102.50 3,716,973.53
106,696.70 2,328,922.22
5,789,483.15 5,789,483.15
470,933.10 136,570.60
243,446.50 3,603,008.20
61,125.90 853,928.82
36,223.00 506,035.31
253,401.50 20,272.12
255,663.10 74,142.30
42,628.91 595,525.80
1,351,700.00 1,351,700.00
566,700.00 566,700.00
435,000.00 435,000.00
45,000.00 90,000.00 45,000.00 260,000.00 130000
130,000.00 260,000.00
Jumlah 15,547,707.94
PPN 10% 1,554,770.79
Total 17,102,478.73
435,000.00
RENCANA ANGGARAN BIAYA
1 3 4 5
I. PEKERJAAN PERSIAPAN
1 Pengukuran, Penyiapan Lokasi dan Pemasangan Bowplank Ls 1.00
Jumlah
Total
KODE
NO. SATUAN VOLUME
ANALISA
1 3 4 5
I. PEKERJAAN PERSIAPAN
1 Pengukuran, Penyiapan Lokasi dan Pemasangan Bowplank Ls 1.00
Jumlah
Total
KODE
NO. SATUAN VOLUME
ANALISA
1 3 4 5
I. PEKERJAAN PERSIAPAN
1 Pengukuran, Penyiapan Lokasi dan Pemasangan Bowplank Ls 1.00
Jumlah
Total
KODE
ANALISA
KODE
NO. SAT. VOLUME
ANALISA
1 3 4 5
I. PEKERJAAN PERSIAPAN
1 Pengukuran & Pematokan Lahan M' 400.00 Sp.1
2 Papan Nama Proyek Bh 1.00 -
3 Perizinan Ls 1.00 -
JUMLAH
PPN 10 %
TOTAL
ASI DASAR TERUTAMA BAGI MASYARAKAT
UHAN BADAS
596,166.44 596,166.44
84,915.60 263,917.68
276,325.50 245,377.04
27,951.00 86,871.71
7,576,454.05 7,576,454.05
1,186,897.47 526,982.48
1,368,109.27 3,755,448.98
20,102.50 1,542,062.78
213,393.40 1,751,959.81
1,059,993.31 1,059,993.31
61,125.90 501,843.64
36,223.00 297,390.83
31,761.13 260,758.84
23,441,200.00 23,441,200.00
21,600,000.00 21,600,000.00
7,200.00 43,200.00
700,000.00 700,000.00
183,000.00 1,098,000.00 0.00096 7.536 7.50
1,354,086.54 1,354,086.54
84,915.60 749,804.75
276,325.50 49,738.59
46,777.50 26,898.10
63,918.42 527,645.10
114,965,887.88 114,965,887.88
1,186,897.47 213,641.54
1,368,109.27 492,519.34
20,102.50 1,413,004.73
213,393.40 162,178.98
1,368,109.27 50,648,853.17
20,102.50 744,215.83
378,182.20 3,562,476.32
1,368,109.27 50,648,853.17
20,102.50 969,342.55
353,514.70 1,798,506.04
1,368,109.27 531,271.03
20,102.50 578,549.95
488,182.20 3,202,475.23
1,812,368.20 1,812,368.20
243,446.50 3,603,008.20
470,933.10 136,570.60
66,500.59 929,013.24
36,223.00 506,035.31 Volume
190,913.25 137,934.82 0.4 0.2 0.8 0.064
293,200.00 85,028.00 3.39
31,761.13 17,786.23 0.30
3,462,865.00 3,462,865.00
210,000.00 210,000.00
66,550.00 399,300.00
199,680.00 1,597,440.00
26,000.00 78,000.00
478,125.00 478,125.00
700,000.00 700,000.00
6 7
2,000,000.00 2,000,000.00
2,000,000.00 2,000,000.00
19,025,608.88 19,025,608.88
84,915.60 12,826,501.38
276,325.50 1,977,108.95
27,951.00 4,221,998.55
76,432,881.18 76,432,881.18
470,933.10 10,108,578.99
831,675.90 62,151,140.01
24,389.75 2,016,544.53
66,500.59 7,940,170.45
36,223.00 4,325,026.20
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
6 7
10,908,353.00
###
1,020.88 408,353.00
500,000.00 500,000.00
10,000,000.00 10,000,000.00
135,939,522.01
###
1,535.73 519,843.73
443,305.83 99,743,811.94 75.25
440,442.79 35,675,866.34 75.25
- 0.00 55.9
- 0.00
- 0.00
5,216,938.65
###
84,915.60 4,585,442.40
46,777.50 631,496.25
372,774,372.23
###
830,303.10 36,666,184.90
66,500.59 1,369,352.85
24,389.75 1,609,723.50
1,304,429.28 300,018.73
1,368,109.27 15,514,359.12
1,368,109.27 15,083,404.70
1,368,109.27 13,790,541.44
1,368,109.27 11,851,930.61
1,368,109.27 22,929,511.37
1,304,429.28 4,278,528.04
32,695.85 19,065,604.05
32,695.85 56,213,647.95
32,695.85 81,480,019.95
32,695.85 5,715,234.58
32,695.85 27,562,928.51
32,695.85 57,663,381.94
- 0.00
- 0.00
- 0.00
- 0.00
48,000.00 1,680,000.00
18,000.00 468,000.00
52,000.00 2,704,000.00
62,000.00 595,200.00
191,596,298.55
###
830,303.10 76,387,885.20
66,500.59 4,575,240.59
24,389.75 2,634,093.00
243,446.50 7,790,288.00
131,081.50 22,939,262.50
356,080.78 77,269,529.26
6,500,000.00
###
3,500,000.00 3,500,000.00
1,000,000.00 1,000,000.00
2,000,000.00 2,000,000.00
Rp. 722,935,484.44
Rp. 72,293,548.44
Rp. 795,229,032.88
46,909.65
46,909.65
Berat
0.3 15.625 4.6875 894,905.86
TANGKI BBM
Pekerjaan Tanah
Galian Tanah 3.7 2.4 0.35 3.108
Buangan Tanah 3.7 2.4 0.35 3.108
Urugan Pasir 3.7 2.4 0.1 0.888
Beton Tumbuk 3.7 2.4 0.05 0.444
Pembesian 60.593
Lantai Dis. 8 - 250 72 153.40 13.00 156.00 5.0265E-05
81.4
3.7 11.00 81.4 5.0265E-05
2.4 16.00 76.8 5.0265E-05
Dinding 24.48 66.60 6.00 72.00 0.0001131
18.84
15.84
7.44
24.24 35.88 3.00 36.00 5.0265E-05
7.2
4.44
Beton 1:2:3
Lantai 3.7 2.4 0.2 1.776
Dinding 3 2 0.8 0.3 0.969
3 0.52 0.3 0.471008
Bekisting 2 0.8 6 9.6
0.8 0.3 6 1.44
SEPTI TANK
Pekerjaan Tanah
Galian Tanah 1.65 2.15 1.75 6.208 6.210
Buangan Tanah 6.210
Urugan Pasir 1.65 2.15 0.05 0.177 0.180
Beton Lantai Kerja 1.65 2.15 0.05 0.177 0.180
Plat Lantai
Beton 1.65 2.15 0.1 0.355 0.36
Tulangan 8 - 15 1.65 28 46.2 76.23 30.11085
2.15 22 47.3 101.695 40.169525
Bekisting 7.6 0.1
Kolom Praktis 15 x 15
Jumlah Panjang/
Pembesian Panjang
Kolom/Balok sengkang
Kolom 12 x 12
Tulangan Utama 4 ø 8 4.00 1.60 4.00
Tulangan Utama 4 ø 8 2.00 1.50 4.00
Sengkang ø 6 - 15 4.00 1.60 0.40 48.00
Sengkang ø 6 - 15 2.00 1.50 0.40 22.00
Balok 20 x 15
Tulangan Utama 4 ø 8 4 1.65 4 26.400
Tulangan Utama 4 ø 8 2 2.15 4 17.200
Sengkang ø 6 - 15 4 1.65 14 56.00 92.400
Sengkang ø 6 - 15 2 2.15 11 22.00 47.300
Jumlah Total
Beton Plat Atas Jalur Panjang Panjang
Pembesian Dia. 8 2.15 12.00 25.80 25.80 5.0265E-05
1.65 16.00 26.40 26.40 5.0265E-05
Beton K225 2.15 1.65 0.07 0.248325 0.250
Bekisting 2.15 1.65 0.1 4.3075 4.310
PERESAPAN
Pekerjaan Tanah
Galian Tanah 1.15 1.15 1.5 1.984 1.99
Galian Tanah Pipa Buangan 4" 7 0.3 0.3 0.630 0.63
Galian Tanah 2.62
Urugan Tanah Galian Pipa 0.58
Buangan Tanah 2.04
Pekerjaan Pasangan
Ijuk 0.85 0.85 0.1 0.072 0.08
Batu Kosong 0.85 0.85 0.4 0.289 0.29
Kerikil 0.85 0.85 0.4 0.289 0.29
Pasangan Batu Bata 0.85 1.5 4 5.100 5.10
PAGAR BRC
Jumlah Tiang 152 64 L P T
Galian Tanah 62 0.3 0.3 0.4
2 0.6 0.6 0.7
Cor Beton K175 62 0.3 0.3 0.4
2 0.6 0.6 0.7
Pipa Tertanam 64 0.04 0.001257 0.5
Buangan Tanah
Dia Besi
Besi untuk angker Dia. 12 12 0.888 64 0.3 17.0496
12 0.888 2 0.7 1.2432
PAGAR BRC 150
Pintu Pagar 2
METER INDUK
Galian Tanah Pipa 9.36 0.4 0.950 3.557 3.557
Volume Pipa 9.36 0.007854 0.074
Urugan Pasir 9.36 0.05 0.468 0.468
Urugan Tanah 3.015
Buangan Tanah 3.015 0.542
Galian Tanah 0.84 0.84 1.340 0.946 2.952
1.44 1.04 1.340 2.007
Pembesian Volume
Lantai Kerja 0.11 m3
Trust Block 4 buah 0.02 m3
Beton Lantai 0.18 m3
Beton Dinding (1,2*2+0,8*2)*0,12 0.48
Pembesian
- Lantai ø 10-15 (Box1) 1.44 8.000 11.52 7.108 kg
- Lantai ø 8-15 Box 1) 1.04 8.000 8.32 5.133 kg
- Lantai ø 10-15 Box 2 0.84 7.000 5.88 3.628 kg
- Lantai ø 8-15 Box 2 0.84 7.000 5.88 3.628 kg
- Dinding Tinggi ø10-15 1.32 4.96 34.00 27.691 kg
- Dinding Melintang ø 8-15 1.32 10.00 4.96 30.603 kg
- Dinding Tinggi ø10-15 (Bo x 2) 1.32 3.36 23.00 18.732 kg
- Dinding Melintang ø 8-15 (Box 2) 1.32 10.00 3.36 20.731 kg
117.255
Dinding Box 1 1.32 4.96 6.55 10.982
Bekisting Box 2 1.32 3.36 4.44
Plesteran 5.40 4.32 9.72 m2
Acian 9.72 m2
Pengecetan Tutup Manhole
m3
m3
m3
m3
76.710 76.71
0.0078414 61.555
16,611,737
m3
m3
m3
m3
30.12 70.290
40.17
0.76 0.760
Jumlah
Panjang Volume
sengkang
0.14
0.07
0.21
5.58
13.970
13.970
-
-
-
-
-
2.232 2.74 M3
0.504
2.232 2.70 M3
0.504
0.040
2.70 M3
17.05 18.29 Kg
1.24
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
Luas
2.0106193
1.2566371
0.23064
0.5233422
PAGAR BRC
Tangki 18,000,000
Besi Plat t=5mm 18.09557 0.090478 692.155693 24000 16,611,737
692.155693 10,106,640 6,995,368
5 mm x 1,22 x 2,44 0.014884 113.8626 1,265,000 11,497,908
0.014884 113.8626 1,821,802
5 mm x 6' x 20'
4
8
0.005
1 feet 0.308
A. TENAGA KERJA
Pekerja OH 0.6600 73,500
Tukang Kayu OH 0.3300 102,500
Kep. Tukang Kayu OH 0.0330 108,500
Mandor OH 0.0330 115,500
B. BAHAN
Papan Kayu Bekisting m3 0.0400 2,870,000
Paku Kg 0.4000 23,000
Minyak Bekisting Liter 0.2000 16,000
Balok Kayu Bekisting m3 0.0150 3,025,000
Plywood tebal 9 mm Lbe 0.3500 90,000
Kayu Dolken Ø 7 cm L = 4 m' Batang 2.0000 25,000
Sekaleng cat (ukuran 2,5 liter) bisa digunakan untuk mengecat 27 m2. Maka, jika ruangan Anda seluas 60,34
Namun, karena biasanya pengecatan selalu dilakukan dua kali (dua lapis), setidaknya Anda perlu membeli sekitar 5
enis Ukuran
Kayu Spesifikasi (PxLxT) Harga (Rp)
Meranti Reng 4x6x4 32,500
Meranti Reng 5x7x4 39,000
Borneo Reng 4x6x4 28,000
Borneo Reng 5x7x4 43,000
Kamper Reng 4x6x4 50,000
Kamper Reng 5x7x4 70,000
Meranti Reng 2x3x4 15,000
Meranti Reng 3x4x4 17,500
Borneo Reng 2x3x4 17,000
Borneo Reng 3x4x4 20,500
Kamper Reng 2x3x4 20,500
Kamper Reng 3x4x4 22,000
Meranti Galar 5 x 10 x 60,000
Borneo Galar 5
4 x 10 x 60,000
Kamper Galar 5
4 x 10 x 95,000
Meranti Balok 6 x 12 x
4 80,000
Meranti Balok 8 x 12 x
4 125,000
Borneo Balok 6
4 x 12 x 80,000
Borneo Balok 8
4 x 12 x 100,000
4
Kamper Balok 6 x 12 x 185,000
Kamper Balok 8
4 x 12 x 210,000
Meranti Kaso 4x6x4 32,500
Meranti Kaso 5x7x4 39,000
Borneo Kaso 4x6x4 28,000
Borneo Kaso 5x7x4 43,000
Kamper Kaso 4x6x4 50,000
Kamper Kaso 5x7x4 70,000
o. 1
Descriptio Knee 90º Knee 45º Tee V. Tee
1/8”-3/8” 5,100 - 6,375 8,670
1/2" 4,335 4,590 5,355 8,670
3/4” 6,120 6,885 7,905 10,455
1” 8,925 10,200 12,495 16,065
1 1/4” 14,280 16,575 18,870 24,225
1 1/2” 17,850 20,400 23,970 30,600
2” 28,050 30,600 35,700 43,350
2 1/2” 53,550 63,750 81,600 89,250
3” 81,600 96,900 107,100 127,500
4” 147,900 165,750 193,800 242,250
5” 408,000 484,500 510,000 637,500
6” 586,500 561,000 688,500 867,000
A.4.1.1.22 Pemasanga 0.00
JUMLAH
HARGA
Rp.
48,510.00
33,825.00
3,580.50
3,811.50
114,800.00
9,200.00
3,200.00
-
-
-
216,927.00
21,692.70
238,619.70
ika ruangan Anda seluas 60,34 m2, membutuhkan 2 kaleng cat, karena 60,34 dibagi 27 hasilnya 2,2
idaknya Anda perlu membeli sekitar 5 kaleng cat untuk mengecat ruangan seluas 60,34 m2.
28,000 35,700 91700
114200
205900
dibagi 27 hasilnya 2,23.
60,34 m2.
1 AKSESORIS Ø ( mm ) JML
REDUCING TEE 400 X 250 1
STUBE END 250 4
FLANGE SOCKET 250 2
FLANGE GATE VALVE 250 2
WELDING 90° ELBOW 250 4
WELDING 45° ELBOW 250 4
CONCENTRIC REDUCER 400 x 250 1
RUBBER RING 250 4
GIP CROSSING 250 2 (7m)
8 CONCENTRIC REDUCER 75 x 50 1
MALE THREAD ADAPTOR 50 2
FEMALE GATE VALVE 50 1
CAP 50 1
19 CONCENTRIC REDUCER 75 x 50 1
MALE THREAD ADAPTOR 50 2
FEMALE GATE VALVE 50 1
CAP 50 1
25 CONCENTRIC REDUCER 75 x 50 1
MALE THREAD ADAPTOR 50 2
FEMALE GATE VALVE 50 1
CAP 50 1
28 CONCENTRIC REDUCER 75 x 50 1
MALE THREAD ADAPTOR 50 2
FEMALE GATE VALVE 50 1
CAP 50 1
29 CONCENTRIC REDUCER 75 x 50 1
MALE THREAD ADAPTOR 50 2
FEMALE GATE VALVE 50 1
CAP 50 1
Aksesories JML
Reducing Tee ø 400 x 250 mm (16" x 10") 1
Stube Bend ø 250 mm (10") 4
Flange Socket ø 250 mm (10") 2
Flange Gate Valve ø 250 mm (10") 2
Welding 90° Elbow ø 250 mm (10") 4
Welding 45° Elbow ø 250 mm (10") 4
Concentric Reducer ø 400 x 250 mm (16" x 10") 1
Rubber Ring ø 250 mm (10") 4
GIP Crossing ø 250 mm (10") 2 (7m)