DAFTAR HARGA SATUAN UPAH, BAHAN & ALAT

Program : Pendidikan Dasar 9 ( Sembilan ) Tahun


Kegiatan : PEMBANGUNAN 1 RUANG KELAS BARU ( RKB )
Lokasi : SDN 10 KWANDANG
Tahun Anggaran : 2023

HARGA
NO

URAIAN SAT SATUAN KETERANGAN


( Rp.)
1 2 3 4 5

UPAH:
1 Tukang O/H 150,000
2 Kepala Tukang O/H 175,000
3 Pekerja O/H 100,000
4 Instalatir O/H 120,000
5 Mandor O/H 125,000

BAHAN LOKAL
BATU / AGREGAT / dll
1 Batu Kali M3 227,200
2 Batu Bata Bh 1,136
3 Batako Bh 2,840
4 Kerikil M3 284,000
5 Pasir Pasang M3 227,200
6 Pasir Urug M3 79,520
7 Tanah urug M3 56,800
8 Sirtu M3 -
9 Kapur @ 100 liter Karung -
10 Ijuk M3 227,200

KAYU
1 Kayu Klas I … M3 -
2 Kayu Klas II M3 4,260,000
3 Kayu Klas II … M3 3,237,600
4 Kayu Klas III ( Bekesting ) … M3 2,158,400
5 Bambu untuk Perancah Btg 34,080
-
BAHAN NON LOKAL
SEMEN
1 Semen @ 50 Kg … Zak 88,040 1,760.80 / kg
2 Semen Putih Kg 2,102
3 Supergrout Kg 13,632

BESI / BAJA
1 Besi Beton Kg 12,496
2 Bendrat Kg 12,496

BATU ALAM / HIAS


1 Palimanan M2 -
2 Karang pilang M2 -
HARGA

NO
URAIAN SAT SATUAN KETERANGAN
( Rp.)
CAT / DEMPUL 2 4 5
1 Cat dasar tembok Catylac Kg 17,040
2 Cat tembok luar Kg 19,312
3 Cat tembok dalam Kg 17,040
4 Cat Mengkilap .. Kg 22,720
5 Politur Kg 22,720
6 Cat atap seng Kg 17,040
7 Menie Kayu Kg 19,880
8 Minyak Cat Kg 19,880
9 Residu (Ter) Ltr 12,496
10 Minyak bekisting Ltr 17,040
11 Plamur Kayu Kg 20,448
12 Plamur tembok Kg 19,880
13 Lem Fox Kg 22,720

KACA
1 Kaca Polos 3 mm M2 124,960
2 Kaca Rayban ASSAHI 5 mm M2 170,400
3 Kaca Rayban DEGREE 5 mm M2 159,040
4 Kaca Polos 4,5 mm M2 153,360

KERAMIK
1 Keramik 60x60 … Dos 181,760
2 Granito 60x60 Dos 210,160 70,053.33 / Bh
3 Keramik 40x40 … Dos 79,520 13,253.33 / Bh
4 Keramik 30x30 … Dos 62,480 5,680.00 / Bh
5 Keramik 20x25 … Dos 62,480 3,905.00 / Bh
6 Kuku Keramik … Dos 51,120 2,044.80 / Bh
7 Keramik Rock 20x20 … Dos 73,840 2,953.60 / Bh
8 List keramik 10x20 Bh 3,408

PAKU / MUR BAUT


1 Paku biasa Kg 34,080
2 Paku Triplex Kg 36,920
3 Paku Seng Kg 34,080
4 Mur baut Bh 17,040
5 Besi strip Kg 14,200
6 Paku Genteng Metal Kg 34,080
PENUTUP ATAP
1 Bubungan seng m1 17,608
2 Atap seng gelombang Lbr 72,704
3 Atap seng plat Lbr 51,120
4 Atap Genteng Metal Lbr 62,480
5 Bubungan Raja m1 39,760
TRIPLEKS
1 Triplex Tbl. 4 mm Lbr 96,560
2 Teakwood Lbr 170,400
3 Profil Kayu SP.4 M1 10,792
4 Kertas Ampelas Lbr 9,656
HARGA

NO
URAIAN SAT SATUAN KETERANGAN
( Rp.)
SANITARY WARE / ELECTRICAL 2 4 5
1 Closet Jongkok TOTO Bh 511,200
2 Closet Duduk 1 Tombol TOTO Bh 2,840,000
3 Urinoar Merk TOTO Type U57M TOTO Bh 3,532,960
4 Kitchen Zink 2 Mata Bh 397,600
5 Wastafel Standar type 546 Merk TOTO Bh 2,840,000
6 Wastafel Standar type LW 246 Merk Toto Bh 710,000
7 Floor Drain Kuningan Bh 28,400
8 Mata Kran Dia 1/2" Bh 28,400
9 Pipa GIV Dia 1/2" M' 24,992
10 Pipa GIV Dia 3/4" M' 28,400
11 Pipa PVC Dia 4" M' 107,920
12 Pipa PVC Dia 3" M' 85,200
13 Pipa PVC Dia 2" M' 39,760
14 Pipa Listrik PVC 1/2 " M' 3,976
15 Accesoris Pipa GIP Medium A Bh 19,880
16 Accesoris Pipa PVC AW Bh 17,040
17 Kabel NYM Eterna 2x2,5 mm M1 8,520
18 Kabel NYM Eterna 3x2,5 mm M1 11,360
19 Saklar Ganda Bh 39,760
20 Saklar Tunggal Bh 28,400
21 Panel Sekring Lengkap Unit 568,000
22 Stop Kontak Bh 28,400
23 Lampu Pijar 5 watt Bh 17,040
24 Lampu TL 20 Watt Bh 53,960
25 Lampu SL 20 Watt Bh 73,840
26 Lampu SL 9 Watt Bh 40,555
27 Armature Down Ligth Bh 48,280
28 Armature Bh 36,920
29 Lampu Hemat Energi 7 Watt Bh 31,808
30 Lampu Hemat Energi 18 Watt Bh 33,938
31 Isolatip Bh 9,656
32 TeeDoos Bh 8,520
33 TBA Bh 11,360
34 Klem Pipa Lot 1,704

ACCESSORIES PINTU & JENDELA


1 Kunci tanam 3 Levers .. Bh 198,800
2 Kunci Tanam 2 Levers .. Bh 176,080
3 Grendel Jendel Kuningan Bh 13,632
4 Engsel Pintu 3 x 4" ARCH Bh 39,760
5 Engsel Jendela 2 x 3" ARCH Bh 25,560
6 Tarikan Jendela dan Ventilasi Kuningan Bh 11,360
7 Kait Angin Jendela Kuningan Bh 31,240
8 Expagnyolet Bh 96,560

Kwandang,1 NOPEMBER 2023


MENGETAHUI : Setuju Melaksanakan : Dibuat oleh :
PT. RAHLIN AULIA MANDIRI KEPALA SEKOLAH PT. RAHLIN AULIA MANDIRI
SDN 10 KWANDANG

ABD. RAHMAN SULEMAN HAIS ADAM, SPd, MSi CHAERUL SRIYO PUTERA ZAKARIA
DIREKTUR NIP. 19740309 199903 1 006 Pimpinan Teknik