KOTA MAKASSAR
TAHUN 2022
BAHAN KAYU
1 Kayu Klas. II Samarinda (balok)/ Lokal M3 Rp 3,850,000.00
2 Kayu Kls. III (papan) M3 Rp 2,200,000.00
3 Kaso 5/7 M3 Rp 2,400,000.00
4 Balok 8/12 M3 Rp 4,200,000.00
BAHAN BESI
1 Paku Campuran ( 5-10 cm ) Kg Rp 18,700.00
2 Besi beton BJTP 24 Kg Rp 16,200.00
3 Besi beton BJTD 40 Kg Rp 16,800.00
4 Kawat beton Kg Rp 36,000.00
5 Wiremesh M8 Kg Rp 12,960.00
BAHAN LANGIT-LANGIT
1 Gypsum Board 122x244x tebal 9 mm ex Jayaboard untuk Plafond Lembar Rp 82,500.00
LAIN - LAIN
1 Minyak bakesting Ltr Rp 26,400.00
2 Dolken Kayu 8/10cm Panjang 4m btg Rp 15,000.00
3 Buis Beton 100 x 50 cm Tebal 10cm K-150 Bh Rp 298,800.00
4 Pengadaan Rak Besi Penyimpanan 6 Tingkat Storage Selving 12040220 White bh Rp 3,034,800.00
5 Pengadaan Kursi Tamu Heinz Dchair Red Gold Leg 54X60X81.5 Cm bh Rp 1,198,800.00
6 Pengadaan Screen Fabric Sieben 2 Screen 115 Fabric Grey bh Rp 1,318,800.00
7 Pengadaan Laci Kantor 3 Tingkat Sieben 2 Mobile Pedestal 3 Drawer Iw bh Rp 1,798,800.00
8 Pengadaan Kursi Kantor Genta Dir Chair Low Back Black bh Rp 7,198,800.00
9 Pengadaan Meja Kantor Sisi Kiri Sieben 2 Manager Desk 140 Va Wln L (U/3) bh Rp 5,998,800.00
10 Pengadaan Meja Kantor Sieben 2 Workstation 2S Iron Wood (U/3) bh Rp 4,678,800.00
11 Pengadaan Meja Kerja Ekstensi WS Sieben 2 Workstation Ext 2Seater Iw (U/3) bh Rp 3,958,800.00
12 Pengadaan Rak Besi Penyimpanan 6 Tingkat Storage Selving 12040220 White bh 3,034,800.00
13 Pengadaan Kursi Tamu Heinz Dchair Red Gold Leg 54X60X81.5 Cm bh 1,198,800.00
14 Pengadaan Screen Fabric Sieben 2 Screen 115 Fabric Grey bh 1,318,800.00
15 Pengadaan Laci Kantor 3 Tingkat Sieben 2 Mobile Pedestal 3 Drawer Iw bh 1,798,800.00
16 Pengadaan Kursi Kantor Genta Dir Chair Low Back Black bh 7,198,800.00
17 Pengadaan Meja Kantor Sisi Kiri Sieben 2 Manager Desk 140 Va Wln L (U/3) bh 5,998,800.00
18 Pengadaan Meja Kantor Sieben 2 Workstation 2S Iron Wood (U/3) bh 4,678,800.00
19 Pengadaan Meja Kerja Ekstensi WS Sieben 2 Workstation Ext 2Seater Iw (U/3) bh 3,958,800.00
BAHAN ELEKTRIKAL
1 Kabel NYM 3 X 2,5 mm m' Rp 17,403.34
2 L.Bow Sekrup bh Rp 2,900.56
3 Sadel bh Rp 1,095.77
4 Penggantung bh Rp 1,482.51
5 Inbow Dos bh Rp 8,379.38
6 T-Dos bh Rp 6,123.40
7 Fizzer + Sekrup bh Rp 451.20
8 Kabel Teets bh Rp 451.20
9 Pipa Spiral Mtr Rp 1,611.42
10 L-Bow bh Rp 2,900.56
11 Pipa Clipsal btg Rp 10,957.66
12 Isolasi bh Rp 7,200.00
13 Saklar ganda 10 A bh Rp 65,520.00
14 Stop kontak daya 10/16 A bh Rp 76,800.00
15 Downlight Philips LED Slim 4.5W tokped bh Rp 59,400.00
16 Spotlight LED 10W bh Rp 45,600.00
17 Pemasangan Ringlight A d 200 cm unit Rp 8,280,000.00
18 Pemasangan Ringlight B d 245 cm unit Rp 10,143,000.00
BAHAN LANTAI
1 Granit Tile Broken White Carara Uk.60 X 60 Dos Rp 312,000.00
2 Granit Tile Broken White Carara Uk.60 X 60 Bh Rp 78,000.00
3 Keramik Wood Texture Uk.60*60 Dos Rp 245,520.00
4 Keramik Wood Texture Uk.60*60 Bh Rp 61,380.00
5 Keramik White Texture Uk.60*60 Dos Rp 132,000.00
6 Keramik White Texture Uk.60*60 Bh Rp 33,000.00
7 Lantai Keramik Tile White Uk.30*30 Dos Rp 57,600.00
8 Lantai Keramik Tile White Uk.30*30 Bh Rp 5,236.36
9 Lantai Keramik Heavy Duty Uk.20*20 Dos Rp 282,000.00
10 Lantai Keramik Heavy Duty Uk.20*20 Bh Rp 20,142.86
BAHAN ALUMINIUM
1 Side Hung Casement 20" psg Rp 742,500.00
2 Casement Handle bh Rp 185,625.00
3 Alumunium louvre m2 Rp 720,000.00
4 Ø20mm Stainless Steel m' Rp 39,600.00
5 Ø40mm Stainless Steel m' Rp 93,000.00
6 Floordeck m2 Rp 150,000.00
UPAH
1 Pekerja OH Rp 142,424.00
2 Tukang OH Rp 178,030.00
3 Kepala Tukang OH Rp 192,272.40
4 Mandor OH Rp 213,636.00
ANALISA HARGA SATUAN PEKERJAAN
1m' Pemasangan 1 m' rangka (60 x 120) cm kayu kelas II atau III 244,687.79
A TENAGA KERJA
Pekerja OH 0.15 142,424.00 21,363.60
Tukang batu OH 0.45 178,030.00 80,113.50
Kepala Tukang OH 0.05 192,272.40 8,652.26
Mandor OH 0.01 213,636.00 1,709.09
B BAHAN
Balok Kayu m3 0.03 3,850,000.00 107,800.00
Paku 5 dan 7 cm kg 0.15 18,700.00 2,805.00
C PERALATAN
A Bahan:
Jaring Anyaman Tulangan Tunggal M6-M8 kg 1.02 Rp 12,960.00 Rp 13,219.20
Kawat benrad kg 0.01 Rp 36,000.00 Rp 180.00
-
B Tenaga Kerja: -
Pekerja oh 0.00 Rp 142,424.00 Rp 356.06
Tukang besi oh 0.00 Rp 178,030.00 Rp 445.08
Kepala tukang oh 0.00 Rp 192,272.40 Rp 480.68
Mandor oh 0.00 Rp 213,636.00 Rp 21.36
C Jumlah (A+B) Rp 14,702.38
D Biaya Umum dan Keuntungan (Maks 15%) 10% Rp 1,470.24
E Harga Satuan Pekerjaan (C+D) Rp 16,172.62
1 m² Pemasangan 1m2 Dinding Bata Ringan Tebal 10cm dengan Mortar Siap Pakai Rp 256,095.41
A Bahan:
Bata ringan tebal 10cm buah 8.40 Rp 13,200.00 Rp 110,880.00
Mortar Siap Pakai (Semen Instan) Kg 0.06 Rp 1,320.00 Rp 83.16
B Tenaga Kerja:
Pekerja oh 0.67 Rp 142,424.00 Rp 95,566.50
Tukang batu oh 0.13 Rp 178,030.00 Rp 23,143.90
Kepala tukang oh 0.01 Rp 192,272.40 Rp 2,499.54
Mandor oh 0.00 Rp 213,636.00 Rp 640.91
C Jumlah (A+B) Rp 232,814.01
D Biaya Umum dan Keuntungan (Maks 15%) 10% 23,281.40
E Harga Satuan Pekerjaan (C+D) Rp 256,095.41
1 m2 Pembuatan 1 m2 Daun pintu Plywood 18 mm Rangkap. Rangka Kayu Kelas II Tertutup (Lebar Sampai 90 cm) 378,854.59
A TENAGA KERJA
Pekerja OH 0.7 142,424.00 99,696.80
Tukang Kayu OH 2.1 178,030.00 373,863.00
Kepala Tukang OH 0.21 192,272.40 40,377.20
Mandor OH 0.035 213,636.00 7,477.26
B BAHAN
Papan Kayu m3 0.025 2,640,000.00 66,000.00
Paku 1 cm – 2.5 cm kg 0.03 18,700.00 561.00
Lem kayu kg 0.5 24,750.00 12,375.00
Plywood 18 mm Lembar 1 258,000.00 258,000.00
C PERALATAN
D Jumlah (A+B+C) 344,413.26
E Biaya Umum dan Keuntungan (Maks 15%) 10% 34,441.33
F Harga Satuan Pekerjaan (C+D) 378,854.59
1 m2 Pembuatan 1 m2 Daun pintu Plywood 12 mm Rangkap. Rangka Kayu Kelas II Tertutup (Lebar Sampai 90 cm) 293,054.59
A TENAGA KERJA
Pekerja OH 0.7 142,424.00 99,696.80
Tukang Kayu OH 2.1 178,030.00 373,863.00
Kepala Tukang OH 0.21 192,272.40 40,377.20
Mandor OH 0.035 213,636.00 7,477.26
B BAHAN
Papan Kayu m3 0.025 2,640,000.00 66,000.00
Paku 1 cm – 2.5 cm kg 0.03 18,700.00 561.00
Lem kayu kg 0.5 24,750.00 12,375.00
Plywood 12 mm Lembar 1 180,000.00 180,000.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 266,413.26
E Biaya Umum dan Keuntungan (Maks 15%) 10% 26,641.33
F Harga Satuan Pekerjaan (C+D) 293,054.59
LANTAI 2 Rp 88,946,223.37
Terbilang : Tiga Milyar Delapan Ratus Delapan Juta Tujuh Ratus Tujuh Puluh Dua Ribu Rupiah
RENCANA ANGGARAN BIAYA SHOWROOM PALOPO
A PEKERJAAN PERSIAPAN
2 LANTAI 2
a. Keramik Lantai m2 242.22 Rp 187,124.96 Rp 45,325,648.65
b. Dinding Bata m2 17.75 Rp 1,122,749.76 Rp 19,931,053.66
c. Dinding partisi m2 104.80 Rp 374,249.92 Rp 39,222,888.46
d. Kusen dan Pemasangan kembali m2 29.71 Rp 1,347,299.71 Rp 40,025,579.69
e. Railing Kayu m2 8.87 Rp 93,562.48 Rp 829,478.16
c. Plafond m2 472.27 Rp 561,374.88 Rp 265,121,074.91
2 Pekerjaan Pedestal
a. Pedestal 40 x 40 cm
- Tulangan Utama Dia. 16 kg 265.45 Rp 22,707.55 Rp 6,027,657.57
- Begel Dia. 10 kg 44.88 Rp 22,014.55 Rp 988,039.21
- Bekisting Multiplek 2x pakai m2 20.48 Rp 207,517.09 Rp 4,249,949.97
- Beton Mutu f’c = 24.0 Mpa (K275) m3 1.28 Rp 1,405,816.16 Rp 1,799,444.69
3 Pekerjaan T Biem
a. T Biem 35 x 60 cm
- Galian Tanah m3 10.73 Rp 123,374.79 Rp 1,323,675.78
- Tulangan Utama Dia. 16 kg 655.03 Rp 22,707.55 Rp 14,874,185.44
- Begel Dia. 10 kg 284.08 Rp 22,014.55 Rp 6,253,962.50
- Bekisting Multiplek 2x pakai m2 20.44 Rp 207,517.09 Rp 4,240,819.22
- Beton Mutu f’c = 24.0 Mpa (K275) m3 7.15 Rp 1,405,816.16 Rp 10,055,240.69
b. Kolom Baja WF
- WF 300x150x6.5x9 kg 675.28 Rp 41,470.00 Rp 28,003,861.60
- Base Plat 16 MM kg 70.34 Rp 38,610.00 Rp 2,715,672.96
- Anchor Bolt M16 pcs 48.00 Rp 260,000.00 Rp 12,480,000.00
3 Pekerjaan Plafond
a Pekerjaan Pasangan Plafond
- Gypsum Board t.9mm m2 213.17 Rp 405,871.51 Rp 86,518,118.85
b Pekerjaan Jendela
- Type A2 Unit 1.00 Rp 9,426,382.81 Rp 9,426,382.81
- Type A5 Unit 1.00 Rp 8,498,995.49 Rp 8,498,995.49
- Type A8 Unit 1.00 Rp 5,593,761.81 Rp 5,593,761.81
- Type B1 Unit 1.00 Rp 5,406,231.76 Rp 5,406,231.76
5 Pekerjaan Pengecatan
a Pengecatan Dinding
- Cat Dinding m2 193.22 Rp 44,821.69 Rp 8,660,447.62
b Pengecatan Plafond
- Cat Plafond m2 213.17 Rp 57,451.45 Rp 12,246,712.34
2 Pekerjaan Dinding
a Pekerjaan Dinding Partisi
- Dinding Partisi Gypsum t.9mm + Rangka m2 27.63 Rp 412,154.76 Rp 11,387,835.91
3 Pekerjaan Plafond
a Pekerjaan Pasangan Plafond
- Gypsum Board t.9mm + Rangka m2 472.27 Rp 405,871.51 Rp 191,681,345.98
b Pekerjaan Jendela
- Type A1 Unit 1.00 Rp 51,894,291.75 Rp 51,894,291.75
- Type A3 Unit 1.00 Rp 7,414,071.55 Rp 7,414,071.55
- Type A4 Unit 1.00 Rp 9,553,811.49 Rp 9,553,811.49
- Type A5 Unit 1.00 Rp 6,601,713.70 Rp 6,601,713.70
5 Pekerjaan Pengecatan
a Pengecatan Dinding
- Cat Dinding Partisi m2 27.63 Rp 44,821.69 Rp 1,238,423.39
b Pengecatan Plafond
- Cat Plafond m2 472.27 Rp 57,451.45 Rp 27,132,655.41
LANTAI 1 Rp 92,437,365.55
D.1 Lampu Penerangan
1 Lampu Lengkap Dengan Armature
a. Downlight Philips LED Slim 4.5W bh 68.00 Rp 99,024.52 Rp 6,733,667.54
b. Spotlight LED 10W bh 6.00 Rp 83,540.92 Rp 501,245.54
c. Pemasangan Ringlight A Diameter 200 cm Ls 1.00 Rp 8,280,000.00 Rp 8,280,000.00
d. Pemasangan Ringlight B Diameter 245 cm Ls 1.00 Rp 10,143,000.00 Rp 10,143,000.00
3 Titik Instalasi
a. Instalasi Penerangan, NYM Cable 2x1.5 ttk 68.00 Rp 514,126.55 Rp 34,960,605.35
b. Instalasi Penerangan, NYY Supreme Cable 2x1.5 ttk 6.00 Rp 514,126.55 Rp 3,084,759.30
c. Instalasi Stop Kontak, NYM Cable 3x2.5 ttk 42.00 Rp 514,126.55 Rp 21,593,315.07
LANTAI 2 Rp 88,946,223.37
D.2 Lampu Penerangan
1 Lampu Lengkap Dengan Armature
a. Downlight Philips LED Slim 4.5W bh 112.00 Rp 99,024.52 Rp 11,090,746.54
3 Titik Instalasi
a. Instalasi Penerangan, NYM Cable 2x1.5 ttk 112.00 Rp 514,126.55 Rp 57,582,173.51
b. Instalasi Stop Kontak, NYM Cable 3x2.5 ttk 29.00 Rp 514,126.55 Rp 14,909,669.93
Pekerjaan Jendela
a. Type A2
b. Type A5
8 mm c. Type A8
d. Type B1
c. Type B3
Pekerjaan Pintu
12 MM a. Type A6
12 MM b. Type A7
12 MM c. Type A8
12 MM d. Type A9
12 MM e. Type A10
f. Type A11
Pekerjaan Jendela
12 MM a. Type A1
12 MM b. Type A3
12 MM c. Type A4
12 MM d. Type A5
8.952
2.8944 2.556
2.7104 3
13.44
5.767
3.0734
53.8692
6.678
9.096
5.76
7.56
L T Luas Kaca
Kaca Full 0.96 3
HPl + Kaca tempred 12 mm + pegangan stainless 0.6 2 0.5
HPl + Kaca Kaca tempred 12 mm + pegangan stainless 0.9 2 0.5
full hpl 0.9 2
full hpl 0.9 2
HPl + Kaca Kaca tempred 12 mm + pegangan stainless 0.9 2 0.5
HPl + Kaca Kaca tempred 12 mm + pegangan stainless 1 2 0.5
3.73 2.4
tempered
Polywood + temperd 12 mm 0.93 1.42 1.4
5.6 2.4
1.58 3.65
pintu kaca
0.86 2 0.5
jendela
0.6 1.02
kusen
0.86
0.69
1.1
0.69
2
2
pegangan
0.86 x 2
1.27 2.42
22.26 2.42
3.18 2.1
3.79 2.4
2.4 2.4
3.6 2.1
stainless
Panjang Hollow
1.22 9.3
kusen
7.4
0.45
0.45
0.45
0.45
0.45
0.45
1.27 HPL TH 5002 NT-WELLINGTON OAK
HPL TACO TH 602 AL - ALUMINIUM BRUSH
HPL TACO TH 602 AL - ALUMINIUM BRUSH
HPL TH 5002 NT-WELLINGTON OAK
HPL TH 5002 NT-WELLINGTON OAK
HPL TACO TH 602 AL - ALUMINIUM BRUSH
HPL TACO TH 602 AL - ALUMINIUM BRUSH
2.33 1.5
1.2
1.12 1.5
2.42 1.2
4/8
7.66
2/2
15.32
4/4
5.24
4/8
5.24
4/8
7.24
2/2
14.48
Lantai 1
Total
Lantai 1
Total
Lantai 2
Luas/m2
30.25
4.53
3.72
38.50 Total
36.86 Total
Luas/m2
73.49
11.49
6.70
33.34
22.19
29.52
4.22
2.23
2.02
185.21
ai 2
Luas/cm2 Luas/m2
368,189.18 36.82 Keramik White Texture Uk.60*60
175,057.99 17.51 Keramik Wood Texture Uk.60*60
383,108.24 38.31 Granit Tile Broken White Carara Uk.60*60
220,497.25 22.05
Total 114.69
Luas/cm2 Luas/m2
319,289.05 31.93
111,802.57 11.18
110,590.20 11.06
Total 54.17
Luas/cm2 Luas/m2
733,678.40 73.37
Total 73.37
Jenis Pekerjaan = Pondasi Sumuran dia. 100 cm
Sub Pekerjaan = Galian Tanah
Jari - jari = 0.60 m
Tinggi = 1.50 m
Jumlah Pondasi = 8.00 bh
Volume Beton = 3.14 x Jari - Jari x Jari - Jari x Tinggi x Jumlah Pondasi
= 3.14 x 0.60 x 0.60 x 1.50 x 8.00
= 13.56 m3
PEDESTAL
Jenis Pekerjaan = Kolom Pedestal
Sub Pekerjaan = Bekisting m2
Lebar = 0.40 m
Tinggi = 1.60 m
Sisi = 4.00 bh
Titik = 8.00 bh
Volume Beton = Lebar x Tinggi x Sisi x Titik
= 0.40 x 1.60 x 4.00 x 8.00
= 20.48 m2
SLAB LANTAI
Jenis Pekerjaan = SLAB LANTAI
Sub Pekerjaan = Pasir urug m3
Panjang = 5.02 m
Lebar = 14.41 m
Tinggi = 0.05 bh
Titik = 1.00 bh
Volume Beton = Panjang x Lebar x Tinggi x Titik
= 5.02 x 14.41 x 0.05 x 1.00
= 3.62 m3
Kolom Baja
Jenis Pekerjaan = Kolom Baja
Sub Pekerjaan = wf 300x150 kg
Panjang = 2.30 m
Titik = 8.00 bh
Berat Jenis = 36.70 kg/m
Volume Beton = Panjang x Titik x Berat Jenis
= 2.30 x 8.00 x 36.70
= 675.28 kg
Jenis Pekerjaan = Kolom Baja
Sub Pekerjaan = Base Plat t.16m kg
Panjang = 0.35 m
Lebar = 0.20 m
Tebal = 0.02 m
Titik = 8.00 bh
Berat Jenis = 7850.00 kg/m3
Volume Beton = Panjang x Lebar x Tebal x Titik x Berat Jenis
= 0.35 x 0.20 x 0.02 x 8.00 x ###
= 70.34 kg
Balok Baja
Jenis Pekerjaan = Balok Baja
Sub Pekerjaan = wf 300x150 kg
Panjang = 74.05 m
Titik = 1.00 bh
Berat Jenis = 36.70 kg/m
Volume Beton = Panjang x Titik x Berat Jenis
= 74.05 x 1.00 x 36.70
= 2717.64 kg
Plat Lantai 2
Jenis Pekerjaan = Plat Lantai 2
Sub Pekerjaan = Bondek m2
Lebar = m
Tinggi = m
Panjang = m
Titik = bh
Volume Beton = Lebar x Tinggi x Panjang x Titik
= 0.00 x 0.00 x 0.00 x 0.00
Luas Total = 75.57 m2
DINDING
Jenis Pekerjaan = DINDING
Sub Pekerjaan = Pas. Hebel m2
Panjang = 34.95 m
Tinggi = 3.00 m
Volume Beton = Panjang x Tinggi
= 34.95 x 3.00
= 104.85 m2
b1 1.00
Jenis Pekerjaan = DINDING b2 1.00
Sub Pekerjaan = Openingan m2 b3 2.00
b1 = 3.00 m2
b2 = 1.80 m2
b3 = 3.44 m2
Volume Beton = b1 + b2 + b3
= 3.00 + 1.80 + 3.44
= 8.24 m2
Total Luas Pasangan Dinding Hebel
= Luas Pasangan Dinding - Luas Openingan
= 104.85 - 8.24
= 96.61 m2
PLAFOND
Jenis Pekerjaan = PLAFOND
Sub Pekerjaan = Plafond m2
luas a = 73.50 m2
luas b = 2.04 m2
luas c = 5.22 m2
luas d = 16.75 m2
R. Kepala Service = 11.63 m2
R. Kasir = 6.69 m2
staf & administrasi = 35.28 m2
staf & administrasi = 10.83 m2
staf & administrasi = 13.33 m2
kpl cabang = 29.41 m2
wc 1 = 2.02 m2
wc 2 = 2.24 m2
area westafel = 4.22 m2
Volume Beton = luas a + luas b + luas c + luas d + R. Kepala Service + R. Kasir + staf & adminis
= 213.17 m2
Lantai 2
Jenis Pekerjaan = Pembongkaran
Sub Pekerjaan = Keramik Lantai m2
Luas 1 = 114.69
Luas 2 = 54.17
Luas 3 = 73.37
Luas Total = 242.22 m2
emasangan kembali m2
area westafel + Volume Beton
Dinding Partisi
Jenis Pekerjaan = Dinding Partisi
Sub Pekerjaan = Dinding Gypsumm2
Luas 1 = 16.16 m2
Luas 2 = 0.46 m2
Luas 3 = 0.43 m2
Luas 4 = 9.98 m2
Luas 5 = 0.38 m2
Luas 6 = 0.22 m2
Volume = Luas 1 + Luas 2 + Luas 3 + Luas 4 + Luas 5 + Luas 6
= 27.63 m2
Plafond
Jenis Pekerjaan = Plafond
Sub Pekerjaan = Gypsum m2
Luas 1 = 54.39 m2
Luas 2 = 48.66 m2
Luas 3 = 55.00 m2
Luas 4 = 21.97 m2
Luas 5 = 28.34 m2
Luas 6 = 36.52 m2
Luas 7 = 5.38 m2
Luas 8 = 9.24 m2
Luas 9 = 18.66 m2
Luas 10 = 29.52 m2
Luas 11 = 10.56 m2
Luas 12 = 14.05 m2
Luas 13 = 36.28 m2
Luas 14 = 17.31 m2
Luas 15 = 86.39 m2
Volume = 472.27 m2
BACK UP DATA
SATUAN KERJA
PEKERJAAN REHABILITASI GEDUNG SHOWROOM HADJI KALLA TOYOTA CAB.PALOPO
JENIS PEKERJAAN PEMBESIAN PILE CAP
LOKASI JL. ANDI DJEMMA
TAHUN ANGGARAN 2022-2023
J/B a b c d e f
1 2 3 4 5 6 7 8 9 10 11 12 13 = sum(7 - 12) 14 15 16 = 14 x 15 17 = 13 x 16 18 = 6 x 17
TYPE F1 TUL. b
1 1.4 1.4 0.5 0.05 16 15 1.58 0.35 1.30 0.35 2.00 10 16 160 320.00 505.04
HORIZONTAL a c
TYPE F1 TUL. b
1 1.4 1.4 0.5 0.05 16 15 1.58 0.35 1.30 0.35 2.00 10 16 160 320.00 505.04
VERIKAL a c
TOTAL BESI ULIR DIA. 13 1010.07
2 BEGEL PD1 0.4 0.4 1 0.05 10 15 0.62 0.05 0.3 0.3 0.3 0.3 0.05 1.30 7 8 56 72.80 44.88
5 BEGEL A1 - A2 5.61 0.35 0.6 0.05 10 15 0.62 0.05 0.25 0.5 0.25 0.5 0.05 1.60 38 2 76 121.60 74.97
6 BEGEL A2 - A4 3.6 0.35 0.6 0.05 10 15 0.62 0.05 0.25 0.5 0.25 0.5 0.05 1.60 24 4 96 153.60 94.69
6 BEGEL 1A - 1C 4.22 0.35 0.6 0.05 10 15 0.62 0.05 0.25 0.5 0.25 0.5 0.05 1.60 29 4 116 185.60 114.42
BACK UP DATA
1 2 3 15 16 = 14 x 15 17 = 13 x 16 18 = 6 x 17
Area Dalam
1 61.79 5.02 14.41 72.3382 11.34 1 6.38 394.16
Gedung
BACK UP DATA
1 2 3 15 16 = 14 x 15 17 = 13 x 16 18 = 6 x 17
Area Dalam
1 96.55 5.40 14.00 75.57 11.34 1 6.66 643.44
Gedung