Rumah Jaga

Panjang Luas Volume


Galian Tanah 33.50 1.76 58.7925 58.79
Urugan Pasir 32.70 0.04 1.1445 1.14
Lantai Kerja 32.70 0.04 1.1445 1.14
Pondasi 32.70 0.62 20.274 20.27
Urugan Tanah Lantai 0.05 36.29
Buangan Tanah 22.5

Pembesian

Panjang/ Jumlah
Sloof/Ring Balok 20 x 15 Panjang JMLH
sengkang sengkang Panjang

Tulangan Utama 4 ø 8 149 149.00


Sengkang ø 6 - 15 0.6 6 3 123 73.80
0.6 3.25 1 23 13.80
0.6 2 2 30 18.00
0.6 3 4 84 50.40

Beton
Bekisting 33.4 2 0.2 13.36

Kolom 15 x 15 Jumlah Tinggi Panjang Panjang


Kolom
Tulangan Utama 4 ø 8 15 3 180
Sengkang ø 6 - 15 0.5 15 3 315 157.50

Beton 0.6
Bekisting 15 3 0.6 27

Pasangan Bata 100.7135 101.00 m2

Dinding Belakang 5.55 16.65 19.99


5.1
1.76
Dinding Depan 5.55 16.65 17.8985
5.1
1.76
1.3625
0.729
Dinding Samping Kanan dan Kiri 5.55 33.3 31.325
0.675
1.3
Kamar 16.65 14.95 14.95
1.7
Dapur 14.79 13.09 13.09
1.7
KM 5.16 3.46 3.46
1.7

Plesteran 202 m2
Acian 202 m2
Keramik 36 Dos
Closet 1 Buah
Bak Mandi 1 Buah

Pekerjaan Kayu
Atap Panjang
Kayu 5/12 12 7.15 85.8 21.45 22
Kayu 6/12 4,5 m x 2 buah x 3 6 4.5 27 6.75 7
Kayu 6/12 1,4 m x 2 buah x 3 6 1.4 8.4 2.1 2
Kayu 6/12 6 m x 1 buah x 3 3 6 18 4.5 5
Kayu 6/12 2,8 m x 1 buah x 3 3 2.8 8.4 2.1 2
16
Papan Misplang 2/20 4,8 m x 4 buah 4 4.8 19.2 4.8 5
Papan Misplabf 2/20 6 m x 2 buah 2 6 12 3 3
7.6 1.9 8
Kayu 5/10 22 btg 0.44 m3
Kayu 6/12 16 btg 0.4608 m3
Papan 2/20 8 btg 1.6 m2 Misplang

Bahan Kusen Pintu dan Jendela Panjang Panjang


Kusen Gendong 2*2,1+3,1+1,85+1,2*2 1 11.55 meter 11.550 m
Kusen Pj1 2*2,1+1 2 5.2 meter 10.400 m
Kusen PJ 2*2,1+0,9 2 5.1 meter 10.200 m
Kusen Jendela (1,1*2+0,8*2) 1 3.8 meter 3.800 m
Boupenligh (1,4*3+0,5*3) 2 5.7 meter 11.400 m
Boupenligh (0,8*3+0,5*2) 2 3.4 meter 6.800 m
54.150

Triplek 4mm 36.00 m2 2.88 m2


11.40 m2 2.88 m2
2.07 m2 2.88 m2
49.47 16.61852 8.64
Pintu 2 mm x 0,8 m 3 buah
Pintu 2 mm x 0,7 m 2 buah
Pengecetan Kayu
Asbes 4,7 x 7,15 m x 2 67.21 m2
Bubungan 7.15 m
Talang Air 14.3 m
Kunci 2 buah
Pegangan Pintu 5 buah
Engsel 5 psg
Volume Berat Berat

5.0265E-05 0.00749 58.793 58.79


2.8274E-05 0.002087 16.380 16.38
2.8274E-05 0.00039 3.063 3.06
2.8274E-05 0.000509 3.995 4
2.8274E-05 0.001425 11.186 11.19
102.762
0.03 4.47 4.47
13.36
Luas Volume Berat

5.0265E-05 0.009048 71.025 71.03


2.8274E-05 0.004453 34.958 34.96
105.99
0.0225 1.0125 1.01
27.00
0.54 0.700 2
0.0420
23.8095
Galian Tanah 33.5 1.755 58.7925 476,190.4762
Urugan Pasir 32.7 0.035 1.1445
Lantai Kerja 32.7 0.035 1.1445
Pondasi 32.7 0.62 20.274
Urugan Tanah 33.5 1.065 35.6775
btg 0.0050 0.440 m3 Gordeng 80,000 1,760,000 1386000
btg 0.0072 0.202 m3 Kuda2 115,000 1,840,000 1451520
btg 0.0072 0.058 m3 Kuda2
btg 0.0072 0.144 m3 Kuda2
btg 0.0072 0.058 m3 Kuda2
0.4608 m3 Kuda2
btg
btg
1.6 m2 3.2

0.96 1 btg 0.0288 0.029


0.87 1 btg 0.0288 0.029
0.85 1 btg 0.0288 0.029
0.32 0.5 btg 0.0144 0.014
0.95 1 btg 0.0288 0.029
0.57 0.5 btg 0.0144 0.014
4.513 5.000 0.144 0.144

12.50 13 18
3.96 4
0.72 1

54.150 0.36 19.494 14.62


Kamper 6 x 12 batang (4m) 185,000 0.0288 34.72222 6,423,611
Kamper 8 x 12 batang (4m) 210,000
Borneo 6 x 12 batang (4m) 80,000
Borneo 8 x 12 batang (4m) 100,000
Meranti 6 x 12 batang (4m) 80,000

Meranti 8 x 12 batang (4m) 125,000


Galian Tanah 5 0.36
Urugan Tanah 5 0.072 0.032
Buangan Tanah
Jumlah Jmlh Panjang
Pembesian
Klm/Blk As/Kolom As/Kolom
Sloof 20 x15
Tulangan Utama 4ø8 4 4 4
Sengkang ø 6 - 15 4 4 4
Balok 20 x15
Tulangan Utama 4 ø 10 6 4 4
Sengkang ø 6 - 15 6 4 4

Ring Balok 20 x15


Tulangan Utama 4 ø 10 4 4 4
Sengkang ø 6 - 15 4 4 4

Kolom 20 x 20
Tulangan Utama 4 ø 10 4 4 5
Tulangan Utama 4 ø 10 1 4 2
Sengkang ø 6 - 15 4 5
Sengkang ø 6 - 15 1 2
Pondasi ø 10 - 15 5 0.6

Plat Beton ø 8mm - 20cm 4 21

Beton
Sloof 16 0.03 0.480 0.480 m3
Kolom 12 0.0225 0.270 0.270 m3
Kolom 80 0.0225 1.800 1.800 m3
Pondasi 5 0.072 0.360 0.360 m3
Balok
Ring Balok
Plat Beton 1.92 1.920 m3

Bekisting P/T
Sloof 16 32 0.2 6.4
Kolom 20 80 0.2 16
Balok 24 48 0.2 9.6
Ring Balok 16 32 0.2 6.4
Lantai 16 1.92 17.92

Kayu 6/12 4.25 17 4.25 4 batang


3.57 14.28 3.57 4 batang

Kayu 5/7 6.38 7.63 2


5.164 7.744 2
3.83 1
2.58
1.25

Kayu 5/7 8 batang 0.2304 0.23 m3


8 batang 0.2304 0.23 m3
4 batang 0.1152 0.12 m3
0.576 0.58
Kayu Rangka Atap 0.820

Papan Lisplang 2/20 6 btg 0.096 0.1 m3

Asbes 84 m2
Bubungan 17 meter
Keramik 11.52 m2

Luas Dinding 0.9 0.75 3.3


0.9 0.8 3.4
Pas. Batu Bata 13.40
0.75 0.9 0.8 0.54
0.25 0.3 0.8 0.06
0.5 0.3 0.8 0.12
0.75 0.3 0.8 0.18
Beton rabat 0.36

Plesteran 0.9 0.6 3


Acian 3
Kolom 3.8 0.2 4 4 12.16
Balok 4.2 0.2 8 1 6.72
4.2 0.15 4 1 2.52
Pagar Railing Tinggi = 90 cm 13.8
1.800 m3
0.104 0.520 1.280 m3
0.520
Panjang/ Jumlah
Panjang Volume Berat
sengkang sengkang

64.00 5.027E-05 0.0032169909 25.253 25.250


0.6 112 67.20 2.827E-05 0.0019000352 14.915 14.920
40.170
96.00 7.854E-05 0.0075398224 59.188 59.190
0.6 168 100.80 2.827E-05 0.0028500529 22.373 22.370
81.560

64.00 7.854E-05 0.0050265482 39.458 39.460


0.6 112 67.20 2.827E-05 0.0019000352 14.915 14.920
54.380

80.00 7.854E-05 0.0062831853 49.323 49.320


8.00 7.854E-05 0.0006283185 4.932 4.930
0.6 140 84.00 2.827E-05 0.002375044 18.644 18.640
0.6 15 9.00 2.827E-05 0.000254469 1.998 2.000
1.7 25 42.50 7.854E-05 0.0033379422 26.203 26.200
101.090
84 5.02654825E-05 0.0042223 33.145 33.150

0.480
2.430

0.720
0.480
1.920

0.1152 0.12 m3
0.1152 0.12 m3
24.4
R

Galian Tanah
Kolom 16 1.85 1.2 1.2 42.62 Pasangan Pondasi
Pondasi 2 1.25 4.4 0.8 8.80 A 5.85
1 1.25 1.8 0.9 2.03 B 5.85
1 1.25 1.35 0.9 1.52 C 7.45
1 1.25 1.3 0.9 1.46 D 7.25
3 1.25 1.8 1 6.75 E 14.925
3 1.25 2.8 1 10.50 F 18.6
1 1.25 1.8 0.9 2.03
1 1.25 1.35 0.9 1.52
1 1.25 1.3 0.9 1.46 Buangan 44.06
1 1.25 1.8 1 2.25 Urugan
2 1.25 1.35 1 3.38
1 1.25 1.3 1 1.63
85.94 85.94

Urugan Pasir 2 5.95 0.9 0.1 1.07 Pas. Batu 2


1 7.25 0.9 0.1 0.65 Kosong 1
2 7.75 1 0.1 1.55 2
1 5.875 1 0.1 0.59 1
1 7.05 0.9 0.1 0.63 1
1 7.05 0.9 0.1 0.63 1
1 4.05 0.9 0.1 0.36 1
5.49 5.49

Floot Plat
Pembesian Jmlh FP Panjang Jmh Pjg
16 16 12 1.2 230.4 0.0002 0.05 363.649
13 16 12 1.2 230.4 0.00013 0.03 240.065

Beton Floot Plat 16 1.44 0.25 5.76 m3


Bekisting Floot Plat 16 4 0.25 16.00 m3

Pembesian Jmlh Jmlh Panjang Jmlh Luas Volume Berat


Sloof 30 x 20 D As Panjang
Tulangan As 6 ø 16 16 6 2 12.9 156 0.0002 0.03 246.22
16 6 3 8.35 152.1 0.0002 0.03 240.06
16 6 1 7.2 43.8 0.0002 0.01 69.13
16 6 1 5.25 32.1 0.0002 0.01 50.66
0.08 606.08
Jmlh Panjang Jmlh Sr Pjg Sr Jmlh Pjg Luas Volume
Tulangan Sr ø 8-15 8 2 12.9 130 0.9 234 5.027E-05 0.012
8 3 8.35 85 0.9 229.5 5.027E-05 0.012
8 1 7.2 73 0.9 65.7 5.027E-05 0.003
8 1 5.25 54 0.9 48.6 5.027E-05 0.002
342 577.8
Jumlah Sr per-Batang 13 13
Kebutuhan besi Sr 44.4462 45.000 btg 4.74 213.3
Total Pembesian Sloof

Beton 2 12.9 0.06 1.548


3 8.35 0.06 1.503
1 7.2 0.06 0.432
1 5.25 0.06 0.315
3.798 3.800
Bekisting 2 12.9 0.6 15.48
3 8.35 0.6 15.03
1 7.2 0.6 4.32
1 5.25 0.6 3.15
37.98 37.980

Kolom 30 x 30 D As JMLH Panjang Jmlh Pjg Volume Berat


Tulangan As 8 ø 16 16 8 16 6.65 851.2 0.0002 0.17 1343.48

Jmlh Sr
Tulangan Sr ø 8-100 8 16 6.3 64 1.1 1126.4 5.027E-05 0.057
Total Tulangan Kolom

Beton Kolom 16 5.8 0.09 8.352 8.35

Bekisting Kolom 16 5.8 1.2 111.36 111.36 m2

RING BALOK
Pembesian
Ring Balok B1 D Jmlh As Jmlh Blk Pjg
Tulangan As 3 ø 16 16 6 4 10.7 259.2 0.0002 0.052 409.10
Tulangan As 2 ø 16 16 2 4 7.4 60 0.0002 0.012 94.70
Tulangan As 2 ø 16 16 2 4 4.9 40 0.0002 0.008 63.13
Tulangan As 3 ø 16 16 6 4 15.2 367.2 0.0002 0.074 579.57
Tulangan As 2 ø 16 16 2 4 11 88.8 0.0002 0.018 140.16
Tulangan As 2 ø 16 16 2 4 7 56.8 0.0002 0.011 89.65
1376.31
Ring Balok B2
Tulangan As 3 ø 16 13 5 4 10.7 216 0.00013 0.029 225.06

Jmlh Panjang Jmlh Sr Pjg Sr Jmlh Pjg Luas Volume


Tulangan Sr ø 8-15 8 4 10.7 72 0.9 259.2 5.027E-05 0.013
Tulangan Sr ø 8-15 8 4 15.2 102 0.9 367.2 5.027E-05 0.018

Total Pembesian Ring Balok


Beton
Beton B1 Memanjang 4 12.9 0.12 6.192
4 0.28355 0.12 0.136
Beton B1 Melintang 0.25 8.35 0.12 0.120
4 0.28355 0.12 0.136
Beton B2 4 8.35 0.06 2.004
4 0.28355 0.06 0.068
8.656 8.66 m3
Begisting Balok
Bekisting B1 Memanjang 2 4 5.16 41.28
2 4 0.28355 2.2684
Bekisting B1 Melintang 2 4 3.34 26.72
2 4 0.28355 2.2684
Bekisting B2 2 1 2.505 5.01
2 4 0.23005 1.8404
77.5468 77.55 m3

PLAT LANTAI ATAS


Pembesian Lantai dan Lisplank
Plat Lantai ø 10-200 10 2 10.85 77.000 ### 7.9E-05 0.131 1030.17
10 2 15.35 54.300 ### 7.9E-05 0.131 1027.77
2057.95
Beton Lantai 15.2 10.7 0.12 20.20085 20.20
Begisting Lantai Atas 15.2 10.7 162.64 162.64 m2

LIST PLANK
Pembesian 10 1.000 51.80 51.800 7.9E-05 0.004 31.94
Beton Lisplank 51.8 0.1 0.37 1.9166 1.92
Begisting Lisplank 15.2 10.7 0.74 38.332 38.33 m2
Plesteran t=15mm 15.2 10.7 0.37 19.166 19.17
Acian Lisplank Luar 15.6 11 0.37 9.842
Acian Lisplank Dalam 15.58 11 0.25 6.645
Acian Lisplank Atas Bawah 15.58 11 0.2 5.316
Acian Lisplank 21.803 21.80

Dudukan Genset (Tulangan)


Pembesian 10 9 3 1 27 7.9E-05 0.0021206 16.6465
10 3 9 1 27 7.9E-05 0.0021206 16.6465
33.293
Beton Pondasi Genset 5.5 2.3 0.6 7.59 7.59
Bekisting 5.5 2.3 0.6 9.36 9.36

Galian Tanah 5.5 2.3 0.37 4.6805


Urugan Pasir 5.5 2.3 0.1 1.265
Lantai Kerja t = 50cm 5.5 2.3 0.05 0.6325

Pas. Batu Bata Dinding 4 2.2 3.9 34.32


4 2.25 3.9 35.1
4 2.7 3.9 42.12
2 5.3 3.9 41.34
3 2.7 3.9 31.59
3 3.7 3.9 43.29
Pas. Batu Bata Dinding 227.76 191.824 191.90
Pintu 1 1 4.5 3.04 13.68
Pintu 2 3 2.15 2 12.9
Ventlasi 1 4 2 8
Kolom Praktis Pintu 1 1 0.15 3.04 0.456
Kolom Praktis Pintu 2 3 0.15 2 0.9
35.936
Plesteran Dinding 767.6
Acian Dinding 767.6

Parkit Kabel
Pas, Batu Bata Parkit Kabel 16.42 0.67 11.00
Plesteran Dinding 11.00
Acian Dinding 11.00
Urugan Pasir 16.42 0.1 1.64
Lantai Kerja 16.42 0.05 0.82

Total Pas. Batu Bata 202.90


Total Pas. Plesteraan
Total Pas. Batu Bata
0.6 0.475 1.66725
0.6 0.475 1.66725
1 0.525 3.91125
1 0.525 3.80625
1 0.575 8.58188
1 0.575 10.695
30.3289 30.33

5.95 0.9 0.15 1.61


7.25 0.9 0.15 0.98
7.75 1 0.15 2.33
5.875 1 0.15 0.88
7.05 0.9 0.15 0.95
7.05 0.9 0.15 0.95
4.05 0.9 0.15 0.55
8.24 8.24

363.650 0.100 0.100 12 230.4 0.04632467 363.65


240.060 0.100 0.100 12 230.4 0.03058152 240.06
603.710 603.71

22.267
Cek Jmlh Panjang/ Panjang Volume Berat
Btg Btg
13.908 1.200 12 172.8 0.0347435 272.74
8.358 0.700 12 151.2 0.03040056 238.64
7.208 0.700 12 50.4 0.01013352 79.55
5.258 0.500 12 36 0.00723823 56.82
666.688 34.733 2.900 647.75 647.75
Berat Jmlh Btg Panjang Panjang Volume
92.333 234.00 19.500 12 234.000 0.0117621 92.33
90.557 229.50 19.200 11 211.200 0.0106161 83.34
25.924 65.70 5.500 11 60.500 0.0030411 23.87
19.177 48.60 4.100 11 45.100 0.002267 17.80
227.991 227.990 577.8 48.200 45 550.8 217.34

894.678

1477.828 6.658 0.600 12 921.6 0.18529867 1,454.59

444.459 444.460
1922.288

10.708 0.900 12 259.2 0.05211525 409.10


7.408 0.700 12 67.2 0.01351136 106.06
4.908 0.500 12 48 0.00965097 75.76
15.208 1.300 12 374.4 0.07527759 590.93
11.008 1.000 12 96 0.01930195 151.52
7.008 0.600 12 57.6 0.01158117 90.91
1445.120 1,424.29

236.310 10.708 0.900 12 216 0.02867017 225.06

Berat Jmlh Btg Panjang Panjang Volume


102.276 259.20 21.600 12 259.200 0.0130288 102.28
144.891 367.20 30.600 12 367.200 0.0184575 144.89
247.167 247.170
1928.600
12.000 55.000 2.000 1320

77.008 6.500 12 1692.6 0.13293649 1,043.55


54.308 4.600 12 1694.64 0.13309671 1,044.81
2057.950 2,088.36

33.29
18.940034 Berat/Btg
18.940034 Berat/Btg
A.4.2.1.15. Pemasangan 1 m2 terali besi strip (2x3) mm Kode Analisa
BIAYA
NO. URAIAN SATUAN KUANTITAS SATUAN
Rp.

A. TENAGA KERJA
Pekerja OH 1.6700 73,500
Tukang Las OH 1.6700 102,500
Kepala Tukang OH 0.1670 108,500
Mandor OH 0.0083 115,500

B. BAHAN
Besi Strip kg 6.1770 #NAME?
Pengelasan cm 27.0800

C. PERALATAN

TOTAL UNTUK BURUH, MATERIAL DAN PERALATAN


OVER HEAD DAN KEUNTUNGAN 10%
HARGA SATUAN DILUAR PPN
HARGA SATUAN DILUAR PPN / METER

Pembuatan 1 m2 pintu besi plat baja tebal 2 mm rangkap, rangka baja siku Kode Analisa
BIAYA
NO. URAIAN SATUAN KUANTITAS SATUAN
Rp.

A. TENAGA KERJA
Pekerja OH 1.0500 73,500
Tukang Las OH 1.0500 102,500
Kepala Tukang OH 0.1050 108,500
Mandor OH 0.0520 115,500

B. BAHAN
Besi Siku L.30.30.3 kg 15.0000
Besi Plat Baja cm 32.8000
Kawat Las 0.0500

C. PERALATAN

TOTAL UNTUK BURUH, MATERIAL DAN PERALATAN


OVER HEAD DAN KEUNTUNGAN 10%
HARGA SATUAN DILUAR PPN
HARGA SATUAN DILUAR PPN / METER
Pembuatan 1 m3 Kusen Pintu & Jendela Kayu Kamper
BIAYA
NO. URAIAN SATUAN KUANTITAS SATUAN
Rp.

A. TENAGA KERJA
Pekerja OH 6.0000 73,500
Tukang Las OH 18.0000 102,500
Kepala Tukang OH 2.0000 108,500

Mandor OH 0.3000 115,500

B. BAHAN
Kayu Balok Kamper M3 1.2000 3,675,000
Paku Kg 1.2500 23,000
Lem Kayu Kg 1.0000 17,000

C. PERALATAN

TOTAL UNTUK BURUH, MATERIAL DAN PERALATAN


OVER HEAD DAN KEUNTUNGAN 10%
HARGA SATUAN DILUAR PPN
HARGA SATUAN DILUAR PPN / METER

Pembuatan 1 m2 Jalusi Kusen Kayu Kamper


BIAYA
NO. URAIAN SATUAN KUANTITAS SATUAN
Rp.

A. TENAGA KERJA
Pekerja OH 0.5000 73,500
Tukang Kayu OH 2.0000 102,500
Kepala Tukang OH 0.2000 108,500
Mandor OH 0.0250 115,500

B. BAHAN
Kayu Balok Kamper M3 0.0600 5,359,100
Paku Kg 0.1500 23,000

C. PERALATAN

TOTAL UNTUK BURUH, MATERIAL DAN PERALATAN


OVER HEAD DAN KEUNTUNGAN 10%
HARGA SATUAN DILUAR PPN
HARGA SATUAN DILUAR PPN / METER

Pembuatan 1 m2 Pintu dan Jalusi Kusen Kayu Kamper


BIAYA
NO. URAIAN SATUAN KUANTITAS SATUAN
Rp.

A. TENAGA KERJA
Pekerja OH 0.5000 73,500
Tukang Kayu OH 2.5000 102,500
Kepala Tukang OH 0.2000 108,500
Mandor OH 0.0250 115,500

B. BAHAN
Kayu Papan Kamper M3 0.0400 5,359,100
Paku Kg 0.1500 23,000

C. PERALATAN

TOTAL UNTUK BURUH, MATERIAL DAN PERALATAN


OVER HEAD DAN KEUNTUNGAN 10%
HARGA SATUAN DILUAR PPN
HARGA SATUAN DILUAR PPN / METER
A.4.2.1.15
JUMLAH
HARGA
Rp.

122,745.00
171,175.00
18,119.50
958.65

#NAME?

#NAME?
#NAME?
#NAME?
#NAME?

A.4.2.1.4
JUMLAH
HARGA
Rp.

77,175.00
107,625.00
11,392.50
6,006.00

202,198.50
20,219.85
222,418.35
222,418.35
JUMLAH
HARGA
Rp.

441,000.00
1,845,000.00
217,000.00

34,650.00

4,410,000.00
28,750.00
17,000.00

6,993,400.00
699,340.00
7,692,740.00
7,692,740.00

JUMLAH
HARGA
Rp.

36,750.00  M2 Jalusi Mati Kusen Kayu kamper Medan


205,000.00 - Kayu Papan Kamper Medan M3 0.0600
21,700.00 - Paku Biasa ½" - 1" Kg 0.1500
2,887.50 - Pekerja Oh 0.5000
- Tukang Kayu Oh 20,000
- Kepala Tukang Oh 0.2000
- Mandor Oh 0.0250
321,546.00 Jumlah
3,450.00 Dibulatkan

591,333.50
59,133.35
650,466.85
650,466.85

JUMLAH
HARGA
Rp.

36,750.00
256,250.00
21,700.00
2,887.50

214,364.00 1.6 0.048 257,237


3,450.00 317,587.50
1.6 574,824.30
942,306.64

535,401.50
53,540.15
588,941.65
588,941.65
5,692,600.00 341,556.00
23,800.00 3,570.00
42,000.00 21,000.00
65,000.00 130,000.00
75,000.00 15,000.00
80,000.00 2,000.00
513,126.00
513,126.
Berta Besi Volume Berat/m Berat/Btg Berat/m
2 1.00 0.0000 0.025 0.30
3 1.00 0.0000 0.055 0.66
4 1.00 0.0000 0.099 1.19
6 1.00 0.0000 0.222 2.66 2.66 0.222
8 1.00 0.0001 0.395 4.74 4.74 0.395
10 1.00 0.0001 0.617 7.40 7.40 0.617
12 1.00 0.0001 0.888 10.66 10.66 0.888
14 1.00 0.0002 1.208 14.50 0
16 1.00 0.0002 1.578 18.94 18.96 1.58
19 1.00 0.0003 2.226 26.71 26.76 2.23
22 1.00 0.0004 2.984 35.81 35.76 2.98
25 1.00 0.0005 0.0059 0.07 46.20 3.85
UKURAN
(mm) (Inch) @4mtr TIPE PN 10" TIPE PN 16" TIPE PN 20"
20 1/2 84.400 106.800 120.000
25 3/4 115.600 160.000 186.800
32 1 186.800 262.400 302.400
40 1 1/4 289.200 396.000 471.600
50 1 1/2 449.200 618.800 738.800
63 2 712.000 983.600 1.119.200
75 2 1/2 1.139.200 1.576.000 1.816.000
90 3 1.624.800 2.096.400 2.711.200
110 4 2.502.000 3.214.400 4.042.000
125 5 4.229.200 6.286.000 7.333.200
160 6 6.994.000 10.262.000 12.180.000
200 8 12.994.800
250 10 19.992.000
Panjang Lebar Tinggi Kr/Kn
Galian Tanah 5.3 0.8 1.2 2 10.176 10.18
Urugan Tanah 5.3 0.8 1.2 2 3.816 3.82
Buangan Tanah 6.36

Pembesian
Plat Lantai Panjang 1 1 40 40
Lebar 5.3 6 7 42

Abutment Bawah Panjang Lebar Tingi


Beton K300 5.3 0.8 0.3 1.272
Pembesian Ø 12-15 5.3 5 26.5 0.0001130973 0.0029971 23.53
0.8 35 28 0.0001130973 0.0031667 24.86
48.39
Bekisting 5.3 0.8 0.3 3.66

Abutment Tinggi
Beton K300 5.3 0.3 1.2 1.908
Pembesian Ø 12-15 5.3 8 42.4 0.0001130973 0.0047953 37.64
1.2 35 42 0.0001130973 0.0047501 37.29
0.8 8 6.4 0.0001130973 0.0007238 5.68
42.97
Bekisting 5.3 1.2 0.3 3.9

Beton 3.18 2 Kr/Kn 6.36 6.36


Pembeian 91.36 2 Kr/Kn 182.7121 182.71
Bekisting 7.56 2 Kr/Kn 15.12 15.12

Sayap
Beton K300 5.3 0.8 1.2 5.088
Pembesian Ø 12-15 5.3 8 42.4 5.0265482E-05 0.0021313 16.73
1.2 35 42 5.0265482E-05 0.0021112 16.57
0.8 8 6.4 5.0265482E-05 0.0003217 2.53
19.10
Balok
Beton 4 1.6 0.3 0.2 0.384
Pembesian 6 Ø 12 4 1.6 6 38.4 0.0001130973 0.0043429 34.09
Sengkang Ø 12-15 4 1.6 11 1.1 48.4 0.0001131 0.0054739
38.4 11 422.4 0.0001130973 0.0477723 375.01
375.02

Plat Lantai
Beton K300 5.3 0.8 1.2 5.088
Pembesian Ø 12-15 5.3 8 42.4 0.0001130973 0.0047953 37.64
1.2 35 42 0.0001130973 0.0047501 37.29
0.8 8 6.4 0.0001130973 0.0007238 5.68
42.97
42.97